Building Safety Act & Building Regulations Advisory Services Capability Statement

www.fulkers.co.uk


Contents. Introduction

4

Building Regulations Duty Holders

6

Building Safety Act Advisory

7

Our Clients

8

A Service That Gets Results

10

BR-PD

12

Client Duties (BS-A)

15

Principal Contractor

16

Emergency Repairs and Regularisation

18

HRB Scope

20

Building Work

22

Meet the Experts

23

About Fulkers

25

Who We Are

26

Our Services

28

About Us

30

ESG

32

3


Introduction.

Michael Bailey Director - Residential & Compliance michael.bailey@fulkers.co.uk 07543 310115 Uncommon Borough, 1 Long Ln, London, SE1 4PG

At Fulkers Bailey Russell (Fulkers), we support clients in delivering projects that are safe, high quality and compliant. Our compliance team works across a wide range of schemes, from new-build to complex remediation projects, helping clients navigate a challenging and evolving regulatory landscape. The team brings technical expertise, attention to detail and a clear understanding of how to deliver projects that meet regulatory requirements while remaining commercially viable. As the industry continues to respond to the demands of the Building Safety Act (BSA), our role is to provide practical, coordinated support that gives clients confidence. Whether we are acting as Project Managers, Cost Consultants, Building Surveyors or Principal Designers, our focus is on providing a responsive, reliable service that adds value at every stage. We take pride in being a long-term partner and in supporting our clients to deliver housing that meets today’s standards and tomorrow’s expectations.

4

Capability Statement: Building Safety Act & Building Regulations Advisory Services


Expert Guidance. We help clients deliver safe, high-quality buildings by providing expert support across development, remediation and compliance. Our team understands the demands of evolving regulation - particularly the BSA - and works closely with housing associations, developers and asset owners to manage risk and navigate Gateway processes.

Our Focus. We focus on helping clients navigate the increasing regulatory demands with confidence. By combining deep technical expertise with a clear understanding of sector-specific challenges, we deliver joined-up, practical solutions that support long-term safety, compliance and quality.

5


Building Regulations Duty Holders. The Building Regulations 2010 have been updated to introduce a series of new statutory dutyholder roles. We can undertake the role of Building Regulations Principal Designer directly and provide targeted support to other dutyholders in meeting their statutory responsibilities, including:

Building Regulations Principal Designer (BR-PD)

Designer

Client

Building Regulations Principal Contractor (BRPC)

Contractor

In addition, we frequently support clients in discharging their duties under the BSA and in developing and managing strategies for Higher-risk Building (HRB) applications. We refer to this role as the BSA Advisor.

6

Capability Statement: Building Safety Act & Building Regulations Advisory Services


Building Safety Act Advisory. We consult on aspects of the BSA regarding building work. This includes:

Emergency repairs & notices associated regularisation certificate applications

Golden thread storage

Building Work Determination (is a GW2 required)

HRB Determination (what is the extent of a HRB)

Mandatory occurrence reporting

Transitional applications

7


Our Clients.

8

Capability Statement: Building Safety Act & Building Regulations Advisory Services


9


A Service That Gets Results. Our Building Regulations advisory service is led and delivered by architects. We believe an architect-led approach provides a clear advantage because architects are experienced in coordinating multidisciplinary design teams and fostering compliance through collaboration. Their deep understanding of the iterative nature of design enables them to identify when additional detail is critical and when proposals need time to develop. As trained generalists, architects are uniquely placed to balance regulatory requirements, design intent and buildability to support robust, compliant outcomes. We call the architects that deliver our service Technical Managers.

We are a legislation first advisory service. All of our Technical Managers have a detailed working knowledge of the BSA and its associated secondary legislation, including the Building Regulations 2010 and the Building (HRB’s Procedures) (England) Regulations 2023. Our advice is grounded directly in statute, and we reference the relevant legislative provisions so clients can clearly understand and verify the basis of our recommendations.

Our strategy results in measurable success:

100% approval rate for New Build Gateway 2 applications. 7

88% 4

weeks faster than industry average for New Build Gateway 2 approvals.

approval rate for all applications (industry average 32%).

weeks faster than industry average for all Gateway 2 approvals. *Data correct as of 1st February 2026

10

Capability Statement: Building Safety Act & Building Regulations Advisory Services


Building Safety Act 2022

Secondary Legislation Architects Act & Consequential Amendments

The Act

Primary Legislation Amendments

Commencement Regulations

Building Control

Higher-Risk Buildings

Part 1 - Overview of the Act

Parliamentary Commissioner Act 1967

The Building Safety Act (2022) Commencement No. 1, Transitional and Saving Provisions Regulations 2022

The Building Regulations etc. (Amendment) (England) Regulations 2023

The HigherRisk Buildings (Descriptions and Supplementary Provisions) Regulations 2023

Defective Premises Act 1972

The Building Safety Act 2022 (Commencement No. 2) Regulations 2022

The Building (Approved Inspectors etc. and Review of Decisions) (England) Regulations 2023

The Building Safety (Registration of HigherRisk Buildings and Review of Decisions) (England) Regulations 2023

The Architects Act 1997 (Amendment) Regulations 2023

The Building Safety (Leaseholder Protections) (Information etc) (England) Regulations 2022

Part 3 – Amends the Building Act 1984

Local Government Act 1972

The Building Safety Act 2022 (Commencement No. 3 and Transitional Provision) Regulations 2022

The Building Safety Act 2022 (Consequential Amendments etc) Regulations 2023

The HigherRisk Buildings (Key Building Information etc.) (England) Regulations 2023

The BSA 2022 (Consequential Amendments and Prescribed Functions) and Architects Act 1997 (Amendment) Regulations 2023

The Building Safety (Leaseholder Protections etc.) (England) (Amendment) Regulations 2023

Part 4 – Higher Risk Buildings

Prescription and Limitation (Scotland) Act 1973

The Building Safety Act 2022 (Commencement No. 4 and Transitional Provisions) Regulations 2023

The Building (Restricted Activities and Functions) (England) Regulations 2023

The Building (Public Bodies and HigherRisk Building Work) (England) Regulations 2023

Part 5 Miscellaneous requirements.

Local Government Act 1974

The Building Safety Act 2022 (Commencement No. 5 and Transitional Provisions) Regulations 2023

The Building Safety (Regulator’s Charges) Regulations 2023

The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023

Part 6 – Legal items.

Health and Safety at Work etc. Act 1974

The Building Act 1984 (Commencement No. 3) (England) Order 2023

The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023

The HigherRisk Buildings (Management of Safety Risks etc) (England) Regulations 2023

Limitation Act 1980

The Building Safety Act 2022 (Commencement No. 6) Regulations 2024

The Building (Registered Building Control Approvers etc.) (England) Regulations 2024

The Higher-Risk Buildings (Keeping and Provision of Information etc.) (England) Regulations 2024

Building Act 1984

The Building Safety Act 2022 (Commencement No. 7 and Transitional Provisions) Regulations 2024

The Building (Registered Building Control Approvers etc.) (England) (Amendment) Regulations 2024

Part 2 – Creates the Building Safety Regulator

The Architects (Fees, Electronic Communications and Miscellaneous Amendments) Regulations 2022

Construction Products

Leaseholder Protections

Responsible Actors Scheme

The Construction Products (Amendment) Regulations 2022

The Building Safety (Leaseholder Protections) (England) Regulations 2022

The Building Safety (Responsible Actors Scheme and Prohibitions) Regulations 2023

“We deliberately avoid reliance on guidance notes and secondhand interpretations, which are often inconsistent, incomplete, or inaccurate. This approach enables us to provide clear, consistent, and reliable advice, particularly where guidance is still emerging or developing.” Michael Bailey, Director

11


Building Regulations Principal Designer. Where building work is undertaken and involves more than one contractor (including subcontractors), the client is required to appoint a BR-PD.

The duties of the BR-PD are set out in Regulation 11M of the Building Regulations 2010. In summary, the BR-PD is responsible for coordinating the design team to ensure that the design, if constructed, would comply with the Building Regulations.

We deliver this role through our team of Technical Managers, who actively monitor the design process, review the information produced by the design team, and identify and record compliance risks. Any issues are logged, tracked and managed through our Compliance Issues Tracker, ensuring clear accountability and resolution.

“The BR-PD role is often misunderstood; it is required on every project involving building work. When delivered properly, a BR-PD significantly reduces compliance risk and protects both project costs and programme.” 12

Richard Russell, Partner & CEO


CASE STUDY:

Ebbsfleet Garden City.

REDROW

Location: Kent

Redrow appointed Fulkers to provide BR-PD services for two non-higher-risk buildings within Ebbsfleet Garden City: the Weldon Heart community centre and Weldon Wellbeing Pavilion sports facilities. Appointed at Stage 4, the project required robust coordination between the design team and contractor to ensure compliance with Building Regulations while maintaining programme momentum. Fulkers provided proactive support to both the design team and Principal Contractor, Thomas Sinden. Our team conducted detailed reviews of design packages, identifying potential compliance issues early and working collaboratively with consultants to resolve them. We coordinated

clear compliance strategies and supported the preparation of robust justifications to demonstrate alignment with Building Regulations. Where NHBC identified discrepancies, Fulkers facilitated constructive discussions between project stakeholders and provided clear guidance on the actions required to achieve compliance. Through early intervention and collaborative problem-solving, Fulkers helped ensure compliance requirements were addressed efficiently, enabling issues to be resolved quickly and keeping the project moving forward. Our approach strengthened coordination across the project team and provided Redrow with confidence that regulatory expectations were being met.

13


CASE STUDY:

Worple Road. LATIUM

Location: Wimbledon

19 Worple Road is a boutique lifestyle hotel development in central Wimbledon, designed to create an active frontage and enhance the surrounding streetscape. The project presented complex party wall constraints and tight site conditions, alongside the need to embed best practice building safety principles within a high-quality hospitality environment. Fulkers was appointed to undertake the BR-PD role, ensuring that building safety and compliance were fully integrated throughout the design and construction process. We have worked closely with the design team and Principal Contractor

14

to coordinate information, manage regulatory interfaces and maintain clear communication with the Registered Building Control Approver. Our focus has been on ensuring proposals are robust, compliant and clearly evidenced, supporting smooth regulatory engagement and reducing risk on site. Now under construction and led by a competent Principal Contractor, the development is progressing toward completion in late 2026. The project will stand as a bespoke, safetyled hospitality scheme that balances design ambition with regulatory excellence.

Capability Statement: Building Safety Act & Building Regulations Advisory Services


Client Duties (BS-A). On HRB projects, the consequences of getting things wrong can be significant - often resulting in months of delay or, in some cases, refusal of approval.

The Building (Higher Risk Buildings Procedures) (England) Regulations 2023 place substantial duties on clients in relation to building control approval and completion certificate applications.

Our BSA service operates in a similar way to a planning consultant for the Building Safety Regulator (BSR). We support clients in discharging their statutory duties and develop clear, proportionate strategies to secure timely and robust approvals.

“We submit multiple applications each month, giving us a continuous feedback loop from the regulator. This ongoing experience allows us to refine our approach, improve documentation quality, and consistently strengthen approval strategies.” Nick Grimmett, Technical Manager

15


Principal Contractor. The BRPC has significant duties on all building work projects, but on HRB’s these responsibilities increase substantially.

The BRPC is responsible for Mandatory Occurrence Reporting, ensuring the building work is carried out in accordance with the approved Gateway 2 design, managing the change control process, and maintaining evidence that the works comply with the Building Regulations.

Contractors undertaking HRB work must therefore make major adjustments to their processes and recordkeeping to meet these regulatory requirements. Failure to comply can delay Gateway 2 approval - and, more critically, Gateway 3 signoff - ultimately delaying occupation and exposing the contractor to significant financial and contractual risk.

“Fulkers have substantial experience working with contractors to ensure that their policies and processes meet the demands of working on a HRB.” Marta Garcia Jimenez, Senior Technical Manager Capability 16 Capability Statement Statement: Building Safety Act & Building Regulations Advisory Services


CASE STUDY:

Building Safety Act Compliance Framework for HRB’s.

UNDISCLOSED

Location: Various

An established Principal Contractor delivering multiple HRB projects appointed Fulkers to develop a comprehensive suite of policies and procedures aligned with the Building Safety Act 2022. The brief focused on ensuring full compliance with Principal Contractor duties under Part 2A of the Building Regulations and the Building (HigherRisk Buildings Procedures) (England) Regulations 2023, while embedding these requirements into the client’s operational framework. Fulkers adopted a law-first approach, grounding all advice directly in legislation rather than external guidance or industry interpretation. Over several months, we undertook a detailed review of the client’s existing procedures and governance structures.

Through structured workshops and strategic consultations with senior leadership, complex regulatory requirements were translated into practical, business-ready processes. This collaborative approach enabled us to design a tailored suite of policies and procedures fully integrated with the organisation’s existing systems and project delivery practices. The client received a comprehensive BSA Policy Manual, supported by adaptable templates and practical guidance documents. Beyond achieving regulatory compliance, the framework provided clarity, confidence and consistency across HRB projects, positioning the organisation as a forwardthinking and well-prepared Principal Contractor within the evolving building safety regime.

17


Emergency Repairs and Regularisation. Where repairs to a building need to be carried out urgently due to a risk to the health, safety or welfare of people in or around the building, the Regulation 10 emergency repairs procedure may be used in lieu of the standard Gateway 2 process.

This enables work to begin immediately. Once the repairs are completed, a Regulation 10 certificate application must be submitted to the BSR.

However, using the emergency repairs process without meeting all the required criteria can lead to stop notices and other enforcement actions from the regulator.

We regularly advise clients on whether the emergency repairs route is appropriate for their situation, and we can manage the preparation and submission of all necessary notices and applications.

18

Capability Statement: Building Safety Act & Building Regulations Advisory Services


19


HRB Scope. In British law, there are five different definitions of a HRB, each applied depending on the specific regulatory context.

The Higher Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023 allow a building to be divided into independent sections, a mechanism that is particularly valuable when carrying out building work to an existing structure.

By applying the independent sections approach, it is often possible to remove nonresidential areas from HRB registrations where the regulations permit.

“Fulkers are experts in the Higher Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023 and have successfully secured the exclusion of commercial areas from a number of HRB’s.” Ruxandra Gruioniu, Technical Manager Capability 20 Capability Statement Statement: Building Safety Act & Building Regulations Advisory Services


CASE STUDY:

136 George Street, W1H 5LD. NATIVE LAND

Location: London

136 George Street is an eight-storey mixed-use building in the City of Westminster, comprising retail, office and residential accommodation. Following the introduction of the Higher-Risk Buildings (Descriptions and Supplementary Provisions) Regulations 2023, the client required specialist advice to determine whether the building contained “independent sections” under Regulation 4. Specifically, they needed clarity on whether the office accommodation could be treated separately from the residential element and therefore fall outside the HRB regime. Fulkers were appointed to undertake a detailed technical assessment of the building’s configuration. Our team carried out a site visit and reviewed the

layout, access arrangements and building services strategy to assess compliance against the regulatory criteria. We then prepared clear, easy-to-understand diagrams identifying the independent sections within the development, supported by a concise technical report setting out our reasoning and conclusions. Our assessment demonstrated that the office and retail areas are independent from the residential HRB section and are not subject to the HRB Regulations. This provided the client with certainty on their statutory obligations and confirmed that the commercial elements of the building could proceed via the traditional building control route.

21


Building Work. Building control approval is required to undertake “Building Work” to a HRB. Some construction work might not meet the definition of Building Work given in regulation 3 of the Building Regulations. Fulkers can advise on the interpretation of regulation 3, and suggest changes to your planned works to optimise you route to compliance.

Building control approval must be obtained before carrying out any “Building Work” to a HRB. However, some construction activities may fall outside the definition of Building Work set out in Regulation 3 of the Building Regulations. Fulkers can provide expert guidance on the interpretation of Regulation 3 and advise on how your proposed works can be adjusted to achieve the most efficient route to Compliance.

22

Capability Statement: Building Safety Act & Building Regulations Advisory Services


OUR TEAM:

Meet the Experts.

Michael Bailey

Marta Garcia Jimenez

Director B.Arch (Hons) Dip.Arch ARB RIAS RIBA

Michael leads Fulkers Compliance Team and is a Chartered Architect with a uniquely broad career spanning proptech product management, real estate development and architectural practice. His experience includes major headquarters projects for UBS and Meta, residential towers, data platforms, carbon reduction strategies and financial product development.

Senior Technical Manager M. Arch, ARB

Marta is a Senior Technical Manager with over 15 years of experience as a registered Architect working on all RIBA stages in projects ranging from large-scale mixed-use residential developments to education and commercial use. Leveraging her experience coordinating complex projects, she enhances her role as BR-PD by providing valuable technical advice.

Nick Grimmett

Ruxandra Gruioniu

Senior Technical Manager

Technical Manager

BA (Hons), DipArch, ARB

BA (Hons) Dip. Arch ARB

Nick is a registered Architect with 10 years’ experience delivering residential and commercial projects. Specialising in RIBA Stages 4 and 5, he focuses on technical design, team coordination and construction-phase delivery. He applies this expertise in his role as BSA and BR-PD, providing clear technical guidance.

Jonathan Evans Technical Manager BSc, M.Arch, PGDip, ARB

Ruxandra is a registered Architect with 10 years practical experience in leading a wide range of projects across various sectors and RIBA work stages. She has extensive experience with RIBA Stage 4 and 5, specialising in technical design, multidisciplinary teams’ coordination and project delivery through the construction phase.

With over 10 years’ experience as a Project Architect, Jonathan has led high-end commercial and residential projects across all RIBA stages, acting as Lead Consultant at Stage 4. He is passionate about sustainable, low-energy design, with hands-on Passivhaus experience and as Lead Designer on the UK’s first accredited Active House.

23


24

Capability Statement: Building Safety Act & Building Regulations Advisory Services


About Fulkers.

25


Who We Are. Established in 1998, Fulkers Bailey Russell is a construction consultancy firm offering tailored solutions to clients investing in construction and property within the public and private sectors.

Our business is split into three key sectors: Private, Public, and Residential & Compliance, allowing us to tailor our approach to each client’s unique needs, especially as they become larger and more complex, often requiring multidisciplinary services. We strive to assist our clients in delivering successful and valuable developments.

Fulkers provides a no-nonsense, flexible, result-orientated service: A modern, forward thinking and professional practice, we value each of our clients. It is our objective to maintain a business which offers value for money and allows director attention on all projects.

26

Capability Statement: Building Safety Act & Building Regulations Advisory Services


What We Do. At Fulkers, our fundamental responsibility is to improve our clients’ business by helping them achieve their goals and effecting changes to their estate as smoothly as possible. As a B Corp our commitment to working with purpose will remain at the heart of everything we do.

Our People. At Fulkers, we are driven by passion and dedication, offering independent and innovative solutions tailored to our clients’ needs. We thrive in a collaborative team environment that fosters success and consistently exceeds client expectations. Our ISO 9001 certification attests to the high quality of our services, systems, and standards.

27


Our Services. We offer a solutions-focused multidisciplinary approach.

Multi-Disciplinary

Project Management

Cost Management

Building Surveying

Compliance

Through partnership with our approved suppliers, we are able to provide a holistic multi-disciplinary service.

Client-side Project Management, Design Management, Contract Administration, Employer’s Agent, Construction Management, Resident Liaison.

Tender Documentation, Procurement, Contract Management, Bank/Project Monitoring, Cost Control.

Lead Consultant, Employer’s Agent, Design Management, Contract Administration,

Building Regs Principal Designer, Building Safety Advisor, Safety Case Reports, Gateway 1, 2 & 3 Applications, BSA Change Control Documentation & Management.

Acoustic Engineering, Architectural Design, Civil and Structural Engineering, Digital Surveying, Energy Design, Fire Management, Laser Scanning and Point Cloud, Lift Engineering, Mechanical and Electrical Engineering, Workplace Consultancy, BREEAM/LEED/WELL Assessors, Ecologists/Biodiversity Consultants, Passivhaus Designers and Certifiers, Carbon Accounting Consultant.

Programming & Scheduling, Supply Chain Management, Governance & Control.

Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.

Due Diligence and Feasibility, Budget Advice & Benchmarking, Cash Flow Analysis, Commercial Governance, Whole-Life Cost Modelling.

Residential, Commercial, Public Buildings & Amenities, Energy Projects, MEP Projects, Data centres.

At Fulkers, our core mission goes beyond just improving our clients’ business. We’re a business that cares – about our clients, and our people. We strive to create a positive impact for all stakeholders, ensuring a smooth and successful journey for our clients whilst fostering a supportive and rewarding environment for our employees.

28

Capability Statement: Building Safety Act & Building Regulations Advisory Services

Feasibility Studies, Acquisition Surveys, Due Diligence Surveys, Access Surveys, Fire Door and Compartment Surveys, Fire Risk Assessments, Planned Maintenance Surveys, Condition Surveys, Dilapidation Surveys, Defect Analysis, Party Walls, Whole-Life Cost Modelling.

Extensions and Refurbishments, Public Buildings & Amenities.

CDM Principal Designer, Pre-Construction Information, Project Monitoring & Inspections.

Health & Safety Auditing, Health & Safety Monitoring, RAMS, Toolbox Talks, Documentation & Advice.


Architecture

Architectural Design (RIBA Stages 0–7), Feasibility Studies, Lead Consultant & Design, Team Coordination

Refurbishment and New Build Design, Heritage & Listed Building Works, Planning & Listed Building Applications, Space Planning & Workplace Strategy, Sustainable Construction, Energy Efficiency & Low Carbon Design, Building Regulations Compliance.

BIM (Building Information Modelling), 3D Visualisation.

Programme & Portfolio Management

Decarbonisation & Sustainability

Strategic Planning, Process Development/ Implementation/ Management, Change Management, Resource Management, Risk Management.

Building Audits & Performance Reviews, Client Sustainability Strategy Support, Funding Guidance & Application Management, Programme & Portfolio Sustainability Management, Regulatory Compliance Advisory.

Governance, Data Analysis & Reporting, Document Control.

The role is supported by our Project Management, Cost Management, Building Surveying and Building Safety Teams.

Feasibility Studies, Project Brief Development, Whole Life Cycle Assessment, Sustainability Policy Development, Sustainable Procurement Strategy.

Public Sector Decarbonisation Scheme (Salix PSDS Projects), Public Sector Estate Decarbonisation Programmes.

Building Safety

Clerk of Works

Our specialist Project Managers & Cost Managers are experienced in the execution of structural, cladding and fire remediation projects.

Site Inspections, QA Inspections, Progress Monitoring, QA Management or Monitoring.

Preparing Scopes from FRAEW’s, Implementing and Hosting the Golden Thread, Managing Condition/Fire Surveys and Resulting Remediation Works, Implementing and Monitoring Quality Control Systems.

Fieldview QA System, Hosting for Clients/ Contractors/Consultants, Management & Training, Asset Labelling Using QR Codes.

Fire Door Inspection, Compartment/ Passive Fire Protection Inspection, Fire Damper Inspections.

In collaboration with our Building Regs PD’s we are experts in remediating Higher Risk Buildings and non-HRB’s.

Big enough to cut it, small enough to care. 29


About Us.

Since the company was founded we have grown into a multidisciplinary consultancy with over 170 employees. Fully owned by three equity partners, we are not restricted by corporate red tape, we are able to take an agile and flexible approach to react to our clients needs quickly.

Richard Russell and Sam Bailey bring Richard Fulker Project and Cost establishes Building Management to Surveyors in Gravesend Fulkers in London

Fulkers establishes nationwide coverage with seven locations

Rebrand creates Fulkers Bailey Russell, with multiple UK offices and overseas affiliations

1998

2018

2019

2014

30

Strong, visible leadership from our senior teams ensures a personable approach and outstanding service delivery. We are big enough to cut it and small enough to care.

Ranked 88th in Building’s Top 100 Consultancy Firms in the UK

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (fewer than 100 staff) category

Fulkers becomes an affiliated member of Northcroft, strengthening the Northcroft Global Network, particularly in the UK and Europe

Ranked 65th Building’s To Consultancy in the UK

2019

2020

2021

2021

Capability Statement: Building Safety Act & Building Regulations Advisory Services


h in op 100 y Firms

Glasgow

Manchester

Cardiff

Bristol

London Basingstoke

Kings Hill Brighton

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for two consecutive years

Fulkers commits to driving positive change and officially becomes a Certified B Corporation, while growing to over 170 people and achieving turnover exceeding £17m

Named in Building’s Top 150 UK Consultants and ranked among the Top 50 Project Managers and Top 50 Surveyors for two consecutive years

2022

2023

2024

Finalist in the Construction Excellence Awards People and Culture category

Named in Building’s Top 150 UK Consultants, climbing four places in the Top 50 Project Managers table

National finalist in the Building Awards Construction Consultant/Surveyor of the Year (100+ staff) category for three consecutive years

Named in Building’s Top 150 UK Consultants, ranked among the Top 50 Project Managers and re-entering the Top 50 Surveyors table

2024

2025

2026

2026

31


Our ESG Commitment. To create awareness. Share knowledge and resource. Use of more sustainable materials and practices. Development of our focus on sustainable procurement process / policy. Develop our corporate social responsibility procurement process / policy. Invest in people and suppliers. Staff training. Ensure sustainability is at the forefront of all client conversations. To lead by example. Develop our KPI’s to reflect the above. 32

Capability Statement: Building Safety Act & Building Regulations Advisory Services


33


Big enough to cut it small enough to care.

www.fulkers.co.uk

34

LondonBuilding l Basingstoke I Brighton I Bristol Kings Hill l Manchester Capability Statement: Safety Act & Building Regulations Advisory| Services


Turn static files into dynamic content formats.

Create a flipbook