Skip to main content

Hannah Landman Bender Portfolio

Page 1

Hannah Landman Architecture Portfolio


T

1 2 3 4 5

000

J

I

H

G

F

E

D

TOWER LEVEL ROOF 205' - 0" TOWER LEVEL 11 190' - 0" TOWER LEVEL 10 175' - 0" TOWER LEVEL 9 160' - 0" TOWER LEVEL 8 145' - 0" TOWER LEVEL 7 130' - 0" TOWER LEVEL 6 115' - 0" TOWER LEVEL 5 100' - 0" TOWER LEVEL 4 85' - 0" TOWER LEVEL 3 70' - 0" TOWER LEVEL 2 58' - 0" TOWER LEVEL 1 44' - 0" PODIUM RETAIL 2 32' - 0" PODIUM RETAIL 1 20' - 0"

GROUND GRADE 0' - 8" 0" -0'

6 7

C

B

A

00


Brunello

Cucinelli

Professional Work

Summer 2020 - Fall 2021

Snarkitecture Professional Work Spring 2019

Crane

Skyscraper Spring 2017

Refuge Thesis

to Create

Spring 2018

Nobe

Incubator

Mixed Program Fall 2017

Synagogue Public Space Summer 2015

Urban

Playground

Public Space Fall 2013

Table of Contents


1


BRUNELLO CUCINELLI Professional


WALL PER FINISH PLANS AND SCHEDULE

1 8" THICK CONTINUOUS ZINC ANGLE. GLUE AND MECHANICALLY FASTENED TO SLAB BY FLOOR COVERING CONTRACTOR TO BE LEVEL WITH STONE. REFER TO DETAIL 3

WOOD FLOOR PER FINISH SCHEDULE GC TO PROVIDE AND INSTALL SCHLUTER SCHIENE PROFILE, TYP. RECESSED CARPET FLOOR PER FINISH SCHEDULE

*NO BEVELED WOOD BORDER IS TO BE USED NEW CUCINELLI WOOD FLOOR.

ALIGN FLUSH

5 8"

THICK STONE ON THIN SET BASE

TOFF

THIN SET ADHESIVE. CONTRACTOR TO FLOAT FLOOR AS REQUIRED TO ACHIEVE A LEVEL AND ALIGNED FLOOR TRANSITION.

1

NEW WOOD SUBTRATE PROVIDED AND INSTALLED BY GC

EXISTING CUCINELLI N.M STONE NEW FLOORING

NM. STONE FLOOR TO BC NEW WOOD FLOOR 6" = 1'-0"

NEW CARPET SUBSTRATE PROVIDED AND INSTALLED BY GC NEW WOOD FLOOR SUBSTRATE PROVIDED AND INSTALLED BY GC

2

3

1 8"

X 81" CORNER QUIRK MITRE LINE OF FLOOR BORDER

5 8"

FLOOR PER FINISH PLAN AND SCHEDULE

[BS-3-#-GC] 4" BASEBOARD 6" = 1'-0"

NEIMAN MARCUS RECESSED BASE BELOW GYP. BD. PARTITION

AISLE

5/8" GYP. BD. PARTITION BY NEIMAN MARCUS

RECESSED STONE BASE

METAL CHANNEL TO BE PAINTED PT-34

METAL CHANNEL TO BE PAINTED PT-34

3 41" X 5 34" EXTRUDED ALUMINUM CHANNEL WITH TAPABLE FLANGES. SOURCE: FLANNERY INC. 1.800.765.7585

3 41" X 5 34" EXTRUDED ALUMINUM CHANNEL

1/8"

VERIFY

5 8"

5 8" GYP. BD. LINE OF CUCINELLI APPLIED WOOD BASE, FINISH TO MATCH WALLS

FRY REGLET REVEAL 58" X 34" #DRMF-625-75

4

TOFF SEE ELEVATIONS

BC FLOOR TO BC CARPET 6" = 1'-0"

AISLE

P.T.E. METAL DIVIDER FROM KLINE COMPANY, INC. P.O. BOX 80415 ATLANTA, GA. 30366 TELE: 1-800-241-0681

USE SAME MATERIAL AS FLOOR. PROVIDED BY CUCINELLI & INSTALLED BY GC

CARPET PAD PER FINISH SCHEDULE

ZINC DIVIDER NO SCALE

5

RECESSED STONE BASE. CUCINELLI FINISHES ON EXISTING 58" GYP. BD. G.C. TO PAINT WITH WL-PT-1-GC

LINE OF FLOOR BORDER, LIMIT OF CUCINELLI WOOD FLOORING X 81" CORNER QUIRK MITRE

CUCINELLI VENDOR SHOP

1 8"

STONE BASE - CUCINELLI NEUTRAL 3" = 1'-0"

NEIMAN MARCUS RECESSED BASE BELOW GYP. BOARD PARTITION

FLY REGLET REVEAL 5/8" X 3/4"

6

PLAN DETAIL - CUCINELLI NEUTRAL 3" = 1'-0"

GC TO PROVIDE BLOCKING AT BACK OF NICHES TO SECURE THEM IN PLACE

FRYREGLET REVEAL MOULDING # DRM-625-75

PARTITION AS SCHEDULED BLOCKING

CEILING, EXISTING TO REMAIN

1 8"

BRACKET AT TOP OR NICHE BACK.GC TO ATTACH BRACKET TO BLOCKING

X 81" REVEAL (TYP.)

ALL OUTSIDE CORNERS SPLINE AND GLUE 5 8" GYP. BD. CONSTRUCTION

NICHE, TYPTYP NICHE,

NEW LOGO

EDGES TO BE EASED

SIGNBAND

FIELD VERIFY

3 41" X 5 34" EXTRUDED ALUMINUM CHANNEL WITH TAPABLE FLANGES.

N.M. DESIGN & FINISHES

7

FASTEN FRAME TO WALL THROUGH BLOCK BEHIND DOOR STOP, FINISH TO MATCH WALL

NOTE: SEE SPECIFIC MILLWORK DRAWINGS FOR DIMENSIONS & FURTHER INFORMATION

CUCINELLI DESIGN & FINISHES

HEAD-CUCINELLI NEUTRAL FRAME 3" = 1'-0"

8

JAMB DETAIL/ HEAD SIMILAR 3" = 1'-0"

9

BLOCKING DETAIL 3" = 1'-0"


7 A4.1

7'-0 1/8" [214cm]

B.O OF SIGN BAND 9'-0" A.F.F

LOWER OPENING HEIGHT TO 7'-8" TO ALIGN WITH NICHE OPENING

NEW SIGN BAND WITH LOGO BY CUCINELLI, LOGO INSTALLED BY GC

7'-0 1/8" [214cm]

℄

4 11/16" [12cm]

B.O OPENING 11'-0" A.F.F B.O OPENING 10'-0" A.F.F

WL-PT-1-GC

NOTE: ALL MATERIAL SHOULD BE FIRE RETARDANT TREATED ALL FINISHES SHOULD BE APPLIED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS FOR ALL THE PARTICULAR SURFACE ALL PAINT FINISH OF METAL PARTS OF BUCK, DOORS, ETC. SHALL BE SEMIGLOSS ALL WALLS TO BE PROPERLY SPACKLED (MIN 3 COATS) TAPED, SANDED AND PREPARED FOR PAINTING OR TO RECEIVE DESIGNATED FINISH,

9 A4.1

2'-9 1/4" [84cm]

A4.1 5

FLASH PATCH ALL AREAS WHERE FLOOR IS NOT LEVEL OR TRUE PRIOR TO FLOORING INSTALLATION

OPEN TO FITTING ROOM & NM. CASHWRAP

6 A4.1

GC TO INSTALL A 1FT(H) 5 8" FIRE-RATED PLYWOOD STRIP AT 8'-8" HIGH, O.C. AFF, ATTACHED TO WALL FOR MILLWORK SUPPORT. SEE MILLWORK DRAWINGS FOR DETAILS

PER MANUFACTURER REQUIREMENTS INCLUDING BUT NOT LIMITED TO PULLS, CATCHES, LOCKS, HINGES AND ALL OTHER TYPES

3 A4.1

GC TO INSTALL A 1FT(H) 5 8" FIRE-RATED PLYWOOD STRIP AT 8'-8" HIGH, O.C. AFF, ATTACHED TO WALL FOR MILLWORK SUPPORT. SEE MILLWORK DRAWINGS FOR DETAILS

GC TO INSTALL BLOCKING AS NECESSARY FOR MIRROR GC TO ADD DRYWALL TO LOWER OPENING HEIGHT TO 7'8" TO MATCH NICHE OPENINGS

FINISHED FLOOR 0'-0" 2 A2.2

ART

1 A2.2

LIMIT OF CUCINELLI DESIGN & FINISHES

1

1 A2.3

3 A4.1

3 A4.1

B.O OPENING 10'-0" A.F.F

9 A4.1

3 A4.1

9'-5 1/4" [288cm]

T.O NICHE 9'-2" A.F.F

3 A4.1

3 A4.1

3 A4.1

PT-34

DRYWALL PLAN 1/2" - 1'-0"

2" REVEAL AT TOP OF MILLWORK FIXTURES

WL-PT-1-GC

BC-LS-FP1

FIRE-RATED PLYWOOD BLOCKING ON TOP OF WALL BY GC. SEE A-1.0 FOR DIMENSIONS, LOCATION AND DETAILS WL-PT-1-GC

J

BC-LS-FP2

C A4.2

EX. WALLS

PROJECT 1 A2.1

OPEN TO FITTING ROOM & CASHWRAP

BC-LS-N2R

BC-LS-N1S

BC-LS-RSA BC-LS-1MH

BRUNELLO CUCINELLI DRAWING LEGEND SHOP LIMIT

1

1 2" REVEAL AT TOP OF MILLWORK FIXTURES

1

WL-PT-1-GC

WC-1

GC TO INSTALL A 1FT(H) 5 8" FIRE-RATED PLYWOOD STRIP AT 8'-8" HIGH, O.C. AFF, ATTACHED TO WALL FOR MILLWORK SUPPORT. SEE MILLWORK DRAWINGS FOR DETAILS

6 A4.1

2" REVEAL AT TOP OF MILLWORK FIXTURES

EX. NEUTRAL FRAME

8 A4.1

3 A4.1

3 A4.1

3 A4.1

LOWER OPENING HEIGHT TO 7'-8" TO ALIGN WITH NICHE OPENING

1

EX. N.M. FINISHES

SIGNAGE ELEVATION 3/4" - 1'-0"

WL-PT-1-GC

T.O NICHE OPENING 7'-8" A.F.F

3 A4.1

7 A4.1

B.O OPENING 11'-0" A.F.F

3 A4.1

3 A4.1

GC TO INSTALL BLOCKING AS NECESSARY FOR HANG BARS

3 A4.1

7.

9 A4.1

22'-2 7/8" [678cm]

ALL AC CEILING DIFFUSERS, REGISTERS AND CEILING GRIDS SHOULD BE FINISHED WITH THE SAME COLOR ARE BY NEIMAN MARCUS

A4.1 6

ALL MATERIALS SHOULD COMPLY WITH ALL STATE AND LOCAL GOVERNING REGULATIONS

NEIMAN MARCUS WOMENS FASHION ISLAND

EX. FLUSH STONE BASE

ST-1 DATE 01/19/2020

DESCRIPTION PRELIMINARY

FINISHED FLOOR 0'-0"

1

EX. N.M. FINISHES

2"

1

REVEAL

2"

REVEAL

1

6" [15cm]

4. 5. 6.

6 A4.1

2. 3.

5 A4.1

1.

2"

REVEAL

LIMIT OF CUCINELLI DESIGN & FINISHES

2

ELEVATION 3/4" - 1'-0"

SHEET TITLE

DRYWALL PLAN

A-1.1

Sample Drawings and Renderings


2


At Snarkitecture, I was able to work on several different projects. The projects featured are Kith Tokyo, a residential project, and the Chidlom Department Store in Bangkok. Kith Tokyo’s design is inspired by traditional Japanese elements as well as futuristic and “out of this world” ideas. This Long Island residential property, originally designed by Norman Foster, was renovated to keep the integrity of its original design, while introducing a modern touch. The framework of the built-in couch was kept, but the upholstery was modernized with new curvature and texture. Architecture hatches were used as an inspiration for part of the design of the Chidlom Department Store in Bangkok.

SNARKITECTURE Professional


Kith Tokyo Kids Conceptual Render

Custom Couch for Residential Project


Chidlom Department Store Diagrams 1

Chidlom Department Store Diagrams 2


3


Raise Podium

Access

Tower

Amenities

Views

Final Building

Crane, a mixed-use skyscraper, was designed to explore a new language of architecture where land meets water while maintaining a regional, industrial character. Crane’s program includes artist lofts, student housing, amenities, and public spaces such as a museum and a restaurant. The dramatic cantilever houses most of the building’s amenities, such as the gym, the event space, and the student lounge.

CRANE

Educational (group project)


Program public space artist lofts student housing amenities

Materials

Elevation


First Floor Lobby

Typical Apartment Floor Plan Section


4

1. The Souk

A place for makers to display and sell their work. A place for shoppers and tourists to buy new clothing.

2. The Bosque

A place for makers, thinkers, designers, and tourists to stroll, ponder, and gather.

3. The Hearth

A place for makers, thinkers, designers and tourists to gather, sit down, sketch, and enjoy the nature of the Everglades, all while enjoying the warmth of fire pits. Water

4. The Lobby

A place for visitors to gather information and check in if staying over night.

5. The Mound

A place for makers to get away, clear their mind, and create.

6. The Orchard Roads

A place for makers to grow food and products that could be eventually used as natural dye for fabrics. It is also a place to grow palm trees.

7. Motion Center/ Palestra

A place for visitors to work out, enjoy water activities, and to play sports .

8. Primitive Huts

A place for designers to stay overnight, and refuge from the rest of the world. - 21 huts

Open Green Space

9. The Paseo

A place for designers to get lost in the nature of the Everglades without distractions from other visitors.

10. The Thimble

A place for designers, makers, and visitors, to research and discover different textiles, and different design processes.

SITE

11. The Refectory

A place for everyone to enjoy food, while socializing and enjoying the unique views.

12. The Drying Area

A place for makers to hang their hand dyed fabric.


Fashion design has the potential to be a voice for change, becoming a discipline that will make an impact on society and change behavior for the better. Through studying the similarities between fashion and architecture, a fashion designer’s retreat will be designed to help designers create with an eye for doing good. The retreat will create a place out of nothing, and house an institute whose aim is to promote fashion that is sustainable and innovative.

Refuge to Create Academic


The Mound

The Motion Center/ Palestra


The Hearth

The Primitive Huts


The Studio

The Sewing Room

The Embroidery Room


The Labyrinth

The Kaleidescope


5


The Nobe Incubator was designed as part of a larger development. The development was designed as a project that would be viable and vital into the year 2100, having adapted to possible sea level rise. The Nobe Incubator is the center lot in the master plan, therefore was designed as a community center for the new development. The goal was to create a public, supportive building where the community will interact through a market space that is linked to an urban hydroponic system which will provide enough food for the entire population of newly developed, neighboring lots, as well as locals. The building will provide community activity and engage the existing locals by providing affordable work share spaces, accessible incubator retail, and healthy food and activities.

Nobe Incubator

Educational (group project) Study Models


Ground Floor Plan


Tower Floor Plan 1


Long Elevation

3D Section

3D Section


Long Section

Short Section

Short Elevation


6


The Highway Church drawing is an exploratory drawing of the textures used in the Highway Church of Italy. The drawing explores how the textures change in response to the design. The Synagogue was designed with a modern take on the idea of bathing in order to purify one self. It explores public vs. private bathing, as well as separation between man and woman. The plan was designed to emphasize these differences, with separate entrances, as well as a progression of pools from public to private.

Highway Church & Synagogue Educational


7


The Urban playground was designed with a repetition of curved modules that create a series of sand boxes. The modules provide shade, and also have slits to allow plants to grow in them. The module was also designed to provide seating, providing prime sight lines for parents to watch their children.

Urban Playground Educational


Plan


Section


Turn static files into dynamic content formats.

Create a flipbook
Hannah Landman Bender Portfolio by Hannah Bender - Issuu