Skip to main content

Version 1 Masterplan - September 2024

Page 1


Pedestrian

WYSEBY HILL

(Proposed)

(Proposed)

(Proposed)

Ecological Enhancement Zone (Proposed)

Seating (Proposed)

Access Point

Marker/Information Board (Proposed)

Compound (Proposed)

(Proposed)

(Proposed)

Wyseby Hill Substation

0

Solar Arrays (Proposed)

Cattle Grazing (Proposed)

Sheep Grazing (Proposed)

Nursery (Proposed)

Nursery (Proposed)

Construction Compound (Proposed)

Footpath Marker/Information Board (Proposed)

Maintanance/Emergancy Access Point

Outdoor Seating (Proposed)

Woodland Ecological Enhancement Zone (Proposed)

Wild Flower Meadow/Pollinator-Friendly Meadow (Proposed)

Habitat Enhancement Area (Proposed)

Avian Habitat Enhancement Zone (Proposed)

Ecological Enhancement Zone

On-site Nursery

Electrical Switchgear (Proposed)

Control Room (Proposed)

Battery Energy Storage Unit (Proposed)

Collector Substation (Proposed)

Primary and National Grid Substation

Peat Bog

Tree and Hedgerow Planting (Proposed)

Surface & River Flooding Risk

Overhead Power Lines Core Footpaths

Poles

Shell/Essar Pipeline Safety Exclusion Zone

New Access Tracks/Bridle Paths (Proposed)

Footpath Surface Hard Standing

Limited Views from A74(M) Limited visibility of the solar farm from the A74(M), minimising visual impact on passing traffic.
Limited Views from West Coast Mainline Railway
Limited views of the solar farm from the West Coast Mainline Railway due to existing landscape screening.
Habitat Enhancement
Gretna Substation

Turn static files into dynamic content formats.

Create a flipbook
Version 1 Masterplan - September 2024 by Green Energy International - Issuu