Postscript 64: The Reintegration of Public School (P.S.) 64 Blake Kem - CORE II, Cadena Studio
1900
1906
1915
1920
1964
1925
1977
1925
2006
2021 2
Assembly on Site
6
Raw Components
Assembly on Site
7
Existing Shell
Program Volumes
Interior Assembly
Circulation System
Structural System
9
Classroom Portal
Ground Floor Plan
10
Activating the void
Activating the void
11
Enlarged Classroom Plan
Classroom View
14
New metal window frame portal to clarify visibility of interior volumes from exterior brushed black steel
1.
Programmed interior volumes plywood finished partition walls with mass timber frames
2.
Mass timber post-and-lintel system, embedded steel plate connections
3.
Existing clay brick masonry wall
4.
Existing terracotta facade detailing - salvaged and refurbished
5.
New metal window frame portal to clarify visibility of interior programmatic volumes from exterior - brushed black steel
Double-glazed window system
Built-in shelves and seating furniture
1.
2. Existing clay brick masonry wall Existing terracotta facade salavage and refurbish
Existing street greenery
New structural stabilization rod between existing masonry wall and new mass timber frame
Interior lighting system
Plywood finished interior partition walls
3.
Exposed existing masonry wall shown in gap beyond Existing steel shape lintel
4. Str
5.
Ex
ist
uc
tur
al
Brushed metal reveal divider filled with 3" cellulose insulation
Int
erv
en
tio
Mass timber column shown beyond
n
New metal window frame portal to clarify visibility of interior volumes from exterior brushed black steel
ing
Sh
ell
4 18" 3-ply CLT panel infill wall
Exposed existing masonry wall shown beyond
Double-glazed window system
15
100% SERVICE
17
50%
INTERACT
18
75% STUDY
19
25% PLAY
20