Think water, think WISA! T
Water& Sanitation
The official magazine of the Water Institute of Southern Africa T
Complete water resource and wastewater management
Africa
Is water an untapped commodity?
PANEL DISCUSSION Deliberating on desalination
THE HOT SEAT
REGIONAL FOCUS Increasing Eastern Cape capacity
We have reached the point where GRP composites posites er, cannot be ignored. Jan Krüger, technical manager, Fiberpipe
P22
January/February 2013 • ISSN 1990-8857 • Cover price R40.00 • Vol 8 No. 1
MEDIA
IT IS TIME TO MANAGE RESOURCES MORE EFFECTIVELY Around the world, demands for water and energy continue to increase, making it essential to manage these vital resources more effectively in the long term. The ability to address this issue requires access to more frequent, accurate and integrated information about how water and energy are used. As a world leader in advanced metering and smart grid technologies, Itron helps utilities to overcome their everincreasing operational, regulatory and environmental challenges. Effective management of resources is at your ďŹ ngertips.
CONTENTS
Volume 8. No.1
Think water, think WISA! T
Water& Sanitation
The official magazine of the Water Institute of Southern Africa T
Complete water resource and wastewater management
Africa
Is water an untapped commodity?
Volunteers’ efforts ensure a cleaner Mutale River
18
ON THE COVER
Water solutions provider NuWater investigates water as a commodity in the mining water reclamation and reuse context
PANEL DISCUSSION Deliberating on desalination
THE HOT SEAT
REGIONAL FOCUS Increasing Eastern Cape capacity
We have reached the point where GRP composites posites er, cannot be ignored. Jan Krüger, technical manager, Fiberpipe
P22
MEDIA
January/February 2013 • ISSN 1990-8857 • Cover price R40.00 • Vol 8 No. 1
43 Port Alfred WWTW receives an upgrade
COVER STORY Mining water?
4
WISA Presidents message 6 Acting chief executive’s message 8 Patrons honoured 9 WISA: International Conference on Water Reuse for Drinking Purposes 10 Excellence in water research honoured 14 Divisional discourse 15 YWP: Conserving the lower Mutale River 18
HOT SEAT Fiberpipe’s Jan Krüger discusses the organisation’s investment in training and knowledge transfer 22 PANEL DISCUSSION Deliberating on desalination
27
REGIONAL FOCUS: EASTERN CAPE Increasing capacity at the Port Alfred WWTW WTW upgrade on track Quinera WWTW upgrade nearing completion
43 46 49
AFRICAN FOCUS Zambia: Conveying confidence at Chambishi CuSEP Project 51 Angola: HDPE pipes chosen for Angolan Cunene Project 52
Quinera WWTW upgrade near completion
49
TRENCHLESS NEWS
53
FEATURE: LABORATORIES & EQUIPMENT
60
FEATURE: RESERVOIRS
69
REGULARS Editor’s comment Infrastructure news Industry news
3 20 25
60
Is the skills dynamic in South Africa’s laboratories still a challenge?
JANUARY/FEBRUARY 2013
1
Water Purification Plant & Equipment INTRODUCTION SWANSA (PTY) LTD trading as SWAN’S WATER TREATMENT is a privately owned South African company specializing in the design and manufacture of the full spectrum of water puriſcation equipment. Cost effective innovations are incorporated in our process and equipment designs with the plant being customised for each installation. Our extensive in-house expertise, ensures that out advanced technology is applied to the clients best advantage. PRODUCT RANGE • Water ſlters • Moore Airlift Rapid Gravity ſlters • Steel pressure ſlters • Steel rapid gravity ſlters Liquid/Solid Separation • Sludge Blanket Vertical Upƀow Clariſers • Diminishing Intensity Floc Conditioners • Incline Sheet Clariſers • Upgrading of Horizontal Flow Clariſers Chemical Dosing • Helical screw feeders • Rotary disc dry feeders • Water operated dry feeders • Gravity solution feeders • Metering pumps • Gas Chlorinators Efƀuent Treatment • Bioſlter rotary distributors • Aerators • Clariſers Miscellaneous • Package plants • Ammoniators • Sulphonators • Pilot operated diaphragm valves • Laboratory ƀoc testers • Automatic pH control • Comparators • Domestic and industrial cartridge ſlters
Swan’s Water Treatment Prop. Swansa (Pty) Limited Reg. No. 80/11814/07 Plot 91, Honingklip, Muldersdrift P O Box 777 Muldersdrift 1747 Tel: 010 594 9999 Fax: 086 609 1595 P Swan
Publisher Elizabeth Shorten Editor Chantelle Mattheus Head of design Frédérick Danton Senior designer Hayley Mendelow Chief sub-editor Claire Nozaic Sub-editor Patience Gumbo Contributors Dawid de Wet Marketing & online manager Martin Hiller Production manager Antois-Leigh Botma Production coordinator Jacqueline Modise Distribution manager Nomsa Masina Distribution coordinator Asha Pursotham Financial manager Andrew Lobban Administration Tonya Hebenton Printers United Litho Johannesburg +27 (0)11 402 0571 Advertising sales Avé Delport Tel: +27 (0)11 467 6224 • Cell: +27 (0)83 302 1342 Fax: 086 502 1216 E-mail: avedel@lantic.net
EDITOR’S COMMENT
Welcoming the new year
A
new year always brings with it new opportunities and challenges, as well as a renewed sense of vigour with which to approach these ‒ and the beginning of 2013 is no different.
As we focus on the year ahead, there are a number of
highlights to look forward to, and no doubt a number of new and unique perspectives and solutions on challenges that continue to plague the water sector to be expected as well. One of these opportunities to collaborate and debate on these challenges
Publisher
and opportunities is the Municipal Water Quality Conference, to be held at Sun City from 7 to 11 July 2013. The focus will be on ensuring the financial sustainability of the
Physical address: No 4, 5th Avenue Rivonia 2056 Postal address: PO Box 92026, Norwood 2117, South Africa Tel: +27 (0)11 233 2600 Fax: +27 (0)11 234 7274/5 E-mail: chantelle@3smedia.co.za MEDIA
ISSN: 1990 - 8857 Annual subscription: R290 (SA rate) E-mail: subs@3smedia.co.za Copyright 2013. All rights reserved. All articles in Water&Sanitation Africa are copyright protected and may not be reproduced either in whole or in part without the prior written permission of the publishers. The views of contributors do not necessarily reflect those of the Water Institute of Southern Africa or the publishers.
water services business within local government, as well as partnership opportunities between the public and private sectors to upscale efforts to improve wastewater services and drinking water management locally. Organised by both the Department of Water Affairs (DWA) and WISA and pertinently themed Together committed to excellent water quality for the future , the conference will focus on
Ensuring the financial sustainability of the water services business within local government
four disciplines, namely wastewater management, drinking
water
quality
management, sustainable economic
municipal
environment and opportunities for partnerships. These themes broadly encompass a number of focal points for submissions and presentations, most of which are also key focus points for Water&Sanitation Africa in the upcoming year. One of these is the importance of credible laboratories, which we have also highlighted in this edition on page 60, along with the achievements of a number of
WISA CONTACTS:
municipalities through the delivery of a number of interesting projects that are cur-
HEAD OFFICE Tel: +27 (0)11 805 3537 Fax: +27 (0)11 315 1258 Physical address: 1st Floor, Building 5, Constantia Park, 546 16th Road, Randjiespark Ext 7, Midrand
rently under construction or have recently been completed in the Eastern Cape. The
BRANCHES
are working towards changing the service delivery dynamic in this region.
Eastern Cape Chairman: Hennie Greeff Tel: +27(0)41 453 3102 Secretary/Treasurer: Chris Dickson Tel: +27(0)41 507 8200
www.ewisa.co.za
upgrade of the Caesars Dam Water Treatment Works in the Addo region is featured on page 46 and the upgrade of the Port Alfred Wastewater Treatment Works to increase the treatment capacity is on page 43. These are two progressive projects that In the previous edition of the magazine, we highlighted SRK Consulting s partner and principal hydrogeologist Peter Rosewarne s 30th anniversary with the organisation. A fuller, more comprehensive version of the article is available on 3S Media s infrastructure website ‒ infrastructurene.ws ‒ as are other interesting articles, events
Free State Chairperson: D.R. Tlhomelang Tel: +27(0)51 403 0800 Secretary/ Treasurer: Riana Wessels Tel: +27(0)56-515-0375
and technologies that are not able to be included in Water&Sanitation Africa due to
KwaZulu-Natal Chairman: Chris Fennemore Tel: +27 (0)31 311 8734 Secretary/ Treasurer: Stephanie Walsh Tel: +27 (0)31 302-4077
for 2012/13 where, as part of the incentive-based regulation approach, exceptional
Western Cape Chairman: Gareth McConkey Tel: +27(0) 21 712 4260 Secretary/ Treasurer: Eleonore Bondesio Tel: +27(0)21 872 0322 WISA mission statement m The Water Institute of Southern Africa provides a forum er for exchange of information and views to improve water resource management in southern Africa.
Endorsed by
the constrained nature of the print medium. Be sure to visit. In closing, the upcoming Municipal Water Quality Conference will also serve as a platform for performance announcements within the wastewater services domain performance will be awarded in terms of the coveted Green Drop Awards ‒ and Water&Sanitation Africa looks forward to sharing these achievements with our readers. Awards such as these are always a positive reinforcement of all the effo ort and dedication that is very much in evidence in the water sector.
Cover opportunity In each issue, Water&Sanitation Africa offers companies the opportunity to get to the front of the line by placing a company, product or service on the front cover of the magazine. Buying this position will afford the advertiser the cover story on pages 4 and 5 and maximum exposure. For more information on cover bookings contact Avé Delport on +27 (0)83 302 1342 or e-mail avedel@lantic.net
JANUARY/FEBRUARY 2013
3
COVER STORY
NUWATER
Mining water? UF Modules at Anglo American Thermal Coal
Water has long been described as a commodity in the same way as coal, metals and oil are. This description becomes more and more relevant as the true value of water starts to be clear, according to water solutions provider NuWater.
A
recent Bank of America Merrill Lynch research report
drainage wastewater reclamation plant at the New Vaal Colliery
describes water as the new oil . Is this just sensation-
near Vereeniging. The New Vaal project involves the treatment
alist? NuWater thinks not and is applying new thinking
and desalination of mine drainage water from a storage dam on
and strategies to water reclamation and reuse that are
the mine and the transmission of the resulting high-quality po-
more common in extractive industries than in water utilities.
table water to Eskom s neighbouring Lethabo power station for reuse as cooling process water. This has environmental sustaina-
Setting sights on sustainability
bility benefits for both Anglo American Thermal Coal and Eskom,
NuWater was established in 2010 following the acquisition of the
as well as economic benefits, says John Holmes, NuWater s CEO,
international GrahamTek 16
describing the project.
reverse osmosis (RO) technology
rights. NuWater quickly consolidated the operations of GrahamTek
Anglo recognised the benefits of our proposal for a completely
Singapore and GrahamTek South Africa, creating an international
modular & mobile (redeployable) wastewater treatment and
technology-led water treatment and desalination solutions and
desalination plant based on our proprietary RO technology. This
services company. It immediately focused its sights on unconven-
allowed us to offer them an economically attractive and flexible
tional desalination applications in the mining, oil and gas, and
solution whereby NuWater charges only for the water treated
power sectors ‒ all large users of water. At the same time, the com-
while retaining ownership and operational responsibility for the
pany has used its credentials in wastewater reclamation for potable
plant. NuWater would simply not have been able to offer this
reuse to drive its business into the more conventional water and
flexible BOO (build, own and operate) model were this a conven-
wastewater sectors. NuWater has developed an impressive portfo-
tional fixed plant rather than our rapidly redeployable design.
lio of reference projects covering multiple industries and geographies from its operations in Cape Town, Singapore and London.
The first high-quality water was produced in December 2010 with production capacity ramping up to its current maximum of 20 000 m3/d. At this current capacity it is believed to be the larg-
4
Modular and mobile
est plant of its type in the world and is confirmation of NuWater s
NuWater started working with Anglo American Thermal Coal
technological and project delivery capability. Johan Fourie,
in late 2010 to deliver a completely modular & mobile mine
technical services manager at the New Vaal Colliery, confirms:
JANUARY/FEBRUARY 2013
COVER STORY NuWater has repaid our confidence in its technology,
in the process of developing some strategic relation-
skills and customer commitment by delivering a world-
ships with providers of distributed power solutions.
class solution.
Active participation Rapid deployment
NuWater is a big believer that the recovery and pota-
NuWater is also currently working with Murray
ble reuse of secondary wastewater from conventional
& Roberts on a project for Gold Fields to deliver two mine wastewater treatment and desalination plants for its mine in Tarkwa, Ghana. Once again, the company was selected for this project based on
wastewater treatment plants presents a major oppor-
Loading Antonov 224 bound for Ghana
tunity to alleviate pressure on water resources. This is, however, a complex topic and goes well beyond technical feasibility. It will require extensive
its proven technology, modular solution and rapid
public consultation to explain the
deployment capabilities.
rationale and discuss concerns about
The project involves two plants, each producing
the suitability of wastewater reclaimed
about 7 500 m3/d of high-quality potable water from
through RO for human consumption.
mine wastewater for reuse or return into the environ-
Holmes
elaborates:
NuWater
in-
ment. The first phase of this project was commissioned
tends to be an active participant in
at the end of 2012, less than four months from the
the
project award, with the balance of the project to be
reclamation and potable reuse both
completed by May 2013. Holmes discusses some of the
in South Africa and in other water-stressed countries
challenges of the project and how NuWater addressed
in sub-Saharan Africa. In Singapore, we have been ac-
them: The Gold Fields Tarkwa project is a logistical
tively involved in the country s secondary wastewater
challenge due to its location and short delivery time
reclamation and reuse strategy and our large-diameter
frames. We have, however, been able to leverage our
(16 ) RO technology is in use at the Singapore Public
operations in Singapore and the
Utilities Board 55 000 m3/d flagship plant at the Bedok
UK to ensure the necessary plant equipment is available on time.
Facing forward NuWater expects to convert more mining-related projects over the next 12 months. In addition, the company is extending its solutions to offer higher recovery to minimise the amount of concen-
NuWater is applying new thinking and strategies to water reclamation and reuse that are more common in extractive industries than in water utilities
trated brine produced from the RO process or to elimi-
discussion
around
wastewater
NEWater Factory, also the site of the national water visitors centre. From a technology point of view, one does not get a much better reference plant than Bedok and this serves NuWater very well when demonstrating the benefits of water reclamation and potable reuse. It has, however, taken a huge investment in public education in Singapore to get people comfortable with the concept of drinking reclaimed sewerage water, even when this is indirectly through recycling of this water back through catchment reservoirs.
nate brine altogether to achieve zero brine, or zero liq-
Whether the value of water ever reaches the lofty
uid discharge (ZLD). According to Jeeten Nathoo, chief
heights of oil remains to be seen. Water is a finite and
technology officer at NuWater: Brine management is a major obstacle to wider and more rapid adoption of RO for large-scale industrial wastewater reclamation projects. Concentrated brine must either be recycled or stored in evaporation ponds, which is costly and,
Anglo New Vaal 15 Mâ„“/d Wastewater Reclamation Plant
increasingly valuable commodity and companies such as NuWater, with the technology and creativity to extract value from wastewater, which would otherwise be considered useless or even harmful, have a valuable role to play in ensuring long-term water security.
in cases of limited space, impractical. Along with both proprietary and externally sourced ZLD technologies, NuWater is developing novel brine concentration processes in order to offer customers brine management solutions as a standard part of its modular and redeployable plant suite. We will be field-testing these on actual brine streams from our existing plants during the course of 2013. Another sector NuWater has targeted for growth is power. Apart from the fact that power and water are considered essential utilities in the modern world, power generally requires significant amounts of water for cooling while water treatment, in particular desalination, requires significant amounts of power. According to Holmes: What is particularly interesting for NuWater is the growth in the market for distributed mid-sized power solutions. Our modular & mobile water treatment and desalination solutions fit very well alongside this growing power market. We are therefore In each issue, Water&Sanitation Africa offers advertisers the opportunity to promote their company s products and services to an appropriate audience by booking the prime position of the front cover, which includes a two-page feature article. The magazine offers advertisers an ideal platform to ensure maximum exposure of their brand. Please call AvĂŠ Delport on +27 (0)11 467 6224/ +27 (0)83 302 1342 to secure your booking.
5
PRESIDENT ’S MESSAGE
We need to position ourselves strategically m sure we can all agree that 2012 passed
developing a database for training
McConkey will drive this process to ensure
like lightning and many of us can count
service providers
that these branches and divisions become
I
successes and positive failures.
• launching our new website.
sustainable and form an integral part of
The end of the year break came as a
It sometimes seems as if WISA is a silent
development in their specific provinces
relief to many, allowing us to have a quiet
partner and does not really take a stand in
and industry.
relaxing moment and to spend time with our
water sector matters, but let me assure you
Anita Pillay and Alvin Lagardien will
loved ones. It also gave us an opportunity to
that this is not the case. We will have our
continue driving the professionalisation
gain some perspective on what we want to
first top-level meeting with the director
of process controllers and there is a huge
achieve in 2013 and how to make it a huge
general of Water Affairs to discuss burning
excitement with regard to the Memorandum
success. In some instances, we know we
issues in the sector and how WISA can
of Understanding already signed between
can achieve more if we do it in a group or
get involved in assisting the department
WISA and the EWSETA.
as a team, so in essence it will be all hands
with
on deck.
and projects.
May I humbly request that as one of your
Melissa Wheal
issues
Similar
discus-
The WISA board recently held a very exciting session to revisit the existing strategy
new year s resolutions, you contribute to
sions will be initi-
one constructive project towards the water
ated with other key
sector, no matter how little? Even if it is just
stakeholders such
to contribute to the upliftment of one indi-
as the CSIR, WRC, tertiary institutions, South
vidual in sector.
African
will ensure the smooth roll-out of the exciting website, which will be the face
of WISA and a website we can identify with.
Association,
I want to congratulate Rand Water on its
WISA will pull out all the stops in 2013,
Energy and Water Sector Education and
Training Academy and have no doubt it will
as the time is right for WISA to endorse
Training Authority, our patron members and
contribute enormously to training in the
its position in the water sector and be the
our international partners.
sector. The City of Cape Town s Bulk Water
Local
Government
voice for constructive consultation and
Now that most of our corporate gov-
Branch achieved the ISO 9001 certification
implementation. During our 2015 to 2019
ernance statutory compliance has been
and it is believed that it is the only munici-
strategic session we were regularly remind-
finalised, WISA has the ideal opportunity
pality in South Africa to acquire such a pres-
ed of the quote by Elon Musk, Imagination
to place itself strategically as a reputable
tigious recognition.
is the limit .
non-profit company.
The key focus in 2013 will be:
Our
• instituting closer relationships with the Department of Water Affairs to local government • expanding into Africa • exhibiting
at
international
and be
• vigorous marketing of WISA, especially
confer-
Well done to the successful Process Controllers open days held in some
branches divisions
reviewed
provinces, giving a clear identity to
will
process controllers.
with their
Let me wish you, on behalf of the
terms of references
board, council and staff of WISA, a
in order to partake
successful and fruitful 2013.
regard
to
in a structured and
ences (SA Water Sector pavilion with
constructive
patron members)
contribution. Valerie
President: Water Institute of
Naidoo and Gareth
Southern Africa
• capacity building and training, and
PATRON MEMBERS • Aecom • Amatola Water • Aveng Water • Baycity Trading 377 cc • BIGEN AFRICA Services • Bloem Water • Botjheng Water • Bushbuckridge Water • City of Cape Town • City of Tshwane • CSIR • Dow Water & Process SA
6
key
• Department of Water Affairs • ERWAT • ESKOM Holdings • eThekwini Municipality • Festo • Golder Associates Africa • Grundfos Alldos • Huber Technology • Johannesburg Water • Magalies Water • Merck • Mhlathuze Water • NCP Chlorchem
Ronald M Brown
sector
• Nelson Mandela Bay Metropolitan Municipality • Overberg Water • PD Naidoo & Associates Consulting Engineers • Prentec • Rand Water • Royal HaskoningDHV • SALGA • SAME Water • Schneider Electric • Sedibeng Water • SembCorp • Siemens
JANUARY/FEBRUARY 2013
• Sobek Engineering • Sulzer Pumps Wastewater SA • TCTA • Tecroveer • Umgeni Water • Veolia Water Solutions & Technologies SA • WAM Technology • Water Research Commission • Water & Sanitation Services SA • WEC Projects • Xylem • Zetachem • ZMG Watech
IN ASSOCIATION WITH
INFRASTRUCTURE DEVELOPMENT Íť MAINTENANCE Íť SERVICE DELIVERY
JOIN THE INFRASTRUCTURENE.WS COMMUNITY FOR FREE
Have your say or get the conversation started about anything and everything related to the infrastructure and service delivery industries.
The official magazine of the Institute of Municipal Engineering of Southern Africa
Winner of the 2011 PICA Non-professional writer of the year
Think water, think WISA! T
IMESA
MEDIA
The official magazine of the Water Institute of Southern Africa T
:DWHU 6DQLWDWLRQ Complete water resource and wastewater management
Africa
INFRASTRUCTURE DEVELOPMENT Íť MAINTENANCE Íť SERVICE DELIVERY
Water storage solutions for Africa
Scan here to go to website
SEMBCORP Vital partners, essential water solutions MUNICIPALITIES Water metering reference guide WATER REPORT Cradle of Humankind
LQ Q WKH
Water
Ekurhuleni
Litter
Looming crisis
Urban infrastructure
Lurking danger
Dirk Meyer, managing director of Corobrik: ÍžDƾŜĹ?Ä?Ĺ?ƉĂů Ĺ?ĹśÄ¨ĆŒÄ‚Ć?ĆšĆŒĆľÄ?ĆšĆľĆŒÄž
Ä?ŽŜĆ?ĆšĆŒĆľÄ?ĆšĹ?ŽŜ ŚĂĆ? Ä‚ĹŻÇ Ä‚Ç‡Ć? Ä?ĞĞŜ ĂŜ Ĺ?ĹľĆ‰Ĺ˝ĆŒĆšÄ‚ĹśĆš ĹľÄ‚ĆŒĹŹÄžĆš Ä¨Ĺ˝ĆŒ Ĺ˝ĆŒĹ˝Ä?ĆŒĹ?ĹŹÍ˜Í&#x; ISSN 0257 1978 Volume 37 No.5 R40.00 (incl VAT)
S
THE HOT SEAT
Dean Mulqueeny, managing director y''s NCP Chlorchem, discusses the company's water treatment solutions P12 P1 12
MEDIA
0D\ -XQH ‡ ,661 ‡ &RYHU SULFH 5 ‡ 9RO 1R
Infrastructurene.ws brings together the communities from our three magazines – IMIESA, Water&Sanitation Africa and ReSource. It is a leading news hub, with in-depth articles, videos and podcasts, an events calendar, and full social media functionality.
STAY IN TOUCH A weekly newsletter keeps you up to date Sign up online for our FREE weekly newsletter and get an instant summary of the latest news, events and developments in the infrastructure and service delivery industries.
VISIT
The @infrastructure4 tweets will keep you updated on all the latest, exciting and, of course, interesting happenings in the infrastructure and service delivery industries.
www.infrastructurene.ws TODAY
READY FOR MORE? To advertise on infrastructurene.ws, contact Jenny Miller jennymiller@lantic.net Tel: +27 (0)11 467 6223 Fax: 086 587 6247 For editorial enquiries contact Chantelle Mattheus chantelle@3smedia.co.za Tel: +27 (0)11 233 2600 Fax: +27 (0)11 234 7275
WISA From the pen of the acting chief executive:
A warm welcome
W
elcome back! We trust that
will be employing an events coordinator
new database will have many new features
you enjoyed the time spent
to support the events manager. Two of
that will add to the benefits of the mem-
with your families over this
WISA s divisions will be hosting conferenc-
bers, such as allowing members to be able
festive season and that you
es in 2013. The Young Water Professionals
to update their own membership profiles
are well rested and ready to tackle the
will be hosting the 3rd Southern African
and upload their CVs as well as a profile
challenges that may lay ahead in 2013.
Regional Biennial YWP Conference from
picture; the database will be Internet-
WISA has recently established an Events
16 to 18 July 2013 at the University of
based, which will enable WISA and its
Management Unit that will focus on
Stellenbosch. The Membrane Technology
members to access their profile from any-
arranging
workshops,
Division will be holding a conference in
where and enable WISA to provide mem-
conferences and exhibitions. The unit will
2013; the date and venue will be con-
bers with information on the membership
mainly run events being held by the WISA
firmed soon.
status at any time.
events
such
as
Head Office, our branches and/or divisions.
WISA has also established the Process
Patron members will have the added
WISA would also like to partner with and
Controller Division in the past year, with
benefit of being able to host their own
assist our members in hosting events that
branches in Gauteng, the Western Cape,
page on the website where they will be
will provide a platform for knowledge
Mpumalanga, Free State and KwaZulu-
able to upload any information.
dissemination. In order for WISA to make
Natal.
launching
I would like to welcome our new patron
the Events Management Unit a success, it
its Process Controller Division early in 2013.
members to WISA and we look forward to
was found that a dedicated events man-
This
will
having a long and fruitful relation-
ager would be required, as well as events
create a platform for
ship with the following organisa-
coordinators to assist and support the unit.
process
tions: SembCorp, Sobek Engineering
WISA, through due process, appointed
and will assist with
Jaco
the
Seaman
who
commenced
work
Limpopo division
will
controllers profession-
at WISA on 5 November 2012. Seaman
alisation
has already started working hard on the
process controllers.
Municipal
Water
Quality
Conference
be
of
the
The new website
and Baycity Trading 377 CC. We look forward to a successful 2013 in which WISA s main focus will
be
on
implementing
taking place in July 2013 as well as the next
and
WISA Biennial Conference & Exhibition
WISA will go live in
Dot Zandberg
taking place in May 2014. In 2013, WISA
January 2013. The
WISA: acting chief executive
8
database
its
strategic plan.
of
JANUARY/FEBRUARY 2013
LET YOUR BRAND STAND OUT WITH 3S MEDIA ‡ 1HHG WR UHDFK \RXU QLFKH WDUJHW PDUNHW" ‡ :DQW PD[LPXP H[SRVXUH" ‡ :DQW D KLJK SHQHWUDWLRQ IRU \RXU PHVVDJH" Then 3S MEDIA’S products are for you. Our brands reach the infrastructure and service delivery, water, waste management, mining and conferencing industries. WE OFFER YOU ‡ %UDQG DGYHUWLVLQJ LQ print magazines, buyers’ guides, directories and supplements ‡ %UDQG DGYHUWLVLQJ LQ exact replica online magazines with limited animation and hyperlinks to your website ‡ 3UHVV RIÀFHV with multimedia functionality on websites accessible via computers or mobile phones, harnessing the power of video and animation ‡ Banner adverts RQ ZHEVLWHV DQG LQ QHZVOHWWHUV WR GULYH WUDIÀF WR \RXU SUHVV RIÀFH your own website event or job listing ‡ Event sponsorships and exhibition stands.
FOR MORE ABOUT 3S MEDIA’S OFFERINGS VISIT www.3smedia.co.za or e-mail enquiries@3smedia.co.za
Scan here to go to website
MEDIA
WISA NEWS
Patrons honoured On 14 November 2012, WISA held its Annual Patron Members lunch, hosted by WISA president Ronald Brown and the WISA board. The event serves as a welcome to new Patron Members, as well as recognising the loyal support to WISA by existing patron members.
A
Solution for partially filled pipes
t the event, which was held at the Viva Espãna Restaurant in the Constantia Office Park, WISA highlighted the activities for 2012, and outlined the plans and activities for 2013.
achieve more
Speaking at the event, Brown indicated that WISA is now WISA
NPC, with a newly endorsed vision: the promotion of professional excellence in the water sector through building expertise, sharing knowledge and improving quality of life. In addition, WISA
No need for civil work and flumes anymore!
came up with a new memorandum of incorporation and a new code of conduct, which was to be endorsed at the last board meeting of 2012. According to Brown, the emphasis going forward will be on Africa, with the institute seeking to expand its reach on the African continent. He also indicated that current acting chief executive, Dot Zandberg, would remain as acting chief executive until August 2013 and in future, the Patrons Lunch could possibly be held biennually with the next one scheduled for the WISA 2014 Conference, which is to be held in Nelspruit, Mpumalanga. Mellissa Wheal gave a sneak preview of the new website, which has been completely redesigned to be more interactive, as well as exhibiting updated member profiles online and enabling members to manage their accounts online. Current discussions are under way to integrate the new WISA website with the Department of Water Affairs
controllers
database and an online WISA newsletter has also been proposed, with the content being based on the user/member s indicated interests. Financially, WISA experienced a good year, with income totalling R8.4 million and expenses of just over R3 million. This was, in part, due to subscription payments as well as two very well attended conferences. The reserves are
The TIDALFLUX 4000 flow sensor with integrated and non-contact capacitive level measuring system provides accurate flow measurement in partially filled pipes. It is designed to measure reliably between 10% and 100% of the pipe cross section. The integrated level sensors in the liner are in no contact with the liquid and are therefore insensitive against fat and oil floating on the surface. The sensor has been designed for measuring all water and wastewater applications including groundwater, potable water, wastewater, sludge and sewage, industry water and salt water in partially filled pipes. Available for a wide diameter range of DN200 up to DN1600 for flow rates up to 90,000 m3/hr! The TIDALFLUX 4000 causes no pressure loss and allows for bi-directional flow metering. With no Filters or straighteners required the flow meter can be installed underground and allows for constant flooding (IP 68). The TIDALFLUX4000 provides years of reliable measurements as it has no internal moving parts and nothing can wear. KROHNE - Process engineering is our world Please see our website for more information
currently tallied at R9.6 million, but this remains, as always, an ongoing concern. The budget for 2013, which exhibits a R2 million deficit, was presented to the board for approval on 15 November 2012.
WISA president Ronald M Brown addressing the WISA patrons
KROHNE South Africa 8 Bushbuck Close Corporate Park South, Randtjies Park, Midrand John Alexander Tel: +27 011 31 4 1391 Fax: +27 011 314 1681 Cell: +27 082 556 3934 johna@krohnesa.co.za
WISA NEWS
WATER RECLAMATION
Timeous water reclamation interventions critical The question is no longer whether reclaimed water should be included in South Africa’s water options, but rather when and how it should be included, finds Chantelle Mattheus at the WISA: International Conference on Water Reuse for Drinking Purposes.
S
outh Africa is at risk if water is not taken seriously
although sufficient alternative water is available, this requires im-
and interventions not applied timeously. This was
proved efficiency and water loss management, reuse, local resource
the primary message from Fred van Zyl, manager:
optimisation through the use of groundwater, desalination and
Planning & Information at the Department of Water
improved control, according to Van Zyl. However, accessibility is
Affairs, when discussing the National Water Resource Strategy 2 as
conditional and comes at a cost, he warned, adding that it requires
the keynote speaker on the first day of the conference, which was
effort and timeous implementation. We need to stretch water as a
held from 9 to 11 October 2012 at the Gateway Hotel in Umhlanga.
resource, water funding and infrastructure.
Currently, the water and regulatory role players in South Africa are proceeding with the revision of the National Water Resource
Correct context
Strategy 2012, led by the Department of Water Affairs. The strategy
Neil van Wyk, chief engineer: National Water Resource Planning
will have a focus on the best use of the limited water resources, in
for the Department of Water Affairs, investigated the idea of reuse
a sustainable manner and to the benefit of society and the environ-
in the context of water supply, covering a number of key water
ment. Water reuse and recycling is one of the key pillars of using
use sectors, as well as highlighting considerations of key strategic
the limited water resources responsibly and efficiently. The confer-
actions that need to be undertaken in the local context before and
ence was aimed at providing a training, education and discussion
while implementing water reuse. According to Van Wyk, reclamation and/ or reuse is a recognised source of water in the water resource planning process, with considerable potential existing for water reuse in irrigation in the agricultural sector, which uses approximately 7.68 billion cubic metres per annum. A very small portion currently uses treated wastewater or effluent. He also highlighted the possible reuse of water for the municipal sector, both in the use of non-potable water and potable water. Direct reuse though is the challenge, said Van Wyk, adding that the main concerns include ‒ but are not limited to ‒ the presence of micro-pollutants, the cost of treatment, the handling of waste or residue streams, the risks associated
opportunity, and delegates included international specialists, local
with operations and management of the reclamation facilities and,
regulators and practitioners in the field of potable reuse of water.
ultimately, public perceptions and acceptance.
According to Van Zyl, there is a perceived sense of water insecu-
Van Wyk said that there were a number of key strategic actions
rity in the local South African context; however, the issue is that up
that needed to be undertaken by the relevant role players in order
until now the main focus has been on infrastructure development
to support a national water reuse strategy, which included pro-
and not on utilising all the water resources available to the water
moting sound decision-making, a clear policy and legislative en-
sector to overcome this shortage. This is despite the fact that the
vironment, clear intentions, information to support reuse and the
country faces a number of challenges in the water sector, the
capacity to implement ‒ not to mention the financing of projects.
most pressing of which is a lack of appreciation for water, its role
He added that there needed to be clear incentives to the up-
and current situation, as well as poor water values and inadequate
take of water reuse technologies, with reuse projects needing
status, and inadequate management and governance.
to be cost effective compared to other water supply alternatives.
Fresh surface water as a resource is at its limit in most areas and
10
The department will take the importance of price signals and
JANUARY/FEBRUARY 2013
WISA NEWS incentives
in
water
reuse
that the solution was no longer
decisions into account when
to build more dams or similar
reviewing the water pricing
infrastructure ‒ direct potable
strategy, said Van Wyk.
use is imminent and will most
Enforcement,
however,
re-
probably be a reality in the next
mained one of the biggest
decade in most catchments
current hurdles, with strict en-
‒ but that it needs to be one
forcement of current discharge
of the multiple solutions sug-
standards
gested and in order to achieve
and
addressing
the management and performance failures of municipal wastewater
treatment
plans
being required and, in fact, critical before due consideration could be given to water reuse. Compliance of existing WWTWs
to
achieve
strict
discharge standards is critical to the future success of water reuse, said Van Wyk.
this political commitment and
“South Africa is at risk if water is not taken seriously.” Fred van Zyl, director, Water Services: Planning & Information, Department of Water and Environmental Affairs
“Reuse of water for potable purposes is an attractive option in all cases.” Johan van
sensitising the public, need to
Rooyen, director: National Water Resource Planning Department of Water Affairs
proceedings seemed to infer that
be encouraged. Speaking on behalf of WISA in the closing, Dr Jo Burgess indicated that the conference the treatment technology was the easy part ,although always having room for improvement. We know what to do, we don t yet know how to do it though,
First forging ahead
said Burgess, adding that the soft issues, relating to community
The Beaufort West Water Reclamation Plant is the first direct (toilet
outreach, acceptance and communication, seemed to be the hard-
to tap) water reclamation plant in South Africa and serves as
er issues in this context, with unity between sectors, regulators and
validation that the idea is more than just a pipe dream .
the public ultimately being possible if this is undertaken correctly.
Beaufort West is well-known for its recurring potable water chal-
We need to focus, going forward, on treatment technologies,
lenges ‒ most notably the continued shortage thereof. In this con-
residue handling and regulator alignment, among others, but most
text, all possible alternatives have been investigated and developed,
importantly on how we communicate, she concluded.
namely managing water losses, installing pre-paid meters and applying local water restrictions ‒ with wastewater reclamation coming up as the only sustainable alternative and the most affordable option, according to Water & Wastewater Engineering s Pierre Marais. The project not only provides a sustainable water supply and sus-
thuthuka group limited
tainable development in the region, but also ensures that the local was achieved through optimising the performance of the existing wastewater treatment works; designing, building and operating a new water reclamation plant under a 20-year public-private partnership concession agreement; and providing a new rising main to the reservoirs. Water & Wastewater Engineering s responsibilities include daily operation, routine maintenance, preventative maintenance and specialised maintenance on membranes, with the company getting paid per kilolitre of reclaimed water. Speaking at the conference, Marais said that key to the process was the communication undertaken with the community by the municipality. The municipality started the process of public awareness regarding reclaimed water with newspaper adverts and through numerous discussions of the matter at community level. In addition, the EIA process was very comprehensive and included the distribution of pamphlets. Not only has the project twice been on the front page of the local newspaper, and school tours through the works are a common occurrence, but the plant also publishes its test results in the local newspaper and hands out water bottles to visitors, as well as insuring transparency with the municipality.
Facing forward The majority of the speakers seemed to fall into two major groupings: the scientific and those dealing with the bigger challenges in public participation. However, the consensus seemed to be
JANUARY/FEBRUARY 2013
11
Engineered Solutions for Africa
Lead anode plant for Kamoto Copper mine,
TGL designs, manufactures, DR Congo. PUZ[HSSZ HUK ÄUHUJLZ T\S[P disciplinary turnkey projects for the chemical, mining, renewable energy, metallurgical and industrial markets in Africa. :DWHU 7UHDWPHQW DQG 5HFODPDWLRQ $LU 3ROOXWLRQ 0DQDJHPHQW 0LQLQJ DQG 0HWDOOXUJLFDO ,QIUDVWUXFWXUH 3URMHFWV 3URFHVV (QJLQHHULQJ 6ROLGV :DVWH 0DQDJHPHQW 3ODQW +D]DUGRXV &KHPLFDOV 0DQDJHPHQW 3ODQW $FLG +DQGOLQJ 3ODQW 3KDUPDFHXWLFDO 3ODQW 3URMHFW )LQDQFH 5HQHZDEOH (QHUJ\ *ULG &RQQHFWLRQ 3URMHFWV
CCD Thickeners for SNC Lavalin, Madagascar
35-million litre reservoir, North West Province, South Africa
TGL has projects in: Zambia, Madagascar, D.R. Congo, Botswana, Malawi, Zimbabwe, Nigeria, Ghana, Namibia, Mauritius, Mozambique Contact: tel: +27 (0)11 468 5956 e-mail: tomm@thuthukagroup.com / www.thuthukagroup.com Adding value to your African project
V Squared V2/11696 Jun2012
municipality is able to deliver on its service delivery mandate. This
WISA NEWS
WATER RECLAMATION KICKER
Reclamation reality Chantelle Mattheus recently visited the Durban Water Recycling reclamation plant – a local and long-standing example of water reclamation technologies at work. The site visit was part of the WISA: International Conference on Water Reuse for Drinking Purposes.
T
he objective of the Durban Water Recycling reclamation plant is simple: to treat 47.5 Mℓ/d of municipal wastewater to a near potable standard for direct reuse in industrial water
production facilities because Mondi Paper had expressed the desire to increase its off-take of reclaimed water. The treatment philosophy, however, is anything but simple. It involves a novel combination of wastewater and potable water plants to produce this nearpotable-quality water that is supplied to the plant s industrial customers. The treatment process on-site involves, among the other key processes, primary treatment (namely screening, degritting and the utilisation of primary settling tanks through which the settleable solids are removed) as well as the use of activated sludge for the removal of COD and nitrogen pollution. Ozonation is also undertaken on-site through the use of pure oxygen to remove colour and degrade non-biodegradable COD. At the chlorination and storage stage of the process, chlorine is used during the stabilisation of the treated water and the plant has a storage capacity of 21 000 m3.
Construction context Durban Water Recycling is a project consortium made up of Veolia Water, Zetachem, Khulani Holdings, Umgeni Water and Marubeni. It has a 20-year concession agreement with the eThekwini Municipality to supply industrial clients Mondi Paper and Sapref [a joint venture between Shell SA Refining and BP Southern Africa] with water from the plant. Both the operating contract and the construction contract were undertaken by Vivendi Water Systems. The 20-year concession was ‒ and is still ‒ the first public-private partnership (PPP) of its kind in South Africa, with a strong reliance on the relative expertise
of
the
partners.
According
to
Sagren
investment being necessitated for the construction of the recycling plant. This while the project has enabled the creation of a long-term revenue stream for the city from a levy raised on the production of recycled water, as well as resulting
Govender, Veolia Water Solutions & Technologies
in a reduction in the city s operating costs and a conse-
general manager, it serves as a model of success
quent reduced cost of water services
for PPPs in South Africa. This year will be the 12th year of the 20-year contract and, as Govender says, time is a good indication of how successful it has been. Ultimately, the timely construction and completion of the project has resulted in the City of eThekwini being able to delay capital investment for increased marine outfall pipeline capacity, as well as the project delaying capital investment for future bulk potable water supply infrastructure, all with no capital
12
The filtering infrastructure at the Durban Water Recycling reclamation plant
The project has enabled the creation of a long-term revenue stream for the city from a levy raised on the production of recycled water JANUARY/FEBRUARY 2013
to Durban s citizens.
Assessing the impact To date, the project has achieved treatment of wastewater to a very high quality standard, while rolling out a compact design, which was fast tracked along with the construction, and extensively reusing the already existing infrastructure
WISA NEWS on-site. For the industrial customers making use of
according to Govender, and the municipality is actively
the water ‒ Mondi Paper and Sapref ‒ the project has
looking for further industrial users and projects that
enabled a 50% saving in their water tariff, with probable lower escalation of recycled water than potable water and the insurance of significantly enhanced drought supply security. On the environmental side, looking at the plant s im-
Attendees of the conference were also taken on a tour of the facilities
could result. However, these industrial streams bring with them their own sets of challenges, whereas residential and domestic effluent is easier to treat. But the technology is available and the possibilities are there, concludes Govender.
pact on the region s sustainable development of water resources, the plant reduces the city s water consumption by 10% when running at capacity and extends the life of the city s water catchment resources substantially, in that unused water in this context can then be directed to unserviced communities. In addition, waste minimisation and pollution load reduction have also been key focuses. A reduction in the sea outfall pollution load of 24% has been recorded, with the process operating at 97.9% water utilisation efficiency. The plant serves as a model for not only successful PPPs in the local context, according to Govender, but ensures that sewage is viewed as a potential resource, providing a new vision for the future where the production of potable water from sewage could be a reality.
Tale of tomorrow The potential for expansion of the operation exists,
JANUARY/FEBRUARY 2013
13
Utilty Systems offer the following suite of products: Water Management Device (WMD) a versatile, multifunctional, remote payment enabled, electronic meter reading and control device with Advanced Metering Infrastructure (AMI) capabilities. The WMD can be programmed remotely, and is thus easily configured in the field for all applications, from the provision of free basic water to AMR and AMI.
The USC WMD is the only device of its kind with SABS approval. Aquadata Automated Meter Reader (AMR) a low-cost, intelligent device that enables utilities to remotely read and monitor the metered consumption of water. Bulk WMD the WMD is available in large bore diameters ie 25, 40 and 50mm diameters.
encouraging responsible water usage
CORPORATION
WISA NEWS
AWARDS
Excellence in water research honoured Three South African researchers in the water sector – Dr Inga Jacobs, Craig Sheridan and Dr Heidi Snyman – were recently honoured for their contributions to the sector at the Excellence in Water Research Awards.
H
eld on 18 October 2012 at the CSIR Knowledge
Commons
in
Pretoria,
the
awards were held in honour of Dr Gerrie Stander,
Ronald Brown, as
described
by
WISA
president,
one of the greatest aquarians
born in South Africa . WISA, the WRC and the CSIR hosted the awards evening in acknowledgement of focused, productive, multidisciplinary research dedicated to the growth and intellect of the respective research disciplines.
Young researchers Dr Inga Jacobs of the WRC was honoured as the Female Young Researcher, with a presentation entitled Bringing the United Nations Watercourses Convention (UNWC) home? A multi-level water governance framework in the Orange-Senqu River Basin in South Africa . Apart from her current role as research manager: knowledge management at the WRC, Jacobs is also currently on a number of boards, including that of WISA, and is chairperson of the International Water Association Young Water Professionals. Craig Sheridan, who was honoured as the Male Young Researcher, gave a presentation on Water: The intra/ inter/cross-disciplinary research arena . Currently registered for a PhD, Sheridan is a lecturer at the School of Chemical and Metallurgical Engineering at the University of the Witwatersrand (Wits) in Johannesburg where he is presently supervising 10 water-related undergraduate research projects and co-supervising eight postgraduate students, seven of which are involved in water-related projects.
Memorial Lecture The Memorial Lecture, Water for Individual Growth and Development , was presented by the final honouree for the night, Dr Heidi Snyman, integrated water and waste specialist at Golder Associates and until recently director of water-centred knowledge at the WRC. The standard this year was exceptionally high, according to WISA vice-president Jo Burgess. My personal take-home message is one of enormous optimism. There seems to be a belief that locally we are not up to international standards. The reality is that we compare well and South Africans are leading the world in lots of ways, especially when it comes to water. We are a very passionate sector, said Burgess in closing.
14
Craig Sheriden (top), Dr Inga Jacobs (middle) and Dr Heidi Snyman receive their awards from Dr Mandla Msibi, director: Research and Innovation at Tshwane University of Technology (left) and WISA president, Ronald Brown (right)
JANUARY/FEBRUARY 2013
DIVISIONAL DISCOURSE
WISA NEWS
Focusing on anaerobic and sludge processes Anaerobic and sludge processes are overlapping issues. The WISA Anaerobic and Sludge Processes Division is concerned with the range covered by these, according to Gordon Borain, chairperson of the division. Chantelle Mattheus recently interviewed Borain on the current context and the division’s focus moving forward.
A
naerobic processes are used for high-strength wastes
it was very much area-dependant. We have some disasters and
and may be completely liquid. Sludges have high sol-
we have some very good examples. There are many good people
ids contents and usually have a high organic load.
in the water industry, but they need leadership and budget,
Historically, wastewater works have been designed
he added.
to treat the liquids to discharge standards and insufficient attention was given to the solids treatment and disposal. This has
Benefits realised
resulted in there being a large number of works around the coun-
Borain explained that biosolids have significant benefits due,
try having insufficient capacity to handle the solids produced, as
in part, to their nutrient levels being low relative to artificial
well as skills shortages. Enforcement of the Department of Water
fertilisers, but they have micro nutrients and soil conditioning
Affairs sludge guidelines is exacerbating these problems in the
benefits. Their disadvantages are pathogens and heavy metals.
short term, but is causing the industry to wake up to a worsening
Pathogens are not an insurmountable problem, but heavy metals
situation, said Borain.
need to removed at source.
According to Borain, the resolution of these problems will require
a
change
in
attitudes by authorities and an investment in skills and infrastructure. Education and training are crucial, but the balance between pure theory and applied theory and training needs to be maintained. Pure theory
“Education and training are crucial, but the balance between pure theory and applied theory and training needs to be maintained”
is needed to advance processes, but operation and upgrading of existing infrastructure is a greater short- to medium-term need.
He therefore advocated trade effluent management supporting
Need expertise with effluent and wastewater treatment? K' Enyuka produces affordable, workable and effective solutions tailored to specific requirements, whether dewatering or the treatment of wastewater and effluent. Its offering includes design, engineering and construction of wastewater treatment and effluent plants as well as dewatering installations.
I doubt that sufficient attention is being given to training young water professionals.
Product quality & energy efficiency Borain believed that the final product quality and energy efficiency are critical areas also needing attention. There are potential budget savings, but the ever-increasing standards that would have to be met are likely to utilise these. When asked which existing plants ‒ or even processes ‒ he considered best practice ideals that the rest of the water community would do well to emulate, Borain responded that that was difficult to answer. There is no best practice. Engineers design to suit the conditions existing at the time and as they see the situation progress-
Hydro-Pyro Metallurgical | Mineral Processing Engineers | Project Managers
ing, he stated. According to Borain, sludge and residuals management has also not been going well, but thanks largely to Green and Blue Drop, there had been a swing in the right direction. When asked what more could be done to remedy the situation, he indicated that
JANUARY/FEBRUARY 2013
15
T +27 11 498 6000 F +27 11 498 6060 E mail@kenyuka.com
Coralynne & Associates +27 (0) 11 422 1949
www.kenyuka.com
WISA NEWS industry where it can and prosecuting where necessary. Realising the full benefits of anaerobic digestion in the local context is also under question. Anaerobic digestion of municipal wastewater sludge has fallen into disuse over the last 20 to 30 years due to the capital cost of infrastructure. With assistance from Eskom, industry is starting to realise that anaerobic digestion not only has low operating costs, but can produce sufficient methane to provide sufficient power for 40 to 50% of the process needs, said Borain. He added that when a 65 Mℓ/d works has an electricity bill of around R1 million, there
protect the quality of South Africa s water
At the helm
is a lot of potential for savings.
for the use by all its people, particularly in
In May 2012, Borain took over as chairperson
our areas of expertise. Our focus must be
of the division. My strength is in waste-
Processes
on municipal wastewater sludge beneficial
water, so I personally wish to encourage
Division is a part
utilisation and utilising anaerobic processes
anaerobic digestion of municipal wastewa-
of WISA. As such,
in the treatment of municipal sludge and
ter and the use of the methane produced
our purpose is to
high-strength industrial effluents.
to generate power, but I want to support
According to Borain, the Anaerobic and Sludge
the industrial use of anaerobic processes,
“Anaerobic digestion of municipal wastewater sludge has fallen into disuse over the last 20 to 30 years due to the capital cost of infrastructure.” Gordon Borain 16
JANUARY/FEBRUARY 2013
said Borain, adding that the water industry needed all its facets to work as a team. The primary focus in the short term needs to be on training at process controller level, Borain concluded.
Proven Bioremediation Technology SOUTH AFRICA
WISA NEWS
WATER CONSERVATION KICKER
Conserving the lower Mutale River Volunteers, including members of the Young Water Professionals, recently cleaned most of the visible waste along the lower reaches of the Mutale River in Limpopo. They also conducted basic water tests with kits sponsored by the IWA. To follow is an account by volunteer Dawid de Wet.
I
t was mid-morning in winter and hot in the
and Ha-Makuya. From here, we followed the river in an
north-eastern corner of the Limpopo province. I
eastward direction past the bridge and down to the
travelled on mountain bike, but often had to push
border of the Makuya Park. We covered 40 km in total
it through the deep sand. The first glimpse of water
and collected 55 bags of rubbish and half a truck tyre.
through the undergrowth was very enticing. There it
Old clothes and nappies formed the bulk of our initial
was, the Mutale River. I squatted to get a better view
cleaning effort. We also found there is much more rub-
and immediately the beauty of the river hit me.
bish in the river than what is visible from the bank. It
Along with Vince Mehers from the Friends of Mutale
is therefore a difficult and slow process. After the first
charity organisation based in Bennde Mutale, we
day, we had collected eight bags of rubbish between
decided to launch a clean-up of the Mutale River. The
the five of us and only covered 8 km. We then made
river emerges from underground below Lake Funduzi
the decision to concentrate our efforts on the following
and flows through some of South Africa s most scenic,
day on certain sections of the river where there is a
undeveloped and isolated countryside areas before
big build-up of rubbish. These rubbish hot-spots are
joining the Levuvhu River in the Kruger National Park.
found at points in the river where people come down
During a reconnaissance walk and visits to different
to wash laundry, vehicles and themselves, and to collect
points on the river, and after consulting stakeholders
water for household purposes. The waste also collects
and experts, we decided to focus our attention on the
on obstructions in the river like rocks or concrete that
lower, more accessible section of the river. Some sec-
forms part of bridges and other constructions. Fishing
tions of the river are totally inaccessible due to reeds
was also a popular activity in the river. This was con-
and other vegetation. One 30 km section flows through
ducted either with rods made from reed or nets.
a canyon just past Tshikundamalema, which we would have had to walk around. Our starting point for the clean-up project was 10 km west of the Sanari Bridge on the road between Masisi
The Mutale River in South Africa’s Limpopo province
We conducted basic water tests at different sites along the river using test kits provided to us for this purpose by the International Water Association (IWA) in conjunction with the Gauteng Young Water Professionals. The results of the tests have been uploaded onto www.worldwatermonitoringday.org. See Table 1 for some of the test results. These tests are great to use as education for kids wanting to know more about the health of their watercourse. The aim of the IWA with these tests is to create as much awareness as possible among young people across the globe. It gives youngsters an idea of the importance of water in their environment. While doing tests and cleaning the area around the Sanari Bridge, we were enthusiastically assisted for two hours by a group of local secondary school boys. This act of responsibility on the school boys part was by far the most rewarding outcome of the whole project.
18
JANUARY/FEBRUARY 2013
WISA NEWS At the Sanari Bridge alone we collected 20 bags of rubbish in and directly beside the river.
Table 1: Results from the IWA water monitoring test kits Date and time
Location
Air temp
Water temp
Dissolved oxygen
pH
Turbidity
Use and comments
2.10.2012 16:15
S22.294 E30.502
33°C
28°C
8 ppm
7.5
0.00JTU
Agricultural
3.10.2012 09:00
S22.283 E30.521
27°C
22°C
6 ppm
7.58
0.00JTU
Residential
3.10.2012 12:00
Same (after 32°C groups washed in the river)
28°C
4 ppm
7.5
40.000JTU
Residential
4.10.2012 08:45
S22.375 E30.934
24°C
6 ppm
7.5
0.000JTU
Natural mayflies
This area is particularly popular with people washing and collecting water and while we were there, five sets of boys with
donkey
carts
collected
water, two water trucks and a couple of vehicles were driven down to collect water and to be washed, two groups of women came down to do laundry and boys played in the water. The
28°C
rubbish bags were collected by EnviroServ and taken to the nearby Exxaro Tshikondeni mine. As we continued our hike along the river, we were followed by two young boys who continuously picked up rubbish and ran after us to put it in our bags. It was heart-warming to experience their help. With an awareness campaign in the local villages, much can be achieved with regard to river health and cleaning the river. This has to be backed up with proper services for the people to have the means to get rid of their rubbish. The next day, we continued our walk and were pleased to find that we could remove most, if not all the visible waste along a 15 km stretch to Nkotswi Bridge. When
TOP Volunteers continue to clean the river while local children collect water MIDDLE The last of the rubbish to be collected BOTTOM Dawid de Wet with his assistants at the Sanari Bridge
we arrived at the bridge, we found the area beautifully clean. This is also an area with a high concentration of water use. Volunteers, and 60 local children from the
holiday
programme
had collected 15 bags of rubbish in the morning. For the rest of the way to the fence of Makuya Park,
The interest shown from different role players and interested parties before, during and after the project was very rewarding
we collected rubbish and enjoyed the atmosphere of the river. We counted over 50 species of bird along our walk. The riparian vegetation is beautiful along the river and there is a feeling of wilderness that combines with the rural sounds making this river so special. Nights beside the river brought reflection and a sense of the immense spirit of the place. The utter peace of flowing water is immeasurable, mysterious and difficult to explain. The interest shown from different role players and interested parties before, during and after the project was very rewarding. It shows the need for projects of this nature. Members of the public must take responsibility and should not have to wait for companies or government before initiating projects of this nature. We hope that the project can continue with Vince getting the communities in the area involved on a more regular basis. Education and the provision of adequate services are extremely important for keeping our rural and still relatively untouched rivers clean and safe. Cooperation between all sections of industry is important and in this regard we have to thank our supporters and advisors, especially Coal of Africa, for their generous sponsorship.
JANUARY/FEBRUARY 2013
19
NEWS
THE TOP INFRASTRUCTURE AND SERVICE DELIVERY STORIES MAKING THE NEWS
Increased access to piped water The proportion of
conducted in South Africa
proportion of households
toilets, however, has increased
households with access to
since the 1994 change in
using the pit toilet with venti-
overall, with the number of
piped water has increased
government, Census 2011, was
lation (i.e. VIP) increased from
households having no toilet
since the census conducted in
conducted in October 2011
6.6% to 8.8% in CS 2007.
declining significantly to 5.2%
2001. This is according to the
with a number of population
This could, in part, be
in Census 2011, as opposed to
Census 2011 results released
and household attributes
attributed to the fact that the
on 30 October 2012.
being measured and a number
proportion of households
of indicators generated
living in formal dwellings has
prevalent in the Coloured
from them.
also increased significantly.
grouping with 2.8% of this
However, the census findings
population group using
The findings show that the proportion of households with access to piped water is high
8.3% in CS 2007. Bucket toilets were more
in all provinces, with the high-
Sanitation in the spotlight
notes that the share of black
this as their primary toilet
est proportion of those with
According to the findings, the
African households living
facility; however, at 2.1% total
piped water inside the dwell-
percentage of households
in formal dwellings remains
population usage it was much
ing or yard being in Gauteng
without proper sanitation ‒ i.e.
lower than that of other
less common than in the 2001
(89.4%), followed closely by
households that use the
population groups .
Census (3.9%).
the Free State (89.1%) and the
bucket toilet system or have
Western Cape (88.4%).
no toilet ‒ has also decreased
white population, 98.8% of
serve not only as a benchmark
Whereas 99.4% of the
The Census 2011 results
over the 1996 to 2011 period.
the Indian/Asian population
for continuing research and
holds without access to piped
According to the findings,
and 92.4% of the Coloured
analysis, but also play an
water is highest in the Eastern
households that have flush
population have access to
essential role in informing and
Cape (22.2%), followed by
toilets connected to the sew-
a flush toilet, only 89% of
measuring public policies ‒ in
KwaZulu-Natal (14.1%) and
age system increased to 57%,
the Black African population
this case, relating specifically
Limpopo (14%).
from 55% in the Community
does, with 8.7% of this group
to the provision of water and
Survey of 2007 (CS 2007). The
having no toilet. Access to
sanitation services.
The proportion of house-
The third census to be
Adopt-a-River project gains momentum The deputy minister
of Water and Environmental
Empowerment Group, which has subsequently adopted it. While
Affairs, Rejoice Mabudafhasi has embarked on Sandspruit River
the original team was only 30 women in the Ficksburg area, it has
clean-up in Senekal, Free State.
subsequently grown to 164 people from a number of surround-
One of our biggest challenges in the water sector is high levels of pollution in our rivers nationally, which are the sources of
Marquard. The project is a completely voluntary initiative.
water. If we do not address this challenge we will not achieve our
It is targeting women specifically as we strive for socio-eco-
development goals, said Mabudafhasi when she embarked on
nomic empowerment of women in their communities, explained
the river clean-up as part of the Adopt-a-River project.
Mabudafhasi, adding that empowerment of women is one of the
The department cannot address this challenge alone. We need
smartest investments any country can make towards its develop-
communities to come on board and participate actively in the
ment. We believe that sustainable water resources management
management of water resources and environment. They are the
will be achieved by full participation of women.
ones closer to these rivers and we believe their indigenous knowl-
So far, the women have acquired skills in solid waste manage-
edge can be useful in changing the status quo, said Mabudafhasi.
ment, occupational health and safety, identification of alien
Adopt-a-River was initiated by the Department of Water Affairs
weeds and herbicide application, water safety, snake handling,
in the hopes of encouraging communities and other stakeholders
20
ing communities, including Ficksburg, Senekal, Clocolan and
first aid, environmental education and life skills.
to take charge of the river systems in their area. It forms one of the
The department will engage the private sector and donors in
projects of the River Health Programme, a nationwide monitoring
negotiating funding of this project as we would like to see it grow
system assessing the health of South Africa s rivers.
bigger and we also wish that that these women can become in-
The Sandspruit River is a small tributary of the Sand River that
volved in economic activities. Training will commence early next
runs past the Matwabeng township. The pollution of the river
year, concluded Mabudafhasi. To date, the Adopt-a-River project
by a number of sources was identified by the Setsoto Women
has created 1 000 job opportunities nationally.
JANUARY/FEBRUARY 2013
NEWS
Investment needed in human capital In the protection of
SWAKOPMUND SEWERAGE PLANT
Mechanical works on track
our ecosystems we must invest
Work on the Swakopmund Wastewater Treatment Works
in the most cost-effective
is track and the plant is scheduled to begin treating up to 12 Mℓ/d
ways with regards to human
of sewage by early 2013. The new plant will replace the town s
capital development and
old wastewater works, which are overloaded and no longer
finance. To this end, I would
comply with legislated discharge standards. The Namibian sub-
like to stress that nations that
sidiary of Veolia Water Solutions & Technologies, Aqua Services &
share ecosystems, such as
Engineering (ASE), was successful in obtaining the tender for the
international waters, can most
supply and installation of the mechanical works for the new plant.
effectively plan for their management if they have common
Historical context
regional agendas, said the
Originally built in 1957, the town s wastewater treatment plant
deputy minister of Water and Environmental Affairs, Rejoice Mabudafhasi, at the launch
Deputy minister of Water and Environmental Affairs, Rejoice Mabudafhasi
was situated just outside of predicted boundary limits, but unexpected growth has resulted in residential areas expanding to within intolerable proximities to the plant ‒ where outdoor fly and odour problems pose health risks to residents.
of the Global Environment Facility International Waters
provide knowledge that allows
Science Conference, which
us to make environmental
pump wastewater from various stations into a balancing tank at
was held at the United
interventions at regional,
the existing works in town. But once the new plant is operational,
Nations Conference Centre in
national and community levels.
sewage will be pumped 9.8 km in a pipeline to the new plant,
Bangkok, Thailand.
Importantly, there needs
where it will be treated, says Christian Stöck, MD at ASE.
The conference, which aims to set the International Waters Science Agenda for the next decade , is a science conference for practitioners and academics to provide leadership in finding solutions for the Earth s most pressing transboundary water challenges. It took place from
to be clear linkages that demonstrate the contribution
Nations that share ecosystems can most effectively plan for their management if they have common regional agendas
24 to 26 September 2012. Although gratified to address
Swakopmund s sewage reticulation system will still drain and
High-quality discharge
that local and
The new plant is designed for biological treatment by means of
national inter-
the activated sludge process and includes biological nitrogen
ventions have
and phosphate removal. Final water treatment processes will
towards region-
include gravity sand filtration and disinfection with chlorine. The
al or ecosystem
new plant s discharge water will be of high quality for reuse in
objectives, she
gardening and irrigation throughout the town, states Stöck. ASE
explained.
considered the odour and vector-related problems, especially
According to
in the collection pump station still located in the centre of the
Mabudafhasi,
town, and employed specific technologies to ensure smells
the delibera-
are eliminated.
tions needed to
The plant s mechanical equipment will be installed by ASE,
focus, among
including the inlet works, biological reactors (with mixers and
others, regional
surface aerators), clarifiers, rapid gravity sand filters, chlorination
cooperation and sharing of
and ferric chloride dosing equipment, sludge thickening, and the
information, investment in
anaerobic digester equipment.
the conference, Mabudafhasi
human capital and technology,
ASE started installing the mechanical equipment for the plant s
said that in order to have
and enhanced community par-
activated sludge system in June 2012. The civil works are approx-
effective common regional
ticipation and the utilisation of
imately 80% complete, which means, for us to meet deadlines,
agendas, the agendas needed
indigenous knowledge in the
we needed to begin our installation, despite the civil works not
to be informed by common
management of ecosystems.
yet being complete, concludes Stöck.
databases, management
In closing, she emphasised
plans and common indicators,
that communities could
which could then inform the
not be excluded from the
local plans.
decision-making processes
There should be a clear
The sewage treatment plant in Swakopmund will treat 12 Mℓ/d of sewage by early 2013
involved and that research
definition of how these
and science must not only
indicators and thresholds will
inform, but also support policy
be monitored by individual
implementation. We need
countries beyond the lifespan
to ensure that the research
of any particular research
results are communicated
project. These indicators must
to all stakeholders involved,
be as efficient as possible and
including communities.
JANUARY/FEBRUARY 2013
21
HOT SEAT
FIBERPIPE
Training towards a sustainable tomorrow Ensuring a sustainable tomorrow is all about investing in knowledge transfer and training, while expanding the field services offered on-site, according to Jan Krüger, technical manager at locally based GRP pipes and fittings manufacturer Fiberpipe.
F
iberpipe identified a key focus of its strategy as the need for technical expertise on-site during installation of its products in order to ensure that the pipes are installed to specification and
perform optimally. The current tender climate, with a focus on cutting costs, has resulted in the reduction of supervision on-site, believes Krüger. The field services team is involved in providing technical expertise, as well as monitoring the installation on-site
ABOVE Fiberpipe field services representative, Jannie Liebenberg, giving the contractor training on the installation process
What we have discovered is that we need people onsite full time so that we can visually assess almost every pipe that is installed at any time, ensuring installation is according to the prescribed specifications of both the consulting engineer and us, through our recommendation of the correct type of installation for that specific project and site, says Krüger.
Pipe installation prioritised
to ensure the correct installation techniques are used by
Ensuring the correct installation of the pipe infrastructure
contractors. According to Krüger, it is very simple to install
becomes pivotal when considering that investment in
a pipe. Simply put, it involves ensuring the bedding is straight and level, and compacted to 90%. The key step in the process, however, is that this needs to be tested before the process of backfilling is undertaken around the installed pipe.
22
“Ensuring installation is according to the prescribed specifications of both the consulting engineer and us” JANURAY/FEBRUARY 2013
HOT SEAT the projects is investment in the sustainability of the
Jaco Fourieshowing the contractor of the Kamfers Dam project how to correctly join the pipes with a Reka Coupling
entire water network and could result in huge savings for the state and the water authorities. If you install a pipeline badly its life cycle is no longer 50 years as anticipated. This could possibly be decreased to only 25 years and the replacement costs are huge. Contractors need to be conscientious from the beginning and ensure the pipeline is installed correctly, says Krüger. Fiberpipe s heavy investment in the field services unit through not only training, but also sourcing the correct staff over the course of the last few years, therefore not only ensures the quality of the installation, but is also evidence of the company s undertaking to ensure sustained best performance of its products after installation.
Field services at work
We have spent a lot of time and energy getting the guys equipped and trained, getting them ready, ensuring the
The largest project
gravity line into the Vaal River.
knowledge transfer is taking place and this year we will
undertaken by the field services
This involved the installation of
be focusing on sharing this knowledge and driving their
team to date was at the Kamfers
700 mm diameter rising main,
presence on-site, says Krüger.
Dam, near Kimberley. The dam,
pump station and gravity south
The company has five permanent members of staff
which was initially an ephem-
and north pipelines, which was
in the field services team; however, it has undertaken
eral pan, has increased in size
undertaken through a combined
training of a number of contract field representatives
over the years due to increased
effort by Sol Plaatje Municipality
close to some of its core projects in order to maintain its
discharge from the local waste-
and Transnet.
reach and increase service delivery, ensuring installation
water treatment works as a result
The contractor, Entsha Henra
is done as effectively and efficiently as possible. The
of increased development in
Construction, was commissioned
work is also cyclical, which is partly why we identify
the region.
to carry out the installation and affected
Fiberpipe supplied the physical
and get them to a standard where we feel comfortable,
the stability of an important
pipes and fittings for all the
adds Krüger.
railway
nearby
phases as well as trained the
and threatened the local pink
contractor s staff on the proper
Dedicated to knowledge transfer
flamingos and other species
installation of the GRP pipe.
The biggest focus in 2013 will be increasing the awareness
breeding grounds.
contract field representatives near the site, train them
This
increase line
has
located
In addition, the company s field
and knowledge of composite materials as an alternative.
To stop the continuing expan-
services unit provided a monitor-
Although it isn t a new material ‒ it has been around
sion of the pan, it was decided
ing service to ensure that instal-
since the 1960s ‒ it is still received as a new technology,
to bypass the running effluent
lation procedures were correctly
says Krüger.
currently supplied to the dam
adhered to and provided techni-
into a reservoir and then by a
cal assistance to the contractor.
In addition, it is also a bit more complicated technology than PVC or steel. Where steel is a homogenous material and exhibits strength in all directions, composite pipe involves the inclusion of glass, which can make the pipe stronger in one direction, explains Krüger. According to Krüger, this challenge is further compounded by the lack of training on glass fibre reinforced (GRP) pipe for engineers at the tertiary institution level,
A contractor with his staff who have been trained by Fiberpipe’s field services
who then don t feel comfortable utilising it. If there is a lack of knowledge then people don t trust the product. Engineers are by nature conservative people ‒ they would rather stick to what they know, says Krüger. He adds that the economics of the product also make it a much more viable alternative. Whereas 20 years ago it was more expensive than steel, today it costs less than
GRP pipes, targeted at engineers already in the
steel and is easier to install. We have reached a point
industry; the course will hopefully be CPD accredited.
where GRP composites cannot be ignored.
He adds that teaching engineers of today and tomorrow
Fiberpipe has already made contact with a few univer-
about composites is essential. People don t realise what
sities in South Africa where its campaign will take the
composites are. Composites are used everywhere and
form of two lectures targeted at the engineering students.
if we can facilitate that change in mindset and create an
From there we hope to expand and roll it out at other
understanding of the benefits and advantages of utilising
tertiary institutions, states Krüger. Another knowledge sharing Fiberpipe has initiated is a course on the use and installation of composite
composites in certain applications, then we will have been successful ‒ but until then this will continue to be our focus.
JANURAY/FEBRUARY 2013
23
INDUSTRY NEWS
WILO
Pioneering change International pump manufacturer Wilo has launched a major rebranding campaign as it focuses on a new, more customer-centric value proposition: pioneering for you. Chantelle Mattheus speaks to Wilo South Africa’s MD, Patrick Hulley, on what the rebranding means for local customers and employees alike.
T
his is a really big
Africa to reflect the name of the
decision
parent group in Germany.
for
Wilo.
One of the things that
the
Courage to change
company
has invested a lot of time and effort
Hulley believes that customers look
in is to understand where the Wilo
towards companies that are brave
brand sits on a global scale. It is a
enough to embrace change during
very strong German organisation
these tough economic times and
that had, historically a very strong
the rebranding is just one small
German
expression of this.
and
European
market
This rebranding is really a major
share ‒ and still does today,
step that indicates we are willing
explains Hulley. However,
as
the
brand
to change, we are well in tune with
has
expanded different cultures and
market needs and therefore we need
markets view the branding in differ-
to represent our company as such.
ent ways. From a German cultural
People see so many brands every
perspective the branding is robust.
day. Companies need to ensure ‒ and
In the new markets where Wilo is
Wilo has done this ‒ that when people view these brands they
viewing the new brand. It starts talking towards the
“It starts talking towards the personality of our company. It expresses that Wilo is not only about the product and profitability, but it is also about the people.” Patrick Hulley,
personality of our company. It expresses that Wilo is not
MD, Wilo South Africa
is the Wilo value proposition to
expanding into, according to Hulley, it is not always as well received and so the rebranding focuses on changing this perception to include local contexts, values and perceptions. Products are being promoted around features and benefits. Branding is around the promise to the customer and as Wilo has investigated our brand over a number of years, we have reached the point now where we have got to show the world that we are not only a German-centric or European-centric brand, but we are truly a global brand. Hulley believes the organisation s focus is clear when
are memorable. However, Hulley is quick to clarify that it is not a rebranding of the company s product approach, which will remain one of technology. The branding is merely to support this aim and to allow people to remember what our products stand for.
Different dynamic The change is twofold. With regards to the branding, the obvious change
only about the product and profitability, but it is also
customers, namely pioneering for
about the people internally, about our customers and
you . It is a more emotional approach as opposed to just a
about the end-point users.
product-centric approach, says Hulley.
Setting the scene
Africa evolve into the headquarters of the sub-Saharan re-
Salmson South Africa is a wholly owned subsidiary
gion. Today we are very focused on South Africa and sup-
of the international pump manufacturer Wilo SE,
port our neighbouring countries, but we will now be mak-
headquartered in Dortmund, Germany. An international
ing a conscious effort into the sub-Saharan region. We have
supplier that has continued to maintain equitable and
already hired people in Kenya, Tanzania and Zambia. We
proficient water quality management worldwide, with
already have a strong customer base in Namibia, Angola,
representation in over 70 countries and an annual
Botswana, Mozambique, Mauritius and Madagascar.
Organisationally, the changing focus will see Wilo South
production rate in excess of eight million pumps,
The intention is to continually add people into
Wilo is one of the largest pump manufacturers in the
the sub-Saharan region. The biggest organisational
world today. From 1 January 2011, the locally based
change is therefore really to expand our footprint,
contingent had used the trading name Wilo South
concludes Hulley.
JANUARY/FEBRUARY 2013
25
INDUSTRY NEWS
ANAEROBIC DIGESTION
Increasing biogas generation Tecroveer recently announced the finalisation of its agreement as an official agent for Norway-based Cambi’s range of technologies.
C
ambi
boasts
more
than
25
completed
Some of the advantages of the
projects worldwide over the past 16 years
Cambi THP technology are:
and is a leading global provider of technol-
• generating more energy (higher
ogy that converts biodegradable material to
biogas production)
renewable energy.
• reducing the final amount of
According to Gary Brown, marketing manager of the
sludge ‒ it improves sludge
Tecroveer Group of companies: We are a technolo-
dewatering
gy-driven company that designs processes and equip-
(Dry Solids)
ment, manufactures, installs and commissions world-
up
to
40%
DS
• it ensures sludge pasteurisation,
class turnkey solutions for all wastewater treatment
i.e. a pathogen-free sludge
related industries. The range of Cambi technologies will
• a stabilised and compost-like
further complement our existing technology offering.
product is produced, with 70%
Cambi is a world leader of the thermal hydrolysis process (THP), which involves the pre-treatment of sewage sludge and industrial concentrates before digestion. This presents an entire new offering to the African wastewater sector, thereby meeting today s needs and the environmental requirements of tomorrow. Cambi s technology and product offerings create value from municipal and industrial sludge; bio-waste,
decrease in odour
The Cambi THP Næstved Plant in Norway. The pulper and flash tank are shown in the front with the reactor at the back
• increased speed and capacity of digestion (less digestion volume) • a reduced carbon footprint. THP enables volatile solids reduction with more biogas, faster anaerobic digestion rates, better dewatering and high capacities, in all Cambi models. The B2 models are the latest and smallest models, which are built as single
including food waste and slaughterhouse residues; and
containerised units. These are suitable for small to medi-
by-products and waste from the processing industry and
um sized plants with a capacity of 1 500 t DS (tonnes dry
agriculture activities.
solids) to 6 500 t DS per year. The B6 product is the mid-
Cambi s patented steam explosion THP technology
size model. These are modularised, packaged units, for
makes use of high-pressure disintegration. THP treats
medium to large-sized plants, with a capacity of 6 500 t
municipal and industrial biosolids and biowaste prior to
DS to 19 000 t DS per year. The B12 product is the largest
anaerobic digestion.
and original product. It comprises pre-built components
Biogas production from anaerobic digestion is maximised using existing capacity
that are assembled on-site. This model is suited for large to very large sized plants, with a capacity of 19 000 t DS to 36 000 t DS per year. The use of the THP in sludge treatment at wastewater treatment plants (WWTPs) offers some major advantages in terms of energy, public health and environmental protection. Medium-sized plants can be converted, with
the import of sludge from other nearby plants, into strategic sludge treatment centres. Here biogas production from anaerobic digestion is maximised using existing capacity, generating a pasteurised sludge with high dry solids content. The generation of electricity from renewable sources, produced from biogas, allows the energy costs of the WWTP plant to be reduced and the WWTP may even have surplus energy production. Brown says: Tecroveer is proud to be associated with Cambi, which has been involved in the development of environmental technology since 1989. Cambi is owned by Petrol AS, PEBA AS and Mallin Venture AS, as well as by its employees. The company makes substantial investments in process and product development, and
Cambi 8 reactor THP plant in Dublin, Ireland
26
resources to build, own and operate plants. We have already made some impression in the South African market and hope to install the first full-scale system shortly.
JANUARY/FEBRUARY 2013
PANEL DISCUSSION
INTRODUCTION
Deliberating on desalination Globally there are around 16 000 desalination plants in operation with a total capacity of over 66 000 000 m3/d.
A
ccording
to
the
industry
shortfalls,
in implementation and the constantly
the
although the process is costly and releas-
evolving technologies available, as well
following pages, although the
ing leftover brine back to the ocean has
as the projects being applied, through
desalination market in South
environmental implications.
one-on-one interviews with key industry
experts
interviewed
in
communities
address
local
Africa is still relatively small, it is growing,
So is this the ideal solution to local
and industries, some municipalities and
water scarcity problems in South Africa
water boards are actively studying the
and in the broader African landscape?
use of desalination to meet their current
Ultimately
and future needs.
which some say is a costly solution for the
desalination
role players across the board.
technology,
Given that more than a third of the
world s water scarcity problems, is being
world already suffers from shortages
used more and more frequently in South
of potable water, according to recent
Africa and worldwide to provide water to
reports, and a rise to 50% expected
areas where there are shortages. It is also
by 2025, it is not unexpected that role
an alternative in the industrial arsenal
players in the water industry evaluate
utilised towards sustainable practices
all the tools available to them to ensure
and therefore is definitely worth closer
sustainable supply and management of
investigation. In this panel discussion,
the scarce resource. For example, the
Water&Sanitation Africa seeks to explore
desalination of seawater can help coastal
the advantages thereof, the challenges
27
s Bio-MASS MANAGEMENT AND SLUDGE DEWATERING EQUIPMENT s -INE and industrial water TREATMENT TECHNOLOGIES
So lut ions
s $RINKING WATER PURIl CATION technologies
.
s $OMESTIC WASTEWATER TREATMENT TECHNOLOGIES AND SYSTEMS
e nk ... Tur
Own Equipment Manufacturer (OEM)
and Supply n o sig
f ..
De
JANUARY/FEBRUARY 2013
yW nt ater e m t Trea
Focused Business Areas s "UILD /WN /PERATE 4RAIN
4RANSFER -AINTAIN s %QUIPMENT MANUFACTURE and refurbish s Accredited laboratory services s %VALUATIONS AND !SSESSMENTS s 4RAINING
“Clean water for future generations� by: s Partnering with nature s Creating an awareness s Sustaining a legacy 4EL &AX i n f o @ t e c r o v e e r.c o .z a w w w.t e c r o v e e r.c o . z a
VEOLIA WATER SOLUTIONS
PANEL DISCUSSION
Gunter Rencken, MD, Veolia Water Solutions
Desalination is increasingly gaining prominence. What are the advantages thereof?
This works by separating ionic
nearest competitor. The
components by means of
Southern Africa branch of
cation and anion exchange
Veolia Water Solutions and
Africa has access to an
membranes. Good progress
Technologies has been
extremely large coastline with
is also being made with a
responsible for construction of
an infinite supply of available
mixture of the above main
several plants over the past few
from large membrane
seawater for coastal towns or
technologies such as hybrid
years, including:
treatment processes is being
cities. As more and more plants
systems utilising MED and
• Mossel Bay (2011) ‒ at
treated with the intention
are being commissioned and
RO technology. The other
15 000 m3/d, this is
of reducing these waste
the technology accelerates,
improvements are the use of
the largest operational
streams to near zero liquid
the capital and operating
alternative energy resources
desalination plant in
discharge status. There are
costs of such plants are
such as wind turbines.
South Africa
major challenges with these
• Knysna (2010) ‒ a 2 000 m3/d
constantly reducing.
processes since the nature of
process or discharge standards.
What is the difference between seawater and wastewater treatment technology? As described
Desalination also provides a
above, seawater desalination
was taken to integrate the
solution for industry to move
technologies consists of
aesthetic design of the
towards zero liquid discharge
mainly two types of proven
plant to blend in with the
status facilities.
or conventional technologies
surrounding upmarket
Is desalination the ultimate panacea for our water availability woes? The
tourist area
preferred solution will always
For industrial clients, this is applicable technology to treat high salinity wastewater to
plant, which was completed
the brine to be treated is vastly
within seven months
different to that of seawater
• Plettenberg Bay (2010) ‒ 2 000 m3/d; special care
such as RO membrane or
and the process steps are unique for such applications.
What are the options available? The technologies
thermal processes. If we look at wastewater with high salinity
(2010) ‒ 1 800 m3/d; capacity
treatment where secure
can basically be split between
content, the treatment option
and technology upgrade was
feed sources are available
two main principles: distillation
would be different in terms of
the main focus of this plant.
as it is the most economical
(thermally driven systems)
pretreatment and membrane
All of these plants are based
model in terms of capital and
and membrane-based
configurations. This process
on the conventional RO
operational costs. Municipal
reverse osmosis (RO).
will be totally dependent on
membrane process principle,
wastewater reuse is also a
the composition of the water in
but with many different
viable option for the future.
multiple effect distillation and
terms of suspended solids and
configurations in terms of the
There is currently also pressure
multi stage flash technology.
dissolved ions in the water.
seawater abstraction, pre-
on local authorities to refurbish
treatment and brine disposal.
and expand their existing
Distillation processes include
Historically, these processes
• Bushman s River Mouth
remain conventional water
of energy or heat are
Price is often quoted as a limiting factor. How quickly is ROI recovered? Price
available. This process is very
is relevant if compared to
What are some of the interesting upcoming projects? We have recently
energy intensive.
conventional water treatment
been awarded a seawater
demand for potable water
have been applied where spare or low cost sources
facilities before they consider desalination plants. Once again this is driven by economics. In many large cities, the
RO technology is a newer
plant costs. As a general rule,
desalination plant for Lamberts
has grown to such an extent
technology than the thermal
the cost of water produced by
Bay; the town has grown and
that local municipalities
options, and is growing rapidly.
seawater desalination could
it has to ensure its future
have no other option than
The main advantage is that the
be as much as double that
water security.
moving towards desalination
energy requirement is much
of conventional municipal
lower than that associated
treatment plants.
with thermal plants. The
Veolia Water SA is also working on a project within
to supplement their current resources.
the power industry whereby
The ROI should rather be
concentrated brine generated
only drawback is that the
viewed in the context of
pretreatment requirements
comparisons to building new
for these systems are more
dams and reticulation systems.
Mossel Bay desalination plant
complex and costly.
What could desalination of tomorrow look like?
What are Veolia Water Solutions desalination experiences? Internationally,
Continuous development
Veolia Water has designed and
is being conducted on
constructed approximately
alternative technologies such
15% of the world s installed
as membrane desalination
desalination capacity ‒ about
by means of electrodialysis.
twice as much as the
JANUARY/FEBRUARY 2013
29
www.degremont.com
SEA WATER: SOURCE OF
REUSE
LIFE. © Les Éditions Stratégiques
Degrémont’s membrane filtration technology is suitable for the whole range of treated wastewater uses, from agriculture and landscaping to industry and many others. Already valued by farmers and industries, the clean water produced by this demanding process makes a major contribution to water conservation and environmental protection.
DESALINATION Degremont draws its desalination experience from its portfolio of more than 250 reverse osmosis plants around the world. The process removes mineral salts by forcing water to cross a semipermeable membrane. With the growth in world demand for drinking water - and with 40% of the world’s population living within 100 km of the sea this technology offers a sustainable solution for the supply of potable water.
FOR THIS & OTHER DEGRÉMONT’S WATER TREATMENT PLANT EQUIPMENT, CONTACT : DUMI LUTHULI, Deputy Managing Director dumi.luthuli@degremont.co.za MORNAY DE VOS, Business Develop. Mg mornay.de.vos@degremont.co.za Tel: +27 (0) 11 807 1983 Fax: +27 (0) 10 591 5095 www.degremont.co.za
THE WATER TREATMENT PLANT SPECIALISTS
PANEL DISCUSSION
DEGRÉMONT Miguel Angel Sanz, Director: Development & Innovation, Degrémont
Desalination is increasingly gaining prominence. What are the advantages thereof? Desalination is
micro- or ultrafiltration. Reverse
the largest desalination plant
osmosis or nanofiltration is
in operation in Europe with a
only used when it is necessary
production of 200 000 m3/d,
to remove salts from water
as well as the Middle East,
the solution when there are
or when a double membrane
Western Australia and Bahrain.
no other sources available.
barrier is required.
Seawater desalination uses
This year we are com-
success.
missioning the largest
When RO is employed for
an inexhaustible source, the
reuse of wastewater purposes,
desalination plant in the world
sea, and it can produce water
the membranes are adapted
in Melbourne, Australia, with a
to use in agriculture, industry
for much lower pressure
total capacity of 450 000 m3/d.
Is desalination the ultimate panacea for our water availability woes? Traditional
and also as drinking water.
than seawater desalination
Since 29 September 2012, a
solutions will always be
Desalination could also be
and higher recovery rates of
third of the production from
present and favoured because
applied in wastewater reuse in
the water.
this plant ‒ 150 000 m3/d
of cost considerations, but
of potable water ‒ is
the role and importance of
being injected into the
desalination will increase year
What are the options available? Two main
Price is often quoted as a limiting factor. How quickly is ROI recovered? Price is
potable water network of
by year.
technologies are used: thermal
always a key factor. Minimising
Commercial Acceptance .
energy or membranes. The
the cost of investments is the
some cases.
the city after the Preliminary The first challenge in every
first uses thermal energy to evaporate the water into vapour, which is thereafter condensed back into liquid form. The second uses pressure to filter the water through
There are cases where desalination is the only viable solution to provide potable water or water for industries
The first challenge in every project is adapting the solution to the real needs of our different customers
membranes (reverse osmosis)
from seawater or brackish water. Desalination is getting a bigger slice of budgets every year due to the scarcity of resources. In addition, desalination is the best solution for
to obtain desalinated water.
driver of all decision-makers.
project is adapting the
the treatment of acid mine
In the case of water reuse,
But when you have no other
solution to the real needs of
drainage (AMD) and for many
thermal technologies are
water sources available,
our different customers. The
problems of industrial supply.
not suitable.
seawater desalination is the
second is the selection of all of
solution and then it is not a
our partners to bring the best
matter of recovering ROI, but a
specialities and experiences
When is the application of desalination ideal?
question of necessity.
for these solutions. The third
Desalination is the solution
is to have good engineering,
when no other sources are
construction and commission-
available, like dry areas or
(RO) technology. The trend
What are Dégremont s desalination experiences?
ing teams experienced enough
seasonal scarcities and when
is towards increasing this
Degrémont is one of the
to face all challenges of the
a very good water quality is
percentage in the future,
pioneers of desalination. Our
projects, the known and the
required. It is a solution for
mainly due to the fact that it
first plant was built in the early
new ones.
water shortages and also an
requires less energy and has a
1970s and since then we have
lower carbon footprint.
put in operation desalination
our technologies and know-
a solution to the different
plants with a total capacity of
how, are the levers to our
problems of the world.
What could desalination of tomorrow look like? Today more than 80% of desalination plants use reverse osmosis
What is the difference in seawater treatment versus wastewater? Seawater
technology. Degrémont is one
desalination always employs
market and the only one that
the use of RO membranes
has nine plants with a capacity
to remove salts from the
of over 100 000 m3/d. We also
raw water. For reuse, other
have long-term operation and
technologies can be used to
maintenance contracts for
purify the treated wastewater.
some of these plants.
These technologies are
These three, combined with
arm of the arsenal to provide
over 2 700 000 m3/d, using RO of the top three players in this
Degrémont has been
conventional like coagulation-
involved in the seawater de-
flocculation, oxidation,
salination plant of Barcelona,
clarification, filtration or absorption, or could be membrane technologies like
The Melbourne, Australia desalination plant recently went “live“
JANUARY/FEBRUARY 2013
31
Water comes in. Water gets used. Water goes back out.
We believe customers deserve access to world-class resources, exceptional service, and a commitment to continuous improvement and innovation. Buckman offers an optimal solution for treatment of utility and process water— an extensive portfolio of specialty chemicals, unmatched technical expertise and service, and a network of experienced associates who quickly identify, prevent, and solve problems. Find out how we can help with your water treatment needs. Visit buckman.com or call 800-BUCKMAN (800-282-5626).
In Africa: Hammarsdale – Tel: +27 (0) 31 736 8800 Bedfordview – Tel: +27 (0) 11 997 5100 email: southafrica@buckman.com buckman.com ©2013 Buckman Laboratories International, Inc.
Apply a better biocide. Ensure a better biosphere.
Now you can get a water treatment program that’s tougher on microbiological activity, easier on the environment. The Oxamine system from Buckman is a safer alternative to gaseous chlorine, and it is more effective in an environment where ammonia is present. It provides better performance in high-demand systems, resulting in improved condenser cleanliness. Oxamine is more effective than chlorine on biofilm control while lowering corrosion rates on common system metallurgies. It is 100% mineral and produces no organic toxins, making it the greenest technology on the market. To learn more, contact your local Buckman representative or visit us online at buckman.com.
©2013 Buckman Laboratories International, Inc.
PANEL DISCUSSION
BUCKMAN Dr Andre Maartens, Divisional sales manager: Energy, Buckman Desalination is increasingly gaining prominence. What are the advantages thereof?
important. By combining brine
ROI might be recovered on
pressure harvesting and, for in-
certain areas of the desalination
stance, solar energy harvesting,
process by utilising energy
Desalination has a smaller
a desalination plant could be
recovery systems, effective
footprint, is usually less complex
almost energy self-sufficient ‒
chemical programmes and
and really works. High-quality
but with very high capital outlay
pretreatment steps.
water is produced in one or two
required.
are able to use solar radiation when energy is not available
be combined with various
concentration polarisation,
What are Buckman s desalination experiences?
energy sources, i.e. solar, wind,
membrane distillation and
We have a wealth of experience
er desalination processes when:
nuclear and even play a role
forward osmosis are all going to
throughout the company. We
• forced by legislation
in energy generation (osmotic
gain prominence.
are involved in numerous de-
• there is an inadequate
processes and it can potentially
Graphene sheets, ion
salination applications, ranging
pressure to energy). It can
and small volumes are required. Companies should only consid-
water supply
from potable water production
and can further combine with
What is the difference between seawater and wastewater treatment? Seawater
various technologies to provide
desalination is energy intensive,
Buckman s expertise has always
water of various qualities. High-
but most seawater desalination
been focused on understanding
quality water can be produced
plants use energy-recovery
the water chemistry, membrane
Is desalination the ultimate panacea for our water availability woes? First is Water
from previously unusable water
systems that have resulted in an
autopsies and the correct
Catchment Area management,
sources to supply quality water
80% reduction of energy used
application of our chemistries.
then water saving technology
for industries and for potable
for water production compared
Recent developments have
and low-tech water reuse. When
use. In addition:
to systems 25 years ago. The
opened up a number of new
these things are in place and
• desalination releases the
geological location of the user
opportunitiess for Buckman.
supply is still limited, desalina-
strain on natural water
is another factor. Brine disposal
These developments include:
tion can be investigated. Recent
sources in countries with
is relatively easy ‒ the brine is
• state-of-the-art online moni-
events at the southern coast of
low rainfall
usually returned to the ocean ‒
toring technology, EZeMonitor
but environmental factors may
• specialised Buckman Green
also be designed in modular configuration for easy expansion
• in cases of severe drought, desalination processes can be utilised for the supply of water • process and industrial waste-
to extremely large industrial
• a higher quality of water is required for certain processes.
water reuse applications.
South Africa showed the folly of jumping at technology first.
Toolbox that empowers our
The days of unlimited water use
sales team to do on-site com-
are over, we need to start living
where human activities are
puter modeling and strategic
conservatively with our water.
centred. The treatment
alliance partners on the engi-
influence feasibility. Wastewater is always available
water can now be reused,
technology is more compatible
neering and equipment side.
making/forcing companies to
with alternative energy sources,
All this is putting Buckman in a
take better responsibility for
such as wind or solar. It is
leading position when it comes
Do you see the desalination market growing substantially in the near future?
their waste streams and tak-
also compatible with existing
to providing total solutions to
The increase in desalination
ing care of the environment
pretreatment like biological
our customer
applications should grow faster
and the impact of the waste
sewage or waste treatment. A
streams on the environment
disadvantage of wastewater
as population growth and water availability puts more pressure
is the degree of removal of
When is the ideal application for desalination?
changing in such a manner
human waste products, medical
We recommend RO for salt
growth can be expected, but
that increasing amounts of
by-products hormones, steroids,
water or wastewater when
not a short-term explosion.
energy in the systems are
etc. More pretreatment may be
adequate energy is available.
Growth in South Africa
reused to drive the process.
required and the process may
If energy costs are a factor or
is estimated to be 28% for
be more complex.
when brine disposal is not
the next five years ‒ up to
possible (sensitive environment
530 300 m3/d. By 2030, it is
factors, for example, then evap-
estimated that 10% of the urban
oration is a cheap but effective
water resources would be from
solution. Evaporation systems
desalination plants.
• desalination processes are
What could desalination of tomorrow look like? be thinner, stronger materials
Price is often quoted as a limiting factor. How quickly is ROI recovered? I believe that
for membranes, probably even
costs will become less relevant
nano-based tubes instead of
as the price and availability
current thin film types. There is
of energy escalates. Costs will
much hype about biocidal mate-
probably almost disappear as a
rials and self-cleaning materials,
limiting factor in the near future
but they are not the next big
(3 to 5 years).
Desalination of the future will
thing to change the technology. Various energy sources and brine pressure reuse will be very
on water suppliers ‒ steady
Water reuse will never be cost effective in comparison to the use of natural water sources.
JANUARY/FEBRUARY 2013
33
SUPERIOR TECHNOLOGY. SUPERIOR SOLUTIONS. NUWATER MODULAR TREATMENT PLANT Seawater
Surface Water
Groundwater
NuWater provides a range of products, services and financing solutions to reclaim or treat almost any quantity and quality of water.
Waste Water
Clean Water
Innovative 16" reverse osmosis technology makes NuWater plants more compact and efficient, with lower operating and maintenance costs. Being modular and mobile, our plants are also rapidly deployable and highly scalable, providing ultimate flexibility in a rapidly changing world. People
Mining
Industry
Oil & Gas
Challenge us to clean your water.
Wastewater Reclamation
FROM TOP: Anglo American New Vaal Colliery – Mine waste water reclamation and reuse. Modular and mobile units for clean water where it is needed. Singapore Public Utilities Board – Secondary sewerage water reclamation and reuse.
www.nuwater.co.za
+27 21 531 0641
PANEL DISCUSSION
NUWATER John Holmes, CEO, NuWater
Desalination is increasingly gaining prominence. What are the advantages thereof?
We are, however, a complete
wastewater is generally far less
solutions and services
energy intensive than that of
company, so our competitive
seawater due to the generally
It is important to remember
advantage is also based on the
lower concentrations of salt
that desalination does not just
efficiency and effectiveness
in wastewater. Wastewater
relate to seawater, but to any
of our complete treatment
reclamation therefore presents
the process of delivering two
water with elevated levels of
plants, which incorporate
a major opportunity.
desalination plants for a Gold
salinity that make it unsuitable
multiple technologies.
Fields mine in Ghana. These plants will treat wastewater
using technology to purify
What could desalination of tomorrow look like? The
How quickly is ROI recovered? Simple ROI calculations are often not the
quality process or potable
and desalinate water such that
potential for desalination
basis for project evaluation.
water, or to be discharged
it is suitable for human and
applications is limited by two
The fact that access to water
into the environment
agricultural consumption are
major challenges: energy
is considered a basic human
in compliance with
indisputable. The question is
consumption and brine. The
right means that the true
environmental protection laws.
really about economics: what
concentrated waste/ brine
cost of high-quality water has
The extremely tight project
does it cost and what is the
stream must be either stored
historically been masked by
timelines have added to the
economic and social value of
or disposed of. Brine from
government subsidisation.
logistical complexity with
water security?
seawater desalination is
NuWater s focus on providing
equipment being brought
discharged back into the
complete water cleaning
in via our Singapore and UK
What are the options available? Options for the
sea and quickly mixes back
services offers customers a
operations. The first phase is
into seawater, although
simple and transparent basis for
currently being commissioned.
separation of dissolved salts
environmental concerns remain.
evaluating their water treatment
from pure water are limited to
Brine from brackish water is
and desalination projects.
thermal separation through
generally more of an issue as
evaporation or freezing, the
disposal options are limited.
for drinking or agriculture. The benefits ‒ and the necessity ‒ of
What are NuWater s desalination experiences?
to either be reused as high-
Is desalination the ultimate panacea for our water availability woes? Technology risk aversion and
use of synthetic membrane
NuWater is focused on
technology such as reverse
developing and refining its
NuWater is focused on four
limited financing options
(RO) or forward osmosis
technologies to increase pure
industry sectors, namely:
continue to be a problem
(FO), or through electrical
water recovery and therefore
mining, oil and gas, power and
in the industry. NuWater
processes (electrodialysis/
decrease the volume of brine
industrial, and potable reuse.
is tackling risk aversion by
eletrodeionisation). RO is the
produced, while also reducing
In each of these sectors we
demonstrating reliability
default choice for large-scale
energy consumption. This
have exceptionally high-quality
in private sector projects
desalination applications as the
involves in-house R&D, process
reference plants.
and by taking on large
total unit cost of desalination
design improvements as well
(including operational and
as incorporating specialist
had its own challenges, from
owning and operating (BOO)
capital costs) makes it the most
third-party technology to
proving our technology
its own plants. The more
cost-effective technology.
complement NuWater s
performance for one of the
flexible financing options
proprietary technologies.
world s most demanding
presented by our BOO model
water customers in Singapore s
can, however, only have a
PUB, to deploying large-scale
significant impact on the rate
modular plants to leading
of uptake if the physical plant
mining customers within
and related infrastructure
weeks of signing contracts. In
is similarly flexible.
each case, however, success
NuWater s modular and
has been determined by our
redeployable plants provide
technological expertise, the
this flexibility and allow for
quality of our plants and our
distributed infrastructure
unwavering commitment to
rather than traditional
customer service.
centralised infrastructure.
What are some of the interesting upcoming projects? We are currently in
the challenges facing the rapid
NuWater specialises in RO applications where our proprietary large-diameter (16 ) RO provides us with a clear technology advantage.
What is the difference in seawater treatment versus wastewater? Desalination of
Each of our projects has
parts of the risk by building,
NuWater is realistic about and large-scale adoption of desalination, but is playing an important role in changing
NuWater small mobile drinking water plant
JANUARY/FEBRUARY 2013
customer mindsets through demonstrable success.
35
VERDER PUMPS SA
PANEL DISCUSSION
Rob Shaw, Sales engineer, Verder Pumps SA
Desalination is increasingly gaining prominence. What are the implications from the pumps perspective? I
secondary bearing, this pump
and, in contrast to sealed
is suitable for pumping solids
centrifugal pumps, the magnet
in the liquid.
capsule of the Verdermag mag
don t necessarily know about
mag drive pump for all heavy-
how desalination plants work,
duty pump applications for
or the intricacies involved
the best economic prices.
This series is an advanced
or whether or not they are
drive pump ensures a safe and leak-free operation. Even under heavy-duty circumstances, the pumps
balance chamber pressure
remain reliable.
is reduced. This causes the
they would need to pump
What makes these products or proposed solutions different? The Verdermag
seawater (brine) and when it
series consists of mag drive
How do these pumps operate ‒ what is their working principle? The
comes to pumping seawater
centrifugal pumps that are
closed single, enclosed
the balance
the pump seals on normal
sealless and hermetically
magnet impeller/magnet
cha chamber
centrifugal pumps become a
closed. The pumps are also
assembly is
pre pressure
major problem.
available as chemical norm
tate free to rotate
inc increasing.
pumps with ANSI and DIN
and slide on
specifications. Excellent
al the central
corrosion resistance makes
red cantilevered
gaining in popularity. The only thing I do know is that
Why are the pump seals in normal centrifugal pumps a problem in this context? Any seal leaks a little bit of product by the nature of how seals work. When seawater comes into contact with the atmosphere it crystallises due to the sodium chloride present
impeller to react with a net force towards the m motor. t valve is However, the c now closing and
m This moves the to impeller towards suct the suction. ne result The net
This series is an advanced mag drive pump for all heavy-duty pump applications for the best economic prices
sta is a very stable axial position for the impeller. There are no axial bearings and radial bearings always operate in a pressurised fluid environment.
in it, resulting in a build-up of crystals at the mechanical
the Verdermag glandless
shaft. The main flow of liquid
seals and the maintenance
range the most reliable pumps
enters the impeller and is
on mechanical seals therefore
for applications in almost all
pressurised, then expelled
becomes rather costly.
areas of industry. Material
into the volute and out
What or where have these technologies been successfully implemented before? Verdermag pumps
choices such as EPTE, PVDF
the discharge.
are guaranteed to operate
How can this challenge be overcome at desalination plants? Verder can eliminate
(polyvinylidene difluoride),
A small portion of the flow
with zero leakage of product.
PFA and silica carbide provide
passes behind the impeller
To prove this point, Verdermag
great opportunities to use
and through the back wear
pumps were installed more
this problem by installing
the mag drive pumps in the
ring clearance and then into
than four years ago on an ice
our range of magnetic
chemical and process industry.
the balance chamber. This
plant of one of the AngloGold
driven pumps. Verdermag
For the more common
liquid then flows through, past
Ashanti mines pumping brine
non-metallic, magnetically
applications, polypropylene is
the bushings to exit the valve.
water and this project is still
driven pumps have been
a cost-effective alternative.
manufactured since 1998.
The advantages of
forward, the valve is opened
Verdermag drive centrifugal
to a greater degree and the
Our claim to fame is our thrust balanced product
pumps include:
line: the TB ‒mag series. Its
• zero leakage (100%
introduction revolutionised the non-metallic, mag drive pumping industry as the first
packed glands
with the ability to pump solids.
• pump s efficiency ensures a clean and safe operating environment
configurations in total, and
• close coupled design
a tremendous flow range to
• no alignment required
meet with the requirements.
• increased mean time
With SiC as standard material
Brine pumps at Mponeng Mine
leak free)
• no external flushing systems
sizes and 14 suction/discharge
considered successful.
• no mechanical seals or
fully thrust balanced pump Model TB offers three impeller
If the impeller moves
between maintenance.
and patented trust balancing
Verdermag mag drive pumps
and wear rings that work as a
have no glands, seals or valves,
JANUARY/FEBRUARY 2013
37
QUALITY FILTRATION SYSTEMS
PANEL DISCUSSION
Herman Smit, Director, Quality Filtration Systems
Desalination is increasingly gaining prominence. What are the advantages thereof? Desalination results
solutions, particularly in
developments in desalination
industrial desalination.
technologies globally. QFS
rights for a new development
of equipment supplied
in previously inaccessible water
in low-pressure desalination
to various world-leading
sources becoming a valuable
from Memsys. Memsys has
projects to supply desalination
about its first Memsys plant,
resource. Modern technologies
commercialised Multistage
technologies in different
which will pave the way for
provide the added advantage
Vacuum Membrane Distillation.
applications in South Africa
application of desalination
of decentralised water
The first Memsys plant in South
‒ brakish water desalination
where it has previously
treatment allowing for water
Africa was commissioned in
in Gansbaai and munipical
been impossible. The
to be treated and used where
November 2012. The Memsys
wastewater reuse in Beaufort
Memsys technology is based
it is needed. Improvements in
technology allows QFS to
West, for example.
on Vacuum Multi-effect
desalination technologies allow
provide answers to brine
targeting of specific dissolved
management and potential
based technologies and has
is a highly efficient thermal
contaminants and result in a
ZLD by concentrating RO brine
been manufacturing mem-
process in a modular concept.
better and more controllable
up to 300 000 mg/ℓ.
brane plants from 1999.
The Memsys modules consist
QFS has signed the exclusive
taps into the valuable resource
QFS specialises in membrane
Major projects include:
final water quality.
What are the options available? Thermal processes
What is the difference in seawater treatment versus wastewater? The basic
used in the previous century
• Steel mill (2010) ‒ 5 Mℓ/d
Membrane Distillation, which
of flat sheet membranes combined with an innovative
desalination process
plate and frame design made
water filtration plant with
of polypropene. The current
membrane processes are the
a water quality of UF
installation will be able to
have been replaced with
same, but the characteristics of
permeate NTU<1.
produce maximum 500 ℓ/h
membrane-based technologies.
the water is very different. Most
The main treatment tech-
• Municipal wastewater reuse
of distilled water and will
of the differences are in the
(2010) ‒ 2.3 Mℓ/d direct
be completely off-grid. QFS
nology used for the removal
pretreatment and materials for
reclamation plant with a
aims to get a recovery rate of
of dissolved contaminants
the equipment in contact with
water quality of SANS Class I,
more than 80% at pumping
is reverse osmosis (RO). The
the water.
used as potable water.
pressures of around 3 bar.
complete process includes
Wastewater desalination
• Brakish water desalination
supporting technologies as
must aim for water recoveries
(2011) ‒ 1.6 Mℓ/d with a
pre- and post-treatment to RO,
of greater than 90% and
water quality of SANS Class I
the most critical of which is the
approaching ZLD compared
pretreatment.
to a typical 45% recovery on
used as potable water. • Industrial wastewater
Is desalination the ultimate panacea for our water situation? Nothing is the ultimate solution in the water
a seawater desalination plant.
treatment plant (2012) ‒
sector. The combination of
pre-filtration to protect the RO
Municipal wastewaters have
5 Mℓ/d with a water quality
conventional technologies and
membranes and has installed
significantly lower salinity
of conductivity <200 µS/cm,
desalination technologies will
successful dual membrane
compared to seawater and
used as process water.
be important for sustainable
plants. We supply, design,
therefore offer some advantag-
manufacture and install
es in terms of cost.
QFS understands the art of
membrane-related desali-
Technologies across a broad
Price is often quoted as a limiting factor. How quickly is ROI recovered? Price can
range of products and markets,
be a limiting factor when
and has the technical know-
competing with conventional
how and backup to support
water sources that do not
membrane-based technologies.
require desalination. ROI on
nation equipment. QFS has partnered with Siemens Water
• Memsys (2012) ‒ 100ℓ/h low
water supply. The water supply
energy distillation plant for
strategy should make use of
distillate water with conduc-
the most appropriate water
tivity <1 µS/cm.
sources for a region, which is a function of multiple inputs.
What are some of the interesting upcoming projects? QFS is very excited
Desalination plant for industrial wastewater
each project is completely
What could desalination of tomorrow look like? QFS
different and is not often
expects rapid developments
desalination. The main drivers
in the development of low-
are the availability and quality
energy RO membranes that
of the water source.
the driving factor behind
will reduce the operating systems. In addition, there
What are QFS s desalination experiences? QFS s link
is a definite move towards
with Siemens provides it
zero-liquid-discharge (ZLD)
with valuable insight in the
costs of desalination
JANUARY/FEBRUARY 2013
39
PROFILE
ESKOM
Ensuring a sustainable tomorrow
As a strategic water user, South African power utility Eskom has a fundamental responsibility to ensure that it manages water resources in an efficient and effective manner.
policies and practices. Eskom committed itself to the mandate s elements of organising engagement activities and actions that will contribute to the public water policy and management. These actions can be understood in terms of their contribution to the broad policy goals embodied in sustainable water management: direct operations and supply chain management, catchment management and community engagement, public policy advocacy
W
ater plays a significant role in electricity
and transparency.
generation and therefore water is a
The focused objective of the Eskom s water man-
strategic primary energy source. Eskom s
agement policy is for the company to be proactive in
power stations run constantly, supplying
addressing water management issues supporting the
in excess of 95% of South Africa s electrical energy and
national policy and strat-
more than half of the electricity used on the African continent. Without water, this output would not be possible. Eskom is a key stakeholder in the water sector using approximately 320 million cubic metres of water across its power stations per annum for financial year 2012. This accounts for about 2% of the total water
Eskom aims to considerably improve the organisation’s relative and absolute water consumption by 2030
usage nationally.
egies in protecting, using, managing,
controlling,
developing and conserving the nation s water resources in a sustainable manner.
The
utility
is
confident it will be able to
Improvements are happening continuously. This will
achieve this objective by focusing on four primary pillars
lead to decrease in absolute water use by 2030. The
namely: stakeholder management, stewardship, assur-
organisation is therefore committed and determined to
ance and compliance, and training and development.
support the drive to improve the management of South Africa s scarce water resources by putting in place a
Sustained supply
number of both innovative and effective water conserva-
The majority of Eskom s coal-fired power stations are
tion and management strategies, policies and practices.
primarily supplied with water from the integrated Vaal River system, with the bulk water being used primarily
Policy prioritised
for cooling. Eskom has a bulk water use licence for ab-
Eskom endorsed the United Nations (UN) CEO Water
straction of water from the integrated Vaal River system.
Mandate in February 2011. The UN CEO Water Mandate
40
is a model of environmental stewardship, as well as a
Essential element
platform for assisting companies with the development,
Eskom uses most of the water for cooling systems with-
implementation and disclosure of water sustainability
in electricity generation and it has two types of cooling
JANUARY/FEBRUARY 2013
PROFILE systems at its power stations. Wet cooling
as energy and water efficiency measures,
to the use of water, but also the effective
is the most common internationally and
Eskom s
water
and efficient use of water by the power
locally, but the company has been phasing
consumption will improve considerably
generation sector, and good management
in dry cooling systems.
by 2030.
practices between the DWA and Eskom
relative
and
absolute
Wet cooling and indirect dry cooling
Over the past two decades, Eskom has in-
systems both use condensers, cooling
troduced a number of innovative technol-
water and cooling towers. In both these
ogies to save and protect water resources.
in areas of water conservation and water demand management. The DWA and Eskom will share, inform and guide regula-
systems, the cooling water flows through thousands
of
condenser
tubes,
Over the past two decades Eskom has introduced a number of innovative technologies to save and protect water resources
with the steam on the outside. Condensation is achieved as a result of the temperature difference between the cooling water and steam. Warm cooling water flows to a cooling
tory
initiatives
on
water management within
the
power
generation sector. The MOU further undertakes to explore synergistic opportunities between
tower where an upward draft These
of air removes the heat from
include
dry
Eskom s Energy Efficiency and Demand
the water. After cooling, this wa-
cooling,
sea-water
Side Management Programme and the
ter returns to the condenser.
cooling, desalination of
DWA s Water Conservation Water Demand
polluted mine water for
Management Programme (WCWDM).
Unfortunately, during wet cool-
use at power stations and technical
With Eskom supplying 95% of South
that a substantial amount of water is lost
improvements on treatment regimens to
Africa s electricity, new entrants into the
through evaporation because the water
maximise the beneficial use of water and
electricity market will more than likely uti-
that has to be cooled is in direct contact
comply to Eskom s zero liquid effluent
lise their policies and practices as a bench-
with the air. The white plume seen on top
discharge policy.
mark against which to measure the perfor-
ing, the upward movement of air means
of cooling towers at most thermal stations
Most notable, however, is that all new
mance, and would do well to learn from
is pure water vapour. Water is then added
power plants will be equipped with dry
the innovative water usage breakthroughs
to replace evaporation losses.
cooling systems.
introduced by Eskom. While not only setting the stage locally in terms of the
Eskom has therefore started using dry cooling systems in its efforts to conserve
Important impact
South Africa s limited water supplies.
The
in
marking its water usage against that of
Although the expense involved in dry cool-
electricity generation was 1.35 ℓ/kWh in
similar power utilities in the first world and
ing systems is greater than in conventional
the financial year 2011/2012, therefore
continues to aim for peak performance.
wet cooling systems, the limited available
the reduction in electricity demand will
water
relative
benchmark, the company is also bench-
water
consumption
economic
automatically lead to the reduction in the
considerations in determining the choice
demand for electricity generation, thus
between the two technologies.
resulting in water savings.
resources
overrides
Matimba, Kendal and Majuba power
As part of a strategy to secure its water
stations are dry cooling power plants
resources,
currently operating in the world. Majuba
inputs and recommendations into the
operates with half the stations on dry and
Energy Chapter of the National Water
the other half on wet. All new plants will
Resources Strategy (the national blueprint
be equipped with dry cooling systems,
for water resources management) cur-
including Medupi and Kusile which will
rently under review by the Department
then be the largest dry cooling system in
of Water Affairs (DWA) in order to secure
the world.
security of water supply.
Containing consumption
Strategic partnership
Decades ago Eskom recognised that the
Eskom
organisation would need to find ways
Understanding (MOU) with the DWA. The
of decreasing water consumption and
MOU serves to establish a strategic part-
contributing to sustainable water usage,
nership between the parties to encourage
hence it has a well-documented com-
cooperation and participation not only in
mitment to support the drive to improve
the management, operations and main-
water management within operations.
tenance activities within the power gen-
It is expected that Eskom s water usage
Eskom
has
a
drafted
substantial
Memorandum
of
eration sector of South Africa with regard
Look out in the coming issues for highlights of Eskom’s WCWDM programme, including the following initiatives: • Mine Water Recovery: The objective is to identify the treatment and reuse of excess mine water from coal mines as an alternate source of water supply. This will reduce the growing pressure on the freshwater resources. • Sewage Water Recovery: There are few stations that currently treat sewage water and then discharge. These stations have been assessed to determine if the treated sewage effluent can be reused at the power stations. • Water Accounting Framework: The objective of this framework is to prescribe minimum requirements for the monitoring, accounting and reporting of water use at Eskom’s power stations to facilitate sound water and effluent management. • Stakeholder and Awareness: This initiative includes ongoing awareness campaigns to educate employees about water use efficiency. • Facilities and Building Management: Megawatt Park is currently in the process of attaining green star rating.
will increase over the next 10 years, due to the return to service of older wetcooled power stations. However, with the
3RZHULQJ \RXU ZRUOG
introduction of new dry-cooled stations, diversification of the energy mix as well
JANUARY/FEBRUARY 2013
41
±'PIER [EXIV#²
±-RJVEWXVYGXYVI ²
Delivering sustainable infrastructure that improves our world. “DOING GOOD WHILE DOING BUSINESS”
Contact www.bigenafrica.com, or the office most convenient to you: Pretoria (012) 842 8700; Johannesburg (011) 802 0560; Bloemfontein (051) 430 1423; Cape Town (021) 919 6976; Durban (031) 717 2571; East London (043) 748 6230; Gabarone gaborone@bigenafrica.com; Kuruman (053) 712 2882; Mafikeng (018) 386 2111; Mthatha (047) 532 5234; Nelspruit (013) 755 1421; Polokwane (015) 297 4055; Richards Bay (035) 753 1235; Rustenburg (014) 597 3655; Umtata (047) 532 5216; Windhoek +26 461 237 346.
REGIONAL FOCUS
EASTERN CAPE
Increasing capacity at the Port Alfred WWTW Increasing the treatment capacity of the Port Alfred Wastewater Treatment Works is set to dramatically alter the service delivery landscape in the coastal holiday town. Chantelle Mattheus interviews the project role players on the scope and progress on the project, given recent flooding in the region.
T
he Ndlambe Local Municipality, in the Cacadu
London on the R72 on the Kowie River mouth, is home
District of the Eastern Cape, is a predominantly
to approximately 6 500 households, many of which
rural area, with its capital in the coastal holiday town of Port Alfred. Recently, the municipality
has taken a number of steps to address two of the major challenges facing the region and specifically Port Alfred: the significant housing backlog in the area and the provision of waterborne sanitation to most households. The housing backlog has been addressed by initi-
reside in Nemato township
“The project was of such a high priority, the municipality allocated its full MIG allocation for the 2011/12 financial year”
and
numerous
informal
settlements, without any or with limited access to waterborne sanitation.
Planning priority
ating the Thornhill integrated housing development,
Bigen Africa s assignment
which is currently being implemented. However, this
was to provide the planning and detail the designs
development and the sanitation goal have resulted
required to upgrade and extend the treatment facility
in an increased demand on the local bulk water in-
to produce an acceptable quality effluent and to cater
frastructure in the town, which includes the sewage
for treatment demands over the medium term, explains
treatment facility. Towards the end of 2010, the Ndlambe Local Municipality appointed infrastructure development company Bigen Africa Services to upgrade the sewage treatment plant for Port Alfred. The scenic, coastal town, which lies midway between Port Elizabeth and East
Location of the new infrastructure with the existing ponds in the background
Bigen principal and the project manager, Ian Pollard. The project was of such a high priority, the municipality allocated its full MIG allocation for the 2011/12 financial year to the project, says Pollard. At the time, as is still the case, Port Alfred is still being serviced by a series of oxidation ponds with an
JANUARY/FEBRUARY 2013
43
REGIONAL FOCUS
minimise the impact on the natural environment. The
civil
works
contract
was awarded to URSA Civil cc at a cost of approximately R15.6 million (all inclusive). Construction in due
August to
commenced 2011
be
November
and
was
completed 2012.
in
When
Water&Sanitation
Africa
spoke to Pollard at the beginning of November all was on track and well in hand. estimated capacity of 1.8 Mℓ/d. With the plant operating within its design capacity and producing a reasonably good quality effluent, the initial plan was to irrigate the effluent from the ponds on a grass area next to the Kowie River estuary. Unfortunately, due to regular
The upgraded facility will have an initial treatment capacity of 5 Mℓ/d
Mechanical focus In May 2012, the mechanical and electrical works contract was awarded to Lektratek Water Technology in association with Service Electrical, with completion envisaged towards the end of November 2012. Although
vandalism and theft of the irrigation equipment, this
we are the mechanical contractor for the project, i.e.
practice was eventually discontinued, which resulted
we supply the mechanical equipment, we have got a
in effluent discharging directly into the estuary. As the
subcontractor that will do the electrical portion of the
volume of effluent increased, the quality of effluent be-
works, explains Lektratek Water Technology s Johan
ing discharged into the river gradually became worse,
van der Walt.
especially in December when otherwise vacant holiday homes were being occupied, explains Pollard. The upgraded facility will have an initial treatment capacity of 5 Mℓ/d with the option to extend the facility
The value of the mechanical and electrical works is R15 million (all inclusive) and includes a 24-month defects liability period as well as an operation and maintenance contract. According to Van der Walt, the only real challenging
to 10 Mℓ/d if required in the future.
aspect of the project was the flooding experienced in
Sustainable design philosophy
the region in October and November of last year, as this
Pollard adds that the Bigen Africa design philosophy
led to flooding of the access roads to the city as well as
aimed to incorporate the existing ponds as far as
flooding of the access road to the site. We were there-
possible, in order to minimise the cost of the new infra-
fore understandably delayed due to the heavy rains and
structure and to provide an integrated treatment pro-
flooding, he says.
cess that is relatively simple to operate and maintain.
Although
the
local
branch
of
Lektratek
Water
As such, the first two (anaerobic and primary aerobic)
Technology, based in Port Elizabeth, is responsible for
ponds are retained in the process train for the (a) re-
the installation of the equipment, which has been fabri-
moval of suspended matter to reduce COD loading to
cated at the Potchefstroom head office, no local labour
the subsequent biological treatment process and (b)
will be used in the installation as it calls for specialised
flow attenuation.
skills. This is a specialised installation crew, explains
Effluent from the primary aerobic pond is collected in
Van der Walt, adding that the electrical subcontractor
a small pump sump and transferred to the secondary treatment units comprising an activated sludge reactor and secondary sedimentation tank with sludge recycle facility. It is also possible to recycle a portion of the effluent from the aerobic pond back to the anaerobic pond to minimise the development of nuisance odour conditions, says Pollard. Effluent from the secondary sedimentation tank will be disinfected to inactivate any harmful organisms before being discharged into the Kowie River estuary.
will, however, be using
“It is also possible to recycle a portion of the effluent from the aerobic pond back to the anaerobic pond to minimise the development of nuisance odour conditions.” Ian Pollard
Sludge produced by and wasted from the activated
local
labour
for
the
digging of trenches and so forth. During the peak of civil construction
activities,
between 50 and 60 people were employed onsite as general workers, steel fixers and shutter hands,
many
of
them
sludge process will be routed to one of three existing
from the local community. All building works were sub-
secondary aerobic ponds, which will be transformed
contracted to local emerging contractors and it seems
into sludge lagoons.
highly likely that the contractor will achieve and possi-
The
secondary
treatment
units
and
associated
bly exceed his tendered offer to spend 30% of the value
infrastructure is located adjacent to the existing
of the works on material, services and labour sourced
ponds on the site of a discontinued quarry to
from the local community, concludes Pollard.
JANUARY/FEBRUARY 2013
45
REGIONAL FOCUS
EASTERN CAPE
WTW upgrade on track The upgrade of the Caesars Dam Water Treatment Works in the Addo region of the Eastern Cape will ensure an increased total output of 6 Mℓ/d, GIBB engineer Thulani Gumede tells Chantelle Mattheus. restrictions are implemented and the SRVM restricts water supply during certain periods of the day to allow time for the reservoirs to partially fill up and to ensure limited supply of water to all communities, says Gumede, adding that it was this severe shortage of water in the area that resulted in the immediate investigation of alternative water supply sources to augment the existing water supply quantity.
A bigger picture The original PBWS project started in 2007 with investigations into all possible sources of water to Paterson carried out. Alternative sources were investigated, including sourcing water from New Year s Dam in Alicedale, from Nooitgedacht Dam in Nelson Mandela Bay Municipality, from
T
he upgrading of the Caesars Dam Water Treatment Works (WTW) is part of the Paterson Bulk Water Supply Project (PBWS), which aims to supply water to the small Eastern Cape town
of Paterson and its surrounding area in order to not only meet current water demand in the area, but also plan and deliver for future water demand. The Sundays River Valley Municipality (SRVM) falls
“The original PBWS project started in 2007 with investigations into all possible sources of water to Paterson carried out”
Kommandokraal
Dam
and Slagboom in the town of Colchester, from the Bushmans River and from the Caesars Dam in Addo. The most economical source was found to be Caesars Dam in Addo, says Gumede. The PBWS project consists of a number of different phases, not
under the jurisdiction of the Cacadu District Municipality.
least of which is the upgrade of
Although a large district, the total population of the SRVM
the Caesars Dam WTW in Addo in order to meet the de-
was estimated at only 37 384 in 2007, with a marked
mand of both Paterson and Addo. Other phases include
annual decrease in the population of 1.3% per year since
the construction of water storage reservoirs at the WTW,
1996 ‒ compared with an annual growth rate of 1.1%
the construction of the pipeline from Addo to Paterson,
within the Cacadu District in its entirety.
as well as pump stations and the construction of a water
The need for the upgrading of the WTW is clear when
storage reservoir in Paterson.
taking into account the local water infrastructure landscape and the fact that the increasing demand has out-
Historic context
stripped the ability to maintain a sustainable supply.
Caesars Dam WTW was last upgraded in 2002 to meet the
The water supply situation to the Paterson town is untenable and has resulted in regular water restrictions in the town and surrounding areas. Severe water
Construction commenced 1 August 2012
peak water demand of 2 880 m³/d. The original design was based on the water demand for the Addo area, being Valencia, Nomathamsanqa Township and Addo Elephant Park. The original plant had a steel clarifier with a capacity of approximately 1 200 m³/d, three pressure filters, two pumps with one acting as a standby and one 2 Mℓ fresh water storage reservoir, with the source of raw water for this plant being the Caesars Dam, explains Gumede. The upgrade in 2002 included the addition of a new intake and new intake pumps, the construction of a concrete clarifier and three additional pressure filters. The total output capacity of this water treatment works after the upgrading was 2 880 m³/d. Due to the increased demand in Addo, the two installed pumps are now running in parallel and the output of the plant is currently 3 200 m³/d, hence the plant is operating well beyond its design capacity.
46
JANUARY/FEBRUARY 2013
REGIONAL FOCUS The upgrade is estimated to be completed in June this year
Employment opportunities The dominant employer to date in the region in the formal sector has been agriculture, with SRVM having reported a 48.9% unemployment rate in 2007. The project is still under construction and currently there are a number of local labourers on-site, says Gumede. At peak we expect a total of 25 labourers on-site.
Construction on track Construction on the upgraded portions of
diameter concrete clarifier, a new feeder
Forward planning
the WTW commenced on 1 August 2012
pump and a new set of rapid gravity sand
Gumede adds that additional sludge drying
and is still under way, with completion es-
filters to replace the existing pressure filters.
beds will also be installed to meet future
timated for June 2013. The main contractor
The site upgrade will involve upgrading of
needs and an environmental upgrading of
on-site is Phambili Civils, with the M&E sub-
the ablution facilities, fencing, access road,
the WTW area will also be undertaken.
contractor being Swan s Water Treatment.
pavements and greening of the site.
The WTW is currently only supplying water and
to the Addo area. According to Gumede,
estimated contract value of R13.7 million,
dosing system is to be upgraded, as well as
the upgrade will ensure a total output of
is considered a standard upgrade using
new raw water pumps installed, namely two
6 Mℓ/d. This output will be able to han-
mainly existing tried and tested technologies,
duty pumps with a combined capacity of
dle the water demand of both Addo and
as indicated by Gumede, certain components
266 m³/h and a standby pump. Additionally,
Paterson up until the year 2035.
will still need to be overhauled, upgraded
50 m of rising main will be upgraded from
The quality of water produced by the
or replaced. Among the new components
a 150 mm diameter to a 250 mm diameter
plant will also improve with the upgrade of
of the WTW is the installation of a new 15 m
uPVC Class 9 pipe.
the WTW, concludes Gumede.
Although the project, which has an
Moreover,
the
chemical
storage
47
JANUARY/FEBRUARY 2013
The Intelligent Choice With a solid track record spanning over half a century, GIBB has established itself as a partner of choice. Backed by a Level 2 BBBEE rating, GIBB provides engineering solutions to a diverse range of markets across the African continent.
1FPQMF t &YQFSUJTF t &YDFMMFODF marketing@gibb.co.za | www.gibb.co.za | +27 11 519 4600
REGIONAL FOCUS
EASTERN CAPE
Dry curtain grouting contract nearing completion at Cengane Dam Esorfranki Geotechnical is poised to complete a curtain grouting subcontract awarded by Norland Construction at the Cengane Dam in the Eastern Cape, about 80 km from Umtata, where a new dam wall is planned as part of the OR Tambo District Municipality’s Upper Culunca regional water supply scheme.
T
his leading geotechnical services company has provided about 600 m2 of dry curtain grouting under pressure to fill any cavities before Norland Construction begins work on the dam wall.
Grout curtains are used under dams where the foundation would
otherwise pass too much seepage, or create dam instability. A grout curtain usually consists of a row of vertically drilled holes filled with pressurised grout. The holes are drilled at intervals and in such a way that they cross each other, creating a curtain. Grout is injected into these holes with grouting jets, which use a high-
ABOVE Site layout at Cengane Dam showing exposed terrain with large boulders BELOW Typical grouting setup and operation for curtain grouting
pressure fluid stream to erode a cavity. This is the first job of its kind that we ve undertaken for some time and we regard it as a step in the right direction as part of our strategic plan to re-enter the
grouting market, says Anton Naude, director at Esorfranki. Past contracts include curtain grouting of an earth wall at Sun City and at Lydenburg Dam. Before the Esorfranki team could begin work at the Cengane Dam site, it had to blast a number of large boulders using a boulder buster to create a workable surface. The primary holes were introduced at 3 m intervals, with secondary holes at 1.5 m intervals and tertiary holes at 7.5 m intervals. Naude says no major leaks were identified and only minor grouting was required.
48
JANUARY/FEBRUARY 2013
REGIONAL FOCUS
EASTERN CAPE
Quinera WWTW upgrade nearing completion The upgrade of the Quinera Wastewater Treatment Works from 6 Mℓ/d to 18 Mℓ/day is estimated to provide adequate capacity for the region for the next 15 years, finds Chantelle Mattheus.
F
ollowing extensive expansion in recent years,
Upgrade unpacked
the Buffalo City Metropolitan Municipality has
SRK Consulting was subsequently appointed by the
been facing a strong and increasing demand
municipality to investigate and report on the capacity
for residential development in the Quinera
of the works. The findings of the report recommended
area, south of the N2 in East London in the Eastern Cape.
that the works capacity be tripled, through an upgrade
However, this continued expansion will place extensive
from 6 Mℓ/d to a capacity of 18 Mℓ/day and in 2007, SRK
strain on a water treatment system already nearing
Consulting was also appointed to design and implement
capacity and as such has necessitated a major upgrade
the upgrade of the Quinera WWTW, which includes the
of the local Quinera (Gonubie) Wastewater Treatment
design and construction of additional infrastructure to
Works (WWTW).
meet the increased volumetric and organic loading of the works.
According to Buffalo City Metropolitan Municipality spokesperson David Langley, the municipality was
The sludge handling capacity of the works will also be
aware that the works was nearing the limit of its installed
upgraded to accommodate the increase in sludge vol-
capacity, both in terms of effluent treatment and sludge
umes with the construction of additional infrastructure
management. The existing Quinera WWTW has a capaci-
and the implementation of a sludge management plan,
ty of 6 Mℓ/d and concerns about the possible overloading
says SRK senior technologist Marinus Meiring.
of the Quinera WWTW resulted in Buffalo City municipal-
Meiring adds that although the original brief called for
ity placing a moratorium on any new developments in
the whole works to be upgraded under one contract, due
the Quinera and Gonubie areas until the capacity of the Quinera WWTW had been increased. The moratorium has been in place since 8 July 2005, so there has been no overloading of the plant ‒ but there have been no major residential developments.
An upgrade of 6 Mℓ/d to 18 Mℓ/d was recommended by SRK consulting
to budgetary constraints the electrical works could not be carried out concurrently with the civil works and the project was split into two phases. Phase 1 will encompass the civil and mechanical works portion, and Phase 2 encapsulates the electrical and electronic works portion of the project.
Challenging context The project has not been without
its
challenges,
although the majority was faced and overcome timeously and efficiently by the
Project team Client: Buffalo City Metropolitan Municipality Principal agent: SRK Consulting Civil/structural engineers: SRK Consulting Electrical engineers: Taylor and Associates Architect: IDC Architects
Phase 1 Principal contractor: Erbacon Construction Mechanical subcontractors: Huber Technology Sulzer (formerly ABS Wastewater Technology)
Phase 2 Principal contractor: URSA Civils / GIVE Ziyawa Joint Venture Electrical subcontractor: Hlumisa Engineering Services Mechanical subcontractors: Huber Technology Sulzer (formerly ABS Wastewater Technology) JANUARY/FEBRUARY 2013
49
REGIONAL FOCUS clarifier scum disposal system to the waste activated sludge buffer tank were also included in the first phase of the project. Finally, an upgrade of the final effluent chlorination system (including a new chlorine house and extended chlorine contact chamber) was also necessitated.
A final flourish The contract for Phase 2 was awarded to URSA Civils/GIVE Ziyawa Construction Joint Venture in August 2012, with final commissioning of the plant expected in November 2013. This phase includes both the continuation of civil and mechanical works, as well as initiation of the majority of the electrical and electronic works. The civils aspects involves construction of a new substation, a paved access road, design and site staff during the project,
a water reticulation network, and the con-
says Meiring.
crete demolition and repairs necessitated
One of those challenges was undertaking
on the existing aerator basin, as well as
the construction of the new infrastructure
the installation and commissioning of me-
at an operational WWTW without affect-
chanical equipment supplied under Phase
ing the operation or performance of the
1 and the final process commissioning of
existing plant.
the plant.
In addition, the project has also been the
The electronic engineering scope of
first time a number of innovative technolo-
works include an access control system,
gies have been implemented in the Buffalo City municipal region, not least of which has been the dewatering of screenings and
The upgrade, which will be completed this year, is estimated to provide sewer capacity for the next 15 years
grit, as well as the odour control of the inlet
installation,
SCADA
installation,
flow, level and effluent quality monitoring equipment, and PLC controls for the plant and motor control systems.
A detailed
works, which is a fully enclosed building,
aerobic reactor, adjacent to, and matching
specification has been prepared to ensure
and the utilisation of fine bubble aeration
the dimensions of the existing reactor,
that the upgraded Quinera WWTW is inte-
to replace surface aerators.
fed from a modified concrete splitter box,
grated within the Buffalo City Metropolitan
Other firsts on-site include mechanical
as well as the equipping of both aerobic
Municipality wastewater network, operates
sludge dewatering by means of filter
reactors with diffuse bubble aeration, using
in accordance with the licence conditions
presses and a high level of automation with
air supplied by the new blowers housed in
and to provide the municipality s operation
regard to plant operation and monitoring
a new acoustically insulated blower house.
and maintenance staff with the resources
of plant performance in real time.
According to Meiring, a new waste
to manage the new plant, says Meiring.
activated sludge dewatering system also
The total construction cost for both phas-
A phased approach
formed part of the contract and the system
es is estimated to be R95 million including
The contract for Phase 1 was awarded to
comprises of waste activated sludge trans-
VAT, with Phase 1 estimated at about
Erbacon Construction in March 2008 and
fer systems from the two aerobic reactors
R49 million and Phase 2 at R45 million.
was completed in September 2009.
to a waste activated sludge buffer tank, a
The work in this contract included the
mechanical dewatering system comprising
Room for expansion
construction of a new inlet works, which
polyelectrolyte dosing and mixing, two lin-
Langley says that once the upgrade of the
will replace the existing inlet works and
ear dewatering screens and two belt filter
WWTW is complete at the end of 2013,
will consist of a concrete inlet structure
presses, as well as a conveyance system to
up-market, medium income and low-cost
equipped with rotating mechanical screens
lift the dewatered sludge to an overhead
housing in the region will benefit signif-
and a vortex degritter, together with odour
distribution system to facilitate loading of
icantly.
control measures, says Meiring.
skips to take the sludge off site.
works is estimated to provide adequate
Other aspects include a second concrete
A pumping system to transfer the water removed from the sludge
“A detailed specification has been prepared to ensure that the upgraded Quinera WWTW is integrated within the Buffalo City Metropolitan Municipality wastewater network” 50
CCTV
The increase in capacity of the
sewer capacity for future developments in the area for the next 15 years.
to the clarifier splitter box,
The existing works is on a 10.7 ha site,
as well as the installation
but a further 6.7 ha of adjacent land could
of a new secondary clarifier
be expropriated for extensions to the
and the upgrade of the
treatment works. There is a possibility that
system for the return of
the Quinera WWTW could develop into a
activated sludge to the
regional treatment works, with modular ex-
aerobic reactors and a new
tensions as required, concludes Langley.
JANUARY/FEBRUARY 2013
AFRICAN FOCUS
ZAMBIA
Conveying confidence at Chambishi CuSEP Project Pipeline solutions provider RARE recently supplied a complete fluid conveyance solution to the Chambishi Copper Solvent Extraction Plant (CuSEP) Project at Chambishi Metals PLC in Zambia in only 105 days. Chantelle Mattheus speaks to RARE manager: pipeline services, Carl von Graszouw, on the intricacies of supply in the African context.
T
he project has seen the works being constructed at Chambishi Metals PLC, which is situated near Kitwe in the Republic of Zambia. Working in Zambia meant that the planning for equip-
ment, materials and personnel had to be precise. RARE had to ensure that the required materials were checked at source before deliveries could take place and we had to coordinate shipping of materials to ensure optimisation of space, explains Von Graszouw. Another challenging aspect of the project was that South African personnel had to return home every 10 weeks. Planning was put into place to ensure that work on-site carried on during these rest periods, according to Von Graszouw, as RARE allocated eight key personnel from South Africa and used 35 Zambian personnel. Forty people were employed on-site at peak. To ensure that all personnel reported to work on time as well, RARE provided a bus to ferry personnel from the various locations in the vicinity in the morning and drop them off in the afternoons. These setbacks were further exacerbated by the fact that the project had to be completed during the dry season to avoid delays due to heavy rains in the region. Budgets for the day-to-day running expenses also had to be precise and monitored daily, adds Von Graszouw.
Project outlined Chambishi Metals PLC produces cobalt and copper and it operates a mineral processing facility for the production and smelting of cobalt and cathode copper near Kitwe in Zambia. The Chambishi CuSEP Project involves upgrading the plant to produce 50 000 tpa LME Grade-A copper by installing copper solvent-extraction circuits to treat the solution arising from various sources within the complex.
The existing copper electro-winning
circuit will be modified to accommodate the solvent
A portion of the complete fluid conveyance solution at the Chambishi Copper Solvent Extraction Plant at Chambishi Metals PLC in Zambia
its contract, which has an estimated value of R16.5 million, entailed the supply, fabrication and erection of HDPE piping and included steel supports. Although no new technologies were used for the project, fabrication of the HDPE piping was done using heated tool butt fusion and socket fusion. While polyethylene pipe has a firm footing within the world s water, oil and gas industries, its use in the mining industry is fast gaining ground as it is often
extraction strip circuit solution. A solvent-extraction
the best choice when conveying minerals and waste.
step will be installed to remove as much copper as pos-
The abrasion resistant, smooth
sible from the solution that is fed to the cobalt refining plant, says Von Graszouw. The new facilities will be built as a combination of Brownfield s installation integrated in to the existing facilities and Greenfield s installation adjacent to the roast/leach circuit. RARE s scope of works according to
inner surface exhibits a good
Fabrication of the HDPE piping was done using heated tool butt fusion and socket fusion JANUARY/FEBRUARY 2013
resistance to most chemicals and the ever-present threat of corrosion, all while demonstrating a high impact strength, costing less comparatively and
51
AFRICAN FOCUS ANGOLA
HDPE pipes chosen for Angolan Cunene Project As part of the master trans-frontier plan with Namibia to supply safe drinking water in the Cunene province, Marley Infrastructure was awarded a US$15 million contract in Angola. RARE had 105 days from site establishment to complete the project
being more easily installed ‒ as exhibited by RARE in this installation.
its range of HDPE pipes, which
Project consisted of
are endorsed by the Southern
the construction of a
African Plastic Pipe Manufacturers
water treatment facility
Association and manufactured
at Xangongo, so that water can be
according to sound quality
extracted from the Cunene River,
standards, carrying the SABS mark
Systems, Flotek, SPF Trading and Ebenheiser, with no
and treated and then pumped
for SANS ISO 4427.
subcontractors used on the project.
along a 100 km pipeline to
RARE s suppliers in this case included Marley Pipe
From site establishment, RARE had 105 days to com-
Logistically, transporting 16
Xangongo, Mongua and Ondjiva.
trailers carrying 16 x 15 m length
plete and handover works, says Von Graszouw, who fur-
Marley supplied over 98 km of
HDPE pipes each to Angola was
ther reports that the project was successfully completed
630 mm PN6 HDPE pipes as well
no easy feat, and Marley partnered
and commissioned on 30 September 2012 ‒ exactly
as about 2 km of 630 mm PN10
with WP Transport to ensure their
according to schedule.
HDPE pipe ‒ marking one of
safe passage, taking into consider-
Marley s largest contributions to a
ation proper crating and stacking
single project.
methods to ensure minimal roll
Unique competencies Von Graszouw believes that RARE secured and was able
One of the provinces devastated
during transportation. The biggest
to optimally deliver on the contract because of the
by the Angolan conflict, Cunene
challenge, however, occurred once
unique competencies inherent in the company. A com-
has suffered from a lack of proper
the pipes had actually reached
bination of factors made RARE the suitable choice, not
supply and sanitation systems,
the Angolan border. Not only did
least of which are our years of experience in chemical
resulting in low levels of access
Marley and Befesa have to make
plant installations in Africa ‒ specifically plastic.
to clean drinking water. Only 15
sure that all documentation for
to 20% of the rural population
every truck was in order, but WP
the proven ability to mobilise and finish projects on time,
has the advantage of a dedicated
also had to appoint a dedicated
as well as having a locally registered business in Zambia
water source.
person to handle the time-con-
Additionally, Von Graszouw points out that RARE has
and having access to key personnel through RARE
The project, however, was not
Zambia. Key equipment was also located in Zambia,
without its challenges. In addition
process resulting in costly delays
which helped the company to avoid additional charges.
to chief negotiations held by
and standing time.
RARE s vision is to become the leading supplier of
Marley MD, Louis Albertyn, and his
suming and rigorous customs
Against all the odds, Marley took
innovative fluid conveyance solutions, with specific
team to assess the critical factors
on the project at hand with the
emphasis on the African continent and the ease at
and risks that the project would
same determination that it puts
which this project was completed seems to indicate
present, Marley s pipes were also
into every venture. For Marley, this
they certainly have the potential to do so.
There
stringently tested for quality con-
project was about more than just
are definitely opportunities for RARE to continue to
trol to evaluate the most suitable
business; it was an opportunity to
be involved in the maintenance of this new/updat-
pipe supplier according to the
uplift communities by giving them
ed infrastructure in Chambishi Metals,
exacting requirements of the cli-
access to the most fundamental
ent. Marley came out on top with
resource of life ‒ water.
Von Graszouw.
52
T
he Cunene River Water
concludes
JANUARY/FEBRUARY 2013
TRENCHLESS
TECHNOLOGY SASTT contact details: Web: www.sastt.org.za President: Michael King Tel: (021) 417 2900 • Fax: (021) 417 2999 E-mail: mike.king@smec.com Honorary director: Joop van Wamelen Tel: (012) 567 4026 • Fax: 086 668 4026 E-mail: director@sastt.org.za
Downhole drilling success A recent drilling project crossing under the N1 in Centurion, near the active Gautrain high speed rail, proved tricky until the right contractor for the job, armed with the right equipment, managed a breakthrough. he project involved the installation
T
Craig Burnie, MD at Vermeer Equipment
takes a lot of specialised skill, warns Garcia,
of four ducks of 110 mm in diameter
Suppliers, says was sourced from Vermeer s
adding that the hammer and rig that Vermeer
over a distance of 130 m through
Beijing Factory. The rig itself was designed for
supplied was supported by training from a
solid rock, crossing under N1 in
large-diameter HDD projects and, according
Pioneer specialist from the US, with Vermeer s
Centurion and under the very active Gautrain
to Burnie, has the features and power need-
assistance, who showed Garcia and his team
rail lines. Several companies had failed and
ed for demanding job site conditions .
exactly what the hammer and rig were capa-
the project had been waiting for a year or
In addition, the open-top vice increases
ble of. This allowed the already highly skilled
two for the right contractor, says Robert
visibility for the operator and offers the ability
team to push the equipment to the limits of
Chico Garcia, JCS Pipeline s operations and
to set large tooling in the vice with ease.
its capabilities on-site in order to deliver on time and according to exacting specifications.
horizontal directional drilling (HDD) manager,
The hammer in this case was used to trav-
adding that the evidence of previous contrac-
erse the approximately 130 m of solid sub-
I was very impressed with the team from
tors attempts to get all the way across were
surface rock, after the initial hole was opened
Vermeer. They always give us outstanding
cleary visible.
to a diameter as prescribed by the consulting
service and their aftersales service is also
engineers. Using the hammer was Step 1 ‒
excellent, concludes Garcia.
Challenging conditions
the hammer is only 160 mm in diameter ‒ but
The biggest challenge on-site was the hard
it allowed us to get all the way across, which
rock. South Africa has some of the hardest
then allowed us to proceed with the rest of
rock in the world, says Garcia. The majority
the project, explains Garcia.
of the bore was solid rock, tested at over
The entire drilling process took only 15 days
300 MPa. The continuous traffic on the N1
for Garcia and his team from JCS Pipelines,
was also challenging, according to Garcia,
with the pilot bore itself done in only a cou-
as well as the fact that the drilling had to
ple of days. Several days were required for a
cross under the tracks of the Gautrain line.
sizeable single jump to the final 355 mm hole
All of these are very different obstacles that
opener (rock reamer). The hammer and rig
not everybody can overcome, but we did,
worked very well in the South African condi-
states Garcia.
tions, adds Garcia.
The entire drilling process on-site pictured below took only 15 days
The equipment of choice in this challenging context was a downhole hammer supplied
Training essential
Pioneer,
Not many people have the experience to use
on a Vermeer D130x150 drill rig, which
the hammer and the related equipment. This
by
Vermeer s
alliance
partner
JANUARY/FEBRUARY 2013
53
TRENCHLESS NEWS
TRENCHLESS TECHNOLOGY
A challenging context The use of trenchless technologies is increasingly gaining momentum in the local infrastructure arena, given the advantages in both efficiency and cost they offer. Chantelle Mattheus speaks to TT Innovations’ director, Neil van Rooyen, about the challenges faced in rolling out these technologies.
A
s with most infrastructure related projects, best practice on-site is always key, but this is under-
A compact pipe
taken in a challenging environment with many factors contributing to an increasingly complex
context under which these projects are rolled out. Infrastructure already in place on-site also provides its own challenges at times. For pipeline rehabilitation projects, this does not pose too much of an issue as the existing plans and records are fairly accurate and are easily verifiable, either by conducting a camera survey of the existing pipeline (gaining access via the manholes) or for pressure networks by locating pipeline markers on the surface such as valves, hydrants or tees, says Van Rooyen. However, the latter is not an option for new trenchless installations by means of horizontal directional drilling or pipe ramming as-built records are crucial. Any discrepancy could lead to the existing services being damaged during the installation process. As a best practice for new installations, all existing services are required to be positively identified (by verifying the depth and location)
favourable for both contractors and clients as projects can
and superimposed onto a long section drawing where the
be rolled out on a more consistent basis ‒ making it easier
proposed installation alignment has also been plotted.
to allocate funding and resources ‒ as opposed to reactive
The local authorities that issue wayleave documents
planning, which only allows for crisis management.
therefore play a critical role in this phase of the project by providing accurate wayleave documents. Any delays
Residual resistance
from these departments usually result in the entire project
Despite the numerous advantages of the trenchless
being delayed.
technologies available, there is still some resistance in
Comprehensive planning process When addressing the challenges relating to planning and the roll-out of these projects, Van Rooyen stresses that clients need to be able to make informed decisions regarding the assets under their control. This can only be done once comprehensive asset condition assessments are undertaken. Proper asset management and resource allocation should therefore be the
Innovations director
the
infrastructure
environment.
Resistance
to change is a common human
tendency,
which is also common to ‒
implementing often
new
misunderstood
‒ technology,
says Van
Rooyen. He states that
main priority of decision-makers. Utilising the appropriate
most clients have various misconceptions regarding
trenchless technology results in reduced overall costs
trenchless technology; these are based predominantly on
and increased asset performance. Unfortunately, most of
hearsay and perception.
the asset management work is undertaken on an urgent basis due to failing infrastructure, he says.
These misconceptions include a belief that the technology is too expensive to implement in smaller rural munic-
He adds that by failing to forecast scheduled mainte-
ipalities and that the process is too mechanised, which re-
nance, project specifications are often hastily prepared.
sults in no local labour participation. However, by using
This allows for a wide range of bid submissions to be
actual data collected from completed projects, both these
accepted, which conforms in principle but not necessarily
misconceptions have been refuted, Van Rooyen explains.
in performance ‒ a further consequence of which is a dis-
A further hindrance is the lack of trenchless construction
proportion between the contractors prices. This dispro-
specifications, which limits the client and engineers
portion is generally indicative of varying product quality.
ability to administrate and evaluate trenchless projects.
He advocates pre-emptive planning strategies as being
54
“Proper asset management and resource allocation should therefore be the main priority of decision makers. ” Neil van Rooyen, TT
Conventional construction is then chosen in favour of
JANUARY/FEBRUARY 2013
TRENCHLESS NEWS trenchless technology, compounding the
is essential to ensure project success and
resistance to change, he says.
also largely reduces the risk both parties are exposed to, he says.
Construction circumstance These misconceptions aside, the practical
Best practice by far
challenges on-site are what ultimately
According to Van Rooyen, simply the use of
impact delivering the project on time.
trenchless technologies can be considered
With proper project planning, mitigating
best practice in itself. Trenchless technology
measures and allowances can be made to
offers
deal with unforeseen site circumstances.
to install, upgrade and replace ageing
An
underground infrastructure. With limited
inherent
challenge
with
trenchless
efficient
construction
means
is
trenching required and a small site footprint,
undertaken underground and out of sight.
this form of no-dig construction is hard
Underground obstructions and difficulties
to refute.
technology
is
the
fact
that
work
This is reinforced by the fact that, for the
therefore do arise ‒ which are largely beyond the contractors control. Unfortunately, many clients pass this risk onto the contractor,
Compact pipe: a renovation procedure for trenchless rehabilitation
same project outcome, trenchless construction requires far less resources than a comparative conventional open-cut operation.
which inherently increases project s cost (as contractors then make allowances for these
effective, and second, clients have unrealistic
This leads to significant reductions in public
risks in their pricing).
expectations regarding the capability of
inconvenience usually caused by construc-
According to Van Rooyen, a far more
the applied trenchless methodology. Both
tion activities, lower health and safety risks
effective mechanism would be for clients to
viewpoints might lead to the entire process
as long open trenches are avoided, and a
allocate contingency amounts to deal with
being viewed negatively.
lower carbon footprint as less construction
Van Rooyen notes that only in recent
plant and natural resources (filling sand and
Safety, on the other hand, is often a
years has the technology been rolled out to
aggregate for reinstatement and road layer
highlight on-site, with safety statistics often
tertiary and training institutions. The pro-
works) are utilised.
improved on a trenchless site versus a
motion of trenchless technology is therefore
conventional open cut operation, predomi-
intrinsic to educating clients and engineers
and
nantly due to the limited trenches. The fact
‒ an ongoing process.
sympathetic to construction inconveniences,
these unforeseen occurrences.
56
an
With increased environmental awareness the
general
public
being
less
that work is undertaken underground and
The technical nature of most trenchless
trenchless construction should therefore,
therefore out of sight can result in unallo-
operations necessitates the use of dedicat-
according to Van Rooyen, be the first
cated services being damaged, which might
ed staff for specific equipment operation,
consideration when undertaking work in
prove hazardous to work crews though,
which also requires the appropriate train-
urban environments. Unfortunately for the
warns Van Rooyen.
ing. Incorrect operation of equipment, in
majority of project awards, clients (largely
particular for new installations (horizontal
mandated by procurement policies) award
Education essential
directional drilling, pipe ramming, etc.) could
contracts based on price only.
Unfortunately, a lack of understanding
lead to damage of equipment, surrounding
consideration needs to be given to the
regarding
the
infrastructure and underground services.
contractor s performance record and the
processes
and
trenchless its
technology
implementation
More
has
A project milestone approach that high-
another consequence, according to Van
lights certain project risks at different stages
in
Rooyen.
He says the reason for this is
and allows for the necessary contingencies
outcome. Stringent contractor evaluation,
twofold: First, role players utilise trenchless
to be in place should be presented to the
performance and accountability are crucial
construction as a
for all
client. This co-accountability and open com-
to ensure the sustainability of this fledgling
pipeline work, which is not always cost
munication between client and contractor
sector, he concludes.
miracle cure
JANUARY/FEBRUARY 2013
selected methodology s achieving
the
appropriateness required
project
DURBAN’S WESTERN AQUEDUCT
TRENCHLESS NEWS
Pipeline begins again The urgently needed second phase of the Western aqueduct pipeline is under way once again. eil Macleod, head of eThekwini
N
fraternity and has selected 16 contractors
Water and Sanitation (EWS), says
to form two panels: one made up of com-
that bids have been received for
panies qualified to deal with large diameter
the first sector of the pipeline
pipes and one comprising companies that
project. These will be adjudicated and the
are able to work with pipes with smaller
tender awarded early this year. The second
diameters. This process was concluded in
sector will also be released for tendering at
September 2012. The 16 contractors includ-
the beginning of 2013.
ed on the panels will be invited to tender
He says EWS has unbundled the 55 km pipeline project into six individual projects,
An aerial image showing the progress of construction in the vicinity of Inchanga Station – part of Phase One of the Western Aqueduct Project, which is almost 80% complete
for the different contracts that make up the overall project.
Macleod states that further delays to this
which will be rolled out over a seven-year
The entire 55 km second phase begins
project will have detrimental consequenc-
period. The 7 km long first sector, valued
at Inchanga Station and ends at Ntuzuma,
es for Durban as current water supply
at approximately R125 million, will stretch
and includes two branch pipelines to
infrastructure is unable to cope with the
from Inchanga Station to Alverstone Neck.
Tshelimnyama and Mount Moriah. It is
forecasted future water demand. In addition
The second, which begins at Alverstone
expected to significantly strengthen the
to large commercial and industrial projects
Neck and has a similar value, will end at
capacity of bulk water supply to the west-
that are on the drawing board, the city s
Ashley Drive in Kloof.
ern regions of eThekwini, injecting up to
population is expected to increase by at
Construction is expected to begin during
400 Mℓ/d. At the same time, it will ultimately
least 20% by 2030. Only the current heavy
the first quarter of 2013. EWS has called for
boost much needed water supplies to the
rains are saving the city from major water
expressions of interest from the contracting
north of Durban.
restrictions, he warns.
JANUARY/FEBRUARY 2013
57
TRENCHLESS NEWS
SLIPLINING
Sliplining Parktown’s ageing water pipeline infrastructure Subsurface pipeline construction and rehabilitation company Trenchless Technologies recently completed a 12-week contract for specialist contractor ConSolve Civils and MPA Consulting Engineers, which saw the company slipline more than 270 m of steel piping at the Parktown reservoir for Johannesburg Water.
T
renchless Technologies
general
manager, Marco Camarda, says that
the
Parktown
relining of Reservoir No 2 and pipework of
says that Trenchless Technologies portion
Reservoir No 1 and No 2.
of the contract involved the sliplining
Reservoir,
Johannesburg
Water
awarded
the
of 275 m of high-density polyethylene
which was built in the 1950s, has
R19 million contract to MPA Consulting
(HDPE) pipe measuring 560 mm in diam-
been in need of a refurbishment for many
Engineers and Con-Solve Civils, which
eter into an existing 600 mm steel pipe,
years. As a result, Johannesburg Water put
then subcontracted a portion of the con-
which serves as the main water feed from
out a tender in September 2011 for the
tract to Trenchless Technologies. Camarda
Rand Water to the Parktown Reservoirs No 1 and No 2. The
Southern
African
Society
for
Trenchless Technology technical standard for sliplining was used by Johannesburg Water on this contract to ensure the quality of the sliplining works. Upon commencement of the project, we conducted closed-circuit television (CCTV) investigations on the pipeline in order to determine its condition and to look for obstructions. The investigations determined
that
the
pipelines
were
badly corroded and pitted, and were in dire need of refurbishment. It was also
Butt-welding of 560 HDPE PE 100 PN 10 in progress
58
JANUARY/FEBRUARY 2013
Trenchless Technology Specialist
Our range of services include: • Pipe Bursting • Horizontal Directional Drilling • Pipe Rehabilitation
• Pipe Ramming • CCTV Inspection • Dewatering
• HDPE Welding • Deep Excavation and Shoring • Underground Service Detection
• Slip Lining
• Industrial Pipe Cleaning
• Close-fit lining: COMPACT PIPE
For more information you can contact us: +27 (0)21 761 3474 F +27 (0)21 797 1151 E info@tt-innovations.co.za www.tt-innovations.co.za
TRENCHLESS NEWS discovered that the pipeline lay at a
through the entirety of the pipeline. The
steep gradient and that there was a tight
only obstacle that we faced was a severe
bend at one section of the pipe. These
bend in the pipeline, at which point we
conditions
had to excavate a pit and remove this
necessitated
a
significant
amount of preparatory work, all of which
bend, describes Camarda.
had to be carried out within very short
Once Trenchless Technologies deter-
shutdown periods to avoid interrupting
mined that the pipeline was clean and
the supply of water to the residents of
free of any obstructions, it commenced
the neighbouring areas, including the
the sliplining works. Four sliplining sec-
Johannesburg General Hospital, which
tions were undertaken in total. Additional
is positioned next door to the reservoir,
works
explains Camarda.
600 mm diameter fabricated tees, bends,
included
installation
of
new
All of the preparatory work, which in-
spool pieces and valves. The contract was
cluded the CCTV investigations, cleaning
completed by the company in less than
of the pipeline and sliplining test work,
12 weeks.
as well as the actual sliplining work, was
The only interruption experienced by
carried out through a small work footprint
Trenchless
consisting of a launch pit at the southern
having to lay a steel pipeline underneath
end of the pipeline and a retrieval pit at
the access road to Reservoir No 1, just
the northern end of the pipeline.
below Reservoir No 2. Here Trenchless
After having cleaned the pipeline, we had to remove any protruding objects by running a spring-loaded steel fingered cleaner through the pipeline. We then carried out sliplining test work using a 2.5 m test piece of HDPE pipe that we ran
Technologies
was
that
of
Technologies excavated across the road,
TOP Delamination and corrosion of the existing steel pipe ABOVE Sample of a removed corroded section of a 600 mm diameter steel pipe
JANUARY/FEBRUARY 2013
laid the steel piping and connected it to a new steel tee piece at one end and onto an existing 600 mm diameter flanged gate valve at the other end. The road was reinstated in just 24 hours.
59
LABORATORIES & EQUIPMENT
COMPETENCE AND CREDIBILITY
Laboratory lessons As far back as 2011, the Water Research Council, along with the National Laboratory Association and Umgeni Water, highlighted gaps in water testing laboratories in South Africa. It’s been almost two years after the revealing study undertaken by Jeffares and Green; Chantelle Mattheus investigates the current state of the dynamic and changing laboratory environment.
S
outh Africa has a limited number of laboratories undertaking water quality testing and the initial research highlighted that staff shortages in these laboratories remained the biggest
problem, with the main concern lying with the laboratories with little or no training at all. There are various challenges within this arena but perhaps the most challenging is staff competence and retaining staff in this era of young working adults, says
Venetia Mitchel, customer liaison manager at independent environmental testing facility Talbot & Talbot. Competent staff is the basis on which we build a quality management system. Without competent staff, the quality system would not function. It is these staff
effluent to sewer, or is suitable for livestock watering
members that drive the crucial requirements of the
or irrigation purposes. A water source sampling service
quality system, says Mitchel, adding that on inter-
by field samplers is also available to assist in the correct
viewing staff we find that our expectations are not
collection of samples for further testing at the labo-
always met in terms of qualification and experience.
ratory. The organisation receives an average of 2 000
In-house training and investment provides us with the
samples per month.
further competence requirements we need.
in one key respect, according to Mitchel: Accreditation
tent and established competitors in the market, but
to the ISO 17025 standard is what sets the competence
we are seeing small emerging start-ups in this field .
base for a laboratory. It provides international recogni-
And while the accreditation of laboratories is what sets
tion of the work undertaken and implies competence of
the quality standard in the industry, Mitchel thinks the
staff and confidence in the results of analyses.
prevalence of established water authorities exploring
She adds that in terms of water testing, the confi-
commercial work also limits the small established
dence of the results of anal-
independent laboratories in terms of competing in a tight market.
Dynamic differences For drinking water testing, Talbot & Talbot provides a suite of analyses that encompasses testing to establish if a specific water source is suitable for human consumption, whether it meets appropriate standards for discharge to a natural water resources or as trade
60
Water testing laboratories are different from other labs
According to Mitchel, there are currently few compe-
“Competent staff is the basis on which we build a quality management system. Without competent staff, the quality system would not function� JANUARY/FEBRUARY 2013
yses is crucial for example in a prosecution case. Quality in any laboratory provides the user with the confidence in the results and speaks to the validation and quality control established in the lab procedures. The quality control provides a point of
LABORATORIES & EQUIPMENT reference for the measurement where
doing analyses at competent laborato-
information from its laboratories for any
standards also provide a reference point
ries, says Swart.
test to confirm the credibility of results
for the measurements.
for which the laboratory is not SANAS
Accreditation key
accredited to perform the specific test on
or competent laboratories speaks to the
The role of SANAS accreditation in the
a water sample. Every year since inception
changes in the market expectations and
process cannot also not be underestimated.
of the Blue and Green Drop certification
the understanding of the importance of
However, this also needs to be viewed in
programmes, the quality of information
standardising measurements, according
the larger context of the current laboratory
submitted by laboratories on behalf of
to Mitchel.
environment,
The growing needs for accredited and/
gaps,
the
municipalities
laboratories
has
credibility and traceability of results has in-
Affairs (DWA) reporting requirements, the
also been identified as being skewed. It
creased. DWA believes this is a positive sign
need for confidence and standardisation
should remain the aim for laboratories
that should be further encouraged as a first
of the measurements provided is para-
doing municipal water quality analyses to
step for some laboratories to comply with
mount to the validity of the database of
be SANAS accredited. We have to, however,
the requirements of SANS 17025, she says.
information being built on the catchment
acknowledge that this is not going to happen
Swart believes that until such time that
and potable water samples taken at dif-
sometime soon without considerable effort.
the country has a surplus of appropri-
ferent points nationally. This provides a
But not having accredited laboratories all
ately
comparison point where known standards
over the country does not mean all results
distributed around the country to ensure
and methods are being applied, which
are not to be trusted.
accessibility in each of the provinces,
If we look at the Department of Water
geographic
where spread
besides of
countrywide
to
confirm
accredited laboratories relatively
It is my opinion that laboratories per-
it remains true that South Africa has
forming municipal water sample analyses
a shortage of SANAS-accredited labs.
have really increased their efforts to im-
However, she adds that as the sector that
prove quality assurance systems within
understands that SANAS accreditation, for
and
their laboratories. Various systems have
instance, applies to the methods of analy-
accredited laboratory staff, as well as
been put in place, varying from ensuring
ses as used within a specific laboratory, I
being a properly accredited laboratory in
continuous calibration of equipment (and
encourage that the industry find ways to
itself, is therefore critical in ensuring safe
keeping records thereof ) and training of
better phrase the shortages of accredited
drinking water for consumers ‒ especially
staff to participation in proficiency testing
labs around the country so that the public
in light of initiatives like the Blue Drop
schemes (the recognised NLA micro and/or
‒ and this can also now include the mu-
Report. While the Blue Drop certification
SABS chemical programmes), says Swart.
nicipal sector that has to make use of the
implies comparison of the same aspects when reporting results.
Impact on water quality Having
the
programme
correctly
has
trained
been
designed
to
However, she goes on to clarify that the
services of the laboratories ‒ understands
evaluate and award excellence in the
DWA requires a municipality to obtain
what they should look for when sourcing
entire business of drinking water quality management at municipalities, and the Green
Drop
evaluates
certification
and
awards
programme
excellence
in
wastewater management practices, actual compliance of drinking water quality to SANS 241 (the South African standard for drinking water) and compliance of wastewater
discharges
to
legislative
requirements forms a large components of the assessments. Not only is it therefore important that the Blue and Green Drop assessments be done against credible information, but
municipalities
must
continuously
furnish the department with data that is representative of the water at the time of sampling to prove that they provide water that is, without a doubt, safe for human consumption, but also return effluent to the environment without add polluting the environment,
says DWA scientist
Mariette Swart, for the Directorate: Water Services Regulation. It thus speaks for itself, most municipalities that have obtained Blue or Green Drop status would not have been able to do so without the support of competent laboratory staff managing and
JANUARY/FEBRUARY 2013
61
LABORATORIES & EQUIPMENT
a laboratory that will be able to do analyses on water for them .
Challenging context When asked what Swart considers to be the biggest challenge facing the laboratories sector, she says that it is difficult for her ascertain as she doesn t work within
“The DWA-LIMS has been designed to expedite the transfer of water quality data into the regulatory systems”
able analytical methods will be used and that results are being interpreted against the latest relevant legislation.
DWA-LIMS unpacked The DWA-LIMS is a Laboratory
the lab sector, but as the regulator for water services and someone that has been actively involved in the
Information Management System, similar to other
revision of the new standard for drinking water (SANS
LIMS systems available on the market, which was
241), a challenge that we hope the lab sector will address
developed by the DWA and is available on request ‒ in
is the additional determinants that municipalities now
particular by municipal owned laboratories. The
has to monitor as part of the SANS 241 .
system is being developed as part of the larger project
An example of this is the risk assessment requirement
of the DWA to ensure receipt of credible municipal
that Cryptosporidium and Giardia spp have to be
water quality data, with specific reference to drinking
monitored (this is only one example, other determi-
water and wastewater quality data in this case.
nants have also been added to SANS 241). While it is
According to Swart, the department is also making
acknowledged that not all laboratories will be able to
the system available to private laboratories primarily
do these analyses, a challenge is posed to the sector to
provide services to municipalities, specifically Blue and
ensure that centres be established to ensure that in the
Green Drop data. The DWA-LIMS has been designed
near future these analyses could be done in at least one
to expedite the transfer of water quality data into the
establishment in each of the provinces, says Swart.
regulatory systems.
She adds that laboratories are also encouraged to
The department commenced rollout of the LIMS
become actively involved in water services delivery in
earlier in 2012 as part of the final development of
their areas. Do not limit your involvement to sample
the system. The DWA was grateful for the comments
analyses only, ensure that you interpret the results for
received by the users, but also the few external sector
municipalities, maybe even going the extra mile to en-
partners who were invited to view the system; overall
sure that municipalities acknowledge receipt of results
responses were positive. The department will now
(especially non-compliant results).
categorise previously received requests, and imple-
She is, however, firm in stating that if a laboratory
62
results, confirming that accept-
mentation of the system is to follow on a more coun-
accepts this responsibility, the laboratory should then
trywide basis as per availability of the DWA IT team,
accept the responsibility to confirm the credibility of
concludes Swart.
JANUARY/FEBRUARY 2013
Omnia Group’s new chlorine plant on track Protea Chemicals, a member of the Omnia Group, recently confirmed that the Environmental Impact Assessment for its new chlorine packing facility has been approved and that the project is targeted to be commissioned in mid-2013.
T
PROVIDING WATERCARE SOLUTIONS FOR MORE THAN 30 YEARS
he new chlorine packing and
our customers this significant extension
distribution
facility
to our product range.
constructed
on
will
the
be
existing
The product range that Protea Chemicals
Omnia site in Sasolburg. Protea
offers the municipal water treatment
Chemicals has a long-term agreement
market extends from basic commodity
with Sasol for the supply of the required
acids and alkalis to performance products
bulk chlorine. Protea Chemicals will build
such as organic and inorganic coagulants
and operate the new packing facility and
and flocculants, and will soon offer
distribute the packed chlorine nationally
chlorine as a sanitising agent.
through its existing and well-established distribution network. This significant new chlorine investment by Protea Chemicals is its third in recent
We have worked hard to position ourselves
as
to
water
the
a
full
service
supplier
treatment
industry,
says Brimacombe.
years and is targeted at increasing the
Protea Chemicals has a wide and well-
company s capacity to supply products to
established network of sales offices and
the water treatment industry.
distribution centres throughout Southern
The
first
was
the
acquisition
of
Zetachem, a manufacturer of organic coagulants and sodium hypochlorite, with both products being widely used in
the
water.
treatment The
of
was
the
with Nalco Company, called Nalco operating
Southern Nalco
is
and a
throughout East
highly
coast of Africa. With
its
expertise
and
intimate
understanding of the water treatment
potable
second
establishment of a joint venture Africa,
and East Africa, and recently the west
Africa. respected
global leader in improving water, air and energy efficiencies in industrial applications.
The new chlorine packing facility will further develop our offering to the water treatment market and enhance our capacity to provide customers with a full range of products and services
Gavin Brimacombe, the MD of Protea Chemicals, says: Protea Chemicals
markets in regional Africa, close on
has long been a supplier of commodity
50 years of experience in storing and
and
performance
into
the
chemical
products
distributing
treatment
industry.
throughout the region, the full support
The new chlorine packing facility will
of its parent company, Omnia Group,
further develop our offering to the
and
water treatment market and enhance
meeting
our capacity to provide customers with
Chemicals is particularly well placed to
a full range of products and services.
successfully deliver on this project and is
We
this
tremendously excited at the prospect of
new facility into production on budget
being able to do so in partnership with its
and on time, and being able to offer
customers, concludes Brimacombe.
look
water
forward
to
bringing
its
hazardous
absolute customers
JANUARY/FEBRUARY 2013
chemicals
commitment needs,
to
Protea
63
We understand that running a business is about ensuring continuous supply, delivery on time, accuracy and providing good old fashioned service. Protea Chemicals is a longstanding and well respected distributor of speciality, functional and effect chemicals in sub-Saharan Africa. The company operates from 21 sites located in all the major centres throughout the region. The provision of safe drinking water remains one of the country’s top priorities. Protea’s entry into the packing and distribution of chlorine will make it easier for you to achieve your objectives by combining the bene¿ts of a new effective supplier with the history and experience of a long term industry leader. For more company information and contacts for nationwide branches please visit www.proteachemicals.co.za
LABORATORIES & EQUIPMENT
SAMPLE KICKER ANALYSIS
Its only as good as the sample The sample is usually the greatest limiting factor in obtaining a true result, therefore sampling is one of the most likely potential sources of error in chemical analysis. Without exception, when collecting a sample, the analyst needs to be sure that the sample is truly representative. y doing analysis in
B
sampling. Adlem chose Sigma
sets up easily and quickly in the
the field, the analyst
SD900 Samplers.
field, and it is simple to operate.
has the advantage of
There
are
many
features
Reduced
maintenance
and
being able to even
that allow the Sigma SD900
reliable results are assured. The
further minimise errors. Callie
Sampler to be ideally suitable
user-friendly keypad for easy
Adlem from CSIR Consulting
for the purpose of field anal-
set-up makes it even easier.
and
ysis. Its durable, heavy-duty
Analytical
Services
The double-walled insulated
changed over to using various
construction
Hach meters for measurement
harsh environments, requires
cool means the sampler can
of pH, EC/TDS, ORP, dissolved
minimum
also
oxygen and turbidity in the
is known for its reliability. The
tive collection of toxic and
field. After making this change
Sigma SD900 Portable Sampler
conventional pollutants.
can
withstand
maintenance
and
base
that
keeps
perform
samples
representa-
he decided that the only way he could do justice to his instruments was to find samplers that are guaranteed to lessen problems
associated
with
Callie Adlem (CSIR) and Christian Loots (Aqualytic cc) inspecting the HACH Portable Colorimeter II for Chlorine and 2100Q Portable Turbidimeter. The Sigma SD900 Auto Sampler will be left on-site to do discreet sampling
64
JANUARY/FEBRUARY 2013
Your Total Water Solution
measuring instrumentation. Laboratory and process solutions for p your drinking water and waste water requirements.
Contact us for your local distributor
Unit 16A, APD Industrial Park, Elsecar Street 2163 Kya Sand, Johannesburg, South Africa Tel: +27 (0)11 708 3705/6 | Fax: +27 (0)11 708 2619 www.hach.com | www.ott.com
LABORATORIES & EQUIPMENT SAMPLE ANALYSIS
DR 6000 lab spectrophotometer newly released Following the success of the widely popular DR 3900 spectrophotometer, launched last year, Hach has launched the new DR 6000 UV VIS spectrophotometer.
Wireless communication Distributed level measurements via the GSM network allow for convenient observation and monitoring from the office. eller AG für
K
measurement per minute. Two volt-
Druckmesstechnik has
age inputs (0 to 2.5 V), two digital
developed a universal,
inputs, a BUS interface (RS 485) for
energy-optimised
operating up to five level sensors
radio module with integrated data
or optionally the SDI12 interface
logger. The GSM-2 remote data
for water analysis units, make the
transmission unit and the free PC
GSM-2 data logger a universal data
software allow you to conveniently
acquisition module for wide area
he new spectrophotometer combines the new
observe levels, measurements and
measuring networks.
features introduced with the DR 3900 with
trends, and monitor limits from the
An air pressure sensor and a
the application of an ultraviolet measuring
comfort of your office. This applies
temperature sensor are already
range <320 nm.
to groundwater levels, wastewater
integrated in the GSM-2, in order
levels and the filling levels of mobile
to take level measurements using
ern UV VIS (ultraviolet visible) spectrophotometer with
tanks on vehicles. However, it also
pressure sensors with long-term
the efficiency of over 250 preprogrammed methods,
applies to completely
stability such
including the most common testing methods, guided
different measure-
as the Keller
procedures and integrated quality assurance software.
ments from appropriate
30 series. The
sensors with suitable
actual sensor no
output signals.
longer has to
T
The DR 6000 combines the quality standards of a mod-
The DR 6000 meets all technical requirements of a modern UV VIS lab photometer. In combination with the preprogrammed procedures, the DR 6000 delivers the high-
be connected
est flexibility in performing specific methods, routine anal-
Design dynamics
to the ambient
yses or convenient, ready-to-use Hach tests. Using TNTplus
The cylindrical design
air via a capillary
chemistry provides the highest quality analysis, traceability
of the GSM-2 with
tube in the
of lot numbers, expiration date check and call-up of the
a diameter of just
Certificate of Analysis provided by the 2D barcode.
48 mm has been chosen so that
The measuring accuracies that can
supply cable.
Where required, the DR 6000 supports regular quality
the data logger, which self-dials in
be achieved from the difference
measures using advanced AQA program features. The ad-
accordance with user requirements,
between the probe signal and the
vanced data management, via Ethernet and LIMS compat-
can simply be placed in the top of
air pressure signal are within the
ibility, rounds out the efficiency of the system. The method
a normal 2-inch diameter sounding
range of a few millimetres.
data set can be extended for drinking water, brewery and
pipe that is used in groundwater
enzymatic food analysis for convenient evaluation of the
measuring equipment. Installation
Flexible functionality
branch-specific parameters.
takes a matter of seconds. The
The GSM-2 DataManager, which
housing is designed to withstand
is flexible and convenient, takes
Basic features include:
condensation and being underwater
over the key functions of a
• proven reference beam technology
for short periods. The GSM antenna
monitoring, acquisition, control and
• 10-fold measurement for fingerprint and scratch
is covered with a lockable covering
organisation unit. The DataManager
cap made from solid plastic.
acquires the measurements,
elimination • wavelength range 190 to 1 100 nm
allocates them, displays them in
Energy efficient electronics
graphical format, provides a signal
Equipped with energy-efficient
when limits are exceeded and then
electronics and a robust lithium
stores them in a mySQL database
battery (3.9 V/32 Ah), the logger
for which no licence fee is required.
• wavelength scan with 0.1 nm resolution
can send the results of 24 meas-
Third parties can access the meas-
• single- and multi-wavelength, time, course, scan,
urements to a PC at headquarters
urements using various export
by e-mail or transfer them to
and Internet functions, and
a mobile phone via SMS. The
integrate them in their data
maximum measuring speed is one
acquisition systems
• multi-adapter for rectangular (10, 20, 20, 50, 1 ) and round (1 ) vials • carousel
adapter
for
mini-series
and
accumulating measurements
user programme • USB interface for storage devices, keyboard, printer and barcode scanner.
JANUARY/FEBRUARY 2013
.
65
Pumps, Mixers, Compressors and Controls that Keep Going – and Keep Saving ABS Submersible Sewage Pump XFP Pumps and Impellers for World-Class Savings The ABS submersible sewage pump XFP was the first pump with a submersible motor meeting the premium-efficiency IE3 standard. Today it still leads the field for reliability and energy performance, thanks especially to new advances in the Contrablock Plus impeller technology, specifically engineered to handle today’s tough wastewater.
The single-vane Contrablock Plus impeller set high new standards for wastewater blockage protection: free solids passage of 75 mm (3 inches) and discharge of 80% of entering fibrous material without cutting.
ABS Submersible Mixer XRW The World-Class Range of Submersible Mixers The ABS submersible mixer XRW was introduced as the first submersible mixer with a permanent magnet motor. But its defining feature was not the motor itself. It was the mixer’s unique balance of energy efficiency and economy.
Two factors decide the configuration of the ABS submersible mixer XRW. The first is the required intensity of the mixing and flow. The second is how premium efficiency can be achieved most economically. Three motor configurations provide the best possible balance.
ABS Flow Booster XSB The Slow-Running Mixer Range With World-Class Savings The slow-running submersible mixer ABS flow booster XSB cuts energy consumption by up to 25%. This is achieved through a premiumefficiency motor, a highly efficient gearbox and a unique, innovative design that boosts mixer efficiency. All models of the ABS flow booster
XSB have premium-efficiency IE3 motors and highly efficient gearboxes. Together with newly optimized propellers, these features give you the highest reliability and efficiency – in any size.
ABS Turbocompressor HST 20 The New Generation of World-Class Turbocompressor With exceptional savings from wire to air, our new turbocompressor ABS turbocompressor HST 20 gives you more output for every kilowatt. And by integrating silencers and other accessories, it makes for a smaller, quieter, more cost-effective installation.
Add the stability of magnetic bearings and intuitive control to optimize your process, and the ABS turbocompressor HST 20 is the very definition of continued leadership.
ABS Pump Controller PC 441 The World-Class Solution for Pump Control and/or Monitoring 2011.06.23 980.3
05:56:19
Low level
1.55 m
l/s 0A
352.5 A
0.15 kWh/m3
PUMP 1
1
2
,.
abc
4
5
PUMP 2
ghi
jkl
1827 l/s
353.8 A
354.1 A
PUMP 3
CA 511
3 0
MAIN
07:25:58
STATUS
07:28:10
SETTING
TREND
m P3 P4 P1 P2 07:30:26
ALARM
3 def
6 mno
7
8
pqrs
tuv
wxyz
*
0
#
PUMP 4 ACKN.
Esc
9
Used for control, monitoring or both, the ABS pump controller PC 441 provides advanced but easy-to-use functions that can reduce service visits and increase the effectiveness of pumping stations – with benefits for the entire collection network. The pump con-
troller is mainly designed for use in municipal wastewater pumping stations. Its many advanced features minimize operational costs and increase the availability of pumping stations and networks throughout their entire life cycles.
World-class
efficiency
inevery wastewaterproduct
The Heart of Your Process
The ABS EffeX Revolution started with a pump. As the first submersible equipment with an IE3 motor, the ABS submersible sewage pump XFP offered world-class energy savings already in 2009. Now the ABS EffeX range is complete – making premium efficiency available in all key applications.
Revolutionary Energy Savings With a full range of premium-efficiency wastewater products, you can save energy throughout collection and treatment. Individual ABS EffeX products save as much as 25-30%, which makes all the difference at today’s energy prices.
Sulzer Pumps Phone 0861772277 wastewater.za@sulzer.com www.sulzer.com Need proof? Scan the QR code or visit www.ABSEffeX.com
Bringing water to Africa and now to the rest of the world
Ground Level Tanks Elevated Tanks: ABECO offers full-service design, manufacture and installation of support tower steelwork. Basic towers consisting of support steelwork with a caged access ladder to the roof of the tank are offered in the absence of further specification. Walkways around the base of the tank or rest platforms on access ladders are available on request. Access is required all around the pressed steel tanks to tighten bolts. The recommended minimum space around the four sides and above the roof is 600 mm and 450 mm beneath the tank Circular Sectional Steel Tanks: In developing sectional steel tanks, ABECO recognised a need for tanks that have the following features: ¾ Low-cost hygienic water storage ¾ Rugged and easily transportable ¾ Minimal site preparation and foundations required ¾ Quick and easy to install ¾ Can be installed using basic equipment ¾ Durable and long lasting ¾ Can be dismantled and re-erected at new sites.
Elevated Tanks
Circular SecƟonal Steel Tanks
Ground-Level Tanks: Ground-level tanks are commonly supported on reinforced concrete dwarf walls fitted with steel capping strips. The purpose of the capping strip is to spread the weight over the full load of the support wall and to provide a level platform on which to erect the tank. For practical reasons, concrete cannot be cast with sufficient accuracy of level. The capping strips should be positioned in place before the installation of the tank starts. Recommended tolerance is ±2 mm. Care should be taken to ensure that foundation walls are parallel and square to each other. Foundation walls must protrude beyond the edge of the tank by a recommended distance of 150 mm. The tapered top section of the wall assists in providing access.
FEATURE
RESERVOIRS
Large-scale Letsemeng tank installation successful SBS Water systems has installed a 3.3 Mℓ tank in Letsemeng in the south-western Free State. Chantelle Mattheus interviews SBS Water Systems MD, Delayne Gray, on the challenges involved in the manufacture, supply and installation of the large-scale tank.
Although Gray admits it was speculated that transportation of the large size tank would be problematic, this proved unfounded during delivery. All parts were transported to the site with our vehicles and no challenge arose, he states.
Tight delivery Complete supply and installation was undertaken by SBS, which resulted in a number of advantages for the company, including having fewer role players involved. The team still adhered to a tight delivery schedule, however, and manufacturing time was kept to the bare minimum of one week. Construction commenced on-site on 2 August 2012, and the construction of the tank was completed less than three weeks later on 21 August 2012. According to Gray, this could only be achieved through teamwork. We
W
hat makes the endeavour even more interesting ‒ apart from the remote nature of the site ‒ is that a number of firsts were achieved while undertaking the
project. Gray tells Water&Sanitation Africa that this is
Construction commenced on 2 August 2012 on-site
had the most enthusiastic, supportive and dedicated team that made this project a success. Our workshop and installation teams certainly put in their best efforts, often working late hours to get the project completed in a timely manner.
SBS Water System s first 3.3 Mℓ tank to be manufactured,
This is in part due to the fact that all installers have the
supplied and installed to date. It is the biggest capacity
necessary in-house training, says Gray, adding that all
tank we offer, says Gray.
team leaders are also qualified in HIRI, legal liability and
In addition, the accompanying infrastructure had to be
have first aid training. The installations team consisted
on a larger scale than ever before. This project required
of a project manager, team leader and four assistants.
the manufacturing of the biggest set of roof trusses ever
However, the whole company is involved in each pro-
done by SBS, he explains, adding that this was achieved
ject from start to finish. We have our own finance, HR,
using one jig only and welding multiple material pro-
technical, drawing and marketing departments that all
files, which ensured the production of lighter and more
contribute towards making a project a success.
cost-effective trusses for the project.
Established in 1998 and based in South Africa, SBS
Water stored in the reservoir will be used for drinking
Water Systems is a Proudly South African, Level 2 BBBEE
and not irrigation. The estimated cost of the entire
business specialising in bulk water storage. SBS is led by
project depends on fittings, as indicated by Gray, but is
the three original shareholders operating from its head
speculated at just under R2.5 million.
office in Pinetown, KwaZulu-Natal, and has a regional office in Gauteng and distributors throughout South
Cold fronts and snow
Africa and internationally.
The conditions on-site also proved challenging in their
With dedicated and efficient
unpredictability, with heavy snow fall blanketing a large
staff and over 14 years experi-
portion of the country during the time of installation.
ence in the prefabricated water
Due to the cold weather during the time of installation,
storage industry, we have the
the installation team set up camp on-site and worked
power to add value to the South
from sunrise to sunset, often in very wet and cold condi-
African market as well as com-
tions, explains Gray, adding that camp took the form of
plete any project presented to
a number of tents erected on-site and in the near vicinity.
us, concludes Gray.
JANUARY/FEBRUARY 2013
69
FEATURE
RESERVOIRS
Reservoirs further social upliftment The Western Cape Department of Agriculture, assisting the Genadendal Farmers’ Union under the 2008 Flood Relief Scheme, has installed two permanent water reservoirs near Voorstekraal, an Overberg village on the outskirts of Genadendal, to enable market gardening as a means of job creation.
D
uring the last week of September 2012, villagers helped install the two panel-type Rainbow reservoirs at a prepared site on a mountain slope overlooking the village.
The reservoirs will supply water to community vegeta-
ble gardens, where crops will be commercially cultivated for sale at the fresh produce market held weekly in nearby Greyton.
The reservoirs will supply water to community vegetable gardens, where crops will be commercially cultivated
It is hoped that this project will encourage related village microenterprise through plans for a monthly market encompassing a broader range of local, organic products, including environmentally friendly cleaning products and cosmetics. In Voorstekraal, water has previously not been available in sufficient quantities for bulk irrigation of semicommercial agricultural ventures.
The
department
selected
Rainbow Reservoirs as the supplier for these reservoirs for reasons of product design. Besides
robust
construction
and long life, the Rainbow reservoir requires no concrete base for capacities up to 400 000 ℓ, a sand
foundation is used instead.
Rainbow reservoir installed on Overberg mountain slope overlooking the village of Voorstekraal
This was an important consideration in the ecologically sensitive Overberg, where the municipality wanted to avoid heavy vehicles ploughing up muddy local tracks to deliver foundational concrete. It also meant that local labour could be used to help with reservoir construction. At the time that the Rainbow irrigation reservoirs were
Reliant on a mountain stream some distance away for
installed
in
late
all water supplies, reticulated water for domestic con-
September
sumption became available only in January 2011 when
trench
the Theewaterskloof Municipality built a weir to enable
ration
water to be tapped in sufficient volumes for purification
laying was at an
and properly reticulated delivery to the village.
advanced stage.
2012, prepa-
for
pipe
For this potable water project, Rainbow Reservoirs in-
At the time of
stalled an initial reservoir of 153 000 ℓ, fed by gravity from
writing, the project
the weir.
was expected to
For the vegetable gardens, two reservoirs of 240 000 ℓ
be
complete
by
each ‒ also gravity fed ‒ have been installed. Although
November
a single tank of larger capacity was considered, strict
preparatory garden
Overberg conservation laws dictated the installation of
cultivation was al-
twin reservoirs with capacities below the legal limit.
ready under way.
and
Index to Advertisers 15 SWAN S WATER TREATMENT
2
Abeco Tanks
68 K Enyuka
Bigen Africa Services
42 KROHNE South Africa
Blue Planet South Africa
17 LEKTRATEK WATER TECHNOLOGY
Buckman
32 NuWater
Degrémont
30 NuWater
34 TT Innovations
58
Echochem Pumps
56 Protea Chemicals
63 Utility Systems
13
9 Tecroveer 44 RARE OFC Thuthuka
27 57 11
Eskom Holdings
40-41 Pumps Valves & Pipes Africa 2013
16 Veolia Water Solutions & Technologies 28
Fiberpipe
22-23 Quality Filtration Systems
38 Verder Pumps South Africa
Fiberpipe
48 SBS Water Systems
GIBB ENGINEERING & SCIENCE
47 SEW-EURODRIVE
Hach South Africa
64 SMEC
Itron
IFC Sulzer Pumps Wastewater
70 Vermeer Equipment Suppliers IBC Videx Storage Tanks 59 Water & Sanitation Services 66-67 Wilo South Africa
JANUARY/FEBRUARY 2013
36 55 72 OBC 24
71
1THREAD_4279_WAT
Geared Motors \ Drive Electronics \ Drive Automation \ Industrial Gears \ Services
We drive the water treatment industry
SEW-EURODRIVE’s MC Extended Bearing Distance (EBD) Industrial Gear Units are ideal for the reliable operation of mixers, agitators and surface aerators. In process plants, large axial and radial forces put large amounts of pressure on the agitator shaft. Traditional designs use separate, external bearings that take on the function of the agitator shaft bearings. This solution often proves cost intensive. Our new EBD concept extends the bearing span across the low speed shaft and offers stronger bearings within the gear unit itself. In many cases separate bearings are no longer required in the agitator or an over-sizing of the gear unit can be avoided. Reliable, efficient and economical, that’s how SEW-EURODRIVE puts the drive into the water treatment industry.
SEW-EURODRIVE - Driving the world. Tel: +27 11 248-7000 Web: www.sew.co.za