IPLAN Final Project Classroom Building Cohort 22 Group 1


Project Overview

OBC Analysis 2.1 Introduction 2.2 General Information 2.3 Building Occupancy 2.4 Building Classification 2.5 Occupant Load 2.6 Fire Separation and Fire Resistance 2.7 Exits and Egress 2.8 Exit through Lobby 2.9 Fire Alarm Systems 2.10 Fire Fighting Provisions 2.11 Standpipe and Hose System 2.12 Spatial Separation 2.13 Health Requirements 2.14 Mezzanine and Interconnected Floors 2.15 Barrier Free Requirements 2.16 Conclusion

1.1. Project Brief 1.2 Team 1.3 Approach and Work Strategy 1.4 Timelines and Meetings 1.5 Site and Urban Context 1.6 Site Analysis and Design Intent 1.7 Program Allocation

Materials and Methods Analysis 3.1 Introduction 3.2 Structure 3.3 Building Envelope 3.4 Façade Materials 3.5 Green Roof

BIM Analysis 4.1 Introduction 4.2 Process 4.3 Project Development 4.4 Visualization 4.5 BIM 360 Challenges 4.6 Conclusion

Conclusion References Appendix


1.1 Project Brief 02 The project was to design a classroom building on the Ryerson campus. The brief defined the building to be in concrete, clad with fiber cement panels as a rain screen system.

Wala Ibrahim OBC Lead

The goal of this assignment was to create a building designed to • illustrate compliance to the OBC. • use the given materials and methods and exhibit the proper use of technology • illustrate these concepts utilizing Revit. • synthesize the concepts taught in the IPLAN program and to be able to successfully express these them in both presentation and written format.

Wala Ibrahim

1.2 The Team

Vandana Prakash Materials Lead

We are a team of five internationally trained architects participating in cohort 22 of IPLAN, a bridging program provided by JVS and Ryerson University. With diverse experiences from Sudan, Ethiopia and India, along with the knowledge and skills gained in OBC, Materials and Methods and Revit, we were able to collaborate successfully to complete this final integrated project.

Ridhi Shah BIM Lead

Each member of the team was a lead of a section and responsible for its design. This report is a result of strong teamwork skills, collaborative workshops, dedicated schedules and timelines and intense research and analysis. Nevertheless, we worked in close collaboration on all aspects of design to develop this project.

Fitsum Berhe BIM Lead CLASSROOM BUILDING

01. INTRODUCTION

Harsimran K Arora Project Lead


Project Background & Overview

June29-july6

July 20-27

Practice run WEEK 5 July 27-Aug 3

4. Revit Work-sharing: That information was then implemented to a 3d model.

Phase 6- compilation

WEEK 4

3. Designing and Planning: Vigorous brainstorming was done in workshops to plan layouts in compliance to the codes and fit in the defined program. Designing elevations as per the code was completed.

Phase 5-detailing the model

Draft report

Phase 4- Revit

July 13-20

2. Research, study and calculations: The next steps were OBC calculations and compiling codes affecting the building. Also, data on materials was conducted to understand assemblies and structure.

Phase 3-designing

WEEK 3

1. Site: A site visit and analysis was conducted to have a better understanding of the surroundings.

5. Detailing the model: Assemblies and materials then were added to Revit as researched and calculated to achieve the desired thermal and sound insulation. 6. Compilation: The last step was to prepare a report and presentation to demonstrate the learning

1.4 Timelines and Meetings We had regular meetings and collaborative workshops to implement data collected on the OBC and materials. With different perspectives, team members brought to the table diverse solutions to challenges faced in integrating codes and materials with design. Meeting agendas were passed on before the meetings and every topic was discussed as scheduled. Meetings were concluded by collectively laying down the next steps for every member and scheduling the next meeting. Timelines were laid out to achieve the milestone submissions and were respectfully followed

WEEK 6 Aug 3-10

Final presentation CLASSROOM BUILDING

01. INTRODUCTION

July 6-13

Phase 2-research and calculations

WEEK 2

03

The approach to the project was divided into 6 phases. All sections were undertaken concurrently in phases.

Phase 1-site

WEEK 1

1.3 Approach and Work Strategy


04

1.6 Site Analysis and Design Intent

▪

▪ The skyline of the neighbourhood expresses mostly high-rise and mid-rise buildings. The site is overshadowed by a high-rise on the eastern façade. The neighboring highrise buildings along with Allen Gardens and green spaces such as Ryerson Community Park assist in reducing the heat island effect. ▪ The site is zoned as institutional education. Identifying the neighbourhood as predominantly residential and commercial, the heart of the neighborhood contains many intuitional buildings belonging to Ryerson University. Being at the main intersection, the site serves as an onset to the campus, the idea was to design a landmark for Ryerson. ▪ Gerrard Street is a heavy traffic street. Having an advantage of accessibility on all sides, loading and parking access was provided through the internal lane on the west.

▪ ▪

▪

The site is located at the intersection of 101 Gerrard Street east and 111 Mutual Street East in downtown Toronto Ward 13.The 13m &12m wide main streets are along the north and the west façade. It also shares 6m wide concrete lanes with adjacent buildings which allows it to be accessible from all facades. There are two existing Ryerson buildings on the site- Cooperative Education building and Graduate Studies building but for the assignment it is a vacant plot. The setbacks of the plot are 2m from the north on Gerrard Street ,1m from the west on Mutual Street, 2m from the east and 3m on the south.

Heavy traffic Gerrard street

High rise overshadowing Ryerson University buildings the eastern facade

towards the west of the site

6m lane

Mutual street

Gerrard street

6m lane

sun path

Existing site with two Ryerson buildings

Site at the intersection of 13 m Gerrard Street and 12m wide Mutual Street

6m wide internal windows in concrete

11:00 AM

4:30 PM

SITE

Jarvis St Baptist Church

CLASSROOM BUILDING

01. INTRODUCTION

1.5 Site and Urban Context


Elevations

Green roof and mechanical room

Elevations designed to break the monotony of simple glass glazing, by using patterned fibre cement panels. The play between complete solid panel and solid cut into half angles sharply contrast the promenade to strike a sense of magnetism. Also the use of ochre colour makes its symbolic to Ryerson with its logo colour.

7th Floor Offices for admin & professional teaching staff: private offices, workstations. Lightwell cut-out into 6th floor 5th & 6th Floors Faculty rooms & staff support: private offices, workstations, lounges, meeting rooms, webinar rooms, copy room , IT room, storage. Lightwell from the 7th floor.

2nd , 3rd & 4th Floors Classrooms: 16 seat classrooms, 30 seat classrooms, breakout rooms. Mezzanine Lounge and resource center

West Elevation

1st Floor Entrance and Reception: Reception, reception workstations,100 seat classroom, food service, waste recycling room 4 storey Basements Parking: 96 car parking with 4 barrier free parking, mechanical rooms, custodial &, long term storage, storm water collection.

North Elevation CLASSROOM BUILDING

05

01. INTRODUCTION

1.7 Program Allocation


Ontario Building Code 06

2.5 Occupant Load

The building is designed to comply with the latest amended version of the Ontario Building Code. To navigate the building code, a road map was determined. As per Clauses 1.1.2.1.(1)&(2) and Sub-clauses 1.1.2.2.(1)(a)(i) & (b)(ii) the Parts 1,7,12,3,4,5 and 6 shall be applied.

Occupant load for classrooms is calculated as per Sub-clause 3.1.17.1.(c)(i). Occupant load for offices and food services is determined as per Table 3.1.17.1. Refer to table 2. Space

Occupanc Net Area/ Occupant Code y Sq. m Load Reference Type

2.2 General Description Site area: 1248 .3 sq. m Building Area: 986.9 sq. m. As per Article 1.4.1.2 Defined Terms - Building area Gross Area: 6460 sq. m. As per Article 1.4.1.2 Defined Terms-Gross area Building Height: 7 storeys . As per Article 1.4.1.2 Defined Terms - Building Height.

Classrooms

A2

2102

795

3.1.17.1.(c) (i)

Food Services

A2

141

128

Table 3.1.17.1

Offices

D

876

94

Table 3.1.17.1

3119

1017

Total

Figure 1. building occupancy in each building’s floors. Table 2. Occupant load per spaces

2.3 Building Occupancy The building has a major occupancy of Group A Division 2 Assembly occupancy, subsidiary occupancy of Group D Business and Personal Services, and Group F Division 3 Low Hazard Industrial use. As per Tables 11.2.1.1.C, 11.2.1.1.J and 11.2.1.1.M. Refer to Figure 1

2.4 Building Classification According to the project height and area, the building is classified as per Article 3.2.2.23 Group A Division 2 Any Height Any Area, which requires the building to be sprinklered and noncombustible. Refer to table 1

Element

Fire Separation

Fire Resistance

Construction Type

Sprinklered

Code Reference

Floors

Yes

2 hr

Noncombustible

Yes

Article 3.2.2.23

Mezzanine

No

1 hr

Noncombustible

Yes

Article 3.2.2.23

Columns

-

2 hr

Noncombustible

-

Article 3.2.2.23

Roof

No

N/R

Noncombustible

-

Article 3.2.2.23

Table 1. Building classification

CLASSROOM BUILDING

02. OBC ANALYSIS

2.1 Introduction


07

2.6 Fire Separation and Fire Resistance

02. OBC ANALYSIS

As per articles 3.1.3.1 and 3.3.1.1 fire separation and fire resistance between building occupancies has been determined. In addition, fire separation is required around the exit stairs, elevator hoist-way and service room shafts. Refer to table 3.

Figure 2. Fire separation and fire resistance

2.7 Exits and Egress 2.7.1 Number of Exits Number of exits is determined upon Table 3.3.1.5B egress For Sprinklered Floor, giving that area of classrooms is more that 200 sq. m and offices is more than 300 sq. m 2.7.2 Distance between Exits Building diagonal is 43 m, as per Clause 3.4.2.3.1.(b) the distance between exits shouldn’t be less than 9m. Figure 5 & 6 2.7.3 Location of Exits As required by Clause 3.4.2.5.1(b) &( c ) the travel distance to any of the exits shouldn’t exceed 40 m in offices and 45 m in occupancies other than high hazard industrial occupancy. Refer to figure 3 & 4.

Figure 3. Travel distance in level 1. Element

Fire Resistance

Enclosure Table 3.1.8.4

Code Reference

A2-D

1 hr

45 min

Table 3.1.3.1

A2-A2

1 hr

45 min

Sentence 3.3.1.1.(1)

D-D

N/R

-

Sentence 3.3.1.1.(1)

Exits

2 hr

1.5 hr

Sentence 3.4..4.1.(1)

Elevator shaft

1.5 hr

1 hr

Table 3.5.3.1

Mechanic-al shaft

1 hr

45 min

Table 3.6.3.1

Table 3. Fire separation between occupancies

Figure 4. Travel distance in level 5.

CLASSROOM BUILDING


2.7.4 Exit Width

2.9 Fire Alarm system: The building shall include two stage fire alarm system complying with Clause 3.2.4.1.(1).(C) & (d) and Clause 3.4.2.3.(1).(e)

2.9.1 Fire Department connection: Complying with sentence 3.2.4.15.(1) , a fire department connection for the standpipe system shall be provided within 45m from nearest fire hydrant.

2.10 Fire Fighting Provision:

Figure 6. Handrail

2.8 Exit through lobby: Figure 5. Exit stair width

2.7.5 Handrail: A handrail on both sides of the stairs with a height of 900 mm is provided, complied with Sentence 3.4.6.5.(1). And Clauses 3.4.6.5.(5).(a) &(b). Refer to figure 6

Exit through lobby is provided, fulfilling the criteria required by Article 3.4.4.2, floor area is sprinklered, path of travel not more than 15m to outdoor and lobby is not in an interconnected area. Refer to figure 7

The building is sprinklered , therefore it is not required to comply with Articles 3.2.5.1 access to above grade storeys and 3.2.5.2 Access to basements. The building roof is accessible by staircase complied with Clause 3.2.5.3.(1)(a) Access route for fire department vehicle is provided for the building complying with Clause 3.2.5.4.(1)(a) located at the principal entrance of the building.

2.7.6 Risers and Treads:

2.11 Standpipe and Hose System:

Riser and treads are designed as per coming amendment in 2022 in Sentence 3.4.6.8.(1)& (2). Maximum riser is 180 mm and tread is not less than 280 mm.

The building shall include a standpipe system , as it is more than 3 storeys in height complying with Clause 3.2.9.1.(1)(a)

2.7.7 Direction of Door Swing: Exits doors swing in the the direction of travel as per Clause 3.3.1.10.(2)(a)

Figure 7. Exit through lobby

CLASSROOM BUILDING

08

02. OBC ANALYSIS

As required by 3.4.3.2.(1)(b), the exit stair width for an assembly building should be 8 mm per person. Maximum occupant load per floor is 260 persons. Required exit width is (260 x 8=) 2080mm. Two exits are provided; each exit width should be 1040 mm. However, the minimum required exit width is 1100 mm as per 3.4.3.2.(7)( c). Refer to figure 5.


2.12 Spatial Separation and Unprotected Openings

As per Article 1.4.1.2, the definition of limiting distance is taken from the center of the street in the north and west elevation, and the center of the lane in the east and north elevation. The exposed building façade is calculated level by level and UPO percentage is determined as per Table 3.2.3.1.D. Unprotected openings are limited for buildings or fire compartment that are sprinklered. Fire resistance of façade is determined as per Table 3.2.3.7. the building is required to be of non-combustible structure as per Article 3.2.2.23 , therefore type of façade construction and cladding also comply. Refer to table 4 and figure 8.

Figure 8. Unprotected openings

LD/m

EBF/sq. m

UPO%

allowed

provided

FFR

Code Reference

North

11.8

998.1

100%

48.50%

N/R

Table 3.2.3.1.D.

South

6

1035

70%

38.80%

45 min

Table 3.2.3.1.D.

East

5

1040

55%

45%

45 min

Table 3.2.3.1.D.

West

9.5

1127

100%

45.60%

N/R

Table 3.2.3.1.D.

Table 4. Unprotected openings calculations

2.13 Health Requirements Number of required washrooms is calculated as per occupant load for each floor in reference to Table 3.7.4.3 A & 3.7.4.3 D for assembly occupancy and Table 3.7.4.7 for offices, considering 14 sq. m per person as required by Sentence 3.7.4.2.(1). Two thirds of male washrooms are replaced by urinals as per Clause 3.7.4.2.(3)(b). Three barrier free washrooms are required as per Table 3.8.2.3A. Refer to table 5 Level

Code Reference

1st Floor

3

5

1

-

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

2nd Floor

3

5

-

1

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

3rd Floor

3

4

1

-

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

4th Floor

3

4

-

1

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

5th Floor

3

2

1

-

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

6th Floor

3

2

-

1

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

7th Floor

-

-

1

1

Tables 3.7.4.3 A &D, 3.7.4.7, 3.8.2.3.A

Table 5. Washroom count

CLASSROOM BUILDING

09

02. OBC ANALYSIS

Percentage of unprotected openings in the building is subject to the limiting distance and exposed building façade.

Elevations


2.14 Mezzanine & Interconnected Floors

The building is required to comply with all barrier free requirements as per Sentence 3.8.1.1.(1). Refer to table 6 which Shows barrier free application considered in the building. Element

Requirement

Code Reference

Entrance

1 pedestrian entrance is required to be barrier free

Table 3.8.1.2

Path of travel

Unobstructed path of travel not less than 1600 mm

Sentence 3.8.1.3.(4)

Barrier free washrooms

1 barrier free washroom is required in each 4-9 washroom stall

Table 3.8.2.3. B

Universal Washrooms

3 plus universal washrooms for over 6 floors

Table 3.8.2.3. A

Doorways

All doors in path of travel have clear width of 860 mm

Sentence 3.8.3.3.(1)

02. OBC ANALYSIS

Mezzanine area was determined as per Clause 3.2.1.1.(3)(a) , 40 % of the open area of first floor. Refer to figure 8 & 9 Figure Interconnected floors are provided in different parts of the building. Between Mezzanine and third floor with a cut out on slab less than 20 m2 complied with City of Toronto requirements and no fire separation is required. 6th and 7th interconnected floors have a cut out with area of 112 m2 , sprinklered glass is provided around the cut out. Refer to figure 10

10

2.15 Barrier Free Design

Table 6. Barrier free requirements

2.16 Conclusion: The building is complied with latest amendment of Ontario Building Code, and that shaped some of building fundamentals such as : Construction type: Non-combustible structure Façade design: fenestration percentage, and Space planning: Dimensions and fire separation between spaces. Figure 8. Mezzanine plan

Although the restrictions that Building Code imposed to avoid fire hazard such as interconnected floors, mechanical solutions such as sprinklered glass is provided to meet client’s requirements. Figure 9. Mezzanine view

Figure 10. Interconnected floors

CLASSROOM BUILDING


Materials & Methods 3.1 Introduction

11

Green roof - Improvising the microclimate

Skylight - daylight into the building

Building

Exterior walls Metal stud wall Rain screen system cladded with cement fiber panels

Concrete slab supported with concrete beams & columns

Building Materials play a significant role in achieving an equilibrium between aesthetics and practicality of the structure while withstanding the harsh weather constraints. Our design approach is to provide student centric & barrier free spaces in a seven-storey classroom building, our focus was to provide a well lit and well-ventilated interior space, reducing the usage of artificial lighting during maximum hours of the day making it energy efficient building. The most important aspect in protecting the built form is to have a series of climatic barriers both internal & external to protect the structure against any type of failure. These components and barriers in the right proportion provide an insulation and the desired R value rating to the built form creating a comfortable environment for the inhabitants.

Raft foundation Slab on grade

Figure 01. Building envelope details Components

Double glazed tempered glass panels

R-Value

Roofs

R-25 ci

Walls

R-13 + R–13 ci

Walls below grade

R–10 ci

Floors

R–12.5 ci

Slab on grade

R–10

Vertical fenestrations

0.35

Skylight

0.36

Figure 02. Minimum requirement of insulation as per SB-10

Figure 03. Zones As per MMAH SB-10 our site is Zone 5 based on the heating degree-days of 3520 as per MMAH SB-01

CLASSROOM BUILDING

03. MATERIALS & METHODS

Structure Building Envelope Skeleton Skin Beams, Columns & Exterior walls, slabs roof & slab on grade - Strength & - Aesthetics Stability - Physical separator


3.2 Structure Soil type: The site is located in the heart of Toronto’s downtown near lake Ontario.

Figure 04. Geological map

As per our analysis of the geology of this area, it contains Lake Iroquois soil, sand and silt sand with a shallow water deposit. Soil having a water table at a depth higher than the foundation level will have low bearing capacity (capacity of soil to support the loads applied to the ground) This type of soil has a tendency to retain moisture; the soil is cold and drains poorly. This causes the silty soil to expand, putting pressure against the foundation and weakening it, which is not ideal to support a foundation. Hence the buildings in such soil must be well reinforced & waterproofed

Retaining Wall : Walls in the basement have been constructed with 200 mm CMU protected with rigid insulation, damp proofing and a waterproofing system.

12

Figure 06. Structural layout

Columns: 300mm x 700mm Varying grid to accommodate the spaces. Floating columns: 300mm x 450mm in the 6th & 7th floors Beams: 300mm x 700mm including the slab thickness Slabs: 200mm thickness 2- way slabs with varied spans as per the column grids.

Retaining wall Lift shaft Cement screed Rigid Insulation Raft foundation beams Raft foundation base slab Slab footing Lift pit Lift pit footing Figure 05. Raft foundation detail

CLASSROOM BUILDING

03. MATERIALS & METHODS

SITE

Foundation: As we are proposing to construct a building having a mass that is seven storeys above grade and four storeys below grade in this type of soil, the building requires a stable foundation. We decided to build with a raft foundation which would give more stability to the structure and reduce the load on the soil as this building floats on the ground as a raft floats on water. There is a 200mm of concrete slab extending over the entire building stiffened by 600mm x 400mm of inverted beams with an infill of rigid insulation covered with 75mm of floor screed.


3.3 Building Envelope:

13

Components

Metal cap flashing Cap sheet mod bit roofing membrane Flexible membrane Base sheet modbit roofing membrane High density cement fiber panels Mineral fiber rigid insulation Air / Water barrier OSB

Thickness

R-Value

Interior Type X gypsum board

16 mm

0.56

Metal studs with batt insulation

152mm

13.00

Exterior grade gypsum sheathing

16mm

0.56

Batt insulation between metal studs Vapour barrier Type X gypsum board

Self adhered Air/Vapor barrier

40mils

0.01

EXP insulation

Mineral fiber insulation

76mm

12.6 ci

Vapor Retarder

Air space

38mm

1.00

Concrete Slab

Fiber cement cladding

8mm

0.38

2° slope

Figure 08. Roof to wall junction detail also showing the parapet wall detail

Table shows R values and thickness for the materials

High density cement fiber panels Air gap with Z channel to fix the cement fiber panels Mineral fiber rigid insulation Air / Water barrier OSB Type X gypsum board Vapour barrier Batt insulation Light metal framing Wooden flooring Furring purlin Extruded polystyrene Insulation Concrete floor slab

Basement retaining wall Air / Moisture barrier Ddrainage mat Rigid Insulation Cement screed Insulation Foundation base slab Damp proofing membrane

Figure 07. Floor Slab to wall junction detail

Figure 09. Slab on grade and retaining wall junction detail

Rigid Insulation Layered gravel Weep tile Raft foundation & wall footing

CLASSROOM BUILDING

03. MATERIALS & METHODS

Building Façade: We aimed to beautifully blend different materials and textures in the façade detailing, by having solid opaque cement fiber panels which contrasted with the glazing, creating a seamless visual connect between the interior & exterior spaces.


3.4 Façade Material

14

Cement Fiber Panels:

Advantages of fiber cement products • Maximum protection against weather •Excellent longevity • Easy installation in any climate • Almost no maintenance required • No cracks, paint or sealant problems • High sustainability • Noncombustible Lightweight panels and joints deflect most of the rainwater Ventilated cavity eliminates the remainder of the moisture by natural drainage and evaporation

Glazing Figure 11. Rainscreen working system Air cannot exit Closed at top

Air enters Open at bottom

Figure 12. Typical idea of the rain screen system

Glazing :

High density cement fiber panels

Building façade has an extensive use of doubleglazed fritted panels. Low E, tinted, fritted glass of helps in reducing glare, lowers the danger to birds.

Air gap with Z channel to fix the cement fiber panels

Provides better insulation value. Increases acoustical control. It creates an interesting visual interfaces between the interior and exterior. Light when passed through these patterns it creates a dramatic play of light and shadows in the interior spaces.

Figure 10. North Elevation

03. MATERIALS & METHODS

Cement fiber panels - Rain screen system

Fiber cement is a composite material with a cement base reinforced with cellulose fibers.

Mineral fiber rigid insulation

Figure 14. Double glazing U-value : 0.25 R-value : 4 Heat from sun passes into the room

Heat from room refracted back due to the coating

Air / Water barrier OSB Light metal framing Batt insulation Vapor barrier Type X gypsum board

Figure 15. Cement fiber panel fixing detail

Figure 13. Exterior wall assembly

CLASSROOM BUILDING


3.5 Green Roof System

Figure 16. Perspective of the proposed Skylight and green roof

Figure 17. Sectional perspective of proposed Skylight and green roof

Vvegetation Vegetation blanket Filter fabric Drainage layer Filter fabric Rigid insulation Root barrier Separation sheet Roofing membrane Concrete roof slab Figure 18. Green roof assembly

CLASSROOM BUILDING

03. MATERIALS & METHODS

The green roof, as an insulation system made of natural local materials, took shape in a variety of vernacular architecture. • It’s a complex layered system that helps in the better performance of the building along with giving an aesthetically pleasing appearance. •Green roofing system improves the Macro climate & urban ecosystem •vegetation and layers composition benefits the quality of life by delaying peak flood while retaining rainwater, reducing CO2 while producing oxygen and recreating biodiversity. •Reduce pollution, water retention. •Reduces heat island effect in urban areas. •Extends roof lifespan by reducing daily temperature fluctuations and provides shading from ultraviolet light. •Provides energy savings from additional insulation & evaporative cooling.

15


BIM Analysis 16

4.1 Introduction

Another important step was linking both 2D and 3D AutoCAD files to the project which helped us to facilitate the initial design process. We linked some rough design ideas and sketches in addition to the 3D massing of the surrounding area acquired from the City of Toronto website .

BIM/ Revit

BIM Lead

Setup

BIM Lead collaborate with each team members Design development - Site Context - Design Program - Application of the research Data from OBC & Material and Methods Collaboration

Work-sharing

BIM Lead + Each Team member

-

Production of drawings Plans, Elevations, details, 3D Models In-house Production

Communication Figure 2.. Stages of the design process

The next stage was the collaboration-work-sharing part of the deign process, where all members of the team participated on the Revit design model while conducting the research on requirements of OBC, Material and methods, and the Revit software itself. With continuous communication among all team members, we collaborated in developing the design working on the same model at the same time. The last stage was the in-house production where we produced various architectural drawings such as; plans sections, elevations, details, and visualization Figure 1. Potentials of BIM

CLASSROOM BUILDING

04. BIM A NALYSIS

We started the design aspect of our BIM process by setting up the Revit platform organized by the BIM leads. This setup stage consisted of some basic and important settings within the Revit file such as adjusting project unit, creating levels, creating work sets and so on. After that we uploaded the file to the cloud-based collaboration and work-sharing platform formerly known as Autodesk BIM 360 recently rebranded as Autodesk construction cloud.

We used BIM in creating an integrated building design through information management, collaboration, and work-sharing among the team members. Using Revit as a BIM tool facilitates in creating a platform for each team member to work collaboratively but at the same time work independently. With the help of Revit cloud work-sharing, each team member was able to work on the same model at the same time, maintaining proper communication.


4.2 The process

17 Creating Levels

4.2.1 Setup Linking AutoCAD

Figure 03.. Levels and imported 2D AutoCAD file

This setup stage was mainly coordinated by the BIM-Revit team leads to reduce errors related to such as; working on the wrong level, duplication of linked files, and work sets

We have started the collaboration and work-sharing by fixing some of the design elements those could be taken as datum. At the early stages of the design there were different ideas on the functional layouts. After discussions on the location for the core, the BIM team leads fixed the core (vertical circulations) so that all team members can work of developing the functional layout and other aspects of the design. To achieve the best result out the collaboration on the same model, we decided to use the combination of two methods. The first one is each member of the team works on separate levels of dealing with such as; functional layouts, furnishing, and finishing materials

Figure 06. Uploading file to BIM 360

Figure 07. Fixing core

Figure 04. Linked 3D AutoCAD file

Figure 05. Work set creation

Figure 8. Working on different floor levels and work sets

Sharing some Revit tool tips among the team The second method was working on different work sets. In this case one team members members helped considerably in acquiring focuses on one single work set but with continues to review other members’ work. Some of common understanding on using the software these work sets we created were the structural system, core and the facade design. when working on the same model. CLASSROOM BUILDING

04. BIM A NALYSIS

Creating Work sets

4.2.2 Collaboration / Work-sharing


OBC

18

4.3 Project development: Tools and elements

4.2.3 Production Revit

Load Family

Edit Type

• •

Duplicating the original wall type Adding core, substrate, etc. with relative thicknesses

•

Stair

All furniture families were edited using this tool and were customized as per required sizes

• •

The staircases were grouped and then pasted at selected levels The arrow adjusts the risers, the dot adds/subtracts risers

Figure 09. Revit used for Path Travel tool and speed

Materials and Methods

Revit

Figure 10. Revit used for Displacement tool and calculation of R values

Displacement tool feature helped us create exploded views to demonstrate our use of materials on the façade. Also R values were fed in properties while wall assemblies were created for each wall type, to calculate the R value of the whole assembly.

Figure 11. render of interiors expressing different elements of Revit used during the process

CLASSROOM BUILDING

04. BIM A NALYSIS

With the help of Path of travel tool and speed, we measured distances from the nearest exit to the corners of every room, to ensure that they are within the code requirements.

Modelling a complex building in Revit gave us an opportunity of understanding the building clearly and in more detail. It has lot of useful tools that allowed us to create a realistic building model.


4.4 Visualization

19

04. BIM A NALYSIS

Figure 12. Sectional axonometric showing tools and elements of Revit

CLASSROOM BUILDING


20

4.5 Challenges Façade deign

Work-sharing Challenges

Independent elements Created on each floor

Curtain wall with some panels converted to solid element

Edit Profile tool

Work-sharing allowed all members to use the same file at once and coordinate seamlessly. However there were some challenges involved with it. The software needed to be synchronized regularly and sometimes the process became very slow when trying to grant for access and that made us lose time in design. To avoid this issue we made sure we synchronized with central file and relinquished the ownership more often. Sometimes the model would give error lowering the speed as the project got more detailed and heavy. Since Revit persists the model in cloud, we encountered difficulties such as very slow data transferring. To speed up the workflow, we tried to work in turns.

Figure 13. Facade design experiment

As shown in figure 13, we tried different methods and tools. Finally, we explored a better one that suits our design. This is done using a curtain wall tool hoisted on to a solid wall and further editing the profile of the curtain wall in the desired pattern. This method gave us a continuous curtain and solid wall elements having a separate area calculation parameters. In addition, it is possible to dismantle these two elements separately without affecting their individual shapes. Furthermore, finishing materials can be applied to the solid wall elements by splitting the surface into smaller panels.

4.6 Conclusion BIM 360 has been a great software that allowed us to continue to be efficient and work remotely as an impact of Global Pandemic. Apart from a few challenges that we faced, the outcome was satisfactory and we were able to create a high quality project with a set of drawings and visual effects.

CLASSROOM BUILDING

04. BIM A NALYSIS

Our idea of creating a facade with a combination of solid, transparent and void elements to break down the big mass into smaller elements was on of the challenges. Moreover, we wanted these elements to have an independent character but at the same time coexist. These characters helped us in the UPO calculation, and the application of materials, and while using the displacement tool to create some graphical models.


Conclusion

21

Being Internationally trained architects, it was a unique opportunity for us to use our diverse skills and knowledge, and work in cohesion. The Ontario Building Code and Materials & Methods were the drivers of our design and Revit was used to demonstrate our understanding of these subjects.

Materials and Methods brought to light how to correspond construction methods with the building codes.. The permissible percentage of the Unprotected Openings helped us design and assess different materials accordingly. The selection of materials for the wall assemblies was carefully considered. R values were calculated for all materials, that gave us the total R value of the wall, roof and other assemblies. The assignment helped us explore innovative qualities of simple materials such as fiber cement panels and concrete. Revit helped us execute OBC and Materials & Methods. It acted as a generator of our design and spaces. Work-sharing and collaboration on BIM 360 was challenging at the beginning. However, with better organization and management, constant communication, the process was much smoother. Designing the envelope was one of the challenges. Each one of us sharpened our skills in Revit by pushing our limits and overcoming trouble shooting issues. We all got hands-on experience by being a part of the back-and-forth process, amidst different areas of Revit, which is used intensively in Architectural practice today. It was indeed a wholesome experience to collectively work on the classroom building through the spectrum of all three courses learnt in the program.

CLASSROOM BUILDING

05. CONCLUSION

The 2020 edition of Ontario Building Code permits the use of noncombustible material which is sprinklered for group A2 – Assembly occupancies. With the aim of meeting the requirements of OBC, the client’s program has been subjected to a few modifications. Some of the many things we considered are exit widths, travel distances, barrier free circulation, water closets, and an exit through the lobby. Thanks to the knowledge we gathered through the program, we were able to decode, analyze and design a structure which was legal and code compliant.


References

22

5.1 Books & Legal Documents

5.2 Websites Mid-Rise Buildings – City of Toronto Search GeologyOntario (gov.on.ca) Maps – City of Toronto LEEsystem | U.S. Green Building Council (criticalconcrete.comD rating) Fire Rated Gypsum (certainteed.com) The insulation building code 2021 | Ecostar Insulation building_manual_ap_1.pdf (ahfc.us) Tables for Calculating Effective Thermal Resistance of Opaque Assemblies (nrcan.gc.ca) Concrete Walls_EN.pdf (tboake.com) Wall Footing Section with "fiber Cement Board" Cladding. There is a basement. - CAD Files, DWG files, Plans and Details (planmarketplace.com) Panels | The Building Enclosure (wordpress.com) Health Dashboard - External prd (autodesk.com) Help - Revit Forum

5.3 Credits David Hine- OBC Instructor, Ryerson University Patrick Saavedra- Materials & Methods Instructor, Ryerson University Sean Robbins- Revit Instructor , Ryerson University Philip Hollet- IPLAN program Manager,JVS toronto Diane Brockman- Program Facilitator, JVS Toronto Andrew Aziz- Teaching Assistant (Revit), Ryerson University

CLASSROOM BUILDING

05. REFERENCES

Ontario Building Code 2012 Building Construction Illustrated- by D.K.Ching Construction Handbook-Chudley MMA Supplementary Standard SB -10


Appendix OBC Matrix

05. APPENDIX

CLASSROOM BUILDING


OBC Matrix

05. APPENDIX

CLASSROOM BUILDING


OBC Matrix

05. APPENDIX

CLASSROOM BUILDING


OBC Matrix

05. APPENDIX

CLASSROOM BUILDING


Net to gross area Ratio Calculation Floor area

Fire rating for external walls

Circulation Area

Percentage

Level 1

452.63 sq.m

944 sq.m

Mezzanine Level

197.464 sq.m

197 sq.m

Level 2

180.00 sq.m

944 sq.m

20%

Level 3

185.27 sq.m

968 sq.m

20%

Level 4

169.17 sq.m

968 sq.m

18%

169.17 sq.m

968 sq.m

18%

Level 6

260.39 sq.m

897 sq.m

30%

Level 7

346.19 sq.m

908 sq.m

38%

Total

1959 sq.m

6595 sq.m

30%

Levels Level 1 Mezz. Level 2 Level 3 Level 4 Level 5 Level 6 Level 7

Required FRR

North 1-1.02

Not Required Not Required

South 1-1.02

45 min

Combustible or Combustibleor Non Non Combustible Combustible

East 1-1.01

45 min

Combustible or NonNon Combustible Combustible

West 1-1.01

Not Required Not Required

47%

Level 5

Gross area 944 sq. m 197 sq. m 944 sq. m 968 sq. m 968 sq. m 968 sq. m 897 sq. m 908 sq. m

Net area 843 sq. m

6879.6sq. m

5186 sq. m

Construction Cladding Type Type

Façade L/H-H/L

764 sq. m 782 sq. m 799 sq. m 799 sq. m 637 sq. m 562 sq. m

CLASSROOM BUILDING

Not Required

Not Required

05. APPENDIX

Levels


Spatial separation calculation 11.8 6 5 9.5

UPO (Unprotected Openings) North 100% South 52% East 40% West 100%

11.8 6 5 9.5

100% 55% 40.70% 100%

11.8 6 5 9.5

100% 55% 40.70% 100%

11.8 6 5 9.5

100% 55% 40.70% 100%

11.8 6 5 9.5

100% 55% 40.70% 100%

Spatial Separation

Wall

Level 1(A2) Level 2(A2) Level 3(A2) Level 4(A2) Level 5(D) Level 6(D) Level 7(D)

Total

EBF ( Exposed Building Façade) North

156

140.4

140.4

140.4

140.4

140.4

140.4

998.4

South

156

140.4

140.4

140.4

140.4

140.4

140.4

998.4

146.25

146.25

146.25

146.25

146.25

146.25

146.25

146.25

146.25

146.25

146.25

146.25

East

157.5

West

157.5

1035 1035

100% 55% 40.70% 100%

11.8 6 5 9.5

100% 55% 40.70% 100%

Building Height Level 1 6m Mezz. 3m Level 2 4.5m Level 3 4.5m Level 4 4.5m Level 5 4.5m level 6 4.5m level 7 4.5m Total 33m Basements Basement 1 3m Basement 2 3m Basement 3 3m Basement 1 3m

CLASSROOM BUILDING

05. APPENDIX

LD (Limiting Distance) North 11.8 South 6 East 5 West 9.5


Interior and Exterior Finishes

05. APPENDIX

Interior finishes Components

Materials

Walls

Metal stud walls with batt insulation and Type X gypsum board

Floors

Concrete slab with extruded polystyrene insulation

Floor finish

• • •

Vinyl flooring Carpet Wooden floor finish

Ceilings

• •

Exposed ceiling False ceiling with acoustically perforated panels

Exterior finishes Components

Materials

Exterior façade

Fibre cement panels

Glazing

Fritted double glaa

Fritted Double glass

False ceiling with acoustical panels

Fiber cement panels

Metal stud wall with batt insulation with type X gypsum board

Wooden flooring

Carpet flooring

Tile flooring

CLASSROOM BUILDING


LEED -Sustainability Initiatives

Location and transportation Project is located on land that has been previously developed The site is not defined as sensitive land (Prime farmland, floodplains, habitat, water bodies, or wetlands

1 Point

LTc4 Surrounding Density and Diverse Uses

The site is located in Downtown Toronto and is surrounded by densely developed residential areas. The site is within walking distance to multiple publicly available diverse uses

5 Points

LTc5 Access to Quality Transit

The site is within proximity to multiple transit nodes including TTC buses, streetcar and metro A bus rapid transit stop: Less than 0.25 mile from 2 bus stops which are Jarvis street and Dundas Street at 0.2 miles and Jarvis street and Carlton which is 0.17 miles

5 Points

LTc7 Reduced Parking Footprint

Parking is less than minimum local code requirement thereby reducing the footprint associated with single vehicle use

1 Point

LTc8 Green Vehicles: Electrical parking

we provided 7 parking of total car parks for electrical vehicles

1 Point

Sustainable site SSp1 Construction Activity Pollution Prevention

provided specification on construction to avoid erosion and sedimentation

1 Point

SSc1 Site Assessment

site analysis is provided on the section of material and methods

3 Points

SSc4 Rainwater Management

rainwater is considered by providing catchment basins for rainwater and storm water tank in the basement

1 Point

SSc5 Heat Island Reduction

SSc5 Heat Island Reduction: green vegetated roof is provided for 50% of roof area to reduce heat island effect. Parking spaces are underground and solar panels are provided on mechanical penthouse to give a reflective roof

3 Points

CLASSROOM BUILDING

05. APPENDIX

LTc2 Sensitive Land Protection


LEED -Sustainability Initiatives Water Efficiency Landscape planted with native vegetation and requires minimal irrigation and maintenance. Landscape doesn’t require permanent irrigation beyond 2 years of establishment

2 Points

WEp2 Indoor Water Use Reduction

50% reduction in water consumption by using water conserving fixtures. All water fixtures are water sense labeled and water appliances and energy start labeled

6 Points

WEp3 Building-Level Water Metering

we applied 2 permanent sub metering for water end uses for irrigation and domestic use

1 Point

Energy and Atmosphere EAc1 Enhanced Commissioning

An individual commission agent will be appointed to conduct commissioning for mechanical , electrical and plumbing systems. The authority will a report a design review of the OPR, review contractor submittal. Building operation reviewed within 10 moths of substantial completion

6 Points

EAc2 Optimize Energy Performance

energy model will be conducted at detailed design phase. Will meet SB10 requirements. Walls and roof are properly insulated. Glazing area reduced to 45% of total wall area specifying efficient double wall glazing. Efficient HVAC equipment and water boilers would be installed. Efficient office equipment and LED lighting fixtures are installed

13 Points

EAc3 Advanced Energy Metering

It requires client decision and electric design to incorporate submeters. advanced energy metering for whole-building energy sources and individual energy sources that represent at least 10% of the total annual consumption are installed. All meters are capable of reporting hourly, daily, monthly, and annual energy use

1 Point

EAc5 Renewable Energy Production

PV generation will be provided on the roof top

1 Point

CLASSROOM BUILDING

05. APPENDIX

WEp1 Outdoor Water Use Reduction


LEED -Sustainability Initiatives Energy and Atmosphere (contd.) low impact refrigerant will be used as part of HVAC equipment's selection that minimize emission of compound that contribute to ozone depletion.

3 Points

EAc7 Green Power and Carbon Offsets

Green Power and Carbon Offsets: this will be deferred to design development phase and requires client decision

2 Points

Materials and Resources MRp1 Storage and Collection of Recyclables

recyclable storage room is provided on level 1

1 Point

MRp2 Construction and Demolition Waste Management Planning

demolition waste management plan will be implemented. specification will be provided to contractor

1 Point

MRc1 Building Life-Cycle Impact Reduction

option 4 , a LCA will be conducted during DD for the project structure and enclosure to demonstrate a minimum 10% reduction compared with a baseline building

5 Points

MRc2 Building Product Disclosure and Optimization - Environmental Product Declarations

we will specify that at least 20 different permanently installed products sourced from at least five different manufacturers that have an Environmental Product Declaration

2 Points

MRc3 Building Product Disclosure and Optimization - Sourcing of Raw Materials

we will specify that least 20 different permanently installed products from at least five different manufacturers that have publicly released a report from their raw material suppliers

2 Points

MRc4 Building Product Disclosure and Optimization - Material Ingredients

we will specify that least 20 different permanently installed products from at least five different manufacturers that demonstrate the chemical inventory of the product.

1 Point

MRc5 Construction and Demolition Waste Management

Will Divert minimum 75% of the total construction and demolition material using four material streams.

1 Point

CLASSROOM BUILDING

05. APPENDIX

EAc6 Enhanced Refrigerant Management


LEED -Sustainability Initiatives Indoor Environment Quality calculation will be conducted by mechanical engineer to demonstrate compliance with ASHRAE 62.1

1 Point

IEQp2 Environmental Tobacco Smoke Control

Signage will be provided prohibiting smoking within 7.5 m of building entrance

1 Point

IEQc1 Enhanced Indoor Air Quality Strategies

3 entry way grilles will be provided at building entrance

2 Points

IEQc2 Low-Emitting Materials

Specification of interior finishes to meet low VOC content requirements. Materials for flooring, walls, ceilings, thermal and acoustic insulation, composite wood, furniture, paints and coatings, adhesives and sealants will be complaint to CDPH standards

3 Points

IEQc3 Construction Indoor Air Quality Management Plan

Contractor will provide specifications to meet SMACNA guidelines

1 Point

IEQc4 Indoor Air Quality Assessment

testing/ IAQ testing will be provided after construction

2 Points

IEQc5 Thermal Comfort

Design HVAC systems and the building envelope to meet ASHRAE 55-2010, Thermal Comfort Conditions for Human Occupancy, with errata

1 Point

IEQc6 Interior Lighting

Providing induvial controllers for 90% and also for shared multi occupant spaces to enable adjustments that meet their need and preferences

2 Points

IEQc7 Daylight

Daylight model will be conducted during DD phase to assess the required daylight parameters . Double glazed fritted glass used to meet the lux level of sunlight exposure

3 Points

IEQc8 Quality Views

Analysis will be conducted at DD phase to assess achievement of 75% clear view for all regularly occupied floor area

1 Point

IEQc9 Acoustic Performance

acoustic analysis will be conducted at DD phase to select finishes with adequate acoustic performance . Sound attenuation will be provided to reduce background noise from HVAC

1 Point

CLASSROOM BUILDING

05. APPENDIX

IEQp1 Minimum Indoor Air Quality Performance


“I don’t think that architecture is only about shelter, it is about a very simple enclosure. It should be able to excite you, to calm you, to make you think”.

Zaha Hadid

CLASSROOM BUILDING


Gerrard St E Approx 13.0Mts wide

01

02

03

04

ENTRY

A1

EMERGANCY ENTRY

Green roof

Private property

6.0Mts wide side road

C1

ENTRY

Approx 11.0Mts wide

Mutual St

B1

Consultant Address Address Phone Fax e-mail No.

Description

Ryerson University

D1 Green roof

Classroom Building Site plan

E1 11032

Date

ENTRY

Project number Date

6.0Mts wide side road

1

Drawn by Checked by

Site plan 1 : 200

A100 Private property

Scale

1:150


01

02

03

04

A1 LIFT

LIFT

Lift lobby

Consultant Address Address Phone Fax e-mail

B1

No.

Description

Date

C1

Lift lobby

Ryerson University Classroom Building

LIFT

D1

Basement B1 floor plan Car lift 01

Car lift 02

Project number Date

E1

Drawn by Checked by

1

A101

Basement B1 floor plan 1 : 150

Scale

1:150


01

02

03

04

A1 LIFT

LIFT

Lift lobby

Consultant Address Address Phone Fax e-mail

B1

No.

Description

Date

C1

Lift lobby

Ryerson University LIFT

Classroom Building

D1 Car lift 01

E1

Car lift 02

Basement B2 floor plan Project number Date Drawn by Checked by

1

A102

Basement B2 floor plan 1 : 150

Scale

1:150


01

02

03

04

A1 LIFT

LIFT

Lift lobby

Consultant Address Address Phone Fax e-mail

B1

No.

Description

Date

C1

Lift lobby

Ryerson University LIFT

Classroom Building

D1 Car lift 01

E1

Car lift 02

Basement B3 floor plan Project number Date Drawn by Checked by

1

A103

Basement B3 floor plan 1 : 150

Scale

1:150


01

02

03

04

A1 LIFT

LIFT

Lift lobby

Consultant Address Address Phone Fax e-mail

B1

No.

Description

Date

C1

Lift lobby

Ryerson University LIFT

Classroom Building

D1

Basement B4 floor plan Car lift 01

Car lift 02

Project number Date

E1

Drawn by Checked by

1

A104

Basement B4 floor plan 1 : 150

Scale

1:150


Gerrard St E

Approx 13.0Mts wide

01

02

11090

03

8200

04

11000

ENTRY

A1 LIFT

Vestibule

LIFT

Work room

10300

Lift lobby Reception

Waiting room Lobby

Work room

EMERGENCY EXIT

Up

Food service

No.

Male W/c Barrier-free W/c

LIFT

6270

D1

Recycling

Garbage

Car lift 01

Classroom Building Main floor plan Project number

Car lift 02 EXIT

Classroom 100 Seating

Date Drawn by Checked by

ENTRY

1

A105

Main floor plan 1 : 150

Date

Ryerson University

Lift lobby Female W/c

E1

Description

Corridor 1.8 mts wide

Corridor 2.3 mts wide

FIRE EXIT

EXIT

5890 ENTRY

C1

8200

Mutual St

Approx 11.0Mts wide

B1

Consultant Address Address Phone Fax e-mail

Scale

1:150


01

02

03

04

---

A1

-

UP

---

Dn

B1 Up

Consultant Address Address Phone Fax e-mail No.

Longue

Description

Date

C1

Ryerson University LIFT

D1

Classroom Building Mezzanine Floor Plan Project number Date

E1

Drawn by

1

Mezzainine Floor Plan

Checked by

A105-A

1 : 150 Scale

1:150


01

02

03

11090

04

8200

11000

A1

Corridor 2.0 mts wide

10300

LIFT

60 Seating

B1

LIFT

Lift lobby

Break-out room

5890

Corridor 1.8 mts wide

Consultant Address Address Phone Fax e-mail No.

60 Seating

Description

Date

8200

Lobby Lift lobby

Corridor 2.2 mts wide

C1 60 Seating

Ryerson University Classroom Building

D1 Sencond floor plan 6270

Barrier-free W/c

Female W/c

E1

60 Seating

Project number Date

Male W/c

Drawn by Checked by

1

A106

Second floor plan 1 : 150

Scale

1:150


01

02

03

11090

04

8200

11000

A1 Corridor 2.0 mts wide

LIFT

10300

16 Seating 16 Seating

16 Seating Corridor 1.8 mts wide

Lift lobby

16 Seating

Corridor 2.5 mts wide

C1

Corridor 2.5 mts wide

5890

B1 16 Seating

LIFT

16 Seating

Consultant Address Address Phone Fax e-mail No.

Description

Date

8200

16 Seating Lift lobby 16 Seating

Ryerson University

Corridor 2.0 mts wide

Classroom Building

D1 30 Seating

Third floor plan

6270

16 Seating

Female W/c

E1

Barrier-free W/c

Male W/c

Project number Date Drawn by Checked by

1

A107

Third floor plan 1 : 150

Scale

1:150


01

02 11090

03

04

8200

11000

A1

16 Seating

16 Seating

Corridor 2.0 mts wide

10300

LIFT

16 Seating

16 Seating

Corridor 2.5 mts wide

Corridor 2.5 mts wide

5890

16 Seating

8200

Lift lobby

Consultant Address Address Phone Fax e-mail

B1

C1

LIFT

No.

Date

16 Seating

16 Seating

Lift lobby

Description

Ryerson University

16 Seating

Classroom Building

D1 6270

16 Seating

Fourth floor plan

30 Seating

Project number Female W/c

E1

Barrier-free W/c

Male W/c

Date Drawn by Checked by

1

A108

Fourth floor plan 1 : 150

Scale

1:150


01

02

03

11090

04

8200

11000

A1 LIFT LIFT

10300

Small staff lounge

Reception

LIFT LIFT

Lift lobby

Accessible terrace

B1

8200

C1

Corridor 1.8 mts wide

Corridor 2.5 mts wide

5890

Large meeting room

Consultant Address Address Phone Fax e-mail No.

LIFT

Ryerson University Classroom Building

D1 6270

Date

Lift lobby Webinar room

Barrier-free W/c

Fifth floor plan Drinking water

Male W/c

E1

Description

Female W/c

Copy room IT room

Project number Date Drawn by Checked by

1

Fifth floor plan 1 : 150

A109 Scale

1:150


01

02

03

11090

04

8200

11000

A1 LIFT

LIFT

10300

Lift lobby

Small staff lounge

Meeting room

C1

8200

Yueli director office

skylight ablove

Corridor 2.5 mts wide

Staff room Corridor 2.5 mts wide

5890

B1

Consultant Address Address Phone Fax e-mail No.

Ryerson University Classroom Building

D1 6270

Date

Lift lobby Lounge

Barrier-free W/c

Drinking water

Male W/c

E1

Description

Female W/c

Sixth floor plan

Yueli director office

EAP office

EAP office

EAP office EAP office

Project number Date Drawn by Checked by

1

A110

Sixth floor plan 1 : 150

Scale

1:150


01

02 11090

03

04

8200

11000

A1 LIFT

LIFT

Lobby

10300

Lift lobby

Consultant Address Address Phone Fax e-mail

8200

C1

skylight ablove

No.

Description

Date

Corridor 3.0 mts wide

Corridor 3.0 mts wide

5890

B1

Lift lobby

Ryerson University Classroom Building

6270

D1 Barrier- Barrierfree W/cfree W/c

Seventh floor plan kitchennete

Project number Date

E1

Janitor

drinking water

Drawn by Checked by

1

A111

Seventh floor plan 1 : 150

Scale

1:150


01

02

03

04

A1

B1

Consultant Address Address Phone Fax e-mail No.

Description

Date

C1

Ryerson University

D1

Classroom Building Roof plan Project number Date

E1

Drawn by Checked by

1

A112

Roof Plan 1 : 150

Scale

1:150


01

02

03

04 2 hr FRR Wall 1.5 hr FRR Wall 1 hr FRR Wall

A1

1.5 hr FRR door 1 hr FRR door 45 min FRR door

7m

18 m

FRR legend

20 m

1 : 150 35 m

5m

B1 33 m

1

5m

Consultant Address Address Phone Fax e-mail No.

Description

Date

.4 D 4

C1

m

15 m 17 17

m

m

Ryerson University Classroom Building

D1

Fire seperation -First Floor Project number

19 m

E1

Date Drawn by Checked by

1

FRR-1st Floor Plan 1 : 150

A119 Scale

1:150


01

02

03

11090

11000

17

A1

04

8200

2 hr FRR Wall

LIFT

1.5 hr FRR Wall 1 hr FRR Wall

LIFT

m Corridor 2.0 mts wide

31

m

1.5 hr FRR door 1 hr FRR door 45 min FRR door

10300

18 m

60 Seating

B1 5890

Corridor 1.8 mts wide

32 m 60 Seating

Lift lobby

FRR legend 1 : 150 Consultant Address Address Phone Fax e-mail No.

Description

Date

C1

D1 6270

Barrier-free W/c

Female W/c

Break-out room Male W/c

E1

Ryerson University Classroom Building

22 m

17 m

Lift lobby

60 Seating

m

8200

Lobby

43

Corridor 2.2 mts wide

35 m

60 Seating

32 m

Fire seperation-2nd Floor Plan Project number Date Drawn by Checked by

1

FRR-2nd Floor Plan 1 : 150

A120 Scale

1:150


01

02

03

04

2 hr FRR Wall 1.5 hr FRR Wall 1 hr FRR Wall 1.5 hr FRR door 1 hr FRR door 45 min FRR door

A1 23

FRR legend

m

1 : 150

m

Consultant Address Address Phone Fax e-mail

m

29

42

35 m

B1 33 m

21

C1

34

m

No.

Description

Date

20 m

m

25 m

19

1

6m

17 m

15 m

D1

m

30 m

Ryerson University Classroom Building Fire seperation- 5th Floor Plan Project number Date Drawn by

E1

Checked by

1

A121

FRR-5th Floor Plan 1 : 150

Scale

1:150


04

03

02

01 Roof Plan 35500 Mechanical Penthouse 33000

Seventh floor plan 28500

Sixth floor plan 24000

Fifth floor plan

Consultant Address Address Phone Fax e-mail No.

Description

Date

19500

Fourth floor plan 15000

Ryerson University Third floor plan

Classroom Building

10500

North elevation Second floor plan 6000 Level 1.5 Mezzanine 3000

Project number Date Drawn by Checked by

Main floor plan

1

North Elevation 1 : 150

A201

0 Scale

1:150


A1

B1

C1

D1

E1 Roof Plan 35500 Mechanical Penthouse 33000

Seventh floor plan 28500

Sixth floor plan 24000

Fifth floor plan

Consultant Address Address Phone Fax e-mail No.

Description

Date

19500

Fourth floor plan 15000

Ryerson University Third floor plan

Classroom Building

10500

West elevation Second floor plan 6000 Level 1.5 Mezzanine 3000

1

West Elevation 1 : 150

Project number Date Drawn by Checked by

Main floor plan

A202

0 Scale

1:150


01

02

03

04 Roof Plan 35500 Mechanical Penthouse 33000

Seventh floor plan 28500

Sixth floor plan 24000

Consultant Address Address Phone Fax e-mail No.

Description

Date

Fifth floor plan 19500

Fourth floor plan 15000

Ryerson University Third floor plan

Classroom Building

10500

South elevation Second floor plan 6000 Level 1.5 Mezzanine 3000

Project number Date Drawn by Checked by

A203

Main floor plan

1

South Elevation 1 : 150

0 Scale

1:150


E1

D1

C1

B1

A1 Roof Plan 35500 Mechanical Penthouse 33000

Seventh floor plan 28500

Sixth floor plan 24000

Consultant Address Address Phone Fax e-mail No.

Description

Date

Fifth floor plan 19500

Fourth floor plan 15000

Ryerson University Third floor plan

Classroom Building

10500

East elevation Second floor plan 6000 Level 1.5 Mezzanine 3000

Project number Date Drawn by Checked by

Main floor plan

1

East Elevation 1 : 150

A204

0 Scale

1:150


01

02

03

04 Roof Plan 35500 Mechanical Penthouse 33000

Seventh floor plan 28500

Sixth floor plan 24000

Fifth floor plan 19500

Fourth floor plan 15000

Consultant Address Address Phone Fax e-mail No.

Description

Date

Third floor plan 10500

Second floor plan 6000

Ryerson University

Level 1.5 Mezzanine 3000 Main floor plan

Classroom Building

0 Basement B1 floor plan

Project number

-5000 Basement B3 floor plan

Date

-7500 Basement B4 floor plan

Drawn by

-10000

1

Section 01

-2500 Basement B2 floor plan

Checked by

A301

Section 1-1 1 : 200

Scale

1:150


01

02

03

04 Roof Plan 35500 Mechanical Penthouse 33000

Seventh floor plan 28500

Sixth floor plan 24000

Fifth floor plan 19500

Consultant Address Address Phone Fax e-mail

Fourth floor plan 15000

No.

Description

Date

Third floor plan 10500

Second floor plan 6000

Ryerson University

Level 1.5 Mezzanine ---

3000

Classroom Building

Main floor plan

0 Basement B1 floor plan -2500 Basement B2 floor plan

1

1 : 200

Project number

-5000 Basement B3 floor plan

Date

-7500 Basement B4 floor plan

Drawn by

-10000

Section 2-2

Section 02

Checked by

A302 Scale

1:150


Consultant Address Address Phone Fax e-mail No.

Description

Date

Ryerson University Classroom Building Exterior Perspective Project number Date Drawn by Checked by

Exterior Perspective

A401 Scale

1:150


Consultant Address Address Phone Fax e-mail No.

Description

Date

Ryerson University Classroom Building Exterior Night View Project number Date Drawn by

Exterior Night View

Checked by

A402 Scale

1:150


Consultant Address Address Phone Fax e-mail No.

Description

Date

View of the entrance lobby

Ryerson University Classroom Building Interior Views Project number Date Drawn by Checked by

A405 View from the mezzanine

Scale

1:150


Consultant Address Address Phone Fax e-mail No.

Description

Date

View of the classroom

Ryerson University Classroom Building Interior Views Project number Date Drawn by Checked by

A406 View from the meeting room in the 6th floor

Scale

1:150