P O R T F O L I O
Professional Project 2023 ( Hawkins Brown )
Responsibility: Stage 3- 4 design development, Visulisation, Planning Application
Software: Revit/ Rhino/ Lumion/ Photoshop/ Illustrator Red Bank
A significant residential-led development connecting the north to the centre of Manchester. Collaborating with Far East Consortium (FEC), we propose a regeneration of Red Bank neighbourhood to create a sustainable residential-led neighbourhood which reinvigorates the green spaces along the River Irk Valley.
trays with stop end at opening
Cavity
barriers for brickwork cladding
barriers for brickwork cladding
Cavity
Cavity
trays with stop end at opening
barriers for brickwork cladding
barriers for brickwork cladding
Cavity
Cavity
Cavity
trays with stop end at opening
Cavity
barriers for brickwork cladding
Cavity
General or
utility veneer plywood
Manchester Metropolitan University Library Transformation
Professional Project 2023 ( Hawkins Brown )
Responsibility: Stage 2-3 design development, Visulisation
Software: Rhino/ Revit/ Lumion/ Photoshop
building
existing part to front facing new extension.
transformation
urban
connection from the existing park to the proposed roof garden, encouraging outdoor learning space.
A new welcoming gateway to library in Manchester Metropolitan University. We proposed an uniformity of double skin facade on whole
across refurbished
The
provides MMU an
permeability as a
Fifth Floor Fourth Floor Third Floor Second Floor First Floor Building long section. Images owned by AHR, responsible of modelling and illustrating Ground Floor Plan. Images owned by AHR responsible of modelling and illustrating
Health & Wellbeing Academy - Univeristy of Huddersfield
Professional Project in 2021 ( AHR Manchester )
RIBA Stages 2 & 3
Responsibility: Revit modelling/ Concept design development/ Stage 2 drawing packages/ Visulisation
The new Health & Wellbeing Academy at the University of Huddersfield has been designed to become a destination where people will engage strongly with the cutting edge health education and researcg taking place in the building. It forms part of the new national health and research campus. The building will be the first University building ever designed to WELL Platinum Standard. Features inspired by the human for, the wellbeing of users is at the heart of this design.
Atrium accommodation
owned
AHR responsible
modelling
stair drawing. Images
by
of
and illustrating
Images owned by AHR responsible of modelling and
illustrating
UP UP W01/W05 FF01 Cafe C06 SK01 W04 FF14 Kitchen C07 SK02 External Simbulance area External Community House area Reception W01 FF07 Simbulance C03 SK01 W01/W10 FF13/FF16 Gait analysis C01 SK01 W01 FF04 Corridor C06 SK01 W01/W03/W05/W10FF03/FF12 Student Hub & Commuter Student Lounge C01 SK01 W02 FF07 LV Switch C05 SK03 W02 FF07 NPG Substation C05 SK03 W02 FF07 Uni. Substation C05 SK03 W02 FF07 Meter room C05 SK03 W01/W10 FF04 Lift Lobby C06 SK01 W01/W09 FF05 Stair 3 C05 SK01 W01/W09 FF05 Stair 2 C05 SK01 W01/W05/W06FF01/FF06 Atrium C06 SK01 Line denotes line of barrier matting Line denotes line of barrier matting x 3 0 0 0 m m h ig h 4858 x 4000mm high (W05Horizontal slat) 5540 Full atrium height refer to HWA-AHR-P1-XX-DR-I-40201 (W06) 9500 W03 wall tiling to kitchenette area only FF12 Vinyl to kitchenette & tables and chairs area W03 wall tiling to kitchen area W02 FF07 C05 SK03 1 3 4 5 7 8 9 10 11 12 A B C 2 J K L F H M N1 P1 Q 18 17 16 15 14 13 2c 2a P 17a 16a 14a 13a Ca Ha 19 G 4b 3a La Lb 4c 6 W01 FF04 Immersive Simulation C03 SK01 W01/W06 FF04 Corridor C01 SK01 W01 FF16 Physio Lab C01 SK02 W01 FF04 Corridor Lift Lobby C06 SK01 W03/W07 FF02 Wet Change C02 SK02 W03/W07 FF02 Wet Change C02 SK02 W01 FF04 Consultant room C03 SK01 W01 FF04 Consultant room C03 SK01 E F1 W01 FF10 Living room C02 SK01 W01/W03 FF04/FF05 Kitchen & dining room C02 SK01 W01 FF04 Community House Corridor C02 SK01 W01/W10 FF03 Student support & Study Space C01 SK01 W01 FF03 Security Office C03 SK01 W01 FF03 Reception Office C03 SK01 W01 FF03 Interview 1 C03 SK01 W03 FF05 WC C02 SK02 W01 FF03 Support team base C03 SK01 flooring TBC, pending confirmation if Simbulance has wheels W01/W09 FF05 Stair 1 C05 SK01 W01 FF05 Lobby C06 SK01 7077 dash = extent of LVT dash = extent of FF05 3917 6023 18 0 refer to drawing HWA-AHR-P1-XX-DR-I-40203 refer to drawing HWA-AHR-P1-XX-DR-I-70306 4883 13722 W01 FF09 Corridor C06 SK01 W03 FF09 WC C02 SK04 4410 6000 7899 4176 2400 Floor Type Finish Legend FF01 - Large Format Porcelain Floor Tiles FF02 - Vinyl - enhanced slip FF03 - Carpet Tiles FF04 - Vinyl - general - smooth contract FF05 - Vinyl - safety flooring FF06 - Barrier Matting FF07 - Anti-slip Epoxy Floor Paint FF08 - Anti-slip Tanking Floor Paint FF09 - Porcelain Floor Tiles FF10 - Broadloom Carpet FF11 - Carpet Tiles on Raised Access Floor System FF12 - LVT FF13 - Specalist gait analysis floor system sprint track FF14 - Vinyl - extra slip resistant for commerical kitchen FF15 - Vinyl - for IT / comms etc FF16 - Vinyl - for physio lab (suitable for treadmill etc) Skirting Type Finish Legend SK01 - Hardwood Skirting SK02 - Coved Vinyl Skirting SK03 - Painted MDF Skirting SK04 - Tiled Skirting to match floor tiling Wall Type Finish Legend W01 - Bio-based matt paint (air purifying plants) W02 - Acrylic heavy duty durable matt emulsion paint W03 - Wall tiling W04 - Hygienic wall system W05 - Feature timber wall linning W06 - Feature green wall linning W07 - Moisture resistant emulsion paint W08 - Feature metal clading to accommodation stairs W09 - Exposed architectural smooth concrete with clear sealant W10 - Contract grade abric backed vinyl wall covering Ceiling Type Finish Legend C01 - Acoustic ceiling afts/ planks with exposed deck C02 - Plasterboard Ceiling C03 - 600 x 600 ceiling tiles with perimeter plasterboard margins C04 - 1800 x 600 ceiling tiles with perimeter plasterboard margins C05 - Exposed soffit C06 - Feature open imber batten ceiling with black acoustic leece backing C07 - 600 x 600 metal ceiling tiles (Kitchen) C08 - 600 x 600 coustic eiling with perimeter plasterboard margins Blue dashed lines denotes proposed extent of full height Vinyl Wall Covering and/or Super Graphics. Orange dashed lines denotes proposed extent of full height timber slat wall cladding (W05). Green dashed lines denotes proposed extent of full height Specialist Green/ Living wall (W06) and timber wall cladding. Specialist all inishes Images owned by AHR responsible of modelling, rendering and illustrating First floor finishes drawing. Images owned by AHR responsible of modelling and illustrating
Feature timber veneer surround with rounded corners Wrap around up-holsters padded inner lining Timber veneer table, supported off chrome post Low level double power outlet fitted in seat booth Centrally located switch operated strip LED light fitting 100 250 100 250 250 250 150 1550 2150 450 35 Series -Ceiling Type Legend 35 Series -MEP Equipment
Atrium reception feature green wall elevation drawing. Images owned by AHR responsible of designing, modelling and illustrating
Atrium study pods elevational drawing. Images owned by AHR responsible of designing, modelling and illustrating
Front elevation drawing. Images owned by AHR responsible of designing, modelling and illustrating
Bay study_strip section drawing. Images owned by AHR responsible of designing, modelling and illustrating
Gould Street Residential Blocks
Professional Project in 2020 ( AHR Manchester ) RIBA Stages 2 & 3
Responsibility: Revit modelling/ Bay Study/ Stage 2 drawing packages/ Visulisation
The 2.7-hectare site is line with Manchester City Council’s Northern Gateway initiative and seeks to be a catalyst and exemplar for the rest of the Norther n Gateway. Plot 1 PRS residential development sets between Pomona Wharf and X1 development along the waterside. The proposal contains circa 162 apartments within diverse mix of home types to encourage a wide range of dwelling types.
Images owned by AHR, responsible of modelling and illustrating
Southern Site Section of All Blocks. Images owned by AHR, responsible of modelling and illustrating
General or utility veneer plywood Steel RHS refer to SE design PFC top rail Steel Wall VCL sealed to Roof VCL Cement-bonded particleboard 150mm Parapet Post to SE Design 250 120 68 100 SHS to SE Design
Block Site Section. Images owned by AHR, responsible o modelling and illustrating
Block B brickwork strip section. Images owned by AHR responsible of modelling and illustrating Block A brickwork strip section. Images owned by AHR responsible of modelling and illustrating
Block A Site Section. Images owned by AHR responsible of modelling and illustrating
The
Spine, Royal College of Physicians
Professional Project in 2020 ( AHR Manchester )
RIBA Stages 4
Responsibility: Revit modelling/ M&E coordination/ Stage 4 drawing packages/ Visulisation
The Spine has been informed by the WELL standard, which implements, validates and measures features that support human health and wellbeing. Inside the Spine, as a continuation of the body narrative, the primary structure represents the skeleton with exposed concrete columns moulded to reflect the trabecular system within human bones. The Spine will be a groundbreaking, world-leading example of biophilic architecture, supporting mental and physical wellbeing for staff and visitors.
- -
- - - - - -14th Floor 13th Floor Second Floor First Floor Ground Floor
- - - - -
Typical Cladding and Structure Juction Detail. Images owned by AHR, responsible of modelling and illustrating Reflected ceiling setting out drawing. Images owned by AHR, responsible of modelling and illustrating
Mineral Wool - sound insulation where required Black covering fabric visible between slats Gypsum plasterboard 2 layers of 15mm Gyproc Wallboard + 2mm skimmed finish 50mm between TOS and top of mullion to line timber cladding through 50 200*200mm RHS clad in timber Gypframe Stud - Width dependant on partition type Timber Slats to run vertically up partitionwidth and spacing to match timber slat ceiling 50 200 50 1515 72 1515 30 40
Typical Ceiling and Partition Juction Detail. Images owned by AHR responsible of modelling and illustrating
Large City Architecture in Second Digital Age
Academic Project 2019 (UCL_March Thesis Design )
Responsibility: Concept to detailed design development, Visulisation, Programming
Software: Rhino/ Unity 3D/ C# programming/ Vray/ Adobe Suite
Inspired by Blockchian technology, the project built upon distributed database within Machine Learning framework, responding to second digital turn of architecture. Each architectural element as intelliegent computing machine has open program and self-contained structure to bring diverse spatialuse in architecture. Following the certain physical connections as rule set for machine learning system, the elements autonomously configure the large-scale urban form related to designed spatial connectivity.
Cloud Crematorium
National Competition: TEAM20_2017 (Honorable Mention)
Individual work
Software: Rhino/ Autocad/ Vray
The proposed eco-crematorium uses the technology of promession and artifical cloud as the eco-friendly ways for a sustainable death. After the process of crystallizing body, particles will be collected and transform into cloud; eventually turning into rain back to nature. The building is composed of three loops in clockwise and counterclockwise direction crossing through all levels seperating the beginning and ending of whole funeral. Following the loop along with designed sequential space, people experience the cloud changing formation as a metophor of life vicissitude.
RF/ Farewell Platform 1F/ Thermal Bath Area GF/ Promession Area BF/ Funeral Hall Celling of Walkway Cloud Forming Bottle Farewell Platform Farewell Walkway Farewell Walkway Cloud Forming Ramp Thermal Bath Path to Farewell Platform Entrance of Farewell Path Ash Storage Room Reception Desk Main Hall Water Collecting Area Ash Seperating Room Bone Collecting Room Entry Path to Thermal Bath Hearse Exit Path Hearse Entry Path Cold Storage Entry Path Funeral Hall Path to Ground Family Room Condolence Room Promession Exit Path Promession Entry Path Condolence Entry Path Farewell Exit Path Thermal Bath Exit Path Thermal Bath Entry Path Farewell Platform Entry Path
19. Farewell Path 20. Farewell Platform 21. Cloud Forming Bottle 22.Raining Path 16. Entrance of Spa Floor 17. Thermal Bath Floor 18. Exit from 2nd Floor 8. Path to 1F 9. Bone Collecting Room 10. Ash Seperating Room 11. Hall 12. Main Entry Path 13. Reception Room 14. Entrance of Farewell Path 15. Exit of Farewell Path 1. Hearse Entry Path 2. Cold Storage 3. Funeral Hall 4. Condolence Room 5. Family Room 6. Path to GF 7. Hearse Exit Path