Skip to main content

GMC K-12 School Experience

Page 1

K-12 Design Portfolio Consistently recognized as a

National Leader

Award Winning #14 ENR

Southeast Design

#18 BD+C AE Firm

2024 SE

Firm of the Year

in K-12 School Design

140+ K-12 Clients

#4 1

Top Education Design Firms in the Southeast Engineering News Record SE

gmcnetwork.com

Building Communities.

www.gmcnetwork.com


t Pelham Park Middle School

gmcnetwork.com

3


Preface At GMC, we believe in community, collaboration and using the power of creativity and hard work to make a difference - in our hearts, homes, city, nation and world. We believe in hope, progress, beauty, and big ideas. We believe that people like us, need us. We are not just an engineering firm. We are not just architects. We are artists, designers, thinkers, doers, makers, and storytellers dedicated to doing great work, for good. We partner with passionate and like-minded individuals, businesses, organizations, and causes that have aggressive hopes and goals for tomorrow and beyond. Dreaming big is the only way to make big dreams come true, and we know that our solutions can only be as great as the

people we serve. Communities are built by people, not companies. And it is that foundational concept that drives how we approach every project, big or small. Because it’s the passion and drive of individuals that feeds the growth and development of what’s next. Together, we will be smart. We will be relevant. We will be meaningful. We will be kind, supportive, enthusiastic and – at the very least – the very best we can be. We are – and will continue to be – a collaborative organization driven by the power of building better, happier, healthier, thriving communities. And we are committed to working with folks who share our vision for realizing their full potential, because we know that great engineering and architecture helps make communities better, for everyone.

Building Co 4

gmcnetwork.com


t Pelham Park Middle School

ommunities. gmcnetwork.com

5


u Athens Alabama High School

6

gmcnetwork.com


Contents 08 14 30 48 72 84 Section 1 Firm Overview

Section 2 High School Experience Section 3 Middle School Experience Section 4 Elementary School Experience Section 5 Career Tech and STEM Experience Section 6 Sports Experience

gmcnetwork.com

7


FIRM OVERVIEW

Who We Are Goodwyn Mills Cawood (GMC), LLC is a leading architecture and engineering firm in the Southeast. We design schools, parks, hospitals, and more, while providing clean water, safe streets, and resilient environments. Guided by the belief that communities are built by people, we serve with quality, integrity, creativity, and care. We work with diverse public and private clients, ensuring projects meet their needs economically and efficiently.

History and Growth GMC traces its roots to 1947, when Donald Mills Sr. founded a small consulting engineering firm. In 1965, George Goodwyn started his own firm after serving in the military and working as a bridge construction superintendent. He later reconnected with former classmate Don Mills Jr., and in 1975 the two merged their companies to form Goodwyn & Mills Consulting Engineers. Steve Cawood joined in 1985, creating Goodwyn, Mills & Cawood, Inc., and the firm’s architecture department followed a year later, launching its multidisciplinary approach. Additional disciplines, including landscape architecture, transportation, environmental, electrical, and geotechnical engineering, were added over time. In 2020, the firm transitioned to an LLC to support growth and expand employee ownership, becoming Goodwyn Mills Cawood, LLC, on December 4, 2020.

1947

Donald Mills Consulting Engineers

75+

Years of Business

1975

1985

2020

Goodwyn & Mills Consulting Engineers

Goodwyn, Mills and Cawood, Inc.

Goodwyn Mills Cawood, LLC

12

Disciplines

30+

Current Offices in Southeast

700+

Professionals

+$2B Designed Annually

Office Locations Alabama

Andalusia Auburn Birmingham Daphne Dothan Eufaula Huntsville Mobile Mobile (USA Office) Montgomery Vernon

Florida

Orlando Pensacola Sarasota Tampa

8

gmcnetwork.com

Georgia

Atlanta Augusta Brunswick Cartersville Duluth Savannah

Louisiana New Orleans

North Carolina Charlotte

South Carolina Charleston Columbia Conway Greenville Rock Hill

Tennessee Brentwood Nashville


Our In-House Disciplines Architecture

Interior Design

Engineering

Environmental

Landscape Architecture

Disaster Recovery

GIS

Planning

Geotechnical

MEP

Transportation

Surveying

Our Comprehensive Approach Goodwyn Mills Cawood (GMC)’s multi-disciplined in-house team delivers a fully integrated approach that streamlines communication, improves efficiency, and enhances project outcomes. By combining expertise across architecture, engineering, environmental services, and planning, we are able to capture both the “big picture” and the essential project details, identifying innovative, practical solutions for every challenge. Founded in 1947, GMC remains committed to creating healthier, more sustainable, and thriving communities, applying a broad base of knowledge to develop strategies that are economically, culturally, and environmentally responsible.

p Emma Hutchinson Elementary School in Atlanta, GA gmcnetwork.com

9


EDUCATION DESIGN

Building the Future of Education: With a legacy of successful projects for over 140 School Districts across the Southeast, Goodwyn Mills Cawood (GMC) delivers innovative, student and teacher - centered solutions for K-12 environments. Our multidisciplinary team brings deep experience, technical excellence, and a commitment to partnership—ensuring every project supports district goals and inspires the next generation. GMC is a trusted leader in higher education design, planning, and construction, with a portfolio spanning hundreds of project Elementary, Middle and High schools throughout the Southeast. Our team’s experience includes new construction, renovations, and comprehensive campus master plans for multiple schools throughout the Southeast. What sets GMC apart is our integrated, multidisciplinary approach. We offer a full suite of in-house services—including architecture, interior design, landscape architecture, civil engineering, transportation engineering, geotechnical engineering, environmental services, and construction administration. This allows us to streamline communication, enhance coordination, and deliver projects efficiently and cost-effectively.

10

gmcnetwork.com


Our project teams are selected for their specialized expertise in higher education environments and their proven ability to collaborate across disciplines. We understand the evolving needs of today’s campuses— flexible learning spaces, advanced research facilities, and sustainable, resilient infrastructure. GMC’s professionals are adept at engaging diverse stakeholder groups, translating institutional vision into actionable plans, and providing creative solutions to complex challenges. Clients consistently praise GMC’s responsiveness, attention to detail, and commitment to partnership. Our depth of resources and hands-on leadership ensure that every project—no matter the size or complexity— receives the personal attention it deserves. We are proud to help colleges and universities create environments that foster learning, innovation, and community for generations to come.

K-12 Projects Over the Past 5 Years:

140+

K-12 Renovations, Interior Upfits & Exterior Upgrades These projects range from full school building reconfigurations and renovations to classroom wing upfits and roof replacements

82

Specialized Additions & Expansions

These K-12 additions include classrooms, gyms, cafeterias, multi-purpose spaces, weight training buildings field houses, performing arts centers, media centers and more.

38

New Construction Projects

These include brand new schools including Early Learning, Elementary, Middle, High School, and Career Centers

17+

School District Facility Assessments, Feasibility Studies, and Master Plans

25+

K-12 Athletic Fields, Playgrounds & Outdoor Student Classrooms

gmcnetwork.com

11


CLIENT ACCOLADES

WHAT ARE OUR

CLIENTS SAYING?

We have been very pleased with the design team. They have been imaginative, attentive, and responsive to our school. — Denise Pearsall

Christ Church Episcopal School

12

gmcnetwork.com

Our new High School has really exceeded our expectations and will have a real impact on our students and community for many years to come. — Jennifer Sittason Hartselle Board of Education

I like my job – love the kids – and – I love this building! — Merry Cox

Principal, League Academy for the Communication Arts


 Athens Alabama High School

I appreciate that it “looks” like a school. It balances tradition with modern. I know that makes it sound simple, but including some traditional elegance is a nice touch that sometimes gets lost in our pursuit to be so transformational and “forward thinking”.

The new Gulf Shores High School is a beautiful, functional, and forwardthinking facility. It includes flexible learning spaces, career-focused labs, collaborative areas, and specialized spaces that will expand opportunities for students for many years to come. GMC’s work has helped create a school that

— Douglas P. Carey, RA NCARB

— Dr. Matt Akin

Executive Director of Facilities Paulding County School District

reflects who we are as a community and where we are headed as a school system. Superintendent, Gulf Shores City Schools

gmcnetwork.com

13


 Homewood High School

14

gmcnetwork.com


NOTABLE

HIGH SCHOOL PROJECTS

gmcnetwork.com

15


HIGH SCHOOLS

DeKalb County School District

Middle and High School at Sequoyah New Construction

Doraville Georgia

485,446

Square Feet

$228.6 M Cost

Ongoing GMC and DLR Group are designing a new middle and high school for DeKalb County School District, featuring a 1,600-student high school and a 1,200-student middle school. The facility will include classrooms, media center, fine arts, auditorium, cafeteria, gym with indoor track, special education, career tech labs, and support spaces. Site amenities include practice fields, baseball and softball fields, and tennis courts.

16

gmcnetwork.com

Status

2,800

Student Capacity


 High School Tower

 High School Courtyard

 Middle School Courtyard

 Middle School Tower

gmcnetwork.com

17


HIGH SCHOOLS

Gulf Shores City Schools

Gulf Shores High School New Construction

In 2017, Gulf Shores established its own city school district to deliver a modern, studentfocused educational experience. The new high school campus spans 50 acres, with a planned second phase for athletics, and features three buildings totaling approximately 275,000 sf. The main two-story academic building centers around a collaborative courtyard and houses multiple career academies, including aviation, finance, engineering, aquaculture, music and video production, and STEM. The campus also offers comprehensive fine arts programs with a 750-seat theater, band, dance, and choral spaces. Athletic facilities include a 1,200-seat arena, football facility, and a planned 100-yard covered practice pavilion.

Gulf Shores Alabama

275,000

Square Feet

$141 M Cost

2026

Completed

1,200

Student Capacity

18

gmcnetwork.com


Throughout the design process, GMC listened carefully, communicated clearly, and provided thoughtful guidance. Their team demonstrated professionalism, creativity, and a strong commitment to quality. They were responsive to our feedback and consistently worked to ensure the final design reflected both our educational goals and the practical needs of operating a modern high school.

Title

- Dr. Matt Akin, Superintendent, Gulf Shores City Schools

gmcnetwork.com

19


HIGH SCHOOLS

Mobile County Public School System

LeFlore High School Renovation & Addition

Mobile Alabama

200,000

Square Feet

$59 M Cost

The LeFlore High School Renovation and Addition project revitalized the historic John L. LeFlore Magnet High School in Mobile, Alabama, known for its fine and performing arts programs. The $59 million project was completed in three phases to minimize disruption, including renovations to the auditorium, pool, gymnasiums, kitchen, cafeteria, and science wing, as well as new additions and improved parking and bus facilities. Enhanced safety features such as glass-enclosed connectors, controlled access lobbies, and security cameras were incorporated throughout the campus. As the largest investment in Mobile County Public School System history, the project supports expanded magnet program enrollment and ensures a modern, secure learning environment.

20

gmcnetwork.com

2025

Completed

1,600

Student Capacity


gmcnetwork.com

21


HIGH SCHOOLS

Rutherford County Schools

Riverdale High School Renovation & Addition

Murfreesboro Tennessee

140,000

Square Feet

$49.6 M Cost

The new additions and renovations at Riverdale High School will total approximately 140,000 square feet and will connect the four separate existing buildings under one roof. The scope of work includes a new performance auditorium, great hall, corridor commons, bio stem labs, art rooms, general classrooms, culinary arts expansion, café expansion and guidance expansion.

2023

Completed

2,124

Student Capacity

22

gmcnetwork.com


gmcnetwork.com

23


HIGH SCHOOLS

Project Award Building Birmingham Awards Honoree, Birmingham Business Journal

Homewood City Schools

Homewood High School Renovation & Addition

The Homewood High School addition and renovation project is part of a system-wide plan to accommodate Homewood City Schools’ growing student population. Approximately 100,000 sf were added to the existing high school, including three new pavilions for fine arts, athletics and academics. The fine arts pavilion features a dance studio, band and choral rooms, theater and related functions. A total of 16 classrooms were added, with 14 being added in the two-story classroom addition, plus two additional classrooms through repurposed areas. The new athletic wing now houses team rooms, locker rooms, offices and state-of-the-art weight training space. A new front entry was also constructed and features a large atrium with a secure vestibule and administrative space. All existing exterior doors were upgraded with new access control. The interior renovations were comprehensive, now bringing in more natural light and widened corridors. The plans also entailed adding new science labs, expanding the dining area, adding spaces for collaborative work and remodeling the media center into a more multipurpose learning environment with comfortable seating and up-to-date technology. In addition, the project included plans for two distinct traffic loops for carpools and student parking to enhance safety and eliminate traffic. Approximately 60 parallel parking spaces were also added.

24

gmcnetwork.com

Homewood Alabama

104,000

Square Feet

$35.5 M Cost

2020

Completed

1,300

Student Capacity


gmcnetwork.com

25


HIGH SCHOOLS

Project Award 2019 BUILDSouth Award New Construction Management Alabama Associated General Contractors

Athens City Schools

Athens High School New Construction

Athens Alabama

284,874

Square Feet

$53 M Cost

The new 284,874-sf Athens High School serves 1,200 students in grades 9-12 within a two-story brick and cast stone building reflecting Athens’ traditional architecture. Designed by GMC, the school features diverse learning environments, including wings for core and specialized curricula such as STEM, arts, healthcare, culinary arts, athletics, and JROTC. Specialized spaces include STEM labs, a 1,200-seat theater, hospital simulation rooms, robotics labs, a two-story art gallery, and nine flexible learning areas. Security and accessibility are enhanced with three monitored entrances and dedicated drop-off points for 9th graders and special needs students, including accommodations for sensory sensitivities.

26

gmcnetwork.com

2019

Completed

1,200

Student Capacity


gmcnetwork.com

27


HIGH SCHOOLS

Project Award 2014 Educational Interiors Showcase Outstanding Design Award American School & University

Montgomery County School District

Park Crossing High School New Construction

Montgomery Alabama

165,000

Square Feet

$29.3 M The 165,000 sf Park Crossing High School was designed to enhance teaching and learning while accommodating student needs. Spaces are visually connected throughout, creating a transparent environment that is easy to monitor. The school features two wings with 28 classrooms, eight science labs, four career tech spaces, and distance learning classrooms. Seven storm-safe rooms with solid concrete walls shelter approximately 1,200 people and withstand winds up to 250 mph. Heavy steel shutters lock in place over windows, directing glass outward to protect occupants.

Cost

2013

Completed

882

Student Capacity

Two indoor amphitheaters serve as collaborative learning spaces with stadium seating that doubles as stairs to the second floor. The cafeteria offers indoor and outdoor dining and opens to the gymnasium, creating a Game Day Dining Area for the Thunderbirds. The library and media center includes a traditional library, cyber café, and outdoor terrace. Athletic fields, band and choral facilities, and smart boards and digital media screens round out the campus.

28

gmcnetwork.com


gmcnetwork.com

29


 Pelham Middle School

30

gmcnetwork.com


NOTABLE

MIDDLE SCHOOL PROJECTS

gmcnetwork.com

31


MIDDLE SCHOOLS

Aiken County Public Schools

North Augusta Middle Addition

This upcoming project will transform North Augusta Middle School with a dynamic and comprehensive addition, replacing the original 1954 building section to better align with the school’s evolving programming needs. This ambitious endeavor will seamlessly integrate the existing 2009 Cafeteria, Music, and Science Classroom addition into the new design, ensuring a cohesive and modern educational environment. As part of this integration, these areas will undergo renovations to enhance their functionality and aesthetic appeal. The new building is projected to span approximately 70,000 sf, offering ample space for innovative learning and community engagement. As the GMC team delves deeper into the programming and Schematic Design phases, we will ensure every detail meets the highest standards of educational excellence.

32

gmcnetwork.com

N. Augusta South Carolina

70,000

Square Feet

$37.9 M Budget

Construction Status

525

Student Capacity


gmcnetwork.com

33


MIDDLE SCHOOLS

Tift County School System

Tift County 7-8 Grade School New Construction

GMC is partnering with Tift County School System to build a new middle school designed to accommodate approximately 1,200 full-time students. This new educational facility will serve as a dedicated space for 7th and 8th graders, providing an environment conducive to learning and growth. GMC worked closely with the Owner and the community to understand the growing and demanding needs of the school. By utilizing PATH, GMC helped the Owner create a program that not only looks at immediate educational needs but also planning for future flexibility.

34

gmcnetwork.com

Tifton Georgia

194,819

Square Feet

$67 M Budget

Construction Status

1,200

Student Capacity


gmcnetwork.com

35


MIDDLE SCHOOLS

Project Award 2025 Project Achievement Award CMAA South Atlantic Chapter

Savannah-Chatham County Public School System

Pulaski K-8 Conversion Renovation & Addition

Savannah Georgia

66,200

Square Feet

$29.6 M Cost

GMC partnered with the Savannah-Chatham County Public School System to expand the Pulaski K-5 campus, creating a dedicated middle school space for local and military base students. The project added 19 instructional units for grades 6-8, supporting 350 more students, and included a new gymnasium sized for middle school sports. GMC’s design optimized existing resources, improved site and internal circulation, and added outdoor and CTAE spaces, all while minimizing disruption through a phased construction approach. The expanded school opened in Fall 2024.

36

gmcnetwork.com

2024

Completed

1,150

Student Capacity


gmcnetwork.com

37


MIDDLE SCHOOLS

Williamson City Schools

Page Middle School Masterplan, Renovation & Addition

GMC partnered with Williamson County Schools on a comprehensive master plan to expand the Page Middle School campus, growing its footprint to accommodate approximately 1,650 students. Phase I added a three-story, 54,200 sf math and science building with 30 classrooms, including three science labs with prep rooms. Phase II introduced a new entrance lobby, student drop-off colonnade, bus loop, parking lot, and expanded stormwater retention area, along with a three-story, 52,080 sf classroom addition, a new student colonnade, and an open-air courtyard, while demolishing the 14,518 sf existing classroom and administration wings. Phase III included a new performance gym with locker rooms, an expanded and renovated media center, and an expanded student commons. GMC’s role spanned master planning, architecture, interior design, civil site engineering, construction materials testing, and construction administration.

Franklin Tennessee

106,280

Square Feet

$19.8 M Cost

Sep 2019 Master Plan Completed

Oct 2019

Phase 1 Completed

Aug 2021

Phase 2 Completed

Apr 2023

Phase 3 Completed

1,650

Student Capacity

38

gmcnetwork.com


gmcnetwork.com

39


MIDDLE SCHOOLS

Elmore County Schools

Redland Middle School New Construction

GMC provided architectural services for Redland Middle School, a new 111,052 sf facility on a 50-acre site serving grades five through eight. The design emphasizes safety, 21stcentury learning, and future expansion. Safety features include three storm shelters: exterior classrooms have storm shelter windows requiring only a hallway crossing, and the special education classroom serves as the third shelter. The main entrance sits left of center so it will become centered once the school expands to accommodate growth from 500+ to 1,000 students, with room on the site to double the building and add athletic fields. The 32 classrooms feature interactive TVs, supplemented by four STEM rooms, a maker’s space, music, choir, speech, art, gifted, and special education rooms, a robotics lab, two science labs, and a gymnasium with locker rooms and a weight room. A central courtyard, reached through the cafeteria, library, and two facing locker vestibules, gives students a daily outdoor break space.The classroom hallways were color-coded by the school’s colors of red and blue to make wayfinding more intuitive for the students. The red hallway is designated for grades five through six while the blue hallway is for seventh and eighth grades.

40

gmcnetwork.com

Wetumpka Alabama

111,052

Square Feet

$26.6 M Cost

2022

Completed

1,00

Student Capacity


gmcnetwork.com

41


HIGH SCHOOLS

Project Award Spring 2019 Outstanding Project Award Architectural Portfolio Learning By Design

Enterprise City Schools

Coppinville Junior High School Masterplan, Renovation & Addition

Coppinville Junior High School (CJHS) is the final phase of Enterprise City Schools’ (ECS) master plan to improve safety and learning environments, consolidating students from several decommissioned schools. With its completion, all ECS campuses now have tornado-safe shelters and enhanced safety features. To build community among students from different schools, spaces are organized along a central “main street” corridor: gathering areas like the gym, media center, and dining hall sit to the east, classroom wings to the west. The wings angle 20 degrees off the main hall, creating space for lockers, restrooms, and glass-lined flex classrooms used for breakout and active learning, each distinguished by its own colorful finishes and visible from the corridor. Each classroom wing functions as a learning community, blending flexible and traditional classrooms around a shared multi-purpose common area, with direct access to the main street’s flex classrooms. Minimal built-in casework keeps fixtures adaptable to varied teaching methods.

42

gmcnetwork.com

Enterprise Alabama

87,977

Square Feet

$16 M Cost

2018

Completed

650

Student Capacity


gmcnetwork.com

43


MIDDLE SCHOOLS

Project Awards 2019 Alabama School Library of the Year for Pelham Park Middle School Library Alabama School Library Association 2019 Merit Award AIA Birmingham Magic City Design Awards 2019 Top Block Award Alabama Concrete Industries Association

Pelham City Schools

Pelham Park Middle School New Construction

GMC designed Pelham Park Middle School for approximately 800 students across the street from the Pelham Recreational Park and adjacent to the Pelham Recreational Center. Located on the same street as the new city library it beings to establish a new civic identity for the City of Pelham. The school's design uses a combination of natural stone, brick masonry, concrete/wood veneer, and expansive glass systems which allow light deep into the building creating an airy, inviting quality to the space. The two-story, 6th, 7th, and 8th grade classroom building is the main entrance into a two-story lobby that connects it to the one-story building beyond by a glass hallway that runs through the central courtyard. The one-story building houses the cafeteria that has capacity for 400 people, and also includes a band room, choral room, business, and culinary academies. Pelham Park Middle school was designed with storm shelters to protect the students from inclement weather. Large scale and age relevant floor graphics bring a touch of both educational and visual interest to the common areas throughout the school. The school's gymnatorium seats 600 and is home to the Pelham Park Panthers. Adjacent to the middle school is a football field and running track.

44

gmcnetwork.com

Pelham Alabama

121,343

Square Feet

$21.6 M Cost

2017

Completed

800

Student Capacity


gmcnetwork.com

45


MIDDLE SCHOOLS

Project Awards Spring 2017 Outstanding Project Award Architectural Portfolio Learning By Design 2016 Outstanding Design Award American School & University Architectural Portfolio Learning By Design

Williamson County Schools

Mill Creek Elementary & Middle School New Construction

Mill Creek Elementary and Middle School is a new K-8 prototype design that joins elementary and middle schools with a connecting spine linking two classroom wings and an auxiliary wing. The spine holds a media center, art labs, and flexible spaces for collaborative learning, while two grand staircases connect the academic wings to an atrium that serves as the pre-function area for the auditorium and cafeteria. The building includes 68 classrooms, four special needs classrooms, and dedicated art, speech, computer, resource, band, music, science, and flex classrooms. The auxiliary wing houses separate elementary and middle school gyms, cafeterias with a shared kitchen, and media centers with a shared circulation desk, and can operate independently after hours. The school shares its site with the high school for joint use of athletic fields and event parking. Construction featured slab on grade, load bearing concrete masonry, hollow core plank with concrete topping, steel joist and metal deck roofing with single ply membrane, and light gauge steel trusses with a shingle roof system. GMC provided planning, programming, architecture, interiors, construction materials testing, and special inspections.

46

gmcnetwork.com

Nolensville Tennessee

233,977

Square Feet

$28.2 M Cost

2016

Completed

800

Elementary Students

800

Middle School Students


gmcnetwork.com

47


 Goodlettsville Elementary School

48

gmcnetwork.com


NOTABLE

ELEMENTARY SCHOOL PROJECTS

gmcnetwork.com

49


ELEMENTARY SCHOOLS

Richland County School District Two

Windsor Elementary Renovation & Addition

Columbia

South Carolina

9,162 SF Addition

7,000 SF Renovation

Windsor Elementary School has been transformed to reinforce the Learning Communities concept, providing enhanced opportunities for both inter-grade horizontal and vertical teaching articulation. The completed project features a new one-story building addition that includes a gymnasium with an accompanying platform stage, green room, ramp, and utility spaces. A second portion of the addition houses group restrooms, a coach’s office, two storage spaces, and a connecting corridor. This addition is seamlessly connected to the existing cafeteria, where a small ramp leads to the platform stage. Throughout the building, “community hubs” were created at various scales to foster new synergies between and within learning (pod) communities. The existing Media Center underwent a full renovation, with the ceiling opened up and new clerestory windows installed to allow natural light into the space. Two adjacent classrooms were fully renovated and converted into a large meeting and collaboration space. Exterior improvements included regrading and replacing the existing rear parking area to create a new, smaller lot sloping toward the new gymnasium. The old playground was demolished and replaced with a new playground located in front of the gym. Additionally, two existing courtyard spaces were converted into outdoor learning areas, further supporting the school’s collaborative and innovative learning environment.

50

gmcnetwork.com

$12.23M Cost

2026

Completed

580

Student Capacity


gmcnetwork.com

51


ELEMENTARY SCHOOLS

Paulding County Schools

Crossroads Elementary School New Construction

Paulding County School District (PCSD) desires to design and build a new prototype elementary school. The anticipated site for the project is the parcel already under construction for the District’s new Middle School, near the intersection of the Seven Hills Connector and Cedarcrest Road. The scope of services GMC is providing includes cost estimates, conceptual plans, and 3D renderings as part of the pre-design phase. GMC will also be in charge of the construction administration once the construction commences.

52

gmcnetwork.com

Acworth Georgia

107,880

Square Feet

$38.2 M Cost

2026

Completed

800

Student Capacity


gmcnetwork.com

53


ELEMENTARY SCHOOLS

Richland County School District Two

Rice Creek Elementary School

Columbia

South Carolina

10,909 SF Addition

3,538 SF Renovation

Renovation & Addition

The renovated and expanded school was designed to create a student-centered learning environment that feels like a home away from home for the Rice Creek community. Building renovations consist of interior wall alterations to the Mod Classrooms, conversion of classrooms into office, and conversion of the existing gym space into two new classrooms. A new gymnasium and renovated cafeteria provide a much-needed large gathering space, that will allow the school to increase its offerings of programs and events while also solving basic functional needs. With space freed-up by the new additions, the organization of spaces within the existing building allowed for additional office, storage, and meeting space. STEAM program, Echo Lab, and the Media Center. These concepts extend beyond the walls of the existing school, providing much-needed improvements to site circulation. The relocated bus drive and expanded stacking drive are significantly improving vehicular safety and alleviating unnecessary burdens on both parents and instructional time. The school also features fresh landscaping and irrigation as well as new playgrounds.

54

gmcnetwork.com

$11.3 M Cost

2025

Completed

800

Student Capacity


gmcnetwork.com

55


Project Awards

ELEMENTARY SCHOOLS

2026 Excellence in School Building Design I A4LE 2026 Peoples Choice Award I AIA South Carolina Spring 2025 Educational Facilities Design Award, Outstanding Project Elementary School Category I Learning By Design 2025 Top Projects I SCBiz News 2025 Education Facility Less Than $50M I CMAA 2024 Merit Award I AIA Greater Columbia

Richland County School District Two

Pontiac Elementary Renovation & Addition

The Pontiac Elementary School addition and renovation sought to create a learning environment that met the school’s functional needs while fostering community, collaboration, and belonging. Before the project, the school was split into two distinct programs, Montessori and Traditional, separated by a large, underutilized courtyard. Teachers described the two programs as disconnected and lacking a sense of wholeness. The addition aimed to bridge that divide. A new media center and Related Arts hub now serves as a shared gathering space connecting both programs, encouraging interaction among students of different learning styles. The addition bisects the former courtyard, activating the remaining outdoor space for play and learning that extends the classroom experience. Montessori classrooms were redesigned with more open, flexible layouts by removing nonload-bearing walls, made possible by space freed up through the new addition. The former media center was converted into a multi-purpose gym, giving all students a larger, centrally located physical education space. Exterior upgrades, including an extended car rider line and improved site circulation, enhanced accessibility and safety. A phased construction approach, supported by existing portable classrooms, kept the school’s educational programs running without interruption throughout renovation.

56

gmcnetwork.com

Elgin

South Carolina

11,299 SF Addition

26,602 SF Renovation

$13.1M Cost

2024

Completed

880

Student Capacity


gmcnetwork.com

57


ELEMENTARY SCHOOLS

Project Awards 2024 Outstanding Project - New Construction: Early Childhood/Elementary School Learning By Design 2024 Regional Best Projects Award of Merit, K-12 Education ENR Southeast 2024 Award of Excellence - Institutional New Construction $20-$25M AGC Build Tennessee 2023 School of the Year Award New School Construction Tennessee School Board Association

Metro Nashville Public Schools

Goodlettsville Elementary School New Construction

The new Goodlettsville Elementary School is every teacher’s dream experience of the ideal teaching environment and every student’s idea of the perfect place to learn. Upon entering the halls, you are transported into a world where anything is possible, and experiences await around every corner. Full of sensory spaces, bright colors, and calming rooms, Goodlettsville Elementary is a unique school where the atmosphere is as much a teaching tool as any textbook.

- Mrs. Tracy Gibson, M.Ed, Executive Principal Goodlettsville Elementary School

gmcnetwork.com

Tennessee

81,700

Square Feet

$23M Cost

Goodlettsville Elementary School is a replacement facility for Metro Nashville Public Schools. The facility is designed for an 800-student core and is 81,700 square feet. A grand hall with clerestory windows organizes the classroom wings and connects it to the library/media center and administrative areas. The library/media center is composed of a large expanse of Northfacing glass allowing for a visual connection to the exterior and community. Special features include a sensory garden and interior sensory nooks. The school is designed to incorporate the concepts of 21st century school design with flexible teaching spaces, sensory experiences and forward-looking technology.

58

Nashville

2023

Completed

800

Student Capacity


gmcnetwork.com

59


ELEMENTARY SCHOOLS

Fort Payne City Schools

Fort Payne Elementary School New Construction

Fort Payne Alabama

107,000

Square Feet

$20 M The new $20M Fort Payne elementary school replaces the aging Williams Avenue Elementary School as part of a larger Fort Payne City Schools initiative to renovate and upgrade its educational facilities. Completed in 2022, the 107,000 sf facility serves grades 3 through 5 and is the first school in Alabama designed to accommodate Power Over Ethernet lighting technology. The design includes individual wings for each grade, a media center, teacher workrooms per grade wing, an ICC-500 compliant storm shelter, and a competition sized gymnasium for flexibility during practices and tournaments. Each wing features unique flooring patterns that give students distinct learning cues as they move through the school, adding individualized character throughout the building. As one of Alabama’s top 20 school districts, Fort Payne continues to deliver a quality educational experience for its students through this landmark facility.

60

gmcnetwork.com

Cost

2022

Completed

820

Student Capacity


gmcnetwork.com

61


ELEMENTARY SCHOOLS

Project Award Fall 2022 Outstanding Project Award Educational Architecture and Interior Design Awards of Excellence Learning By Design

Atlanta Public Schools

Emma Hutchinson Elementary School Renovation

GMC provided architecture, interior design, landscape architecture, and construction administration services for the renovation of Hutchinson Elementary School (PK-5) for Atlanta Public Schools. The project included new roofing, a secure entry vestibule, redesigned administration areas, space reallocation, ADA and Life Safety upgrades, and updated doors, hardware, lighting, and finishes. GMC worked closely with APS and Balfour Beatty Construction to deliver the project on time and within budget.

Atlanta Georgia

95,000

Square Feet

$7.6 M Cost

2020

Completed

295

Student Capacity

62

gmcnetwork.com


gmcnetwork.com

63


ELEMENTARY SCHOOLS

Project Award 2022 Outstanding Project Award Spring Educational Architecture and Interior Design Awards of Excellence Learning By Design

Atlanta Public Schools

Charles L. Gideons Elementary School Renovation & Addition

Atlanta Georgia

75,000

Square Feet

$14.3 M Cost

2019

Completed

GMC partnered with Atlanta Public Schools to renovate and expand Charles L. Gideons Elementary School, creating a 75,000 sf learning environment for 825 students in grades PK-5. The project included demolishing outdated sections to address circulation, security, and space standards, and designing 33 core classrooms to support both traditional and Kindezi’s small-class pedagogy. Upgrades encompassed new classroom windows, renovated learning and support spaces, improved accessibility and security, updated finishes, lighting, signage, and modernized building systems and site features.

64

gmcnetwork.com

825

Student Capacity


gmcnetwork.com

65


ELEMENTARY SCHOOLS

Project Award 2024 Citation Award AIA Greater Columbia

Aiken County School District

Millbrook Elementary School Renovation & Addition

The Millbrook Elementary School renovation & expansion re-imagined an existing 800-student campus in Aiken, SC, originally constructed in the 1950s. The project involved removing original structures and connecting two existing buildings with a new addition, bringing the school into the 21st century. This new arrangement significantly enhanced safety and security by creating a single, secure entry point for both bus and car riders, and established a central interior corridor for cohesive and safe student circulation throughout the entire school. The new two-story, 20-classroom addition redefined Millbrook’s campus identity along the main road, presenting a clearly defined and intuitive entrance and administration area. An outdoor plaza situated between the car and bus drop-off loops ensures safe student entry without crossing traffic, complemented by an extended car loop to alleviate neighborhood congestion. Construction was executed with a detailed phasing plan to maintain school operations and student safety while the campus remained fully occupied.

66

gmcnetwork.com

Aiken

South Carolina

26,000 SF Addition

6,000 SF Renovation

$9.6 M Cost

2022

Completed

800

Student Capacity


gmcnetwork.com

67


ELEMENTARY SCHOOLS

Project Awards 2022 Merit Award Historic Preservation/Adaptive Reuse AIA Greater Columbia 2021 Honor Award for Renovation1 A4LE SC Chapter 2020 Citation Award AIA South Carolina

Aiken County School District

Graniteville Elementary School Renovation & Addition

Formerly a building that served as an adult education center for Aiken County Public Schools has been transformed into a 400 student capacity award winning Elementary School. The existing building and site were renovated in order to properly support the building’s new program and to comply with current codes and regulations. A 4,500 sf cafeteria addition serves the elementary school and also functions as a large assembly space for school and after-hours activities. The school district’s food service administration staff were displaced to accommodate new classroom space, resulting in the addition of 1,000 sf of office space to accommodate their staff. Significant measures were also made to improve the overall safety of the campus. Originally designed in the 1960s, much of the existing building had classrooms that open directly to the exterior. In order to create a secure and safe campus, two layers of site security were added; an 8’-0” black chain link security fence around the perimeter of the site, and a 6’-0” decorative aluminum fence that connects each of the existing structures, creating a secure interior campus. In addition to these improvements, a vehicle stacking drive, emergency access road, new playgrounds, landscaping, and general exterior improvements were added, including a dilapidated access road that was transformed into a pocket park between classroom wings.

68

gmcnetwork.com

Aiken

South Carolina

5,500 SF Addition

5,000 SF Renovation

$6.4 M Cost

2018

Completed

400

Student Capacity


gmcnetwork.com

69


ELEMENTARY SCHOOLS

Pelham City Schools

Pelham Ridge Elementary School New Construction

Pelham Ridge Elementary School is the first new construction school designed for the newlyformed Pelham City School Board. The new elementary school is a two-story brick and stone building with wood elements, which reflects the desired character and materiality of the existing schools in the district. The new elementary school includes 45 classrooms, administrative areas, a cafeteria, a multipurpose gym and stage, and a media center. Pelham Ridge incorporates a variety of learning environments in addition to the typical classroom. These supplemental learning spaces include two “break-out” learning spaces, a flexible classroom, and two courtyards. Two (2) of the classroom wings adjacent to the courtyards are designed to function as storm shelters and meet the Alabama Building Commission’s state standard for storm shelters, ICC 500. Pelham Ridge Elementary also incorporates sustainable practices such as the use of all LED lighting and flooring made from rapidly renewable materials.

70

gmcnetwork.com

Pelham Alabama

119,500

Square Feet

$19.8 M Cost

2016

Completed

780

Student Capacity


gmcnetwork.com

71


 Riverchase Career Connection Center

72

gmcnetwork.com


NOTABLE

CAREER TECH & STEM PROJECTS

gmcnetwork.com

73


CAREER TECH

Aiken County School District

Aiken

Career and Technology Center

South Carolina

Aiken County Public School District and Aiken Technical College expanded their partnership and career preparation opportunities for Aiken County students with the addition of a new 100,000 sf Career and Technology Center. To kick-off construction, two outdated buildings on the Aiken Technical College campus were demolished to pave the way for a state-of-the-art Career and Technology Center.

Est. Completion

Renovation & Addition

100,000

Square Feet

$47 M Budget

2026

The new building will showcase the programs and the work that occur within it, including state-of-the-art auto technology, diesel technology, and cosmetology labs, in addition to new computer labs and common spaces, and administrative spaces. Students will learn from professional instructors in authentic workplace inspired environments through hands on learning, gaining knowledge and skills directly related to future career paths. GMC provided comprehensive architectural design services including interior design and project management.

74

gmcnetwork.com

700

Student Capacity


gmcnetwork.com

75


CAREER TECH

Project Award 2024 Excellence in Construction 2nd Place (Merit Award) Program Management ABC Alabama Chapter

Fort Payne City Schools

Career Technical School Beat Center (Building, Electric Vehicle and Aviation Technology) New Construction

Fort Payne Alabama

11,500

Square Feet

$5.8 M Cost

2023

Completed

The new Fort Payne BEAT Center, which stands for Building, Electric Vehicle and Aviation Technology, is located adjacent to Fort Payne High School and directly behind the existing culinary arts building. The new single-story building is approximately 11,500 sf. The building contains career training rooms and classrooms for three career paths in construction, electric vehicles or drone aviation (drone technology). The entire building is designed as an ICC- 500 compliant storm shelter consisting of traditional continuous concrete footings, structural pre-cast concrete panels on the exterior and roof complemented with a low slope membrane material. The school partnered with GMC and Scout Program Management to design the facility.

76

gmcnetwork.com

735

Student Capacity


gmcnetwork.com

77


STEM SCHOOL

Project Award Fall 2023 Outstanding Project Award Educational Architecture and Interior Design Awards of Excellence Learning By Design

Washington County School System

Innovative Gifted Accelerated Learning (IGAL) Academy Renovation

GMC transformed a former 13,500 sf youth detention facility in Sandersville, Georgia into the Washington County Schools IGAL (Innovative Gifted Accelerated Learning) Academy—a center for culinary arts and hands-on learning. Integrated with the adjacent high school campus, the facility features a renovated commercial kitchen for teaching and events, five flexible maker classrooms, updated restrooms, offices, and meeting spaces. Site improvements include new paving, landscaping, and high school tournament-ready tennis courts. GMC collaborated with the district to secure state and local funding for the project.

78

gmcnetwork.com

Sandersville Georgia

13,500

Square Feet

$5.8 M Cost

2023

Completed


gmcnetwork.com

79


CAREER TECH

Project Award 2020 Building Birmingham Awards Honoree Birmingham Business Journal

Hoover City Schools

Riverchase Career Connection Center (RC3) Renovation & Addition

The 96,273 sf facility, formerly used as a middle school for Shelby County and later Pelham County, features five career academies focused on health science, fire, and emergency services, cyber innovation (computer programming, software development, software analysis, network security, and network administration), food and hospitality, and skilled trades (carpentry, electrical work, welding, and HVAC).This first-of-its-kind school in Alabama will help prepare students for what they will see in a real-life work environment, and help them find careers best suited to their skills and abilities. The school system initially had a goal of enrolling 400 students their first year but ended up with 735, including some from neighboring school districts.

80

gmcnetwork.com

Hoover Alabama

96,273

Square Feet

$15.8 M Cost

2019

Completed

735

Student Capacity


gmcnetwork.com

81


HIGH SCHOOLS STEM SCHOOL

Williamson County Schools

Brentwood High School STEM Building Master Plan and Renovation

GMC created a master plan for both Brentwood Middle and Brentwood High School. From that master plan, multiple projects are underway, including the 64,500 sf $10.2 million expansion of the Brentwood High School campus with a STEM-focused building designed to respond to the quickly changing educational needs in the science and technology areas. The facility houses 30 classrooms, four science labs, and a multipurpose area. It is the first building in the WCS district designated for STEM studies and also the first to serve both middle and high school students. The project required the entire site parking and vehicular circulation to be redesigned. It also included a new turf athletic field for the existing stadium, as well as a new access road and parking lot. The design maintained car and bus drop-off operations throughout construction.

82

gmcnetwork.com

Brentwood Tennessee

64,506

Square Feet

$10.2 M Cost

2019

Completed

1,750

Student Capacity


gmcnetwork.com

83


84

gmcnetwork.com


NOTABLE

SPORTS PROJECTS

gmcnetwork.com

85


SPORTS

Aquinas High School

Aquinas High School Athletic Complex New Construction

This project maximized the athletic field area by rotating the football/soccer field ninety degrees and shifting the baseball field toward Highland Avenue, giving each sport its own dedicated space. The new complex improves accessibility with a wider entrance and switch-back ramp, while preserving the tradition of the Irish Walk. A new building between the home stands houses concessions, restrooms, a referee room, a training room, and storage. Upgrades also include all-aluminum Dant Clayton bleachers with expanded seating, a larger press box, a wheelchair ramp, and four entrances for easier fan movement. The baseball complex gained new dugouts, a batting cage, a bullpen, better fan seating, and the school’s first-ever lighted home games, which also support safer evening gatherings and tailgating. A new turf field rounds out the project, offering greater safety, performance, and playability in any weather.

86

gmcnetwork.com

Augusta Georgia

$8.6 M Cost

2024

Completed

240

Capacity


gmcnetwork.com

87


SPORTS

Andalusia City Schools

High School Stadium & Theatre Renovation & Addition

Andalusia City Schools partnered with GMC for comprehensive architectural services on the renovation of Andalusia High School’s stadium, transforming it into a modern athletic hub. The project introduced artificial turf for both football and softball fields and a 6,802 sf field house with home and visitor concessions, locker rooms, maintenance facilities, and a halftime gathering area.

Andalusia Alabama

6,802

Square Feet

$7.5 M Cost

2020

Completed

6,800

Capacity

Seating capacity was expanded to 4,000, with GMC renovating 2,800 existing aluminum seats and adding a new home grandstand with 400 VIP chair-back seats and 800 bleacher seats. Former seating areas were converted into a covered picnic plaza, creating a social space overlooking the field while maximizing the client’s budget. A new 5,340 sf, three-level press box anchors the site, housing concessions on the first floor, a VIP suite on the second, and a coaches and media level on the third with optimized sightlines for game-day filming. A multi-level entry plaza with its own concession area completes the complex, offering fans an unobstructed view from the south end zone. Musco field lighting and a new scoreboard with a matrix board were purchased directly by the owner.

88

gmcnetwork.com


gmcnetwork.com

89


SPORTS

Pelham City Schools

Pelham High School Field House New Construction

The Pelham High School Field House is a 17,000 sf facility. This pre-engineered metal building has been modified from the typical open, long-span metal building. Where the program allowed, architects inserted a row of columns to break up the form into a low bay space and a high bay space. The low bay houses locker rooms, meeting rooms, a training room, and an equipment room. The high bay serves as a backdrop to the stadium and contains an 8,400 sf combined agility area and weightlifting area, which is washed with natural light from the north-facing clerestory windows. GMC served as the architect, landscape architect and civil engineer for the project.

90

gmcnetwork.com

Pelham Alabama

17,000

Square Feet

$2.9 M Cost

2018

Completed

4,000

Capacity


gmcnetwork.com

91


SPORTS

Greenville County Schools

Multiple Stand-Alone Weight Rooms New Construction

GMC was hired by Greenville County Schools to design stand-alone Weight Room buildings at (13) school locations throughout the district. Each Weight Room building creates equity and parity at each school location as a prototype design of the same size and configuration providing the same array of equipment and amenities. The Weight Room buildings represent and inspire each school location, are open yet secure, and symbolize each dynamic program. Each building is stand-alone but fits within its context and connects in a meaningful way with a protected and secure pathway. Each Weight Room building consists of a large weight room space, a secure entrance, coaches office, changing rooms, and restrooms.

92

gmcnetwork.com

Greenville

South Carolina

$1.9 M

Each Weight Room

2024

Completed

13

Weight Rooms


gmcnetwork.com

93


SPORTS

Albertville City Schools

Albertville High School Football and Soccer Field Improvements New Construction

This project involved the removal of the existing synthetic turf and goal posts and the installation of a new, high-performance synthetic turf system at Albertville High School’s football and soccer field. The project also included replacing the existing goal posts and accessories that come with that. The newly installed synthetic turf provides a safer, more durable and aesthetically improved playing surface for athletes. The updated system ensures better field performance, longevity, and reduced maintenance requirements, supporting the needs of the football and soccer programs for years to come.

94

gmcnetwork.com

Albertville Alabama

2

Acres

$600,000 Cost

Ongoing Status


Butler County Schools

Greenville High School Field House & Indoor Practice Facility

Greenville Alabama

15,000

Square Feet

$1.7 M Cost

2009

Completed

New Construction

GMC provided architectural design services for Butler County BOE for a new Greenville High School Field House & Indoor Practice Facility. On the ground floor, the building houses a training room, restrooms and showers, a laundry room, a locker room with 100 lockers, an equipment room, and a 30 yard x 20 yard “Prograss” synthetic playing surface. The upper floor consists of 3,600 sf with practice equipment storage, a video editing room, separate offensive and defensive meeting rooms, a head coach’s office, 8 other individual assistant coach’s offices, and a connecting balcony that overlooks the practice field. The larger practice area volume of the building is housed by a metal building that joins a brick and block portion dug into the hillside, so that the locker room and bathrooms were on the same level as the indoor practice field, but the meeting rooms and offices were up at the outdoor practice field level. gmcnetwork.com

95


STADIUM PROJECTS

 Central High School of Clay County

 Mountain Brook High Athletic Fields

96

gmcnetwork.com


 Springville High School

 Gulf Shores High School Athletic Facilities gmcnetwork.com

97


 Jackson Olin High School

 Tift County High School Pavilion

98

gmcnetwork.com


 Arab High School gmcnetwork.com

99


100

gmcnetwork.com


t Homewood High School


www.gmcnetwork.com 102

gmcnetwork.com


Turn static files into dynamic content formats.

Create a flipbook
GMC K-12 School Experience by Goodwyn Mills Cawood - Issuu