Data Centres & Critical Environments Capability Statement
www.fulkers.co.uk
About Fulkers. Established in 1998, Fulkers Bailey Russell (Fulkers) is a construction consultancy firm offering tailored solutions to clients investing in construction and property within the public and private sectors.
Our business is split into three key sectors: Private, Public, and Residential & Compliance, allowing us to tailor our approach to each client’s unique needs, especially as they become larger and more complex, often requiring multidisciplinary services. We strive to assist our clients in delivering successful and valuable developments.
Fulkers provides a no-nonsense, flexible, result-orientated service: A modern, forward thinking and professional practice, we value each of our clients. It is our objective to maintain a business which offers value for money and allows director attention on all projects.
2
Capability Statement: Data Centres & Critical Environments
Our Approach. At Fulkers, our fundamental responsibility is to improve our clients’ business by helping them achieve their goals and effecting changes to their estate as smoothly as possible. As a B Corp our commitment to working with purpose will remain at the heart of everything we do.
Our People. At Fulkers, we are driven by passion and dedication, offering independent and innovative solutions tailored to our clients’ needs. We thrive in a collaborative team environment that fosters success and consistently exceeds client expectations. Our ISO 9001 certification attests to the high quality of our services, systems, and standards.
Data Centres & Critical Environments Expertise.
Vasili Eleftheriou Managing Director vasili@fulkers.co.uk 07554 418795 Uncommon Borough, 1 Long Ln, London, SE1 4PG
At Fulkers, we support clients in delivering highly resilient, technically complex and operationally critical environments across the data centre, life sciences, research, manufacturing and infrastructure sectors. Our teams work within live operational facilities where maintaining uptime, business continuity and operational integrity is paramount. We understand the challenges associated with delivering projects in environments where downtime is not an option. From hyperscale and co-location data centres to cleanrooms, laboratories, manufacturing facilities and secure infrastructure, we provide technically informed and commercially focused support tailored to each client’s operational requirements. Our experience spans critical power and cooling infrastructure, BMS upgrades, resilience improvements, HV/LV systems, renewable energy integration, specialist fit-outs and complex refurbishment programmes. Whether acting as Project Managers, Cost Consultants, Programme Managers or strategic advisors, we focus on proactive coordination, risk management and collaborative delivery to ensure projects are delivered safely, efficiently and with minimal disruption. We take pride in building long-term partnerships with our clients, supporting them in developing future-ready, sustainable and resilient critical environments that align with evolving operational, technological and regulatory demands.
4
Capability Statement: Data Centres & Critical Environments
Our Experience.
5
CASE STUDY:
IBM EMEA Data Centre Infrastructure & Resilience Programme.
IBM
Location: UK and EMEA Value: >£75m
IBM required the ongoing upgrade and replacement of critical infrastructure across its live UK and EMEA data centre portfolio while maintaining uninterrupted operations. The programme included resilience improvements, power and cooling upgrades, security enhancements and specialist fit-outs across highly sensitive operational environments, including listed buildings and 24/7 facilities.
upgrade at Greenford including generators, UPS facilities and switchgear, and £6.2m HV switchgear replacement works at North Harbour. Additional projects included live chiller replacements, data hall expansions, security upgrades with biometric access controls, and new machine room developments. All works were independently commissioned and subject to Integrated Systems Testing.
Fulkers team members delivered cradle-to-grave project and cost management services across a range of critical infrastructure schemes over a 15-year period. Key projects included a £12m resilience upgrade to a 100,000ft² IBM Mega Centre incorporating diesel rotary UPS systems and static transfer switches, an £18m infrastructure
The programme successfully modernised IBM’s critical infrastructure estate with zero downtime across all live environments. The upgrades improved operational resilience, cooling efficiency, physical security and future asset management capability while maintaining uninterrupted business operations throughout delivery.
6
Capability Statement: Data Centres & Critical Environments
CASE STUDY:
Equinix Critical Infrastructure Upgrade Programme.
EQUINIX
Location: Slough Value: Undisclosed
Equinix required the ongoing upgrade and modernisation of critical infrastructure across its UK data centre portfolio while maintaining uninterrupted operations and protecting customer service level agreements. The programme included BMS consolidation, lifecycle replacement of critical plant and resilience improvements across multiple live colocation environments supporting global clients. Fulkers is providing Technical Project Management, Programme Management and Cost Management services across a range of critical infrastructure projects. This includes the migration of multiple sites onto a new Building Management System platform while maintaining full visibility and control of operational plant. Fulkers is also supporting the replacement of UPS systems and batteries, alongside
programmes to upgrade CRAC units, generators and chillers with more energy-efficient solutions as part of Equinix’s lifecycle maintenance strategy. In parallel, the team manages day-to-day infrastructure projects across operational data hall campuses, coordinating stakeholders, consultants and contractors through all RIBA stages. The programme is improving operational resilience, efficiency and maintainability across Equinix’s live data centre estate while minimising risk and avoiding disruption to critical services. Fulkers collaborative delivery approach supports informed decision-making, programme continuity and longterm infrastructure performance across multiple operationally critical environments.
7
CASE STUDY:
Deutsche Bank Data Centre Upgrade Programme.
DEUTSCHE BANK
Location: Various Value: >£70m
Deutsche Bank required the ongoing expansion and enhancement of its critical data centre infrastructure to support increasing IT demand, operational resilience and future business growth. The projects needed to be delivered within live operational environments while maintaining service continuity and supporting evolving technology requirements. Fulkers team members, under previous employment, provided project management and cost management services across a range of critical infrastructure and data centre projects. This included the fit-out of a new data hall delivering an additional 400kW of power capacity, and upgrades to uninterrupted power supply (UPS) pod cooling systems through the installation of new air handling units. Additional schemes included full pre- and post-contract cost management for a £37m, 30,000ft² 2N resilient data centre in Hayes, incorporating support offices and upgraded incoming electrical supplies. Fulkers also delivered option studies for a £30m IT extension project and cost planning services for a £4m rapid deployment “Net Shelter” solution to address immediate IT capacity requirements. The programme enhanced the bank’s operational resilience, IT capacity and infrastructure flexibility while supporting uninterrupted operations across live critical environments. Fulkers technical and commercial expertise enabled the successful planning and delivery of scalable, high-performance data centre solutions aligned to the client’s longterm growth strategy.
8
Capability Statement: Data Centres & Critical Environments
CASE STUDY:
Barclays Data Centre & Critical Infrastructure Programme.
BARCLAYS
Location: Various Value: >£50m
Barclays required ongoing support to expand and modernise its critical infrastructure and data centre estate in response to significant portfolio growth and increasing operational demands. Projects needed to be delivered within live operational environments while maintaining resilience, business continuity and future scalability across missioncritical banking operations. Over a 10-year period, Fulkers team members delivered project management, cost management and risk management services across a broad range of infrastructure and data centre schemes. Key projects included Project Dart, delivering a 24,000ft² white space fit-out with future technical expansion capability, and Project Spear, a new-build
data centre on the Gloucester campus. Additional works included £3m CRAC cooling upgrades in Canary Wharf, £3m busbar and cabling replacement works in West London, and £2m communications room cooling replacement works within live facilities. The team also supported the development of a new 65,000ft² Tier 4 data centre, a 16,000ft² Tier 4 extension incorporating mixed water and CO₂ cooling systems, disaster recovery fit-outs, and detailed cost planning for a £50m data centre and HV infrastructure expansion in Gloucester. The programme enhanced Barclays’ operational resilience, technical capacity and infrastructure flexibility while maintaining uninterrupted operations across live critical environments.
9
CASE STUDY:
National Composites Centre Phase II Exp
UNIVERSITY OF BRISTOL
Location: Bristol Value: Undisclosed
10
Capability Statement: Data Centres & Critical Environments
pansion.
The National Composites Centre required a major expansion to support increasing demand for advanced manufacturing, research and development facilities across sectors including composites, bio-engineering, photonics and quantum computing. Phase II needed to more than double the existing facility to approximately 194,000ft² while accommodating specialist manufacturing equipment, laboratory cleanrooms and diverse stakeholder requirements within an accelerated programme and complex funding environment. Fulkers provided project and cost management services throughout the fast-track expansion programme. The development included laboratorygrade cleanrooms, freezer stores, training and conference facilities, office accommodation and specialist manufacturing spaces housing three gantry cranes and one of Europe’s largest
hydraulic presses for composite manufacturing. To mitigate programme risks, Fulkers developed a phased procurement strategy separating enabling groundworks and major rock excavation from the main NEC3 Design & Build contract procured under OJEU procedures. Fulkers also coordinated specialist third-party suppliers responsible for the installation and commissioning of the hydraulic press infrastructure, while undertaking ongoing cost reporting, whole-life costing, value engineering and financial modelling. The project successfully delivered a technically complex, highly serviced research and manufacturing environment within a challenging programme. Fulkers collaborative and commercially focused approach enabled effective stakeholder management, programme certainty and futureready facilities supporting world-class research and innovation.
11
CASE STUDY:
NCC Critical Environment & Workshop Expansion Programme.
UNIVERSITY OF BRISTOL
Location: Bristol Value: £10m
The National Composites Centre required a series of phased refurbishment, expansion and infrastructure projects to support evolving advanced manufacturing and aerospace research programmes. The works needed to be delivered within live operational environments while accommodating specialist equipment, cleanroom requirements and new customer operational needs. Fulkers provided programme and project management services across multiple projects including the £500k APC Mezzanine conversion, creating new office accommodation with acoustic separation from operational workshop areas and new high-level escape infrastructure. Additional works included the £1.5m Workshop 3 Extension incorporating storage, plant space, a substation, LV switchroom and specialist fatigue rig facilities 12
Capability Statement: Data Centres & Critical Environments
supporting the iCAP research programme. Fulkers also led the £6m Wing of Tomorrow Programme, coordinating four major work packages including refurbishment works for Spirit AeroSystems and a new-build extension for Airbus, both incorporating new gantry cranes. Phase 2 works included £2m of cleanroom environmental upgrades and engineering improvements delivered through phased works and move management within live facilities. The programme successfully enhanced the NCC’s operational capability, specialist manufacturing capacity and research infrastructure while maintaining continuity across live environments. Fulkers phased delivery approach enabled complex technical upgrades to be completed efficiently with minimal disruption to ongoing operations and research activities.
CASE STUDY:
Vectura Cleanroom Refurbishment & R&D Expansion.
VECTURA GROUP
Location: Chippenham Value: £1.5m
Vectura required the expansion of its operational facility in Chippenham to increase manufacturing, research and development capability in response to growing demand. The project needed to deliver specialist cleanroom environments within an existing live facility while minimising disruption to ongoing operations. Fulkers supported the refurbishment and conversion of existing warehouse and storage areas to create approximately 8,000ft² of new research and development space. The project included the delivery of Class C and Class D cleanroom environments designed to support specialist pharmaceutical and manufacturing activities.
Careful planning and coordination were required to integrate the new facilities within the existing operational site while maintaining compliance with the technical and environmental standards required for controlled cleanroom spaces. The project successfully expanded Vectura’s manufacturing and research capability through the creation of high-specification cleanroom facilities within a live operational environment. The refurbished spaces provide flexible and future-ready accommodation to support ongoing innovation, product development and operational growth.
13
CASE STUDY:
Cytiva Global Life Sciences Manufacturin
CYTIVA
Location: Various Value: £XX
Cytiva required strategic support to expand and modernise its global manufacturing and life sciences facilities across the UK, Europe, the US and Canada. The programme needed to support increased production capacity for critical healthcare and life sciences products while maintaining consistency in project governance, delivery standards and operational continuity across multiple international sites.
site-wide expansion, the £200m Pensacola expansion programme, and document control support for a new £30–40m manufacturing facility in Cardiff. Fulkers has also developed new document control and process support models alongside capital plan management services to support the delivery of complex manufacturing and infrastructure programmes.
Fulkers provides multidisciplinary building consultancy services to Cytiva under the Danaher umbrella, leading capital project delivery teams across the UK and US. Services include Client Directorship, Project Management, PMO, Programme Management, Commercial Management, Cost Management and Document Control. Key projects include the £20m Newquay
Fulkers integrated delivery approach has supported the successful expansion of Cytiva’s global manufacturing capability while improving programme governance, delivery consistency and operational efficiency. The ongoing partnership continues to support critical life sciences infrastructure and long-term global growth objectives.
14
Capability Statement: Data Centres & Critical Environments
ng Expansion Programme.
15
CASE STUDY:
Institute for Advanced Automotive Propulsion Systems.
UNIVERSITY OF BATH
Location: Bath Value: £70m
Institute for Advanced Automotive Propulsion Systems (IAAPS) required the delivery of a worldclass research and innovation facility to support the development of next-generation low and zeroemission vehicle technologies. The facility needed to provide highly specialised testing and research environments capable of supporting advanced propulsion systems, battery technologies and realworld vehicle performance assessments within a globally competitive automotive research sector. Fulkers supported the delivery of the new IAAPS facility located at the Bristol & Bath Science Park. The development incorporated state-of-the-art experimental research platforms designed to enable detailed systems-level investigations and whole vehicle testing under real-world operating conditions. The facility was designed with future 16
Capability Statement: Data Centres & Critical Environments
flexibility in mind to support the evolving transition from combustion engine technologies towards battery and electric vehicle innovation. Through its open innovation model, the scheme provides access to world-class research infrastructure for academics, industry partners and SMEs, promoting collaboration across the automotive and advanced engineering sectors. The project established a nationally significant centre for advanced propulsion research, strengthening the UK’s position within the global automotive innovation market. IAAPS is expected to stimulate substantial research investment, support business growth and create new employment opportunities across the wider automotive and technology sectors.
CASE STUDY:
Sky Workplace, Infrastructure & Technology Programme.
SKY MEDIA
Location: London Value: >£35m
Sky required ongoing client-side consultancy support to manage a complex and fast-paced portfolio of workplace, infrastructure and technology projects across its UK and international estate. Alongside capital delivery, there was a need to maintain operational resilience, ensure compliance across critical assets and align programmes with evolving governance, estate and business continuity requirements. Embedded within Sky’s Property Services Group, Fulkers provides project management, cost management and strategic advisory services across a diverse portfolio, with a particular focus on critical environments and infrastructure resilience. Working in alignment with Sky’s governance systems and project delivery toolkit, Fulkers supports
masterplanning, feasibility studies, capital delivery and a five-year lifecycle maintenance strategy across the estate, including asset criticality reviews and bundled compliance programmes. Projects delivered include BMS infrastructure upgrades in Scotland, UK-wide energy monitoring rollouts, RF test laboratory facilities, lift refurbishment programmes to improve compliance and efficiency, and the delivery of six bespoke Sky VIP arena refurbishments across the UK. Fulkers has established a trusted long-term partnership with Sky, enabling responsive project delivery, improved estate performance and operational resilience across critical workplace and technology environments.
17
CASE STUDY:
Advanced Engineering Centre. UNIVERSITY OF BRIGHTON
Location: Brighton Value: £2.5m
University of Brighton required the delivery of a state-of-the-art engineering research facility to expand its advanced engineering capabilities and strengthen collaboration with industry partners. The project needed to provide highly specialised teaching and research environments capable of supporting innovation within the automotive and advanced manufacturing sectors. Fulkers provided a range of project delivery services for the university’s £14m Advanced Engineering Building (AEB) located at the Moulsecoomb campus. Completed in 2017, the facility was designed to support cutting-edge engineering research and industrial knowledge exchange through collaboration with local engineering companies and automotive sector partners. Following the
18
Capability Statement: Data Centres & Critical Environments
successful delivery of the main building on time and within budget, Fulkers was subsequently appointed to project manage the delivery of the university’s first specialist test cell laboratory within the facility. The laboratory was developed to support pioneering research into multi-cylinder split-cycle engine technology. The project established one of the UK’s leading advanced engineering research facilities, enhancing the university’s capability for industry collaboration, innovation and specialist research. Fulkers successful delivery reinforced a trusted relationship with the client and supported the expansion of highperformance research infrastructure within the live university environment.
CASE STUDY:
University of East Anglia Data Centre Decarbonisation Programme.
UNIVERSITY OF EAST ANGLIA
Location: Norwich Value: £1m
University of East Anglia required the refurbishment and optimisation of its existing data centre as part of a wider energy and carbon reduction strategy. Located within a Grade II listed building at the Norwich Research Park, the project needed to increase operational capacity and cooling performance while significantly improving energy efficiency and maintaining uninterrupted support for year-round research activities. Fulkers supported the delivery of the data centre refurbishment programme, working closely with specialist contractors to develop a flexible and technically detailed design tailored to the constraints of the existing listed building. The project focused on increasing data centre capacity
and enhancing cooling infrastructure while preserving the existing building fabric. Careful planning and stakeholder coordination enabled all works to be delivered within a live operational research environment with minimal disruption to university operations. The project successfully transformed the performance and efficiency of the university’s critical data centre infrastructure, improving the Power Usage Effectiveness (PUE) from 2.08 to 1.19. The upgraded facility now provides increased operational capacity, improved cooling resilience and significantly reduced energy consumption, supporting the university’s long-term sustainability and research objectives.
19
CASE STUDY:
Leonardo UK Estate & Critical Infrastruct
LEONARDO
Location: UK Value: £50m
Leonardo required strategic support to modernise and optimise project delivery across its UK estate while maintaining alignment with operational, governance and long-term business objectives. The programme needed to support highly technical and operationally sensitive environments including laboratories, cleanrooms, data centres and secure infrastructure facilities. Fulkers provides multidisciplinary consultancy services across Leonardo’s UK estate, supporting estate strategy, capital project delivery and long-term masterplanning initiatives. Working collaboratively with the client, Fulkers implemented a bespoke governance framework to improve consistency, agility and best practice across project delivery processes. The team supports a diverse portfolio
20
Capability Statement: Data Centres & Critical Environments
of projects including M&E upgrades, security and fire improvements, flexible workplace solutions, laboratories, cleanrooms, data centre upgrades and feasibility studies. Fulkers is also leading the phased masterplanning of the Yeovil campus, identifying opportunities to repurpose assets, improve infrastructure efficiency and introduce sustainable new-build solutions aligned with future operational requirements. The programme has enhanced project governance, operational resilience and estate flexibility across Leonardo’s UK portfolio. Fulkers collaborative and strategically focused approach continues to support the delivery of sustainable, future-ready facilities while aligning investment decisions with business continuity, whole-life costing and carbon reduction objectives.
ture Programme.
21
CASE STUDY:
University of Surrey Critical Facilities & C
UNIVERSITY OF SURREY
Location: Guildford Value: £100m+
Over a 15-year relationship with the University of Surrey, Fulkers has supported the delivery of complex capital and maintenance projects across live academic, research and healthcare environments. Projects ranged from refurbishments and infrastructure upgrades to specialist facilities requiring strict operational continuity, compliance and stakeholder coordination.
clean rooms, laboratories and mission control spaces, alongside the £45m School of Veterinary Medicine and healthcare-focused refurbishments for NHS screening facilities. Additional works included research park upgrades, sports facilities, infrastructure improvements and long-term compliance projects including high voltage, CHP and MTHW upgrades.
Fulkers provided project and cost management services across a diverse portfolio including the £7.2m refurbishment of the Kate Granger Building, delivered within a live campus environment with extensive MEP replacement, IT infrastructure integration and fit-out works. Specialist critical environment projects included a £7.6m satellite research and assembly facility incorporating
Fulkers collaborative and technically focused approach enabled the successful delivery of highly serviced and operationally sensitive environments while maintaining campus functionality and minimising disruption. The long-standing partnership demonstrates trusted delivery capability across critical research, healthcare and education facilities.
22
Capability Statement: Data Centres & Critical Environments
Campus Infrastructure Programme.
School of Veterinary Medicine
Sports Park
Kate Granger Building
23
CASE STUDY:
University of Sussex Estate & Critical Infrastructure Programme.
UNIVERSITY OF SUSSEX
Location: Brighton Value: £56.7m
The University of Sussex required ongoing support to maintain, refurbish and enhance its awardwinning campus while preserving the architectural significance of its listed buildings. Operating within a live university environment, projects demanded careful coordination to minimise disruption to teaching, residential and research activities, alongside the management of ageing infrastructure and critical estate systems. Since 2004, Fulkers has supported the University of Sussex Estates and Facilities team in delivering a broad programme of capital works, infrastructure upgrades and compliance-led projects. This included £5m of masterplan enabling and infrastructure works, annual refurbishment
24
Capability Statement: Data Centres & Critical Environments
programmes across academic, residential and teaching spaces, and specialist projects such as the £1.5m data centre and office refurbishment. Additional works delivered by members of the team included district heating and CHP installations, library refurbishments, catering outlet upgrades and new-build teaching and residential facilities. Fulkers has helped the university modernise and maintain operationally critical environments while protecting the integrity of its Grade I and listed heritage assets. The long-term partnership reflects consistent delivery across complex live-campus projects, supporting resilience, compliance and enhanced user experience for students, staff and visitors.
CASE STUDY:
University of Reading Decarbonisation & PV Infrastructure Programme.
UNIVERSITY OF READING
Location: Reading Value: £1.7m
The University of Reading secured Salix funding to deliver a large-scale decarbonisation programme across three campuses, focused on reducing energy consumption and carbon emissions through LED lighting replacement and solar PV installations. The challenge involved coordinating multiple contractors across live academic environments while meeting strict funding, programme and operational deadlines ahead of the academic year. Fulkers provided project management services throughout all RIBA stages for the £1.7m programme. The works included the replacement of 7,500 lighting units across 11 buildings and the installation of almost 2,000 solar PV panels across nine buildings, generating approximately 700KWp of renewable energy. To accelerate delivery and
manage risk, the programme was split across five contractors, enabling simultaneous works across campuses while maintaining flexibility during COVID-related restrictions. Fulkers coordinated design, tendering and delivery activities, ensuring close collaboration between contractors, consultants and the university sustainability team. The programme successfully modernised critical campus infrastructure while supporting the university’s long-term sustainability strategy. The phased and collaborative delivery approach enabled works to be completed within tight timescales and budgets, providing significant long-term energy savings, improved operational efficiency and reduced carbon emissions across the estate.
25
CASE STUDY:
Epic Systems UK Headquarters & Critical Infrastructure Programme.
EPIC SYSTEMS
Location: North Somerset Value: £Confidential
Epic Systems required the delivery of its first major UK headquarters campus, combining operational resilience, long-term scalability and industryleading sustainability performance. The 90-acre Bristol masterplan needed to accommodate future growth for up to 1,200 staff while integrating critical utility infrastructure, renewable energy systems and Net Zero Carbon operational targets. As a US-based client unfamiliar with UK statutory and delivery processes, Epic required a trusted advisor to coordinate complex technical, planning and infrastructure requirements. Fulkers is providing project and cost management services across the phased delivery of five office buildings, a 3,000-seat auditorium, training facilities, food services and underground parking. The infrastructure strategy includes HV 26
Capability Statement: Data Centres & Critical Environments
substations, generator back-up systems, PV inverter infrastructure, geothermal bore fields and ground source heat pumps, alongside scalable utility routes designed for future campus expansion. Fulkers also supported detailed life cycle assessments, embodied carbon studies and renewable energy strategies targeting operational energy use below 70kWh/m²/year and Net Zero Carbon in Operation. The project is creating a future-ready, low-carbon campus designed to support long-term operational resilience and sustainable growth. Fulkers collaborative delivery approach has enabled the successful coordination of complex infrastructure, sustainability and critical environment requirements across a major international development programme.
FURTHER EXPERIENCE:
Various Case Studies. Key members of the Fulkers team have also successfully delivered the following projects during previous appointments: EMEA Data Centre Operations & Expansion, JPMorgan Chase / JLL, Basingstoke & Bournemouth: Managed permits, RAMS and operational resilience processes across live critical environments, including support for the construction of two new data halls.
LV Infrastructure Installation, Pirbright Institute, Pirbright, £4m package (£120m project): Delivered LV infrastructure including power distribution, emergency lighting, controls, containment and photovoltaic (PV) systems within a specialist research facility.
Critical Infrastructure Refurbishment, Boeing, Frimley: Managed replacement of UPS, cooling systems, BMS, Wi-Fi and access control systems within live operational facilities.
Substation 1 Refurbishment, Ministry of Defence / Enerveo, Tadley, £15m: Refurbishment of live secure substation facility including temporary substation installation to maintain uninterrupted operations.
Critical Infrastructure & Additive Manufacturing Facility Boeing, Farnborough, £2m: Design and build refurbishment and fit-out project including demolition, new offices, plant room, roof and cladding works, and creation of a closely controlled additive manufacturing environment with regulated temperature and humidity controls. Scope included replacement of pipework, electrical systems, data infrastructure, M&E equipment and delivery of IT communication rooms within a critical infrastructure environment. Additive Manufacturing & Critical Infrastructure Facility Boeing, Farnborough, £2m: Delivered refurbishment and fit-out works including controlled temperature and humidity environments, IT communication rooms and critical MEP infrastructure. Data Centre HV & LV Upgrade, Telefónica, Bristol £3.5m: Replacement of end-of-life critical M&E infrastructure including transformers, LV panels, UPS systems, generators, PDUs and DFUs within a live data centre environment.
Critical Infrastructure Upgrade Programme, Equinix, London: Commercial lead across 22 live critical infrastructure projects including chiller upgrades, generator renewals, CRAH/AHU replacements, fire alarm upgrades and data hall refurbishments. Crown House Technologies, New build project, Hinkley Point C, Bridgewater, £10m: Provided pre-contract cost planning, NEC contracts, and procurement advice to a client on a new build facility within the Hinkley Point C nuclear development. Also provided post contract commercial support engaging subcontractors and various supply chain agreements. New Build Facility, Crown House Technologies / Hinkley Point C, Bridgwater, £10m: Provided precontract cost planning, NEC contract administration and procurement advice for a new-build facility within the live Hinkley Point C nuclear development. Also delivered post-contract commercial support, subcontractor engagement and supply chain management within a highly regulated critical infrastructure environment.
27
28
Capability Statement: Data Centres & Critical Environments
About Fulkers.
29
Our Services. We offer a solutions-focused multidisciplinary approach.
Multi-Disciplinary
Project Management
Cost Management
Building Surveying
Compliance
Through partnership with our approved suppliers, we are able to provide a holistic multi-disciplinary service.
Client-side Project Management, Design Management, Contract Administration, Employer’s Agent, Construction Management, Resident Liaison.
Tender Documentation, Procurement, Contract Management, Bank/Project Monitoring, Cost Control.
Lead Consultant, Employer’s Agent, Design Management, Contract Administration,
Building Regs Principal Designer, Building Safety Advisor, Safety Case Reports, Gateway 1, 2 & 3 Applications, BSA Change Control Documentation & Management.
Acoustic Engineering, Architectural Design, Civil and Structural Engineering, Digital Surveying, Energy Design, Fire Management, Laser Scanning and Point Cloud, Lift Engineering, Mechanical and Electrical Engineering, Workplace Consultancy, BREEAM/LEED/WELL Assessors, Ecologists/Biodiversity Consultants, Passivhaus Designers and Certifiers, Carbon Accounting Consultant.
Programming & Scheduling, Supply Chain Management, Governance & Control.
Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.
Due Diligence and Feasibility, Budget Advice & Benchmarking, Cash Flow Analysis, Commercial Governance, Whole-Life Cost Modelling.
Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.
At Fulkers, our core mission goes beyond just improving our clients’ business. We’re a business that cares – about our clients, and our people. We strive to create a positive impact for all stakeholders, ensuring a smooth and successful journey for our clients whilst fostering a supportive and rewarding environment for our employees.
30
Capability Statement: Data Centres & Critical Environments
Feasibility Studies, Acquisition Surveys, Due Diligence Surveys, Access Surveys, Fire Door and Compartment Surveys, Fire Risk Assessments, Planned Maintenance Surveys, Condition Surveys, Dilapidation Surveys, Defect Analysis, Party Walls, Whole-Life Cost Modelling.
Extensions and Refurbishments, Public Buildings & Amenities.
CDM Principal Designer, Pre-Construction Information, Project Monitoring & Inspections.
Health & Safety Auditing, Health & Safety Monitoring, RAMS, Toolbox Talks, Documentation & Advice.
Architecture
Architectural Design (RIBA Stages 0–7), Feasibility Studies, Lead Consultant & Design, Team Coordination
Refurbishment and New Build Design, Heritage & Listed Building Works, Planning & Listed Building Applications, Space Planning & Workplace Strategy, Sustainable Construction, Energy Efficiency & Low Carbon Design, Building Regulations Compliance.
BIM (Building Information Modelling), 3D Visualisation.
Programme & Portfolio Management
Decarbonisation & Sustainability
Strategic Planning, Process Development/ Implementation/ Management, Change Management, Resource Management, Risk Management.
Building Audits & Performance Reviews, Client Sustainability Strategy Support, Funding Guidance & Application Management, Programme & Portfolio Sustainability Management, Regulatory Compliance Advisory.
Governance, Data Analysis & Reporting, Document Control.
The role is supported by our Project Management, Cost Management, Building Surveying and Building Safety Teams.
Feasibility Studies, Project Brief Development, Whole Life Cycle Assessment, Sustainability Policy Development, Sustainable Procurement Strategy.
Public Sector Decarbonisation Scheme (Salix PSDS Projects), Public Sector Estate Decarbonisation Programmes.
Building Safety
Clerk of Works
Our specialist Project Managers & Cost Managers are experienced in the execution of structural, cladding and fire remediation projects.
Site Inspections, QA Inspections, Progress Monitoring, QA Management or Monitoring.
Preparing Scopes from FRAEW’s, Implementing and Hosting the Golden Thread, Managing Condition/Fire Surveys and Resulting Remediation Works, Implementing and Monitoring Quality Control Systems.
Fieldview QA System, Hosting for Clients/ Contractors/Consultants, Management & Training, Asset Labelling Using QR Codes.
Fire Door Inspection, Compartment/ Passive Fire Protection Inspection, Fire Damper Inspections.
In collaboration with our Building Regs PD’s we are experts in remediating Higher Risk Buildings and non-HRB’s.
Big enough to cut it, small enough to care. 31
About Us.
Since the company was founded we have grown into a multidisciplinary consultancy with over 170 employees. Fully owned by three equity partners, we are not restricted by corporate red tape, we are able to take an agile and flexible approach to react to our clients needs quickly.
Richard Russell and Sam Bailey bring Richard Fulker Project and Cost establishes Building Management to Surveyors in Gravesend Fulkers in London
Fulkers establishes nationwide coverage with seven locations
Rebrand creates Fulkers Bailey Russell, with multiple UK offices and overseas affiliations
1998
2018
2019
2014
32
Capability Statement: Data Centres & Critical Environments
Strong, visible leadership from our senior teams ensures a personable approach and outstanding service delivery. We are big enough to cut it and small enough to care.
Ranked 88th in Building’s Top 100 Consultancy Firms in the UK
National finalist in the Building Awards Construction Consultant/Surveyor of the Year (fewer than 100 staff) category
Fulkers becomes an affiliated member of Northcroft, strengthening the Northcroft Global Network, particularly in the UK and Europe
Ranked 65th Building’s To Consultancy in the UK
2019
2020
2021
2021
h in op 100 y Firms
Glasgow
Manchester
Cardiff
Bristol
London Basingstoke
Kings Hill Brighton
National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for two consecutive years
Fulkers commits to driving positive change and officially becomes a Certified B Corporation, while growing to over 170 people and achieving turnover exceeding £17m
Named in Building’s Top 150 UK Consultants and ranked among the Top 50 Project Managers and Top 50 Surveyors for two consecutive years
2022
2023
2024
Finalist in the Construction Excellence Awards People and Culture category
Named in Building’s Top 150 UK Consultants, climbing four places in the Top 50 Project Managers table
National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for three consecutive years
Named in Building’s Top 150 UK Consultants, ranked among the Top 50 Project Managers and re-entering the Top 50 Surveyors table
2024
2025
2026
2026
33
Our ESG Commitment. To create awareness. Share knowledge and resource. Use of more sustainable materials and practices. Development of our focus on sustainable procurement process / policy. Develop our corporate social responsibility procurement process / policy. Invest in people and suppliers. Staff training. Ensure sustainability is at the forefront of all client conversations. To lead by example. Develop our KPI’s to reflect the above. 34
Capability Statement: Data Centres & Critical Environments
35
Big enough to cut it small enough to care.
www.fulkers.co.uk
36
LondonData l Basingstoke Brighton I Bristol | Kings Hill l Manchester Capability Statement: Centres & CriticalIEnvironments