t r o P
Ver. 1.3
2019-2021
o i l fo
Architecture
Haru
n Qa
ssim
Profile
Name:
My
Harun Qassim
academ ic
career
spans
over
4
years
of
U n iversity educat ion. A m ix of Arch itecture, I ndustrial Design, V isual Design and a strong aphinity
for
Art
H istory
(I mpression ism,
‘My interests revo lve a ro u n d t h e
Surrealism, Dada ism and the early modern ist movement). Beyond my t ime in the classroom; a rich variety of art exh ibit ion visits, on-site exam inat ions and a keen eye for design has e n r ic h e d m y d e s ig n l i t e r a c y.
Projects
wh ich
Architecture
revolve
and
been
the
main
work.
H owever
more
around
Urban
hallmarks m icro
of
Macro
Design my
Architecture
have
body
of
involving
Furn iture design are also explored as part of
s o lv i n g i n t rica c ies surrounding urban
my M aterials Design Projects with bioplast ics. I n essence the wide range of scopes explored allowed
me
understanding
to
gain
for
a
the
greater
level
architectural
of
design
process
planning and the Architecture role
in
has
H u m a n i t y,
always
played
s o c iet y,
a
pivotal
commun it ies
and
environmental
with in the individual. I n my case, I feel the effects
on
the
individual
scale
to
a
h igher
magn itude and thus decided to devote myself into studying architecture and impacting the bu ilt environment around myself in a posit ive manner
to
bring
about
socially-responsible
projects and plans into the material world
challenges ahead. W ith a strong emphasis placed on moving away from anthropocentric
The
Portfolio
collect ive was
was
created
Architectural
developed
Architecture.
during The
to
body
my
projects
showcase of
work
educat ion present
the that
within in
this
Portfolio were developed both independently and within group settings.
2
The projects in th is Portfolio were designed within
bounds
of
the
un iversity’s
curriculum and formulated with the assistance of
U n iversity
staff
and
my
fellow
group
members.
Throught their assistance and gu idance along with
my
developing
design
understanding,
I
was able to conjure projejcts and designs of a wide scale and scope. M aking full use of my design
d esig n ,’
the
felxibility
to
create
and
explore
the
realm of arch itecture and push my designs to the fullest.
Contents
B
A
C 1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN YourSpreadsheets AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS. 2. WORK TO FIGURED DIMENSIONS ONLY. 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND YourSpreadsheets DRAWINGS AND SPECIFICATIONS.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN 'Q SOLUTIONS' AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS. 2. WORK TO FIGURED DIMENSIONS ONLY. 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND 'Q SOLUTIONS' DRAWINGS AND SPECIFICATIONS.
- Concrete Exterior Walls (Rendered & Exposed) 350mm thick. - Stone Cut pathway blocks, 720mmx720mm - Disability Ramp covers a vertical height of 1.8m - Measurements are made in Millimeters and dimensions are done in a closed line style - DS= Drawing Section, Each section Line has its own suite of drawings
Wooden Panels provide auditory control in theatre room. The elevated space above the stage allows for greater light control over the stage
Support beams are used to support the curved wooden structure
The space beneath the theatre is hollowed out to provide ample supprt for the seated patrons and the supporting beams for the wooden audiorty fixtures
CONSTRUCTION ISSUE Address line 1 Address line 2 Telephone line 1 Fax line 1 www.YourSpreadsheets.co.uk
Q SOLUTIONS
CNR OR GEORGE & HENRY ST 2ND FLOOR PLAN WEST SECTION 1:200
00002
Urban Redevelopment
Waterfront Revival
Projects Pages: 5 - 7
10/11/2019
DJ
DJ
A2/F2
Technical Proficiency, Drawings and Sketches
Pages: 9 - 13
Pages: 15 - 19
3
Urban Redevelopment Project: An Aging C ity Revitalised Hemp Fibre coated in Bio-Plastic Chic Lighting System
Hemp Fibre Bio-Plastic Bond Product can also act as a sealant for vents and other piping systems
Studio 3 / Susta inable Design + Urban Planning
C O N T E X T
T
he
premise
brief
of
the
Hemp Fibre Bio-Plastic Coated binding solutions are used to create seating solutions
- H E M P
P L A S T I C S
s t u d io’s
revolved
around
integrating
susta inable
bu ilding principles into large
scale design. W ith a foundat ion in M aterial Based Design we began to provide design
C
solut ions for the ear-marked development complex With
proposed
the
locat ion
for and
Port
Melbourne.
design
principles
O
decided, my team and I began to tackle the matter by devising a bioplast ic solut ion.
N
After conduct ing a series of experiments a hemp-based bioplast ic was developed to be used as a structural support system that was both flexible yet durable
C E P T
Following
the
establishment
of
a
design
material a series of B io-plast ic furn iture was workshoped as a possible replacement to
tradit ional
plast ic,
wood
and
other
tradit ional materials for furn iture. Once successful I began to expand the scope of the material to encompass fixtures, duct solut ions and a wide variety of common bu ilding has
materials. Th is
given
the
project
experimentat ion a
large
amount
C
S H emp-based B ioplast ic with gelat in
K
O
E
N
T
C
Hemp Fibres are H emp-based B ioplast ic with gelat in thicker and of a higher consistnacy in the stiff or upright portions of the joint
v a r i a t i o n a n d a h u g e s u s t a i n a b i l i t y f a c t o r. As
the
project
complexity
and
continues detail,
to
the
increase
in
bio-plast ics
return as a strong design solut ion to a series of problems.
C
E
H
P
E
T
S
H emp-based B ioplast ic
Furniture
In the bent portions of the joint the hemp fibres are less woven and take up far less surface area, allowing the plastic to flex more freely and He m p -with based B ioplast ic with gelat in bend ease
5
Site Analysis / M aster Planning Phase
Site Analysis / M aster Planning Phase
During the Analysis phase of the
T
he
site
chosen
implementat ion
for
the
our
new
of
susta inable bu ilding material coincided
with
the
unveiling
of the V ictorian State Government’s new development Port of
zone
Melbourne. a
in
With
Melbourne
surrounded
by
a
F isherman’s the
Bend,
announcement
U n iversity
multitude
of
Campus amen it ies
and services, I devised a renovat ion plan for
an
the
exist ing
campus
bu ilding
yet
U n i ve r s i t y. T h u s the
former
was the
H olden
that
fell
Assembly
were
considered
by
and
monitored
as the scale of the project began to decrease from M aster-planning to
Lo c a l - p l a n n i n g .
As
such
parameters including pedestrian movement,
bu ilding
heights
and
the proposed changes to the site provided an important view into the possible challenges the site
Image: Site Perspective: Aerial Perspective
Image: Site Perspective: Ground Level-Photo.
may face
within
unutalised Cultural
project, a wide variety of factors
the
Centre Plant
of
was
confirmed for renovat ion
The
bu ilding
factory
is
blocks
flanked with
by
two
another
5-story
series
Image: Site Perspective: Rhino 3-D Model.
of
Image: Site Perspective: Rhino 3-D Model.
industrial bu ildings on it’s northern flank. The rear of the site lies the car-store of
Existing Site:
Existing Site:
t h e r e m a i n i n g H o l d e n Se r v i c e C e n t r e a n d
Proposed Changes Map Overlay
Building Height Map Overlay
beyond that lies more I ndustrial Sites and I nst illat ions.
Futur e Turn er Str eet et re
The
bu ilding’s
Art-Deco
Facade
is
on
a
St
lm Sa
prist ine example of the movement with in M elbourne and is to be persevered during Height (m)
the
bu ild
and
complimented
during
the
0-5
Proposed UoM Campus Site
5 - 15
design process.
Proposed Future Development
Proposed Infrastructure Changes: Future Turner Street
INDUSTRIAL LEGACY: The University hopes to preserve the building’s heritage (earmarked for renovation)
15 - 30 30 - 60
Proposed Project Site
Proposed Site
Since this project was conducted during the were
COV I D - 1 9 possible;
Pandem ic, however
no
this
site-visits also
Image: Site Analysis, Visualising different data sets
meant
t h a t COV I D - 1 9 a n d ot h e r p a n d e m ic s wo u ld
Existing Site:
Existing Site:
play a role in the design process moving
Zones of Use & Function Map Overlay
Pedestrian Movement Map Overlay
forward
Proposed Site Existing Roads
6
Industrial
No Pedestrian Access
Services & Industrial
Difficult Pedestrian Access
Commercial & Industrial Retail & Commercial Proposed Site Location
Full Pedestrian Access Cycling Routes Impassable Terrain
Designing with Susta inable M aterials The
redesign
of
for
the
Heritage
Bu ilding
allowed
for
the
insertion
of
new
and
innovative technology systems that utalise the bio-plastics developed to create a more susta inable bu ilding
Image: Internal View Sustainability Option
Proposed University of Melbourne Future Campus Development
Prevailing Northern Winds
Pedestrian Pathways and Major Routes
Lawns and Green Spaces
Image: Site Perspective: Environmental Effects
Image: Site Perspective: Automated Bar, Part of the Automation System
Image: Short Section, Detailing Bioplastic Staircase and Furniture
Image: Short Section, Detailing Bioplastic Staircase and Furniture
7
Waterfront Revival Project: A N ew Perspective for Docklands Image: Master Plan, North Wharf, Dockland’s Victoria Harbour
Master Plan The s with ite cur r ty o the aid ently h o f the of b en uses inte rior efacto one Pe dev space rs. The rmane elop ed w being u Woode nt stru n c s ith l arg ed for Boat c ture wh e ca t e rgo heir re ntre, T ich is th fu tran h e sfer rbishm e Ocea Enter pr n en and stor t work Educat ise Shi p io . age use After i n Cent Trust. s in n A co r min spectin e and llec a d he t g nce the in n unspe ion of 3 teri the or o cified t separa rail h t f line s th the lar ird-par e group at r t g ema e stee y. All b s that re ls u in fr om hed an t the W store B o the d larg discu oden B oats an ssin e cr oat d ot g ane c s th with th entre her ma at u a r sed e on-si re still itime m te c to o acti em r per ate aftsme ve with orabilia n; th on t m he p e sh ajoriier. ed w as
Studio 4 / Waterfront Architecture
T and
the
he
S t u d io’s
premise
on
redeveloping
was
To w n h o u s e + M ulti-level Style: Residential B locks with Medium desnity bu ildings
M ixed Style: M ixed use with an emphasis on Community based services
The Residential blocks and zones within Docklands comprise of both the townhousing sectors and the high-rising multi-use bu ildings further West.
Community bu ildings such as the Docklands Li b r a ry, T h e Docklands HUB and the numerous outdoor gyms and training equipment. These sites are vital to giving the area it’s culture.
Regarding the townhouses closer the Docklands Park on the East is a closed circu it with a community sense.
based
Podium Style:
waterfront
of
the
abandoned
Docklands
Wharf.
Emphasises on reducing the crowding effect that larger skyscrapers create by offseting the centre of the bu ilding
By
linking the exist ing with the proposed
imagined,
our
aims
were
to
go
beyond
the modest designs put forth by the government
Townhouse + Multi-level Style: Residential Blocks with Medium desnity buildings
Mixed Style: Mixed use with an emphasis on residential and commercial
Podium Style: Mixed use with an emphasis on residential and commercial
Mixed Style: Mixed use with an emphasis on Community based services
This style of bu ilding also allows for greater sunlight coverage over pedestrian walkways and is lowers the height the covers the roads and walkways adjacent to the bu ilding.
Water Dependant Activites: Yarra Based
Canoeing & Kayaking (Clubs & Public Services): Melbourne’s Yarra hosts many clubs and buisnesses that either hire or operate Canoeing and Kayak sessions for a multitude of patrons.
Contemprary Comercial Style:
La r g e w i n d o w s with a campus like layout of greeneries and other ammenaties, t h e s e o f fi c e bu ildings are built with a strong emphasis being placed on human welbeing.
Large Vessel Sailing and Resoration:
Proposed Site:
Currently, the Enterprise Ship Building Trust opperates out of the warehouse located within the proposed site location and provides a maritime history experience with cruises and
Wa te r Dependant Ac t iv ites : T h e Ya rra
other water activites available
and look to create an regional and internat ional
Image: Dockland’s Design Language Study
waterfront hub for commerce, learn ing and travel.
Future Development
The analysis conducted featured inside interviews with the exist ing propert ies, extensive research into
the
Docklands
culture
and
design
Perimeter of Proposed Project C o n i n g To w e r Observation Platform
Proposed Green Spaces
Proposed Developments (State and C ity Governments)
language
along with general research into precedents of a sim ilar scale
Image: Dockland’s Location Study
Propos
ed Pub lic V ie wing P latform at the O ld-Ob V ictor servat ing to ia H ar i o n To w life pa bour er rt of D ocklan ds’ ma ur con ritime trol to wer wi histor platfor y, t h e ll be r m, pro V ictor estore viding ia d with unriva a publ led vie ic view ws bac ing k into Anticip the ce ated D ntral c elivery i t y. Fundin : 2022 g Part ies: De velope r, T B A”
“Bring
Harbo
Image: Dockland’s Future Development Map
Image: Site Building Study
9
Engineered Environment System: T h e S i t e’s ex i s t i n g W h a r f i s c u r r e n t ly s i n k i n g a n d i n d i s r e p a i r, b y p r o d u c i n g a s e r i e s o f s t a c k a b l e c o n crete blocks that serve a variety of purposes, from s t o n e c a s e m a t e s t h a t f i l t e r w a t e r, t o t e r r a i n b l o c k s that can grow vegetat ion, the new foundat ion could become th is variable, morphable piece of arch itecture that can create a wide variety of different environments.
Part of the environment system is the prevalence of water playing an integral role in the temperature control, aesthet ic value and technological advancement with in the water-block engineering system.
M odular Outdoor Environments System The versat ility of th is modular system allows for a great
sense
of
variat ion
along
the
environment,
replicat ing the experience of a natural environment
Image: Example of waterfront-Blocks in a rest spot configuration
Image: Engineered Blocks System Breakdown
Image: Waterfront Experience Blocks in Perspective
Image: Site Water Filtration System
10
Image: Waterfront Experience Blocks Deconstructed
Space Study and D istrict Allocation
District 2: INDUSTRY / EDUCATION
District 1: TRANSPORTATION
District 3: ENTERTAINMENT
Marine Research and Exhibition
Sky Gardem & Water Treatment Se r v i c e s M a in C irculation Space
40 m
20 m 400sqm
20 m
1600sqm
40 m
M odular Waterfront Image: Site District Allocation
Early Concept to Completed Ferry Stat ion:
Bearth & Docking Points
As part of the waterfront revival project I decided to bu ild a Transportat ion hub that was centred around water-borne transportat ion to and from the new development. Bu ilding on the site of the former boat bu ilding workshop, the project tapped into the storied marit ime h istory of Docklands along with the
Exploded Axonometric Image: Ferry Station Exploded Axonometric
new cultural development that the area has experienced. The Ferry Stat ion features 4 ma in components: A Sky Garden and Water Treatment Plant, M a in C irculat ion Space, M odular Waterfront, Bearth & Docking Points
Main Movement Streams
Water-I nteraction Space
Treated Water Movement
Daily Commuters
Cafe
To w a r d s CBD
Gallery Space
-0.60
Waiting Area
-0.60
-1.80
Bearths -3.00
Atrium / Hallway
Reception / M a in Entry
0.00
Plan - G round F loor
10m 0m
5m
20m
Ferry Stat ion Systems: The site houses a wide variety of ta ilor-made systems to increase
Environmental Control
Waterfront Experience Se c t i o n s
the comfort levels of temporary and long-stay commuters and staff with in the bu ilding. From the passive cooling caused by the treated water wh ich moves through the
Sky-Garden
centre and within the walls of the bu ilding to the Waterfront experience sect ion. Each and everyone of the systems with in the bu ilding work Plan - F irst F loor
together to provide the opt imal hu-
10m 0m
5m
20m
man experience in a susta inable and e c o - f r i e n d l y m a n n e r,
Image: Ferry Station Plans
11
Sky Garden
Waiting Area Waterfront Experience
Main Atrium
Se r v i c e s Access to Dock
Image: Exterior Render
W e s t Se c t i o n
10.00m 5.00m
20.00m
D iagonal Elevator: Provides an equal expierence for all patrons of the Ferry Stat ion
Diagonal Elevator
Image: Exterior Render, Intimate Water Experience Module
Va r i a b l e W a t e r f r o n t M o d u l e s : After developing the Water-B lock engineered support system in wh ich the
Intimate Water Experience M odule Free Standing Stage Experience M odule
s i t e’s va r io u s m o d u le s w e r e d eve lo p e d a t o p o f ; t h e F e r r y S t a t io n a d d e d a further block variat ion system. Th is system features a waterfront segment that can be modulated and altered for a variety of events and purposes The Free Standing Stage Experience M odules:
Fishing Se a s o n Experience M odule
Th is module creates a disconnected stand for events and other seasonal events for viewing experience. I nt imate Water Experience M odule: The int imate water experience module creates a series of steps that gradually lower to the water to allow visitors to better interact with the water F i s h i n g Se a s o n E x p e r i e n c e M o d u l e The fish ing module offers a more act ivity based recreat ional waterfront, where individuals and groups can fish and learn about the local marine biology
Image: Variation in Waterfront Modules
12
Project Poster Designed by H arun Q
Ferry Station Poster Designed by H arun Q
13
S w i n b u r n e’s A M D C B u i ld i n g DESIGN REFINEMENT
C O V I D - Sa f e R e d e s i g n I n response to the Coronavirus Pandem ic, indoor spaces are at risk of being unsafe to use for the forseeable future. Thus as part of a redevelopment project centred around the AMDC Bu ilding, a group of 4 students each took a floor from levels 5 to 8 of the AMDC Bu ilding and redesigned The I nternal Changes to the AMDC Bu ilding a ims to address the lack of
BIM AND DESIGN DECISION + FEEDBACK Image: AMDC DesignLOOP Sequence
C O V I D - Sa f e q u a l i t i e s o r c o n s i d e r a t i o n s . I s s u e s s u r r o u n d i n g C i r c u l a t i o n , SOUTHERN FACADE
Se a t i n g D e n s i t y , R o o m C a p a c i t y & C O V I D - Sa f e a m e n i t i e s .
7 Design Gu idel i n e s f o r a Sa f e P o s t Covid-19 Transit ion
SUMMER SUNLIGHT HOURS (December to February)
NORTHERN FACADE
Image: Sunlight hours on existing AMDC Part of the redesign of AMDC’s floor plan was the addit ion of a new facade to replace the exist ing design. Proposals for the new facade were closely t ied i n t o t h e C O V I D - Sa f e d i r e c t i o n t a k e n d u r i n g t h e i n t e r n a l r e d e s i g n
TEAM MEMBERS AND PROJECT BRIEF
Level 8
SEDA
Level 7
DAVID
Level 6
HARUN
Level 5
ACHOL
Image: Breakdown of Level Allocation Image: Facade options and Shade section studies
FACADE FUNCTION
Image: Shoebox Analysis with 2-part Facade
Image: Facde Airflow Functionality
15
Revit Workflow and Design Process
The first iteration of the facade utalised Weaverbird to create a perforated plastic compound facade, The shadow studies along with the performative analysis confirms the f a c a d e’s s k i n l i ke p r o p e r t ie s
The Facade consists of a two phase system:
C l a d d i n g La y e r : The outer shell/layer serves as a shading system to reduce the glare and overall solar radiat ion entering the North face of the bu ilding. The materials for the outer cladding shell is constructed from a lightweight t itan ium cladding.
S k i n La y e r : T h e I n n e r f a c a d e La y e r i s constructed from a durable plast ic polymer that is both breathable and durable The facade funct ions to increase a irflow into the interior of the AMDC Bu ilding wh ilst reducing the amount o f So l a r R a d i a t i o n . T h e i n c r e a s e in Airflow is necessary to ach ieve t h e C O V I D - Sa f e I n t e r n a l c i r c u l a t i o n for prolonged occupancy of the classrooms
The F inal I terat ion of the facade provides the opt imal amount of shadding and interact ion with the environment. The increased Ve n t i l l a t i o n p a i r s w i t h t h e C o v i d F r e e I n t e r n a l La y o u t t o c r e a t e a visually stunn ing and performat ive facade.
16
Image: Current Covid-Unsafe Seating arrangement
Image: Current Covid-Safe internal Changes Floor Plan
B y m o d i f y i n g t h e f l o o r p l a n ’ s w a l l s , r o o m s a n d c i r c u l a t i o n p a t h w a y s . A m o r e C O V I D - Sa f e s p a c e w a s d e v e l o p e d . B y u s i n g R e v i t t o d o c u m e n t t h e p r o c e s s a n d h o s t a c l o u d f i l e a n d R h i n o t o c r e a t e u n i q u e R e v i t f a m i l i e s f o r C O V I D - Sa f e f u r n i t u r e . T h e B I M a p p a r a t u s a l l o w e d u s t o w o r k s e a m l e s s l y between the two main programs Image: Facade Comparision
1
3D - SECTIONAL PERSPECTIVE - EXISTING
DASH.Design Pty Ltd A 12 FAKE ST MELBOURNE 3132 P 04123123123 E SA.DESIGN@GMAIL.COM
The design and any accompanying documentation is confidential and is to be used solely for the purpose of evaluation of our design. The design and accompanying documentation is and remains the exclusive right of DASH.Design Pty Ltd until a written release is signed by the director of DASH.Design Pty Ltd. The design is schematic only and subject to council and other requisite approvals.
2
Image: Internal Render of new Furniture Families and Layout
3D -PROPOSED FACADE SECTION PERSPECTIVE Copy 1
CLIENT:
DRAWN:
SWINBURNE UNIVERSITY
SK
PROJECT:
SHEET NAME:
DATE:
SCALE:
AMDC BUILDING 3 NOVEMBER 2021
Image: Elelvations
FACADE
CHECKED BY:
Checker
REVISION No.: B SHEET No:
AD09-00-01
Image: Elelvations
17
The Bu ilding
B I M C o v i d -
I nformation Management System Introduced in this project is similar to how most workflows are achieved in
S a f e P o s t e r
the proffessional scene, making th is project’s aims serve beyond producing an architectural piece but rather understanding the principles behind collaborative workflows
18
C o r r o b o r r i e C e n t r e Te c h n i c a l Drawing Package Te c h n i c a l D r a w i n g s
Design Concepts
Design Concepts
The drawing package displayed along with design concepts and 3d massing was devised as part of the Corroborrie Centre project. The a im of the project was to design a Corroborrie Centre for the Arts on an exist ing carpark. The aim of the design's organic and formless glass façade is to serve as both a cultural signifier though it's similar disposition to an Indigenous tent structure; and through it's unique and challenging aesthetic, provides ample architectural energy to properly serve as a cultural arts centre. Considering the lack of any design overlays within the site's placement, it is free of any restrictions as along as some semblance of design consideration was made to the existing area. Whilst the overarching glass structure serves as a progressive and architecturally challenging piece, the interior spaces will follow a more modernist approach, with architecturally sound planar spaces that offer the most efficient means of housing people-centred spaces.
The project served as my first foray into
TThe glass façade structure that sits on the eastern portion of the site houses an amphitheatre beneath it. The differing angles of the glass panels helps to disrupt the flow of light entering the amphitheatre, internal balcony and other internal structures.
techn ical drawings, with a heavy reliance on AutoCAD to produce the line drawings needed Design as part of the d r a Concepts wing package
Design Concepts
The aim of the design's organic and formless glass façade is to serve as both a cultural signifier though it's similar disposition to an Indigenous tent structure; and through it's unique and challenging aesthetic, provides ample architectural energy to properly serve as a cultural arts centre. Considering the lack of any design overlays within the site's placement, it is free of any restrictions as along as some semblance of design consideration was made to the existing area. Whilst the overarching glass structure serves as a progressive and architecturally challenging piece, the interior spaces will follow a more modernist approach, with architecturally sound planar spaces that offer the most efficient means of housing people-centred spaces.
TThe glass façade structure that sits on the eastern portion of the site houses an amphitheatre beneath it. The differing angles of the glass panels helps to disrupt the flow of light entering the amphitheatre, internal balcony and other internal structures.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN YourSpreadsheets AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN YourSpreadsheets AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.
2. WORK TO FIGURED DIMENSIONS ONLY.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN YourSpreadsheets AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.
2. WORK TO FIGURED DIMENSIONS ONLY.
2. WORK TO FIGURED DIMENSIONS ONLY.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND YourSpreadsheets DRAWINGS AND SPECIFICATIONS.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND YourSpreadsheets DRAWINGS AND SPECIFICATIONS.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN 'Q SOLUTIONS' AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN 'Q SOLUTIONS' AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.
2. WORK TO FIGURED DIMENSIONS ONLY.
2. WORK TO FIGURED DIMENSIONS ONLY.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND 'Q SOLUTIONS' DRAWINGS AND SPECIFICATIONS.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND 'Q SOLUTIONS' DRAWINGS AND SPECIFICATIONS.
First Floor - Concrete Exterior Walls (Rendered & Exposed) 350mm thick.
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND YourSpreadsheets DRAWINGS AND SPECIFICATIONS.
1. THE COPYRIGHT OF THIS DRAWING IS VESTED IN 'Q SOLUTIONS' AND IT MAY NOT BE REPRODUCED IN WHOLE OR PART OR USED FOR THE MANUFACTURE OF ANY ARTICLE WITHOUT THE EXPRESS PERMISSION OF THE COPYRIGHT HOLDERS.
Parking ramp sits on a 15 degree slope between the mouth of the Parking garage door.
2. WORK TO FIGURED DIMENSIONS ONLY. 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECT'S, SERVICE ENGINEER'S AND 'Q SOLUTIONS' DRAWINGS AND SPECIFICATIONS.
Roof Level - Concrete Exterior Walls (Rendered & Exposed) 350mm thick.
- Stone Cut pathway blocks, 720mmx720mm
- Concrete Exterior Walls (Rendered & Exposed) 350mm thick.
- Stone Cut pathway blocks, 720mmx720mm
- Stone Cut pathway blocks, 720mmx720mm
- Disability Ramp covers a vertical height of 1.8m
- Disability Ramp covers a vertical height of 1.8m
- Disability Ramp covers a vertical height of 1.8m
- Measurements are made in Millimeters and dimensions are done in a closed line style
- Measurements are made in Millimeters and dimensions are done in a closed line style
- Measurements are made in Millimeters and dimensions are done in a closed line style
- DS= Drawing Section, Each section Line has its own suite of drawings
- DS= Drawing Section, Each section Line has its own suite of drawings
- DS= Drawing Section, Each section Line has its own suite of drawings
Wooden Panels provide auditory control in theatre room. The elevated space above the stage allows for greater light control over the stage
Support beams are used to support the curved wooden structure
The space beneath the theatre is hollowed out to provide ample supprt for the seated patrons and the supporting beams for the wooden audiorty fixtures
CONSTRUCTION ISSUE
CONSTRUCTION ISSUE
Address line 1 Address line 2 Telephone line 1 Fax line 1 www.YourSpreadsheets.co.uk
CNR OR GEORGE & HENRY ST
10/11/2019
A2/F2
DJ
1:300
00002
02/09/13
DJ
01/09/13
CONSTRUCTION ISSUE
Q SOLUTIONS
CNR OF GEORGE & HENRY ST
ROOF PLAN DJ
05/09/13
DJ
GROUND BEAM GB2 REVISED.
Address line 1 Address line 2 Telephone line 1 Fax line 1 www.YourSpreadsheets.co.uk
Q SOLUTIONS
1:200
DJ
REMOVED GB32. ADDED NEW REINFORCEMENT TO GB4 AND GB12. ADDED NEW GB48.
Address line 1 Address line 2 Telephone line 1 Fax line 1 www.YourSpreadsheets.co.uk
CNR OR GEORGE & HENRY ST
00002
NEW LINKS ADDED TO GB23.
B A
YourSpreadsheets
Q SOLUTIONS
2ND FLOOR PLAN WEST SECTION
C
YourSpreadsheets
10/11/2019
A6/S2
DJ
DJ
The Concrete slab on the northren slab is far more dense due to the slope of the terrain, more stabilty is needed to keep the newly cut northern section from sliding
Underground support collumns keep the structure centrally supported.
UNDERGROUND CARPARK/LOADING DOCK 1:200
00002
10/11/2019
HQ
D2/UC
HQ
C
19
Architecture Portfolio - Harun Qassim
Portfolio Document 20 pages / Architectural Projects created by Harun Qassim In conjunction with University Staff & Group members that have been mentioned for their contributions