Gonzalo Mu単oz Vera
2012_Portfolio
_about me My experience as architect denotes a continuous learning process, often steep but winding in the end. What I most appreciate from the experience I have had is precisely that, the constant and neverending learning. While work is a need for learning, I can not hide my passion for it even though most of the time it seems a burden, especially as a practitioner. Perhaps that is what gives to architecture its taste and interest, to encourage yourself for new goals and projects to reach. Rethinking our current status in architecture, learning from the yesteryear, trying to not failing again, and most important that all to be a real contribution for pursuing better cities have been my favourites objectives.
The road seems to be long, but I’m getting valuable tools through the experiences in which I have been involved. Undoubtedly, these tools also have helped to reveal me some interests which I have tilted profoundly towards history and theory of architecture. Concerns like the tangible and intangible heritage are themes that catched my eye. Not only in the physical environment, but also incorporating emotions, attitudes, learning from the human being whom we are serving everyday with our work.
s e l e c t e d
a c a d e m i c p r o j e c t s _recent graduate program project
We are the Vultures
(Project for the History & Theory Project Summer Term 2012 - McGill University) Montreal, CANADA Year
About
2012
This project considered two main assumptions—allegories—about an eggcup’s function. These allegories created a point of departure for the subsequent design process. First, an eggcup is understood as a container, a temporary step between the cooking of the egg and its consumption. Cooking is the egg’s last show before its disappearance. Second, the eggcup is like a coffin for its burial ceremony. The project also recognizes that the egg cup is like Charon who in ancient Greek mythology carried dead bodies into the underworld from one point to another in the Acheron River. As with Charon, the eggcup is the place where a dead body is placed and devoured by an external being. In the case of the project, the eggcup is reflected as a Tower of Silence or Darkmeh from Zoroastrian culture. In these towers, dead human bodies were placed on top. There the bodies were left to wait for vultures to literally make them disappear. This eggcup, in a manner similar to the Zoroastrian ritual, encourages a consumer to impale an egg through a copper needle in order to experience its fragility. Then, the egg is cooked with steam and heat from boiled water inside the cubic container. In this act of cooking fire, wind and water work together to create a solid meal whose remains—the eggshells— will evoke the link with the land.
Terminal Metro Station - Temple of Maipu
(Final Year Project - University of Chile 2006) Santiago, CHILE Year Size
About
2006 30000 sqm The project started as an alternative urban design to the official metro extention plan towards Maipu downtown. My proposal, which differed from the official one, detected the most notable points in the districts belonging to this new extension, promoting new urban areas and highlighting those who were forgotten by the time. Regarding the project, this was not only configured as a terminal station, but it also was projected as an intermodal station allowing different types of transportation to arrive and departure from there. Finally, a new building is emerging on the skyline of the city as as part of a master plan also proposed.
Workshop International Forum Unesco 2005 - Heritage Inventory Project, phase 2 in Saint Andre’s Lake. (participant as exchange student from University of Alcala, Spain) Santiago do Cacem, PORTUGAL Year
Status Employer Size About
2005 Completed UNESCO 60 sqm
The workshop consisted in developing design proposals from previous data compiled in a first phase. The project designed consisted in the restoration and a new use of the “Fish House”, by means of relaunch a tourist circuit in Santiago do Cacem. The project included a site museum and a small aquarium in one of its buildings.
p r a c t i c i o n e r
a r c h i t e c t _selected works
Gabriela Mistral Cultural Center (Diego Portales Building enhancement) Santiago,CHILE
Year
Status
2008-2010 1st stage completed
Employer
Lateral Arquitectura y Dise単o
Budget
US$400.000
Client Size About
MOP - Ministry of Public Works 44.000 sqm The project was the award winner of a public national contest about the Diego Portales building remodeling. The project was conceived as a re-opening to the city. This large volume located in downtown Santiago is now opened as a public space fostering cultural activities.
Ñuñoa Underground Parking Lot Santiago, CHILE
Year
Status
2008 Under construction
Employer
PLAN Arquitectos
Budget
US$ 200.000
Client Size About
Municipality of Ñuñoa 13.400 sqm
The project was conceived by the need for an underground parking in harmony with the situation around. It is located in a typical district of the city (Ñuñoa), therefore a respect for the environment was crucial. The project also includes comercial shops, restaurants and services. Hence, this core area of Ñuñoa will improve its conditions to allow better usage of its facilities avoiding an urban damage in the area.
Restoration and enhancement of the Fort Chaicura and Battery Balcacura Ancud, CHILE
Year
Status
2007-2010 Completed
Employer
PLAN Arquitectos
Budget
US$ 50.000
Client Size About
MOP-Chiloe Plan 300 sqm
The project was the award winner of a public national contest that sought a restoration and enhancement for these Spanish Fortifications in southern Chile. The project’s aim was to intervene as less as possible, proposing thus a circuit of platforms around to protect these archaeological sites. A local museum preserves the materials found during the expedition in the field.
_selected contests
Sustainable Neighborhood in Coronel, Chile 3rd Place - International Contest Year
2011
Team
Benjamin Johnson, Ignacio Muñoz, Gonzalo Munoz
Budget
US$2000
Client Size About
Ministry of Publics Works - TRANSELEC 230000 sqm
The project’s aim was to develop a sustainable housing project in the town of Coronel, Bío-Bio, a southern region of Chile. It was also included in the program a concern about the recent earthquake who took place in Chile in February, 27th, 2010.
Maipu Plaza Redesign Contest Santiago, CHILE Year
2009
Team
Felipe Zumaeta, Jean Claude Brunel, Gonzalo Munoz
Budget
US$200.000
Client Size About
Metro Santiago, Municipality of Maipu 100 sqm
The contest consisted of a new design proposal for Maipu’s Plaza. This was due to the arrival of the new subway lines, which would lead to further changes in this green area. The project was based on a mapping of the growing conditions of the current place, in order to find a particular pattern, instead of a design coming from nowhere. This sought to pay attention on the users’ daily activities and their appropriation of the Plaza. The project also raised the pedestrian activity as a key role in the square, in where every step would help to generate electric energy for own lighting in the Plaza.
Restoration of University of Chile’s main building Santiago, CHILE Year
2008
Employer
PLAN Arquitectos
Budget
US$200.000
Client Size About
University of Chile 5000 sqm The stains of time in this nineteenth century building held a contest which, besides raising a main restoration, asked for a proposal in renovating its aspect and usage. The project opened up this building (the largest public university in Chile) towards the urban area around. It generated a public platform, allowing new rooms for exhibitions and meetings. In the upper floor be housed administration offices and other facilities.
Improving the Metropolitan Government building Santiago, CHILE Year
2007
Employer
PLAN Arquitectos
Budget
US$120.000
Client Size
About
Metropolitan Government of Santiago 3000 sqm
The proposal’s aim was to dump the inner courtyard in this the building towards the city. This sought to generate a closer relationship between a public building and a public space for its users, avoiding a hidden condition placed there. The redesign of this courtyard presented a new reception hall as a filter between the urban life outside and the courtyard, configurating a privileged calm plaza located at the same downtown area.