001_PE_SEPT26 29/07/2026 17:34 Page 1
TO EE FR DE RA ET TH
PROFESSIONAL
ELECTRICIAN THE BUSINESS MAGAZINE FOR THE ELECTRICAL TRADE
& INSTALLER SEPTEMBER 2026
TRUE TO FORUM FORUM LAUNCHES A NEW RANGE OF BHS DECORATIVE LIGHTING
ENTER THE CPD ZONE!
YOU COULD EARN 1 X CPD CREDIT TOWARDS YOUR ANNUAL PROFESSIONAL RECORD
ALSO IN THIS ISSUE: INDUSTRY NEWS ● LIGHTING SPECIAL ● NEW PRODUCTS ● CAUGHT ON CAMERA ● AND MORE
PE Page Grid_Layout 1 27/07/2026 14:50 Page 1
003_PE_SEPT26_Layout 1 03/08/2026 14:23 Page 3
Total Average Net Distribution: 92,786 Certification period: 1 January 2025 - 31 December 2025
September 2026 Volume 42 No.8
Software & Apps
33
91
Are AI-powered tools helping electricians to build stronger businesses and relationships?
94
How Tradefox’s latest training simulator is helping electricians prepare for the hidden dangers of PME networks
97
From instant calculations to CPD records, what are the features electricians are relying on daily?
98
Why the call you didn’t hear is often the job you didn’t get
Regulars 7
VIEWPOINT
9
NEWS
23 THE TRAINING GROUND 23 ASK OVIA 63 ELEX PREVIEW
An electrician who is achieving ‘cold feats’
64 MADE 2 MEASURE 129 CAUGHT ON CAMERA
55 What effect can diversity have on the maximum demand of an installation?
COVER STORY 20 Forum Lighting Solutions unveils
100 How feedback from users is helping to shape the CPD Progress Tracker App
59 The requirements of BS 7671 when routing and concealing cables within a building’s fabric
a new iconic BHS decorative lighting brand
102 Why one spark’s frustrations with disconnected software inspired him to build an all-in-one business platform for electrical contractors
Lighting Comment & Special Reports
66 Why choosing the right LED strip system can be far easier than many installers expect
25 Should public safety be the first principle in any national rollout of plug-in solar PV?
68 How Kinetic lighting controls are
33 We catch up with an electrician who continues to achieve cold feats
37 Why WAGO believes automation will play a big part in the future
The CPD Zone 42 The team at NAPIT give our
104 What was the thinking, development and feedback that led to the launch of Cable Bug?
redefining wireless switching
29 What do the latest competence regulatory requirements mean for electrical professionals?
Products & Business Solutions
71
Why does listening to the industry remain at the heart of the Lumineux’s plans for growth?
74 Is lighting the retrofit market’s
106 Taking a closer look at four of Electrorad’s hottest electric heating solutions
108 What’s changing on the EV
best kept secret?
charging landscape?
76 How a co-ordinated range is making outdoor lighting specification and installation simpler
78 Exploring a smarter approach to battery-compatible site lighting
111
Could protecting the point of ignition redefine electrical safety as we know it?
112 Introducing a practical playbook
reader submissions the ‘Codebreakers’ treatment
80 Do you know how to use accent
to help others navigate the complexities of estimating
45 Clarifying the difference between
114 Debunking some key EV myths
the various terms used to describe the current-carrying capacity of conductors
lighting to provide that extra ‘wow’ factor?
83 The Ovia Inceptor Milli downlight
116 Does Live Electrical Distribution
48 Dr Zzeus, Tom Brookes, responds
84 Steve Hewish takes the ROBUS
to another fire-safety-related reader query
50 Why taking a few extra minutes to verify Type B RCD DC tripping performance could enhance electrical safety
52 The experts at NICEIC answer more frequently asked questions
UK offer more than you realise?
is put under the spotlight VEGAS LED strip range for a spin
117 Which products have been specified, and where?
119 Rounding up the newest
86 Can you benefit from a more
products, tools and equipment to help you with your work
flexible approach to lighting switches and control?
88 How has innovative use of
Prize Draws
lighting controls helped transform a compact Brighton courtyard into a private urban oasis?
19 WIN! Get your hands on a Repenic premium smart switch bundle
PROFESSIONAL ELECTRICIAN September 2026 3
PE Page Grid_Layout 1 29/07/2026 09:59 Page 1
PE Page Grid_Layout 1 29/07/2026 10:00 Page 2
PE Page Grid_Layout 1 24/07/2026 10:31 Page 1
007_PE_SEPT26_Layout 1 30/07/2026 14:23 Page 7
@proelectrician
professionalelectrician
Meet the team Editor RICHARD BOWLER email: pe@hamerville.co.uk Digital Manager REBECCA MCGEOCH email: rmcgeoch@hamerville.co.uk Digital Assistant ADAM ROBERTS email: aroberts@hamerville.co.uk Advertisement Manager ANTHONY SCOTT email: ascott@hamerville.co.uk Assistant Advertisement Manager IAN TURNER email: ianturner@hamerville.co.uk Design GEMMA WATSON Production Assistant KERRI SMITH Group Production Manager CAROL PADGETT Distribution Manager KARL CLARK Printed by: PCP TELFORD Published by: HAMERVILLE MEDIA GROUP Regal House, Regal Way, Watford, Herts, WD24 4YF Tel: 01923 237799 Fax: 01923 246901 Email: pe@hamerville.co.uk PROFESSIONAL ELECTRICIAN is the business journal for the electrical contracting industry. It is available to the trade at leading electrical wholesalers throughout the UK. © 2026 Subscriptions to PROFESSIONAL ELECTRICIAN are available. Please contact us for rates.
Image References (Adobe Stock): Pg 26 Solar Panels © ShStock Pg 29 Magnifying Skills © Patpitchaya Pg 41 CPD Sign © TreenaBeena
pe@hamerville.co.uk
Professional Electrician, Regal House, Regal Way, Watford, Herts, WD24 4YF
Editor’s Viewpoint
Would MPs pass the ‘competence’ test? There’s an interesting concept gaining greater prominence in the electrical industry at the moment. It’s called competence. You may even have heard of it :) Its principle is grounded in the fact that, just because someone can call themselves an electrician, or has a particular qualification, it doesn’t automatically mean they’re competent to carry out every conceivable type of electrical work. As the industry embraces specialist technologies such as solar PV, battery storage and EV charging, greater emphasis is being placed on proving that the individual carrying out the work has the knowledge, skills and experience required for that specific task. Radical stuff, isn’t it? Apparently, if you’re going to make important decisions, take responsibility for something and potentially affect the safety of others, you should be able to demonstrate some idea of what you’re doing. Which got me thinking: perhaps someone should send a copy of the new competence requirements to Westminster. Because while electrical businesses are increasingly expected to prove that the right person is doing the right job, government appears to operate a slightly different system. There, you can seemingly be handed responsibility for an entire department on Monday, spend Tuesday learning where the toilets are and, by Friday, be reshuffled into another role covering a subject about which you know equally little. Today, you’re overseeing transport. Tomorrow, energy. Next week? Who knows. Health? Education? Defence? Stick your hand in the tombola and see what comes out. No competence matrix, practical assessments or CPD records required. Just a new office, another red box and a team of civil servants quietly explaining how everything works. Imagine applying the same approach in the electrical industry: “Morning, Dave. I know you’ve spent 20 years doing domestic rewires, but we’ve decided you’re designing a large-scale battery storage system today. Here’s the manual. Best of luck.”
You, your customers and the industry as a whole just wouldn’t accept it. And, increasingly, the regulatory framework won’t either. Yet when it comes to running the country, we seem remarkably comfortable with the idea that changing someone’s job title automatically downloads all the necessary knowledge into their brain overnight. Perhaps Whitehall could borrow a few ideas from the electrical sector. Before taking responsibility for a department, ministers could demonstrate relevant knowledge, skills and experience. Where gaps exist, training could be provided. Those new to the role could operate under suitable supervision and their competence could be periodically reviewed. We could even introduce a Ministerial Competence Scheme, though, admittedly, getting enough people through the initial assessment could delay implementation. Of course, working in government isn’t the same as skilled electrical work. Ministers are there to make political decisions, supported by civil servants and specialist advisers. Nobody expects the Transport Secretary to service a train or the Energy Secretary to wire an inverter. But the underlying principle still applies. Responsibility should be matched by capability, and the greater the consequences of your decisions, the stronger the argument that you should understand the subject. That’s why the electrical industry’s increased focus on individual competence should be welcomed. Yes, it will bring additional responsibilities and, inevitably, paperwork. But the principle is difficult to argue against. Being an electrician shouldn’t mean being considered competent to do everything electrical simply because of the title on your business card. Perhaps those running the country could learn something from that. Have a good month and enjoy the issue.
Richard B owler PROFESSIONAL ELECTRICIAN September 2026 7
PE Page Grid_Layout 1 24/07/2026 10:32 Page 1
009_PE_MAY26_Layout 1 30/07/2026 14:40 Page 9
news @proelectrician
For the latest electrical news visit www.professional-electrician.com
professionalelectrician
pe@hamerville.co.uk
Professional Electrician, Regal House, Regal Way, Watford, Herts, WD24 4YF
NICEIC unveils remote EV charging course NICEIC has launched a new tutor-led remote training course designed to help electrical contractors gain a recognised electric vehicle charging point (EVCP) qualification without the need to attend a training centre. The one-day Level 3 Award in the Requirements for the Design and Installation of Domestic and Small Commercial Electric Vehicle Charging Installations (2921-34) is accredited by City & Guilds and remotely invigilated. Sessions are delivered in real time by experienced tutors, allowing learners to ask questions and receive immediate feedback
while developing their knowledge and competence in EV charge point installation. Alex Robinson, Head of Training at NICEIC, said: “With consumer demand for electric vehicles continuing to grow, we’re seeing real-world electrification become a defining theme for the year ahead. “In 2025 alone, EV sales rose by 28%, with around one in three new cars sold now fully electric. That pace of change means we need more contractors competent in the technology to meet demand and enable the roll-out. “Our focus is to make high-quality training more accessible to electrical
contractors across the UK. This course allows us to reach those who may not be able to travel to a training centre, while still delivering the tutor-led experience that supports real understanding and competence.” GET MORE INFORMATION OR SECURE A PLACE ON A FUTURE COURSE AT: WWW.RDR.LINK/ECB001
New guidance published on competence requirements The Building Safety Regulator and the Ministry of Housing, Communities and Local Government have published new guidance setting out the Mandatory Technical Competence (MTCs) requirements for self-certification schemes. The new framework helps scheme operators assess whether installers have the right skills, knowledge, experience and behaviours to carry out and certify
work safely and competently. The MTCs aim to create a more consistent approach to competence across the sector, while keeping pace with changes in regulation, standards, industry practice and technology. The framework covers several areas of work, including electrical, air conditioning, plumbing and heating, insulation, roofing, fenestration, gas, liquid fuel, and solid fuel and biomass.
It’s a useful read for anyone involved in competent person or self-certification schemes, particularly as expectations around competence continue to develop. Check out the article on pages 29 and 30 to find out more about what it means for you and your business.
ESR releases EICR Fact Sheet for tenants The Electrical Safety Roundtable (ESR) has launched a new EICR Fact Sheet designed to help tenants better understand electrical safety checks carried out in their homes. While an EICR provides important information about the condition of an electrical installation and any investigative or remedial work required, the technical nature of the document can make its findings difficult for tenants to interpret. To help improve understanding, the ESR’s Electrical Safety in Social Housing
The resource explains what an EICR is and the difference between satisfactory and unsatisfactory outcomes. It also provides information on C1, C2, C3 and FI classification codes, alongside examples of observations tenants may encounter within a report.
Sub-Group has developed a fact sheet that landlords can provide to tenants alongside their EICR, giving them a better understanding of the inspection’s findings.
VIEW AND DOWNLOAD THE EICR FACT SHEET FOR TENANTS BY VISITING: WWW.RDR.LINK/ECB002
PROFESSIONAL ELECTRICIAN September 2026 9
009_PE_MAY26_Layout 1 30/07/2026 14:48 Page 10
news @proelectrician
For the latest electrical news visit www.professional-electrician.com
professionalelectrician
pe@hamerville.co.uk
Professional Electrician, Regal House, Regal Way, Watford, Herts, WD24 4YF
SkillELECTRIC 2026 UK finalists announced The eight electrical apprentices who scored highest across this year’s SkillELECTRIC national qualifying heats have been named as the 2026 UK finalists. They consist of: Jessica Lott – UCS College Group (Bridgwater)/Jowett & Jowett Lee McLean – SECTT/Adlib Rhys Howey – SECTT/WPP Electrical Ryan Whitford – SECTT/NG Bailey Sam Chadderton – Hopwood Hall College/Isolate Electrical Scott Drew – HM Royal Engineers Tanvir Singh – Leicester College/C&B Electrical
Will Boyer – Blackburn College/Paul Wilson Electrical and Renewable Energy Solutions The finalists will compete in the SkillELECTRIC UK Final at Bridgend College during the week commencing 16th November. Around 50 other WorldSkills UK national competition finals will also take place across venues in South Wales that week, involving more than 400 competitors. Organised by industry charity National Electrotechnical Training (NET), SkillELECTRIC forms part of the WorldSkills UK competition framework.
To be crowned SkillELECTRIC champion, the finalists will need to complete a challenging two-day practical installation task within a strict timescale and against rigorous marking criteria. Eligible competitors who perform strongly could also have the opportunity to represent the UK in the Electrical Installation competition at WorldSkills 2028 in Japan. GET MORE INFORMATION ON SKILLELECTRIC AT: WWW.RDR.LINK/ECB003
Frank Bertie retires as NAPIT MD Frank Bertie has retired from his role as Managing Director of NAPIT following more than 34 years with the organisation. Having served as Technical Director for more than 32 years before becoming Managing Director two years ago, Frank has played a key role in shaping NAPIT’s technical direction, supporting members and helping to raise standards across the electrical industry. His career in the sector began after watching electricians rewire his family home at the age of 14 sparked an interest in the trade. Frank went on to
study Electrical and Electronics at a local technical college before securing an apprenticeship with a local firm. Beginning his career working to the 14th Edition of the Wiring Regulations, he would later contribute to the development of the 18th Edition.
Reflecting on his time with the organisation, Frank said: “It’s been a pleasure working at NAPIT – the staff are a great bunch who are always willing to help each other. NAPIT is all about the people.” Although stepping away from his full-time position, Frank will continue his long association with NAPIT in a consultative role, providing technical knowledge and support to the organisation. Stephen Melton has stepped up from his position as Commercial and Compliance Director to become Managing Director, having joined NAPIT in 2019.
Strengthen your safety knowledge Martindale Electric has introduced a new Safe Isolation Procedure video, providing a practical step-by-step guide to carrying out safe, compliant electrical isolation. Presented by Martindale safe isolation expert Glenn Patullo, the video covers every stage of the process, from obtaining permission and completing risk assessments to proving a circuit is live, isolating and locking off, proving dead and re-proving the voltage indicator. It 10 September 2026
also explains the importance of checking exposed metalwork for live voltages. The guide demonstrates the correct lockout/tagout process and the required testing sequence for single and three-phase systems. It also highlights why multimeters and non-contact voltage detectors shouldn’t be used for proving dead. It also outlines the correct procedure for safely re-energising circuits once work is complete.
PROFESSIONAL ELECTRICIAN
WATCH THE VIDEO IN FULL AT: WWW.RDR.LINK/ECB004
PE Page Grid_Layout 1 24/07/2026 10:35 Page 1
009_PE_MAY26_Layout 1 30/07/2026 14:53 Page 12
news @proelectrician
For the latest electrical news visit www.professional-electrician.com
professionalelectrician
pe@hamerville.co.uk
Professional Electrician, Regal House, Regal Way, Watford, Herts, WD24 4YF
ESF introduces new ‘one-stop shop’ website Electrical Safety First has launched a new website bringing together electrical safety information, practical tools, technical guidance and industry resources in a single online platform. Designed for consumers, electricians and other industry stakeholders, the website includes an upgraded ‘Find an Electrician’ tool incorporating live data feeds from five recognised industry certification bodies – NICEIC, MCS, Flexi-Orb, SELECT and Blue Flame Certification. The site also features a new interactive Units Calculator, designed to help users better understand electrical consumption and energy use. For electrical professionals, a dedicated Resources for Electricians section provides access to a library of free technical guidance and training
materials developed in collaboration with more than 15 industry organisations. Resources include Best Practice Guides covering a range of electrical installation topics, guidance produced by the Wiring Regulations Advisory Group, an Amendment 4 Pocket Guide and access to the Apprentice Channel of Excellence training video platform. Customised experience Accessibility has also been incorporated into the website’s design, with an integrated toolbar allowing users to customise their browsing experience, alongside a translation tool designed to make electrical safety information available to a wider audience. The website was developed following two rounds of user testing involving 28
participants, including members of the public, electricians and accessibility testers. Feedback was used to inform its structure, navigation, design and content. Rory Carroll, Communications Director at Electrical Safety First, said: “By bringing together expert advice, practical resources and industry-leading guidance in one place, this website is the UK’s go-to destination for electrical safety information.” VISIT THE NEW WEBSITE AT: WWW.RDR.LINK/ECB005
009_PE_MAY26_Layout 1 30/07/2026 14:57 Page 13
Thorlux Lighting celebrates 90 years at the forefront of UK luminaire manufacturing UK-based lighting manufacturer Thorlux Lighting has marked its 90th anniversary throughout the summer with charity events and the opening of a refreshed visitor centre at its Redditch, Worcestershire headquarters. As the company continues to innovate and works towards a validated net-zero target, its future remains bright. Founder Frederick William Thorpe first manufactured Thorlux luminaires in 1936. Based in a small factory in Small Heath, Birmingham, the company initially made vitreous enamelled steel reflectors. This was the beginning of a journey
that would see Thorlux grow into a globally recognised manufacturer of luminaires and lighting control systems, becoming the largest company in the FW Thorpe Group. Thorlux has installed a spinning lathe used since the 1930s as the centrepiece of its refreshed Thorlux Application Centre. The centre also includes an improved Emergency Lighting Experience, providing guests with a realistic, educational power failure escape scenario. Thorlux remains at the forefront of modern UK luminaire manufacture, with multi-million-pound investments in
advanced technology at its Redditch factory. The company still proudly makes over 90% of its products in the Midlands, employing 500 people locally. Thorlux specialises in energy-efficient, sustainable products, and is working towards achieving Net-Zero emissions by 2040. Mark Stevenson, Marketing Lead at Thorlux, said: “90 years is a major milestone for Thorlux. As a proud UK manufacturer, it is important to reflect on our accomplishments so far – from pioneering energy-saving controls to relighting the clock faces of Big Ben – while keeping our eyes on the future. The best is still to come!”
PE Page Grid_Layout 1 28/03/2026 09:32 Page 1
009_PE_MAY26_Layout 1 30/07/2026 14:59 Page 14
news @proelectrician
For the latest electrical news visit www.professional-electrician.com
professionalelectrician
pe@hamerville.co.uk
Professional Electrician, Regal House, Regal Way, Watford, Herts, WD24 4YF
Joy of BEX as new Group consolidates specialist brands LED GROUP has announced the launch of BEX Group, Building Electrification Experts, as its new identity and platform for building electrification and sustainable energy solutions. Bringing together trusted specialist electrical power brands, including ROBUS, FuseBox and ATC, under the BEX Group brand will strengthen the firm’s leading position in the electrification and sustainable energy solutions sector. Operating across lighting, circuit protection and electric heating, the company supports residential, commercial, and industrial projects across more than 40 countries worldwide. The launch comes as electrification and energy efficiency become the core themes of built environment, driven by tightening regulation, rising energy costs and growing demand for low-carbon infrastructure. By unifying its brands under a single platform, BEX Group is positioned to serve customers and contractors with greater consistency, scale and specialist depth.
Headquartered in Dublin, BEX Group employs more than 300 people across its international operations, with offices, warehouses, and logistics spanning Europe, the Middle East, and Australasia. Mick G. Slein, CEO of BEX Group, said: “The launch of BEX Group represents an important milestone in the evolution of our business and reflects the scale of our ambition for the future. “Over more than four decades, we have built trusted brands, strong customer relationships, and deep expertise across the electrical sector. Bringing ROBUS, FuseBox and ATC together under the BEX Group identity creates a stronger platform for growth, innovation, and future acquisitions. “Electrification is one of the most significant trends shaping the built environment, and we believe BEX Group is uniquely positioned to support that
transition through specialist expertise, long-term investment, and a continued focus on our customer needs.” The Group’s products and solutions are developed around real contractor insight and practical application, ensuring products are reliable, easy to install, and designed to perform on-site. The launch follows a period of significant growth for the business, including the acquisition of FuseBox in 2023, the acquisition of ATC in 2025, and continued investment in international infrastructure, customer support, and operational capability to facilitate the future growth of the Group. GET MORE DETAILS ABOUT BEX GROUP AND ITS SPECIALIST BRANDS AT: WWW.RDR.LINK/ECB006
009_PE_MAY26_Layout 1 30/07/2026 15:06 Page 16
news @proelectrician
For the latest electrical news visit www.professional-electrician.com
professionalelectrician
pe@hamerville.co.uk
Professional Electrician, Regal House, Regal Way, Watford, Herts, WD24 4YF
Super Rod hosts debut Elite Testers Conference Super Rod has held its first Elite Testers Conference, welcoming testers, partners and friends of the business for a day of conversation, collaboration and celebration. For Super Rod, the day was about putting its values into action: Listen, Innovate and Deliver. The testers who attended are at the heart of how Super Rod's products get better – their feedback shapes what the company builds next. Bringing everyone together in person, many for the first time, was Super Rod's way of listening more closely, celebrating that collaboration, and saying a proper
thank you. Colleagues from Klein Tools Europe also joined the day, adding an extra value to the proceedings and reflecting how closely the Klein Tools family works together. The day didn't stop when the formal programme wrapped up. Guests headed to Retroids Arcade Bar in Worcester for a chance to unwind and get to know each other outside of the conference room. The following day, everyone was welcomed to The Happy Electrician workshop for more hands-on time together, rounding off a memorable event. “We were thrilled to host our friends
and partners for this first Elite Testers Conference,” said Vanessa Molloy, Head of Sales & Marketing at Super Rod. "Thanks to every one of our testers for your collaboration, your commitment, and for sharing the best moments with us.” BROWSE SUPER ROD’S RANGE OF PRODUCTS AND SOLUTIONS AT: WWW.RDR.LINK/ECB007
WAGO launches prize promotion WAGO is giving UK electricians the chance to win thousands of pounds’ worth of prizes through its new Click, Click, Win! online promotion. Running until 31st October, the campaign is open to qualified UK electricians and those registered with recognised industry bodies including NICEIC, NAPIT, OFTEC, BESCA, Blue Flame Certification and ELECSA. Designed to reward existing customers while introducing more installers to WAGO's connection
technology, the promotion is free to enter. Participants simply visit the Click, Click, Win! webpage, enter their details and complete an interactive memory game for the chance to win instant prizes or gain entry into monthly prize draws. Monthly entries are carried forward throughout the campaign, increasing participants' chances of winning. Prizes include more than 1,300 instant-win vouchers, alongside star prizes such as a PlayStation 5 Pro, Samsung 65-inch 8K TV, Apple
smartwatch, Bose headphones, a £5,000 TUI holiday voucher and a year's supply of WAGO connectors and tooling. ACCESS THE PROMOTION WEBSITE AT: WWW.RDR.LINK/ECB008
BEAMA guide supports safer switchgear specification BEAMA's Low Voltage Switchboard and Busbar Systems (LSBS) Group has published a new guide to help professionals specify and procure low-voltage switchgear and controlgear assemblies more effectively. As electrical distribution systems become increasingly demanding, the new 16 September 2026
publication, Specifying a Low-Voltage Switchgear and Controlgear Assembly, provides practical guidance to help ensure assemblies comply with relevant standards and are suitable for their intended operating conditions. Designed to complement the BS EN IEC 61439 series, the guide highlights key considerations including conformance, design verification, environmental conditions and marking requirements.
PROFESSIONAL ELECTRICIAN
Aimed at specifiers and procurement teams, the publication encourages informed decision-making that supports the safety, efficiency and reliability of electrical installations.
ACCESS AND DOWNLOAD THE GUIDE AT: WWW.RDR.LINK/ECB009
PE Page Grid_Layout 1 24/07/2026 10:51 Page 1
PE Page Grid_Layout 1 29/07/2026 09:21 Page 1
019_PE_SEPT26_Layout 1 30/07/2026 14:26 Page 19
PRIZE DRAW
WIN A PREMIUM SMART SWITCH! To celebrate the September launch of its new smart switch range, Repenic is offering five lucky readers the chance to win a premium smart switch bundle – a total prize value of £700+. Exclusive discount coupons will also be available to entrants to explore the wider Repenic smart wiring accessories range.
I
n many people’s minds, smart products still mean white plastic boxes, while beautifully designed switches are often assumed to be good-looking, but limited inside. Repenic was created to break that stereotype. Small details can change the way a home feels. Switches, dimmers and sockets are used every day, yet they are often treated as purely functional. Repenic brings smart home technology and interior design together in one co-ordinated wiring accessories range, proving that intelligence and aesthetics do not have to be separate. The range includes smart toggle switches, rocker switches, dimmers and sockets, designed for modern homes, refurbishments and professional projects. Across the range, familiar operation is combined with App and voice control,
independent energy monitoring, OTA updates and built-in safety protection, giving users smart functionality without losing the feel of traditional controls. Designed to fit standard UK 25 mm back boxes, Repenic products are practical to install and visually consistent throughout the home. Get more details on the full Repenic range by scanning the QR code, visiting: www.repenic.com or checking out the advertisement on page 82 in this issue.
HOW TO ENTER ENTER THE FREE PRIZE DRAW TO WIN A REPENIC SMART SWITCH BUNDLE BY FILLING OUT THE CONTACT FORM AT: WWW.RDR.LINK/ECB010 Deadline for entries: 10/10/2026. Usual T&Cs apply.
W IN PROFESSIONAL ELECTRICIAN September 2026 19
020_PE_SEPT26_Layout 1 30/07/2026 15:37 Page 20
COVER STORY Steve Kaye, Sales & Marketing Manager at Forum Lighting Solutions, introduces the company’s new iconic BHS decorative lighting brand.
MAKE YOURSELF AT HOME
A
t Forum Lighting Solutions, we’re rolling out an extensive new catalogue of BHS decorative lighting to the wholesale electrical market, marking a significant expansion of our offering and bringing high-quality interior design directly to trade counters, and electrical professionals, nationwide. Through this major new range of decorative lighting products, launched under the prestigious and instantly recognisable BHS name, we’re giving electrical installers the opportunity to capture a larger share of the lucrative decorative lighting market while providing their customers with access to a trusted household brand. Celebrating a century of British design legacy By introducing the BHS label to our portfolio, we’re bringing almost a century of retail heritage directly to the electrical trade channel. Founded in London in 1928, British Home Stores was built on a simple purpose: to offer well-designed, affordable products for everyday living. Throughout the 20th century, BHS grew into one of the UK’s most trusted high-street
20 September 2026
reimagining it for modern living, bringing high-street design directly to the wholesale trade counter.
department store brands. Celebrated for making good design accessible, its homeware and lighting ranges became fixtures in generations of British households, earning an enduring reputation for reliability and timeless appeal. While the physical high-street stores closed their doors in 2016, marking the end of a retail era, the emotional connection customers had with the brand remained incredibly strong. Today, British Home Stores lives on as a heritage-led homeware and lighting brand, rooted in its long-standing values of quality, timeless design and attainable style. Through our partnership with BHS, we’re building on that legacy and
PROFESSIONAL ELECTRICIAN
Six distinct styles for modern living We’ve carefully curated the new BHS range into six distinct style families, each designed to cater to evolving consumer tastes. For high-impact glamour, All That Glitters features dramatic crystal elements, polished chrome and statement chandeliers. The Showhome collection, meanwhile, delivers a polished, aspirational look through oversized glass pendants, sleek velvet textures and neutral palettes. For those seeking a more nostalgic interior, Mid Century channels the sophistication of the 1950s and ’60s through clean geometric lines, warm brass tones and iconic orb styling. For minimalist functionality, Scandi combines pale woods, matt finishes and soft monochromatic tones to create calm, light-filled spaces. Our Heritage collection introduces vintage British elegance through timeless antique brass finishes, sophisticated ribbed glasswork and classic silhouettes that bring period character to traditional homes. Finally, Country captures modern farmhouse charm and rustic tranquillity by
020_PE_SEPT26_Layout 1 30/07/2026 15:39 Page 21
layering natural materials such as woven rattan, exposed wood and cracked ceramic textures to create a warm, wholesome and beautifully lived-in feel. By offering such a diverse selection of styles, we’ve made it easier for contractors and homeowners to find the perfect decorative lighting solution for almost any interior project. Unrivalled trade support and availability We understand that, in the fast-paced electrical trade, product availability is everything. That’s why we’re backing this major launch with the logistical support our customers expect from Forum, helping wholesalers and contractors avoid the long factory lead times often associated with high-end decorative lighting. We’re fully stocking every item in the new BHS decorative range at our central distribution hub, with orders available for immediate dispatch and guaranteed next-day delivery. This means trade professionals can keep their projects moving forward without unnecessary and costly delays. To support the launch, we’ve also produced a comprehensive, beautifully designed 96-page dedicated catalogue.
Far from being a standard technical manual, it’s packed with inspirational lifestyle imagery and has been created as a powerful counter-top selling tool. Installers can use the catalogue when sitting down with homeowners, helping customers to visualise exactly how individual fittings could look in-situ and making the product selection process easier. The complete BHS decorative lighting range, alongside our wider portfolio, can also be viewed through our website, where customers can place orders directly via our dedicated online portal. A complete, one-stop lighting portfolio While we’re incredibly excited about the launch of the BHS decorative range, it doesn’t replace our core identity. Instead, it complements the established and trusted product families that have made Forum a staple brand on wholesale shelves for many years. Trade professionals can continue to rely on Kinetic for wireless, battery-free switching solutions that can help revolutionise installation times, while Zink Outdoor provides sleek, architectural garden lighting designed to withstand the elements. For more specialised environments, our Spa Bathroom range provides IP-rated, safety-compliant fittings engineered for damp environments without compromising on style. Coast Outdoor, meanwhile, offers long-lasting, corrosion-resistant fixtures designed to withstand harsh, salty coastal air. We complete our portfolio with Culina Kitchen, featuring high-output task lighting, under-cabinet arrays and track systems tailored to the demands of modern cooking spaces. Together with the new BHS decorative range, these established product families allow us to provide wholesalers and installers with a comprehensive, one-stop lighting portfolio that covers a huge variety of applications and environments. The BHS range by Forum is now officially available to order, and we’re excited to see it bringing something new to trade counters, as well as brightening up homes across the UK. BROWSE THE FORUM BHS DECORATIVE LIGHTING RANGE AT: WWW.RDR.LINK/ECB011
PROFESSIONAL ELECTRICIAN September 2026 21
PE Page Grid_Layout 1 24/07/2026 10:53 Page 1
023_PE_SEPT26_Layout 1 30/07/2026 14:30 Page 23
THE TRAINING GROUND I don’t have a Level 2 electrical qualification but I have over 10 years’ experience in the trade. Can I do the Experienced Worker Assessment? Potentially yes, if you can pass what is known as the EWA Entry Test. If you have developed extensive knowledge on-site over the years, but don’t meet the EWA entry criteria of holding a Level 2 theory qualification, the EWA Entry Test is now available for those with substantial practical experience and technical understanding to demonstrate their proficiency to the required standard before embarking on the EWA. Before you start, you must ensure you’re suitable for the Experienced Worker Assessment – don’t risk wasting your money by not completing it. This means reviewing the EWA ‘Skills Scan’ to confirm you: ● Currently carry out the full scope of work required, ● Have sufficient practical experience, ● Can generate the workplace evidence required
within the 18-month assessment period. If you believe you’re eligible but don’t hold a Level 2 theory qualification listed in the Skills Scan, providing you have significant work experience, typically 10 years or more, you can consider taking the EWA Entry Test. We recommend reading the test coverage information on the EWA website to confirm you understand the underpinning knowledge of electrical science and principles expected at this level. It’s a Level 3 test with 50 questions covering electrical practices, theory, design principles and the wider technical understanding expected of a qualified electrician. Tests are delivered during scheduled assessment windows throughout the year, and you’ll need to attend a training centre in person to sit the test. If you pass the Entry Test, you must enrol onto the relevant Experienced Worker Assessment within six months. VISIT THE EWA WEBSITE FOR MORE INFORMATION AND SUPPORT AT: WWW.RDR.LINK/ECB012
Q. I’m working on sites where bollards keep getting knocked, bent or vandalised, and clients are fed up with constant replacements. Is there an exterior bollard on the market that can handle impact, reduce maintenance callouts, and still offer flexible lighting options? When you’re upgrading outdoor lighting on commercial or residential sites, durability isn’t just a nice to have – it’s the difference between a fitting that lasts and one that becomes a maintenance headache. Ovia’s Beelo Bollard has been engineered specifically with that installer reality in mind, and its standout feature is the optional impact absorbing base. This accessory is a genuine problem-solver on sites where bollards are vulnerable to knocks, scrapes or outright vandalism. The base incorporates a built in spring mechanism that allows 360° impact absorption and enables the bollard to tilt up to 30° upon impact and then return to its original upright position. That translates to fewer call-outs and replacements for installers, and a lighting scheme that stays intact, even in high traffic or high risk areas such as car parks, retail environments and office complexes. The Beelo Bollard’s modular design also makes life easier on-site. Each head – Flat, Domed, Cone or Louvered – is prewired with a Unicrimp Q Nect IP68 connector and supplied with cable and lever connectors for quick, safe, waterproof connection. Swapping a head takes seconds: three screws out, align, reattach. Performance-wise, Beelo delivers serious output: up to 3600 Lm, 144 Lm/W efficacy, CCT switchability (3000K/4000K/6000K) and power switchability (14 W/19 W/24 W), all in an IP65, IK08 housing built for real world conditions.
ECB013
PE Page Grid_Layout 1 24/07/2026 10:55 Page 1
025_PE_SEPT26_Layout 1 30/07/2026 15:34 Page 25
COMMENT
“A RUSHED ROLLOUT COULD WEAKEN CONFIDENCE” hilst we support wider access to cheap and clean energy, plug-in solar PV units should only enter the mass market once the necessary regulatory, technical and product safety framework is fully in place. Without that foundation, there’s a serious risk of avoidable hazards in homes, uncertainty for the electricity system, and lasting damage to public confidence in the energy transition. As organisations representing electrical safety, engineering standards and technical competence across the electrotechnical sector, we believe there are serious issues that must be addressed before any mass-market adoption. We’re urging government to proceed with caution and ensure that safety, product assurance, competence and system resilience are designed into any rollout from the outset.
W
Public safety shouldn’t be a secondary consideration It remains unclear how plug-in solar panels will interact with the millions of existing electrical installations in UK homes, particularly in older properties where this wiring may have deteriorated, the operation of uni-directional RCDs (residual current device) and RCBOs (residual current circuit breaker with overcurrent protection) may be affected, and maintenance may have been inconsistent. A product marketed as simple and consumer-friendly could in practice be connected to electrical installations that were never assessed for this type of product. In such cases, there could be an increased risk of fire and danger to life due to the inability of the circuit to deal with the importation of power.
As the potential adoption of plug-in solar PV units continues to create debate, a group of leading industry authorities – consisting of ECA, ESF, IET, NICEIC and SELECT – explain why public safety must be the first principle in any national rollout.
There are six public safety issues:
flow – Generating 1 Bi-directional and consuming electricity isn’t the same Plug-in solar PV units operate differently to the conventional appliance plugged into an electrical installation. Rather than just supplying power to an appliance, with plug-in PV units, the installation now has to import power, meaning that power flow is in both directions. This introduces technical issues that leave most homeowners unaware of the dangers. With electrical sources being applied to
what we often refer to as the ‘load side’ of protective devices, Amendment 3:2024 to BS 7671:2024 addressed this very issue. Under certain conditions, the RCD, a key protective device in the home’s consumer unit, can be compromised. It may be possible to reset but the protective device may not operate as normal. This could be dangerous as the assumed protection will not be active. One death resulting from this lethal failure has already been reported by one Australian state, however it should be noted that this view isn’t shared by regulators from other Australian states.
PROFESSIONAL ELECTRICIAN September 2026 25
025_PE_SEPT26_Layout 1 30/07/2026 15:35 Page 26
COMMENT
risk 2 Fire Over 50% of UK housing stock is more than a century old. These properties may have old, damaged or deteriorating electrical wiring, unfit to carry extra load. Without a proper electrical assessment, it’s unwise to add a plug-in solar PV unit and is indeed contrary to existing British Standards, i.e. clause 5 of BS 1363-1. Plug-in solar PV units, especially multiple units, can increase the risk of localised overheating of cables.
and dangerous 3 Inconsistent product standards The government has announced that plug-in solar panels will be made available quickly, but if products reach the retail market before a robust and enforceable UK standard is fully embedded, consumers may be exposed to inconsistent quality, unclear compliance requirements and unsafe imports. For example, some products are already being promoted with flattened cables intended to pass under doors or through openings not designed for electrical equipment. Without clear standards, testing and enforcement, such accessories could normalise unsafe practice in domestic settings and increase the risk of insulation damage and overheating, raising the potential for fire.
without a clear notification and oversight regime, visibility of what’s connected to the system will be reduced at the very point when visibility matters most. The electrical industry recommends that clear guidance is given to consumers to notify the DNO, before a device becomes operational. The risk isn’t theoretical. If multiple flats in a single block were each to install plug-in solar PV units, the cumulative effect on the local network could be significant. We should be wary of treating these systems as negligible simply because each individual unit is small. At scale, small installations can produce material consequences for network planning, safety and resilience.
and insurance questions 5 Liability remain unresolved There are also serious unanswered questions about insurance and liability. If a fire or electrical fault is linked to a plug-in solar PV unit, it’s not yet clear how insurers will assess cover where the product was self-installed, not declared in advance or connected to an unsuitable electrical installation. Consumers shouldn’t be encouraged to adopt these products before they fully understand the consequences, potentially leaving landlords, leaseholders and insurers to manage the fallout.
capacity is vital to network 6 Daisy-chaining 4 Grid Consumers, seeking convenience, resilience One of the central safeguards in the UK electricity system is that new electricity generating technologies are introduced in a way that network operators can monitor and manage. Industry advice has long been that new installations such as solar PV units and EV chargepoints should be notified to the local Distribution Network Operator (DNO) because cumulative demand and generation affect local network capacity and stability. If plug-in solar PV units are normalised as an off-the-shelf consumer purchase
26 September 2026
may use extension leads, adaptors or multiple devices on the same circuit. Improvised installations significantly increase the likelihood of overheating and fire, as well as creating trip and fall hazards from trailing cables poor installations/fixings into gardens or on balconies with a risk of becoming loose or falling from height, with disastrous consequences. A particular concern if used in a high-rise building. Additionally, rooftop solar PV has a single dedicated connection to the
PROFESSIONAL ELECTRICIAN
electrical installation through an inverter. An inverter converts the direct current (DC) generated by the solar panels to alternating current (AC) which is the type of electricity that’s conventionally used to power homes and feed into the National Grid. When a power cut in the street occurs, the inverter will shut down very quickly to halt the export of power. Where multiple plug-in solar PV units are plugged in to the electrical installation through socket outlets, each has an individual connection to the installation, and it isn’t known how quickly multiple plug-in solar PV units will shut down in the event of a power cut. A low upfront cost must not ultimately override safety The appeal of plug-in solar PV units is obvious: low-cost, visible and quick to deploy. But affordability alone isn’t a sound basis where electrical safety is concerned. If cost becomes the dominant driver, there’s a danger that quality assurance, competent installation, enforcement and consumer protection will be treated as optional rather than essential. A poorly regulated bargain product may reduce bills in the short-term, but it can also transfer risk onto households, emergency services, insurers, network operators and, ultimately, government. A rushed rollout could potentially weaken confidence in the energy transition. The electrotechnical industry advocates innovation and recognises the potential role that new technologies can play in expanding access to cleaner energy. But plug-in solar PV units shouldn’t be rolled out unless, and until, the supporting framework is in place: clear product standards, robust enforcement, competent installation pathways, appropriate consumer guidance, and a mechanism to protect both householders and the electricity distribution network. Due diligence isn’t a barrier to progress. It’s what makes progress safe, credible and sustainable.
PE Page Grid_Layout 1 06/01/2026 10:31 Page 1
PE Page Grid_Layout 1 08/05/2026 10:55 Page 1
029_PE_SEPT26_Layout 1 30/07/2026 15:29 Page 29
SPECIAL REPORT With individual competence under increasing scrutiny, Michael Collinge MIET, Technical Director at Flexi-Orb, delves into what the latest regulatory requirements mean for electrical businesses and their workforce.
MAKING COMPETENCE YOUR BUSINESS
I
’d like to start this article by stating, for transparency purposes, that these observations reflect my personal views, informed by my involvement in standards development, conformity assessment and competence assurance, including membership of the EAS Management Committee and relevant BSI, CENELEC and IEC committees. They should not be taken as representing the views of the Building Safety Regulator, BSI, CENELEC, IEC, the Energy Storage Association, the EAS Management Committee, Flexi-Orb, Certi-fi Schemes Limited, or any other organisation with which I’m associated... Significant changes In July of this year, the Building Safety Regulator strengthened its focus on Mandatory Technical Competence for individuals carrying out regulated work through self-certification schemes. The subsequent message for electrical businesses is straightforward: people should only undertake work when they can demonstrate the knowledge, skills, experience and behaviours required for the activities they’re authorised to perform. Business registration, company procedures and the oversight of a Qualified Supervisor remain important.
However, greater emphasis is now being placed on the competence of the individual carrying out the work. The updated Electrotechnical Assessment Specification (EAS) reinforces this direction, particularly in specialist areas such as solar PV, battery energy storage systems (BESS), EV charging equipment and micro-wind systems. A greater focus on the individual For many years, competence within an electrical business has often been judged through the qualifications, experience and oversight of the Qualified Supervisor. That role remains central to technical governance, quality assurance and compliance, but it cannot substitute for the competence of everyone else involved in the work. Businesses need to understand what each person is capable of doing, where supervision is needed and where further training or experience may be required. The key question is: can the individual demonstrate competence in the work they’re expected to undertake? That means looking beyond job titles and certificates. It requires evidence that the person can apply their knowledge and skills safely and consistently in practice. Competence must be present throughout the process, including design,
installation, inspection, testing, commissioning and certification. Qualifications remain an essential part of the competence picture, but they don’t automatically prove competence in every type of work. Solar PV, battery storage, EV charging and other low-carbon technologies introduce new equipment, risks, standards and design considerations. An experienced electrician may be highly competent in conventional installation work but still require additional training and practical experience before taking responsibility for the design or commissioning of an energy storage system. Competence combines technical knowledge, practical skills, relevant experience, professional behaviour, awareness of legislation and standards, understanding of manufacturer requirements and recognition of personal limitations. It must also be maintained. Standards change, products develop and working practices evolve. Evidence that was sufficient several years ago may no longer reflect the work being carried out today. Regulation 16 of the Electricity at Work Regulations 1989 requires those undertaking work where technical knowledge or experience is necessary to possess the knowledge or experience
PROFESSIONAL ELECTRICIAN September 2026 29
029_PE_SEPT26_Layout 1 30/07/2026 15:30 Page 30
SPECIAL REPORT needed to prevent danger. BS 7671 also requires electrical installation work to be carried out by individuals with appropriate education, training and practical skills. Competence must match the task Competence is specific to the activity being undertaken. For example, someone competent to install equipment may not yet be competent to design the system. Or, similarly, a person may be capable of working under supervision but not ready to inspect, commission or certify work independently. Experience in domestic wiring doesn’t automatically demonstrate competence in solar PV design. At the same time, experience in EV charging doesn’t necessarily demonstrate competence in energy storage, periodic inspection or micro-wind systems. Businesses therefore need to define the competence required for each activity. This is particularly important in specialist technologies, where system integration, protective measures, commissioning, product requirements and technology-specific standards may all need to be understood. A broad job title such as “electrician” can’t, on its own, demonstrate competence across every area of work. What evidence should be considered? Evidence should be relevant to the activity, proportionate to the risk and reasonably current. It may include: ● recognised qualifications; ● occupational competence assessments; ● manufacturer training; ● supervised workplace experience; ● practical observations and technical discussions; ● completed work, inspection and test records; ● continuing professional development; and ● evidence of working to current standards. A certificate may show that someone has completed training, but not necessarily that they can apply it safely and consistently in the workplace. Equally, an experienced electrician may demonstrate competence through work records, practical assessment, technical discussion and professional development without
30 September 2026
repeating a full qualification. The purpose is not to collect certificates but instead to build a credible picture of what the individual can do. The continuing role of the QS The move towards individual competence doesn’t reduce the importance of the Qualified Supervisor. The role remains vital in maintaining standards, supporting quality assurance and ensuring work is carried out in line with relevant requirements. Supervision should be used appropriately. It is reasonable for trainees, developing electricians and those moving into new areas of work to operate under supervision. The level of oversight should reflect both the risk of the work and the competence of the person undertaking it. What supervision cannot do is permanently cover gaps in competence. Businesses should therefore be clear about who is authorised to carry out each activity, what evidence supports that authorisation, where supervision is required, what limitations apply and when competence will be reviewed. Practical steps for electrical businesses A sensible starting point is to list the categories of work carried out by the business and identify everyone involved in designing, installing, inspecting, testing, commissioning and certifying that work. For each person, consider whether the available evidence matches their responsibilities. Where gaps are identified, they may be addressed through practical assessment, supervised experience, mentoring, technical discussion or further training. A competence matrix can record work categories, individual roles, qualifications, experience, assessment evidence, CPD, authorisation levels, restrictions and review dates. Used properly, it becomes a working management tool rather than a document produced only for an assessment visit. The same approach should apply to agency workers, labour-only operatives and subcontractors. Responsibility for establishing competence doesn’t disappear because someone is
PROFESSIONAL ELECTRICIAN
self-employed or temporarily engaged. An opportunity to strengthen the industry Handled well, these changes should improve safety, strengthen confidence in electrical work and give greater recognition to the people carrying out the work on-site. They can also support clearer development routes into specialist areas such as solar PV, energy storage, EV charging and other low-carbon technologies. For employers, a structured approach provides a stronger basis for allocating work, planning training and managing risk. The direction is clear - competence must be demonstrated by the people carrying out the work, not assumed from a business name, job title or qualification alone. The Building Safety Regulator’s Mandatory Technical Competence requirements and EAS 2026 provide an opportunity for electrical businesses to place evidence, authorisation and individual capability at the centre of their technical governance. Practical checklist ● Identify each category of work carried out by the business. ● Record who designs, installs, inspects, tests, commissions and certifies the work. ● Check that the evidence held matches each person’s responsibilities. ● Record qualifications, experience, assessments, CPD and authorisation limits. ● Address gaps through appropriate training, supervision, mentoring or assessment. ● Include employees, agency workers and subcontractors. ● Review competence when roles, technologies, standards or regulations change. ● Keep records current and use them to support day-to-day decisions. ACCESS AND READ THE BUILDING SAFETY REGULATOR’S MANDATORY TECHNICAL COMPETENCE REQUIREMENTS REPORT AT: WWW.RDR.LINK/ECB014
PE Page Grid_Layout 1 24/07/2026 11:00 Page 1
PE Page Grid_Layout 1 27/07/2026 14:42 Page 1
033_PE_SEPT26_Layout 1 30/07/2026 15:16 Page 33
SPECIAL REPORT
TO SEE YOU AGAIN
More than 30 years after PE first followed his Antarctic adventure – and a decade after reporting on Halley VI's dramatic relocation – we catch up with an electrician who continues to achieve cold feats.
H
ow many electricians can say they've helped keep one of the world's most remote scientific research stations running? Even fewer can claim to have done it over a career spanning more than 30 years. Yet that's exactly what Robert Curtis has achieved, after returning to Antarctica at the age of 61 for another deployment with the British Antarctic Survey (BAS), proving that experience and determination remain invaluable assets in one of the harshest working environments on Earth. More than 30 years after first travelling to Antarctica with BAS, and a decade after helping relocate the famous Halley VI Research Station away from a dangerous crack in the Brunt Ice Shelf, the Barry-based electrician, who currently works for Cardiff Community Housing Association, has once again returned to the frozen continent. A journey that almost didn't happen Interestingly, this latest expedition was almost over before it started. Before being cleared to travel south, Rob had to pass BAS's demanding
medical assessment, which meant losing around 12 kg to reduce his BMI below the required limit. At the same time, he had been diagnosed with Type 2 diabetes and needed to prove he could control the condition through diet and exercise. Rob explains: “My biggest challenge for my last deployment south was my struggle against a Type 2 diabetes diagnosis and my determination to control my weight.
member in one of the most extreme environments the Earth has to offer.” Keeping science alive through the Antarctic winter Today, Halley VI operates as a summer-only station following major changes to the Brunt Ice Shelf. Around 40 personnel occupy the base between late November and early February, including scientists, engineers, electricians, plumbers, a doctor and support staff. Although everyone leaves before winter, the station continues operating autonomously as temperatures fall to -55°C. A microturbine generator supplies up to 30 kW of power to science modules housing climate experiments and communications equipment, all monitored remotely from BAS headquarters in Cambridge.
“Hours of gym work and hill walking allowed me to conquer this hardest of challenges, including manhauling a tractor tyre around Cardiff Bay. “There were times when I thought I would never see the majestic beauty of Antarctica ever again. But luckily, the British Antarctic Survey values experience and a proven ability to work as a team
PROFESSIONAL ELECTRICIAN September 2026 33
033_PE_SEPT26_Layout 1 30/07/2026 15:21 Page 34
SPECIAL REPORT
That makes the electricians' work during the short summer season absolutely critical. “With Halley VI now operating autonomously throughout the Antarctic winter, it is more essential than ever that all electrical systems are checked and maintained during the short summer window period,” says Rob. “If electrical systems fail once we leave the station, there’s no going back to reset a breaker, which could lead to a science programme having to be aborted. “Engineers and scientists will be working constantly together at the BAS Cambridge headquarters to monitor remote signal readings to avoid any potential problems with the scientific equipment.”
Three decades of change With Antarctica itself changing faster than ever before because of human induced climate change, the technology supporting it has evolved dramatically. “The biggest difference over the last 30 years is the increased ability to communicate across the thousands of miles from the UK to Antarctica,” says Rob. “In 1996 we were restricted to a 500-word email every month with family, friends and our Cambridge headquarters, but in 2026 Starlink allows us to WhatsApp family and friends or find the instructions for a piece of electrical equipment almost instantaneously.” He continues: “Despite those advances, the mindset of the maintenance team remains the same. You must be able to work as a team and be prepared to work through problems and make full use of the equipment and tools you have on station. Once the ship or
34 September 2026
plane departs, you’re on your own.” He also believes BAS is entering a new era of engineering. “By far the biggest change in the last 30 years is the ability to use satellite communication systems to both monitor and control the scientific experiments. “The next major change is the push to ensure that all of BAS's research stations are no longer powered by barrels of oil and are converted to renewables. In a place where solar and wind energy is so abundant, this change is long overdue.” Looking ahead, Rob believes drones and robotics will increasingly be used to undertake hazardous surveys and scientific work, although he hopes there will always be a place for human engineers on the ice. Lessons beyond Antarctica Although few electricians will ever experience Antarctica, Rob believes the qualities needed to succeed there are relevant to every installer. He says: “You don’t need to be a perfect electrician with knowledge of every electrical system or piece of equipment. “But you do need to work as a team and learn from errors because, as humans, we’re all destined to make mistakes.” Interestingly, Rob’s Antarctic experience has also provided an unexpected advantage back in the UK. “I always joke that having worked for BAS in Antarctica on your CV means all future job interviews become easy, because interviewers bored with asking the same technical questions suddenly ask you about penguins, seals and icebergs!”
PROFESSIONAL ELECTRICIAN
An adventure worth pursuing Reflecting on more than three decades with BAS, Rob remains immensely satisfied at the contribution he has made to climate science. “I’m extremely proud of my long career with the British Antarctic Survey and being part of such an excellent team which delivers reliable climate science to the world.” He also hopes his story encourages younger electricians to consider a very different career path. “I would urge any young electricians out there who like adventure and are not frightened of the cold to send their CV off and one hell of an adventure may unfold. “It is a privilege to work in Antarctica. You will make friends which will last a lifetime and you’ll also cherish some very special and unique memories.” And after six expeditions, could there be another? Rob replies: “Never say never. I know BAS values experience and dedication and, as the old rugby motto goes: 'Youth and enthusiasm is no match for age and treachery!' “Watch this space.”
PE Page Grid_Layout 1 24/07/2026 11:12 Page 1
PE Page Grid_Layout 1 24/07/2026 11:13 Page 1
037_PE_SEPT26_Layout 1 30/07/2026 18:34 Page 37
SPECIAL REPORT For 75 years WAGO has built its reputation on trusted electrical connections. Here, we discover why the company believes automation will have a big part to play in shaping its next chapter, creating new opportunities for installers along the way.
DRIVING THE AUTO-MATIC
A
sk most electricians about WAGO and the first thing that comes to mind is connectors. For generations, the company's products have become synonymous with making electrical connections quicker, safer and more reliable. That reputation has been earned over 75 years, during which time WAGO has grown from a family-owned business in Germany into a global engineering company spanning electrical interconnection, interface and automation technology.
While the anniversary is an opportunity to celebrate that heritage, WAGO's UK leadership believes its biggest opportunity lies firmly in the future. The business has more than tripled its UK and Ireland operation over the past seven years, investing heavily in people, facilities and technical expertise, including the opening of its new headquarters in Rugby. Alongside its established electrical offering, automation is now a key part of the company's long-term strategy.
Building on strong foundations Few businesses reach 75 years by simply standing still. From pioneering spring-pressure connection technology, WAGO has continually expanded its offer into interface electronics, control systems, building automation and industrial automation. Today, the business employs around 9,000 people globally, invests around 10% of annual revenue in research and
development and generated €1.34 billion in revenue during 2025. The UK business reflects that growth. Established in Britain since 1990, WAGO UK & Ireland now employs around 90 people and continues to expand from its purpose-built Rugby headquarters, where the company's own building management, lighting control and energy management technologies are showcased in practice. Darren Hodson, Managing Director of WAGO UK & Ireland, believes the company is now entering another important chapter. He says: "We're incredibly proud of our heritage, but we're equally excited about what's next. Customers know and trust WAGO because we've always focused on solving real problems. “Today's challenges are different – whether that's improving productivity, reducing energy use or making buildings and industrial processes smarter. That's where automation has such an important role to play."
PROFESSIONAL ELECTRICIAN September 2026 37
037_PE_SEPT26_Layout 1 30/07/2026 18:35 Page 38
SPECIAL REPORT
Why automation matters For many electrical contractors, automation can still feel like a specialist discipline, however, John Mackey, Head of Automation Sales at WAGO UK & Ireland, believes it should instead be viewed as the natural progression towards smarter, more connected electrical installations. He says: “There’s no doubt that the pace of technological change is accelerating for manufacturers. As a result, businesses need to become more productive, with better energy-efficiency, connectivity and more resilience. “WAGO brings together strong German engineering with an open automation philosophy which puts us in an excellent position to help businesses modernise without creating unnecessary complexity." That principle sits at the heart of WAGO's automation strategy. Rather than encouraging customers to replace existing infrastructure, WAGO focuses on open, scalable technologies that integrate with existing systems, allowing organisations to install, connect, monitor and automate in manageable stages. Its offer now extends well beyond hardware to include software platforms, custom engineering solutions, commissioning, cybersecurity, training and service support. “Customers aren't looking for technology for technology's sake," John continues. "They want practical solutions that improve performance and deliver value without disrupting their existing operations. That's exactly where we believe WAGO can make a real difference.”
Growth sectors WAGO has identified manufacturing, buildings and energy as three of its key strategic markets, with particular focus on applications such as energy management, room automation, cybersecurity, building decarbonisation and smart factories. The opportunities are significant. Food and beverage manufacturing remains the UK's largest manufacturing sector and continues to invest heavily in automation. Meanwhile, the UK's microgrid market is forecast to grow rapidly as organisations invest in renewable energy, decentralisation and greater resilience. At the same time, AI is driving unprecedented investment in data centres, creating growing demand for advanced power management, monitoring and control technologies. WAGO is already supporting many of these applications while continuing to develop products specifically for this expanding market. Opportunity knocks While these trends are often discussed in terms of manufacturers and end users, Darren believes they represent a major opportunity for electrical professionals.
He says: “Electrical contractors are increasingly involved in projects that bring together power, controls, networking and energy management. The installer's role is evolving, and with that comes the opportunity to offer customers better value than ever before." To support that transition, WAGO is investing in solution partners, technical resources, knowledge sharing and application expertise, helping installers develop the confidence to deliver sophisticated automation projects. John believes electricians are well placed to benefit from this development, stating: “The electrical industry has always adapted to new technologies, and automation is simply the next stage of that evolution. “Installers already have many of the core skills. By building knowledge around connected systems, software and energy management, they can position themselves at the centre of one of the industry's biggest growth areas." Looking ahead WAGO's ambition is to grow its UK business to £75 million by 2030, with industrial automation becoming a much larger part of that journey. For Darren, however, success will still be measured in the same way it has been for the past 75 years. “The technology may continue to evolve, but our focus remains exactly the same,” he concludes. “It's about understanding our customers, solving their challenges and helping them succeed. That's what built WAGO over the last 75 years, and it's what will define the next 75 as well.” BROWSE WAGO’S RANGE OF AUTOMATION PRODUCTS AND SOLUTIONS AT: WWW.RDR.LINK/ECB015
38 September 2026
PROFESSIONAL ELECTRICIAN
PE Page Grid_Layout 1 27/07/2026 14:44 Page 1
PE Page Grid_Layout 1 24/07/2026 11:36 Page 1
041_PE_SEPT26_Layout 1 30/07/2026 08:26 Page 41
THE CPD ZONE
ENTER THE CPD ZONE AND EARN 1 CPD CREDIT TOWARDS YOUR PROFESSIONAL RECORD!
c
ontinuing professional development (CPD) can be broadly defined as any type of learning you undertake which increases your knowledge, understanding and experiences of a subject area or role. To help professionals to better document and prove this process, our CPD Zone contains content and articles that have been checked, verified and accredited by a third-party specialist organisation. Collectively, the content within this section has been deemed worthy of 1 x CPD credit, or one hours’ worth of CPD. Once this content has been consumed, readers will have the opportunity to scan a QR code which will provide a bespoke, downloadable certificate that can be used as part of a
professional’s ongoing CPD record. This means that if you’re a monthly reader of PE, you could earn up to 11 credits, or 11 hours’ worth of CPD, just by reading a regular copy of your favourite independent industry magazine in 2024. DO NOT SCAN THE QR CODE UNLESS YOU HAVE READ ALL OF THE CONTENT WITHIN THIS SECTION! A large element of CPD involves self-certification and relies on professionals being honest about what they have actually read, consumed and digested. A QR code and RDRLink code have been placed with the final article in this month’s CPD Zone and ONLY once you have read ALL of the articles within this section, should you then scan/enter the code to receive your bespoke certificate. By skipping any of these steps, you’re not just cheating the system, but yourself and your fellow professionals at the same time!
NEW USERS – ACCESS YOUR BESPOKE CPD CERTIFICATE IN FIVE STEPS 1. Read ALL of the content and articles included within this month’s CPD Zone. 2. Scan the QR code or enter the RDRLink code with the last article in this section. 3. Enter your email address. 4. Fill out your details on the contact form. 5. Download your certificate for use as part of your annual CPD record. PREVIOUS USERS – ACCESS YOUR CPD CERTIFICATE IN FOUR STEPS 1. Read ALL of the content and articles included within this month’s CPD Zone. 2. Scan the QR code or enter the RDRLink code with the last article in this section. 3. Enter your name and email address. 4. Download your certificate for use as part of your annual CPD record. All certificates are valid for one year from the issue date. If you’re having any issues with downloading your certificate or using the system, please email us at: pe@hamerville.co.uk
PROFESSIONAL ELECTRICIAN September 2026 41
042_PE_SEPT26_Layout 1 30/07/2026 08:29 Page 42
THE
CODEBREAKERS JOHN HOLLAND: WE CARRIED OUT AN EICR RECENTLY AND CAME ACROSS THIS… WHAT CODE WOULD YOU RECOMMEND? Whenever a kitchen refurbishment is undertaken the extent of the work needs to be considered, not just from an electrical point of view but from the location of base and wall units to determine any conflicts with existing services. This refurbishment didn’t consider the position of the existing electrical services where they clash with the new base and wall units and this has resulted in the accessories being partially blocked and some restricted access. With regards to functional switching, this may not be a major issue, as long as suitable means of isolation exists elsewhere. The cooker switch is poorly located for operation, although it’s normally good practice to provide one, there are no specific requirements for its presence.
GET THE BOOK AND CRACK THOSE CODES!
The main issue would be for maintenance, inspection and testing where the accessories are recessed and grouted in (where the tiles are covering the edges) and the wall and base units preventing the removal of the accessories. In the case of a faulty accessory, this would require removal of the kitchen units and potentially damage to the tiling to allow access to replace or repair the wiring or accessories. Potentially there may also be issues with the fixing of the wall and base units where any cable runs have been concealed within the wall. Although not good workmanship, and unfortunately an electrician may not have even been involved in the refurbishment, there is no immediate danger or a potential danger. Therefore, the appropriate classification code would be a C3, Improvement recommended.
Updated for BS 7671:2018+A2:2022, NAPIT’s EICR Codebreakers publication is purpose-written to aid contractors, inspectors and clients, and now includes updates to align with Amendment 2 of the IET 18th Edition Wiring Regulations. The book is the perfect technical aid for electrical professionals and their customers.
42 September 2026 PROFESSIONAL ELECTRICIAN
042_PE_SEPT26_Layout 1 30/07/2026 08:37 Page 43
Need help with cracking those all-important EICR codes? Every month the technical team at NAPIT will be studying your latest ‘Caught on Camera’ photos and offering advice on the next steps, should you find a similar installation. If you want the team at NAPIT to help crack your codes then send your pictures through to us at: pe@hamerville.co.uk
DAVID HORN: (PIC 1) THIS NEUTRAL CARRIED POWER FOR A SHOWER BLOCK WITH A 9 KW ELECTRIC SHOWER ALONG WITH THE HOOK-UPS FOR A SIX-PITCH CARAVAN SITE. IT WAS SUPPLIED FROM A THREE-CORE 16 MM SWA CABLE WHICH HAD THE ARMOUR UNWOUND TO GET IT INTO THE BUILDING. (PIC 2) INTERESTING CABLE MANAGEMENT OF THE SAME SWA CABLE... It’s surprising how often conductors are installed into equipment with undersized terminals without the correct preparation of the conductor for a particular situation. The cutting of any of the copper strands of a conductor reduces the current carrying capacity of the conductor and can lead to thermal damage to the conductor and, in this case, the distribution board. Although not evident from the image, it should also be considered whether the circuit is undersized generally for the stated supplied load of a 9 kW shower and six caravan pitch supplies. The steel wire armouring of the SWA cable has been removed to allow entry to the building. This has removed the mechanical protection for the conductors (the covering to the conductors is bedding and is not a cable sheath for mechanical protection). It would be difficult to appropriately gland an SWA cable to the enclosure without any armouring present. This being an SWA 3-core cable with the 3rd core being utilised as a CPC may mean the SWA may not be required as a protective conductor, but it is still required for mechanical protection. The SWA is also not suitably glanded at entry to the enclosure and there is no means of protection against abrasion from the visible sharp edges at point of entry. The SWA conductors haven’t been correctly identified, red and yellow conductors. The SWA has not been adequately supported against premature collapse due to the use of non-proprietary cable supports. Therefore, the appropriate classification code would be a C2, Potentially dangerous-urgent remedial action is necessary due to the cable installation.
The A2:2022 18th Edition Codebreakers publication is priced at £22.00 (members) and £24.00 (non-members). It is available in both hard copy and digital versions * Price is VAT exempt and excludes postage and packaging.
ORDER YOUR COPY OF NAPIT CODEBREAKERS BY VISITING: WWW.RDR.LINK/ECB016
PE Page Grid_Layout 1 24/07/2026 11:44 Page 1
045_PE_SEPT26_Layout 1 30/07/2026 08:41 Page 45
THE CPD ZONE
IZ AND IT EXPLAINED This article from the experts at NICEIC aims to clarify the difference between the various terms used to describe the current-carrying capacity of conductors and to demonstrate how they are both used to determine a suitable cross-sectional area (CSA) of conductor, taking account of any relevant correction factors.
W
hen selecting a suitable cable for the circuit's current, two methods can be used. The first involves selecting a cable based on its tabulated current-carrying capacity (It) and then applying any applicable correction factors to determine its current-carrying capacity under the actual installation conditions (Iz). This will typically require several attempts to arrive at a satisfactory solution and is not recommended. The second, and arguably more effective, method involves applying the correction factors to the rated current or current setting of the protective device (In) and then selecting a cable that can carry the current value obtained from this calculation. Determining a suitable CSA for a conductor involves more than just considering the current; factors such as the impedance and voltage drop of the circuit are also important. However, this article simplifies the design process to focus solely on current-carrying capacity. Protecting a circuit from overload Every circuit shall be designed to ensure there is sufficient protection from overload. Other than when a fixed load is used, this is generally achieved by using a suitable overcurrent protective device. When selecting a cable for a circuit and using a device listed in Regulation 433.1.201, such as a circuit-breaker, protection from overload current can be
achieved by satisfying the requirements of Regulation 433.1.1 and the following conditions: Expression 1
Ib ≤ In ≤ Iz Where: Ib is design current of the circuit; In is rated current or current setting of the protective device; and Iz is current-carrying capacity of a cable for continuous service under the particular installation conditions concerned. Once the design current has been determined, the protective device rating can be selected and then the current-carrying capacity of the cable.
“Determining a suitable CSA for a conductor involves more than just considering the current...”
Determining the current-carrying capacity of a cable (Iz) Appendix 4 of BS 7671 - Current-Carrying Capacity and Voltage Drop for Cables is an informative part of BS 7671 to aid designers in selecting suitable cables. To find Iz, the following five steps should be taken: 1. Select the correct table from Appendix 4 Identify the relevant table for the cable type to be used. Due to switchgear considerations, this is usually a table representing 70 °C conductor operating temperatures. For example, when using a multicore steel wire armoured cable, reference Table 4D4A. 2. Select the applicable reference method Follow the first row and select the correct installation reference method. 3. Select the correct column for the number of conductors For each reference method there are two columns – one for single-phase, and one for three-phase. Select the relevant column.
Fig 1. lb, ln, lz illustrated
PROFESSIONAL ELECTRICIAN September 2026 45
045_PE_SEPT26_Layout 1 30/07/2026 08:42 Page 46
THE CPD ZONE 4. Find the tabulated current Follow the table downwards to identify a tabulated current that is equal to or greater than the protective device rating (In). 5. Follow the row from right to left to reach the first column of the table Follow a horizontal line from the tabulated current to the first column; the first column represents the CSA of the cable. Using the five steps process outlined here, a cable is selected based on its tabulated current rating (It). To find the Iz of this cable, the relevant correction factors are to be applied to It as shown in Formula 1. Iz = It x Cg x Ca x Cs x Cd x Ci x Cf x Cc Where: Iz is current-carrying capacity of a cable for continuous service under the particular installation conditions concerned; It is tabulated current-carrying capacity of a cable; Cg is rating factor for grouping; Ca is rating factor for ambient temperature; Cs is rating factor for thermal resistivity of soil; Cd is rating factor for depth of burial; Ci is rating factor for conductors embedded in thermal insulation; Cf is rating factor for semi-enclosed fuse to BS 3036; and Cc is rating factor for circuits buried in the ground. Formula 1. General Iz calculation
Using the ‘Iz method’ detailed in this section involves trial and error, as the current-carrying capacity of the cable can be greatly reduced depending on the correction factors applied. If the value falls below the protective device’s rating (In), a larger CSA cable is selected and the calculation is carried out again. Only when Iz is greater than In is the cable suitably provided with protection from overload. Example A steel wire armoured cable (Table 4D4A) serving a single-phase 30 A load is grouped with another circuit and runs through a plant room with an ambient temperature of 40 °C. The cable is clipped direct, and the circuit protective device is suitably selected and rated at 32 A. Using the five-step method described previously, a cable with a 4.0 mm2 conductor is first selected as it has a tabulated current-carrying capacity of 38 A. Using Formula 1 with only the relevant correction factors applied, Iz is calculated in Equation 1: Iz = It x Cg x Ca x Cs x Cd x Ci x Cf x Cc Where: Cg = 0.87 40 °C ambient temperature. 70° C thermoplastic insulation (Appendix 4. Table 4B1; and Ca = 0.85 two circuits. Single layer on a wall (Appendix 4. Table 4C1) Iz = It x Cg x Ca Iz = 38 x 0.85 x 0.87 Iz = 28 A Equation 1. Worked Iz calculation
This cable would not be suitable as Iz < In,
Fig 2. Example scenario
46 September 2026 PROFESSIONAL ELECTRICIAN
therefore the calculation would need to be repeated with the cable having the next largest CSA. This method can require several iterations to determine a suitably sized conductor. In the case of this example, the next larger CSA conductor is 6 mm2 (It, 49 A). If the calculation is repeated for this cable, the Iz is 36 A, which would be suitable. Selecting a cross-sectional area using the It method There is a quicker method to determine a suitably sized conductor, which removes the trial-and-error process described previously. Instead of applying the correction factors to a selected cable, this method involves dividing the rating of the protective device by the applicable correction factors. The resulting value is then used to find a tabulated value that is equal to or greater than it. This is shown in Formula 2. It ≥
In Cg x Ca x Cs x Cd x Ci x Cf x Cc
Formula 2. General It calculation
Using the previous example, this calculation is carried out in Equation 2. It ≥
It ≥
In Cg x Ca
32 0.85 x 0.87
It ≥ 43.3A Equation 2. Worked It calculation
The result from the calculation indicates that a cable with a tabulated current-carrying capacity equal to or greater than 43.3 A will be suitable. Following the five-step process from the previous section, but replacing the In value with the numerical value obtained using Equation 2, will help to select the appropriate cable. Fig 1 illustrates this method and shows that a cable with live conductors having a CSA of 6.0 mm2 and a current-carrying capacity of 49 A is required. This value can sometimes be confused as the value for Iz. When the cable is selected using this method, the designer would not necessarily need to know the value of Iz. Using the It method, it is unnecessary to calculate Iz during the conductor selection and therefore Formula 1 need
045_PE_SEPT26_Layout 1 30/07/2026 08:44 Page 47
Now that Iz has been obtained, the conditions for overload protection given in 433.1.1 (a) and (b) can be verified using Expression 2: Ib ≤ In ≤ Iz 30A ≤ 32A ≤ 36A Expression 2. Verification of overload protection
Table 1. Reproduction of Table 4D4A from BS 7671:2018+A4:2026 with the steps to selecting the conductor size overlaid
not be applied. However, If the designer wishes to calculate Iz and verify compliance with Regulation 433.1.1, the applicable rating factors can be applied to the value of It for the cable selected, as shown in Equation 3:
Iz = It x Cg x Ca x Cs x Cd x Ci x Cf x Cc Iz = It x Cg x Ca Iz = 49 x 0.85 x 0.87 Iz ≈ 36 A Equation 3. Worked Iz verification calculation
Summary The article explored two common methods of determining the cross-sectional area of a conductor based on the current-carrying capacity. The It method can involve fewer steps than the Iz method and may be preferred, although with this method the value of Iz is not known unless a further calculation is performed.
GET MORE DETAILS ABOUT NICEIC REGISTRATION AT: WWW.RDR.LINK/ECB017
048_PE_SEPT26_Layout 1 30/07/2026 15:44 Page 48
Dr. Zzeus
Q: I’m designing a fire detection and alarm system from plans, but the building isn’t yet occupied. How do I estimate the likely ambient sound levels in the different areas? Does BS 5839-1:2025 provide any guidance?
● Restaurants: 72–75 dB(A) ● Commercial kitchens: 65–75 dB(A) ● Quiet cafeterias: 55–65 dB(A) ● Noisy cafeterias: 68–78 dB(A)
Yes. BS 5839-1:2025 Annex C provides typical occupational background noise levels for many common building types and areas. This is particularly useful when the system is being designed from drawings, and it isn’t yet possible to take representative sound-level measurements in the completed, occupied building. The figures are expressed as typical A-weighted sound pressure levels, Lp, in dB(A). Examples include:
● Noisy, uncarpeted corridors:
Corridors and circulation spaces ● Quiet, uncarpeted corridors:
45–55 dB(A)
Offices and general working areas ● Cellular offices: 40–50 dB(A) ● Open-plan offices: 50–70 dB(A) ● Noisy offices: 70–85 dB(A) ● Conference/meeting rooms:
40–45 dB(A)
66–76 dB(A) ● Carpeted corridors: 28–32 dB(A)
The difference between a carpeted and uncarpeted corridor can be substantial and shouldn’t be ignored during design. Leisure and sports facilities ● Squash courts: 65–80 dB(A) ● Ice rinks during public sessions:
69–80 dB(A) ● Swimming or diving pools: 72–79 dB(A) ● Fun pools: 81–87 dB(A) ● Bowling areas: 78–85 dB(A) ● Quiet sports halls: 60–72 dB(A) ● Noisy sports halls: 72–82 dB(A) ● Sports halls during loud ball games:
78–93 dB(A)
● Courtrooms: 40–50 dB(A) ● Exhibition halls: 63–73 dB(A)
Educational buildings ● Quiet classrooms: 56–68 dB(A) ● Noisy classrooms: 64–72 dB(A) ● Quiet library book or reading areas:
35–45 dB(A) ● Noisy or heavily air-conditioned library areas: 50–60 dB(A) ● Library reception areas: 50–60 dB(A) Hospitals and hotels
For hospital wards and hotel bedrooms: ● Television switched off: 28–35 dB(A) ● Television switched on: 60–70 dB(A) This illustrates how significantly the expected background noise can change depending on how the room is being used.
Retail buildings ● Quiet shops or stores: 50–60 dB(A) ● Noisy shops or stores: 65–75 dB(A) ● Shopping malls: 70–75 dB(A) ● Banks and building societies, public
areas: 50–64 dB(A) Factories, warehouses and plant rooms Factories: ● Control rooms: 70–75 dB(A) ● Light assembly areas: 80–85 dB(A) ● Heavy engineering areas: 95–105 dB(A)
Plant rooms: ● Quiet boiler rooms: 66–72 dB(A) ● Noisy boiler rooms: 76–86 dB(A) Warehouses: ● Quiet warehouses: 47–63 dB(A) ● Noisy warehouses: 63–80 dB(A) How should the figures be used?
Restaurants, dining rooms and kitchens
48 September 2026
The designer can use the appropriate
PROFESSIONAL ELECTRICIAN
Dr. Zzeus, Tom Brookes, answers another fire-related reader query
Annex C figure as an initial estimate of the sound level the fire alarm must overcome. For example, if an open-plan office is expected to have a background noise level of up to 70 dB(A), the fire alarm design must take that expected noise into account when determining the required alarm sound pressure level and the number and positioning of sounders. However, Annex C is informative guidance. It is not a replacement for proper sound-level measurements. Noise levels can vary significantly between apparently similar buildings and can also change with occupancy, equipment operation, and the time of day. The standard advises that, where Annex C is used to assess a fire detection and alarm system, the higher of the two quoted figures should normally be used as the appropriate design value. Wherever reasonably practicable, actual measurements should subsequently be taken in the building under representative operating conditions. Dr ZZEUS Tip: Annex C doesn’t specify the sound level the fire alarm must achieve. It tells you the likely background noise that the alarm will have to overcome. It is therefore an excellent starting point when designing from plans, but the designer must still apply the audibility recommendations of Clause 16, consider the intended use of every area and verify the completed installation under realistic conditions.
PE Page Grid_Layout 1 24/07/2026 11:45 Page 1
050_PE_SEPT26_Layout 1 30/07/2026 08:46 Page 50
THE CPD ZONE
DOES AN RCCB TYPE B TRIP ON DC? Martin Plumbridge TMIET, Technical Manager at Doepke, highlights why taking a few extra minutes to verify Type B RCD DC tripping performance could enhance electrical safety.
W
e‘ve witnessed an increase in reports from several well-informed installers relating to Type Bs that don’t function correctly in the presence of DC components. For example, one design was marked as bidirectional but failed a smooth DC tripping test. Although the basic requirements of BS 7671 don’t require verification that the Type B RCD protection feature works, it would seem prudent to spend a few minutes checking that modern complex domestic systems, costing possibly £10,000 or more, are protected by a functioning RCD. A simple test with the correct instrument can be performed to verify that the RCD trips when subject to smooth DC.
RCD tests and thresholds The existing BS7671 1 x RCD verification test required for example for 30 mA RCDs relates to an AC sinusoidal residual current, irrespective of the type of RCD. ● All RCCBs subjected to 50 Hz residual current are designed to trip between >50% - <100% IΔn, which equates to 15 to 30 mA. The max switch off time at 1 x is 0.3s. ● Type A, type F, and type B pulsed residual current (50 Hz); the tripping current threshold changes to >35% - < 140% IΔn. Type A (BS EN 61008-1) must still trip with the pulsed waveform superimposed on 6 mA smooth DC. Type F (BS EN 61008-1 and BS EN 62423) must still trip with the pulsed waveform superimposed on 10 mA smooth DC. Type B (BS EN 61008-1 and BS EN 62423) subjected to smooth DC residual current must trip between >50% - <200% IΔn i.e. for 30 mA equates to 15 < 60 mA DC on both cycles 0° and 180°.
50 September 2026
PROFESSIONAL ELECTRICIAN
050_PE_SEPT26_Layout 1 30/07/2026 17:24 Page 51
The standards define the tripping thresholds and times based on the residual current components. Although BS 7671 only requires verification of the AC trip threshold irrespective of the type, Michael Peace’s IET Article in Issue 91 July 2022 explains that other tests are not precluded. Why DC tripping characteristics matter RCD Types A and F use a magnetic core to detect imbalance between live and neutral conductors. Smooth DC residual current above the design current can saturate this core – a phenomenon known as DC blinding. When the core is saturated, The RCD becomes insensitive to further imbalance. Trip thresholds increase unpredictably; the device may fail to trip entirely. This is a major safety concern because a circuit could carry a dangerous fault current without any protective disconnection. Type B RCDs are designed to detect smooth DC and trip when it exceeds the default value. This maintains sensitivity to both AC and pulsating DC components while also responding to pure DC leakage. Test instruments For test instruments equipped with a Type B RCD setting, a multiplier of 2 × IΔn is applied in accordance with the product standard BS EN 62423. We have witnessed an increase in complaints relating to a number of type Bs that do not function correctly in the presence of DC components – particularly those that are marked as bidirectional. A simple test can be performed to verify DC tripping on DC currents.
Repeat the same test on the opposite side of the unit. For a true bidirectional RCD it should still trip to the relevant parameters.
Testing procedure for Type B RCDs The testing procedure for a type B RCD is relatively straightforward from connecting the live, neutral and earth to probes the appropriate terminals on the load side and carrying out the tests. Once complete, carry out the same test on the supply side to check the device is true bidirectional. Carry out the standard AC test first (following all testing safety procedures). DC Tripping test applicable to any 2-pole 30 mA type B (Outgoing circuit should be disconnected). To measure RCD tripping current on a Fluke 1654B 1. Turn the rotary switch to IΔn position. 2. Press F1 to select the test current phase, 0° or 180°. 3. Press F3 to select the RCD test-current waveform: smooth – DC current to test type B RCD. 4. Press F4 to select the RCD current rating (10, 30, 100, 300 or 500 mA). 5. Press and release ‘test. Wait for the test to complete.
Conclusion So, does a Type B RCCB trip on DC? Well, the answer is that it should do, but some don’t. If it is detecting DC it should trip between >50% - <200% IΔn, which equates to 15 to 60 mA range on both cycles 0° and 180° for 30 mA device. If it is truly bi-directional it will trip on DC, irrespective of which side you connect the supply. The testing procedure for a Type B RCD including DC test takes a few minutes in addition to the standard AC test. If it is a complex installation requiring Bi-directional RCD functionality you can verify the operation by repeating the test on the reverse side As you can see here, it’s worth a few additional minutes checking that your modern complex domestic system and the people using it are adequately protected by the RCD you have specified and installed. BROWSE DOEPKE’S RANGE OF CIRCUIT PROTECTION PRODUCTS BY VISITING: WWW.RDR.LINK/ECB018
052_PE_SEPT26_Layout 1 30/07/2026 08:50 Page 52
NICEIC. The sign of a serious professional.
Q&A
NICEIC FAQs month, our our team team of ofexpert, expert,technical technicalengineers engineersanswer answeressential questions Each month, essential questions from NICEIC-certified businesses. Here IURP 1Ζ&(Ζ& FHUWLȴHG EXVLQHVVHV Ȃ KHUH DUH WZR RI WKH ODWHVW TXHULHV we share some of the latest Amendment 4 queries. Q We are working in a domestic apartment block
A MD 4
Q We have been asked to install some additional
and have been questioned over the types of lighting on existing circuits within a school. All of How would we recognise when a PNB system has been used? Will PNB be lighting labelled?will be installed using cable supports that we have installed. Within the the the additional Q communal area where a suspended ceiling is to be surface-mounted conduit. However, the existing It might bewe labelled. Under Electricity Safety, Quality and Continuity Regulations have supported the cables using steel circuits that we are extending are wired using A installed, (ESQCR) requirements, the Distribution Network Operator (DNO) must provide information ties to a cable tray system. Within the individual thermoplastic insulated and sheathed cables about the type of earthing system free of charge. So, if in doubt, consult the DNO. apartments, where a solid plasterboard ceiling is buried in the walls. Do we need to upgrade the to be installed, we have used cable anchors and circuits to include additional protection? There are also two key features, published in Energy Networks Association (ENA) plastic ties. Should these also be steel ties? guidance, that might help you: A The alterations/additions that you are undertaking on the existing circuit(s) would need to meet the A Regulation 521.10.202 requires that all wiring it can’t be PNB. ● If there are more than four energy consumers, requirements of BS 7671 (641.5). systems shall be supported in such a wayreference that, in the ● If the distance from the earth electrode is greater than 40 metres from However, this would not necessarily require the HYHQW RI D UH WKH\ ZLOO QRW EH OLDEOH WR SUHPDWXUH any of the energy consumers, it can’t be PNB. existing circuit to be upgraded, provided that there collapse and result in an entanglement risk. ZHUH QR GHIHFWV RU RPLVVLRQV WKDW ZRXOG DHFW WKH Typically, for cables that are installed above a VDIHW\ RI \RXU DOWHUDWLRQV RU DGGLWLRQV What is the maximum for that TN-C-S ceiling, it isZe likely the PNB? means of Q plasterboard $Q\ GHIHFWV LGHQWLȴHG RQ WKH H[LVWLQJ FLUFXLWV WKDW VXSSRUW ZLOO UHPDLQ HHFWLYH IRU ORQJ HQRXJK WR DOORZ You can find some reference in ENA Engineering Recommendation P23. Table 1 ZRXOG QRW DHFW WKH VDIHW\ RI \RXU SODQQHG ZRUNV SHUVRQV WR HJUHVV WKH EXLOGLQJ DQG IRU ȴUHȴJKWHUV WR A gives values for Ze for 230 V single phase TN and TT supplies not exceeding 100 VKRXOG EH UHFRUGHG RQ WKH FHUWLȴFDWLRQ SURGXFHG HQWHU WKH EXLOGLQJ DQG GHDO ZLWK WKH ȴUH HWF $OO WKH WLPH amps. in accordance with the requirements of regulation the cables are contained within the ceiling void, and 6HH DOVR WKH DUWLFOH LQ WKLV LVVXH RQ DGGLWLRQV the plasterboard is intact, they are protected from the For TN-C-S, it lists 0.35, with a note stating that: “this value was quoted for both DQG DOWHUDWLRQV VHH /HWȇV JHW WHFKQLFDO S HHFWV RI KHDW DQG ȴUH Protective Multiple Earthing (PME) and Protective Neutral Bonding (PNB) earthing Itarrangements.” should also be noted that even in the event of the plasterboards failing, the cables will pass through joists, So, you can use that which is cited in ENA ER P23. where this is still necessary for0.35 theirvalue, routing, further limiting
QUESTION
WKH OLNHOLKRRG RI WKHLU FDXVLQJ DQ HQWDQJOHPHQW ULVN )RU WKHVH UHDVRQV WKH XVH RI SODVWLF WLHV RU FOLSV LQ D ȵRRU YRLG DERYH D SODVWHUERDUG FHLOLQJ LV DFFHSWDEOH
If you are an NICEICFHUWLILHG EXVLQHVV ORRNLQJ for convenient CPD resources, scan the QR FRGH IRU PRUH LQIRUPDWLRQ
S
PE Page Grid_Layout 1 24/07/2026 11:47 Page 1
PE Page Grid_Layout 1 09/06/2026 11:08 Page 1
055_PE_SEPT26_Layout 1 30/07/2026 08:57 Page 55
THE CPD ZONE
MAXIMUM DEMAND & DIVERSITY
F
or economic and reliable design of an installation within thermal limits and admissible voltage drop Regulation 311.1 of BS 7671 requires, the maximum demand shall be determined. In determining the maximum demand of an installation or part thereof, diversity may be taken into account.
In this article, Jake Green, Head of Technical Engagement at Scolmore Group, looks at the effect diversity can have on the maximum demand of an installation.
Determining loads When considering maximum demand, firstly we must look at the current demand of our final circuits. This is determined by adding the current demands of all points of utilisation and the associated equipment and then assessing the overall power or current. This is typically calculated from the connected load, or in the case where the actual load is unknown, such as with a ring final circuit, the protective device for that specific circuit. Consider, for example, the current of a 6 kW freestanding cooker: P=I V
6000 = 26.08 𝐴 230
It is unlikely that a cooker circuit will draw the full load current for the period the cooker is in use. By way of an example, any electric cooker or hob will not draw much current when the desired temperature has been reached. Only the current necessary to maintain temperature will flow. If this was not taken into account, the number of circuits that could be installed in an installation would be reduced greatly. Because of this the designer of an electrical installation can consider diversity as they assess the maximum demand of an installation (311.1). How is diversity applied? When taking diversity into account, BS 7671 does not provide guidance of values to utilise when applying diversity. To do this guidance from other publications, predominantly The Onsite Guide or Guidance Note 1, is used for the calculation of diversity. These values are guidance, and designers may use
PROFESSIONAL ELECTRICIAN September 2026 55
055_PE_SEPT26_Layout 1 30/07/2026 09:01 Page 56
THE CPD ZONE
engineering judgment and experience or sometimes referral to manufacturers’ data are used. In this article we will concern ourselves with The Onsite Guide. Appendix A of The Onsite Guide Table A1 is used to assume the current demand of the points of utilisation and current using equipment: Taking the example from the prevous page, using Table A1 we can see that household cooking appliances can be assumed to be the first 10 A of the rated current plus 30% of the remainder of the rated current, plus 5 A if a socket-outlet is incorporated within the control unit (Cooker Switch). This means that the assumed current demand is as follows: 10 + (30% of the remainder ) +5 = Current Demand 26.08 𝐴 – 10 = 16.08 𝐴 10 + (30% of 16.08) + 5 = Current Demand 10 + 4.82 + 5 = Current Demand 10 + 4.82 + 5 = 19.82 𝐴 Now we can see the current demand assumption can be classified to be 19.82
A which has a rather significant difference to the rated current of the appliance. This takes into consideration the type of load and its characteristics. Similar calculations can be carried out with other types of load. There are potential issues in following the guidance issued in The OSG. For example, the value of 100 W per luminaire is based on lamps which are no longer in use (tungsten filament). Many modern lighting circuits supply LED lamps or strips and the nature of the load is determined by both the lamp/strip and the driver. When applying diversity, however, we can take guidance from Table A2 of The Onsite Guide: For lighting from Table A2 under the heading types of premises, a guide of 75% of the total current demand can be applied for diversity for small hotels, boarding houses, guest houses, etc. Once diversity is applied to all circuits within an installation, it’s clear to see how this can dramatically lower the maximum demand and provide a somewhat closer value to what the measured value of
current drawn might be over time. However, experience may indicate that the values given in these tables are excessive, and the experienced designer may apply other factors to further reduce the assessed maximum demand. Vigilance should be used from Table A2 as some specific loads are not advised to allow for diversity due to the nature of the loads, such as thermostatically controlled water heaters in an individual household. Conclusion When obtaining the maximum demand of an installation in accordance with Regulation 311.1, it is important to recognise that the assessed current demand will not be fully utilised over a 24-hour period, and therefore diversity may be applied to determine a more realistic maximum demand. BROWSE THE ELUCIAN RANGE OF CIRCUIT PROTECTION SOLUTIONS AT: WWW.RDR.LINK/ECB019
PE Page Grid_Layout 1 24/07/2026 11:59 Page 1
PE Page Grid_Layout 1 29/07/2026 09:20 Page 1
059_PE_SEPT26_Layout 1 30/07/2026 09:06 Page 59
THE CPD ZONE
Fig 2: Prescribed wiring zones conforming to Regulation 522.6.202 (P152 BS 7671: 2018 +A4 2026)
Fig 1: Regulation 522.6.202 (P152 BS 7671: 2018 + A4: 2026).
Jonathan Swain, Technical Commercial Engineer at NAPIT, explains the requirements of BS 7671 when routing and concealing cables within a building’s fabric. He highlights the importance of understanding permitted cable zones, mechanical protection and external influences to minimize the risk of damage, ensuring safety and compliance throughout electrical installations.
HIDDEN DANGERS T
he ability to correctly route cabling within an installation is a key skill for any installation electrician. This article considers the requirements of BS 7671 when cabling is concealed within the fabric of the building, to reduce the risk of impact to our wiring systems – or, as it’s more conversationally referred to, reducing the risk of our cables being screwed or nailed into. In this article, we will not be considering Building Regulations compliance, although this must, of course, be adhered to in addition to BS 7671 requirements to ensure that our installations do not compromise the structural integrity or fire safety of a building.
External influences Part 3 of BS 7671 requires the designer of an electrical installation to assess the external influences to which the installation will be subjected. In appendix 5, we are provided with three general categories: environment, utilisation and construction of buildings. Further detail is then provided for external influences that may apply within these categories. Correctly identifying these influences the designer to select and erect the installation to meet requirements. For example, the reason routing cabling through cavity walls is considered inadvisable is that, when considering ‘environment’ as an external influence, a designer must account for flora (AK) and fauna (AL). The reason PVC twin and earth cabling is not installed externally is its lack of suitability for UV exposure – solar radiation (AN), etc. When wiring systems are embedded within the building fabric, the external influence of impact is a primary concern. Even within low-risk domestic or light commercial environments, there is still potential for mechanical stress due to the risk of penetration to a concealed wiring system.
This is of particular note when considering another external influence in domestic properties – utilisation. Most users of domestic installations, for example, will be of capability BA1 (Ordinary) and may be less able to perceive and mitigate risk of damage to the installation than someone who is BA5 (Skilled). As a general requirement, BS 7671: 2018 +A4: 2026 states in Regulation 522.6.1 that: ‘Wiring systems shall be selected and erected so as to minimise the damage arising from mechanical stress, e.g. by impact, abrasion, penetration, tension or compression during installation, use or maintenance.’ As electricians, we should always be mindful of how and where wiring systems are installed, regardless of the specific requirements reviewed in this article.
Cables concealed in walls In Amendment 4, Regulation 522.6.202 now sets out the requirements for correct routing and installation of cables (in a wall or partition) in a clear and easy to understand table format (Fig 1). The requirements remain the same with
PROFESSIONAL ELECTRICIAN September 2026 59
059_PE_SEPT26_Layout 1 30/07/2026 09:08 Page 60
THE CPD ZONE
Fig 3: Example of a mis-interpretation of prescribed cable zones. There is no cable connecting to the accessory from above to create a vertical prescribed zone.
selection and erection decisions informed by the installed depth i.e. less than or greater than 50 mm and whether or not the wall is constructed of metallic parts. In this Regulation, we find the familiar descriptions of the cable zones prescribed when concealing cables in walls, as shown in Fig 2. The intent of indent (i) of the Regulation is to make it more likely that users of the installation will be able to identify the cable route and avoid damage when drilling or nailing into the structure. Accessories can create permitted zones horizontally and vertically from an accessory. The corners formed by walls and ceilings can also be used (up to 150 mm) because it is less likely that this part of the wall will be used for hanging shelves or pictures. However, additional care must be taken when kitchen units and the like are installed, as these are often within the 150 mm of a wall.
Fig 4: Alternative solutions as per Regulation 522.6.204 (P152 BS 7671: 2018 +A4: 2026)
NAPIT Technical Tip: Where an accessory is used to create a prescribed zone, it is only valid if there is cable connecting to that accessory indicating the zone presence. The presence of an accessory alone does not automatically create cable routes vertically or horizontally. In Fig 3, we can see an example where a cable zone has been ‘borrowed’ from the socket below to run cabling for an outside light on the reverse of the wall. The problem with this is that if that socket were to be opened to determine cable routes, any future users would only identify cabling running down the wall from the socket – with no indication of an additional cable concealed above. The intent of the regulation will not have been met, and users of the installation are not given the opportunity to avoid the risk of damaging the wiring system.
60 September 2026 PROFESSIONAL ELECTRICIAN
“Most electricians will recall a call-out to a homeowner who has nailed through a cable when hanging pictures.” Although commonly referred to as such, there is no such thing as a “safe zone” – there are, however, prescribed zones. Most electricians will recall an out-of-hours call-out to a homeowner in distress who has nailed through a cable when hanging pictures! For this reason, the regulation also requires additional protection by means of a suitable RCD. As can be seen in Table 52.1 (Fig 1): where additional protection (by means of a 30 mA or less RCD) is not provided, perhaps because of selectivity considerations, an alternative option is given to comply with Regulation 522.6.204 (Fig 4). It should be noted that where a wall or partition has metallic parts there will still be a requirement to install in prescribed zones. Of the options shown in Fig 4, the most likely to be achievable is the provision of sufficient mechanical protection to protect the wiring system or earthed metallic covering so that, in the event of cable damage, automatic disconnection of supply (ADS) is achieved. If mechanical protection alone is provided, it must be sufficient to withstand the likely impact, and with modern power tools, this can be difficult to achieve. Fig 5 displays how earthed metallic protection can be provided by using Steel Wire Armoured Cable (SWA) and earthed metallic conduit.
059_PE_SEPT26_Layout 1 30/07/2026 09:11 Page 61
Fig 6: Regulation 522.6.201 (P151 BS 7671: 2018 + A4 2026)
Cables in floors and ceilings For cabling installed in floor or ceiling structures, BS 7671 does not provide permitted cable zones as it does for walls and partitions. In these cases, Regulation 522.6.201 applies (see Fig 6). Cables need to be installed so they are unlikely to be damaged. For example, securing cables near the top or bottom of
joists where missed plasterboard or floorboard fixings could present a hazard is unlikely to meet this requirement. Where cabling passes through a joist or ceiling support, it must be at least 50 mm from the top or bottom of the joist to avoid damage from fixings above or below. If this cannot be met, we return to Regulation 522.6.204, where the options are again to provide sufficient mechanical protection or use a suitable earthed wiring system or covering (see Fig 7). NAPIT Technical Tip: Proprietary ‘safe plates’ are unlikely to meet the requirements of 522.6.204 – particularly given the widespread use of power tools, nail guns etc. Guidance suggests a steel covering of a minimum 3 mm thickness. If this is a chosen method of protection, the designer must decide whether this is sufficient. It is important to note though, as stated in the regulation, if earthed mechanical protection is used as the means of compliance, it must meet BS 7671 requirements for a protective conductor for the circuit.
This may apply where the use of existing notches or holes cannot be avoided. The use of RCDs is not a substitute for these requirements. Fig 8 shows an example of a cable protection safe plate, however, these may not meet current safety requirements. Conclusion Correct positioning of cables can often be challenging for installers. When routing a concealed wiring system through a building, electricians must navigate not only Building Regulation compliance but also BS 7671 requirements to achieve fundamental electrical safety. FOR MORE INFORMATION ON NAPIT REGISTRATION VISIT: WWW.RDR.LINK/ECB020
CPD ZONE ENDS! SCAN THE QR CODE TO CLAIM YOUR CPD CREDIT FOR THIS EDITION OR VISIT: WWW.RDR.LINK/ECB021
PE Page Grid_Layout 1 29/07/2026 09:23 Page 1
063_PE_SEPT26_Layout 1 30/07/2026 09:13 Page 63
PROFESSIONAL ELECTRICIAN Sponsored by
ELEX2026 The Electricians’ Exhibition
CONTINUE YOUR PROFESSIONAL DEVELOPMENT AT ELEX SHOW!
Running across two days, the ELEX show returns next month with a brand new venue – Stoneleigh Park. What’s more, we’ve got great news for visitors that are serious about CPD!
R
ecent changes to The Electrotechnical Assessment Specification (EAS) which sets out the minimum requirements for a business to be recognised as technically competent by a Certification or Registration Body, includes a requirement for businesses to maintain appropriate records of qualifications, training (including Continuing Professional Development) and experience. To support this requirement, EVERY ELEX seminar is now CPD accredited, ensuring those individuals who make the time and effort to attend will receive a direct certificate of completion, which can
form a key part of your ongoing Continuing Professional Development record. With industry regulation and legislation changing constantly, the extensive ELEX seminar programme will cover an array of topics, including the latest Amendment 4 to the 18th Edition and the changes this covers, along with best practice and technical advice for professionals to get stuck into. Presentations will be delivered by experts in their field and the only cost to delegates is their time. All seminars will take place in the IET Seminar Theatre located centrally in the exhibition hall and there’s no need for delegates to pre-book, just pre-register to attend the show. Whether you need some advice on the direction the sector is heading, want to chat with manufacturers about their latest solutions, view live demonstrations of the latest products or bag yourself a great
YOUR SHOW, NEAR YOU... ●
At a venue near you Across two days ● Free parking (van friendly) ● Free entry ● Free T-Shirt & a free bacon roll* ●
(*limited to first 1,000 visitors) ●
Show bargains Hands-on demos ● Meet manufacturers ● Networking opportunities ● CPD accredited seminars and certificates ●
show deal on tools and equipment from leading brands, your regional ELEX tradeshow has it all. ELEX returns next month with a new venue on this year’s calendar – Stoneleigh Park, West Midlands – October 22nd & 23rd, 10am - 4pm
REGISTER FOR YOUR FREE ELEX STONELEIGH PARK SHOW TICKET BY VISITING: WWW.RDR.LINK/ECB022 PROFESSIONAL ELECTRICIAN September 2026 63
064_PE_SEPT26_Layout 1 30/07/2026 09:16 Page 64
Working on your own? Need some technical advice? Don’t know where to turn? Ask Megger. What it doesn’t know about installing and testing electrical systems isn’t worth knowing. Every question will be answered by the Megger Technical Team, and the best will be published in Professional Electrician. So, take advantage of the ‘every question answered’ guarantee today. Email your questions to: meggermeasures@hamerville.co.uk
You ask: I’VE BEEN THINKING ABOUT ADDING A THERMAL CAMERA TO MY TOOL KIT, BUT I’M NOT SURE WHETHER IT WOULD BE USEFUL ENOUGH TO JUSTIFY THE COST AND THE AMOUNT OF TIME IT WOULD TAKE TO LEARN HOW TO USE IT. WHAT DO YOU THINK?
Megger says: First of all, we’re confident you’d find a thermal camera to be very useful. It can, for example, help you to identify overheating components, loose connections, overloaded circuits and unbalanced loads in seconds – often before these problems develop into serious issues. Overall, it provides you with convenient and effective support for fault-finding, producing EICRs and carrying out preventative maintenance, helping you to diagnose problems faster and work more efficiently. And, if you choose the new Megger TC120, you won’t have to worry about cost or complexity. This entry-level thermal camera has been designed to be affordable and easy to use but no compromises have been made in performance. It has IR-Perfclear technology which enhances details and reduces noise so that you get a clear infrared image in real time, and it also includes a 2MP visible light camera with photo and video recording. You’ll be using the TC120 within minutes of taking it out of the box and, before long, you’ll wonder how you managed without it. It’s definitely an investment you won’t regret! VISIT THE MEGGER TC120 PRODUCT INFORMATION PAGE AT: WWW.RDR.LINK/ECB023
64 September 2026
PROFESSIONAL ELECTRICIAN
065_PE_SEPT26_Layout 1 30/07/2026 09:21 Page 1
TO EE FR DE RA ET TH
PROFESSIONAL
ELECTRICIAN SPECIAL FEATURE
STRIP SEARCHERS GET A GRIP OF THE STRIP WITH SOME TOP TIPS FROM INTEGRAL LED
LIGHTING HOW TO LIGHT UP YOUR BUSINESS PROSPECTS AS THE DARK SETS IN
& INSTALLER
066_PE_SEPT26_Layout 1 30/07/2026 09:25 Page 66
LIGHTING LED strip lighting offers almost limitless design possibilities, but with so much choice, selecting the right solution can seem daunting. In this article, the team at Integral LED simplify the specification process and explain how choosing the right LED strip system can be far easier than many installers expect.
GETA GRIP OF THE STRIP
T
he rise of COB (Chip-on-Board) LED strip has helped transform modern lighting design. From social media-inspired residential projects to retail, hospitality and commercial environments, seamless linear lighting has become one of the most requested lighting features by clients and specifiers alike. LED strip lighting can create everything from subtle mood lighting and feature illumination through to functional task lighting and large-scale architectural effects. However, whilst the finished result often appears simple, selecting the correct products requires an understanding of output, IP ratings, drivers, profiles and controls. So, where do you start when a client asks for LED strip lighting as part of their project?
At ceiling height, you'll typically need a similar output to a downlight – usually between 600 and 1,000 lumens per metre. If the strip is being used indirectly, such as within a ceiling cove or recessed niche, a higher output may be required to achieve the desired effect. Under kitchen cabinets, shelving, staircases and joinery applications, the strip is positioned much closer to the illuminated surface, so lower outputs are often sufficient. In many cases, 400-650 lumens per metre provides the ideal balance between functionality and visual comfort.
Choosing the right LED strip The first question to ask (and usually the easiest to answer) is: “Where is the strip going?”
66 September 2026
PROFESSIONAL ELECTRICIAN
White Digital Chasing creates dynamic lighting effects that add movement and energy to modern spaces and environments.
Choosing the correct colour temperature can influence the mood of a space and elevate the overall design.
The next consideration is IP rating. Fortunately, the same principles that apply to downlights also apply to LED strip. For dry environments such as living rooms, offices and meeting rooms, IP20 products are usually suitable. Bathrooms, kitchens and areas where splashing may occur should typically use IP65-rated strip, whilst outdoor installations and locations exposed to the elements are often best served by IP67 solutions. The second key question determines which driver you'll need: “How much LED strip is required?” If the chosen strip consumes 10 W per metre and the installation requires 15 metres, the total load is 150 W. As a rule of thumb, allow an additional 10% capacity to ensure the driver is not operating continuously at maximum load. In this example, a 165 W driver would be appropriate. The next step is to consider maximum run lengths. Standard COB strip often runs up to 5 metres from a single feed point before voltage drop becomes a concern. If longer runs are required,
066_PE_SEPT26_Layout 1 30/07/2026 17:26 Page 67
쑮 Ultralong MAX enables continuous runs of up to 30 metres from a single driver, helping simplify larger LED strip installations.
installers may need to power the strip at multiple points or specify specialist long-run solutions. Products such as Ultralong MAX help overcome this challenge, supporting continuous COB runs of up to 30 metres powered from a single end or up to 60 metres powered from both ends. Planning the installation Which brings us to the next question: “How are you going to wire it?” Most LED strip installations rely on drivers concealed within ceiling voids, cupboards or service areas. Planning the location of these components early can simplify installation and make future maintenance significantly easier. Choosing the right connector system can also save valuable installation time. Crimp connectors with integrated cables eliminate the need for soldering and allow straightforward connections back to the driver. Corner connectors and flexible linking accessories can further simplify installations where layouts need to follow changes in direction. Once the strip, driver and connectors have been selected, there is one final consideration: “Which profile will you use?” Every LED strip install needs a profile, just as a GU10 lamp requires a fitting. Aluminium profiles protect the strip, help dissipate heat and provide a more reliable mounting surface. Wooden shelving, painted surfaces and kitchen cabinetry may all suffer from reduced adhesion due to dust, oils or surface finishes, making profile an essential part of a professional installation. Installers can typically choose between surface-mounted, recessed and plaster-in profiles depending on the application. The best manufacturers will clearly identify which strips are compatible with each profile, helping to simplify specification. Finishing touches For electricians who need additional flexibility, there are several specialist strip options available.
Looking ahead As customer expectations continue to evolve, LED strip lighting is increasingly being specified as a primary lighting source rather than simply an accent feature. Installers are being asked to deliver seamless lighting effects, flexible control options and cleaner architectural finishes across a growing range of projects. Having access to a comprehensive ecosystem of strip, drivers, controls, connectors and profiles can simplify specification whilst ensuring compatibility throughout the installation.
Bendy LED strip delivers smooth curves and warm accents for detailed architectural and interior applications.
Free Cut LED strip can be cut at virtually any point along the strip, reducing waste and removing the limitations associated with traditional cut intervals. This makes it particularly useful for shelving, joinery and bespoke installations where precise lengths are required. Longer runs become easier to achieve with products such as Ultralong MAX, whilst RGBW strip allows colour-changing effects to be introduced into a project. For applications that require changing colour temperature throughout the day, CCT Tunable strip provides the flexibility to adjust from warmer to cooler white tones. Digital strip takes this a step further by introducing movement, chasing effects and dynamic lighting scenes that can transform the atmosphere of a space.
About Integral LED Integral LED delivers trusted lighting solutions across commercial, industrial and residential sectors. The company offers one of the UK's most comprehensive LED strip lighting ranges, including COB, Free Cut, Ultralong MAX, CCT Tunable and RGBW solutions, supported by compatible drivers, controls, connectors and aluminium profiles. BROWSE OR DOWNLOAD THE LATEST LED STRIP BROCHURE BY SCANNING THE QR CODE OR VISITING: WWW.RDR.LINK/ECB024
PROFESSIONAL ELECTRICIAN September 2026 67
068_PE_SEPT26_Layout 1 30/07/2026 09:50 Page 68
LIGHTING
NO STRINGS ATTACHED
Joshua Hammerton, Co-Founder of Enkin, explains how the company's latest Kinetic lighting controls are redefining wireless switching with smarter functionality, faster installation and greater flexibility for retrofit projects.
A
t Enkin, we’ve always believed lighting controls should make life easier for electricians, while offering smarter, more flexible solutions for customers. That’s why we’re excited to launch our new range of Kinetic receivers, designed to work with decorative toggles, push button, rocker switches and plastic paddle switches in collaboration with two of the UK’s leading switch and socket companies, The Soho Lighting Company and Lieber. These new switch modules combine self-powered Kinetic technology with our intelligent lighting control technology and advanced safety features. Until now, wireless Kinetic switches have largely been restricted to basic on/off functionality. We wanted to change that. Our new modules remove that limitation by supporting a broader range of lighting control solutions, including dimming, smart control, dual-channel switching and double-pole switching.
Designed to make installations quicker, cleaner and more flexible, the switch generates its own energy every time it is pressed, removing the need for batteries or wiring to the switch. It then wirelessly communicates with our new Kinetic receivers, giving electricians a simple solution for both new installations and retrofit projects. Keeping disruption to a minimum The benefits for electricians are plenty. There are no chasing walls to run switch cables, no batteries to replace and far less disruption when adding or relocating lighting controls. It's particularly useful for listed buildings, renovations and properties where rewiring is difficult or simply not practical. As an electrician, I've spent years seeing the same challenges on-site. Running cables isn't always practical, especially on retrofit projects where time, disruption and cost all add up. We wanted to create something that genuinely makes life easier for electricians while giving
customers a smarter way to control their lighting. By combining Kinetic energy harvesting with our dimming technology, we've developed a completely new way of thinking about lighting control. Our mission at Enkin is to become the market-leading brand in retrofit lighting and controls, bringing intelligent, easy-fit solutions to every home and space. This new product range combines elegant switch design with our intelligent, award-winning technology to deliver smarter, next-level lighting control. We've built the Kinetic switch on Enkin's reputation for developing intelligent lighting controls that simplify installation and solve everyday challenges on-site. Following the success of our award-winning dimming products, we've once again challenged conventional lighting control by removing the need for traditional switch wiring without compromising on performance. The next step in lighting control Our Kinetic Switch and Receiver range represents the next step in lighting control technology, combining battery-free switching with intelligent dimming in one simple solution. As demand for retrofit-friendly and energy-efficient solutions continues to grow, we believe Kinetic dimming technology is set to play an important role in the future of lighting control. The new Kinetic product range launches this month.
GET MORE DETAILS ON ENKIN’S NEW KINETIC PRODUCT RANGE BY VISITING: WWW.RDR.LINK/ECB025
68 September 2026
PROFESSIONAL ELECTRICIAN
PE Page Grid_Layout 1 24/07/2026 15:49 Page 1
PE Page Grid_Layout 1 24/07/2026 12:05 Page 1
071_PE_SEPT26_Layout 1 30/07/2026 15:47 Page 71
LIGHTING
LISTENING, LEARNING AND LIGHTING THE WAY
I
f you were looking at Lumineux from the outside, you might describe the last few months as a busy period of innovation. We’ve introduced our new Apex range, launched LumiWave and, with LumiSmart also joining the portfolio this year, broadened the solutions we can offer customers. From inside the business, however, I’d describe it less as a period of innovation and more as a period of listening. One thing that has stood out to me since joining Lumineux is how close the business is to its customers.
With a number of significant developments taking place at Lumineux, David Street, Head of Marketing, explains why listening to the industry remains at the heart of the company’s plans for growth. Conversations with contractors, wholesalers and end users have always been important and I’m keen that we continue building on that. Listening means more than asking customers what products they want. It’s about understanding the challenges they face, where time is being lost and where we can make their working lives easier.
Apex and LumiWave are good examples of that thinking, although they approach it from completely different directions. Changing the habit With Apex, we weren’t trying to reinvent the bulkhead. There’s only so much you can do with that type of product. It needs to be reliable, do its job and, importantly, be something electricians are happy to fit. Rather than trying to change what a bulkhead is, we focused on how electricians actually install them. We looked at the installation process and asked where we could make life easier. If we could create a product that was straightforward to work with and something contractors would pick up because they knew it was easy to fit, then we’d achieved what we set out to do. That thinking is where our ‘Change the Habit’ campaign came from. We want installers to look again at a product they may buy automatically and consider whether there’s an option that can make their working day simpler. I think sometimes there is too much focus within our industry on what’s new rather than what’s genuinely useful.
PROFESSIONAL ELECTRICIAN September 2026 71
071_PE_SEPT26_Layout 1 30/07/2026 15:48 Page 72
LIGHTING
Contractors often appreciate products that are well thought through, reliable and easy to use. If improving an existing product delivers more value than adding another feature for the sake of it, that’s what we’ll do. A smarter approach LumiWave has been developed to solve a very different challenge. Emergency lighting testing, record keeping and compliance all take time and can create a significant administrative burden, especially across larger buildings or multiple sites. LumiWave helps automate much of that process, giving contractors, facilities managers and building owners better visibility of their emergency lighting systems while reducing the administration involved. Technology is moving quickly across the electrical industry, with growing demand for smarter, connected and energy-efficient installations. However, I don’t think many contractors get out of bed in the morning simply wanting more technology. They require reliable products that are straightforward to install and help them get the job done as quickly and efficiently as possible. That’s the reminder we continue to give ourselves when looking at connected solutions. Technology should
only exist if it solves a genuine problem. LumiWave does that by simplifying emergency lighting compliance, while LumiSmart has been developed to make intelligent lighting control easier to specify, commission and manage. They’re different solutions, but both are built around making life easier for the installer and delivering a better experience for the end user. Keeping things straightforward As products and systems become more advanced, manufacturers have a responsibility to ensure they remain accessible to those expected to install them. The best product in the world won’t succeed if people don’t understand it or they believe it will be complicated to install. Electricians are busy and don’t have time to read lengthy manuals before getting started, which is why we’ve placed so much emphasis on making our products straightforward. That needs to be backed by clear installation guides, useful technical literature and knowledgeable support when required. Whether somebody is installing a straightforward lighting product or a connected solution such as LumiSmart or LumiWave, we want them to know support is available. That could mean technical advice, commissioning assistance or simply someone at the end of the phone to answer a question. Confidence in the product is important, but confidence in the support behind it matters just as much. Investing in the bigger picture The new product launches are probably the most visible part of what has been happening at Lumineux recently, but they’re only one element of a much bigger picture. We’ve continued to invest across the business, strengthening our product portfolio, expanding our sales and marketing teams, developing our technical capabilities and building the support our customers expect. From my perspective, I’ve wanted to bring a more proactive approach to marketing. That doesn’t mean marketing for marketing’s sake, but instead communicating consistently, sharing useful information and spending more time understanding what our customers need.
72 September 2026
PROFESSIONAL ELECTRICIAN
That’s why you’ll have seen Lumineux investing more in PR, digital content and social media, while working more closely with trade publications and industry partners. We’re putting greater focus behind these activities because I believe they help us remain connected to the market and the people using our products. Alongside that, we’ll continue investing in new products, technologies and the people behind them. What comes next? We’ve got plenty planned over the next 12 months, both in terms of new products and how we support the market. With LumiSmart joining the portfolio, alongside the continued development of LumiWave and our core lighting ranges, we’ll continue broadening the solutions available to customers. The thinking behind them, however, won’t change. We’ll keep spending time with contractors, wholesalers and end users because those conversations help shape where we go next. The industry won’t stand still, and neither will we. Our job is to keep learning, improving and looking for ways to make a practical difference. BROWSE THE LUMINEUX RANGE OF LIGHTING PRODUCTS AND SOLUTIONS AT: WWW.RDR.LINK/ECB026
PE Page Grid_Layout 1 05/06/2026 09:01 Page 1
074_PE_SEPT26_Layout 1 30/07/2026 09:57 Page 74
LIGHTING
Stamen Tasev, Country Manager UK & Ireland at Shelly, looks at the reasons why lighting is the retrofit market’s best kept secret.
LIGHT YEARS AHEAD
S
mart home technology has had a perception problem in the UK. For years it was associated with new builds, high budgets and a level of technical complexity that put off the majority of homeowners and the installers who serve them. Lighting, in particular, felt like something you planned from the ground up or didn't bother with at all. That perception is changing, and from where we sit, the retrofit lighting opportunity is one of the most exciting in the market right now.
The UK home is ready for this Britain's housing stock remains one of the oldest in Europe, with the vast majority of homes that will exist in 2040 already built today. The government's retrofit strategy continues to focus on upgrading existing homes rather than relying on new-build standards alone, recognising that improving the energy performance of the UK's ageing housing stock is essential to meeting Net-Zero targets. Lighting is where that question now has a compelling answer. Modern smart dimmer and switching devices are designed to work with the wiring already
in place, including the many older UK properties that lack a neutral wire at the switch. Installers can walk into a home and upgrade an entire floor of lighting in a day, using the existing switches and fittings, without touching a single ceiling rose or lifting a floorboard. The result for the homeowner looks and feels like a high-end system. The installation is clean, fast and profitable for the trade. What homeowners actually want The conversations we're having across the UK point consistently in the same direction. Homeowners want control – the ability to set the correct light for the right moment, whether that's a bright, energising start to the morning, a softer atmosphere in the evening, or lights that respond automatically when they leave a room. They want schedules that mean they never come home to a dark house and they want to stop worrying about whether they left something on. Energy is the other constant. The focus on household energy efficiency shows little sign of slowing. The latest ONS housing efficiency data shows that while the average efficiency of homes in England and Wales is improving, older
74 September 2026
PROFESSIONAL ELECTRICIAN
074_PE_SEPT26_Layout 1 30/07/2026 10:03 Page 75
properties continue to lag behind newer housing stock, creating significant scope for retrofit technologies that can reduce unnecessary energy consumption. The installer advantage What's shifted most significantly in the last couple of years is installer confidence. Smart lighting used to require a specialist – someone with deep knowledge of a proprietary ecosystem, dedicated training and often a minimum project size that made smaller residential jobs unviable. That's no longer the case. The technology has become genuinely accessible, and the best solutions on the market today are designed with the installer in mind: quick to configure, reliable in the field, and backed by support that doesn't disappear after the sale. In the case of those installers who haven't yet made smart lighting a core part of their offering, the
timing has rarely been better. The demand is already there among their existing customers, the installation barrier has come down dramatically, and the margin opportunity, both on the initial fit and on the ongoing relationship with a customer whose system can grow over time, is real. Where we're heading Lighting is rarely the end of the story. Once a homeowner experiences
responsive, automated light in their home, the appetite for extending that intelligence to heating, security and shading typically follows. This represents the beginning of a longer and more valuable customer relationship for installers, and for the smart home market as a whole, lighting is increasingly the front door. At Shelly, what drives us day-to-day is making that entry point as wide as possible – ensuring the technology is affordable, flexible and straightforward enough that no installer feels locked out of the opportunity, and no homeowner feels it isn't for them. The UK retrofit market is vast, largely untouched, and ready. The industry just needs to meet it where it is. BROWSE THE FULL SHELLY RANGE OF PRODUCTS AND SOLUTIONS BY VISITING: WWW.RDR.LINK/ECB027
076_PE_SEPT26_Layout 1 30/07/2026 10:10 Page 76
LIGHTING
Jason Covell, Product Manager at Brackenheath, reveals how the brand is making outdoor lighting specification and installation simpler through a co-ordinated range that’s designed with electricians firmly in mind.
A BRIGHTER SPOT
B
rackenheath’s new iSpot collection combines unified installation, flexible functionality, and installer-focused features across a complete family of outdoor luminaires.
Meeting the changing demands of outdoor lighting Homeowners increasingly expect outdoor lighting to do more than simply illuminate a space. Products must complement the appearance of the property, operate reliably throughout the year and provide practical features that improve security, convenience and energy efficiency. The new iSpot Outdoor Lighting collection from Brackenheath has been developed to meet these expectations while also making product selection and installation more straightforward for electrical contractors. One co-ordinated family of luminaires The collection brings together bulkheads, floodlights, lanterns, up-and-down lights and bollards within one co-ordinated outdoor-lighting family. Each product follows the same design, allowing installers to create a consistent appearance across entrances, pathways, driveways, gardens and other exterior areas. Traditionally, contractors may need to select products from several different ranges or manufacturers, with no guarantee that the finishes, designs, or functionality will complement one another. The iSpot
76 September 2026
collection provides a complete solution from a single established lighting brand, helping installers achieve a more uniformed and professional result across the property. Simplifying installation and future upgrades Selected products within the range have been developed around a unified installation. This can make future product changes and upgrades easier by reducing the need for significant alterations to existing fixing points or cable positions. For example, a homeowner may be able to replace a floodlight with a lantern or an up-and-down light using the same fixing positions. This provides greater flexibility both during the initial installation and for future upgrades. Flexible control options in a single product The iSpot bulkhead also combines four operating options within a single product. Configurable functions include PIR detection, photocell operation, PIR with dimmed standby lighting and manual override. Installers can therefore adapt the fitting to suit the property and application without needing to specify or buy several separate product variants. This flexibility can help wholesalers and contractors reduce stock complexity while giving homeowners greater control over how their outdoor lighting operates. The lighting can be configured to respond to movement, switch automatically according to ambient light levels, or maintain a reduced background output
PROFESSIONAL ELECTRICIAN
before increasing to full brightness when activity is detected. Enhanced detection for improved security Selected PIR models provide a detection range of up to 10 metres and incorporate anti-creep coverage. This helps reduce the blind spot directly beneath a conventional motion sensor, improving detection when someone approaches close to the fitting. Designed for excellent year-round outdoor performance Designed for exposed outdoor environments, the collection provides IP65 protection against dust and water ingress, including around the PIR sensor, together with an IK07 impact-resistance rating. This helps ensure reliable performance throughout the year in a wide range of exterior applications. Supported by decades of expertise Backed by more than 45 years of Brackenheath lighting experience, the iSpot collection combines contemporary design, installer-focused engineering, and flexible control options within one co-ordinated range. GET MORE DETAILS ON THE BRACKENHEATH ISPOT OUTDOOR LIGHTING COLLECTION AT: WWW.RDR.LINK/ECB028
PE Page Grid_Layout 1 24/07/2026 12:10 Page 1
078_PE_SEPT26_Layout 1 30/07/2026 10:13 Page 78
LIGHTING
UNI-VERSAL APPEAL Keeping tools and lighting powered shouldn't complicate the job. Shyel Stark, Product Sourcing Director at Luceco Lighting, discusses a smarter approach to battery-compatible site lighting.
W
hilst cordless power tools have transformed the way tradespeople work, one challenge remains – managing multiple batteries, chargers and power sources across different equipment platforms. Recognising this issue, Luceco has developed its UniVolt range of inspection and work lights to provide a more flexible approach to portable site lighting. Designed around the needs of today’s installer, the range allows tradespeople to use the batteries they already own, delivering powerful, reliable illumination without the need to invest in additional battery platforms. It is compatible with many of the leading 18/20 V power tool battery brands, including Black & Decker, Bosch Pro, Dewalt, Makita, Milwaukee, Porter Cable and Stanley. Designed around the installer Whether carrying out inspections, working in confined spaces or installing equipment across larger sites, clear visibility helps professionals complete tasks with confidence. Luceco’s UniVolt range has been developed with these considerations in
78 September 2026
mind, combining high-output LED technology with practical features designed for professional use. By using batteries, it eliminates the need to wait for items to recharge, and the battery can be replaced immediately on-site, making better use of the equipment already available in the van or workshop. Installers invest heavily in their cordless tool platforms, so it makes sense that their lighting should work alongside those systems rather than create another battery requirement. UniVolt has been designed to provide a simple, practical solution that fits seamlessly into the way tradespeople work. Whilst traditional rechargeable lighting products can experience a gradual reduction in brightness as battery power decreases, UniVolt models feature smart electronics designed to maintain stable illumination throughout the task. This consistent light output is a major benefit of the range and ensures installers have dependable visibility when accuracy is critical. Flexible lighting for every application Designed to meet the varied requirements of professional users, the UniVolt range includes a selection of portable lighting solutions:
PROFESSIONAL ELECTRICIAN
● The UniVolt 18-20 V Triple Head Work
Light (LILWV250G65) delivers 2,500 lumens of daylight illumination, with rotating side panels that allow users to adjust light coverage depending on the application. A magnetic base and tripod mount provide further flexibility, making it ideal for temporary task lighting. ● For larger areas, the UniVolt Titan
Telescopic Work Light (LILTPV750G65) provides up to 7,500 lumens, combining a heavy-duty aluminium and polycarbonate housing with an adjustable light head and extendable tripod. This makes it suited to demanding environments where powerful, reliable illumination is required. ● The UniVolt Heavy Duty Open Area
Work Light (LWHOAV400G65) is designed for challenging site
078_PE_SEPT26_Layout 1 30/07/2026 17:27 Page 79
conditions, offering 360˚ illumination, 4,000 lumens and a durable IP65 and IK10-rated construction. It also includes a USB power-bank function, adding further practicality when working away from fixed power sources.
across work areas, utilising a 90˚ tilting head, integrated fold-out hanging hook and four selectable lighting modes.
● For ultimate flexibility, the Hybrid Twin
Head Work Light (LILHYV350G65UK) combines battery and mains operation. Running from either a compatible 18/20 V battery or a standard 220-240 V supply, it ensures installers always have a reliable lighting option available. Delivering up to 3,500 lumens, the twin head design offers full tilt and twist movement for focused or wide-area lighting, while an integrated 13 A socket provides additional functionality when connected to mains power. ● The UniVolt LED Spotlight
(LILSPV200G65) delivers powerful, adaptable illumination. It provides up to 2,000 lumens of bright 6500K daylight output for clear visibility
Innovation that supports productivity Beyond convenience, the UniVolt concept supports more sustainable working practices by reducing the need for additional battery purchases and helping installers maximise the equipment they already own. With contractors managing multiple teams, this compatibility can also simplify equipment management, allowing lighting solutions to be deployed quickly without concerns over different battery platforms. The best innovations are those that solve genuine problems. We wanted to create a range that helps installers work
more efficiently, whether they’re carrying out a quick inspection or requiring reliable illumination across a much larger site. As cordless technology continues to influence the way tradespeople work, the demand for flexible, efficient and reliable equipment will continue to grow. By allowing professionals to use the batteries they already rely on, UniVolt removes unnecessary complexity and helps installers focus on what matters most – completing the job safely, efficiently and without interruption. BROWSE LUCECO’S UNIVOLT RANGE OF INSPECTION AND WORK LIGHTS BY VISITING: WWW.RDR.LINK/ECB029
080_PE_SEPT26_Layout 1 30/07/2026 10:19 Page 80
LIGHTING
I LIKE YOUR
ACCENT
W
hile you’ll be asked to install general lighting using downlights, pendants or panels for most domestic installations, accent lighting will add depth, mood and interest. This plus task lighting will transform a flat lighting scheme into something with a real ‘wow’ factor. And it’s not difficult to do with a little bit of knowledge.
Do you know how to use accent lighting to provide that extra ‘wow’ factor? Anthony Martindale, Senior Product Manager at Collingwood Lighting, provides some tips so that you are seen as far more than “just an installer.” Creating layering of light A great lighting scheme uses layers of light to create the right atmosphere for a space. It combines general or ambient lighting with task and accent lighting to create a visually interesting whole. While task lighting will enable them to complete a task, whether that is working at a computer or preparing food, accent lighting will add interest to a room. Rather than simply make a room bright, you need to work with your customer to create a look that will impress them and visitors. It’s not just about adding more light but considering where to use it and what to leave in shade. A common mistake is to overdo a scheme, which will ruin what you and your customer are trying to create. Instead, think about creating bright focal areas, darker zones to add depth and soft background lighting. Where to use accent lighting When you walk into a room consider what stands out. Talk to your customer and ask them how they want a room to feel and what they want people to notice when they walk in.
80 September 2026
PROFESSIONAL ELECTRICIAN
Lighting design is all about contrast, so prioritise and pick two or three features that they want to highlight. Common examples include artwork, architectural details, shelving, textured walls, plants or cabinets. Top tips for accent lighting You want to see the effect of the lighting but not the source, so the lighting either needs to be hidden from view or directed at the object to avoid glare. For artwork and sculptures use adjustable spotlights or picture lights to direct light where it’s needed. A narrow beam angle will create drama. Think about using uplighters or downlighters to emphasise architectural details like exposed brick, textured walls, columns, or interesting ceiling designs. For an easy upgrade, which is simple to install and will add a touch of sophistication to any space, add LED strips to shelves, cabinets, wardrobes or even stairs. These offer a soft light and emphasis any linear features in a room. You can take this a step further by hiding LED strip, which offers a soft diffuse light that creates atmosphere for a
080_PE_SEPT26_Layout 1 30/07/2026 10:22 Page 81
sophisticated feel in any room. You can use it in ceiling coving, headboards or behind furniture. To emphasis texture, wall grazing is another useful trick to have up your sleeve. If your customer has a brick or stone wall, or even wooden panels, you can help emphasise this area by installing fittings close to the wall. This creates light and shadow to emphasis texture. Another option is wall washing. Here you place spotlights a few feet away from the wall to create a soft even glow that will smooth out imperfections and make a room feel larger. Other factors to consider Your customer will need to control their accent lighting so recommend separate switching and/or dimming. If they have the budget, then more sophisticated control systems allow them to consider setting different lighting scenarios, depending on what mood they want to create in a room. Because you use accent lighting to emphasise features it’s worth considering the colour temperature of the lighting. For
warmer coloured features such as oranges or reds or for wood, a warmer correlated colour temperature (CCT) of 2700K or even 2200K will help make it glow. If you’re highlighting cooler colour temperatures such as blues, greens or white then recommend a higher CCT of 4000K to make it even more vibrant. And if you’re lighting artwork then the colour rendering index (CRI) is important. For most lighting, a CRI of more than 80 is fine, but where you want a very accurate colour representation then choose a source that has a CRI of greater than 90.
Adding accent lighting in the right place is a simple way to improve your customer’s lighting. Using it in combination with ambient and task lighting will help produce sophisticated multi-layered effects. Ultimately, a few well-placed suggestions are likely to help you win more business with a higher value. BROWSE THE FULL COLLINGWOOD LIGHTING PRODUCT RANGE BY VISITING: WWW.RDR.LINK/ECB030
ADGRIDS_PE_ADGRIDS.PMM_May06 03/08/2026 10:12 Page 82
083_PE_SEPT26_Layout 1 30/07/2026 10:29 Page 83
LIGHTING
ONE IN A MILLI Small in size but big on options, the Ovia Inceptor Milli downlight goes under the spotlight as Reece Hardy puts it to the test.
W
without having to disturb the fixed wiring. Space above the ceiling was restricted on parts of this installation, so the relatively shallow height of the LED unit was another advantage. The Milli also incorporates a rotatable twin insulation cover, allowing it to be safely installed beneath insulation while providing an additional 5 mm of clearance when adjusted.
hen you’re replacing existing downlights, you don’t always know exactly what you’re going to find until the old fittings come out. Limited ceiling voids, existing cabling and different lighting requirements can all make what should be a straightforward job that little bit more challenging. That’s why having a versatile replacement option can make life much easier. I recently had the opportunity to try the Ovia Inceptor Milli downlights on a domestic replacement installation, where the customer wanted to upgrade a number of older fittings without disturbing the existing ceiling or completely rewiring the lighting circuit.
Your flexible friend The first thing that appealed to me was the flexibility built into each fitting. The Inceptor Milli offers selectable 4 W or 6.4 W outputs alongside three selectable colour temperatures. This meant I could adjust the fittings to achieve the light level and appearance the customer wanted without having to carry or order different versions. The fittings are also IP65 rated, fire-rated and dimmable as standard, making them suitable for a wide range of locations, including kitchens and bathrooms. The versions supplied to me had white bezels, although alternative finishes are available if required. For this particular job, I was able to utilise the original cabling, with the supplied Flow push-fit connectors making the replacement process relatively straightforward. Each downlight comes
with a pre-wired male connector, along with a three-pole female push-fit connector with loop. One thing I did notice is that space within the loop connector is fairly limited, so I’d recommend using 1 mm² cable maximum where possible. If you’re terminating three cables, they need to be threaded in carefully. The screwless terminals do have release mechanisms, however, which is useful if cables need to be repositioned. Two screws on top of the free socket connector then allow the cap to be securely locked in place. A feature I particularly liked was the plug-and-socket arrangement between the connector and the downlight itself. Once the wiring is connected, the lamp simply plugs into the socket. This means individual fittings can easily be disconnected from the daisy chain for testing, maintenance or replacement
Versatile and easy to install From a safety perspective, the fittings are fire-rated for 30, 60 and 90-minute ceiling constructions and incorporate an intumescent strip designed to expand in the event of a fire and help seal the opening around the fitting. It’s also good to see some thought given to the product’s longer-term environmental impact. Ovia assesses the range using the CIBSE TM66 methodology, looking at factors including product construction, disassembly and the potential to recycle or refurbish individual materials. Overall, I found the Inceptor Milli to be a versatile and installer-friendly downlight. The selectable wattage and colour temperature, compact dimensions and plug-in connection system are all useful features, particularly on replacement jobs where flexibility can make the difference between a straightforward installation and an unnecessarily complicated one. GET MORE INFORMATION ON THE OVIA INCEPTOR MILLI RANGE AT: WWW.RDR.LINK/ECB031 WATCH A PRODUCT DEMONSTRATION VIDEO AT: WWW.RDR.LINK/ECB032
PROFESSIONAL ELECTRICIAN September 2026 83
084_PE_SEPT26_Layout 1 30/07/2026 10:37 Page 84
LIGHTING
Steve Hewish, Senior Electrician at Unique Group (SW), takes the ROBUS VEGAS LED strip range for a spin to see whether its extensive choice of options can hit the jackpot.
A SAFE BET
L
ED strip has become an increasingly useful option for electricians, whether you’re lighting underneath kitchen cabinets, around bathroom mirrors, outside spaces or creating feature lighting in commercial and hospitality settings. The key, however, is having a system that gives you enough flexibility to adapt to different jobs. That’s where the ROBUS VEGAS range immediately caught my attention. There’s a broad choice of strip available, including single colour, tuneable white, RGB and RGBW options, with IP20 and IP67 versions covering both indoor and outdoor applications. The strip I was sent to test was used to replace the lighting in a conservatory and provide illumination above a hot tub, so the IP-rated strip and drivers were ideal for the job. The IP-rated drivers are particularly useful for outside installations or areas such as poorly sealed or insulated conservatories, where moisture can potentially be an issue.
84 September 2026
Once installed, the finished result looked really effective. The LED strip provided a clean, even spread of light around the conservatory, while the lighting above the hot tub helped create more of a feature of the area rather than simply providing functional illumination. It completely changed the feel of the space after dark and, most importantly, the customer was pleased with the end result. For me, it was a good example of how LED strip can transform an area without the lighting itself becoming too intrusive. Since completing the installation, I’ve also had the opportunity to try the non-IP-rated drivers, which are well suited to more conventional indoor domestic and commercial applications. Lots of options available One of the biggest strengths of the VEGAS range is the sheer number of options available. There are multiple colour temperatures, as well as colour-changing strips, while different controller options allow the lighting to be operated manually, remotely or through Wi-Fi, depending on the requirements of the installation. There’s also a good selection of LED drivers, ranging from 15 W right up to 320 W, so you can select the appropriate power supply to match the length of strip being installed. The 24 V system also allows for longer runs while helping to reduce the risk of dimming and potential unit failure. Installation is made easier by the availability of clip connector packs, while the strip can be cut every three LEDs and reconnected as required. ROBUS also offers a cut-to-length service, which could
PROFESSIONAL ELECTRICIAN
be particularly useful if you want strips prepared to specific lengths before arriving on-site. Another big plus for me is the choice of profiles available. Depending on the application, you can opt for angled, recessed or walk-over profiles, with accessories including corners and T-pieces helping to create a much neater, more professional finish. From an installer’s point of view, the warranty is worth mentioning too. The range comes with a three-year warranty, including two years of on-site cover, meaning that if a ROBUS product fails during that period, it can be replaced without cost to the installer. Overall, I found the ROBUS VEGAS range to be a very versatile LED strip solution. The combination of different strips, drivers, controllers, profiles and accessories means you can adapt the system to suit almost any installation. Having now used it on a real job and seen the finished effect for myself, I’d certainly consider specifying it again. BROWSE THE ROBUS VEGAS LED STRIP RANGE AT: WWW.RDR.LINK/ECB033
PE Page Grid_Layout 1 24/07/2026 15:50 Page 1
086_PE_SEPT26_Layout 1 30/07/2026 10:42 Page 86
LIGHTING
CONTROL, ALT, DELIGHT Carrying every possible switch isn't always the smartest solution. Paul Foulkes, Country Manager at Theben, explores a more flexible approach that can keep future upgrade options open.
O
pen the average electrician's van and you'll probably find a collection of lighting accessories – two-way switches, intermediate switches, rotary dimmers, pneumatic timers and multiple finishes. Yet the one you need is often still sitting on the wholesaler's shelf. There is another approach, however. By standardising on retractive switches and selecting the appropriate control device behind them, installers can tackle a wider range of lighting applications without carrying every possible switch. Customers benefit from a consistent finish, while electricians gain greater flexibility when requirements change.
One switch, multiple functions From the customer's perspective, a retractive switch is simple – press it and something happens. What happens depends on the control device behind the switch. That could be: ● Basic on/off switching ● Dimming ● App-configured dimming ● Timed staircase lighting The visible accessory remains the same throughout the property, while a compact device provides the required function. This creates a consistent appearance while allowing installers to carry fewer switch types and simply select the control device to suit the application. Simplifying multi-way switching A traditional staircase circuit uses two-way and intermediate switches connected with 3-core-and-earth cable. An electronic latching relay such as the Theben OKTO
86 September 2026
540 BN offers another option, allowing multiple retractive switches to control the same lighting circuit. Because the switches send only a control signal, standard twin-and-earth cable can often be used instead of 3-core-and-earth. With the latter costing around 25% more, savings can quickly add up on larger projects. It also gives installers greater flexibility when designing or extending the circuit. When the customer changes their mind A customer may initially ask for basic switching before later deciding they want dimming. With retractive switches already installed, the visible controls remain the same while the control device is upgraded. The DIMAX 540 plus B provides push-button dimming without requiring a neutral conductor at the device. A short press switches the lights on or off, while pressing and holding adjusts the light level. For customers wanting more functionality, the DIMAX 540 APP B adds app-based commissioning with features including scenes, groups and astronomical switching, while the wall switch itself remains unchanged. A smarter staircase timer Timed staircase lighting can also benefit from the same approach. The ELPA 540 APP BN can be installed in a suitable flush-mounted box and operated from switches or retractive push-buttons. Lighting stays on for the programmed period before switching off automatically, with timing and additional functions configured through an App. Features such as switch-off pre-warning and extendable lighting periods make it well suited to apartment buildings, communal areas and retrofit projects.
PROFESSIONAL ELECTRICIAN
Flexibility built in Not every lighting circuit needs electronic control, but where there are multiple switching points or future upgrades are likely, retractive switches keep those options open. The same approach supports: ● On/off control with the OKTO 540 BN ● Push-button dimming with the DIMAX 540 plus B ● App-configured dimming with the DIMAX 540 APP B ● Timed lighting with the ELPA 540 APP BN As with any lighting installation, device loading, LED compatibility, enclosure space and cable arrangements should be checked alongside manufacturer instructions and BS 7671. The result is a simpler, more flexible installation, with fewer switch types in the van, less specialist cable on-site and more options when the brief changes. GET MORE DETAILS ON THEBEN’S RANGE OF PRODUCTS AND SOLUTIONS AT: WWW.RDR.LINK/ECB034
087_PE_SEPT26_Layout 1 30/07/2026 10:50 Page 87
LIGHTING
A SPECT-ACULAR ALTERNATIVE
Lighting industry specialist, Craig Taylor, has launched Spectre Lighting, a new commercial LED lighting business focused on UK stock availability and technical project support. The company has introduced an initial portfolio of commercial LED products designed for commercial, industrial and architectural applications, supported by UK-based stockholding to help reduce lead times and improve project scheduling. Spectre Lighting has been established in response to ongoing supply chain challenges within the construction sector, with the business aiming to provide contractors, specifiers and wholesalers with greater certainty over product
availability and delivery. Alongside its product portfolio, the company will provide technical guidance throughout the project lifecycle, covering areas including optical specification, compliance, installation and post-installation troubleshooting.
Increasing lead times Founder and Managing Director, Craig, brings more than 25 years of lighting industry experience to the business, having progressed from Production Operative to Board Director during his career. He said: “The commercial lighting sector has drifted towards a ‘box-shifting’ mentality. Customers are often faced with long lead times for high-quality products
or readily available alternatives that come with limited technical support. “We built Spectre to eliminate that compromise by combining reliable stock availability with genuine technical expertise.” The company’s initial product range focuses on luminaires for applications where performance, optical control and thermal efficiency are key considerations. Craig added: “Having spent a quarter of a century on the factory floor, in boardrooms and on active project sites, I know where the friction points are for contractors. “Our ambition is simple: to be a dependable and technically transparent partner for the UK lighting market.”
GET MORE DETAILS ON THE SPECTRE LIGHTING PRODUCT PORTFOLIO AND TECHNICAL SERVICES BY VISITING: WWW.RDR.LINK/ECB035
088_PE_SEPT26_Layout 1 30/07/2026 10:52 Page 88
LIGHTING
In this article the team at Rako Controls share details about how innovative use of lighting controls has helped transform a compact Brighton courtyard into a private urban oasis.
COURT APPEAL
I
n city homes where outdoor space is often limited, a courtyard can easily become a place that’s viewed more than it is used. This project set out to change that, transforming a compact urban garden into a luxurious retreat that could be enjoyed long after sunset. The client wanted more than practical exterior lighting – a space that could feel calm and intimate on a quiet evening, become more vibrant when entertaining, and remain closely connected to the character of the home.
With its Moroccan-inspired detailing, decorative screens, textured surfaces, planting and water feature, the garden already possessed a strong identity. The role of the lighting was to reveal these elements at night, enhancing the character of the space without overwhelming it. Rather than illuminating everything equally, the design focused attention where it mattered most. Planting, architectural details, patterned screens, textured tiles and the main focal point were all carefully highlighted, using layers of light to create contrast, dimension and visual interest. The result is a space that changes dramatically once daylight fades. Instead of disappearing into darkness, it takes on an entirely different character.
Creating atmosphere through control A Rako lighting control system was specified to provide complete flexibility while keeping operation simple. Rather than relying on multiple switches or individual circuits, the client can adjust the entire garden with a single touch. Several lighting scenes were created to suit different moments throughout the evening, from low-level, relaxed settings
88 September 2026
PROFESSIONAL ELECTRICIAN
to brighter scenes for entertaining. This allows the space to respond naturally to how it is being used while keeping the technology intuitive. For the client, the experience is effortless. There’s no need to think in terms of circuits, zones or switching. Instead, they simply choose how they want the space to feel. This was particularly important in a compact courtyard, where every detail influences the overall experience. A single fitting set too brightly can dominate the garden, while a balanced scene can transform the entire environment. Pattern, shadow and texture One of the defining qualities of the garden is its use of pattern. Decorative screens, tiled surfaces and architectural detailing contribute to its Moroccan-inspired character, creating a sense of privacy, enclosure and escape. At night, these details become part of the experience. Light washes textured
088_PE_SEPT26_Layout 1 30/07/2026 10:54 Page 89
walls, catches perforated screens and produces shifting shadows that add rhythm and visual richness. The result is not just illumination, but a layered and immersive environment. Warm colour temperatures were used to complement the earthy palette, from the terracotta walls and textured tiles to the natural materials and planting. Against the evening sky, this warmth creates a soft and welcoming glow that makes the garden feel sheltered and inviting. The scheme deliberately avoids over-lighting. Certain areas are allowed to recede into shadow while important features are selectively illuminated. This restraint adds dimension and prevents the space from feeling flat or overly bright.
helping the garden feel layered despite its compact footprint. This balance between planting, architecture and light creates a strong sense of cohesion. Every element has a purpose, yet nothing feels overworked.
An outdoor room Although modest in size, the courtyard was designed to feel like an outdoor room. The seating area, patterned floor tiles, warm wall finishes and enclosed layout create an environment that feels intimate and cocooning rather than exposed. Lighting reinforces this sense of enclosure, bringing the comfort typically associated with interior spaces into the garden and helping it feel like a natural extension of the home. Through scene-based control, the client can move easily between different settings. Softer scenes create a quiet retreat for evenings outdoors, while brighter arrangements make the space welcoming for guests. A feature wall brought to life The focal point of the project is the Moroccan tiled feature wall with its integrated water fountain. During the day it adds colour, texture and personality, but after sunset it becomes the visual centrepiece of the garden. A bespoke lighting arrangement was developed around this feature, with each fitting positioned to accentuate the texture, colour and craftsmanship of the tiles. Carefully directed uplighting reveals details that are not fully appreciated in daylight. The water feature introduces another sensory element. Subtle illumination enhances the reflective qualities of the green tiles, while the movement of water brings a gentle sense of life to the space. Light, texture and reflection work together to create a calm and engaging focal point.
The solution Rako RMT500 and RMS800 modules were used to provide reliable control of both the lighting and water features. The system was selected for its flexibility, ease of programming and dependable scene-based operation. Behind the scenes, sophisticated programming delivers a seamless user experience. The technology remains unobtrusive, allowing the lighting, materials, planting and water features to take centre stage.
The fountain was also incorporated into the lighting scenes, allowing water and illumination to operate as a single design element. Whether the space is used for entertaining, relaxation or a quiet late evening outdoors, the feature wall remains at the heart of the experience. Planting after dark Planting plays an important role in the garden’s evening character. Uplighting to the trees and specimen plants introduces height and structure, drawing the eye through the space and softening the surrounding architecture. The olive tree, palms and low-level planting become almost sculptural at night. Their forms, textures and shadows introduce movement and visual interest,
A luxurious outdoor experience The finished garden demonstrates the impact that intelligent lighting can have on smaller exterior spaces. Through careful layering and intuitive control, the courtyard has become a far more versatile and enjoyable part of the home. What was once a compact outdoor area is now an elegant evening retreat with a strong focal point, visual depth and lighting that adapts effortlessly to different occasions. Luxury technology should never feel complicated. In this project, it works quietly in the background, allowing the client to focus entirely on the experience of the space. GET MORE DETAILS ON THE RAKO CONTROLS RANGE OF LIGHTING CONTROLS BY VISITING: WWW.RDR.LINK/ECB036
PROFESSIONAL ELECTRICIAN September 2026 89
PE Page Grid_Layout 1 31/07/2026 13:47 Page 1
091_PE_SEPT26_Layout 1 30/07/2026 10:56 Page 91
SOFTWARE & APPS
SEEN &
HEARD
Following the launch of two new business tools for trade professionals, we put the questions to Ben Dyer, Founder & CEO of Powered Now, to find out how AI-powered tools are helping electricians build stronger businesses and customer relationships. What problem is Powered Now’s ‘AI Receptionist’ and 'Here Is My Work' trying to solve for today's electrical contractor?
Q
Most electricians are effectively running two businesses. There's the electrical work, the skilled, physical stuff they trained for. And then there's the business of finding customers and keeping them coming back. The second of these is where most electricians are losing, not because they're bad at their trade, but because they have no system for it. ‘Here Is My Work’ fixes the visibility problem. A professional website, a place to showcase completed jobs with photos, and a system to collect genuine customer reviews, built specifically for electricians and designed to run with minimal effort. It connects directly to Powered Now's AI Receptionist, so when an enquiry comes in and the electrician is on-site, the call gets answered, the details get taken, and the job gets booked. The electrician finds out when they come off-site, ensuring the lead doesn’t go cold.
Why has showcasing completed work become so important in winning electrical contracts?
Q
The way customers choose electricians has changed. A referral used to be enough. Now it's the starting point. The customer gets the recommendation, searches online, looks at the website and reviews, and decides, all before picking up the phone.
Photos matter because electrical work is invisible once it's done. A neatly installed consumer unit or EV charger signals professionalism to a customer who may not understand the technical details but can see that the work looks right. ‘Here Is My Work’ gives electricians a structured way to build that evidence over time. Every completed job is a photo, a review request, and a stronger profile. After a few months, that profile is working harder than any advert they could run. Many electricians are already busy enough on the tools. How have you designed the platform to minimise the amount of admin involved?
Q
Simple answer: if it takes too long, it won't get used. ‘Here Is My Work’ works from a phone so uploading a job photo takes thirty seconds. The website is built from information you already have with review requests sent out automatically, so you don’t need to remember to ask. On the operational side, Powered
PROFESSIONAL ELECTRICIAN September 2026 91
091_PE_SEPT26_Layout 1 30/07/2026 11:00 Page 92
SOFTWARE & APPS
“Happy customers will often intend to leave a review and then forget. Unhappy ones don’t.” Now handles quotes, invoices, scheduling and certificates in one App. The AI Receptionist then ties it together – when a call comes in while the electrician is on-site, it answers, captures the lead, and books the job. By the time they finish the current job, the next one is already in the diary. The platform places a strong emphasis on helping users own their customer reviews. Why is this becoming increasingly important?
Q
Because most electricians are letting their reputation happen by accident. Happy customers will often intend to leave a review and then forget. Unhappy ones don't. The result is an online reputation that reflects the minority of experiences rather than the quality of the work overall. ‘Here Is My Work’ makes review collection automatic. Every completed job triggers a request. Over time those reviews become one of the most powerful things working in the electrician's favour, driving more enquiries, which the AI Receptionist captures, before Powered Now converts into booked jobs. There's a longer-term point too. Reviews are increasingly how search engines and AI tools decide which businesses appear when someone searches locally. Building that record now is an investment that compounds. Can you share any early feedback or success stories from electricians who have already started using ‘Here Is My Work’?
Q
Robert Brown of RB Electrical Services put it better than we could: “Powered Now AI Receptionist has answered six calls so far in a few days
92 September 2026
and four of them ended up booking jobs. That’s a 66% conversion straight to a booked job.”
Q
That's the point in a number. The calls were already coming in. The leads were already there. What was missing was a reliable way to capture them when Robert was on-site doing his job. The AI Receptionist handled the calls, booked the jobs, and Robert came off-site to find his week already filling up.
I’d recommend three things, in order of impact:
Looking ahead, how do you see AI changing the way electricians promote and grow their businesses?
Q
It's already changing. The question is who's paying attention? The immediate impact is on lead capture. The AI Receptionist answers calls when an electrician is on-site, takes details, and books jobs. For a sole trader losing enquiries every week to an unanswered phone, that's not a small improvement, it changes how the whole business operates. The connection to ‘Here Is My Work’ is straightforward. A stronger online profile generates more inbound calls. The AI Receptionist makes sure those calls convert rather than go cold. More leads, none of them missed.
PROFESSIONAL ELECTRICIAN
What advice would you give to an electrician who has never really promoted their work online before?
1. Get your ‘Here Is My Work’ profile live. It doesn't need to be perfect – a description of what you do, your CPS registration, and a handful of job photos is enough to start. Add to it after every job. 2. Collect reviews systematically. Send every customer a direct link after the job. A text works better than asking in person. Ten recent reviews will win more work than any advert. 3. Make sure every enquiry gets answered. Powered Now’s AI Receptionist handles calls when you're on-site so no lead goes unanswered. Most electricians are losing more work to an unanswered phone than they realise. GET MORE DETAILS ON POWERED NOW’S HERE IS MY WORK AND AI RECEPTIONIST OFFERINGS BY VISITING: WWW.RDR.LINK/ECB037
ADGRIDS_PE_ADGRIDS.PMM_May06 30/07/2026 09:28 Page 93
094_PE_SEPT26_Layout 1 30/07/2026 11:06 Page 94
SOFTWARE & APPS
THE CURRENT STATE OF AFFAIRS Experienced professional, Bob Preston, looks at the risks posed by diverted neutral current (DNC) and describes how Tradefox’s latest training simulator is helping electricians prepare for the hidden dangers of PME networks.
B
The outer layer of the skin, the stratum corneum, is often described as a protective shield. In reality, it behaves more like a thin, unreliable film that can change from moment-to-moment. Moisture softens it, pressure flattens it, while sweat ducts and hair follicles provide conductive pathways. Even a small amount of hydration can significantly reduce its effectiveness as a protective barrier.
y way of introduction, I’m a MEICA engineer with 28 years’ experience in the electrical industry, having worked in every role from sweeping the floor to leading PMO teams. I’ve also contributed to the development of the latest City & Guilds 2366 Diploma, helping to shape the training that will guide the next generation of electricians. I now work with Tradefox, the company that pioneered digital safe isolation simulations and who PE readers will be familiar with thanks to the efforts of Founder, James Cornet. Having recognised the risks associated with failures on PME networks, the Tradefox team is back with a cutting-edge diverted neutral current (DNC) test simulator. Potentially dangerous assumption The original simulator proved incredibly effective at teaching engineers how to safely isolate a circuit from the primary supply. However, it was based on a potentially dangerous underlying assumption: once the main switch is off, the danger has gone. It didn’t account for the external threat posed by Protective Multiple Earthing (PME) and Combined Neutral and Earth (CNE) networks. In a broken neutral scenario on a PME network, an installation’s earthing can become a return path for neighbouring properties. Standard safe isolation procedures, such as switching off the local main switch, do nothing to isolate this imported danger. When I began developing the DNC simulator, I carried out extensive research, starting with biophysics.
94 September 2026
Human skin has long been treated as the industry’s quiet safety net – a built-in resistor that supposedly shields us from low-voltage contact. For decades, electricians and gas engineers have worked on the assumption that if a touch voltage sits below familiar thresholds, the danger is low. Modern research paints a very different picture. Skin is a fragile and inconsistent barrier, particularly under conditions we encounter every day – damp hands, sweat, pressure, large contact areas and cold metal surfaces. Combine these biological realities with the electrical behaviour of modern UK distribution systems and the industry faces an important truth: low voltage doesn’t necessarily mean low risk.
PROFESSIONAL ELECTRICIAN
Well documented effects Voltage can also actively break it down. When an electric field reaches the skin, lipids shift, water is drawn into the membrane, nanopores form and conductivity increases. These effects are well documented in biophysics. Similar mechanisms are used in medical electroporation and transdermal drug delivery. During accidental electrical contact, applied voltage can make the skin more permeable, hydrated and conductive. Once the outer layer gives way, deeper tissues – the viable epidermis and dermis – offer significantly less resistance because they’re hydrated and electrolyte-rich. That helps explain the dramatic reductions in total body impedance identified in IEC 60479-1 under certain conditions. Damp hands, large contact areas or firm pressure can push impedance down considerably. At sufficiently low impedance, even relatively small touch voltages may produce currents capable of causing serious physiological effects, including loss of muscular control, respiratory interference and an increased risk of ventricular fibrillation. The conditions that contribute to this risk are commonplace: leaning against a radiator, gripping a tap, touching a boiler
094_PE_SEPT26_Layout 1 30/07/2026 11:10 Page 95
casing, holding a metal tool with sweaty hands or standing barefoot on a damp floor. Everyday behaviour can create circumstances in which skin resistance is reduced and the body becomes more vulnerable. That vulnerability is particularly relevant because of the scale of CNE cable installed across the UK. The country has an extensive PME/CNE infrastructure, supplying millions of homes, businesses, farms and industrial sites. This creates a potential vulnerability – if the neutral is compromised, bonded metal components within an installation can rise in voltage and carry diverted neutral current. The danger extends beyond electric shock. Ignition risk is equally important and can easily be overlooked. Voltage alone doesn’t determine whether a spark is possible; the energy available and the current flowing through the path must also be considered. Bonded pipework can carry diverted neutral current without presenting a large voltage difference. Equipotential bonding may minimise potential differences, but it doesn’t necessarily prevent current from flowing. If a clamp is loosened or a pipe
carrying current is cut, interrupting that path can release energy and potentially create a spark. For this reason, current measurement has become an essential part of identifying the risk. Voltage pens and non-contact testers cannot detect diverted neutral current because they indicate electrical potential rather than the current flowing through a conductor. Taking foreseeable hazards into account A pipe sitting at a relatively low voltage may initially appear harmless, but current flowing through it could still present a hazard if the path is interrupted. Measuring current can help establish whether bonded metalwork forms part of an active return path, whether a neutral fault may be present and whether additional precautions are required before work begins. The legal framework also expects engineers to take foreseeable hazards into account. Health and safety legislation requires risks to be identified and appropriately managed, while electrical regulations seek to prevent unexpected energisation and equipment becoming live during work.
Gas safety requirements similarly demand that danger is prevented during activities such as purging and isolation. Relying solely on voltage testing may therefore fail to provide the complete picture where diverted neutral current is concerned. The combined evidence from biophysics, IEC 60479-1 and the behaviour of modern PME networks leads to an important conclusion: relatively low voltage rises on bonded metalwork can still be associated with currents capable of presenting a risk to people, property and livestock. That is why, through my work with Tradefox, I’ve been involved in developing a new simulator that explicitly models the complex failures associated with PME networks – scenarios that the original safe isolation simulator was never designed to address. Along with this, we are launching an electrical safety campaign to raise awareness about the dangers of PEN faults. The aim of this is to give electricians and engineers the opportunity to experience these conditions in a safe, controlled environment and understand why established assumptions may no longer be enough. The modern electrical landscape requires safety practices and training to evolve alongside it. We need to measure current as well as voltage, consider available energy rather than potential alone, and recognise that a low voltage reading does not automatically equal a low-risk situation. The physics has always been there. Our understanding, training and working practices now need to catch up. FIND OUT MORE ABOUT TRADEFOX AND ITS RANGE OF TRAINING SIMULATORS AT: WWW.RDR.LINK/ECB038
PROFESSIONAL ELECTRICIAN September 2026 95
ADGRIDS_PE_ADGRIDS.PMM_May06 24/07/2026 13:03 Page 96
097_PE_SEPT26_Layout 1 30/07/2026 11:14 Page 97
SOFTWARE & APPS
KNOWING WATT’S WHAT From instant calculations to CPD records, PE chats with Gary Lince, Director of Pro Certs Software, about the features electricians are relying on every day. For readers who are discovering the Electrical Tools & Reference App for the first time, can you give us an overview of what it offers and explain why you originally developed it?
Q
The Electrical Tools & Reference App provides instant access to the most commonly referenced tables such as cable rating tables and installation reference methods. In addition to the tables and charts, the electrical calculators offer instant calculations on the go, reducing the immediate need to reference the technical books or memorise complex calculation formulas. The App brings together a wide range of calculators, reference tables, technical documents and forms in one place. Which features do you find electricians rely on most during a typical working day, and how can they help save time on-site?
Q
The most used section of the Electrical Tools & Reference App is the Max Zs Values and Cable Calculator. The Max Zs values is a quick look-up tool for fuses, RCBOs and MCBs, while also included are some manufacture MCCB Zs tables which provides the information you need, when you really need it.
This is highly utilised by electricians conducting electrical inspections as the information is available instantly and you always have it in your pocket, which saves time on manual calculations and referencing the technical books and guides. Accuracy is vital when carrying out electrical calculations and referencing the Wiring Regulations. How do you ensure that the calculators, technical data and reference information within the App remain reliable, up-to-date and easy to use?
Q
The Electrical Tools & Reference App is hand-crafted by experienced engineers, with all the calculations manually written and extensively tested. All reference tables are cross-referenced with the relevant standards. When an update to a standard is published, we manually check what has changed and apply the relevant changes to the App. One of the features within the App's Electrical Forms section is the ability to create and store Continuing Professional Development (CPD) Records. Why did you decide to include this functionality, and how can it help electricians demonstrate their ongoing competence and keep their professional records organised?
Q
As the requirement for recording CPD activities has grown, the recording and storing of all the CPD material you’ve consumed
becomes very cumbersome. You always have your phone on you, so as soon as you complete a CPD activity you can very quickly record it on your phone ready to generate a PDF record to show your CPS provider assessor, when required. Looking ahead, what can users expect from future developments, and how do you use customer feedback to shape the direction of the App?
Q
We recently published an update to include a user log-in so we can facilitate data syncing across multiple devices. Currently, the Electrical Tools & Reference App is in the process of being completely rebuilt from the ground up, utilising new technologies and frameworks which will ensure the longevity and maintainability going forward. New features will include an AI assistant amongst many others, which haven’t been made public yet. We welcome and act all on feedback we receive, and we encourage new feature requests. Users can contact us directly from within the App or via our website. GET MORE DETAILS ON THE PRO CERTS SOFTWARE ELECTRICAL TOOLS & REFERENCE APP BY VISITING: WWW.RDR.LINK/ECB039
PROFESSIONAL ELECTRICIAN September 2026 97
098_PE_SEPT26_Layout 1 30/07/2026 11:20 Page 98
SOFTWARE & APPS
THE ANSWER TO
MISSED CALLS Dru McPherson, Founder of Whoza AI, explains why the call you didn’t hear is the job you didn’t get.
I
magine you’re in a loft. It’s thirty degrees up there. You have one hand on a cable and the other on a torch, and your phone is ringing in your jacket pocket, downstairs, in the hall. That’s not necessarily a discipline problem, but a physics problem instead. Any article that tells an electrician to “prioritise responsiveness” without acknowledging that has already lost you. A recent survey of more than 220 tradespeople (source: Fix Radio) found that 34% believed they’d lost work because they couldn’t answer the phone. Six in ten said they struggled to answer while working. Nobody in that survey was being lazy, they were simply up a ladder.
“Most trade voicemail is a recording of an individual who sounds annoyed to have been called.” 98 September 2026
So the question is not whether you should answer more calls. Obviously you should. The question is what to actually do about it – and the honest answer is that the options are cheaper and more varied than some would like you to know. Start with the free stuff, because most people never do Fix your voicemail message. Most trade voicemail is a recording of an individual who sounds annoyed to have been called. “You've reached Dave, leave a message.” Nobody leaves a message for that person. A voicemail that converts does three things: 1. it tells the caller when you’ll ring back, and means it – “I return calls
PROFESSIONAL ELECTRICIAN
between five and six.” 2. it tells them what to include: name, postcode, and what has gone wrong. 3. It gives them a route if it’s urgent – a text number, a WhatsApp – anything that doesn’t require you to be free at that exact moment. Set up a divert. If there’s anyone – a partner, a family member, a mate who may be off the tools – who can take calls during the day, a divert costs you nothing and has the potential to catch more work than any App. The paid options, and what they don't always tell you Traditional answering services put a human on your phone. They work. They’re priced accordingly, and the thing to interrogate is what happens after the call. Most take a message and promise a call-back. AI answering is the newer option, and it’s where I have a commercial interest – so treat what follows with appropriate suspicion.
098_PE_SEPT26_Layout 1 30/07/2026 11:23 Page 99
Let’s look at what it’s genuinely capable of first: a) it answers on the first ring, at three in the morning, on a bank holiday, b) it tells an emergency from a quote request, c) it never gets bored. Where it still falls over, and you deserve to hear this from someone who sells it, is that it can mishear postcodes. That’s precisely the thing you cannot afford to get wrong, so any system worth buying should capture numbers by keypad as a backup. It can also struggle with a strong accent on a windy site, with some customers hanging up the moment they realise it’s a machine. Not many. But some. The one question that actually matters Whatever you’re being sold, human or machine, ask this: Does it book the job, or does it take a message and promise a call-back? That distinction is the whole game and very few explain it. A caller told “someone will get back to you shortly” will often hang
“Whatever you’re being sold, human or machine, ask this: Does it book the job, or does it take a message and promise a call-back?”
shows recognition accuracy drops measurably for Scottish and northern English voices. The training data behind these models is largely undisclosed, but the results speak for themselves. If you work in Glasgow, Newcastle or Aberdeen, ask any vendor directly how their system copes with your customers' accents. Do not accept "very well" as an answer. Ask them to prove it.
up and ring the next name on the list. That person or business answers and you never hear from that potential customer again. The missed call you know about is annoying. The missed call you never find out about is the one that’s actually costing you money.
What is Whoza.ai? Whoza.ai builds AI call answering for UK trades from Perth and Tomintoul. It answers the phone, works out whether it’s a real job, and sends the details to your WhatsApp. And, if you let it, it will book the job into your diary rather than promising a call-back.
And a Scottish complaint… Most voice AI is built in America. Peer-reviewed research – including a 2025 study run on real calls to two Scottish public-service organisations –
GET MORE INFORMATION ON WHOZA.AI BY VISITING: WWW.RDR.LINK/ECB040
100_PE_SEPT26_Layout 1 30/07/2026 11:32 Page 100
SOFTWARE & APPS
TRACKING PROGRESS
PE talks to Ben Baker, Electrician and Inventor of the CPD Progress Tracker App, to find out how feedback from users is shaping the platform and what new features could be on the horizon. Since we last featured the CPD Progress Tracker App, what feedback have you received from electricians using it in the real world, and has any of that influenced future development?
Q
The most encouraging feedback has been that the App is achieving what I originally designed it to do in terms of making CPD recording straightforward, quick and useful. I recently received my first public review from an iOS user who had previously been using folders and Excel spreadsheets to record CPD. He explained that the old process had become difficult to manage and was mainly useful only to himself, whereas the App made it much easier to record training promptly after completing it. He is now transferring his existing CPD records into the App.
That feedback was particularly valuable because it confirmed that simplicity is one of the App’s main strengths. CPD itself isn’t necessarily difficult, but recording it properly, locating supporting evidence and presenting it later can become fragmented and time-consuming. My intention has always been to remove as much of that friction as possible. The reviewer also suggested adding CSV import functionality so existing spreadsheet records could be transferred more easily. It’s something I’m now seriously considering for a future update. I’m currently developing another App that imports and analyses CSV files, so the experience gained from that project should help me assess how the functionality could be introduced reliably. More broadly, the feedback has reinforced the direction of future development. I want to add greater flexibility and profession-specific features without losing the quick and straightforward recording process users value. Any new feature should make CPD management easier rather than adding unnecessary complexity. You’ve mentioned plans to introduce custom fields for profession-specific CPD requirements as an optional add-on. How would this work and what additional flexibility could it offer?
Q
The current version is intentionally simple, allowing users to record an activity, date, time spent, supporting details and evidence without working through an unnecessarily complicated process. The planned optional upgrade would retain that straightforward core while enabling users to tailor the App more closely to the requirements of their trade, profession or membership body.
100 September 2026
PROFESSIONAL ELECTRICIAN
Different organisations ask for CPD to be recorded in different ways. Some may require categories of learning, reflective comments, learning outcomes or evidence of how an activity has influenced working practices. Others may use points, credits or annual targets rather than time alone. Custom fields would allow users to record the information relevant to them without forcing everyone to complete fields they don’t need. An electrician, for example, might categorise activities under technical knowledge, health and safety, regulations, inspection and testing or business development. I’m also considering profession-specific templates that could automatically suggest suitable fields and tracking methods when a user sets up the App. These could
100_PE_SEPT26_Layout 1 30/07/2026 11:35 Page 101
then be adjusted to suit the individual rather than imposing one fixed format. Users who simply need a quick and reliable CPD record could continue using the core App as it is, while those with more detailed professional or audit requirements could choose a one-time upgrade offering custom fields, points or credits, advanced targets and more detailed exports. Having developed the App from first-hand experience of the frustrations surrounding CPD logging, where do you see it evolving over the next 12 months?
Q
I’d like CPD Progress Tracker to become more flexible and useful to a wider range of users while preserving the simplicity that was central to the original idea. Profession-specific custom fields and templates are likely to form an important part of that development, allowing users to tailor the App to their trade, professional body or employer. This could include points, credits, categories, learning outcomes and more detailed targets where required. I’m also considering CSV import functionality following the suggestion in the App’s first public review. This could
“The App has already evolved beyond its original version through multiple new features...” make it much easier for users to transfer existing CPD records from spreadsheets rather than manually entering several years of information. Other potential developments include more flexible exports, improved progress and target reporting, and further refinements to how users search, organise and retrieve records and supporting evidence. We aim to make the App increasingly useful when preparing for audits, appraisals, professional reviews or membership renewals. The App has already evolved beyond its original version through features including improved search, support for multiple professions and multilingual functionality. I expect future development to follow the same principle: listen to how people are using it, identify where unnecessary effort still exists and introduce improvements that remove that effort without making the App complicated.
Ultimately, I want CPD Progress Tracker to remain a straightforward everyday tool while becoming capable of supporting more detailed professional requirements when users need it. FIND OUT MORE AND PURCHASE THE CPD PROGRESS TRACKER APP BY VISITING: WWW.RDR.LINK/ECB041
PROFESSIONAL ELECTRICIAN September 2026 101
102_PE_SEPT26_Layout 1 30/07/2026 11:39 Page 102
SOFTWARE & APPS
IF THE APP FITS Electrical Qualified Supervisor and dynamik.app inventor, George Dobre, reveals why his own frustrations with disconnected software inspired him to build an allin-one business platform specifically for electrical contractors.
L
ike many people in the electrical trade, I know what it’s like to finish a full day’s work only to realise there are still hours of paperwork waiting for you. I was running my business using a mixture of spreadsheets, paper certificates and separate Apps for invoicing, accounting and certification, alongside a phone full of job photos I could never find when needed. The biggest frustration wasn’t simply paying for several subscriptions; it was that none of the systems talked to each other. I’d complete a certificate in one place, raise an invoice somewhere else, then enter the same customer and job information again into the accounts. Every extra step took time and created another opportunity for something to be missed. So, in my quest to find a better way, I decide to create dynamik.app. Joining the dots The idea behind dynamik.app is simple: to give electrical contractors one place to manage the whole operation, from the first quote through to the final certificate and payment. Certification, scheduling, estimates, invoicing, accounting, CIS, payroll and client communication all sit within one connected platform. A quote becomes a job, the job carries its certificates, completed work feeds into the invoice, and the invoice flows through to the accounts. Customer details only need to be entered once and will follow the job throughout. In terms of efficiency and productivity, this means less double-entry, fewer missed invoices and a clearer picture of what’s happening across the business. Certification on-site As an electrician myself, certification was always going to sit at the heart of the platform. dynamik.app supports 18 recognised certificate types, including EICs, EICRs and Minor Works, alongside certificates for EV charging, solar PV, fire alarms, emergency lighting and PAT testing.
102 September 2026
PROFESSIONAL ELECTRICIAN
Engineers can complete certificates from a phone or tablet on-site, working through the information board-by-board and circuit-by-circuit. Observations are colour-coded by classification, while completed certificates are stored against the relevant job and client. A helping hand from AI I’m in the unusual position of being both an electrician and a programmer, so I understand the job from both sides. That has influenced how we use AI within dynamik.app. Rather than adding AI for the sake of it, I wanted to apply it to repetitive jobs that genuinely consume contractors’ time. For example, users can describe a job in plain English or upload a site floor plan to generate a draft risk assessment covering hazards, risk levels, control measures and PPE requirements. The qualified person remains in control, reviewing and approving everything before it’s issued. There’s also Volt, the platform’s built-in assistant. You can ask questions such as “Which invoices are overdue?” or “How many jobs have we got booked this week?” and receive answers based on live information within your account. Most importantly, I want the platform to keep evolving around the people using it. If contractors tell us there’s a feature, certificate or workflow that would make their working lives easier, we want to hear about it. After all, the best tools for the trade should be shaped by the people actually using them. To celebrate the App’s launch, George has kindly set up an exclusive offer for PE readers, so that anyone registering using the code PE2026 will be eligible for six months of free access to the platform. Just use the link below for more information. GET MORE DETAILS ON DYNAMIK.APP BY VISITING: WWW.RDR.LINK/ECB042
ADGRIDS_PE_ADGRIDS.PMM_May06 27/07/2026 09:30 Page 90
104_PE_SEPT26_Layout 1 30/07/2026 11:44 Page 104
PRODUCTS & BUSINESS SOLUTIONS
GET THE
BUG What gaps in the market or day-to-day challenges faced by electricians and installers led C.K Tools to develop Cable Bug?
Q
Electrical installations are constantly evolving, and so too are the materials electricians work with. One of the biggest changes in recent years has been the increasing use of Low Smoke Zero Halogen (LSOH) cable, particularly across commercial buildings, schools, hospitals and other public environments where fire safety is a key consideration. While LSOH cable offers important safety benefits, it also presents a practical challenge on-site. When compared to traditional PVC cable, it's tougher to strip cleanly and can become even more difficult to work with in colder conditions. As cable specifications have evolved, we recognised that electricians needed a purpose-built solution for preparing modern flat cable quickly, safely and consistently. Cable Bug was developed in direct response. Rather than trying to reinvent the toolbox, we focused on improving one of the most repetitive tasks electricians perform every day. Saving just a few seconds on each cable might seem insignificant, but over the course of a working day, or an entire career, it adds up to a significant improvement in productivity.
104 September 2026
We quiz Tim McCann, Trade Marketing & Communications Manager at C.K Tools, about the thinking, development and feedback that has led to the launch of Cable Bug.
Which specific tasks or installation scenarios was Cable Bug designed to make easier, quicker or more accurate for electricians working on-site?
Q
Cable Bug is designed for the everyday task of preparing flat cable, but it really comes into its own when working with modern LSOH cable. With more projects specifying LSOH cable, electricians increasingly need a tool that can cope with its tougher outer sheath while still delivering a clean, controlled strip. That becomes particularly valuable during colder weather, when the material can become even less forgiving.
“Rather than trying to reinvent the toobox, we focused on improving one of the most repetitive tasks electricians perform every day.”
PROFESSIONAL ELECTRICIAN
Whether installing lighting, power circuits, consumer units or containment systems, Cable Bug helps prepare cable quickly and consistently while reducing the risk of damaging the insulation beneath the outer sheath. By removing much of the guesswork from cable preparation, it helps maintain workflow, improve consistency and allows installers to move confidently from one task to the next. For those who may be looking to get the most out of their cable preparation, pairing Cable Bug with our Redline VDE combi cutters rounds out the process, giving installers the ultimate stripping solution – from initial cut through to a clean, finished strip. Can you talk us through any stand-out design features or innovations, and explain the advantages they offer compared to more traditional cable stripping methods?
Q
The biggest innovation behind Cable Bug is its simplicity. It wasn't developed because electricians needed another
104_PE_SEPT26_Layout 1 30/07/2026 11:45 Page 105
cable stripper, but instead because the cables themselves are changing. As LSOH becomes more widely specified, installers need tools that are purpose-built to work with these tougher materials while delivering the same speed and consistency they've always expected. Rather than relying on a utility knife and the user's judgement, Cable Bug provides a controlled, repeatable stripping action that's engineered specifically for modern flat cable. Its compact ergonomic design means it's comfortable to use throughout the day and small enough to live permanently in a pocket or tool pouch, so it's always close to hand. Sometimes innovation is less about adding extra features and more about removing unnecessary effort. Cable Bug has been designed to make one of the most common tasks on-site quicker, safer and more consistent.
How much input did professional electricians or trade users have during the development and testing process, and did any feedback directly influence the final product?
Q
Trade feedback sits at the heart of our product development process. Our ongoing research with electricians consistently told us they wanted a tool that genuinely saved time and made a repetitive job easier. That insight was the starting point for Cable Bug. To explore how best to solve the problem, we worked with the product design course at Bangor University, who developed a range of prototype approaches. Their work pointed clearly towards bladed solutions as the strongest direction, and those findings informed our product development team as they set about creating Cable Bug.
The result is a compact, intuitive tool that's comfortable to carry and integrates naturally into an electrician's everyday work gear. Accuracy and durability are critical on-site considerations. What testing or performance standards has Cable Bug been subjected to, to ensure it can cope with demanding working environments?
Q
Professional electricians and installers expect tools to perform consistently in demanding conditions, day after day, so durability and reliability were key priorities throughout Cable Bug's development. The product has undergone extensive testing to ensure it delivers consistent stripping performance across repeated use, including on tougher LSOH cable. Materials and construction have been selected to withstand the knocks, drops and daily wear associated with professional use while maintaining reliable performance over time. Cable Bug has also been specifically engineered so that it's impossible to damage the inner cables during stripping, giving electricians complete confidence in the quality of every strip. Ultimately, electricians judge a tool by how it performs after months of daily use, not just when it's new. That's the beauty of the simplicity behind Cable Bug's design – it has been engineered to deliver dependable results every time it's picked up. GET MORE DETAILS ON THE C.K TOOLS CABLE BUG BY VISITING: WWW.RDR.LINK/ECB043
PROFESSIONAL ELECTRICIAN September 2026 105
106_PE_SEPT26_Layout 1 30/07/2026 11:57 Page 106
PRODUCTS & BUSINESS SOLUTIONS
A WARM WELCOME
From intelligent controls to straightforward installation, we take a closer look at four of Electrorad’s hottest electric heating solutions for today’s installers.
2. AEROFLOW 1. ACCORTO The Accorto electric radiator has been designed with installers, landlords and developers in mind, delivering a combination of straightforward installation, intelligent controls and reliable performance. Available in a range of outputs, Accorto is suitable for everything from apartments and housing developments to student accommodation and social housing projects. Its slim, contemporary design complements modern interiors while providing responsive, comfortable heating.
When customers are looking for premium electric heating, Aeroflow continues to be one of Electrorad's most popular solutions. Manufactured in Germany, the Aeroflow combines advanced electric heating technology with high-quality construction to provide responsive warmth and excellent comfort. Its unique fireclay core releases heat gradually, helping to maintain an even room temperature while reducing temperature fluctuations. Integrated Wi-Fi control allows homeowners to manage their heating remotely via a smartphone and, with compatibility for voice assistants, it makes everyday operation even easier. The Aeroflow offers straightforward installation with no pipework, servicing or annual maintenance required. Once installed, the radiator is ready to provide reliable heating for years to come. Available in multiple sizes and outputs, the unit is suitable for homes, apartments, extensions and commercial spaces where customers are looking for a premium electric radiator with advanced controls and exceptional build quality.
What sets Accorto apart are the features that help reduce unnecessary energy use and minimise customer call-backs. Integrated open window detection, aluminium with ceramic core, and accurate digital temperature management all work together to improve comfort and efficiency. For landlords and property managers, the built-in landlord lock function helps prevent unwanted changes to heating settings, while the occupancy sensor automatically reduces output when rooms are unoccupied. Installation is quick and straightforward, with no ongoing maintenance requirements, making it an ideal solution for new-build and refurbishment projects alike.
106 September 2026
3.CONTRACT PANEL HEATER Electrorad’s Contract Panel Heater provides a practical, cost-effective solution for installers working on residential and commercial projects where dependable performance and ease of installation are essential. Designed for straightforward replacement or new installations, the unit offers clean styling and fast heat-up times, making it ideal for apartments, offices and homes. Supplied with an accurate electronic thermostat, simple user controls and Wi-Fi connection as standard, the heater allows users to maintain comfortable room temperatures. Multiple output sizes ensure there is a model suitable for virtually every room. Additionally, with no plumbing, boilers or ongoing servicing required, you can complete installations quickly while delivering a professional finish. The Contract Panel Heater offers an attractive product when seeking an affordable electric heating solution without compromising on quality or reliability.
PROFESSIONAL ELECTRICIAN
106_PE_SEPT26_Layout 1 30/07/2026 17:28 Page 107
4. DIGILINE Electrorad's Digiline electric radiator combines modern styling with intuitive digital controls, making it an ideal choice for installers looking for a reliable heating solution that's quick to fit and easy for customers to use. Designed to look exactly like a gas heated radiator it's ideal for domestic and commercial applications, The Digiline delivers responsive heating with precise electronic temperature control to help maintain consistent comfort throughout the day. The easy-to-use, side mounted, digital control allows users to create heating schedules that suit their lifestyle, helping improve convenience while avoiding unnecessary energy use. Open window detection and intelligent heating functions further enhance efficiency without adding complexity for the end user. Available in a variety of outputs and a low level option, the Digiline is suitable for living rooms, bedrooms, home offices and apartments, offering installers flexibility across a wide range of projects. Plus, by adding the optional Zigbee WiFi gateway you can control them from anywhere in the world! Installation is fast and uncomplicated, with no pipework, servicing or annual maintenance required. This means shorter installation times for contractors and fewer future maintenance concerns. Supported by Electrorad's experienced technical team and strong product availability, the Digiline offers installers a dependable electric heating solution that delivers excellent performance, straightforward installation and great value.
BROWSE ELECTRORAD’S FULL RANGE OF ELECTRIC HEATING PRODUCTS AND SOLUTIONS BY VISITING: WWW.RDR.LINK/ECB044
108_PE_SEPT26_Layout 1 30/07/2026 12:39 Page 108
PRODUCTS & BUSINESS SOLUTIONS
DRIVING THE CHARGE
Emily Holland, Head of Training & Culture at Rolec, explores the evolving EV charging landscape and the knowledge, technology and support contractors need to capitalise on growing opportunities. requirements, future expansion, and ongoing management all influence system design and installation. Location Different charging environments require alternative hardware solutions, with workplace, public, residential, and fleet applications all presenting distinct operational demands. For example, exposed or high-traffic environments often require a more robust infrastructure that offers durability and vandal resistance.
T
he EV industry is evolving at an unprecedented pace, and navigating this rapidly changing landscape requires expertise, partnerships, and long-term thinking. Rolec has consistently demonstrated these principles, establishing itself as an innovator in EV charging solutions. No longer a future-facing trend, EV charging is a day-to-day reality influencing installation requirements across residential, commercial, workplace, fleet, and public environments. As adoption continues to accelerate across the UK, it’s becoming an increasingly significant part of the electrical contractor’s workload. As things have progressed, EV charging has evolved from a specialist offering into a core service area, creating new opportunities for growth while introducing new technical considerations. Charging speeds, site requirements, connectivity, load management, interoperability, and software integration are all key factors in successful project delivery.
108 September 2026
With demand growing, contractors are increasingly expected to provide guidance that goes beyond installation alone. Customers are looking for trusted partners who can help them select the right charging solution, future-proof their infrastructure, and maximise long-term value from their investment. Home or commercial use EV charging In the case of domestic installations, homeowners are typically seeking a charging solution that combines affordability, reliability, and ease of use. Contractors therefore need products that are straightforward to install while delivering dependable performance for the end user. Rolec’s EVO, ZURA, and BasicCharge ranges have been developed with these priorities in mind, helping installers deliver cost-effective home charging solutions without compromising on quality. Commercial EV charging projects often require contractors to consider factors beyond the charger itself. Site layout, electrical capacity, user
PROFESSIONAL ELECTRICIAN
Outlet options Commercial sites are increasingly looking to maximise charging availability while minimising infrastructure costs. Dual and quad outlet units can help reduce groundwork, cabling, and installation time while increasing the number of charging outlets available on-site. Multi-outlet solutions such as Rolec's HEX charger are helping operators maximise charging availability from a single installation footprint. Connectivity challenges Reliable connectivity is essential for monitoring, billing, and access control. However, this can become challenging in underground car parks or remote locations where signal strength may be limited. To address this, Rolec’s charging solutions offer multiple connectivity options, including 4G, Wi-Fi, and Ethernet, ensuring chargers remain online 24/7. Charging speeds Charging speeds range from 7.4 kW AC fast charging to ultra-rapid DC solutions up to 650 kW, depending on application and site requirements. In commercial and fleet environments, operational efficiency is critical, with vehicle downtime, turnaround times, and site utilisation all key considerations.
108_PE_SEPT26_Layout 1 30/07/2026 12:42 Page 109
Data management The ability to extract and analyse data is becoming increasingly important for commercial operators. Access to detailed reporting, including energy consumption per vehicle, enables a clearer understanding of operational costs and fleet efficiency and chargepoint utilisation. Innovation in EV infrastructure Alongside growing demand, EV charging technology continues to evolve rapidly. The most significant developments aren’t just about faster charging speeds, but also smarter systems and more efficient energy management. Load management Load management has moved from an optional feature to a standard requirement. Dynamic load balancing is now frequently used to prevent overloading supply infrastructure, particularly in multi-charger set-ups. These systems allow several chargepoints to operate within available capacity by intelligently distributing power across a site. Interoperability OCPP (Open Charge Point Protocol) has become increasingly important in preventing vendor lock-in. Customers are actively seeking flexibility across networks and software platforms, rather than closed ecosystems. Rolec supports this approach with products designed to
be natively OCPP compliant. The company currently works with more than 45 chargepoint management system (CPMS) partners worldwide. Integrated software The value of EV charging is no longer defined solely by hardware. Back-office platforms play a critical role in monitoring, billing, remote management, and energy optimisation, shifting purchasing decisions towards total system capability rather than unit price alone. More than ever, EV charging is no longer being treated as a standalone technology but as a core part of the larger energy ecosystem, where integration and interoperability are key decision factors when specifying infrastructure. DC charging for destinations and fleets remains one of the most active areas of development, driven by the need for future-proof ultra-rapid charging solutions that perform reliably in high-use operational environments.
Knowledge is key With installation requirements becoming more varied, contractors are expected to understand not only charger hardware, but also load management, connectivity options, software platforms, energy optimisation, and future expansion considerations. In response, leading manufacturers are placing greater emphasis on knowledge transfer, an approach that sits at the foundation of Rolec’s strategy. This includes enhanced technical support, training, and project assistance. At Rolec, this extends beyond product supply, supporting contractors throughout the project lifecycle – from initial enquiries and specification support through to commissioning, onboarding, and handover. This collaborative approach reflects a broader shift across the EV industry, where successful project delivery depends on strong partnerships between manufacturers, contractors, consultants, and end users. Rolec’s support is reinforced through hands-on training, access to technical resources, and practical guidance across a wide range of EV infrastructure applications. With over 35 years of manufacturing experience, the company continues to develop charging solutions that prioritise reliability, flexibility, and ease of installation. To find out about the support Rolec offers to installers, get in touch by email: Emily.Holland@rolecserv.co.uk or call: 01205 724 754. BROWSE ROLEC’S RANGE OF EV CHARGING SOLUTIONS AT: WWW.RDR.LINK/ECB045
PROFESSIONAL ELECTRICIAN September 2026 109
ADGRIDS_PE_ADGRIDS.PMM_May06 24/07/2026 16:57 Page 110
111_PE_SEPT26_Layout 1 30/07/2026 12:50 Page 111
PRODUCTS & BUSINESS SOLUTIONS
Could protecting the point of ignition redefine electrical safety as we know it? The Engineering Team at ASES GROUP takes a closer look.
THE HEAT IS OFF
T
he history of electrical engineering is one of continual innovation, driven by a common objective to reduce risk before it becomes danger. From fuses and MCBs to RCDs, smoke alarms, SPDs and AFDDs, each advancement has addressed a recognised vulnerability and added another layer of protection. Collectively, these technologies have made modern electrical installations safer than ever. Yet one question remains: what protects the precise location where many electrical fires can begin? Behind socket outlets, switches, fused connection units and junction boxes are electrical terminations expected to operate reliably for decades. During their service life, these connections experience repeated heating and cooling cycles, while conductors expand and contract, materials age and electrical loading changes. Over time, these processes can increase contact resistance, potentially resulting in localised heating within the enclosure. This may remain invisible to occupants and undetected by conventional protective devices. The progression can be gradual. Increased contact resistance leads to localised heating, followed by insulation degradation and, potentially, ignition. By the time smoke becomes apparent, combustion may already have developed inside the electrical enclosure. This raises another important point – should protection begin closer to the potential source of ignition?
Moving protection closer to the hazard Every significant advancement in electrical safety has progressively moved protection closer to the risk. MCBs respond to overloads and short circuits, RCDs disconnect dangerous earth leakage currents, while smoke alarms provide vital warning once combustion products enter the occupied space. Each performs a vital role. However, none is specifically designed to suppress combustion within an electrical back box itself. Recognising this has led engineers to consider a different approach, by protecting the confined space where ignition may occur. This philosophy has driven the development of ASES SHIELD, an autonomous technology designed specifically to protect the electrical enclosure itself. Installed discreetly behind a standard socket outlet or switch, ASES SHIELD monitors thermal conditions within the back box without altering the appearance or normal operation of the finished installation. When abnormal temperatures indicative of a developing fault are detected, the system initiates electrical isolation by activating the circuit’s RCD. Should ignition still occur, an integrated clean extinguishing agent is automatically released within the enclosure, helping to suppress combustion before fire can spread beyond the back box. Rather than replacing established protective devices, the technology
introduces an additional layer of defence where conventional protection has historically ended. Designed for easy installation ASES SHIELD has been engineered to integrate into conventional electrical back boxes while remaining concealed after installation. It requires no programming, external power supply or routine maintenance. The latest power socket range further simplifies installation through screwless conductor termination, colour-coded connections and inspection openings that allow installers to verify electrical parameters. Modern electrical installations must accommodate changing patterns of use, increasing loads and decades of service. As buildings evolve, fire protection strategies must evolve with them. Protecting the point of ignition doesn’t replace established protective devices, good electrical design or competent installation. Instead, it complements them by addressing a hidden area that has traditionally received comparatively little direct protection. As understanding of electrical fire behaviour continues to develop, could localised protection within the electrical enclosure represent the next logical evolution in electrical safety? GET MORE INFORMATION ON THE ASES SHIELD FIRE SAFETY DEVICE BY VISITING: WWW.RDR.LINK/ECB046
PROFESSIONAL ELECTRICIAN September 2026 111
112_PE_SEPT26_Layout 1 30/07/2026 13:01 Page 112
PRODUCTS & BUSINESS SOLUTIONS
GETTING THE PRIC£ RIGHT? Drawing on years of industry experience, Electrical Estimator, Adam Berry, explains why he has created a practical playbook to help others navigate the complexities of estimating.
A
fter leaving school at 17, I entered the electrical industry by joining a small local electrical firm, completing my apprenticeship on mainly commercial and industrial projects, with a few large domestic jobs thrown in. Following a decade on the tools, I moved into the office as an Estimator, before progressing into Contracts Management, however I soon realised estimating was where my strengths lay, so I returned to it. Over recent years, I’ve worked for Tier 1 Main Contractors on M&E projects valued up to £150 million, and I now estimate the electrical element of commercial and data centre projects for a Tier 1 MEP firm.
Few practical resources One of the main reasons I decided to write The Electrical Estimator’s Playbook is through my own first-hand experience of how difficult that initial move from the tools into estimating can be. When I was first looking to make the transition, there was no structured training programme or practical manual explanation of how to estimate electrical projects from start to finish. Much like my apprenticeship, I learned on the job with support from experienced colleagues, but plenty came through trial and error. As my career progressed, I realised little had changed. While there are excellent resources covering electrical installation and technical standards, there wasn’t a practical guide dedicated to electrical estimating in the UK. I wanted to create the resource I wish had
112 September 2026
existed when I started – something practical, easy to follow and based on real-world experience rather than theory. Building confidence The book is aimed at electrical estimators, electricians considering a move into estimating, and contractors wanting to develop their commercial understanding and tendering skills. It guides readers through the estimating process, starting with the fundamentals before progressing to contracts, risk management, procurement, negotiations, BIM, AI and preconstruction. For working electricians and smaller contractors, I hope it provides the confidence to take the next step. Many excellent electricians are capable of delivering larger projects but can be held back by uncertainty around pricing them accurately. While experience will always be invaluable, the book provides a framework and practical processes to help readers progress from pricing smaller works to confidently tendering for projects worth £350,000 and beyond. More than counting costs One of the biggest estimating mistakes I see is focusing on material and labour costs while overlooking the wider commercial and contractual picture. Incomplete scope reviews, failing to identify Contractor Designed Portions (CDP), misunderstanding contract conditions, underestimating preliminaries and failing to qualify assumptions can turn a potentially profitable project into a difficult one.
PROFESSIONAL ELECTRICIAN
Another common issue is relying too heavily on drawings without properly reviewing the specification, where important requirements affecting cost and programme can be missed. Good estimating involves understanding risk, identifying scope gaps, interpreting technical documents, engaging with suppliers and subcontractors, and building a competitive, commercially robust tender. Throughout the book, I cover practical techniques for take-offs, building costs from first principles, reviewing tender documentation, preparing clarifications, understanding contracts and submitting professional tenders. Above all, I want readers to develop a structured approach and the confidence to make informed commercial decisions, rather than relying on guesswork. The Electrical Estimator’s Playbook is priced at £49 and available through selected channels. For orders of three or more copies, contact: electricalestimatorsplaybook@gmail.com GET MORE INFORMATION OR ORDER A COPY OF THE ELECTRICAL ESTIMATOR’S PLAYBOOK BY VISITING: WWW.RDR.LINK/ECB047
ADGRIDS_PE_ADGRIDS.PMM_May06 24/07/2026 17:14 Page 113
114_PE_SEPT26_Layout 1 30/07/2026 13:05 Page 114
PRODUCTS & BUSINESS SOLUTIONS
DEBUNKING THE EV MYTH Tom Bloor, Managing Director at evec, looks at why electric vehicles are becoming one of Britain's greatest electricity grid assets rather than the burden many may still believe them to be.
F
or years, one myth has overshadowed the EV industry – that Britain's electricity grid won't cope if everyone switches to electric vehicles. It's an understandable concern. As transport and heating become increasingly electrified, stories about grid capacity have fuelled fears that growing demand will overwhelm the network. The events of the recent UK summer only intensified that debate. Britain experienced multiple unprecedented Electricity Margin Notices from the National Energy System Operator (NESO) as heatwaves increased electricity demand while low wind generation and reduced European power supplies tightened capacity. Traditionally associated with winter, these warnings demonstrated the growing challenges of balancing the grid during periods of extreme weather. But, in my opinion, the conclusion many people draw is wrong. Electric vehicles are not a threat to the grid – they're part of the solution. Working alongside flexibility specialist Axle Energy, evec is transforming connected EV chargers into intelligent energy assets that help balance demand, maximise renewable energy use and improve grid resilience. Turning chargers into grid assets Traditionally, an EV charger simply draws electricity from the grid to charge a vehicle. Through evec's vecFLEX platform, however, chargers become active participants in Britain's energy system.
114 September 2026
when required while helping to stabilise the grid – and earning rewards for doing so. The scheme offers up to £140 in the first year and £120 annually thereafter, with more than £300,000 already paid to customers since its launch in March of this year. Customer feedback has been equally positive, with 93% reporting they’re satisfied or very satisfied with vecFLEX, while 96% intend to continue participating. In reality, every evec charger has the potential to become part of Britain's energy infrastructure. Through our partnership with Axle, customers aren't simply buying a charger – they're becoming part of a smarter, cleaner and more resilient energy system. Drivers simply tell us when they need to charge, we handle the rest, and they get rewarded for supporting the grid.
“Electric vehicles are not a threat to the grid – they’re part of the solution.” Powered by Axle Energy's flexibility technology, vecFLEX allows customers to schedule when they need their vehicle ready. Charging is then automatically managed in the background, with sessions briefly paused during periods of peak demand and shifted to times when electricity is cleaner, cheaper and more plentiful. Participation is effortless for customers. Drivers receive a fully charged vehicle
PROFESSIONAL ELECTRICIAN
Removing barriers to flexibility Historically, participation in flexibility schemes has been limited by metering requirements. Many required households to have compatible smart meters operating under Half-Hourly Settlement (HHS), excluding a significant proportion of UK homes. evec has helped remove that barrier by becoming the first affordable EV charging manufacturer to achieve CoP11 approval. Rather than relying on household smart meters, participation can instead be measured directly through the charger itself. This means around 90% of evec customers are now eligible for vecFLEX regardless of their smart meter status, dramatically widening access to flexibility services.
114_PE_SEPT26_Layout 1 30/07/2026 13:07 Page 115
Consumer culture The real challenge facing Britain's electricity system isn't how much electricity EVs consume – it's when they consume it. Because vehicles spend most of their time parked, charging can be shifted away from periods of peak demand without affecting drivers. This reduces pressure on the network, absorbs surplus renewable generation and helps avoid expensive infrastructure upgrades that would otherwise be funded by consumers. Flexible charging is also vital for making better use of renewable energy. Wind and solar generation naturally fluctuate, with clean electricity sometimes going unused when supply exceeds demand. Intelligent EV charging can absorb that surplus energy, reducing waste while increasing reliance on renewable power.
“The real challenge facing Britain’s electricity system isn’t how much electricity EVs consume – it’s when they consume it.” The heatwaves experienced this summer provided a clear demonstration of why this flexibility is becoming increasingly important. During June and July, NESO sought an additional 1,900 MW of capacity, with securing extra supply expected to cost around £10
million. At the same time, reduced nuclear generation in France highlighted how interconnected Europe's electricity systems have become. For evec, these events reinforce that flexibility will become one of the UK's most valuable energy resources. Since launching in 2022, our mission has been to make EV charging more affordable and accessible. Through vecFLEX, installers, wholesalers and customers can now benefit from a charger that continues delivering value long after installation – reducing costs, supporting renewable energy and helping build a smarter, more resilient electricity network for Britain. GET MORE DETAILS ON EVEC’S VECFLEX PLATFORM AND EV CHARGING SOLUTIONS AT: WWW.RDR.LINK/ECB048
116_PE_SEPT26_Layout 1 30/07/2026 13:17 Page 116
PRODUCTS & BUSINESS SOLUTIONS
LIVE IS FULL OF SURPRISES Live Electrical Distribution UK offers far more than installers may realise. Umer Farooq, Technical Product Manager, highlights four solutions from its extensive product portfolio.
TYPE 1+2 SURGE PROTECTIVE DEVICES Live Electrical’s Type 1+2 Surge Protective Devices offer a practical solution for protecting electrical installations and connected equipment against transient overvoltages. Available in single-phase and three-phase configurations, the range is suitable for residential, commercial and light industrial applications. By combining Type 1 and Type 2 protection in a single device, the range is designed to manage both higher-energy surges associated with lightning-related events and lower-level transients caused by switching operations. This helps simplify product selection where enhanced surge protection is required. The devices use hybrid MOV and GDT technology, together with an internal disconnection mechanism, to provide co-ordinated protection and improved operational safety. They’re DIN-rail mounted for straightforward installation and are suitable for use with TT and TN earthing arrangements. Their modular construction also supports easier inspection and replacement, giving installers a compact and convenient surge protection option.
METAL ENCLOSED DOOR-INTERLOCKED FUSED SWITCHES Live Electrical’s MFS125 range provides a robust 100 A, three-phase and switched-neutral solution for demanding indoor and outdoor industrial or commercial installations. The enclosure is manufactured from 1.2 mm steel and finished in an RAL 7035 epoxy powder coating, offering a durable finish.
116 September 2026
Each unit is supplied ready assembled with a 125 A 4P switch disconnector, a 125 A 3P fuse holder and 3 x 100 A fuses, helping reduce component selection and assembly time on-site. The door-interlocking mechanism prevents the enclosure from being opened while the switch is in the “ON” position, supporting safer operation and maintenance. For secure isolation, the rotary handle can be padlocked in the “OFF” position. Removable gland plates simplify cable entry and management, while a key-locking option helps prevent unauthorised access.
HEAT PUMP PROTECTION CONSUMER UNITS As heat pump installations become more widespread, selecting suitable electrical protection is essential for safety, reliability and compliance. Inverter-driven compressors and associated power electronics can produce residual currents that differ from those found in conventional loads, making the correct RCD type particularly important. Live Electrical’s dedicated metal heat pump protection units bring the key protective devices together in one compact enclosure. Each unit includes a 100 A main switch, Type 2 surge protection, dedicated RCD protection and an MCB for the heat pump circuit, with additional ways available for associated equipment such as immersion heaters and control circuits.
PROFESSIONAL ELECTRICIAN
The range is available with Type F, Type B and Type B-HP RCCBs to suit different heat pump designs and manufactures requirements.
DC SOLAR COMBINER BOXES Live Electrical’s DC Solar Combiner Boxes provide a convenient, ready-assembled solution for bringing multiple PV strings together before connection to the inverter. Available in 4x In 1x Out , 3x In 3x Out and 6x In 3x Out 600 V DC & 1000 V DC formats, the range supports projects of different sizes – from smaller commercial systems to larger multi-string solar installations. Each enclosure combines key protection and isolation functions in one organised unit, including individual +/- PV string fuses, DC circuit breakers, DC T2 surge protection and dedicated MC4 connectors. This helps reduce the number of separate components that installers need to select, assemble and wire on-site, while creating a cleaner and more professional installation. The weather-resistant IP65 enclosure also makes the units suitable for demanding environments. Replaceable connectors and clearly arranged internal components further support straightforward installation and future maintenance.
BROWSE LIVE ELECTRICAL’S EXTENSIVE PRODUCT RANGE IN FULL AT: WWW.RDR.LINK/ECB049
117_PE_SEPT26_Layout 1 30/07/2026 13:23 Page 117
PRODUCTS IN PRACTICE
IDEAL helps to ReStore Romford charity shop With more than 130,000 families living in the UK without permanent housing, IDEAL Electrical is trying to make a difference by leveraging the skills of its electrician network to become part of the solution. As an example, IDEAL recently brought together local electricians and industry volunteers for a one-day service event at Habitat for Humanity’s Romford ReStore, with the goal of enhancing the space that serves both as a retail location and supports local residents who face the misfortune of experiencing housing insecurity. During the event, volunteers completed key electrical improvements throughout the space, including installing hot water heaters, pendant lighting and two-way switching stair lighting, as well as replacing hand dryers and relocating lighting displays. These upgrades helped improve the functionality and experience of the ReStore, allowing the site to better serve customers, volunteers and local residents seeking support.
The Romford ReStore, which opened in November 2024, is the first ReStore in Great Britain. The home improvement charity shop sells donated new and gently used furniture, household goods and building materials, with proceeds helping fund Habitat for Humanity’s work to create affordable housing and sustainable communities. The location also serves as a Community Hub, offering women and families at risk of homelessness or housing poverty a welcoming place to access advice, practical support, volunteer opportunities and skill-building resources.
The activation also addressed a major challenge in housing support: access to basic furniture and household goods. In the UK, only 2% of social housing is currently furnished, leaving many new residents struggling to afford essentials such as beds, wardrobes and kitchen appliances. At the same time, more than half of the 1.6 million tons of home furnishings and household materials discarded each year by homeowners could be re-used with little or no repair. Through efforts like the Romford ReStore activation, IDEAL Electrical and Habitat for Humanity Great Britain are working to address housing insecurity by improving community spaces, supporting access to affordable household goods, reducing waste and investing in long-term solutions. The activation is part of IDEAL Electrical’s three-year partnership with Habitat for Humanity, reflecting a shared belief that building stronger communities requires more than financial support. By bringing electricians, volunteers and industry partners directly into the work, IDEAL is helping turn professional skills into practical community impact. BROWSE IDEAL ELECTRICAL’S FULL RANGE OF PRODUCTS AND SOLUTIONS AT: WWW.RDR.LINK/ECB050
PROFESSIONAL ELECTRICIAN September 2026 117
118_PE_SEPT26_Layout 1 30/07/2026 13:29 Page 117
PRODUCTS IN PRACTICE
ESP has recently provided fire safety for a major mixed use regeneration project. The transformation of Stroudley Walk in Bromley by Bow is creating a new neighbourhood at the heart of East London. The development will deliver 274 new homes, including 82 available through London Affordable Rent and 33 for shared ownership. Homes will range from studio apartments to four bedroom family houses, forming a diverse and inclusive community. The regeneration spans four new blocks positioned between Bruce Road and Bromley High Street, close to Bow Road. Alongside the residential element, the scheme will introduce flexible retail, commercial and community spaces, as well as significant public realm improvements. A new pocket park and a part pedestrianised street will help create a safe, welcoming environment for residents and visitors. Total protection Against this backdrop, the project required a fire safety system that could support a complex, multi-building development while ensuring long term reliability and ease of maintenance. The electrical team selected ESP’s MAGfire addressable fire alarm system to provide comprehensive protection across the entire site.
ESP works it’s MAGic on regeneration project The installation covers the full development, with addressable control panels positioned within each block and a network of detectors, call points, and sounder/visual alarm devices distributed throughout corridors, apartments, plant rooms, and communal areas. The addressable fire system spans the entire site and is configured to allow clear device identification, rapid fault finding, and tailored cause and effect programming for each building. One of the key reasons for selecting MAGfire was the ease of installation and commissioning. The addressable architecture reduced wiring complexity and allowed the team to configure the system efficiently, even across multiple buildings. The ability to scale the system in the future was also a major advantage, particularly for a development expected to evolve over time. Clear oversight of all devices The system now operates as a fully integrated network, giving facilities management clear oversight of all devices and panels. Each building’s panel communicates with its associated devices, ensuring rapid detection and alerting while maintaining full compliance with BS 5839 1. The flexibility of the MAGfire platform also allowed the team to tailor evacuation strategies for both residential and commercial areas. DPC Electrical Contracts and the wider DPC Electrical Team completed ESP’s fire alarm training prior to installation, which
118 September 2026
PROFESSIONAL ELECTRICIAN
they found practical, clear, and directly applicable to the work on-site. The training covered system design, device addressing, panel programming, and commissioning, giving the team confidence as they progressed through the installation. DPC Electrical Team members had also used ESP products on previous projects, including fire systems, CCTV, access control, and smart security solutions – familiarity that made the decision to specify MAGfire even more straightforward and reinforced DPC’s wider technical capability across complex construction projects. Reflecting on the project, Adam Cracknell, DPC Electrical Director, commented: “Stroudley Walk is a complex mixed use development, so the DPC Electrical Team needed a fire alarm system that was reliable, easy to configure, and scalable. “ESP’s MAGfire range ticked every box. The addressable panels and devices were straightforward to install, and the support from ESP throughout the project was excellent. He added: “We value systems that combine performance, easy commissioning and long term maintainability. MAGfire delivered on all fronts. “We now have a robust system in place that provides full coverage across the site and will serve the development well for years to come.” GET MORE DETAILS ON ESP’S MAGFIRE RANGE BY VISITING: WWW.RDR.LINK/ECB051
119_PE_SEPT26_Layout 1 30/07/2026 13:32 Page 119
Products round up
Comprehensive circuit protection for modern installations As electrical installations become increasingly sophisticated, effective circuit protection has never been more important. With homes and commercial buildings incorporating technologies such as solar PV, battery storage, EV charging and heat pumps, today's electrical systems require protection against a wider range of faults while remaining straightforward for installers to specify and fit. One area of growing importance is protection against transient overvoltages. Modern properties contain more sensitive electronic equipment than ever before, making Type 2 Surge Protection Devices (SPDs) an essential consideration. By helping to protect connected equipment from power surges, SPDs can reduce the risk of costly damage and improve long-term system reliability. Incorporating AFDD protection
Fire safety is also receiving greater attention. The latest Wiring Regulations place increased emphasis on Arc Fault Detection Devices (AFDDs), which can detect dangerous arc faults caused by damaged cables, deteriorating insulation or loose connections before they develop into a fire risk. Incorporating AFDD protection where appropriate can
help improve overall installation safety while supporting regulatory compliance. Alongside enhanced protection, installers continue to demand products that make life easier on site. Features such as generous wiring space, flexible cable management and installer-friendly designs can help reduce installation time while maintaining high standards of workmanship. Large and varied offering
Future-proofing installations is equally important as electricity flows become increasingly bidirectional through the adoption of renewable technologies. Consumer units and protective devices must now accommodate changing energy demands while remaining compliant with evolving standards. Developed with these requirements in mind, the Timeguard Circuit Protection Range combines comprehensive protection with practical installation features. The range includes factory-fitted Type 2 SPDs, AFDD/RCBO combinations and bidirectional RCBOs designed to support renewable energy applications, providing electricians with flexible solutions for both new installations and consumer unit upgrades.
With electrical systems continuing to evolve, circuit protection remains the foundation of every safe and reliable installation. By combining the latest protective technologies with installer-focused design, the Timeguard Circuit Protection Range helps electricians deliver compliant, future-ready installations with confidence. BROWSE THE TIMEGUARD CIRCUIT PROTECTION RANGE AT: WWW.RDR.LINK/ECB052
PROFESSIONAL ELECTRICIAN September 2026 119
119_PE_SEPT26_Layout 1 30/07/2026 13:37 Page 120
Products round up
Switch on to the Onyx advantage Rointe has introduced the Onyx high heat retention storage heater, combining intelligent connectivity and energy-efficient performance to provide consistent comfort while helping households optimise energy consumption. SAP-accredited, Onyx offers high levels of heat retention, with independent laboratory testing verifying that the unit retains more than 55.3% of its stored heat after 16 hours. This enables heat to be released gradually throughout the day, helping to improve overall system efficiency. Unlike conventional storage heaters that charge continuously throughout the off-peak electricity period, Onyx incorporates Smart Charging technology.
Using an advanced control algorithm, the heater calculates the amount of stored heat required for the following day and determines when charging should begin. By delaying charging until required, the system is designed to avoid storing more energy than necessary, minimise heat losses and optimise consumption. Integrated Wi-Fi Direct technology enables Onyx to connect directly to the home’s wireless router without requiring additional gateways or communication devices. The heater can also be managed through the Rointe Nexa platform alongside compatible electric radiators, towel rails, water heaters and underfloor heating thermostats.
Through the App, users can adjust temperatures, programme schedules, monitor energy consumption, remotely lock devices and create automated heating scenarios based on their location. Rointe Smart Adaptive technology intelligently regulates heat output to maintain a stable indoor temperature while reducing unnecessary energy consumption. A touch-sensitive visual display provides access to operating information including charge levels, target temperature, heating schedules and operating modes. Designed to complement modern interiors, Onyx combines a contemporary appearance with practical heating performance. Its high heat retention and intelligent energy management can also help improve the efficiency of electric heating systems and support current UK EPC requirements. Combining intelligent charging, simplified installation and connected control, Onyx expands Rointe’s portfolio of electric heating solutions for modern homes. BROWSE THE ROINTE ONYX RANGE IN FULL AT: WWW.RDR.LINK/ECB053
120 September 2026 PROFESSIONAL ELECTRICIAN
119_PE_SEPT26_Layout 1 30/07/2026 13:39 Page 121
Products round up WISKA COMBI Junction Box Range For decades, the WISKA COMBI junction box range has provided electricians, contractors and wholesalers with a reliable solution for creating safe and secure electrical connections. Designed for demanding environments, the range combines durability with installer-friendly features to simplify installation and deliver long-term performance. Continuous product development, driven by feedback from the industry, has seen the COMBI range evolve to make installations faster and more efficient. Key features include WISKA's distinctive bellied lid for increased wiring space, flexible cable entry options and IP66/IP67 ingress protection for dependable performance in challenging conditions. The latest addition, the COMBI 310, has been developed to address on-site installation challenges, further strengthening one of the electrical industry's best-known junction box ranges. Combining quality, practicality and proven reliability, COMBI remains a trusted choice for professional electrical installations. GET MORE DETAILS AT: WWW.RDR.LINK/ECB054
CED ELECTRICAL GROUP Axiom Product Launches CED Electrical Group has continued to expand its Axiom portfolio with a series of new product launches designed to meet the needs of today's electrical installers. Recent additions include the Vault consumer unit range, featuring standard and surge protection models with installer-friendly features such as double cable clamps, aligned 32 mm entry points, full MCB blanks and a busbar terminal cover. The Axent decorative wiring accessories range offers ultra-slim screwless and screw-fix switches and sockets in four contemporary finishes, while the MagCharge wireless charging socket integrates Qi2-compatible magnetic charging directly into standard wall sockets. Completing the latest launches is a comprehensive range of Axiom Switch Fuse Isolators and Switch Disconnectors, available from 32 A to 200 A, providing reliable protection, safe isolation and dependable control for commercial, industrial, agricultural and distribution applications. GET MORE DETAILS AT: WWW.RDR.LINK/ECB055
THRION Dry Lining Boxes Thrion's Dry Lining Boxes offer a secure and reliable solution for mounting switches and sockets in plasterboard walls for both new-build and refurbishment projects. Manufactured from flame-retardant PVC, the range is BS 5733 compliant and carries both CE and UKCA approval. Available in 1-gang and 2-gang configurations, with 35 mm and 47 mm depths, plus round and multi-gang options, the boxes are designed to suit a wide variety of domestic and commercial applications. Featuring distinctive high-strength green fixing lugs, they provide a tight, flush fit for faster, more secure installation. Offering consistent product availability and a choice of sizes not widely stocked elsewhere, the range gives electricians, contractors and wholesalers a dependable solution for everyday electrical installations. GET MORE DETAILS AT: WWW.RDR.LINK/ECB056
DEXPRO Dehumidifier Range DexPro's dehumidifier range provides an energy-efficient solution for controlling excess moisture in residential and commercial properties. Designed to tackle condensation, damp, mould and musty odours, the units help create healthier and more comfortable indoor environments while protecting walls, furnishings, clothing, electronics and other valuables from the effects of excess humidity. Suitable for homes, offices, retail premises and rental properties, the compact dehumidifiers are particularly effective where poor ventilation or seasonal humidity can lead to persistent damp. Easy to use and requiring minimal maintenance, they offer dependable performance for a wide range of applications. By improving indoor air quality and reducing conditions in which mould can develop, the units also help rooms feel warmer, potentially reducing heating demand during colder months. Combining efficiency, practicality and reliable moisture control, the range provides installers with a solution they can recommend with confidence. GET MORE DETAILS AT: WWW.RDR.LINK/ECB057
PROFESSIONAL ELECTRICIAN September 2026 121
119_PE_SEPT26_Layout 1 30/07/2026 13:41 Page 122
Products round up
Non-corrosive lighting takes a new turn Knightsbridge has expanded its commercial lighting portfolio with Helix, a modular non-corrosive range engineered to provide flexibility, durability and installation efficiency across demanding commercial and industrial environments. An upgrade to the established Torlan range, Helix is suitable for indoor and outdoor applications and comprises three product tiers – Helix One, Helix Shift and Helix Max – each tailored to different project requirements. Manufactured from anti-corrosive polycarbonate and fitted with stainless steel clips as standard, all Helix fittings are rated IP66 and IK10 for protection against water, dust and impact. Installation features include rear, side and end conduit entries, detachable terminal blocks, large bracket fixing points and compatibility with BESA box mounting. Cost-effective and modular
Helix One provides a cost-effective modular option with fixed wattage outputs and a 4000K colour temperature. Available in 2, 4, 5 and 6 ft versions, the range includes 230 V and selected 110 V models. The latter are supplied with a 1 m flex and IP65 junction box for site applications. Plug-and-play emergency and microwave sensor modules provide
122 September 2026 PROFESSIONAL ELECTRICIAN
additional flexibility. Helix Shift adds quad-wattage adjustability and selectable 3000K, 4000K and 5700K colour temperatures, enabling installers to tailor light output and ambience to individual applications. Available from 13 W to 60 W, it also supports plug-and-play emergency and microwave sensor modules. Reliable performance
Completing the range, Helix Max is supplied with an integrated corridor sensor featuring three-step dimming functionality. Combining quad-wattage performance with tri-CCT adjustability, it is designed to improve energy efficiency in circulation spaces and other applications requiring intelligent lighting control. Optional emergency modules are available, with fittings offered in 4, 5 and 6 ft formats. Compatible with accessories used across Knightsbridge’s batten and Preceptor linear ranges, Helix provides a scalable lighting solution designed to simplify installation while delivering reliable, low-maintenance performance. BROWSE THE KNIGHTSBRIDGE HELIX NON-CORROSIVE RANGE AT: WWW.RDR.LINK/ECB058
119_PE_SEPT26_Layout 1 30/07/2026 13:43 Page 123
Products round up
ATC Tiger ECO Hand Dryer ATC's Tiger ECO hand dryer has been developed to provide a fast, hygienic and energy-efficient solution for a wide range of commercial washrooms. Suitable for healthcare, education, hospitality and office environments, it combines a 15-second drying time with low noise levels from 70 dB(A) and optional HEPA filtration to support improved hygiene. Available in white, matt black and brushed stainless steel finishes, the unit also features an LED countdown indicator and touch-free operation for an enhanced user experience. Designed for heavy daily use, the Tiger ECO offers variable power outputs from 600 W to help reduce energy consumption and running costs, while maintaining reliable performance in busy locations. Combining quiet operation, contemporary styling and durable construction, it provides a versatile hand-drying solution for a wide variety of commercial applications. BROWSE OR DOWNLOAD THE CATALOGUE AT: WWW.RDR.LINK/ECB059
UNICRIMP Molyslip Metal Cutting Compound Unicrimp has added Molyslip Metal Cutting Compound to its Q-Crimp portfolio, offering contractors a high-performance lubricant for steel conduit installations and other metal cutting applications. Fortified with MoS₂, the soft paste delivers excellent lubricity and cutting performance, helping to improve surface finish while reducing tool wear and damage. With a low melting point of 52°C and extreme pressure additives, the compound is suitable for drilling, reaming, tapping, single-point thread cutting and sawing, even on tough workpiece materials. Its stable paste formulation, featuring an unworked penetration of 375 mm/10, can be applied by brush or dipping, providing a practical solution for a wide range of workshop and on-site applications. Backed by a five-year shelf life, Molyslip Metal Cutting Compound offers long-lasting performance and reliability for professional installers. GET MORE DETAILS AT: WWW.RDR.LINK/ECB060
M2 ELECTRICAL Fan Isolator Switch Solutions M2 Electrical has expanded its wiring accessories range with two new ventilation control products designed to support safe, compliant extractor fan installations. The new fan isolator key switch grid module helps prevent unauthorised tampering by requiring a key to isolate the fan, making it particularly suited to social housing and rental properties where reliable ventilation is essential. Complementing the range is a 10 A triple pole fan isolator pull-cord switch with neon, providing simple operation while allowing extractor fans to operate as intended. The integrated neon indicator offers clear visual confirmation of the power status. Developed in response to growing demand for effective ventilation solutions following tighter legislation around damp, mould and indoor air quality, both products combine safety, compliance and ease of installation, providing electricians and landlords with practical solutions for domestic ventilation systems. GET MORE DETAILS AT: WWW.RDR.LINK/ECB061
SWITCHTEC Electrical Control Components Catalogue Issue 10 Switchtec has launched Issue 10 of its Electrical Control Components Catalogue, expanding to more than 175 pages and featuring an even broader range of products for electrical wholesalers and distributors. The latest edition introduces new additions including industrial plugs and sockets, contactors and pre-assembled light towers, alongside Switchtec's established portfolio of relays, DIN rail terminal blocks, push buttons, control stations, isolators, switch disconnectors, power supplies, timers, surge protection devices and audible and visual alarms. Designed for easy product selection, the catalogue includes full-colour images, technical specifications and ordering information, while integrated QR codes provide instant access to the latest product details online. Backed by more than 7,000 stock lines and next-day delivery on orders placed before 4pm, the catalogue provides wholesalers and installers with a comprehensive source of electrical control components. GET MORE DETAILS AT: WWW.RDR.LINK/ECB062
PROFESSIONAL ELECTRICIAN September 2026 123
119_PE_SEPT26_Layout 1 30/07/2026 13:51 Page 124
Products round up
FireAngel raises its Spec
New from FireAngel is Spec+ – a range of mains-powered domestic safety alarms designed to support professional installation, simplify replacement and provide long-term protection across residential applications. Developed for the UK professional market, the range includes dedicated smoke and heat alarms alongside multi-sensor devices combining smoke, heat and carbon monoxide (CO) detection. Classified as Grade D1 in line with BS 5839-6, all core alarms feature a sealed 10-year rechargeable lithium backup battery and are designed for a 10-year lifespan.
Improved response The smoke alarms combine FireAngel’s Thermoptek and UltraSense technologies, which work together to improve response to fire risks while reducing nuisance alarms caused by lifestyle factors and contaminants. Bug mesh and dust compensation features are also incorporated to help improve device longevity and minimise interference. Built-in Bluetooth (BLE) connectivity comes as standard, enabling up to 50 Spec+ devices to be interlinked wirelessly, through hardwired connections or using a combination of both, without requiring additional modules. The range comprises the SP500 Smoke Alarm, SP510 Heat Alarm, SP520 Multi-Sensor Smoke & Heat Alarm, SP530 Multi-Sensor Heat & CO Alarm and SP540 Multi-Sensor Smoke, Heat & CO Alarm. Compatible wireless and hardwired low-level control units are also available.
“Every alarm is individually tested during manufacture, while the range also carries third-party SGS certification.” Depending on the model, technologies include optical sensing, Thermoptek, UltraSense, Class A1 thermistors, Thermistek and electrochemical CO sensors. The heat and multi-sensor models also feature a streamlined design without a protruding heat cap. Products within the range comply with relevant standards including BS EN 14604, BS 5446-2 and EN 50291-1, depending on
124 September 2026 PROFESSIONAL ELECTRICIAN
alarm type. Every alarm is individually tested during manufacture, while the range carries third-party SGS certification. All core Spec+ alarms are supplied with a 10-year warranty. BROWSE THE FIREANGEL SPEC+ RANGE BY VISITING: WWW.RDR.LINK/ECB063
119_PE_SEPT26_Layout 1 30/07/2026 13:53 Page 125
Products round up
ROBUS HARBOUR EXPRESS EDGE ROBUS has launched the HARBOUR EXPRESS EDGE LED corrosion-proof fitting, introducing a range of installer-focused features designed to speed up installation and simplify maintenance. Replacing traditional clips with a new hinge design, the fitting also features a quick-release in-line connector, allowing the base and diffuser to be detached in seconds while keeping internal wiring secure. A patent-pending detachable BESA mount enables the base to be fixed first before the luminaire twist-locks into place. The modular design allows the gear tray, LED board and diffuser to be replaced independently, while optional plug-and-play emergency and microwave sensor modules add further flexibility. Available in lengths from 2 ft to 6 ft, the fitting offers four power outputs from 8 W to 70 W, selectable 4000K, 5000K and 6500K colour temperatures, efficacy of up to 175 lm/W and lumen outputs up to 11,000 lm. GET MORE DETAILS AT: WWW.RDR.LINK/ECB064
MAKITA DC18SJ Battery Charger Makita has introduced the DC18SJ battery charger, a compact charging solution designed to keep 14.4 V and 18 V LXT batteries powered wherever the job takes users. Featuring USB-C Power Delivery (USB-PD) technology, the charger can be used with a wide range of compatible power sources, including portable power banks, vehicle 12 V sockets and mains supplies. Compatible with the full Makita 18 V LXT battery range, it uses a three-stage charging process and can charge a 6.0 Ah battery in approximately 145 minutes when powered via a 12 V vehicle socket. Smart charging controls and LED status indicators provide clear information on charging progress and operating conditions. Also available as part of Makita's 1916H8-8 Power Source Kit LXT, the DC18SJ offers a practical charging solution for professionals working on the move. GET MORE DETAILS AT: WWW.RDR.LINK/ECB065
SCHNEIDER ELECTRIC Acti9 iC60 H3 3-Phase RCBO Schneider Electric has expanded its Acti9 circuit protection range with the launch of the iC60 H3 3-Phase RCBO, designed to help commercial and industrial installations meet BS 7671 requirements while maximising distribution board space. Providing protection against overloads, earth faults and short circuits, the compact device occupies just three modules, compared with seven for the previous design, allowing more efficient board layouts in both retrofit and new-build applications. The RCBO features Type A RCD technology, solid neutral and voltage-dependent operation, while reduced wiring connections help simplify installation and upgrades from MCBs. Compatible with PowerTag Energy Sensors, the unit also supports circuit-level energy monitoring through the EcoStruxure Energy Hub and building management systems, helping users improve efficiency and maximise system uptime. GET MORE DETAILS AT: WWW.RDR.LINK/ECB066
KNIPEX Tool Case for Photovoltaics KNIPEX has introduced a new Tool Case for Photovoltaics, providing electricians with a complete set of professional tools for installing and maintaining MC4 and MC4 Evo 2 solar connectors. At the heart of the kit are the Crimp System Pliers, factory-calibrated to deliver consistent, reliable crimps on cables up to 10 mm², with compatibility across the full MC4 connector range. The case also includes cable shears for cutting copper cables up to 15 mm in diameter, a precision insulation stripper with blades for 4.0, 6.0 and 10.0 mm² cables, and a dedicated mounting tool set for tightening and unlocking PV connectors. Housed in a robust impact-resistant case with precision-cut foam inserts, the kit keeps tools organised and protected on-site. The versatile crimping system is also compatible with a wide range of additional KNIPEX dies and locators for broader electrical applications. GET MORE DETAILS AT: WWW.RDR.LINK/ECB067
PROFESSIONAL ELECTRICIAN September 2026 125
119_PE_SEPT26_Layout 1 30/07/2026 13:59 Page 126
Products round up
Spartan Pro puts a new spin on downlights
All LED has introduced the Spartan Pro, a new fire-rated downlight designed to remove one of the common frustrations electricians face when changing colour temperature after installation. At the heart of the fitting is All LED’s patented RotaLens Technology, designed and engineered in the UK by CEO, Jamie Shemie. Rather than removing the downlight from the ceiling to access a hidden switch, installers can simply rotate the front lens to select between 3000K, 4000K and 6500K. The approach eliminates the need to negotiate spring clips or disturb the surrounding ceiling, making colour temperature adjustment quicker and easier after installation. Building on the original Spartan platform, Spartan Pro retains the familiar two-part push-fit connector with loop-in, loop-out terminals for straightforward wiring. Selectable 4 W and 6 W outputs
provide flexibility across different applications, delivering up to 755 lumens and efficiencies of up to 126 lm/W. The fitting is IP44 rated, insulation coverable and suitable for use in bathrooms, kitchens and modern airtight construction. Requiring a ceiling void of just 40 mm, it is also suited to both new-build and refurbishment projects.
For a discreet finish, Spartan Pro features an ultra-slim 0.8 mm bezel, while a range of compatible snap-on bezels enables installers to complement different interior schemes without replacing the fitting. Available finishes include Polar White, Carbon Black, Satin Nickel, Polished Chrome, Anthracite, Antique Brass, Brushed Brass and Polished Brass. Fire testing covers 30, 60 and 90 minutes in timber joists, 30 and 90 minutes in I-joists, and 30 minutes in metal web joists. The fitting also meets the requirements of Parts B, C, E and L of the Building Regulations. Combining familiar installation with a simpler approach to colour temperature selection, Spartan Pro is designed to make fitting, adjustment and future changes easier for electricians. GET MORE DETAILS ON THE ALL LED SPARTAN PRO DOWNLIGHT BY VISITING: WWW.RDR.LINK/ECB068
126 September 2026 PROFESSIONAL ELECTRICIAN
119_PE_SEPT26_Layout 1 30/07/2026 14:03 Page 127
Products round up IDEAL ELECTRICAL 6 mm² Lever Connector IDEAL Electrical has expanded its connector portfolio with a new 6 mm² Lever Connector, developed to support faster, more reliable electrical installations across commercial, industrial and infrastructure projects. Suitable for 0.5 mm² to 6.0 mm² conductors, the reusable connector has been designed to simplify wiring while improving installation confidence. Installer-focused features include an easy-open lever to reduce hand strain, an audible 'click' to confirm secure closure, a clear inspection window, continuity check port and integrated strip-length guide. Rated at up to 41 A and 450 V, the connector is available in 2-port, 3-port and 5-port versions, offering flexibility across a wide range of applications. The reusable design also allows connectors to be removed and reused, making it easy to correct wiring changes or accidental splicing errors on-site. GET MORE DETAILS AT: WWW.RDR.LINK/ECB069
BUNKER BUNKER x Velocity Tool Bags BUNKER Storage has partnered with Velocity Pro Gear to launch an exclusive range of professional tool bags designed for demanding site conditions. The BUNKER x Velocity collection comprises an Open Tote, Backpack and Kit Bag, all finished in an exclusive Desert Storm colourway. Each bag features a 900D waterproof nylon exterior, a 3.2 mm rigid polypropylene base for stability and impact resistance, and marine-grade rivets for long-lasting durability. The Open Tote includes 25 storage pockets for fast tool access, while the Backpack offers 31 pockets, hands-free carrying, an integrated V-Light and an exclusive BUNKER Velcro patch. The larger Kit Bag provides generous storage capacity for heavier workloads. Designed to keep tools organised, protected and easily accessible, the range delivers a practical storage solution for professional tradespeople working on-site. GET MORE DETAILS AT: WWW.RDR.LINK/ECB070
OVIA Pitch Finder LED Sports Floodlighting
CONTACTUM Type 2 Compact SPD Range Contactum has expanded its circuit protection portfolio with a new Type 2 Compact Surge Protection Device (SPD) range for its Defender 2.0 consumer units and Defender B Boards. Designed to protect against transient overvoltages, the compact units maximise available space within distribution boards without compromising performance, offering installers greater flexibility as additional circuits and technologies are integrated into modern electrical installations. Developed in line with the latest BEAMA guidance and manufacturers' instructions, the SPD for Defender 2.0 consumer units can, under defined conditions, be installed without a dedicated MCB, using the Distribution Network Operator fuse for protection instead. Suitable for domestic, commercial and industrial applications, the range supports compliant, space-efficient board layouts while delivering the same level of protection as traditional SPDs. The launch reinforces Contactum's commitment to practical, standards-compliant circuit protection solutions.
Ovia has launched Pitch Finder, a high-performance LED sports floodlighting system engineered for professional outdoor sports facilities. Available in 600 W, 1200 W and 1800 W configurations, the modular platform can be tailored to suit applications ranging from local training grounds to major stadiums. Three optic options – symmetrical wide, symmetrical narrow and asymmetrical wide – deliver precise light distribution, excellent uniformity and reduced glare. Supporting DALI (standard), 0–10 V and DMX dimming protocols, the system integrates easily with modern lighting controls. Built for demanding outdoor environments, Pitch Finder features IP66, IK08 and C4 corrosion resistance, alongside a 100,000-hour LED lifetime for long-term reliability. Compatible accessories include spigot mounts, visors and a magnetic aiming device, while Ovia's in-house lighting design team provides specification, lighting calculations and compliance support for every installation. GET MORE DETAILS AT: WWW.RDR.LINK/ECB071
GET MORE DETAILS AT: WWW.RDR.LINK/ECB072
PROFESSIONAL ELECTRICIAN September 2026 127
ELEX2026
ELEX MAG AD PE - SEPT26_Layout 1 15/07/2026 10:15 Page 1
THE HANDS-ON TRADESHOW FOR PROFESSIONAL ELECTRICIANS PROFESSIONAL ELECTRICIAN
Sponsored by
The Electricians’ Exhibition
1000’S OF SHOW DEALS ● TOP ELECTRICAL BRANDS ● AMENDMENT 4 SEMINARS ● FREE ENTRY ● FREE PARKING ● FREE PROFESSIONAL ELECTRICIAN T-SHIRT ● FREE BACON ROLL
FORTHCOMING SHOWS:
STONELEIGH PARK
WEST MIDLANDS 22ND & 23RD OCTOBER 2026
SANDOWN PARK
SURREY
ALEXANDRA PALACE
18TH & 19TH NOVEMBER 2026
4TH & 5TH FEBRUARY 2027
LONDON
REGISTER FOR FREE AT WWW.ELEXSHOW.INFO
129_PE_SEPT26_Layout 1 30/07/2026 14:19 Page 129
CAUGHT ON
C A M E R A SOCIAL SNAPS!
COLIN TURNER: WE CAME ACROSS THIS INSTALLATION AT A COMMERCIAL-TYPE ENVIRONMENT WHEN CALLED OUT TO INSTALL A BATTERY SYSTEM ON THE CUSTOMER’S PREMISES. I HOPE YOU FIND THESE PICTURES AS INTERESTING AS I DID…
JASMINE: MY NAN LIVES IN A RESIDENTIAL APARTMENT AND EVERYONE SHARES THE SAME LAUNDRY ROOM. THIS IS THE PLUG THAT WAS ON THE DRYER. RESIDENTS REPORTED THAT THEY SMELLED BURNING AND THIS IS WHAT THE ELECTRICIAN FOUND…
Get your regular fix of CAUGHT ON CAMERA! PE’s website includes weekly Caught on Camera ‘Exclusives’, featuring the best (and worst) of the shocking snaps that readers have posted to our Twitter, Facebook and Instagram pages. Don’t forget to tag us in on your posts, or DM us your pictures and caption directly and you may just see your pictures featured on these pages or our website.
PROFESSIONAL ELECTRICIAN September 2026 129
130 SEPTEMBER 2026 INDEX_Layout 1 30/07/2026 09:40 Page 130
ADVERTISER INDEX Here is a useful summary of all the adverts that appear in this issue of Professional Electrician. Each is listed with its page number and a direct URL that will get you straight to the relevant online information.
ASES GROUP s.r.o. ..............................................page 90 www.rdr.link/ECB100 Carl Kammerling International Ltd ....................page 62 www.rdr.link/ECB101 Castline Systems .................................................page 93 www.rdr.link/ECB102 CED Electrical Group ..........................................page 24 www.rdr.link/ECB103 Chump Tools Ltd ...............................................page 110 www.rdr.link/ECB104 CTEC Ltd .............................................................page 28 www.rdr.link/ECB105 CTEC Ltd .............................................................page 51 www.rdr.link/ECB106 CTEC Ltd .............................................................page 96 www.rdr.link/ECB107 CTEK Sweden AB ..............................................page 103 www.rdr.link/ECB108 Deta Electrical Company Ltd (Brackenheath) ...page 85 www.rdr.link/ECB109 Deta Electrical Company Ltd (Timeguard) .........page 69 www.rdr.link/ECB110 deXpro Ltd ........................................................page 115 www.rdr.link/ECB111 Doepke UK Ltd ....................................................page 61 www.rdr.link/ECB112 Drayton Controls .........................................pages 12,13 www.rdr.link/ECB113 Electrical Contractors Association (ECA) ...........page 39 www.rdr.link/ECB114 Electrium Sales Ltd .............................................page 14 www.rdr.link/ECB115 Electrorad UK Ltd ...............................................page 11 www.rdr.link/ECB116 ELEX ..................................................................page 128 www.rdr.link/ECB117 Elite Security Products Ltd .................................page 79 www.rdr.link/ECB118 Enkin ...................................................................page 54 www.rdr.link/ECB119 Evec Ltd ...............................................inside front cover www.rdr.link/ECB120 GenetiQ ..............................................................page 99 www.rdr.link/ECB121 Hager UK Ltd .......................................................page 22 www.rdr.link/ECB122 IDEAL INDUSTRIES EMEA ...................................page 58 www.rdr.link/ECB123 Integral Memory plc ...........................................page 70 www.rdr.link/ECB124 Live Electrical Distribution Ltd ...........................page 44 www.rdr.link/ECB125 Lumineux Lighting ............................................pages 4,5 www.rdr.link/ECB126 M2 Electrical .....................................................page 107 www.rdr.link/ECB127 Martindale Electric Co. Ltd ................................page 36 www.rdr.link/ECB128 Metrel UK Ltd ...................................................page 103 www.rdr.link/ECB129 Metway Electrical Industries Ltd .......................page 53 www.rdr.link/ECB130
ML Accessories Ltd .............................................page 15 www.rdr.link/ECB131 ML Accessories Ltd .............................................page 27 www.rdr.link/ECB132 NICEIC .................................................................page 32 www.rdr.link/ECB133 Niglon Ltd .........................................................page 113 www.rdr.link/ECB134 Olympic Fixings ................................................page 113 www.rdr.link/ECB135 Ovia Lighting .......................................................page 75 www.rdr.link/ECB136 Powered Now .....................................................page 56 www.rdr.link/ECB137 Pro Certs Software .............................................page 93 www.rdr.link/ECB138 Repenic Ltd .........................................................page 82 www.rdr.link/ECB139 ROBUS ...................................................................page 8 www.rdr.link/ECB140 Rointe ................................................outside back cover www.rdr.link/ECB141 Rolec Services Ltd ...............................................page 40 www.rdr.link/ECB142 Saxby Lighting .....................................................page 17 www.rdr.link/ECB143 Saxby Lighting .....................................................page 31 www.rdr.link/ECB144 Scolmore International Ltd ................................page 81 www.rdr.link/ECB145 Scolmore International Ltd ................................page 96 www.rdr.link/ECB146 Selectric ..............................................................page 35 www.rdr.link/ECB147 Shelly ...................................................inside back cover www.rdr.link/ECB148 Stiebel Eltron UK Ltd ........................................page 110 www.rdr.link/ECB149 Switchtec Ltd ......................................................page 82 www.rdr.link/ECB150 Sync Energy ........................................................page 73 www.rdr.link/ECB151 Theben Automation Ltd .....................................page 77 www.rdr.link/ECB152 The CPD Book ...................................................page 113 www.rdr.link/ECB153 Thrion UK ............................................................page 49 www.rdr.link/ECB154 TLW Global .........................................................page 87 www.rdr.link/ECB155 Tradefox ..............................................................page 93 www.rdr.link/ECB156 UNICRIMP Ltd ...................................................page 110 www.rdr.link/ECB157 WAGO Ltd .............................................................page 6 www.rdr.link/ECB158 WAGO Ltd ...........................................................page 57 www.rdr.link/ECB159 WISKA UK Ltd .....................................................page 18 www.rdr.link/ECB160 XS Training Ltd ....................................................page 47 www.rdr.link/ECB161
PE Page Grid_Layout 1 24/07/2026 17:15 Page 1
PE Page Grid_Layout 1 24/07/2026 17:17 Page 1