ARCHITECTURE PORTFOLIO
N.P.T - 2.20
REGISTRO HID
REGISTRO PLUVIAL
REGISTRO PLUVIAL
REGISTRO PLUVIAL
REGISTRO ELE REGISTRO VYD
REG. ELÉCTRICO
REGISTRO PCI/HID
REGISTRO VyD
R-VYD
R-E-E
R-ELEC
R3.80
R-5
imp.
lic.
Indica puerta sand.
sand.
B.
imp.
G E O R G I N A V. ZO P F
01
GEORGINA V. ZOPF | ARCHITECT georginazopf@gmail.com https://www.linkedin.com/in/georgina-vega/ 970.846.8770
EDUCATION
SOFTWARE SKILLS
Universidad Iberoamericana | Mexico City | Bachelor’s degree In Architecture and Urbanism
Autodesk
August 2015 - May 2021 | 94/100 average (Mexico) / 3.76/4.0 average (USA) | Graduated with Honors | Licensed Architect in Mexico University of Westminster | London, United Kingdom | Study abroad program in Architecture
September 2018 - January 2019 | Academic excellence during study abroad program
LANGUAGE PROFICIENCY English
Full professional working proficiency Certificate in Advanced English (CAE) | University of Cambridge Spanish
Auto CAD | Advanced Revit | Advanced 3DS MAX | Advanced Slicer for fusion 360 | Advanced Adobe
Photoshop | Advanced Illustrator | Advanced InDesign | Advanced Premier Pro | Advanced Lightroom | Advanced
Others
Sketchup | Advanced Rhinoceros 3D | Advanced Grasshopper | Advanced Bluebeam | Intermediate Wix | Advanced Unreal Engine | Intermediate Blender | Intermediate Artificial Intelligence | Advanced Microsof t Off ice
Excel | Advanced Power Point | Advanced Word | Advanced
ACHIVEMENTS / CERTIFICATES / CREDENTIALS 2023 | EDGE-Expert training - Certificate of attendance 2022 | BOMA 2017 Off ice Measurement Standard Course Certificate of completion | Building Owners and Managers Association
Native language
2017 | Building Performance Analysis certif icate | Autodesk
French
2017 | LEED Green Associate | US Green Building Council Credential ID: 11203357-GREEN-ASSOCIATE
Intermediate working proficiency DELF A2 | Alliance Française Mexico
VOLUNTEERING Ayudar por un hogar | Project Architect | January 2018- May 2018
In September of 2017 Mexico suffered a terrible earthquake that left many people without homes. My university offered a program to help rebuild houses and I decided to engage with it. We helped a family by restructuring their house and making it safe to live in. The project was in Coajomulco, Morelos. This experience helped me understand the basics of site construction. IMPACT | Project Architect | June 2019- January 2020
As part of my Internship in WeWork, I engaged in an IMPACT activity. I decided to help an organization for children called Fundación PAIDI which currently protects the rights and takes care of forty children and adolescents between three and seventeen years of age that are either orphans or that suffer from economical disadvantages within their families. A group of Interns and I raised money, painted and refurbished 3 rooms of the children’s house which were previously in bad conditions. COPEVI | Project Architect | July 2020- January 2021
Due to the conditions of social inequality in Mexico, I decided to collaborate with COPEVI in the improvement of public spaces in Iztapalapa. Iztapalapa has been a historically marginalized town since colonial times. The people of this town are low-income and in recent years the urban sprawl has been growing uncontrollably, causing the deterioration of public spaces and fostering insecurity and violence. Through the rehabilitation of public spaces I collaborated with COPEVI to make Mexico a better country.
02
PROFESSIONAL EXPERIENCE elanc c e Arc Ar c hite hit e c t / R Re e siden side n t ial R Re e alto alt o r a att Mex Me x ico ic o S So o t h eby eb y ’s Int In t e rnat rna t ional io nal R Re e alty alt y / St Ste e ambo amb o a t S So o t h eby eb y ’s Int In t e rnat rna t ional io nal R Re eFr e elan alt altyy | Mar 2 20 024 - P Prr e sen se n t
After several years working as a commercial real estate broker / space planner. I decided to pursue entrepreneurship and expand my professional experience independently. I began freelancing in architecture while also becoming a Residential Real Estate Broker with Mexico Sotheby’s International Realty. Later, after meeting my husband, I relocated to Steamboat Springs, Colorado, where I obtained my Colorado real estate license and joined the Zopf Team at Steamboat Sotheby’s International Realty. B r oke ok e r a g e Manag Mana g e r -Spa -Sp a c e Planne Plann e r | C Cushman ushman & W Wak ake e f ield, Me Mexx ico ic o C Cit ityy | Ma May y2 20 02 1 -Mar -Marc ch 2 20 0 24
After graduating from architecture school, I was offered a position with the same team I had previously worked with in 2017–2018. As a professional specializing in Space Planning and Commercial Real Estate Brokerage, I developed comprehensive solutions for clients throughout the commercial real estate process. As a Space Planner, I analyzed and optimized commercial spaces using parametric area calculations, client-specific design guidelines, international safety standards, and market trends. I developed space programs that enabled clients to make informed decisions about their real estate strategies. My responsibilities included conducting BOMA measurements, evaluating production processes, and recommending modifications to buildings under construction, with the goal of improving efficiency, functionality, and marketability. As a LEED Green Associate, I also incorporated principles of sustainable design into my approach to space planning, integrating environmentally responsible strategies and promoting energy-efficient solutions. In my role as a Broker, I leveraged my architectural background to provide clients with a more comprehensive perspective on their real estate needs. I contributed to marketing initiatives, collaborated with market research and project development teams, prepared property materials, and supported the full brokerage process. My responsibilities included prospecting and cold calling, negotiating transactions, developing pricing strategies, and conducting property and site visits. This combination of architectur-al expertise and real estate experience allowed me to bridge design, market analysis, and business strategy to deliver more informed solutions to clients. P r o je jec c t Arc Ar c hite hit e c t |FR-EE |FR-EE / F Fe e rnando rnan do R Ro o m e r o Ent En t e rprisE rp risE | F Fullull-tt ime im e | Jul 2 20 020 - J Jan an 2 20 02 1
As a Project Architect at the firm of award-winning architect Fernando Romero (recognized for pioneering designs), I led the conceptual proposal for a monument, was part of the executive project and construction team for a house in Mexico City and contributed to the conceptual phase of designing a museum and retreat center. My responsibilities included tasks such as creating layouts ranging from architectural plans to construction detail plans in AutoCAD, performing 3D computer modeling using SketchUp, Rhino, and Grasshopper, as well as creating diagrams, editing photos, and engaging in physical modeling. This experience taught me a solid foundation in designing non-traditional structures. I also improved my skills in comprehending project concepts and presenting ideas in a professional manner. Being part of a firm focused on futuristic architecture helped me develop a forward-thinking mindset and explore innovative architectural concepts. I left this role due to the COVID pandemic and family circumstances. As the position required working in person, I made the decision to step away to protect my father, whose health concerns made it especially important to minimize his exposure to the virus. P r o je jec c t Arc Ar c hite hit e c t Int In t e rn | T Talle allerr de Arquit Ar quite e c t ura ur a Mauricio Mauric io R Ro o c ha + G Gab abriela riela C Carrillo arrillo | J Jan an 2 20 020 - Jul 2 20 02 0
As a Project Architect Intern at the firm of award-winning architects Mauricio Rocha and Gabriela Carrillo I contributed to the final phase of expanding and renovating the Anahuacalli Museum of Diego Rivera in Mexico City. My responsibilities centered on drawing and modeling Mauricio’s ideas for the museum’s main entrance and the audiovisual/maintenance building. I played a key role in generating finish plans, construction plans, and carefully choosing options of furniture, fixtures, and equipment for the project. Coordinating with fabricators and product representatives was also part of my responsibilities. Particularly, the maintenance building’s transformation involved the enlargement and renovation of a warehouse initially designed by the renowned Mexican architect and painter, Juan O’Gorman. This space was revived to accommodate the restoration laboratories, main workshop, control room, public bathrooms, and an audiovisual room for the museum. Engaging in this project offered invaluable lessons in managing the responsibility associated with intervening in a World Heritage building with significant social impact. It taught me the intricacies of managing projects down to the smallest detail while navigating the challenges of construction. I left this role after being offered an opportunity at FR-EE, whose innovative approach, use of advanced architectural technologies, internationally recognized work, global presence, and opportunities to contribute to projects with a broader international scope strongly aligned with my interests and long-term career goals. jec c t Arc Ar c hite hit e c t Int In t e rn ffo o r Nor No r t h L LA ATAM | W We eWo r k | Jun 2 20 01 9 - J Jan an 2 20 02 0 P r o je
As a Project Architect Intern at WeWork with the Enterprise team, specializing in custom solutions, I played a pivotal role in overseeing projects for large companies interested in WeWork spaces. From conceptual design to construction documentation and supervision, I contributed across all stages. My work spanned North LATAM, covering projects in Mexico City, Guadalajara, Monterrey, Colombia, Costa Rica, Argentina, and Brazil. This experience provided me with advanced proficiency in Revit and state-of-the-art construction and architectural technologies. Additionally, I gained expertise in developing detailed finish plans with precise material specifications. I was working at WeWork during the company’s “We Crashed” period, when the organization underwent significant restructuring and all interns were laid off. Knowing of my strong admiration for architect Mauricio Rocha, my manager, who had previously worked there, referred me to his practice, where I was fortunate to secure a position. Sp Spa a c e Planne Plann e r | C Cushman ushman & W Wak ake e f ield, Me Mexx ico ic o C Cit ity| y| S Se ep 2 20 01 7 - S Se ep 2 20 01 8
As a Space Planner, I supported clients throughout commercial real estate projects by developing practical, efficient, and market-informed space solutions. My responsibilities included identifying client needs, conducting space analyses, preparing test fits, and optimizing layouts in accordance with design guidelines, market considerations, and applicable safety standards. I also produced architectural renderings for property listings and proposed developments, helping communicate design potential to prospective buyers. The role required close collaboration with clients and project teams to ensure that layouts and design solutions aligned with each project’s functional, spatial, and commercial requirements. I left this position to pursue a study abroad program in London. After exploring other opportunities, I returned to the same team in 2021, bringing a broader perspective and expanded skill set to my role. *References available upon request.*
03
COVER LETTER Architecture has been an interest of mine for as long as I can remember. As a child, I was constantly building houses with Jenga blocks, sketching spaces, and later designing homes through computer games. Although I grew up dancing ballet and considered pursuing it professionally, architecture ultimately became the path that most strongly combined the things I enjoy: creativity, discipline, problem-solving, and the challenge of turning an idea into something tangible. I was born in Mexico City and spent part of my childhood living in Puerto Rico, an experience that allowed me to become fluent and comfortable working in both English and Spanish from an early age. I earned my degree in Architecture from Universidad Iberoamericana in Mexico City and obtained my professional architecture license in Mexico. During my studies and early career, I had the opportunity to work with award winning architecture and design firms, where I gained experience in architectural design, space planning, construction documentation, visualization, and client collaboration. As my career developed, I transitioned into freelance architectural work while expanding my professional experience into real estate. This shift opened the door to new opportunities and allowed me to broaden my perspective beyond traditional architectural practice. Working in real estate has given me a deeper understanding of how architecture, functionality, marketability, and client needs intersect. It has also strengthened my communication skills and taught me to evaluate projects not only from a design perspective, but also through the lens of the people who will ultimately live in, use, purchase, or invest in a space. After relocating to Steamboat Springs to join my husband, who was born and raised here, I temporarily stepped away from architectural practice while completing my U.S. work authorization process and obtaining my Colorado real estate license. Over the past year, I have worked alongside my husband in real estate, an experience that has broadened my professional perspective and strengthened my understanding of the local market, client needs, and the relationship between design and real estate. However, architecture has always been the career I am most passionate about, and I have greatly missed being part of the profession. I am eager to return to architecture, continue building my career in Steamboat Springs, and pursue U.S. architectural licensure. My goal is to pursue licensure through NCARB’s International Architect Path. As part of this process, I will need to complete the Architectural Experience Program (AXP), including 3,740 hours of professional experience across its six experience areas under the appropriate supervision of a U.S.-licensed architect. I understand that practicing architecture in the United States involves different building codes, regulations, construction methods, documentation standards, and professional practices than those I encountered in Mexico. I see this as an opportunity to continue learning and developing as an architect, and I am fully prepared to invest the time and effort necessary to adapt, strengthen my knowledge, and grow within the profession in the United States. I am hardworking and genuinely enjoy being challenged. Design is the kind of work that keeps me curious and engaged, and I am excited by the possibility of bringing my international experience, design background, bilingual communication skills, real estate knowledge, and strong work ethic to a local architectural practice. The accompanying portfolio features five selected projects that highlight different aspects of my architectural experience and design capabilities. While it is not an exhaustive representation of my work, I carefully selected these projects to provide a concise overview of my approach to design, technical documentation, visualization, and problem-solving. Some of my professional work is not included due to confidentiality agreements and NDAs with previous firms; however, the projects presented here reflect the range of skills, attention to detail, and design thinking I have developed throughout my architectural experience. I would be grateful for the opportunity to discuss how my background and experience could contribute to your firm. More importantly, I am looking for a practice where I can become part of a team, continue developing professionally, and build a long-term career in architecture in Steamboat Springs. Thank you for your time and consideration. I look forward to the opportunity to connect. Sincerely, Georgina Zopf
04
01 EXPANSION ANAHUACALLI MUSEUM Selected works from my Internship at Taller de Arquitectura Mauricio Rocha + Gabriela Carrillo MUSEO 150, SAN PABLO TEPETLALPA, COYOACÁN, MEXICO CITY, MEXICO
02 TORREDOLONES HOUSE Freelance Project for Rodrigo Ducoing Architects AV. P.º DE LA REFORMA 50, POLANCO V SECC, MEXICO CITY, MEXICO
03 ATECOCOLLI AUDITORIUM 9th and 10th Semester Final Project - Universidad Iberoamericana AV. P.º DE LA REFORMA 50, POLANCO V SECC, MEXICO CITY, MEXICO
04 BATÁN LIBRARY 7th Semester Final Project - Universidad Iberoamericana AV. P.º DE LA REFORMA 50, POLANCO V SECC, MEXICO CITY, MEXICO
05 ARENA SANTA FE
4th Semester Final Project Universidad Iberoamericana YUCATAN 47, TIZAPÁN SAN ÁNGEL,MEXICO CITY, MEXICO
INDEX
05
For the best viewing experience and to access the document in high resolution, please use the Dropbox link below:
https://www.dropbox.com/scl/fo/ rq4owt6eiq80yooczlp59/AMeZIT8afBaC1KDZZxAhGI4?rlkey=8o8r934mvx71jvlsfmw5er4be&dl=0
06
The following document contains detailed drawings and floor plans that may lose clarity when viewed or zoomed in through this platform. The PDF Dropbox version will allow you to view the drawings at their intended quality and level of detail.
07
ANHUACALLI MUSEUM INTERNSHIP AT TALLER DE ARQUITECTURA MAURICIO ROCHA + GABRIELA CARRILLO MUSEO 150, SAN PABLO TEPETLALPA, COYOACÁN, MEXICO CITY, MEXICO / 2020 / SELECTED WORKS
During my time as a Project Architect Intern at the award-winning firm of Mauricio Rocha and Gabriela Carrillo, I contributed to the final phase of the expansion and renovation of the Diego Rivera Anahuacalli Museum in Mexico City. My responsibilities focused on translating Mauricio Rocha’s design ideas into architectural drawings and models for the museum’s main entrance and the audiovisual and maintenance building. I produced finish plans and construction documents, assisted in selecting furniture, fixtures, and equipment, and coordinated with fabricators and product representatives. I worked extensively on the transformation of the maintenance building, which involved expanding and renovating a warehouse originally designed by renowned Mexican architect and painter Juan O’Gorman. The renovated space was adapted to accommodate restoration laboratories, a main workshop, a control room, public restrooms, and an audiovisual room for the museum. Participating in this project provided invaluable experience in understanding the responsibility involved in intervening in a historically and culturally significant building with a strong social impact. It also taught me how to manage a project down to the smallest detail while navigating the technical and practical challenges of the construction process.
N.P.T - 2.20
PRE EXISTING STRUCTURE REGISTRO HID
REGISTRO PLUVIAL
REGISTRO PLUVIAL
REGISTRO PLUVIAL
REGISTRO ELE REGISTRO VYD
REG. ELÉCTRICO
REGISTRO PCI/HID
REGISTRO VyD
MUSEO STREET
R-VYD
R-E-E
R-ELEC
R3.80
R-5
imp.
lic.
Indica puerta sand.
sand.
B.
imp.
CONTEXT
22.29 3.70
11.88
3.60
4.11
5.00
5.00
30.96
6.68 7.54
6.78
12.44
2.83
6.63
4.25
4.37 L.+5.34 L.+4.51
0.83 0.86
L. +3.55
0.11 "A N A H U A C A L L I"
0.94
MUSEO DIEGO RIVERA
L. +2.59 5.48
1.04
L. +1.55
1.70
L. ±0.00
EXTERIOR FACADE
9.50
7.66
37.07 0.37
3.94
1.49
1.59
0.67
7°
2.68
2.68
0.55 0.68
CT-06 CT-05
CT-02
CT-04
CT-03
4.01
3.97
4.04
3.95
4.02
4.00
4.02
4.24
CT-07 CT-09
CT-01
CT-07
CT-08
CT-11
CT-08
RTY LINE
PROPE
0.77
SLOPE ACCESS BOX
SLOPE 1%
1.94 GARDEN F.F.L. 0.27
RTY LINE
4.03
F.F.L. 0.20 SL
TRASH
CL-03
PROPE
4.41
F.F.L. 0.17
PE
F.F.L. 0.00
TRANSFORMER
SECURITY
SERVICE VEHICLE ACCESS
O
F.F.L. 0.23 F.F.L. 0.17
1%
F.F.L. 0.00
VOICE & DATA
CL-03
4.97
1%
SERVICE ACCESS
SAN. ACCESS
Access
Access
ACCESS BOX LOW VOLTAGE
ACCESS BOX
E
TY
LIN
ER
OP
PR
4.40
SL
F.F.L. 0.23
O
PE
SL
O
1%
PE
1%
EXHIBIT WORKSHOP Access
PEDESTRIAN ACCESS
AUDIOVISUAL ROOM F.F.L. 0.17
F.F.L. 0.17
GARDEN F.F.L. 0.27
ELEC. ACCESS
F.F.L. 0.17
CISTERN ACCESS
CL-04
TY
STORM ACCESS
Access
LIN
ER
EXHIBIT / WOOD STORAGE
SLOPE 1%
OP
PR
SAN. ACCESS
F.F.L. 0.17
TRANSITION STORAGE
STORM ACCESS
CONSERVATION & RESTORATION LAB
V&D ACCESS
E
2.95
F.F.L. 0.17
ENTRY PLAZA
SAN. ACCESS
F.F.L. 0.17
F.F.L. 0.17
STORM ACCESS
HYD. ACCESS
F.F.L. 0.17
Access
MAINTENANCE WORKSHOP
Access F.F.L. 0.17 SLOPE 1%
LOBBY F.F.L. 0.17
SAN. ACCESS
SAN. ACCESS
SLOPE 1%
CL-04
6.49
CL-01 CL-10
CISTERN COVER
CL-01 CL-10
14.00
Access
ELEC. ACCESS
LOCKERS Women
CL-02
2.39
V&D ACCESS
F.F.L. 0.17
EXHIBIT STORAGE
LOCKERS Women
F.F.L. 0.17
LOCKERS men
WC WOMEN
WC MEN
T
rack rack
CL06
2.39
F.F.L. 0.17
ETHNOGRAPHY STORAGE F.F.L. 0.17
T
LOCKERS Men
CL-02
MONITORING ROOM
7.56
C&R LAB STORAGE
F.F.L. 0.17
FIRE/HYD. ACCESS
Shower
WC
Shower
SINK & STORAGE AREA
Shower
WC
WC
Urinal
SITE
Shower
Urinal
CL-06
2.51
WC
FFL 0.14
CT-08 CT-07 CT-09
GROUND FLOOR - OPTION 1 SCALE 1:100
meters
CT-03
CT-04
CT-02
CT-01
CT-06 CT-05
CT-11
CT-07
CT-08
DIEGO RIVERA ANAHUACALLI MUSEUM Renovation, expansion and construction of spaces
DIEGO RIVERA ANAHUACALLI MUSEUM Remodeling, expansion and construction of spaces
LOCATION SKETCH:
DIEGO RIVERA ANAHUACALLI MUSEUM Renovation, expansion and construction of spaces
LOCATION SKETCH:
LOCATION SKETCH:
DIEGO RIVERA ANAHUACALLI MUSEUM Renovation, expansion and construction of spaces
SITE PLAN:
45.08 4.02
DIEGO RIVERA ANAHUACALLI MUSEUM
4.24
REMODEL, EXPANSION AND SPACE CONSTRUCTION
7.29
0.43
0.12 0.36 0.10
4.04
3.97
CT-04
4.01
0.37
3.94
CT-02
0.55 0.68
2.68 0.67
CT-07
4.00
4.02
CT-07 CT-09
SITE PLAN:
CT-11
CT-08
4.02
4.24
CT-08
3.95
4.04
CT-03
3.97
CT-04
4.01
0.37
3.94
CT-02
1.59
1.49
9.50
0.55 0.68
2.68 0.67
CT-06 CT-05
EL. +2.93
7°
2.68
CT-01
CT-07
CT-08
B.O.S.
TOP OF BEAM BOTTOM OF BEAM
P.L.
PARAPET LEVEL
B-02 50Ø
50Ø
- 1.00
SUMP PIT
0.80 mx 0.80m x 1.0 m
BAP-03 100Ø A=78.21m²
TBL-01
RAINWATER SYSTEM
CLEAR HEIGHT 2.25 m
0.30 A.F.F.L.
T.O.S. -2.57
B-09
T.R. 100Ø
TBL-08
13Ø
64Ø
150Ø
RAINWATER CISTERN WITH
SF-01
13Ø
64Ø
V=15 m³ A=9.70 m² H(total)=2.50 m
6Ø
P
P IP
- 0.90
H(use)= 1.55m
0.73
BAP-04 100Ø A=60.36
SEE CONTINUATION ON DRAWING IH03, CONNECTS TO PUMP DISCHARGE B01, B02
BASEMENT ANA-MA-A5-04-01 DRAWING
2.51 50Ø FROM MAINTENANCE RAINWATER CISTERN FOR POTABLE WATER TREATMENT
CL-03
CL-03
26/07/2019
FOR REVIEW
15/05/2020 R.D.P. 25/06/2020
pe
2.0
T.O.S. + 4.31
Slo
pe
Slope 1%
Slope 2.0%
Slope 2.0%
T.O.S. + 3.10
1%
SCALE 1:100
UEPM-01 H= 0.57 M
T.O.S.
CT-03
CT-04
CT-02
CT-06 CT-05
CT-01
CT-07
Slope 1% Slope 1%
T.O.S. + 3.50
T.O.S. + 2.70
Slop
e 1%
R.D.P.
Slope 1% Slope 1%
T.O.S. + 2.30
S.L. +3.55
T.O.S. + 3.50
T.O.S. + 2.30
Slope 1%
T.O.S. + 2.95
EL. ±0.00
T.O.S. + 3.50
T.O.S. + 3.50
2.70
CT-02
CT-01
CT-07
DRAWN:
FILE:
DIEGO RIVERA ANAHUACALLI MUSEUM
R4
Remodeling, expansion and construction of spaces
3.97
4.04
3.95
4.02
GLASS
GLASS
GLASS
GLASS
GLASS
4.00
4.02
GLASS
GLASS
LOUVERS
LOUVERS
4.24 T.O.S.+5.29 B.O.S.+5.00
0.34 0.17 0.31 0.20 0.21 0.45
METAL SHUTTER
METAL SHUTTER
METAL SHUTTER
METAL SHUTTER
GLASS
B.O.B.+4.83
T.O.S.+4.46 B.O.S.+4.21
S.L.+3.55 B.O.B.+4.00
B.O.B.+2.13
3.72
GLASS
F.F.L. 0.17
EL±0.00
SITE PLAN:
NORTH ELEVATION meters
scale 1:100
NORTH:
DIEGO RIVERA ANAHUACALLI MUSEUM
45.08
Remodeling, expansion and construction of spaces
4.02
4.24
4.00
3.95
4.04
3.97
4.01
LOUVERS
4.02
LOUVERS
LOUVERS
LOUVERS
LOUVERS
LOUVERS
LOUVERS
GLASS
LOUVERS
LOUVERS
LOCATION MAP:
3.95
8.03
4.01
3.97
GLASS
GLASS
4.04
3.95
4.02
GLASS
GLASS
GLASS
4.00
4.02
LOUVERS
LOUVERS
4.24 T.O.S.+5.29
GLASS
GLASS
LOUVERS B.O.S.+5.00
0.34 0.17 0.31 0.20 0.21 0.45
EL+3.58 GLASS
NOMENCLATURE:
T.O.S.+5.29
45.08 3.95
LOUVERS
0.15 0.31 0.31 0.52
T.O.S.+4.46 B.O.S.+4.21
SIDEWALK LEVEL FINISHED FLOOR LEVEL TOP OF SLAB
T.O.S. B.O.S.
BOTTOM OF SLAB
T.O.B.
S.L. +3.58
0.45
LOUVERS
T.O.S.+4.46 B.O.S.+4.21
B.O.B.+4.83
S.W.L. F.F.L.
B.O.B.+4.83
TOP OF BEAM
B.O.B.
B.O.B.+4.00
BOTTOM OF BEAM
P.L.
PARAPET LEVEL
L.L.
5.43
S.L.+3.55 B.O.B.+4.00
LINTEL LEVEL
T.O.W.
TOP OF WALL LEVEL
DIEGO RIVERA ANAHUACALLI MUSEUM W.L. Alteration, addition and area construction E.F.F.L.
3.76
WATER LEVEL
EXISTING FINISHED FLOOR LEVEL
SYMBOLS:
5.46 METAL SHUTTER
METAL SHUTTER
GLASS
EL±0.00
B.O.B.+2.13
3.72
GLASS
INDICATES SECTION LINE
CT-1
METAL SHUTTER
INDICATES GRID LINE CT-1
METAL SHUTTER
METAL SHUTTER
LOCATION MAP:
N.P.T ±0.00
GLASS
F.F.L. 0.17
4.97
4.03
EL±0.00
SOUTH ELEVATION
14.00
SITE PLAN:
4.41
7.56
10.89
2.95
2.50
2.39
2.54
2.54
2.69
0.33
0.55 1.00 0.12
N.L.B.L. +2.98
3.95
4.04
3.97
4.01
LOUVERS
LOUVERS
LOUVERS
LOUVERS
LOUVERS
LOUVERS
GLASS
LOUVERS
LOUVERS
3.95
2.58 2.75
0.17
0.15 0.31 0.31 EL+3.58 0.52 EL. +3.17 0.45
N.L.A.L +2.70
6.49
T.O.S.+4.46 B.O.S.+4.21
5.43
scale 1:100 2.75 2.58
OVERALL PLAN:
LINTEL LEVEL
EL. +2.22
EL. +2.21
WATER LEVEL EL. +1.87
EL. +1.87
EL. +1.86
EXISTING FINISHED FLOOR LEVEL
1.86
EL. +1.86
03/07/2020
FOR REVIEW
ARCH. FERNANDO VICTOR TORROELLA LABRADA D.R.O. REG: 0004 NOMENCLATURE:
F.F.L. 0.17
CT-1
CT-1
0.17
-N.B.
PAVEMENT LEVEL
STRUCTURAL CORESPONSIBLE:
-N.P.T.
FINISHED FLOOR LEVEL
ENG. ALEJANDRO GONZALES DEL PLIEGO TOP OF SLAB C/SE REG.:0073
-N.L.A.L.
BOTTOM OF SLAB
-N.L.B.L. INDICATES SECTION LEVEL
-N.L.A.T.
TOP OF BEAM
-N.L.B.T.
BOTTOM OF BEAM INSTALLATIONS DESIGN CORESPONSIBLE: PARAPET LEVEL ENG. LUIS BERNARDO ARGUELLES MEDRANO C / I.REG: 0017 CLOSURE LEVEL
-N.P.
INDICATES UP
meters
UP
-N.C.
MASONRY TOP LEVEL
-N.C.M.
INDICATES DOWN
DN
-N.AG. INDICATES LEVEL CHANGE IN PLAN
4.97
4.03
PREEXISTING WALLS SLAB PROJECTIONS
4.41
4.40
7.56
SYMBOLS:
2.95
2.50
2.39
2.39
0.31 0.52 1.74 0.31 0.45 T.O.S.+5.29 0.30
2.95
6.49
4.40
4.41
INDICATES CONCRETE/EXISTING WALL
2.71
2.71
N.E. +3.55
4.41
INDICATES NEW BRICK WALL INDICATES FLOOR LEVEL6.49 CHANGE INDICATES CEILING LEVEL CHANGE
4.40
2.95
7.54
LOUVERS NEW AUDIOVISUAL ROOM PROJECT INCLUDED PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND MAINTENANCE STAFF
GLASS
N.E. +1.90 GLASS
GLASS
EL. +2.21
EL. +1.87
EL. +2.21
T.O.S. +3.10
EL. +1.87
EL. +1.86
1.86
EL. +1.86
2.75 2.58
3.15 EL±0.00
FOR REVIEW
R5
FOR REVIEW
LOUVERS
DISPLAY STORAGE
DISPLAY STORAGE
DISPLAY STORAGE
5.50
0.26
SHUTTER ARCH. FERNANDO VICTOR TORROELLAMETAL LABRADA GLASS D.R.O. REG: 0004
GLASS
N.L.A.L. +3.55
N.P.T±0.00
DIEGO RIVERA AND FRIDA KAHLO UP MUSEUMS TRUST BANK OF MEXICO LEVEL CHANGE IN PLAN
DRAWING:FACETOFACE DIMENSION CENTERLINETOCENTERLINE DIM. CENTERLINETOFACE DIMENSION
ARCHITECTURAL / MAINTENANCE
N±0.00
PROJECTION LINE CONTENT: STONE MASONRY
NORTH, SOUTH, EAST AND WEST ELEVATIONS CONCRETE/EXISTING MASONRY ADDED BRICK MASONRY FLOOR LEVEL CHANGE CEILING 1:100 LEVEL CHANGE
SCALE:
EL±0.00
F.F.L. 0.17
DIMENSIONS:
METERS
REVISED DESIGN INCLUDES AUDIOVISUAL ROOM, DATE: PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND MAINTENANCE STAFF
JULY 03, 2020
DRAWING NO.: DESCRIPTION
REV
INSTALLATIONS DESIGN CORESPONSIBLE:
ENG. LUIS BERNARDO ARGUELLES MEDRANO
C / I.REG: 0017 meters meters
scale 1:100 scale 1:100
DN
D.
PROJECT:
PREEXISTING MASONRY PREEXISTING BEAMS
B.O.S.+4.21 B.O.B.+4.00 N.P.T. -0.20
3.72
GLASS
SECTION LEVEL
OWNER:
U.
N.L.B.T. +4.00 N.L.B.L. +3.25 T.O.S.+4.46
B.O.B. +2.13
ENG. ALEJANDRO GONZALES DEL PLIEGO C/SE REG.:0073
CROSS SECTION 02 WEST ELEVATION
meters
scale 1:100
N.L.B.T. +4.83
B.O.S.+5.00 B.O.B.+4.83
3.75 S.L. +3.55 3.45
LOUVERS
08/06/2020
DISPLAY STUDIO 03/07/2020 MAINTENANCE
STRUCTURAL CORESPONSIBLE:
EAST ELEVATION - PROPOSED
STREET, SAN PABLO TEPETLAPA N.P.T 150 MUSEOPLAN LEVEL ±0.00 COYOACAN, MEXICO CITY N.L.A.T. +4.31
RESPONSIBLE CONSTRUCTION DIRECTOR
N.P.T. -0.17
F.F.L. 0.17
0.17
0.20 0.31 0.31 0.20 0.31 0.45
15/05/2020
FOR REVIEW
LOUVERS R4 Slope 1%
DATE
DESCRIPTION
GLASS
R3
N±0.00
EL +0.85
0.85 0.17
REV
S.L. +3.55
B.O.S. +2.98 EL. +2.71
EL. +2.21
LOUVERS
EL +3.48
GLASS
0.38 0.50 0.12 0.28 EL. +2.22
SECTION LINE
CT-1
CT-1
7.54
0.12
LOCATION:
N.L.A.T. +5.14
INDICATES PROJECTION LINE
0.10
ARCH. MARIO GUADARRAMA HERNÁNDEZ CDUyA REG: 0188 GRID LINE
6.49
INDICATES FACETOFACE DIMENSION INDICATES CENTERLINETOCENTERLINE DIMENSION INDICATES CENTERLINETOFACE DIMENSION INDICATES STONE WALL
B.O.S. +2.58
H2O LEVEL
URBAN & ARCHITECTURALEXISTING DESIGN FINISHED CORESPONSIBLE FLOOR LEVEL
-N.P.T.E.
14.00
08/06/2020
CT-01
RESPONSIBLE CONSTRUCTION DIRECTOR
EL +0.85 EL±0.00
INDICATES PLAN LEVEL
N.P.T±0.00
scale 1:100
15/05/2020
FOR REVIEW
R5
NORTH:
3.15
0.85
INDICATES SECTION LINE
N.P.T ±0.00
EAST ELEVATION - PROPOSED meters
DATE
DESCRIPTION
R3
CT-02 R4CT-03 FOR REVIEW
B.O.S. +2.98 EL. +2.71
SYMBOLS:
EL±0.00 0.17
CT-01
INDICATES CONCRETE/EXISTING WALL
INDICATES NEW BRICK WALL INDICATES FLOOR LEVEL CHANGE INDICATES CEILING LEVEL CHANGE
T.O.S. +3.10
EL. +2.21
EL. +2.21
TOP OF WALL LEVEL
W.L.
CT-02
NEW AUDIOVISUAL ROOM PROJECT INCLUDED PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND MAINTENANCE STAFF REV
EL +3.48
GLASS
0.38 0.50 0.12 0.28
INDICATES STONE WALL
CT-03
N±0.00
N.P.T. -0.17
0.17
N.P.T. -0.20
GLASS
PARAPET LEVEL
L.L.
INDICATES GRID LINE
SOUTH ELEVATION
3.42
2.71
LADIES RESTROOM
INDICATES PROJECTION LINE
TOP OF SLAB TOP OF BEAM BOTTOM OF BEAM
P.L.
E.F.F.L.
meters
4.41
VESTIBULE SIDEWALK LEVEL
BOTTOM OF SLAB
GLASS
B.O.B.
T.O.W.
CROSS SECTION 01
3.76
F.F.L. 0.17
INDICATES FACETOFACE DIMENSION INDICATES CENTERLINETOCENTERLINE DIMENSION INDICATES CENTERLINETOFACE DIMENSION
N.L.B.L. +2.11
FINISHED FLOOR GLASSLEVEL
T.O.S. B.O.S. T.O.B.
B.O.B.+4.00
4.40
AUDIOVISUAL ROOM
S.W.L. F.F.L.
B.O.S. +2.58
EL±0.00
2.95 NOMENCLATURE:
T.O.S.+5.29
B.O.B.+4.83 S.L.0.10 +3.58 0.41 0.31 0.60 0.47 0.12
PREEXISTING WALLS SLAB PROJECTIONS
N.L.A.L +2.70
N.L.B.L. +3.25
N.L.B.L. +2.58
7.54
N±0.00
N.P.T. -0.17
8.03
LOUVERS
0.33
NORTH:
N.E. +1.40
2.99
3.15
45.08 4.02
LOUVERS
INDICATES UP
INDICATES LEVEL CHANGE IN PLAN
0.38 0.12
0.50
INDICATES DOWN
3.44 N+3.58
N.L.A.L. +3.10
INDICATES SECTION LEVEL
UP
DN
2.60 N.E. +3.55
N +2.48
INDICATES PLAN LEVEL
N.P.T±0.00
2.39
meters
scale 1:100
meters
DIEGO RIVERA ANAHUACALLI MUSEUM
URBAN &Alteration, ARCHITECTURAL DESIGN CORESPONSIBLE addition and area construction
Alteration, addition and area construction ARCH. MARIO GUADARRAMA HERNÁNDEZ CDUyA REG: 0188
DATE
ANA-MA-A1-03-01 15/05/2020
R2
FOR CHECK
R3
FOR DRAWN CHECK BY:
R4
FOR CHECK
FILE: 08/06/2020
TA-MR+GC
R5
03/07/2020
RESPONSIBLE CONSTRUCTION DIRECTOR
ARCH. FERNANDO VICTOR TORROELLA LABRADA D.R.O. REG: 0004
LOCATION MAP: MAP: LOCATION
LOCATION:
STRUCTURAL CORESPONSIBLE:
150 MUSEO STREET, SAN PABLO TEPETLAPA COYOACAN, MEXICO CITY 4.03 4.41
4.40
6.49
4.41
2.95
7.54
10.89
2.60
S.L. +3.55
3.15
14.00
2.54
LOUVERS
2.95
LOUVERS
2.54
2.69
2.50
7.56
2.39
LOUVERS
GLASS
T.O.S.+5.29
2.39 0.20 0.31 0.31 0.20 0.31 0.45
3.44
LOUVERS
METAL SHUTTER
N.P.T. -0.17
GLASS
GLASS
S.L. +3.55
AUDIOVISUAL ROOM
0.17
LADIES RESTROOM
VESTIBULE
DRAWING:
0.17
2.95
2.50
2.39
2.39
F.F.L. 0.17 N.P.T. -0.17
0.31 0.52 0.31 0.45 0.32
CONTENT:
NORTH, SOUTH, EAST AND WEST ELEVATIONS
DUCT RETURN
SCALE: OVERALL PLAN: PLAN: OVERALL
EL±0.00 N±0.00
DIMENSIONS:
1:100
CT-03 CT-03
DATE:
N±0.00
WEST ELEVATION
CT-02 CT-02
UEPM-01 H=0.60 M
LI036CO180P432
CORESPONSIBLE FOR URBAN AND ARCHITECTURAL DESIGN
ARCH. MARIO GUADARRAMA HERNÁNDEZ CDUyA REG: 0188
N.L.A.T. +4.31
N.L.B.T. +4.83
LOCATION:
N.L.A.L. +3.55
150 MUSEO ST., SAN PABLO TEPETLAPA COYOACÁN, MEXICO CITY
N.L.B.T. +4.00 N.L.B.L. +3.23
UEPM-01 H=0.60 M
PROPRIETOR:
CT-01 CT-01 METERS
3.23
DIEGO RIVERA AND FRIDA KAHLO MUSEUMS TRUST BANK OF MEXICO
3.75
PROJECT:
RESTORATION CONSERV. LAB.
ANA-MA-A1-03-01
N.P.T. -0.17
DOOR
JULY 03, 2020
DRAWING NO.:
GARDEN
LAB STORAGE CONS. + RESTORATION
CULTURAL STORAGE
CULTURAL STORAGE
N±0.00
N.P.T. -0.20
SHEET:
FILE:
DRAWN BY:
TA-MR+GC
meters
R5
CT-03 CT-03
CT-02 CT-02
ARCHITECTURAL / MAINTENANCE
CONTENT:
CT-01 CT-01
CROSS SECTIONS CT01, CT02 AND CT03
RAIN CISTERN
NORTH: NORTH:
CROSS SECTION 01
1.79
DUCT SUPPLY
UEPC-01 H=0.60 M PIPES EXIT
N.E. +1.90
N.P.T. -0.20
scale 1:100
6.49
ENG. LUIS BERNARDO ARGUELLES MEDRANO C / I.REG: 0017
ARCHITECTURAL / MAINTENANCE
N.E. +3.55
N.L.A.L +2.70 N.L.B.L. +2.58
N.L.B.L. +2.11
3.42
CORESPONSIBLE FOR SYSTEMS DESIGN:
7.56
N.L.A.T. +5.14 B.O.S.+4.21 B.O.B.+4.00
B.O.B. +2.13 N.L.B.L. +3.25
2.58 2.75
N±0.00
N+3.58
0.33
1.00
3.72
14.00
4.40
PROJECT:
T.O.S.+4.46
B.O.S.+5.00 B.O.B.+4.83
0.33 5.50 0.55 0.12
N.L.B.L. +2.98 N.E. +1.40
ENG. ALEJANDRO GONZALES DEL PLIEGO C/SE REG.:0073
OWNER:
DIEGO RIVERA AND FRIDA KAHLO MUSEUMS TRUST BANK OF MEXICO
SCALE:
DIMENSIONS:
DATE:
CROSS SECTION 03
PAVEMENT LEVEL LEVEL PAVEMENT
-N.B. -N.B.
BOTTOM OF OF SLAB SLAB BOTTOM
-N.L.A.T. -N.L.A.T.
TOP OF OF BEAM BEAM TOP
-N.L.B.T. -N.L.B.T.
BOTTOM OF OF BEAM BEAM BOTTOM
H2O LEVEL LEVEL H2O
-N.P.T.E. -N.P.T.E.
2.50
2.39
EXISTING FINISHED FINISHED FLOOR FLOOR LEVEL LEVEL EXISTING
SYMBOLS: SYMBOLS:
4.97 2.95
4.03
N.L.B.T. +4.83 N.L.A.L. +3.55
SECTION LINE LINE SECTION
CT-1 CT-1
1.74
CT-1 CT-1
4.41
N.L.A.T. +5.14 0.31 0.52 0.31 0.45 0.30
LOUVERS LOUVERS
4.40
N.P.T ±0.00
N.L.A.T. +4.31
3.45
DISPLAY STUDIO MAINTENANCE
Slope 1% 1% Slope
DISPLAY DISPLAY STORAGE STORAGE
DISPLAY DISPLAY STORAGE STORAGE
DISPLAY DISPLAY STORAGE STORAGE
2.95
2.50
2.39
2.39 TOB +5.14
SECTION LEVEL LEVEL SECTION
0.31 0.52 0.31 0.45 0.32
UP UP
E.L. +3.55
DN DN
D. D.
LOUVERS
LEVEL CHANGE CHANGE IN IN PLAN PLAN LEVEL
N±0.00
PROJECTION LINE LINE PROJECTION
EL±0.00
0.26
BOB +4.83
3.43
E�HIBIT �ORKSHOP
STONE MASONRY MASONRY STONE
Slope 1%
N.P.T. -0.17
E�HIBIT STORAGE
CONCRETE/EXISTING MASONRY MASONRY MAINTENANCE CONCRETE/EXISTING
E�HIBIT STORAGE
BOB +4.00
scale 1:100
CT-05
FFL 0.20 CT-04
CT-06
CT-05
NORTH:
DATE DATE
DESCRIPTION DESCRIPTION
REV REV
scale 1:100 meters
CT-06
CT-04
EL±0.00
E�HIBIT STORAGE
REVISED DESIGN DESIGN INCLUDES INCLUDES AUDIOVISUAL AUDIOVISUAL ROOM, ROOM, REVISED PUBLIC RESTROOMS RESTROOMS AND AND CHANGING CHANGING ROOMS ROOMS FOR FOR GUIDES GUIDES PUBLIC AND MAINTENANCE MAINTENANCE STAFF STAFF AND
CROSS SECTION 04
CROSS SECTION 02
SITE PLAN SKETCH:
3.75
ADDED BRICK BRICK MASONRY MASONRY ADDED FLOOR LEVEL LEVEL CHANGE CHANGE FLOOR CEILING LEVEL LEVEL CHANGE CHANGE CEILING
FFL 0.17
TOB +4.31
TOS +3.55
BOS +3.23
GLASS FACETOFACE DIMENSION FACETOFACE DIMENSION CENTERLINETOCENTERLINE DIM. DIM. CENTERLINETOCENTERLINE CENTERLINETOFACE DIMENSION DIMENSION CENTERLINETOFACE
0.26
1.79
PREEXISTING MASONRY PREEXISTING BEAMS
E.L. +1.90
3.75
N.P.T. -0.20
7.56 6.49
PLAN LEVEL LEVEL PLAN
N.P.T±0.00 U. U.
N.L.B.T. +4.00
N.L.B.L. +3.25 N.E. +1.90 GLASS GLASS
14.00
GRID LINE LINE GRID
2.39
N.E. +3.55
N±0.00
R4
MASONRY TOP TOP LEVEL LEVEL MASONRY
-N.AG. -N.AG.
7.56 6.49
LOCATION SKETCH: FILE:
TA-MR+GC
CLOSURE LEVEL LEVEL CLOSURE
-N.C. -N.C. -N.C.M. -N.C.M.
14.00 4.40
DRAFTED:
PARAPET LEVEL LEVEL PARAPET
-N.P. -N.P.
4.03
ANA-MA-A1-02-03
TOP OF OF SLAB SLAB TOP
-N.L.A.L.
DIEGO RIVERA ANAHUACALLI MUSEUM Remodelin�, e�pansion and construction o� spaces
CODE:
FINISHED FLOOR FLOOR LEVEL LEVEL FINISHED
-N.P.T. -N.P.T.
meters -N.L.A.L. -N.L.B.L. -N.L.B.L.
4.41
JULY 03, 2020
NOMENCLATURE: NOMENCLATURE:
scale 1:100
4.97
METERS
1:100
meters
scale 1:100
meters FOR CHECK CHECK FOR R3
R2
FOR CHECK CHECK FOR
08/06/2020
R4
FOR CHECK CHECK FOR
03/07/2020
15/05/2020
NOMENCLATURE: S.L.
SIDE�ALK LEVEL
FFL
FINISHED FLOOR LEVEL TOP OF SLAB
TOS BOS
RESPONSIBLE CONSTRUCTION CONSTRUCTION DIRECTOR DIRECTOR RESPONSIBLE
BOTTOM OF SLAB
TOB
ARCH. FERNANDO FERNANDO VICTOR VICTOR TORROELLA TORROELLA LABRADA LABRADA ARCH. D.R.O. REG: REG: 0004 0004 D.R.O.
TOP OF BEAM
BOB
BOTTOM OF BEAM
P.L.
STRUCTURAL PLANS WAREHOUSE 14.00
2.50
2.39
6.49
2.95
4.41
4.40
0.13
SYMBOLS: INDICATES GRID LINE
ENG. LUIS LUIS BERNARDO BERNARDO ARGUELLES ARGUELLES MEDRANO MEDRANO ENG.
2.26
0.22 I.REG: 0017 0.14CC // I.REG: 0017 1.08 1.11
2.69
3.44
2.54
2.54
2.60
0.26
My role involved coordinating with the structural engineer and project manager to translate the proposed structure’s dimensions into the floor plans and model. We worked closely with the engineer to ensure Mauricio’s vision was respected and that the structure remained in harmony with our design intent. Through several iterations, we refined the design and materiality to achieve the vision for the audiovisual room and warehouse structure. DUCT DUCT RETURN RETURN
PIPES EXIT PIPES EXIT
N.E. +1.90
UEPC-01 UEPC-01 H=0.60M M H=0.60
GARDEN
1.79
UEPM-01 UEPM-01 H=0.60M M H=0.60
LI036COLI036CO180P432 180P432
RESTORATION CONSERV. LAB.
LAB STORAGE STORAGE LAB CONS. ++ CONS. RESTORATION RESTORATION
CULTURAL STORAGE STORAGE CULTURAL
UEPM-01 UEPM-01 H=0.60M M H=0.60
CULTURAL STORAGE STORAGE CULTURAL
N.L.B.T. +4.83 N.L.A.L. +3.55
ARCH. MARIO MARIO GUADARRAMA GUADARRAMA HERNÁNDEZ HERNÁNDEZ ARCH. CDUyA REG: REG: 0188 0188 CDUyA
N.L.B.T. +4.00
EL+3.58 EL+3.17
LOCATION: LOCATION:
TOS +2.70
BOS +2.58
BOS +2.11
3.75
1.01 1.01
N±0.00
EL±0.00
FFL 0.17
GLASS
GLASS
MEN�S RESTROOM PROJECT: PROJECT:
2.99
VESTIBULE
EL±0.00
Slope 1%
0.17
SHEET: SHEET:
INDICATES LEVEL CHANGE IN PLAN
INDICATES FACETOFACE DIMENSION INDICATES CENTERTOCENTER DIMENSION INDICATES CENTERLINETOFACE DIMENSION INDICATES PROJECTION LINE
FFL 0.17
INDICATES STONE �ALL INDICATES CONCRETE/EXISTING �ALL INDICATES NE� BRICK �ALL INDICATES FLOOR LEVEL CHANGE INDICATES CEILING LEVEL CHANGE
ARCHITECTURAL / MAINTENANCE
NE� PROJECT INCLUDES AUDIOVISUAL ROOM, PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND MAINTENANCE STAFF
CONTENT: CONTENT:
CROSS SECTIONS CT01, CT02 AND CT03
RAIN CISTERN
SCALE: SCALE:
scale 1:100
DATE: DATE:
METERS
CODE: CODE:
FILE: FILE:
DRAFTED: DRAFTED:
TA-MR+GC
4.97
14.00
4.40
FOR REVIE�
08/06/2020
FOR REVIE�
06/07/2020
ARCH. FERNANDO VICTOR TORROELLA LABRADA D.R.O. REG: 0004
R4
4.03
4.41
DATE
15/05/2020
FOR REVIE�
R2 R3
RESPONSIBLE DIRECTOR OF CONSTRUCTION
ANA-MA-A1-02-03
meters
DESCRIPTION
R1
JULY 03, 2020
meters
scale 1:100
CROSS SECTION 03
REV
DIMENSIONS: DIMENSIONS:
1:100
CROSS SECTION 05
INDICATES DO�N
D.
PREEXISTING �ALLS PREEXISTING BEAMS
E.L. +1.90
3.16
AUDIOVISUAL ROOM
0.17
N.P.T. -0.17
U.
BOS +2.98
DIEGO RIVERA AND FRIDA KAHLO MUSEUMS TRUST BANK OF MEXICO
SHO�ER
INDICATES LEVEL IN SECTION INDICATES UP
EL+3.48
TOS +3.10
0.38 0.50 0.12
PROPRIETOR: PROPRIETOR:
2.28 2.11
FFL±0.00
GLASS
150 MUSEO ST., SAN PABLO TEPETLAPA COYOACÁN, MEXICO CITY
0.41
0.47 0.12 0.47 0.28 0.19
TOS +2.30
2.75
N.P.T. -0.20
INDICATES LEVEL IN PLAN
GLASS
N.L.A.T. +4.31
N.L.B.L. +3.23
DUCT DUCT SUPPLY SUPPLY
DOOR DOOR
3.23
N±0.00
INDICATES SECTION LINE
FFL ±0.00
CORESPONSIBLE FOR FOR URBAN URBAN AND AND ARCHITECTURAL ARCHITECTURAL DESIGN DESIGN CORESPONSIBLE
N.L.A.T. +5.14
N.E. +3.55
�ATER LEVEL EXISTING FINISHED FLOOR LEVEL
CORESPONSIBLE FOR FOR SYSTEMS SYSTEMS DESIGN: DESIGN: CORESPONSIBLE
2.46
2.39
0.31 0.52 0.31 0.45 0.32
PARAPET LEVEL TOP OF �ALL
�.L. EFFL
CT-1
2.95
2.50
2.39
2.39
7.56
6.49
LINTEL LEVEL
TO�
4.97
4.03
14.00
ENG. ALEJANDRO ALEJANDRO GONZALES GONZALES DEL DEL PLIEGO PLIEGO ENG. C/SE REG.:0073 REG.:0073 C/SE
CT-1
4.40
L.L. STRUCTURAL CORESPONSIBLE: CORESPONSIBLE: STRUCTURAL
7.56
STRUCTURAL CORESPONSIBLE:
ENG. ALEJANDRO GONZALES DEL PLIEGO C/SE REG.:0073
7.56
6.49
2.95
0.30
2.50
2.39
BUILDING SYSTEMS DESIGN CORESPONSIBLE:
ENG. LUIS BERNARDO ARGUELLES MEDRANO C / I.REG: 0017
2.39
0.31 0.45 0.30
0.30 0.20
0.76
URBAN � ARCHITECTURAL DESIGN CORESPONSIBLE
TOB +4.31
ARCH. MARIO GUADARRAMA HERNÁNDEZ CDUyA REG: 0188
TOS +3.55 BOB +4.00
LOCATION:
150 MUSEO STREET, SAN PABLO TEPETLAPA COYOACÁN, MEXICO CITY
BOS +3.25
E.L. +1.90 3.45
EL±0.00
FFL 0.17
1.10 0.20 0.30
Slope 1%
0.60
0.60
LOCKERS Men
O�NER:
3.75
DIEGO RIVERA AND FRIDA KAHLO MUSEUMS TRUST BANK OF MEXICO FFL 0.20
EL±0.00
PROJECT:
SHEET:
ARCHITECTURAL / MAINTENANCE
CONTENT:
CROSS SECTIONS CT04, CT05 AND CT06
SCALE:
CROSS SECTION 06 scale 1:100
DIMENSIONS:
METERS
1:100 meters
DATE:
CODE:
JULY 06, 2020
ANA-MA-A1-02-04 FILE:
DRA�N:
TA-MR+GC
R3
3.97
0.27
F.F.L. 0.17
EL. ±0.00
D.R.O. REG: 0004
F.F.L.0.20
URBAN & ARCHITECTURAL DESIGN CORESPONSIBLE PROJECT: ARCH. MARIO GUADARRAMA HERNANDEZ CDUyA REG: 0188
150 MUSEO ST., SAN PABLO TEPETLAPA
ARCHITECTURAL / MAINTENANCE COYOACAN, MEXICO CITY
LONGITUDINAL SECTIONS CL01, CL02
GLASS
4.01
GLASS
GLASS
3.95
0.37
0.25
DIEGO RIVERA & FRIDA KAHLO MUSEUM TRUST BANK OF MEXICO
7.66
SCALE: URBAN / ARCHITECTURAL DESIGN CONSULTANT
6.72
DIMENSIONS:
METERS
PROJECT: ARCH. MARIO GUADARRAMA HERNÁNDEZ 1:100 CDUyA REG: 0188
DATE:
0.25
JULY 03, 2020
LOCATION:
0.10 0.10 0.38 0.50 0.60 0.140.12
NO.: 150 MUSEOSHEET ST., SAN PABLO TEPETLAPA DRAWING: COYOACAN, MEXICO CITY ARCHITECTURAL / MAINTENANCE
ANA-MA-A1-02-01
T.O.S. +3.10 EL. +3.48 EL. +2.84
CONTENT: DRAWN BY:
PROPRIETOR:
FILE:
CL01, CL02 TA-MR+GC DIEGO RIVERALONGITUDINAL AND FRIDA SECTIONS KAHLO MUSEUMS TRUST BANK OF MEXICO
B.O.S. +2.98
SCALE:
METAL SHUTTER
TRANSITION STORAGE
METAL SHUTTER
METAL SHUTTER
MUSEUM / LUMBER STORAGE
GLASS
2.86
2.99
0.16
0.17
METAL SHUTTER
DATE:
AUDIOVISUAL ROOM
EL. 0.032
METERS
JULY 03, 2020
EL. ± 0.00 SHEET NO.:
SHEET:
ANA-MA-A1-02-01
ARCHITECTURAL / MAINTENANCE DRAWN BY:
CONTENT:
FILE:
TA-MR+GC LONGITUDINAL SECTIONS CL04 AND CL06
EXISTING CISTERN
SCALE:
DIMENSIONS:
ARCHITECTURAL / MAINTENANCE ROOF PLAN UNITS:
METERS
JUNE 25, 2020
ANA-MA-A1-01-03 TA-MR+GC
FILE:
R5
METERS
1:100 DATE:
CODE:
METERS
R9
DIMENSIONS:
1:100
PROJECT:
3.15
B.O.S. 0.17
150 MUSEO STREET, SAN PABLO TEPETLAPA COYOACAN, MEXICO CITY
DATE:
GLASS
2.99
0.20
DIEGO RIVERA & FRIDA KAHLO MUSEUM TRUST OF LABRADA MEXICO ARCH. FERNANDO VICTORBANK TORROELLA
DRAWING:
OWNER:
CODE:
11/06/2020
BUILDING SYSTEMS DESIGN CORESPONSIBLE:
ENG. LUIS BERNARDO ARGUELLES MEDRANO CONTENT: OWNER: C / I.REG: 0017
4.04
GLASS
LOCATION:
SCALE:
4.01
FOR REVISION
FOR REVISION 03/07/2020 MEDRANO OWNER:ENG. LUIS BERNARDO ARGUELLES
MEP DESIGN CONSULTANT:
METAL SHUTTER
SHEET:
COYOACAN, MEXICO CITY
R6 R7
ENG. ALEJANDRO GONZALES DEL PLIEGO C/SE REG.:0073 LOCATION:
ARCH. MARIO GUADARRAMA HERNÁNDEZ CDUyA REG: 0188
meters
03/07/2020
DATE DESCRIPTION ENG. ALEJANDRO GONZALES DEL PLIEGO LOCATION: C/SE REG.:0073
PABLO TEPETLAPA FOR REVISION 150 MUSEO ST., SAN08/06/2020
R5
EL. +3.58
CT-08
DATE 15/05/2020 08/06/2020
D.R.O. REG: GUADARRAMA 0004 ARCH. MARIO HERNANDEZ
INCLUDES PROPOSED AUDIOVISUAL CDUyA REG: 0188ROOM PROJECT PUBLIC RESTROOMS, CHANGE ROOMS FOR GUIDES AND STAFF MAINTENANCE STAFF STRUCTURAL CORESPONSIBLE: REV
CONSTRUCTION DIRECTOR
STRUCTURAL CONSULTANT:
3.95
GLASS
GLASS
1:100
3.95
T.O.S. +2.30 B.O.S. +2.13
EL. 0.27
4.02
ENG. ALEJANDRO GONZALES DEL PLIEGO C/SE REG.:0073
T.O.S. 3.37
CT-11
EL. ±0.00 F.F.L.0.20 T.O.S. +3.50
32.52 4.00
DIEGO RIVERA AND FRIDA KAHLO MUSEUMS TRUST BANK OF MEXICO
CT-06 CT-05
B.O.S. +3.25 B.O.B. +2.9
2.90
C / I.REG: 0017
TEMPORARY STORAGE
MUSEOGRAPHY STORAGE
0.25 0.35
7.29
PROJECT:
meters
METAL SHUTTER
0.38 0.12
MAINT. CHANGING ROOMS
meters
B.O.S. 0.67
5.46
0.50
MEN'S RESTROOM
1.94
15/05/2020
SCALE 1:100
GLASS
N.E. +3.55
F.F.L. 0.17
0.27
0.95 0.17
03/07/2020
ENG. LUIS BERNARDO ARGUELLES MEDRANO INDICATES CONCRETE / EXISTING C / I.REG: 0017 R9 FOR REVIEW INDICATES PROPOSED BRICK INDICATES FLOOR LEVEL CHANGE RESPONSIBLE CONSTRUCTION DIRECTOR INDICATES CEILING LEVEL CHANGE FERNANDO VICTOR LABRADA URBANARCH. & ARCHITECTURAL DESIGNTORROELLA CORESPONSIBLE
08/06/2020
4.02
URBAN AND ARCHITECTURAL DESIGN CORESPONSIBLE
0.17 0.50
F.F.L.0.17
3.20
T.O.S. + 2.30
EL+3.58
N.L.A.L. +3.10
WOMEN'S RESTROOM
FOR REVIEW LONGITUDINAL SECTION 25/06/2020 02 - PROPOSED
ENG. LUIS BERNARDO ARGUELLES MEDRANO C / I.REG: 0017
LOCATION MAP:
N +2.48
0.20
4.24
15/05/2020 08/06/2020
INDICATES FLOOR LEVEL CHANGE INDICATES CEILING LEVEL CHANGE
INDICATES PLAN LEVEL CHANGE
NEW AUDIOVISUAL ROOM PROJECT INCLUDED
MAINTENANCE STAFF
ENG. ALEJANDRO GONZALES DEL PLIEGO
INDICATES FACETOFACE DIM. C/SE REG.:0073 DESCRIPTION REV INDICATES GRIDTOGRID DIM. INDICATES GRIDTOFACE DIM. R7 FOR REVIEW INDICATES PROJECTION LINE BUILDING SYSTEMS DESIGN CORESPONSIBLE: R8 FOR REVIEW INDICATES STONE MASONRY
B.O.S. +2.13
DATE
DESCRIPTION
FOR REVIEW FOR REVIEW
2.13
45.08
4.97
4.02
FOR REVIEW INDICATES PLANFACETOFACE LEVEL DIMENSION
C.L.TOC.L. DIMENSION FOR REVIEW C.L.TOFACE DIMENSION INDICATES SECTION LEVEL FOR REVIEW INDICATES PROJECTION LINE
ARCH. FERNANDO VICTOR TORROELLA NEWLABRADA BRICK WALL INDICATES DN. INDICATES
D.R.O. REG: 0004
STRUCTURAL CORESPONSIBLE: PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND PREEXISTING PARTITIONS
T.O.S. +2.30
F.F.L.0.20
DOOR
MONITORING ROOM
INSTALLATIONS DESIGN CORESPONSIBLE:
5.00
T.O.S. +2.13
ANA-MA-A1-01-01
TA-MR+GC
2.71
4.00
2.00
DATE
R7
INDICATES UP INDICATES STONE WALL RESPONSIBLE CONSTRUCTION DIRECTOR INDICATES CONCRETE / EXISTING WALL D.
T.O.S. +3.50
B.O.S. +3.25 B.O.B. +2.9 F.F.L. 0.17
EL. 0.27 N.E. + 3.55
1.87
METERS
DRAWN BY:
8.03
F.F.L. 0.17
TEMPORARY STORAGE 4.02
3.95
0.05 0.25
scale 1:100
JUNE 25, 2020
SHEET NO.:
EL±0.00
4.04
B.O.S. +2.13
0.25 0.35
T-2
R5
CONTENT:
0.41 0.31 0.60 0.47
3.97
T.O.S. +2.30 N.E. + 3.55
0.95
2.90 1.940.27 EL.
EXISTING BEAM
STRUCTURAL CORESPONSIBLE:
DIMENSIONS:
1:100 DATE:
EL+3.58 EL. +3.17
MUSEOGRAPHY STORAGE 4.01
B.O.S. +3.25 B.O.B. +2.9
0.05 0.25
0.17 EL. ±0.00
UEPM-01 H=0.60 M
NEW AUDIOVISUAL ROOM PROJECT INCLUDED PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND MAINTENANCE STAFF
BASEMENT PLAN
SCALE:
N.L.A.L +2.70
2.90
PREEXISTING WALLS DESCRIPTION INDICATES SECTION LINE PREEXISTING BEAMS
R8 R9
T.O.S. +3.50 U.
0.25 0.35
2.30
PIPES OUT
R3
ARCH. FERNANDO VICTOR TORROELLA LABRADA
0.31 0.52 0.31
ARCHITECTURAL / MAINTENANCE
CONTENT:
scale 1:100
MAINT. CHANGING ROOMS 4.00 3.95
2.00
LONGITUDINAL SECTION 10
scale 1:100
DRAWING:
4.00
0.95
0.17
MONITORING ROOM
0.30
R4
D.R.O. REG: 0004
S.L. +3.58
Slope 1% Slope 1%
S.L. +3.55
CT-04
CT-03
ROOF PLAN
PROJECT:
LOUVERS
45.08
MEN'S RESTROOM 4.03
REV
F.F.L.±0.00
S.L. + 3.55 0.05 0.25
4.24
T-2
MONITORING ROOM
DOOR
2.00
METERS
STONE WALL
RESPONSIBLE CONSTRUCTION DIRECTOR
0.31
T.O.B. +4.31
R.D.P.
R.D.P.
S.L. +3.55
DIEGO RIVERA & FRIDA KAHLO MUSEUMS TRUST CT-07 CT-09 BANK OF MEXICO
meters
4.02
4.24
4.02
T-2
CONCRETE/EXISTING WALL
CT-08
OWNER:
BASEMENT PLAN
LOUVERS
4.02
4.00 DOOR
TEMPORARY STORAGE
NEW BRICK WALL
REV
e 1% Slop T.O.S. + 2.70
R.D.P.
T.O.S. + 4.31
e 2.0
Slop
R.D.P.
T.O.S. + 2.30
CL-06
CT-08
CT-11
4.24
4.00
4.02
EXISTING BEAM
CEILING LEVEL CHANGE meters
scale 1:100
S.L. +3.58
R.D.P.
%
e 2.0%
2.0
UEPM-02 H= 0.57 M
150 MUSEO STREET, SAN PABLO TEPETLAPA COYOACAN, MEXICO CITY
CT-08
SCUPPER (TO T.O.S.+4.31)
Slop
%
pe
Slope 1%
T.O.S. + 2.95
LOCATION:
8.03
4.02
3.95
PIPES OUT
LONGITUDINAL SECTION 02 CHANGE - PROPOSED FLOOR LEVEL
B.O.B. +4.00
ARCH. MARIO GUADARRAMA HERNÁNDEZ CDUyA REG: 0188
2.39
%
Slo
URBAN & ARCHITECTURAL DESIGN CORESPONSIBLE + 3.50
scale 1:100
3.95
4.04
MUSEUM STORAGE
INDICATES DOWN
DN
NEW AUDIOVISUAL ROOM PROJECT INCLUDED INDICATES LEVEL PLAN PUBLIC RESTROOMS AND CHANGING ROOMS FORCHANGE GUIDESIN AND INDICATES GRID LINE MAINTENANCE STAFF
F.F.L. ±0.00
4.04
3.97
UEPM-01 H=0.60 M
LONGITUDINAL SECTION 06 PROPOSAL PROJECTION LINE
T.O.B. +5.14 B.O.B. +4.83
Slope 1%
CL-02 CL-06
CL-02
CL-02 CL-06
T.O.S. + 2.95
ENG. LUIS BERNARDO ARGUELLES MEDRANO C / I.REG: 0017
2.39
SCUPPER (TO T.O.S.+4.31)
T.O.S. + 4.31
2.0
T.O.S. + 3.50
Slope 1% 2.39 INSTALLATIONS DESIGN CORESPONSIBLE:
7.56
pe
2.0
R.D.P.
T.O.S. + 2.30
D.R.O. REG: 0004
ENG. ALEJANDRO GONZALES DEL PLIEGO C/SE REG.:0073
CT-07 CT-09
Slope
4.01
0.30
FACETOFACE DIMENSION C/LTOC/L DIMENSION C/LTOFACE DIMENSION
S.L. +3.58
T.O.S. + 3.10
1%
R.D.P. Slo
%
pe
Slo
S.L. STRUCTURAL CORESPONSIBLE: +3.55
19Ø AUXILIARY RAINWATER CISTERN FILL. FROM MAIN WATER SUPPLY
2.0
Slo R.D.P.
R.D.P.
ARCH. FERNANDO VICTOR TORROELLA LABRADA
2.39
SCUPPER (TO T.O.S.+4.31)
R.D.P.
FOR CONSTRUCTION FOR REVIEW
R4
2.51
50Ø TRANSFER TO POTABLE WATER CISTERN
7.56
2.0
%
SCUPPER (TO T.O.S.+4.31)
%
%
DATE
DESCRIPTION
R2 R3
RESPONSIBLE CONSTRUCTION DIRECTOR
SEE CONNECTION ON DRAWING IH03
SEE CONTINUATION ON DRAWING IH03
Slope 2.0%
Slope 2.0%
NEW BRICK WALL FLOOR LEVEL CHANGE CEILING LEVEL CHANGE
INCLUDES NEW AUDIOVISUAL ROOM PROJECT, PUBLIC RESTROOMS AND CHANGING ROOMS FOR GUIDES AND MAINTENANCE STAFF REV
2.95
RAINWATER SYSTEM
1% / 150Ø
T.R. 100Ø
64Ø -0.17 0.40 CT-2 - 0.57
3.97
3.95
PIPES EXIT
DOWN
1%
1%
CL-04
TBL-09 50Ø
R.D.P. Slope
CL-02
-1.32 AC
CISTERN B-08 50Ø
TBL-07 50Ø
T.R. 100Ø
150Ø
B-10
- 1.62
V.M.
64Ø
64Ø
64Ø 50Ø
32Ø
pe
4.01
45.08 4.00
UEPM-01 H=0.60 M
CL-06
32Ø
T-02
25Ø
Slo
3.95
4.00
4.03
SECTION LEVEL UP
2.00
Slop e 1%
50Ø
50Ø 25Ø
T-01
Slope 1%
32Ø
32Ø 32Ø
25Ø
50Ø FROM RAINWATER CISTERN
CL-04
25Ø
WATER SYSTEM
CLEAR HEIGHT 2.25 m T.O.S.
TBL-10
150Ø
50Ø TO POTABLE WATER CISTERN 19Ø AUXILIARY RAINWATER CISTERN FILL
CL-04
4
SYSTEM
45.08
4.03
SECTION LINE PLAN LEVEL
- 0.95
150Ø S.R.
B-11 RY SANITA
CONNECTS TO EXISTING CHANNEL OR DISCHARGES ONTO NATURAL GROUND FOR INFILTRATION
T.O.S. + 5.14
Slope 2.0%
PROJECTION LINE STONE WALL CONCRETE / EXISTING WALL
Slope 1%
-1.30
FACETOFACE DIMENSION CENTERLINETOCENTERLINE DIMENSION CENTERLINETOFACE DIMENSION
Slope 1%
50Ø
6.49
CL-01 CL-10
B-01
-1.02 F-01
150Ø
- 0.67
- 1.17
150Ø
150Ø
CT-2
MECHANICAL ROOM
2.9
R.D.P. Slope S.L. +3.58 Slope
2.0
Slo
14.00
CL-01 CL-10
50Ø
100Ø NATURAL GROUND
CISTERN ACCESS
50Ø
H(use)=2.70 m
MASONRY TOP LEVEL
INDICATES NEW BRICK WALL INDICATES UP H2O LEVEL INDICATES FLOOR LEVEL CHANGE INDICATES CEILING LEVEL CHANGE EXISTING FINISHED FLOOR LEVEL
UP
SYMBOLS:
LEVEL CHANGE IN PLAN
CL-01 CL-10
CL-03
CL-03
CL-01 CL-10
- 1.46
150Ø ELECTRICAL ACCESS BOX
1.0 X 1.0m
V=44.44 m³ A=16.46 m2 H=2.80 m
150Ø
LINTEL LEVEL
INDICATES CONCRETE / EXISTING WALL
E.F.F.L.
D.
INDICATES LEVEL IN PLAN
BOTTOM OF BEAM LINE INDICATES PROJECTION
INDICATES STONE WALLLEVEL IN SECTION F.F.L.±0.00 INDICATES
L.L.
WATER LEVEL
FACETOFACE DIMENSION INDICATES BOTTOM OF SLAB SECTION LINE C.L.TOC.L. DIMENSION TOPDIMENSION OF BEAM C.L.TOFACE PARAPET LEVEL
P.L.
CT-1
pe
F.F.L. -3.37 B.O.S.
EXISTING CISTERN
150Ø V.M.
TOP OF SLAB
F.F.L. ±0.00
B.O.B.
WOMEN'S RESTROOM
%
PLAN LEVEL CHANGE
19Ø
CLEAR HEIGHT 2.70 m
50Ø
100Ø
F.F.L.
TOP OF WALL LEVEL
F.F.L. ±0.00
WATER LEVEL
INDICATES CHANGE PLAN EXISTING LEVEL FINISHED FLOORINLEVEL
T.O.S.
EXISTING FINISHED FLOOR LEVEL
F.F.L.±0.00
INDICATES TOPDOWN OF WALL LEVEL
DN
W.L. E.F.F.L.
SYMBOLS: PREEXISTING WALLS PAVING LEVEL PREEXISTINGFINISHED BEAMS INDICATES FLOOR LEVEL GRID LINE
B.O.S.
meters
PARAPET LEVEL LINTEL LEVEL
T.O.W.
T.O.S. 3.37
M.T.L.
T.O.S. + 3.10
BOTTOM OF BEAM
L.L.
H2O L.
1%
1%
BOTTOM OF SLAB
INDICATES LEVELTOP IN SECTION OF BEAM INDICATES UP
P.L. UP
T.O.B.
BOTTOM OF BEAM
DOWN
DN
FROM MUNICIPAL WATER SUPPLY 19Ø
PER FLOOR
PREEXISTING CISTERN
19Ø WATER SYSTEM
Slope
WATER LEVEL
B.O.S.
F.F.L.±0.00 T.O.B.
PARAPET LEVEL
U.
R.D.P. Slope R.D.P.
PARAPET LEVEL
FINISHED FLOOR LEVEL
INDICATES LEVEL IN PLAN TOP OF SLAB
B.O.B.
NORTH:
3.20
ENCLOSURE LEVEL
CT-1
CT-1
CT-1
19Ø
19Ø
%
2.70
INDICATES SECTIONSIDEWALK LINE LEVEL
F.F.L. ±0.00
T.O.S.
PAV.L.
GRID LINE
e 1%
T.O.S. + 4.31
1.5
14.00
150Ø
scale 1:100
BOTTOM OF BEAM
S.L. F.F.L.
E.L.
CT-1
pe
SECTION LEVEL UP
F.F.L.0.17 B.O.S. 0.67
PLANT ROOM
TOP OF SLAB
LONGITUDINAL SECTION TOP 01 OF BEAM
TOP OF SLAB BOTTOM OF SLAB TOP OF BEAM
LINTEL LEVEL TOP OF WALL LEVEL
EXISTING FINISHED FLOOR LEVEL
INDICATES GRID LINE
EL. ±0.00
0.17 0.50 RAIN CISTERN
SIDEWALK LEVEL FINISHED FLOOR LEVEL
L.L.
NOMENCLATURE:
F.F.L.0.17
V. + D. 1 14"
P.L.
T.O.S. + 3.10
Slop
Slo
PLAN LEVEL
I-PL T-PVC-100 MM
BIO 1T - 2"
64Ø A.P.
TRANSITION STORAGE EXISTING CISTERN SLAB FLOWABLE CONCRETE FILL
SYMBOLS:
R.D.P. Slop
GRID LINE SECTION LINE
F.F.L. ±0.00 F.F.L.±0.00 UP
I-ELE
13Ø A.F. 1.45 1T - 16 MM
I-SAN T-PVC-50 MM
T-PVC-50 MM
P.L.
SYMBOLS:
BOTTOM OF SLAB
T.O.B. B.O.B.
S.L. +3.58 e 1%
EXISTING FINISHED FLOOR LEVEL
SYMBOLS:
50Ø
T-PVC-50 MM
T.O.B.
B.O.B.
W.L.
E.F.F.L.
T.O.S. +2.60
2.60
0.17
FINISHED FLOOR LEVEL
T.O.S.
W.L.
WATER LEVEL
E.F.F.L.
19Ø
1.45
T.O.S.
T.O.W. NORTH:
T.O.S. 3.37 EL. ±0.00 3.72
0.50
SIDEWALK LEVEL METERS
F.F.L.
E.F.F.L.
TOP OF WALL
W.L.
-1.21
T-PVC-50 MM
MUSEOGRAPHY / WOOD STORAGE
F.F.L. B.O.S.
SITE SKETCH:
NOMENCLATURE:
SCALES.W.L. 1:100
S.L. +3.55
N.E. + 3.55
EXISTING CISTERN
T.O.W.
ENCLOSURE LEVEL
T.O.W.
1.34 - 0.17 - 1.51
MUSEOGRAPHY / MAINTENANCE WORKSHOP
0.52
S.L.
B.O.B. +4.00
CT-1
E.L.
4.40
SIL
50Ø
T-PVC-50 MM
I-SAN T-PVC-100 MM
LONGITUDINAL SECTION 04 NOMENCLATURE:
BOTTOM OF SLAB
T.O.B. B.O.B.
3.72
CT-1
TOP OF SLAB
EL. ±0.00 T.O.B. +5.14 B.O.B. +4.83 F.F.L.0.17 T.O.B. +4.31 B.O.S. 0.67
3.20 0.45 2.70 EL. +2.43 0.95
0.17
0.31
CT-1
FINISHED FLOOR LEVEL
T.O.S.
T.O.B. +4.31 0.17B.O.B. +4.00 0.50S.L. + 3.55 0.31 0.52 T.O.S. +2.60 1.59 0.31
0.76
0.95
1.71
CT-1
SIDEWALK LEVEL
F.F.L.
4.40
150Ø
I-PL T-PVC-50 MM I-PL T-PVC-50 MM
AUDIOVISUAL ROOM
0.52
meters
B.O.S.
NOMENCLATURE:
4.03
6.49
I-PL I-PL T-PVC-100 MM T-PVC-50 MM
4T - 27 MM
0.17
0.35
TRANSITION STORAGE
1%
NORTH:
S.L.
4.41
0.42
2.43
0.84
MUSEUM / MAINTENANCE STORAGE
SITE PLAN:
NOMENCLATURE:
4.24
FAN
LI036CO180P432
1.58
CONCRETE SLAB f'c=250 kg/cm2 THK.=10 cm
S.L. +3.55
4.41
UCPM-02 H= 1.43 M
FAN
I-ELE 1T - 16 MM
2.52
0.25
scaleNORTH: 1:100
Slope 1%
4.03
UCPM-01 H= 1.43 M
FAN
RETURN BOX
1.47
EXISTING CISTERN
0.40
MUSEUM / MAINTENANCE STUDIO
NORTH:
T.O.S. +2.60 3.72
4.02
0.31 0.45 UCPC-01 H= 1.43 M
I-ELE 1T - 16 MM
CT-1
pe
1.94
B.O.B. +4.00
4.24
2.60
Slo
1.94
4.02
4.00
RETURN DUCT
UEPM-01 H=0.60 M
CONCRETE SLAB f'c=250 kg/cm2 THK.=10 cm
0.50
VESTIBULE 2T - 21 MM
T.O.S. + 2.65
4.00
4.02
1.45
EXISTING CISTERN SLAB FLOWABLE CONCRETE FILL
0.96
0.28
2.75 2.58
F.F.L. 0.17
4.02
3.95
TRANSITION STORAGE
1.10
3.30
3.95
4.04
1.10
R.D.P.
0.77
4.97
1.45
0.38
LONGITUDINAL SECTION 01 0.77
45.08
3.97
MUSEOGRAPHY / WOOD STORAGE
1.10
F.F.L. 0.17
EL. ±0.00
4.97
4.04
4.01
1.10
EL. ± 0.00
3.97
3.95
T.O.S. +2.70
B.O.S. +3.03
CT-11
CT-08
4.01
0.37
MUSEOGRAPHY / MAINTENANCE WORKSHOP
N.E. + 3.55
0.95
45.08 3.95
7.66 7.29
SITE PLAN SKETCH: 0.10 0.66 0.78 0.35 EL. +3.58 0.17 0.12 0.30 0.43 0.55 1.01 0.12 0.36 0.10 2.75 2.28 B.O.S. +2.58
T.O.S. +2.70
T.O.S. +3.15 EL. +2.41
B.O.S. +2.58 B.O.S. +2.11
AUDIOVISUAL ROOM
0.17
EL. +3.58
EL. +2.48
7.66
7°
2.68
CT-01
2.75 2.58
F.F.L. 0.17
9.50 37.07
1.49
1.59
CT-06 CT-05
0.37
7.66
3.30
7.66
3.95
CL-01
1.01
B.O.S. +2.58
EL. ±0.00
4.02
CT-03
LOCATION SKETCH:
CL-02
0.55
T.O.S. +2.70 B.O.S. +3.03
4.00
T.O.B. +4.31
1.59
CL-04
T.O.S. +3.15
37.07 4.02
4.24
CT-07 CT-09
T.O.B. +5.14 B.O.B. +4.83
0.31 0.52 0.31 0.45
EL. +3.58
CL-01
4.00
CL-01
4.02
CL-02
3.95
CL-02
4.04
CL-01
3.97
CL-02
4.01
CL-04
3.95
CL-06
0.37
7.66
CL-06
LOCATION MAP:
RTH ELEVATION
0
08
JULY 03, 2020
ANA-MA-A1-02-02
DRAFT:
FILE:
TA-MR+GC
R7
R9
09
INSTALATIONS For the project’s installations, I worked with several specialists to gather their technical information and consolidate it into a cohesive plan, ensuring everything aligned and functioned in harmony. I also assisted the project manager in ensuring all installations achieved Mauricio’s vision of aesthetics and cleanliness, while respecting the existing structure and design concept. ELECTRICAL INSTALATIONS 2.68
2.68
3.95
LIGTING SYMBOL LEGEND ID
7°
0.68
0.55
1.49
CT-06 CT-05
CT-01
0.67
CT-02
1.59
0.37
CT-04
4.01
3.97
4.04
3.95
CT-03
9.50
7.66
37.07
4.02
4.02
4.00
4.24
CT-07 CT-09
CT-07
CT-08
PROPERTY
Symbol
LINE
ID
Units Amount
Description
Piece
4
4.97
0.77 1.94 LINE
FFL +0.00
FFL +0.00
Z51
Z51
Z51
Z51
Z51
Z51
Z51
Z51
Z51
Z51
CL-03
CL-03
F
Z50
Hermetic light fixture for LED lamp, 32 W, 3200 lm, 3000 K, universal voltage 110–277 V, IP65, DR acrylic, gray polycarbonate housing. Light source: 2 Osram T8 LED tubes, 3000 K.
Piece
18
ILU-01-06-B
Luminario hermetico para lampara LED, de 32W integrada, 3200Lm, 3000°K, voltaje universal, 110-277V, ip65, acrilico DR, gabinete de policaebonato, color gris. Con driver para emergencia marca OSRAM integrado.
Piece
9
Z49
Piece
29
PE 1%
FFL +0.00
Access
Z51
ILU-01-12
Z51
Z51
Z51
Z51
ACCESS BOX
LOW VOLTAGE
W Z50
F
ACCESS BOX
Z2
DESCRIPTION COST
Z1
W Z50
F
F
DESCRIPTION COST
SL
DESCRIPTION COST
4.40
OP
E 1%
W
Z54
Z1
Z2
Z54 Z48
Z48
PE
F
Z50
1%
DESCRIPTION COST
Z55
O SL
FFL +0.00
ERTY PROP
Z55
Z55
MUSEOGRAPHY WORKSHOP
Z49
Z55
Z48
Access
Z2
Z56
Z56
Z47 Z6
Z4
Z3
Z2
Z3
Z2
Z56 Z47
Surface-mounted emergency linear direct-light fixture. Brand: Deneb, GEMINIS line, model/ key: DB.GS.D.336.6X9W.N, with dimensions of 3.36 m length × 0.0762 m height × 0.05 m width. Manufactured with an aluminum extrusion body, finished in baked matte black electrostatic powder coating. Assembled with metric Allen security screws.Includes a direct-light LED lamp with a power of 6 × 9 W, dimmable. Aluminum reflector. Acrylic diffuser. Suspended with 1/16” steel cable for a height of 1 m. Electrical components: 1 × 9 W Osram LED lamp, PrevaLED Line type, CRI >80, color temperature 4000 K. Programmable dimmable Osram driver, operating voltage 120/277 volts.
ILU-01-12-BAT
Z47
Z1 Z56
Z7
ELEC. BOX
2.95
CL-04
FFL +0.00
Z49 CISTERN ACCESS
Access
STORM BOX
Z9
Z6
Z57
AV ROOM FFL +0.00Z47
Z57
Z2
Z3
Z57
Z46
SAN. BOX
FFL +0.00
STORM BOX
Z7
Z6
Z56
Z57
Z46
Z57
Z46
Z1
Z57
Z46
Z9
Z7A
Z8
MUSEOGRAPHY STORAGE
Z7A
Z5
Z7A
Z5
Z49 Z9
Z40
SAN. BOX
Z5
Z40
Z40
Z40
VESTIBULE FFL +0.00
Z40
Z2A
Z5
Z2A
Z2A
Z40
Z40
Z40
Z40
Z40
FFL +0.00
Z40
D
Z53
Z53
Z18
Z18
STORAGE LAB
Z28, Z53
Z18
Z18
FFL +0.00
Z18
Z18'
Z18
Z32
7.56
2.39
rack rack
CL-02 2.39
Z26,Z27
Z40
Z32
UE-M-01 H=0.60 M
Z41
Z36
Z19 ETNOGRAPHY STORAGE ROOM Z19 FFL +0.00 Z19
Z21
Z19
FFL +0.00Z21
Z21
Z41
Z39
Z36
Z20A
UE-M-02 H=0.60 M
DRIVER
Z51 Z20
Z22
Z20
Z52
Z22
Z22
Z44 Z45 Z45
SINK & STORAGE
Z53
WC
Z45
AREA Z42
SINK & Z43
Z41
Z44
Z45
Z45
STORAGE
Z54
AREA
Z41
Z40 Z40
Z40
Z44
Z43
Z45
CT-08 CT-03
CT-04
CT-02
CT-06 CT-05
GROUND FLOOR
MTS
3
MTS
18
MTS
15
Recessed floor luminaire with steel body and clear glass, for PAR38 LED lamp, 16W, 100–127V, IP55. Tecnolite brand, Model H-790/CF, BACO I model.
MTS
5
ILU-F13
Post-top luminaire for pole-mounted installation, made of injected aluminum with a micro-pulverized baked graphite paint finish. Acrylic diffuser, integrated LED technology, 80W, 4000K, 8100 lm, 120° beam angle, 50,000-hour lifespan, 85 CRI, 127–277 VAC.
MTS
5
8
Piece
21
Piece
CT-01
CT-07
11
ILU-06-02
Linear luminaire with integrated LED lamp, 180 cm in length, made of aluminum with a white finish and opaline diffuser. Power: 15W, 3000K, CRI 80, 60,000-hour lifespan, 100–140V. IP50, integrated solid-state driver. MAGG brand, Model L6438-1E0.
Piece
11
CT-08
CT-11
meters
SCALE 1:100
Piece
Linear luminaire with integrated LED lamp, 90 cm in length, made of aluminum with a white finish and opaline diffuser. Power: 6W, 3000K, CRI 80, 60,000-hour lifespan, 100–140V. IP50, integrated solid-state driver. MAGG brand, Model L6427-1E0.
FFL +0.00
CT-07 CT-09
61
Linear recessed floor luminaire. Recessed linear floor lamp, Construlita brand, Model OU/6031/GB/CA. Monochromatic LED recessed floor bar, 3000K, 127V, 60 Hz. Dimensions: 112 cm, 44W. Includes driver and LED, as well as accessories for floor installation. Review fixing/anchoring details.
12
ILU-06-01
ILU-04-02 Z45
Z45
Z40
Z44 Z41
Z38
Z22
Z20
Z33
Z40
DRIVER
Z38
Z35
Z45
Z45
Z54
Z51
Z22
Z20
Z45
Z44
Z41
Z54
Surface-mounted linear luminaire. Consists of an LED strip and aluminum profile with a natural finish and opaline acrylic diffuser. The LED strip is 10W/linear meter, 1058 lm luminous flux, 3000K, 90 CRI, 120° beam angle. Includes dimmable operating driver, 120–277V. IP65.
Z45
Z45 Z44
Z38
MTS
Z45
Z44
Z40
Z44
Z39
Z51
Z20
Z20A UEPM-02 H= 0.57 M
Z26,Z27
Z40 Z40
Z40
Z41 Z38
Z35
Z35
Z26,Z27
SITE
Z40
Z40
Z38
Z39
WOMEN
Z21
Z21
Z36
LOCKERS
MUSEOGRAPHY STORAGE ROOM Z21
Z19
Z40
Z45
Z44
Z38
Z35
Z34
Z35
Z19A
Z33 Z33
Z29
Z40 Z44
Z41 Z32
3
ILU-F8
ILU-F1
Recessed conical ceiling luminaire with baffle, featuring a 30° visual cutoff angle. Made of machined aluminum with a low-profile finish of less than 1 mm. For MR16 LED lamp, 7W, 480 lm luminous flux, 3000K, 90 CRI, 12V.
ILU-02-02
Z29 TO Z33 Z35 TO Z39 Z40 TO Z41 Z44 TO Z45
Z41
Z19A
UEPM-01 H= 0.57 M
Z29 DRIVER
Z38
Z32
Z32 Z29
Z32
Z31
Z30
Z29 Z29
Z35
Z34
Z32
LOCKERS MEN
Z28
CL- 6
Z34
Z19A
Z53
Z29
Z24,Z25
V&D BOX
FFL +0.00
Z18'
Z18
Z29
LOCKERSZ29 LADIES
Z28
D
Z18'' 18'
Z18'
Z18
Z28
SECURITY ROOM Z24,Z25
Z18'
CL-06
2.50
Z53
CL-02
Z37
Z28
FFL +0.00
Z24,Z25
17
Piece
Driver Piece
Z40
Z40
Z8
D
ELEC. BOX
FIRE/WATER BOX
Piece
Surface-mounted linear luminaire with direct lighting, 224 cm in length. DENEB brand. Made of aluminum with an electrostatic matte black paint finish. Includes direct LED lighting with 4x9W dimmable power, aluminum reflector, and 80% diffused acrylic diffuser. Stamped aluminum end caps, 1/8” thick. LED lamp: 1x9W Osram PrevaLED Line type, CRI >80, 3000 K color temperature, 4200 lm, 120° beam angle. Programmable dimmable Osram driver, operating voltage 120/277 volts.
Z40
Z40
Z40
MAINTENANCE WORKSHOP
Z2A
SAN. BOX
Z7A
ILU-01-18
Z1
D Z1,Z2,Z2A
TRANSITION STORAGE ROOM Access
SAN. BOX
Z8
Z2
Z3
Z4
Z3,Z4,Z5 D Z6,Z7,Z7A
Z6,Z7,Z7A
UE-C-01 H=0.60 M
ERTY PROP
FFL +0.00
Z4
D
CONSERVATION ND RESTORATION LABORTORY
V&D BOX
LINE
Z1
FFL +0.00
STORM BOX
WATER BOX
FFL +0.00
Z4
CISTERN COVER
CL-01 CL-10
6.49
CL-01 CL-10
Z6
FFL +0.00
CL-04
14.00
Z7
11
Adjustable accent luminaire to be integrated into a linear luminaire, made of injected aluminum. Micro-pulverized baked paint finish, for PAR30 LED lamp. For interior use, IP20 protection rating. DENEB brand, Code: db/EF/P3/GS/224. PAR30 lamp, 12W power, 880 lm, 3000K, 90 CRI, 25° beam angle, 127V. Philips brand, Code: 929001286004.
ILU-18-01
Z1 Z56
Z7
FFL +0.00
FFL +0.00
1
MTS
Adjustable surface-mounted luminaire for slab/ceiling installation, made of injected aluminum. Micro-pulverized baked paint finish, for PAR30 LED lamp. For interior use, IP20 protection rating. DENEB brand, Code: db/EF/P3/C10. PAR30 lamp, 12W power, 880 lm, 3000K, 90 CRI, 25° beam angle, 127V. Philips brand, Code: 929001286004.
ILU-16-02
Z48
Z49
GARDEN
ILU-16-01
Surface-mounted linear direct-light fixture. Brand: Deneb, GEMINIS line, model/key: DB.GS.D.336.6X9W.N, with dimensions of 3.36 m length × 0.0762 m height × 0.05 m width. Manufactured with an aluminum extrusion body, finished in baked matte black electrostatic powder coating. Assembled with metric Allen security screws. Includes a direct-light LED lamp with a power of 6 × 9 W, dimmable. Aluminum reflector. Acrylic diffuser. Suspended with 1/16” steel cable for a height of 1 m. Electrical components: 1 × 9 W Osram LED lamp, PrevaLED Line type, CRI >80, color temperature 4000 K. Programmable dimmable Osram driver, operating voltage 120/277 volts.
SAN. BOX
Z49
W Z50 LINE
Piece
Surface-mounted luminaire for slab/ceiling installation, made of injected aluminum. Micro-pulverized baked paint finish, for PAR30 LED lamp. For interior use, IP20 protection rating. DENEB brand, Code: db/EF/P3/C3. PAR30 lamp, 12W power, 880 lm, 3000K, 90 CRI, 25° beam angle, 127V. Philips brand, Code: 929001286004.
O SL
4.03
4.41
ILU-01-06-A
Z49
W
FFL +0.00
FFL +0.00
VOICE & DATA
FFL +0.00
GARDEN
DESCRIPTION COST
Z49
Units Amount
Light strip with 3 lighting levels (585 lm/m, 1140 lm/m, and 2050 lm/m). THREE FLUX. 5 m long LED strip, 10W/linear meter, 2050 lm luminous flux, 3000K, 90 CRI, 120° beam angle. Low energy consumption and long lifespan, 24V. LUXLED brand, Model: TL2835633020TL. Housed in a flangeless aluminum profile, natural finish, for surface mounting or recessed installation, 3 m long, designed to receive LED strip. Includes lens/diffuser, set of 2 side end caps, set of 2 clips, and flat bar. IP65 protection rating. ILUMILEDS brand, Code: ILUDXA1812KIT. Dimmable power supply in TRIAC mode. Features protection against short circuit, overload, and overvoltage. Long lifespan and high reliability. IP65, suitable for exterior or interior use, 24V, for a maximum power of 100W. LUXLED brand, Code: FA100TL24DE.
ILU-10-03
E 1%
SLOP ACCESS BOX
SLOPE 1% PROPERTY
FFL +0.00
Description Linear luminaire with integrated LED lamp, 120 cm in length, made of aluminum with a white finish and opaline diffuser. Power: 8W, 3000K, CRI 80, 60,000-hour lifespan, 100–140V. IP50, integrated solid-state driver. MAGG brand, Model L6436-1E0.
Symbol
ILU-07-02
Direct-indirect linear light fixture, 224 cm in length. DENEB brand. Made of aluminum, finished with electrostatic matte black paint. Includes a direct-light LED lamp with 4 × 7 W dimmable power, and an indirect-light LED lamp with 3 × 7 W dimmable power. Aluminum reflector. 80% diffused acrylic diffuser. Die-cut aluminum end caps, 1/8” thick. LED lamp: 1 × 7 W Osram PrevaLED Line type, CRI >80, color temperature 3000 K, 4200 lm, 120° beam angle. Programmable dimmable Osram driver, operating voltage 120/277 volts.
ILU-01-02
CT-11
CT-08
For the electrical installations, we worked with the electricians to achieve the project’s vision. This involved many iterations of selecting lighting fixtures that would harmoniously fit the space. We communicated our vision for what we wanted to illuminate, and they returned with proposals, which we then refined together to ensure harmony within the space. Finally, we coordinated with the contractor, communicating the final iteration and project details so they could execute the vision. CONTACTS INSTALATIONS
HIDAULIC INSTALATIONS SINK
38.59
6.26
9.38
SHWR. 4.02
4.24
4.00
4.02
3.95
4.04
3.97
4.01
3.95
0.18°
1.45
0.55
0.70
7°
2.70
13Ø C.W. 1.5 F.U.
0.65
CT-07
CT-03
CT-02
CT-04
CT-06
CT-01
CT-05
13Ø 13Ø
W.C.
13Ø C.W. 1.5 F.U. 13Ø H.W. 1.5 F.U.
LAV.
13Ø C.W. 1 F.U. 13Ø C.W. 1 F.U. 13Ø C.W. 1 F.U.
13Ø C.W. 1 F.U. PROPERTY
0.77
LINE
SLOP
4.97
E 1%
BOX
V&D
SLOPE 1%
1.94
F.F.L. 0.00
13Ø C.W. 1.5 F.U. 13Ø H.W. 4.5 F.U.
F.F.L. 0.00
F.F.L. -0.17 F.F.L. -0.27
13Ø C.W. 1.5 F.U.
13Ø C.W. 1.5 F.U.
13Ø H.W. 1.5 F.U.
13Ø H.W. 1.5 F.U.
13Ø C.W. 1.5 F.U.
O
13Ø H.W. 5.5 F.U.
CL-03
PE
CL-03
1%
F.F.L. -0.20
4.41
F.F.L. -0.23
13Ø C.W. 1.5 F.U.
SHWR.
13Ø H.W. 1.5 F.U.
19Ø C.W. 2 F.U.
SL
4.03
13Ø C.W. 1.5 F.U. 13Ø H.W. 1.5 F.U.
13Ø H.W. 1 F.U. 19Ø C.W. 2 F.U.
F.F.L. -0.17
SANITARY BOX
13Ø H.W. 1 F.U. SHWR. 13Ø C.W. 1 F.U. 13Ø C.W. 1.5 F.U.
BOX LOW VOLTAGE
A.R.V. 19Ø
13Ø H.W. 1.5 F.U. ACCESS BOX
2.98 PRO
PERT
Y LINE
PE
1%
O
SL
F.F.L. -0.23
PE
Leviton Decora Plus duplex receptacle/outlet, industrial specification grade for heavy-duty applications, smooth gray face, S.M.A.O., with Leviton Decora wall plate, gray, S.M.A.O. Amperage and voltage per electrical drawings.
1%
O
SL
LAV.
32Ø C.W. 7 F.U. A.R.V. 19Ø
19Ø H.W. 4 F.U. 13Ø C.W. 1 F.U. SHWR.
19Ø C.W. 2 F.U. W.C.
13Ø C.W. 1 F.U.
13Ø C.W. 1 F.U. 13Ø H.W. 1 F.U.
13Ø H.W. 1 F.U.
W.C.
1.42
19Ø C.W. 2 F.U.
32Ø C.W. 16 F.U.
13Ø H.W. 1 F.U.
2-T-16mm
2-T-16mm
2-T-21mm
2-T-21mm
2-T-27mm
LAV.
F.F.L. -0.17
1-T-21mm 2-T-27mm
Receptacle protrudes. Solution to be determined S.M.A.O
CISTERN ACCESS
2-T-21mm STORM DRAIN BOX
E
CSOL01 F CSOL02 M
METAL SHUTTER 2-T-27mm
2-T-27mm
2-T-27mm
2-T-27mm
MUSEOGRAPHY STORGE ROOM
SANITARY BOX
0.26
MAINTENANCE WORKSHOP
SANITARY BOX
64Ø C.W.
VESTIBULE
SANITARY BOX
F.F.L. -0.17
T 2
19Ø DOWN TO G.F.
CL-04
TRNSTITION STORAGE ROOM
1-T-16mm
E
SEE CONTINUATION DRAWING IH-04
38Ø C.W.
64Ø FROM CISTERN POTABLE WATER
STORM DRAIN BOX
RESTORATION LAB
V/D BOX
CL-04
ELEC. BOX
PIPING IN FLOOR
64Ø C.W.
4-T-27mm
2-T-27mm
2.95
38Ø C.W.
38Ø C.W.
CL-01
CL-01 1.16
38Ø CW DOWN TO GROUND FLOOR
38Ø C.W.
38Ø P.W.
64Ø C.W.
W.C.
STORM DRAIN BOX
F.F.L. -0.17
38Ø C.W.
SANITARY BOX
2.62
WATER BOX
13Ø C.W.
0.02 F.F.L. -0.17
32Ø P.W. 25Ø H.W.
50Ø SHUTOFF VALVE
50Ø C.W.
CISTERN COVER
F.F.L. -0.17
F.F.L. -0.27
F.F.L. -0.17
25Ø P.W. 25Ø H.W. 64Ø C.W.
LAV.
14.00
C-SOL-01
A.R.V. 19Ø
25Ø H.W. 7.5 F.U.
13Ø C.W. 1 F.U.
AV ROOM
F.F.L. -0.17
2.72
C-SOL-02
13Ø H.W. 1 F.U.
HSS COLUMN
64Ø P.W.
64Ø C.W.
64Ø FROM MECHANICAL ROOM
1-T-16mm ELEC. BOX
FIRE/WATER BOX
F.F.L. -0.17
2.69
RESTORATION LB STORAGE ROOM
F.F.L. -0.17
UP TO ROOF DF-19,21 & 23
F.F.L. -0.17
64Ø C.W.
2-T-27mm 2-T-27mm
0.26
SECURITY ROOM
64Ø FEED TO OFFICES
CL-02
UEPM-01 H= 0.57 M
rack rack
2.40
2.45 V/D BOX
F.F.L. -0.17
DET 01 - RECEPTACLE CONFLICT DETAIL
MUSEOGRAPHY STORAGE ROOM 1-T-16mm
F.F.L. -0.17
LOCKERS
LOCKERS
scale 1:5 LOCKERS
F.F.L. -0.02
LOCKERS
WC MEN
UEPM-02 H= 0.57 M
COL
CL-02
ETNOGRAPHY STORAGE ROOM
1-T-16mm 7.56
HOT
meters
URR
WC LADIES
CHE
13Ø C.W.
SITE HOSE line BIBB
F.F.L.
-0.14
slope CT-03
CT-04
CT-02
CT-06
CT-05
CT-01
PROPOSED GROUND FLOOR SCALE 1:50
UNIO 19Ø C.W. 13Ø H.W.
VOICE & DATA
slope 1% property
TRASH 25Ø C.W. 5.5 F.U.
GARDEN
line
13Ø H.W. 1.5 F.U.
13Ø H.W.
TRANSFORMER
19Ø H.W. 3.5 F.U.
SECURITY
PEA
SHUTOFF VALVES BELOW SINK
13Ø H.W.
13Ø C.W.
19Ø H.W. 2.5 F.U.
METERS
25Ø P.W. 4.5 F.U.
13Ø C.W. BELOW SINK
25Ø P.W. 4.5 F.U.
Leviton Decora Plus duplex receptacle/outlet, industrial specification grade for heavy-duty applications, smooth gray face, S.M.A.O., with Leviton Decora wall plate, gray, S.M.A.O. Amperage and voltage per electrical drawings.
IN FLOOR
slo pe
EXISTING PIPE ASSUMED ROUTE
19Ø
1%
A.E.V.
SHUTOFF VALVES
19Ø H.W. 2.5 F.U.
P.W. CONNECTION
19Ø
13Ø
EXISTING
13Ø
Access
M
BOX LOW VOLTAGE
BOX
25Ø H.W. FROM ROOF
19Ø 25Ø CW 7.5FU
erty
line
slo pe
prop
1%
1%
IN FLOOR
MUSEOGRAPHY WORKSHOP Access
TABLE 1 TUBOPLUS EQUIVALENCIES
19Ø 25Ø CW 7.5FU AUDIOVISUAL
SUPPLY TO POTABLE WATER CISTERN
ROOM
19Ø
POLYPROPYLENE
EQUIVALENT (")
COPPER
20 mm
1/2 INCH
13 mm
25 mm
3/4 INCH
19 mm
32 mm
1 INCH
25 mm
40 mm
1 1/4 INCH
32 mm
50 mm
1 1/2 INCH
38 mm
63 mm
2 INCHES
50 mm
75 mm
2 1/2 INCHES
90 mm
3 INCHES
CISTERN COVER
GARDEN
SANITARY BOX
STORM BOX
PLBG BOX
Access
STORM BOX
CISTERN ACCESS
CONSERVATION & RESTORATION LAB
V&D BOX
line
FROM POTABLE WATER CISTERN
prop
SANITARY BOX
FROM HYDROPNEUMATIC
CONNECTS TO OFFICE BUILDING, SEE DRAWING IH03
64Ø C.W.
64Ø CW 69FU
slope 1%
64Ø CW 85FU
64Ø CW 79FU
64Ø CW 62.5FU
64Ø CW 55FU
50Ø CW 15.5FU
38Ø CW 9FU 25Ø CW 6FU
64Ø CW 78FU
LAB STORAGE CONS. & RESTORATION
UP TO ROOF
LOCKERS Women
meters
rack rack V&D BOX
WC
ETHNOGRAPHY STORAGE
LOCKERS Women
MUSEOGRAPHY STORAGE
WC
13Ø CW 1.5 FU
T
38Ø CW 4.5FU
Shower
Urinal
13Ø CW 1FU 19Ø CW 2FU 13Ø CW 1FU 13Ø CW 1FU
25Ø CW 5FU
WC MEN
32ØCW 3FU
32Ø CW 5.5FU
WOMEN
Shower
38Ø CW 9FU
13Ø CW 3FU
MATERIAL TUBOPLUS
38Ø CW
32Ø CW 3FU
13Ø CW 1FU 38Ø CW 6FU
SINK &
32Ø CW 3FU
13Ø CW 1FU
75 mm
BLACK STEEL
38Ø SEE CONTINUATION
13Ø H.W. FROM ROOF
COLOR
GALVANIZED STEEL IN FLOOR
38Ø
13Ø CW 1FU
13Ø CW 1.5FU
63 mm
TABLE 2
50Ø CW 15FU
38Ø CW 7FU
13Ø CW 1FUAREA WC
32Ø CW 3FU 32Ø CW 3FU
32Ø CW 3FU
13Ø CW 1FU
STORAGE
WC
13Ø H.W. FROM ROOF
50Ø CW 17FU
13Ø CW 3FU
13Ø CW 1FU 19Ø CW 2FU
19Ø CW 2FU
32Ø CW 4.5FU
13Ø CW 1.5FU
13Ø CW 13Ø H.W. FROM 1.5FU ROOF
32Ø CW 3FU
13Ø CW 1FU
19Ø CW 4FU 19Ø CW 3FU
Shower
Urinal
H.W. FROM ROOF 13Ø
LOCKERS men
38Ø CW 6.5FU
32Ø CW 4.5FU
Shower
13Ø CW 1.5FU
38Ø CW 3FU
19Ø C.W. UP TO ROOF
38Ø CW 5.5FU
32Ø CW 4.5FU
32Ø CW 3 FU
SITE
38Ø CW 18FU
38Ø CW 9FU 50Ø CW 15FU 50Ø CW 22FU
T
LOC Men
32Ø CW 5.5FU
slope 1%
25Ø CW 7.5FU
50Ø CW 14FU
MONITORING ROOM
Access
LOBBY
SANITARY BOX
P,O= 2.3 kg/cm2
19Ø CW 2FU
64Ø CW 83FU
FP/PLBG BOX
RAISED-FLOOR RECEPTACLE FRONT ELEVATION
SANITARY BOX
64Ø C.W.
P,O= 2.3 kg/cm2
ELEC. BOX
MAINTENANCE WORKSHOP
MUSEOGRAPHY / WOOD STORAGE
UP TO ROOF
EQUIPMENT IN MECH. ROOM
Access
slope 1%
TRANSITION STORAGE
Access
A
ELEC. BOX
erty
STORM BOX
ON DRAWING IH04
A'
0.26
scale 1:5
PVC
38Ø
CAST IRON COPPER
GROUND FLOOR OPTION 1 scale 1:100
meters
EQUIPMENT ERA BRAND SOLAR WATER HEATER
Leviton Decora Plus duplex receptacle/outlet, industrial specification grade for heavy-duty applications, smooth gray face, S.M.A.O., with Leviton Decora wall plate, gray, S.M.A.O. Amperage and voltage per electrical drawings.
CSOL01 FOR HIGH PRESSURE CSOL02 MODEL CHP20240 WITH 20 TUBES, 1.8 M LONG, AND 250 L STORAGE TANK
37.07 4.02
4.24
4.00
7.66
3.95
4.02
4.04
3.97
4.01
0.37
3.94
1.59
1.49
9.50
0.55 0.68
2.68
7°
2.68
0.67
HYDRAULIC SYMBOLS COLD WATER PIPING HOT WATER PIPING R.W.D.P.
4.97
0.77
URREA BRAND BALL VALVE
T.O.S. + 2.65 1%
CHECK VALVE
PE
SLO
URREA F19CR HOSE BIBB
1.94 SLOPE 1%
0.26
S.L. +3.55
4.03
INDICATES FLOW DIRECTION PEARTYPE HANGER A.E.V.
PE
RAISED-FLOOR RECEPTACLE SIDE ELEVATION
UNION NUT
S.L. +3.55
CL-03
4.41
H.W. 25Ø FROM ROOF
scale 1:5
SPIR
SANITARY BOX
Access
pe slo
The Project manager and I worked closely with the client to determine their needs in the warehouse and allocated outlets accordingly. We also ensured the outlets’ design and placement were aesthetically integrated with the architecture.
IND
13Ø C.W. 1.5 F.U.
19Ø C.W.
METERS
URR
1%
13Ø C.W.
BOX
CT-07 GROUND FLOOR
SCALE 1:100
13Ø C.W.
property
SLO
4.40
R.W.D.P.
%
1.5
NOTES
S.L. +3.58
SLOPE
T.O.S. + 3.20
1% 1%
SLOPE
T.O.S. + 4.31
TABLE 1 TUBOPLUS EQUIVALENCIES
meters
R.W.D.P.
R.W.D.P.
%
E 2.0
R.W.D.P.
T.O.S. + 4.31
OP
E 2.0
%
R.W.D.P.
%
SL
OP
E 2.0
%
R.W.D.P.
SL
R.W.D.P.
R.W.D.P.
S.L. +3.58
25Ø SLOPE 1%
SLOPE 1%
C.W. FROM
T.O.S. + 2.30
19Ø T.O.S. + 3.50
SLOPE 1%
SLOPE 1%
meters
S.L. +3.55
SLOPE 1%
PE 1%
SLOPE 1%
G.F. 25Ø
T.O.S. + 3.50
UEPM-02 H= 0.57 M
H.W. DOWN
19 mm
1 INCH
25 mm
1 1/4 INCH
32 mm
50 mm
1 1/2 INCH
38 mm
63 mm
2 INCHES
75 mm
2 1/2 INCHES
90 mm
3 INCHES
MATERIAL TUBOPLUS
A.R.V.
SLOPE 1%
A.R.V.
19Ø
T.O.S. + 2.30
13Ø
3/4 INCH
40 mm
T.O.S. + 2.30 19Ø
T.O.S. + 3.50
SLOPE 1%
CAST IRON COPPER
T.O.S. + 3.50
63 mm 75 mm COLOR
1. DIAMETERS ARE INDICATED IN MILLIMETERS. 2. PIPING AND FITTINGS FOR THE COLD AND HOT WATER PLUMBING SYSTEM SHALL BE POLYPROPYLENE (TUBOPLUS), JOINED BY HEAT FUSION, OR SIMILAR. 3. DIAMETERS SHOWN ON THE DRAWING CORRESPOND TO THE NOMINAL SIZES OF COPPER PIPE (SEE TABLE 1 ON THIS DRAWING FOR THE EQUIVALENT POLYPROPYLENE PIPE SIZES). 4. WATERSYSTEM PIPING SHALL BE HYDROSTATICALLY TESTED AT 6 kg/cm² USING A HYDROSTATIC TEST PUMP UNTIL THE REQUIRED PRESSURE IS REACHED; THE PRESSURE SHOWN ON THE PRESSURE GAUGE SHALL REMAIN UNCHANGED FOR 2 HOURS. 5. HOTWATER PIPING SHALL HAVE 1/2"THICK NOMALOCK BRAND FOAMEDPOLYMER INSULATION. 6. WATER SUPPLY TO LAVATORIES SHALL HAVE AN URREA MODEL 401SC COMPACT ANGLE VALVE WITH COFLEX. 7. EXPOSED PIPING SHALL BE PAINTED FOR IDENTIFICATION IN ACCORDANCE WITH NOM026STPS2008; POTABLEWATER PIPING SHALL USE COMEX SKYBLUE ALKYD PAINT. 8. REQUIRED PENETRATIONS ALONG INSTALLATION ROUTES THROUGH STRUCTURAL ELEMENTS SHALL BE PROVIDED BY CIVIL WORKS. 9. SEE DETAILS ON DRAWINGS IHS00
13Ø 13Ø
S.L. +3.55
BLACK STEEL PVC
T.O.S. + 2.95
50 mm
TABLE 2
R.W.D.P.
R.W.D.P.
19Ø
SLOPE 1%
T.O.S. 9Ø + 2.95
H.W. DOWN
scale 1:100
R.W.D.P.
19Ø
SLOPE 1%
T.O.S. + 2.95
13Ø
ROOF PLAN
1% 1%
13 mm
25 mm
GALVANIZED STEEL
UEPM-01 H= 0.57 M
SLOPE 1%
T.O.S. + 2.95
SLOPE
%
19Ø T.O.S. + 2.95
C.W. FROM
G.F. 19Ø
T.O.S. + 2.95
E 2.0
T.O.S. + 4.31
COPPER
1/2 INCH
32 mm
2.0
SLO
T.O.S. + 2.95
T.O.S. + 3.50 2.39
PE
SLOPE 1%
T.O.S. + 3.50 19Ø SLOPE 1%
2.39
SLO
T.O.S. + 2.55
SLOPE
19Ø
S.L. +3.55
7.56
S.L. +3.58
%
R.W.D.P.
SLOPE 1%
T.O.S. + 2.30
2.51
25Ø
R.W.D.P.
OP
%
1% 1%
R.W.D.P.
PE 2.0%
SL
E 2.0
SLOPE
SLO
T.O.S. + 4.31
OP
SCUPPER (TO T.O.S. +4.31)
T.O.S. + 3.20
SLOPE
R.W.D.P.
2.0
SLO
SCUPPER (TO T.O.S. +4.31)
SLOPE 2.0%
SL
SCUPPER (TO T.O.S. +4.31)
SLOPE 2.0%
2.95
PE
SLOPE 2.0%
SLOPE 2.0%
SLOPE 2.0%
R.W.D.P.
S.L. +3.58
%
OP
EQUIVALENT (")
20 mm
T.O.S. + 3.20
E 2.0
SL
SCUPPER (TO T.O.S. +4.31)
1% 1%
S.L. +3.58
OP
T.O.S. + 5.14
6.49
POLYPROPYLENE
SLOPE SLOPE
SL
14.00
SPIRAX SARCO AIR ELIMINATOR VALVE
H.W. 13Ø FROM ROOF
13Ø S.L. +3.55
T.O.S. + 2.30
meters
The Project manager and I worked closely with the client to determine faucet placement, and with the engineers to determine the best location for water heaters and routing for the water pipes.
1. DIAMETERS A 2. PIPING AND F PLUMBING SY JOINED BY HE SIMILAR. 3. DIAMETERS THE NOMINAL ON THIS DRAW PIPE SIZES). 4. WATERSYST AT 6 kg/cm² US THE REQUIRE ON THE PRES 2 HOURS. 5. HOTWATER NOMALOCK B INSULATION. 6. WATER SUPP MODEL 401SC COFLEX. 7. EXPOSED PIP IDENTIFICATIO POTABLEWA ALKYD PAINT. 8. REQUIRED P THROUGH ST BY CIVIL WOR 9. SEE DETAILS
HIGH-PRESSURE FLOAT VALVE
TBL-01
CONTROL PANEL FOR TWO 3.0 H.P. PUMPS, 220/3/60, FOR A HYDROPNEUMATIC SYSTEM, WITH ALTERNATING AND SIMULTANEOUS PUMP OPERATION.
TBL-07
CONTROL PANEL FOR TRANSFER OF TWO 1.5 H.P. PUMPS, 220/1/60, PRESSURE-OPERATED.
-0.17 SIL
1.00
1.70
-0.67 FROM MUNICIPAL
FILTER WASTE
WATER CONNECTION 19Ø
19Ø
PER FLOOR
19Ø
150Ø
200Ø
F-01
-1.02
19Ø
R.W.D.P. Ø100
200Ø
1.07
R.W.D.P. Ø150
0.90
-0.98
-1.00 150Ø
-1.17
14.00
-1.30
6.49
Ø150 TO
A
50Ø
150Ø
-1.02
50Ø C
-1.30
2.95
32Ø
SYSTEM
CHANNEL OR DISCHARGES ONTO
NATURAL GROUND FOR
50Ø
32Ø
B
INFILTRATION
32Ø
50Ø
T-02
TBL-09
H(usable)= 1.55m
CISTERN T.O.S.
50Ø
MECHANICAL
TO 50Ø
-1.17
ROOM
0.73
STORM DRAIN
S.R. 50Ø
RAINWATER CISTERN
-0.17 0.40 CT-2 - 0.57
1.55
H(usable)= 1.55 m
BAP-04 100Ø A=60.36
SEE CONTINUATION ON DRAWING IH03, CONNECTS TO
ACCESS LADDER
PUMP DISCHARGE B01, B02
B-09 B-08
64Ø
GRATING
ANA-MA-A5-04-01
50Ø FROM MAINTENANCE RAINWATER
0.25
-2.97
DRAWING
B-11
CISTERN FOR POTABLE WATER TREATMENT
A.C.
3P CALM INLET, 150 mm DIAMETER.
S.F.
3P OVERFLOW SIPHON, 150 mm DIAMETER.
- 0.57
IN OFFICES
SR 2.80
- 1.42
TBL-08
PRESSURE SWITCH
P
TBL-07
50Ø
50Ø
T-01
50Ø
INDICATES FLOOR ANCHOR SUPPORT, CONSTRUCTED WITH 3"X3"X3/16" STEEL PLATE, 1"X3/16" TUBE AND HALF-PIPE OF THE NEXT LARGER DIAMETER THAN THE SUPPORTED PIPE; VARIABLE HEIGHT.
150Ø
1.55
1.55
50Ø
50Ø
B-03 B-08
0.65
B-10
B-09 64Ø
0.25
AC
-2.97
PUMPING SUMP
50Ø TRANSFER TO POTABLE WATER
0.65 x 0.65 x 0.65 m
CISTERN
0.65
19Ø AUXILIARY RAINWATER CISTERN FILL.
SEE CONTINUATION
-2.97
AC
BASEMENT
PRESSURE GAUGE
IP
SF-01 FLOATING SUCTION. WELLMATE HYDROPNEUMATIC TANK, MODEL WM35WB, T-01,T-02 0.61 m DIA. x 1.89 m HIGH, 450-LITER CAPACITY.
IRVINGTYPE
SEE CONNECTION ON DRAWING IH03
50Ø
9.- SEE DETAILS ON DRAWING IHS-00.
150Ø
TO CLEANOUT
FIRST-FLUSH RAIN SENSOR, INSTALLED ON THE ROOF TO CONTROL THE OPENING OF THE ACTUATED VALVE; PROVIDE 3/4" ELECTRICAL CONDUIT TO THE ROOF.
S.I.L.
V=15 m³ A=9.70 m² H(total)=2.50 m
10
- 1.32
FOOT VALVE WITH STRAINER TO CLEANOUT
2.50
150Ø
1.- DIAMETERS SHOWN IN MILLIMETERS. 5.- VISIBLE PIPING SHALL BE PAINTED FOR IDENTIFICATION IN ACCORDANCE WITH 2.- PIPING FOR THE INTERNAL COMBUSTION ENGINE NOM-026-STPS-2008. POTABLE-WATER PIPING ASSEMBLY SHALL BE 18-GAUGE STEEL. SHALL BE PAINTED SKY BLUE WITH COMEX 3.- PIPING AND FITTINGS ALKYD PAINT. USED IN THE COLD-WATER HYDRAULIC INSTALLATION AND FOR FILLING THE 6.- CIVIL WORK SHALLSHALL INCLUDE THE OPENINGS DOMESTIC WATER SERVICE BE TUBOPLUS, REQUIRED ALONG WITH HEAT-FUSION JOINTS.INSTALLATION ROUTES THROUGH STRUCTURAL ELEMENTS. 4.- PIPING IN THE PUMP SUMP SHALL BE 8.- DRAWING VALID FOR INSTALLATIONSJOINTS. ONLY. SCHEDULE 40 PVC WITH SOLVENT-CEMENTED
PIPING FOR COLD-WATER COLD-WATER RISER UP S.C.A.F. CONVEYANCE
150Ø
FROM FILTER
BUTTERFLY VALVE
2.80
SF
50Ø
2.51
KIT WITH ELECTRIC ACTUATOR (80-240 VAC/DC) FOR JJ BRAND VALVE AND NEM MODEL CH-SR, FOR A 150 mm IND-GF PVC BUTTERFLY VALVE (INOX-EPDM).
V.M.
TBL-07
50Ø
4.- THE HYDRAULIC PIPING NETWORK SHALL BE HYDROSTATICALLY TESTED AT 6 KG/CM2 USING A HYDROSTATIC TEST PUMP UNTIL THE REQUIRED PRESSURE IS REACHED; THE PRESSURE SHOWN
ON THE GAUGE SHALL REMAIN UNCHANGED NOTES FOR 2 HOURS.
UNICANAL SUPPORT HYDRAULIC SYMBOLS
B.C.A.F. RISER DOWN PUMPEDCOLD-WATER PIPING B-08, B-09 HORIZONTAL CENTRIFUGAL PUMP, BARNES MODEL NB 200, COUPLED TO A 1.5PANEL H.P. ELECTRIC MOTOR, CONTROL FOR MANUAL PUMP-SUMP DRAINING, TBL-10 INDICATES FLOW DIRECTION URREA F-555 BALL VALVE TO DELIVER AT APUMP, TOTAL115/1/60, HEAD OF FOR 100 ONEl.p.m. 0.5 H.P. TBL-11 32 m MANUALLY OPERATED. FLOOR-MOUNTED NON-SLAM CHECK VALVE PIPE SUPPORT B-10, B-11 BARNES SUBMERSIBLE EFFLUENT PUMP, MODEL EH-512 L, 0.5 H.P.,EVO 115/1/60. DN 200 RAINWATER FILTER, 200 mm INLET F-01 FLEXIBLEFLOAT HOSE WITH AND 150 mm OUTLET. HIGH-PRESSURE VALVEFLANGED ENDS CONTROL PANEL FOR TWO 3.0 H.P. PUMPS, 220/3/60, 0.50 m LONG EQUIPMENT TBL-01 FOR A HYDROPNEUMATIC NOTES SYSTEM, WITH ALTERNATING SYMBOLS EQUIPMENT KITHYDRAULIC WITH ELECTRIC ACTUATOR (80-240 VAC/DC) FOR JJ NOTES HYDRAULIC SYMBOLS UNION 9.- SEE DETAILS ONNETWORK DRAWING SHALL IHS-00.BE 4.- THE HYDRAULIC PIPING AND SIMULTANEOUS PUMP OPERATION. SUBMERSIBLE PUMP, BARNES MODEL SS6011-5.0 BUTTERFLY VALVE BRAND VALVE AND NEM MODEL CH-SR, FOR A 150 mm 1.- DIAMETERS SHOWN IN MILLIMETERS. SUBMERSIBLE PUMP, BARNES MODEL SS6011-5.0 B-01,B-02 PIPING FOR COLD-WATER HYDROSTATICALLY TESTED AT 6 KG/CM2 USING A V.M.9-STAGE, WITH 5 H.P. ELECTRIC MOTOR, 220/3/60, 1.- DIAMETERS SHOWN IN MILLIMETERS. PIPING FOR COLD-WATER B-01,B-02 9-STAGE, WITH 5 H.P. ELECTRIC MOTOR, 220/3/60, IND-GF PVC BUTTERFLY VALVE (INOX-EPDM). CONTROL PANEL FOR TRANSFER OF TWO 1.5 H.P. PUMPS, CONVEYANCE HYDROSTATIC TEST PUMP UNTIL THE REQUIRED PEAR-TYPE PIPE HANGER TBL-07 TO DELIVER 302 l.p.m. AT 30 m T.D.H. CONVEYANCE 2.- PIPINGISFOR THE INTERNAL COMBUSTION ENGINE 220/1/60, PRESSURE-OPERATED. TO DELIVER 302 l.p.m. AT 30 m T.D.H. FOOT VALVE WITH STRAINER PRESSURE REACHED; THE PRESSURE SHOWN 2.- PIPING FOR THE INTERNAL COMBUSTION ENGINE SHALL BEREMAIN 18-GAUGE STEEL. ONASSEMBLY THE GAUGE SHALL UNCHANGED PUMPED PIPING ASSEMBLY SHALL BE 18-GAUGE STEEL. FIRST-FLUSH SENSOR, INSTALLED ON ROOF UNICANAL SUPPORT CONTROL PANEL FOR RAIN FIRST-FLUSH SEPARATION, SPLTHE BRAND HORIZONTAL CENTRIFUGAL PUMP, BARNES MODEL NB 200, PUMPED PIPING FOR 2 HOURS. B-08, B-09(FOR CONTROL PRESSURE GAUGE TO CONTROLH.P. THE OPENING OFAND THEACTUATED ACTUATED VALVE; IP RAIN SENSOR 3.- PIPING AND FITTINGS USED IN THE COLD-WATER B-08, B-09 HORIZONTAL CENTRIFUGAL PUMP, BARNES MODEL NB 200, ELECTRIC MOTOR, S.I.L.COUPLED TO AOF1.5THE 3.- PIPING AND FITTINGS USEDF-555 IN THE COLD-WATER PROVIDE 3/4" ELECTRICAL CONDUIT COUPLED TO A 1.5 H.P. ELECTRIC MOTOR, VALVE); INCLUDES HIMEL-TYPE URREA BALL VALVE TBL-08 BUTTERFLY HYDRAULIC INSTALLATION AND FORFOR FILLING THE TO DELIVER 100 l.p.m. AT ABALL TOTAL HEAD OFENCLOSURE, COLD-WATER RISER UP S.C.A.F. 5.VISIBLE PIPING SHALL BE PAINTED URREA F-555 VALVE HYDRAULIC INSTALLATION AND FOR FILLING THE ROOF. LED LIGHTS, BASES, RELAYS, TO DELIVER 100 l.p.m. AT A TOTAL HEAD OF SWITCHES, SELECTORS, PRESSURE SWITCH DOMESTIC WATER SERVICE SHALL BE TUBOPLUS, P 32 m TO THE IDENTIFICATION IN ACCORDANCE WITH DOMESTIC WATER SERVICE SHALL BE TUBOPLUS, 32 m CONTACTORS, LABELING AND WITH HEAT-FUSIONPOTABLE-WATER JOINTS. 3P SUBMERSIBLE CALM INLET, 150 mmIDENTIFICATION. DIAMETER. A.C. NON-SLAM CHECK VALVE BARNES EFFLUENT PUMP, MODEL EH-512 L, WITH HEAT-FUSION NOM-026-STPS-2008. PIPING B.C.A.F. COLD-WATER RISER DOWN B-10, B-11 JOINTS. NON-SLAM CHECK VALVE INDICATES FLOOR ANCHOR SUPPORT, SHALL BE PAINTED SKY BLUE WITH COMEX B-10, B-11 BARNES SUBMERSIBLE EFFLUENT PUMP, MODEL EH-512 L, 3P115/1/60. OVERFLOW SIPHON, 150 mm DIAMETER. S.F.0.5 H.P., 0.5 H.P., 115/1/60. 4.- PIPING IN THE PUMP SUMP SHALL BE CONSTRUCTED WITHVALVE 3"X3"X3/16" STEEL PLATE, ALKYD PAINT. CONTROL PANEL FOR MANUAL PUMP-SUMP DRAINING, HIGH-PRESSURE 4.- PIPING IN THE PUMP SUMP SHALL BEFLOAT TBL-10 SF-01 INDICATES FLOWTUBE DIRECTION SCHEDULE 40 PVC WITH SOLVENT-CEMENTED JOINTS. CONTROL FOR TWO 3.0FLOAT H.P. PUMPS, HIGH-PRESSURE VALVE 220/3/60, SUCTION. 1"X3/16" AND HALF-PIPE FOR ONEFLOATING 0.5PANEL H.P. PUMP, 115/1/60, SCHEDULE 40 PVC WITH SOLVENT-CEMENTED JOINTS. OF THE NEXT CONTROL PANEL FOR TWO 3.0 H.P. PUMPS, 220/3/60, TBL-11 TBL-01 FOR A HYDROPNEUMATIC SYSTEM, WITH ALTERNATING LARGER DIAMETER THAN THE SUPPORTED PIPE; 6.- CIVIL WORK SHALL INCLUDE THE OPENINGS MANUALLY OPERATED. WELLMATE HYDROPNEUMATIC TANK, MODEL WM35WB, TBL-01 FOR A HYDROPNEUMATIC SYSTEM, WITH ALTERNATING UNIONVARIABLE PIPE 4.- THE HYDRAULIC PIPING NETWORK SHALL BE AND SIMULTANEOUS PUMP OPERATION. FLOOR-MOUNTED SUPPORT HEIGHT. T-01,T-02 REQUIRED ALONG INSTALLATION ROUTES 0.61 m UNION DIA. x 1.89 m HIGH, 4.- THE HYDRAULIC PIPING NETWORK SHALL BE AND SIMULTANEOUS PUMP OPERATION. HYDROSTATICALLY TESTED AT 6 KG/CM2 USING A THROUGH STRUCTURAL ELEMENTS. AT 6 KG/CM2 USING A EVO DN 450-LITER 200 RAINWATER FILTER, 200OF mmTWO INLET CONTROL PANELCAPACITY. FOR TRANSFER 1.5 H.P. PUMPS, HYDROSTATICALLY TESTED HYDROSTATIC TEST PUMP UNTIL THE REQUIRED PEAR-TYPE PIPE HANGER TBL-07 CONTROL PANEL FOR TRANSFER OF TWO 1.5 H.P. PUMPS, F-01 HOSE WITH FLANGED ENDS HYDROSTATIC TESTFLEXIBLE PUMP UNTIL THE REQUIRED AND 150 mmPRESSURE-OPERATED. OUTLET. PEAR-TYPE PIPE HANGER 220/1/60, TBL-07 IS REACHED; THE PRESSURE SHOWN 8.-PRESSURE DRAWING VALID FOR INSTALLATIONS ONLY. 220/1/60, PRESSURE-OPERATED. 0.50 mTHE LONG PRESSURE IS REACHED; PRESSURE SHOWN ON THE GAUGE SHALL REMAIN UNCHANGED EQUIPMENT UNICANAL SUPPORT CONTROL PANEL FOR FIRST-FLUSH SEPARATION, SPL BRAND NOTES ON THE GAUGE SHALL REMAIN UNCHANGED HYDRAULIC SYMBOLS KIT WITH ELECTRIC ACTUATOR (80-240 VAC/DC) FOR JJ HOURS. ON DRAWING IHS-00. UNICANAL CONTROL PANEL FOR FIRST-FLUSH SEPARATION, SPL BRAND 9.-FOR SEE2DETAILS (FOR CONTROL OF THESUPPORT RAIN SENSOR AND ACTUATED FOR 2 HOURS. SUBMERSIBLE PUMP,OF BARNES MODEL SS6011-5.0 VALVE BRAND VALVE AND NEM MODEL CH-SR, FOR A 150 mm (FOR CONTROL THE RAIN SENSOR AND ACTUATED SHOWN INBUTTERFLY MILLIMETERS. B-01,B-02 9-STAGE, PIPING FOR COLD-WATER V.M. BUTTERFLY VALVE); INCLUDES HIMEL-TYPE ENCLOSURE,1.- DIAMETERS TBL-08 IND-GF WITH 5 H.P. ELECTRIC MOTOR, 220/3/60, COLD-WATER RISER UP S.C.A.F. PVC BUTTERFLY VALVE (INOX-EPDM). 5.- VISIBLE PIPING SHALL BE PAINTED FOR TBL-08 BUTTERFLY VALVE); INCLUDES HIMEL-TYPE ENCLOSURE, CONVEYANCE COLD-WATER RISER UP BASES, RELAYS, S.C.A.F. SWITCHES, SELECTORS, LED LIGHTS, 5.- VISIBLE PIPING SHALL BE PAINTED FOR TO DELIVER 302 l.p.m. AT 30 m LED T.D.H. IDENTIFICATION IN ACCORDANCE WITH SWITCHES, SELECTORS, LIGHTS, BASES, RELAYS, 2.- PIPING FOR THE INTERNAL ENGINE FOOT COMBUSTION VALVE WITH CONTACTORS, LABELING AND IDENTIFICATION. IDENTIFICATION IN ACCORDANCE WITHSTRAINER NOM-026-STPS-2008. POTABLE-WATER PIPING B.C.A.F. CONTACTORS, LABELING AND IDENTIFICATION. COLD-WATER DOWN ASSEMBLY SHALL BE 18-GAUGE STEEL. RISER NOM-026-STPS-2008. POTABLE-WATER PIPING B.C.A.F. PUMPED FIRST-FLUSH RAIN SENSOR, INSTALLED ON THE ROOF PIPING RISER COLD-WATER DOWN SHALL BE PAINTED SKY BLUE WITH COMEX GAUGE B-08, B-09 HORIZONTAL CENTRIFUGAL PUMP, BARNES MODEL NB 200, SHALL BEIPPAINTED PRESSURE SKY BLUE WITH COMEX TOCONTROL CONTROLPANEL THE OPENING OF THE ACTUATEDDRAINING, VALVE; ALKYD PAINT. FOR MANUAL PUMP-SUMP S.I.L. 3.PIPING AND FITTINGS USED IN THE COLD-WATER COUPLED TO A 1.5 H.P. ELECTRIC MOTOR, TBL-10 INDICATES FLOW DIRECTION ALKYD PAINT. PROVIDE 3/4" CONDUIT CONTROL PANEL FOR MANUAL PUMP-SUMP DRAINING, TBL-10 URREA BALL VALVE INDICATES FLOW DIRECTION ONE 0.5ELECTRICAL H.P.F-555 PUMP, 115/1/60, HYDRAULIC INSTALLATION AND FOR FILLING THE TO DELIVER A TOTAL HEAD OF TBL-11 TOFOR THE ROOF.OPERATED. FOR ONE1000.5l.p.m. H.P. AT PUMP, 115/1/60, PRESSURE SWITCH 6.- CIVIL WORK SHALL INCLUDE THE OPENINGS P MANUALLY TBL-11 DOMESTIC WATER SHALL BE TUBOPLUS, 32 m MANUALLY OPERATED. 6.- CIVIL WORKSERVICE SHALLFLOOR-MOUNTED INCLUDE THE OPENINGS PIPE SUPPORT REQUIRED ALONG INSTALLATION ROUTES 3P CALM INLET, 150 mm DIAMETER. A.C. WITHREQUIRED HEAT-FUSION JOINTS. NON-SLAM CHECK VALVE FLOOR-MOUNTED PIPE SUPPORT ALONG INSTALLATION ROUTES B-10, B-11 BARNES SUBMERSIBLE EFFLUENT PUMP, MODEL EH-512 L, THROUGH STRUCTURAL ELEMENTS. INDICATES FLOOR ANCHOR SUPPORT, DN 200 RAINWATER 200 mm INLET 0.5 H.P., 115/1/60. THROUGH STRUCTURAL ELEMENTS. OVERFLOW SIPHON, 150FILTER, mm DIAMETER. F-01 3PEVO S.F. EVO DN 200 RAINWATER FILTER, 200 mm INLET FLEXIBLE FLANGED ENDS 4.- PIPING IN THE PUMP SUMP SHALLHOSE BEWITHWITH CONSTRUCTED 3"X3"X3/16" STEEL PLATE, F-01 AND 150HIGH-PRESSURE mm OUTLET. FLOAT VALVE FLEXIBLE HOSE WITH FLANGED ENDS AND 150 mm OUTLET. 8.- DRAWING VALID FOR INSTALLATIONS ONLY. SF-01 FLOATING SUCTION. SCHEDULE 40 PVCVALID WITH1"X3/16" SOLVENT-CEMENTED JOINTS.OF THE NEXT CONTROL PANEL FOR TWO 3.0 H.P. PUMPS, 220/3/60, 0.50INSTALLATIONS m TUBE LONGAND HALF-PIPE 8.- DRAWING FOR ONLY. 0.50 m LONG TBL-01 FOR A HYDROPNEUMATIC SYSTEM, WITH ALTERNATING LARGER DIAMETER THAN THE SUPPORTED PIPE; WELLMATE HYDROPNEUMATIC TANK, MODEL WM35WB, KIT WITHUNION ELECTRIC ACTUATOR (80-240 VAC/DC) FOR JJ 9.- SEE DETAILS ON DRAWING IHS-00. NETWORK SHALL HEIGHT. WITH ELECTRIC ACTUATOR (80-240 VAC/DC) FOR JJ T-01,T-02 0.61 AND KIT SIMULTANEOUS PUMP OPERATION. m DIA.VALVE x 1.89AND m HIGH, BUTTERFLY VALVEBE 9.- HYDRAULIC SEE DETAILSPIPING ONVARIABLE DRAWING IHS-00. BRAND NEM MODEL CH-SR, FOR A 150 mm 4.- THE V.M. 450-LITER CAPACITY. BUTTERFLY VALVE HYDROSTATICALLY TESTED AT 6 KG/CM2 USING A BRAND VALVE AND NEM MODEL CH-SR, FOR A 150 mm IND-GF PVC BUTTERFLY VALVE (INOX-EPDM). V.M. CONTROL PANEL FOR TRANSFER OF TWO 1.5 H.P. PUMPS, HYDROSTATIC TEST PUMP UNTIL THE REQUIRED IND-GF PVC BUTTERFLY VALVE (INOX-EPDM). PEAR-TYPE PIPE HANGER TBL-07 FOOT VALVE WITH STRAINER 220/1/60, PRESSURE-OPERATED. PRESSURE IS REACHED; THE PRESSURE SHOWN FOOT VALVE WITH STRAINER FIRST-FLUSH RAIN SUPPORT SENSOR, INSTALLED ON THE ROOF ON THE GAUGE SHALL REMAIN UNCHANGED UNICANAL CONTROL PANEL FOR FIRST-FLUSH SEPARATION, FIRST-FLUSH RAIN SENSOR, INSTALLED ON SPL THE BRAND ROOF PRESSURE GAUGE TO CONTROL THE OPENING OF THE ACTUATED VALVE; FOR 2 HOURS. IP (FORTO CONTROL OF THE RAIN SENSOR AND ACTUATED FROM S.I.L. PRESSURE GAUGE CONTROL THE OPENING OF THE ACTUATED VALVE; IP PROVIDE 3/4" ELECTRICAL CONDUIT S.I.L.BUTTERFLY VALVE); INCLUDES HIMEL-TYPE ENCLOSURE, ROOF 100Ø TBL-08 PROVIDE 3/4" ELECTRICAL CONDUIT COLD-WATER RISER UP S.C.A.F. 5.- VISIBLE PIPING SHALL BE PAINTED SWITCH FOR TO THE ROOF. PRESSURE P SWITCHES, LED LIGHTS, BASES, RELAYS, F.F.L. -0.17 TO THESELECTORS, ROOF. PRESSURE SWITCH IDENTIFICATION IN ACCORDANCE WITH P CONTACTORS, LABELING AND IDENTIFICATION. 3P CALM INLET, 150 mm DIAMETER. A.C.B.C.A.F. NOM-026-STPS-2008. POTABLE-WATER PIPING COLD-WATER RISER DOWN 3P CALM INLET, 150 mm DIAMETER. A.C. INDICATES FLOOR ANCHOR SUPPORT, SHALL BE PAINTED SKY BLUE WITH COMEX 3P OVERFLOW SIPHON, FLOOR 150 mm ANCHOR DIAMETER. S.F. INDICATES SUPPORT, CONSTRUCTED WITH 3"X3"X3/16" STEEL PLATE, 3P OVERFLOW SIPHON, 150 mm DIAMETER. S.F. CONSTRUCTED WITH 3"X3"X3/16" STEEL PLATE, ALKYD PAINT. 0.30 0.30 TBL-10 CONTROL PANEL FOR MANUAL PUMP-SUMP DRAINING, INDICATES FLOW DIRECTION SF-01 FLOATING SUCTION. 1"X3/16" TUBE AND HALF-PIPE OF THE NEXT FOR ONE 0.5 H.P. PUMP, 115/1/60, SF-01 FLOATING SUCTION. 1"X3/16" TUBE AND HALF-PIPE OF THE NEXT TBL-11 LARGER DIAMETER THAN THE SUPPORTED PIPE; WELLMATE HYDROPNEUMATIC TANK, WM35WB, THE OPENINGS MANUALLY OPERATED. LARGER DIAMETER THAN THEMODEL SUPPORTED PIPE; 6.- CIVIL WORK SHALL INCLUDE TO FILTER WELLMATE HYDROPNEUMATIC TANK, MODEL WM35WB, T-01,T-02 0.61 m DIA. VARIABLE HEIGHT. 100Ø FLOOR-MOUNTED PIPE SUPPORT x VARIABLE 1.89 m HIGH, REQUIRED ALONG INSTALLATION ROUTES HEIGHT. T-01,T-02 0.61 m DIA. x 1.89 m HIGH, 450-LITER CAPACITY. THROUGH STRUCTURAL ELEMENTS. EVO DN 200 RAINWATER 450-LITER CAPACITY.FILTER, 200 mm INLET F-01 FLEXIBLE HOSE WITH FLANGED ENDS AND 150 mm OUTLET. -0.17 8.- DRAWING VALID FOR INSTALLATIONS ONLY. 0.40 TO RAINWATER CISTERN 0.50 m LONG 0.95
-1.32
STORMWATER SYSTEM
1% / 150Ø
1.25
EVO 150 FILTER
-1.32
- 1.42
TBL-11
- 0.90 T.R. 100Ø
H(usable)= 1.55m
64Ø
BAP-03 100Ø A=78.21m²
A'
CISTERN
150Ø
RAINWATER CISTERN
P
P IP
FROM TO 50Ø STORM DRAIN
B'
V=15 m³ A=9.70 m² H(total)=2.50 m
SF-01
6Ø
0.30
50Ø
TO OFFICE RAINWATER
WITH
13Ø
13Ø
TBL-01
STORMWATER SYSTEM
-2.57
TBL-07 T.R. 100Ø
50Ø
F.F.L. 0.17 100Ø STORMWATER
PIPE
RAINWATER CISTERN
V=15 m³ A=9.70 m² H(total)=2.50 m
50Ø
25Ø
ACCESS TO MECHANICAL ROOM
64Ø
AC
2.25 m
TBL-08
32Ø
25Ø
T-01
0.80 mx 0.80m x 1.0 m
-1.32
CLEAR HEIGHT
0.30 A.F.F.
B-09 50Ø
32Ø
25Ø
50Ø FROM RAINWATER
CISTERN
SUMP PIT
50Ø
- 0.98
B-10
CISTERN B-08 50Ø
64Ø
B-02
50Ø
C'
WITH
50Ø TO POTABLE WATER CISTERN
19Ø AUXILIARY RAINWATER CISTERN FILL
150Ø - 1.00
150Ø
S.R. - 1.42
2.25 m
MECHANICAL ROOM
25Ø
WATER SUPPLY
H(usable)=2.70 m
0.80
B-01
- 0.67
- 1.17
64Ø
V.M.
64Ø
64Ø
CLEAR HEIGHT T.O.S. -2.57
TBL-10
150Ø
150Ø
F-01 150Ø
B-11
EM ST SY
V.M.
50Ø
150Ø
V=44.44 m³ A=16.46 m2 H=2.80 m
CISTERN EXISTING 75M3
150Ø
150Ø - 1.46
50Ø
MECHANICAL ROOM
RY TA NI SA
Ø150 TO V.M.
F.F.L. -3.37 B.O.S. -0.67
H(usable)=2.5m EXISTING CISTERN
100Ø
CONNECTS TO EXISTING
150Ø
CLEAR HEIGHT
2.70 m EXISTING CISTERN
V=62.5 m³ A=25m² H=3 m
100Ø
150Ø
PULL BOX
50Ø
WATER SUPPLY SYSTEM
-1.21
ELECTRICAL
1.0 X 1.0m
A.C.
EXISTING CISTERN
19Ø
50Ø
19Ø 1.34 - 0.17 - 1.51 150Ø
SCHEDULE 40 PVC WITH SOLVENT-CEMENTED JOINTS.
UNION PEAR-TYPE PIPE HANGER
EQUIPMENT CONTROL PANEL FOR FIRST-FLUSH SEPARATION, SPL BRAND (FOR CONTROL OF THEMODEL RAIN SENSOR AND ACTUATED SUBMERSIBLE PUMP, BARNES SS6011-5.0 B-01,B-02 TBL-08 INCLUDES 9-STAGE,BUTTERFLY WITH 5 H.P.VALVE); ELECTRIC MOTOR,HIMEL-TYPE 220/3/60, ENCLOSURE, SWITCHES, SELECTORS, LED LIGHTS, BASES, RELAYS, TO DELIVER 302 l.p.m. AT 30 m T.D.H. CONTACTORS, LABELING AND IDENTIFICATION.
B-10
FROM MAIN WATER SUPPLY CONNECTION
ON DRAWING IH03
PLUVIAL INSTALATIONS
SANITARY INSTALATIONS
0.65
S.T.V. 50Ø A ROOF
37.07
50Ø property
line
BOX
TRANSFORMER
SANITARY SEWER
1%
1.59
1.49
0.77
4.41
op
8.4 / 1% / 100Ø
sl
0.67 - 0.17 - 0.84
T.R. 100Ø
100Ø
100Ø
100Ø
CH-25
100Ø 100Ø
50Ø
rack rack
FOR
50Ø
UEPM-02 H= 0.57 M
WC Shower
CH-282
T.R. 100Ø
CH-282
Shower
50Ø
2.51
50Ø
7.56
T.R. 100Ø
CH-25
e
op
Sl
T.O.S. + 2.95
T.O.S. + 3.50 T.O.S. + 2.95
2.39
Slope 2.0%
Slope 2.0%
Slope 2.0%
Slope 2.0%
(TO T.O.S.+4.31)
CH-4954 Slo pe
RWP 100Ø CH4954
T.O.S. + 4.31
2.0
%
e
op
Sl
T.O.S. + 3.20
Slope
Slope
2.
T.O.S. + 3.20
R.W.P.
CH-4954
2.0
%
pe
Slo
R.W.P.
%
R.W.P.
T.O.S. + 4.31
2.0
T.O.S. + 2.95
Slope Slope
SCUPPER 75Ø
RWP 100Ø
1%
T.O.S. + 2.55
1%
RWP 100Ø
RWP 100Ø
CH-4954
T.O.S. + 2.95
T.O.S. + 2.95
Slope 1% Slope 1%
T.O.S. + 2.30
T.O.S. + 2.95
07 AREA
CH-4954
R.W.P.
R.W.P.
CH-4954
04 AREA 05 AREA
UEPM-01 H= 0.57 M
S.L. +3.58
08 AREA
S.L. +3.58
RWP 100Ø
pe
CH-4954
T.O.S. + 3.20
TERMINATION
1%
CH-4954
(TO T.O.S.+4.31)
Slo
GALVANIZED STEEL
1% VENT PIPE
1%
RWP 100Ø
CH-4954
RWP 100Ø
03 AREA
02 AREA
e
1%
VENT CAP S.L. +3.58 50Ø
R.W.P. op
RWP 100Ø
R.W.P.
0%
2.
R.W.P.
Slope
0%
2.
Sl
SCUPPER SCUPPER 75Ø SCUPPER 75Ø
SCUPPER (TO T.O.S.+4.31)
RWP 100Ø
RWP 100Ø
SEE CONNECTION ON DRAWING IS00
R.W.P.
0%
2.
R.W.P. CH-4954
T.O.S. + 3.50
Slope 1%
2.39
VENT PIPE TERMINATION
VENT CAP 50Ø Slope 1%
Slope
13 AREA0%
SCUPPER 75Ø
SCUPPER 75Ø SCUPPER
SCUPPER (TO T.O.S.+4.31) RWP 100Ø CH4954
GALVANIZED STEEL
0%
2.
Slope 1%
S.L. +3.55
STORAGE
e
op
Sl
R.W.P.
01 AREA
AREA
T.O.S. + 4.31
T.O.S. + 2.30
100Ø
SINK & 100Ø
0%
2.
RWP 100Ø R.W.P. CH4954
50Ø
T.R. 100Ø
T.R. 100Ø
e
op
Sl
R.W.P.
100Ø
CH-25
50Ø
50Ø
CH-282
T.R. 100Ø
50Ø
CH-25
WC
T.R. 100Ø
2.95
100Ø
WC WOMEN
50Ø
50Ø
50Ø
50ØWC
CH-282
T.R. 100Ø
Urinal
Shower
50Ø
Shower
50ØWC
50Ø
WC MEN
50Ø
100Ø
100Ø
Urinal
MINISPLIT
50Ø
50Ø 50Ø
DRAIN
SITE
CH-25 CH-25
LOCKERS MEN
WOMEN
100Ø
100Ø
50Ø 100Ø
100Ø
LOCKERS
50Ø CH-25
VOICE/DATA BOX
100Ø
100Ø
50Ø
MUSEOGRAPHY STORAGE
ETHNOGRAPHY STORAGE
UEPM-01 H= 0.57 M
R.W.P.
S.L. +3.58
1%
100Ø
CONSERVATION & RESTORATION
100Ø LOCKERS MEN
WOMEN
10 AREA
1%
1%
06 AREA
Slo
T.R. 100Ø
LAB STORAGE
100Ø
100Ø LOCKERS
12 AREA
Slope 1% Slope 1%
T.O.S. + 2.30
T.O.S. + 3.50
Slope 1% Slope 1%
Slope 1%
100Ø
ROOM
T.O.S. + 5.14
Slope 1%
T.R. 100Ø MONITORING
SCUPPER 75Ø
Slope 1%
50Ø
ELECTRICAL BOX
Slope 2.0%
slope 1%
50Ø
Slope 1%
IG-20 50Ø
S.T.V. 50Ø
slope 1%
SANITARY BOX
11 / 1% / 100Ø
e
op
Access
LOBBY
Sl
11 AREA 6.49
- 0.16 0.658 - 0.814
slope 1%
- 0.17 0.62
MAINTENANCE WORKSHOP - 0.79
SANITARY BOX
11 / 1% / 100Ø
S.L. +3.55
09 AREA
R.W.P.
RWP 100Ø CH4954
- 0.17 0.51 - 0.68 MUSEOGRAPHY / WOOD STORAGE
TRANSITION STORAGE
Slope
Slope
CH-4954
14.00
- 0.17 0.40 - 0.57
Access
1%
RWP 100Ø
STORM DRAIN BOX
SANITARY BOX
Access
FIRE/HYDRAULIC BOX
%
14 AREA
50Ø
5 / 1% / 100Ø
Access
STORM DRAIN BOX
CONSERVATION & RESTORATION LAB
R.W.P.
T.O.S. + 4.31
1.5
IG-20 50Ø
STORM DRAIN BOX
HYDRAULIC BOX
CISTERN ACCESS
100Ø
pe
pe
GARDEN
DRAINAGE
Slo
A
4.40
50Ø SANITARY BOX
- 0.17 0.40 - 0.57
15 AREA
pe
S.L. +3.58 CXF-03
ELECTRICAL BOX VOICE/DATA BOX
VENT CAP 50Ø
T.O.S. + 2.65 Slo
Slope 1%
0.706
12.75/ 1% / 150Ø
AUDIOVISUAL
ROOM
50Ø
line
R.W.P. CH-444
S.L. +3.55
- 0.28 - 0.984
4.03
CISTERN COVER
erty
7°
2.68
RWP 100Ø
MUSEOGRAPHY WORKSHOP
prop
2.68
DRAINAGE
Access
CONNECTS TO OFFICE BUILDING
9.50
0.55 0.68
1.94
150Ø - 0.28 - 1.184
FROM EXISTING
e
0.37
3.94
VENT PIPE TERMINATION
4.97
9.5 / 1% / 150Ø
10 / 1% / 150Ø
Access
0.904
1%
line
4.01
CONNECTION TO MAIN
BOX
pe
erty
3.97
CH-282
100Ø
BOX LOW VOLTAGE
slo
prop
4.04
0.67
50Ø
50Ø
- 0.17 0.919 - 1.089
SANITARY BOX
Access
SECURITY
50Ø
CL-03
1% sl
op
e
CLEANOUT
7.66
3.95
GALVANIZED STEEL
CH-25
- 0.17 0.764 - 0.934 - 0.984
EXISTING
4.02
VOICE & DATA
TRASH
GARDEN
line
4.00
50Ø
1%
slope 1% property
4.02
4.24
slope
T.O.S. + 2.30
T.O.S. + 3.50
Slope 1%
T.O.S. + 2.95
T.O.S. + 3.50
T.O.S. + 3.50
UEPM-02 H= 0.57 M
S.L. +3.55
GROUND FLOOR OPTION 2
S.L. +3.55
T.O.S. + 2.30
S.L. +3.55
meters
scale 1:100
'A
ROOF PLAN
meters
scale 1:100
meters
S.T.V. 50Ø TO ROOF
PROPERTY
FREE
LINE
E 1%
SLOP
SINK
50Ø
50Ø SINK
ACCESS BOX
IG-20 50Ø
50Ø GREASE TRAP VISIBLE BELOW CABINET
EXISTING CLEANOUT
- 0.17 0.40 - 0.57
50Ø
FROM EXISTING DRAINAGE
- 0.17 0.769 - 0.939 - 0.989
W.C. T.R. 100Ø
- 0.17 0.62 - 0.79
T.R. 100Ø O
100Ø
LAV. CH-25 50Ø
100Ø 100Ø
50Ø
50Ø
100Ø
50Ø
0.904 100Ø
100Ø
CH-282
100Ø
T.R. 100Ø
CISTERN COVER
GARDEN
100Ø
CONNECTION TO MAIN SANITARY SEWER
- 0.28 0.706 - 0.984
12.75/ 1% / 150Ø
0.658 - 0.16 - 0.814
CXF-01
100Ø
HYD. BOX
-0.67
- 0.99
STORM DRAIN BOX
PROPERTY
MAINTENANCE WORKSHOP 0.53 SANITARY BOX
1% / 150Ø
- 0.70
100Ø
BAP-14 100Ø A=11.405m² BAP-14 100Ø A=11.405m²
SLOPE 1%
VESTIBULE
BAP-07 100Ø A=26.82m²
100Ø
T.R. 100Ø
1% / 150Ø BAP-04 100Ø A=62.5m²
0.55
- 0.75
Access
SLOPE 1%
SLOPE 1%
BAP-06 100Ø A=40.06m²
BAP-05 100Ø A=35.98m²
CONSERVATION & RESTORATION
1
MONITORING ROOM
LOCKERS Women
CM-02
LOCKERS Men
LOCKERS Women
MUSEOGRAPHY STORAGE
ETHNOGRAPHY STORAGE
UEPM-01 H= 0.57 M
VOICE/DATA BOX
Shower
WC Shower
LOCKERS Men
WC MEN
WC WOMEN
Urinal
Urinal
WC
Shower UEPM-02 H= 0.57 M
Sink and
Shower
WC
SITE
storage area
WC
scale 1:100
meters
LINE
slope ACCESS BOX
1% / 100Ø
0.568 - 0.738
SANITARY BOX
BAP-03 100Ø A=58.1m²
BAP-02 100Ø A=60.36m²
LAB STORAGE
- 0.822
1% / 150Ø
T.R. 100Ø 0.40
BAP-14 100Ø A=55.45m²
100Ø
0.78
GROUND FLOOR - OPTION 2
PROTECTION AGAINST FIRE INSTALATIONS 1%
21.67
VOICE & DATA
EXT S.M.
slope 1%
TRASH
GARDEN
- 0.57
BAP-13 100Ø A=55.45m²
MUSEOGRAPHY / WOOD STORAGE 0.652
Access
- 0.95
T.R. 100Ø
BAP-01 100Ø A=78.21m²
FIRE/HYD. BOX
rack rack
The Project manager and I worked closely with the engineers to determine the best location for the sewer lines and cleanouts, along with the optimal direction for their routing.
Access
BAP-12 100Ø A=47.24m²
TRANSITION STORAGE SANITARY BOX
ELECTRICAL BOX
0.82
BAP-11 100Ø A=47.24m²
PERT
LINE
MEDIA
ROOM
1% / 100Ø BAP-08 100Ø A=28.73m²
Access
CONSERVATION AND
RESTORATION LABORATORY
Y LINE
0.50
STORM DRAIN BOX
STORM DRAIN BOX
CISTERN ACCESS
ELECTRICAL BOXVOICE/DATA BOX
150Ø PRO
PROPERTY
BAP-14 100Ø A=23m² BAP-09 100Ø A=31.32m²
1% / 100Ø
SANITARY BOX
150Ø
FROM SERVICE BUILDING
0.40
BAP-10 100Ø A=23.28.90m²
BAP-14 100Ø A=23m²
CONSERVATION AND RESTORATION PLAN ANA-MA-A5-01-01
100Ø
- 0.28 - 1.184
50Ø CH-282
- 0.57 100Ø
1% / 100Ø
MUSEOGRAPHY WORKSHOP
Access
50Ø
W.C.
CH-25
9.5 / 1% / 150Ø
50Ø 50Ø CH-282 CH-282
1%
50Ø
LAV. 100Ø
100Ø
100Ø
PE
1%
LAV. 50Ø CH-25
50Ø
Access
ACCESS BOX
SL
PE
50Ø 50Ø
SANITARY BOX
Access LOW VOLTAGE
Y LINE
PERT
SINK
O
50Ø
SECURITY
ACCESS BOX
- 0.17 0.919 - 1.089
4.5 / 1% / 150Ø
100Ø
SL
SINK
50Ø TO ROOF
50Ø
100Ø
100Ø
PRO
W.C.
GREASE TRAP VISIBLE BELOW CABINET
S.T.V.
LAV. CH-25
50Ø
1%
50Ø
W.C. SINK
BAP-15 100Ø A=28.8m²
PE
50Ø TO ROOF
- 0.17 - 0.855
IG-20 50Ø
A.F.F.
TRANSFORMER
O
- 0.17 0.874 - 1.044
S.T.V.
0.685
6.5 / 1% / 100Ø
TRASH
GARDEN
SL
5.5 / 1% / 150Ø
- 0.17 0.51 - 0.68
11 / 1% / 100Ø
LINE
100Ø
8.4 / 1% / 100Ø
11 / 1% / 100Ø
DISCHARGE
VOICE AND DATA
SLOPE 1%
PROPERTY
TRANSFORMER
SECURITY
2.83
2.69
2.40
2.45
slo
pe
1%
SAN. C.O.
Access
Access
G.P.C.I
FLAT BAR
FROM ROOF, SEE SHEET PCI04
SCUPPER 75Ø
H
ACCESS BOX
LOW VOLTAGE
ACCESS BOX
Y LINE
EXT S.M.
slo
PERT
pe
PRO
pe
slo
1%
0.83
1% MUSEOGRAPHY WORKSHOP
Access
T.O.S. +3.55
PARAPET DRAIN CH4954 EXT S.M.
A/V ROOM
0.30
100Ø CISTERN COVER
GARDEN
SAN. C.O.
B.O.S. +3.25
R.W.P.
Access
STORM BOX
4.17
STORM BOX
CONSERVATION EXT S.M. LAB RESTORATION
H
V&D BOX
G.P.C.I
PRO
100Ø
STORM BOX
WATER BOX
CISTERN ACCESS
ELEC. BOX
Y LINE
PERT
slope 1%
TRANSITION STORAGE Access
SAN. C.O.
MAINTENANCE WORKSHOP
MUSEOGRAPHY / WOOD STORAGE SAN. C.O.
Access
VESTIBULE
SAN. C.O.
3.45
slope 1%
EXT S.M.
slope 1%
Access H
100Ø
ELEC. BOX
FROM ROOF, SEE SHEET PCI04
LAB STORAGE
PCI/WATER BOX
F.F.L. 0.17 N.P
CONSERVATION & RESTORATION
MONITORING ROOM
LOCKERS Women
EXT S.M.
LOCKERS Men UEPM-01 H= 0.57 M
ck
MUSEOGRAPHY STORAGE
ra
WC
Shower
LOCKERS men
WC MEN
75Ø P.C.I
Shower UEPM-02 H= 0.57 M
WC Shower
Sink & storage area
Shower
WC
SITE
CONNECTION TO BUILDING MAIN STORMWATER SYSTEM
F.F.L. 0.17
MUSEOGRAPHY STORAGE
F.F.L. 0.20
EL. ±0.00
WC WOMEN
Urinal
Urinal
S.C.P.C..I 75Ø, SEE SHEET PCI04 V&D BOX
ETHNOGRAPHY STORAGE
LOCKERS Women
A'
VSEE CONTINUATION ON PSHEET PCI00
3.75
PER FLOOR
FROM ROOF, 75Ø SEE SHEET
WC
PCI-04
PER FLOOR
A
SEE CONTINUATION ON SHEET PCI00
GROUND FLOOR - OPTION 2 meters
scale 1:100
37.07 4.02
4.24
4.00
4.02
9.50
7.66
3.95
4.04
3.97
4.01
0.37
3.94
1.59
1.49
0.55 0.68
2.68
7°
2.68
0.67
R.W.L.
4.97
T.O.S. + 2.65
0.77 Slo
pe
1%
1.94 Slope 1%
4.03
S.L. +3.55
CL-03
S.L. +3.55
4.41
FROM ROOF, SEE DRAWING PCI04
S.L. +3.58 e 1%
R.W.L. Slo
4.40
pe
%
Slop
T.O.S. + 3.20
Slop
T.O.S. + 4.31
1.5
e 1% 64Ø F.P.
R.W.L.
e 1%
0%
pe
2.
R.W.L. Slo
pe
S.L. +3.58
e 1%
Slop
Slop
e 1%
2.
0%
SCUPPER (TO T.O.S. +4.31)
SCUPPER (TO T.O.S. +4.31)
SCUPPER (TO T.O.S. +4.31)
R.W.L. 0%
0%
pe
2.95
2.
pe
T.O.S. + 4.31
Slo
R.W.L.
2.
Slo
0%
75Ø F.P.
pe
2.
SCUPPER (TO T.O.S. +4.31)
64Ø F.P.
T.O.S. + 3.20
S.L. +3.58
R.W.L.
R.W.L. Slo
pe
2.0
%
Slo
T.O.S. + 3.20
S.L. +3.58
Slope 2.0%
T.O.S. + 5.14
Slope 2.0%
Slope 2.0%
Slope 2.0%
Slope 2.0%
6.49
Slop
Slop
Slo
14.00
e 1%
R.W.L.
T.O.S. + 4.31
0%
pe
Slo
2.
pe
Slo
%
pe
2.0
%
Slo
75Ø F.P.
2.0
R.W.L.
T.O.S. + 4.31
e 1%
Slop
T.O.S. + 2.55
Slop
e 1%
R.W.L. 19Ø A.R.V.
R.W.L.
R.W.L.
T.O.S. + 2.95
2.39
T.O.S. + 2.95
T.O.S. + 2.95
50Ø F.P. RISER DOWN TO G.F., SEE DRAWING PCI03
Slope 1% Slope 1%
T.O.S. + 3.50
Slope 1% Slope 1%
T.O.S. + 2.30
T.O.S. + 3.50
Slope 1% Slope 1%
T.O.S. + 2.30
ROOF PLAN SCALE 1:100
meters
S.L. +3.58
T.O.S. + 2.95
T.O.S. + 3.50
S.L. +3.55
S.L. +3.55
Slope75Ø 1% F.P.
T.O.S. + 3.50
UEPM-02 H= 0.57 M
75Ø F.P.
S.L. +3.55
R.W.L.
R.W.L.
Slo pe
T.O.S. + 2.30
Slope 1%
UEPM-01 H= 0.57 M
T.O.S. + 2.95
Slope 1%
T.O.S. + 2.95
Slope 1%
T.O.S. + 2.95
T.O.S. + 3.50
Slope 1%
75Ø F.P.
Slope 1%
2.39
75Ø FROM G.F., SEE DRAWING PCI03
R.W.L.
T.O.S. + 3.50
S.L. +3.55
7.56
R.W.L.
Slope 1%
1%
Slope 1%
T.O.S. + 2.30
2.51
T.O.S. + 2.30
75Ø F.P. RISER DOWN TO G.F., SEE DRAWING PCI03
meters
The Project manager and I analyzed Mexican fire protection requirements and proposed appropriate locations for fire equipment to ensure compliance during licensing.
The Project manager and I worked closely with the engineers to determine rainfall slopes and drainage placement, ensuring drains and water pipes were both functionally sound and aesthetically integrated with the architecture.
11
FINISHES The material concept for the audiovisual room, facade, changing rooms, and bathrooms was to use locally sourced materials, restoring the structure’s existing character and appearance while preserving the history of the materials, combining new and old elements. Part of my responsibilities was rendering the materials in the model to select colors and materials, sourcing material options, reviewing samples on-site with the project manager and Mauricio Rocha who would define the final version of each material to be used. FINISHES - AUDIO VISUAL ROOM / FACADE
Existing volcanic stone coping.
6cm-thick volcanic stone coping, per sample shown on site.
Polished-finish concrete.
Recinto stone slabs, 7cm thick, in large-format panels/ layout.
Concrete slab (topping/floor) with a polished finish, with disc-cut [saw-cut] joints.
Exposed (fair-faced) concrete slab system, with silver-edge formwork [panels], panel layout/joint pattern per drawings.
WEST FACADE
FINISHES - RESTROOMS AND CHANGING ROOMS
Polished-finish concrete.
Concrete slab with polished finish, cuts made with disc/ saw, and Forzza polyurea waterproofing, accent color as per approved on-site sample (A.A.O.S.)
Recinto stone slabs, 7cm thick, in large-format panels/ layout.
Brick wall finished with fine polished plaster/render and two coats of matte vinyl paint, accent color; with a 7.5cm baseboard of Forzza polyurea waterproofing, accent color, as per approved onsite sample (A.A.O.S.)
Brick wall finished with fine polished plaster and Forzza polyurethane waterproofing coating, accent color (A.A.O.S)
Restored pre-existing slab system, with two coats of matte vinyl paint, accent color as per approved onsite sample (A.A.O.S.)
12 PLANO LLAVE
FIXTURES A1
E2 E4
A1 A1 E3 D1 D2
B3
E2
E2 E2
D1
E4
E4
E4 E4
D2
E3
E3
E3
D3
B2
B2
D1
B1
B1
B1
B1
D2
A3
A3
B2
A2
A3
A3 E1 A3
B2
A2
C4 E4
D3
A4 C3
D4
A4 E1 D1 D2
D3
A4
D4
E1 C1 C2
D1 D2
D3
A4
C2 C1
A4
C3 C1 C2
D1 D2
D3
A3 A4 E1
D1 D2
D3
B3
D4
C2 C1
D1
E3 E2 E4
A2
A3
E1
A2
A3
E1
D2 D1 D2
B4
A2
A3
A2
A3 A4 E1
E1
D2 D1 D2
A1 B4
D3
D3
E3 E2 E4 D1
B3
D3
E3 E2 E4
B1 B2
A1
C3 A4
E1 A4 A3
B1 B2 E2
B1 B2
D4 C3
E3 E2 E4
B2 A4 E1
A3
A2
E1
B1 B2
D1
E4
D4 A3
A3
D2
A2
D3
E3
B2
A2
C4
A3 E1
E3
B2
E4 B2
E3 E2
A1
A2
D3
D3
E3
FIXTURE SCHEDULE
My role involved sourcing multiple options for all fixtures, with pricing, and presenting them to the project manager and Mauricio Rocha so they could decide which elements to use for the bathrooms based on their desired aesthetic. I also rendered the options to help visualize which would look best.
HARDWARE
A1
A2
A3
Door handle set, KUMA brand, model 1964, stainless steel finish.
Door bolt/latch, Herrajes Bralle brand, model 388 NS, brushed nickel finish.
Classic double hook, HELVEX brand, model 106, chrome finish.
A4 Grab bar, HELVEX brand, model B-610-S, stainless steel (AISI 304), satin/brushed finish, 61 cm (24”) length.
B1
B2
B3
B4
Bathroom faucet, HELVEX brand, model TV121-1.9, satin finish.
Sink (kitchen/utility basin), TEKA brand, model BE 40.40.25, satin finish.
Hose bibb (outdoor spigot), URREA brand, model 19CR, chrome material.
C1
C2
C3
C4
Shower head, HELVEX brand, model H201, satin finish.
Shower valve/faucet set, HELVEX brand, model C-44, satin finish.
Floor drain, HELVEX brand, model 24-CH, satin finish.
HELVEX’s 24RHLI, stainless steel slotted grate, satin/ brushed finish.
D1
D2
D3
D4
Toilet (WC), HELVEX brand, model TZF NAO17, white color.
Toilet seat, HELVEX brand, model AT-1, white color.
Flush valve, HELVEX brand, model FB-110-383.5, brass material.
Waterless urinal, HELVEX brand, model MG Mojave TGS2, white color.
E1
E2
E3
E4
Toilet paper roll holder/dispenser, JOFEL brand, model AE57001, satin finish.
Paper towel dispenser, BOBRICK brand, model B-2974, satin finish.
Trash can, simplehuman brand, 9 gal capacity, model 46531025, satin finish.
Soap dispenser, BOBRICK brand, model B-2111, satin finish.
Bathroom sink, KOHLER brand, model K-8188, white color. Concrete bathroom counters/vanities built on-site, with Caesarstone quartz slab, gray color A.A.O.S.
BASIN + SINK
SHOWER + DRAINAGE
WC +URINAL
ACCESSORIES
MUSEO DIEGO RIVERA ANAHUACALLI REMODELACIÓN, AMPLIACIÓN Y CONSTRUCCIÓN DE ESPACIOS
CROQUIS DE LOCALIZACION:
CROQUIS DE CONJUNTO:
0.12
0.47
cuarzo marca Final finish using 2 cm thick Caesarstone quartz te 4003 de 2cm slab, Sleek Concrete 4003 model, gray color, panel adhered to a Tablacemento cement board panel on juntas a 45°,
with marble adhesive, with 45° mitered joints. Slab layout/cutting pattern to be defined.
G Durock de uerzo en juntas19 mm-thick USG Durock cement board panel with reinen la cara forcing tape at the joints and a Tyvek waterproof membrane
0.35
0.13
0.12
Grifo para pileta a base de tubo galvanizado de 21",
Sink faucet made from 1/2” galvanized pipe, acodo a 45° y llave de nariz 45° elbow, and a galvanized hose bibb, S.M.A.galvanizada s.m.a.
0.45 0.28 NORTE:
on the exterior face.
1 1/2” x 1 1/2” tubular profile.
0.45
Cespol para tarja modelo TV-030 Helvex TV-030 sink P-trap in chrome marca Helvex color cromo o finish, or similar, S.M.A. similar sm.a. NOMENCLATURA: -N.F. -N.P.T. -N.L.A.L.
NIVEL DE FIRME NIVEL DE PISO TERMINADO LECHO ALTO DE LOSA
-N.L.B.L.
LECHO BAJO DE LOSA
-N.L.A.T.
LECHO ALTO DE TRABE
-N.L.B.T.
LECHO BAJO DE TRABE
-N.P. -N.C. -N.C.M. -N.AG. -N.P.T.E.
NIVEL DE PRETIL NIVEL DE CERRAMIENTO NIVEL CORONAMIENTO DE MURO NIVEL DE AGUA NIVEL DE PISO TERMINADO EXISTENTE
13
TORRELODONES HOUSE FREELANCE PROJECT FOR RODRIGO DUCOING ARCHITECTS | 2024 - 2025 C. ANTONIO MUÑOZ MANZANEQUE, TORRELODONES, 28250, MADRID, SPAIN
Torrelodones House was a freelance residential visualization project developed for one of my former architecture professors Rodrigo Ducoing. After relocating to Spain, he began designing a home for himself and his wife and hired me to create the architectural model and a series of renderings to help them visualize the project as it evolved. My role focused on translating the design into a detailed three-dimensional model and producing visualizations that allowed them to explore materials, spatial relationships, and design decisions. The process became an important tool for refining the project and bringing greater clarity to the home they had envisioned. It was especially meaningful to collaborate professionally with a professor whose work and teaching I greatly admired, while contributing to such a personal project: the realization of a home designed around their vision and aspirations.
STORAGE
STAFF BEDROOM
UP
KITCHEN FEEL 961 WINE
BATH OFFICE 1
OFFICE 2
CL. PANTRY
F.F.L. ± 0.00
DINING
F.F.L. - 0.30
F.F.L. - 0.15 VESTIBULE
TV / GUESTS
BOOKCASE
PEDESTRIAN ACCESS
VEHICLE ACCESS
BATH 0.7552
LIVING
PARKING
1.0000
GROUND FLOOR AREA: 125.66 M2
14
LINENS
W.I.C. 0.9000
LAUNDRY
0.9000
SLOPE 30%
GAME ROOM
0.9000
F.F.L.
0.8000
DOWN
0.9000
W.I.C.
BEDROOM 1
PRIMARY BEDROOM BEDROOM 2 1.2900 1.3500
BATH 1
UPPER FLOOR
TERRACE
15
CROSS SECTION
CROSS SECTION
SECTION A-A’
GND FFL EXTERIOR
16 EAST FACADE
CHIMNEY
WEST FACADE
CHIMNEY
RIDGE
RIDGE
PARAPET
PARAPET
PARAPET
PARAPET
UPPER FFL
UPPER FFL
GND FFL
GND FFL
EXTERIOR
SECTION B-B’
CHIMNEY
CHIMNEY
RIDGE
RIDGE
PARAPET
PARAPET
PARAPET
UPPER FFL
UPPER FFL
GND FFL
EXTERIOR
CHIMNEY
RIDGE
EAST ELEVATION
GAMES / TV
BEDROOM 2
UPPER FFL
BATH
GND FFL
CELLAR EXTERIOR
EXTERIOR
WES
GND FFL
LIVING
EXTERIOR
SECTION B-B' CHIMNEY
LEVATION
RIDGE
EAST ELEVATION
VÍ
A
D
E ES
GAMES / TV
RV
IC
C.
DE
AN
TO
NIO
IO
V1 N-
TV BEDROOM 2 GAMES /BATH
CELLAR
SECTION B-B'
CHIMNEY
CELLARLIVING
RIDGE
WEST ELEVATION
PARAPET
UPPER FFL
BEDROOM 2
GND FFL
WEST ELEVATION
PARAPET
BATH
EXTERIORLIVING
UPPER FFL
CONTEXT AERIAL VIEW
GND FFL EXTERIOR
SECTION B-B'
MU
ÑO
ZM
AN
ZA
NE
QU
E
VÍA
DE
SER
VIC
IO
N -V
1
C.
DE
AN
N TO
IO
MU
Z ÑO
MA
N
N ZA
EQ
UE
17
AXONOMETRIC DIAGRAM
Chimney +8.32 Ridge +7.97
Parapet +6.00
Parapet +4.00
FFL U.F. +3.10
FFL G.F. ± 0.00 Exterior -0.30
NORTH ELEVATION (ENTRANCE) Chimney +8.32 Ridge +7.97
Parapet +4.00
FFL U.F. +3.10
FFL G.F. ± 0.00 Exterior -0.30
SOUTH ELEVATION
18
CROSS SECTION
CROSS SECTION
19
ATECOCOLLI AUDITORIUM 9TH AND 10TH SEMESTER FINAL PROJECT - UNIVERSIDAD IBEROAMERICANA AV. P.º DE LA REFORMA 50, POLANCO V SECC, MEXICO CITY, MEXICO
The focus of this project was to explore parametric design by learning how to use Rhino and Grasshopper to model advanced architectural forms and structures. The assignment involved applying these tools to develop a contemporary proposal for the existing National Auditorium in Mexico City. The Atecocolli is one of the most representative elements of the culture of Anahuac. The symbolism and meanings it contains are closely related to the philosophy, art, and mysticism of ancient peoples. The word Atecocolli refers to the marine conch shell, an instrument commonly sounded during the various stages of ceremonies and rituals such as dance, the temazcal, and music. The Atecocolli was chosen as the concept for the development of this auditorium because it holds a deep connection to sound and Mexican culture, and it will endure through the architecture of this space, a space whose purpose is to foster culture around sound and the environment. The design process evolved until the curves of an atecocolli were successfully conceptualized into the facades and elevations of the auditorium, generating a livable interior space that helps amplify sound while simultaneously allowing visitors to admire the performances and the beauty of this celestial space.
SECTION A-A’
SECTION B-B’
WEST ELEVATION
SOUTH ELEVATION
20
BACKSTAGE LEVEL
PARKING LEVEL
LEVEL 1
GALLERY LEVEL
RESTAURNT LEVEL
LEVEL 3
The Atecocolli Auditorium is designed to accommodate 10,000 people and features various areas that operate year-round, including its restaurants. The auditorium also includes an event space where art exhibitions can be mounted and conferences can be held. The facade system of the Atecocolli consists of metallic hexagons that draw reference to nature. The hexagons are made of metal and finished in cochineal red, a color chosen to symbolize this singular and iconic Mexican hue. Select hexagons are made of glass to allow natural light to filter through to the vegetation inside the restaurants.
21
The structural design proposes a temporary system of columns and supporting elements to facilitate the assembly process. Once this temporary framework is in place, the prefabricated nodes and structural components would be connected. Rhino and Grasshopper were used to model each node, define the height of each column, and calculate the dimensions of the structural elements. This parametric design process ensures that the components could be accurately fabricated and assembled to form the proposed final structure.
HIGHTS TABLE
X
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
3m
3m
W
X
Y
Z
A1 B1 C1 D1 E1
F1 G1 H1
I1
J1
K1
117m
0. 20.54922 1. 30.230142 2. 26.502072 3. 29.829096 4. 36.3214 5. 31.074077 6. 18.254651 7. 37.815275 8. 38.547297 9. 29.136104 10. 8.729745 11. 36.705856 12. 40.365473 13. 35.480671 14. 10.840343 15. 33.403951 16. 40.598554 17. 38.817557 18. 24.193951 19. 27.373354 20. 39.563951 21. 40.449805 22. 31.892949 23. 17.056896 24. 36.995302 25. 40.897465 26. 36.202628 27. 10.779422 28. 30.292277 29. 40.098727 30. 39.393439 31. 26.563609 32. 17.927863 33. 36.920386 34. 40.348 35. 33.901509 36. 2.766696 37. 29.542746 38. 39.544343 39. 37.845428 40. 20.940342 41. 16.148769 42. 36.107294 43. 39.034054 44. 29.795345 45. 0.231177 46. 29.888376 47. 38.255977 48. 33.533416 49. 8.026549 50. 19.520429 51. 36.085948 52. 35.379324 53. 16.60177 54. 12.474557 55. 33.590563 56. 34.403166 57. 16.352433 58. 8.072163
58. 8.072163 59. 31.422402 60. 32.249443 61. 11.935373 62. 10.621313 63. 30.689204 64. 26.65221 65. 18.853227 66. 28.314424 67. 11.003035 68. 10.494172 69. 25.240844 70. 6.976489 71. 14.957918 72. 17.561227 73. 0.385258 74. 16.663009 75. 7.544905 76. 1.11259 77. 11.300739 78. 11.722198 79. 5.543963 80. 0.924653 81. 11.839881 82. 14.566892 83. 0.133864 84. 13.70392 85. 15.4827 86. 6.860915 87. 16.224416 88. 2.06558 89. 7.763662
3m
Y
1 7m
2 7m
3 7m
4 7m
5 7m
6 7m
7 7m
8 7m
9 7m
10 7m
11 7m
12 7m
13 7m
14 7m
15 120m
7m
16 7m
17 7m
18 7m
19 7m
20 7m
21 7m
22 7m
23 7m
24 7m
25 7m
26 7m
27 7m
28 7m
29 7m
30
3m
3m
3m
3m
3m
3m
6m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
3m
6m
3m
3m
22
CONNECTION N5-N10 N5-N4 N3-N4 N10-N9 N3-N8 N3-N2 N2-N7 N1-N2 N1-N6 N8-N13 N5-N10 N7-N12 N4-N9 N6-N11 N13-N12 N11-N12 N3-N5 N5-N8 N5-N7 N5-N2
N2-N4 N4-N7 N4-N6 N1-N4 N8-N10 N10-N13 N10-N12 N7-N10 N7-N9 N9-N12 N9-N11 N6-N9
TUBE/ DIMENSION (m) 0. 33.132212 1. 15.951816 2. 34.702511 3. 19.150652 4. 41.941561 5. 11.907509 6. 42.802967 7. 13.491129 8. 43.853561 9. 23.216642 10. 17.963668 11. 24.206929 12. 18.17631 13. 27.130252 14. 18.977342 15. 18.18895
Hollow carbon steel tube, 80mm in diameter, dimensions indicated in table; inserted into the indicated node approximately 50mm and welded on site.
Prefabricated node. Composed of a 100mm diameter carbon steel sphere, welded to a 120mm diameter hollow carbon steel sphere.
16. 23.535921 17. 20.722666 18. 20.545002 19. 24.28116 20. 23.663206 21. 21.614715 22. 20.540065 23. 25.776124 24. 16.489076 25. 13.016872 26. 13.654478 27. 16.595937 28. 16.694811 29. 13.859691 30. 13.71188 31. 18.402975
Hollow carbon steel tube, 80mm in diameter, dimensions indicated in table; inserted into the indicated node approximately 50mm and welded on site.
N12 Prefabricated node. Composed of a 100mm diameter carbon steel sphere, welded to a 120mm diameter hollow carbon steel sphere.
23
Connected to the prefabricated nodes, a secondary structural system is designed to form the building’s exterior framework and façade. Each hexagonal metal panel is secured and attached to the nodes. These smaller components connect to the larger structural nodes, creating a continuous exterior system that combines transparent and metallic elements.
Prefabricated stainless steel element composed of a 10cm diameter sphere with extending plates measuring 15cm in length, 1cm in thickness, and 8cm in width. 1cm diameter aluminum bolt.
Stainless steel plate, 1cm thick, 15cm long, and 8cm wide.
10cm
Stainless steel tube, 10cm in diameter. 3cm 10cm
7cm
10cm
Prefabricated stainless steel element, 1cm thick.
1cm diameter aluminum bolt.
24 3
1
2
P1
0
P1 1
P1
4
P1
5
P1
3
A0
P1
6
A3 P1
2
P1
8
P1
7
A1
9
P2
0
1 A4
P2
2
P4
P8 P7
P3
P1 P2
P9
P2 A2
P1
P6
P5
P2
4
P2
3
A3
A1
A0
A2 A0
A4
A1
A4 A2
A3
25
BATÁN LIBRARY
7TH SEMESTER FINAL PROJECT - UNIVERSIDAD IBEROAMERICANA YUCATAN 47, TIZAPÁN SAN ÁNGEL,MEXICO CITY, MEXICO
The Batán Library project emerged from an in-depth study of the needs of the surrounding community. Each student in the class was assigned the same site and asked to analyze its context and propose a project that would contribute to the rehabilitation of the area. I examined the neighborhood’s social, economic, and physical conditions to determine the most appropriate purpose and design for the project. Based on this research, I proposed a public library in response to the area’s lack of accessible educational and cultural resources. The design extends beyond the traditional function of a library by incorporating spaces for public recreation, community interaction, and pedestrian improvements throughout the neighborhood. The library provides a free and welcoming environment where people can access information, develop new skills, and expand their opportunities. This was especially important because the project is located in an economically disadvantaged area of Mexico where many residents have limited access to educational and cultural resources.
Atlamaya San Ángel Inn
Flor de María Altavista
Lomas de San Angel Inn San Ángel Chimalistac
Tizapan
Copilco El Bajo
Olivar de los Padres Progreso
Ermita Tizapan Copilco Copilco and Universidad
Loreto y Campamento
Progreso Tizapan
La Otra Banda
University City Jardines del Pedregal
Pre-Hispanic Era (2500 B.C - 1521 A.D)
Tizapán, nearly as ancient as its rivers, translates from Nahuatl as "upon chalk". Legends tell of ancient Mexicas sent here to perish by serpents that once thrived in the area. The condemned ended up consuming the serpents, possibly referencing the conflict between the Mexicas and the Tepanecas.
“The Image Of the City” Keving Lynch Analysis Paths
Primary Secondary Tertiary
Site
Nodes
Landmarks
Primary Secondary Tertiary
Primary Secondary Tertiary
18th Century
Early evangelization saw Tizapán fall under Dominican influence upon their arrival in the New Spain. By then, the city flourished with a thriving textile industry. It also served as a hub for trade in the bountiful produce from numerous orchards nourished by the same rivers feeding the textile factories.
1950
The piping of the Magdalena rivers - which birthed present-day Eje 10 Sur - and the Chico river - now called Yucatán Street - intensified traffic. This action formed part of an urban infrastructure project aimed at controlling floods and regulating water flow in the area.
19th Century
Textile factories like La Hormiga and La Alpina emerged, becoming primary employment sources for locals. Additionally, one of the city's most significant paper mills, the Loreto factory, was established. Tizapán expanded alongside San Ángel, which by the 19th century had become a community of summer residences.
26 Population Total: 8,412
6,000
Employment
Population by Age Total: 9,750
Total: 18,162
6,000
0-14
15-24
70+
Total: 3,779
Total: 3,189
Total: 1,146
EAP
5,000
Total: 14,687
Total: 7,869
Total: 6,818
4,000 4,000
4,000
2,000
3,000 2,000
2,000
1,000 0
0
Green Areas
Sun Path
0
Underground Rivers
Solid & Void
Summer
N
W
Winter
E
S
Site
Site
Land Use
Wind Rose Diagram NNW
N
Site
Site
Roads & Pathways
Services & Facilities
NNE
NW
NE 10%
WNW
ENE
W
E
WSW
ESE
SW
SE SSW
1.1-2.1 m/s 2.2-3.2 m/s 3.3-4.3 m/s 4.4-5.4 m/s 5.5-6.5 m/s
S
SSE
Site HC CB E
Site
Site Pathways Roads
1970
Social Security clinics and local shopping centers were built, increasing the floating population. Construction began on the ring road (Periférico), the Toluca Avenue underpass, and later, the extension of Revolución Avenue, altering the original layout of Tizapán.
1960
Textile factories closed in Tizapán due to economic and industry shifts. This not only meant job losses but weakened community life. New roadways, commercial and educational facilities construction, alongside factory closures, led to the loss of public spaces once used for recreational activities.
Present Day
Rising traffic necessitates more roads, impacting pedestrian flow with narrower sidewalks. Urban and economic shifts, coupled with governance issues, pose challenges for maintaining public spaces. Nonetheless, Tizapán’s original families’ descendants persist, fostering a resilient community spirit.
27
DESIGN AND CONCEPT SHAPE AND FORM
The building’s form and organization were shaped by the surrounding context. Its geometry follows the site’s property lines and responds to the axes created by neighboring streets and buildings. Part of the structure was elevated to create a shaded public space for a farmers’ market, pedestrian circulation, and community gatherings. The building was also designed in response to the sun’s orientation. Shading elements and carefully positioned windows help prevent overheating and protect the books from direct sunlight, while allowing natural and indirect light to enter where needed. Together, these strategies create comfortable spaces where residents can gather, learn, recreate, and support local businesses.
28
ROOF 9.00 N2 6.00 N1 3.00 PB 0.00
ROOF 9.00 PROJECT AND TECHNOLOGY
R
R
4.25 m²
14
NORTH
WOMEN'S WC 13.87 m²
ACCESSIBLE WC
4.25 m²
31
WOMEN'S ROOM
13.87 m²
5.97
MECHANICAL ROOM
FIRST AID 17.64 m²
19.69 m²
MAINT. RM. 7.82 m²
N1
WOMEN'S WC 13.87 m²
31
5.97
A
MAINT. ROOM
7.82 m²
STORAGE
16.43 m²
1
10
29
1 10.1
15
LOCATION PLAN
9.18
LOCATION PLAN
18
18
COUNTER
30.76 m²
10
PB
18 1 10.1
1 10.1
6.48
29 15
9.51
PANTRY 30.82 m²
9.88
10
C-01
LOCATION PLAN
29 15
12
32 31 15 1030 12 17 29 19 24 25 34 7 8
KITCHEN
12
8.87
19.97 m²
9 10.0
17 9.71
17
7.84
30 19
34 6 10.0
19
7.84
PROJECT
PROJECT
LIBRARY
24
SIMBOLOGÌA
158.09 m²
PROJECT
8.93
9.83
8.86
9.97
BATAN LIBRARY
AUDITORIUM
BOOKSTORE 403.80 m²
30
19
8.61
10.12
8.86
? ?
24
BATÁN
6 10.0
6 10.0
LOBBY 479.44 m²
8.68
10.05
8.86
20
30 9.11
34
34
ROOF
BATAN LIBRARY
24
DRAWING TITLE
DRAWN BY
LEVEL 1
CONSULTANTS
8
10.51
K
F 9.89
I
L
10.01
2
C
ADDRESS
7 10.22
9.63
A-01
SCALE
G 10.51
K
F 9.89
2
Álvaro Obregón, Mexico City
C-01
D
21.88
Yucatán St., Tizapán,
1:150
04/12/2019 15:26:11
11.00
G
C-01
I 10.01
8
Raùl de Villafranca 9.79
10.05
L C
ADDRESS
Yucatan Street, Tizapan, Alvaro Obregon, Mexico City A-02
SCALE
GROUND LEVEL
LEVEL 1
Georgina Vega
A
Josè Vigil
7
1:150
21.88
D
G 10.51
K
F 9.89
I
7
10.01
Josè Vigil
NOMBRE DEL PLA
Raùl de Villafranca
Yucatan St., Tizapan, Alvaro Obregon, Mexico City A-03
SCALE
LEVEL 2
BIBLIOTECA BATÁN
6.00
CONSULTANTS
ADDRESS 9.48
PROYECTO
N2
DRAWN BY
Georgina Vega
ADVISORS
Josè Vigil Raùl de Villafranca
D
LEVEL 2
DRAWN BY
Georgina Vega
8 L C 10.88
DRAWING TITLE 25
1:150
04/12/2019 15:27:33
25
04/12/2019 15:26:19
7.84
GROUND FLOOR
Q 15 12 17 19 -24 25 14 A CG
9.00
DRAWING TITLE
25
PLANO DE LOCALIZACIÒN
LEGEND 9 10.0
9 10.0
8.82
7.75
0.00
16
LEGEND
20
20
TERRACE 62.65 m²
12
LEGEND
CAFETERIA 129.47 m²
7.84
16
9.79
9.38
16
RECEPTION 188.11 m²
17
NORTE
3.00
0 10.5
0 10.5
7.82 m²
1 C-01
PROYECT TECNOLO
NORTH
MEN'S WC 13.87 m²
0 10.5
5.97
31
FREIGHT LIFT 4.20 m² MAINT. ROOM
A
N2
Q
MEN'S WC 13.87 m²
7.68
ACCESSIBLE WC
MEN'S ROOM 13.87 m²
6.00
32 7.68
7.68
TRASH ROOM 10.43 m²
13
Q
NORTH
Q
4.25 m²
PROJECT AND TECHNOLOGY
R
32
32
ACCESSIBLE WC
PROJECT AND TECHNOLOGY
13
13
LOADING /
UNLOADING AREA
PLANTA DE TECH
N1
DIBUJADO POR Georgina Vega
3.00
ASESORES Josè Vigil
PB
Raùl de Villafranca
0.00 CONTEXT
Calle Yucatàn, Tiza Alvaro Obregòn CD
DIRECCIÒN
A-04
ESCALA
The ground floor includes a bookstore, auditorium, cafeteria, reception area, and service spaces. The first level contains the main library, study areas, computer access, and an outdoor study terrace. The third level provides additional book collections and reservable meeting rooms for group activities and community gatherings. ROOF 9.00 N2 6.00 N1 3.00 PB 0.00
NORTH FACADE ROOF 9.00 N2 6.00 N1 3.00 PB 0.00
EAST FACADE
ROOF 9.00 N2 6.00 N1 3.00 PB 0.00
29 ROOF The project also includes an outdoor amphitheater where residents can share artistic and cultural performances, as well as an indoor auditorium for conferences, exhibitions, community meetings, and discussions about social initiatives. The design of the project9.00 draws N2 inspiration from Luis Barragán’s interpretation of Mexican architecture through monumental walls, simple geometric forms, controlled 6.00 openings, filtered natural light, and a strong connection between interior and exterior spaces. Rather than directly reproducing historical N1 motifs, the project reinterprets Mexican vernacular and pre-Hispanic spatial qualities to create a sense of identity, serenity, and commu3.00 nity. PB 0.00 -1 -2.25
ROOF 9.00 N2 6.00 N1 3.00 PB 0.00
SECTION 01
ROOF 9.00 N2 6.00 N1 3.00 PB 0.00 -1
SECTION 02
-2.25
ROOF 9.00 N2 6.00 N1 3.00 PB 0.00
EAST FACADE
30
BIBLIOTECA DEL BATÁN TALLER DE PROYECTO Y TECNOLOGÍA OTOÑO 2019 ALUMNA Georgina Vega Méndez
The Batán Library connects Tizapán’s future with its cultural and environmental history. A preserved batán structure at the center of PROFESORES José VigilMore than a place for learning, the the building recalls the area’s relationship with the Río Magdalena and its former textile activity. Raúl de Villafranca library becomes a space for memory, community identity, and reflection, encouraging residents to value their heritage and support the rehabilitation of the neighborhood.
CAFETERIA CAFETERÍA NIVEL 2 2 LEVEL
AUDITORIUM AUDITORIO LEVEL NIVEL 1 1
TIENDA DE STORE LIBROS BOOK PLANTA BAJA LEVEL GROUND
31
ARENA SANTA FE
4TH SEMESTER FINAL PROJECT - UNIVERSIDAD IBEROAMERICANA GUILLERMO GONZALEZ CAMARENA 1400, SANTA FE, MEXICO CITY, MEXICO
Arena Santa Fe was a fourth semester proyect for the subject of (Proyects 4). The main purpose of the semester was to learn how to develop the executive proyect for an apartment complex with a shopping center, that corresponded with the economical necesities of the site and its surroundings. The proyect´s location was chosen to be at: Guillermo Gonzalez Camarena, 1400, Santa Fe Centro, México City. Santa Fe is one of the most economically active centers within the mexican capital, it is sorrounded by univerities, offices, and small apartments. It is one of the most expensive parts of Mexico to live, renting an apartement costs arround 18 USD x sqm monthly.
Employees
Av.
Sa nta
Fe
Residents Students
Location
Av. de
Los Po etas
Guillermo Gonzalez Camarena 1400, SantaFe Centro, 01376 Ciudad de México, CDMX
One of the biggest problems in Santa Fe is that it wasn´t designed for pedestirans, there is no affordable housing, many people struggle daily to walk around this city, parks are non existant and people don´t have enough affordable places to eat.
8,000 inhabited dwellings
25,000 - 30,000 permanent residents
Services
Employees
Don’t live in Santa Fe
Students
Most of the people who live in apartments in Santa Fe are high class, students, workers and families.
They live in Santa Fe
N
160,000 floating population
13,500 students
40,000 daily vehicle trips
32
1
B
2
C
E
D
F
G
H
Kitchen
Storage
F.F.L. 54.45m Restrooms UP
ROOFTOP TOWER 1
Janitor's closet
F.F.L. 50.70m
Restrooms
LEVEL 14
MOTOR LOBBY LEVEL 5.3m
F.F.L. 47.20m
UP
LEVEL 13 Administration
GARDENS LEVEL 5.3m
F.F.L. 43.70m LEVEL 12
Access Squash courts
F.F.L. 40.20m
Multipurpose room Game room
LEVEL 11 ss
ce
Ac
Seating area
F.F.L. 36.95m
F.F.L. 36.70m
ROOFTOP TOWER 2
LEVEL 10
Restrooms
Reflecting pool
F.F.L. 33.20m
F.F.L. 33.20m
LEVEL 9
LEVEL 9
GARDENS
LEVEL 5.3m
F.F.L. 29.70m
F.F.L. 29.70m
LEVEL 8
LEVEL 8
Reflecting pool DN
Gym
F.F.L. 26.20m
F.F.L. 26.20m
Playground
F.F.L. 26.20m
LEVEL 7
LEVEL 7
ROOFTOP TOWER 3
Garden
F.F.L. 22.70m
F.F.L. 22.70m
LEVEL 6
LEVEL 6
F.F.L. 19.20m
F.F.L. 19.20m
Garden
E OP SL
5%
LEVEL 5
LEVEL 5
Reflecting pool
F.F.L. 15.70m
F.F.L. 15.70m
Restrooms
LEVEL 4
LEVEL 4
Garden
DOWN
cti
fle
Playground
Re
ng
ol
po
ROOFTOP
F.F.L. 12.20m
F.F.L. 12.20m
LEVEL +8.00m
LEVEL 3
LEVEL 3
Terrace with tables
F.F.L. 8.70m
F.F.L. 8.70m
LEVEL 2
LEVEL 2
Bridge
SLOPE 15%
ROOFTOP
Bridge
LEVEL +8.00m
Table and kiosk area
F.F.L. 5.20m
F.F.L. 5.20m
LEVEL 1
LEVEL 1
F.F.L. 1.70m
F.F.L. 1.70m
GF APARTMENTS
GF APARTMENTS
Terrace with tables
SLOPE 15%
Bridge
ROOFTOP
LEVEL +8.00m
Reflecting pool Garden Reflecting pool
MARKET
F.F.L. -5.30m
Reflecting pool
ROOFTOP
LEVEL 1.80m
F.F.L. -5.30m
LEVEL +8.00m
Crafts area Garden
Reflecting pool
NORTH FACADE
Garden Playground
PARKING EXIT DN
SLOPE 5%
DOWN
DOWN
DOWN
SIDEWALK
DOWN
LEVEL 0.90m
Reflecting pool
DOWN
The land has a topography that descends from the street all the way down to the apartments. In this proyect the street was previously dangerous for pedestrians, and dificult to walk, so the one of the main purposes of the proyect was to develop a place with pleasent features for pedestrians.
DOWN
5% SLOPE
Garden
PARKING ENTRANCE DN
SIDEWALK
LEVEL +0.00m
Reflecting pool
Garden
COMPLEX - MOTOR LOBBY
Starting at the first part of the land there is a park that welcomes people to the market, with recreational spaces for children and places to sit for people that walk by.
Grill Area
ROOFTOP LEVEL +42.0m
Circulation Core
GARDENS LEVEL -5.3m Multipurpose Room
Squash Courts
Circulation Core
DN
ROOFTOP
LEVEL +59.5
Table Area
1
Sundeck Area
2
B
C
D
E
F
G
H
MOTOR LOBBY LEVEL +31.5m
Water Feature
GARDENS LEVEL -5.3m
F.F.L. 54.45m TOWER 1 ROOF Water Feature
Pool
F.F.L. 50.70m LEVEL 14
Playground Garden
F.F.L. 47.20m LEVEL 13 Garden
F.F.L. 43.70m
PE
LEVEL 12
5%
SLO
F.F.L. 40.20m LEVEL 11
Water Feature Restrooms Garden
DN
Water Feature
Playground
F.F.L. 36.70m LEVEL 10
ROOFTOP LEVEL +8.00m
Table Terrace
Bridge
ROOFTOP
SLOPE 15%
Bridge
LEVEL +8.00m
Tables & Kiosks
F.F.L. 36.95m TOWER 2 ROOF
F.F.L. 33.20m LEVEL 9
F.F.L. 33.20m LEVEL 9
F.F.L. 29.70m LEVEL 8
F.F.L. 29.70m LEVEL 8
F.F.L. 26.20m LEVEL 7
F.F.L. 29.95m LEVEL 7
F.F.L. 29.95m TOWER 3 ROOF
Table Terrace
SLOPE 15%
Bridge
ROOFTOP
F.F.L. 22.70m LEVEL 6
F.F.L. 26.20m
F.F.L. 19.20m LEVEL 5
F.F.L. 22.70m LEVEL 6
F.F.L. 15.70m LEVEL 4
F.F.L. 19.20m
F.F.L. 12.20m LEVEL 3
F.F.L. 15.70m LEVEL 4
LEVEL 7
Water Feature
LEVEL +8.00m Garden Water Feature
MARKET
Water Feature
LEVEL -1.80m
ROOFTOP
LEVEL +8.00m
Artisan Area
Garden
Water Feature Garden
LEVEL 5
Playground
PARKING EXIT DN
SLOPE 5%
DN
DN DN
SIDEWALK Water Feature DN
DN
Garden
PARKING ENTRANCE
F.F.L. 8.70m LEVEL 2
F.F.L. 12.20m
F.F.L. +6.20m MARKET ROOF
F.F.L. +6.20m MARKET ROOF
LEVEL 3
DN
LEVEL -0.90m
F.F.L. +2.20m MARKET UPPER LEVEL
F.F.L. +2.20m MARKET UPPER LEVEL
PE 5%
SLO
BMW
SIDEWALK LEVEL +0.00m
F.F.L. -1.80m MARKET LOWER LEVEL
Garden
CROSS SECTION OF THE COMPLEX
COMPLEX - ROOF TOP
CROSS SECTION OF THE COMPLEX
F.F.L. +0.00m SIDEWALK F.F.L. -1.80m MARKET LOWER LEVEL
Water Feature
33
THE MARKET
1.2
1.3
1.4
1.5
1.7
1.6
1.8
1.9
Near Santa Fe there is a very poor town, this proyect´s market was designed to accomodate not only known restaurants in the kiosks, but also local restaurants from the poor towns near santa fe. The idea is to create a calendar and assign free some of the kiosks in certain dates to certain businesses. 3.7
2.1
2.2
3.8
F.F.L. +6.20m ROOFTOP MARKET
3.6
2.3
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
DN
4.1
3.5 2.4
3.4
1.8
2.5 3.3
2.6
E
OP
SL
2.7
F.F.L. +2.20m UPPER FLOOR MARKET F.F.L. +0.00m SIDEWALK F.F.L. -1.80m GROUND FLOOR MARKET
5%
3.2
4.2
Seating Area
DN
1.7
4.3
ol
ng
cti
fle
Food Kiosks
Po
Re
Restrooms
Access Control
Circulation Core
UP
1.6 Food Kiosks
Seating Area
Access
Hall
Seating Area
Seating Area
LEVEL -1.80m
Food Kiosks
MARKET - GF
3.1
2.8
Seating Area
Food Kiosks
4.5
LEVEL -1.80m
Food Kiosks
MARKET - GF
Access
1.4
LEVEL -1.80m
4.4
Access
Exhibition
MARKET - GF
1.5
MARKET - GF
4.6
LEVEL -1.80m
Reflecting Pool
Food Kiosks
Garden
Access Reflecting Pool
MARKET
Access
Reflecting Pool
4.7
LEVEL -1.80m
1.3
Crafts Area
Garden
1.1
Access Seating Area
Exhibition
Reflecting Pool
Hall
1.2
4.8
Garden
F
F.F.L. +6.20m ROOFTOP MARKET F.F.L. +2.20m UPPER FLOOR MARKET F.F.L. +0.00m SIDEWALK F.F.L. -1.80m GROUND FLOOR MARKET
MARKET LONGITUDINAL SECTION
Playground
F G
DN DN
Circulation Core UP
SLOPE 5%
DN
DN DN
SIDEWALK
DN
LEVEL -0.90m
Reflecting Pool DN
Garden
DN
SLOPE
5%
DN
MARKET LONGITUDINAL SECTION
LONGITUDINAL SECTION - MARKET
SIDEWALK
LEVEL +0.00m
Reflecting Pool
GROUND FLOOR - MARKET
F.F.L. 6.80m
2.1
F.F.L. 6.80m
4.1
3.6
2.3
3.7
3.8
3.7
3.5
1.8
2.5
4.3 3.2
2.7
F.F.L. -1.80m F.F.L. -1.80m GROUND FLOOR MARKET GROUND FLOOR MARKET
1.6
4.4
MARKET 1.5 3.1
2.8
CROSS SECTION - MARKET
4.7
1.1
EXPO ROOM 4.8
1.2
LEVEL 1 - MARKET 3.8
3.7 2.1
4.1 3.6 2.2 2.3 3.5
1.8
2.4
C3
3.4 T2
2.5
4.2
3.3
T2
2.7 C3
T4
T2
C3
T2
T2
T2 T4 T4
C3
1.5
C3
C3
C3
T2
T4
T2
T2
T4 C3
T2
T4
T2
T2
C3
T4 T4
T2
T4 C3
T4
T2
T2 T4
T2
C3
T2
T2
3.1
T2
4.5
T2
T2
T2
C3
C3
C3
4.6
T2
T2
T2
T2
T2
T4
T2
C3 T2
T2 C3
T2
C3
C3
C3
4.7
T2
C3 T2
T2
T4
T2
T2
T4
T4
T4
4.4
T2 C3
T4
C3
T4
T4 T2
C3
T2
T4
1.1
C3
T4 C3
C3
2.8
T2
T2
C3
T2
T2
C3
T4
C3 T2
T4 T4
C3
T2 T2
T2
T2
T2 T2
C3
T4 T4
C3
T4
T2 T2
C3
T2 T2
T2
T4
T4 T4
4.3
T4
C3 T2
C3 C3
T2
1.3
3.2
C3
T2
T4
1.6
T4 T2
T2
1.4
C3
2.6
T2
T4
T2
T2 T4
1.2
C3 C3
T2
T2 T4
C3
T2
C3
T2
T2 T4
C3
T2 C3
STRUCTURAL PLAN - MARKET
RAMP
MARKET CROSS SECTION
4.6
1.3
1.7
F.F.L. 0.72m F.F.L. 0.72m RAMP
4.5
MARKET
MARKET
C3
F.F.L. 6.20m ROOFTOP MARKET
F.F.L. 6.20m ROOFTOP MARKET
F.F.L. UPPER 2.20m FLOOR MARKET UPPER FLOOR MARKET
4.2
3.3 2.6
1.4
3.8
F.F.L. 2.20m
3.4 2.4
1.7
3.8
3.7
Garden
2.2
F G
T4
C3
4.8
MARKET CROSS SECTION
34 H G F E
THE APARTMENTS
D
B
AC
3
C
4
3
C
F.F.L. 54.45m TOWER 1 ROOF
The apartments consist of three towers that connect through elevators, stairs, parking and services; All services are shared among the tennants and owners.
Kitchen
Storage
F.F.L. 50.70m
Restrooms UP
LEVEL 14
Janitor's Closet
Circulation Core
3
B
F.F.L. 47.20m
MOTOR LOBBY
LEVEL 13
LEVEL -5.3m UP
F.F.L. 43.70m
5
Administration
GARDENS
LEVEL 12
Circulation Core
LEVEL -5.3m
Access
F.F.L. 40.20m
A
Squash Courts
4
LEVEL 11
Multipurpose Room
Game Room ss
ce Ac
Seating Area
F.F.L. 36.95m TOWER 2 ROOF Restrooms
Reflecting Pool
6
GARDENS
F.F.L. 33.20m
LEVEL -5.3m
LEVEL 9
Reflecting Pool
F.F.L. 29.70m LEVEL 8
DN
Gym
Playground Garden
F.F.L. 26.20m LEVEL 7 Garden
F.F.L. 22.70m
PE SLO
LEVEL 6
5%
Reflecting Pool
F.F.L. 19.20m LEVEL 5
1
Garden
DOWN
Playground
F.F.L. 15.70m LEVEL 4 2
F.F.L. 12.20m
1.2
1.1
1.3
1.4
1.5
LEVEL 3
1.7
1.6
H
F.F.L. 8.70m LEVEL 2
F.F.L. 5.20m
G
MOTOR LOBBY
F E
LEVEL 1
D
F.F.L. 1.70m GROUND FLOOR APARTMENTS F.F.L. +0.00m SIDEWALK
3
BMW
Bathroom
F.F.L. -1.80m MARKET
Living
F.F.L. -5.30m
C
Bathroom
Bedroom
Circulation Core
Kitchen/Dining
Bathroom
Living
3
Bedroom
UP
Bedroom
Living
GARDENS
Kitchen/Dining
Bedroom
Living
Bedroom
Living
F.F.L. -5.30m
Bedroom
Kitchen/Dining
Bathroom
Bathroom
Kitchen/Dining Kitchen/Dining
UP
Hall
Circulation Core
Bathroom Kitchen/Dining
Bathroom
B
BASEMENT -02
Bedroom
5
Bedroom
Living
Living
Living
Living
Bedroom
Kitchen
Bedroom Bedroom
Kitchen/Dining
Bedroom
F.F.L. -12.30m
Bathroom
Kitchen/Dining
Bathroom
Kitchen/Dining
Bathroom
BASEMENT -01
Bathroom
Bathroom
F.F.L. -8.80m
Kitchen/Dining
Kitchen/Dining Hall
Living
Bedroom
BASEMENT -03 Bathroom
LONGITUDINAL SECTION - MARKET
Dining
Bathroom
F.F.L. -15.8m
Bathroom
4
Hall
BASEMENT -04
Bedroom
Living
Closet
F.F.L. -19.30m
LONGITUDINAL SECTION OF THE COMPLEX
Living Kitchen/Dining
A
Kitchen/Dining
Bathroom
Secondary Bedroom
Closet
Kitchen/Dining Bathroom
Primary Bedroom
Living
Kitchen
Bathroom
6 Bedroom
Living
Closet Dining
C''
APARTMENT TYPOLOGIES
Primary Bedroom
D
E
F
G
H
Bathroom
C' Secondary Bedroom
H C
G
1 F
3
Y LINE
PROPERT
E Storage
B Y LINE
PROPERT
UP
Emergency Generator
Maintenance Room
Apartment Access
Storage
C''
D
DN
D
E
F
G
2
H
C'
4
DN UP
Apartment Access
A
5
UP
C
PROPERTY LINE
3
PROPERTY LINE
BASEMENT 01 LEVEL -8.80
DN
CIAS T1
T2
Kitchen
T2
C1
T2
T2
Storage
C1
TY LINE CIAS PROPER COLINDAN
T3
T2
C1
OP
E
15%
C1
T1
T1
T2
T3
SLOPE 15%
PROPERTY LINE
SLOPE 15%
C2 T2
T3
T3
T3 T2
T2
T3
T2
T3
Pool
T3
C2
T3
T3
T2
2
EXIT
T3
UP T2
T3
IAS
6
CO T2
T3
T3
ANC
IAS
NC
DA
LIN
T3 C2
T3
T2
COL
IND
T3 T2
T3 C2
LEVEL +60.25
C2
T3
T3
C2
UP
ROOFTOP
T2
T3 T2
T2
T3
T3
1
4'
A
C2
T2
T2
3'
Sundeck area
T2 T3
C2
T2
T2 T3
T2
5'
T2
T3
T2
T2 T3
T3
T3
LEVEL +59.5
T3
T2
T3
T3
C2
T1
C1 T2
4
ROOFTOP TOWER 1
T3 C2
T3 T1
T3
T3
T2
T2 T2
T2
T2
T2 T2
1'
5
C1 T1 C1
T3
T3
C2
Multipurpose room
6
T2
T2 T3 T2
T2
T3
T2
T3
T3
C2
T2
LEVEL +42.0m
B
T3
C2 T2
T2 T3
C1
UP
LEVEL +31.5m
ROOFTOP TOWER 2
T2
T1
T2
T3
T2 T1
T2
T2 C1
2'
ROOFTOP TOWER 3 Grill area Dining area
DN
Restrooms
T1 C2
T3 C2
T2
T2
T1
T2 T2
T3
T2 C1
T1
T2
2
T3
T2
T3
T2 C1
T3
T3
Commercial Access
1
T2
T2
T3 UP
Cleaning room
DN
Restrooms
4 5 T2
C1
C1
T3
T3
T3
T2
T2
COLINDANCIAS
SL
1'
T2
T2
T1
T2 T1
T3 T1
T3
T1
T3
C1
C1
T3 C2
T2
C
T1 T1 T2
T2
T2
T1 T2
T2
T2
T1
T3 T2 C1
T2
15%
Restrooms
T2
T2
T2
T3
OP
C1
C1
C2
T2
A SL
E
T2
T2
6 DN
T1
T2
COLINDANCIAS
Security Apartment Access Control
PROPERTY LINE
3
T2
COLINDAN
T1
T2
B
POOL
T2
LEVEL +58.0m
T3
2'
ROOF TOP
ENTRANCE 3' 4'
5'
1 H G F E D
2
BASEMENT - LEVEL 01
3
BASEMENT - STRUCTURAL PLAN
T1 T1 T1
T1
C
T2
T1
T2
T1
C1
T1
3
The towers are designed in a descendent way so that it has a high efficiency towards the sun. A park with a playground and sitting spaces welcome people who walk from the street to the apartments; Starting at the mottor lobby of the apartements there is a gym, with changing rooms, a teens lounge, an adults lounge, and an event hall with a kitchen and bathrooms.
T1
T2
T1 T1
T1
T2
T2
T1
C1 T1
C1
C1
C1
C1
T2
T2
T2
T2
T1
T2
T2
T2
T2 T1
C1
C1
C1 T1
5
T1
C1
B T1
4
T1
C1 T2
T2
T1
C1 T2
T1
T2
C1
A
T2 T2
6
T1
T1 T1
T1
C1
T2 C1
C1 T2
C1 T1
T1
T2
T1
T1
T1
T1
C1
STRUCTURAL PLANS - APPARTMENTS
1
2
35 The project has 4 parking basements. The first basement is for market customers and apartment visitors, while the last 3 basements are for apartment residents. These 3 towers have 9 typologies: The first tower is for families, therefore, there are 2 typologies: apartments with a master bedroom and another for one or two children. The second and third towers are combined for students and individuals. There are apartments for 2 students and others for up to 4 students. The roof of each tower holds services available to all the apartments owners and tenants, there is a pool, a barbecue and an outdoors event hall. H´
LEVEL +5.20
20 CM THICK CONCRETE FLOOR SLAB, REINFORCED WITH WELDED STEEL MESH AND LOSACERO STEEL DECK. MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM. 1.10
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM. GAUGE 12 WIRE, 0.105" DIAMETER, GALVANIZED STEEL. SUSPENDED GYPSUM-BOARD CEILING, TABLAROCA BRAND, WITH 20 CM SUSPENSION, FIXED TO THE DUROCK LINE TIE-CHANNEL FRAME. FASTENED WITH 3 TURNS IN 3", ACCORDING TO ASTM C 636 STANDARD.
BOX SOFFIT OF DUROCK CEMENT-BOARD PANEL, 13MM THICK (EXTERIOR AND INTERIOR FACE).
3.50
BEDROOM APARTMENT LEVEL 01
LAMINATED GLASS FACADE, SOLAR TEMPERED GLASS MODEL, "TECHO GLASS SOLAR" BRAND, 12MM THICK,
2.40
2.50M X 1.50M WITH RIB-SUPPORT ANGLE BRACKET, SPECIAL ALUMINUM PROFILE, "HERRALUM" BRAND.
ELEGANZA B ALUMINUM RAILING WITH ROUND TUBE HANDRAIL 1 1/2", 9MM TEMPERED GLASS GUARD, 91CM HIGH, "INOXALUM" BRAND.
EXTERIOR CUMARU DECK FLOORING, 150CM X 14CM X 0.19CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET. INTERIOR BLOND WOOD FLOORING, 170CM X 40CM X 0.12CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET WITH MATTE VARNISH.
LEVEL +1.70
20 CM THICK CONCRETE FLOOR SLAB, REINFORCED WITH WELDED STEEL MESH AND LOSACERO STEEL DECK. MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM. 1.10
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM. GAUGE 12 WIRE, 0.105" DIAMETER, GALVANIZED STEEL. SUSPENDED GYPSUM-BOARD CEILING, TABLAROCA BRAND, WITH 20 CM SUSPENSION, FIXED TO THE DUROCK LINE TIE-CHANNEL FRAME. FASTENED WITH 3 TURNS IN 3", ACCORDING TO ASTM C 636 STANDARD.
BOX SOFFIT OF DUROCK CEMENT-BOARD PANEL, 13MM THICK (EXTERIOR AND INTERIOR FACE). LAMINATED GLASS FACADE, SOLAR TEMPERED GLASS MODEL, "TECHO GLASS SOLAR" BRAND, 12MM THICK, 2.50M X 1.50M WITH RIB-SUPPORT ANGLE BRACKET, SPECIAL ALUMINUM PROFILE, "HERRALUM" BRAND.
TYPOLOGY 1 7.00
5.90
EXTERIOR AREA
GYM MOTOR LOBBY LEVEL
EXTERIOR PAVEMENT: 12.5CM THICK CONCRETE SLAB. SEMI-POLISHED PORCELAIN TILE FLOOR, COLOMBINO MODEL PE IV, LIGHT BEIGE, 120CM X 120CM X 0.08CM, "INTERCERAMIC" BRAND, BUTT-JOINTED AND SET WITH INTERCERAMIC TILE ADHESIVE.
LEVEL -5.30 LEVEL -5.12
20 CM THICK CONCRETE FLOOR SLAB, REINFORCED WITH WELDED STEEL MESH AND LOSACERO STEEL DECK. MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM. 1.03
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM.
60CM THICK RETAINING WALL, EXPOSED-FINISH REINFORCED CONCRETE.
2.44
LEVEL -8.80
BASEMENT PARKING 01 VISITORS AND COMMERCIAL
20 CM THICK CONCRETE FLOOR SLAB, REINFORCED WITH DOUBLE WELDED STEEL MESH AND LOSACERO STEEL DECK. MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM. 1.07
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM.
TYPOLOGY 2
H´
36 REINFORCED CONCRETE LEDGE, POLISHED FINISH. DUROCK CEMENT-BOARD WALL, 16MM THICK, WITH 2" X 2" PTR FRAME, GAUGE 18. EXTERIOR CUMARU DECK FLOORING, 150CM X 14CM X 0.19CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET.
ROOFTOP POOL LEVEL 16
LEVEL +55.78
25 CM THICK CONCRETE WALL, REINFORCED WITH STEEL MESH. VENETIAN MOSAIC TILE, FONTIBRE MODEL, NAVY BLUE, 5.2CM X 5.2CM X 0.08CM, "INTERCERAMIC" BRAND, BUTT-JOINTED AND SET WITH PSP INTERCERAMIC ADHESIVE.
30 CM THICK CONCRETE SLAB, REINFORCED WITH STEEL MESH, WELDED STEEL MESH, AND LOSACERO STEEL DECK.
MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM.
1.10
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM. GAUGE 12 WIRE, 0.105" DIAMETER, GALVANIZED STEEL.
5.08 SUSPENDED GYPSUM-BOARD CEILING, TABLAROCA BRAND, WITH 20 CM SUSPENSION, FIXED TO THE DUROCK LINE TIE-CHANNEL FRAME. FASTENED WITH 3 TURNS IN 3", ACCORDING TO ASTM C 636 STANDARD.
BOX SOFFIT OF DUROCK CEMENT-BOARD PANEL, 13MM THICK (EXTERIOR AND INTERIOR FACE).
BEDROOM APARTMENT LEVEL 15
LAMINATED GLASS FACADE, SOLAR TEMPERED GLASS MODEL, "TECHO GLASS SOLAR" BRAND, 12MM THICK,
2.40
2.50M X 1.50M WITH RIB-SUPPORT ANGLE BRACKET, SPECIAL ALUMINUM PROFILE, "HERRALUM" BRAND.
ELEGANZA B ALUMINUM RAILING WITH ROUND TUBE HANDRAIL 1 1/2", 9MM TEMPERED GLASS GUARD, 91CM HIGH, "INOXALUM" BRAND.
EXTERIOR CUMARU DECK FLOORING, 150CM X 14CM X 0.19CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET. INTERIOR BLOND WOOD FLOORING, 170CM X 40CM X 0.12CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET WITH MATTE VARNISH.
LEVEL +50.70
20 CM THICK CONCRETE FLOOR SLAB, REINFORCED WITH WELDED STEEL MESH AND LOSACERO STEEL DECK. MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM. 1.10
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM. GAUGE 12 WIRE, 0.105" DIAMETER, GALVANIZED STEEL. SUSPENDED GYPSUM-BOARD CEILING, TABLAROCA BRAND, WITH 20 CM SUSPENSION, FIXED TO THE DUROCK LINE TIE-CHANNEL FRAME. FASTENED WITH 3 TURNS IN 3", ACCORDING TO ASTM C 636 STANDARD.
BOX SOFFIT OF DUROCK CEMENT-BOARD PANEL, 13MM THICK (EXTERIOR AND INTERIOR FACE).
3.50
BEDROOM APARTMENT LEVEL 14
LAMINATED GLASS FACADE, SOLAR TEMPERED GLASS MODEL, "TECHO GLASS SOLAR" BRAND, 12MM THICK,
2.40
2.50M X 1.50M WITH RIB-SUPPORT ANGLE BRACKET, SPECIAL ALUMINUM PROFILE, "HERRALUM" BRAND.
ELEGANZA B ALUMINUM RAILING WITH ROUND TUBE HANDRAIL 1 1/2", 9MM TEMPERED GLASS GUARD, 91CM HIGH, "INOXALUM" BRAND.
EXTERIOR CUMARU DECK FLOORING, 150CM X 14CM X 0.19CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET. INTERIOR BLOND WOOD FLOORING, 170CM X 40CM X 0.12CM, "AMBIENCE FLOORS" BRAND, BUTT-JOINTED AND SET WITH MATTE VARNISH.
LEVEL +47.20
20 CM THICK CONCRETE FLOOR SLAB, REINFORCED WITH WELDED STEEL MESH AND LOSACERO STEEL DECK. MAIN BEAM: W IR STEEL PROFILE, STEEL 242, 50CM X 80CM. 1.10
SECONDARY BEAM: W IR STEEL PROFILE, STEEL 242, 30CM X 50CM. GAUGE 12 WIRE, 0.105" DIAMETER, GALVANIZED STEEL. SUSPENDED GYPSUM-BOARD CEILING, TABLAROCA BRAND, WITH 20 CM SUSPENSION, FIXED TO THE DUROCK LINE TIE-CHANNEL FRAME. FASTENED WITH 3 TURNS IN 3", ACCORDING TO ASTM C 636 STANDARD.
BOX SOFFIT OF DUROCK CEMENT-BOARD PANEL, 13MM THICK (EXTERIOR AND INTERIOR FACE). LAMINATED GLASS FACADE, SOLAR TEMPERED GLASS MODEL, "TECHO GLASS SOLAR" BRAND, 12MM THICK,
BEDROOM APARTMENT LEVEL 13
G
2.50M X 1.50M WITH RIB-SUPPORT ANGLE BRACKET, SPECIAL ALUMINUM PROFILE, "HERRALUM" BRAND.
H
37
GEORGINA V. ZOPF ARCHITECTURE GEORGINAZOPF@GMAIL.COM 970.846.8770