Baltic Creek Public Meeting

Page 1


GREAT RIVERS GREENWAY

 Regional multi-county public agency/parks and trails district:

 City of St. Louis

 St. Louis County

 St. Charles County

 Actively building 19 greenways across the region

 135 miles of greenways planned, designed and built so far

 250+ successful working partnerships, municipalities and institutions

 Creating a legacy of greenways for future generations to enjoy

WHAT IS A GREENWAY?

Greenways are outdoor spaces connecting people & places.

Pedestrian & Bicycle Trails Conservation Projects

Trailheads with Amenities Neighborhood Connections

PURPOSE OF MEETING

• Provide Background on Baltic Creek Greenway Project

• Review of Alignment Options

• Review of Alignment Feasibility Considerations

• Feedback on Alignments

ST. CHARLES COUNTY GREENWAY PLAN

Based on input from over 1000 residents.

Baltic Creek Greenway Timeline

 December 2020 -St. Charles County Greenway MP Completed

NEW GREENWAY: From Dardenne Greenway at St. Charles Community College to the KATY Trail via Veterans Tribute County Park

 April 2024 -Baltic Creek Greenway MP Competed

 June 2024 -Baltic Creek North

Area Feasibility Study Kickoff

2021 St. Charles County Priority Greenway Projects

Veterans Tribute Park
St. Charles Community College

Off-Road Alignment

Road Adjacent Alignment

Existing Path (Adjacent)

Existing Path (Off-Road)

10% -15% Slope Alignment

Challenge = Traffic

Challenge = Highway

North Middle South

Big Challenge = Slope

GRG BALTIC CREEK SURVEY RESULTS

• Total Responses = 235

• Survey open from 3/6 to 3/31

• Alignment A & Alignment C was overwhelmingly preferred

• Alignment B (MRMD) - Strong Objection

CONsPROsEvaluation

Total Length 0.97 miles

Pedestrian Safety Upgrades

Alignment A Considerations –Boardwalk adjacent to parking lot

Alignment A Considerations –Example Boardwalk adjacent to creek

Alignment A Considerations –

Dardenne Greenway Trail Connection Under MRMD Bridge

Alignment C Considerations –Trail location behind the Farm Supply

Alignment C Considerations –Trail through woods to connect to Kountz Trail

Alignment C Considerations –Example Boardwalk in wooded area

Alignment C Considerations –

Kountz Trail Upgrades

NEXT STEPS

• Incorporate feedback from Open House

• Continue Stakeholder Outreach

• Preferred Alignment Recommendation

• Findings Report Aug/Sept

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Baltic Creek Public Meeting by Great Rivers Greenway - Issuu