4.5 Asset Programs to meet Demand

Parks and Gardens

Transport

Stormwater Drainage

Sewer

Water • Construction of new parks and gardens • Acceptance of responsibility for assets gifted by land developers • Acquisition, rationalisation and disposal of park play and fitness equipment

• Construction of new roads • Sealing of Unsealed roads • Acceptance of responsibility for assets gifted by land developers • Development of Transport strategy to minimise impact of heavy vehicle traffic on unsealed network

• Construction of new drainage pipelines and open drains • Construction of Flood Levees • Construction of stormwater detention and retention basins • Acceptance of responsibility for assets gifted by land developers

• Construction and upgrade of sewerage networks, pump stations and treatment facilities • Acceptance of responsibility for assets gifted by land developers

• Construction and upgrade of water networks, pump stations and treatment facilities • Acceptance of responsibility for assets gifted by land developers

4.5 Asset Programs to meet Demand

The new assets required to meet growth will be acquired free of cost from land developments and constructed/acquired by the organisation. New assets constructed/acquired by the organisation are discussed in Section 5.5.

Acquiring these new assets will commit the organisation to fund ongoing operation, maintenance and renewal costs for the period that the service provided from the assets is required. These future costs are identified and considered in developing forecasts of future operation, maintenance and renewal costs in Section 6.