Skip to main content

37 EoYS 2021

Page 1

Postscript 64: The Reintegration of Public School (P.S.) 64 Blake Kem - CORE II, Cadena Studio


1900

1906

1915

1920

1964

1925

1977

1925

2006

2021 2


Assembly on Site

6


Raw Components

Assembly on Site

7


Existing Shell

Program Volumes

Interior Assembly

Circulation System

Structural System

9


Classroom Portal

Ground Floor Plan

10


Activating the void

Activating the void

11


Enlarged Classroom Plan

Classroom View

14


New metal window frame portal to clarify visibility of interior volumes from exterior brushed black steel

1.

Programmed interior volumes plywood finished partition walls with mass timber frames

2.

Mass timber post-and-lintel system, embedded steel plate connections

3.

Existing clay brick masonry wall

4.

Existing terracotta facade detailing - salvaged and refurbished

5.

New metal window frame portal to clarify visibility of interior programmatic volumes from exterior - brushed black steel

Double-glazed window system

Built-in shelves and seating furniture

1.

2. Existing clay brick masonry wall Existing terracotta facade salavage and refurbish

Existing street greenery

New structural stabilization rod between existing masonry wall and new mass timber frame

Interior lighting system

Plywood finished interior partition walls

3.

Exposed existing masonry wall shown in gap beyond Existing steel shape lintel

4. Str

5.

Ex

ist

uc

tur

al

Brushed metal reveal divider filled with 3" cellulose insulation

Int

erv

en

tio

Mass timber column shown beyond

n

New metal window frame portal to clarify visibility of interior volumes from exterior brushed black steel

ing

Sh

ell

4 18" 3-ply CLT panel infill wall

Exposed existing masonry wall shown beyond

Double-glazed window system

15


100% SERVICE

17


50%

INTERACT

18


75% STUDY

19


25% PLAY

20


Turn static files into dynamic content formats.

Create a flipbook
37 EoYS 2021 by GSAPP_Digital Publishing - Issuu