Cascia Hall - STEM Education, Athletics & Student Life Facilities Update

Page 1

&

STEM EDUCATION, ATHLETICS

STUDENT LIFE FACILITIES UPDATE

The higher your structure is to be, the deeper must be its foundation. - Saint Augustine Cascia Hall exists to build minds and hearts. We combine the raw materials of student potential and enthusiasm, parent love and dedication, and educator knowledge and support to build up young men and women to be leaders…today and in the future. We do this in keeping with the framework of our centuries-old Augustinian tradition of education, which is to develop the student: mind, body, and soul. To meet the needs of the new generation of learners, we understand that the school, too, must be built up. With this in mind, the initiative for a new facility at Cascia Hall targeting STEM Education, Athletics & Student Life was conceived. Key features of the facility include: • New learning spaces • Laboratories with prep rooms • Biosafety level 2 (BSL-2) science research laboratory • Robotics shop and playing field • HUB collaborative learning space • Dedicated spirit store location • Outdoor learning extension

• Campus ministry suite • Renovated common spaces • New kitchen and updated serving area • Alumni center • Outdoor gathering plaza • Renovated girls’ and boys’ locker rooms • Renovated and enlarged health and wellness center

During the COVID-19 pandemic, we put our plans aside, but it’s now time for us to consider again the proposition to broaden and deepen the foundations that will prepare our young people to be productive and engaged members of society. In these pages, you will find details of the project. I hope that what you find here will stir your imagination with the tremendous possibilities this venture will provide for our students and school. Even as education has changed significantly, our mission endures. May the Lord look with kindness upon us and grant us His blessing. Peace, Fr. Philip Cook, O.S.A., Ph.D. Headmaster


- Toilets - Lab Learning Exten

TOILET

CAMPUS MINISTRY 493 SF

ALUMNI CENTER 656 SF

COLONNADE

TOILET

867 SF THE CONSTRUCTION OF THE NEW FACILITY IS ONE PROJECT INVOLVING TWO STEPS. TOILET

STEP 1 (in blue) SPIRIT STORE 391 SF kitchen, dining hall and weight includes a new room expansions, and interiorplaza renovation to already existing structures plaza at Cascia Hall.

OFFICE 109 SF

STEP 2 (in red) is new construction of spaces for STEM education and areas for student life.

SECURITY OFFICE 128 SF

EXISTING UPPER SCHOOL GYMNASIUM

REPARAT P OR L L A A

 

N

IA

OL

HOOL SC

CASCIA

H

Y

T CA H

IC •

AU

T S U G

IN

A

A

 

 

COMMENCING: SPRING ’24 CONCLUDING: SUMMER ‘26


IT

EXISTING CAFETERIA ROOF

TOILET

TOILET

MECH. JAN.

ELEV. STAIRS

OPEN TO BELOW

SHOWERS 472 SF

PREP ROOM 472 SF

LAB 1637 SF

LAB 1603 SF

CORRIDOR

STORAGE

PREP ROOM

SHOWERS 473 SF

OFFICE 151 SF

RENOVATED GIRLS' LOCKER ROOM 1111 SF

CLASSROOM 757 SF

OPEN TO BELOW

MECH.

RENOVATED BOYS' LOCKER ROOM 1539 SF

OPEN COLLABORATIVE SPACE 837 SF

LAB LEARNING EXTENSION 966 SF

SCIENCE RESEARCH LAB 1576 SF

FIRST FLOOR

SECOND FLOOR

STOR.

EXISTING BUILDING

Area Plans KITCHEN 1674 SF

C

  



DN 

RENOVATED COMMON SPACE 3269 SF

A

SERVERY 1877 SF







MECH. JAN.

ELEV. STAIRS

THINK TANK 501 SF

DN

ROBOTICS PLAYING FIELD 903 SF

COURTYARD

RENOVATED COMMON SPACE 3502 SF

CLASSROOM 1326 SF

TOILET

TOILET

DN

ROBOTICS SHOP 853 SF

THINK TANK 507 SF

MECH. 49 SF

EXISTING UPPER SCHOOL GYMNASIUM

CAMPUS MINISTRY 493 SF

ALUMNI CENTER 656 SF

TOILET

COLONNADE 867 SF

EXISTING CAFETERIA ROOF

OFFICE 109 SF

SPIRIT STORE 391 SF OFFICE 123 SF

plaza VESTIBULE SECURITY 199 SF OFFICE 128 SF

SHOWERS 472 SF

TRAINING ROOM 437 SF

EXISTING BUILDING EXTENT OF EXISTING CONSTRUCTION

RENOVATED BOYS' LOCKER ROOM 1539 SF

OFFICE 151 SF CORRIDOR

B

 

STORAGE

DN



OPEN TO BELOW

PREP 47

L 160

STOR. 170 SF



OPEN TO BELOW

MECH.

COMMANDO HEALTH AND WELLNESS CENTER 4260 SF

COMMANDO TUNNEL

EXISTING BUILDING

BASEMENT



STOR.

SHOWERS 473 SF

PREP ROOM

ENTRY 149 SF

plaza

EXISTING BUILDING





IT

LOUNGE/ YOGA 467 SF

FACILIT Y PLANS

RENOVATED COMMON SPACE 3366 SF

 

Phase A - Locker Rooms and showers - Kitchen - Servery - Renovated Common Space - Security Office - Vestibule - Exterior Overhang renovation - Commando Tunnel - Commando Health and Wellne - Training Room - Office - Storage - Site Allowance - Plaza - Courtyard Phase B - 1st floor - Spirit Store - Toilets - Alumni Center - Campus Ministry - Colonnade - Think Tanks - Classroom - Robotics - Lounge - Mech/ IT - Stairs and Elevator - 2nd floor - Science Research Lab - Labs - Open Collaborative Space - Toilets - Lab Learning Extension

RENOVATED GIRLS' LOCKER ROOM 1111 SF

A

 

A

A

 

 

SCIENCE RESEARCH LAB 1576 SF


C O S T O P I N I O N provided by Manhattan Construction Group Description Cost Basement Renovation $694,552 First Floor Renovation $1,623,448 Weight Room Addition & Renovation $1,415,412 First Floor Addition $6,116,245 Kitchen Breakout $1,921,128 Second Floor Addition $6,066,814 Site Allowance $355,145 Total $18,192,744 Construction Contingency w/ Cost Escalation $2,419,636 Owner Provided Items * $6,195,722 * Material Testing; FFE (Furniture, Fixtures & Equipment); Design, Engineering & Consulting; Maintenance Endowment, Campaign Costs

Step 1 from the previous page

Step 2 from the previous page

Our challenge to raise $26.8 million to build the new facility has already been met with generous donations in the amount of $7.3 million. This is 27% of the goal! We are extremely grateful for the individuals and families who have demonstrated their belief in and support of % the project.

27

Total $26,808,102

NAMING OPPORTUNITIES

Naming opportunities are an ideal way to leave a legacy, honor a loved one, or show commitment to the school. These opportunities are limited, and some are already funded. If you have an interest in funding one of the available opportunities listed below, you are encouraged to contact Emily Walton at 918.746.2614 or ewalton@casciahall.com. Naming Opportunity Availability STEM Building Kitchen, Servery, Dining Hall Funded Health and Wellness Center Lab Classroom (2) BSL-2 Science Research Lab Student Commons (Outside Upper School Gymnasium) Renovated Boys Locker Room Renovated Girls Locker Room Funded Alumni Center Classroom (2) Plaza Outside Alumni Center Robotics Playing Field Robotics Shop Spirit Store Lab Learning Extension Funded Open Collaborative Space/HUB Campus Ministry Suite Funded Vestibule (New Entrance to Upper School Gym Lobby/Student Commons) Colonnade Adjoining Plaza Funded Think Tank Corridor Funded Think Tank (2)

Naming Opportunity Availability Courtyard Funded Lounge/Yoga Security Office Training Room Prep Room Funded Prep Room - Science Research Funded Commando Tunnel Funded Elevator Funded Open Staircase Overlooking Courtyard Funded Locker Room Corridor Funded Alumni Center/Campus Ministries Corridor Closed Staircase Entry to Health and Wellness Center Funded Offices in Campus Ministries Center Robotics Corridor Funded Training Office Funded Corridor Adjoining BSL-2 Science Research Lab Corridor Adjoining HUB E/W Corridor Adjoining HUB N/S

Do you have bulldog spirit and determination? Do you want to be involved with the project? Join the growing list of volunteers who are building a better Cascia Hall…now and in the future. Contact Emily Walton at 918.746.2614 or ewalton@casciahall.com and let her know you’re all in and willing to help achieve our goal.