Skip to main content

GRC Rail Experience

Page 1

SELECT EXPERIENCE

Rail Projects 2018


PROJECT

CLIENT

Gold Coast Light Rail 01 McConnell Dowell

DETAILS • • •

• Gold Coast Light Rail 02 CPB Contractors

13km light rail system 14 trams, 16 stations Route between Gold Coast University Hospital and Broadbeach

Connecting existing light rail at Gold Coast University Hospital to heavy rail at Helensvale

SERVICES

•

Contract administration

•

Tender phase measurement Estimating Procurement services Design cost management Claims preparation

• • • •

High Capacity Metro Trains

Downer EDI

Newcastle Light Rail

Downer Infrastructure Services

• •

65 7-car trains two dedicated maintenance facilities to Melbourne’s busiest rail corridor

• • •

Schedules of quantities Tender evaluation Cost planning

• •

2.7km light rail with six stops • Capacity to hold 1200 passengers per hour •

Design cost management Cost planning

•

Options studies for the reconfiguration, demolition and expansion

•

Master planning budgeting

Rosewood, Shorncliffe, Ormeau, Coomera, Nerang, Helensvale, Sparc Architects Robina, Varsity Lakes Stations

•

Condition assessments

•

Asset management budgeting

Yeerongpilly Station

•

Minor platform upgrade

•

Cost planning

•

12.6 kilometre dual-track passenger line between Petrie and Kippa-Ring (six stations)

• • •

Estimating Budget alignment Variation assessment

Queensland Rail Building & Asset Sunshine Coast Depot – Services Multi Use Facility

Moreton Bay Rail Link

GRCQS.COM

Sparc Architects

Thiess


PROJECT

CLIENT

DETAILS

SERVICES •

Queensland Rail Stabling Yards

Richlands Railway Station

GRCQS.COM

CPB Contractors

John Holland (Horizon Alliance)

•

•

•

Design and development cost planning Variation preparation

• • • •

Cost planning Value management Trade packages Tender review

New train stabling facilities in four locations in SEQ

Stage 01 Darra to Springfield transport corridor project


Turn static files into dynamic content formats.

Create a flipbook
GRC Rail Experience by GRC Quantity Surveyors - Issuu