The Social Factory
The Factory Workers Manual

The Factory Workers Manual
Welcome to the Social Factory. A place for work. Within this guide you will find a series of maps to assist you through your day to day life work.
Your salary will be paid weekly into your Social Factory bank account all earnings can be spent within the wall in our social level. Workers accommodation is included as part of your factory pay
The factory is open 24/7. Your shifts will be displayed within your accommodation.
The Social Factory uniform will be placed within your wardrobe, feel free to try it on
face
split into 4 faces
level
over 15 levels
block
with each face divided into 12 blocks relative to stair cores
Surveillance cameras are located in and around your home, the data utilised to provide a more personalised experience in your home. The more access you give the more money you make as a result.
order within the social factory is essential. Our homes are equiped with a sound system to ensure you obide to the rules of the social factory.
never miss a shift
our electronic weekly planner will issue your working shifts within the social factory and remind you where and when you need to be.
our personalised advertisement board situated in every living room space will offer the latest products. situated on both living room walls so you it can always be viewed.
one person
floor plan
section 0 1m
two person
floor plan - level 01
floor plan - level 00 0 1m
Section 0 1m
three to four person
floor plan - level 01
floor plan - level 00
three to four person
Section
three to four person
floor plan - level - 01
floor plan - level 00
three to four person
Section
Every Second Flat core will be equipped with a service lift for transport of goods to the social level and flats when required.
In the event of a fire please make your way to the closest possible stair core. Your nearest place of safety is located no more than 30m per Scottish Government guidance.
10m
10m
10m
10m
10m
10m
10m
10m
10m
10m
10m
10m
The Data Factory sets out to utilise the data you share with us. Our goal? To produce cutting edge analysis to allow us to make life easier for our workers. Workers in this factory will be tasked with gathering and analysing data, the raw material of this factory.
The data antennas receive and transmit valuable information from around the Social Factory.
Your Data transferred as fast as possible
Workers within this factory will use the upload and downland stations located on every level to transfer the materials needed.
Located on level 02 of the Data Factory is the metro station. Trains run frequently through the day and night within the Data Factory between buildings and on towards your home.
The Social Factory makes an allowance for one data server rack per person. Workers will maintain servers and transfer data when needed.
Data Transfer Units
5m
Data here is analysed after being transferred from Stage 01. Workers will be expected to produce a prediction product for human future behaviour.
0 5m
typical plan
Human future prediction products will be tested within these pods. Workers will be expected to moderate these tests. typical plan
0 5m
Testing Screen
The typical testing pod allows for monitoring of individuals as they take their prediction product tests. When tests are taken it is essential that the operator is present.
Operator screen
Products are traded within these stock exchange style booths. One individuals data takes the form of a stock readily available to purchase.
Inside the Trading Floor
The Edu Factory allows users to learn how to act in a generic manner. There are a variety of courses for all ages and skill levels. The Edu Factory welcomes all to improve their generic abilities. stages of data production
typical plan
Inside the typical lecture theatre
typical plan
Inside the library: a typical study booth
Examination
Tests will be either manual or online and can be sat within the testing centre of the social factory. Workers will be allowed to resit these tests if necessary
Upon successful completion of examination workers will graduate from the Edu Factory as a generic. Workers can now enrol in a new course for learning.
The Typology Factory, the builder of the Social Factory in its entirety. The workers of this factory will produce the generic dwelling with intentions of use not only in the Social Factory but within the Central Belt as a whole.
Building materials are delivered and stored within these spaces, workers should look to maintain these spaces and distribute the materials when required
Building Assembly
The typical assembly unit for assembly of the building cell
Buildings are checked from the quality control platform to ensure they meet the standards of the factory
Quality Control Platform
Buildings are checked from the quality control platform to ensure they meet the standards of the factory
The units produced within the typology factory will now be sold within the final stage sales room before distribution and delivery to their final destination
Glenn Mckerracher rooms+cities