Promoting professional excellence in the water sector
Water& Sanitation The official magazine of the Water Institute of Southern Africa
Complete water resource and wastewater management
Africa
DOW
Water-perfect
partnerships
Wastewater Energy savings at WWTWs Pipes and pipelines Managing bulk pipelines
in the hot seat
Wastewater and biosolids treatment processes are P16 increasingly being modified for the generation of biogas. Dr André van Niekerk and Theunis Duminy of Golder Associates
media
March/April 2014 • ISSN 1990-8857 • Cover price R50.00 • Vol 9 No. 2
1 minute. 1 technology. 808,000 liters
of water saved. The numbers are truly astounding. Looking at just one of Nalco’s innovations, 3D TRASAR™ Technology, these are the water savings experienced every minute by our customers worldwide. In fact, since its introduction 3D TRASAR Automation alone has saved over two trillion gallons of water. It’s only one of a broad offering of Nalco technologies and services that save water and reduce energy consumption, helping companies reduce operational costs and environmental footprints. Let us show you how to operate more sustainably, and more profitably. Contact Nalco Africa today.
R E I N V E N T I N G T H E WAY WAT E R I S M A N A G E D Nalco Africa Operations Building 14, Ground Floor, Greenstone Hill Office Park Emerald Boulevard, Greenstone Hill, South Africa Tel: +27 10 590 9120 Fax: +27 10 590 9130 nalcoafricareception@nalco.com www.nalco.com/sa © 2014 Ecolab USA Inc. All rights reserved
Contents
Volume 9. No.2
Promoting professional excellence in the water sector
Water& Sanitation The official magazine of the Water Institute of Southern Africa T
Complete water resource and wastewater management
Africa
DOW
Water-perfect
WASTEWATER Energy savings at WWTWs PIPES AND PIPELINES Managing bulk pipelines
ON THE COVER
13
DOW is creating public-private cooperation p4
YWPs are educating school children on careers in the water industry
Regulars Editor‘s comment Africa round-up Industry news Product news
WISA President’s comment: Engaging 2014 with passion Introducing Lester Goldman: WISA CEO YWP: Reflecting on a year of highlights WRC NEWS Energy efficiency
Wastewater Cost-effective capacity upgrade Wastewater treatment technology of the future Energy savings at WWTWs Pressure filters for wastewater treatment Corrosion resistance ACH flocculants ideal for use in WWTWs Turnkey wastewater solutions at Degrémont Treatment plant races towards completion
MEDIA
March/April 2014 • ISSN 1990-8857 • Cover price R50.00 • Vol 9 No. 2
Regional focus Creative solutions to dam challenges Water loss tackled in eThekwini Western Aqueduct pipeline expanded
78 80 81
10
water boards Researchers and industry join forces Harvesting electricity Innovative internship programme launched
82 84 86
16
water Metering Turning revenue collection around Domestic water management in focus
89 90
4
6 8 13
Pipes and pipelines Managing bulk pipelines Deteriorating infrastructure A three-meter diameter dismantling joint SABS ensures heavy-metal-free pipes SAPPMA and SAICE sign memorandum GRP pipes top choice for Abagold project Completion of R4.3 million pipeline project Ultraflo mPVC pipes Technical paper: Predicting the pressure-leakage relationship
Dr André van Niekerk and Theunis Duminy of Golder Associates
63 65 67 69 70 72 74
HOT SEAT Golder: A positive impact
Wastt Wastewater and biosolids treatment processes are P16 incre e increasingly being modified for the generation of biogas.
Panel discussion Panel introduction Remy Jaffray, Degrémont Brett Dunbar, Nalco Africa Hennie Roets, Rare Steve Herbst, Prei Instrumentation Rob Holmes, Quality Filtration Systems Adrian Viljoen, Prentec
3 18 22 92
COVER STORY DOW – water-perfect partnerships
IN N THE HE HOT OT SEAT EA AT
24 26 28 31 33 34 37 38 40
44 46 48 50 52 55 57 59
59
AMD treatment plant nears completion
March/April 2014
1
BUSINESS
GIVE YOUR SMALL BUSINESS A BIG ADVANTAGE. Whether your business uses a car, truck, bakkie, scooter* or all of these, we can help you get the most out of it. Our state-of-the-art tracking system provides you with up to date information that you can use to track fuel consumption, monitor driver behaviour, control delivery times, and maximise efficiency - all from a comprehensive web-based interface. To speak to us about maximising your business’s potential, no matter the size, call us on 0860 60 50 40 or go to tracker.co.za
Tracker Business. Track. Control. Maximise.
BRAVE/TRC/587/E
*Model dependent
Editor’s comment
Publisher Elizabeth Shorten Editor Maryke Foulds Head of design Frédérick Danton Senior designer Hayley Mendelow Designer Kirsty Galloway Chief sub-editor Claire Nozaïc Sub-editor Beatrix Knopjes Contributors Dr Jo Burgess, Kobus Prinsloo, Nicolette Pombo-van Zyl, AM Cassa, JE van Zyl Marketing manager Hestelle Robinson Digital manager Esther Louw Client services & production manager Antois-Leigh Botma Production coordinator Jacqueline Modise Distribution manager Nomsa Masina Distribution coordinator Asha Pursotham Financial manager Andrew Lobban Administration Tonya Hebenton Printers United Litho Johannesburg +27 (0)11 402 0571 Advertising sales Avé Delport Tel: +27 (0)11 467 6224 • Cell: +27 (0)83 302 1342 Fax: 086 502 1216 • Email: avedel@lantic.net
South Africa kicks off Water Week 2014 This year marks 20 years of water delivery for social and economic development, says the Department of Water Affairs (DWA).
W
ater Week, which runs
households and supply
from 17 to 23 March 2014,
2.1 million households
will set the stage for a
with
number of water initia-
The water projects will
tives throughout the country. The key
provide new infrastruc-
message of the DWA is that water is life
ture, rehabilitation and
and needs to be respected, conserved
upgrading
and enjoyed. The provision of water has
ones as well as improv-
been a key priority for government since
ing water management infrastructure. In
the advent of democracy. Since 1994,
expanding the water supply, the following
government has been hard at work en-
projects were recently launched: the Mooi-
suring that all South Africans have access
Mngeni Transfers Scheme 2, including the
to water. Government is committed to
Spring Grove dam in KwaZulu-Natal which
continuing to roll out its interventions to
will boost declining water supply in the area
ensure universal access to water. In 1994,
and benefit approximately 5 million people,
only 59% of the South African population
as well as the newly constructed De Hoop
had access to clean and safe drinking
Dam in Limpopo, which will supply water
water. By 2013 it had progressed to a na-
to towns and poorly serviced communities
WISA contacts:
tional average of 95.2%. This will further
in the Greater Sekhukhune Waterberg and
Head office Tel: +27 (0)11 805 3537 Fax: +27 (0)11 315 1258 Physical address: 1st Floor, Building 5, Constantia Park, 546 16th Road, Randjiespark Ext 7, Midrand
improve through government’s 10-year
Capricorn district municipalities.
Publisher
media Physical address: No 4, 5th Avenue Rivonia 2056 Postal address: PO Box 92026, Norwood 2117, South Africa Tel: +27 (0)11 233 2600 Fax: +27 (0)11 234 7274/5 Email: maryke@3smedia.co.za
ISSN: 1990 - 8857 Annual subscription: R300 (SA rate) Email: subs@3smedia.co.za Copyright 2014. All rights reserved.
All articles in Water&Sanitation Africa are copyright protected and may not be reproduced either in whole or in part without the prior written permission of the publishers. The views of contributors do not necessarily reflect those of the Water Institute of Southern Africa or the publishers.
basic
sanitation.
of
existing
plan to address the water-access backlog.
Other exciting projects for 2014 will in-
Government acknowledges that water
clude the launch of Phase 2 of the Ermelo
challenges still persist in some areas.
Water Scheme, the completion of the
Being a water-scarce country – one with
Ga-Segonyana Community Water Supply
infrastructure and maintenance chal-
Project
lenges – means that the provision of
drinking
water continues to remain a challenge
and Ga-Mopedi), Phase 2 of the Lesotho
in some areas. A lack of engineering skills
Highlands Water Project, the Moqhak Water
Free State Chairperson: D.R. Tlhomelang Tel: +27(0)51 403 0800 Secretary/ Treasurer: Riana Wessels Tel: +27(0)56-515-0375
prevents the proper maintenance of wa-
Project in the Free State and the insertion of
ter infrastructure and water quality is also
acid mine drainage pumps in the Gauteng
negatively affected by pollution.
Central Basin, the handover of the Bulk
Plans for a sustainable water infra-
Water Project Paul Roux, the launch of lower
KwaZulu-Natal Chairman: Chris Fennemore Tel: +27 (0)31 311 8734 Secretary/ Treasurer: Stephanie Walsh Tel: +27 (0)31 302-4077
structure is, however, a key focus this
Tugela Bulk Water scheme, borehole rehabil-
year. Through the Strategic Integrated
itation project launch and the launch of the
Projects, South Africa has a 10-year plan
Coffee Bay Bulk water supply project.
BRANCHES Eastern Cape Chairman: Hennie Greeff Tel: +27(0)41 453 3102 Secretary/Treasurer: Chris Dickson Tel: +27(0)41 507 8200
www.ewisa.co.za
Western Cape Chairman: Gareth McConkey Tel: +27(0) 21 712 4260 Secretary/ Treasurer: Eleonore Bondesio Tel: +27(0)21 872 0322
(which water
will
supply
to
Sedibeng,
sustainable Ncweng
to address the estimated excellence
sector in the water
itation Water& San Africa Promoting
professional
magazine The official T
Com plet e
urce wate r reso
ewa ter and wast
Institute of the Water
man agem
of Southern
Africa
backlog of adequate wa-
Maryke Foulds
ter supply to 1.4 million
Editor
ent
Cover opportunity
DOW
fect Water-per
WISA mission statement The Water Institute of Southern Africa provides a forum for exchange of information and views to improve water resource management in Southern Africa.
WASTEWATER Ws gs at WWT
Energy savin
PIPELINES PIPES AND bulk pipelines Managing
Endorsed by P16
N IN HE THE OT HOT AT EA SEAT
sses are treatment proce of biogas. and biosolids generation Wastt water Waste fied for the Associates being modi y of Golder incree singly increa Theunis Dumin Dr André van
Niekerk and
March/April
1990-885 2014 • ISSN
MEDIA
2 • Vol 9 No. price R50.00 7 • Cover
In each issue, Water&Sanitation Africa offers companies the opportunity to get to the front of the line by placing a company, product or service on the front cover of the magazine. Buying this position will afford the advertiser the cover story and maximum exposure. For more information on cover bookings contact Avé Delport on +27 (0)83 302 1342 or email avedel@lantic.net
March/April 2014
3
Cover story
Water-perfect partnerships E
Water from coal may sound impossible but happens every day. By Susan Cole, regional commercial manager sub-Saharan Africa, Dow Water & Process Solutions
ach
day
in
north-
eastern South Africa, an award-winning water reclamation plant turns con-
ventional wisdom on its head and supplies up to 30 Mℓ day of potable water. Considering a person must consume about two litres of water a day to live healthily, 30 Mℓ is enough daily drinking water for up to 15 million people. Since
2007,
the
eMalahleni
Water Reclamation Plant, situated in the Witbank coal fields of South Africa’s has
Mpumalanga
desalinated
province,
rising
under-
ground water, from four major coal mines (one now defunct) into potable water; benefitting the local environment, alleviating serious operational challenges and meeting up to 20% of the local municipality’s daily requirements. A decade ago, commercial and municipal
water
partnerships
like eMalahleni were rare. Today, many
municipalities
around
the world are partnering with local industries to meet their common water needs. By doing so, municipalities and businesses reduce their capital and treatment costs, improve sustainability
and
meet
ever-growing
local residential and commercial water demands.
Impetus for public-private water cooperation In early 2008, United Nations Secretary-General Ban Ki-moon warned attendees at the World Economic
Forum
in
Davos,
Switzerland, that a rising global shortage of water resources could mean
increased
conflicts
fewer
economic
opportunities.
and
“Population growth will make the problem worse,” he said, “so will climate change. As the global economy grows, so will its thirst. Many more conflicts lie just over the horizon.”
4
March/April 2014
Cover story
In response to the SecretaryGeneral’s
speech,
several
water-dependent
large
companies,
Still, the region struggles with its
Highveld’s land and river system,
water supply.
the eMalahleni Water Reclamation Water
Plant treats mine water using a
and
Reclamation Plant was built, the
dual-stage ultrafiltration membrane
SABMiller, joined with international
municipality of eMalahleni was reg-
process. The result, according to
partner organisations such as the
ularly being fined for drawing more
Anglo Coal’s project manager, is
International Finance Corporation
than its permissible quantity of
treated water that’s purer and bet-
to form the Water Resources Group
water from the local dam. “We were
ter than local surface or tap water.
(WRG). The WRG is a unique public/
drawing about 120 Mℓ of water a
On average, the eMalahleni plant
private/civil society partnership that
day, but our license only allowed us
purifies 25 Mℓ of water each day,
“helps government officials and
to draw 70 Mℓ and our people were
of which 16 Mℓ are supplied to
other water sector specialists ac-
drinking water with the animals,”
the fast-growing eMalahleni Local
such
as
Coca-Cola,
Nestlé
Before
the
eMalahleni
celerate reforms that will
Municipality. The remain-
ensure sustainable water
ing water is sufficient to
resource management for
meet the water supply
long-term
needs of all of the area’s
development
coal plants. Future plans
and economic growth”.
call for expanding the wa-
Key learnings in South Africa
ter plant’s capacity from
That’s why private-public
water daily.
30 Mℓ to 50 Mℓ of potable
water partnerships such able and illustrative of the
A collaborative standard
challenges and opportu-
Technological
nities available to locales
in membrane and water
that follow a similar path
treatment
toward sustainability.
will go a long way toward
as eMalahleni are so valu-
To
understand
the
benefitting
advances technology
regions
of
success of the eMalahl-
the world such as South
eni
Africa, which is expected
Water
Plant,
it’s
understand
Reclamation useful where
to
to have a 17% supply/
and
demand gap by the year
why it was needed in the Witbank
area.
Located
about 90 miles east of South
Africa’s
largest
city, Johannesburg, the
South Africa is expected to have a 17% supply/ demand gap by the year 2013
Witbank coal mines are in
2030, based on current usage levels. That’s why South Africa has created the
Strategic
Water
Partners Network (SWPN), comprised of members
the Highveld plateau, the
such
as
those
associ-
country’s most vital residential and
said former eMalahleni Mayor Lina
ated with the eMalahleni Water
commercial region.
Malatjie, in a 2010 interview.
Reclamation Plant, to cooperatively
Once filled with teeming grass-
Thus,
the
eMalahleni
Local
find ways between government and
lands over more than 150 000 m2
Municipality
Anglo
private industry to improve water
(an area the size of California), today
Coal South Africa and BHP Billiton
conservation, supply diversification
the Highveld is South Africa’s most
Energy Coal South Africa (BECSA)
and water quality.
vital industrial, mining and farming
to collect and treat rising under-
As evidenced by the initial suc-
region, and is home to the country’s
ground water from Anglo Coal’s
cess of the eMalahleni plant, the
largest concentration of cities. The
Landau, Greenside and Kleinkopje
SWPN and South Africa are well on
Highveld’s meandering rivers sup-
mines, and BECSA’s defunct South
their way toward closing the water
ply much of the region’s fresh water
Witbank mine.
supply/demand gap and creating a
and its peat-rich soil acts as a natural water filter for potable water.
Rather mine
joined
than
water
with
allowing to
leach
polluted into
the
more sustainable water future for all users.
March/April 2014
5
President ’s comment
Engaging 2014 with passion 2014 will be a busy and important year for WISA. Not only is it hosting the biannual WISA Conference, but it is also focusing on the challenges carried over from 2013. President of WISA Ronald Brown looks at some of the highlights and challenges.
C
olleagues, I’m sure
throughout the Water Sector in
into the WISA family. He brings
that by now some of the
South Africa.
with him extensive experience as a
objectives that we have
We acknowledge the successes
business executive and we are look-
set for 2014 have started
of 2013 with the highlights being
ing forward to his stewardship to
materialising (at least the ones
WISA’s appointment as the imple-
grow, strengthen the organisation
that we are able to plan for) and
menting agent for the profession-
administratively and operationally
that we have – armed with a great
alisation of the process controllers
with the guidance and support to
sense of positivity, pride and vigour
by the Department of Water Affairs
and from the Board and Council as
– started making great strides to
and WISA’s appointment as the
we together proceed to position
engage the challenges as the year
regulatory institution by the Energy
WISA to the level where it effective-
started off. For some of us the year
and Water Sector Training Authority
ly plays a pivotal role in the water
may have started off with a bang,
for training service providers for
sector. We also extend our sincere
while others are still easing into it.
process controllers and here we
appreciation to Dot Zandberg who
There are also those who’ve kept
acknowledge the ground-breaking
steered the ship during difficult and
the wheels of their organisations
work done by Professor Lagardien
very exciting times.
rolling throughout the change of
and his dedicated team. These are
This is also the year for the WISA
calendar
we
indeed milestones for WISA and
biennial conference, which will be
have made it to 2014 and we have
prestigious achievements for the
held in Mbombela, Mpumalanga,
to make our plans and strategies
organisation as well.
and I trust you are equally as excited
year.
Nonetheless,
Towards the end of last year,
about the upcoming conference as
the
the WISA Board concluded a very
we are because it will be unique.
progress thereof with due diligence
important process in its administra-
Yes, we have broken the routine
to ensure the desired success and it
tion with the appointment of our
with Mpumalanga by exploring a
is my prayer that we record 2014 as
new CEO, Lester Goldman, and we
new venue in a province other than
a year of immeasurable successes
would like to welcome him warmly
traditional provinces and towns.
for this year a reality by managing, monitoring
6
and
evaluating
March/April 2014
RR004
President ’s comment
NOW yOu CaN HaVE EyEs iN EVEN THE mOsT DiFFiCulT TO rEaCH PlaCEs!
Let us all strive for at least one major achievement in 2014 that we can use as a benchmark for all our other future projects This we have done in the true South African and WISA spirit to expose the diversity and inclusivity of the landscape wherein we conduct our business – the water sector has no boundaries. We need to support the organising committee and applaud them for the mammoth task they have undertaken with the support of the WISA head office and the respective portfolio chairperson. Collectively we need to move forward, holding hands, methodically assessing and tackling the issues that we are faced with in the sector by assisting where there is a need for it in order to render the water sector a proud sector where vibrant cohesive approaches transforms the perceived insurmountable to definitely achievable and significantly so. WISA needs to be at the forefront of this as it will give effect to our motto “Promoting professional excellence in the water sector” and I call on our members to embrace this motto as we journey through 2014 and beyond. Some of the highlights to look forward to during this year are: • the Blue Drop Certification process • the Green Drop Performance assessment
We operate light and mobile pipeline CCTV inspection systems that can send a camera down a narrow tunnel and video transmit the findings.
• our national elections • finalisation of the Regulation 17. We also acknowledge the opening of the new Colesberg Wastewater Treatment Works by the Honourable Minister of Water and Environmental Affairs, Edna Molewa, and look forward to many such projects which will improve the image of the Water Sector and the lives of our communities
•
Explores pipe diameters ranging from 150mm up to 2 metres
•
Over 350m of transmission cable
•
Pan and tilt camera for enhanced inspections
•
Fully waterproof and explosion proof systems available
•
HD colour footage with precise crack measurements
and their surrounding environment. Let us all strive for at least one major achievement in 2014 that we can use as a benchmark for all our other future projects and let’s get into the habit of sharing our experiences to overcome the slow and disjointed growth in our sector. This one achievement should stand out in such a manner that it will leave a legacy of capacitating and bringing happiness and true character to the lives of all involved and impacted by it. I wish you well and I am also mindful of the fact that there may be some disappointments, but that you will overcome them and more so, I trust that the successes will by far outweigh your disappointments because you would have turned disappointments into opportunities. “Every successful journey starts off with one step and a passion and if guided by a moral compass, the journeying becomes easier, the lessons along the way are well learnt and success becomes the destination.” –Unknown. Ronald M Brown
Contact us for more information or for a FREE Quotation.
President: Water Institute of Southern Africa
Tel: 010 040 3219 www.rescuerod.co.za • info@rescuerod.co.za MARCH/April 2014
7
WISA news
Introducing Lester Goldman: WISA CEO A business manager with particular interest in professional associations, Goldman brings his experience in business and financial management to the organisation. Maryke Foulds speaks to him about his vision for the organisation in 2014.
W
hat is your background and training? How will it assist in the smooth running of this organisation?
followed by four years as the
Mandela Metropolitan
DBA through NMMU. I hold
COO of another professional
University (NMMU). I further
professional memberships in
association. I have joined
received an MBA from the
the South African Institute of
WISA directly from the
Netherlands Business School in
Professional Accountants as
I have spent 10 years with
South African Institute of
2006 and am currently complet-
well as the Institute of Directors.
leading non-profit organisations
Professional Accountants.
ing my doctoral thesis on the
I feel that many South African
I hold a Bachelor’s of
topic of the professionalisation
professional institutes are
Commerce from Nelson
of associations in pursuit of my
faced with similar challenges
for small business development and youth development,
8
March/April 2014
Welcome to the future – a future of Mwangaza We are all writing a part of the script which tomorrow’s society will play out. At Royal HaskoningDHV we would like the title to read: ‘Welcome to the future’ - and for our chapter in that script to read ‘Mwangaza’ - a Swahili word which means ‘light’. Together with our partners and clients we consider how we can create a welcoming future - developing efficient and smart living. Whether switching on a light, travelling to work or drinking a clean glass of water - the solutions and work of our engineers surround us, making lives better and brighter. Our work contributes to the sustainable development of communities. Together, we deliver innovative sustainable answers to today’s challenges. Royal HaskoningDHV is an independent, international engineering and project management consultancy.
royalhaskoningdhv.com/za
WISA news
of transforming themselves
accreditation of some of
further such registration
and their industries, dealing
these training programmes
and allied services. All credit
with the brain drain and
are questionable and may
to WISA board and staff in
issues of service delivery and
not hold any credibility.
this regard.
corporate governance. While
WISA has recently become
some have come up with an
recognised as a professional
innovative solution to these
body, and part of its duty
challenges, most haven’t.
as a professional body
Instead of them reinventing
would be to look at the
the wheel every time, I am
accreditation and validation
What are some of the events planned for the year and how will this bring WISA’s message across? The 2014 WISA
trying to develop a strategy
of training organisations,
Conference is the flagship
or a framework to help such
as well as relevant material.
event of the year –
organisations overcome
This would mean that
happening 25 to 29 May in
these common obstacles.
the sector would have
Mbombela, Mpumalanga,
standardised training,
and will provide a platform
which would assist in the
for a sharing of ideas and
development of individuals
information. The various
and the water sector as
process controller divisions
a whole.
will be holding workshops
What are some of the challenges currently facing the water industry in South Africa? How can WISA as an organisation assist the water industry in furthering its aims for an inclusive and representative industry?
and open days throughout the country. The Excellence
assistance on a strategic
What are your thoughts on the current status of technical personnel in South Africa? Can WISA assist with training on a technical front? I do see
level and do see the need
WISA assisting in this regard;
research for the sector.
to strengthen stakeholder
however, this will only be
relationships. Accredited
once relevant resources
training is a major challenge
are available and we are
in the water sector. There
able to deliver. The roll-out
are many organisations
of the new professional
that provide training
designation “Professional
within the water sector,
Process Controller” is
There is a real problem with service delivery in the country. Any thoughts on this that you would like to share with our readers? Service
however the validity and
certainly the catalyst to
delivery, and the resultant
I see WISA providing
WISA news
“Many South African institutes are faced with similar challenges of transforming themselves and their industries.” Lester Goldman, CEO, WISA
in Water Research Awards is due to take place in October 2014, where young researchers will be awarded for their achievements in
symptoms, is something we should address collectively and should include all stakeholders in the resolution process. Solutions and implementation should be well planned. Good governance and transparency is essential to all these processes.
Any other thoughts? I would like to see WISA becoming the pre-eminent global professional body in this sector, and require inputs from all stakeholders, in this regard. I encourage readers to contact me with suggestions, so that we can team up to make a difference in our sector and in our country. MARCH/April 2014
9
WRC news
Energy efficiency Historically, electricity efficiency measures have not been a priority in the South African water industry due to the relatively low cost of electricity, writes Jo Burgess of the Water Research Commission.
O
ver the past five to
provide the South African water
in wastewater processes focused
ten years, this situation
and wastewater treatment sectors
on aeration. Simple changes in
has rapidly been chang-
with an objective and logical eval-
control methods and set points have
ing due to the increased
uation of the current and expected
frequently shown substantial quick
demand, lack of electricity generat-
impact and consequences of power
wins and checks on plant, control
ing infrastructure and subsequent
outages on water and wastewater
methods, operational routines and
increase in electricity costs. Energy
treatment services.
will in future remain a high-cost item for municipalities and utilities
Compendiums,
that operate and maintain water and
not been actively pursuing and
wastewater processes.
implementing
South energy
Africa
has
while,” comments project leader Dr Marlene van der Merwe-Botha. One of the WRC-funded studies
savings
investigated and demonstrated the
Energy consumption continues to
projects on a large scale, mainly as
potential hydropower generation in
increase as more people are provid-
result of the abundance of readily
pressurised water supply conduits.
ed with water and sanitation, and
available and cheap electricity in
A pilot installation was erected at
new technologies are implemented
the country. This means that case
the Elardus Park Reservoir (Tshwane
to meet stricter effluent and pota-
studies and operational data are not
Metropolitan
ble water quality requirements. To
readily available. In cases where en-
initial results reflected the benefit
position the water sector globally
ergy savings applications have been
and expected return from such an in-
with regard to energy consumption,
made, the data is poorly recorded
vestment, even if the system is only
the Global Water Research Coalition
and not verified. Hence, the South
operated at a duty of 50%.
(GWRC) has embarked on a project
African Compendium may need to
entitled ’Energy Efficiency in the
be developed to guide towards best
cipality conducted a feasibility study
practice of ‘developmental industry’,
on the Northern Aqueduct in the
as opposed to being a compendium
Durban potable water distribution
of best practice by way of case
system. This project is fairly complex,
study documentation.
consisting of 39 reservoirs, and
Energy consumption continues to increase as more people are provided with water and sanitation
eThekwini
Municipality).
Metropolitan
The
Muni-
Dr Valerie Naidoo, WRC research
water demand is often in danger of
manager, says South Africa has one
exceeding the supply. The feasibility
of the most advanced water and
study was based on the installation
Water Industry: A Compendium of
wastewater sectors on the continent.
of six mini-hydrogenerators, each
Best Practices and Case Studies’,
Understanding the complexity of
capable of providing 150 to 180 kW.
which
best
South Africa’s water supply chain is
Based on this study, invitations for
practices worldwide. The project is
a critical component of analysing
tender were put out by eThekwini
supported by the GWRC partners, as
the impact of power outages on this
Metro for six turbines. However,
represented by the four Continental
sector. Numerous factors influence
these were going to cost in the
Coordinators, in Australasia, Europe,
the amount of energy utilised in
region of R35 million, which was
Southern Africa and North America.
the water supply chain, including
deemed too expensive and as a
Each continental group has pro-
the stage of the water supply chain,
result, the specifications of the
duced a report of best examples
technology utilised, the use of pump
tender were modified in order to
submitted by utilities in their region.
or gravity feeds and the quality of
reduce costs. The modified request
When all four continental reports are
the water being treated.
for tender was for two turbines,
documents
these
available, they will be compiled into
It should be noted that certain
but, to date, the council has reject-
consume
ed this option. The cost of these
The WRC therefore commissioned
more energy than others. For exam-
turbines is expected to be between
a study to help understand the
ple, reverse osmosis membranes use
R6 million and R8 million each. In
potential impact that current energy
significantly more energy than other
the meantime, eThekwini Metro is
supply challenges are having on
filtration techniques.
exploring the option of funding from
the global compendium.
10
maintenance have proven worth-
Contrary to the UK and US Energy
treatment
technologies
South Africa’s water and waste-
“Up to 50% energy savings have
Eskom, the national electricity sup-
water services. The project was to
been demonstrated by case studies
plier. Eskom has projects in which
March/April 2014
WRC news electricity generation of between
and beverage industries (distillery,
annum
1 000 kW and 1 MW are funded at a
brewery, winery, fruit juicing and
than R300 million
rate of R0.70/kW for a period of three
canning), and domestic backwater
per annum, making
to five years after commissioning.
(sewage). Through this, an estimated
the existing waste-
Should this funding be obtained, the
10 000 MWh can be recovered from
water
project for two mini hydro-genera-
wastewaters in the whole of South
operation possibly
tors in the Northern Aqueduct is ex-
Africa, representing 7% of the Eskom
unaffordable.
pected to go ahead. Rand Water and
electrical power supply.
Failure
to
more
treatment
of
the
Bloem Water are others pursuing this
Energy has also become a key driv-
option, with Bloem Water progress-
er in the wastewater treatment value
ment
ing towards installing a 150 kW unit
chain of Johannesburg and every
would have a dev-
in the next few months, which will
effort is being made to produce
astating effect on
supply electricity to its headquarters.
“green energy” and reduce power
the economy, en-
Another WRC project recognised
consumption. Johannesburg Water
vironment,
opportunities that exist to improve
operates and maintains six waste-
services and social
the current wastewater treatment
water treatment works and treated
activities of the city.
processes by applying new solutions
about 1 million m3 of sewage per day
In line with the Department of
and technologies that can reduce
in 2010. All of the sewage treated
Energy’s Integrated Resource Plan of
energy inputs or generate energy.
wastewater
treat-
operations
health
was by the activated sludge pro-
2010, South Africa needs to increase
A WRC survey conducted in 2009
cess and about 90% of the 260 dry
its capacity by 45 000 MW by 2030.
on the quality and quantity of waste-
tonnes of sludge produced per day
This figure excludes Eskom’s present
waters in South Africa identified the
consisted of waste activated sludge.
capacity expansion projects.
top three sectors with the greatest
It is estimated that by 2020 the cost
potential energy recovery as: the for-
of electricity for the treatment of
mal and informal animal husbandry
wastewater in Johannesburg will
sector (cows, pigs and chickens), fruit
have risen from R97 million per
Dr Jo Burgess
For More questions contact Dr Jo Burgess, research manager, Water Use and Waste Management
March/April 2014
11
water level measurements ‌ be inspired ‌ www.keller-druck.com
Y WP
Reflecting on a year of highlights Not only is South Africa a rather big place, but it also faces a range of regionspecific challenges in the water sector, says Inga Jacobs of the YWP.
T
his is why the provincial
river clean-up initiatives. Finally,
11 December 2013. The biogas
chapters of YWP are a
we
development
to energy plant is the first one of
crucial component of WISA
events which focus on nurturing the
its kind installed at a municipal
as they provide ‘closer to
more ‘intangible’ qualities needed
treatment works and was officially
home’ access to provincial events
to succeed in our careers. These
launched last year. The system
and a forum to discuss issues
interventions range from working
involves collection of the biogas
relevant to the water sector in the
on writing and public speaking skills
produced in the anaerobic digest-
province that you live and work.
to improving business development
ers, gas conditioning and scrubbing
knowledge and skills.
and finally the operation of a gas
Provincial YWP chapters aim to
organise
skills
arrange four different kinds of inter-
This article features some of the
to power generator. The electricity
actions. Firstly, we arrange technical
fun initiatives that have been ar-
produced by the generators is fed
events, which usually take the form
ranged by the Gauteng Young Water
back into the wastewater treatment
of site tours and offer a ‘hands on’
Professionals during the past year.
works grid to reduce the reliance on
learning experience to participants. events, which include workshops,
presentation by Shaun Deacon of
lectures, seminars and symposiums.
The
Johannesburg
Thirdly, we arrange outreach events,
organised a tour of the biogas
the process of digestion and the
which can be anything ranging
facility at Johannesburg Northern
challenges and benefits of the pro-
from school education events to
Wastewater Treatment Works on
ject. This was followed up by a walk
we
arrange
academic
Photo by Jozua Loots
electricity provided by Eskom.
Technical events Biogas tour in Johannesburg
Secondly,
Looking at a career in the water industry
Gauteng
YWP
committee
The attendees were first given a
March/April 2014
Water,
explaining
13
Y WP
around the facility, guided by Jason Gifford of WEC Projects, where each process in the biogas to power generation facility was described in depth.
Provincial YWP chapters aim to arrange four different kinds of interactions
The
workshop
provided
a platform to expose high school teachers
learners to
and
some
of
their the
challenges and opportunities
Africa in January and February 2014
facing the water and wastewater
Rand Water Tour
to facilitate the YWP Publications
sector in South Africa. Time was
The Rand Water Technical Tour took
Workshops Series. He kindly made
also spent exploring the diverse and
place on 16 October 2013 at Rand
himself available to do a water-
exciting career and study oppor-
Water Scientific Services and Water
energy nexus lecture during his
tunities that can be pursued in the
Wise. Here, 59 young professionals
YWP Publications Road Show. This
water sector.
participated in the three activities
lecture took place on 24 January
The workshop was marked by the
scheduled for the day. The first ac-
2014 and was funded and chaired
positive participation and enthu-
tivity was a water treatment experi-
by Eskom and the Department of
siasm shown by the learners. The
ment where delegates were divided
Science and Technology.
event was sponsored by Thuthukani
into groups and took part in actual
The aim of the seminar was to cre-
SNF. It was a privilege for Gauteng
water treatment experiments. The
ate an awareness of the important
YWP to engage with such a vibrant
second activity was a train tour of
couplings between water and ener-
group of learners.
the Rand Water treatment plant.
gy. It showed how energy is used in
The third activity was a laboratories
a variety of water cycle operations
tour offering exposure to how water
and demonstrated how water is
is analysed in the Microbiology
used – and misused – in all kinds of
and Chemistry Laboratories. Rand
energy production and generation.
Water
and
the
Vaal
University
of Technology were partners for this event.
Outreach events High School Education Event On 16 August 2013, the Gauteng
Academic Events Water Energy Nexus Lecture, featuring Professor Gustaf Olsson
YWPs
Professor Gustaf Olsson, from Lund
learners and their teachers attended
University in Sweden, visited South
the workshop.
Ponego
spent
the
morning
Secondary
School
with in
Katlehong. About 200 Grade 12
For more details about how to get involved in YWP provincial or national activities, please visit our website: www.sa-ywp.org.za/gauteng-committee.html. Remember, all you need to do is become a member of the Water Institute for Southern Africa (WISA) or the International Water Association (IWA) and register to join YWP. If you’re 35 years old or younger, or are within five years of completing a degree in water, then you are eligible.
March/April 2014
Positive paticipation and enthusiasm marks the work of the YWP Photo by Jozua Loots
15
Hot seat
A positive impact Wastewater and biosolids treatment processes are increasingly being modified for the generation of biogas, offering a source of energy to generate power and heat. Maryke Foulds speaks to Dr André van Niekerk and Theunis Duminy at Golder Associates.
G
older is a global con-
reliance on supplied power during
there will be WWTW that will not only
sulting organisation that
power-supply interruptions.
be energy neutral, but will be able to
provides a wide range of
export excess power onto the grid.”
to
Golder is at the forefront of this
engineering and construction servic-
keep essential treatment equipment
innovative application of technology
es in the specialist areas of earth, wa-
and processes running smoothly.
and expertise. The knowledge of
ter, environment, energy and, more
Implementing
modern-day
generating biogas and converting it
specifically, how to turn a wastewater
technology as part of a more holistic
to heat and electricity is not new, but
plant into a sustainable enterprise
wastewater
strategy,
South Africa is to a large extent only
from an energy perspective.
also enables wastewater treatment
now realising the full potential of the
works (WWTWs) to decrease their
impact thereof on energy and the
carbon footprint.
running costs at WWTWs. While the
independent
consulting,
Following the successful commissioning of a combined heat and
16
This is an important factor when considering
what
is
this
needed
treatment
power plant by Johannesburg Water
“WWTWs globally – and increasingly
process itself is essentially straightfor-
recently, Van Niekerk (principal for
in South Africa – have a long-term
ward and technically proven, one of
mine and industrial water treatment)
vision to be energy neutral,” says
the biggest aspects of such a project
and Duminy (who heads up its water
Van Niekerk. “Currently there is no
is retrofitting an existing plant to be
engineering division) are of the view
facility that has yet achieved this on a
able to run efficiently as a biogas to
that this technology will not only
continuous basis, but it is technologi-
power facility.
save on electricity costs, but crucially
cally feasible and definitely financially
“In the past, wastewater as a com-
reduce
viable. It is forecasted that by 2025,
modity was approached purely in
water
service
authorities’
March/April 2014
Hot seat terms of regulatory compliance and was seen as a cost item by water services authorities,” Van Niekerk says. “It is, however, now approached as both a business cost driver and an environmental/social reputational issue. As a global company, Golder can tap into global expertise to assist in the planning phases of such an upgrade or expansion.” Golder’s global operations have been instrumental in assisting with technology transfer. In that sense Golder, in conjunction with South African industry, are on the cutting edge of introducing this type of technology to the South African market. to maximise energy output, a pre-
is performing to a predetermined
Sludge optimisation and the bottom line
cleaned gas supply needs to be
set of criteria reflected in contractual
assured. There are three compounds
penalties and incentives.
Duminy concurs: “Another factor to
of specific concern in biogas that are
consider is how to condition sludge
detrimental to gas engines. Hydrogen
a
to
treatment
sulphide in a gas engine can oxidise
approach
capacity. Through processes such as
and form sulphuric acid, which is
although these are limited in
cell lysis, electrical pulse and sonic
detrimental. Any moisture is detri-
the municipal water sector in
technologies, waste sludge can be
mental to equipment – the gas must
South Africa. Due to the spe-
pre-conditioned to enhance biogas
be dry. Another compound or group
cialised equipment, proprietary
production in anaerobic digestion.
of compounds called saloxanes (silica
pre-treatment approaches and
“The use of cell-lysis technology in
derivatives) are contained in the gas.
performance requirements of
the application of biogas-to-energy
If it gets into the gas engine and is
such an installation, this type
for WWTWs is most certainly unique
fired at very high temperatures, it
of facility requires a contractual
in South Africa and Johannesburg
can form hard glassy deposits with
Water is the first water utility to
obvious serious impacts on the life of
make use of such ground-breaking
engines. Effective pre-treatment and
technology in the municipal sector.
the removal of all contaminants from
In essence the business case for
the gas stream is crucial for optimal
biogas stands on two legs: the capital
functioning – impacting directly on
question on what it will cost to retro-
a reasonable pay-back period and
fit an existing wastewater facility and
equipment life.
optimise
available
Given the potential scale of project, public-private is
partnership
also
feasible,
“The funding approach has a significant impact on the best contractual approach.” Theunis Duminy, water engineering manager, Golder Associates approach that optimises the design,
install a biogas-to-energy plant; and
Moving on towards the actual im-
building, operating and maintenance
the life cycle question on what the
plementation and financing of such
thereof within a defined battery limit
payback period would be based on
a project, Duminy says: “The funding
and operating range.
the annual cost saving in electrical
approach has a significant impact
It has been estimated that the
power. To optimise the business case,
on the best contractual approach.
running cost of a WWTW in South
municipalities must carefully look at
There are various funding options
Africa could double in real terms be-
the sources of sludge, how to opti-
that can be considered that ranges
tween now and 2020, a trend driven
mise and pre-condition, as well as the
from the municipality or metro’s
primarily by the increasing cost of
facilities which will be retrofitted to
own revenue funds, grant funding or
energy. Increasing operational costs
maximise biogas-to-energy produc-
co-funding tied to an operations and
provides for a very strong business
maintenance approach.” With the
case to drive these biogas-to-energy
n
latter, the operator needs to ensure
projects. In the municipal sector,
order
that his equipment and installation
where a focus on capital investment
tion.” I
“WWTWs globally – and increasingly in South Africa – have a longterm vision to be energy neutral.” Dr André van Niekerk,
has dominated in the past, a change towards evaluating projects holistically is gaining ground. Utilities and municipalities are starting to look at the life cycle costing rather than just the initial capital outlay. The fact does remain that a biogas-to-energy plant
principal for mine and industrial water
can pay for itself within five years if
treatment, Golder Associates
all the right criteria are in place. March/April 2014
17
Africa
Flagship water plant for Zambian mine processes, but will be diverted
A high-end containerised water plant has been earmarked for Kansanshi Copper Mine in Zambia
V BELOW LEFT One of the six 40-foot shipping containers BELOW Fully engineered systems for longterm benefits
for carbon filtration, double-pass reverse osmosis, passed through a polishing filter and continuous electro de-ionisation after passing
eolia Water Solutions
Veolia will completely manufac-
through the initial sand filtration
and Technologies South
ture, test and certify the plants at
skids. The softened water for use
Africa will provide the
its factory in Sebenza, Gauteng,
in the smelter’s processes will be
treatment plant – built
before they are transported to site.
diverted from the demineralisation
into six 40-foot shipping contain-
The 40-foot containerised plants
stream before the second pass re-
ers – to the mine. As part of a new
are designed to be linked up to one
verse osmosis membranes.
copper smelter project, the mine
another on site, and will operate as
Veolia’s position at the upper-end
aims to grow its annual copper out-
a single plant with multiple output
of the containerised plant market
put from 340 000 tonnes in 2013 to
streams to produce a combined
secured
400 000 tonnes by 2015.
42.5 m3 of treated water per hour.
international
contract
against
competitors.
The
“As the world’s eighth largest cop-
“The plant has been designed to
per mine, the new Kansanshi smelt-
ensure maximum viability, so we
and Services Division uses only
er has very specific requirements for
have taken a high-end engineering
best-of-class
boiler feed, process and drinking
approach to match each treatment
is highly specialised within the
water,” says Nigel Bester, project
stage’s
smaller-scale water and wastewater
engineer
requirements.
at
Veolia’s
Engineered
water
with This
the
mine’s
means
that
company’s
Engineered
Systems
componentry
and
treatment market.
Systems and Services division. “The
boiler feed water, for instance, isn’t
“We have an extensive footprint
result is a flagship water treatment
subjected to all the treatment steps
throughout Southern Africa, which
solution that upgrades river water
necessary for drinking water, which
means we can service our clients
to match each requirement exactly,
is much more viable than treating
comprehensively. As part of the
with guaranteed availability due
all the feed water to high-quality
global
to a duty standby design on all
drinking standards, regardless of its
access to some of the best technol-
process streams.”
application,” says Bester.
ogies, which means that, overall, we
Veolia,
we
further
have
After clarification, iron removal
provide the entire, fully engineered
and sand filtration, the drinking
package that provides long-term
water train consists of activated
benefits,” says Bester.
carbon
filtration,
ultimately
UV
polishing
and
disinfection.
The
boiler-feed water will be subjected to
18
the
the
same
initial
March/April 2014
Africa round-up
Infrastructure news from around the continent in association with
Office of Conflict Management
exploitation of disadvantaged and
and Litigation. In the introduction,
vulnerable populations,” it notes.
Brown says that the report can
availability, quality and access are
of conflict in an area as well as the
traditional practices, water politics,
potential for negotiating peace and
upstream and downstream flows,
building resilience.
pollution, climate change and
The report says that population
natural disasters. Low resilience
growth and movement to urban
to environmental disruptions can
areas pose significant challenges
lower economic productivity, trigger
to governing water infrastructure.
unemployment and damage public
As demand for water grows,
perceptions of the competence of
competition will likely increase if per
government institutions.
capita freshwater availability is not effectively and fairly managed. Effective water management
UGANDA Access to clean water
Other factors that affect water
guide workers in evaluating the risk
“Water is a shared interest even in deeply divided communities and regions,” Chris Kosnik, acting
Uganda to access clean water by
also should take into account
director of USAID’s Office of Water,
constructing two gravity-water
factors like intense agricultural and
said at the Wilson Center. He added:
Water International – Uganda is a
flow systems and seven rainwater
industrial demands, and needs to
“Water can be a powerful connector,
faith-based, non-profit organisation
tanks in Ruhaama county Ntugamo
share water supply fluctuation and
encouraging cooperation and
that helps communities in develop-
district and Nyabushozi, in
water safety data.
negotiation in lieu of competition
ing countries to acquire safe drink-
Kiruhura district.
Living
ing water. It has constructed up to
“Effectively sharing water information during emergencies such
“People in these areas dig water
or violence.” He said that for the first time,
263 boreholes in the north-eastern
dams but when drought comes,
as floods or severe contamination
beginning in 2014, USAID has a
region of Uganda.
the dams dry up, so the water
is crucial for protecting human and
water strategy. The five-year effort
reserved in tanks can be used,”
environmental health and man-
aims to ensure that 10 million
elaborates Muhumuza.
aging perceptions of insecurity in
more people will have improved
tense and tenuous circumstances,”
access to drinking water, 6 million
the report says.
people will gain improved access to
semi-arid Karamoja sub-region
Africa Effective water management prevents conflict
ment is the issue of the lack of
people will get access to improved
where water scarcity has been a
Countries with unreliable supplies
transparency about water rights
agricultural productivity.
big challenge. Most people in this
of water are more vulnerable to con-
and private sector contracts that
region derive their livelihood from
flict, according to a new report from
can mask preferential treatment or
build formal and informal institu-
pastoralism since rainfall is not
the US Agency for International
corrupt governance. “Corruption
tional relationships of collaboration
sufficient to support agriculture.
Development (USAID).
can increase marginalisation and
on water monitoring, management
This move has given thousands of households in the region access to safe water. The north-eastern region of Uganda region includes the
Alex Muhumuza, the programme’s
Also affecting water manage-
Conflict Toolkit, was released 24
office for Living Water International
February at the Woodrow Wilson
– Uganda, says the problem of water
International Center in Washington.
shortage has been a big challenge
It says that conflict is often generat-
to the people of Karamoja and
ed by competition over water and
their livestock.
other natural resources. Effective
“Harvesting rainwater is also a
water management can bring dis-
challenge because people there
puting parties together to prevent
live in grass-thatched houses, but
conflict and foster reconciliation. The Water and Conflict Toolkit is
that can provide clean water,”
meant to be a resource for aid and
notes Muhumuza
development workers in fragile
The agency has also supported communities in south-western
The report urges countries to
The report, called the Water and
manager at the western region
now they have at least boreholes
sanitation and another three million
and conflict-affected areas, says Melissa Brown, director of USAID’s
March/April 2014
19
feature
Africa round-up and investment. It says that they
is where UNHCR [The UN’s refugee
should make access to clean water
agency] is,” she says. More than
more affordable and equitable,
730 women and children from the
enhance citizen knowledge about
village moved into the settlement’s
water as a resource and water use,
primary school. “When we fled to
improve citizens’ communications
the settlement, the refugees were
with policymakers and take into
generally very supportive and
account the potential for conflict
accommodating because they knew
around access.
what was happening,” says Hawa.
“Fair and effective water resource
Becky Ben Ondoa, UNHCR’s
management is a concern of
community services associate, says:
everyone,” Brown says.
“Even though Amadi village had become a ‘no-go’ area, we knew
South sudan Fresh water brings life back to traumatised South Sudan Village Would you want
that the school would have to be
to live in a village where corpses
were told it was safe for them to
contaminated the only source of
return home.
water? That was the predicament
vacated for the start of the new school year.” Once the fighting ended in Amadi, the villagers
But how could they go back when
Africa High-level energy meeting will benefit African nations The second high-level
Ethiopian Renaissance Dam and the Gibe Three hydropower projects, which will produce almost 9 000 MW of electricity between
that confronted residents of Amadi
there was no clean water in their vil-
meeting of the Africa-EU Energy
them when completed, as well as
village when they tried to return
lage? A UNHCR monitoring mission
Partnership was held recently, with
Ethiopia’s pioneering wind farms
home during a lull in the violence
confirmed what the villagers had
calls from different speakers for
which he said are the largest in
that has wracked South Sudan for
already discovered – decomposing
continued efforts to ensure access
sub-Saharan Africa.
the past three months.
human remains were polluting the
to energy by Africans across the
only source of water.
continent. The energy partnership is
“When our husbands and the village youth went to check the
“It was imperative that we act
one of the eight partnerships of the
Angola Conclusion of energy and water projects on the cards in Angola The National
village sometime after the shooting
quickly,” says Ondoa. “To encourage
EU-Africa Joint Strategy, which was
had stopped, they came across
the Amadi community to return
adopted in 2007.
the bodies of soldiers and civilians
to their village, alternative water
strewn across our cassava fields and
points for the local community had
for Infrastructure and Energy, Dr
government has prioritised out-
in the streams from which we drew
to be found as a matter of priority.”
Elham Ibrahim, focused on the
comes of the main projects in the
progress and importance of the
energy and water sector by 2017.
our water,” recalls Hawa Ladu, a
The African Union Commissioner
A UNHCR partner, ACROSS,
Development Plan of the Angolan
This was announced by the
located a water drilling company
initiatives launched by the African
and in two weeks the village had
Union Commission and its partners,
minister of Former Combatants
the South Sudanese capital, Juba,
two functioning boreholes, ready to
since the inception of the AEEP.
and Motherland Veterans, Kundi
and – luckily for the inhabitants
meet the needs in Amadi. The men
She spoke specifically on the
Paihama, when addressing the main
– only three kilometres from
came first to check on the safety,
Geothermal Risk Mitigation Facility,
act of the celebrations of the 53
Gorom Refugee Settlement, home
their families followed.
which encourages public and
years of the beginning of the armed
private sector geothermal devel-
struggle for the national liberation.
mother of six. The tiny village lies 25 km from
to 2 500 Ethiopian refugees. It
“I cannot tell you how grateful
was to prove a safe haven when
we are for the boreholes UNHCR
opment projects by providing cost
Amadi village got caught up in the
has provided us – and embarrassed
share grants for surface studies and
Development Plan also includes the
violence that erupted in the country
that we continue asking for more
drilling of reservoir confirmation
programme for the rehabilitation of
last December.
assistance,” says Hawa. “However,
wells. “Under the facility, grants
secondary and tertiary roads, as well
under the circumstances, we have
have been awarded to five projects
as the construction of structures of
the villagers tolerated looting of
no choice,” since their farming
in Kenya and Ethiopia, amounting
logistic platform and support for
their food by opposition forces, who
implements had been looted along
to US$22 million (R230 million) and
rural trade.
stole even “the stew in our pots”.
with their food and grain.
other agreements will be signed in
As Hawa recounts it, for a while
Sometimes the soldiers brazenly
March 2014.”
The villagers are busy harvesting
He added that the National
The minister said that greater attention will be focused on the
ordered villagers to carry the looted
the last cassava tubers still in the
The Minister of Water, Irrigation
successful implementation of the
food to their makeshift camps.
ground – a modest provision
and Energy for Ethiopia, Alemayehu
municipal integrated programme
to see them through the long
Tegenu, highlighted the importance
for rural development and fight
seasonal rains.
of appropriate and robust national
against hunger and poverty.
But when warfare engulfed the village in mid-January, it was time
policies and strategies in the suc-
The event was also attended
to run. “Bullets whizzed through the
“Life as we know it has changed
air and some landed in our walls as
for the worse,” says Hawa. “Even our
cess of Africa’s energy ambitions. He
by the provincial governor, Paulo
soldiers advanced on Amadi,” says
husbands have become like women
pointed to several projects which
Pombolo; Media minister, José Luís
Hawa. She, her husband, their chil-
– helpless and fearful – as we all
have been initiated in Ethiopia as
de Matos; Secretaries of State and
dren and their neighbours fled to
wait for the situation in our country
a result of the nation’s focus on
representatives of political parties
nearby Gorom Refugee Settlement.
to resolve itself. As to how long that
integrating energy into the core
with seats at the National Assembly.
They regarded Gorom as the saf-
will be, only God and this country’s
of its national and development
decision-makers know.”
agenda. These include the Grand
est place to seek refuge “because it
March/April 2014
Information supplied by www. allafrica.com
21
Industry news
Water security project pays off Oudtshoorn, capital of the Klein Karoo, has been linked to good design since the ostrich feather boom of the 1870s, with its flamboyant fashions and opulent palaces.
T
his year, in a modern
and Turin, with Cape Town taking the
water from groundwater sources to
twist to the story, its munic-
2014 slot. All these cities are dedicat-
a wide area stretching form De Rust
ipal water project has been
ed to using design as a tool for social,
in the east to Calitzdorp in the west,
selected as part of World
cultural and economic development.
including the town of Dysselsdorp.
Design Capital 2014 (WDC2014).
The scheme was transferred to the Oudtshoorn Municipality in 2005.
World Design Capital is a prestig-
submission processes drew 1 253
ious designation bestowed every sec-
entries to be part of the DC2014
The rural component of the scheme
ond year by the International Council
programme. Some 450 projects, in-
accounts for about 50% of the total
of Societies of Industrial Design.
cluding Oudtshoorn’s, were selected.
supply of drinking water. Its main
Previous winners were Helsinki, Seoul
The submission was put forward by
beneficiaries are farm workers and
Societal impact What impact can the project have on people’s lives? The proposed deep groundwater scheme is designed as a secure transition from an increasingly risky reliance on surface water (prone to severe reduction through climate change) to a resource providing a sustainable buffer against water scarcity through drought intervals that may, in future, endure over decades rather than years. Where demand outstrips available freshwater supplies, enhanced community resilience requires that groundwater be managed scientifically in conjunction with surface water and be equally shared among all segments of society. The project will benefit rural and urban communities in the greater Oudtshoorn region. What are the main stages of the project? The main stages of the project have been reconnaissance and research (2003 to 2006); exploration, production drilling, monitoring and aquifer testing (2004 to 2010); and expanded exploration and feasibility studies, alongside final wellfield design (2012 to present). The next stages are wellfield production drilling (2014 to 2017) and supply to Oudtshoorn (2017 to present).
22
Two rigorously adjudicated public
water, energy and earth sciences
previously disadvantaged people liv-
consultancy Umvoto Africa, which
ing in the rural area between De Rust
has worked with the Oudtshoorn
and Calitzdorp.
local municipality for over a decade. Paul
Müller,
acting
The
present
supply
from
the
director:
groundwater source is insufficient to
Technical Services for the municipal-
meet the demand, so augmentation
ity, explained that the current water
of the source is urgent, said Müller.
project goes back to 1999 when
A pipeline from the nearby Blossoms
a visionary councillor, Issy Baron,
groundwater well field would allevi-
dreamed of turning the arid Klein
ate the shortage.
Karoo into an oasis. He wanted to
Groundwater
from
the
deep
ensure water security for all commu-
fractured-rock aquifer in the Table
nities in the region.
Mountain Group (TMG) will augment
The Klein Karoo Rural Water Supply
the existing surface water storage in
Scheme (KKRWSS) was implemented
the Melville and Raubenheimer reser-
by the Department of Water Affairs in
voirs in the foothills of the Swartberg
the early 1990s. It supplies drinking
range, says Dr Chris Hartnady, Umvoto
March/April 2014
Industry news Africa’s technical director. It will also
Africa, local stakeholders, landown-
from
augment TMG and other groundwa-
ers and farming organisations and
is, however, recharged by rainfall.
ter sources from the KKRWSS in the
drilling specialists.
Provided that the abstraction of
the
wellfield.
Groundwater
western part of the Kammanassie
The municipal cost to date has
groundwater by all parties in the
range and thus provide additional
been R24 million and an additional
region is properly monitored and
assurance of supply to communities
R27 million has been allocated by
managed to ensure that in the long
like Dysseldorp and De Rust.
the Department of Water Affairs. The
run less water is withdrawn than the
total cost of the project is estimated
recharge from rain, groundwater is a
at R200 million.
sustainable option.”
The
combined
ground-
and
surface-water sources will be managed conjunctively to ensure that
Rowena
The project area also has potential
yield is optimised and losses are
Hay, says challenges have included
as a geoheritage site – a tourist
minimised in the overall scheme.
siting the deepest, highest-yielding
destination
The Blossoms groundwater will be
production borehole in the hardest,
local and regional economic benefits
piped to a reservoir in Oudtshoorn
most abrasive quartzitic sandstone
throughout the year, she said. This
during the hot summer months, or
formations known. Umvoto also had
would create more income for the
as needed.
to research and manage how water
community and help ensure greater
The proposed bulk water scheme
falling in surrounding mountains
buy-in to the project.
will be designed by WorleyParsons,
reached the wellfield area (where the
which has been involved with the
aquifer is closest to surface, albeit still
feasibility studies to date. Partners
at least 300 m below ground).
have of
included
the
Environmental
Development
Department Affairs
Planning,
Umvoto
Africa’s
MD,
“The main concerns have been
and
proving aquifer yield, evaluating cost
the
benefits and establishing whether
Water Research Commission, the
the farming area in the Outeniqua
Department of Water Affairs, the
region would be negatively impacted
Development
if Oudtshoorn pumped groundwater
Bank
of
Southern
Groundwater from the deep fracturedrock aquifer in the Table Mountain Group will augment the existing surface water storage
that
would
provide
BELOW Dr Chris Hartnady, technical sirector of Umvoto Africa, discusses the water project with Oudtshoorn Municipality Executive Mayor Alderman Gordon April
Project teams Umvoto Africa specialises in resource development and sustainability. The firm has in-depth knowledge of groundwater modelling, hydro-and-geological, hydrochemical processes and a technical staff complement of 13 with international and national reputations and all postgraduate degrees. Three of Umvoto’s innovative groundwater projects (for the Stanford, Hermanus and Oudtshoorn municipalities) have been selected for WDC2014 to highlight how design can improve the lives of people and communities, and build resilience. See www.umvoto.com. Global company WorleyParsons is a leading provider of project delivery and consulting services to the resources and energy sectors and complex process industries. The Water Solutions consulting practice provides solutions across the entire water spectrum, from resource management and abstraction to treatment and reuse. Consultants with global experience have a particular focus on investigation, troubleshooting, conceptual and functional design, and advisory services.
March/April 2014
23
Pipes and pipelines
Every year millions of children die from drinking polluted water.
Managing bulk pipelines
Davey have water disinfection covered.
Bloem Water has successfully implemented a bulk pipeline leak detection and assessment project, writes Mokutu Kgwale of Bloem Water and Kobus Prinsloo of SSIS.
L
Experts in water.
ocating and repairing leaks on large-diameter transmission pipelines is important in maintaining safe and reliable service delivery. These leaks are often more sparse and therefore more difficult to
locate, which can lead to prolonged leakage and extensive water loss. Utilities that have a leak detection programme in place for their large diameter transmission mains often achieve greater reduction in non-revenue water (NRW), which is the amount of water lost before it reaches the customer.
Experts in water.
Many homes in and around South Africa use water collected from unsecure sources such as rainwater harvesting, rivers and boreholes. All surface water can harbour micro-organisms that are potentially dangerous to your health. Davey Water Products offer a range of products designed to make drinking water safer. From manual dosing with liquid to point of entry filtration, UV, and water softening systems. It is easy to treat all incoming water into the home to ensure water clarity and safety at every tap. Email us on davey@safequip.co.za to find out more about the full Davey range or contact any of the Safequip branches to find your nearest dealer. Gauteng: Western Cape: Kwazulu-Natal: Eastern Cape:
011 021 031 041
397 907 563 451
7723 2500 8807 0026
Davey is exclusively distributed by Safequip.
QUALITY FIRE SOLUTIONS
24
March/April 2014
Pipes and pipelines Furthermore, a leak detection inspection is a valuable step as part of a condition assessment programme. Utilities can avoid expensive capital replacement programmes by gathering real data on the condition of their pipelines and addressing problems as they arise. Bloem Water, which provides water services to the central region of South Africa, recently implemented an
asset
condition
assessment
project that included a comprehensive leak detection programme using inline methods on a strategic 1 200 mm pre-stressed concrete pipe (PCP) that supplies the City of Bloemfontein with roughly 60% of its drinking water. Inline leak detection is a very accurate method of leak detection because the acoustic sensor used to identify the sound of the leak is brought directly to the source, unlike traditional methods, such as correlators and listening sticks. Such techniques lack the accuracy needed to locate leaks in larger pipes because the sound of a leak dissipates
surveys to provide visual confirma-
indicative
rapidly in large diameter pipes.
tion on the location of the leaks in
accounts to approximately 1 200 kℓ/
leak
sizing
categories
order to aid in the interpretation
day. Interestingly, of all the pipeline
technologies
of findings and plan interventions.
leaks detected, only three leaks
were successfully applied. A total
Sahara is a tethered inline leak
showed any surface signs of leakage.
length of 103 km between De Hoek
location and condition assessment
This reiterates the importance of not
reservoir and Brandkop reservoir
technology that pinpoints the lo-
relying on surface inspections as the
were inspected.
cation of leaks at the same time as
only means of detecting large diam-
the
inspecting the internal condition of
eter pipeline leaks.
Both SmartBall and Sahara Audio Video
To
inspection
maximise
efficiency,
SmartBall leak detection technol-
the pipeline and verifying the cause
The findings of the latest leak
ogy was used first to cover large
of leakage using a combined acous-
detection surveys were compared
sections of the distance in single
tic
to that of a previous Sahara leak
deployments. The SmartBall tool
CCTV camera.
Engineering evaluation and risk assessment were factored into the development of a pipeline specific management strategy
hydrophone
with
integrated
OPPOSITE Sahara Leak Detection set-up ABOVE SmartBall prior to insertion into the pipeline
detection inspection project perVisual leak verification
formed in 2007/2009 to establish
was also performed at all
trends. This information combined
accessible components
with a first order engineering evalua-
along the pipeline.
tion of available pipeline design and
Leaks were identified
manufacturing data, the failure histo-
and classified as either
ry of the pipeline, operating records
pipeline leaks, i.e. on the
and the hydraulic behaviour of the
pipeline
system were incorporated into a risk
barrel
component
itself ),
leaks
(i.e.
assessment model for the pipeline.
is a free swimming leak detection
valves, air valves, scour valves, etc.)
leak
detection
platform that operates while the
or off-takes. The majority of the
engineering
The
evaluation
pipeline remains in service. It is
leaks were found to be components
assessment were factored into the
equipped with an acoustic sensor
while pipeline leaks were detected
development of a pipeline specific
that identifies acoustic anomalies
mainly on joints (i.e. where the PCP
management strategy. Bloem Water
associated with leaks, the acoustic
was connected with prefabricated
can now implement this strategy as
signature is then analysed to deter-
steel joint pieces). Some of the
a guideline to proactively manage
mine if it is a leak, air pocket or an
leaks on these joints may be attrib-
this valuable asset in order to pro-
external noise.
uted to poor bedding, improper VJ
long its remaining useful life, avoid-
The SmartBall inspections were
(Viking Johnson) connections, etc.
ing expensive capital replacement of
followed by selective Sahara AV
The estimated water loss based on
the asset.
March/April 2014
findings, and
risk
25
feature
Pipes and pipelines
New for old
Deteriorating infrastructure A statement issued by Edna Molewa ,the Minister of Water and Environmental Affairs, states that non-revenue water losses in South Africa is in the region of 1.58 billion cubic metres. By
KROHNE WATERFLUX meets SANS1529-1:2006 fit for trade metrology – exceeds class D Specifications
Nicolette Pombo-van Zyl, content director for African Utility Week
Replace all mechanical bulk water meters? Now it’s possible with the WATERFLUX from KROHNE.
T
WATERFLUX – the new electromagnetic water meter – is bringing technological change to the water industry. It measures precisely and maintenance-free very small and large flow rates – from night-time demands up to fire-fighting operations. Throughout its entire service life of 25 years over several custody transfer periods.
his has severe cost implications, not to mention supplied water being wasted each year. Nonrevenue water (NRW) in South Africa is estimated to cost R7.2 billion per year, this calculated at a
nominal production cost of R4.50/m3 in 2013. As South Africa is deemed a water-stressed country it is of vital importance to investigate and implement measures that can be undertaken by municipalities to manage this valuable resource, with one such being the targeted replacement of pipes.
Its unique, RILSAN -lined measuring tube is wear-free and without mobile measuring parts, eliminating the need for maintenance. This reduces follow-up costs for statutory recalibrations – as an overhaul or replacement of the water meter is no longer necessary. ®
It was at the 13th annual African Utility Week conference and exhibition held in Cape Town recently where the question was raised and discussed on whether mains replacement projects results in a reduction in real losses. For this to be realised, water utilities need to recognise that as the water distri-
Both the low initial costs and the significantly reduced operating costs pay off in daily operation. Employ the WATERFLUX instead of mechanical bulk water meters and create financial freedom for new projects – simply exchange new for old.
bution infrastructure is in a continuous state of deterioration;
KROHNE – Water is our world. Please see our website for more information www.krohne.com/waterflux-series KROHNE South Africa 8 Bushbuck Close Corporate Park South Randtjiespark, Midrand Tel.: +27 113141391 Fax: +27 113141681 Cell: +27 825563934 John Alexander j.alexander@krohne.com www.za.krohne.com
26
March/April 2014
Pipes and pipelines
How to offset infrastructure damage
The question was raised and discussed on whether mains replacement projects results in a reduction in real losses the replacement of mains must be an ongoing, continuous programme. In addition to the above prepara-
of reducing construction times and environmental impacts. • For areas where partial mains
tory considerations, the discussion
replacement occurs, it will be ben-
expanded on the following construc-
eficial over the long term to ensure
tion considerations:
that the pressure across the entire
• Various contractual implementation
supply area is managed in order to
vehicles should be investigated to
ensure that leakage levels are, in
derive the solution that best fits the
fact, reduced
objectives of the water utility. If not
• The mains replacement contractor
conducted in-house, turnkey con-
must be made responsible for the
tracts such as the New Engineering
performance of the new infrastruc-
Contact (NEC) offer a number of ad-
ture and various key performance
vantages to tackling a programme
indicators must be measured as part
of this nature.
of the hand over process. Factors
• provide budget on a permanent basis to cover the cost of annual mains replacement • implement systems to gather and store performance data for analysis in terms of tracking the deterioration rate of water mains in order to predict replacement times • training of employees to recognise the different types of water main faults and sensitise them to the importance of having accurate information in the faults database • analysing the causes of failures must be undertaken and forwarded to the engineers and the procurement department in order to shape future mains replacement material selection and installation methodologies • reducing the pressure in each district metered area must be undertaken as much as possible before mains replacement. There is the added benefit that this reduction may improve the zone performances such that the replacement of the pipes is considerably deferred • have in place consecutive leak detection and repair exercise to minimise losses as much as possible • tracking of the mains failures for at least three years prior to prioritising areas for replacement and determine the Burst Frequency Index (BFI) for both mains and service connections • the prioritised zones must be assessed to prove beyond doubt that the prioritised area will yield significant results when rehabilitated • conducting assessments to determine if it will be beneficial to replace service connections only as this can be done at a fraction of the cost of rehabilitating the reticulation mains.
• Thoughtful consideration should
such as real loss, NRW, MNF, snap-
potential to damage or destabilise
be given to not only the type
shot ILI, fire flow and average pres-
the existing services.
of material used, such as PVC, HDPE, and ductile iron, but also
sure can be used for this purpose • Coordinate
with
other
• Replace
all
service
connections
service
during the replacement of the water mains as these connections
methodol-
providers so as to rehabilitate all
ogy used as each material and
services at the same time where
are often of a similar age to the dis-
methodology
potentially
possible to limit future disturbances
tribution mains and statistically they
offer significant benefits in terms
as these disturbances have the
account for 50% of the leakage.
to
the
construction can
March/April 2014
ALL IMAGES When pipe infrastructure goes wrong
27
Pipes and pipelines
A three-metre diameter dismantling joint A significant pipeline located in Southern Africa, which is currently under construction, is expected to accommodate the region’s water demand growth projected to 2030.
A
s part of the construc-
Africa, which placed the order with
without having to cut into the pipe
tion of this more than 8 km,
South
Klamflex
in which the flow meter is installed.
3.5 m diameter pipeline, a
Pipe Couplings for the dismantling
The purpose of the dismantling joint
number of innovative tech-
joint, explains the background to the
is firstly to ensure an easy installation
nologies were required for what is
project. “The pipeline itself is 3.5 m
and secondly for the dismantling
said to be sub-Saharan Africa’s largest
in diameter, but in the section where
of the flow meter when necessary.
water pipeline. One of these was the
the flow meter has been installed it
Without the dismantling joint, it
design, manufacturing and testing of
is 3 m in diameter and therefore the
would mean that you are left with a
a 3 m dismantling joint.
size of the line at that point has been
very tight tolerance to work within.
reduced” says Rampathi.
This would be very difficult during in-
To account for the water that is
BELOW A section of what will be one of Africa’s longest pipelines
28
African
company
to be extracted from the Vaal Dam,
The specifications of this flow meter
stallation and also during dismantling,
the electromagnetic flow meter was
are an internal diameter of 3 002 mm,
when inspections are undertaken and
chosen. A tender document was put
with a maximum flow rate of 900 Mℓ/
maintenance is conducted to clean
out to the open market and Krohne
day, thus not only making it the larg-
out the debris that has accumulated
South Africa was selected to supply
est of its kind in the world, but also
inside the flow meter.
the
meter,
a first in Africa. “This is the tenth 3 m
including the dismantling joint and all
flow meter that Krohne has manufac-
Pressure testing
the other accessories required for the
tured,” commented Rampathi.
Andy Lawrence, managing director
electromagnetic
flow
of Klamflex Pipe Couplings explains
flow meter.
What is a dismantling joint?
the manufacturing process of the
The dismantling joint is the piece of
dismantling joint and discusses some
and
equipment that allows for the remov-
of the technicalities encountered.
logistics manager at Krohne South
al of the electromagnetic flow meter
“The dismantling joint had to be
About the flow meter Deon
Rampathi,
projects
March/April 2014
Pipes and pipelines pressure tested to ensure the integrity
to determine what the required thick-
of the welding and the steel structure
ness of the blank flanges should be to
in its entirety. It was specified at the
withstand 15 bar pressure. To be able
outset that the pressure test needed
to withhold such a pressure, reinforc-
to cater for one and a half times the
ing was required and our engineer
design pressure. “Testing at 15 bars
John Somers-Vine, designed eight
for a period of 15 minutes for this
high-tensile tie-rods in the centre,
large diameter is a first for us and
sealed with O-ring seals on the flange
it required changes to our design
that actually held the two flanges
to accommodate for this extreme
together, so that they didn’t bow out
pressure. On a size like this, just one
with the pressure”.
bar makes a huge difference, it goes
The normal operating pressure of
the process was the torque that had
up incrementally and it becomes very
the pipeline where the dismantling
to be applied to the bolts to tighten
difficult,” says Lawrence.
joint will be installed was specified
them. Lawrence explains: “We had
to be 6 bars. Industry standards
to purchase a 90 mm spanner head
of
dictate that the test pressure must
that you wouldn’t get in your average
Klamflex Pipe Couplings located in
be 1.5 times the working pressure, i.e.
toolbox.
Chamdor, Krugersdorp, to witness the
9 bars. However, for this installation
that we needed close to 3 000 Nm of
pressure testing of the dismantling
the client insisted on a 15 bar test
torque to tighten the bolts on the dis-
joint. “Today, we have proven that
pressure, which is nearly 70% more
mantling joint, which is a lot of force.”
the dismantling joint could take the
than the normal test pressure. The
Having reached a milestone in
15 bar pressure.” Lawrence explains
15 bar test pressure was achieved
design and technological capabilities,
what was required in order to actually
with ease demonstrating the strength
Lawrence adds: “Overall this has
conduct the pressure test. “We had to
and integrity of the Klamflex disman-
proven our design capabilities. We
design and build a test-rig on-site. Our
tling joint.
are now open to many more op-
A team of officials recently visited the
manufacturing
facilities
engineers conducted a finite element
One of the other challenges that
analysis on the actual blank flanges
were encountered by Klamflex during
Sensus iPerl Ad2013(1).pdf
1
8/18/13
5:20 PM
Our
engineer
ABOVE All dismantling joints have to be pressure tested
calculated
portunities, not only in South Africa, but internationally.”
March/April 2014
29
feature
Pipes and pipelines
SABS ensures heavymetal-free pipes The South African Plastic Pipe Manufacturers Association (SAPPMA) has welcomed the South African Bureau of Standards’ (SABS) announcement that all PVC pipes manufactured in South Africa have to be free of heavy metals by July 2015.
T
he General Manager
as sewer, drainage and mine pipes.
membership over the past eight
at the SABS Certification,
“Although lead does not leach from
years and as such has formed part of
Gauteng, Sibongile Dhlamini,
the plastic pipes and does not pose
the regular SAPPMA factory audits,”
confirmed earlier that the
any danger to people once installed,
says Venter.
technical committee of the SABS
we felt compelled to create a safer
Dhlamini concludes: “In the interest
Standards
amended
environment for the manufacturers
of the consumer and good business
series of standards to ensure that all
where lead poisoning does pose a
practice, the SABS strongly promotes
heavy metal stabilisers are removed
risk for their workers. As a result, all
the highest possible product quality
in the manufacturing of PVC Pipes.
PVC pipe manufactured by SAPPMA
standards as well as environmentally
“Local manufacturers of PVC pipes
members
are
friendly manufacturing processes and
who are SABS certified have been
stabilised
environmentally
materials. We therefore urge compa-
granted a window period of 24
friendly materials such as calcium
nies to ensure they comply and begin
months as of 30 October 2013 to get
zinc or organics-based stabilisers
the process of removing heavy met-
their house in order and to comply
instead. Adherence to the policy
als from their manufacturing process,
with the new
has been a requirement for SAPPMA
if they have not yet done so.”
Division
has
relevant standard
are
lead-free
with
and
Standards have been amended to ensure that all heavy metal stabilisers are removed
requirements.” Pipes bearing the SABS mark of quality will have to be resubmitted for testing, after which new permits will be issued. Commenting on this announcement,
SAPPMA
chairman
Jan
Venter says that the association welcomes the decision by the SABS. “Representing a socially responsible industry, SAPPMA already embarked on a voluntary removal of heavy metal stabilisers from PVC pipes back in 2006 because it added value to SAPPMA’s life cycle thinking and took into account end-of-life issues and waste management options. The reason for the initiative was based on health and environmental considerations and was done at considerable cost to our members,” Venter explains. The policy was fully implemented by SAPPMA in July 2009 and applied to drinking water systems as well March/April 2014
31
Pipes and pipelines
SAPPMA and SAICE sign memorandum The Southern African Plastic Pipe Manufacturers Association’s (SAPPMA) South African plastic pipe industry facilitator has signed a Memorandum of Understanding (MOU) with the South African Institution of Civil Engineering (SAICE).
T
he MoU encourages the
and on varying media platforms
two parties to cooperate
about each other’s activities. The
to lobby and challenge
parties will have regular consulta-
statutory
and
tion sessions to advise each other
legislation
structures to facilitate the achieve-
on their programmes and activities.
ment of their common objectives.
With SAICE’s backing, SAPPMA will
Some of the areas of cooperation
be able to participate in graduate
agreed upon include the mobili-
engagement
sation of resources, where the two
various universities in the country
parties have agreed to support each
and spread the message about the
other in sourcing funds for the im-
need for engineers who are dedi-
plementation of their activities and
cated to advancing the pipes and
plans that fall within the framework
plastic industry.
of the MOU.
programmes
at
New plastics programme launched
One of the first tasks of coop-
SAPPMA CEO Jan Venter says:
eration is SAICE’s assistance in
“The cooperation agreement with
distributing
SAICE is aimed at expanding the
published
association’s reach to the new
engineers from their bookshop and
generation of engineers entering
e-sales facility. The 2013/14 manual
the South African market. It is im-
was released in October last year
portant for the local pipe industry to
and provides technical information
ensure an influx of graduates with
on the selection of plastic pipes
qualifications to further develop the
for water supply and wastewater
sector. SAICE is an influential associ-
disposal projects.
ation and, with our target audience being
largely
civil
SAPPMA’s technical
recently
manual
for
“Plastic pipes are one of their
engineering
priority areas of SAICE via its Water
linked, greater access to them is
Division, and we are grateful to
now ensured.”
have a formalised our partnership
The agreement also entails a
with them. As an organisation, they
commitment to enhance and sup-
have the calibre and influence we
port each party in the creation and
need to increase our presence and
maintaining of relations with similar
educate the engineers about the
international institutions, as well as
importance of ensuring high stand-
raising awareness in publications
ards of manufacture and installation
The cooperation agreement with SAICE is aimed at expanding the association’s reach to the new generation of engineers entering the South African market
when
it
comes
to
plastic pipes. Similarly, we
believe
partnership
that will
our offer
SAICE value by granting them access to the local plastics relevant
industry
and
information,”
says Venter.
Plastics|SA’s Training Division has launched a brand new learning programme for thermoplastic welding inspectors or future inspectors who need to know more about the criteria for proper inspection of plastics fabrication welded joints. According to Kirtida Bhana, training executive for Plastics|SA, the Thermoplastic Welding Inspection Programme provides an excellent overview for everyone in the thermoplastic fabrication industry. “South Africa has a high demand for plastics welding inspectors, due to the increased use of plastic welding across various industries. Many mining and construction companies are specifying that products traditionally made from steel or metal be manufactured from plastic. Our new course is a non-NQF programme that focuses on plastics as a material of choice and various fabrication methods such as butt welding, socket fusion, electro-fusion, hot air, hot air extrusion and solvent welding, with the main focus being on the inspection of plastics fabrication welded joints,” Bhana explains. Owing to their good properties, plastic pipes are increasingly being used to replace metal and ceramic pipes. However, as with all pipelines and regardless of the materials used, the integrity of plastic pipe joints (welds) is critical to the success of the pipeline. To this end, the Southern African Plastic Pipe Manufacturers Association (SAPPMA), through its Installation and Fabrication Plastics Pipe Association initiative, has welcomed and endorsed the development of the Thermoplastic Welding Inspection Programme. “An entire pipeline depends on the quality of a weld. The repercussions of poor welding could even be life-threatening in mines or at construction sites and our industry therefore needs qualified welding inspectors who would be able to spot poor or inferior quality welding or confirm the quality and safety of the weld,” says Jan Venter, CEO of SAPPMA. The training courses last three days. The pilot programme will be launched at Plastics|SA’s training centre in Johannesburg on 8 to 10 April 2014, after which the course will also be offered at the association’s Cape Town and Durban branches, or presented in-house at a company’s premises. The fee is R4 218.00 plus VAT per learner for non-member companies and R3 796.20 plus VAT per learner for member companies. For more information, contact renee.mclean@plasticssa.co.za Issued on behalf of Plastics|SA.
March/April 2014
33
Pipes and pipelines
GRP pipes top choice for Abagold project The history of Abagold dates back to 1991 when a pilot abalone hatchery was set up in the Old Harbour in Hermanus.
I
n 2013, the company reported a record growth of 310 t
and its hatchery produced a record 4.3 million spats. Fiberpipe is proud to have been associated with this leading producer of abalone since 2009.
Project phases According to Christiaan de Wet, Abagold’s engineering manager, during this initial project for the sea water supply upgrade, Abagold installed two sections of DN700 diameter Vectus GRP lines. The first was a 110 m section to take water from the sea water pumps to the filtration unit and the second was a 500 m pipeline to supply additional water from the filtration unit to one of the grow-out facilities. Both pipelines involved custom-made reducers to connect to the pump discharge outlets and several bends of varying complexity to allow for installation around existing infrastructure. Both pipes are exposed to direct sunlight and were treated for UV protection. “At the time of installation, the aquaculture industry was mainly using HDPE for its large diameter supply pipes and PVC for the smaller diameter. The HDPE was historically more cost effective. However, Fiberpipe’s (formerly Amitech) range of GRP pipes was not only more cost effective in the initial capital investment, but also had reduced friction coefficients
34
March/April 2014
Pipes and pipelines and lower levels of bio-fouling, both
pipeline set from the primary pumps
contributing to an improved system
to the filtration unit is made up of
efficiency, resulting in a reduced life
GRP Flowtite pipes that were supplied
cycle cost,” says De Wet.
and manufactured by Fiberpipe. This
Installation of the Vectus pipes was
includes the 1 200 mm suction lines
quite a simple process with the basic
with eccentric reducers and the dis-
bell and spigot arrangement and the
charge lines with concentric reducers,
double seal system, which allows for
bends and straight section of DN900
individual seal integrity tests. “This
diameter for each primary pump. The
is a huge advantage when installing
components were all manufactured
long pipelines. Connections are so
off-site and installed with final on-
much faster and cleaner than having
site adjustments and welds. The four
to weld the HDPE sections together,”
primary pumps pump into a collector,
comments De Wet.
from where the water flows under
In 2010, Abagold started with the
gravity through two separate pipes,
Flowtite pipes. De Wet says “the
design and development of a brand
each feeding three of the six swirl
original plan was to go with a pair of
new water reticulation system. This
separators. Pipeline friction, diameter
DN700 GRP pipes, but these proved
was partly to supply additional water
and length were critical in this section
to be too restrictive and the larger
for the new grow-out production
to ensure even distribution to the six
diameter DN1200 pipes were found
facility Abagold was planning to con-
swirlers. Due to the complex nature
to be the optimum size for capital
struct and also to replace the outdat-
and the restrictive environment of
investment versus life cycle cost
ed existing system. “The new system
the swirler connections, these special
for this application. Due to existing
was designed to filter 20 000 m3/h of
fittings were manufactured on-site. As
infrastructure,
sea water to 60 microns (0.06 mm).
a result of the remote location of the
ideas had to be implemented with
A set of four low head, large volume
site, a local installer was trained by
the installation of this line. Complex
primary pumps, each capable of
Fiberpipe’s personnel and the connec-
bends and very difficult on-site
supplying 5 000 m3/h of raw sea
tions were all inspected and approved
connections had to be made and
water, will supply the filtration unit.
by Fiberpipe upon completion.
Fiberpipe’s on-site personnel did a
several
All 15 suction lines for the sec-
tremendous job. Long sections of the
6 swirl separators, 11 fine mesh drum
ondary pumps were manufactured
line were installed into excavations
filters and a large settlement tank and
off-site. These were a combination of
into bedrock.”
treatment area. A secondary pump
DN600 and DN700 pipes. The second-
set distributes water from this filtra-
ary pumps have GRP discharge lines
and commissioned 825 m of the
tion unit to the production facilities,”
to a point where they connect to the
DN1200 line, and a further 220 m
explains De Wet.
original pipelines.
of the remaining 675 m has been
has,
to-date,
installed
Construction started in 2011 and
The main lines supplying the new
installed. The remaining sections will
the system was commissioned in
grow-out production facility are a
be installed and commissioned in the
December of 2012. The complete
paired set of DN1200 underground
near future.
March/April 2014
ABOVE UV protection being applied to the pipe
innovative
The filtration unit consists of a set of
Abagold
OPPOSITE Aerial view of the site of Abagold in Hermanus
35
feature
South Africa
SUSTAINABLE ENGINEERING SOLUTIONS
Ingérop South Africa is a multi-disciplinary consulting engineering and project management company with more than 120 qualified personnel involved in various projects throughout Africa. As a member of the Ingérop Group of companies - a long established privately-owned French consulting engineering firm currently employing more than 1,500 permanent staff members – we have immediate access to international expertise and technologies enabling us to continuously provide our clients with innovative and appropriate world-class solutions. Established in 1957, Ingérop South Africa has developed strong capabilities to serve both the public and private sector clients in the fields of: infrastructure, public transport, energy, water, environment and socio economic studies. Our range of services include consulting and feasibility studies on any subject relevant to our disciplines, design and construction supervision, as well as commissioning of works on major projects. Corporate Social Investment (CSI) is another key element of the company's business strategy. Our CSI initiatives are aimed at establishing and sustaining positive social development in our surrounding communities. With education being one of our primary CSI focus areas, we continuously concentrate on improving and uplifting previously disadvantaged schools.
Ingerop South Africa supports the MH Joosub Senior Secondary School in Lenasia
Hatfield Station, Pretoria
LJVBPL Raccordement de Laval – West France
Cahorra Bassa Dam, Mozambique
Vidin Calafat Bridge, Bulgaria
Head Office: Block E, Edenburg Terraces, 348 Rivonia Boulevard, Rivonia P.O Box 3867, Rivonia 2128, Tel: (011) 808 3000, Fax: (011) 808 3001, jhb@ingerop.co.za Offices situated in South Africa: Gauteng, Western Cape, Kwa-Zulu Natal & Limpopo Also present in: Botswana, Lesotho, Mauritius, Mozambique and Senegal
Pipes and pipelines
Completion of R4.3 million pipeline project A recent municipal upgrade project in Vosloorus to replace an existing asbestos cement (AC) pipeline installed in the 1980s has been completed.
A
leading veyance
fluid
con-
pipe difficult to cut and splice to un-
of AVK valves in various sizes, includ-
products
and
dertake repair work,” he explains.
ing; 200 mm, 300 mm and 500 mm.
solutions expert successfully completed its role in
Patji reveals that HDPE is non-toxic
The contract was officially com-
supplying
pleted in mid-2013 without any
supplying the pipes and valves to
drinking water, while the lightness of
major challenges encountered. As
potable water upgrade project.
the material makes it an easier and
municipalities across South Africa
Inceldon was contacted in mid-
quicker type of pipeline to install.
continue to invest more capital into
2012 to supply more than 1.4 km
“The lightweight properties of HDPE
pipeline upgrades, Patji is confident
of 560 mm diameter locally manu-
make it easier for workers to carry
of the future outlook for Incledon in
factured high-density polyethylene
and lay. More pipes can be loaded
the civils market.
(HDPE) pipe.
onto a truck, thereby reducing carbon
HDPE was selected as the material
of
replace
safe
for
more impact strength than AC pipes, which substantially reduces the risk of
high impact strength, low friction
cracking and subsequent leaks.”
environmentally
friendly characteristics.
BELOW HDPE was selected as the material of choice to replace the existing AC pipeline
emissions too. HDPE pipes also boast
existing AC pipeline due to its and
to
entirely
the
properties
choice
and
BOTTOM HDPE is non-toxic and entirely safe for supplying drinking water
According to Patji, the SANS 4427 approved pipes, which have a pres-
Robinson Patji, sales representative:
sure rating of 12.5 bar, were delivered
civils, says: “AC pipelines pose some
to the project in 12 m lengths by
potential health concerns for both
Incledon. As part of its comprehensive
workers and end users. These pipes
service offering, Incledon also sourced
are also very brittle and tend to crack
a professional welding contractor on
under stress from trench loads. The
behalf of the municipality, in addition
brittleness also makes this type of
to supplying the project with a range
March/April 2014
37
Pipes and pipelines
Ultraflo mPVC pipes
966 part 2
DPI Plastics’ proprietary Ultraflo mPVC pressure pipes were supplied in standard 6 m lengths to the Kapinga Irrigation Project in Zambia, which was established in mid-2013.
T
PVC-M Pressure Pipe SANS 966-2 –PVC-M (modified poly vinyl chloride) pressure pipe systems for potable water conveyance.
he appointed contractor, Inter-Africa Irrigation, selected the Ultraflo range of pressure pipes for the project due to its high-strength characteristics, notes IAIS manager Craig Rawlinson.
“Inter-Africa Irrigation has been making use of Ultraflo
• Ultraflo PVC-M pressure pipes are available in diameters of 50 to 630mm and pressure ratings of 6 to 25 Bar. • Ultraflo is tough and reliable making it ideal for African conditions. • Ultraflo is also energy efficient and has a low carbon footprint.
mPVC piping at its Zambian irrigation projects, due to the fact that the range boasts higher impact resistance and improved ductility. It also features increased hydraulic capacity and a more reliable performance, when compared to standard PVC piping products,” he states. DPI Plastics exports manager Rajesh Naval states that the Ultraflo mPVC pipes were supplied to the Kapinga project in diameters ranging between 11 mm to 450 mm. “The pipes supplied to the project are manufactured in accordance with SABS 966 specifications, which guarantees an operating pressure of up to 18 MPa. What’s more, its lighter mass ensures that the Ultraflo range is easier and more cost-effective to transport, which is a major benefit in a remote area such as Kapinga.” Rawlinson points out that Inter-Africa Irrigation makes use of predominantly locally sourced staff on its Zambia projects. “We have total of about 70
For a complimentary copy of our latest Product and Technical CD, e-mail marketing@dpiplastics.co.za
Johannesburg : +27 11 345 5600 Cape Town : +27 21 957 5600
Southern African Vinyls Association
local
residents
info@dpiplastics.co.za www.dpiplastics.co.za
Member of the Dawn Group
38
March/April 2014
Pipes and pipelines
ABOVE DPI Plastics export manger Rajesh Naval BELOW LEFT PVC pipe ready for export BELOW DPI Plastics technical & product manager Renier Snyman working on the Kapinga project. Sourcing local staff is important, as it leads to job creation and skills development. This leaves a lasting and meaningful impression on the community, together with the new irrigation system.” According to Rawlinson, the Kapinga project has been running smoothly, with no major challenges encountered to date. “DPI Plastics has proven to be a reliable and trustworthy supplier and that has gone a long way in ensuring that everything remains on schedule. DPI Plastics also boasts a highly competitive cost-to-performance ratio, which is an important aspect in this industry.” Inter-Africa Irrigation specialises in the supply and installation of full scale solutions for drip, micro-jet and centre pivot irrigation projects in Southern Africa. Rawlinson points out that the company has developed a strong market share in Zambia. “Our high-quality workmanship has ensured significant growth in Zambia, an emerging market that holds tremendous promise, due to the high demand for continued infrastructural development.” Looking to the future, Naval is confident that DPI Plastics will continue to gain measurable market share through its Ultraflo range, particularly within the exports market. “There has been a steady increase in demand for mPVC piping, particularly from emerging African economies such as Zambia, the DRC and Mozambique. DPI Plastics has already established a good reputation in these regions and is well positioned to satisfy this rise in demand,” he concludes.
MARCH/April 2014
39
Technical paper
Predicting the pressureIn this abridged article by AM Cassa
relationship between pressure head
and JE van Zyl, presented at the last
and leak area in pipes with longitudi-
by creating different geometric re-
nal, spiral and circumferential cracks.
gions, establishing separate approxi-
WISA conference, we look at the
It was found that there is a linear
mating functions in each region and
relationship in pressure-leakage by
relationship between the crack area
then joining them together to make
and pressure head for all crack types,
a model containing many small inter-
using head-area slopes and leakage
pipe materials and loading condi-
connected sub-regions of elements.
exponents of cracks in pipes.
tions tested. The impact of loading,
The ABAQUS Finite Element soft-
material, section and crack properties
ware was used in this investigation
problems. Finite Elements are used
on the head area slope were also
as well as the software program
ressure has a major
investigated and an attempt make
SolidWorks, where the pipes are
impact
of
to find an expression to describe
modelled according to the dimen-
leakage from leak openings
the head area slope as a function
sions required. The study is based
in pipes and studies have
of these properties. Mathematical
on a 110 mm diameter class 6 uPVC
shown that the leakage exponents
relationships were developed that
pipe with a wall thickness of 3 mm
in networks can be sustainably larger
give reasonable descriptions of the
(see Table 1). The pipes that were
than the theoretical orifice exponent
head area slopes of longitudinal,
modelled in this study assumed office
of 0.5. The most important reason for
spiral and circumferential cracks. With
hydraulics and elastic behaviour of
this behaviour is that leak areas are
these relationships, it will be possible
the pipe material. Ten-noded quad-
not fixed, but increase as a function
to predict the behaviour of different
ratic tetrahedron elements were used
of pressure.
types of leak openings in different
throughout the pipes. Sensitivity
pipes and pipe materials.
analyses were done for each config-
P
on
the
rate
In this study, Finite Element analysis was used to investigate the
The study focused on three types of
uration to determine the optimal el-
cracks – longitudinal,
ement size. Generally the sizes of the
spiral and circumfer-
elements in the region around the
ential – and their be-
cracks were 1 mm and 2 mm for all
haviour under certain
three types of cracks, while the rest of
pressure
the pipe had element sizes of 5 mm.
conditions.
Three separate equa-
The boundary conditions of the
tions were found that
pipe consisted of clamping the pipe
can be used to predict
along an internal line furthest away
the head area slopes of
from the crack, as well as a point
cracks in pipes. These
on the outside of the pipe adjacent
equations
based
to the internal line. The pipes were
on the crack properties
loaded with an internal pressure from
(orientation, length and
the water in the pipe and an applied
width), the pipe mate-
stress at the ends of the pipe to stim-
rial properties and the
ulate the longitudinal stresses within
pipe section properties.
the pipe material.
Finite element analysis
Leak area as a function of pressure
This study first used
The results of this and a previous
finite
to
study2 confirmed that the areas of
analyse the behaviour
leaks expand linearly with pressure,
of longitudinal, spiral
irrespective of the pipe material,
and
circumferential
leak type of loading state. However,
cracks in pipes un-
this is only true under linear elastic
der
The
material behaviour and thus doesn’t
Finite Element Method
necessarily represent the behaviour
is
of all leaks in a distribution system.
elements
pressure. an
numerical
established analysis
The results for 60 mm cracks in lon-
for
gitudinal, circumferential and spiral
obtaining approximate
configuration are shown in Figure 1.
solutions to a wide
This linear relationship has important
variety of engineering
implications for the modelling of
technique
40
are
used
March/April 2014
Technical paper
leakage relationship Variable
Value
Units
600
kPa
Property or dimension
Varied
Pressure head, h (kPa)
0, 100, 200, 300, 400, 500, 600, 700, 800, 900, 1000
3
GPa
Poisson’s ratio, v
0.4
—
Young’s modulus, E (GPa)
3, 10, 30, 90, 200
Poisson’s ratio, v (-)
Longitudinal stress, σl
5.2
MPa
0.17, 0.21, 0.29, 0.4, 0.45, 0.5
mm
Longitudinal stress, σl (MPa) (excluding longitudinal cracks)
Length of pipe, Lpipe
900
0, 1.3, 2.6, 3.9, 5.2
3
mm
Wall thickness, t (mm)
2, 2.5, 3, 4, 5
Internal Diameter, ID
104
mm
Internal Diameter, ID (mm)
20, 30, 40, 50, 80, 104, 150, 200, 250, 300, 350
Length of crack, Lcrack
60
mm
Length of crack, Lcrack (mm)
10, 30, 60, 100, 130, 150
Width of crack, Wcrack
1
mm
Width of crack, Wcrack (mm)
0.1, 0.5, 1, 2
Pressure head, h Material Properties
Geometry pipe Crack geometry
Young’s modulus, E
Wall thickness, t
change. Note that a logarithmic scale
leakage flows. Using this linear rela-
Keeping all the parameters the
tionship, Equation 2, below, is found
same as the base pipe, except the
for describing leakage behaviour
parameter being investigated, and
As can be seen from Figure 2, the
in any system where leaks increase
varying each parameter in turn ac-
crack length has the dominant effect
linearly with pressure.
cording to Table 2, the relationship
of the pressure-area slope for all three
between the head-area slope and
crack types, followed by the wall
2
is used on the y-axis.
each parameter was obtained. It was
thickness, Young’s modulus and inter-
This equation is identical to that
also possible to see which parameter
nal diameter. The relationship for the
proposed by May3 and others, but the
affected the head-area slope the
longitudinal stress is also interesting
interpretation given by Casse et al4 is
most. Figure 2 shows a bar graph
to note that, as the crack is orientated
different. Instead of interpreting leaks
with all the parameters against the
away from the longitudinal direction,
as fixed or variable, the results show
range over which the head sloped m
the longitudinal stresses have more of
TABLE 1 (above left) Dimensions and properties of a class 6 uPVC pipe TABLE 2 Variations in dimensions and properties of the pipe
that all cracks have variable areas and it is only the extent of variation that differs. Based on equation, the behaviour of any given leak with pressure can be modelled if the pressure-area slope m of the leak is known. Thus further work was conducted to determine the effects of the different influencing parameters on m.
Effect of parameters on pressureleakage slope m Understanding what role each influencing parameter plays in the behaviours of the crack in relation to pressure, it is important when trying to predict a mathematical relationship describing this behaviour. Initially, a base pipe was studied with only the pressure being varied to study the basic interaction between pressure and leakage, and pressure and the leak area (see Figure 1). Simulations were then run where each parameter was
FIGURE 1 (left top) relationship between area of crack and the pressure head
varied one at a time to study its effect on the pressure-leakage relationship of the pipe. This study looked at the impact of the parameters have on the
FIGURE 2 Graph showing head-area slope range for each parameter
head-area slope only. Table 2 shows the values of the pipe and leak properties that were used for each of the parameters in the analysis. March/April 2014
41
SU BSC R IB E
SUBSCRIBER CONTACT DETAILS
TRADE & TECHNICAL PUBLICATIONS Z AR
550
Surname
SADC I nt. US $ US $
80
100
Name Designation Company Type of business
Hard copy + Digital
360
40
50
Digital only
Address Code Tel
Fax
Cell
300
60
80
200
30
40
Hard copy + Digital
Digital only
Email VAT Reg. No Order #
PAYMENT OPTIONS EFT Deposit
200
40
60
150
30
40
BANK DETAILS Nedbank Branch code: 128405 Acc. number: 1284129934 Acc. type: current Acc. name: 3S MEDIA
Hard copy + Digital
Please use Ref #
Digital only
MasterCard
550
80
100
360
40
50
Visa
American Express
/
Expiry date Credit Card Number
Hard copy + Digital
Last 3 digits on back of card
Digital only
Debit order — Please contact Accounts on +27 (0)11 233 2600 to arrange
300
60
80
Hard copy + Digital
I have read the terms and conditions below and I agree to abide by them Authorising signature
200
30
40
Date Contact person for payments
Digital only
BUSINESS & CONFERENCING PUBLICATIONS 300
60
80
200
30
40
200
40
60
Hard copy + Digital
Digital only
SACONFERENCE directory
SUBSCRIPTION SALES
NOMSA MASINA
Hard copy + Digital
SINGLE COPY SALE R50 INCL VAT (EXCLUDING SA CONFERENCE)
TERMS & CONDITIONS • All rates include postage and VAT. • Foreign subscriptions include airmail rates. • The subscription will be activated when we receive receipt of payment. • The subscription form can serve as a pro-forma invoice with a tax invoice to follow. • Proof of payment to be sent with signed copy of the subscription form. • Unpaid invoices will be cancelled after 3 months, thus cancelling the subscriptions. • Renewal subscriptions are automatically renewed on payment of invoice and cancelled if not paid within 3 months from date of invoice. • Electronic return of this form is deemed as an authorised purchase. Fax or email proof of payment to activate your subscription.
t+27 (0)11 233 2600 • 086 663 6672 nomsa@3smedia.co.za Subtotal: VAT: Total:
No.4 5th Avenue, Rivonia 2191 PO Box 92026, Norwood 2117
Tel: +27 (0)11 233 2600 Share Call: 086 003 3300 www.3smedia.co.za
MEDIA
Technical paper an effect on the head-area slope m. Once all the relationships for all the parameters were obtained, it was possible to use various data processing techniques to formulate mathematical relationships between the head area slope and the parameters of the pipe and crack. Regression analysis was used on the data to obtain three mathematical models describing the head-area slope m as a function of the parameters of the pipe and crack.
References 1. J M Gere, Mechanics of Materials, 5th ed., pub Brooks/Cole, United States (2001) 2. A M Cassa, J E van Zyl, R F Laubscher, Proc. WISA2006, paper No. 438, (2006) 3. J May, Pressure Dependent Leakage, World Water and Environmental Engineering (October 2004) 4. A M Cassa, J E van Zyl, R F Laubscher, Urban Water Journal, 7(2) p.109 (2010)
The three mathematical models obtained through regression analysis for longitudinal, spiral and circumferential crack respectively are equations 3, 4 and 5 (right), which can be used to predict the head area slope m for any pipe section, material and crack length within the bounds of the regression analysis. The values of m predicted by the equations are compared to the finite element
5. A Chadwick, J Morfett, Hydraulics in Civil and Environmental Engineering, 3rd ed., pub E & FN Spon, London (1999) 6. M Farley, S Trow, Losses in Water Distribution Networks, pub IWA Publishing, London (2003) 7. B Greyvenstein, J E van Zyl, Journal of Water Supply-AQUA, 56(2) p.117, (2007) 8. K H Huebner et al., The Finite Element Method for Engineers, 4th ed., pub. John Wiley & Sons, Inc., New York, (2001)
values in Figure 3 for all three cracks
Conclusion The study showed that regardless of the orientation of the crack, it was possible to express the leak area with a linear equation and then use it to propose a better description for leakage through an orifice. It also investigated the parameters that play a role in the behaviour of cracks in pipes
3 4
5
under pressure. Longitudinal, spiral and circumferential cracks were analysed. The work shows that the individual properties of the pipe and the geometry of the crack play a more significant role in the area of the crack than previously thought. Regression analysis was used to obtain three mathematical models to predict the head area slope m as a function of the parameters of the pipe and the crack. These equations were only tested for a limited range of parameters used in finite element models and are limited to linear elastic behaviour. These expressions can then be related back to the proposed leakage equation to get three new equations for leakage each for a different crack type.
FIGURE 3 Comparison of Equation 4 prediction of m to the finite element results for all three crack types
43
March/April 2014
5281
mining fire protection municipal water conservation food & beverage
Tanks
TM
A premium product made by SBS Water Systems (Pty) Ltd
Contact us today for professional service:
+27(0)860 482 657 info@sbstanks.co.za Search: SBS Tanks
TM
Industry Leaders in Water Storage Solu�ons Individual tanks up to 3.3 megalitres Fully cer��ed by professional engineers Rapid onsite construc�on Low maintenance Ready for opera�onal use upon commissioning Installa�on done at safe working heights Tank content not in direct contact with tank walls Freespan dome roof with no internal columns Cost effec�ve Tried & trusted for more than 14 years Level two BBBEE contributor & proud members of:
www.sbstanks.co.za Thabeni Village ‐ Eastern Cape 63kl SBS Tank Installed TM
Wastewater
Cost-effective capacity upgrade Maryke Foulds speaks to Headstream’s commercial director Julian Moore.
H
eadstream
recently
has
treatment performance to enable it to
In simple terms, the HYBACS process
commissioned
meet nutrient discharge standards,”
is a hybrid BNR activated sludge pro-
explains Moore.
cess where a fixed biomass process
its third plant in South a
“This is very exciting as it demon-
is combined with a conventional
HYBACS retrofit to upgrade the
strates that the HYBACS process is
suspended biomass activated sludge
Hartbeesfontein WWTW.
ideally suited for upgrading con-
process followed by conventional
“While we are extremely proud
ventional activated sludge plants
secondary settlement via a clarifier.
of our first two plants, these were
to increase treatment capacity and
It thus lends itself as an ideal retrofit
greenfield new builds and not an
improve
technology for the widely used con-
upgrade to an existing plant. The
existing treatment infrastructure is
Hartbeesfontein project is the up-
extremely important in South Africa
The fixed biomass reactor, which
grade of an existing plant to double
and it is in this scenario that HYBACS
is called a SMART unit and is unique
treatment capacity from 4 Mℓ/d
is significantly more competitive than
to the HYBACS process, contains a
to 8 Mℓ/d while also improving
alternative technologies.”
very high concentration of attached
Africa,
which
is
44
performance.
Upgrading
ventional activated sludge process.
March/April 2014
Cost Effective Upgrade to Increase Treatment Capacity, Improve Performance and Reduce Energy Consumption Hartbeesfontein WWTW - Upgrade from 4Mℓ/d to 8Mℓ/d
2 recent HYBACS upgrades demonstrate its cost effectiveness and ease of implementation: Hartbeesfontein WWTW: HYBACS upgrade to provide BNR and increase in treatment capacity from 4Mℓ/d to 8Mℓ/d: • 100% increase in treatment capacity • 8 SMART units installed • No Civil Works to increase aeration tank volume • 40% saving in kWh per Mℓ/d (installed power)
Tubli WWTW - Upgrade from 40Mℓ/d to 100Mℓ/d
Tubli WWTW (Bahrain): HYBACS upgrade to increase treatment capacity from 40Mℓ/d to 100Mℓ/d: • 150% increase in treatment capacity • 42 SMART units installed • No Civil Works to increase aeration tank volume • 40% saving in kWh per Mℓ/d • R3,6 million cost per Mℓ/d increase • ��cellent �f�luent �uality: • <0,3mg/ℓ Ammonia • <10mg/ℓ TN • <30mg/ℓ COD • <15mg/ℓ TSS HYBACS is supplied in South Africa by Headstream Water Holdings (Pty) Ltd www.headstreamwater.co.za info@headstreamwater.co.za t 011 886 7805
water solutions
Wastewater biomass and also delivers an oxygen
which we estimate to be up to 40%
of the HYBACS upgrade section of
transfer
higher
when compared to a conventional
the plant is 40% lower per megalitre
than that achieved in the suspended
8 Mℓ/d plant, will significantly reduce
treated than the rest of the plant and
biomass
the ongoing electricity costs for the
one can really appreciate the overall
municipality.”
life cycle cost savings delivered,”
rate
significantly
reactors.
Therefore
the
SMART units are able to remove a high portion of the incoming COD
The plant is currently in its initial
in a very efficient manner, which
commissioning phase with the first six
when combined with the existing
SMART units already installed and op-
since
suspended biomass activated sludge
erational. The remaining two SMART
exceptional, despite the plant receiv-
reactors enables the plant to deal with
units will be installed in a second
ing a higher influent loading than
a significantly increased load.
phase in the coming months to take
designed for, with the effluent quality
the treatment capacity to 8 Mℓ/d.
consistently exceeding the effluent
“The HYBACS process was initially
explains Moore. Results at the HYBACS Tubli WWTW commissioning
have
been
completed
standard set: <0.3 mg/ℓ per litre of
to address the key challenges they
upgrade project is the upgrade of
ammonia; <10 mg/ℓ TN; <30 mg/ℓ
faced due to rapid urbanisation
the Tubli WWTW in the Kingdom of
COD; and <15 mg/ℓ TSS. In addition,
and industrial development around
Bahrain completed by Bluewater Bio,
results show a significant improve-
existing plant sites. Thus a significant
the owners of the HYBACS technolo-
ment in sludge settleability with
increase in treatment capacity and
gy. This HYBACS upgrade comprises
sludge from the HYBACS upgraded
an improvement in effluent quality
the conversion of two of the existing
portion of the plant flocculating rap-
developed in South Korea in order
Another
recently
The SMART units at Hartbeesfontein WWTW
were needed, but there was no space in which to expand plants. The key drivers for the development of the HYBACS process was that it needed to retrofit onto existing activated sludge plants and it needed to be able to significantly increase treatment capacity and improve effluent quality within the current plant footprint,” explains Moore. “Additional drivers were cost effectiveness, energy efficiency and the removal of odour, particularly important given that high-density accommodation surrounded many of the plant sites in the cities.” The Hartbeesfontein upgrade was urgently required due to the increased flow into the existing plant combined with the higher loading on the plant from a local abattoir. The upgrade to double treatment capacity to 8 Mℓ/d is
10 aeration lanes and four of the ex-
idly and settling 40 times faster than
being achieved with a HYBACS design
isting 12 clarifiers into a HYBACS plant
the rest of the plant while operating
that involves the installation of eight
by installing 42 SMART units upstream
at a MLSS 3822 mg/ℓ and achieving
SMART units upstream of the existing
of the aeration lanes. The upgraded
a SVI 42.9 mℓ/g. “This is a very signifi-
suspended biomass activated sludge
HYBACS plant treats 100 Mℓ/d mean-
cant development for us as it demon-
reactors. Additional modifications to
ing that the two aeration lanes, origi-
strates the excellent performance
the plant infrastructure include:
nally designed for 40 Mℓ/d, now have
of HYBACS on a large scale as the
• the
a 150% uplift in capacity.
Tubli WWTW is a large plant treating
conversion
of
the
primary anaerobic
“No additional civil construction was
100 Mℓ/day. The next phase planned
biological
required to increase the volume of the
is to upgrade the next 40 Mℓ/day of
aeration lanes and the entire upgrade
the conventional plant to 100 Mℓ/d so
• increasing oxygenation capacity in
was achieved within the current plant
that the total HYBACS portion of the
the aerobic reactor with an fine bub-
footprint. The cost of the upgrade was
plant is expanded to 200Mℓ/day.
ble diffused air (FBDA) system
US$20 million (R220 million) of in-
“We are confident that when pro-
• the construction of a new clarifier.
vestment for an increase in treatment
fessionals in the industry see these re-
“As no increase in the volume of the
capacity of 60 Mℓ/day. That equates
sults and the cost efficiencies that are
aeration reactor was required, the
to just over R3.6 million per addi-
achievable then they will be willing to
HYBACS process provided a signifi-
tional Mℓ/day of treatment capacity
embrace an innovative solution and
cant saving for the municipality with
which demonstrates the exceptional
recommend the HYBACS process to
respect to reduced civil construction
cost effectiveness of HYBACS in an
their clients, particularly in an upgrade
costs. In addition, the energy savings
upgrade scenario. Add to that the
scenario, so they can save their clients
that the HYBACS process will deliver,
fact that the electricity consumption
both capex and opex costs.”
settling tanks
tanks for
to
enhanced
phosphate removal
March/April 2014
45
Wastewater
Wastewater treatment technology of the future ”When chemicals are used to treat water, one is actually adding secondary pollution to the water. In other words by solving one problem, you are creating another one,” says Palmach Zeevy of P2W.
P
ollution
Water
and how the P2W technology deals
includes the heavy metals, pH and
(P2W) was established in
to
with such challenges: “What we have
conductivity in the water. Simply
2005 and has a number
found to be constant challenges are
put, P2W makes use of reactors,
of
sites
that the levels of sulphates often
which remove the sulphates in the
in Europe and Israel. In Africa, the
vary, the pH is not steady and that
water without the need for the use
company currently has four projects
the
of any membranes.
at mines that it operates, at sizes
changes in the contamination of
Zeevy explains that most process-
of 12 to 14 Mℓ/day, treating every
heavy metals. The need for lime
es today used to treat AMD con-
possible contaminate in one system.
in the process also creates large
sume large amounts of lime, which
“All the possible contaminates that
volumes of sludge. All of these as-
results in large amounts of sludge
are found in wastewater are being
pects are eliminated and dealt with
at the end of the process. This
treated in one online process. The
through our technology offering,”
process is known as the high-den-
unique thing about P2W is that our
says Zeevy.
sity
commissioned
cannot
tolerate
sludge
(HDS)
pre-treatment
technology is capable of handling
One of the first challenges is the
phase. It is a two-stage treatment
anything from cyanide to heavy met-
large volumes of contaminated wa-
process, which requires lime and
als and sulphates at the same time.
ter. The system offered by P2W has
makes use of membranes. The P2W
This is all done without membranes
absolutely no limitations in terms of
treatment process doesn’t make
and without chemicals,” says Zeevy,
the size of the system that can be
use of any lime, but rather uses a
who is executive chairman and
used for these volumes.
one-step online process, skipping
founder of P2W.
BELOW The site of P2W's plant at Golden Star Resources in Ghana
membranes
In South Africa, the most com-
the HDS stage. Zeevy reiterates
The company has mastered the
monly used systems make use of
that using lime and chemicals is
challenges of acid mine drainage
membranes. Overall, the membranes
not only costly, but adds secondary
(AMD) through its state-of-the-art
are vulnerable and subject to the
pollution to the water. The P2W
technology. Zeevy explains the main
harsh
strong
process eliminates chemicals, which
challenges in the treatment of AMD
pre-treatment
which
is a far more sustainable approach.
conditions
of
the
process,
Zeevy says: “Our vision and mission is to save lives and the environment each and every day with our treatment technology”. In addition, the P2W process requires very little maintenance and is monitored and controlled online. In terms of challenges such as energy efficiency, P2W requires just 1 kW/h for 1 000 ℓ of polluted water. South Africa has its own unique challenges with AMD. P2W became involved in providing a solution to these challenges when the company was approached at a leading event in Cape Town two years ago. “P2W was approached by government officials at Mining Indaba who asked about our technology being modified specifically for treating AMD in
46
March/April 2014
Wastewater South Africa. They had heard about
America and Canada that have been
the gold and coal mining sectors
the performance of our technology
specifically set-up to treat cyanide
where it is responsible for several
at several sites in Ghana and were
and sulphates. The biggest break-
state-of-the-art patented solutions
asking whether we could adopt the
through is P2W’s latest development
for the full destruction of cyanide
same technology for AMD.”
in treating slurry directly from the
and sulphates reduction. Based on
In 2012, P2W launched a pilot
mine. The end product results in
its core technology, the company
plant for the treatment of sulphates
decontaminated ore and water of
develops, markets, sells and installs
in mine water in Randfontein. This
such a quality that will allow the
the most efficient, cost-effective and
successfully demonstrated the tech-
mine to discharge it for reuse back
environmentally friendly wastewater
nology’s ability to treat sulphates
into production. Zeevy closes by
treatment systems for heavy metal
in AMD water without the need
stating that the next generation
removal, including arsenic, copper,
for chemicals or for the traditional
of systems and technologies to be
cadmium, lead, nickel, manganese,
reverse osmosis membrane method-
introduced into the market globally
cobalt, etc.
ology. The technology has matured
by P2W are innovative compared to
significantly since then and today
the current treatment methods that
AMD with contaminated levels of
are available worldwide.
BELOW Palmach Zeevy and team on-site at AngloGold Ashanti Obuasi
4 000 to 4 800 ppm can be treated to 250 ppm and below without any
About P2W
lime or other pre-treatment. The
P2W is a privately owned clean-
technology has raised the attention
technology
of both the government and the
research
private sector to provide solutions
engineering
for AMD challenges.
offices located in Ghana and the
company and and
with
its
development, administrative
P2W has invested extensively in
US. P2W also has branches in
research and development. Zeevy
Lima, Peru, and São Paulo, Brazil.
says the company currently has
P2W provides advanced industrial
five pilot plants operating in Latin
wastewater treatment systems to
47
March/April 2014
METERING
CLEAN POWER
LARGE POWER USERS
WATER
INVESTMENT & FINANCE
TECHNOLOGY | KNOWLEDGE | INTERACTION Find cost-effective solutions to water and wastewater treatment, non-revenue water and metering
13 – 14 May 2014, Cape Town, South Africa Focus days: 12 May 2014 | Site visits: 15 May 2014
14TH ANNUAL
Co-located
Activate your FREE expo pass online and get access to CPD accredited technical workshops. www.african-utility-week.com | www.clean-power-africa.com
African Utility Week
Host Utility
Exclusive for 5 years: 2014 - 2018
T&D / SMART GRIDS
GENERATION
Wastewater
Energy savings at WWTW EFTEC is a supplier and manufacturer of fine bubble aeration systems, diffuser systems, stainless steel air manifolds, air compressors or blowers and complete aeration process control systems. By Maryke Foulds
H BELOW Fine bubble aeration is fast gaining momentum in South Africa
48
ennie
Basson,
MD
“There are a number of benefits
and the membrane of different mix
of EFTEC, to discuss the
to using the system – the biggest
of EPDM. New developments in
range of products and
of course is an energy saving of
membrane technology have resulted
services on offer, with a
up to 50%, depending on the size
in EPDM membranes coated in a
specific emphasis on its fine bubble
and design of plant. The single
twin layer of PTFE that improves
aeration system which is gaining in
largest user of energy in a WWTW
resistance on diffusor creep (stretch)
popularity throughout South Africa.
is the biological process and this is
as well as the resistance for bio-
It is his view that while this is not a
where the energy saving will occur,”
logical growth on the membrane
new technology, improved materials
says Basson.
itself. PTFE membrane will also keep
have enhanced its efficiency to such
This is in part due to the use of im-
its original form four times longer
a degree that it is now the preferred
proved materials. “Most fine bubble
than normal EPDM. The materials
aeration
aeration systems are manufactured
are also available for tube diffuse
with polypropylene base material
aeration systems.”
system
North America.
in
Europe
and
March/April 2014
Wastewater In the aeration system, which includes the air manifolds, particular caution must be taken in the design of the air manifold system – airflow velocities in any section of pipework should not exceed a flow velocity of 40 m/second in order to limit the friction and heat generation of the air. Another factor to consider is the removal of condensate from the aer-
Instrumentation is crucial for the control of a WWTW, especially when utilising fine bubble aeration
ation system mounted on the floor. A build-up of condensate can result in tearing of the membrane due to the water being pressed through the membrane. Condensate forms at high humidity together with a high
temperature
generated
by
compressors. Due to the high pres-
loss of efficiency and capacity of the
is based on the principle of most
sure increase, moisture will condense
plant. Engineers need to clarify in ad-
open valve algorithms. In laymen’s
as soon as the air cools off at basin
vance what the actual requirement
terms that means the more open
water temperature.
is and specify a standard that all
the valve, the lower the friction – the
suppliers can comply with in terms
lower pressure the blower puts out,
Instrumentation
of the performance and output of
the lower the energy cost without
Instrumentation is crucial for the
compressor blowers.
compromising
the
efficiency
ABOVE EFTEC are exclusive distributors of fine bubble aeration technology
of
control of a WWTW, especially when
Care must also be taken that
utilising fine bubble aeration. You
compressor/blowers must be witness
can only control what you can meas-
tested with an actual job motor. In
that
ure – for each aeration system you
other words, it must be tested with
above, as well as the control system
would need at least one V-Port knife
the motor that will be installed on-
of the blowers, combines all of these
gate valve with a modulating actua-
site. Witness testing must also be
to control the system 24 hours a day,
tor, a mass flow air meter and an LDO
in compliance with ISO 5389. The
seven days a week. It also facilitates
oxygen dissolved oxygen meter.
reason for selecting a specific test
off-site monitoring. Water treatment
the system. The basic control system requires the
instruments
described
These units work in conjunction
norm is that all suppliers for a specific
companies can now monitor the per-
to control the biological air demand
project must comply with the norm
formance of various plants off-site
and will satisfy the demand by sup-
resulting in the client getting the
at the click of a button. It also assists
plying sufficient air volume with the
best value for his money.
the equipment supplier in monitoring the maintenance requirements
correct oxygen mass required. The use of these types of instruments
Equipment
will track the oxygen demand closely
The
24 hours a day. At no point will
includes the small compact units
under-aeration or over-aeration take
from 37 kW to 400 KW and fully
place, resulting in energy saving.
engineered units from 90 kW up
Siemens
and gives preventative maintenance compressor
range
instructions to the end user.
to 3.3 MW and with capacity up
EFTEC products and services As
the
distributor
to 123 000 m3/hour. All Siemens of
machines has got dual point control
International
– the control of the output pressure
(SSI) Aeration Systems from the US,
independently from the output flow
leading diffuser manufacturers in the
rate by means of either inlet guide
world, EFTEC also has agreements
veins or frequency inverters for the
with Siemens Turbo Equipment from
pressure and outlet diffuser veins
Germany for the municipal market
for flow control. This is applicable
for sub-Saharan Africa.
for direct drive units (high-speed
Stamford
exclusive Scientific
When specifying or purchasing
machines with air foil or magnetic
compressors or blowers, specific care
bearings) or constant speed blowers
must be taken in the terminology
without variable speed drives.
used to specify the airflow. The vast specification differences can result
Process control
in electrical motor size differences of
EFTEC utilised the Siemens air bio
up to two frame sizes. It is misleading
control system for biological aer-
and the end user will pay for the
ation process control. The system
t (0)12 803 5486
Main projects • Recent installations include the water recovery growth project for Sasol Secunda where four Siemens KA10 compressors plus two control systems were installed. • The supply of nine 600 kW fully engineered compressors delivering 24 600 normal m3/h each for supply to the city of Tshwane for the Rooiwal WWTW plus three air control systems. The contractor on this project was WEC Projects. • Aeration systems were installed at the following plants. Bushkoppies WWTW for Johannesburg Water and a refurbishment a 4 x 65 Mℓ/per day plant. The main contractor was Eigenbau. • Robertson WWTW – aeration system and compressors, main contractor was Lectratek Water. • Standerton WWTW – 2 aeration systems, main contractor was Eigenbau. • Refurbishment of the Zeekoegat WWTW 40 Mℓ/per day, main contractor Lectratek. • Various projects are also pending finalisation.
March/April 2014
49
Wastewater
Pressure filters for wastewater treatment Water Purification Chemicals & Plant (WPCP), a multidisciplinary water treatment specialist, manufactures a range of pressure filters designed for the removal of suspended solids and other impurities from water and wastewater.
W
50
PCP’s single and
managing director. “These pressure
WPCP DW 6 pressure filters are
dual media pressure
filters efficiently remove materials
available in standard sizes, with
filters are used for the
like iron, manganese, colloids and
diameters between 700 mm and
removal of colour and
other precipitates in ground or sur-
2.7 m. Other configurations and siz-
suspended solids to ensure water is
face water. Even at fairly high filtra-
es can be custom designed to meet
efficiently purified for human con-
tion rates – more than 10 m/h – our
specific
sumption, generally down to a tur-
pressure filters ensure water purifi-
water quality and footprint speci-
bidity level of less than 0.5 NTU, or
cation meets the stringent require-
fications, as well as backwash and
for effluent disposal with suspended
ments of SANS 241 Class 0, or any
flow requirements.
solids removal down to less than
suspended solids specification for
0.1 ppm,” says Martin Overy, WPCP’s
waste and industrial applications.”
March/April 2014
requirements,
including
These pressure filters are available with a manual or automatic
Wastewater
WPCP filter beds are designed for a high solids holding capacity, which results in extended filter service life and reduced backwash requirements
the
polyurethane material of up to
These pressure filters are enhanced
incoming flocculated and settled
1 500 micron. The dirt load capacity
by air blowers, piping and valves, as
raw water is pumped or gravity fed
of these filters ranges from 3 to 6 kg
well as a full set of instrumentation.
over the filtration media, where the
suspended solids per cubic metre of
The latest filtration systems are op-
science of filtration takes place.
filtration media.
erated using a Programmable Logic
operating
principle,
where
The general assumption is that
The backwash system or regime
Controller (PLC) and SCADA system for optimum efficiency.
are
usually consists of air, then air
trapped in the space between the
and water, then water only, with
The appropriate size of filters
media – usually sand. What actually
a final water backwash rate of 25
recommended for each application
happens is the smaller dirt particles
to 30 m/h. The pressure filter se-
depends on the flow rate and
are attracted to the larger sand
lected for each specific application
water/wastewater conditions. WPCP
particles by Van der Wahl’s forces,
determines the underdrain or filter
offers a technical advisory service to
resulting in very clear water, down
nozzles design.
ensure the installation of the appro-
dirt
and
suspended
solids
to less than 0.5 NTU, if operated and
for a high solids holding capac-
backwashed properly. WPCP’s have
a
pressure maximum
WPCP filter beds are designed
filters,
which
pressure
of
400 kPa, are manufactured from
ity, filter
which
results
service
life
priate filtration system. The company has made a sig-
in
extended
nificant investment in the latest
and
reduced
equipment and ongoing research to
backwash requirements.
WPCP manufactures a range of single and dual media pressure filters, designed for industrial and municipal water treatment
ensure optimum efficiency and the
robust materials, including glass
Single media filtration systems
reinforced plastic (GRP) and steel.
generally have a layer of 0.95 mm
total hygiene of every installation.
To ensure resistance to corrosion,
silica sand (800 to 1 000 mm bed
services
the internal lining consists of a
depth) or dual media systems, with
chemical aspects of drinking water
twin pack of solvent-free epoxy
a top layer of Hydroanthrazit (300 to
treatment, the latest filtration tech-
product, of 300 to 400 micron.
400 mm) and a bottom layer of silica
nologies and the design of major
The external coating is a twin pack
sand (600 or 800 mm).
water purification plants.
The company offers a range of
March/April 2014
that
encompasses
the
51
3847 Wetpaint Advertising
Wastewater
Corrosion resistance When wastewater travels through sewer lines, it can become anaerobic or septic (the dissolved oxygen can become depleted) as a result of the metabolic processes of microbes commonly found in the wastewater.
U
nder
anaerobic
conditions,
specific
sulphate-reducing bacteria thrive and generate hydrogen sulphide (H2S) as a byproduct of
their respiration.
H2S has a low solubility in wastewater and when it escapes
from the wastewater and moves into the air, it is easily
recognised by its characteristic offensive, rotten egg odour. It can also be responsible for severe corrosion problems and toxic conditions within wastewater conveyance and treatment facilities.
Rainwater Harvesting Systems that last for more than a lifetime
“Andrew Mentis has developed a range of corrosion- resistant floor grating and handrailing in galvanised, 304 stainless steel and 3CR12 options, which are ideally suited to the extreme conditions found in wastewater treatment plants. All products in these ranges are designed and
The world is changing around us everyday. Technological advances demand ongoing upgrades and solutions, but not ROCLA Rainwater Harvesting Systems. Because superb design and leading-edge manufacturing processes ensure that ROCLA provides the truly permanent rainwater harvesting solution. ROCLA’s Rainwater Harvesting Systems offer an unmatched water capture and re-use solution, which greatly reduces dependence on municipal potable water. With the looming water crises, ROCLA’s revolutionary ecoRain™ system offers a sustainable and cost saving water-supply solution to Southern Africa. ROCLA Rainwater Harvesting Systems are ready for the future. ROCLA is ISO 9001:2008 certified and has the SABS mark of approval on all applicable products.
ROCLA
OUR DIFFERENCE IS CONCRETE
Contact ROCLA now on Tel: (011) 670-7600 or Fax: 086 675 8985 Web: www.roclaproducts.co.za
52
March/April 2014
Wastewater engineered
to
suit
situations
where the strength to weight ratio is important, such as wastewater treatment plants,” points out Elaine van Rooyen, marketing manager of Andrew Mentis. “The water and wastewater industry encompasses the mechanical and chemical processes used to remove pollutants from wastewater, for reuse in the environment. These processes can create a slippery environment
for
operators
and
technicians, with vapours, water and chemicals creating slick underfoot and handhold conditions near large machinery and tanks,” Van Rooyen explains. An emphasis on safety underpins the development of all Andrew Mentis floor grating and handrailing products. “Weakened handrailings and floor gratings, caused by corrosion and damp, can result in slips, trips or falls. In addition, due to the fact that broken handrailing or floor grating needs to be replaced, downtime is incurred, which negatively impacts on productivity,” Van Rooyen says. Galvanising or using stainless steel in a wastewater treatment plant is not only a safe and cost-effective option, but it does not compromise the aesthetics of the environment. Andrew Mentis’ Rectagrid RS40 floor
grating
is
manufactured
using a pressure locking system pioneered by the company. The locking
characteristics
guarantee
the structural integrity of the product and further enhance its integrity in a corrosive environment. “The transversals on the floor grating are positively and permanently locked to the bearer bars
corrosion-resistant benefits. These
and the locking method at the
handrails are not only functional,
diameter by 2.5 mm wall thickness
intersections is designed to use the
but also resilient and durable,” says
specifications, and are also available
full depth of the bearer bar when
Van Rooyen.
in 3CR12, 304 and 316 stainless steel
The
stanchions
are
42.9 mm
calculating loads. This attention to
The tubular handrailing system
detail ensures that the load bearing
is complemented by a range of
capacity is top of mind when design
standard angles and matching ac-
handrailing were selected for the
and manufacturing is undertaken,”
cessories, with different bends and
Zeekoegat wastewater treatment
according to Van Rooyen.
end closers adding to the versatility
plant and other treatment plants
steel
of the product. “Enhanced customer
in the industry. We believe that
tubular handrailing is reputed for its
service was a driving factor, with
each application deserves individ-
corrosion and stain resistance qual-
the stanchions and bends forming
ualised attention and as such we
ities. “We have designed the stan-
part of a system of interlinking
customise products to meet specific
chion base plates to allow moisture
components that can be installed
application
to drain from the stanchion itself,
without the need for special tools,”
specified client timeframes,” Van
thus adding further credence to its
Van Rooyen comments.
Rooyen concludes.
Andrew
Mentis’
stainless
polished to a satin finish. “Both
March/April 2014
Rectagrid
and
requirements,
Mentis
OPPOSITE The transversals on the floor are permanently and positively locked to bearer bars ABOVE Tubular handrails are complemented by a range of standard angles and matching accessories
within
53
bidim
R
Wastewater
ACH flocculants ideal for use in WWTWs Water Purification Chemical and Plant (WCP) manufactures a range of flocculants at the company’s KwaZulu-Natal facility, which is highly efficient in potable water and wastewater treatment.
T
he WPCP range of FLOCC
and the use of a streaming current
flocculants is used for the
ion analyser. The dosage rates and
removal of suspended solids
methods
and colour from raw river
applications. These flocculants are
depend
on
individual
and dam water and also for sludge
available in 30 kg or 240 kg return-
dewatering in waste water treat-
able plastic drums and in 1 t mini
ment,” says Martin Overy, managing
bulk containers.
ACH is used as a primary flocculant in the WPCP FLOCC range and as the key ingredient in flocculant blends
director of WPCP, a multidisciplinary
WPCP also has a full analytical
The company’s range of services
water treatment specialist. “ACH
service from its in-house laboratories.
encompasses the chemical aspects
flocculants, with low iron grade, are
Various forms of disinfection include
of drinking water treatment, the
also suitable for the paper industry
bromine/chlorine
‘Bromochlor’
latest filtration technologies and
and in the pharmaceutical sector for
tablets via a tablet feeder, ozonation
the design of major water purifica-
antiperspirant manufacture.
and hydrogen peroxide.
tion plants.
WPCP manufactures a range of flocculants at the company’s KwaZuluNatal facility
“The advantage of manufacturing at
these the
facility
flocculants company’s
in
in-house production
Hammarsdale
is
that
WPCP has complete control over quality stringent al
standards, local
according
and
specifications.
to
internation-
This
includes
approval from the South African Department of National Health and Population Development.” Aluminium Chlorhydrate (ACH) is used as a primary flocculant in the WPCP FLOCC range and as the key ingredient in flocculant blends. These user-friendly liquids, which are effective over a wide range of turbidities, eliminate the need for alum- or ferric-based coagulants and significantly reduce the consumption of alkali aids. The
company
manufactures
approximately 200 t of ACH per month. The company supports this production with a technical advisory and support service throughout the country. Technical experts advise users on dosing, dosing equipment March/April 2014
55
24/7
24/7
1980
Zest Electric Motors established in Jhb
1961
WEG established in Brazil
n
Durban branch opens
1991
Cape Town branch opens
1994
Richards Bay branch opens
1997
We push boundaries to deliver n We listen to our customers n We focus on all our customers, big and small
THROUGH OUR PEOPLE
Trichardt branch opens
1998
who care Access to 26 000 people worldwide who care
Angola Botswana DRC Ghana Kenya Mozambique Namibia
Nigeria South Africa Tanzania Uganda Zambia Zimbabwe
|
www.zest.co.za
Rustenburg branch opens
2002
Middelburg branch opens
Port Elizabeth branch opens
To find out more scan the code or visit: zest.co.za/sustainability
2007
2002
To find out more scan the code 00 ZEST (9378) | www.zest.co.za or0861 visit: zest.co.za/sustainability
Zest acquires IMS Cape
2007
Zest acquires Shaw Controls (est 1986)
2007
BLUE IS THE NEW GREEN
+27 11 723 6000
0861 00 ZEST (9378)
www.zest.co.za
BLUE IS THE NEW GREEN
CUSTOMER FOCUSSED
INTEGRATED SOLUTIONS
AFRICAN MULTI-NATIONAL
9
Power Generation & Energy Solutions Substations & Electrical Infrastructure n Mobile Power Solutions
Electrical, Instrumentation & Control Engineering n Installation
ENERGY
Zest acquires EnI Electrical (est 1984)
2008
Zest acquires Zest Energy (est 2008)
2009
Zest Electric Ghana opens
2010
2013 WEG acquires Zest WEG Group Zest WEG Group acquires Hawker Siddeley Transformers (est 1956)
2010
Manufacturing facilities on 4 continents n 55 000 motors produced per day n 3rd largest electrical manufacturer worldwide n WEG products distributed in over 185 countries n 2.5% of WEG’s annual net income spent on R&D n
n
n
EnI Electrical
n
n
Mini Substations Transformers n Switchgear
WEG Transformers Africa
n
n
Packaged Switchgear Motor Control Centres n E-Housing n Containerised Substations
Shaw Controls
n
n
ZEST Energy
n
n
Electric Motors Variable Speed Drives n Soft Starters n Transformers n Switchgear n Diesel Generator Sets
ZEST Electric Motors
2020 And beyond
PRESENCE IN AFRICA BLUE IS THE NEWMARKET GREENOFFERING
WHY TECHNICAL SUPPORT
750 people across Africa
TECHNICAL SUPPORT
PASSION
n
24/7 technical back-up n Fully qualified technicians n 5 Fully equipped training centres across Africa n 187 site visits into Africa per year
WHERE YOU NEED IT, WHEN YOU NEED IT
SUPPORT
Coralynne & Associates +27 (011) 422 1949
ZEST indentity. Derivative of the proportions of the logo, it is based on a proportion of width and height of 2-to3. The distance between the GRID elements is 1/3 of the height of an element.
Coralynne & Associates +27 (011) 422 1949
Wastewater
Turnkey wastewater solutions at Degrémont The volume of wastewater continues to increase as a result of changing demographics, economic development and urban spread.
U
rban
wastewater
detergents and so on). Greendaf is a
Sludge treatment
treatment is a techno-
compact package system to remove
To define and select an optimal
logical
economic
phosphorous in case of strict dis-
sludge
challenge; the goal is to
charge regulations. This technology
information is needed: the sludge
preserve biodiversity and protect
is easy to operate, quick to start and
composition in relation to its origin
water resources while ensuring the
functions with little need for reagents.
and the final destination of treated
and
well-being of local populations. To support local authorities with
Combined of
treatment
combining
several
sewage sludge (recycling, recovery, and destruction).
called
The steady growth in the volume of
treatment systems of varying com-
membrane bioreactors. These biore-
sludge generated by water treatment,
plexity based on the quality of the ef-
actors incorporate activated-sludge
linked both to demographic change
fluent to be treated and the sensitivity
biological
as
and the increasing urban sprawl, leads
of the medium.
ultrafiltration-membrane clarification
to increasingly tighter constraints for
typically
to produce effluent that can be dis-
the municipalities. The treatment of
requires several treatment stages,
charged into sensitive areas or reused.
sludge in order to reduce its volume
including pre-treatment; primary, sec-
Ultrafor Package System is a range of
and transform it into a recoverable
ondary and tertiary treatment; odour
MBR standard solutions for the treat-
product is now a necessity.
removal and sludge treatment.
ment of urban and industrial
treatment
units
following
stages
purification
package
treatment
the
urban growth, Degrémont designs
Wastewater
in
consists
treatment,
as
well
wastewater, available in skid
Treatment
form for a smaller footprint
Pre-treatment protects raw water re-
and greater ease of use.
covery, removing anything that could
Depending on the con-
hamper subsequent treatment pro-
centration of the sludge in
cesses. This could include screening,
the tank and the envisaged
straining grit and grit removal treat-
treatment capacity, several
ment. Primary treatment of waste-
solutions may be introduced.
water removes solid contaminants
Odorous
gas
from urban and industrial
(BOD),
demand
wastewater treatment plants
(COD) and suspended solids (SS).
oxygen
must be controlled by cap-
In some cases, this thickens sludge.
turing gases as soon as they
Depending on the quality of the water
are emitted and by covering
to be purified, various primary and
emission areas.
BOTTOM Ultrafor Package System
Polymer injection
Coagulant injection
emissions
such as biochemical oxygen demand chemical
Influent water
BELOW Greendaf TW
GreendafTM TW belongs to the rapid air-flotation systems range and is specially designed for the clarification of cleared water. This process is for facilities with a maximum flow rate of 10 000 m3/h.
secondary settling units may be used, such as the Densadeg primary lamellar settling tank. Secondary treatment is the biological treatment of water using a wide variety of microorganisms, primarily bacteria. These microorganisms convert biodegradable organic matter contained in wastewater into simple substances and additional biomass. The goal of tertiary treatment is to remove unwanted elements such as SS, COD, phosphorus and specific compounds
(pesticides,
metals, March/April 2014
57
Geared Motors \ Drive Electronics \ Drive Automation \ Industrial Gears \ Services
1THREAD_4571_WAT
We drive the water industry
SEW-EURODRIVE, a BEE company, leaders in the field of geared motors are now able to supply an Industrial Gear Unit that offers more efficiency for mixing and agitating applications with their MC range of Extended Bearing Distance (EBD) Industrial Gear Units. In process plants, large axial and radial forces occur at the agitator shaft during agitating processes. Traditional designs solve this problem with separate, external bearings that take on the function of the agitator shaft bearings, a solution that very often proves cost intensive. Our new EBD concept extends the bearing span across the low speed shaft and offers stronger bearings within the gear unit itself, which means that in many cases separate bearings are no longer required in the agitator or an over sizing of the gear unit can be avoided. These high torque MC Industrial Gear Units can be used for the reliable operation of mixers, mounting flanges, agitators and surface aerators.
SEW-EURODRIVE - Driving the world.
Tel: +27 11 248-7000 Web: www.sew.co.za
Wastewater
Treatment plant races towards completion The new acid mine drainage (AMD) treatment plant at the Central Basin’s ERPM South West Vertical Shaft will be ready for operation soon, representing a herculean effort by Group Five and its subcontractors.
S
enior site agent: civil
being
engineering Wayne Poulsen
necessarily mean the end of Group
reports that the high-den-
five’s involvement, however, as a
TCTA is a special-purpose vehicle
sity sludge treatment plant
12-month defects liability period
established by the Department of
will follow.
Water Affairs to implement emer-
and pump system at the Central Basin’s ERPM South Vertical Shaft,
assessed.
This
does
not
The project is critical to prevent
Holden, a business analyst at TransCaledon Tunnel Authority (TCTA).
gency works water management
near Germiston, is nearly complete.
AMD
River,
on the Witwatersrand Gold Fields,
The
date
which would have the disastrous
with a special focus on AMD. The
had been pencilled in as 29 January
consequence of affecting the water
AMD project comprises construction
2014, while the ready-for-operation
supply to Gauteng. “Without this
of the necessary infrastructure, or
date is 18 April 2014. However,
project, the major impact will be on
upgrading of existing infrastructure,
due to the increase in the scope of
water security for anyone who draws
to extract and treat acid mine water,
certain works, there is a claim for
water, directly or indirectly, from
and then to convey the treated wa-
extension of time that is currently
the Vaal River system,” says Richard
ter to nearby water sources.
ready-for-trial-operation
entering
the
Vaal
March/April 2014
BELOW The sludge plant is nearing completion
59
Wastewater Construction of the treatment plant at the South Vertical Shaft began in February 2013, with site hand-over taking place on 8 January 2013. The decision to use an existing defunct shaft was the result of a due diligence study that evaluated the cost of constructing a new shaft. Group Five Civil Engineering was appointed as main contractor, with its full scope of works ranging from civil works to earthworks, building and mechanical and electrical installation. “If you take it that we started on 8 January, are currently installing mechanical equipment and have started with the electrical cabling, plus the bulk of the civil works is nearing completion, our progress has been quite remarkable, despite the difficulties that we have experienced,� reports Poulsen. In terms of the basic treatment process, Poulsen explains that an extraction pump station, featuring two
massive
dewatering
pumps,
will pump acid water from the existing ERPM shaft. The water will
60
March/April 2014
Wastewater
be pumped to the AMD splitter
shaft-structure design for it to be able
213 m at that point, was unavailable
box, where it is channelled into two
to accommodate the pumps.
at that time.
5 m-deep reactors, with a combined concrete footprint of 80 m x 80 m.
“The changes to the shaft pump
“The redesign process was relatively
station were quite significant, due to
quick, but the structure got signifi-
Lime-dosed water is pumped into
the increased quantity of reinforcing.
cantly more complicated as a result
the reactor from the lime-dosing
This was always a bit of a grey area
of the new design. There is a lot more
plant, comprising lime storage silos,
because we had
dosing equipment and eight concrete
to
tanks (each 16 m in diameter and 4 m
shaft to check for
high). Two thickeners, each 47 m in
any
diameter, will settle out the solids.
and to see what
The treated water will be discharged
condition
via pipelines to the nearby Elsburg
shaft is in. In the
Spruit and the sludge via pipeline to
original
an existing ERPM tailings facility.
there are seven compartments in the
tudinal and horizontal beams, with
shaft and they had planned to use #3
a lot of the design changes being in
and #6.
the reinforcing to be able to accom-
In terms of challenges faced by the project, Poulsen says that the loca-
probe
the
blockages, the
An extraction pump will pump acid water from the existing ERPM shaft
design,
reinforcing. The direction of the beams changed. Whereas before there
were
short horizontal beams,
now
there are longi-
tion of the thickeners, for example,
“However, when we put cameras
modate this. They are now leaving
required more rock-blasting than
down and probed, #6 was blocked,
all seven of the compartments open
had
anticipated.
#3 had a minor obstruction, #2 and
instead of just two, to facilitate mov-
Some of the delay was due to some
#5 were clear to water level, but #2
ing the pumps around and to allow
unforeseen ground conditions, not to
had something else further down.”
access if required at a later stage.”
mention that the programme was al-
Poulsen says this investigation was
Poulsen adds: “Overall, we are
ways tight. However, the main reason
not conducted upfront initially as the
well on track with this project. That
for Group Five’s extension-of-time
equipment to scan below the water
includes mechanical, commissioning,
submission was changes to the
level, which had already reached
the whole complete scope.”
been
originally
ABOVE Treated water will be discharged into the Elsburg River
March/April 2014
61
Panel Intro
Mine water treatment
Finding sustainable solutions to serious issues Water supplies around the world are increasingly under pressure, writes Maryke Foulds.
T
his is due to not only the rising
global
water. This is a costly business,
population,
financially impacting on both in-
but the resource demand
dustry and the supply chain. For this
created, resulting directly
reason, the prediction, prevention,
in an increase in industrial pro-
containment and treatment of mine
cesses, pollution and inequitable
water as well as acid mine water
water distribution.
must be considered carefully and
As does
demand the
increases,
abstraction
so
too
from
our
processes.
with great clarity.
How
the
issues
are
addressed may well affect the sus-
putting
Legacy issues and accountability
tainability of mining in South Africa
more pressure on an already fragile
Because South Africa has such a
for the foreseeable future. In this
water sector.
long history of mining, the country
panel discussion we asked leading
existing
water
systems,
There are two aspects to the mine
has only recently developed and
industry experts their opinion on
water issue. The use of water in the
implemented comprehensive leg-
processes and technologies to deal
mine, the rehabilitation thereof and
islation to regulate environmental
with these challenges as well as the
the creation of acid mine water,
management
way forward for the industry.
and
mine
closure
ABOVE Central Basin’s AMD project is under way BELOW The project at central will prevent mine water entering the Vaal
which is characterised by a low pH and a high salt and heavy metal content. On both scores, it is of vital importance that this water is treated and reintroduced back into the water system or for use into the plant.
What is all the fuss about? According to a recent report by DeLoitte, due to the interconnectivity of ground and surface water systems in South Africa, high volumes of polluted water have the potential to severely impact on the quality of South Africa’s water supply. This impact has the potential to affect all major industries, across the value chain. Preventing the formation or the migration of AMD from its source – i.e. mining pits, waste storage facilities and underground working – is generally considered to be the preferable option, although this is not feasible in many locations and in such cases it is necessary to collect, treat and discharge mine March/April 2014
63
Degrémont, a subsidiary of SUEZ ENVIRONNEMENT Degrémont Industry, your partner in sustainable, efficient and cost-effective water management
Ensuring water supply, protecting the environment WATER TREATMENT FOR THE POWER INDUSTRY:
To cope with major changes in policy, climate and population, operators of thermal power plants (coal, lignite, fuel oil, gas, biomass, biogas, nuclear and solar) must meet the following objectives: • Maintain or improve their energy plant’s competitive advantage by controlling water quality at the various application points • Comply with increasing environmental and health’constraints within the wider context of sustainable development.
WATER TREATMENT FOR UPSTREAM OIL AND GAS INDUSTRY:
Water is a critical part of the Production process of Upstream Oil & Gas industries which use and produce high quantities of water from Exploration to Production: • External source of water for injection • Produced Water / Waste water • Reuse / Produced Water reinjection
WATER TREATMENT FOR THE DOWNSTREAM OIL AND PETROCHEMICAL INDUSTRY:
• Water is a raw material used and treated in large quantities (injection water, production water, process water, wastewater, rainwater, cooling water, tank cleaning water, domestic wastewater…) by the oil industry, from extraction activities through to the petrochemical and refining process. The Degrémont Industry Oil & Petrochem Centre of Excellence, which specializes in water treatment for this industry, develops cutting-edge technologies for risk control and the ongoing quest for reduced operating costs of the entire water cycle.
WATER TREATMENT FOR THE METAL AND STEEL INDUSTRY:
The steel and metallurgy industries are capital intensive and operate in global markets prone to cyclical variations, meaning that they must be as competitive as possible in terms of both cost and quality. Degrémont Industry operates in all areas of metallurgy and steelmaking: • Tube manufacturing • Pipes • Hollow profiles • Steel materials • Steel fabrication products • Production of precious metals and other non-ferrous metals • Founding
WATER TREATMENT FOR THE MINING INDUSTRY Optimum water management and value creation • Understanding of the specific needs of mining industrialists • In-house expertise in water treatment and project management allowing you to stay focused on your core business challenges • Water quality and quantity guarantee • Acid mine drainage • Worldwide presence, locally-adapted, and custom solutions • Safe and reliable technologies • Expertise in stakeholder management: improving your image and your community relations by enhancing re-use of reclaimed effluents • Ensuring compliance and continuous operations at the mine sites with sufficient servicing capabilities • Optimum OPEX and asset preservation • Continuous improvement in both design and operation
COMMITTED TOGETHER TO WATER, A SOURCE OF LIFE
Tel: +27 (0) 11 807 1983 • Fax: +27 (0)10 591 5095 www.degremont.co.za
Panel discussion
Mine water treatment
DegrÉmont
W
Remy Jaffray General manager at Degrémont
hy is mine water a key focus for water management?
for each partner, taking into
RJ Mine water is a complex
and opex.
Please list your latest successes and challenges (i.e. projects)
account local legislation, environmental risk, capex
effluent, containing value as well as a high potential environmental risk.
environmental regulation, the water licenses, the price
We are working
What are the reuse possibilities of treated mine water? Technically, we are
of the raw material
on the development of acid
and the implementation of a
mine drainage treatment for a
sustainable economic model
gold mine.
for AMD. is Densadeg, which is a solids
What are your challenges in dealing with this issue?
able to produce drinking water
The main challenge is to
must consider the reuse in the
What is the future of mine water treatment in SA? The
find a sustainable economic
economical context. The reuse
future of mine water treatment
enables the acceleration
model to treat the mine
could be internal use, irrigation,
is linked to the national
of physio-chemical water
water and develop new
drinking water and so on.
cost-saving technologies.
is not unique but multiple,
What is the latest in mine water recovery research and how will this be implemented at Degrémont? The latest in
which means that we must
mine is the valorisation of ore
develop a tailor-made solution
in wastewater.
What makes mine water treatment unique from other processes? Mine water
Another exciting development
from acid mine drainage, but we
contact settling project that
treatment. It is based on a
BOTTOM A copper mine in Chile utilising Degrémont technology BELOW Densadeg process in Louisville, US
dual chemical injection system that ensures its optimum use. Another major advantage is the integration into the same unit of the essential functions.
Optimum water management and value creation Optimum water management and value creation is achieved with the following: • understanding the specific needs of mining industrialists • in-house expertise in water treatment and project management, allowing you to stay focused on your core business challenges • water quality and quantity guarantee • worldwide presence, locally adapted, and custom solutions • safe and reliable technologies • expertise in stakeholder management improving your image and your community relations by enhancing reuse and reclaimed effluents • ensuring compliance and continuous operation at the mine sites with sufficient servicing capabilities • optimum opex and asset preservation • continuous improvement in both design and operation.
March/April 2014
65
Nalco technologies empower vigorous and effective mine water management.
Nalco can help you use less, save more, and effectively treat water returned to the environment. Look to the highly skilled Nalco sales engineers who are ready to address your mine water challenges, and reduce your operating costs with economically and environmentally sustainable water management solutions. Call Nalco Africa today.
Nalco Africa Operations Building 14, Ground Floor, Greenstone Hill Office Park Emerald Boulevard, Greenstone Hill, South Africa Tel: +27 10 590 9120 Fax: +27 10 590 9130 nalcoafricareception@nalco.com www.nalco.com/sa Š 2014 Ecolab USA Inc. All rights reserved
Panel discussion
Mine water treatment
Brett Dunbar Marketing communications specialist water and process services Africa
Nalco Africa
W
hy is mine water a key focus for water management? BD As mining
Nalco has developed a
competing
unique set of innovations and
customers, we
programmes to ensure suitable
hesitate to point to
is one of the driving forces of
water quality management to
individual projects,
the economy in South Africa, it
reduce, recycle and reuse water,
yet with over
has a major role to play in water
at the same time improving
20 000 3D TRASAR technology
industry in South Africa needs
reuse, recycling and recovery
product quality and process
systems implemented across
to continuously improve
due to the water-heavy nature
efficiencies (while reducing the
the world, our customers
its approach and ability to
of the operations, across the
environmental footprint).
globally are saving 808 000 ℓ
streamline processes and
of water every minute. Simply
improve operations. With the
put, daily around the world, 3D
growth of our population,
TRASAR Technology is saving
rapid urbanisation, increased
Africa is one of the most
What makes mine water treatment unique from other processes? The higher
the equivalent of 1.5 days of the
industrialisation and a change
water-scarce countries, it is
levels of metals and solids in
water needs of Johannesburg.
in weather patterns, the entire
imperative for such an industry
the mine water effluent require
to be tackled head-on when
specialised attention and
looking at the challenges of
treatment solutions.
entire sector from underground refrigeration to dust control activities. Knowing that South
What is the future of mine water treatment? The mine water treatment
water treatment industry in
BOTTOM 3D TRASAR Technology for Cooling Water
water management.
BELOW 3D TRASAR Technology for membranes
What are your challenges in dealing with this issue?
What are the reuse possibilities of treated mine water? Depending on
The main concerns are always
the nature of the treatment
around water scarcity and water
programme, treated mine water
quality. Most mining operations
could be used again as process
find themselves in highly water-
water and even potable water.
the region will soon be under pressure to make meaningful contributions to water conservation efforts.
scarce environments where
in order to reduce water use
Where is the latest in mine water recovery research and how will this be implemented at Nalco? With
and ensure treated water can be
over 19 R&D facilities, over 1 600
reused and repurposed. Nalco
scientists and over 6 300 patents
assists mining operations by
around the globe, Ecolab uses
ensuring correct water mapping
the data gathered through the
of the water they use in their
Nalco 360°service to constantly
processes, leading to enhanced
innovate our offerings to
and more efficient operations.
our customers.
their challenges are around ensuring the need to optimise and streamline their operations
The need to ensure that the
always a challenge for a mine
Please list your latest successes and challenges (i.e. projects). Due to the
due to the unique processes
confidential nature of our
involved for mining operations.
operations with our often
quality of the water is suitable for the specific process is also
3D TRASAr technology for cooling 3D TRASAR technology saves our global customers water - so much water that we built a counter to keep track of the savings as part of our eROI approach. Our global society is building road maps to sustainable development that conserve the earth’s non-renewable resources. One of our most precious resources is water. Cooling systems, no matter what their size or design, come with multiple operational challenges. Scale, corrosion, fouling and biological growth... all are threats and all can impact costs. Complicating the situation is the widely varying chemical composition of feedwater. 3D TRASAR technology for Cooling Water utilises unique real-time monitoring, patented actives based control technology, proprietary stress resistant chemistry and 24/7 information management capabilities to detect, determine and deliver improved scale, corrosion and microbiological performance in cooling systems. Therefore, the 3D TRASAR system detects the upsets that precede scaling, corrosion and biofouling and then delivers the appropriate chemical response. The result is a balanced, efficient and safe cooling system. Less maintenance, no over- or under-dosing of chemicals, lower operating costs and maximum asset protection are the key deliverables.
March/April 2014
67
TRUSTED PIPELINE PRODUCTS
RARE Plastics High Density Polyethylene (HDPE) Piping is manufactured to SANS ISO 4427 standards. Sizes available from 110mm to 1000mm RARE also carries a large inventory and full range of steel pipes in various grades to API, ASTM, SANS 719. Pipeline installation can be carried out in house making use of our Pipeline Services Division.
RARE PLASTICS T: 016 362 2868 info@rare.co.za
HEAD OFFICE (JHB) T: 011 906 8000
DURBAN T: 031 902 2440/5
www.rare.co.za
plastics A Division of the Rare Group
Panel discussion
Mine water treatment
Rare
W
Hennie Roets Director: New Business Development at Rare
hy is mine water a key focus for water management? HR Mines
process control is required as
seldom required
mining water pollutants such
•u p to 99% water
use large amounts of water in
to human health. The mining
• f ast into action
hydrometallurgical processes
community is generally slow
– six to eight
and also in pyrometallurgical
to adopt new technology
weeks delivery and one week
1 Mℓ/day demonstration plant
processes to carry slurries
and it take years for novel
operational from arrival on site
was installed at one of the
and concentrates. Mining
breakthrough technologies to
processes normally pollute
penetrate the mining water
large volumes of process and
treatment industry. With global
• s calable and adaptable
electro-coagulation process
cooling water which, if left
commodity prices softening,
• t reats complex polluted water
adjusted the pH, removed
untreated, can result in ground
mines are slow to invest in large
– treats inorganic and organic
metals and reduced sulphates
water pollution.
water treatment plants unless
pollutants simultaneously
without the addition of any
Water is also needed for dust control underground and on
as heavy metals are detrimental
•m odular – very little to no civil work required
operational cost savings can
•v ery low running costs –
be realised.
complex water treated <R2/m3 • low power demand and low
haul roads and waste dumps.
water, provided there are no
What makes Rare’s mine water treatment different from other processes?
contamination risks. In contrast,
Conventional water cleaning
high-quality potable water is
This water can be lower-quality industrial water or mine
recovery
carbon footprint.
Please list your latest successes and challenges A
biggest mining groups in the world. In this application, the
chemicals to result in reuseable water that can be released back into nature. An Advance Oxidation Potential plant of 6 Mℓ/day to reduce cyanide to client specifications will
technologies need significant
What are the reuse possibilities of treated mine water? My view is that reuse
required for domestic purposes
investment in people and
of mine water should be made
with Fraser Alexander Water
in office and administration
infrastructure, and demand
a pre-requisite for mining
Treatment as the design, build,
buildings and in camps at
continuous high levels of
licenses. Most mining processes
operate and maintain partner.
remote mines.
expenditure. Rare Water
do not require water at drinking
be commissioned soon. This project is done in conjunction
Treatment has put together
water standards for certain
policing of water used and
several leading-edge
mining applications. Rare Water
qualities released will force
technologies to deliver a cost-
Treatment has proven at a
What is the future of mine water treatment in South Africa? The question should
mines to become even more
effective system that can treat
coal mining operation that pH
rather be: What is the future of
focused on best practices in
complex contaminated water at
adjustment, metal removal and
mining without water treatment
water management.
at low costs. Features include:
sulphate reduction could be
developments? Arguably one
• simple proven equipment,
achieved in a simple one-step
of the most exciting eras is
electro-coagulation plant.
facing the mine water treatment
Increased legislation and
What are your challenges in dealing with this issue?
with few moving parts that are
Mining waters are complex in
• sludge consists of larger flocs –
nature and seldom require a
less bound water, settles faster
single process to clean, whether it is for reuse or for release. If water is to be used for human or animal consumption, the utmost
industry at the moment.
simple to operate and maintain
• chemical dosing is
Pre-shipment inspection of 40 m3/hour electro coagulation plant
Where is the latest in mine water recovery research and how will this be implemented at Rare? In conjunction with various South African tertiary
Many mining projects are on the drawing board, a large proportion of which became marginal because of lower commodity prices. In a water-scarce country there
institutions, Rare Water
will be pressure to consider
Treatment has adopted
new water treatment strategies
a dual approach
that will give the mining groups
towards research
more options, including:
and development.
• new lower cost technologies
Firstly, the focus is on
• the use of off-balance sheet
pH adjustment, metal
water treatment plants
removal and sulphate
by embarking on design,
reduction in coal mine
build, operate and maintain
water without any
options from reliable water
chemical addition. The second focus is on Advance Oxidation Potential applications:
treatment companies • increased legislation and policing will force existing mines to get their act together.
Cyanide destruction
Time will be of the
and chemical
essence and in future
oxygen demand
implementation time will be an
(COD) treatment.
important consideration.
March/April 2014
69
Panel discussion
Mine water treatment
Prei Instrumentation
W
Steve Herbst Managing director at Prei Instrumentation
hy is mine water a key focus for water management? SH South
by the presence of recycled
A number of
sludge. Optionally, air may
variations of this
for sensitive glass
be introduced in this tank to
process exist, as
pH sensors.
Africa is a water-scarce country
oxidise iron and manganese
dictated by the
and every effort must be made
and assist in their precipitation.
chemistry of ARD,
to protect our future supply.
The resulting slurry is directed
its volume, and other factors
to a sludge-settling vessel,
generally; the products of
What are your challenges in dealing with this issue? Prei
gold, platinum, coal, etc., is a
such as a clarifier. In that vessel,
the HDS process also contain
Instrumentation, the
key economic activity in South
clean water will overflow for
gypsum and unreacted lime,
distributor of Hach online
Africa employing many people
release, whereas settled metal
which enhance both its
analysers, has a differential pH
and is the base of the wealth in
precipitates (sludge) will be
settle ability and resistance
sensor that was developed in
South Africa.
recycled to the acid mine
to re-acidification and
1970 to measure pH in harsh
The mining operations on
drainage treatment tank, with
metal mobilisation.
applications, more accurately
most South African operating
a sludge-wasting side stream.
Mining minerals such as
mines is below the water table and requires up to 10 000 m³/ day to be decanted. As soon as the pumping of this water is stopped the mine floods. This water rises until it flows freely from the mine.
BELOW pH sensor with a bit of the lime chipped off to show what colour it should be BOTTOM Hach differential pH sensor totally coated with a lime crust (if left unattended for a few days)
As one can see from the
differential pH has a reference
pH dependant (requires pH
glass electrode in a pocket
control). However with the
of chemically concentrated
quantity of lime that has to be
7 pH solution behind a
added and the precipitated
replaceable salt bridge. This
metals and sulphides, this slurry
chemically concentrated 7 pH
is like cement, not the place
solution will still be poisoned
The biggest problem is where the ground and rock is disturbed and comes into contact with water, this water becomes acidic. Acid rock drainage occurs naturally within some environments as part of the rock weathering process, but is exacerbated by largescale earth disturbances characteristic of mining and other large construction activities, usually within rocks containing an abundance of sulphide minerals. This acidic water is extremely detrimental to the environment and totally unusable for anything until it has been neutralised and purified (filtered). By far, the most commonly used commercial process for treating acid mine drainage is lime precipitation in a highdensity sludge (HDS) process. In this application, slurry of lime is dispersed into a tank containing acid mine drainage and recycled sludge to increase water pH to about 9. At this pH, most toxic metals become insoluble and precipitate, aided
70
with less maintenance. The
above, this process is very
March/April 2014
Panel discussion
Mining operations on most South African operating mines is below the water table and requires up to 10 000 m³/day to be decanted
environment for equipment
down as better methodologies
and analysers. Wide range of
are developed.
pH, from -3 to +10 pH, heavy
as standard in the municipal
Please list your latest successes and challenges (i.e. projects) All four of the
by the process solution, but
However, in the acid mine
potable or wastewater
acid mine water plants built or
it will take longer for the
water, these differential pH
treatment plants.
being built on the Coalfields
reference solution to drift
sensors still have to be cleaned
from 7 pH, and then it is
and calibrated every shift.
metals, sulphides and so on. None of the above is found
in the Emalathleni area use
will still become “dirty”;
that these sensors have an
Where are the reuse possibilities of treated mine water? The use of treated
however, it is more robust
expected lifespan of one to two
wastewater varies based on
and supporting the staff on
and is therefore easily cleaned
years (in normal applications,
geographic region, treatment
these plants.
and can be replaced. The
life expectancy is five to
method, local discharge
end result is unsurpassed
eight years).
requirements and reuse
replaceable. The Salt bridge
measurement accuracy,
The biggest difference is
Standard combination pH
Hach analysers, supplied and supported by us. We have spent the last few years training
requirements. Acid mine water
What is the future of mine water treatment in SA? Acid
reduced reference junction
sensors have a maximum life
can be successfully treated
mine water treatment will be
potential and elimination of
expectancy of seven days.
and sold as potable water.
extremely important and vital
There are also commercial
for a sustainable environment
uses for the by-products. The
as well as for the water security
costs of the water produced
of our country. This has become
by these plants are coming
an industry in its own right.
sensor ground loops. These sensors provide greater reliability, resulting in less downtime and maintenance.
What makes mine water treatment unique from other processes? Harsh
March/April 2014
71
Panel discussion
Mine water treatment
Quality Filtration Systems
W
Rob Holmes technical director at Quality Filtration Systems
hy is mine water a key focus for water management? RH Due to
mining activity takes place in a
is not easy to
region. Unlike other industrial
determine. This
or reused on site.
water treatment, mine
increases the level
New and unique
the nature of the technologies
waters can continue being a
of complexity, both
process designs
available from QFS, through
concern to the environment
from a technical
are required.
our global partnership
for long periods after the
and a commercial perspective.
agreements, we tend to focus
mining activity has ceased.
on difficult applications. Mine
Also, the mine water can
water management is one of
often be a result of multiple
these areas, where the water
entities operating in a region.
What makes mine water treatment unique from other processes? The
quality is variable and the
Commercially, challenges
challenges are mainly related
mine waters can be readily
treatment challenges can
exist with budgeting for
to sustainability of the
converted into reusable water
be significant. We believe
these projects, as they can be
treatment solution. Often mine
sources. Quality of treated
water treatment requirements
mine water is often not a
become critical for mining
limiting factor in developing
operations to continue and a
a project. In many cases, the
solution is required in a short
quality required for reuse is
time frame. There are several
less stringent that the quality
options available for rapid
required for discharge to the
deployment of treatment
environment, so recovery and
plants. However, the long-term
reuse makes a lot of sense.
The Memsys Vacuum Membrane Distillation process has been readily gaining traction in multiple applications globally our suite of technologies is
capital intensive, and often
sustainability of mine water
uniquely positioned to handle
unplanned, temporary or
treatment must be considered,
these challenges.
emergency projects. Some
taking into account the energy
What are the reuse possibilities of treated mine water? With the available treatment approaches today,
new business models are being
requirements and final disposal
What exactly are the challenges? Mine water
developed that address these
of waste products. Most mine
Where is the latest in mine water recovery research and how will this be implemented at QFS?
challenges, shifting more
water treatment applications
Much of the research and
treatment is different
responsibility onto service
require a zero liquid discharge
development is now focused
from most industrial water
providers. Additionally, the
approach. The contaminants
on the treatment of the
treatment mainly in the way it
responsibility for treatment
concentrated by the treatment
final fraction of mine water
is created. Mine water can be
of impacted water caused by
process cannot be easily
after traditional desalination
formed before, during or after
historical mining activities
discharged to the environment
treatment. Traditionally, the contaminants are
Steam Raising Cube
removed from mine water by precipitation chemistry, leaving the insoluble salts
Multiple Effect Cubes Condenser Cube
to concentrate in a small volume of effluent (brine). This results in a high strength brine solution of mixed salts. Research is now focused on the most energy efficient way to treat, concentrate and dispose of these salty streams to avoid the construction of additional solar evaporation ponds, which are becoming problematic for mining operations. QFS is bringing international developments in the field of highly concentrated brine treatment to the local market.
LEFT Diagram of membrane vacuum distillation OPPOSITE Photograph of membrane vacuum distillation
72
March/April 2014
Panel discussion
Please tell us about your latest successes We have been focused on developing new technologies to a point where they can be readily implemented at a practical scale. In particular, our focus has been on building a demonstration plant for a novel new high-salinity treatment process. The Memsys Vacuum Membrane Distillation process has been readily gaining traction in multiple applications globally and has the potential to change the landscape of brine treatment in the mining sector as well. This new technology, developed in Germany, is based on well-known principles of membrane distillation. The breakthrough came a few years ago with the invention of a novel new system to turn the concept into a commercial product that can be implemented economically. Making use of simple materials, low pressures and scalable manufacturing processes, Memsys systems are modular and economical. As the Southern African integrator for Memsys technology, we have successfully commissioned a 12 m3/day demonstration unit at our facility in the Western Cape. The QFS demonstration plant is completely “off the grid” with solar thermal collectors to provide the thermal energy, and photovoltaic cells to provide the electrical energy. We are pursuing further options to pilot and demonstrate the technology in the field. We believe this technology will be a key step on the way to complete zero liquid discharge (ZLD) solutions.
What is the future of mine water treatment in South Africa? We see the technology advancing, with new research and exciting new technologies being developed. The requirement for complete ZLD solutions will drive innovation and implementation of new technologies. By combining proven chemical precipitation, desalination and thermal processes, zero liquid discharge can be economically attractive. MARCH/April 2014
73
Panel discussion
Mine water treatment
Prentec
W
Adrian Viljoen Process director at Prentec
hy is mine water a key focus for water management? AV The effect
are exposed to water and air.
water often results
Underground water infiltrates
in a net surplus
brines is an
mining operations and
of water and a
important aspect of
of mining activities impacts
rainwater is collected in voids,
need to discharge
water management
the quality of water through
resulting in the need for mine
water. Most mines
chemical and biological
dewatering to be able to mine.
are situated in areas where
not permitted to infiltrate and
interactions as soils and rocks
Limited surface storage of
they may not discharge water
impact ground water quality.
that exceeds the regulated
Specially lined ponds used as
quality (into the rivers and
evaporation pans are used for
environment). Environmental
brine management; however,
legislation also requires that
there is increasing pressure to
groundwater quality should
eliminate brine management
not be affected through
at mines using lined ponds in
mining activities.
the future.
in that these are
In order to reduce the implement treatment plants
What are your challenges in dealing with this issue? The
to improve the quality of
effective treatment of mine
water before discharge. The
water requires the following:
water treatment may result
• an accurate prediction of the
volumes of water, mines
in a concentration of salts in the form of a brine. The management of concentrated
74
mine water quality • a process design that can be operated effectively over
March/April 2014
From
concept ...
...to reality
Delivering intelligent turnkey solutions to the water industry since 1974 We have led the way as South Africa’s premier provider of water, sewage and industrial effluent treatment technology. We now expand this know-how into mine water treatment. Prentec’s New Generation Mine Water Treatment incorporates years of experience in process technology, manufacturing and engineering implementation. Our modular LoRO systems use this experience to achieve Low Capital, Low Operating, Low Chemical, Low Energy and Low Waste solutions to mine affected water problems. CNR Proton & Molecule Streets, Chloorkop Ext 1, Kempton Park, Gauteng, RSA PO Box 12181, Kempton Gate, 1617 t +27 11 976 5234 • f +27 11 976 2802 • info@prentec.co.za • www.prentec .co.za
Panel discussion the life of mine (and after
been proposed, the economics
used for mine water treatment
10 Mℓ/d LoRO plant at Exxaro’s
mine closure)
and especially the energy
and is able to complement
Matla Mine.
requirement to produce other
these with new ideas and
chemicals has not as yet been
optimisation to be able to offer
installation of integrated
The chemical quality of the
proven, especially considering
low capital, low operating
wastewater and mine
mine water may be relatively
the low concentration
cost, low chemicals, low power
water solutions at Anglo’s
easy to predict. The prediction
and small quantities likely
and low waste mine water
Twickenham and Xstrata’s
of organic quality and the
to be produced reducing
technology (LoRO). We take
Horizon mines. The
extent of biological activity in
the profitability.
particular pride in the art of
solutions use a combination
uniquely configuring LoRO
of biological processes,
• the ability to achieve zeroliquid discharge.
the feed water has, up to now,
Mine water can be
Prentec has completed the
not always been incorporated
considered a resource. It has
systems to meet the specific
membrane bioreactors and
in the feed water specification.
been proven that treated
needs of each particular case
reverse osmosis to attain our
This poses specific challenges
mine water meets the SANS
for optimal results.
goal of LoRO. In these cases,
to the long-term operation and
potable water standard and
must be considered during the
in some cases exceeds this in
developing new technologies
treatment of shaft water.
plant design.
order to meet the regulated
which will be available for
Glencore has also engaged
discharge standards imposed
the challenges of changing
Prentec to engineer a mine
What makes mine water treatment unique from other processes? Mine
for discharge of water into the
mine water quality.
water reclamation plant at its
environment. The technology
Prentec’s processes offer the
Tweefontein Mine.
for treatment of the mine
opportunity to integrate brine
water is not unique in its
water provides both physical
management with mine water
challenges. When compared
filtration barriers as well as
treatment, thereby providing
to conventional potable water
chemical treatment to be able
flexibility in the operation and
What is the future of mine water treatment in South Africa? Mines will have to
treatment, mine water requires
to ensure the quality of the
ensuring that our processes
continue to treat mine water in
sophisticated treatment
water, with the final treatment
remain low capital and low in
order to ensure environmental
processes and process controls
barrier being reverse osmosis.
operating costs.
compliance. This is therefore
to ensure that it meets the
Stringent process monitoring
required potable or discharge
and effective management
engaged by Coaltech Research
cost of treatment itself and
standards. When compared
of mine water treatment will
Organisation to develop
the water treatment process
to industrial water treatment,
ensure compliance to the SANS
brine treatment technology.
is small in comparison to
the challenges are similar.
standards for potable use.
Coaltech has recognised that
the infrastructure required
South Africa is a water
brine disposal or minimisation
for mine water collection,
Mine water will contain
Prentec is continually
Prentec has further been
zero waste results from the
a necessary investment. The
contaminants dependant on
scarce country and the largest
remains the single biggest
feed dams, environmental
the mining activity (coal/gold/
opportunity is the reuse of
cost driver for mine water
dams, brine dams (if
platinum mining) and may
the water for industry/power
reclamation. On the basis of
necessary) and so on, to
occur as either neutral with
stations and as municipal/
support from Coaltech, Prentec
ensure the management
mineral pollutants or highly
potable water. The treatment
is developing technology that
of mine water on site. The
acidic with significant levels
of mine water will thereby not
will dramatically reduce overall
environmental regulations
of contaminants which need
only reduce the contamination
costs and potentially generate
and demands placed on the
to be removed. The need
of water in the environment,
usable salts from the RO brine.
mining sector – especially
for high recovery processes
but also preserve water in the
thereby reduces the volumes
rivers and impoundments for
of effluents from the mine
other uses.
with regard to “zero liquid
water treatment processes
that makes mine water unique
What is the latest in mine water recovery research and how will this be implemented at the company? Prentec
when compared to other
is able to offer a range of
water treatment.
technologies for the treatment
(mainly as a result of the large volumes of water that need to be treated). This is probably the most significant aspect
Please list your latest successes and challenges (ie projects). Prentec offered
discharge” – and a restriction
a high recovery process for
mine places a challenge on
mine water treatment and
technology to ensure that this
is currently constructing a
can be achieved.
in building brine ponds for residue management at the
of mine water. Prentec has the
What are the reuse possibilities of treated mine water? Currently the only reuse opportunity that has been explored is the separation of sparingly soluble salts during the treatment of mine water using reverse osmosis. Although other processes have
competence and experience in all processes currently being
OPPOSITE A modular mine water treatment plant during assembly at a Prentec workshop RIGHT (From left) Adrian Viljoen, Vivian Moller, Martin Pryor and Kathy Karakatsanis, the Prentec mine water team March/April 2014
75
Profile
Newcomer in the water supply market Vovani Water Products is a new and exciting company supplying commodity and specialised products for the water industry, especially to original equipment manufacturing (OEM) companies.
BELOW Installation of IMT UF modules in India BOTTOM Fedco pump installation at ArcelorMittal, Vanderbijlpark OPPOSITE ROPV FRP pressure vessels at ArcelorMittal, Vanderbijlpark
V
ovani was established
vision and business ethics,” says Smit.
Its microfiltration products are most-
in 2004 and has operated
“Vovani Water Products believes
ly used in the food & beverage indus-
in its current form as an
every South African has the right to
try, but its focus has mainly moved
equipment supplier since
potable drinking water, and we want
to its UF products and the treatment
2011. Henk Smit, sales director, is re-
to play a part of making this a reality
of surface water, wastewater and sea
sponsible for the entrance of Vovani
by supplying our products to OEM
water for desalination projects.
Water Products into the market and
companies and getting involved in
manages the sales and marketing
exciting and life-changing projects.”
division of the company.
Vovani offers the Southern African unique
and
a
unique
SevenBore
fibre, which consists of seven capillary membranes enclosed in an
internationally, which we are intro-
products for the water and food &
asymmetric foam structure, making
ducing into the Southern African
beverage industries, which includes
it 20 times stronger than some of its
market in order to offer these unique
the following:
single membrane fibre competitors.
and price-competitive products to
• FRP pressure vessels for reverse os-
The UF modules are manufactured
all companies in the water industry. I
mosis (RO), nanofiltration (NF) and
in various sizes with various surface
am proud to be affiliated with these
ultrafiltration (UF) applications
areas, to suit your application and
companies, as we share the same
• s tainless steel pressure vessels
configuration. This flexibility allows
•m icrofiltration and UF membrane
Vovani to be able to replace competitor’s membranes in current installa-
modules •h igh-pressure multi-stage and single stage centrifugal pumps •e nergy recovery devices for high pressure RO applications
tions with modules from IMT, with no or little modifications. Vovani can also supply the UF modules in rack systems, with manifolds and inter-
• fl exible couplings and weld stubs
connecting pipework manufactured
• l ow flow ultrafiltration units for
from polypropylene or stainless steel. Fedco specialises in RO feed pumps
various applications • f ogging disinfection units.
for the wastewater, brackish and
ROPV is the biggest FRP pressure
desalination market, especially RO
vessels supplier in the Asia/Pacific
high-pressure feed pumps. These
region and has installed over 300 000
pumps are manufactured in the US
units worldwide. ROPV manufac-
and great care is taken to supply the
tures and supplies high-quality FRP
correct pump and solution for each
pressure vessels for the interna-
application. The pump configura-
tional market for applications from
tions are vast and materials used for
wastewater recovery to desalination.
manufacturing and contact with the
Pressure vessels are manufactured
feed water ranges from 316L SS to
with 8, 16 or 18 inch diameters and
Super Duplex materials.
can house one to eight RO or NF
Fedco also manufactures an energy
elements. Pressure ratings are from
recovery device (ERD) called the
21 bar/300 psi to 83 bar/1 200 psi.
Hydraulic Pressure Booster, which is
Vovani
76
has
specialised
“We represent well-known brands
market
IMT
polyethersulfone (PES) membrane
represents
Innovative
a one-of-a-kind product in the mar-
Membrane Technologies (IMT) from
ket when considering its engineering
the Netherlands, which manufac-
and operation. The efficiency of the
tures microfiltration and UF modules.
Hydraulic Pressure Booster system
March/April 2014
Profile is rated at 80% and higher, and has a major impact on the operation cost of RO water treatment plants. Vovani also supplies the industry with flexible couplings and weld stubs from PASS. These products are of the highest quality and extremely price competitive. The flexible couplings and weld stubs are especially used with FRP pressure
FRP PRESSURE VESSELS
vessels, but also in the rest of water treatment plants as connection pieces for pipework. Aqua Solutions from Australia has chosen Vovani as its partner in the supply of complete low flow UF units. These UF units can be used for domestic or commercial use, and is an easy system to operate and to maintain. The AquaSentry is a low cost, lightweight (12 kg) and portable water purification unit that requires no energy input. The unit is gravity fed and only requires 1 to 2 bar to operate fully. The AquaSentry can produce 750ℓ/h of potable drinking water from rivers, dams, boreholes or as pretreatment of seawater for desalination. The UF-PRO affords practical, small-scale potable water treatment using proven UF membrane technology. The system controller provides continuous, automatic water production via an Eco-Flush Clean Cycle, with minimal operator input. It is compact, tough, easy to transport and simple to install. The UF barrier filtration process provides primary disinfection by removing pathogens and particulates to supply safe drinking water from the majority of non-saline surface and ground waters. Additional post-filtration treatment includes ultraviolet or chlorine disinfection, or MIOX can be utilised if desired. water
M
Y
CM
Typical applications: • decentralised
C
treatment
and
bottled
production
water
MY
CY
• community and rural small-scale • remote mining and resource communities • point-of-entry filtration and RO pretreatment
CMY
K
• emergency and temporary water supplies.
MARCH/April 2014
77
Regional focus
Creative solutions to dam challenges About 47% of construction work has been completed on the R212 million Imvutshane Dam, 30 km north west of Stanger in KwaZulu-Natal.
T BELOW Completion of the dam is scheduled for 2015
his dam is a key link in
and supervise the construction of
Municipality, is implementing the
supplying the rural people
the 3.1 million m3 dam, completion
extensive R402 million Maphumulo
in Maphumulo, KwaZulu-
is scheduled for February 2015.
Bulk Water Supply Scheme. This
Natal, with a reliable source
“Excavation on the spillway has
of safe drinking water. Currently
been completed and, to increase
Maphumulo
over 50% of the population are
its depth by an additional 8 m, two
Plant, an extensive network of
without any formal water supply
small explosive blasts have been suc-
pump stations, bulk water-supply
and the remainder depend on an
cessfully carried out. The outlet pipe
pipelines,
unreliable small schemes. During
has been jacked through a rocky hill-
water and the construction of the
winter and droughts, water is scarce
side and has completed two-thirds
Imvutshane Dam.
throughout the region.
of its 106 m journey,” comments
According Engineers
to
MBB
Consulting
Pietermaritzburg,
ap-
pointed by Umgeni Water to design
Tyler Bain, MBB’s project engineer. Umgeni Water, as bulk water supplier
to
the
Ilembe
District
includes the construction of the Water
reservoirs
Treatment
for
treated
The design of the dam offered some
interesting
challenges.
Geological studies showed that the rock was badly weathered in the area designated for the spillway. MBB designed a concrete lined spillway that will be anchored into ground; this is a safety measure to ensure the dam can withstand extreme floods. “The 28 m high, 305 m long embankment will be built using different construction methods; a section will be clay core and the remainder will be built of compacted earth with a rock shell. Sufficient clay and rock have been sourced on-site so the amount of materials that has to be transported is minimal.” Another challenge was a pothole where the dam crosses the river,
78
March/April 2014
Regional focus
ABOVE Outlet pipes will be fitted inside the concrete sleeve BELOW Crew during construction which was unsuitable as a foundation. To mitigate this, jet grouting will be used to create a strong, watertight foundation for the dam’s embankment. This entails drilling into the ground and creating columns of soil and cement by introducing cement grout at high pressure. A series of underground, overlapping columns will be constructed to form an impervious “wall” up to 16 m in height. “The pothole also caused foundation headaches for the outlet pipes. MBB solved the problem, in a fairly cost-effective way, by jacking the pipes through the adjacent hill. A powerful hydraulic jack is being used to push a concrete pipe 106 m through the rocky prominence. While the pipe is being driven through the ground, behind a shield, excavation takes place simultaneously,” he concludes. To ensure the concrete sleeve is watertight, the gap be-
C
M
Y
CM
MY
CY
CMY
K
tween the pipe and the rock is sealed with cement grout and the rock is being grouted at specific places. The outlet pipes will be fitted inside the concrete sleeve and, during construction will divert water away from the site, while continuing to supply water to the treatment plant.
Umgeni Water is implementing the extensive R402 million Maphumulo Bulk Water Supply Scheme
MARCH/April 2014
79
Regional focus
Water loss tackled in eThekwini All available resources will be deployed to reduce the escalating rate of water loss in Durban.
Fixing water leaks is critical to offset water losses
C
oncern
has
been
water leakages because water will
2% year-on-year. Despite this chal-
expressed that water loss
soon become an expensive commod-
lenge, the Water and Sanitation Unit
continues to rise, with the
ity if nothing is done to conserve it.”
has made some positive progress in
indicating
Sithole said the administration is
this regard, with interventions like the
non-revenue water having risen from
exploring all possible remedies and 55
installation of new pressure reducing
34% to 37%.
people have already been employed
valves (PRV), removing illegal con-
The City Manager, Sibusiso Sithole,
to detect water leakages. “We have
nections, metering unmetered prop-
will take all possible measures to
to try and use every available mecha-
erties, maintaining existing PRVs and
deal with this challenge, including
nism to save water and that is why we
conducting active leak detections.
the use of technology and local
now have hired people to detect wa-
Meanwhile, a stern warning has
communities to detect and fix water
ter leakages where they use a GPS to
been issues to land invaders who
leaks. The chairperson of the Human
map the exact location of the leak and
continue to occupy pieces of land
Settlements
Infrastructure
this enables our maintenance teams
illegally in different areas in the city.
Committee, Cllr Nigel Gumede, said
to immediately attend to where a
Sithole warned that the municipality
the problem was further complicated
leakage has been identified.”
would continue its effort to demolish
latest
figures
and
by illegal connections and the mushrooming of informal settlements. He said there was a need to educate the people on water saving and to
80
He said the municipality was also
illegal structures and was looking
looking at models from other cities
at strengthening the Land Invasion
as to how they were dealing with the
Unit. “People who continue to invade
issue of non-revenue water.
land must not have hope that we
put a stop to illegal connections.
The municipality is currently paying
will provide them with services. We
“People need to learn to use water
an excess of R163.6 million towards
need to send a strong message that
sparingly, and they need to be
non-revenue water annually and the
we cannot allow people to do as
properly trained about how to detect
trend is growing by approximately
they please.”
March/April 2014
Regional focus
Western Aqueduct pipeline expanded eThekwini municipality is taking extra measures to bring shortterm relief to communities in the northern areas of the city affected by water shortages.
T
C
M
he
municipality
will
invest
an
additional
R116 million to expand the diameter of the existing pipeline in order to increase the flow of water to the affected areas. This is in addition to a new fleet of
water tankers that have been bought to ferry water to com-
munities as well as 100 extra JoJo tanks. The executive committee conducted an inspection on the progress of the Western Aqueduct water pipeline project in
Y
CM
MY
CY
CMY
K
Hillcrest, which is expected to provide a long-term solution to water supply challenges in the Inanda, Ntuzuma, KwaMashu (INK) areas and new developments like Cornubia. The R3.3 billion Western and Northern Aqueduct projects involve the laying of an almost 100 km of pipeline. The first phase of the Western Aqueduct, which included a 19 km pipeline, is completed and three other phases are being rolled out simultaneously after the council provided an additional R580 million last year to bring forward the completion date by two years to 2017. The contract was also unbundled and awarded to different contractors after legal challenges delayed the project. City manager Sibusiso Sithole says the municipality will be identifying extra resources to fund the short term interventions for the INK areas. “Our infrastructure is presently running at full capacity and the short-term solution is to increase the diameter of existing piping. We are looking at an investment of about R116 million to supply water to these areas, translating to 116 km of piping.” Mayor James Nxumalo says they are pleased with the progress of the Western Aqueduct Project. “The visit gave us an understanding of how far the project has gone. We are happy that it is proceeding according to plan and once it’s completed it will relieve the pressures of water supply in the affected areas. We urge people to continue using water sparingly and to report illegal connections which often cause damage to our infrastructure.” MARCH/April 2014
81
Water boards
Researchers and industry join forces A new research chair, sponsored by the East Rand Water Care Company (ERWAT), will focus on innovations in water research, as well as upping water treatment and water management skills in the water sector. About ERWAT The East Rand Water Care Company (ERWAT) was established in 1992 as a Section 21 company. Its shareholders are the Ekurhuleni Metropolitan Municipality (majority shareholder), Johannesburg Metropolitan Municipality and Lesedi Local Municipality. ERWAT provides bulk wastewater conveyance and a highly technical and proficient wastewater treatment service to some 2 000 industries and more than 3.5 million people who have access to sanitation services. It is currently custodian of 19 wastewater care works, treating a combined capacity of some 696 Mℓ of wastewater per day. The majority of the operations are in the Ekurhuleni Metropolitan Council (Eastern Gauteng).
T
82
and management skills of scientists,
history of working and cooperating
engineers and technical personnel.
with, as well as supporting different
Wolfaardt recently returned from
universities and research institutions
Canada, where he has held a Canada
over a number of years. The compa-
Research Chair in Environmental
ny looks forward to build on these
Interfaces and Biofilms since 2004.
accomplishments, now in this formal
Prof Eugene Cloete, Vice-Rector: Research
and
Innovation
at
Stellenbosch University and chair-
and
structured
association
with
Stellenbosch University. “In
a
water-scarce
country,
man of the SUWI Advisory Board,
we are continuously faced with
says ensuring a safe water supply
ever-changing
in
for South Africa and Africa is pos-
and constitutional challenges in the
Wastewater
Management
sible, but will require innovation
water industry. We need to find sus-
will
hosted
and action.
tainable solutions to these challeng-
he
ERWAT be
Chair
by
technical,
financial
University’s
“We are very excited about the
es to ensure the protection of our
Water Institute (SUWI). Prof Gideon
establishment of the ERWAT Chair
environment and water resources,”
Wolfaardt, a recognised expert and
and the opportunities it provides for
maintains Twala.
leading researcher in the biological
world-class research and innovation
and engineering aspects of water
in South Africa’s water sector. The in-
research, will be the first research
stitute is also the ideal home for this
professor to hold the chair.
chair, as we pride ourselves on con-
Stellenbosch
The focus of the new ERWAT chair
tinually exploring new approaches
will be on scientific and technical
to water treatment that are durable,
advances in wastewater manage-
cost-effective and more efficient,”
ment, water quality, water use and
he says.
demand, as well as fostering partner-
ERWAT’s managing director, Mr
ships to improve the water research
Pat Twala, says ERWAT has a proud
March/April 2014
About the Stellenbosch University Water Institute (SUWI) Established in 2010 in response to the formidable and unprecedented challenges that face South Africa and the African continent at large, SUWI is a multidisciplinary research enterprise that coordinates research from a multitude of academic disciplines such as natural science, social science, agricultural science, engineering and law. Research is done in collaboration with government and industry to solve water-related challenges, to provide technology transfer and to develop human resources.
Water boards
Partnering with industry Maryke Foulds asks Prof Gideon Wolfaardt, the new ERWAT chair at the University of Stellenbosch, about some of the issues in the water industry today.
W
hat is the biggest challenge facing SA’s water industry? The increasing
demand for good-quality water for industry, to service the needs associated with rapid urbanisation, and food production in the context of finite resources. This is compounded by pollution of both surface and subsurface water reserves. As a result, and similar to many other countries, South Africa is faced with the challenge to make difficult choices in terms of water allocation with potentially serious economic, social and environmental consequences.
How will you foster the partnerships in the industry? For
C
M
Y
CM
MY
CY
CMY
K
me it has never been a question whether I should collaborate with industry and government partners. These collaborations often lead to interesting new questions and are often the base of subsequent fundamental research. Successful collaborations are founded on a good match between academic and industry partners; important criteria for this to develop are honesty about expertise and capacity (academics) and realistic expectations (non-academic partner). These worked well for me in the past and I hope to continue along these lines.
What is the role of research institutions? There is an increased awareness of the fact that our health, food supply, economic stability, etc., are all dependent on a healthy ecosystem and related ecosystem services. The numerous pressures on the ecosystem are well described in both scientific and popular literature; however, a defining challenge of our time is that we do not have decades to solve serious problems and challenges related to natural resources. These problems are complex and we need to transcend disciplinary boundaries. Research institutions are best positioned to provide the platforms for forming teams with experts from disciplines ranging from economics, humanities, science/ engineering to law, and with sufficient agility so that the problem can dictate the relative involvement of the different disciplines versus putting teams together looking for a problem to solve. MARCH/April 2014
83
Water boards
Harvesting electricity Recently installed hydroelectric technology has proven to be a huge success for Bloem Water’s head office in Pellisier, producing 96 kW/h of energy from a pressurised conduit.
mines, all owning and operating gravity water supply distribution systems that could be considered for small-, mini-, micro- and pico-scale hydropower installations. Most of these water distribution systems may be equipped with turbines or
ABOVE Large amounts of raw and potable water are conveyed daily under pressurised and gravity conditions OPPOSITE Bloemfontein has suffered crippling power outages in the past
pumps as turbines, supplementing
S
outh Africa is acknowl-
To
edged to not be particularly
been
endowed with the best hy-
in
where
power energy may be used on-site,
dropower conditions, as may
around 30 kW/h of power is being
supplied to the national electricity
occur elsewhere in Africa and the rest
generated in the pipeline at the exit
grid, or fed an isolated electricity
of the world. However, large quanti-
to the Elardus Park reservoir. This was
demand cluster.
ties of raw and potable water are con-
followed by the Bloem Water instal-
Africa is the most underdeveloped
veyed daily under either pressurised
lation, converting to a sustainable
continent with regard to hydropower
or gravity conditions over large dis-
energy source as the main supply of
generation, with only 6% of the esti-
tances and elevations. The University
energy for operating its head office
mated potential exploited, explains
of Pretoria, supported by the Water
in Pellisier. The Bloem Water facility
Marco van Dijk, project leader from
Research
is
will be the largest unit to date in the
the University of Pretoria.
engaged in a study investigating
country, producing 96 kW/h of ener-
and demonstrating the potential of
gy from a pressurised conduit.
Commission
the
technology
successfully
Tshwane
has
and reducing the requirements for
demonstrated
pressure control valves. The hydro-
Municipality,
Municipalities
consume
around
60% of their energy requirements
exploiting the excess pressure or hy-
The Caledon-Bloemfontein potable
in the distribution of water services
dropower energy available from pres-
water supply system supplies the
cost. For example, energy accounts
surised water distribution systems.
majority of the water demand in
for around 40% of Rand Water’s cost
This type of energy generation,
Bloemfontein. The water is supplied
in the production of water. With in-
referred to as conduit hydropower,
to the Brandkop Reservoir, which is
creases in electricity costs, this could
is
where Bloem Water’s head office is
possibly reach 55% and more.
different
hydropower
84
(WRC),
date,
to
the
conventional
generation
usually
located. Excess energy is dissipated
associated with large dams. The
through
excess energy available in pressur-
before
ised conduits (pumping or gravity),
the reservoir.
pressure being
control
discharged
For the Bloem Water project, a
valves
96 kW crossflow turbine and syn-
into
chronous generator will be installed. This is about 10% of the full potential
which is normally dissipated through
According to the WRC’s executive
of the pipeline. The turbine will be
a pressure-reducing valve, is trans-
manager, Jay Bhagwan, pumping
housed in a turbine room, currently
formed into clean, renewable hydro-
systems account for nearly 20% of
under construction, located next to
electric energy by means of a turbine.
the world’s electrical energy demand.
the Brandkop Reservoir. The Bloem
In other words, it is simply harnessing
In South Africa, for example, there
Water head office will be directly
what is already available in the exist-
are 284 municipalities and several
connected to this hydropower plant,
ing water infrastructure.
water supply utilities, as well as
says Mokutu Kgwale, director for
March/April 2014
Water boards Infrastructure Development, Operations & Maintenance at Bloem Water. Approximately 30% of the water supplied via the CaledonBloemfontein pipeline will be diverted through the turbine. The turbine’s runner will be turned due to the water passing through it, which will excite the generator allowing hydroelectric energy to be generated. After passing through the turbine, the water will be discharged through a constructed opening in the roof of the south-west corner of the reservoir. Control equipment will regulate the flow and pressure through the turbine, resulting in the generation of clean, stable electricity at the correct voltage and frequency of 50 Hz. The generated electricity will be connected via the control equipment to the main supply of the head office. Sufficient renewable energy will be generated to supply the peak demand of Bloem Water’s head office as well as meeting the electricity requirements of the reservoir terrain. About 800 MWh could be generated annually with this micro-hydropower installation. Bhagwan further comments: “This demonstration project will provide huge savings for Bloem Water, as well as a quick return on investment. Bloem Water, if able to exploit all the opportunities in its networks, can become a serious player in energy as well. A good international example of such could be drawn from the German company Zweckverband Landeswasserversorgung, which delivers water to three million customers in Baden-Württemberg and Bavaria. Since the early 1970s, it has been using power generated continuously from energy recovery”. Hydropower schemes have very long lifetimes and high efficiency levels with low operating and maintenance costs. Hydroelectric energy technology is a proven technology that offers high efficiencies as well as reliable and flexible operation, confirms Van Dijk. Conduit hydropower requires a small capital investment and has a short return on investment
C
M
Y
CM
MY
CY
CMY
K
period. As long as people use water, renewable electricity can be generated.
MARCH/April 2014
85
Water boards
Innovative internship programme launched Magalies Water has launched the pilot of the innovative Magalies Water Capacity Building Programme. The programme is designed to address the need for skilled and employable students. Magalies water in a nutshell The water board Magalies Water was established in 1969, mainly to supply the needs of the platinum mines in the Rustenburg and Thabazimbi areas. For this purpose, the Vaalkop Water Treatment Works was constructed next to the Vaalkop Dam with an initial capacity of 18 Mℓ/d. Currently, the entity’s infrastructure traverses three provinces: the North West (Bojanala), Limpopo (Waterberg) and Gauteng (part of Tshwane). The Magalies Water area of supply spans 42 000 km2. Growth in water demand in the area of supply has resulted in the extension of the organisation’s infrastructure and footprint in order to deliver water in bulk to these areas. Magalies Water currently owns and operates the Vaalkop, Wallmansthal, Klipdrift and Cullinan Water Purification plants. In addition, Magalies Water also operates the Temba Water Purification Plants on behalf of the City of Tshwane.
86
M
agalies provides
Water water
as a strategic intervention for job creation, skills development and community development. To this end, Magalies Water has partnered with its professional service providers involved in the implementation of its capex programme and selected tertiary institutions to
ser-
provide practical on-the-job train-
vices in the following
ing to the selected students. The
provinces: North West,
following three tertiary institutions
Limpopo and Gauteng. New op-
were selected by Magalies Water to
portunities for accelerated capacity
build strategic partnerships with to
building for students were identified
commence with the programme:
in the organisation’s extensive pro-
Orbit Further Education and Training
gramme to upgrade existing and
in
develop new water infrastructure
University of Technology (technician,
to
technologist level) and the University
meet
growing
demand
for
potable water. Infrastructure
Brits
(artisan
level),
Tshwane
of Pretoria (engineer level). The studevelopment
has
been identified by the government March/April 2014
dents were selected after a rigorous selection process.
Water boards In addition to technical in-service
expenditure is in the order of R2 bil-
development. Magalies Water plans
training that the interns/students will
lion. Some of the projects are part
to leverage its capex programme to
receive, the programme draws on
of the Strategic Integrated Projects
accelerate skills development in the
international mentoring best prac-
coordinated by the Presidency.
water sector. The general skills that Magalies Water and the broader water
tices to allow for open channels of their educational institutions, the
Infrastructure development and skills development
contractors and professional service
Infrastructure
providers overseeing the interns and
catalyst to job creation and skills
communication between the interns,
development
is
sector have identified as a need are engineers, technicians, technologists, a
artisans, scientists, process controllers, and plant operators, among others.
Magalies Water’s operations. Magalies Water is supported by ONYXX Human Capital and Royal HaskoningDHV in the development and implementation of this unique capacity-building programme. The
programme
launched
in
January 2014 at Vaalkop Plant with seven
students
who
have
been
offered internships for the 2014 calendar year – four TUT students/
OPPOSITE Practical on-thejob training
graduates and three FET students. Magalies Water has an extensive infrastructure programme for the
LEFT The programme was launched at Vaalkop plant
upgrading of existing water infrastructure and for the development of new infrastructure. The total capital
March/April 2014
87
Water me tering
Turning revenue collection around A local municipality situated in the West Rand of Johannesburg was losing a significant amount of revenue from faulty and non-operational water meters at an upmarket housing estate located in its area of jurisdiction.
A
n analysis conducted
Kent prepaid water meters in this
installed on the consumer’s own
at the time showed that as
particular estate,” says Basson.
property shows how much credit is
many as 37% of the water meters in the residential
on the meter and how much water
About prepaid metering
has been used.
estate were not operating at all. As a
With prepaid metering, the consum-
The prepaid metering system has
result, the local municipality appoint-
er is in control of their own water
numerous benefits, including the fact
ed Utility Management Solutions
usage, as they decide how much
that any water leaks on the premises
(UMS) to undertake the installation of
water to purchase according to their
can be detected immediately as
Elster Kent prepaid water meters to all
requirements at any one time. This
they will be shown on the meter.
the homes in the residential estate.
system ensures that the consumer
From a water services authority’s
Leon Basson, sales and marketing
can now budget for their water bill
(WSA) perspective, the Elster Kent
director at Elster Kent Metering,
and that they will not receive any
prepaid metering system is a reliable
explains that the project included
surprise bills from the water utility. At
system that is an effective income-
the replacement of 1 022 existing
any time, the system that has been
generating system for water sales.
water meters with Elster Kent prepaid meters. The payback time including installation was 7.6 months. This has since resulted in the local municipality now being able to collect revenue
GRAPH 1 (left) The average water consumption, per consumer meter per month, since the project was initiated
that was previously lost due to inoperable prepaid metering systems. Although the local municipality has been involved in prepaid metering for over 10 years now, it had identified that as a result of some of the residents in the estate being undercharged for their water consump-
BELOW Elster Kent prepaid water meters
tion and in certain cases not being charged at all, urgent interventions were required due to a significant loss of revenue. Basson says that the increase in water sales in the estate from the start of the project was a massive 197%. In the first four-month period, water sales amounted to an average of R138 070 per month. This obviously takes into consideration that the months from January to April are in the summer season of Gauteng
where
residents
would
water their gardens. During the next four months, water sales increased to an average of R300 949 per month. “This shows the turnaround in water billing as a result of the new Elster March/April 2014
89
Water me tering
Domestic water management in focus Utility Systems, a Durban-based company, is an industry leader in the field of domestic water management, including the fields of electronic flow limitation and prepayment metering.
90
March/April 2014
We do not inherit the earth from our ancestors, we borrow it from our children Tel: +27 (0) 31 700 4143 Fax: +27 (0) 31 700 4147 enquiries@utility-systems.co.za www.utility-systems.co.za
Water me feature tering
T
he Utility Systems prepaid
installation. It goes without saying
metering system is, in fact,
that this greatly increases consumer
the only prepayment sys-
acceptance of the metering system.
tem that is approved by the
STS Association for water metering.
The WMD has a built-in radio that communicates by radio frequency
Utility Systems is a supplier to all
over the ISM band to mobile or
major metros in South Africa, and
fixed data collectors, which in turn
also supplies over 50 municipalities
uploads data into a database for use
and water service providers coun-
by water service providers.
trywide. Internationally, there are
The WMD also uploads reports on
projects in Africa, the Middle East
leaks and tampering, enabling the
and South America.
Utility Systems data bridge software Utility Systems’ Data Bridge software converts technical data mined from the water meter through the built-in data log in the WMD, into usable and easy to read information enabling utilities to: • accurately and electronically read meters and collate data • seamlessly integrate it into an existing municipal billing and/or management system without the need to run a proprietary system in parallel • detect leaks • discourage endemic corruption or tamper by dishonest meter readers and/or consumers • engage in water demand management • carry out accurate synchronised water balancing.
consumer to be notified and, in turn,
Easy
Product quality and after-sales
address leaks on their premises, and
payment networks
Pay
and
other
similar
support offered by Utility Systems is
for the water service provider to take
• cell phone-based vending
of the highest standard, and it is this
corrective and punitive measures
• Internet-based vending.
excellent product and professional
should the consumer tamper with a
As
service that results in repeat sales to
meter installation.
is based on the STS standard, it
many satisfied customers.
The Utility Systems User Interface
the
utility
systems
vending
means that, unlike the more dated
At the core of Utility Systems’
Unit (UIU) is a customer interface
prepayment
product offering is the electron-
that is linked to the meter installa-
service provider does not have to
ic control valve and the Water
tion by means of a radio link. It has
purchase and maintain a proprietary
Management Device (WMD). When
an LCD display that displays the
vending system. Customers are free
fitted to a pulse output water meter,
meter reading as reflected by the
to use any of a number of vending
WMD, the remaining credit
When fitted to a pulse output water meter, the WMD allows for a wide range of metering applications
systems,
the
water
service providers.
allocation, leak and tamper
The bulk meter is a large bore
alarms, and is the portal
version of the WMD and not only
through which the tokens
controls the flow of water to places
are entered in a prepay-
like schools and factories if required,
ment metering application.
but also enables water service pro-
As the Utility Systems
viders to undertake real-time zonal
prepaid metering system
water balancing with an installed
is
of metering applications. Well over
transfer specification (STS) associ-
Utility Systems also offers the
600 000 of these devices have been
ation, it allows for a wide variety
Aquadata device for purely AMR
sold both locally and internationally.
of prepayment vending options,
installations and is ideally suited for
which include:
gated communities that have a bulk
with a pulse output meter in one
•p oint of sale vending terminals
water supply but want to recover
of the meter box housing systems,
• i ndependent vendors such as the
The WMD is generally housed
and can be electronically modified in the field to implement any one
accredited
major
by
grocery
the
standard
base of WMDs.
the WMD allows for a wide range
chains
through
the volume of water for each household as it actually consumes. The
Utility
Systems’
advanced
of a number of different metering
metering system offers cutting-edge
system options, all at full pressure.
smart metering and demand man-
These include:
agement to water service providers,
• the
allocation
of
a
finite
or
and, in doing so, drastically reduces
pre-negotiated daily or month-
non-revenue
ly allowance – ideal for those
water – the scourge of most water
who only receive the free basic
service providers. Utility Systems is
water allowance
part of the JSE-listed MICROmega
• prepayment metering
and
group of companies.
unaccounted
OPPOSITE USC prepaid water metering system BELOW USC User Interface Unit (UIU) and Water Management Device (WMD)
• automated meter reading (AMR) • advanced metering infrastructure (AMI) – the ability to read meters and to control the flow of water to a household remotely. The advantage of this is that every meter installation looks identical but the water service provider is able to tailor the appropriate solution for each individual customer without any physical change to the March/April 2014
91
Produc t news
New service offerings Consulting engineering firm GIBB has expanded its environmental offerings with the introduction of two new service lines: waste engineering and geographic information systems (GIS).
T
his
follows
research
into
environmental
extensive
expertise in waste landfill design and
in the rest of Africa where there is a
emerging
contaminated land management.
lack of data); slope analysis and visual
services
trends in international and
African markets.
92
“Importantly, being part of an integrated
engineering
impact assessments.”
company
He said GIS is not just about
means waste engineering can utilise
mapping and data capturing. “An
General manager for the envi-
the services of power and energy and
important aspect of what we offer is
ronmental services sector at GIBB,
GIBB Capital to deliver a complete
spatial analysis, for example: least-
Dr Urishanie Govender, says GIBB
solution,” said Govender.
cost-route analysis allows us to take
identified waste engineering as an
Deon de Witt, who heads up the
all factors into account and come up
important growth area for the firm
GIS service line, says his unit provides
with least-cost models. Often projects
following a market gap analysis. “We
spatial data on projects, ranging from
commence without proper GIS anal-
responded to the market through
base maps to spatial analysis. “Some
ysis being conducted. This can mean
organic growth and forming strate-
of our major offerings include least-
going back to the drawing board to
gic partnerships with key players in
cost-route analysis, catchment delin-
find solutions to challenges that could
waste engineering, who have specific
eation, remote sensing (particularly
have been dealt with upfront.”
March/April 2014
The Intelligent Choice With a solid track record spanning over half a century, GIBB has established itself as a partner of choice. Backed by a Level 2 BBBEE rating, GIBB provides engineering solutions to a diverse range of markets across the African continent.
People • Expertise • Excellence marketing@gibb.co.za | www.gibb.co.za | +27 11 519 4600
Produc t news
30 years in the industry Maryke Foulds asks Mannie Ramos of Abeco about some of the company’s highs and lows, and whether have things changed during that time.
W
hat are the highs and lows you have experienced since 1984?
urban poor, often lacking
groundwork for our long-term
Abeco offers a unique
access to safe drinking
growth. Africa is the future and
perspective on potable water,
water. In order to address
to date we have supplied over
wastewater, fire protection and
We started out with the aim of
this issue of water scarcity,
30 countries in Africa with our
industrial liquid applications.
satisfying the ever-increasing
investment is required to
tanks. We have modernised
We know the merits of each
need for hygienic storage
improve wells and rainwater
our factory and invested in
type of construction, allowing
of water. Thirty years on, we
catchment systems.
modern equipment allowing us
us to objectively propose
to adapt to the changes in the
the right type of storage for
industry and meet future growth
each application. The biggest
anyone else. The way business
What are the latest products or trends? We have enhanced
projections. We are actively
challenge is to maintain both
was done has changed over
our product range and
looking at potential acquisitions
quality products and top-notch
the years as technology has
introduced a powder-coated
that fit in with our company
support to continue driving
progressed and profit potentials
tank to our range which can hold
objectives and strategy.
customer loyalty and in so doing
have been eroded. Today you
up to 30 284 m3, which is very
can lose a deal for 5% but
competitive against concrete
then be called to fix someone
tanks. We have also introduced
else problem because inferior
wastewater treatment, digesters
products have used and no after
and industrial liquid tanks to our
service is available on a lot of
liquid containment solutions.
foreign products.
We have also entered the dry
have erected more water tanks in Southern Africa than
maintain our dominance as the
How can you assist in the challenging water industry?
bulk storage with tanks, which
What is the most pressing issue facing the water industry today? Africa is
can hold anything from bottom ash to dewatered sludge.
after Australia and those
What is planned for Abeco in the future? Through hard work
who suffer the most are the
we have been able to lay the
the second driest continent
biggest supplied of water tanks in Southern Africa.
Abeco highlights •R eaching over 25 000 installations • T he installation of the first 5 Mℓ rectangular tank back in 2008, which is still the biggest bolted steel tank in Southern Africa to date • T he installation of the first 3 Mℓ circular bolted tank in 2009 • T he installation of 5 x 500 m3 tanks on 25 m stands on the north-eastern coast of Central America – the structure had to be designed to withstand hurricanes, which had historically played devastating roles in the area •W e have supplied tanks to 30 countries •B eing the first steel tank manufacturer to get ISO 9001 accreditation in 2010 •C elebrating 30 years of manufacturing tanks •G etting the right to apply the SABS certification mark – we are the only sectional tank manufacturer with this certification.
March/April 2014
Th e N a me t h a t Re a lly H o ld s Wa ter Est. 1983 Manufactured in South Africa Specialists In: Pressed Sectional Steel Tanks • Structural Steel • Supporting Towers • Water Storage
Abeco House, 6A Bradford Rd Bedfordview, South Africa
Tel: +27 11 616 7999 | Fax: +27 11 616 8355 E-mail: Abeco@icon.co.za
www.abecotanks.co.za
93
All water is rainwater Harvest yours today… it’s free! With the cost of water likely to increase and the escalation in water outages in many urban areas, smart homeowners are supplementing their municipal water supply by installing rainwaterharvesting tanks. Harvesting free rainwater to water the garden, clean the house, wash the car and flushing the loo, significantly reduces your dependence on municipal water supply. The good news for styleconscious homeowners is that JoJo tanks not only come in a wide range of sizes (from 750Lt to 20 000Lt), they’re also available in fashionable colours that suit most home colour schemes. JoJo tanks are made from the best quality virgin food grade materials and is the first tank with an 8-year warranty. Tough and good-looking… that’s why we proudly write our name on the outside of our tanks.
013 262 3021
www.jojotanks.co.za
JoJo-Tanks-South-Africa
@JoJo_Tanks
Produc t news
Rain harvesting systems In an age where water resources are tightly controlled and regulated, it is incumbent on greenhouse growers to make the most efficient use of water they have and to look around for additional water sources that are freely available.
R
ainwater can be one
A pressure booster pump then dis-
of these additional free
tributes the water for irrigation use.
Rainwater can easily be blended to other municipal or borehole
water sources. For small,
JoJo water tanks are an ideal
water sources and can be used to
medium or large commer-
method of storing this relatively
irrigate the crop. Rainwater is a soft
cial growers, with large greenhouse
clean water source, as the darkened
water and may prove beneficial if
roof areas, the potential to capture
tanks prevent algae growth, and
your borehole water is hard. This
large volumes cannot be underesti-
splitting of your water storage
may help reduce chemical costs
mated. A 6 000 m2 greenhouse roof
means that maintenance can be
as softener use may decrease. It is
with an annual rainfall of 700 mm
done on tanks without having to
easy to blend these water sources
can harvest around 3 302 Kℓ of wa-
empty your entire water storage.
in a buffer water tank that is fed
ter in a year. To capture rainwater
Split water storage also can spread
separately from the rainwater stor-
from a 20 mm rainfall event would
risk, as if one tank is damaged, your
age system and borehole storage
require storage space of around
entire water storage system is not
system. Small holding or buffer
100 Kℓ, which would require either
lost. Sealed water tanks also prevent
ten 10 000 ℓ tank or five 20 000 ℓ
biological, chemical and physical
tanks. The systems are relatively
contamination from easily entering
simple to set up and consist of
the tanks. A modular format also al-
gutters, downpipes, pipework and
lows you to expand storage require-
adequate pre-filtration of rainwater.
ments as needs and budget allows.
Rainwater can easily be blended to other municipal or borehole water sources and can be used to irrigate the crop
Drip irrigation has been shown to increase crop yields, compared to traditional large droplet spray irrigation
March/April 2014
95
Produc t news
It makes sense to use the captured rainwater with waterwise efficient drip irrigation systems
tanks with this mixed water supply
water resources. As drip irrigation
allow the grower to test the water
systems irrigate more slowly, in
and treat it if pH levels etc. require
litres per hour, it may be possible
adjustment. It is also easy to mix liq-
to use the smaller kilowatt pressure
uid fertilisers into these small tanks
pump, saving in pump costs as well
for fertigation requirements.
as electricity costs. These pumps can
Capturing rainwater from green-
easily be used in conjunction with
houses, tunnels, etc., is also useful
photovoltaic systems with battery
as you are capturing water from
back up.
the immediate area for use on site. It also can help tremendously
Water facts
with stormwater mitigation and
• Some 1.1 billion people, or 18 % of the word’s population, lack access to safe drinking water, and over 2.4 billion people lack access to adequate sanitation. • More than 2.2 million people in developing countries, most of them children, die each year from diseases associated with lack of access to safe drinking water, inadequate sanitation. • A report released in early October 2009 by the Water Research Commission of South Africa found that South Africa has 4% less water than 20 years ago. • Rand Water is predicting that demand for water in South Africa will outstrip supply by 2025. • In Cape Town, the scenario is not much better with a water shortage prediction by 2016. • If South Africans continue with their wasteful water practices, there simply will not be enough water to meet the country's future needs and we may have to start paying even more for water! • South Africans can change the scenario by changing their behaviour towards water usage and becoming water wise and savvy about rainwater harvesting.
can help prevent flooding and water damage. It makes sense to use the captured rainwater with waterwise efficient drip irrigation systems. Correct filtration of the rainwater, both before it enters the water storage tanks as well as after the pressure booster system, prevent clogging of drip emitters and is part of good drip irrigation design. Drip irrigation allows the grower to use less water to achieve the same or better results. Drip irrigation allows the grower to place the correct amount of water, mixed with the right ingredients, at the right place at the right time. This allows uniform distribution of water and nutrients. Drip irrigation systems can also reduce labour costs. Drip irrigation has been shown to increase crop yields, compared to traditional large droplet spray irrigation systems, while utilising less
Index to Advertisers 14th Annual African Utility Week 47 Abeco Tanks 93 Aquadam 6 Atlas Copco 11 Degrémont 64 DFC 30 DOW OFC DPI Plastics 38 Eftec 48 Elster Kent 88 Endress + Hauser 20 ERWAT IBC Fiberpipe 34 Gast International 62 GIBB South Africa 92 Golder Associates 16 Hansen Industrial Gearboxes 87 Headstream Water Holdings 44
96
Ingérop South Africa JoJo Tanks Kaytech KELLER AG fur Druckmeestechnik Krohne South Africa KSB Pumps Mather + Platt Nalco Nalco NewElec Prentec Prei Instrumentation Quality Filtration Systems Rainbow Reservoirs Rescue Rod Rocla Royal HaskoningDHV SafeQuip
March/April 2014
36 94 54 12 26 14 22 IFC 66 39 74 71 73 40 7 52 8 24
SBS Water Systems 43 Sensus South Africa 29 SEW Eurodrive 58 Sika 9 The Rare Group 68 ThyssenKrupp 60 Tracker Connect 2 Utility Systems 90 Verder Pumps 35 Vovani Water Projects 77 Vovani Water Projects 79 Vovani Water Projects 81 Vovani Water Projects 83 Vovani Water Projects 85 Water & Sanitation Services OBC WILO 32 WPCP 50 Zest WEG Group 56
I N N O V A T I V E
W A S T E W A T E R
T R E A T M E N T
YOU URGENTLY NEED:
Specialist knowledge on wastewater management Complete professional solutions to wastewater problems
BACKED BY 20 YEARS OF EXCELLENCE, ERWAT BRINGS YOU: Expertise and experience in all aspects of wastewater Consultation, sourcing and facilitation of services to address your needs SANAS 17025 accredited laboratory analysis Value-added service at affordable prices
Why don’t you contact us today? t 011 929 7000
f 011 929 7031
mail@erwat.co.za
www.erwat.co.za