Skip to main content

Waterfront Revival, The Water-Block Project | Harun Qassim

Page 1

Portfolio Studio 4

Harun.Q

THE

Imaging sustainability will not be easy; it requires stepping boldly into a contested sphere, challenging those who cling (increasingly desperately) to ‘old ways’ and ‘old visions’; it also involves serious questioning of many who are already committed to action to remedy the worst aspects of unsustainable practice, including many working under the banner of ecoTowards a new Manifesto .doc Imaging Sustainability Page 2 of 29 design. Everything suggests that imaging sustainability will bring design and designers into a new and critical role in shaping all aspects of development, because of an urgent need to reinvent the world. Re-inventing the world – as somewhere that is environmentally sustainable – will not be just about its reconstruction (which is the focus for most current efforts in ecodesign) but about its re-animation with different values, different priorities, different dreams about life and progress Re-animation requires different knowledge, different creativity and skills and different sensibilities than those considered necessary for design for ‘reconstruction’ (which I will refer to from here on as ‘eco-re-design’ Bringing a sustainable existence into vision is to give expression to an idea that now lies close to the surface for so many people: the future cannot be what it used to be. Tipping-points and crossroads The future, of course, doesn’t exist, it has to be made, but there is a sense in which it has long been taken as predictable, comprised of attributes to be expected, ‘unfolding’ along a particular trajectory from the past-present. Within ‘Western’ civilisations and in ‘Western’ thought since the seventeenth century that view of the future has been framed by the concept p of progress which has provided a sense of continuity and predictability – the pathway to the future is supposed to involve incremental, observable improvements in the human condition. Today, that idea is being shaken from so many different quarters. Viewed from a global perspective it can be very hard to see any clear line of improvement in humanity’s lot. While it is true that global consumption has expanded at an unprecedented rate over the last century, improving living standards for hundreds of millions of people, 7 international agencies predict inc an increasing divergence between those who benefit from economic and technological development and those who do not. 8 The overall consumption of the richest fifth of the world

W AT E R - B L O C K PROJECT 2021

ARC30001, Sem 1, 2021, Swinburne University Unit Convenor: Dr Mehrnoush Latifi Studio Leaders (Dr Mehrnoush Latifi or Dr Sascha Bohnenberger - Fehr)


My interests revo lve a ro u n d t h e s o lv i n g i n t rica c ies surrounding urban planning and the environmental Harun Qassim

challenges ahead. W ith Arch itecture has always played a p ivot a l r o le i n H u m a n i t y, s o c iet y, commun it ies and with in the individual.

a strong emphasis

In my case, I feel the effects on the individual scale to a h igher magn itude and thus decided to devote myself into

placed on moving away

studying architecture and impacting the bu ilt environment around myself in a posit ive manner to bring about

from anthropocentric

socially-responsible projects and plans into the material world

design,


A

B

Form Finding to Form Making

Waterfront Development

A.1

Form Finding/Making Machine

B.1

V i c t o r i a H a r b o u r, A N a r r a t i v e

A.2

I t e r a t i o n s M a t r i x s & l i s t o f Va r i a t i o n s

B.2

Precedent Study

A.3

D igital M odeling and Experimentat ion

B.3

Design Proposal, A N ew N arrat ive

A.4

Operat ion and Prin icples

Reflect ions


C

D

Concept Design

Deta iled Design

C.1

S p e c u l a t i v e D e s i g n ( M i d Se m e s t e r

D.1

P l a n s , Se c t i o n s & G e n e r a l L a y o u t

C.2

Precedent Studies

D.2

Final Renders

C.3

M asterplann ing

D.3

Poster Presentat ion

C.4

Presentat ion)

Devlopment of Design and Stages of Construct ion


I nitial Form F inding I terations A s p a r t o f o u r F o r m F i n d i n g Te c h n i q u e p r o c e s s w e produced series of small-scale Form F inding machines to explore different form finding techn iques and gather data needed to either choose or combine a technique that has been developed.

I mage: H arun’s Form F inding Experiment


Te c h n i q u e E m p l o y e d : C o m p u t a t i o n a l f o r m - fi n d i n g methods for fabric structures

Pro f W. J Lewis sta tes: “F or m-findin g is a proces s that d ete r m i nes the surface con figu ra t io n o f a fa b ric str u c ture u n der pre -s t res s . T h is p ro cess ca n b e carried ou t usi n g a va riet y o f num e rica l m eth ods, of wh ic h the mos t co m m on a re : ( i ) t ra nsie n t stiffness, (ii) fo rce d e n sit y, a nd ( iii ) d yna m ic relaxation”

Thread Based Mesh

T h e i n c lu sio n o f e la stic e f fe cts. I n some fo r m u la t io n s b oth the e la st ic a n d geometric e f fec t s a re i nclud e d in form-fin din g calc u la t io n s . Such a n a p p ro a ch is n ot, in p rin ci p le, n e cessa ry, as form-fin din g calc u la t io n s ca n a p p ly to a ny type of m ate ria l . A lt ho ug h the i nclu sion of th e e la s t ic s t if f n ess m a t ri x ha s the advantage of i n c re a si n g o f t he ove ra l l st iffness, wh ic h he lps to ke e p t he i ncremen ts of d is p la ce m e n t s sm a l l , a t t he same time, it i n t rod u ces sig n i fica nt co m p lications, suc h a s : • a n e e d for co ntrol / m o n itorin g of the valu es o f t h e te nsion forces, wh ic h would vary sig n i fica nt ly d uri ng t he iterations, a cco rd i n g to t he e la st ic stra i n i n g produ ced.

A.1

- Thread (Limited Elast icity) - Cube Frame provides 3-D imensional forms

Bubble F ilm

M aterials & Components - So a p F i l m So l u t i o n

Te c h n i q u e Va r i a b l e s i nvo lve d :

I mage: Line element representat ion of a s a d d l e - s h a p e d surface modeled by constant tension cables

M aterials & Components

- Free-Form Frame p r o v i d e s a fl u i d form

D e s i g n f o r Te c h n i q u e I mplementation.

M obile Anchor Points + N egative Space

M aterials & Components - Ve r t i c a l l y Opposed Wooden Posts

T h e H ybrid Fo r m -F i n di n g M a ch ine e m p loys th e co nven tio n s o f al l 3 tec h n iq ues in va ry ing degrees M obile Anchor Points

Thread Component

- Places an Emphasis on N egat ive Space So a p Film

The main co m po n en ts of t he H y b rid Fo r m -F i n di n g M ac h i n e co m b ine to fo r m t he relatio n sh i p between th e Soa p F ilm a nd t he M o bile A n c h o r P osts. T h is p rov id es t he b a sis o f a fo r m fi n di n g experi m e nt a nd a llows fo r greater extrapola t io n


I mage: Close-Up shot of the eyelets and thread.

Form F inding M ach ine Tradit ional soap-film form making with the addit ion of va r ia b le p o i n t s o n t h e x ,y & z a x is .

I mage: Perspect ive Shot

T h e f o r m i s c r e a t e d t h r o u g h t h e So a p F i l m ’ s p h y s i c a l t e n dency to fill as space with the least amount of material possible, creat ing the most efficient form of coverage over an area

I mage: Perspect ive Shot I mage: Close-Up view from beneath the form finding machine

Form Finding Machine


Image: Top View of Form Finding Machine

Image: Close-Up shot of the eyelets and thread.

Operation of the Form F inding M achine Phase #1

M i n i m al Su rface

Image: Close-Up shot of the Eyelets and Thread interacting

Th e M a c h i n e u s es it ’s 8x8 g rid to fa cilita te t he gen erat ion of an inn u m e ra b le a m o u nt o f a ncho r p o i nt s t ha t crea te variable forms. These fo r m s ca n b e rep lica te d m a t hem a t ica l ly t hrou gh a grid-set of d a ta . I n G ra s s ho p p er te r m s t h is wo uld b e re presen ted by: G rid - - - > Po i nt s ---> Curves ---> Ge o metry. The ge o m et ry o f t h e sha p e is d e fi ne d by t he d a ta e ntered at th e ‘poin ts’ port io n o f t h e e q u a t io n a s t ha t se rve rs a s o ur va riable. Th u s by u sin g

A.1

t h is b a sic eq ua t io n a set o f fo r m s ca n b e con ceived

Image: View from beneath the grid


Operation of the Form F inding M achine Phase #2 B.O.M

Exploded

So l u t i o n

B ill of M aterials

Axonometric

Recipes

Timber Dowel:

4

12.7 mm x 1.2 m 4 x

1

Timber Dowel: 8 mm x 1.2 m

3 x P i n c h o f Sa l t

18 x

Hot Water

1

2

Glucose Syrup - 2 Ta b l s p o o n s

Sta inless Steel Eyelet

D i s h w a s h i n g So l u t i o n 4 Ta b l e s p o o n s

2mm D iameter

5

18 x

3 Rubber Grommit:

6

7/18 inch Hot Water

4 x

4

Glucose Syrup - 2 Ta b l s p o o n s

2

Rubber Grommit:

D i s h w a s h i n g So l u t i o n 4 Ta b l e s p o o n s

5/18 Inch 18 x

3

5

7

Acrylic Base 3x P inch of Sugar

3mm Thick

Hot Water Glucose Syrup - 2 Ta b l s p o o n s

3 mm Thick Working Thread

D i s h w a s h i n g So l u t i o n 4 Ta b l e s p o o n s

6

m

m

6

9

150mm

3

400 x 300mm 13mm & 8.2mm H oles 4x4 +2 G rid

7 8

295mm

Plastic Tub 396 x 295mm

8

Form Finding Machine


Operation of the Form F inding M achine Phase #3

6 S ta g e I n s t il la t io n #1

#5

A.2

#2

#6

#3

#7

#4

#8


Form Finding Machine


Physical Form F inding I terations: 6 - Peg Combination The 6 - P e g co m b i n a t io n e nta il s co nfig uri ng t he num b er of an ch or poin ts of each form is set to 6 with a predeterm in ed lo cat io n o n the grid’s c a n d y a x is . H owever t he eleva t io n o r z-a xis is set as th e variable an d is u sed to create u n iqu e an d different fo r m s. T h is te c hn iq u e p rov id es a q u ick a nd si m p le fo r m a t fo r e nvelopin g th e framework an d providin g a wide array of sh apes. W ith sm al l tweaks a n d a lte ra t io ns i n t he p la cem e nt a nd elevat ion of th e pegs, a vastly differen t sh ape can be produ ced

* +1 = 1 cm

V. 1

The 6 peg combinat ion used in th is experi-

+10

ment focuses on keeping only two variable

+9

heights with a difference of 4 indicies ( 4

+8

Centimeters)

4cm

Six - Pegs

+7 +6

400 mm

+4

2cm

+5

1cm

+3

Constant Poles

+2 M obile Poles

+1 Plan V iew

300 mm

V. 2

* +1 = 1 cm

The second experiment featured more

+10

variat ion in hegiht discrepancies between

+9

t h e p o l e s a l l o w i n g f o r a m o r e fl a t

+8

project ion across the view.

4cm

Six - Pegs

+7 +6

+3

1cm

+4

2cm

+5 Constant Poles

+2

M obile Poles

+1 Plan V iew

Six - Pegs

V. 3 * +1 = 1 cm

than the previous iterat ion, however had

+10

more variat ion in hegiht discrepancies

+9

b e t w e e n t h e p o l e s a l l o w i n g f o r a m o r e fl a t

+8

project ion across the view.

+7

4cm

The second experiment featured less pegs

+6

+3 +2 +1 Plan V iew

A.2

1cm

+4

M obile Poles

2cm

+5 Constant Poles


Physical Form F inding I terations: 10 - Peg Combination T he 10 - P e g co m b i n a t io n e nta il s co nfig uri ng t he num b er of an ch or poin ts of each form is set to 10 with a predeterm in ed lo cat io n o n the grid’s c a n d y a x is . H owever t he eleva t io n o r z-a xis is set as th e variable an d is u sed to create u n iqu e an d different fo r m s T h is te c hn iq u e p rov id es a q u ick a nd si m p le fo r m a t fo r e nvelopin g th e framework an d providin g a wide array of sh apes. W ith sm al l tweaks a n d a lte ra t io ns i n t he p la cem e nt a nd elevat ion of th e pegs, a vastly differen t sh ape can be produ ced. * +1 = 1 cm

V. 1

The 10 peg combinat ion used in th is

+10

experiment focuses on ma inta ing a steady

+9

leve l o f va ria b ilt iy b et we e n t h e h e ig h t s o f

+7 +6

400 mm

t r a v e l a l o n g a s i t fi l l s t h e v o i d s l e f t b y t h e

+5

thread.

+4

2cm

p r o v i d e s a l o w e r g r a d i e n t f o r t h e fi l m t o

4cm

+8

b o t h t h e ‘ M o b i le’ a n d ‘C o n s t a n t ’ P o le s . T h i s

+3

Constant Poles

1cm

Te n - P e g s

+2 M obile Poles

+1 Plan V iew

300 mm

V. 2

* +1 = 1 cm

The second experiment featured more

+10

variat ion in hegiht discrepancies between

+9

t h e p o l e s a l l o w i n g f o r a m o r e fl a t

4cm

Te n - P e g s

+8

project ion across the view.

+7 +5

2cm

+6

1cm

+4

Constant Poles

+3 +2

M obile Poles

+1 Plan V iew

Te n - P e g s

V. 3 * +1 = 1 cm

than the previous iterat ion, however had

+10

more variat ion in hegiht discrepancies

+9

b e t w e e n t h e p o l e s a l l o w i n g f o r a m o r e fl a t

+8

project ion across the view.

+7

4cm

The second experiment featured less pegs

+4 +3

M obile Poles

1cm

+5

2cm

+6 Constant Poles

+2 +1 Plan V iew

Form Finding Machine


Form Finding Machine


A.3


Form Finding Machine


y

x z

Matrix Generation Drafts: Along the X, Y & Z axis

A.2


Form F inding Conclusions The Form F inding Experiment provided our group with the

necessary frame work to continue generating forms with

substance, gu idance and an experimental method. The forms

produced in this stage of our project were further devel-

oped by each group member independantly through a series

of speculative design excersies. Currently our forms lack the

response to environment and function neccesssary to create

an arch itecturally sound form, space or object.

Form Finding Machine


Group 1: North Wharf Devlopement Project - Buildings on Water


Master Plan The with site cur re th of t he in e aid o ntly ho us terio f ben efa es on r sp ace ctors. e Perm The a ope being Woo nent s us d wit h la ed for den Bo tructu rge r t car heir re at cent e which go t r ran furbish e, The is the sfer m E O and ent wo cean E nterpr is r stor d age k. After ucatio e Ship T n use s in inspec Centr rust. A e an ting min coll d d he e t nce he inte an uns ction o r p f the rail ior of t ecified 3 sepa h r line s th e large third-p ate gr o a at r s ema teel s rty. All ups tha h in fr t b om ed and ut the restor the eB disc Woo o larg u d e cr ssing w en Boa ats and ane s th ith the t centr other m at u e ar o sed n-site e st aritim e c to o il per raftsm l active memo ate e on t n; the with m rabilia he p she d wa ajority ier. s de vel-


B.1


Waterfront Development


D e s i g n La n g u a g e o n S i t e

B.1


Southbank: Southbank draws a sophisticated crowd to its cultural venues, which include the Malthouse theater and the state-of-the-art Melbourne Recital Centre which hosts classical concerts. There are clubs, food courts and designer shops in the sprawling Crown Casino complex. The lively riverside promenades feature al fresco fine dining.

CBD: The main Business hub of the city and it’s most central section, serving as it’s nucleus, thousands of commuters travel through the city from this junction point. Thus serving an important role as the site’s main transport link.

Docklands: Docklands is a modern harbor development dominated by high-rises and the colourful Melbourne Star Observation Wheel, and popular for its shopping and waterside dining. The area's pedestrian plazas are adorned with public murals, sculpture and light displays. Plagued by obscure and backroom deals the area has not lived up to it’s potential.

Port Melbourne: South Wharf: South Wharf hosts the city’s main exhibition centres, and many waterside restaurants. It also hosts a modest hotel district.

West Melbourne: Being originally largely an industrial area, a significant portion of West Melbourne is occupied by the Port of Melbourne, the Dyson Railway Yards and the Melbourne Markets. It also contains an increasing number of residential and commercial properties, consisting of a mixture of Victorian single and double storey terrace houses and converted warehouses at the north-west corner of the Melbourne CBD.

A formerly heavily industrial sector along Melbourne’s southern coast with close proximity to dock services. It has since slowly transitioned into an upscale coastal suburb with a high concentration of cyclist and public transport infrastructure

Area Study: Analysis of the surrounding area’s general makeup and constitution.

Waterfront Development


B.1


Proposed Development

The Proposed Development for the site was developed in conjunct ion with both the C ity and State Governments and hopes to revitalize M e l b o u r n e’s w a t e r f r o n t . W ith Dockland’s beginn ing to fall beh ind on it’s proposed projects with only half being brought into reality the

Existing Green Spaces

remain ing projects have been further halted by the

Proposed Green Spaces

Corona-virus Pandem ic. Proposed Developement Spaces Overlap with Proposed Design Area

Waterfront Development


Future Development Perimeter of Proposed Project C o n i n g To w e r Observation Platform

Propos

ed Pub lic V ie win

Proposed Green Spaces

Proposed Developments (State and C ity Governments)

g Plat form a t the O ld-Obs V ictor ervatio ing to ia H ar n To w e life pa bour r rt of D ocklan Harbo ds’ ma ur con ritime trol to wer wi histor platfor y, t h e ll be r m, pro V ictor estore viding ia d with unriva a publ led vie ic view ws bac ing k into th Anticip e cent ated D ral cit elivery y. Fundin : 2022 g Part ies: De velope r, T B A”

“Bring

B.1


S ite D i m e n t io n s : Wa te r f ro n t Proposed Site

La t it u d e : 37 ° 49 ’ 1 0.9 6 ” S

Lo n g it u d e : 1 4 4 ° 5 6 ’ 1 1 . 8 9 ” E

M a x i m u m W id t h : 1 1 0 m

M a x i m u m Le n g t h :

Tota l Su r fa ce A re a :

615m

67,6 5 0 m 2

219m 58.6m 40m 38.4m 185m 56.6m 40m 8m 39.7m 486m 36.3m 23.3m 75m 46.4m 110m

100m 286.4m

58m 285m 415m 145.9m 183.9m

Waterfront Development


Site D imen

This S ite ca n hold 139,40 0 Peo ple

sions Perim eter: 787.9m Area: 27880 m

Surfac e

This S ite ca n hold 192 To wn

house s

B.1

This S ite ca n hold 6,970 Eleph

ants


To w n h o u s e + M ulti-level Style: Residential B locks with Medium desnity bu ildings

M ixed Style: M ixed use with an emphasis on Community based services

The Residential blocks and zones within Docklands comprise of both the townhousing sectors and the high-rising multi-use bu ildings further West.

Community bu ildings such as the Docklands Li b r a ry, T h e Docklands HUB and the numerous outdoor gyms and training equipment. These sites are vital to giving the area it’s culture.

Regarding the townhouses closer the Docklands Park on the East is a closed circu it with a community sense.

Podium Style: Emphasises on reducing the crowding effect that larger skyscrapers create by offseting the centre of the bu ilding

Townhouse + Multi-level Style: Residential Blocks with Medium desnity buildings

Mixed Style: Mixed use with an emphasis on residential and commercial

Podium Style: Mixed use with an emphasis on residential and commercial

Mixed Style: Mixed use with an emphasis on Community based services

This style of bu ilding also allows for greater sunlight coverage over pedestrian walkways and is lowers the height the covers the roads and walkways adjacent to the bu ilding.

Contemprary Comercial Style:

La r g e w i n d o w s with a campus like layout of greeneries and other ammenaties, t h e s e o f fi c e bu ildings are built with a strong emphasis being placed on human welbeing.

Proposed Site:

Surrounding Area: Bu ilding Style and Structure

The Bu ilding Study dissects the different types of bu ilt la n d s c a p e s t h a t e n c o m p a s s t h e s i t e’s s u r r o u n d i n g s . These different styles are su ited to their purpose of use and somet imes are a response to their respect ive site. We hope that by understanding the bu ildings that surround our site we will be able to better respond to the site

Waterfront Development


B.1

AG E

P O P U L AT I O N


Public Greens & other Public Spaces

Ron Barassi Snr Park Docklands Park

Point of Intrest A:

Community Park

Buluk Park

Proposed Site Boundries

Vic Harbour, Newquay Promenade + City Trail

Public Parks

Community Gardens

Sports Equipment and Facilities

Waterfront Development


Wa te r I nd ep en den t Activity La te A f terno on , Ear ly Even in g Bu luk Park H igh Activity (Sports and Casual Recreation)

Promenade - H igh Activity (Sports and Casual Recreation)

Docklands The H ub H igh Activity (Sports and F it ness)

Bu lu k Park Spor ts Equ ipment - M oderate Activity (Spor ts an d F it ness)

Docklands Park - Low Activity (Casual Recreation) Commun ity Garden Low Activity (Casual Recreation, Commun ity Garden)

Activity Intensity

B.1


Profile: Boatmaking Warehouse

Waterfront Development


Boatmaking Warehouse D imensions D imesnions sourced via Google Earth

Lenght: 171m W idth: 26.9m H eight: 8.2m

29 . 5 m

17 8. 2 m 2 6 .9 m

B.1

6 .9 m

1 m


Waterfront Development


Waterfront Study: Sydney F ish M arket The Sydney fish market serves as a strong precedent to follow for our waterfront redevelopment project due to a variety of sim ilarit ies in funct ion, a ims and atmosphere. The M arket serves as a tradit ional fish market where produce is sold, however by utallising an openplan system with modular funct ion zones, the designers are able to intent ionally create spaces that have a strong connect ion through f u n c t i o n o r e x p e r i e n c e w i t h e a c h o t h e r. F o r e x a m p l e , b y p l a c i n g t h e Te a c h i n g b l o c k a b o v e t h e m a i n l o g i s t i c s b l o c k , t h e d e s i g n e r s c r e a t e a visual line between the two wh ich creates a sense of connect ion and complement.

B.2


Lu s h G re e n e ry is ke pt i n c los e proxim ity to the Bu ilding The smooth and gradient curve B lends well with the seascape

By using steps as opposed to a slope or a series of ramps, the user is able to control their level of interaction with the body of water

T h e La n d - W a t e r relationship is met with natural materials in both accessible and in-accebale areas

Site Atmosphere

Image: Source, https://www.sydneyfishmarket.com.

W a t e r f r o n t D e vau/Corporate/Redevelopment elopment


B.2


Waterfront Development


Image: UrbanLab’s EcoBoulavard, Concept Drawing.

I m p o r t a n c e o f t h e Ya r r a T h e Ya r r a

R iver

plays

a

vital

role

in

the

physical,

psychological and social fabric of the proposed site. Situated

Wa te r Dependant Ac t iv ites : T h e Ya rra

at

the

end

of V ictoria

H a r b o u r,

our

wharf

serves as an art ificial pen insula thats juts out from Docklands, thus surrounding it from 3-sides with water f r o m t h e Ya r r a . The

Ya r r a

also

serves

to

accentuate

the

Maritime

culture our project a ims to rebirth, providing ample amounts of riverfronatge for our project to encompass and expand on. M u c h l i k e t h e E c o B o u l e v a r d s o f U r b a n La b’ s c o n c e p t o f a wa t e r - b a s e d c i t y, o u r p r o j e c t c o u ld s e rve a s a m icrocosm for the idealist relat ionsh ip that could be

B.3

f o r g e d b e t w e e n p e o p l e a n d w a t e r.


Water Dependant Activites: Yarra Based

Canoeing & Kayaking (Clubs & Public Services): Melbourne’s Yarra hosts many clubs and buisnesses that either hire or operate Canoeing and Kayak sessions for a multitude of patrons.

Image: ‘Day on the Yarra’ Creator - COLIN PAGE Copyright: DELWP 2016.

A D a y o n t h e Ya r r a : The

multitude

the

Ya r r a ’ s

commun ial

of

water-based

shoreline

creates

acknowledgement

act ivit ies

on

a

of

and

culture a

sense

of

c o n n e c t i v i t y t o t h e w a t e r. R ivers and other bodies of water requ ire more infrusture than tradit ional over-land act ivites and are thus less appealing for policy-makers a n d t h e g e n e r a l p u b l i c . H o w e v e r, b o d i e s o f w a t e r s u c h a s t h e Ya r r a h o l d i m m e n s e p o t e n t i a l f o r Large Vessel Sailing and Resoration: Currently, the Enterprise Ship Building Trust opperates out of the warehouse located within the proposed site location and

greater commun ity interact ion and a general i m p r o v e m e n t t o t h e So c i o - E c o n o m i c a l m a k e - u p of Docklands

provides a maritime history experience with cruises and other water activites available

Waterfront Development


V ision Statements (Derived from Site Analysis F indings) H arun: The Bridge Between The Site has numerous shortfalls

David: The M aritime Cultural Revival Our early visit to the site gave us an insight

and lim itat ions that are both natural

that revealed a lesser known marit ime

and art ificial. Both requ ire immense

culture. Th is raw, honest and very real

redevelopment efforts of the current

connect ion to the water is someth ing that

s i t e’s la n d s c a p e t o o b t a i n a h a b i t a b le

we need to harness and bring to forefront of

space for the public and private

the Docklands redevelopment. N ot only for

enterprises to enjoy and thrive

the fact that there is simply a need for th is from the perspect ive of seafarers but also due to the richness it brings to the area. The waters edge provides for an escape from the hustle and bustle of city life. Water and land are a dichotomy known to people

D e s p i t e t h e s e l i m i t a t io n s , T h e s i t e’s lo c a t io n at the ismuth of Dockland’s allows it to serve as it’s showpiece and also its link to the rest of M elbourne. Both a nucleus for Docklands’ culture and recreat ion wh ilst also breathing new life into the surrounding suburbs, districts and areas.

B.3

for generat ions. Docklands has an opportunity to keep th is culture going for generat ions.


Image: Collage / Photomontage

“The Bridge Between” The Bridge Between serves as a design goal for the project’s link The two convergant themes into one effect ive waterd eve lo p m e n t a l p h a s e . T h e p r o j e c t w i l l a i m t o “ B r id g e’ t h e g a p f r o n t r e d ev lo p m e n t p r o j e c t . W i t h t h e a i m s o f t h e p r o j e c t between Dockland’s industrial past / surrounding with the

established through a response

e m e r g i n g c o m m e r c ia l a n d c u l t u r a l id e n t i t y. O u r p r o j e c t w i l l p hys ic a l ly, ps yc o lg ic a l ly a n d m et a p h o r ic a l ly l i n k .

Waterfront Development


Speculat ive Design

C.1


Form-Generat ion Process:

1:4

1:3

1:2

Form Generat ion Process

Placing in Context

C o n t e x t Se c t i o n

Water Relat ionsh ip

Concept Design


F indings - Speculat ive Design:

The Speculat ive Design assignment catagorised the sequence of developing a d e v e l o p e d p r o p o s a l a s F o r m - C o n t e x t - F u n c t i o n - W a t e r. W ith the gu idleine established, The design process focused on responding to the context and the possible funct ions as opposed to a completed form.

C.1


Concept Design


Design I dea A: Water Walkways

C.1


P i e r - E SC A P E / A e d a s A r c h i t e c t s , Davis Brody Bond and Martha Sc h w a r z P a r t n e r s A e d a s A r c h i t e c t s , D a v i s B r o d y B o n d a n d M a r t h a Sc h w a r t z P a r t n e r s p r o p o s a l P i e r E SC A P E a i m s t o s t r e n g t h e n t h e c o n n e c t i o n s b e t w e e n w a t e r, l a n d , n a t u r e , c i t y , c u l t u r e , c i v i c s p a c e a n d i n f r a s t r u c t u r e w i t h a “ s e r i e s o f d o c k - l i k e e x t e n s i o n s ”. T h e p r o p o s al respects the h istory of the P ier wh ile ident if ying un ique opportun it ies that will them to create a 21st century waterfront experience that is both a h istorical and contemporary dest inat ion

P i e r E SC A P E e n v i s i o n s N a v y P i e r a s a w o r l d - c l a s s u r b a n l a n d s c a p e t h a t p r o t e c t s La k e M i c h i g a n , p r o m o t e s e c o n o m i c g r o w t h a n d creates an escape for the people of Ch icago. Enterta inment, recreat ion, culture and ecology weave together to create places t h a t a r e “e x c i t i n g , e n r i c h i n g , a n d s u s t a i n a b l e .”

Concept Design


C.2


Concept Design


C.2


Ferry D istrict: (D istrict chosen to pursue further)

Concept Design


Potent ial Form The potent ial form for the ferry stat ion was derived from a pract ical experimentat ion of the bu ilding’s intended funct ion o f f a c i l i t a t i n g t h e m o v e m e n t o f p e o p l e f r o m l a n d t o w a t e r. The form so far shows the basic outline of th is operat ion in

C.2

act ion. Further iterat ions of the ideat ion process

is needed to produce a rat ionally finct ional form


Concept Design


A r c h i t e c t u r a l Zo n i n g

Existing Site

tran

spo

rt

din

ing industr

ia l

art

N etworking P r o p o s e d S i t e B o u n d a ry ne tram li pedestr

La n d s c a p i n g a n d F e a t u r e s

ia n s

M asterplan After

a

consultat ion

session

with

my

team

mates,

we

began to formulate our mastplan for the site and it’s boundries. By utalising the design ethos we developed earlier in our design formulat ion stage, we were able to

watersedge treatment canals

institute measures such as; increaing the surface area to water by removing a large port ion of our southern wa-

amphitheatre

w e t la n d s waterpark

terfront, in doing so we expanded our water-borne bu ilding capacity to allow for our 3 programs to either bu ild close or on the water

C.3


Concept Design


C.2


Deta iled Design


M odular Outdoor Environments System The

versat ility

modular

system

a

sense

great

along

the

replicat ing

of

of

this

allows

for

variat ion

environment, the

experience

of a natural environment

D.1


Art ificial Aqu ifer System T h e s i t e’s w a t e r s y s t e m i s s u p p l ie d by t h e w a t e r p u r i f ic a -

o r a s a w a t e r s o u r c e f o r t h e s i t e’s b u i ld i n g s t o p r ov id e

t ion system that is facilitated by the

d r i n k i n g a n d s e r v i c e w a t e r. T h e s e l f - s u f f i c i e n t s y s t e m w i l l

engineered substrate

b l o c k s d e v i s e d e a r l i e r. B y u s i n g a s e r i e s o f c h a n n e l s t h a t

drast ically reduce the water usage of the site and provide

cont inually filter the body of water as it is pumped tot he

an eco-friendly alternat ive

surface. Either as water features to cool the environment

Deta iled Design


D.1


Deta iled Design


D.1


Concept Design


F indings from Program Placement M atrix: After visuallising the placement of the 4 ma in systems and experiment ing with adding

an

addit ional Tram

stop

module,

I

was

able

to

assertain

placement scheme for the Ferry Stat ion’s services

C.4

the

opt im ial


F indings from Angle M atrixes: After

visuallising

the

possible

angles

that

the

ferry

stat ion could be posit ioned in order to create the opt imal built

environment,

I

decided

to

factor

in

view

quality

as the major variable to consider along with number of Ferry Docking points. I n doing so i was able to choose the 66 Degree angle due to it’s performance in providing opt imal view quality wh ilst not completely comprom ising it’s funct ionality

Concept Design


C.4


Concept Design


Water-I nteraction Space

Cafe Services

Below Water - Basement Level

Services

Gallery Space

-0.60

Waiting Area

-0.60

-1.80

Bearths -3.00

Atrium / Hallway

Reception / M a in Entry

0.00

Plan - G round F loor D.1

10m 0m

5m

20m


Sky-Garden

Plan - F irst F loor

10m 0m

5m

20m

Deta iled Design


W e s t Se c t i o n

10.00m 5.00m

20.00m

D iagonal Elevator: Provides an equal expierence for all patrons of the Ferry Stat ion

Diagonal Elevator

D.1


Sky Gardem & Water Treatment Se r v i c e s M a in C irculation Space

M odular Waterfront

Bearth & Docking Points

Exploded Axonometric Deta iled Design


Main Movement Streams

Treated Water Movement

Daily Commuters

To w a r d s CBD

Ferry Stat ion Systems: The site houses a wide variety of ta ilor-made systems to increase

Environmental Control

Waterfront Experience Se c t i o n s

the comfort levels of temporary and long-stay commuters and staff with in the bu ilding. From the passive cooling caused by the treated water wh ich moves through the centre and within the walls of the bu ilding to the Waterfront experience sect ion. Each and everyone of the systems with in the bu ilding work together to provide the opt imal human experience in a susta ibable and e c o - f r i e n d l y m a n n e r,

D.1


Experience Zones:

Deta iled Design


D.1


F i s h i n g Se a s o n Experience M odule

Intimate Water Experience M odule

Free Standing Stage Experience M odule

Deta iled Design


D.1


Concept Design


Outdoor Waterfront Experience Space

C.2


Te r r a D e A q u a : B u i l t E n v i r o n m e n t

Concept Design


C.2


D i s t r i c t

T e r r a

1:

F e r r y S t a t i o n

Experiences Study

T h e F e r r y S t a t io n E n c o m p a s s e s t h e s i t e’s m o s t c o m m o n a n d a c c e s s i b l e i n t e r a c t i o n w i t h W a t e r t h r o u g h t h e F e r r y Te r m i n a l a n d t h e Se a s o n a l p i e r s y s t e m . W o r k i n g i n c o n c e r t , t h e T h e s i t e ’ s m a i n attractions are cocooned in an envelope of susta inability run environments that maintain a homeostasis effect within the bu ilding, providing a un ique and impressionable experience

D e

A living, breathing environment in the truest sense “ Te r r a D e A q u a ” h a s b e e n e n g i n e e r e d f r o m the ground up to be as ecologically efficient and effective in creating a strong connection between water and M an. From the modulation of the core structural components to the variation in design between the zones that occupy the site;

A q u a

Te r r a D e A q u a i s a b e a c o n o f i n c l u s i v e , interactive and connective architecture

C irculation M ovement Experiencing Travel Adventure

F irst F loor Plan

G round F loor Plan

Concept Design 10

20

30

40


Appendix

C C.C

Appendix for Form F inding to Form Making

F i r s t S i t e La n d s c a p i n g I terat ion I n it ially i had devised a layered system for bu ilding the terra in of our site in order to bu ild height and provide a larger variety of views and view quality


I n it ial M aster Plan I terat ions Early in the design period i had devised a system of modulat ion and program allocat ion in order to cater for the most opt imal waterfront

and

human

experience

possible.

H owever

after

consultat ion and deliberat ion we had decided to part ways with these in it ial ideas for a stronger concept


First Site La n d s c a p i n g I terat ion The Model was used in expla in ing a layer tesselat ion system

Framing System I terat ion The Model was used in expla in ing a possible fram ing system

F e r r y Te r m i n a l Entry The Model was used in expla in ing the Ferry Stat ion through a sect ion-based model

C.C


Appendix

D D.D

Skin System The

skin

system

devised

was

never

fully

developed

during

the

design process, however it held sim illar deisgn goals and provided unqie solut ions to the problems that were presented during the analysis and design phase

Appendix for Form F inding to Form Making

Bu ilding System: Panels I nst illat ion

Bu ilding System: Panel M odulat ion Structural M odule: Provides structural support for the bu ilding

700

mm

1,400m

m V isibility M odule: Provides a glass pane to increase outward visibility and increase sunlight

So l a r E n e r g y M o d u l e : Provides a susta inable energy solution for the bu ilding

G reen M odule: Provides a framework for plants to be cultivated both externally and internally

The panels are attached to a steel grid system that bisects the face of each bu ildi n g a n d p r o v i d e s a m o d u l a r l a y o u t w h i c h c a n d e fi n e e a c h g r i d ’ s p r o p o s e d f u n c t i o n and thus corresponding panel

Concept Design


Turn static files into dynamic content formats.

Create a flipbook
Waterfront Revival, The Water-Block Project | Harun Qassim by Harun Qassim - Issuu