Skip to main content

GEETA_Interior Design Portfolio_2019-2020

Page 1

Interior Design PORTFOLIO 2019-2020

Geeta Limbu


G E E TA L I M B U g e e t a l i m b u 1 6 @ y a h o o. c o m +91-8861061196

My Design Philosophy Think about some of the friends in your life right now. Who are the standouts? And why? For the most part, it will be the ones with whom you feel the greatest connection. The reason? The unique qualities of their personality gel with the unique qualities of your personality. That connection you feel can mean the difference between a good friend and a great friend. Design is no different. Designing depends on different personality. Personality speaks to people and emotionally engages your audience. My taste in design engages a whole lot of personality trait involvement.


CONTENTS

01 02

GOOGLE Bengaluru

Coorporate Design

Microsoft STC

Coorporate Design


01 GOOGLE

Corporate Design

Google LLC is an American multinational technology company that specializes in Internet-related services and products, which include online advertising technologies, a search engine, cloud computing, software, and hardware. Google was founded on September 4, 1998, by Larry Page and Sergey Brin while they were Ph.D. students at Stanford University in California. Google India started its operation in 2004 with 5 employees. Today, they have close to 5,000 employees across India. Google in India operates from four cities- Bangalore, Hyderabad, Gurgoan and Mumbai. With one of the largest campus outside of the US, Google Hyderabad continues to be google’s headquarters in India.


SITE LOCATION AND DISCRIPTION

Project is located at RMZ infinity, a grade A tech park on Old Madras Road, Bangalore built in 2008. Building is adjacent to Residential, Retail, Medical and hospitality services. There are Five Blocks ( Tower A, B, C, D & E) in the tech park. Site is located at – Tower D Level 3 & Level 4


FUNDAMENTAL FLOOR PLATE ANAYLSIS - 3RD AND 4TH FLOOR

1. BUILDING INFRASTRUCTURE

AHU Rooms Toilets

Fire exit staircase Lift Bank Service Lift

2. DAYLIGHT ANALYSIS

Primary Space Secondry Space Tertiary Space Day Light


3. FIRE EXIT ROUTES

Fire Exit Route Fire Exit Staircases Existing fire exit staircases - 2 no. width of each staircase is 1500mm. As per NBC, 50 people can evacuate per 500mm width of staircase. Total population as / fire exit norms per floor can be maximum up to 300 ppl. Tentative seating capacity per floor - 110 nos. Hence the provided number of fire exit staircases suffices for the total headcount as per code. Fire egress route is within 45m lenght as per NBC code.

4. VERTICAL STACKING


CONCEPT DEVELOPMENT

SOFT INDUSTRIAL WITH BIOPHILIA This concept was developed as an altogether different concept to have a workplace never before done with the industrial and a rustic look feel yet keeping in mind the Google identity which is brought in through the brand colours used in a rustic and muted manner.


MATERIAL BOARD


CONCEPT LAYOUT

This option was developed on the neighborhood cencept with meeting room and collab spaces planned for a cluster of workstation.

Built-up area - 20,535 sqft Usable area - 14068 sqft Circulation - 3300 sqft WORKSTATIONS - 120sqft / person Nos. 117 AREA - 6910 sqft MEETING ROOMS - 1:1.16 No. of Meeting seats - 100 AREA - 1820 sqft INFORMAL AND COLLABORATIVE SPACE - 1:23 No. of finformal Space - 5-7 AREA - 1780 sqft

3RD FLOOR

Built-up area - 20,535 sqft Usable area - 14068 sqft Circulation - 2045 sqft

WORKSTATIONS AREA - 2152 sqft MPR AREA - 1614 sqft CAFETERIA AREA : 3745 sqft LOUNGE AND COFFEE AREA : 1550 sqft INFORMAL AND COLABORATIVE SPACE AREA : 818 sqft

4TH FLOOR


This option was developed on the concept of central core with meeting room surrounding the same. The workstation space was kept free from the meeting and collab spaces.

Built-up area - 20,535 sqft Usable area - 14068 sqft Circulation - 4907 sqft WORKSTATIONS - 120sqft / person Nos. 117 AREA - 5037 sqft MEETING ROOMS - 1:1.16 No. of Meeting seats - 100 AREA - 2077 sqft INFORMAL AND COLLABORATIVE SPACE - 1:23 No. of finformal Space - 5-7 AREA - 2271 sqft

3RD FLOOR

Built-up area - 20,535 sqft Usable area - 14068 sqft Circulation - 3500 sqft WORKSTATIONS AREA - 2045 sqft

MPR AREA - 1400 sqft CAFETERIA AREA : 2271 sqft LOUNGE AND COFFEE AREA : 2271 sqft

4TH FLOOR


3RD FLOOR LAYOUT

4TH FLOOR LAYOUT


ENTRY LOUNGE

SOCIAL HUB


MEETING ROOMS


4 PAX MEETING ROOM 1

INSTYLE : ACUSTIC 1. BASE : NATURAL

INSTYLE : ACUSTIC 2. QUARTZ

INSTYLE : ACUSTIC 1. LIME

CARPET : MILIKEN UDR113-141-05MOSS GREEN

14 PAX MEETING ROOM

INSTYLE : ACUSTIC 3. FIELD

INSTYLE : ACUSTIC 4. RAL : 6011

CARPET : MILIKEN EDG118-141 INCANDESCENT


Acoustical De • • • •

Sound isola Reverberat Speech Intl Noise Crite

List of Key S • • • • •

BS82333:2 practice. Google stan BS EN ISO building. Elements CIBDR Buid

OPEN WORKSTATION

Sound Isolati • • • • •

Door / glaze The glazed vide sound The demisin provide sou It is recomm play / pen n All partitions

Sound Absor

False ceiling: Th (nrc 0.9).

Wall panelling: T two adjacent wa

COLLAB ZONE

• •

25mm thk P 12mm thk P


ACOUSTICAL DESIGN PARAMETER

esign Parameters considered for office space:

ation (D.) tion Time (RT) lligibility (STI) eria (NC)

Color code drawing for each room with typical fising details were shared Meeting rooms / Phone rooms

Standards:

2004--Sound Insulation and noise reduction for tbuildings - Code of

ndards [PGv2.8] O 717-1:1997 Acoustics - Rating of sound insulation in buildings and of

Part 1 Airborne sound insulation. dlines 2003 - Building Services Noise and Vibration levels.

Acoustical Material Option

ion:

ed partition shall provide the sound isolation value of Dw30. and the dry wall partition of the meeting room towards corridor shall proisolation value of Dw35. ng wall partition between meeting room -01 and meeting room-02 shall und isolation valus of Dw45 mended not to puncture / cut the core Dry wall partition to fix the LED disniches in flush with wal. s should be up to true ceiling

rption:

he acoustucal spray shall be of minimum 25mm thk of class-B sound abosorption (NRC 0.8) ans the grid ceiling shall be of class-A sound absortion

Two walls of the meeting room to be finished with class-B sound absorbtive material (NRC-0.8). The sound sbsorptive material to be distributed on alls with non-parallel profile.

PET panels diredt amount or PET panels with 25mm airgap.

LIGHTING CONCEPT Lighting Design that strives to align with Google.

Inovation in Lignting Design & Lighting Solutions to create visually productive and inpiring work enviroment.

Diversity of lighting solutions executed in a cohesive way so as to be appropriate for all age group.

Thrustworthy Computing for a visually balanced and efficient work enviroment.

Enviromently responsible lighting solution by leveraging

efficient through day-light harvesting, Occupancy sensing, Light tuning for new normal thersholds and automatic sun-shading solution through out the working day.


CAFETERIA AND MICRO KITCHEN DESIGN CONCEPT

L4 Tower D CAFE 1. 100 seat Cafe is planned for on this level with limited Back of House support kitchen facility and dish wash area with refuse holding room. Cafe and kitchen shall be supported from kitchen on L5 Tower E Main Kitchen. 2. Google GOGO space WOKJOY brand food concept has been selected for this cafe. 3. Kitchen and Servery counter design has been completed based on WOKJOY brand guidelines and standards


CONCEPT WorkJoy celebrates the night market culture food in major Asian Citues by providing a casual yet quick dining experience with an international menu. TheArchtectural experience to be playful. bright color and resh combined with industrial finishes to create an intriguing playful space.


LADIES WASHROOM


GENTS WASHROOM


02 MICROSOFT STC

Corporate Design

Microsoft (Nasdaq “MSFT” @microsoft) enables digital transformation for the era of an intelligent cloud and an intelligent edge. Its mission is to empower every person and every organization on the planet to achieve more. Microsoft set up its India operations in 1990. Today, Microsoft entities in India have over 16,000 employees, engaged in sales and marketing, research, development and customer services and support, across 11 Indian cities – Ahmedabad, Bengaluru, Chennai, New Delhi, Gurugram, Hyderabad, Kochi, Kolkata, Mumbai, Noida and Pune. Microsoft offers its global cloud services from local data centers to accelerate digital transformation across Indian startups, businesses, and government organizations. Microsoft India Development Center (IDC) is one of Microsoft’s largest R&D centers outside the Redmond headquarters. Set up in Hyderabad in 1998, IDC drives Microsoft’s strategy of globally shared development to build products and services. With a presence in Hyderabad, Bengaluru, and now NCR, IDC houses three technology groups and core engineering services, driving some of the most impactful and innovative work happening across Microsoft.


INSPIRATION The design and architecture of the KP Towers office is also locally relevant, with the region’s Okhla Bird Sanctuary serving as its inspiration. Wide, open corridors are fitted with vibrant murals depicting the region’s biophilia. Installations of Greater Flamingos, Closed-Winged Ducks, Cranes, and other bird species at the Okhla Bird Sanctuary are strategically placed to pay homage to NCR’s rich biodiversity.

The space captures the brilliance of the outside world, offering panoramic views of the calm, serene waters of River Yamuna. Employees can take advantage of the natural vistas and ample natural sunlight in a facility that’s designed to boost their well-being and leisure while offering flexible, inclusive workplaces that can be endlessly customized to suit their needs.

COLOR

AND MATERIAL PALETTE

Colour palette inspired by nature and pastel shades of stone and rock, flowers in the local region. Material palette blending in Industrial aesthetics


STUDY OF BASE BUILDING

2nd to 7th floor : KP Tower, Sector 16B, Noida, India.


LAYOUT

TYPICAL FLOOR PLAN

7TH FLOOR PLAN


SOCILA HUB


ENTRANCE TO TEAM BASE SPACE


OPEN OFFICE

LARGE MEETING ROOM


MEETING ROOM TYPES


7TH FLOOR VIEW

7TH FLOOR - ENTRANCE AND LOUNGE 7TH FLOOR - ENTRANCE TO TEAM BASE SPACE

7TH FLOOR - SOCIAL HUB


7TH FLOOR - CONFERENCE ROOM

7TH FLOOR - GAME ZONE


AFTER COMPLETION

7TH FLOOR ENTRACNE

7TH FLOOR ENTRACNE

7TH FLOOR RECREATION

ENTRANCE TO TEAM BASE SPACE


7TH FLOOR SOCIAL HUB

TYPICAL SOCIAL HUB

7TH FLOOR - CONFERENCE ROOM


G E E TA L I M B U g e e t a l i m b u 1 6 @ y a h o o. c o m +91-8861061196


Turn static files into dynamic content formats.

Create a flipbook