Methodology: Mixed-methods analysis

Focus groups and interviews

Site and facility evaluations

Recreation trends analysis

Operational assessment

Community workshops

Programs assessment

Financial assessment Demographic analysis

Level of service analysis Online community survey

Community benchmarking

Statistically-valid public survey

Engage: Stakeholder Interviews

Methodology:

20 separate focus groups including participating from more than 50 people, including representatives from:

– PR Administration

– PR Programming

– PR Maintenance

– Planning

– Village Council + Mayor

– City Manager’s Office

– Fine Arts

– PRA Board

– MSV Library

– Finance

– Private program operators

– Resident stakeholders

Top 5 Priorities:

1. New Indoor Recreation Center - Strong consensus on the urgent need for a flexible, multi-generational community recreation facility.

2. Improved Tot Lots and Playground Facilities - Expansion, enhancement, better parking, restroom facilities, and consideration of potential relocation.

3. Enhanced Walkability and Connectivity - Improvements to pedestrian crossings, linking parks via trails and sidewalks, addressing barriers like major roadways.

4. Equitable Distribution of Amenities - Emphasis on addressing disparities between east and west sides of Miami Shores Village, providing balanced distribution of parks and recreation opportunities.

5. Flexible and Multi-purpose Greenspaces - Development and activation of versatile outdoor areas suitable for various activities and community events.

Engage: Community Workshops

6

Engage: Public opinion survey

Priority Needs:

Concept: Multi-generational Community Ctr.

Vision:

 Multi-generational Social and Recreational “HUB” of Miami Shores Village.

 Flexible and adaptable multipurpose interior spaces.

 Dedicated gymnastics room.

 Double gymnasium with indoor walking/exercise track.

 Integrated resiliency and emergency infrastructure.

 Context-sensitive scale and aesthetic with indoor-outdoor design.

Concept:

Total SF: 59,772

Gymnasium 14,440 SF MP Rooms 7,550 SF

Gymnastics 4,500 SF

Covered Terraces 4,056 SF Storage 3,795 SF Fitness 2,150 SF Restrooms 1,960 SF

School 1,750 SF

Office/Admin 1,000 SF

SF

Second Floor
1. First Floor (39,607

Concept: Exterior Inspiration

Concept: Interior Inspiration

MULTI-PURPOSE PROGRAMMING SPACES

INTEGRATED ART

SOCIAL SPACES

OUTDOOR SPORTS COURTS

NATURAL LIGHT
OPEN ATRIUM
INDOOR FITNESS
DOUBLE GYMNASIUM W/ WALKING TRACK

Concept: Circulation + Access

OUTDOOR SPORTS COURTS

Concept: Site Adjacencies

OUTDOOR SPORTS COURTS

Concept: Building Features

OUTDOOR SPORTS COURTS

Concept: Scale

Comparison of the existing infrastructure that will be replaced with a future multigenerational community center.

Existing SF (to be removed):

1. Community Center +/-17,000 SF

2. Fieldhouse +/- 5,000 SF

3. Outdoor Courts +/- 18,000 SF +/- 40,000 SF

4. Proposed New Center SF: – Floor 1

Note:Location is approximate and meant to illustrate the scale of the building only. Park site plan will be updated once a building program and scale are confirmed.

Next Steps: Project roadmap

Needs Assessment Phase (complete)

Vision Phase (begin)

Vision workshop (5/28/25)

Park site master plans

Comm. Ctr. Plan development

MASTER PLAN

Community engagement (begin)

Existing system assessment (begin)

Master Plan project start-up

RFP procurement phase begins (internal)

Action Plan + phasing (begin)

Special election (TBD)

Prep. for referendum

Plan Adoption (4/26)

Final draft master plan (3/31/26)

Draft community center plan