Surrey House Project Honey (10372) practical completion statement rev 1 prepared for
Globe Kingston Limited 09 December 2024
practical completion statement Surrey House Island Site – Project Honey (10372)
contents 1.
Practical completion statement and PC Checklist
2.
McLH Practical Completion pack
appendices appendix a – Final Certificate Letter – Buildings A, B and C appendix b – Mecserve Validation Report appendix c – DAA Statement of Practical Completion appendix d – MNP Statement of Practical Completion appendix e – Aecom Statement of Practical Completion appendix f– EOC Statement of Practical Completion appendix g – ACS Technical Audit Remediation Tracker appendix h – Chartplan Planning Conditions Tracker appendix i– Warranty Tracker appendix j – Guarantee Tracker appendix k – Snag Reports and related supporting documents •
Project Honey - Building A Snag Report 05.12.24
•
Project Honey – Building B Snag Report 05.12.24
•
Project Honey – Building C Snag Report 05.12.24
•
Project Honey – External Works Snag Report 05.12. 24
•
Project Honey – Façade Snag Report 05.12. 24
•
Project Honey – Tenant Snag Report 09.12.24
•
Project Honey – Water Management
•
Project Honey – Car Park Water Management
•
Key Re-inspections post PC R3
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/16 PC & EoD/16.1 PC/PC pack documents/contents page 241209 r2.docx
Practical Completion Statement and PC Checklist
.
FH090-151015
McLH Practical Completion Pack
FH090-151015
PRACTICAL COMPLETION Eden Campus Kingston Upon Thames, KT1
29 NOVEMBER 2024 TH
CONTENTS 1
Eden Campus Overview
3
2
Building A - GAs
7
3
Building B - GAs
14
4
Building C - GAs
22
5
EPC Certificates
28
6
BREEAM
32
7
O&M
34
8
Health and safety
43
9
Conformity Certificates
47
10
Wired Certificates
52
11
Key schedules
54
12
Completion photos
57
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
2
1
EDEN CAMPUS OVERVIEW
This document represents a package of design information forming an overview of the redevelopment of the Surrey House Island site – Eden Campus, Kingston Upon Thames.
The following information summarises achievements, certificates and images of the Eden Campus at Practical Completion.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
3
UP
UP
UP
Eden Campus oVERVIEW 1.1 The Eden Campus Site plan
UP
REET BROOK ST WHEA TFIELD
WAY
HO GS MIL L
RIV ER
EDEN STREET
Retail
Residential Lobby
Air Intake 7.67 m² 82.6 ft²
B3 A Core
-
Retail
UP
UP
OUTLINE OF EXISTING LEVER HOUSE BUILDING
Retail
UP
Corridor
B3 B Core -
OAD S'S R AME ST J
raised
Eden Campus, Kingston Upon Thames KT1 GENERAL NOTES Practical Completion document
shared
surface
NOTES
1. Drawing to be read in conjunction with ' ITEMS TO BE DEVELOPED AS PART OF STAGE 3/4 ' schedule 2. For Landscape design refer to Landscape Architect documentation 3. For Structural elements refer to Structural Engineer's documentation. 4. For M&E elements refer to Services Engineer's documentation.
KEY PLAN
Ownership Boundary Line Orange line denotes the demarcation between the McLH
REV
NOTES
DATE
BY
AUTH
DRAWING STATUS
4
For Information TITLE
SK
ISO SHEE
S4
Eden Campus oVERVIEW 1.2 Key Design Drivers: The Eden Campus
As a team we have aspired to deliver a design led, commercially aware, environmentally responsible architectural proposal that will provide a vibrant and productive workplace setting.
Design for Place-making Implementing a first class place-making strategy is key to grounding the scheme. By reinvigorating this underused area of Kingston, activating the street frontages and encouraging permeability across the island site, creating a greater sense of place and purpose. Landscaping elements widen the street scape and create opportunities for urban greening, with enhancements to the public realm and street level planting. The landscape design acts both as a visual marker for the site whilst setting the
Design for Future Flexibility With high quality design and adaptability placed firmly at the heart of the new buildings, Eden Campus has delivered some of the largest floor plates in the borough. With the floors offering a multitude of flexible workplace options centred on a dynamic reception and social hub at 6th floor level, it will provide an inspiring environment for its future occupants. The M&E proposals also allow the services to operate as separate entities in case of potential subdivision of floorplates and multioccupancy for future tenants.
buildings apart from its competitors. Both building users & members of the public
The structural design of the beekeepers car park has future proofed its functionality,
can enjoy the delights of the Woodland Walk, Green Street and numerous rooftop
should vehicle demands reduce and/or needs arise for further uses it can be retro-
terraces, all of which create opportunity of spacial variation and access to high
fitted to suit.
quality outdoor spaces.
Design for Sustainability Implementing a forward thinking strategy and innovative technologies to optimise the energy functionality of the buildings, whilst reducing their carbon emissions and impact on the surrounding environment. The design team has sought to achieve
Design for Wellbeing The office design helps to promote health and wellbeing aspects relating to flexible office working; through open plan layouts, maximising natural light and views out whilst optimising circulation.
a pragmatic and achievable balance between social, economic and environmental issues and their relationship to a commercial building. From the outset mitigating the environmental impact of the building has been a key consideration. The result is achieving a BREEAM rating of EXCELLENT and an EPC rating of A - both of which were required by the funding team as a key deliverable.
Design for Activity The dynamic reception and feature staircase are the focus and heart of the commercial office buildings, these have been conceived as the social hubs for the buildings & these spaces have been designed with a multitude of potential informal meeting points for those passing through the spaces.
Design for Low Carbon Travel The Eden Campus development enhances the sites connectivity to the surrounding public transport infrastructure and responds to the increase in cycling demand to provide a more sustainable and low-carbon travel to and from work and the town
The proposed retail space & active frontages across the site will engage both the local community, passersby & the building occupants. The proposed high quality retail spaces will attract top high street/boutique brands for all to enjoy.
centre.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
5
de
Eden Campus oVERVIEW
fa
ça
Commercial HQ Office pu
bl
ic
The Honey and The Hive buildings are the focal point of the Eden Campus Scheme. The brief for the Office Buildings was to provide the
Brook Street
following key functions:
The Hive Office
Create a BREAAM excellent CAT A Office facility to serve a world leading occupier, Unilever.
Reception
To incorporate a high level of sustainability pub
embodied in the design- reflecting the climate
lic f
emergency.
aça
New quality green space for private and public use
de
on a site currently lacking external public amenity. Create a more generous public realm through the widening of Eden Street. Attract positive interaction through active frontage along Eden Street.
Eden
retail
The Honey Office
woodland walk
Street
Encompass the key needs of the occupier whilst
publ
addressing the need for flexibility in future use and adaptations of the building.
ic faç
ade
St James’s Road Creating Architectural Presence & Identity The two offices harmoniously compliment each other whilst having a defined and unique identity which distinguishes them. The buildings appearance takes cues from the site context within Kingston, combined with the aspiration to create a HQ building with grandeur and architectural presence.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
6
2
BUILDING A GA S
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
7
Building A GAs 2.1 Building A - GF plan
A-1a
A-1
A-2
A-2a
3600
A-3
4050
4950
A-3a
A-4
2700
6300
A-4a
A-5
1350
A-6a
7650
7650
A-6
A-7a
1350
6300
A-7
A-8a
2700
4950
A-8 4050
A-9a 3600
A-9 5400
N
A-A 1
Eden Street
AXX001-ZZ-DR-A-0301
Ownership Boundary Line
FFL 8.400 m Raised Entrance
A-B
CAT A omitted area to be shell and core only. RAF removed.
00-001
9000
Office
A-C
00-R14
Riser
7.600 m
Entrance Lift Lobby
Corridor
00-L03
00-L01
00-010
00-025
1:21
Passenger Lift
Passenger Lift
00-R09
WC Core 00-L07
Corridor 03 7.200 m
9000
00-034
Lobby
Domestic Hot Water 00-002
Corridor 01
FFL 8.400 m 00-R03
Refuse Store
Office
AXX001-ZZ-DR-A-0306
Stair 01
Service Corridor
00-S02
Corridor 08 7.200 m
1
00-001
00-007
Cleaners
00-S01
00-011
00-020
00-019
AXX001-ZZ-DR-A-0302
00-R04
Landlords Low 00-R06 Smoke Vent Voltage Riser
00-R05
Smoke Vent Life Safety
A-D
1
00-006
Lift Lobby
Corridor 02
00-028
A-0304 -ZZ-DRAXX001
00-R02
Low Temperature Hot Water
00-003
AXX001-ZZ-DR-A-0308
Passenger Lift
00-R01
7.200 m
1
00-L04
Passenger Lift
District Heat Network
00-026
1
00-L02
Evacuation Lift
00-027
Back Of House
Mechanical Ventilation Riser
00-005
00-004
WC Core
Stair 02
00-L06
00-L05
FF/Passenger Lift
FF/Passenger Lift
00-R07
00-031
Tenant Riser
Stair Lobby
Brook Street
00-R11
Drainage requirement to be confirmed
00-029
7.200 m
00-022
Store
9000
Lobby
00-018
Service Yard
Booster Tank Room
00-024
Telecommunications
Life Safety Switch
Dry Riser
Corridor 00-030
Corridor
00-023
00-021
00-033
Corridor
00-032
Dry Riser
Fire Command Center
00-012
Service Yard St James's Road
FFL 8.400 m
00-R12
00-013
Corridor
00-014
FFL 7.750 m
Potential Expansion
FFL 7.200 m
Subject to occupier's CAT A fit out
A-E FFL 8.400 m
4950
FFL 7.200 m 00-017
UK Power Networks FFL 7.550 m
8.250 m
00-015
00-016
Low Voltage Switch
Low Voltage Transformer
00-R15
Dry Riser
FFL 7.550 m
FFL 7.550 m
00-R16
A-F
Dry Riser
1
Woodland Walk
AXX001-ZZ-DR-A-0303
1
AXX001-ZZ-DR-A-0307
1
IXX001-ZZ-DR-A-0300
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
0m
1m
3 IXX001-ZZ-DR-A-0301
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Ground Floor Plan
8
PROJECT
Eden Campus SCALE AT A1:
1 : 100
DRAWING
SCALE AT A3:
1: 200
DAA JOB NO.
19064 REV.
Building A GAs 2.2 Building A - L01-04
A-1a
A-1
A-2
A-2a
3600
A-A
4050
A-3 4950
A-3a
A-4
2700
6300
A-4a
A-5
1350
A-6a
7650
7650
A-6
A-7a
1350
6300
A-7
A-8a
2700
4950
A-8
A-9a
4050
A-9
3600
A-1a
A-1
5400
A-2
A-2a
A-3
A-3a
A-4
A-4a
A-5
1
A-6a
A-6
A-7a
A-7
A-8a
A-8
A-9a
A-9
AXX001-ZZ-DR-A-0301
A-A
N
1
A-A
3600
4050
4950
2700
6300
1350
7650
7650
1350
6300
2700
4950
4050
3600
N
5400
A-A
AXX001-ZZ-DR-A-0301
Floor finishes to be protected when temporary works installed
A-B
A-B Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.
01-001
Office
02-001
Office FFL 16.350 m 9000
9000
FFL 12.600 m
A-C
A-C 01-L01
Mechanical Ventilation Riser
Riser
Riser
01-L07
9000
01-L02
01-L04
Passenger Lift
Passenger Lift 01-R02
01-R01
01-002
Lift Lobby
01-003
Corridor 02
01-R03
Riser
A-D
01-R11
01-S03
Extract Riser
Landlords Low Smoke Vent Voltage Riser
01-L06
01-L05
01-R18
02-R01
Domestic Hot Water 02-002
Lift Lobby
02-003
Corridor 02
02-R03
02-R11
02-S03
Extract Riser
02-S04
Stair 02
Tenant Riser
Stair Lobby
02-R06
Landlords Low Smoke Vent Voltage Riser
Smoke VentLife Safety
A-D
1 AXX001-ZZ-DR-A-0302
1
02-007
Cleaners
02-S02
Stair Lobby
02-L06
AXX001-ZZ-DR-A-0306
02-S01
02-L05
FF/Passenger Lift
Riser
02-006
02-R04
02-R05
AXX001-ZZ-DR-A-0308
02-R14
Corridor 01
FFL 16.350 m
Riser
1
CAT A omitted area to be shell and core only
02-R02
Low Temperature Hot Water
01-R07
FF/Passenger Lift
Passenger Lift
Passenger Lift
02-R16
01-S01
Stair 01
Mechanical Ventilation Riser
02-L04
02-L02
Evacuation Lift
Stair 01
FF/Passenger Lift
02-R07
Tenant Riser
758
FF/Passenger Lift
1
AXX001-ZZ-DR-A-0306
Cleaners 01-S02
Stair Lobby
02-L07
CAT A omitted area to be shell and core only
1
02-R09
02-005
WC Core
WC Core
0304 ZZ-DR-AAXX001-
AXX001-ZZ-DR-A-0302
01-R06
Smoke Vent Life Safety
Stair Lobby
1
01-006
01-R04
01-R05
01-S04
Stair 02
Riser
Corridor 01
FFL 12.600 m
01-R16
1
AXX001-ZZ-DR-A-0308
01-R14
02-L03
Passenger Lift
Passenger Lift
02-004
Riser
Domestic Hot Water
Low Temperature Hot Water
0304 ZZ-DR-AAXX001-
02-R17
CAT A omitted area to be shell and core only but RAF to be installed
Mechanical Ventilation Riser
02-L01
Mechanical Ventilation Riser
Riser
01-R09
01-005
WC Core Evacuation Lift
02-R10
02-R15
Passenger Lift
WC Core
CAT A omitted area to be shell and core only
1
01-L03
Passenger Lift
01-004
01-R17
9000
01-R10
01-R15
02-R12
02-R13
01-R12
01-R13
Dry Riser
Dry Riser
Dry Riser 9000
9000
Dry Riser
Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.
A-E
Feature Stair
Feature Stair
A-E
Void
4950
4950
Feature Stair
Curtain wall mullion and floor finishes to be protected when temporary works installed
A-F
A-F 1
Reception Entrance Roof
AXX001-ZZ-DR-A-0307
1
1
AXX001-ZZ-DR-A-0303
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
1m
5m
10m
12m
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
Indicative bleacher arrangement aligned with SE loading zones
A-1a
A-2
A-2a
3600
A-A
4050
4950
A-3a 2700
A-4 6300
P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06 C07
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
A-3
P01
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
1:100
A-1
REV
KEY PLAN
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
A-5
AXX001-ZZ-DR-A-0301
1350
DATE
BY
AUTH
03/12/21
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
GENERAL NOTES
CONSTR. RECORD CR 03-Proposed Building A - GA First Floor Plan PROJECT
Eden Campus SCALE AT A1:
19064
1: 200
DRAWING
REV.
A-6a
7650
7650
A-6
A-7a
1350
6300
A-7
© Darling Associates Ltd.
A-8a
2700
4950
A-8
4050
A-9a
3600
0m
C07
1m
5m
10m
12m
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
1:100
A-9
A-1a
A-1
5400
N
A-A
A-2
A-A
A-B
A-2a
3600
REV
KEY PLAN
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
DAA JOB NO.
SCALE AT A3:
1 : 100
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
TITLE
EDC-DAA-AXX001-01-DR-A-0300
1
A-4a
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD
4050
A-3 4950
A-3a 2700
A-4 6300
A-5
AXX001-ZZ-DR-A-0301
1350
P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05
NOTES
DATE
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
BY
AUTH
03/12/21
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Second Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
DAA JOB NO.
SCALE AT A3:
19064
1: 200
DRAWING
REV.
EDC-DAA-AXX001-02-DR-A-0300
1
A-4a
P01
A-6a
7650
7650
A-6
A-7a
1350
6300
A-7
A-8a
2700
4950
© Darling Associates Ltd.
A-8 4050
A-9a
3600
C05
A-9
N
5400
A-A
A-B
03-001
04-001
Office
Office
FFL 23.850 m 9000
9000
FFL 20.100 m
A-C
A-C 03-R10
03-L01
Mechanical Ventilation Riser
03-R15
Riser
03-R17
03-L07
9000
03-L02
Evacuation Lift
03-R01
03-R02
Domestic Hot Water 03-002
Lift Lobby FFL 20.100 m
03-003
Corridor 02 03-R16
Riser
03-R03
03-R11
03-S03
Extract Riser
Stair 02
03-S04
Stair Lobby
03-L06
03-L05
FF/Passenger Lift
1 AXX001-ZZ-DR-A-0302
03-006
FF/Passenger Lift
Cleaners 03-S02
Stair Lobby
1
04-R01
AXX001-ZZ-DR-A-0306
04-R11
04-S03
Extract Riser
Stair 02
04-S04
Stair Lobby
Tenant Riser
04-L06
04-L05
FF/Passenger Lift
FF/Passenger Lift
AXX001-ZZ-DR-A-0302
1
04-007
Cleaners 04-S02
Stair Lobby
AXX001-ZZ-DR-A-0306
04-S01
Stair 01
04-R07
Tenant Riser
Dry Riser
9000
Dry Riser
9000
1
04-008
04-R13
Dry Riser
Riser
04-006
04-R04
Landlords Low04-R06 Smoke Vent Voltage Riser
Smoke Vent Life Safety
A-D
AXX001-ZZ-DR-A-0308
04-R14
Corridor 01
FFL 23.850 m 04-R05
04-R03
03-R12
03-R13
Dry Riser
04-002
Lift Lobby
04-003
1
CAT A omitted area to be shell and core only
04-R02
Domestic Hot Water
Corridor 02
03-R07
Mechanical Ventilation Riser
04-L04
Passenger Lift
Low Temperature Hot Water
Riser
03-S01
Stair 01
04-L02
Passenger Lift
04-R16
1
03-007
04-R09
04-005
WC Core 04-L07
Evacuation Lift
0304 ZZ-DR-AAXX001-
03-R06
Landlords LowSmoke Vent Voltage Riser
Smoke VentLife Safety
A-D
Riser
Passenger Lift
WC Core
CAT A omitted area to be shell and core only
AXX001-ZZ-DR-A-0308
03-R14
Corridor 01 03-R04
03-R05
1
CAT A omitted area to be shell and core only
Passenger Lift
04-L03
Passenger Lift
04-004
Riser
03-L04
Passenger Lift
Low Temperature Hot Water
0304 ZZ-DR-AAXX001-
04-R17
Mechanical Ventilation Riser
WC Core
WC Core
04-L01
Mechanical Ventilation Riser
Riser
03-R09
03-005
CAT A omitted area to be shell and core only
04-R10
04-R15
Passenger Lift
03-004
Riser
1
03-L03
Passenger Lift
9000
0m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
AXX001-ZZ-DR-A-0307
Feature Stair
Feature Stair
Feature Stair
A-E
A-E
4950
4950
Void
A-F
A-F
1
1 AXX001-ZZ-DR-A-0303
1
AXX001-ZZ-DR-A-0307
AXX001-ZZ-DR-A-0303
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
Eden Campus, Kingston Upon Thames KT1 Practical Completion document GENERAL NOTES
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m 1:100
1m
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
1
AXX001-ZZ-DR-A-0307
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
GENERAL NOTES
CONSTR. RECORD CR 03-Proposed Building A - GA Third Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
DRAWING
EDC-DAA-AXX001-03-DR-A-0300 © Darling Associates Ltd.
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
TITLE
DAA JOB NO.
19064 REV.
C05
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m 1:100
1m
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
9
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Fourth Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
DRAWING
EDC-DAA-AXX001-04-DR-A-0300 © Darling Associates Ltd.
DAA JOB NO.
19064 REV.
C05
Building A GAs 2.3 Building A - L05-08
A-1a
A-1
A-2
A-A
A-2a
3600
4050
A-3 4950
A-3a
A-4
2700
6300
1
A-4a
A-5
AXX001-ZZ-DR-A-0301
1350
A-6a
7650
7650
A-6
Floor finishes to be protected when temporary works installed
1350
A-7a
6300
A-7
A-8a
2700
4950
A-8 4050
A-9a 3600
A-9
A-1a
A-1
N
5400
A-A
A-2
A-A
A-2a
3600
4050
A-3 4950
A-3a
A-4
2700
6300
1
A-4a
A-5
AXX001-ZZ-DR-A-0301
1350
A-6a
7650
7650
A-6
A-7a
1350
6300
A-7
A-8a
2700
A-8
4950
4050
A-9a 3600
A-9
N
5400
A-A
06-013
Terrace
A-B
A-B
Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.
05-001
A-C
A-C
05-R10
9000
05-L07
05-L02
Evacuation Lift
Passenger Lift
05-R01
Domestic Hot Water 05-002
Lift Lobby FFL 27.600 m
05-003
Corridor 02 05-R16
05-R03
Riser
05-S03
05-S04
Stair 02
FF/Passenger Lift
Evacuation Lift
1
Passenger Lift
06-R01
06-R02
06-R11
06-S03
Extract Riser
1
Domestic Hot Water 06-002
Landlords Low 06-R06 Smoke Vent Voltage Riser
06-S04
Stair 02
06-R13
05-R12
06-R07
Tenant Riser
06-R12
Dry Riser
Dry Riser
9000
Dry Riser
AXX001-ZZ-DR-A-0306
06-S01
Stair 01
FF/Passenger Lift
FF/Passenger Lift
Tenant Riser
Stair Lobby
06-L05
06-L06
1
06-007
Cleaners 06-S02
Stair Lobby
AXX001-ZZ-DR-A-0302
06-006
Corridor 01 06-R04
06-R05
Smoke VentLife Safety
A-D
9000
1
AXX001-ZZ-DR-A-0308
06-R14
Lift Lobby FFL 31.513 m
06-003
Corridor 02
06-R03
AXX001-ZZ-DR-A-0306
Mechanical Ventilation Riser
06-L04
Passenger Lift
Riser
05-R07
FF/Passenger Lift
05-R13
Dry Riser
06-L02
Low Temperature Hot Water
05-S01
06-R09
06-004
WC Core 06-L07
0304 ZZ-DR-AAXX001-
Stair 01
06-L03
Passenger Lift
WC Core
Riser
1
05-007
Stair Lobby
05-L05
06-L01
Passenger Lift
06-005
06-R17
1 AXX001-ZZ-DR-A-0302
Cleaners 05-S02
05-L06
Stair Lobby
Riser
05-006
05-R06
Landlords Low Smoke Vent Voltage Riser
Smoke Vent Life Safety 05-R11
Extract Riser
AXX001-ZZ-DR-A-0308
05-R14
Corridor 01 05-R04
05-R05
CAT A omitted area to be shell and core only
Terrace
1
CAT A omitted area to be shell and core only
05-R02
Low Temperature Hot Water
1
0304 ZZ-DR-AAXX001-
A-D
Mechanical Ventilation Riser
05-L04
Passenger Lift
06-013
05-R09
05-005
WC Core
WC Core
Riser
06-R10
Mechanical Ventilation Riser
Passenger Lift
05-004
05-R17
CAT A omitted area to be shell and core only but RAF to be installed
05-L03
05-L01
Passenger Lift
Riser
9000
Mechanical Ventilation Riser
05-R15
06-001
Office
Void projection to level above
9000
9000
Office
Feature Stair
Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.
A-E
4950
4950
Feature Stair
A-E
A-F
A-F
1
1
1
AXX001-ZZ-DR-A-0307
AXX001-ZZ-DR-A-0303
1
AXX001-ZZ-DR-A-0303
2
AXX001-ZZ-DR-A-0307 Floor finishes and curtain wall mullion to be protected when temporary works installed
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
NOTES
REV
KEY PLAN
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Acoustic Report and Glare report. Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. read in conjunction with all Stage A-1a Other specialist A-2 5. Drawing to beA-2a A-3 5 DAA A-3a OtherA-1 specialist design consultant's requirements as appointed by the Main Contractor. design sub-contractor's requirements as appointed by the Main Contractor. documentation. P = Preliminary C = Contractual 6. GA 4050 Elevations and Sections 4950 to be read in conjuction 3600 2700 with A-A 0m 1m 5m 10m 12m Facade Consultants' drawings
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
Indicative bleacher arrangement aligned with SE loading zones
A-4 6300
P01
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
1
A-4a
A-5
A-6a
Water Tank AXX001-ZZ-DR-A-0301 Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. 7650 7650
Indicative commercial kitchen equipment aligned with SE loading zones 1350
IXX001-ZZ-DR-A-0300
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
A-6
A-7a
1350
6300
P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06 C07
A-7 2700
NOTES
DATE
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD
A-8a
4950
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC AC
A-8
4050
DRAWING STATUS
ISO SHEET STATUS
GENERAL NOTES
CONSTR. RECORD CR 03-Proposed Building A - GA Fifth Floor Plan PROJECT
Eden Campus
A-9a 1 : 100
SCALE AT A1:
3600 DRAWING
SCALE AT A3:
A-9
DAA JOB NO.
19064
NREV.
5400
EDC-DAA-AXX001-05-DR-A-0300
1:100
NOTES
C07
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Acoustic Report and Glare report. Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. read in conjunction with all Stage A-1a Other specialist A-2 5. Drawing to beA-2a A-3 5 DAA A-3a OtherA-1 specialist design consultant's requirements as appointed by the Main Contractor. design sub-contractor's requirements as appointed by the Main Contractor. documentation. P = Preliminary C = Contractual 6. GA 4050 Elevations and Sections 4950 to be read in conjuction 3600 2700 with A-A 0m 1m 5m 10m 12m Facade Consultants' drawings
REV
KEY PLAN
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
TITLE
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
Indicative bleacher arrangement aligned with SE loading zones
A-4 6300
P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
1
A-4a
A-5
A-6a
Water Tank AXX001-ZZ-DR-A-0301 Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. 7650 7650
Indicative commercial kitchen equipment aligned with SE loading zones 1350
A-6
A-7a
1350
6300
A-7 2700
NOTES
DATE
BY
AUTH
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
03/12/21
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
4950
4050
A-8a
A-8
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Sixth Floor Plan PROJECT
Eden Campus
A-9a 1 : 100
SCALE AT A1:
3600 DRAWING
SCALE AT A3:
1: 200
A-9
DAA JOB NO.
19064
© Darling Associates Ltd.
NREV. A-A
5400
EDC-DAA-AXX001-06-DR-A-0300
1:100
C05
© Darling Associates Ltd.
Terrace Below Terrace Below
Projection line of Canopy Over 8th Floor Terrace
A-B
A-B Projection line of Grillage Flooring from level 09.
07-001
Office
CAT A omitted area to be shell and core only
9000
9000
FFL 35.263 m
Subject to occupier's fit out
08-001
Office
Additional means of escape
A-C
A-C
07-R10
Mechanical Ventilation Riser
07-L01
08-R07
Passenger Lift
WC Core
Riser
07-L07
07-L02
Evacuation Lift
Passenger Lift
Passenger Lift
07-R01
07-R02
07-R03
07-S04
Stair Lobby
07-L05
07-007
FF/Passenger Lift
Stair Lobby
08-L04
Stair 03
08-R02
Cleaners
Low Temperature Hot Water
Terrace Below
A-D
Domestic Hot Water 08-002
08-R05
Tenant Riser
1
08-R06
Smoke Vent Life Safety
Landlords Low Smoke Vent Voltage Riser
08-L06
08-L05
AXX001-ZZ-DR-A-0306 08-S02
FF/Passenger Lift
1 AXX001-ZZ-DR-A-0302
08-005
Corridor 01 08-R04
08-R08
M-Vent Riser
07-R07
1
AXX001-ZZ-DR-A-0308
08-010
Lift Lobby FFL 39.176 m
08-003
Corridor 02
08-R03
AXX001-ZZ-DR-A-0306
07-S01
Stair 01
FF/Passenger Lift
07-R13
1
1
Cleaners 07-S02
07-L06
Passenger Lift
08-R01
Terrace
0304 ZZ-DR-AAXX001-
Landlords Low Smoke Vent Voltage Riser
Smoke VentLife Safety
07-S03
Stair 02
07-R11
Extract Riser
AXX001-ZZ-DR-A-0302
07-006
08-S03
Passenger Lift
08-L02
Evacuation Lift
AXX001-ZZ-DR-A-0308
Corridor 01
07-R06
08-004
WC Core 08-L07
1
07-002
07-R04
08-008
Plant Room
08-S04
Stair Lobby
Riser
07-R14
Lift Lobby
07-R05
Passenger Lift
08-R10
1
Domestic Hot Water
Low Temperature Hot Water 07-003
Corridor 02
A-D
07-R09
Mechanical Ventilation Riser
07-L04
Riser
Terrace Below
0304 ZZ-DR-AAXX001-
WC Core
07-004
07-R17
9000
9000
1
Void
08-L01
M-Vent Riser 07-005
CAT A omitted area to be shell and core only
FF/Passenger Lift
Stair Lobby
08-S01
Stair 01
08-R09
Dry Riser
07-R12
Dry Riser
Projection line of Canopy Over 8th Floor Terrace
9000
9000
Dry Riser
08-007
Plant Room Feature Stair
A-E
A-E
4950
4950
Feature Stair
A-F
Terrace
A-F Bridge Link Roof
1
1 AXX001-ZZ-DR-A-0303
AXX001-ZZ-DR-A-0303
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m
1m
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
1:100
AXX001-ZZ-DR-A-0307
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
1
1
AXX001-ZZ-DR-A-0307
KEY PLAN
CAT A work Omitted in these highlighted areas.
Indicative bleacher arrangement aligned with SE loading zones
Indicative commercial kitchen equipment aligned with SE loading zones
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
GENERAL NOTES
CONSTR. RECORD CR 03-Proposed Building A - GA Seventh Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
DRAWING
EDC-DAA-AXX001-07-DR-A-0300
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
TITLE
DAA JOB NO.
19064 REV.
C05
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m
1m
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD
BY
AUTH AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Eighth Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
1: 200
DRAWING
EDC-DAA-AXX001-08-DR-A-0300
1:100
© Darling Associates Ltd.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
DATE 03/12/21
DAA JOB NO.
19064 REV.
C05
© Darling Associates Ltd.
10
Building A GAs 2.4 Building A - Roof & Mezzanine
A-1a
A-1
A-2
A-2a
3600
A-A
4050
A-3 4950
A-3a
A-4
2700
6300
1
A-4a
AXX001-ZZ-DR-A-0301
1350
A-5
A-6a
7650
7650
A-6
A-7a
1350
6300
A-7 2700
A-8a 4950
A-8 4050
A-9a 3600
A-9
A-1a
A-1
5400
N
A-A
A-2
A-2a
3600
A-A
4050
A-3 4950
A-3a 2700
A-4 6300
1
A-4a
AXX001-ZZ-DR-A-0301
A-5
1350
A-6a 7650
1350
A-6
A-7a 6300
A-7 2700
A-8a
A-8
4950
4050
A-9a 3600
A-9 5400
N
7650
A-A
1 AXX001-ZZ-DR-A-0301
Feature Canopy Over 8th Floor Terrace FFL 8.400 m
A-B Biodiverse Roof with inclined PVs over
A-B
Roof
Edge of biodiverse roof
9000
9000
Plant screen min height 3000mm
09-001
Roof Plant Room Note Refer to drawing EDC-DAA-AXX001-00-DRA-0300 for Ground Floor Plan.
AOV
A-C
A-C Void
Lift Overrun
Lift Overrun
1
Roof
Plant Room below
1
Void
1
0304 ZZ-DR-AAXX001-
AXX001-ZZ-DR-A-0302
1
M0-002
1
Back of House Storage
0304 ZZ-DR-AAXX001-
FFL 43.341 m
FFL 43.341 m
AXX001-ZZ-DR-A-0308
9000
9000
Terrace L08
1
M0-L07
Evacuation Lift
AXX001-ZZ-DR-A-0308
Terrace L06
AXX001-ZZ-DR-A-0302
1
AXX001-ZZ-DR-A-0306
A-D Lift Overrun
Lift Overrun
1
AXX001-ZZ-DR-A-0302
M0-001
Lift Lobby FFL 9.900 m
1
AXX001-ZZ-DR-A-0306
A-D
09-S01
M0-S02
Stair 01 FFL 43.281 m
Stair 02
AOV M0-003
Corridor FFL 9.900 m
M0-R01
FFL 9.056 m
9000
9000
Double height
Dry Riser M0-004
A6 - Wired Room
FFL 9.900 m
Plant screen min height 3000mm
Edge of biodiverse roof
Roof
Mansafe to perimeter
A-E Note Refer to drawing EDC-DAA-AXX001-00-DRA-0300 for Ground Floor Plan.
4950
4950
A-E
Feature Canopy Over 8th Floor Terrace A-F
A-F
1
1 AXX001-ZZ-DR-A-0303
AXX001-ZZ-DR-A-0303
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m
1m
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
1:100
AXX001-ZZ-DR-A-0307
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
1
1
AXX001-ZZ-DR-A-0307
KEY PLAN
CAT A work Omitted in these highlighted areas.
Indicative bleacher arrangement aligned with SE loading zones
Indicative commercial kitchen equipment aligned with SE loading zones
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
GENERAL NOTES
CONSTR. RECORD CR 03-Proposed Building A - GA Roof Plant Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
DRAWING
EDC-DAA-AXX001-09-DR-A-0300
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
TITLE
DAA JOB NO.
19064 REV.
C04
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m
1m
3 IXX001-ZZ-DR-A-0301
5m
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04
NOTES
DATE
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATES CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD
AUTH AC
10/12/21 11/02/22 11/03/22 18/03/22 22/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Ground Floor Mezzanine Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
DRAWING
EDC-DAA-AXX001-M0-DR-A-0300
1:100
© Darling Associates Ltd.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
BY
03/12/21
DAA JOB NO.
19064 REV.
C04
© Darling Associates Ltd.
11
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
Building A GAs 2.5 Building A - Elevations
The drawing is copyright of Da unless otherwise stated. All di discrepancies to be reported t building regulations and other relevant British Standard spec planning permission, it shall n Associates. This drawing may accept responsibility for the in are required appertaining to s appointment representative.
Drawings, specifications and s Employer's Requirements doc specifications, Civil Engineer' Other specialist design consu design sub-contractor's requir P = Preliminary C = Contrac
A-F
A-E
A-D
1
1
AXX001-ZZ-DR-A-0306
AXX001-ZZ-DR-A-0308
A-C
A-B
0m
1m
1:100
1
A-1a
A-2
A-2a9000
7650
A-3
A-3a
A-4
9000
7650
A-4a
AXX001-ZZ-DR-A-0307
A-5
9000
7650
9000 - Structure Grid
7650
A-6a
A-6
7650 - Facade Grid
9000
A-7
A-7a
7650
A-8a
A-8
9000 7650
A-9a 9000
KEY PLAN
31950
A-9
4950
7650
A-R9
9000
9000 - Structure Grid
9000
A-R9
+46.681 m
3400
3400
3400
+46.681 m
A-09
A-09
+43.281 m
Top of Balustrade +40.376 m
4105
4105
4105
+43.281 m
A-08
NOTES
Top of Balustrade +40.376 m
1. For Landscape design re documentation 2. For Structural elements a Structural Engineer's doc 3. For M&E elements refer t 4. Drawing to be read in con Acoustic Report and Glare 5. Drawing to be read in con documentation. 6. GA Elevations and Sectio Facade Consultants' draw
A-08
+39.176 m
+39.176 m
3913
3913
3913
1
IXX001-ZZ-DR-A-0302
A-07
A-07
+35.263 m
06-001
3750
Top of Balustrade +32.713 m
3750
3750
+35.263 m
Top of Balustrade +32.713 m
Bridge Link
A-06
A-06
+31.513 m
3913
3913
3913
+31.513 m
A-05
A-05
+27.600 m
3750
3750
3750
+27.600 m
A-04
A-04
+23.850 m
3750
3750
3750
+23.850 m
A-03
C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01
A-03
+20.100 m
3750
3750
3750
+20.100 m
A-02
REV
A-02
+16.350 m
FINAL ISSUE RECO External lighting, Lou CONSTRUCTION IS FIRST CONTRUCTIO STAGE 4 UPDATES STAGE 4 FIRST ISS CONTRACT ISSUE U FINAL CONTRACT IS CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRAC DRAFT ISSUE FOR
3750
3750
3750
+16.350 m
A-01
A-01
+12.600 m
+12.600 m Brook Street
2700
2700
MAXIMUM HEIGHT: 3.9m
2700
St James's Road
DRAWING STATUS
A-M0
CONSTR.
A-M0
+9.900 m
A-00
+8.400 m
FFL 7.550 m
TITLE
A-00
FFL 7.900 m
FFL 7.550 m
1500
1500
1500
+9.900 m
FFL 8.400 m
+8.400 m
FFL 7.250 m
FFL 7.550 m
03-Proposed Building A - GA E
FFL 7.200 m
PROJECT GENERAL NOTES
Facade louvres - for further details refer to Clarke's drawings
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. 9000 Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. A-R9 P = Preliminary C = Contractual +46.681 m
A-9
0m
1m
5m
P01
A-9a
10m
REV
KEY PLAN
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, 9000 Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA 7650 documentation.
A-8
A-8a
A-7
A-7a
A-6 9000
7650
A-6a
1
AXX001-ZZ-DR-A-0307
A-5
A-4a
9000 7650
A-4
A-3a
9000 15300
P02 P03 P04 P05 P06 P07 P08 C01 C02 C03
9000 7650
6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
C04
Eden Campus
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, for- Services and Clarke for Facade design FacadeHAL louvres for further details
The drawing is copyright of Darling unless otherwise stated. All dimen discrepancies to beA1: reported to Da SCALE AT building regulations and other statu relevant British Standard specifica planning permission, it shall not be Associates. This drawing may inco DRAWING accept responsibility for the integri are required appertaining to such i appointment representative.
1 : 100
refer to Clarke's drawings
NOTES
DATE
BY
AUTH
DRAFT ISSUE FOR INFORMATION 03/12/21 PURPOSES ONLY STAGE 3 CONTRACT ISSUE 10/12/21 STAGE 3 UPDATE 03/03/22 CONTRACT ISSUE 11/03/22 FINAL CONTRACT ISSUE 18/03/22 CONTRACT ISSUE UPDATED 06/04/22 STAGE 4 FIRST ISSUE 16/08/22 STAGE 4 UPDATES 03/10/22 FIRST CONTRUCTION ISSUE 9000 09/11/22 CONSTRUCTION ISSUE UPDATES 26/05/23 External lighting, Louvres and Equitone panels 11/06/24 division added 7650 FINAL ISSUE RECORD 25/10/24
A-3
DRAWING STATUS
A-2a
AC
ISO SHEET STATUS
0m
03-Proposed Building A - GA South Elevation A-2 A-1a
A-B
PROJECT
7650
Eden Campus SCALE AT A1:
1 : 100
1m
1:100
TITLE
A-C 9000
DAA JOB NO.
SCALE AT A3:
19064
1: 1 : 200
DRAWING
12m
EDC-DAA-AXX001-ZZ-DR-A-0303
1:100
© specifications Darling Assoc Drawings, and sche Employer's Requirements docume specifications, Civil Engineer's dra Other specialist design consultant' design sub-contractor's requireme P = Preliminary C = Contractual
CONSTR. RECORD CR
AC AC AC AC AC AC AC AC AC AC AC
EDC-DAA-A
1
1
AXX001-ZZ-DR-A-0308
AXX001-ZZ-DR-A-0306
9000 - Structural Grid
KEY PLAN
A-D
A-E 9000
A-F 4950
A-R9
+46.681 m
REV.
C04
3400
Provision for security shutter across service yard.
3400
© Darling Associates Ltd. A-09
A-09
+43.281 m
NOTES
4105
4105
+43.281 m
Top of Balustrade +40.376 m
Top of Balustrade +40.376 m
1. For Landscape design refer to documentation 2. For Structural elements and flo Structural Engineer's documen 3. For M&E elements refer to Se 4. Drawing to be read in conjunc Acoustic Report and Glare repo 5. Drawing to be read in conjunc documentation. 6. GA Elevations and Sections to Facade Consultants' drawings
A-08
A-08
+39.176 m
3913
3913
+39.176 m
A-07
A-07
+35.263 m
3750
3750
+35.263 m
Top of Balustrade +32.713 m
Top of Balustrade +32.713 m
A-06
A-06
+31.513 m
3913
3913
+31.513 m
A-05
A-05
+27.600 m
3750
3750
+27.600 m
A-04
A-04
+23.850 m
3750
3750
+23.850 m
C04 C03 C02 C01 P06 P05 P04 P03 P02 P01
A-03
A-03
+20.100 m
3750
3750
+20.100 m
REV
A-02
A-02
FINAL ISSUE RECORD External lighting, Louvres CONSTRUCTION ISSUE FIRST CONTRUCTION IS STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDA CONTRACT ISSUE UPDA FINAL CONTRACT ISSU STAGE 3 CONTRACT IS
+16.350 m
3750
3750
+16.350 m
A-01
A-01
+12.600 m
2700
2700
+12.600 m
DRAWING STATUS
CONSTR. R
A-M0
A-M0
+9.900 m 1500
1500
+9.900 m
A-00
TITLE
A-00
FFL 8.400 m
+8.400 m
+8.400 m
03-Proposed Building A - GA Wes
FFL 7.600 m
PROJECT
Eden Campus SCALE AT A1:
1 : 100
DRAWING
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued.
Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design Eden Campus, Kingston Upon Thames KT1 Practical Completion document GENERAL NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist
NOTES
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with
KEY PLAN
REV
NOTES
DATE
P01
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES External lighting, Louvres and Equitone panels division added FINAL ISSUE RECORD
03/12/21
AC
10/12/21 03/03/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 26/05/23 11/06/24
AC AC AC AC AC AC AC AC AC AC
25/10/24
AC
P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04
BY
AUTH
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA North Elevation PROJECT
Eden Campus SCALE AT A1:
SCALE AT A3:
DAA JOB NO.
12
EDC-DAA-AX
© Darling Associa
Building A GAs 2.6 Building A - Sections
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
A-F
7650
7650
A-4
A-3a
1350
A-3
6300
A-2a
2700
A-2
4950
4050
3600
A-R9
A-09
950
01-L02
Passenger Lift
01-L07
01-004
Evacuation Lift
WC Core
01-001
A-01
1000
WC Core
Passenger Lift
3200
00-L04
2700
00-005
Office
00-002
Lift Lobby
00-L02
Passenger Lift
A-M0
+9.900 m 00-028
Corridor 03
+8.400 m
00-027
4105 2800 1113
3913 2800 2800
3750
950
1200
1113
3913 950 2800
950
950
01-001
Water Ta Indicativ Any asso base sch
Office
C04 C03 C02 C01 P09 P08 P07 P06 P05 P04 P03 P02 P01
01-002
Lift Lobby
Services zone
01-001
Office
Eden Street
FINAL ISSUE RECO CONSTRUCTION IS CONTRUCTION ISS FIRST CONTRUCTIO STAGE 4 UPDATES STAGE 4 FIRST ISS STAGE 4 UPDATES CONTRACT ISSUE U FINAL CONTRACT IS CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRAC DRAFT ISSUE FOR
REV
Back Of House
A-00
00-009
+8.400 m
Reception
A-M0
+9.900 m
00-026
District Heat Network
02-001
Seconda Indicativ aligned w integratio variation
03-001
Office
A-01
Back of House Storage
00-L07
Evacuation Lift
Services zone
02-002
Lift Lobby
+12.600 m
M0-002
2700
1500
00-001
Riser
2400
00-R13
A-00
03-002
Lift Lobby
2700
1500
M0-L07
Evacuation Lift
4200
A-M0
+9.900 m
+12.600 m
2700
2700
1800
+12.600 m
02-001
Office
Woodland Walk
Office
A-01
Services zone
Main Eq Indicativ area alig space/va deviating
A-02
+16.350 m
3750
01-002
Lift Lobby
A-02
+16.350 m Services zone
2800
01-L04
Passenger Lift
2800
950
1050
1350
WC Core
Office
2700
01-005
01-001
Riser
2400
3750
3750
01-R14
Services zone
Office
02-001
Office
A-02
+16.350 m
2800
Services zone
950
02-004
WC Core
2800
02-L07
Evacuation Lift
3750
02-L02
Passenger Lift
03-001
950
950
02-002
Lift Lobby
Services zone
Indicativ kitchen e with SE
04-001
A-03
+20.100 m
2800
Passenger Lift
2800
950
1050
1350
Office
02-L04
2700
Riser
02-005
WC Core
02-001
2400
950 2800
3750
Services zone
+20.100 m
Office
Fire curtain to feature stair
Office
03-001
Office A-03
02-R14
Services zone
04-002
Lift Lobby
2800
03-004
WC Core
04-001
Office
4200
03-L07
Evacuation Lift
Indicativ arrangem SE loadi
A-04
+23.850 m
3750
03-L02
Passenger Lift
2800
03-002
Lift Lobby
Services zone
A-03
+20.100 m
Fire curtain to feature stair
Services zone
2800
+23.850 m
950
950
1050
03-L04
Passenger Lift
2800
WC Core
03-001
Office
2700
Riser
2400
950
03-005
2800
3750
03-R14
1350
A-04
Services zone
05-001
Office
950
04-001
Office
A-04
+23.850 m
Services zone
Lift Lobby
2800
04-004
WC Core
Top of Balustrade +32.713 m
1000
04-L07
Evacuation Lift
06-013
Terrace
06-001
Office
A-05
+27.600 m
3750
04-L02
Passenger Lift
Services zone
2800
04-002
Lift Lobby
2800
950
950 2800
950
1050
04-L04
Passenger Lift
2700
WC Core
Office
2400
04-005
04-001
2800
3750
1350
A-05
Services zone
05-001
Office
Office +27.600 m
05-002
Fire curtain to feature stair
05-001
950
WC Core
2800
05-004
Evacuation Lift
3913
05-L07
3913
05-L02
Passenger Lift
06-002
Lift Lobby
A-06
+31.513 m Services zone
05-002
Lift Lobby
A-05
+27.600 m
06-001
Office
+31.513 m
1113
05-L04
Passenger Lift
Fire curtain to feature stair
950
Office
1213
1513
WC Core
2800
2800
Riser
05-005
05-001
2700
Services zone
3913
05-R14
2400
1113
+31.513 m
A-06
950
06-001
Office
A-06
+35.263 m
Top of Balustrade +32.713 m
06-013
Terrace
1. For Landscape documentation 2. For Structural e Structural Engin 3. For M&E eleme 4. Drawing to be r Acoustic Report 5. Drawing to be r documentation. 6. GA Elevations Facade Consul
A-07
2800
06-005
WC Core
NOTES 07-001
Office
950
06-L07
Evacuation Lift
07-002
Lift Lobby
3200
06-L02
Passenger Lift
1200
06-002
Lift Lobby
3750
2800
Passenger Lift
Office
2800
+35.263 m
950
1050
1350
Office
06-L04
2700
Riser
WC Core
2400
3750
3750
06-004
06-001
07-001
Office A-07
06-R14
Fire curtain to feature stair
Office
A-07
+35.263 m
08-001
Lift Lobby
2800
07-001
WC Core
08-002
08-001
Office
3750
07-004
3913
07-L07
Evacuation Lift
Terrace
+39.176 m
3913
1200
07-L02
Passenger Lift
A-08
3913
07-002
Lift Lobby
Top of Balustrade +40.376 m 08-009
A-08
+39.176 m
4105
Top of Balustrade +40.376 m
1113
08-001
Office
2800
08-L07
Evacuation Lift
1113
Passenger Lift
2800
1513
1213
07-L04
2700
WC Core
Office
2400
3913
3913
07-005
07-001
Riser
A-09
+43.341 m
+43.281 m
4105
08-L02
Passenger Lift
4105
08-002
Lift Lobby
A-08
07-R14
Roof Plant Room 1305
1305 2800
1705
1405 2700
2400
4105
4105
08-L04
+44.837 m 09-001
+43.281 m
Passenger Lift
+44.837 m
Roof
3400
09-002
+43.281 m
08-004
Drawings, specifications and s Employer's Requirements doc specifications, Civil Engineer' Other specialist design consu design sub-contractor's requir P = Preliminary C = Contrac
+46.681 m
A-R9
3400
09-001
Roof Plant Room +43.341 m
WC Core
A-B
9000
1
AXX001-ZZ-DR-A-0308
KEY PLAN
09-001
Roof Plant Room +43.341 m
08-008
A-C
9000
+46.681 m
3400
3400
3400
+46.681 m
+44.837 m
Plant Room
A-D
9000
1
+46.981 m
+39.176 m
A-E
AXX001-ZZ-DR-A-0306
+46.681 m
A-09
4950
A-1a
3400
1350
A-4a
950
6300
A-5
AXX001-ZZ-DR-A-0307
2800
2700
1
A-6a
950
4950
+46.681 m
A-R9
A-6
2800
4050
A-7a
4200
3600
A-7
1200
5400
A-8a
3750
A-8
38281
A-9a
1500
A-9
The drawing is copyright of Da unless otherwise stated. All di discrepancies to be reported t building regulations and other relevant British Standard spec planning permission, it shall n Associates. This drawing may accept responsibility for the in are required appertaining to s appointment representative.
00-001
Office
00-002
Lift Lobby
A-00
+8.400 m
+7.400 m DRAWING STATUS
CONSTR. TITLE
03-Proposed Building A - GA S
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
PROJECT
Eden Campus SCALE AT A1:
1 : 100
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
A-9
A-9a
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, 5400 Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor.
3600
P = Preliminary C = Contractual A-R9
A-7a
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a AXX001-ZZ-DR-A-0307 variation.
1350 Indicative commercial kitchen equipment aligned with SE loading zones
7650 Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
A-6
6300
1
A-6a
P01 P02 C01 C02 C03 C04
A-5
A-4a 7650
A-4
NOTES
DATE
STAGE 4 UPDATES STAGE 4 FIRST ISSUE FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD
A-3a
1350
BY
AUTH
10/08/22 16/08/22 09/11/22 20/01/23 26/05/23 25/10/24
A-3
6300
DRAWING STATUS
AC AC AC AC AC AC
ISO SHEET STATUS
CONSTR. RECORD CR
DRAWING
TITLE
© Darling Assoc
EDC-DAA-A
03-Proposed Building A - GA Section C-C PROJECT
A-2a
2700
A-2 Eden Campus A-1a
4950
4050
3600 SCALE AT A1:
DAA JOB NO.
SCALE AT A3:
1 : 100
19064
1: 200
A-R9
DRAWING
3400
EDC-DAA-AXX001-ZZ-DR-A-0308
3400
3400
+46.681 m
REV
KEY PLAN
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing with Fire Strategy A-7 Report, A-8 to be read in conjunction A-8a Acoustic Report and Glare report. 2700 5. Drawing to be4050 read in conjunction with 4950 all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
09-S01
09-001
Stair 01
A-09
+46.681 m REV.
C04
3400
GENERAL NOTES
© Darling Associates Ltd.
09-002
Roof Plant Room
Roof
A-09
+43.281 m
08-R06
08-R04
08-002
Lift Lobby
08-R05
08-R03
Life SafetySmoke Vent
08-R08
M-Vent Riser
08-001
08-009
Office
A-08
+39.176 m
Riser
Stair 01
07-R06
07-R04
07-002
Stair Lobby Smoke VentLandlords Low Lift Lobby Voltage Riser
07-R05
07-R03
Life SafetySmoke Vent
07-S04
07-S03
Stair Lobby
Stair 02
06-S04
06-S03
07-R11
3913
07-007
Cleaners
07-S02
3913
07-001
Office
07-R14
07-S01
2800
4040
1113
+39.176 m
Top of Balustrade +40.376 m 1200
Terrace
8018
A-08
08-S02
Stair Lobby Smoke VentLandlords Low Voltage Riser
4105
08-S01
Stair 01
4105
08-S01
Stair 01
08-008
Plant Room
2800
3978
1305
+43.281 m
07-001
Extract Riser
Office
A-07
A-07
+35.263 m
06-007
Stair 01
Cleaners
06-R04
Stair Lobby Smoke VentLandlords Low Voltage Riser
06-002
Lift Lobby
06-R05
06-R03
Life SafetySmoke Vent
Stair Lobby
Stair 02
06-R11
Extract Riser
06-001
06-013
Office
Terrace
Top of Balustrade +32.713 m
A-06
Riser
2800
05-007
Stair 01
Cleaners
05-R06
05-R04
Stair Lobby Smoke VentLandlords Low Voltage Riser
05-002
Lift Lobby
05-R05
05-R03
Life SafetySmoke Vent
05-S04
Stair Lobby
05-S03
Stair 02
05-R11
3913
05-001
Office
05-S02
3913
3913
05-S01
05-R14
A-06
+31.513 m
1113
Services zone
05-001
Extract Riser
2800
1113
+31.513 m
3750
Office
06-R06
1200
Riser
06-S02
2800
06-001
06-R14
3750
3750
06-S01
3750
950
+35.263 m
Office
Riser
04-007
Cleaners
04-R06
04-R04
04-002
Lift Lobby
04-R05
04-R03
Life SafetySmoke Vent
04-S04
Stair Lobby
+27.600 m Services zone
04-S03
Stair 02
04-R11
Extract Riser
3750
04-001
Office
04-S02
Stair Lobby Smoke VentLandlords Low Voltage Riser
04-001
2800
04-R14
2800
3750
04-S01
Stair 01
2800
Services zone
950
950
A-05
38281
+27.600 m
950
A-05
Office
A-04
Riser
03-001
Office
03-007
Cleaners
03-S02
03-R06
03-R04
Stair Lobby Smoke VentLandlords Low Voltage Riser
03-002
Lift Lobby
+23.850 m
950
03-R05
03-R03
Life SafetySmoke Vent
03-S04
Stair Lobby
Services zone
03-S03
Stair 02
03-R11
Extract Riser
3750
03-R14
2800
3750
03-S01
Stair 01
03-001
Office
2800
Services zone
2800
950
950
A-04
+23.850 m
A-03
Riser
02-001
02-007
Office
Cleaners
01-001
01-R18
Stair 01
02-S02
02-R06
02-R04
Stair Lobby Smoke VentLandlords Low Voltage Riser
02-002
Lift Lobby
+20.100 m
950
02-R05
02-R03
Life SafetySmoke Vent
02-S04
Stair Lobby
Services zone
02-S03
Stair 02
02-R11
Extract Riser
3750
02-R14
2800
3750
02-S01
02-001
Office
2800
Services zone
2800
950
950
A-03
+20.100 m
A-02
A-02
01-R06
01-R04
01-002
Lift Lobby
+16.350 m
950
01-R05
01-R03
Life SafetySmoke Vent
01-S04
Stair Lobby
Services zone
01-S03
Stair 02
01-R11
Extract Riser
3750
Cleaners
Riser
01-S02
Stair Lobby Smoke VentLandlords Low Voltage Riser
01-001
Office
2800
Office
01-S01
Stair 01
2800
01-R14
3750
3750
950
+16.350 m
A-01
A-01
00-001
Office
00-002
Lift Lobby
+12.600 m
00-R05
00-R03
00-011
Life SafetySmoke Vent Service Corridor
M0-S02
Stair 02
2700
00-R04
2700
00-R06
M0-002
Back of House FFL 9.900 m Storage
A-M0
+9.900 m
1500
00-007
Cleaners
A-00
Woodland Walk
1500
A-M0
+9.900 m
00-031
Stair Lobby Smoke VentLandlords Low Voltage Riser
A-00
2700
4200
00-S01
Stair 01
3200
2700
Brook Street
1000
+12.600 m
+8.400 m
+8.400 m
FFL 7.200 m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued.
Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design Eden Campus, Kingston Upon Thames KT1 Practical Completion document GENERAL NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist
NOTES
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial
Water Tank
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 04/03/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building A - GA Section A-A PROJECT
Eden Campus SCALE AT A1:
SCALE AT A3:
DAA JOB NO.
13
3
BUILDING B GA S
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
14
952
B-B
B-C
7223
B-D
7425
B-E
9000
1
B-A B-Aa
9000
7425
BXX001-ZZ-DR-A-0302
N
Building B GAs 3.1 Building B - GF Plan
B-F
B-Ga 7223
B-G
952
Brook Street Projection line of Portal above.
820
B-1 B-2
CAT A omitted area to be shell and core only
1
Subject to occupier's CAT A fit out
1
Green Street
00-014
Telecommunications
00-012
BXX001-ZZ-DR-A-0306
Tank Room
00-009
Reception FFL 7.750 m
00-001
Reception
FFL 8.250 m
Low Voltage Riser 00-005 Stair Lobby 02
00-R05
Sprinkler Riser
Cleaners
Life Safety 00-R04
Smoke Vent
00-L05
FF Lift
00-R01
Low Temperature Hot Water
FFL 8.400 m
00-R07
00-004
00-R02
00-003
00-006
Stair Lobby 01 FFL 8.400 m
WC
00-R10
Tenant Riser
1
B-3
FFL 8.400 m FFL 8.400 m
00-L04
Evacuation Lift 00-S02
00-R09
Dry Riser
00-007
Passenger Lift 03
Electrical Riser FFL 8.100 m
710
00-R03
FFL 7.650 mDomestic Hot Water
B-4
00-L02
00-L01
FFL 8.150 m
B-5 FFL 8.100 m
1
BXX001-ZZ-DR-A-0304
IXX001-ZZ-DR-A-0301
FFL 7.650 m
3
00-009
UK Power Networks
Low Voltage Transformer FFL 7.400 m
1:40
00-011
District Heat Network FFL 7.400 m
FFL 7.400 m
Passenger Lift 02
Passenger Lift 01
Project line of Portal above.
FFL 7.400 m
00-008
1:16
00-R08
00-010
Back Of House Corridor
00-L03
00-R06
Lift Lobby FFL 8.400 m
00-S01
Stair 01 FFL 8.400 m
00-002
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
00-013
Bin Store
Cold Water Storage
Mechanical Equipment
9740
Stair 02 FFL 8.400 m
BXX001-ZZ-DR-A-0303
1
BXX001-ZZ-DR-A-0301
9760
IXX001-ZZ-DR-A-0300
1050mm deep cable trench with GRP ventilated covers supported on steel anglesrefer to UKPN spec drawings
Woodland Walk 1
BXX001-ZZ-DR-A-0307
1
BXX001-ZZ-DR-A-0305
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
Eden Campus, Kingston Upon Thames KT1 0m 1m 5m 1:100 Practical Completion document
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06 C07
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission CONSTRUCTION UPDATES FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 09/11/22 20/01/23 26/05/23 11/09/23 05/10/23 26/01/24 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building B - GA Ground Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
1: 200
DRAWING
EDC-DAA-BXX001-00-DR-A-0300 © Darling Associates Ltd.
DAA JOB NO.
19064 REV.
C07
15
952
7223
B-D
7425
B-E
9000
9000
B-F
B-Ga
7425
7223
B-G
B-A
B-Aa
952
952
B-B
7223
B-C
B-D
7425
B-E
9000
1
B-C
9000
BXX001-ZZ-DR-A-0302
B-B
1
B-A B-Aa
BXX001-ZZ-DR-A-0302
N
Building B GAs 3.2 Building B - L01-L04
B-F
B-Ga
7425
7223
B-G
952
Brook Street Projection line of Portal above.
B-1
CAT A omitted area to be shell and core only but RAF to be installed
B-2
820
820
B-1
B-2
CAT A omitted area to be shell and core only but RAF to be installed
01-001
Office 9760
1
1
BXX001-ZZ-DR-A-0301
BXX001-ZZ-DR-A-0301
Reception Entrance Roof
1
BXX001-ZZ-DR-A-0306
Low Temperature Hot Water WC
Stair 02
9740
Back Of House Corridor
01-R09
Dry Riser 01-S01 Stair 01
01-002
Lift Lobby FFL 12.600 m
01-009
Life Safety
01-L03
02-005
Stair Lobby 01
02-R10
Tenant Riser
WC
02-S02
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
02-L04
Evacuation Lift
02-003
Stair 02
02-R09
02-002
Dry Riser 02-S01 Stair 01
Lift Lobby FFL 16.350 m
02-L03
Passenger Lift 03 02-R08
Electrical Riser
Electrical Switch
01-L02
Passenger Lift 02
02-L02
02-L01
01-R03
710
Domestic Hot Water
B-5
B-4
1
02-R04
Smoke Vent
01-010
01-L01
Passenger Lift 01 710
02-R01
Low Temperature Hot Water
Life Safety
02-L05
FF Lift
01-R06
01-R08
Electrical Riser
B-4
Cleaners
Low Voltage Riser 02-006 Stair Lobby 02
02-R05
02-R07
Sprinkler Riser
02-004
02-R02
Reception Entrance Skylight
Mechanical Equipment
Passenger Lift 03
B-3
Green Street
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
01-L04
Evacuation Lift
01-003 01-S02
Wired Equipment Room
01-011
BXX001-ZZ-DR-A-0303
01-006
Stair Lobby 01
02-R06
01-R04
Smoke Vent
01-L05
FF Lift
01-R01
01-008
Mechanical Equipment
Low Voltage Riser 01-005 Stair Lobby 02
01-R05
Life Safety
9740
Cleaners
1
Reception Entrance Double Height
01-R07
Sprinkler Riser
01-004
01-R02
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306
B-3
02-R03
Passenger Lift 02
Passenger Lift 01
Domestic Hot Water
B-5
1
1
1
BXX001-ZZ-DR-A-0307
BXX001-ZZ-DR-A-0305
1
1
BXX001-ZZ-DR-A-0307
BXX001-ZZ-DR-A-0305
N
1
Woodland Walk
BXX001-ZZ-DR-A-0304
Projection line of Portal above
BXX001-ZZ-DR-A-0304
1
9760
02-001
Office
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
5m
10m
B-1 820
1:100
12m
9000
9000 Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
7425
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06 C07
NOTES
DATE
B-Ga
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE 7223 FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD
952
BY
AUTH
03/12/21 B-G
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS GENERAL NOTES
TITLE
unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
03-Proposed Building B - GA First Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
DRAWING
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and DAA JOB NO. SCALE AT A3: specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual REV.
19064
1: 200
0m 1m 5m EDC-DAA-BXX001-01-DR-A-0300 1:100
B-1
C07
10m
© Darling Associates Ltd.
B-2
NOTES
CONSTR. RECORD CRof Darling Associates. This drawing shall not be scaled. All dimensions are in mm The drawing is copyright
CAT A omitted area to be shell and core only
12m
B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
B-C
7425
9000
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
B-F
REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06 C07
7425
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE 7223 ISSUE CONTRACT FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD
B-Ga
952
DATE
B-G
BY
AUTH
03/12/21
AC
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building B - GA Second Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
DAA
SCALE AT A3:
19
1: 200
DRAWING
EDC-DAA-BXX001-02-DR-A-0300 © Darling Associates Ltd.
B-2
03-001
04-001
9760
9760
Office
1
1
FFL 23.850 m
BXX001-ZZ-DR-A-0301
BXX001-ZZ-DR-A-0301
1
BXX001-ZZ-DR-A-0306
Smoke Vent 03-006
B-3
04-R01
Stair Lobby 01
03-R10 Low Temperature Tenant Riser Hot Water
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
03-L04
Evacuation Lift
WC
03-S02
03-R09
03-002
Stair 02
Dry Riser
Lift Lobby FFL 20.100 m
03-S01
03-L03
Stair 01
Passenger Lift 03
03-R06
03-003
04-R07
Low Temperature Hot Water
Cleaners
Stair Lobby 01
04-R10
Tenant Riser
WC
04-S02
FFL 23.850 m
04-S01
04-L03
Stair 01
04-R08
04-L02
04-L01
Passenger Lift 02
Domestic Hot Water
710
B-4
04-R03
Passenger Lift 02
Passenger Lift 01
Domestic Hot Water
1
1
BXX001-ZZ-DR-A-0304
B-5
1
BXX001-ZZ-DR-A-0307
1
BXX001-ZZ-DR-A-0305
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
Eden Campus, Kingston Upon Thames KT1 Practical Completion document 1. For Landscape design refer to Landscape Architect's
1
BXX001-ZZ-DR-A-0307
1
BXX001-ZZ-DR-A-0305
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
NOTES
documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA
BXX001-ZZ-DR-A-0304
710
Dry Riser
Lift Lobby Passenger Lift 03
B-5
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist
04-R09
04-002
Stair 02
03-L02
Passenger Lift 01
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
04-L04
Evacuation Lift
04-003
Electrical Riser
03-L01
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
04-R04
Smoke Vent 04-006
Electrical Riser
03-R03
Life Safety
04-L05
FF Lift
03-R08
B-4
04-R05
Sprinkler Riser
04-004
04-R02
Low Voltage Riser 04-005 Stair Lobby 02
1
03-R04
03-L05
FF Lift
03-R01
9740
Life Safety
1
Cleaners
04-R06
Sprinkler Riser
03-004
03-R02
Low Voltage Riser 03-005 Stair Lobby 02
Mechanical Equipment
B-3
03-R05
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306 03-R07
9740
1
B-E
9000
Indicative bleacher arrangement aligned with SE loading zones
Office
GENERAL NOTES
KEY PLAN
B-D
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
1
REV
B-F
BXX001-ZZ-DR-A-0303
1m
7425
B-E
Mechanical Equipment
0m
B-D
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
820
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
KEY PLAN
B-C
BXX001-ZZ-DR-A-0302
B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
1
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
BXX001-ZZ-DR-A-0302
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial
Water Tank
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23
AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS GENERAL NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD unless otherwiseCR stated. All dimensions shall be checked on site prior to commencing the works and any TITLE
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
03-Proposed Building B - GA Third Floor Plan PROJECT
Eden Campus SCALE AT A1:
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist
NOTES
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial
Water Tank
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23
AC AC AC AC AC AC AC AC AC AC AC AC
16 DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building B - GA Fourth Floor Plan PROJECT
Eden Campus SCALE AT A1:
SCALE AT A3:
DA
952
7223
B-C
B-D
7425
B-E
9000
9000
B-F
B-Ga
7425
7223
B-A B-Aa
B-G
952
952
7223
B-C
B-D
7425
9000
9000
820
B-2
B-2
B-F
B-Ga
7425
7223
B-G
952
CAT A omitted area to be shell and core only but RAF to be installed 06-001
05-001
Office 9760
1
BXX001-ZZ-DR-A-0301
FFL 27.600 m
BXX001-ZZ-DR-A-0301
9760
Office
FFL 31.350 m
2
IXX001-ZZ-DR-A-0300
1
1
05-006
9740
05-R09
05-002
Dry Riser
Lift Lobby FFL 27.600 m
05-S01
Stair 01
05-L03
WC
06-S02
Dry Riser 06-S01 Stair 01
Lift Lobby FFL 31.350 m
06-L03
Passenger Lift 03 06-R08
Electrical Riser 06-L02
06-L01
Passenger Lift 02
Passenger Lift 01
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
06-R09
06-002
Stair 02
05-L02
05-L01
Domestic Hot Water
710
710
Bridge Link
05-R06
05-R08
Electrical Riser
05-R03
Stair Lobby 01 06-L04
Evacuation Lift
06-003
Mechanical Equipment
Passenger Lift 03
06-R04
Smoke Vent 06-006
06-R10
06-R01
06-R05
Life Safety
06-L05
FF Lift
06-001
9740
WC
05-S02
Stair 02
Cleaners
Low Temperature Tenant Riser Hot Water
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
05-L04
Evacuation Lift
05-003
06-R07
Sprinkler Riser
06-004
06-R02
Low Voltage Riser 06-005 Stair Lobby 02
Stair Lobby 01
Low Temperature Tenant Riser Hot Water
B-4
B-3
1
05-R04
Smoke Vent
05-R10
05-R01
05-R05
Life Safety
05-L05
FF Lift
06-R06
Cleaners
Mechanical Equipment
05-R07
Sprinkler Riser
05-004
05-R02
Low Voltage Riser 05-005 Stair Lobby 02
1
B-3
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306
B-4
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306
06-R03
Passenger Lift 02
Passenger Lift 01
Domestic Hot Water
B-5 1
1
BXX001-ZZ-DR-A-0305
1
BXX001-ZZ-DR-A-0307
1
1
BXX001-ZZ-DR-A-0307
BXX001-ZZ-DR-A-0305
N
1
BXX001-ZZ-DR-A-0304
B-5
BXX001-ZZ-DR-A-0304
1
B-E
B-1
B-1 820
B-B
1
B-B
BXX001-ZZ-DR-A-0302
B-Aa
1
B-A
BXX001-ZZ-DR-A-0302
N
Building B GAs 3.3 Building B - L05-L08
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 5m
10m
12m
B-1 820
1:100
7425
Indicative bleacher arrangement aligned with SE loading zones
B-D
9000
B-E
9000 Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
7425
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
REV
B-F
P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED 7223 STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD
DATE
B-Ga
952
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
B-G
DRAWING STATUS
GENERAL NOTES
NOTES
ISO SHEET STATUS
drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR.The RECORD CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
03-Proposed Building B - GA Fifth Floor Plan PROJECT
specifications and schedules are to be read in conjunction with the following where applicable: Eden CampusDrawings, Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and
1 : 100
specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA NO. SCALE AT A3:consultant's requirements as appointed by Other specialist design the JOB Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
DRAWING
0m
SCALE AT A1:
19064
1: 200 1m
REV.
5m
EDC-DAA-BXX001-05-DR-A-0300 1:100
10m
C06
Indicative bleacher arrangement aligned with SE loading zones
7425
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
B-D
9760
DATE
BY
03/12/21
B-Ga
952
AUTH
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR
AC
B-G
10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC AC
TITLE
03-Proposed Building B - GA Sixth Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
SCALE AT A3:
1: 200
DRAWING
EDC-DAA-BXX001-06-DR-A-0300 © Darling Associates Ltd.
B-2
9760
1
FFL 38.850 m
BXX001-ZZ-DR-A-0301
1
WC
07-S02
08-R01
Dry Riser
Lift Lobby FFL 35.100 m
07-S01
07-L03
Stair 01
WC
08-S02
Dry Riser
Lift Lobby
08-S01
08-L03
Stair 01
07-R06
Mechanical Equipment
Passenger Lift 03 Electrical Riser
Passenger Lift 02
08-L02
08-L01
Domestic Hot Water
B-4
1
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
08-R09
08-002
Stair 02
08-R08
710
710
Stair Lobby 01 08-L04
Evacuation Lift
08-003
B-5
08-R03
Passenger Lift 02
Passenger Lift 01
Domestic Hot Water
1
BXX001-ZZ-DR-A-0305
1
1
BXX001-ZZ-DR-A-0304
B-5 1
BXX001-ZZ-DR-A-0307
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
Eden Campus, Kingston Upon Thames KT1 1. For Landscape design refer to Landscape Architect's documentation Structural elements and flood void details refer to Practical Completion2. Fordocument
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 12m
Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
1
BXX001-ZZ-DR-A-0307
1
BXX001-ZZ-DR-A-0305
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
10m
08-R04
Smoke Vent 08-006
08-R10
07-L02
07-L01
Passenger Lift 01
08-R05
Life Safety
08-L05
FF Lift
FFL 38.850 m
Passenger Lift 03 07-R08
Electrical Riser
07-R03
Cleaners
Low Temperature Tenant Riser Hot Water
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
07-R09
07-002
Stair 02
08-R07
Sprinkler Riser
08-004
08-R02
Low Voltage Riser 08-005 Stair Lobby 02
Stair Lobby 01 07-L04
Evacuation Lift
07-003
B-4
B-3
9740
07-R10 Low Temperature Tenant Riser Hot Water Bridge Link Roof
9740
07-R04
Smoke Vent 07-006
08-R06
07-L05
FF Lift
07-R01
1
Cleaners
Low Voltage Riser 07-005 Stair Lobby 02
07-R05
Life Safety
BXX001-ZZ-DR-A-0303
07-R07
Sprinkler Riser
07-004
07-R02
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306
B-3
BXX001-ZZ-DR-A-0304
1
BXX001-ZZ-DR-A-0301
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED 7223 STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD
08-001
1
5m
7425
P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06
Office
FFL 35.100 m
BXX001-ZZ-DR-A-0306
1m
P01
B-F
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
07-001
0m
B-E
Secondary Equipment Room (SER) 9000 Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
9000
Office
GENERAL NOTES
REV
KEY PLAN
B-C
B-1
© Darling Associates Ltd.
B-2
12m
1. For Landscape design refer to Landscape Architect's B-A B-Aa B-B documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 952 elements refer to Services 7223 3. For M&E Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
1
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
CAT A work Omitted in these highlighted areas.
Mechanical Equipment
1m
KEY PLAN
B-C
820
0m
1. B-A For Landscape B-Aa design refer to Landscape Architect's B-B documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 952 7223 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
BXX001-ZZ-DR-A-0302
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
1
GENERAL NOTES
BXX001-ZZ-DR-A-0302
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS
GENERAL NOTES
ISO SHEET STATUS
NOTES
drawing is copyright of Darling CR Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR.The RECORD unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
03-Proposed Building B - GA Seventh Floor Plan PROJECT
Eden CampusDrawings, specifications and schedules are to be read in conjunction with the following where applicable: SCALE AT A1:
1 : 100
DRAWING
Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. SCALECivil AT Engineer's A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
19064
1: 200
0m
1m
5m
REV.
10m
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC AC AC
17
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building B - GA Eighth Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
DRAWING
SCALE AT A3:
1: 200
952
7223
B-C
B-D
7425
B-E
9000
9000
B-F
B-Ga
7425
7223
N
B-G
B-A
952
952
B-B
B-C
7223
B-D
7425
B-2
B-E
9000
9000
B-1 820
B-1 820
B-Aa
1
B-B
BXX001-ZZ-DR-A-0302
B-Aa
1
B-A
BXX001-ZZ-DR-A-0302
N
Building B GAs 3.4 Building B - L09- LR11
B-F
B-Ga
7425
7223
B-G
952
Terrace
B-2
FFL 46.513 m
CAT A omitted area to be shell and core only 09-001
10-001
Office 9760
1
1
CAT A omitted area to be shell and core only
BXX001-ZZ-DR-A-0301
1
09-R04
Smoke Vent 09-006
09-R09
09-002
Dry Riser
Lift Lobby
09-S01
FFL 42.600 m
Stair 01
09-L03
Evacuation Lift
WC
10-R09
10-002
Dry Riser10-S01 Stair 01
Lift Lobby 10-L03
Passenger Lift 03
09-R06
10-R08
Electrical Riser
10-L02
10-L01
Passenger Lift 02
Passenger Lift 01
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
10-L04
10-003 10-S02
09-L02
09-L01
09-R03
10-006
Stair Lobby 01
Mechanical Equipment
Electrical Riser
10-R04
Smoke Vent
10-R10
FFL 46.513 m
Passenger Lift 03 09-R08
10-R05
Life Safety
10-L05
FF Lift
Stair 02
9740
WC
Cleaners
Low Temperature Tenant Riser Hot Water
For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings
Evacuation Lift
09-003 09-S02
Domestic Hot Water
710
710
10-R01
10-R07
Sprinkler Riser
10-004
10-R02
Low Voltage Riser 10-005 Stair Lobby 02
Stair Lobby 01 09-L04
Stair 02
B-4
B-3
10-R06
09-R01
09-R10 Low Temperature Tenant Riser Hot Water
9740
Life Safety
09-L05
FF Lift
Mechanical Equipment
Cleaners
10-R03
Passenger Lift 02
Passenger Lift 01
Domestic Hot Water
1
1
BXX001-ZZ-DR-A-0305
1
BXX001-ZZ-DR-A-0307
1
1
BXX001-ZZ-DR-A-0307
BXX001-ZZ-DR-A-0305
1m
5m
10m
B-1
12m
9000
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
9000
7425
B-F
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06 C07
NOTES
DATE
DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE 7223 CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD
BY
B-Ga B-G 03/12/21 10/12/21 11/02/22 11/03/22 18/03/22 952 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24
AUTH
DRAWING STATUS GENERAL NOTES
ISO SHEET STATUS
NOTES
AC AC AC AC AC AC AC AC AC AC AC AC AC AC
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
TITLE
03-Proposed Building B - GA Ninth Floor Plan PROJECT
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Eden Campus Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and
1 : 100
specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. Other specialist SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
DRAWING
0m
SCALE AT A1:
19064
1: 200
1m
REV.
5m
820
EDC-DAA-BXX001-09-DR-A-0300 1:100
C07
B-1
10m
12m
B-C CAT A work Omitted in
7425
KEY PLAN
B-D
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
these highlighted areas.
9000
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
9000
1
7425
11-R01
Sprinkler Riser
Smoke Vent
ISO SHEET STATUS
CONSTR. RECORD CR
AC AC AC AC AC AC AC AC AC AC AC AC AC AC
TITLE
03-Proposed Building B - GA Tenth Floor Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
Roof Plant
DAA JOB NO.
SCALE AT A3:
19064
1: 200
REV.
C06
Plant Screen
FFL 50.503 m
B-3
AOV 9740
9740
11-S01
Lift Overrun
Riser Overrun
Riser Overrun
Lift overrun
710
B-5
Plant screen
1
BXX001-ZZ-DR-A-0304
Plant screen
1
BXX001-ZZ-DR-A-0307
Plant screen
BXX001-ZZ-DR-A-0305
Mansafe/Fall arrest barrier
1
BXX001-ZZ-DR-A-0307
Mansafe/Fall arrest barrier
1
BXX001-ZZ-DR-A-0305
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
NOTES
4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
Mansafe/Fall arrest barrier
1
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
1. For Landscape design refer to Landscape Architect's Eden Campus, Kingston Upon Thames KT1 documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. Practical Completion document 3. For M&E elements refer to Services Engineer's documentation.
Plant screen
Riser Overrun
Stair 01 Overrun
Lift Overrun
1
B-5
B-4
BXX001-ZZ-DR-A-0304
Lift overrun
710
Riser Overrun
1:100
DRAWING STATUS
AC
EDC-DAA-BXX001-10-DR-A-0300
Refer to M&E engineers documentation
Lift overrun
12m
AUTH
© Darling Associates Ltd.
Stair 01
Riser Overrun
10m
BY
10/12/21 17/01/22 11/02/22 95211/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 21/07/23 22/09/23 25/10/24
DRAWING
Lift overrun
5m
DATE
B-Ga 03/12/21 B-G
Stair Lobby 01
Riser Overrun
1m
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT7223 ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CONSTRUCTION ISSUE UPDATES CAT A Omissions FINAL ISSUE RECORD
BXX001-ZZ-DR-A-0306
11-001
0m
P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06
1
11-R02
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
P01
1
FFL 50.503 m
FFL 50.503 m
Lift overrun
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
REV
Terrace L10
FFL 50.503 m
BXX001-ZZ-DR-A-0303
FFL 50.503 m
B-3
GENERAL NOTES
B-F
B-2
BXX001-ZZ-DR-A-0301
1
BXX001-ZZ-DR-A-0306
B-4
B-E
9760
9760
© Darling Associates Ltd.
BXX001-ZZ-DR-A-0301
1
B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. unlessRECORD otherwise stated. All dimensionsCR shall be checked on site prior to commencing the works and any
AC
Terrace L10
1:100
B-2
B-E
1
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
1
0m
7425
KEY PLAN
B-D
these highlighted areas.
BXX001-ZZ-DR-A-0303
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
B-CCAT A work Omitted in
BXX001-ZZ-DR-A-0302
B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
820
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
BXX001-ZZ-DR-A-0302
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
1
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
N
N
1
B-5 BXX001-ZZ-DR-A-0304
B-5
B-4
1
Sprinkler Riser
09-004
09-R02
Low Voltage Riser 09-005 Stair Lobby 02
1
B-3
09-R05
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306 09-R07
BXX001-ZZ-DR-A-0303
BXX001-ZZ-DR-A-0306
BXX001-ZZ-DR-A-0304
1
BXX001-ZZ-DR-A-0301
9760
Office
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC
DRAWING STATUS GENERAL NOTES
ISO SHEET STATUS
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
03-Proposed Building B - GA Roof Plant Floor Plan PROJECT
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Eden Campus SCALE AT A1:
1 : 100
Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. AT A3: requirements as appointed by the Main Other specialistSCALE design consultant's Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
DRAWING
0m
19064
1: 200
1m
5m
EDC-DAA-BXX001-11-DR-A-0300 1:100
REV. 10m
C04
12m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
KEY PLAN
CAT A work Omitted in these highlighted areas.
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative bleacher arrangement aligned with SE loading zones
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Indicative commercial kitchen equipment aligned with SE loading zones
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04
NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD
DATE
BY
AUTH
03/12/21
AC
10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24
AC AC AC AC AC AC AC AC AC AC AC
18
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03-Proposed Building B - GA Roof Plan PROJECT
Eden Campus SCALE AT A1:
1 : 100
DRAWING
SCALE AT A3:
1: 200
DAA JOB
EDC-DAA-BXX001-R11-DR-A-0300
190
R
C0
Building B GAs 3.5 Building B - Elevations
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
1
1
BXX001-ZZ-DR-A-0305
B-G
B-Ga 952
B-F 7223
BXX001-ZZ-DR-A-0307
B-E 7425
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
B-D 9000
B-C 9000
B-B 7425
7223
952
Structure Grid
B-R2-Building B Roof
B-1 B-2
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual B-R2-Building B Roof
B-Aa B-A
B-3
B-4
B-5
1
BXX001-ZZ-DR-A-0306 820
9760
9740
710
+54.068 m
+54.068 m
0m
1m
5m
10m
12m
3600
3600
1:100
KEY PLAN
B-11-Eleventh Floor
B-11-Eleventh Floor
+50.468 m
3955
3955
+50.468 m
Top of Balustrade +47.713 m
Balustrade +47.713 m
B-10-Tenth Floor
B-10-Tenth Floor
+46.513 m
3913
3913
+46.513 m
NOTES
B-09-Ninth Floor
B-09-Ninth Floor
+42.600 m
+42.600 m
B-08-Eighth Floor
B-08-Eighth Floor
+38.850 m
3
1
3750
3750
+38.850 m
3750
3750
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
IXX001-ZZ-DR-A-0302
IXX001-ZZ-DR-A-0302 Hatch area denotes area to be fire rated with a FR90 shaft wall installed behind glazing to extents shown as per Fire engineer's advice.
B-07-Seventh Floor
3
IXX001-ZZ-DR-A-0302
B-07-Seventh Floor
+35.100 m
3750
3750
+35.100 m
06-001
Bridge Link
B-06-Sixth Floor
B-06-Sixth Floor
+31.350 m
3750
3750
+31.350 m
B-05-Fifth Floor
B-05-Fifth Floor
+27.600 m
3750
3750
+27.600 m
B-04-Fourth Floor
B-04-Fourth Floor
3750
4
IXX001-ZZ-DR-A-0302
FINAL ISSUE RECORD External lighting, Louvres and Equitone panels division added CONSTRUCTION ISSUE UPDATES FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDATED FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY
REV
NOTES
25/10/24 11/06/24 26/05/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 03/03/22 10/12/21 03/12/21
DATE
AC AC AC AC AC AC AC AC B-03-Third Floor AC +20.100 m AC AC AC
BY AUTH
3750
3750
B-03-Third Floor
+20.100 m
C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01
3750
+23.850 m
+23.850 m
B-02
B-02
+16.350 m
3750
3750
+16.350 m
B-01
DRAWING STATUS
+12.600 m
ISO SHEET STATUS
CONSTR. RECORD CR
B-01
+12.600 m
4200
PROJECT
B-00
FFL 7.250 m
SCALE AT A1:
1 : 100
00-009
Reception B-00
Eden Campus
+8.400 m
+8.400 m SCALE AT A3:
1: 200
DRAWING
EDC-DAA-BXX001-ZZ-DR-A-0302
4
IXX001-ZZ-DR-A-0310
4200
TITLE
03-Proposed Building B - GA East Elevation
FFL 7.900 m
DAA JOB NO.
19064 REV.
C04
© Darling Associates Ltd.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
19
Building B GAs 3.6 Building B -Elevations
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
B-A B-Aa
B-B
B-C
B-D
B-E
7223
7425
9000
B-Ga
BXX001-ZZ-DR-A-0305
BXX001-ZZ-DR-A-0307 952
B-F
1
1
9000
7425
Structure Grid
7223
952
B-G
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
B-5
B-3
B-2
1
B-1
BXX001-ZZ-DR-A-0306
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
B-R2-Building B Roof
B-4
710
9740
9760
820
Structure Grid
B-R2-Building B Roof
+54.068 m
0m
1m
5m
10m
12m
+54.068 m
3600
3600
1:100
KEY PLAN
B-11-Eleventh Floor
B-11-Eleventh Floor
+50.468 m
3955
3955
+50.468 m
B-10-Tenth Floor
Top of Balustrade +47.713 m
B-10-Tenth Floor
+46.513 m
3913
3913
+46.513 m
NOTES
B-09-Ninth Floor
B-09-Ninth Floor
+42.600 m
3750
3750
B-08-Eighth Floor
+38.850 m
B-08-Eighth Floor
+38.850 m
3
3750
3750
+42.600 m
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
IXX001-ZZ-DR-A-0302 Hatch area denotes area to be fire rated with a FR90 shaft wall installed behind glazing to extents shown as per Fire engineer's advice.
B-07-Seventh Floor
B-07-Seventh Floor
+35.100 m
3750
3750
+35.100 m
B-06-Sixth Floor
B-06-Sixth Floor
+31.350 m
3750
3750
+31.350 m
B-05-Fifth Floor
B-05-Fifth Floor
+27.600 m
3750
3750
+27.600 m
B-04-Fourth Floor
B-04-Fourth Floor
3750
C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01
B-03-Third Floor
+20.100 m
FINAL ISSUE RECORD External lighting, Louvres and Equitone panels division added CONSTRUCTION ISSUE UPDATES FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDATED FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY
NOTES
DATE
AC AC AC AC AC AC AC AC AC AC AC AC
+23.850 m
B-03-Third Floor
+20.100 m
BY AUTH
4
3750
3750
REV
25/10/24 11/06/24 26/05/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 03/03/22 10/12/21 03/12/21
3750
+23.850 m
IXX001-ZZ-DR-A-0302
B-02
B-02
+16.350 m
3750
3750
+16.350 m
B-01
DRAWING STATUS
+12.600 m
B-01
ISO SHEET STATUS
CONSTR. RECORD CR
+12.600 m
TITLE
4200
4200
03-Proposed Building B - GA West Elevation PROJECT
B-00
+8.400 m
FFL 7.900 m
FFL 7.650 m
FFL 7.875 m
FFL 8.100 m
FFL 8.150 m
Eden Campus SCALE AT A1:
1 : 100
B-00
SCALE AT A3:
1: 200
DRAWING
EDC-DAA-BXX001-ZZ-DR-A-0304
DAA JOB NO.
+8.400 m
19064 REV.
C04
© Darling Associates Ltd.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
20
Building B GAs 3.7 Building B - Sections
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design GENERAL NOTES
B-5
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
B-G
B-Ga 952
B-F 7223
B-E
B-D
7425
9000
B-R2-Building B Roof
+53.724 m
B-B
B-Aa
7425
7223
B-A 952
1
BXX001-ZZ-DR-A-0307
B-3
BXX001-ZZ-DR-A-0305
1
B-2
B-5
B-1
B-4
B-3
B-2 B-1 1
BXX001-ZZ-DR-A-0306
9760
710
820
9740
9760
820 0m
+54.068 m
B-R2-Building B Roof
REV
DATE
Office
Flood void
Sprinkler Tank
3600 3955 3913 950 2800 950 2800 3750 950 2800 950 2800
950
3750
2800 1400
00-001
Reception
TITLE
3750
02-001
Lift Lobby
01-001
Office
Eden Campus 1: 200
DRAWING
EDC-DAA-BXX001-ZZ-DR-A-0306
ISO SHEET STATUS
TITLE
03-Proposed Building B - GA Section A-A
00-002
Lift Lobby
00-001
Reception
PROJECT
Eden Campus 1 : 100
B-00
+8.400 m Flood void
SCALE AT A3:
DRAWING STATUS
CONSTR. RECORD CR Services Zone
SCALE AT A1:
FFL 8.400 m
+8.400 m PROJECT Woodland Walk
1 : 100
SCALE AT A3:
1: 200
DRAWING
Brook Street
EDC-DAA-BXX001-ZZ-DR-A-0305
DAA JOB NO.
© Darling Associates Ltd.
19064 REV.
C04
© Darling Associates Ltd.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
BY AUTH
Services Zone
01-002
4200
00-006
Stair Lobby 01
4200
00-S01
Stair 01
03-Proposed Building BB-00 - GA Section B-B
SCALE AT A1:
DATE
AC AC AC AC AC AC AC AC AC AC AC AC
Office
2800
00-009
Reception
02-002
Lift Lobby
ISO SHEET STATUS
4200
00-001
Reception FFL 8.400 m
+8.400 m
950 3750
3750
3750
01-001
+12.600 m
4200
00-001
Reception
NOTES
25/10/24 26/05/23 20/01/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 04/03/22 10/12/21 03/12/21
Services Zone
B-01
CONSTR. RECORD CR
4200
4200
4200
00-014
Telecommunications
03-001
Office
FINAL ISSUE RECORD CONSTRUCTION ISSUE UPDATES CONTRUCTION ISSUE FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDATED FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY
01-006
Stair Lobby 01 Office
DRAWING STATUS
00-012
03-002
Lift Lobby
C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01
B-02
+16.350 m
B-01
Tank Room
950
02-001
+12.600 m
FFL 8.400 m
04-001
Office
Services Zone
REV
Office
Office
+12.600 m
04-002
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Services Zone
02-005
Stair Lobby 01
Stair 01 01-001
Services Zone
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
05-001
Office
B-03-Third Floor
+20.100 m
BY AUTH
3750
01-001
3750
3750
3750
01-001
2800
3750 3750
03-001
Office
01-S01
Office
950 3750
950
Stair Lobby 01 3750
AC AC AC AC AC AC AC AC AC 02-S01 AC Stair 01 AC AC
+16.350 m
B-01
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
Services Zone
03-006
Stair 01
B-02
+16.350 m
2800
950
NOTES
05-002
Lift Lobby
3750
02-001
Office
Services Zone
4200
Office
Indicative commercial kitchen equipment aligned with SE loading zones
06-001
Office
Lift Lobby
3750
02-001
3750
3750
3750
02-001
Office B-02
25/10/24 26/05/23 20/01/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 04/03/22 10/12/21 03/12/21
3750
B-03-Third Floor
+20.100 m
FINAL ISSUE RECORD CONSTRUCTION ISSUE UPDATES CONTRUCTION ISSUE FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE B-03-Third Floor CONTRACT ISSUE UPDATED +20.100 m FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY
3750
C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01
03-001
Office
3750
3750
3750
3750
03-001
Office
06-002
Lift Lobby
B-04-Fourth Floor
+23.850 m 03-S01
03-001
04-001
Office
Water Tank Indicative location for water tank area aligned with SE drawings. Any associated B-04-Fourth Floorcosts for design and integration deviating from the +23.850base m scheme will be subject to a variation.
B-04-Fourth Floor
+23.850 m
Office
Services Zone
04-006
Stair Lobby 01 2800
Office
2800
3750
+27.600 m 04-S01
Stair 01
3750
04-001
Indicative bleacher arrangement aligned with SE loading zones
B-05-Fifth Floor
3750
950
Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.
05-001
Office
3750
Office
Stair Lobby 01
3750
Office
2800
950
04-001
2800
04-001
Services Zone
Services Zone
05-006
Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration B-05-Fifth Floor deviating from the base scheme will be subject to a variation. +27.600 m
B-05-Fifth Floor
+27.600 m
3750
05-S01
3750
2800
05-001
Office
07-001
Office
B-06-Sixth Floor
+31.350 m
commercial +31.350Indicative m kitchen equipment aligned with SE loading zones
950
950 2800
3750
05-001
Office
1200 2800
06-001
Office
2800
3750
3750
3750
Stair Lobby 01
Stair 01 05-001
Office
950
Lift Lobby
B-06-Sixth Floor
Services Zone
07-002
Services Zone
Services Zone
1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
06-006
Stair 01
3750
3750
3750
3750
B-06-Sixth Floor
+31.350 m
Top of Balustrade +47.713 m
B-07-Seventh Floor
Indicative bleacher arrangement aligned with SE loading zones
06-001
Office
950
Office +35.100 m
06-S01
06-001
Office
Services Zone
08-001
Office
2800
07-001
B-07-Seventh Floor
06-001
2800
3750
07-006
Stair Lobby 01
+35.100 m
Office
1155 3913
3913 950 2800
Lift Lobby
2800
+35.430 m
08-002
Services Zone
950
Office
Services Zone
950
3750
3750
Office
B-07-Seventh Floor
+35.100 m
09-001
Office
B-08-Eighth Floor
+38.850 m
2800
Office
07-001
Office
Services Zone 3750
950
07-001
2800
3750
07-001
08-001
950
Office
Services Zone
Services Zone
08-006
Stair Lobby 01
3750
3750
3750
Office
B-08-Eighth Floor
+38.850 m
+42.600 m
+42.600 m
1. For Landscape design refer to Landscape Architect's 08-S01 documentation Stair 01 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. B-08-Eighth Floor in conjunction with Fire Strategy Report, 4. Drawing to be read +38.850 m Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA07-S01 Stair 01 documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings
2800
Office
08-001
09-002
Lift Lobby
B-09-Ninth Floor
B-09-Ninth Floor
3750
950
08-001
2800
3750
Services Zone
Terrace
NOTES
09-001
Office NOTES
08-001
Stair Lobby 01
Office
B-09-Ninth Floor
+42.600 m
3913
09-001
Services Zone
10-007
10-001
Office
09-006
Stair 01
3913
09-001
Office
Lift Lobby
B-10-Tenth Floor
+46.513 m
3913
3913
3913
09-001
10-002
2800
Top of Balustrade +47.713 m
10-007
Terrace
+46.513 m
Office
Services Zone
1113
3955
10-001
Office B-10-Tenth Floor
09-S01
B-00
3955
3955
10-001
Office
+46.513 m
Woodland Walk
Stair Lobby 01
1200
10-001
Office
12m
10-006
Stair 01
3955
3955
4005
3955
10-001
Office B-10-Tenth Floor
10m
B-11-Eleventh Floor
+50.468 m
10-S01
5m
11-001
Stair Lobby 01
KEY PLAN B-11-Eleventh Floor +50.468 m
+50.468 m
3600
12m
11-S01
Stair 01
3600
10m
3600
5m
1:100
B-11-Eleventh Floor
1m
1:100
+54.068 m
KEY PLAN
2648
1m
3600
0m
3600
3600
3550
+52.524 m
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
BXX001-ZZ-DR-A-0306
953
+54.068 m
B-C 9000
1
B-4
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. 710 9740 Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. B Roof Other specialistB-R2-Building design consultant's requirements as appointed by the Main Contractor. Other specialist +54.068 mrequirements as appointed by the Main Contractor. design sub-contractor's P = Preliminary C = Contractual
GENERAL NOTES
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design
21
DAA JOB NO.
19064 REV.
C04
4
BUILDING C GA S
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
22
1
CXX001-ZZ-DR-A-0304
N
Building C GAs 4.1 Building C - GF Plan
1
CXX001-ZZ-DR-A-0302 Parking Schedule ALL Cars Description 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 22KW Electric Parking Bay Regular Parking Bay Regular Parking Bay Regular Parking Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay Regular Parking Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay Regular Parking Bay Grand total: 355
03
C-E
Ground Floor (Mezz) Parking
FFL 10.271 m
1:80
1:80
1:80
1:80
1:22
AXX00
1
1-ZZ -DR-A -03
Woodland Walk Lobby FFL 7.700 m
Core 1 Lobby
C-D
1:13
1:13
1:12
FFL 10.244 m
FFL 10.244 m
1192
FFL 10.065 m
1:12
FFL 10.237 m
Woodland Walk Lobby
FFL 10.220 m
1200
1:80
FFL 10.037 m
1:80
Core 2 Lobby Service shaft 2
Void over Cycle Store
C-C 1
1
Stair 1 Shaft
FFL 7.710 m
1:6
1:6
Core 1 - L00 Lift Lobby FFL 7.980 m
Unisex WC
Thermal Stores
1020
CXX001-ZZ-DR-A-0305
1
FFL 7.710 m
FFL 8.010 m
FFL 7.960 m
Stair 2 Shaft
Plant Corridor
CXX001-ZZ-DR-A-0306
Cold Water Tank
CXX001-ZZ-DR-A-0301
Level C-01 C-01 C-01 C-01 C-01 C-02 C-02 C-02 C-02 C-02 C-03 C-03 C-03 C-03 C-03 C-04 C-04 C-04 C-04 C-04 C-05 C-05 C-05 C-06 C-M0 C-M1 C-M1 C-M1 C-M2 C-M2 C-M2 C-M2 C-M2 C-M3 C-M3 C-M3 C-M3 C-M4 C-M4 C-M4 C-M4 C-M4 C-M5 C-M5 C-M5 C-M6
Count 7 1 4 15 2 7 1 2 18 2 7 1 2 17 2 7 1 2 17 2 10 2 18 30 2 8 1 21 9 1 2 15 2 9 1 17 2 9 1 4 13 2 12 14 3 30
FFL 8.492 m
Unisex Changing
FFL 7.985 m
FFL 8.310 m
1:25
FFL 7.960 m
1220
IRON
C-B
FFL 7.710 m
Life Safety Switch Room
Core 2 - Final Exit (External)
Switch Room
FFL 8.350 m
Changing Circulation
Changing Circulation
Entrance / Exit Ramp
1:13
Front Lobby
1:13
FFL 8.310 m FFL 7.960 m
[No Slope]
[No Slope] FFL 7.710 m
Store room
1400
IRON
UKPN Ring Main Unit
1935
Unisex Changing
1425
FFL 7.745 m 1:16
C-A
C-2
C-3
C-4
CXX001-ZZ-DR-A-0303
1
FFL 7.728 m
C-1
Generator Room
Female Changing
Male Changing FFL 7.750 m
FFL 7.750 m
Up
FFL 7.710 m
1:16
Comms room
Cleaner's Store
Transformer Room
IRON
1:14
1:14
1120
C-5
C-6
C-7
C-8
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
GENERAL NOTES
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
Eden Campus, Kingston Upon Thames KT10m 1m 1:100 Practical Completion document
5m
10m
12m
KEY PLAN
REV
NOTES
DATE
P01 P02
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue, incorporating minor layout amendments First Construction Issue & GFL Revision to show amended parking layout Stage 5 Upates FINAL ISSUE RECORD
19/08/22 23/09/22
AC AC
13/10/22
AC
P03 P04 C01 C02 C03 C04
BY
AUTH
DRAWING STATUS
ISO SHEET STATUS
CONSTR. RECORD CR TITLE
03/11/22
AC
16/01/23
AC
03-Proposed Building C-Ground Floor Plan & Mezzanine
25/01/23
AC
PROJECT
05/10/23 25/10/24
AC
Eden Campus SCALE AT A1:
1 : 100
DAA JOB NO.
SCALE AT A3:
1: 200
DRAWING
23
EDC-DAA-CXX001-00-DR-A-0300 © Darling Associates Ltd.
19064 REV.
C04
2
C-E
7kW EV - Accessible
01-Z
1:80
1:80
1:12
1:12
FFL 15.925 m
Core 2 Lobby Service shaft 2
Regular
AXX0
Regular
FFL 14.533 m
7kW EV - Regular 22kW EV - Regular
CXX001-ZZ-DR-A-0306
FFL 14.531 m
Service shaft 1
C-B
Motorcycle, Regular
Flue
1:6
1 FFL 14.532 m
Stair 2 Shaft
1:12
Core 1 Lift Lobby
4
1:12
1:12
1
CXX001-ZZ-DR-A-0305
Stair 1 Shaft
FFL 14.550 m
22KW Electric Parking Bay
Core 2 Lobby FFL 14.550 m
Second Floor Parking
1:80
FFL 11.800 m
1:6
Riser
CXX001-ZZ-DR-A-0301
Motorcycle, Regular
Core 2 Lobby 1:80
1
15
Motorcyle Space Types
Service shaft 1
FFL 11.778 m
First Floor Parking
1:6
C-C
1:80
FFL 11.786 m
1:80
FFL 15.906 m
36
7KW Electric Parking Bay
22kW EV - Regular
1 FFL 11.779 m
CXX001-ZZ-DR-A-0306
Stair 2 Shaft
1:12
1:12
1:12
Regular Parking Bay
7kW EV - Regular
1:6
1:6
CXX001-ZZ-DR-A-0305
Stair 1 Shaft
C-B
1:12
1:12
FFL 13.175 m
FFL 15.907 m
Riser
CXX001-ZZ-DR-A-0301
Core 1 Lift Lobby FFL 11.800 m
Core 1 Lift Lobby FFL 15.925 m
Core 2 Lobby
1:6
1
Riser
1
7kW EV - Accessible
Regular Car Parking Space Types
1:12
1:12
Riser
Second Floor Mezz Parking
FFL 15.904 m
FFL 13.154 m
Service shaft 2
C-C
2
C-D
FFL 13.154 m
FFL 13.154 m
Core 1 Lift Lobby FFL 13.175 m
7KW Electric Wheelchair Accessible Bay
1:80
1:80
First Floor (Mezz) Parking
Z-DRA-03
03
1
Z-DRA-03
01-Z AXX0
C-D
1
Standard - Accesible
1 Wheelchair Accessible Bay
1
CXX001-ZZ-DR-A-0302
03
C-E
CXX001-ZZ-DR-A-0304
Wheelchair Accessible Car Parking Space Types
1
CXX001-ZZ-DR-A-0302
Standard - Accesible
1
CXX001-ZZ-DR-A-0304
N
Building C GAs 4.2 Building C - L01 - L04
Flue
Grand total: 59
Electrical riser
C-3
C-4
C-6
C-7
C-1
C-8
C-5
C-6
C-7
C-8
19/08/22 23/09/22
Z-DRA-03
C02
TITLE
Wheelchair 4 building regulations and otherAccessible statutory Bay requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
13/10/22
AC
03/11/22
AC
25/01/23
AC
03-Proposed Building C-First Floor Plan & Mezzanine
25/10/24
AC
PROJECT
Eden Campus
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
As indicated
0m
DRAWING
01-Z
AXX0
SCALE AT A1:
12m
REV
KEY PLAN
NOTES
DATE
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue & GFL Revision to show amended parking layout C02 FINAL ISSUE RECORD
C-E
BY
AUTH
1: 200
0m
REV.
5m
10m
AC AC
13/10/22
AC
03/11/22
AC
25/01/23
AC
03-Proposed Building C-Second Flo
25/10/24
AC
PROJECT
Eden Campus SCALE AT A1:
Core 2 Lobby
1:80
1:12
Regular 7kW EV - Regular
1:6
25
22kW EV - Regular
Stair 2 Shaft
CXX001-ZZ-DR-A-0306
1 FFL 22.782 m
FFL 22.781 m
FFL 22.779 m
Service shaft 1
C-B
1500
Fifth Floor Parking
Motorcycle, Regular
Flue
1:6
1:6
Core 1 Lift Lobby FFL 22.800 m
1:12
1
Stair 1 Shaft
2
1:12
CXX001-ZZ-DR-A-0305
22KW Electric Parking Bay
Motorcycle, Regular
Core 2 Lobby FFL 17.300 m
1:80
1:80
C-B
Riser
1
CXX001-ZZ-DR-A-0301
Motorcyle Space Types
Service shaft 1
Third Floor Parking
16
1:80
FFL 17.281 m
C-C
7KW Electric Parking Bay
1:80
FFL 17.283 m
22kW EV - Regular
1 1:12
1:12 FFL 17.282 m
Stair 2 Shaft
CXX001-ZZ-DR-A-0306
Stair 1 Shaft 1:12
1
CXX001-ZZ-DR-A-0301
Core 1 Lift Lobby FFL 17.300 m
Service shaft 2
1:12
Regular 7kW EV - Regular
1:6
Riser
FFL 24.175 m
Core 2 Lobby
34
Riser
1:6
1:6
Riser
C-C
Regular Parking Bay
FFL 24.154 m
FFL 24.157 m
FFL 24.175 m
Service shaft 2
CXX001-ZZ-DR-A-0305
Core 1 Lift Lobby
1:12
Regular Car Parking Space Types
FFL 18.675 m
1:12
1:12
1:12
1:12
FFL 24.157 m
FFL 18.656 m
FFL 18.675 m
1
Fifth Floor Mezz Parking
C-D
FFL 18.657 m
1:
EDC-DAA-CXX
C02
1:80
1:80 FFL 18.654 m
Core 1 Lift Lobby
SC
DRAWING
12m
© Darling Associates
1:80
Third Floor Mezz Parking
TITLE
As indicated
© Darling Associates Ltd.
C-D
CONSTR. RE
19/08/22 23/09/22
P03
19064
1m
DRAWING STATUS
P01 P02
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, 7KW Electric Wheelchair Accessible Bay 2Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
EDC-DAA-CXX001-01-DR-A-0300 1:100
1:100
1
CXX001-ZZ-DR-A-0302
03
03
C01
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm
1
P04
GENERAL NOTES ISO SHEET STATUS
unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any CONSTR. RECORD CR discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the
01-Z
P03
AC AC
DRAWING STATUS
Standard - Accesible
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD
AUTH
7kW EV - Accessible
P01 P02
BY
1
DATE
CXX001-ZZ-DR-A-0304
N
NOTES
Z-DRA-03
REV
Standard - Accesible
KEY PLAN
C-E
10m
C-4
Wheelchair Accessible Car Parking Space Types
1
CXX001-ZZ-DR-A-0302
7kW EV - Accessible
1
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
5m
C-3
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services CXX001-ZZ-DR-A-0304
GENERAL NOTES
C-2
CXX001-ZZ-DR-A-0303
1 C-5
AXX0
C-2
CXX001-ZZ-DR-A-0303
1 C-1
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
1
NO
C-A
C-A
1m
Electrical riser
NOTE: Refer to HALSION drawings for EV Chargers Type and positioning
Core 2 Lobby
FFL 22.800 m
Flue
Grand total: 58
NO
NOTE: Refer to HALSION drawings for EV Chargers Type and positioning
Electrical riser
Electrical riser
C-2
C-3
C-4
1 C-5
C-6
C-7
C-1
C-8
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and
NOTES
C-3
C-4
C-5
C-6
C-7
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
GENERAL NOTES
C-2
CXX001-ZZ-DR-A-0303
CXX001-ZZ-DR-A-0303
1 C-1
0
C-A
C-A
KEY PLAN
REV
NOTES
DATE
P01 P02
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD
19/08/22 23/09/22
AC AC
CONSTR. RECORD CR
13/10/22
AC
TITLE
03/11/22
AC
25/01/23
AC
03-Proposed Building C-Third Floor Plan & Mezzanine
25/10/24
AC
PROJECT
P03 P04 C01 C02
BY
AUTH
DRAWING STATUS
Eden Campus
GENERAL NOTES ISO SHEET STATUS
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and
NOTES
C-8
KEY PLAN
REV P01 P02
NOTES
24
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location P03 Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue & GFL Revision to show amended parking layout C02 FINAL ISSUE RECORD
DATE
BY
AUTH
DRAWING STATUS
CONSTR. RE
19/08/22 23/09/22
AC AC
13/10/22
AC
03/11/22
AC
25/01/23
AC
03-Proposed Building C-Fifth Floor P
25/10/24
AC
PROJECT
TITLE
Eden Campus
1 C-E
AXX0
01-Z
1
7kW EV - Accessible
Sixth Floor Mezz Parking
FFL 26.907 m
FFL 26.900 m
Regular Car Parking Space Types
FFL 26.925 m
1:12
1:12
FFL 25.531 m
FFL 25.529 m
1 Service shaft 1
Motorcycle, Regular
1:80
1:80
Sixth Floor Parking
Stair 2 Shaft
FFL 28.300 m
Motorcyle Space Types
Service shaft 1
C-B
Stair 1 Shaft Core 1 Lift Lobby
Core 2 Lobby FFL 25.550 m Flue
Core 2 Lobby FFL 28.300 m
C-B
Flue
Grand total: 60
PV Array Roof L07 Electrical riser
Electrical riser
1
1
C-5
C-6
C-7
C-4
C-5
C-6
C-7
C-8
1 19/08/22 23/09/22
AC AC
CONSTR. RECORD CR
13/10/22
AC
TITLE
1
66 66
L LL L
H HH
L LL L
HH H
66 66
L LL L
HH H
HH H
L LL L
HH H
L LL L
HH H
66 66
L LL L
L LL L
HH H
L LL L
HH H
L LL L
HH H
HH H
66 66
L LL L
H HH
L LL L
66 66
L LL L
L LL L
HH H
HH H
HH H
66 66
L LL L
L LL L
HH H
L LL L
L LL L
HH H
HH H
66 66
L LL L
L LL L
L LL L
HH H
H HH
HH H
66 66
L LL L
HH H
HH H
L LL L
HH H
66 66
L LL L
HH H
L LL L
L LL L
HH H
L LL L
HH H
66 66
L LL L
L LL L
L LL L
HH H
H HH
66 66
L LL L
L LL L
HH H
HH H
55 55
L LL L
L LL L
HH H
CORE - 12
CORE - 10
L LL L
L LL L
CORE - 12
AXX0
HH H
HH H
CORE - 12
HH H
CORE - 12
HH H
HH H
CORE - 12
CORE - 10
AC
PROJECT
Eden Campus
SC
1:
22 22
L LL L
HH HH
66 66
HH HH
L LL L
HH HH
L LL L
HH HH
L LL L
HH HH
66 66
L LL L
HH HH
L LL L
HH HH
L LL L
HH HH
66 66
HH HH
HH
L LL L
HH HH
L LL L
22 22 HH
L LL L
HH HH
66 66
L LL L
HH HH
L LL L
HH HH
HH HH
L LL L
66 66
L LL L
L LL L
HH HH
L LL L
HH HH
66 66
L LL L
L LL L
HH HH
HH HH
66 66
L LL L
L LL L
L LL L
HH HH
HH HH
L LL L
66 66
L LL L
L LL L
HH HH
HH HH
L LL L
66 66
HH HH
CORE - 12
L LL L
HH HH
CORE - 12
HH HH
CORE - 12
L LL L
HH HH
CORE - 12
HH HH
CORE - 12
CORE - 12
66 66
HH HH
CORE - 12
CORE - 12
CORE - 12
L LL L
CORE - 12
HH HH
HH HH
CORE - 12
L LL L
CORE - 12
HH HH
L LL L
CORE - 12
L LL L
CORE - 12
HH HH
CORE - 4
CORE - 4
CORE - 12
L LL L
CORE - 12
66 66
L LL L
CORE - 12
CORE - 12
L LL L
CORE - 12
CORE - 12
HH HH
CORE - 12
L LL L
940 940
CORE - 12
Single Tier Cycle Store
Core 2 Lobby - LG FFL 7.200 m
Service shaft 2
FFL 6.635 m SSL 35.425 m
TOC 4.865 m
Rainwater Harvesting
Stair 1 Shaft
SSL 7.200 m
(Flood void grille)
FFL 7.200 m
C-C
Stair 2 Shaft
CXX001-ZZ-DR-A-0305
1
TOC 6.215 m
CXX001-ZZ-DR-A-0301
1
FLOOD VOID
SSL 7.200 m
SSL 7.200 m
CXX001-ZZ-DR-A-0306
1
1
25/10/24
TITLE
CORE - 4
HH HH
CORE - 4
940 940
(Flood void grille)
CXX001-ZZ-DR-A-0306
AC
Bike Repair Station & Pump
Single Tier Cycle Store
FFL 6.648 m
1
25/01/23
03-Proposed Building C-Seventh Flo
© Darling Associates FFL 7.200 m
Core 1 Lift Lobby FFL 6.635 m
CXX001-ZZ-DR-A-0305
AC
Bike Repair Station Bike Repair Station && Pump Pump
Woodland Walk Lobby
CXX001-ZZ-DR-A-0301
03/11/22
EDC-DAA-CXX
1:102
FFL 6.635 m FFL 6.635 m
1
CONSTR. RE
AC
SINGLE TIER BIKE ROOM TOTAL: 74
C-D
C-C
DRAWING STATUS
AC AC
DRAWING
30no. Shef f ield Stand (60no. s paces) 2no. Sheff ield Stand with Rail 12no. Secure Vertical 1no. Bike Repair Station + Pump
C-D
AUTH
150 150
C02
© Darling Associates Ltd.
Cycle Entrance (External)
BY
13/10/22
1 : 100
12m
CORE - 12
10m
CORE - 12
REV. 5m
CORE - 12
1m
CORE - 12
0m
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue & GFL Revision to show amended parking layout C02 FINAL ISSUE RECORD
Cycle Stacker Store
CORE - 12
03
03
Z-DRA-03
01-Z
FFL 7.200 m
DATE 19/08/22 23/09/22
P03
SCALE AT A1:
19064
CORE - 12
1: 200
CORE - 12
Z-DRA-03
1:27
NOTES
P01 P02
1:109
FFL 6.635 m
CORE - 12
01-Z
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. as appointed by the Main Contractor. Other specialist Other specialist design consultant's requirements design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
CORE - 12
AXX0
55 55
HH H
CORE - 10
LL L
HH H
LL L
66 66
HH H
HH H
66 66
6 66
6 6
6 6
6 6
6 6
6 6
6 6
6 6
66 66
HH
LL
HH
LL
HH
LL
HH
HH
HH
LL
LL
HH
HH
LL
HH
LL
LL
HH
LL
LL
HH
LL
HH
LL
HH
HH
LL
HH
LL
HH
LL
HH
LL
HH
LL
HH
LL
HH
HH
LL
LL
LL
HH
HH
HH
LL
LL L
CORE - 12
FFL 6.905 m
CORE - 10
LL L
CORE - 12
HH H
CORE - 12
HH H
CORE - 12
LL L
CORE - 12
LL L
CORE - 12
HH H
CORE - 12
HH H
CORE - 12
LL L
CORE - 12
LL
HH
HH
HH
LL
LL
SCALE AT A3:
EDC-DAA-CXX001-06-DR-A-0300 1:100
1:100
CORE - 12
LL
DRAWING
12m
6 6
0m
HH
Eden Campus As indicated
LL
PROJECT
CORE - 12
LL
AC
HH
25/10/24
REV
KEY PLAN
CORE - 12 CORE - 12
LL
AC
HH
AC
25/01/23
1
CXX001-ZZ-DR-A-0302
C-E
LL
03/11/22
03-Proposed Building C-Sixth Floor Plan & Mezzanine
SCALE AT A1:
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that Woodland Walk Lobby are required appertaining to such information should be sought from the relevant profession or their FFL 6.590 m appointment representative.
HH
C02
DRAWING STATUS
LL L
P04 C01
AUTH
CORE - 12
1
CXX001-ZZ-DR-A-0304
N
DATE
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD
CORE - 12
CXX001-ZZ-DR-A-0304
NOTES
P01 P02 P03
BY
GENERAL NOTES ISO SHEET STATUS
REV
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 10m
C-3
CORE - 12
KEY PLAN
C-E
5m
C-2
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
CORE - 12
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
1
C-1
C-8
CORE - 12
GENERAL NOTES
CXX001-ZZ-DR-A-0303
C-4
CORE - 12
C-3
CORE - 12
C-2
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
CORE - 12
C-1
CXX001-ZZ-DR-A-0303
C-A
C-A
1m
CXX001-ZZ-DR-A-0306
1:12
1:12
1:12 FFL 25.532 m
Stair 2 Shaft
Riser
CXX001-ZZ-DR-A-0301
1
1
Stair 1 Shaft Core 1 Lift Lobby
1
22kW EV - Regular
CXX001-ZZ-DR-A-0305
CXX001-ZZ-DR-A-0301
CXX001-ZZ-DR-A-0306
Riser
FFL 25.550 m
60
C-C
7kW EV - Regular
1:6
1:6
1
Regular Parking Bay
Riser
1:6
Riser
Core 2 Lobby
Roof garden
Service shaft 2
Regular
Service shaft 2
C-C
FFL 30.150 m
Core 1 Lift Lobby FFL 30.150 m
Core 2 Lobby
CXX001-ZZ-DR-A-0305
1:12
FFL 26.900 m
Core 1 Lift Lobby FFL 26.925 m
C-D
1:80
1:80
C-D
Z-DRA-03
03 Z-DRA-03
AXX0
01-Z
1
1
CXX001-ZZ-DR-A-0302
03
C-E
1
CXX001-ZZ-DR-A-0304
Wheelchair Accessible Car Parking Space Types
1
CXX001-ZZ-DR-A-0302
Standard - Accesible
1
CXX001-ZZ-DR-A-0304
N
Building C GAs 4.3 Building C - L05 - L07, LG
FLOOD VOID
C-B
Flood flow structural openings/ detail to be considered
SSL 7.200 m
C-B
FLOOD VOID Capacity Here to be explored with detail design of ramp
SSL 6.645 m
C-1
C-2
C-3
C-4
1 C-5
C-6
C-7
C-8
C-1
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
NOTES
C-3
C-4
C-5
C-6
C-7
KEY PLAN
REV
NOTES
DATE
P01 P02
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. FINAL ISSUE RECORD
19/08/22 23/09/22
AC AC
13/10/22
AC
03/11/22
AC
25/10/24
AC
P03 P04 C01
BY
AUTH
DRAWING STATUS
GENERAL NOTES
ISO SHEET STATUS
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD CRshall be checked on site prior to commencing the works and any unless otherwise stated. All dimensions TITLE
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
03-Proposed Building C-Roof Plan PROJECT
NOTES
C-8
25
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
GENERAL NOTES
C-2
CXX001-ZZ-DR-A-0303
CXX001-ZZ-DR-A-0303
C-A
1
C-A
FLOOD VOID
KEY PLAN
REV P01 P02
NOTES
Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location P03 Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue, incorporating minor layout amendments C02 Stage 5 Upates
DATE
BY
AUTH
19/08/22 23/09/22
AC AC
13/10/22
AC
03/11/22
AC
16/01/23
AC
05/10/23
DRAWING STATUS
ISO
CONSTR. RECORD C TITLE
03-Proposed Building C-Lower Ground Floor Plan PROJECT
Building C GAs 4.4 Building C - Elevations
C-8
C-7
C-6
C-5
C-4
C-3
C-2
C-E
C-1
C-D
C-C
C-B
C-A
Parapet +35.375 m
32.765 m
C-R7-Building C Roof
C-R7-Building C Roof
+32.500 m
C-R7-Building C Roof
+32.500 m
C-R7-Building C Roof
+32.500 m
+32.500 m
C-M7-Mezzanine above Seventh Floor
C-M7-Mezzanine above Seventh Floor
+30.150 m
+30.150 m
C-07-Seventh Floor
C-07-Seventh Floor
+28.300 m
+28.300 m
C-M6-Mezzanine above Sixth Floor
C-M6-Mezzanine above Sixth Floor
+26.925 m
+26.925 m
C-06-Sixth Floor
C-06-Sixth Floor
+25.550 m
+25.550 m
C-M5-Mezzanine above Fifth Floor
C-M5-Mezzanine above Fifth Floor
+24.175 m
+24.175 m
C-05-Fifth Floor
C-05-Fifth Floor
+22.800 m
+22.800 m
C-M4-Mezzanine above Fourth Floor
C-M4-Mezzanine above Fourth Floor
+21.425 m
+21.425 m
C-04-Fourth Floor
C-04-Fourth Floor
+20.050 m
+20.050 m
C-M3-Mezzanine above Third Floor
C-M3-Mezzanine above Third Floor
+18.675 m
+18.675 m
C-03-Third Floor
C-03-Third Floor
+17.300 m
+17.300 m
C-M2-Mezzanine above Second Floor
C-M2-Mezzanine above Second Floor
+15.925 m
+15.925 m
C-02-Second Floor
C-02-Second Floor
+14.550 m
+14.550 m
C-M1-Mezzanine above First Floor
C-M1-Mezzanine above First Floor
+13.175 m
+13.175 m
C-01-First Floor
C-01-First Floor
+11.800 m
+11.800 m
C-M0-Mezzanine above Ground Floor
C-M0-Mezzanine above Ground Floor
+10.040 m
+10.040 m
C-00-Ground Floor
C-00-Ground Floor
+8.310 m
+8.310 m
TOF +7.710 m
TOF +7.560 m
TOF +7.560 m
C-LG-Lower Ground
+6.635 m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
GENERAL NOTES
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
1m
5m
10m
REV
KEY PLAN
C01 C02 C03 C04
C-1
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
C-2
C-3
C-4
C-5
C-6
NOTES
DATE
STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD
C-7
BY
12/06/23 18/07/23 12/10/23 25/10/24
AUTH AC AC AC AC
C-8
DRAWING STATUS
ISO SHEET STATUS GENERAL NOTES
TITLE
03-Proposed Building C - East Elevation - GA PROJECT
Eden Campus SCALE AT A1:
Parapet +35.425 m
SCALE AT A3:
1 : 100
1: 200
DRAWING
12m
1:100
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
REV
KEY PLAN
C-A
C-B
C-C
C-D
C01 C02 C03 C04
C-E
NOTES STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD
DATE
BY
12/06/23 18/07/23 12/10/23 25/10/24
AUTH AC AC AC AC
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAArequirements JOB NO. as appointed by the Main Contractor. Other specialist Other specialist design consultant's design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
19064
0m
1m
EDC-DAA-CXX001-ZZ-DR-A-0304 1:100
Parapet +32.740 m
NOTES
drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD The CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any
REV. 5m
10m
C04
12m
© Darling Associates Ltd.
C-R7-Building C Roof
C-R7-Building C Roof
+32.500 m
C-R7-Building C Roof
+32.500 m
C-R7-Building C Roof
+32.500 m
+32.500 m
Parapet +30.850 m
C-M7-Mezzanine above Seventh Floor
C-M7-Mezzanine above Seventh Floor
+30.150 m
+30.150 m
C-07-Seventh Floor
C-07-Seventh Floor
+28.300 m
+28.300 m
C-M6-Mezzanine above Sixth Floor
C-M6-Mezzanine above Sixth Floor
+26.925 m
+26.925 m
C-06-Sixth Floor
C-06-Sixth Floor
+25.550 m
+25.550 m
C-M5-Mezzanine above Fifth Floor
C-M5-Mezzanine above Fifth Floor
+24.175 m
+24.175 m
C-05-Fifth Floor
C-05-Fifth Floor
+22.800 m
+22.800 m
C-M4-Mezzanine above Fourth Floor
C-M4-Mezzanine above Fourth Floor
+21.425 m
+21.425 m
C-04-Fourth Floor
C-04-Fourth Floor
+20.050 m
+20.050 m
C-M3-Mezzanine above Third Floor
C-M3-Mezzanine above Third Floor
+18.675 m
+18.675 m
C-03-Third Floor
C-03-Third Floor
+17.300 m
+17.300 m
C-M2-Mezzanine above Second Floor
C-M2-Mezzanine above Second Floor
+15.925 m
+15.925 m
C-02-Second Floor
C-02-Second Floor
+14.550 m
+14.550 m
C-M1-Mezzanine above First Floor
C-M1-Mezzanine above First Floor
+13.175 m
+13.175 m
C-01-First Floor
C-01-First Floor
+11.800 m
C-01-First Floor
+11.800 m
+11.800 m
C-M0-Mezzanine above Ground Floor
C-M0-Mezzanine above Ground Floor
+10.040 m
+10.040 m
C-00-Ground Floor
C-00-Ground Floor
+8.310 m
C-LG-Lower Ground
+6.635 m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued.
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and
C-LG-Lower Ground
+6.635 m
Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services Eden Campus, Kingston Upon Thames KT1 Practical Completion document
GENERAL NOTES
+8.310 m
C-LG-Lower Ground
NOTES
+6.635 m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
KEY PLAN
REV C01 C02 C03 C04
NOTES STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD
DATE 12/06/23 18/07/23 12/10/23 25/10/24
BY
AUTH AC AC AC AC
DRAWING STATUS
ISO SHEET STATUS GENERAL NOTES
drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD The CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE
03-Proposed Building C - West Elevation - GA PROJECT
Eden Campus
discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and
NOTES
KEY PLAN
26
REV C01 C02 C03 C04
NOTES
STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD
DATE 12/06/23 18/07/23 12/10/23 25/10/24
BY
AUTH AC AC AC AC
Building C GAs 4.5 Building C - Sections
C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8 C-E
SSL 35.350 m
C-D
C-C
C-B
C-A
USL 35.100 m SSL 32.600 m
Flowcrete screed to falls SSL 32.600 m
Flowcrete screed to falls
TOU 32.750 m
4950
C-R7-Building C Roof
225
C-M7-Mezzanine above Seventh Floor
C-M7-Mezzanine above Seventh Floor TOS +29.785 m
+30.150 m
+30.150 m
Ramp Down Route
Core 1 Riser A
Ramp Up and Down Routes
Fourth Floor Parking
Fourth Floor Parking
C-M4-Mezzanine above Fourth Floor
+21.425 m
Ramp Down Route
+20.050 m
Third Floor Parking
Third Floor Parking
C-M3-Mezzanine above Third Floor
+18.675 m
Ramp Down Route
+17.300 m
Second Floor Parking
C-M2-Mezzanine above Second Floor
C-M1-Mezzanine above First Floor DryRiser-1
Ramp Up Route
First Floor Parking
Ramp Up and Down Routes
First Floor Parking
Unisex WC
Unisex Changing
Unisex Changing
Entrance / Exit Ramp
Unisex Changing
SSL 8.010 m
Stair 1 Shaft
C-M0-Mezzanine above Ground Floor Thermal Stores SSL 8.310 m
+10.040 m
Flood Void
Flood Void
Flood Void
C-LG-Lower Ground
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services
NOTES
The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.
Heights (Above Ordnance Datum) Key: TOS = Top of Slab / Top of Structural Screed TOU = Top of Upstand TOW = Top of Wall SSL = Structural Slab Level USL = Underside Soffit Level FFL = Finished Floor Level
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 5m
10m
12m
1:100
?
2750
1:80
+14.531 m
C-02-Second Floor
+14.550 m
+13.156 m
1:12
1:6
First Floor Parking 1:80
C-01-First Floor
+11.800 m
+10.244 m
1:13
Entrance / Exit Ramp 1:12
+8.350 m
1:16
Flood Void
Flood Void
C-00-Ground Floor
+7.875 m
+8.310 m
C-LG-Lower Ground
+6.635 m
GENERAL NOTES
C-03-Third Floor
+17.300 m
+15.906 m
1:6
Cycle Store
3405
Stair 2 Shaft FFL 7.155 m FFL 6.635 m
1m
Ground Floor (Mezz) Parking 1:80
C-M0-Mezzanine above Ground Floor
+10.040 m
Cold Water Tank
C-00-Ground Floor Flood Void
1:80
+17.281 m
1:12 +11.785 m
+8.310 m
0m
1:80
3135
Core 1 - L00 Lift Lobby FFL 7.960 m
C-04-Fourth Floor
+20.050 m
+13.175 m
+11.800 m
C-05-Fifth Floor
+22.800 m
First Floor (Mezz) Parking
C-M1-Mezzanine above First Floor
+13.175 m
Ramp Down Route
+20.031 m
Fourth Floor Parking 1:80
+15.925 m
+14.550 m
C-01-First Floor
+18.656 m
Fifth Floor Parking 1:80
Third Floor Parking
C-M2-Mezzanine above Second Floor
+15.925 m
Ramp Down Route
Third (Mezz) Floor Parking 1:80
Second Floor (Mezz) Parking 1:80
2750
Ramp Up Route
C-02-Second Floor
Second Floor Parking
Ramp Up and Down Routes
+21.406 m
+22.781 m
+18.675 m
2750
Ramp Up Route
C-03-Third Floor
C-M3-Mezzanine above Third Floor
Ramp Up and Down Routes
Fourth Floor (Mezz) Parking 1:80
+21.425 m
2750
Ramp Up Route
+25.550 m
+24.175 m
C-M4-Mezzanine above Fourth Floor
C-06-Sixth Floor
+24.156 m
2750
+24.175 m
1:80
2750
C-M5-Mezzanine above Fifth Floor
2750
Fifth Floor Parking
Sixth Floor Parking +25.531 m
Fifth Floor (Mezz) Parking
2750
C-M5-Mezzanine above Fifth Floor
Ramp Up and Down Routes
Fifth Floor Parking
+28.300 m
+26.925 m
1:80
C-07-Seventh Floor
2750
Ramp Down Route
TOS +28.295 m
+26.906 m
2750
Sixth Floor Parking
Sixth Floor Parking
C-M6-Mezzanine above Sixth Floor
+26.925 m
+22.800 m
C-04-Fourth Floor
PV Array Roof L07 1:80
Sixth Floor (Mezz) Parking 1:80
2750
Ramp Up and Down Routes
Ramp Up Route
TOS +29.585 m
2655
C-M6-Mezzanine above Sixth Floor
+25.550 m
C-05-Fifth Floor
1:80
3490
3225
+28.300 m
Ramp Up Route
Intensive Planters +30.250 m
PV Array Roof L07
C-07-Seventh Floor
C-06-Sixth Floor
Roof Garden L07 Mezz
1675
PV Array Roof L07
+32.500 m
TOU 30.375 m
2350
2200
2200
Stair 2 Shaft
4525
DryRiser-1
Stair 1 Shaft
C-R7-Building C Roof
TOU 30.375 m
+32.500 m
1dr Lift Shaft
4200
250 250
C-R7-Building C Roof
+32.500 m
225
SSL 32.600 m
2747
250
SSL 33.075 m
+6.635 m
FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services KEY PLAN
REV P01 P02 C01 C02
NOTES GENERAL NOTES DATE
BY
AUTH
DRAWING STATUS
ISO SHEET STATUS NOTES
KEY PLAN
(Above Ordnance Datum) Key: CONSTR. RECORDHeights CR TOS = Top of Slab / Top of Structural Screed
The drawing is copyright19/08/22 of Darling Associates.AC This drawing shall not be scaled. All dimensions are in mm Initial Stage 3 Issue unless otherwise stated.23/11/22 All dimensions shall be INITIAL FORMAL ISSUE ACchecked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the First Construction Issue & GFL Revision to show 25/01/23 AC building regulations and other statutory requirements. All materials and workmanship shall conform with the amended parking layout TITLE relevant British Standard specifications and codes of practice. If this drawing forms part of an application for FINAL ISSUE RECORD 25/10/24 AC
03-Proposed Building C - GA Section A-A
planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. PROJECT
TOU = Top of Upstand TOW = Top of Wall SSL = Structural Slab Level USL = Underside Soffit Level FFL = Finished Floor Level
REV
NOTES
D
P01 C01
INITIAL FORMAL ISSUE First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD
23 25
C02
Eden Campus
Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. SCALE AT A1: SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual
1 : 100
0m 1:100
1m
5m
DRAWING
1: 200
10m
12m
EDC-DAA-CXX001-ZZ-DR-A-0301
DAA JOB NO.
19064 REV.
C02
© Darling Associates Ltd.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
27
25
5
EPC CERTIFICATE
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
28
EPC Certificate 5.1 Building A
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
29
EPC Certificate 5.2 Building B
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
30
EPC Certificate 5.3 Building C
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
31
6
BREEAM CERTIFICATE
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
32
BREEAM Certificate 6.1 BREEAM EXCELLENT
BREEAM New Construction 2018
Pre-assessment : Design (Interim) : Project Honey (Honey) BREEAM Rating Credits available
Credits achieved
Credits targeted
% Credits achieved
Weighting
Category score
Target score
Man
18.0
16.0
16.0
88.89%
11.00%
9.77%
9.77%
Hea
11.0
8.0
8.0
72.73%
8.00%
5.81%
5.81%
Ene
21.0
13.0
13.0
61.90%
14.00%
8.66%
8.66%
Tra
12.0
11.0
11.0
91.67%
11.50%
10.54%
10.54%
Wat
9.0
7.0
7.0
77.78%
7.00%
5.44%
5.44%
Mat
14.0
8.0
8.0
57.14%
17.50%
10.00%
10.00%
Wst
11.0
9.0
9.0
81.82%
7.00%
5.72%
5.72%
LE
13.0
12.0
12.0
92.31%
15.00%
13.84%
13.84%
Pol
12.0
9.0
9.0
75.00%
9.00%
6.75%
6.75%
Inn
10.0
3.0
3.0
30.00%
10.00%
3.00%
3.00%
Total
131.0
96.0
96.0
73.28%
-
79.57%
79.57%
Rating
-
-
-
-
-
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
Excellent
Excellent
33
7
O&M
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
34
O&M 7.1 McLaughlin & Harvey Building A
BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames
BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames
TABLE OF CONTENTS
REVISION REGISTER Revision Number
Status
Author
Date
BUILDING FABRIC MANUAL ACCEPTANCE FORM 1.0
INTRODUCTION
1.1
General
1.2
How to Use your Building Fabric Manual
1.3
Technical Author
1.4
Other Key Documents
2.0
THE CONTRACT WORKS AND PROJECT DIRECTORIES
2.1
Description of Works
2.2
Building Ownership Details
2.3
Project Directory
2.4
Contractors / Sub Contractors
3.0
STATUTORY CONSENTS AND THIRD-PARTY CERTIFICATION
3.1
Planning Consents
3.2
Building Control Consents
4.0
DESIGN CRITERIA & INFORMATION
4.1
Key Structural Principles
4.2
Insulation Values
4.3
Fire Ratings
4.4
Surveys / Reports
5.0
BUILDING FABRIC
5.1
Construction Methods & Materials
6.0
GUARANTEES / CERTIFICATES & TEST CERTIFICATES
6.1
Guarantees
6.2
Certificates of Compliance
6.3
Test/Commissioning Certificates
7.0
OPERATIONAL & MAINTENANCE INFORMATION
7.1
Maintenance Contracts & Contractors
7.2
Building Fabric Maintenance
8.0
SUB-CONTRACTOR & DIRECT SUPPLIER O&M INFORMATION
8.1
Architectural Metalwork – CMF Ltd
8.2
Brick/Block Work – Swift Brickwork
8.3
Cutting GRP – Dura Composites
8.4
Dry Lining / Ceilings – AT Jones London
8.5
Façade – Clarkes
8.6
Fire Curtain – Coopers Fire Ltd
8.7
Fire Stopping - Middlesex
8.8
Flood Grills – Flood Stop Ltd
8.9
Glazed Doors – OWS
Rev A
Draft
Suzi Berry
17.01.24
Rev B
Draft
Neil Christie
19.09.24
Rev C
Draft
Neil Christie
04.11.24
BUILDING FABRIC MANUAL Incorporating Health & Safety File Information UNILEVER HEADQUARTERS, BUILDING A BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER
NOVEMBER 2024
___________________________________________________________________________________________
Prepared for McLaughlin & Harvey by Riddell Project Management Buchan House, Carnegie Campus, Dunfermline, Fife, KY11 8PL Web: www.riddellpm.co.uk Email: admin@riddellpm.co.uk Tel: 01383 622 500
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
_________________________________________________________________________________________
© 2024 Riddell PM
_________________________________________________________________________________________
© 2024 Riddell PM
35
O&M 7.2 McLaughlin & Harvey Building A
BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames 8.10 Groundworks & Frame – Mitchellson
BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames
BUILDING FABRIC MANUAL ACCEPTANCE FORM
8.11 Joinery – Swift Crafted Ltd 8.12 Landscape – Frosts
Project
Unilever Headquarters, Building CA
Principal Contractor Project Manager
Andrew Finnegan
Return to Address:
McLaughlin & Harvey
Tel:
15 Trench Road Mallusk Newtownabbey BT36 4TY
Andrew.finnegan@mclh.co.uk
Web
www.mclh.co.uk
8.25 Waterproofing & Roofing (Hard & Soft) – AYM Services Ltd
Client Address:
Cube Retail Estate
9.0
HEALTH & SAFETY FILE INFORMATION
Tel:
9.1
Residual Hazards
9.2
Hazardous Materials Used
21A Kingly Street London W1B 5QA
9.3
Removal and Dismantling of Plant and Equipment
jonathan@cube-re.com
9.4
Nature and Location of Significant Services
Web
www.cube-re.com
9.5
Fire Strategy
9.6
Emergency Contacts
9.7
Cleaning Access & Maintenance
8.13 Lifts – Otis Elevator Company 8.14 Mansafe Systems - PTSG 8.15 MSCP Pre-Cast – F P McCann 8.16 Painting – AC Beck & Son 8.17 Piling – Van Elle 8.18 Raised Access Flooring - Kingspan 8.19 Screed – UK Subfloors 8.20 Service Yard Gate – Charter Global 8.21 Signage - Norsign 8.22 Solar Shading / Car Park Envelope – Maple Sunscreening 8.23 Sunray Doors - Sunray 8.24 UKPN Ceiling Durasteel - Invicta
10.0 AS BUILT DRAWINGS 10.1 Architect – Darling Associates Architects 10.2 Structural Engineer – Robert Bird Group 10.3 Landscape Architect – McIlwaine Landscape Architect
We confirm having received the complete Building Fabric Manual for this Project. Signed:
On behalf of Globe Kingston Ltd:
10.4 Groundworks and Frame – Mitchellson 10.5 Fire Curtain – Coopers Fire Ltd
………………………………………………………….
Name:
………………………………………………………….
Date:
………………………………………………………….
10.6 Architectural Metalwork – CMF Ltd 10.7 Dry Lining / Ceilings – AT Jones London 10.8 Service Yard Gate – Charter Global 10.9 Lifts – Otis Elevator Company
_________________________________________________________________________________________
© 2024 Riddell PM
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
_________________________________________________________________________________________
© 2024 Riddell PM
36
O&M 7.3 McLaughlin & Harvey Building B
BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames
BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames
TABLE OF CONTENTS
REVISION REGISTER Revision Number
Status
Author
Date
BUILDING FABRIC MANUAL ACCEPTANCE FORM 1.0
INTRODUCTION
1.1
General
1.2
How to Use your Building Fabric Manual
1.3
Technical Author
1.4
Other Key Documents
2.0
THE CONTRACT WORKS AND PROJECT DIRECTORIES
2.1
Description of Works
2.2
Building Ownership Details
2.3
Project Directory
2.4
Contractors / Sub Contractors
3.0
STATUTORY CONSENTS AND THIRD PARTY CERTIFICATION
3.1
Planning Consents
3.2
Building Control Consents
4.0
DESIGN CRITERIA & INFORMATION
4.1
Key Structural Principles
4.2
Insulation Values
4.3
Fire Ratings
4.4
Surveys / Reports
5.0
BUILDING FABRIC
5.1
Construction Methods & Materials
6.0
GUARANTEES / CERTIFICATES & TEST CERTIFICATES
6.1
Guarantees
6.2
Certificates of Compliance
6.3
Test/Commissioning Certificates
7.0
OPERATIONAL & MAINTENANCE INFORMATION
7.1
Maintenance Contracts & Contractors
7.2
Building Fabric Maintenance
8.0
SUB-CONTRACTOR & DIRECT SUPPLIER O&M INFORMATION
8.1
Architectural Metalwork – CMF Ltd
8.2
Brick/Block Work – Swift Brickwork
8.3
Cutting GRP – Dura Composites
8.4
Dry Lining / Ceilings – AT Jones London
8.5
Façade – Clarkes
8.6
Fire Curtain – Coopers Fire Ltd
8.7
Fire Stopping - Middlesex
8.8
Flood Grills – Flood Stop Ltd
8.9
Glazed Doors – OWS
Rev A
Draft
Suzi Berry
17.01.24
Rev B
Draft
Neil Christie
02.08.24
Rev C
Draft
Neil Christie
04.11.24
BUILDING FABRIC MANUAL Incorporating Health & Safety File Information UNILEVER HEADQUARTERS, BUILDING B BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER
NOVEMBER 2024
___________________________________________________________________________________________
Prepared for McLaughlin & Harvey by Riddell Project Management Buchan House, Carnegie Campus, Dunfermline, Fife, KY11 8PL Web: www.riddellpm.co.uk Email: admin@riddellpm.co.uk Tel: 01383 622 500
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
_________________________________________________________________________________________
© 2024 Riddell PM
_________________________________________________________________________________________
© 2024 Riddell PM
37
O&M 7.4 McLaughlin & Harvey Building B
BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames 8.10 Groundworks & Frame – Mitchellson
BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames
BUILDING FABRIC MANUAL ACCEPTANCE FORM
8.11 Joinery – Swift Crafted Ltd 8.12 Landscape – Frosts 8.13 Lifts – Otis Elevator Company 8.14 Mansafe Systems - PTSG 8.15 MSCP Pre-Cast – F P McCann 8.16 Painting – AC Beck & Son (Contracts) Ltd 8.17 Piling – Van Elle 8.18 Raised Access Flooring - Kingspan 8.19 Screed – UK Subfloors
Project
Unilever Headquarters, Building C B
Principal Contractor Project Manager
Andrew Finnegan
Return to Address:
McLaughlin & Harvey
Tel:
15 Trench Road Mallusk Newtownabbey BT36 4TY
Andrew.finnegan@mclh.co.uk
Web
www.mclh.co.uk
8.20 Solar Shading / Car Park Envelope – Maple Sunscreening 8.21 Sunray Doors - Sunray 8.22 UKPN Ceiling Durasteel - Invicta 8.23 Waterproofing & Roofing (Hard & Soft) – AYM Services Ltd 9.0
HEALTH & SAFETY FILE INFORMATION
9.1
Residual Hazards
Client Address:
Cube Retail Estate
9.2
Hazardous Materials Used
Tel:
9.3
Removal and Dismantling of Plant and Equipment
9.4
Nature and Location of Significant Services
21A Kingly Street London W1B 5QA
9.5
Fire Strategy
jonathan@cube-re.com
9.6
Emergency Contacts
Web
www.cube-re.com
9.7
Cleaning Access & Maintenance
10.0 AS BUILT DRAWINGS 10.1 Architect – Darling Associates Architects 10.2 Structural Engineer – Robert Bird Group 10.3 Landscape Architect – McIlwaine Landscape Architect 10.4 Groundworks and Frame – Mitchellson 10.5 Fire Curtain – Coopers Fire Ltd
We confirm having received the complete Building Fabric Manual for this Project. Signed:
On behalf of Globe Kingston Ltd:
10.6 Architectural Metalwork – CMF Ltd 10.7 Dry Lining / Ceilings – AT Jones London
………………………………………………………….
Name:
………………………………………………………….
Date:
………………………………………………………….
10.8 Lifts – Otis Elevator Company
_________________________________________________________________________________________
© 2024 Riddell PM
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
_________________________________________________________________________________________
© 2024 Riddell PM
38
O&M 7.5 McLaughlin & Harvey Building C
BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames
BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames
TABLE OF CONTENTS
REVISION REGISTER Revision Number
Status
Author
Date
BUILDING FABRIC MANUAL ACCEPTANCE FORM 1.0
INTRODUCTION
1.1
General
1.2
How to Use your Building Fabric Manual
1.3
Technical Author
1.4
Other Key Documents
2.0
THE CONTRACT WORKS AND PROJECT DIRECTORIES
2.1
Description of Works
2.2
Building Ownership Details
2.3
Project Directory
2.4
Contractors / Sub Contractors
3.0
STATUTORY CONSENTS AND THIRD PARTY CERTIFICATION
3.1
Planning Consents
3.2
Building Control Consents
4.0
DESIGN CRITERIA & INFORMATION
4.1
Key Structural Principles
4.2
Insulation Values
4.3
Fire Ratings
4.4
Surveys / Reports
5.0
BUILDING FABRIC
5.1
Construction Methods & Materials
6.0
GUARANTEES / CERTIFICATES & TEST CERTIFICATES
6.1
Guarantees
6.2
Certificates of Compliance
6.3
Test/Commissioning Certificates
7.0
OPERATIONAL & MAINTENANCE INFORMATION
7.1
Maintenance Contracts & Contractors
7.2
Building Fabric Maintenance
8.0
SUB-CONTRACTOR & DIRECT SUPPLIER O&M INFORMATION
8.1
Architectural Metalwork – CMF Ltd
8.2
Bicycle Parking – Turvec
8.3
Block C Louvres – Contrasol
8.4
Brick/Block Work – Swift Brickwork
8.5
CarPark Fitout – Original Joinery
8.6
Cutting GRP – Dura Composites
8.7
Dry Lining / Ceilings – AT Jones London
8.8
Façade – Clarkes
8.9
Fire Curtain – Coopers Fire Ltd
Rev A
Draft
Suzi Berry
17.01.24
Rev B
Draft
Neil Christie
19.09.24
Rev C
Draft
Neil Christie
04.11.24
BUILDING FABRIC MANUAL Incorporating Health & Safety File Information UNILEVER HEADQUARTERS, BUILDING C BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER
NOVEMBER 2024
___________________________________________________________________________________________
Prepared for McLaughlin & Harvey by Riddell Project Management Buchan House, Carnegie Campus, Dunfermline, Fife, KY11 8PL Web: www.riddellpm.co.uk Email: admin@riddellpm.co.uk Tel: 01383 622 500
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
_________________________________________________________________________________________
© 2024 Riddell PM
_________________________________________________________________________________________
© 2024 Riddell PM
39
O&M 7.6 McLaughlin & Harvey Building C
BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames
BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames
8.10 Fire Stopping - Middlesex 8.11 Flood Grills – Flood Stop Ltd
BUILDING FABRIC MANUAL ACCEPTANCE FORM
8.12 Glazed Doors – OWS 8.13 Groundworks & Frame – Mitchellson
Project
Unilever Headquarters, Building C
Principal Contractor Project Manager
Andrew Finnegan
Return to Address:
McLaughlin & Harvey
Tel:
15 Trench Road Mallusk Newtownabbey BT36 4TY
Andrew.finnegan@mclh.co.uk
Web
www.mclh.co.uk
8.26 UKPN Ceiling Durasteel - Invicta
Client Address:
Cube Retail Estate
8.27 Waterproofing & Roofing (Hard & Soft) – AYM Services Ltd
Tel:
21A Kingly Street London W1B 5QA
8.14 Joinery – Swift Crafted Ltd 8.15 Landscape – Frosts 8.16 Lifts – Otis Elevator Company 8.17 Mansafe Systems - PTSG 8.18 MSCP Pre-Cast – F P McCann 8.19 Painting – AC Beck 8.20 Piling – Van Elle 8.21 Raised Access Flooring - Kingspan 8.22 Screed – UK Subfloors 8.23 Service Yard Gate – Charter Global 8.24 Solar Shading / Car Park Envelope – Maple Sunscreening 8.25 Sunray Doors - Sunray
9.0
HEALTH & SAFETY FILE INFORMATION
9.1
Residual Hazards
jonathan@cube-re.com
9.2
Hazardous Materials Used
Web
9.3
Removal and Dismantling of Plant and Equipment
www.cube-re.com
9.4
Nature and Location of Significant Services
9.5
Fire Strategy
9.6
Emergency Contacts
9.7
Cleaning Access & Maintenance
We confirm having received the complete Building Fabric Manual for this Project. Signed:
………………………………………………………….
10.0 AS BUILT DRAWINGS 10.1 Architect – Darling Associates Architects 10.2 Structural Engineer – Robert Bird Group 10.3 Landscape Architect – McIlwaine Landscape Architect 10.4 Groundworks and Frame – Mitchellson
On behalf of Globe Kingston Ltd:
Name:
………………………………………………………….
Date:
………………………………………………………….
10.5 Fire Curtain – Coopers Fire Ltd 10.6 Architectural Metalwork – CMF Ltd 10.7 Dry Lining / Ceilings – AT Jones London 10.8 Car Park Fitout – Original Joinery 10.9 Service Yard Gate – Charter Global 10.10 Lifts – Otis Elevator Company 10.11 Block C Louvres – Contrasol 10.12 Bicycle Parking – Turvec _________________________________________________________________________________________
© 2024 Riddell PM
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
_________________________________________________________________________________________
© 2024 Riddell PM
40
O&M 7.7 Halsion Mechanical Services ________________________________________
______________________
____________
MECHANICAL SERVICES OPERATING & MAINTENANCE MANUAL Project Honey
2-1 General 2-2 The Electricity At Work Regulations 2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Road Transport On Site 2-8 Specialist Waste Regulations 2014 2-9 Fire Precautions 2-9 Moving and Rotating Machinery 2-10 Further Legislation
6. EQUIPMENT AND SUPPLIERS SCHEDULES
3. GENERAL DESCRIPTION 3-1 Mechanical Scope of Works 3-2 Design Criteria 3-3 Outline Description 3-4 Above Ground Drainage, Rainwater (Including Rainwater Harvesting) & Car Park 3-5 Cold Water Services 3-6 Hot Water Services 3-7 Heating and Cooling 3-8 Ventilation 3-9 Sprinkler 3-10 BMS
AT 4. OPERATING PROCEDURES
3 St James’s Road Kingston Upon Thames London KT1 2BA
1. INTRODUCTION AND GUIDE 1-1 Introduction 1-2 Scope 1-3 Contents 1-4 The Manual Users 1-5 Contractual & Legal Information 1-6 Project Directory 1-7 Emergency Information 1-8 Users Own Emergency Contacts 1-9 Document History 1-9-1 Initial Document Information 1-9-2 Distribution List 1-9-3 Document Status & History
2. HEALTH AND SAFETY 2-1 General 2-2 The Electricity At Work Regulations 2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Road Transport On Site 2-8 Specialist Waste Regulations 2014 2-9 Fire Precautions 2-9 Moving and Rotating Machinery 2-10 Further Legislation
Eden Campus, KingstonDESCRIPTION Upon Thames KT1 3. GENERAL Practical Completion document 3-1 Mechanical Scope of Works 3-2 Design Criteria 3-3 Outline Description 3-4 Above Ground Drainage, Rainwater (Including Rainwater Harvesting) & Car Park
4-1 General 4-2 Introduction 4-3 Automatic Operation 4-3-1 Controls 4-4 Cold Water Services 4-5 Domestic Hot Water Services 4-6 Low Temperature Hot Water Heating Services 4-7 Chilled Water Service 5. MAINTENANCE PROCEDURES 4-8 Ventilation Systems
5-1 Introduction 5-2 Maintenance Matrix 5-3 Air Cooled Condensing Units 5-4 Air Filters (Panel/Bag Type Cells) 5-5 Air Handling Units Including Centrifugal Supply Fan Units 5-6 Air Venting 5-7 Atmospheric Electric Hot Water Heaters 5-8 Automatic Controls 5-9 Axial Fans 5-10 Belt Drives 5-11 Boilers 5-12 Boiler Flues 5-13 Centrifugal Water Circulation Pumps 5-14 Controls Panels 5-15 Convectors (Fans) 5-16 Cold Water Storage Tanks 5-17 Cold Water Booster Pump Sets 5-18 Gas System 5-19 General Pipework Systems 5-20 HWS Electric Water Heaters 5-21 Ductwork 5-22 Dampers and Fire Dampers 5-23 Drainage and Rainwater Systems 5-24 DX Split Systems 5-25 Electric Motors 5-26 Float Operated Lever Valves 5-27 Gauges 5-28 Insulation 5-29 Insurance Inspections 5-30 Extract Hoods 5-31 Overhead Door Fan Convectors 5-32 Radiators 5-33 Roof Extract Fans 5-34 Safety Valves 5-35 Strainers 5-36 Temperature Tests 5-37 Motor Control Gear 5-38 Mountings 5-39 Pressurisation Unit 5-40 Thermostatic Radiator Valves 5-41 Twin Fan Toilet Extract Unit 5-42 Unvented Electric Hot Water Heaters 5-43 Water Analysis Tests 5-44 Water Maintenance 5-45 Water Treatment for Heating and Chilled Water Closed Systems 5-46 Legionella Control 5-47 Water Chillers 5-48 Fault Finding
7. MANUFACTURERS LITERATURE 7-1 Fan Coil Units 7-2 Attenuators 7-3 Rainwater Harvesting 7-4 Pulsed Water Meters 7-5 Fire Dampers 7-6 Shower Channels 7-7 X Pots 7-8 Thermal Stores / Hot Water Calorifiers 7-9 Dominator Sets 7-10 CAT 5 Booster 7-11 Electric Radiant Panels 7-12 Grilles 7-13 Pumps / Pressurisation Units / Booster Sets 7-14 UV Treatment 7-15 ASHP / Chillers / QAVH Units 7-16 Thermostatic Mixing Valves 7-17 Extract Fans / VAVs / MSFDs 7-18 MVHRs / CAVs 7-19 Cold Water Storage Tanks 7-20 AHUs 7-21 Sanitaryware
8. COMMISSIONING DATA 8-1 ASHP / Chiller & WSHP Commissioning Certificates 8-2 AHU Commissioning Certificates 8-3 LTHW System Commissioning Certificates 8-4 CHW System Commissioning Certificates 8-5 Cold Water Booster Set Commissioning Certificate 8-6 Tap Temperatures 8-7 Drainage and Rainwater Stack Test Certificates 8-8 Chlorination Certificates 8-9 Extract Fans Commissioning Certificates 8-10 BMS Commissioning Certificates 8-11 Sprinkler Pressure Test Certificates 8-12 Dry Riser Pressure Test Certificates 8-13 Smoke Ventilation Certificates 8-14 Trace Heating Commissioning Certificates 8-15 CAT 5 Booster Set Commissioning Certificates 8-16 UV Filter Certificates 8-17 FCU Secondary Air Certificates 8-18 Motorised Fire Smoke Damper Certificates 8-19 Fire Damper Certificates 8-20 Toilet Extract Venilation Certificate
9. DRAWINGS 9-1 Schematics 9-2 Plantrooms 9-3 Drainage 9-4 Domestics 9-5 Piped Services 9-6 Ventilation 9-7 Sprinklers
10. SPRINKLER SYSTEM
11. BUILDING MANAGEMENT SYSTEM
41
O&M 7.8 Halsion Electrical Services
2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Regulatory Reform (Fire Safety) Order 2005 2-7-1 Responsible Persons 2-8 Road Transport on site 2-9 Special Waste Regulations 2014 2-10 Further Legislation
________________________________________ 3. GENERAL DESCRIPTION
______________________
____________
ELECTRICAL SERVICES OPERATING & MAINTENANCE MANUAL PROJECT HONEY &
3 St James’s Road Kingston Upon Thames London KT1 2BA
3-1 Main Supply & LV Distribution 3-2 General Lighting, Emergency Lighting & Controls 3-3 General LV Power (Small Power) 3-4 Facilities For The Disabled 3-5 CCTV 3-6 Data Transmission 3-7 Fire Detection & Alarm 3-8 Earthing, Bonding, EMC Measures & Surge Protection 3-9 Lightning Protection 4. OPERATING PROCEDURES
4-1 General 4-2 State of Plant (Checklist) 4-3 Main LV Switchboard 4-4 Distribution Boards 4-5 Lighting and Small Power Circuits 4-6 Emergency Lighting System 4-7 External Lighting System 4-8 Mechanical Installation 4-9 Lightning Protection 4-10 Miscellaneous Equipment
5. MAINTENANCE PROCEDURES
1. INTRODUCTION AND GUIDE 1-1 Introduction 1-2 Scope 1-3 Contents 1-4 The Manual Users 1-5 Contractual & Legal Information 1-6 Project Directory 1-7 Emergency Information 1-8 Users Own Emergency Contacts 1-9 Document History 1-9-1 Initial Document Information 1-9-2 Distribution List 1-9-3 Document Status & History
5-1 Introduction 5-2 Maintenance Matrix 5-3 Specialist Maintenance 5-4 Monitoring of Electrical services 5-5 Periodic Testing & Inspection 5-6 Routine & Preventative Maintenance 5-6-1 General Introduction 5-6-2 Maintenance Requirements 5-6-3 Preventative Maintenance 5-6-4 Maintenance Programme 5-6-5 Maintenance Records 5-6-6 Switchboards & Switchgear 5-6-7 Distribution Boards 5-6-8 Light Fittings 5-6-9 Emergency Lighting Installation 5-6-10 Switch Socket Outlets & Spur Outlets 5-6-11 Contactor/Time Switches 5-6-12 External Lighting Fittings
7. MANUFACTURERS LITERATURE 7-1 Transformers & Ring Main Units 7-2 Switchboards 7-3 Distribution Boards 7-4 Automatic Transfer Switches 7-5 Generator 7-6 Internal & External Lighting 7-7 Lighting Control 7-8 Fire Alarm 7-9 Disabled Refuge 7-10 Disabled WC Alarms 7-11 CCTV 7-12 Data 7-13 Lightning Protection 7-14 PV 7-15 Electric Vehicle Chargers 7-16 Wiring Accessories
8. COMMISSIONING DATA 8-1 NIC Installation Certificates 8-2 NIC Emergency Lighting Certificates 8-3 Distribution Board Test Sheets 8-4 Fire Alarm Commissioning Certificates 8-5 Fire Alarm Cause and Effect sign off 8-6 Disabled Refuge Commissioning Certificate 8-7 HV Test Sheets 8-8 Lighting Control Commissioning Certificates 8-9 Lighting Protection Commissioning Certificates 8-10 PV Commissioning Certificates 8-11 EVC Commissioning Certificates 8-12 CCTV Commissioning Certificates 8-13 Substation Earthing Certificates 8-14 Data Fluke Test Results
9. DRAWINGS 9-1 Schematics 9-2 Containment 9-3 Small Power 9-4 Lighting 9-5 Fire Alarm & Disabled Refuge 9-6 Lightning Protection 9-7 Externals
6. EQUIPMENT AND SUPPLIERS SCHEDULES
2. HEALTH AND SAFETY 2-1 General 2-2 The Electricity At Work Regulations 2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Regulatory Reform (Fire Safety) Order 2005 2-7-1 Responsible Persons 2-8 Road Transport on site 2-9 Special Waste Regulations 2014 2-10 Further Legislation
Eden Campus, Kingston Upon Thames KT1 Practical Completion document 3. GENERAL DESCRIPTION
3-1 Main Supply & LV Distribution 3-2 General Lighting, Emergency Lighting & Controls
42
8
HEALTH & SAFETY FILE
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
43
health & safety file 8.1 Building A
0.0 DOCUMENT VERIFICATION
CONTENTS
Job Title
Project Honey Eden Campus
Job Number
2800
5.0 TRADE PACKAGE INFORMATION .............................................................................. 21
Document Title
H&S file
File Reference
PD16 ORSA PD_H&S File May 2023.docx
APPENDIX 1 RISK REGISTER ............................................................................................ 21
Document Information
0.0 DOCUMENT VERIFICATION ......................................................................................... 4 1.0 THIS HEALTH & SAFETY FILE .......................................................................................5
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024.docx
HEALTH & SAFETY FILE
4.3.13 External Cleaning ....................................................................................... 20
Revision
Issue Date
Filename
A
04/10/24
Description
1.1 Key H&S File Content & Format .................................................................. 6 1.2 Key H&S File Issues ..............................................................................................7
Name
2.0 GENERAL PROJECT INFORMATION ........................................................................... 9
Signature
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB041024 H&S file Building A rev 0 Prepared By
Approved By
James Bucknall
Chris Bracewell
04/10/24
2.1 Client............................................................................................................................. 9 2.2 Project ........................................................................................................................ 9 2.3 Site location............................................................................................................ 9 2.4 Responsibilities of the Owner .................................................................... 9 2.5 Details of parties ............................................................................................... 10
Date
04/10/24
Revision
Issue Date
Filename
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB171024
B
17/10/24
Description
H&S file Building A rev 1
2.6 Compliance Considerations ..................................................................... 10 2.7 Existing Site Information .............................................................................. 10 2.8 Asbestos, Deleterious Materials and COSSH.................................. 11 2.9 Significant Site Services ................................................................................ 11
Name
2.10 Emergency Contacts .................................................................................... 12
Prepared By
Approved By
James Bucknall
Chris Bracewell
17/10/24
Signature
3.0 CONSULTANT INFORMATION .................................................................................... 13 3.1 Architect ................................................................................................................... 13 3.2 Landscape Architect ...................................................................................... 13
Date
17/10/24
Revision
Issue Date
Filename
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024
C
31/10/24
Description
3.3 Mechanical and Electrical............................................................................ 13 3.4 Statutory Consents..........................................................................................14 3.5 Fire ..............................................................................................................................14 3.6 Cleaning Access and Maintenance ......................................................15 3.7 Plant Replacement ........................................................................................... 16 3.8 Structural and Civil .......................................................................................... 16
Name
4.0 SIGNIFICANT RESIDUAL HAZARDS........................................................................... 18
H&S file Building A rev 2 Prepared By
Approved By
James Bucknall
Chris Bracewell
31/10/24
31/10/24
Signature
4.1 Residual Hazards and Significant Risks to be considered .....18 4.2 Significant Residual Hazards ......................................................................18 4.2.1 Definitions ............................................................................................................18 4.2.2 “Suitable and Sufficient” Risk Assessment Risk Assessment ...................................................................................................................18
HEALTH & SAFETY FILE
Date
4.3 Residual Hazards ............................................................................................... 19 4.3.1 Any Work at Height ...................................................................................... 19 4.3.2 Any Works in occupied areas .............................................................. 19 4.3.3 Access to roofs, roof mounted plant & equipment etc. ... 19 4.3.4 Cleaning of windows, window frames, cladding, signage etc........................................................................................................................................ 19 4.3.5 Access to plant rooms/areas and equipment ......................... 19
Eden Campus – Project Honey UNILEVER HEADQUARTERS, BUILDING A BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER
4.3.6 Hot-Work and any work involving the risk of fire .................. 19 4.3.7 Work on Services .......................................................................................... 19 4.3.8 Replacement of ‘high level’ lights etc. ........................................... 19
Cube Real Estate
4.3.9 Internal painting, spraying, decorating etc. ................................ 19
31 October 2024
4.3.10 Alterations to Fire Protection ........................................................... 20 4.3.11 Work in confined spaces, hazardous atmospheres etc... 20 4.3.12 Any work involving fumes, noise, dust etc. .............................. 20
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
2
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024
3
44
health & safety file 8.2 Building B
0.0 DOCUMENT VERIFICATION
CONTENTS
Job Title
Project Honey Eden Campus
Job Number
2800
5.0 TRADE PACKAGE INFORMATION .............................................................................. 21
Document Title
H&S file
File Reference
PD16 ORSA PD_H&SFile May 2023.docx
APPENDIX 1 RISK REGISTER ............................................................................................ 21
Document Information
0.0 DOCUMENT VERIFICATION ......................................................................................... 4 1.0 THIS HEALTH & SAFETY FILE .......................................................................................5
2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB171024.docx
HEALTH & SAFETY FILE
4.3.13 External Cleaning ....................................................................................... 20
Revision
Issue Date
Filename
2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB260924
A
26/09/24
Description
H&S file Building B
1.1 Key H&S File Content & Format .................................................................. 6 1.2 Key H&S File Issues ..............................................................................................7
Name
2.0 GENERAL PROJECT INFORMATION ........................................................................... 9
Prepared By
Approved By
James Bucknall
Chris Bracewell
26/09/24
Signature
2.1 Client............................................................................................................................. 9 2.2 Project ........................................................................................................................ 9 2.3 Site location............................................................................................................ 9 2.4 Responsibilities of the Owner .................................................................... 9
Date
26/09/24
Revision
Issue Date
Filename
2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB260924
B
17/10/24
Description
H&S file Building B
2.5 Details of parties ............................................................................................... 10 2.6 Compliance Considerations ..................................................................... 10 2.7 Existing Site Information .............................................................................. 10 2.8 Asbestos, Deleterious Materials and COSSH.................................. 11 2.9 Significant Site Services ................................................................................ 11
Prepared By
2.10 Emergency Contacts .................................................................................... 12
Name
3.0 CONSULTANT INFORMATION .................................................................................... 13
Checked By
James Bucknall
Approved By Chris Bracewell
Signature
3.1 Architect ................................................................................................................... 13 3.2 Landscape Architect ...................................................................................... 13 3.3 Mechanical and Electrical............................................................................ 13 3.4 Statutory Consents..........................................................................................14
Date
17/10/24
dd/mm/yy
17/10/24
Prepared By
Checked By
Approved By
dd/mm/yy
dd/mm/yy
dd/mm/yy
3.5 Fire ..............................................................................................................................14
Revision
3.6 Cleaning Access and Maintenance ......................................................15 3.7 Plant Replacement ........................................................................................... 16 3.8 Structural and Civil .......................................................................................... 16
4.0 SIGNIFICANT RESIDUAL HAZARDS........................................................................... 18
Issue Date
Filename
dd/mm/yy
Description
Name
4.1 Residual Hazards and Significant Risks to be considered .....18
Signature
4.2 Significant Residual Hazards ......................................................................18 4.2.1 Definitions ............................................................................................................18
Date
4.2.2 “Suitable and Sufficient” Risk Assessment Risk Assessment ...................................................................................................................18
HEALTH & SAFETY FILE
4.3 Residual Hazards ............................................................................................... 19 4.3.1 Any Work at Height ...................................................................................... 19 4.3.2 Any Works in occupied areas .............................................................. 19 4.3.3 Access to roofs, roof mounted plant & equipment etc. ... 19 4.3.4 Cleaning of windows, window frames, cladding, signage etc........................................................................................................................................ 19 4.3.5 Access to plant rooms/areas and equipment ......................... 19
Eden Campus – Project Honey UNILEVER HEADQUARTERS, BUILDING B BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER
4.3.6 Hot-Work and any work involving the risk of fire .................. 19 4.3.7 Work on Services .......................................................................................... 19 4.3.8 Replacement of ‘high level’ lights etc. ........................................... 19
Cube Real Estate
4.3.9 Internal painting, spraying, decorating etc. ................................ 19
17 October 2024
4.3.10 Alterations to Fire Protection ........................................................... 20 4.3.11 Work in confined spaces, hazardous atmospheres etc... 20 4.3.12 Any work involving fumes, noise, dust etc. .............................. 20
2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB171024
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
2
2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB171024
3
45
health & safety file 8.3 Building C
0.0 DOCUMENT VERIFICATION
CONTENTS
Job Title
Project Honey Eden Campus
Job Number
2800
5.0 TRADE PACKAGE INFORMATION .............................................................................. 21
Document Title
H&S file
File Reference
PD16 ORSA PD_H&S File May 2023.docx
APPENDIX 1 RISK REGISTER ............................................................................................ 21
Document Information
0.0 DOCUMENT VERIFICATION ......................................................................................... 4 1.0 THIS HEALTH & SAFETY FILE .......................................................................................5
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024.docx
HEALTH & SAFETY FILE
4.3.13 External Cleaning ....................................................................................... 20
Revision
Issue Date
Filename
A
04/10/24
Description
1.1 Key H&S File Content & Format .................................................................. 6 1.2 Key H&S File Issues ..............................................................................................7
Name
2.0 GENERAL PROJECT INFORMATION ........................................................................... 9
Signature
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB041024 H&S file Building A rev 0 Prepared By
Approved By
James Bucknall
Chris Bracewell
04/10/24
2.1 Client............................................................................................................................. 9 2.2 Project ........................................................................................................................ 9 2.3 Site location............................................................................................................ 9 2.4 Responsibilities of the Owner .................................................................... 9 2.5 Details of parties ............................................................................................... 10
Date
04/10/24
Revision
Issue Date
Filename
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB171024
B
17/10/24
Description
H&S file Building A rev 1
2.6 Compliance Considerations ..................................................................... 10 2.7 Existing Site Information .............................................................................. 10 2.8 Asbestos, Deleterious Materials and COSSH.................................. 11 2.9 Significant Site Services ................................................................................ 11
Name
2.10 Emergency Contacts .................................................................................... 12
Prepared By
Approved By
James Bucknall
Chris Bracewell
17/10/24
Signature
3.0 CONSULTANT INFORMATION .................................................................................... 13 3.1 Architect ................................................................................................................... 13 3.2 Landscape Architect ...................................................................................... 13
Date
17/10/24
Revision
Issue Date
Filename
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024
C
31/10/24
Description
3.3 Mechanical and Electrical............................................................................ 13 3.4 Statutory Consents..........................................................................................14 3.5 Fire ..............................................................................................................................14 3.6 Cleaning Access and Maintenance ......................................................15 3.7 Plant Replacement ........................................................................................... 16 3.8 Structural and Civil .......................................................................................... 16
Name
4.0 SIGNIFICANT RESIDUAL HAZARDS........................................................................... 18
H&S file Building A rev 2 Prepared By
Approved By
James Bucknall
Chris Bracewell
31/10/24
31/10/24
Signature
4.1 Residual Hazards and Significant Risks to be considered .....18 4.2 Significant Residual Hazards ......................................................................18 4.2.1 Definitions ............................................................................................................18 4.2.2 “Suitable and Sufficient” Risk Assessment Risk Assessment ...................................................................................................................18
HEALTH & SAFETY FILE
Date
4.3 Residual Hazards ............................................................................................... 19 4.3.1 Any Work at Height ...................................................................................... 19 4.3.2 Any Works in occupied areas .............................................................. 19 4.3.3 Access to roofs, roof mounted plant & equipment etc. ... 19 4.3.4 Cleaning of windows, window frames, cladding, signage etc........................................................................................................................................ 19 4.3.5 Access to plant rooms/areas and equipment ......................... 19
Eden Campus – Project Honey UNILEVER HEADQUARTERS, BUILDING A BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER
4.3.6 Hot-Work and any work involving the risk of fire .................. 19 4.3.7 Work on Services .......................................................................................... 19 4.3.8 Replacement of ‘high level’ lights etc. ........................................... 19
Cube Real Estate
4.3.9 Internal painting, spraying, decorating etc. ................................ 19
31 October 2024
4.3.10 Alterations to Fire Protection ........................................................... 20 4.3.11 Work in confined spaces, hazardous atmospheres etc... 20 4.3.12 Any work involving fumes, noise, dust etc. .............................. 20
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
2
2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024
3
46
9
CONFORMITY LETTERS
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
47
CONFORMITY letters 9.1 Darling Associates Architects Building A, B, C
Delivery: e-mail
27th November 2024
To wh o m it m ay c o n c er n R E: L e t t e r of C on f or m it y – UL C am p u s _ B u il di n gs A + C To date & throughout the construction phase we have checked the works for quality, completeness and compliance with the Employer’s Requirements and have checked the completion documentation as it relates to our design discipline and hereby confirm there are no significant items to be raised which could potentially prevent the issue of the Sectional Completion Statement. Throughout the construction phase, there have been a number of instructed occupier variations which have resulted in deviations away from the Employer’s Requirements. All variations have been formally approved and instructed by the client’s representative.
Delivery: e-mail
8th November 2024
To wh o m it m ay c o n c er n R E: L e t t e r of C on f or m it y – UL C am p u s _ B u il di n g B To date & throughout the construction phase we have checked the works for quality, completeness and compliance with the Employer’s Requirements and have checked the completion documentation as it relates to our design discipline and hereby confirm there are no significant items to be raised which could potentially prevent the issue of the Sectional Completion Statement. Throughout the construction phase, there have been a number of instructed occupier variations which have resulted in deviations away from the Employer’s Requirements. All variations have been formally approved and instructed by the client’s representative.
We have prepared and provided our lists of minor outstanding works. The snagging process is currently ongoing & in line with the McLH design programme. Yours sincerely,
Alexander Cook RIBA Associate
Founder + Chair Chris Darling RIBA Managing Director Alastair Roberts RIBA Directors Gareth Watkins RIBA Tomas Pierce RIBA Julie Pears MRICS (non-exec) Project Directors Thomas Bartram RIBA Rupert Calvert RIBA David Hurst RIBA Vania Piccioli RIBA Laura Podda RIBA Carolina Rodriguez Associates Alexander Cook RIBA Pedro Guinapo ARB James Le Ball RIBA Fabrizio Maiorano ARB Consultant Richard Houghton FRICS Darling Associates Ltd. Registered Company No: 4717408. 1 Greencoat Row, London SW1P 1PQ
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
Yours sincerely,
Alexander Cook RIBA Associate
Founder + Chair Chris Darling RIBA Managing Director Alastair Roberts RIBA Directors Gareth Watkins RIBA Tomas Pierce RIBA Julie Pears MRICS (non-exec) Project Directors Thomas Bartram RIBA Rupert Calvert RIBA David Hurst RIBA Vania Piccioli RIBA Laura Podda RIBA Carolina Rodriguez Associates Alexander Cook RIBA Pedro Guinapo ARB James Le Ball RIBA Fabrizio Maiorano ARB Consultant Richard Houghton FRICS Darling Associates Ltd. Registered Company No: 4717408. 1 Greencoat Row, London SW1P 1PQ
48
CONFORMITY letters 9.2 Halsion Building A, B, C
11th November 2024
11th November 2024
241111-KPC-02
241111-KPC-01
Allen Nash MCLH 15 Trench Road Newtownabbey County Antrim BT36 4TY
Allen Nash MCLH 15 Trench Road Newtownabbey County Antrim BT36 4TY
Dear Allen,
Dear Allen,
RE: Project Honey Kingston Upon Thames. MEPH Installation – Building A & C
RE: Project Honey Kingston Upon Thames. MEPH Installation – Building B
Please take this letter as confirmation that the Mechanical, Electrical and Public Health services have been designed and constructed in accordance with relative legislation, Employers Requirements, Contractors proposals, Services specifications, Services design layouts issued and the local planning authorities requirements.
Please take this letter as confirmation that the Mechanical, Electrical and Public Health services have been designed and constructed in accordance with relative legislation, Employers Requirements, Contractors proposals, Services specifications, Services design layouts issued and the local planning authorities requirements.
Yours sincerely,
Yours sincerely,
Kevin Cambridge Design Manager
Kevin Cambridge Design Manager
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
49
CONFORMITY letters 9.3 RBG Building A, B, C
ROBERT BIRD GROUP [RBG company number(s) will be inserted automatically]
ROBERT BIRD GROUP [RBG company number(s) will be inserted automatically]
Reference: 4881-RBG-ZZ-XX-CO-ST-00002-LG:LG 241107
Reference: 4881-RBG-ZZ-XX-CO-ST-00001-LG:LG 241108
08 November 2024
08 November 2024
Sam Peach Mclaughlin & Harvey Griffin Court Farringdon LONDON EC1A 9PN
Sam Peach Mclaughlin & Harvey Griffin Court Farringdon LONDON EC1A 9PN
Dear Sam
Dear Sam
RE: BUILDING A & C – CONSULTANT STATEMENT ON COMPLETION OF STRUCTURE & CIVIL WORKS
RE: BUILDING B – CONSULTANT STATEMENT ON COMPLETION OF STRUCTURE & CIVIL WORKS
In accordance with our Deed of Appointment and to the extent required by the scope of our services under that Deed, we visited site over the course of the civil and structural works to review the progress of the works and quality of the workmanship.
In accordance with our Deed of Appointment and to the extent required by the scope of our services under that Deed, we visited site over the course of the civil and structural works to review the progress of the works and quality of the workmanship.
As far as can be ascertained from a visual inspection of the works and using the standard of reasonable skill and care referred to in the Deed of Appointment, the works appear to be: constructed generally in accordance with our design documents, good engineering practice and to the best our knowledge in accordance with the ER’s.
As far as can be ascertained from a visual inspection of the works and using the standard of reasonable skill and care referred to in the Deed of Appointment, the works appear to be: constructed generally in accordance with our design documents, good engineering practice and to the best our knowledge in accordance with the ER’s.
Our inspection was limited to those parts of the works which were reasonably accessible at the time of the visit, no opening works have been undertaken to ascertain the quality of the workmanship.
Our inspection was limited to those parts of the works which were reasonably accessible at the time of the visit, no opening works have been undertaken to ascertain the quality of the workmanship.
This letter is for the sole benefit of the client and shall not be relied upon by any third party except those who we have provided collateral warranties.
This letter is for the sole benefit of the client and shall not be relied upon by any third party except those who we have provided collateral warranties.
Yours faithfully
Yours faithfully
ROBERT BIRD GROUP
ROBERT BIRD GROUP
Simon Cloherty Operations Director Europe
Simon Cloherty Operations Director Europe
LONDON OFFICE
LONDON OFFICE
4881-RBG-ZZ-XX-CO-ST-00002-LGLG 241108 - Building A & C PC Letter
LEAD. CREATE. DELIVER. SUSTAIN
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
Level 01 Harling House 47-51 Great Suffollk Street LONDON SE1 0BS United Kingdom p: +44 20 7633 2880
| w: robertbird.com
4881-RBG-ZZ-XX-CO-ST-00001-LGLG 241108 - Building B PC Letter
LEAD. CREATE. DELIVER. SUSTAIN
Level 01 Harling House 47-51 Great Suffollk Street LONDON SE1 0BS United Kingdom p: +44 20 7633 2880
| w: robertbird.com
50
CONFORMITY letters 9.4 Fire Safety Building A, B, C
Title: Revision: Date: Author:
Title: Revision: Date: Author:
Project Honey – Building A Fire Safety Compliance Statement 00 29th November 2024 Daniel Taylor BSc(Hons) AIFireE
Project Honey – Fire Safety Compliance Statement 01 8th November 2024 Daniel Taylor BSc(Hons) AIFireE
Title: Revision: Date: Author:
Sam Peach
Sam Peach
Sam Peach
McLaughin & Harvey 15 Trench Road, Mallusk, Newtownabbey, Co. Antrim, BT36 4TY
McLaughin & Harvey 15 Trench Road, Mallusk, Newtownabbey, Co. Antrim, BT36 4TY
McLaughin & Harvey 15 Trench Road, Mallusk, Newtownabbey, Co. Antrim, BT36 4TY
Project Honey – Building C Fire Safety Compliance Statement 00 29th November 2024 Daniel Taylor BSc(Hons) AIFireE
29th November 2024
8th November 2024
29th November 2024
Project Honey – Building A Part B Compliance Statement
Project Honey – Building B Part B Compliance Statement
Project Honey – Building C Part B Compliance Statement
Dear Sam,
Dear Sam,
Dear Sam,
Further to the information provided in relation to developing the fire strategy report and other works such as CFD modelling, plus the implementation site visits carried out to the proposed development known as Project Honey (for Building A), and that we have been involved with and have reviewed against the requirements of Part B to the Building Regulations we confirm acceptance of the standard of work and the intent proposed, have coordinated design team meetings and coordination with other parties during the design phase and construction phase to reach completion of works.
Further to the information provided in relation to developing the fire strategy report and other works such as CFD modelling, plus the implementation site visits carried out to the proposed development known as Project Honey (for Building B), and that we have been involved with and have reviewed against the requirements of Part B to the Building Regulations we confirm acceptance of the standard of work and the intent proposed, have coordinated design team meetings and coordination with other parties during the design phase and construction phase to reach completion of works.
Guidance is taken from BS 9999: 2017 as the primary design code. Where necessary, CFD and other technical assessments have been carried out to support the design intent and have been 3rd party reviewed.
Guidance is taken from BS 9999: 2017 as the primary design code. Where necessary, CFD and other technical assessments have been carried out to support the design intent and have been 3rd party reviewed.
Further to the information provided in relation to developing the fire strategy report and other works such as CFD modelling, external fire spread analaysis, cladding surface spread of flame assessment, plus the implementation site visits carried out to the proposed development known as Project Honey (for Building C), and that we have been involved with and have reviewed against the requirements of Part B to the Building Regulations we confirm acceptance of the standard of work and the intent proposed, having coordinated design team meetings and coordination with other parties during the design phase and construction phase to reach completion of works.
Having reviewed the design proposals, and various design data sheets relating to Part B provided to us we consider that the materials proposed will achieve the minimum performance requirements required in current guidance at the time of construction.
Having reviewed the design proposals, and various design data sheets relating to Part B provided to us we consider that the materials proposed will achieve the minimum performance requirements required in current guidance at the time of construction.
Conclusion
Conclusion
By virtue of meeting the requirements noted above it is considered that they comply with Part B of the Building Regulations.
By virtue of meeting the requirements noted above it is considered that they comply with Part B of the Building Regulations.
Conclusion
Should you have any queries on the above please do not hesitate to get in touch.
Should you have any queries on the above please do not hesitate to get in touch.
By virtue of meeting the requirements noted above it is considered that they comply with Part B of the Building Regulations.
Yours sincerely,
Yours sincerely,
Should you have any queries on the above please do not hesitate to get in touch.
Guidance is taken from Approved Document B 2019, 2020& 2022 as the primary design code. Where necessary other technical assessments have been carried out to support the design intent and have been 3rd party reviewed/accepted by the Approving Authorities. Having reviewed the design proposals, and various design data sheets relating to Part B provided to us we consider that the materials proposed will achieve the minimum performance requirements required in current guidance at the time of construction.
Yours sincerely,
Daniel Taylor BSc (Hons) AIFireE Senior Fire Engineer
Daniel Taylor BSc (Hons) AIFireE Senior Fire Engineer
Marshall Fire Ltd Weston Business Centres, Parsonage Road, Takeley, Essex, CM22 6PU
Marshall Fire Ltd Weston Business Centres, Parsonage Road, Takeley, Essex, CM22 6PU
M: +44 (0) 7710589610 E: dtaylor@marshallfire.co.uk
M: +44 (0) 7710589610 E: dtaylor@marshallfire.co.uk
Registered Address: Weston Business Centres Parsonage Road Takeley Essex CM22 6PU Registration Number: 13143461 VAT number: 379 1699 35
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
Daniel Taylor BSc (Hons) AIFireE Senior Fire Engineer Marshall Fire Ltd Weston Business Centres, Parsonage Road, Takeley, Essex, CM22 6PU M: +44 (0) 7710589610 E: dtaylor@marshallfire.co.uk
Registered Address: Weston Business Centres Parsonage Road Takeley Essex CM22 6PU Registration Number: 13143461 VAT number: 379 1699 35
Registered Address: Weston Business Centres Parsonage Road Takeley Essex CM22 6PU Registration Number: 13143461 VAT number: 379 1699 35
51
10
WIRED CERTIFICATES
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
52
WIRED CERTIFICATES 10.1 Building A, B
Project Honey - Building A
Project Honey - Building B
has achieved WiredScore Platinum rating
has achieved WiredScore Platinum rating
for its digital connectivity
for its digital connectivity
Arie Barendrecht Founder & CEO
WiredScore champions the modern day necessity for cutting-edge technology in real estate by providing the definitive standards for the digital connectivity of commercial and residential buildings. Visit wiredscore.com to learn more.
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
John Meko Global Director of Operations
3 Saint James's Road, Kingston upon Thames KT1 2DH, United Kingdom Certification ID: 34598 WiredScore - V3 - Office Certification valid until: May 30, 2025
Arie Barendrecht Founder & CEO
WiredScore champions the modern day necessity for cutting-edge technology in real estate by providing the definitive standards for the digital connectivity of commercial and residential buildings.
John Meko Global Director of Operations
3 Saint James's Road, Kingston upon Thames KT1 2DH, United Kingdom Certification ID: 34599 WiredScore - V3 - Office Certification valid until: June 27, 2025
Visit wiredscore.com to learn more.
53
11
KEY SCHEDULES
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
54
Key Schedules 11.1 Door schedule
TIMBER DOOR - MASTER KEY SCHEDULE Revision: Status: Document No.
Line No.
DOOR DETAIL
CYLINDER DETAIL
1 2 3 4 7 9 12 13 14 15 17 22 23 24 26 27 28 29 34 35 40 42 43 44 47 49 52 53 54 55 59 62 63 64 65 71 72 73 74 75 78 82 83
Door No. D-00-003 D-00-004 D-00-006 D-00-008 D-00-025 D-00-042 D-00-052 D-00-064 D-01-007 B D-01-010 B D-01-023 A D-01-083 D-01-088 D-02-005 B D-02-012 D-02-019 D-02-022 B D-02-025 A D-03-012 B D-03-019 B D-03-025 A D-03-093 D-03-098 D-04-015 B D-04-022 B D-04-025 D-04-103 D-04-108 D-05-013 B D-05-015 B D-05-029 A D-05-113 D-05-118 D-06-008 D-06-010 B D-06-025 D-06-123 D-06-128 D-07-006 B D-07-010 B D-07-014 A D-07-133 D-07-138
Location 00-003 - WC 00-005 - WC Core 00-017 - BOH 00-016 - BOH 00-004 - Cleaners 00-004 - WC Core 00-006 - Corridor 01 01-031 Stair Lobby 01-003 - WC 01-004 - Cleaners 01-R18 - Cleaners 01-004 - WC Core 01-005 - WC Core 02-003 - WC 02-005 - WC Core 02-004 - WC Core 02-004 - Cleaners 02-007 - Cleaners 03-004 - Cleaners 03-003 - WC 03-007 - Cleaners 03-004 - WC Core 03-005 - WC Core 04-004 - Cleaners 04-003 - WC 04-007 - Cleaners 04-004 - WC Core 04-005 - WC Core 05-004 - Cleaners 05-003 - WC 05-007 - Cleaners 05-004 - WC Core 05-005 - WC Core 06-004 - Cleaners 06-003 - WC 06-007 - Cleaners 06-005 - WC Core 06-004 - WC Core 07-004 - Cleaners 07-003 - WC 07-007 - Cleaners 07-004 - WC Core 07-005 - WC Core
Door Description FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60
Thickness 54 54 44 44 44 54 54 54 54 44 54 54 54 54 54 54 44 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54
84 85 91 92 93 95 98 100 6 8 9 14 16 17 25 26 27 30 31 32 37 39 41 46 47 49 54 55 56 62 63 65 70 71 76 79
D-08-002 B D-08-004 B D-08-032 D-08-143 D-09-004 D-09-023 D-10-009 D-10-022 D-00-029 D-00-044 D-00-048 D-01-012 B D-01-029 A D-01-030 D-02-030 D-02-031 A D-02-032 A D-03-022 A D-03-023 A D-03-024 B D-04-022 A D-04-023 D-04-028 D-05-026 D-05-027 D-05-029 B D-06-019 B D-06-022 D-06-023 A D-07-011 D-07-012 A D-07-021 D-08-024 B D-08-029 A D-09-031 D-10-031
08-004 - Cleaners 08-003 - WC 08-010 - Cleaners 08-004 - WC Core 09-003 - WC 09-004 - Cleaners 10-004 - Cleaners 10-003 - WC M-00-005 - Stair Lobby 02 M-00-005 - WC Core M-00-031 - Stair Lobby M-1-005 - Stair Lobby 02 M-01-004 - WC Core M-01-005 - WC Core M-02-006 - Stair Lobby 02 M-02-004 WC Core M-02-005 - WC Core M-03-005 - WC Core M-03-004 - WC Core M-03-005 - Stair Lobby 02 M-04-005 - WC Core M-04-004 - WC Core M-04-005 - Stair Lobby 02 M-05-005 - WC Core M-05-004 - WC Core M-05-005 - Stair Lobby 02 M-06-005 - Stair Lobby 02 M-06-004 - WC Core M-06-005 - WC Core M-07-005 - WC Core M-07-004 - WC Core M-07-005 - Stair Lobby 02 M-08-005 - Stair Lobby 02 M-08-004 - WC Core M-09-005 - Stair Lobby 02 M-10-005 - Stair Lobby 02
FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S
44 54 54 54 54 44 44 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 44 54 54
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
Screw Position
Iron. Set Ref. Product Code 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008a 1621.70.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 008b 1621.80.BLK 009Ab 4nr 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK
008a 009Ab 008b 009Ab 009Ab 4nr 008a 008a 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Aa 009Ab 009Ab
1621.70.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.70.BLK 1621.70.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK
Cylinder Length 80 80 70 70 70 80 80 80 80 70 80 80 80 80 80 80 70 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80
70 80 80 80 80 70 70 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Description 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K
70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K GMK (General Master) Building A WC Core Entrances Building A Cleaners Cupboards Building A BOH Building B WC Core Entrances Building B Cleaners Cupboards Building B BOH Builing B Stair Lobby 02
LOCKING PLAN Cylinder Marking
Finish Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black
Cylinder Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Key Qty 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3
DOOR DETAIL Francis Hunter MCLH Acceptance Acceptance
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x x
x x
x
x
x
x x
x x
x x
x x
x
x x
x
x
x
x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x
x
x
x
x
x
Door No. D-00-003 D-00-004 D-00-006 D-00-008 D-00-025 D-00-042 D-00-052 D-00-064 D-01-007 B D-01-010 B D-01-023 A D-01-083 D-01-088 D-02-005 B D-02-012 D-02-019 D-02-022 B D-02-025 A D-03-012 B D-03-019 B D-03-025 A D-03-093 D-03-098 D-04-015 B D-04-022 B D-04-025 D-04-103 D-04-108 D-05-013 B D-05-015 B D-05-029 A D-05-113 D-05-118 D-06-008 D-06-010 B D-06-025 D-06-123 D-06-128 D-07-006 B D-07-010 B D-07-014 A D-07-133 D-07-138
Location 00-003 - WC 00-005 - WC Core 00-017 - BOH 00-016 - BOH 00-004 - Cleaners 00-004 - WC Core 00-006 - Corridor 01 01-031 Stair Lobby 01-003 - WC 01-004 - Cleaners 01-R18 - Cleaners 01-004 - WC Core 01-005 - WC Core 02-003 - WC 02-005 - WC Core 02-004 - WC Core 02-004 - Cleaners 02-007 - Cleaners 03-004 - Cleaners 03-003 - WC 03-007 - Cleaners 03-004 - WC Core 03-005 - WC Core 04-004 - Cleaners 04-003 - WC 04-007 - Cleaners 04-004 - WC Core 04-005 - WC Core 05-004 - Cleaners 05-003 - WC 05-007 - Cleaners 05-004 - WC Core 05-005 - WC Core 06-004 - Cleaners 06-003 - WC 06-007 - Cleaners 06-005 - WC Core 06-004 - WC Core 07-004 - Cleaners 07-003 - WC 07-007 - Cleaners 07-004 - WC Core 07-005 - WC Core
Door Description FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60
CYLINDER DETAIL Thickness 54 54 44 44 44 54 54 54 54 44 54 54 54 54 54 54 44 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54
Screw Position
Iron. Set Ref. Product Code 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008a 1621.70.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 008b 1621.80.BLK 009Ab 4nr 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK
Cylinder Length 80 80 70 70 70 80 80 80 80 70 80 80 80 80 80 80 70 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80
Description 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K
Builing B Stair Lobby 02
Building B BOH
Building B Cleaners Cupboards
Building B WC Core Entrances
LOCKING PLAN Cylinder Marking
Finish Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black
Cylinder Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Francis Hunter MCLH Acceptance Acceptance
Key Qty 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x x
x x
x
x
x
x
x
x x
x x
x x
x x
x
x
x x
x x
x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x x
x
x
x x
x
x x x x
x
x x
x
x x
x x
x x x x
x x
x
x
1 2 3 4 7 9 12 13 14 15 17 22 23 24 26 27 28 29 34 35 40 42 43 44 47 49 52 53 54 55 59 62 63 64 65 71 72 73 74 75 78 82 83
x
x x
Cylinder face (visible) Cylinder body (concealed)
Building A BOH
Project Honey (McLaughlin & Harvey Site) 3 St James' Road Kingston Upon Thames Surrey KT1 2BA
Authorised Signature to be registered (Tick Box) : Yes No Cylinder identify marking instructions (Tick Box) : Yes No Differ number to be marked on (Tick Box) :
Building A WC Core Entrances
Project Address :
GMK (General Master)
Project Name : Project Honey
Building A Cleaners Cupboards
Customer Address : 2 Epsom Downs
Metro Centre Tadworth Surrey KT20 5LR
Contact Name : Alex Money
Builing B Stair Lobby 02
Building B BOH
Building B Cleaners Cupboards
Cylinder face (visible) Cylinder body (concealed)
Building B WC Core Entrances
Project Honey (McLaughlin & Harvey Site) 3 St James' Road Kingston Upon Thames Surrey KT1 2BA
Building A BOH
Project Address :
Authorised Signature to be registered (Tick Box) : Yes No Cylinder identify marking instructions (Tick Box) : Yes No Differ number to be marked on (Tick Box) :
Building A WC Core Entrances
Project Name : Project Honey
DESCRIPTION
Contact Name : Alex Money
Building A Cleaners Cupboards
Name of Suite Owner : Swift Crafted Ltd
C03 CR EDC-SWI-ZXX001-ZZ-SH-X-3201
DESCRIPTION
Customer Address : 2 Epsom Downs
Metro Centre Tadworth Surrey KT20 5LR
GMK (General Master)
Name of Suite Owner : Swift Crafted Ltd
TIMBER DOOR - MASTER KEY SCHEDULE
C03 CR EDC-SWI-ZXX001-ZZ-SH-X-3201
Line No.
Revision: Status: Document No.
x x
x
x
x
x
x
x
55
Key Schedules 11.2 Electrical keys Building A Electrical keys Electrical Keys Fire Alarm Panel Refuge Alarm panel Disabled Alarm Distribution Board LV panel Castel lock Keys Generator Fuel tank Lighting control Data cabs ATS Smoke vent EVC PV Fire Alarm Panel key switch Refuge Alarm Panel key switch MSFD Panel key switch Building A GRP enclosure
Type
Quantity
Accessories
KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY
2 2 2 50 2 3 2 2 10 10 10 2 10 2 2 2 2 2
MCP key
Type
Quantity
MCCP ASHP AHU Sprinkler Trace Heating
KEY KEY KEY KEY KEY
4 6 4 4 2
Accessories
Type
Quantity
Accessories
KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY
2 2 2 50 2 3 N/A N/A 10 10 10 2 10 2
MCP key
Francis Hunter Acceptance
Electrical Keys Fire Alarm Panel Refuge Alarm panel Disabled Alarm Distribution Board LV panel Castel lock Keys Generator Fuel tank Lighting control Data cabs ATS Smoke vent EVC PV Fire Alarm Panel key switch Refuge Alarm Panel key switch MSFD Panel key switch Building A GRP enclosure
Type
Quantity
Accessories
KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY
2 2 2 50 2 3 2 2 10 10 10 2 10 2
MCP key
KEY
2
KEY
2
KEY
2
KEY
2
KEY
2
KEY
2
KEY
2
KEY
2
Type
Quantity
KEY KEY KEY KEY KEY KEY
4 6 4 4 2 2
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
MCLH Acceptance
Francis Hunter Acceptance
Mechanical Keys MCCP ASHP AHU Sprinkler Trace Heating Rain water harvesting
Type
Quantity
KEY KEY KEY KEY KEY KEY
4 6 4 N/A 2 2
Item
Flood Barriers Manhole Keys Mansafe PPE (Harness, Lanyard, Transfastener) Portable Davit Arms Davit Arm Accessories Rail Travellers Davit Storage Boxes New Haden Pump Key
Accessories
MCLH Acceptance
MCLH Acceptance
Francis Hunter Acceptance
Accessories
Quantity
All Areas Free Issued Material Item
Mirror Tiles Wall Grab Rails (620mm) Pull Down Rail Paper Towel Dispenser Doc M Shelf Loose Sanitary Bin Wall Hooks Doc M Sink Doc M Pan Sink Plub and trap Downlights Linear Light Fittings Drapes Drapes MVHR
MCP key
All Areas Equipment
MCP key
Building B Mechanical Keys Mechanical Keys MCCP ASHP AHU Sprinkler Trace Heating Sprinkler Tank
MCLH Acceptance
Building C Electrical keys
Building C Mechanical Keys
Building B Electrical keys Electrical Keys Fire Alarm Panel Refuge Alarm panel Disabled Alarm Distribution Board LV panel Castel lock Keys Generator Fuel tank Lighting control Data cabs ATS Smoke vent panel EVC PV Fire Alarm Panel key switch Refuge Alarm Panel key switch MSFD Panel key switch Building A GRP enclosure
Francis Hunter Acceptance
MCP key
Building A Mechanical Keys Mechanical Keys
MCLH Acceptance
MCLH Acceptance
Francis Hunter Acceptance
MCLH Acceptance
Francis Hunter Acceptance
Quantity
Area
1 20 boxes 3 1 1 1 1 2 1 1 1 3 TBC 4 5 1
Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC CAT A Areas L01, L02, L03, L04 L01, L02, L03, L04, L07 A
MCLH Acceptance
Francis Hunter Acceptance
TBC 2 5 4 6 2 1
Francis Hunter Acceptance
56
12
COMPLETION PHOTOS
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
57
Completion photos
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
58
Completion photos
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
59
Completion photos
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
60
Completion photos 12.1 Site wide - Building A
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
61
Completion photos 12.2 Building B
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
62
Completion photos 12.3 Building B
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
63
Completion photos 12.4 Building B
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
64
Completion photos 12.5 Building A
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
65
Completion photos 12.6 Building A
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
66
Completion photos 12.7 Building A
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
67
Completion photos 12.8 Building A
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
68
Completion photos 12.9 Building C
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
69
Completion photos 12.10 Building C
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
70
Completion photos 12.11 Building C
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
71
Completion photos 12.12 Building C
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
72
Completion photos
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
73
Eden Campus, Kingston Upon Thames KT1 Practical Completion document
74
appendix a Final Certificate Letter – Buildings A, B and C
FH090-151015
David Lunt Francis Hunter Limited 21a Kingly Street London W1B 5QA
Sweco Building Control Limited Eldon House 2 - 3 Eldon Street (Gated entrance via Wilson Street) London, EC2M 7LS +44 2030 021 210
5 December 2024 Project Reference: 66101102
New mixed use development, Project Honey, Surrey House, Kingston upon Thames, London, KT1 Dear David We refer to the above project and confirm that part of the works relating to the Initial Notice comply with the Building Regulations. We enclose a copy of our Final Certificate for Buildings A and B (Office) and Building C (Multistorey Car Park) and advise that we have also forwarded the same to the Local Authority Building Control and the Fire Authority in accordance with the Regulations. Please do not hesitate to contact us should you require any further information or if we can be of help in any other way. Yours sincerely
Gregory Kypri Class 3G/H - Specialist Building Inspector Registration Number: RBCP03881C5R +44 2030 021 210 +44 7824 140 350 gregory.kypri@sweco.co.uk Enclosed
Reg. Office Address: Sweco Building Control Limited, Grove House, Mansion Gate Drive, Leeds, LS7 4DN +44 113 262 0000 | info@sweco.co.uk | www.sweco.co.uk Sweco Building Control Limited, a company incorporated in England & Wales (Reg. No.: 02891295)
appendix b Mecserve Validation Report
FH090-151015
02nd December 2024 Project Honey Kingston Unilever Campus
Dear David, PC COMPLETION – PROJECT COMPLETION BUILDINGS A, B AND C We hereby confirm, exercising the standard of reasonable skill and care required by our Appointment (“the Appointment”) and subject to the terms and conditions of the Appointment, that the MINIMUM DESIGN CRITERIA Rev 03 dated 26/11/20 ,’Minimum Acceptable Standards’ have been met across buildings A, B and C of the Unilever Campus, Kingston. Mecserve is satisfied the commissioning has been satisfactorily completed to building A, B and C in accordance with the approved commissioning plan. Evidence has been collated for each item to show compliance.
Yours sincerely
Peter Kirk Director On behalf of Mecserve Enclosed – Minimum Design Criteria Rev 03 (26/11/2020)
appendix c DAA Statement of Practical Completion
FH090-151015
appendix d MNP Statement of Practical Completion
FH090-151015
Our Ref:
SV/lb/220051.c.A01
27th November 2024 Mr David Lunt Francis Hunter Ltd 115 Southwark St, London SE1 0JF By email <david.lunt@francishunter.co.uk>
Dear David, PROJECT HONEY (EDEN CAMPUS) - CLIENT MONITORING ROLE – BLOCK A COMPLETION Mason Navarro Pledge has been commissioned to provide a Civil and Structural Engineering Client Monitoring Role (CMR) in connection with the above project. Our scope of services was defined in our fee letter reference SV/lb/220055.c.01 dated 15th November 2021 and our project Appointment. Building A is at a point of Practical Completion. We confirm that our monitoring role is complete and that we have no outstanding comments to be addressed before Practical Completion can be accepted. Buildings B and C will be covered by separate statements of completion. Yours Sincerely,
STEPHEN VERNON For Mason Navarro Pledge Ltd
Our Ref:
SV/lb/220051.c.B01
14th November 2024 Mr David Lunt Francis Hunter Ltd 115 Southwark St, London SE1 0JF By email <david.lunt@francishunter.co.uk>
Dear David, PROJECT HONEY (EDEN CAMPUS) - CLIENT MONITORING ROLE – BLOCK B COMPLETION Mason Navarro Pledge has been commissioned to provide a Civil and Structural Engineering Client Monitoring Role (CMR) in connection with the above project. Our scope of services was defined in our fee letter reference SV/lb/220055.c.01 dated 15th November 2021 and our project Appointment. Building B is at a point of Practical Completion. We confirm that our monitoring role is complete and that we have no outstanding comments to be addressed before Practical Completion can be accepted. Buildings A and C will be covered by separate statements of completion. Yours Sincerely,
STEPHEN VERNON For Mason Navarro Pledge Ltd
Our Ref:
SV/lb/220051.c.C01
28th November 2024 Mr David Lunt Francis Hunter Ltd 115 Southwark St, London SE1 0JF By email <david.lunt@francishunter.co.uk>
Dear David, PROJECT HONEY (EDEN CAMPUS) - CLIENT MONITORING ROLE – BLOCK C COMPLETION Mason Navarro Pledge has been commissioned to provide a Civil and Structural Engineering Client Monitoring Role (CMR) in connection with the above project. Our scope of services was defined in our fee letter reference SV/lb/220055.c.01 dated 15th November 2021 and our project Appointment. Block C is an open sided car park structure that is designed to accommodate rain water ingress through the open facade. Surface water within the car park is managed through a series of cross falls on car park slabs to internal channels, which discharge to the below ground drainage network. During construction, rain water became trapped in the hollow precast floor units and has been seeping out as the structure dries. The majority of the structure is now complete dry but in some limited and local areas, water seepage is still active at the point of Practical Completion. Water trapped within the structure is unmanaged and could be from construction or could be associated with live water ingress through the façade. To enact PC, the contractor shall agree to monitor water seepage until such a time that the structure is free of unmanaged water. During this period, the contractor shall put in place measures to prevent water seepage damaging vehicles within the car park. Water damage to surfaces or fittings during the period of monitoring shall be repaired at the contractor’s cost. Buildings A and B will be covered by separate statements of completion. Yours Sincerely,
STEPHEN VERNON For Mason Navarro Pledge Ltd
appendix e Aecom Statement of Practical Completion
FH090-151015
AECOM Limited Aldgate Tower 2 Leman Street London E1 8FA United Kingdom aecom.com
Our Ref: 60627560/dte/r2
Date: 06/12/24
GLOBE KINGSTON LIMITED NFU Mutual Tiddington Road, Stratford upon Avon, Warwickshire CV37 7BJ
Dear Employer Surrey House Island Site, Kingston on Thames, Surrey - Building A&C Notwithstanding anything to the contrary contained in this letter, this statement is prepared for AECOM Limited’s (“AECOM”) client, Globe Kingston Limited (the “Employer”), and is subject to the terms of AECOM’s appointment with that Employer dated 14th January 2022 (the Appointment) in relation to services performed at the project limited to the Surrey House Island Site, Kingston on Thames, Surrey – Building A&C and AECOM shall not be construed as owing any greater duty or obligation than the exercise of reasonable skill and care in accordance with the Appointment. In carrying out our Services using reasonable and care in accordance terms of Appointment AECOM has, undertaken inspections and, confirm that the works are in accordance with the project requirements (Employer’s Requirements/Contractor’s Proposal) for the Surrey House Island Site, Kingston on Thames, Surrey – Building A&C, (in so far as such requirements have been provided to AECOM), and with due professional regard to the approved plans and building control compliance (if any) so as to enable practical completion of Building A&C. We have prepared and provided to the Employer Agent our list of outstanding items and snags as stated with the following documents below; -
Completion Key Issues_Bldg A_C Project Honey – Building A Snag Report 05.12.24 Project Honey – Building C Snag Report 05.12.24 Project Honey – External Works Snag Report 05.12.24 Project Honey – Facade Snag Report 05.12.24
Yours sincerely
David Emerson Regional Director AECOM Limited T: M:07803 599698 E: david.emerson@aecom.com Encs
Completion Key Issues_Bldg A_C Via link Project Honey – Building A Snag Report 05.12.24 Project Honey – Building C Snag Report 05.12.24 Project Honey – External Works Snag Report 05.12.24 Project Honey – Facade Snag Report 05.12.24
AECOM Limited registered in England & Wales, Company number 1846493. Aldgate Tower, 2 Leman Street, London, E1 8FA aecom.com
1/1
Project Honey - Kingston Practical Completion – Key issues
60627560/dte 06/12/24
Building A&C 1.
Walkround 29/11/24 a. General valve tags to be fitted throughout b. External wireways in courtyard to be cut back to ground level c. A number of illuminated exit signs missing from car park exit doors to stairs & final exit d. MCLH ongoing water quality management & testing of sealed mech LTHW/CHW systems until BSRIA BG 29/2021 compliance achieved e. Clear all rubbish off site f. Protection to Bldg C lobby plastic smoke vent louvres
2. 3.
O&M manuals to be updated from draft Issues from Cause & Effect 28/11/24 Any remedial works to equipment to resolve C&E demo should be annotated on final test certificates
a.
During L8/9 tests - EVAC lift door sticking on GF. OTIS removed from service until resolved.
b.
Fire and Refuge panels not networked with main reception/fireman entrance panels.
c.
L6 link bridge fire curtain not operational at time of witness (supplied/controlled from building A)
Lifts Building A – 1.
Block A L1 – 78N14B709 – Note suggesting that this is not the original DoC. Suggest that Otis confirm when the tests were undertaken that align with this certificate. This is dated now but should be stated when put into use in July as that would be when the tests as statement as to compliance were on the test sheet, or were they repeated. Whilst we have a DoC for PC the lift can only have one DoC issued and this should be the one from July 2024, not a reissued one.
2.
Block A Lift 7 – Is an evacuation Lift but indicated as compliant with EN81-72, as opposed to BS9999 Annex G. They are not the same Code. This lift has evacuation intercoms adjacent to it. Otis to clarify.
\\na.aecomnet.com\lfs\EMEA\London-UKLON06\Legacy\UKLON06PFPSW001\UFI\Jobs\PR469433_Project_Honey\300_Communications\310_Client\Completion Key Issues_Bldg A_C.docx
\\na.aecomnet.com\lfs\EMEA\London-UKLON06\Legacy\UKLON06PFPSW001\UFI\Jobs\PR469433_Project_Honey\300_Communications\310_Client\Completion Key Issues_Bldg A_C.docx
AECOM Limited Aldgate Tower 2 Leman Street London E1 8FA United Kingdom aecom.com
Our Ref: 60627560/dte/r1
Date: 11/11/24
GLOBE KINGSTON LIMITED NFU Mutual Tiddington Road, Stratford upon Avon, Warwickshire CV37 7BJ
Dear Employer Surrey House Island Site, Kingston on Thames, Surrey - Building B Notwithstanding anything to the contrary contained in this letter, this statement is prepared for AECOM Limited’s (“AECOM”) client, Globe Kingston Limited (the “Employer”), and is subject to the terms of AECOM’s appointment with that Employer dated 14th January 2022 (the Appointment) in relation to services performed at the project limited to the Surrey House Island Site, Kingston on Thames, Surrey – Building B and AECOM shall not be construed as owing any greater duty or obligation than the exercise of reasonable skill and care in accordance with the Appointment. In carrying out our Services using reasonable and care in accordance terms of Appointment AECOM has, undertaken inspections and, confirm that the works are in accordance with the project requirements (Employer’s Requirements/Contractor’s Proposal) for the Surrey House Island Site, Kingston on Thames, Surrey – Building B, (in so far as such requirements have been provided to AECOM), and with due professional regard to the approved plans and building control compliance (if any) so as to enable sectional completion of Building B. We have prepared and provided to the Employer Agent our list of outstanding items and snags as stated with the following documents below; -
Completion key issue Bldg B_final Project Honey – Building B Snag Report 05.12.24
Yours sincerely
David Emerson Regional Director AECOM Limited T: M:07803 599698 E: david.emerson@aecom.com Encs
-
Completion key issue Bldg B_final Project Honey – Building B Snag Report 05.12.24 (by link)
AECOM Limited registered in England & Wales, Company number 1846493. Aldgate Tower, 2 Leman Street, London, E1 8FA aecom.com
1/1
Project Honey - Kingston Sectional Completion – Key issues
60627560/dte 11/11/24
Building B 1.
MCLH ongoing water quality management & testing of sealed mech LTHW/CHW systems until BSRIA BG 29/2021 compliance achieved
2.
O&M manuals to be updated from draft in period allocated
\\na.aecomnet.com\lfs\EMEA\London-UKLON06\Legacy\UKLON06PFPSW001\UFI\Jobs\PR469433_Project_Honey\300_Communications\310_Client\Completion Key Issues_Bldg B_final.docx
appendix f EOC Statement of Practical Completion
FH090-151015
David Lunt Francis Hunter 3rd Floor, 115 Southwark Street, London SE1 0JF
20215/PC-1-1 Date:06/12/2024
Dear David, Surrey House Island Site, Kingston on Thames – EOC Statement of Completion In carrying out our services following the scope of our terms of appointment as facade engineers, we have made periodic site visits to review the progress and quality of the works and commented on the compliance of the Contractors’ Proposals against the Employer’s Requirements. Insofar as the information we have received, the facade site water testing was conducted in accordance with the CWCT standard and the project performance specification We confirm that to the best of our knowledge, as far as we could reasonably review on site, and notwithstanding the Project Honey – Façade Snag Report dated 05/12/2024 and review of O&M manual, the works have been undertaken in accordance with the facade ERs, or to agreed divergences from the facade ERs, and have been completed to reasonable general standard. On this basis, in so far as we have been able to ascertain, we have not adverse comment to the issue of Practical Completion Certificate. Yours sincerely,
Kevin Yin Façade Technical Director
appendix g ACS Technical Audit Remediation Tracker
FH090-151015
TECHNICAL AUDIT REMEDIATION TRACKER Buildzone Ref BZ9084931 Number: Address: Project Honey Eden Street Kingston KT1 1ER Surveyor:
Ahmet Ozcagli
Key:
Urgent Remediation Informative Remediation Resolved
No.
Remediation 1.00
Observations / Remediation / Comments
1.01
Client is advised to provide below information for works before site visit: •Provide images of works before visit including pile caps, foundations before concrete pour, floor slab before concrete pour, Core twin wall installations •Provide pile integrity tests certificates. •Provide pre-pour QA inspection records for foundations, slabs, columns and core wall installations.
1.02
Provide images of drainage works before backfilling.
1.05
Provide structural engineer’s solution or approval for the low concrete coverage for steel over precast slab at Block A ground floor.
1.07
Provide structural engineer’s solution or approval for the low concrete coverage for steel over precast slab at Block B ground floor.
1.08
Provide structural engineer’s solution or approval for the low concrete coverage for steel over precast slab at Block C ground floor.
1.11
For Block B, provide structural engineer’s written approval of fire door opening core wall cutting works.
1.13
Provide repair method statement and images of repairs at Block C precast elements. Method statement provided. Repairs observed on site. Provide images of Block C car park floors before concrete pours.
1.14 1.17
Client is advised to provide repair methodology of repair applications to floor concrete at Block C roof level.
1.18
Client is advised to provide repair methodology of repair applications to floor concrete at Block C 1st level.
1.20
Provide waterproofing leak tests for Block A.
1.21
Provide waterproofing leak tests for Block B.
1.23
Provide waterproofing leak tests for Block C.
1.32
Block A level 8 moisture damaged plasterboard observed. Client is advised to provide images of changed plasterboards.
1.35 1.36
Provide images of completed façade cladding works at Block B ground floor.
Observed on site
Block B level 10 terrace parapet capping works ongoing at he time of inspection. Client is advised to provide images of completed parapets.
Approved Consultant Services
Inspections Required: 27 (Twentyseven) Inspection No: 23 of 27 Date of Inspection: 22.11.2024 Updated: 03.12.2024 LP
Current Status
2.05 Duplicate 2.01 Duplicate
2.00
Technical Submissions
2.01
Pre-pour QA inspection reports
2.02
Building control inspection records
2.03
Full RIBA Stage 5 Architectural Drawings
2.04
Full RIBA Stage 5 Structural Drawings and Calcs
2.05
Pile integrity test results
2.06
Cube test results
2.07
Heat soak and impact test glass specifications
2.08
Terrace and flat roof IBG
2.09
List of full cladding materials proposed
2.10
Windows & external door manufacture guarantees
2.11
Provide QA records for precast elements from manufacturer
3.00
Other matters arising (at time of inspection)
3.01
Provide all statutory and certification documentation at project completion inline with technical reporting
Bauder Guarantee for all blocks provided.
Fire consultant QA records Bolt checking QA records Basement waterproofing QA records Weld test certs Static load test certs BBA certification for any rainscreen cladding or brick slips Building Control Completion Cert(s) EPC Mechanical Ventilation certification Chlorination certs Gas/water/elec certs No Gas Fire door compliance commissioning Fire suppression, alarm commissioning Sound tests Air tests Lift Commissioning Drainage pressure testing (written confirmation from AI) & or CCTV
Approved Consultant Services
BZSS to review
N/A
appendix h Chartplan Planning Conditions Tracker
FH090-151015
Detail Planning Application No: 22/02905/FUL – Consented 11/01/2023 Updated 29/11/2024 Surrey House, 34 Eden Street NCP Car Park, St James Road Former Hippodrome, Eden Street And Bo Concept, The Roundhouse 20 Eden Street PROPOSAL: Application under S73 of the Town & Country Planning Act 1990 to carry out development without compliance with condition 1 (Approved plans) of planning permission ref: 21/04022/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02495/FUL (Full Planning application for the demolition of Surrey House, Multi Storey Car Park, Hippodrome and Bo Concept and the erection of 2 (two) Office buildings [Use Class - E(g)(i)] Building A and Building B: Building A 9 storeys (22,144 (GEA) sqms) Building B 11 storeys (11,587 (GEA) sqms). The erection of a replacement multi storey car park of 354 spaces plus cycle parking (for use as a public car park at weekends) landscaping, public realm upgrades, servicing, pedestrian and vehicular access) dated 02/12/2021. Variations to include alterations to bridge link, elevations, floorplates, ground floor level access, rooftop plant and screen, service yard, reduction to height of Buildings A and B, alterations to landscaping/public realm, removal of basements and stairs on sides of Building A. T This application is accompanied by an Environmental Statement. Taking into account the Environmental Information contained within the Environmental Statement and addenda thereto, which was submitted under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 and subject to a ‘Legal Agreement’, PERMIT subject to the following conditions: This application is accompanied by an Environmental Statement. BRIEF OUTLINE OF CONDITIONS (See Notice of Decision of Planning Application 22/02905/FUL for Full Specification) 1
The approved development shall be carried out in accordance with the following drawings/details: (See consent for full list of drawings)
TIME LINE SENSITIVITY Informative
TO BE ACTIONE D BY
APPLICATION SUBMISSION
PROGRESS Response to questions posed by fund
NMA App deposited re cladding deposited and validated 27/04/23
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
APPROVAL DATE
Ref: 23/01117/NMA Consented 25/05/23 NMA Re Spandrel changes Deposited 09/08/23 Ref: 23/02182/NMA Validated 09/08/23 Consented 07/09/23 Louvre NMA App deposited validated 03/01/24 Ref: 24/00017/NMA Consented 23/04/24 2
3
Informative The development hereby permitted shall begin before the nd nd expiration of three years from 2 December 2021 (2 December 2024) . The development shall be completed in accordance with samples above for all facing materials including fenestration and boundary Pre treatments (gates, fences / walls, other) including details of ground works manufacturing specification which shall be submitted to and condition approved in writing by the Local Planning Authority before above ground works on site are commenced. The development shall then be built in accordance with these approved samples and completed prior to occupation.
MCLH
11th 2022
November
Validation details 22/03576/CLC NMA Deposited re Facing Material amendments Deposited 25/09/23 Validated 27/09/23 23/02623/NMA Consented 23/04/24
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 30/01/23 22/03576/CLC
1 4
5
6
Notwithstanding the details shown on the approved plans additional architectural detailing plans at scale 1:10/ 1:5 showing all openings and key elements of the building / landscape (windows, doors, facade glazing, fins and parapets, spandrel panels, entrance and associated publicly visible features, signage, lighting in publicly accessible areas, vents / intakes / exhausts, grilles / louvres, rooftop plant, other elevational features shall be submitted to and approved in writing by the Local Planning Authority before the relevant element is commenced on site. The development shall be constructed in accordance with the approved details. Prior to any occupation an updated full and detailed landscape and planting plan, including details of additional tree planting on Brook Street shall have been submitted to and approved in writing by the local planning authority. The Strategy shall include the details of the 6 trees to be planted in Brook Street along with the proposed locations and details of the tree pits and tree grilles. The Trees planted on Brook Street shall comprise of 3no. Fastigiate Hornbeam (Carpinus betulus ‘Fastigiata’) planted at a minimum of 550cm tall with a minimum single clear stem of 200cm and a girth of 30-35cm, and 3no. Fastigiate Hornbeam (Pyrus calleryana ‘Chanticleer’) planted at a minimum of 450cm tall with a minimum single clear stem of 200cm and a girth of 25-30cm. The Strategy shall be implemented within the first planting season following completion of the development and the landscape and planting shall thereafter be maintained for five years to the satisfaction of the Local Planning Authority. Any trees or planting that die during this period shall be replaced during the following planting season, and the areas shown to be landscaped shall be permanently retained for that purpose. No above ground development shall take place until details of all external lighting have been submitted to and approved in writing by the Local Planning Authority. The external lighting shall be installed in accordance with the approved details and thereby retained as such unless a variation is subsequently submitted to and approved in writing by the Local Planning Authority.
Pre development condition, relevant to each section
MCLH
Application deposited 15/08/23 Ref: 23/02245/CLC Validated 22/08/23
Consented 10/10/23
Pre-occupation condition
MCLH
Application deposited 11/06/24 Ref: 24/01446/CLC
Consented 06/08/24
Pre above groundworks condition
MCLH
Application deposited 31/10/22 Validated Ref: 22/03480/CLC
Consented 23/01/23
Pre above ground development
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
22/03480/CLC
7
Notwithstanding the provisions of the Town and Country Planning Informative (General Permitted Development) (England) Order 2015 (or any Order revoking or re-enacting this Order) No fans, louvres, ducts, external lighting or other external plant other than those shown on the drawings hereby approved shall be installed without the prior written approval of the Local Planning Authority.
8
All works on site shall take place in accordance with the details approved pursuant to 22/00273/CLC (Details of Demolition and Construction Environmental Management Plan)
9
10
11
Informative The development shall be carried out in accordance with details approved by 22/00759/CLC (Levels). The development shall be carried out in accordance with details approved under 22/00371/CLC pursuant to Condition 10 (Site Waste Management Plan). Within 6 months of above ground works a Public Realm Management Plan, including measures to minimise any adverse microclimatic impacts of the development have been submitted to and approved in writing by the Local Planning Authority. Prior to the beneficial occupation of the development hereby approved the hard and soft landscaping shall be fully implemented and made available for all residents and thereafter maintained for the lifetime of the development.
12
13
Informative
Informative
Within 6 months of commenceme nt of above ground works
MCLH
Application deposited 10/05/24 Ref 24/01192/CLC Decision due 05/07/24
Consented 28/10/24
by
Informative The development hereby permitted shall be carried out in accordance with the approved Transport Statement. Prior to the commencement of any development above ground level, details of secure cycle parking facilities to serve the development to which this permission relates shall be submitted to and approved in writing by the local planning authority. The cycle parking facilities as shown in the approved details shall be provided prior to beneficial occupation of the development to
Pre development condition (above ground)
MCLH
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 30/01/23 Ref: 22/03841/CLC
which this permission relates and shall be permanently retained for that purpose and kept free from obstruction thereafter. 14
15
The hard surfaces hereby approved shall be made of porous materials and retained thereafter or provision shall be made and retained thereafter to direct run-off water from the hard surface to a permeable or porous area or surface within the /curtilage of the property. The revised energy strategy as approved by 22/00683/CLC on 3rd January 2023 shall be implemented throughout the development of the site.
16
Informative
Informative
Informative Any flat roofed area that is not identified as communal or private amenity space or roof terrace shall not be converted or used as a balcony or sitting out area, and no access shall be gained except for maintenance purposes.
17 A public art and way-finding strategy should be submitted to the local planning authority for approval prior to commencement of above ground works. The public art and wayfinding strategy shall identify proposed public art and way-finding works to be installed as part of the detailed landscaping strategy. The Strategy shall detail the mechanism for selecting the public art and way-finding works and the maintenance and management of the art works. The works of art shall be installed prior to the beneficial use of the car park or in accordance with the timeframe set out in the public art and wayfinding strategy and thereafter retained in accordance with the agreed maintenance and management plan. 18
Prior to the occupation of the development hereby approved, details of the works relating to highway works required in connection with the proposed bus stop and bus stand, including any relocation of services and pedestrian crossings, shall be submitted to and approved by the Local Planning Authority or by the Council as Highway Authority pursuant to Section 278 of the Highways Act 1980, and carried out in accordance with the approved details. Such details shall include the agreement of levels and construction details.
Pre above groundworks condition
MCLH
Consented 21/03/23 Ref:
22/03873/C LC
Pre occupation condition
MCLH
Application deposited 23/05/24 Ref: 24/01313/CLC Decision due: 18/07/24
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
DOC Consented 05/09/24
19
All works are to be to the Council's adoptable highway standards and shall include any associated drainage works, lighting improvements, landscaping, street furniture, road markings, signage, traffic orders, and any necessary alterations to statutory undertakers equipment. Any widening to the public footways shall be retained permanently available for pedestrian circulation and the widened areas dedicated as highway pursuant to the Highways Act 1980. The development shall be carried out in accordance with the details approved on 25.02.2022 Reference 22/02595/CLC (Written Scheme of Investigation WSI - Archaeology). No development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works. If heritage assets of archaeological interest are identified by stage 1 then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/ development shall take place other than in accordance with the agreed stage 2 WSI which shall include: A. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works; B. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI.
20
NMA to change wording to ‘within 12 months of occupation’.
Pre demolition condition
NMA application deposited 28/06/24 Ref: 24/01621/NMA
FHPM/Ch art Plan
Awaiting imminent response to the signing off of the various matters regarding this condition through an NMA, to include transport welfare facilities.
Decision due by 26/07/24
DOC app deposited 31.12.21 App validated 05/01/22 Ref: 21/04117/CLC
Consented 25/02/22
Additional Archaeology report submitted to LPA, validated 10/08/22 Ref: 22/02595/CLC
Consented 23/09/22
Application deposited 17/06/24 Ref:
Consented 21/08/24
Informative The servicing of commercial unit(s) hereby permitted shall only take place between 0700 and 2000 on any day, including Sundays and Bank Holidays.
21
Prior to occupation a Pedestrian Environment Review Study (PERS), considering the ten Healthy Streets indicators, as set out in the Mayor’s Transport Strategy, 2018 shall be submitted to and agreed in writing by the Local Planning Authority, the findings of which shall be implemented in accordance with timeframes
Pre occupation condition
Milestone
24/01511/CLC
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
agreed with the Local Planning Authority and thereafter permanently retained. 22
Decision 12/08/24
Prior to the occupation of the office, details as to how the approved Pre occupation development has been designed to connect to a future District condition Heating Network in the surrounding area and provision for the development’s connection shall be submitted to and agreed in writing by the Local Planning Authority and thereafter permanently retained.
23
The development shall be carried out in accordance with details Informative approved pursuant to 22/00463/CLC in relation to Condition 23 (Ecological Management Plan)
24
Prior to the occupation of development a Delivery and Servicing Management Plan shall be submitted to and approved in writing by the Local Planning Authority.
Pre occupation condition
The rating level of the noise determined by the cumulative sound emissions of the plant hereby permitted shall be at least 5dBA lower than the existing background noise level at any given time of operation. The noise levels shall be measured or predicted 1m externally to any window at the nearest residential facade. Measurements and assessment shall be made according to British Standard 4142:2014. The site and building works required to implement the development shall be only carried out between the hours of 08.00 and 18.00 Mondays to Fridays and between 08.00 and 13.00 on Saturdays and not at all on Bank Holidays and Sundays. The demolition secured through demolition PD Consent 20/02696/PRA and construction works shall be implemented in
Informative
25
26
27
MCLH
Application deposited and validated 23/11/23 Ref: 23/03103/CLC Decision 16.01.24
Chart Plan/Unilv er/MIlest one
due
due
Consented 08/11/24
by
Application deposited 17/06/24 Ref: 24/01510/CLC Decision due: 12/08/24
Informative
Informative
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 11/09/24
accordance with details approved pursuant to Condition 27 (Section 61 of Control of Pollution Act 1974). 28
29
30
31
32
33
34
The Development shall be carried out in accordance with the details approved on 08.03.2022 Reference 22/00411/CLC (Air Quality Technical Note Technical Note J13011 F1) All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA’s supplementary planning guidance “Control of Dust and Emissions During Construction and Demolition” dated July 2014 (SPG), or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not, without the prior written consent of the local planning authority. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register. Prior to commencement of above ground works on the development hereby permitted, a Damage Cost Assessment in line with the requirements of the GLA Sustainable Design and Construction Practice must be submitted to and approved in writing by the local authority. The development shall be implemented in accordance with the Fire Statement approved under 22/00557/CLC and retained as such for the lifetime of the development. The development shall be carried out in accordance with details approved by 22/03872/CLC on 5th January 2023 regarding the exhaust point to ensure the health and safety of residents nearby. The Development shall be carried out in accordance with the details approved 11.03.2022 Reference 22/00359/CLC (Contamination Ground Investigation Report).
Informative
Should remedial works be required in relation to contaminated land, the remedial strategy shall be submitted to and agreed in writing by the Local Planning Authority, prior to the commencement of the development works and remedial works.
Informative Remedial works condition
Informative
Pre above ground works condition
AQ Consultan ts / Chart Plan
App deposited 25/10/22 PP-11645457 Validated Ref: . 22/03432/CLC
Informative
Informative
Informative
-
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 23/01/23 22/03432/CLC
35
36
On completion of the agreed remedial works, a closure report and certificate of compliance endorsed by the interested party/parties, shall be submitted to and agreed in writing by the Local Planning Authority, prior to the occupation of the site by end users. If during implementation of this development, contamination is encountered which has not previously been identified, the additional contamination shall be fully assessed and a specific contaminated land assessment and associated remedial strategy shall be submitted to and agreed in writing by the Local Planning Authority before the additional remediation works are carried out. The agreed strategy shall be implemented in full prior to completion of the development hereby approved. Prior to commencement of groundworks (excluding site investigations and demolition), a final detailed drainage design, including drawings, supporting calculations, SuDS Statement and Drainage Assessment Form shall be submitted to and approved in writing by the local planning authority. A detailed management plan confirming routine maintenance tasks for all drainage components must also be submitted to demonstrate how the drainage system is to be maintained for the lifetime of the development. The system shall be implemented and thereafter managed and maintained in accordance with the approved details
Informative Contamination condition
Pre above groundworks condition
MCLH
Application deposited and validated 22/09/22 Ref: 22/03000/CLC
37
No building hereby permitted shall be occupied until evidence Pre occupation (photographs and installation contracts) is submitted to condition demonstrate that the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components
MCLH
Application deposited 25/07/24 Validated 30/07/24 24/01842/CLC Decision due by 19/09/24
38
Within 6 months of the commencement of any development above ground level, details of waste and recycling facilities to serve the development to which this permission relates shall be submitted to and approved in writing by the local planning authority.
Within 6 months of commencemen t of above groundworks condition
MCLH
Application deposited with LPA 07/08/23 Ref:
Consented 09/05/23
As part of the consultation process questions have been raised by the project engineer and circulated for their sign off on the 27th November. Planning authority and engineer now being chased.
23/02158/CLC Validated 09/08/23
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 11/10/23
39
The development (including any works of demolition) shall be carried out in accordance with details approved under 22/00306/CLC (Arboricultural Report and Drawings).
Informative
40
The approved protection scheme (Condition 39) shall be implemented prior to commencement of any work on site including demolition, and be maintained to the reasonable satisfaction of the Local Planning Authority until the completion of the development or until such stage as detailed within the approved AMS.
Informative
41
The development shall be carried out in accordance with the submitted Flood Risk Assessment (FRA) by Cole Easdon Consultants Limited (dated November 2022; issue no. 2; job no. 8922) and the Design Note by Robert Bird Group titled ‘Flood Volume Attenuation Strategy Clarifications – Updated MSCP’ (dated 02/09/2022; project no. 4881; document no. 4881-RBG-ZZ-XX-DN-CV-87002, issue 02) and the following mitigation measures it details:
Informative
To be provided by the applicable consultant referencing the criteria referred to in the condition.
Finished floor levels shall be set no lower than 8.8mAOD for more vulnerable residential uses • Finished floor levels shall be set no lower than 8.4mAOD for less vulnerable commercial uses • Finished floor levels shall be set no lower than 7.9mAOD for the commercial reception area • Flood storage mitigation shall be provided • Flood voids shall be installed These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme’s timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 42
The development shall be carried out in accordance with the submitted Interim Flood Storage Scheme detailed within the letter from MNP to the Environment Agency (SV/ib/220051-04; dated 15
Informative
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
February 2021), with the location of the temporary storage amended in the Design Note by Robert Bird Group titled ‘Flood Volume Attenuation Strategy Clarifications – Updated MSCP’ (dated 02/09/2022; project no. 4881; document no. 4881-RBG-ZZXX-DN-CV-87002, issue 02). The car park ramp tank will be implemented at the trigger points specified and remain in perpetuity until the demolition of Lever House is complete. 43
Prior to occupation, a maintenance plan to manage the flood voids and grilles over the lifetime of the development will be submitted to, and approved in writing by, the local planning authority in consultation with the Environment Agency. The Plan should cover general maintenance and inspection as well as maintenance after a flood event. The approved management plan will then be implemented in full throughout the lifetime of the development.
Pre occupation condition
MCLH
44
Prior to occupation, a scheme detailing the flood resistance measures must be submitted to, and approved in writing by, the local planning authority with guidance from the Environment Agency. The scheme should include details on the passive flood barriers up to 8.31 metres above Ordnance Datum (mAOD) to protect: The shared reception of the Hive and Honey Buildings The car park basement access ramp, stairwell and lift lobbies The scheme shall be fully implemented and subsequently maintained, in accordance with the scheme’s timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority.
Pre occupation condition
MCLH
45
Surface water draining from areas of car park hardstanding shall be passed through an oil separator or series of oil separators, prior to being discharged into any watercourse, soakaway or surface water sewer. The separator(s) shall be designed and constructed to have a capacity compatible with the area being drained, shall be installed prior to the occupation of the development and shall thereafter be retained and maintained throughout the lifetime of the development.
Informative
Application resubmitted 17/09/24 Validated 17/09/24 24/02292/CLC
DOC submitted Ref: 24/02707/CLC Decision due 26/12/24
Consented 18/11/24
Consented 29/11/24
To be provide by applicable engineer.
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 29/11/24
Clean roof water or vehicle washdowns and detergents shall not pass through the separator(s) and should be drained instead to foul sewer or sealed system. 46
47
A Car Park Management Plan demonstrating how the use of the car Pre occupation park will be controlled, including any restrictions and detailing the condition signage necessary within the site to direct pedestrians and vehicles shall be submitted to and approved in writing by the local planning authority before the first occupation of the development. The development shall be carried out in accordance with the approved details. By the time the development hereby permitted is substantially Informative complete, pedestrian/vehicular intervisibility splays of 2.8 m x 3.3 m shall have been provided in each direction where the access meets the back edge of footway, and shall be permanently retained free from any obstruction to visibility higher than 1.0m above ground level.
48
49
'Within six months of the commencement of the above ground development' details regarding the relocated bus driver welfare facilities on Brook Street, have been submitted to and agreed in writing by the Local Planning Authority. The relocated bus driver welfare facilities shall be delivered in accordance with time frames agreed with the Local Planning Authority prior to development, other than demolition and thereafter permanently retained. Bus driver welfare facilities will be retained throughout development. A. The development hereby permitted shall incorporate security measures to minimise the risk of crime and disorder and meet the specific security needs of this development in accordance with Secured by Design Commercial 2015 or its equivalent required security standards. Details of these measures shall be submitted to and approved in writing by the local planning authority prior to commencement of the development and shall
MCLH / Occupier
Within 6 months of commencemen t of above groundworks condition
MCLH
Pre development condition
MCLH FHPM Kabsec
DOC deposited 08/11/24 24/02804/CLC Decision due 03/01/25
Ongoing - statutory consultation responses expected w/c 9th December NMA application applicable.
Application deposited 03/04/23 Ref:
no
longer
Consented 31/05/23
23/00892/CLC
/ /
App deposited 21/02/22 Validated 22/02/22 Ref: 22/00558/CLC (Originally submitted under Planning Consent
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
(TRANSIT APPLICATION )* Consented 28/04/22
20/02499 /FUL – App form sent to LPA to request transfer to this app 19/04/2022)
be implemented in accordance with the approved details prior to occupation.
B.
As the proposed development is in close proximity to Kingston Town Centre, a crowded place, I would seek that that a blast assessment be completed by a member of the Register of Security Engineers & Specialists (RSES); this is order to determine the appropriate glazing specification for the building(s).
TO BE REVISED AS BELOW
C.
Prior to occupation of the offices a Secured by Design accreditation certificate or its equivalent from the Metropolitan Police Design Out Crime Office shall be submitted to and approved by the Local Planning Authority. D) Prior to the functioning of the multi-story carpark Park Mark Certification is achieved. 49
REVISED . A. The development hereby permitted shall incorporate security measures to minimise the risk of crime and disorder and meet the specific security needs of this development in accordance with Secured by Design details approved under 22/00558/CLC (other than the car park/ cycle parking proposed in Building C which is superseded by this permission.) Details of the car park/ cycle parking measures shall be submitted to and approved in writing by the local planning authority within 3 months of commencement of above ground works of the car park. The development shall be implemented in accordance with the approved details prior to occupation.
DOC 49a deposited Ref: 24/02744/CLC Decision due: 30/12/24
49a Consented 29/11/24
Within 3 months post commenceme nt of ground works.
B. As the proposed development is in close proximity to Kingston Town Centre, a crowded place, I would seek that a blast assessment be completed by a member of the Register of Security Engineers & Specialists (RSES); this is in order to determine the appropriate glazing specification for the building(s). C. Prior to occupation of the offices a Secured by Design accreditation certificate or its equivalent from the Metropolitan Police Design Out Crime Office shall be submitted to and approved by the Local Planning Authority.
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 29/11/24
D. Prior to the functioning of the multi-storey car park, Park Mark Certification is achieved. The development shall be implemented in accordance with the approved details.
50
51
52 53
54
A retail management plan to include opening hours and the link to the wider occupation of the site shall be submitted to the local planning authority for approval prior to commencement of the use of the Eden St retail units. The retail units shall operate in accordance with the approved management plan. Prior to occupation of the new office building, the woodland walk shall be made available to members of the public in accordance with hours of access and a management plan to be submitted to the local planning authority for approval. The woodland walk shall operate in accordance with the approved details. The car park shall be implemented in accordance with the details approved under 22/03504/CLC dated 29th December 2022. The development shall be implemented in accordance with the details approved on 07.03.2022 under reference 22/00292/CLC (Water re-use/harvesting).
Pre condition
use
Occupier
Application deposited 26/06/24 Ref: 24/01603/CLC Decision due: 21/08/24
Consented 28/10/24
Pre occupation condition
Occupier
Application deposited 17/06/24 Ref: 24/01509/CLC Decision Due: 12/08/24
Consented 11/09/24
Details shall be submitted to the local planning authority prior to commencement of development to demonstrate how the comprehensive landscaping strategy would achieve the proposed Urban Greening Factor of at least 0.3 within the site. The development shall be carried out in accordance with the approved details prior to occupation of the development.
Pre development condition
MCLH
Application deposited 03/04/23 Ref:
Consented 22/05/23
Informative Informative
23/00893/CLC
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
55
56
The minimum water consumption targets as per The London Plan 2021, i.e. 105 l/person/day for residential units and a BREEAM rating of ‘Excellent’ for the Wat 01 credits for non-residential uses. It should be stressed that these are the minimum requirements and need to be improved upon where possible . Air Quality Neutral Assessment: A Damage Cost Assessment using the most up to date damage cost toolkit from Defra and the most recent version of the EFT must be submitted to and approved in writing by the local planning authority within 3 months of commencement of development.
Informative
Within 3 months of commencemen t of development condition Informative
AQ Consultan ts
MCLH
57
The development must be carried out in accordance with the Dust Management Plan Reference approved on 07.03.2022. The applicant must install PM10 monitoring equipment at the site boundary, with exact locations to be determined through discussion with the local authority Environmental Health department.
58
No construction shall take place within 5m of the water main. Information detailing how the developer intends to divert the asset / align the development, so as to prevent the potential for damage to subsurface potable water infrastructure, must be submitted to and approved in writing by the local planning authority in consultation with Thames Water. Any construction must be undertaken in accordance with the terms of the approved information. Unrestricted access must be available at all times for the maintenance and repair of the asset during and after the construction works. Any piling must be undertaken in accordance with the terms of the approved piling method statement approved under 22/00390/CLC.
Report to be submitted – No time constraint specified.
In order to demonstrate compliance with the ‘be seen’ postconstruction monitoring requirement of Policy SI 2 of the London Plan, the legal Owner shall at all times and all in all respects comply with the energy monitoring requirements set out in points a, b and c below. In the case of non-compliance the legal Owner shall upon written notice from the Local Planning Authority immediately take all steps reasonably required to remedy noncompliance.
Various submissions
59
60
App deposited 25/10/22 PP-11645457
Consented 23/01/23 22/03432/CLC
Application deposited 05/08/24 Ref: 24/01921/CLC Decision due 02/10/24
Consented 12/09/24
Informative
Francis Hunter to provide response
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
a. Within eight weeks of planning permission being issued by the Local Planning Authority, the Owner is required to submit to the GLA accurate and verified estimates of the ‘be seen’ energy performance indicators, as outlined in Chapter 3 ‘Planning stage’ of the GLA ‘Be seen’ energy monitoring guidance document, for the consented development. This should be submitted to the GLA's monitoring portal in accordance with the ‘Be seen’ energy monitoring guidance.
61
62
b. Once the as-built design has been completed (upon commencement of RIBA Stage 6) and prior to the building(s) being occupied (or handed over to a new legal owner, if applicable), the legal Owner is required to provide updated accurate and verified estimates of the ‘be seen’ energy performance indicators for each reportable unit of the development, as per the methodology outlined in Chapter 4 ‘As-built stage’ of the GLA ‘Be seen’ energy monitoring guidance. All data and supporting evidence should be uploaded to the GLA’s monitoring portal. The owner should also confirm that suitable monitoring devices have been installed and maintained for the monitoring of the in-use energy performance indicators, as outlined in Chapter 5 ‘In-use stage’ of the GLA ‘Be seen’ energy monitoring guidance document. c. Upon completion of the first year of occupation following the end of the defects liability period (DLP) and for the following four years, the legal Owner is required to provide accurate and verified annual in-use energy performance data for all relevant indicators under each reportable unit of the development as per the methodology outlined in Chapter 5 ‘In-use stage’ of the GLA ‘Be seen’ energy monitoring guidance document. All data and supporting evidence should be uploaded to the GLA’s monitoring portal. This condition will be satisfied after the legal Owner has reported on all relevant indicators included in Chapter 5 ‘In-use stage’ of the GLA ‘Be Seen’ energy monitoring guidance document for at least five years. . The development shall be carried out in accordance with the approved details ref. 22/00622/CLC and maintained as such in perpetuity. The development shall be carried out in accordance with the plans and details approved under 22/03626/CLC (Drinking Water
Informative
Informative
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
63
64
65
66
Infrastructure) approved 30/12/22, and drinking water made available to the public for free in accordance with the plans and details prior to occupation of the development, and in perpetuity. The measures set out in the Air Quality Positive Statement AQPS approved on 08.03.2022 under reference 22/00412/CLC shall be implemented in accordance with the details so approved, and thereafter retained, unless otherwise agreed in writing by the local planning authority.
Informative
Prior to the occupation of each building the post-construction tab of the GLA’s whole life carbon assessment template should be completed accurately and in its entirety in line with the GLA’s Whole Life Carbon Assessment Guidance. The post-construction assessment should provide an update of the information submitted at planning submission stage, including the whole life carbon emission figures for all life-cycle modules based on the actual materials, products and systems used. This should be submitted to the GLA at: ZeroCarbonPlanning@london.gov.uk. along with any supporting evidence as per the guidance. Confirmation of submission to the GLA shall be submitted to, and approved in writing by, the local planning authority, prior to occupation of the relevant building The development shall be carried out in accordance with the Ducting Space for Full Fibre Connectivity Infrastructure Plans approved on 07.03.2022 under reference 22/00681/CLC these plans shall be implemented prior to occupation and maintained as such in perpetuity.
Pre occupation condition
Prior to the occupation any building, a Post Completion Report setting out the predicted and actual performance against all numerical targets in the relevant Circular Economy Statement shall be submitted to the GLA at: circulareconomystatements@london.gov.uk along with any supporting evidence as per the GLA’s Circular Economy Statement Guidance. The Post Completion Report shall provide updated versions of Tables 1 and 2 of the Circular Economy Statement, the Recycling and Waste Reporting form and Bill of Materials. Confirmation of submission to the GLA shall be submitted to, and
Pre occupation condition
MCLH
Now post occupation condition post approval of NMA
Timeline NMA deposited 05/08/24 (see NMA table below)
NMA Consent now received
Consented 18/11/24
Deposited 05/08/24 Decision due by 02/09/24 Ref: 24/01919/NMA
Informative
Now post occupation condition post approved NMA
MCLH
Timeline NMA deposited 05/08/24 (See NMA table below)
NMA Consent now received
Deposited 05/08/24 Decision due by 03/09/24 Ref: 24/01931/NMA
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Consented 18/11/24
67
approved in writing by, the local planning authority, prior to occupation. Notwithstanding the submitted details, prior to commencement of any above ground development (excluding demolition), details of a plant screen on top of Block A and Block B shall have been submitted to and approved in writing by the local planning authority. The approved plant screen shall be installed in accordance with the approved details prior to the occupation of the development hereby approved.
Prior to commencemen t of above ground works
MCLH/ DAA
App deposited 25/10/22 PP-11631141
Consented 26/01/23 22/03431/CLC
NMA APPLICATIONS
Application submission
Progress Response to posed by fund
NMA Application deposited re amendments to Building A and B Spandrel Panels
Deposited with LPA 09/08/23 Ref: 23/02182/NMA
Consent questions Consented 07/09/23
Validated 09/08/23 Consented 07/09/23 NMA Condition 3 (Facing Materials)
Deposited 25/09/23 Validated 27/09/23
Consented 23/04/24
23/02623/NMA Foot Bridge Link
Deposited and 03/10/23 Ref: 23/02702/NMA
validated
Consented 23/04/24
NMA Condition 1 – Louvre NMA
Application validated 03/01/24 Ref: 24/00017/NMA Consented 23/04/24 Application deposited 28/06/24 Decision due by 26/07/24 Ref: 24/01621/NMA
Consented 23/04/24
NMA Condition 18 (Highways)
Awaiting imminent response to the signing off of the various matters
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
regarding this condition through an NMA, to include transport welfare facilities. NMA Condition 64 (Carbon Assessment – Timeline change)
NMA Condition 66 (Economy Statement – Timeline change)
NMA Condition 46 (Car Park Management Plan – Timeline Change)
NMA Condition 44 – Flood Resistance, change wording from passive to active
Application deposited 05/08/24 Decision due by 02/09/24 Ref@ 24/01919/NMA Application deposited 05/08/24 Decision due by 03/09/24 Ref: 24/01920/NMA Application deposited 06/08/24 Decision due by 03/09/24 Ref: 24/01931/NMA Application deposited 31/10/24 Decision due: 28/11/24 Ref: 24/02705/NMA
Consented 18/11824
Consented 18/11/24
Replaced with application Consent received
DOC
Consented 26/11/24
Section 106 Obligations No.
Item
Description
1
Affordable Workspace contribution
2
Kingston Employment Support Services Contribution
3
Skills Employment and Apprenticeship Plan Contribution.
The Owner covenants to pay the Affordable Workspace Contribution to the Council prior to Occupation of the Development. Kingston Employment Support Services Contribution" means the sum of £232,000 Index Linked to be paid by the Owner to the Council towards the Council's work match brokerage initiative; Skills Employment and Apprenticeship Plan Contribution" means the sum of £50,000 Index Linked to be paid by the Owner to the Council towards implementation of the
Value percentage £250,000
/
Timescale
Latest Status
Prior to Occupation of the development
Paid
£232,000,
Prior to Commencement of the development.
Paid - 6th February 2023
£50,000
Prior to Commencement of the development
Paid - 6th February 2023 Pre-Construction SEP & Stakeholder Allocation sent to LPA 03.07.23
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
Skills Employment and Apprenticeship Plan. 4
5
The Owner covenants to submit to the Council for approval a Skills Employment and Apprenticeship Plan – Construction Phase within 3 months of Commencement of the Development to include the following provisions:
Skills Employment and Apprenticeship Plan – Operational phase
•
70 employment opportunities for residents of the South London Partnership Boroughs or students and graduates of the Mayor's Construction Academy. • 20 apprenticeships for Local Residents. • Two Local Businesses to be invited to quote for contracts less than £150,000 in value; and • Not less than 15% of the total value of goods and services procured throughout the construction phase to be procured from Local Businesses or businesses based in Neighbouring Boroughs The Owner covenants to use its best endeavours to comply with the Skills Employment and Apprenticeship Plan – Construction Phase during the construction of the Development PROVIDED THAT the Owner and the Council may agree amendments to the Skills Employment and Apprenticeship Plan – Construction Phase in writing from time to time. Skills Employment and Apprenticeship Plan – Operational Phase" means a plan setting out targets for local employment, skills and training and detailing mechanisms for
Within 3 month of commencement of the development (Clause 2.3 of S106)
Submitted to the Council approval 04/11/24 24/02800/LEG Decision due 31/12/24
for
Variation submitted 21/11/24 to accommodate shortfall in requirement Ref: 24/02933/DOV Decision due by 16/01/25
Within 18 months of commencement of the development. (Clause 2.6 of S106)
Report sent to LPA 24/09/24 Validated 21/10/24 24/02371/LEG Decision due 03/01/25
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
6
Carbon Dioxide Emissions Target
7
Carbon Dioxide Offsetting Contribution
8
Energy Monitoring Portal
9
Construction Environmental Management Plan
delivering such opportunities during the operational phase of the Development Carbon Dioxide Emissions Target” means a 35% carbon reduction against Part L2a of the Building Regulations 2013.
Carbon Dioxide Offsetting Contribution" means a sum of money (Index Linked) calculated on the basis of £60 per tonne for 30 years to be agreed between the Council and Owner (both parties acting reasonably) and paid by the Owner to the Council in the event that the Development cannot achieve the Carbon Dioxide Emissions Target and the shortfall in emissions reduction has not been offset through an accredited scheme or alternative off site off setting has not been agreed with the Council, to be used if payable towards the Council's Carbon Offset Fund which seeks the delivery of carbon dioxide emissions reductions projects within the Royal Borough of Kingston Upon Thames inter alia through retrofit of social housing, schools and civic buildings, investment in renewable energy projects and low-carbon lighting projects; “Energy Monitoring Portal” means the ‘Be seen’ webpage of the GLA’s website and the email address ZeroCarbonPlanning@london.gov.uk, or any other such method of submission that may replace this Construction Environmental Management Plan” means the plan to be submitted by the Owner to the Council for approval in accordance with paragraph 15 of Schedule 1;
35% carbon reduction against part L2a of the Building Regulations 2013 £60 per tonne for 30 years to be agreed
Following practical completion
N/A
To be submitted within 8 weeks of the grant of the Planning Permission
Completed
N/A
Prior to Commencement of the Development the Owner shall submit the Construction Environmental Management Plan
Submitted and approved
Following practical completion
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
10
Construction Phase Flood Management Plan
11
Rooftop Garden Management Plan
12
Car Park Management Plan
13
Delivery and Service Management Plan
14
District Heating Network
15
Highway and Public Realm Enhancement Works
16
TFL Works
Construction Phase Flood Management Strategy" means the measures set out in the flood risk assessment prepared by Cole Easdon Consultants Limited dated November 2020 (issue 5) submitted with the Planning Application and the supplementary letter issued by Mason Navarro Pledge Limited dated February 2021 attached to this deed at Appendix 2 as the same relate to the Land; Rooftop Garden Management Plan" means the plan for the provision of managed public access to the Rooftop Garden as may be varied from time to time in writing; "Car Park Management Plan" means a management plan detailing measures for the management of the use of the car park within the Development including restrictions on use of the car park by users other than the occupier(s) of the offices within the Development. Delivery and Servicing Management Plan” means the plan to be submitted by the Owner to the Council for approval in accordance with paragraph 16 of Schedule 1; “District Heating Network" means a third party district heating network to be developed within the Council's area and which is capable of providing electricity to the Development; “Highway and Public Realm Enhancement Works" means the highway and public realm enhancements identified for indicative purposes only on the Highway and Public Realm Enhancements Plan TfL Works" means the relocation of Transport for London's welfare facility from Brook Street near the corner of Eden Street
N/A
The Development shall be constructed and completed in accordance with the approved Construction Phase Flood Management Strategy.
Ongoing
N/A
Prior to Occupation of the Development (Tenant obligation)
Rooftop Management submitted to LPA 19/06/24
N/A
Prior to Occupation of the Development
N/A
Prior to Occupation of the Development
N/A
Plan
Action for Unilever
DHN rooms provided within Building A and B.
N/A
Following an agreement pursuant to section 278 of the Highways Act 1980
Discussions ongoing (Planning condition approved).
N/A
Within 12 months following first Occupation of the Development
Will form part of S278 works
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
17
Travel Plan
18
Woodland Walk Management Plan
as shown for indicative purposes only on the Highway and Public Realm Enhancements Plan; Travel Plan” means a full travel plan to be submitted to the Council for approval in consultation with Transport for London pursuant to paragraph 14 of the First Schedule; Woodland Walk Management Plan” means a management plan to be submitted to and agreed by the Council in accordance with paragraph 8 of the First Schedule which shall contain arrangements for management of the Woodland Walk including the management of public access to the Woodland Walk;
N/A
Prior to Occupation of the Development (Clause 14)
N/A
Application sent to LPA 18/10/24 24/02801/LEG Decision due 13/12/24
Action for Unilever Prior to Occupation of the Development
Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk
appendix i Warranty Tracker
FH090-151015
warranty schedule project: Surrey House date:
19/11/24
consultant
ref
redacted order sent
employer
tenant
fund
lender
primary warranties 1.00
main consultants
1.01
Employers Agent
FHPM
COMPLETED
COMPLETED
COMPLETED
COMPLETED
1.02
Monitoring Architect
DAA
COMPLETED
N/A
COMPLETED
COMPLETED
1.03
Monitoring Civil and Structural Engineer (main and monitoring)
MNP
COMPLETED
COMPLETED
COMPLETED
COMPLETED
1.04
MEP Engineer
Aecom
COMPLETED
COMPLETED
COMPLETED
COMPLETED
1.05
Cost Consultant
G&T
COMPLETED
N/A
COMPLETED
COMPLETED
1.06
Main Contractor
MCLH
COMPLETED
COMPLETED
COMPLETED
COMPLETED
1.07
Demolition Contractor
Shorts
COMPLETED
N/A
COMPLETED
COMPLETED
1.08
s278 Works
FHPM
Returned to Gwlng 24/10/24…sent to BCLP for comment.
N/A
To be issued with appointment
To be issued with appointment
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
19/11/24
consultant
redacted order sent
ref 2.00 2.01
tenant
fund
lender
Warranties/LoR within 12 months of unconditional or no more drawdowns for relevant trades Architect Novated x 3 appointments DAA COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.02
Contractors Engineer
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.03
Cladding consultant x 3 appointments
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.04
Right of light consultant
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.05
Measurement Surveyor consultant
Plowman & Craven
COMPLETED
COMPLETED
2.06
Validation Engineer
Mecserve
Signed by consultant….sent to Tenant. Agreed with Consultant. Reliance letter to be Updated reliance letter issued once details are with Consultant for provided. approval.
2.07
Environmental consultant
GEA
N/A
COMPLETED
COMPLETED
COMPLETED
2.08A
Landscape Architect
Gillespies
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.08B
Landscape Architect - Contractor Appointment
McIIlwaine
2.09
Principal Designer x 3 appointments
ORSA
Received, certified copy Signed by Consultant and Signed by consultant, to be Signed by consultant, required. contractor…...arranging sent to tenant. arranging signature by signature by funder. lender. COMPLETED COMPLETED COMPLETED COMPLETED
Robert Bird (RBG) Eckersley O'Callaghan (EOC) Point2
employer
COMPLETED
Reliance letter to be issued Reliance letter to be issued once details are provided. once details are provided.
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
19/11/24
consultant
redacted order sent
employer
tenant
fund
lender
Fire Strategy Consultant SWECO Fire Strategy Consultant x 2 (one Marshall direct/retained and one with contractor) ….see below for contractor appointment
N/A COMPLETED
N/A COMPLETED
N/A COMPLETED
N/A COMPLETED
2.10C
Fire Strategy Consultant- Contractor Appointment
Marshall
Received, certified copy Issued to consultant for required. signature
Awaiting confirmation from funder to date.
Signed by consultant and contractor, arranging signature by lender.
2.11
Piling Bored.Sheet subcontractor
Van Elle
Received
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.12
Concrete frame subcontractor
Mitchellson
Received
COMPLETED
COMPLETED
COMPLETED
COMPLETED.
2.13
Roofing subcontractor
AYM
Received
COMPLETED
Signed by the subcontractor and sent to Tenant
COMPLETED
Signed by sub-contractor and contractor. Arranging signature by the Lender.
2.14
MEPH subcontractor
Halsion
Received
COMPLETED
COMPLETED
COMPLETED
COMPLETED
2.15
Façade, cladding and curtain walling
Clarkes
Received
COMPLETED
COMPLETED
COMPLETED
Signed by the subcontractor and contractor. Arranging signature by the Lender.
ref 2.10A 2.10B
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
ref 2.16
19/11/24
consultant Acoustic consultant- Contractor Appointment
Hann Tucker
2.17
Lift subcontractor
Otis
2.18
Car Park Contractor (if separate)
2.19
Architectural metalwork/secondary steelwork
2.20
Plant screens and Louvres (if separate) Clarkes - See 2.15 Soffit cladding (if appropriate) Clarkes See 2.15 Steelwork connections (if appropriate) Mitchellson See 2.12
2.21 2.22
redacted order sent
employer
tenant
fund
lender
Received, certified copy Signed by the consultant, Awaiting confirmation required. to be sent to tenant from funder to date
Signed by consultant and contractor, arranging signature by the Lender.
Received
COMPLETED
COMPLETED
COMPLETED
Signed by sub-contractor and contractor. Arranging signature by Lender.
FP McCann
Received
COMPLETED
COMPLETED
COMPLETED
Signed by sub-contractor and contrator…arranging lender signature.
CMF Limited
Received
COMPLETED
COMPLETED
COMPLETED
COMPLETED
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
ref 2.23
19/11/24
consultant
redacted order sent
Design, supply and installation and commissioning of feature stair fire curtain etc.
Coopers Fire Limited
2.24
Feature staircase
2.25
Mansafe system
CMF Limited See 2.19 PTSG Received
2.26
Glazed doors and screens
OWS Fire Received Rated Limited
2.28
Flood protection equipment
2.29
Car park cladding (if separate)
RBG warranty See 2.02 Maple Received Sunscreening Limited
3.01
Sent in link 26/09/24
3 Secondary consultants supporting Planning Application only Acoustic consultant Hann Tucker
3.02
Air Quality consultant
3.03
Arboriculture consultants
AQ Consultants Landmark Trees
employer COMPLETED
COMPLETED
tenant Signed by the subcontractor. Sent to Tenant
COMPLETED
Signed by the subcontractor and contractor, arranging signature by Employer.
Signed by the subcontractor, sent to Tenant
COMPLETED
Signed by sub-contractor. Sent to Tenant.
fund
lender
COMPLETED
Signed by the subcontractor and contractor. Arranging signature by the Lender.
COMPLETED
COMPLETED
Signed by the subSigned by sub-contractor contractor and contractor, and contractor, arranging arranging signature by signature by lender. funder.
COMPLETED
Signed by contractor and sub-contractor. Arranging signature by Lender.
Appointment completed N/A
Funder warranty completed
N/A
Appointment completed N/A
Funder warranty completed Funder warranty completed
N/A
Appointment completed N/A
N/A
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
19/11/24
fund
lender
Archeological consultants
RPS Consultancy
Appointment completed N/A
Funder warranty completed
N/A
3.05
Asbestos consultant
Search Environmental
Appointment completed N/A
Funder warranty completed
N/A
3.06
Ecological consultant
Appointment completed N/A
Planning consultant
3.08
Security consultant
Kabsec
N/A
N/A
3.09
Blast consultant
Aibara
COMPLETED
N/A
Funder warranty completed Funder warranty completed COMPLETED (reliance letter) COMPLETED
N/A
3.07
Ecology Practice Chart Plan
3.10
Cladding Access consultant
Agreed with FHPM and N/A KF
Agreed with FHPM and KF N/A
3.11
Transport consultant
PTSG (Through MCLH) Milestone
COMPLETED
N/A
COMPLETED
N/A
3.12
Environmental Impact Statement consultant
Stantec
COMPLETED
N/A
COMPLETED
COMPLETED
Approved Inspector
Sweco
3.13 4.00
4.01 4.02
consultant
redacted order sent
ref 3.04
employer
tenant
Appointment completed N/A
N/A... statutory service
N/A... statutory service
N/A... statutory service
N/A N/A N/A
N/A... statutory service
Other Wind and microclimte consultant
BRE
N/A
N/A
N/A
N/A
Heritage and Townscape Consultant
Peter Stewart Consultancy
Completed
N/A
N/A
N/A
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
19/11/24
consultant
4.03 4.04 4.05
redacted order sent
employer
tenant
fund
lender
Viability study
Housing Expectations
Completed
N/A
N/A
N/A
Building Control
MLM (Sweco)
Completed
N/A
N/A
N/A
PC Validation Consultant
Colliers
Issued for signature to Consultant
Issued for signature to Consultant
Issued for signature to Consultant
Issued for signature to Consultant
Signed by the subcontrator…sent to the Tenant.
COMPLETED
Signed by the subcontractor and contractor, arranging signature by lender
ref
Building C roof landscape package and Frost associated works. 4.06
6.00 6.01
Sub-sub- contractor warranties Design and supply of twin wall (Mitchelson sub-sub contractor)
6.02
Kilsaran
Received dated COMPLETED copy…certified copy provided 30/9/24
Received
Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature
Issued to sub-sub contractor for signature
N/A
Design of PT slabs (Mitchelson sub-sub CCL contractor)
Received
Signed by sub-subcontractor
Signed by sub-subcontractor
N/A
6.03
Design, manufacture, installation (Mitchelson sub-sub contractor)
Intersteel
Received
Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature
Issued to sub-sub contractor for signature
N/A
6.04
Design and manufacture (Mitchelson sub-sub contractor)
Creagh
Received
Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature
Issued to sub-sub contractor for signature
N/A
Signed by sub-subcontractor
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
warranty schedule project: Surrey House date:
19/11/24
consultant
redacted order sent
fund
lender
Design and manufacture(Mitchelson sub-sub contractor)
FP McCann
Awaited
Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature
Issued to sub-sub contractor for signature
N/A
6.06
Sub-sub-contractor (Halsion)
Carbon3
Received, certified copy required
Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature
Issued to sub-sub contractor for signature
N/A
6.07
Sub-sub-contractor (Halsion)
Issued to sub-sub contractor for signature
N/A
6.08
Sub-sub-contractor (Halsion)
Issued to sub-sub contractor for signature
N/A
6.09
Sub-sub-contractor (Halsion)
Safe and Sound Received, certified Issued to sub-sub Issued to sub-sub Control copy required contractor for signature contractor for signature Systems Limited Novenco Received, certified Issued to sub-sub Issued to sub-sub Building and copy required contractor for signature contractor for signature Industry UK Ltd Argus Fire Received, certified Issued to sub-sub Issued to sub-sub Protection copy required contractor for signature contractor for signature Company Limited
Issued to sub-sub contractor for signature
N/A
D2 Integrated Systems Ltd
Issued to sub-sub contractor for signature
N/A
ref 6.05
Sub-sub-contractor (Halsion)
employer
tenant
Received, certified Issued to sub-sub Issued to sub-sub copy required contractor for signature contractor for signature
6.10
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119
appendix j Guarantee Schedule
FH090-151015
PROJECT HONEY PRODUCT GUARANTEE SCHEDULE Manufacturer / Product Guarantees Description
Name
Type
Wicona extrusion warranty
Clarkes
Product guarantee
Uplocated to Centrodoc
Clarkes ATJ (Buildings A and B), OJL (Building C) Swiftcrafted (Buildings A and B) OJL (Building C)
OJL (Building C) Clarkes AYM Clarkes Charter Global A1S Coopers Flood stop Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion
Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee
Sprinkler system storage tank and ancillaries
Halsion
Product guarantee
Sprinkler systems e.g. sprinkler heads ASHP FCU Lighting Manufacturer
Halsion Halsion Halsion Halsion
Product guarantee Product guarantee Product guarantee Product guarantee
Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc. Please note the below ground tank is formed as part of the structure so is not covered by Argus, however the tank liner is. Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc
PPC colour coat warranty Ceiling raft panels Ceiling raft panels Internal doors (Timber) Internal doors (Timber) Internal doors (Glazed) Internal doors (Glazed) Internal ironmongery Internal ironmongery Glass Roofing material Revolving doors Roller Shutter Fire Curtains Feature Stair Fire Curtains Flood Protection Equipment Chillers Fire alarm system e.g. panels, detectors and sounders Domestic cold water tanks CAT 5 break tanks Electric radiant heater panels CHW and LTHW thermal stores CHW and LTHW ancillary equipment e.g. pressurisation units Electrical transformers Electrical switchboards and switchgear Electrical distribution boards Electrical meters Electrical isolators and outlets Heat meters and water meters All ductwork and accessories e.g. dampers All pipework and accessories e.g. valves Duct mounted attenuators BMS controls system MVHR units Air grilles and diffusers Lighting devices e.g. PIRs
OWS (Buildings A and B)
OJL (Building C) Swiftcrafted (Buildings A and B)
Comments
Lighting Controls Generators Air Handling Units EV Chargers External Lights Pumps & Fans Roof PV Panels
Halsion Halsion Halsion Halsion Halsion Halsion Halsion
Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee
Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc
appendix k Snag Reports and Related Supporting Documents Project Honey - Building A Snag Report 05.12.24 Project Honey – Building B Snag Report 05.12.24 Project Honey – Building C Snag Report 05.12.24 Project Honey – External Works Snag Report 05.12. 24 Project Honey – Façade Snag Report 05.12. 24 Project Honey – Tenant Snag Report Project Honey – Water Management Project Honey – Car Park Water Management Key Re-inspections post PC R2
FH090-151015
Project Honey – Building A Snag Report 05.12.24
.
FH090-151015
Building A Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T1.53382707
test 2
11/27/2024
12/4/2024
Post PC Defect
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Zak Diaby)
Building A>Eighth Floor Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.1432
Wall damage low level
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/6/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 2:03:19 PM T345546.1434
Damage to riser. Requires knocking the dent out and touching up
Images
11/26/2024 2:08:54 PM T345546.1436
Wall is flexing too much behind the column
Images
11/26/2024 2:15:08 PM T350553.2102
insulation/jackets missing from pipework
Images
11/26/2024 2:48:35 PM
12/5/2024 10:39:47 AM
11/26/2024 2:48:45 PM
11/26/2024 2:50:38 PM
Project Name: B5412 Project Honey
Page 1 Of 260
T350553.2103
box to be removed
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 2:52:57 PM 1
T350553.2106
pooling to be fixed on top of riser
Images
11/26/2024 3:02:12 PM Comments
Created By
Date
SI to be raise for additional work
Dariusz Grzelka (Aym (Services) Limited)
11/27/2024 8:18:10 PM
Building A>Eighth Floor>0801 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.920
Damage to million to be made good
10/30/2024
11/1/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/30/2024 10:49:32 AM 2
T350553.2002
insulation to be made good around duct
Images
11/13/2024 12:14:13 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 2 Of 260
3
T350553.2005
spur to have circuit reference
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 12:16:19 PM 4
T350553.2006
redundant bracket to be removed
Images
11/13/2024 12:17:07 PM Comments
Created By
Date
Not Halsion's, this was used for the site temps drainage, please revert snag to relevant trade
James Parker (Halsion )
11/15/2024 1:18:14 PM
This is Halsions, this was for a svp pipe that was removed from design. Please action asap!!
Ian Robertson (McLaughlin & Harvey)
11/19/2024 6:16:38 PM
5
T350553.2007
metal clips required on armours
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/18/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Images
11/13/2024 12:20:16 PM 6
T345546.1350
paint on copex’s and duct work
Images
11/13/2024 2:44:09 PM
12/5/2024 10:39:47 AM
11/13/2024 2:44:18 PM
11/13/2024 2:44:39 PM
Project Name: B5412 Project Honey
Page 3 Of 260
7
T345545.1136
firestopping incomplete
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Jack Monaghan)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Jack Monaghan)
11/13/2024
11/18/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
Images
11/13/2024 2:45:08 PM 8
T345545.1137
firestopping incomplete
Images
11/13/2024 2:45:25 PM 9
T345546.1351
Firestopping incomplete
Images
11/13/2024 2:45:32 PM 10
T345546.1438
Extend conduit and tidy cables
Images
11/26/2024 2:19:22 PM Building A>Eighth Floor>0802 Lift Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2067
Basket not earth linked with the rest of the system.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 4 Of 260
Images
11/1/2024 4:15:49 PM T338993.2068
11/1/2024 4:15:55 PM
11/1/2024 4:16:04 PM
11/1/2024 4:16:10 PM
Missing rod cups and end cups.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/1/2024 4:20:24 PM T338993.2069
11/1/2024 4:20:30 PM
Containment install is incomplete. Missing containment form the lift supplies.
Images
11/1/2024 4:21:17 PM
11/1/2024 4:21:22 PM
11/1/2024 5:03:52 PM
11/1/2024 5:04:09 PM
11/13/2024 3:24:22 PM
11/13/2024 3:24:32 PM
11/13/2024 3:24:38 PM
11/13/2024 3:25:17 PM
11/13/2024 3:25:48 PM Comments
Created By
Date
No photo evidence attached of the work done.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 2:02:03 PM
T338993.2082
2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat and spur.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/1/2024 5:01:41 PM
12/5/2024 10:39:47 AM
11/1/2024 5:01:46 PM
Project Name: B5412 Project Honey
Page 5 Of 260
T338993.2097
Additional metal cable ties required on cable drops and cables running out of containment.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/1/2024 5:44:20 PM T338993.2098
11/1/2024 5:44:25 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
11/1/2024 5:50:58 PM T338993.2099
Cable not run / secured properly.
Images
11/1/2024 5:51:55 PM T338993.2101
All the emergency lights missing the green led, indicating the health of the battery.
Images
11/1/2024 5:53:43 PM 1
T350553.1989
insulation damaged and incomplete
Images
11/12/2024 11:22:01 AM 12/5/2024 10:39:47 AM
11/12/2024 11:22:10 AM
11/12/2024 11:22:36 AM Project Name: B5412 Project Honey
Page 6 Of 260
2
T456527.1
Mastic to be tidied up behind architrave
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 8:57:15 AM 3
T456527.2
11/20/2024 8:57:23 AM
Damages on door to be made good
Images
11/20/2024 8:58:07 AM 4
T456527.3
11/20/2024 8:58:13 AM
Make good to adhesive on door frame
Images
11/20/2024 8:59:34 AM 2
T456527.4
Protection to be removed at bottom of architrave
Images
11/20/2024 9:00:07 AM 5
T456527.7
Raise doors as rubbing against floor
Images
11/20/2024 9:04:38 AM 12/5/2024 10:39:47 AM
11/20/2024 9:04:43 AM
11/20/2024 9:04:49 AM Project Name: B5412 Project Honey
Page 7 Of 260
6
T456527.165
PAR to be installed
11/25/2024
12/29/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/25/2024
12/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/25/2024 2:13:23 PM 5
T456527.166
Damage to floor finish to be made good
Images
11/25/2024 2:14:33 PM
11/28/2024 10:49:34 AM
Comments
Created By
Date
Floor has been patched but cable is still in floor
Alex Money (Swiftcrafted)
11/28/2024 10:49:50 AM
7
T456527.168
Raise doors to avoid any more damage to floor finish
11/25/2024
12/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/25/2024
12/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Images
11/25/2024 2:15:35 PM 8
T456527.169
11/25/2024 2:15:41 PM
Large gal between architrave and concrete wall to be made smaller
Images
11/25/2024 2:16:39 PM 9
T345546.1440
Realign tiles and ceiling bays
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 8 Of 260
Images
11/26/2024 2:29:52 PM 10
T345546.1441
Damage to ceiling raft bars damaged by Halsion
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/26/2024 2:31:21 PM 11
T345546.1444
General review on installation
Images
11/26/2024 2:35:57 PM 12
T345546.1446
11/26/2024 2:36:08 PM
11/26/2024 2:36:15 PM
Containment doesn’t look right and is slanted. requires straightening up
11/26/2024 2:36:25 PM
Images
11/26/2024 2:44:08 PM 13
T456527.199
11/26/2024 2:44:14 PM
why is there a fire exit sign here as there is no exit? should it be the other side of the door
Images
11/26/2024 3:07:46 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 9 Of 260
14
T408928.107
fire escape sign missing
11/26/2024
12/29/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
11/26/2024 3:10:03 PM Building A>Eighth Floor>0803 Corridor 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2066
Basket not earth linked with the rest of the system.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/1/2024 4:13:55 PM T338993.2074
11/1/2024 4:14:02 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
11/1/2024 4:40:44 PM T338993.2075
Missing lighting cable for the exit sign on the office plate. Not wired.
Images
11/1/2024 4:43:48 PM
11/1/2024 4:43:53 PM
11/1/2024 4:44:05 PM
12/2/2024 11:08:51 AM
Comments
Created By
Date
Missing exit sign is from west side while Halsion attached photo from north side.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 3:05:30 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 10 Of 260
T338993.2079
2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat and spur.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/25/2024
12/29/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/25/2024
12/29/2024
Snag
Opened
Fit-out
Swiftcrafted
Darling Associates (Robyn Harrison Church)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/1/2024 4:50:05 PM T350553.1932
11/1/2024 4:50:10 PM
2nd fix power incomplete electric heater not wired
Images
11/13/2024 11:28:51 AM 1
T456527.170
11/19/2024 5:29:06 PM
Can back up generator be raised further up as it is too visable
Images
11/25/2024 2:18:21 PM 2
T456527.171
Damaged glass in door to be replaced
Images
11/25/2024 2:19:29 PM 3
T456527.384
Fill lifting eyes that are halved due to wall
Images
11/27/2024 12:22:04 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 11 Of 260
4
T456527.385
White smoke detector to be changed to black
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:22:31 PM 5
T456527.386
Sprinkler head to be installed
Images
11/27/2024 12:22:55 PM Building A>Eighth Floor>0804 WC Core
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.457
smoke head missing
10/5/2024
10/12/2024
Snag
Opened
M&E
Halsion
Darling Associates (Liana Maltezou)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/5/2024 11:21:50 AM 2
T350553.1658
back box cover missing from containment
Images
10/29/2024 8:56:19 AM 1
T350553.1659
tiewraps to be cut short
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 12 Of 260
Images
10/29/2024 8:56:59 AM 3
T345546.970
Black fire alarm required
10/31/2024
11/6/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/4/2024
11/11/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/4/2024
11/11/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Vanngel Natso)
Images
10/31/2024 11:12:30 AM T338993.2111
Additional metal cable ties required on cable drops and cables running out of containment.
Images
11/4/2024 9:18:36 AM T338993.2120
11/4/2024 9:18:44 AM
Conduit coupler failed.
11/4/2024 9:19:08 AM
Images
11/4/2024 10:24:54 AM 4
T338993.2228
11/4/2024 10:25:01 AM
Vanity not cleaned.
Images
11/8/2024 11:39:10 AM
12/5/2024 10:39:47 AM
11/8/2024 11:39:15 AM
Project Name: B5412 Project Honey
Page 13 Of 260
3
T338993.2230
Socket not labelled.
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/8/2024 11:43:44 AM Building A>Eighth Floor>0805 Corridor 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2070
Additional support required in line with building control comments that services should be supported as close as possible before and after fire stopping to prevent the weight falling on it.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/1/2024 4:26:48 PM T338993.2086
11/1/2024 4:26:53 PM
2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat.
Images
11/1/2024 5:21:27 PM T338993.2087
2nd Fix Small Power / Commissioning incomplete. FD not 2nd fixed.
Images
11/1/2024 5:21:58 PM T338993.2088
11/1/2024 5:22:03 PM
2nd Fix Small Power / Commissioning incomplete. Solenoid valve not 2nd fixed.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 14 Of 260
Images
11/1/2024 5:22:48 PM T338993.2089
11/1/2024 5:22:53 PM
Cleaner’s socket not fixed flash on the wall.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/22/2024
11/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/1/2024 5:24:41 PM T338993.2105
11/1/2024 5:24:53 PM
2nd Fix Lighting / Commissioning incomplete.
Images
11/1/2024 5:59:22 PM T350553.1933
11/1/2024 5:59:34 PM
11/1/2024 5:59:41 PM
2nd fix power incomplete electric heater not installed
Images
11/13/2024 11:27:35 AM 1
T350553.2085
11/19/2024 5:27:57 PM
Sprinkler plug missing
Images
11/22/2024 9:50:48 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 15 Of 260
2
T456527.159
Redundant holes created by Halsion to be filled
11/25/2024
12/29/2024
Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Darling Associates (Robyn Harrison Church)
11/25/2024
12/29/2024
Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Darling Associates (Robyn Harrison Church)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/25/2024 2:08:51 PM 3
T456527.163
Make good around riser door edge
Images
11/25/2024 2:11:55 PM 4
T456527.388
Can plasterboard be brought down to floor
Images
11/27/2024 12:25:17 PM 5
T456527.389
Damages in plasterboard to be made good
Images
11/27/2024 12:25:41 PM 6
T456527.391
Socket to be installed flush
Images
11/27/2024 12:26:43 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 16 Of 260
7
T456527.392
Damages in wall to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:27:22 PM 8
T456527.393
White smoke detector to be changed to black
Images
11/27/2024 12:28:13 PM 9
T456527.394
Sprinkler cap to be made good
Images
11/27/2024 12:28:40 PM Building A>Eighth Floor>0807 Plant Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1990
All isolators to be properly labelled
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 11:25:13 AM 2
T350553.1992
11/12/2024 11:25:18 AM
dosing pot wiring to be tidied up and tiewrapped
12/5/2024 10:39:47 AM
11/12/2024 11:25:23 AM
Project Name: B5412 Project Honey
Page 17 Of 260
Images
11/12/2024 11:29:21 AM 3
T350553.1993
11/12/2024 11:29:37 AM
trace heating wiring incomplete
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 11:30:24 AM 4
T350553.1994
heat meter box to be secured and cabling tidied
Images
11/12/2024 11:31:18 AM 5
T350553.2025
All isolators/spurs missing reference
Images
11/13/2024 12:41:20 PM 6
T350553.2026
heat meter probes to be connected
Images
11/13/2024 12:42:08 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 18 Of 260
7
T350553.2107
all heat meter probes and panel to fix
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 3:06:38 PM Building A>Eighth Floor>0808 Plant Room Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1154
pipework metal cadding incomplete to LTHW CHW in cylinder room
10/10/2024
10/17/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/23/2024
10/30/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/23/2024
10/30/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 11:13:02 AM 1
T350553.1567
11/13/2024 11:13:15 AM
11/19/2024 5:12:17 PM
11/19/2024 5:12:28 PM
Fire alarm interface to BMS enclosure incomplete
11/19/2024 5:12:39 PM
Images
10/23/2024 2:11:28 PM T350553.1568
11/19/2024 5:16:57 PM
11/19/2024 5:17:08 PM
Insulation incomplete to LTHW/CHW on plant terrace
Images
11/13/2024 11:00:18 AM 2
T350553.1569
11/13/2024 11:00:40 AM
Cabling incomplete in plant terrace
12/5/2024 10:39:47 AM
11/13/2024 11:00:47 AM
11/13/2024 11:01:03 AM
11/19/2024 5:18:15 PM 10/23/2024
Project Name: B5412 Project Honey
11/19/2024 5:18:32 PM 10/30/2024
Incomplete Works
11/19/2024 5:18:58 PM Opened
11/19/2024 5:19:05 PM M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Page 19 Of 260
Images
11/13/2024 10:59:42 AM 3
T345546.948
11/13/2024 2:37:48 PM
repaired damages to tank room cladding
11/19/2024 5:22:37 PM 10/25/2024
10/28/2024
Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Dominic Driver)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/25/2024 6:30:40 PM 4
T350553.1977
metal clad insulation incomplete
Images
11/12/2024 11:10:52 AM 5
T350553.1978
11/12/2024 11:11:00 AM
electrical tray damaged to be replaced
Images
11/12/2024 11:11:39 AM 6
T350553.1979
tiewraps to be cut short
Images
11/12/2024 11:12:18 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 20 Of 260
7
T350553.1980
insulation to be made good
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 11:13:11 AM 8
T350553.1981
smoke head to be fitted
Images
11/12/2024 11:13:38 AM 9
T350553.1983
pumps to be properly labelled
Images
11/12/2024 11:15:23 AM 10
T350553.1984
11/12/2024 11:15:28 AM
water heaters to be properly labelled
Images
11/12/2024 11:16:04 AM 11
T350553.1985
All isolators to be properly labelled
Images
11/12/2024 11:17:00 AM 12/5/2024 10:39:47 AM
11/12/2024 11:17:04 AM
11/12/2024 11:17:10 AM Project Name: B5412 Project Honey
Page 21 Of 260
12
T350553.1986
pressure switch to be piped
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
Roofing
Aym (Services) Limited
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Roofing
Aym (Services) Limited
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 11:17:48 AM 13
T350553.1987
wshp to be properly labelled
Images
11/12/2024 11:20:18 AM 14
T350553.1988
Booster set to be properly labelled
Images
11/12/2024 11:21:21 AM 15
T345545.1112
damage to plant enclosure
Images
11/12/2024 12:23:34 PM 16
T345545.1113
drip from top of plant enclosure is there a fall to the down pipe?
Images
11/12/2024 12:24:31 PM 12/5/2024 10:39:47 AM
11/12/2024 12:24:38 PM Project Name: B5412 Project Honey
Page 22 Of 260
17
T345545.1114
fire exit signs to be installed in all plant areas
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/12/2024
11/18/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/12/2024
11/18/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 12:25:58 PM 18
T427849.1478
Improve lagging
Images
11/12/2024 12:27:41 PM 2
T427849.1479
General Make good of ripped lagging in plant area
Images
11/12/2024 12:31:10 PM 19
T350553.2009
11/12/2024 12:31:16 PM
Lights not working and reference required on switch
Images
11/13/2024 12:22:53 PM 20
T350553.2010
Cable tray over loaded for amount of cables it has on it no spare capacity
Images
11/13/2024 12:24:07 PM 12/5/2024 10:39:47 AM
11/13/2024 12:24:15 PM Project Name: B5412 Project Honey
Page 23 Of 260
21
T350553.2011
Cable tray over loaded for amount of cables it has on it no spare capacity
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 12:54:39 PM 22
T350553.2012
11/13/2024 12:54:55 PM
Cable tray not earthed to main cable tray
Images
11/13/2024 12:26:32 PM 23
T350553.2013
Metal clips required on vertical cables
Images
11/13/2024 12:27:07 PM 24
T350553.2014
lighting insufficient for emergency egress
Images
11/13/2024 12:30:25 PM 25
T350553.2015
excess cable to be pulled above tray neatly
Images
11/13/2024 12:31:04 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 24 Of 260
26
T350553.2016
metal clips required on armours
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 12:31:31 PM 27
T350553.2017
All isolators/spurs missing reference
Images
11/13/2024 12:32:19 PM 28
T350553.2018
Remove redundant box
Images
11/13/2024 12:33:16 PM 29
T350553.2021
Missing black plates in DB and DB schedules missing
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
30
T350553.2022
Tray missing or uni strut required to support cables
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 12:38:35 PM 31
T350553.2023
metal clips and sub main reference required
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 25 Of 260
Images
11/13/2024 12:39:17 PM 32
T345546.1357
Damage to tank room cladding
11/13/2024
11/18/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Dominic Driver)
Images
11/13/2024 2:56:37 PM Comments
Created By
Date
damage by other trades ( SI required for reparation )
Dariusz Grzelka (Aym (Services) Limited)
11/25/2024 7:47:00 AM
33
T350553.2053
extra emergency light required at emergency exit route dark spot where you need to duck under ductwork
11/19/2024
11/26/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/19/2024 5:24:32 PM 34
T350553.2104
11/19/2024 5:24:43 PM
Condense to be trapped and pointed to pebbles
Images
11/26/2024 2:58:06 PM 35
T350553.2105
insulation lids to be fitted to top of buffers
Images
11/26/2024 2:59:01 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 26 Of 260
Building A>Eighth Floor>08L01 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2008
redundant ties and wire removed from tray
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 12:20:58 PM
11/13/2024 12:21:05 PM
Building A>Eighth Floor>08R05 LS
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.395
Make good to damages under riser door
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:29:06 PM Building A>Eighth Floor>08R10 MVent Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2108
plug missing from vent
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 3:18:03 PM Building A>Eighth Floor>08S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1668
small power incomplete heaters/thermostats not wired
10/29/2024
11/5/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 11:33:58 AM 12/5/2024 10:39:47 AM
11/19/2024 5:34:16 PM Project Name: B5412 Project Honey
Page 27 Of 260
T338993.2115
2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat.
11/4/2024
11/11/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/4/2024
11/11/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/4/2024 9:40:22 AM T338993.2119
11/4/2024 9:40:27 AM
2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat.
Images
11/4/2024 10:05:48 AM 1
T456527.390
11/4/2024 10:05:48 AM
Fill holes that were created by Halsion but are no longer required
Images
11/27/2024 12:26:18 PM 2
T456527.449
Make good to lifting eye holes filler
Images
11/27/2024 2:50:39 PM Building A>Eighth Floor>08S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2092
Containment install is incomplete for Lift supply.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 28 Of 260
Images
11/1/2024 5:30:41 PM T338993.2108
11/1/2024 5:30:51 PM
All the emergency lights missing the green led, indicating the health of the battery.
11/1/2024
11/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/1/2024 6:07:22 PM 1
T456527.450
Fill gap next to architrave
Images
11/27/2024 2:51:41 PM 2
T456527.455
Damages to architrave to be made good
Images
11/27/2024 2:54:26 PM
11/27/2024 2:54:31 PM
Building A>Eighth Floor>08S03 Stair 03
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.398
Fill chips in edges of steps
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:32:26 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 29 Of 260
2
T456527.400
Mastic gap in plasterboard
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:33:43 PM 3
T456527.401
Painting to be completed
Images
11/27/2024 12:34:29 PM 4
T456527.402
Another coat of paint required
Images
11/27/2024 12:34:51 PM 5
T456527.403
Clean steps
Images
11/27/2024 12:35:21 PM 6
T456527.407
Ensure all covers are placed on junction box
Images
11/27/2024 12:37:16 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 30 Of 260
Building A>Eighth Floor>08S04 Stair Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.397
Fill holes in concrete
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:31:14 PM Building A>Eighth Floor>Terrace
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1562
finish between last slab and balustrade has a gap that is too big no more than 5mm
11/14/2024
11/18/2024
Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Conor Colton)
Images
11/14/2024 12:39:23 PM
11/14/2024 12:39:28 PM
Comments
Created By
Date
AYM working following drawing ,any extra details, please rise SI
Dariusz Grzelka (Aym (Services) Limited)
11/28/2024 4:43:15 PM
2
T408928.105
general damaged tiles from lock in screws
11/26/2024
12/29/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
Francis Hunter (Luke Nurser)
Images
11/26/2024 3:03:55 PM
11/26/2024 3:04:05 PM
11/26/2024 3:04:15 PM
Comments
Created By
Date
Tiles damaged by other trades ,SI needed for replacement
Dariusz Grzelka (Aym (Services) Limited)
11/28/2024 2:22:44 PM
Building A>Fifth Floor>0501 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1640
FA call point not 2nd fixed.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 31 Of 260
Images
10/3/2024 6:50:22 PM T338993.1645
10/3/2024 6:50:25 PM
Lights not in line between them and with rafts.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/3/2024 7:00:54 PM T338993.1652
10/3/2024 7:01:00 PM
10/3/2024 7:01:08 PM
Additional metal cable ties required on light cables drop.
10/3/2024 7:01:14 PM
10/3/2024 7:03:35 PM
10/3/2024 7:04:12 PM
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/17/2024
10/24/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/3/2024 7:16:25 PM T338993.1654
Wrong Light lengths used.
Images
10/3/2024 7:18:52 PM 2
T350553.1326
10/3/2024 7:19:14 PM
Fire Curtain cabling to be clipped to ceiling
10/3/2024 7:19:42 PM
Images
10/17/2024 5:18:50 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 32 Of 260
3
T345546.891
Realign socket on South core wall
10/24/2024
10/28/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
10/24/2024
10/31/2024
Snag
Opened
Floors raised access
Kingspan
Darling Associates (Liana Maltezou)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/24/2024 12:02:42 PM 4
T345545.756
RAF to be fixed down around feature stair fire curtain where underfloor firestopping was installed
Images
10/24/2024 12:10:13 PM 5
T350553.1835
light not working
Images
11/1/2024 10:36:09 AM 6
T350553.1836
11/1/2024 10:36:21 AM
CO2 sensor missing
Images
11/1/2024 10:40:04 AM 7
T350553.1843
PIR missing from ceiling tile
Images
11/1/2024 11:01:31 AM
12/5/2024 10:39:47 AM
11/21/2024 3:18:56 PM
Project Name: B5412 Project Honey
Page 33 Of 260
Comments
Created By
Date
Not on drawing, please could the tile be changed
Brett Pitcher (Halsion )
11/21/2024 3:18:14 PM
8
T345545.827
making good required to OWS door
11/1/2024
11/8/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/6/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
11/1/2024
11/8/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/1/2024 11:56:07 AM 9
T345546.1049
Realign and refit raised access Floring – for reference purposes Clarkes remove them to complete for fade works
Images
11/1/2024 12:15:05 PM 8
T345545.834
11/1/2024 12:15:11 PM
screws missing on door connector making it wonky
Images
11/1/2024 12:16:51 PM 10
T427849.1197
Riser edge damage to be made good
Images
11/1/2024 12:18:46 PM 11
T427849.1198
11/1/2024 12:18:54 PM
Riser edge damage to be made good
12/5/2024 10:39:47 AM
11/1/2024 12:19:01 PM
Project Name: B5412 Project Honey
Page 34 Of 260
Images
11/1/2024 12:24:06 PM 12
T427849.1199
11/1/2024 12:24:13 PM
Riser edge damage to be made good
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/6/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
11/1/2024 12:24:31 PM 13
T345546.1058
11/1/2024 12:24:37 PM
Crack in ceiling
11/1/2024 12:24:45 PM
Images
11/1/2024 12:24:43 PM 14
T427849.1204
Blind box needs aligning
Images
11/1/2024 12:29:33 PM 15
T345545.845
light missing insert
Images
11/1/2024 12:36:38 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 35 Of 260
16
T345545.847
light not working
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/4/2024
11/11/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/1/2024 12:37:36 PM 17
T427849.1210
Riser door edge to be made good
Images
11/1/2024 12:38:34 PM 18
T345545.851
11/1/2024 12:38:41 PM
magic man to attend to riser doors
Images
11/1/2024 12:44:16 PM 19
T345545.852
11/1/2024 12:44:23 PM
magic man to attend to riser doors
Images
11/1/2024 12:46:33 PM 20
T345545.900
alignment to be corrected
Images
11/4/2024 11:39:14 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 36 Of 260
21
T427849.1571
RAF tile too short and should go all the way into the stair
11/15/2024
11/19/2024
Snag
Opened
Floors raised access
Kingspan
Darling Associates (Robyn Harrison Church)
11/15/2024
11/19/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
Images
11/15/2024 10:52:30 AM 22
T427849.1572
Consecutive steps too short and gaps inconsistent
Images
11/15/2024 10:53:51 AM
11/15/2024 10:53:57 AM
Comments
Created By
Date
Design/manufacturinginstallation tolerances
Gabriel Luta (CMF)
11/19/2024 11:47:55 AM
Design/manufacturing/installation tolerance
Gabriel Luta (CMF)
11/19/2024 3:33:59 PM
STATUS CHANGE: There may be a gap tolerance but this should still be consistent please rectify
Dominic Driver (McLaughlin & Harvey)
12/4/2024 8:49:49 AM
23
T427849.1573
Gap from step to edge too large and to be made good
11/15/2024
11/19/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
Images
11/15/2024 10:54:55 AM Comments
Created By
Date
Design/ manufacturinginstallation tolerances
Gabriel Luta (CMF)
11/18/2024 12:15:08 PM
STATUS CHANGE: Please confirm the tolerance detail to confirm your comment
Dominic Driver (McLaughlin & Harvey)
12/4/2024 8:48:49 AM
24
T456527.31
Larger spacers to be installed to make it more consistent
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 10:13:14 AM 12/5/2024 10:39:47 AM
11/20/2024 10:13:25 AM Project Name: B5412 Project Honey
Page 37 Of 260
25
T345546.1379
Scews missing
11/20/2024
11/28/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 10:14:04 AM 24
T456527.32
11/20/2024 10:14:21 AM
Welds are on the outside at this corner but on the inside of the others
Images
11/20/2024 10:15:09 AM 26
T456527.33
Missing screws to be installed
Images
11/20/2024 10:15:57 AM 27
T345545.1141
11/20/2024 10:16:03 AM
rebar label to be removed from soffit
Images
11/20/2024 10:18:31 AM 28
T456527.34
Firestopping to be completed where conduit has been removed
Images
11/20/2024 10:19:04 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 38 Of 260
29
T345546.1380
RAF is high than feature stair angle
11/20/2024
11/28/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/28/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/28/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 10:21:33 AM 30
T345545.1142
skirting stops too shy of feature stair, to be extended
Images
11/20/2024 10:22:39 AM 31
T345546.1381
Fire curtain doesn’t appear to be full raised. On the picture the LHS is flush and the RHS is sitting slightly under he boxing
Images
11/20/2024 10:22:49 AM 32
T345545.1143
fire curtain to be cleaned can you confirm if this is corroded and affected the warranty?
Images
11/20/2024 10:24:20 AM 33
T345546.1382
change RAF
Images
11/20/2024 10:24:40 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 39 Of 260
34
T345546.1383
Gap is too big where meets feature stairs
11/20/2024
11/28/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/20/2024 10:27:19 AM 35
T345545.1145
skirting stops too shy of feature stair, to be extended
Images
11/20/2024 10:31:21 AM 36
T350553.2212
light not working
Images
11/29/2024 4:33:48 PM 37
T350553.2213
light end cap needs fixing
Images
11/29/2024 4:36:32 PM 38
T350553.2214
All cables to be tucked behind margin so they are not visible
Images
11/29/2024 4:38:14 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 40 Of 260
39
T350553.2215
light dips below ceiling, needs lifted
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 4:40:08 PM 40
T350553.2216
cable to be tied up
Images
11/29/2024 4:41:10 PM 41
T350553.2217
rods to be capped
Images
11/29/2024 4:42:06 PM 42
T350553.2218
light not working
Images
11/29/2024 4:42:43 PM 43
T350553.2219
light is brighter than all the rest.
Images
11/29/2024 4:43:56 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 41 Of 260
44
T350553.2220
lights do not align
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
11/29/2024 4:45:28 PM 45
T350553.2221
all sockets to be referenced
Images
11/29/2024 4:46:16 PM 46
T408928.177
remove black insulation for tile edge and close gap
Images
12/4/2024 9:24:56 AM 47
T408928.178
damage to tile edge
Images
12/4/2024 9:25:32 AM 48
T408928.179
ensure tiles are properly aligned
Images
12/4/2024 9:26:13 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 42 Of 260
49
T408928.180
number of panels misaligned on row. re align
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
12/4/2024 9:27:19 AM 50
T408928.181
general clean dirty ceiling tiles before re alignment takes place
Images
12/4/2024 9:29:17 AM 51
T408928.182
ensure tiles are properly aligned
Images
12/4/2024 9:30:53 AM 52
T408928.183
ensure tiles are properly aligned
Images
12/4/2024 9:31:41 AM 53
T408928.184
ensure tiles are properly aligned
Images
12/4/2024 9:32:17 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 43 Of 260
54
T408928.185
realign row and ensure no visible black cloth
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
12/4/2024 9:34:17 AM 55
T408928.186
light not aligned with tiles. confirm this is in line with drawings
Images
12/4/2024 9:35:54 AM 56
T408928.187
damage to tile edge
Images
12/4/2024 9:37:15 AM 57
T408928.188
realign row and ensure no visible black cloth
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
58
T408928.189
damaged tile to replace
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
12/4/2024 9:40:51 AM 59
T408928.190
faulty light
Images
12/4/2024 9:45:33 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 44 Of 260
60
T408928.191
damaged tile
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
12/4/2024 9:47:56 AM Building A>Fifth Floor>0502 Lift lobby
7
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1180
BMS cabling incomplete
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/17/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
10/23/2024
10/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/24/2024
10/28/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
Images
10/11/2024 8:47:21 AM 1
T345546.599
10/29/2024 11:28:10 AM
11/7/2024 9:03:01 AM
11/13/2024 3:59:27 PM
11/20/2024 11:12:09 AM
Running man sign isn’t positioned correctly.Installed as per drawing but the the actual sign is overlapping the architrave which isn’t right
Images
10/17/2024 5:05:11 PM 2
T350553.1549
BMS cabling to be tidied and tied up neatly
Images
10/23/2024 10:31:07 AM 3
T345546.875
Scratch to the top of black frame
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 45 Of 260
Images
10/24/2024 11:40:49 AM T338993.1892
Additional bracket required. Long run of basket without support.
10/25/2024
11/1/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/25/2024 3:36:13 PM T338993.1898
10/25/2024 3:36:18 PM
10/25/2024 3:36:23 PM
10/25/2024 3:36:32 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/28/2024 9:50:52 AM
10/28/2024 9:51:06 AM
10/31/2024 3:22:33 PM
Comments
Created By
Date
No photo evidence uploaded confirming task is addressed, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 5:35:15 PM
T338993.1916
Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket is 50mm lower.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 2:30:54 PM
10/28/2024 2:30:54 PM
11/11/2024 8:33:53 AM
Comments
Created By
Date
Still 15mm to low, please raise to 450mm to bottom of socket
James Parker (Halsion )
11/12/2024 7:50:05 AM
4
T427849.1003
Lift refuge point call to be installed
12/5/2024 10:39:47 AM
10/30/2024
Project Name: B5412 Project Honey
11/1/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Page 46 Of 260
Images
10/30/2024 12:14:58 PM 5
T427849.1007
Lift call button to be installed
10/30/2024
11/1/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
10/30/2024
11/1/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/1/2024
11/8/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/6/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Dominic Driver)
Images
10/30/2024 12:17:51 PM 6
T427849.1008
Lift letter sign to be installed
Images
10/30/2024 12:18:27 PM 7
T427849.1183
Scratches along lift door to be made good
Images
11/1/2024 11:50:36 AM 8
T345546.1033
11/1/2024 11:50:43 AM
Paint scuffed to be rectified on doors
Images
11/1/2024 11:50:22 AM
12/5/2024 10:39:47 AM
11/1/2024 11:50:30 AM
Project Name: B5412 Project Honey
Page 47 Of 260
9
T427849.1184
Take entire protection off lift door and architrave
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/6/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/1/2024
11/8/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/1/2024 11:52:15 AM 10
T427849.1185
Protection on lift to be removed
Images
11/1/2024 11:55:26 AM 11
T427849.1187
11/1/2024 11:55:32 AM
Remove protection around lift doors
Images
11/1/2024 11:57:24 AM 12
T345546.1037
11/1/2024 11:57:31 AM
Give another clean to the fire curtains
Images
11/1/2024 11:58:14 AM 13
T427849.1195
11/1/2024 11:58:20 AM
Architrave damage to be made good
Images
11/1/2024 12:16:57 PM 12/5/2024 10:39:47 AM
11/1/2024 12:17:03 PM Project Name: B5412 Project Honey
Page 48 Of 260
Building A>Fifth Floor>0503 Corridor 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1919
Additional metal cable ties required on cable drops and cables running out of containment.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/1/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 3:25:36 PM 1
T427849.1014
10/28/2024 3:25:54 PM
Lift architrave to be installed
Images
10/30/2024 12:22:28 PM 2
T427849.1178
Damage on radiator to be made good
Images
11/1/2024 11:40:48 AM 3
T345545.821
floor to be cleaned
Images
11/1/2024 11:43:45 AM 4
T338993.2197
Sprinkler’s lagging missing foil on the end of the lagging.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 49 Of 260
Images
11/8/2024 10:31:34 AM
11/8/2024 10:31:39 AM
Building A>Fifth Floor>0504 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1635
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
10/3/2024 6:37:54 PM 1
T427849.713
10/3/2024 6:38:17 PM
Halsion to change pipe work as per bench mark
Images
10/24/2024 11:15:00 AM 2
T427849.1127
Face plate not sitting on flush
Images
11/1/2024 10:38:21 AM 3
T427849.1131
Face plate not sitting on flush
Images
11/1/2024 10:41:59 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 50 Of 260
4
T345545.797
face plate not flush
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/8/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Jack Monaghan)
Images
11/1/2024 10:50:30 AM 5
T345545.798
firestopping sticker to be replaced
Images
11/1/2024 10:52:32 AM Building A>Fifth Floor>0505 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1631
Lights not in line.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
Images
10/3/2024 6:24:41 PM T338993.1632
10/3/2024 6:24:46 PM
Green led indicator missing on Emergency lights.
Images
10/3/2024 6:25:12 PM 1
T427849.663
Toilet seat not installed
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 51 Of 260
Images
10/24/2024 10:24:20 AM 2
T345546.846
complete the boxing and pipework detail as per the benchmark
10/24/2024
10/28/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/24/2024 10:35:41 AM 3
T350553.1832
copex to be tidied up and cover exposed cables
Images
11/1/2024 10:12:47 AM Building A>Fifth Floor>0506 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1553
FSD cabling to be tidied up/tiewraped neatly
10/23/2024
10/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/25/2024
11/1/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/23/2024 10:56:49 AM T338993.1891
Additional bracket required. Long run of basket without support.
Images
10/25/2024 3:33:01 PM 12/5/2024 10:39:47 AM
10/25/2024 3:33:07 PM Project Name: B5412 Project Honey
Page 52 Of 260
T338993.1893
Remove excess cable tie.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 9:33:06 AM
10/28/2024 9:33:12 AM
10/28/2024 9:33:31 AM
10/28/2024 9:34:17 AM
Comments
Created By
Date
No photo evidence uploaded, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 5:17:26 PM
T338993.1899
Light not working.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 1:47:15 PM
10/31/2024 2:42:33 PM
Comments
Created By
Date
Photo evidence uploaded form corridor 02 while the light in question is on corridor 01.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 5:15:43 PM
T338993.1901
Additional metal cable ties required on cable drops and cables running out of containment.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 1:48:33 PM T338993.1914
10/28/2024 1:48:39 PM
10/28/2024 1:48:49 PM
Cables not dressed / secured properly.
Images
10/28/2024 2:25:10 PM
10/28/2024 2:25:16 PM
10/28/2024 2:25:31 PM
10/28/2024 2:25:44 PM
10/31/2024 3:50:27 PM
Comments
Created By
Date
Cables not properly secured, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 5:20:53 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 53 Of 260
2
T427849.993
Smoke detector to be changed to black
10/30/2024
11/1/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
10/30/2024
11/1/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/30/2024 12:08:41 PM 3
T427849.1009
Gasket peeling off door to be made good
Images
10/30/2024 12:19:03 PM 1
T350553.1852
gripple wire to be cut short
Images
11/1/2024 11:17:55 AM 1
T338993.2206
Cut down heaters grips.
Images
11/8/2024 10:51:19 AM
11/8/2024 10:51:26 AM
Building A>Fifth Floor>05L01 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2211
insufficient aces to air point on Chw return
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 54 Of 260
Images
11/29/2024 4:32:50 PM Building A>Fifth Floor>05R09 MVent Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.831
paint to be cleaned off damper plate
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
11/1/2024 12:11:45 PM Building A>Fifth Floor>05R12 Dry riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.437
fill gap next to lift architrave
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:40:19 PM Building A>Fifth Floor>05R15 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1209
Riser door edge I o be made good
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/1/2024 12:37:41 PM Building A>Fifth Floor>05S01 Stair 01 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 55 Of 260
1
T345545.1040
snots throughout balustrade
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/11/2024 4:09:39 PM
11/12/2024 2:26:53 PM
Comments
Created By
Date
still snots throughout railings and top rail
Conor Colton (McLaughlin & Harvey)
11/26/2024 9:51:18 AM
Building A>Fifth Floor>05S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1895
Halsion to reinstall the FA call point when ATJ raises the back box at correct height. Top of the equipment 1200mm FFFL.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 9:37:26 AM Building A>Fifth Floor>05S03 Stair 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1921
Remove label from PIR.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 3:32:00 PM
10/28/2024 3:32:06 PM
10/31/2024 3:51:46 PM
Comments
Created By
Date
Photo evidence uploaded from Stair Lobby, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 5:25:29 PM
1
T345545.1242
lifting eyes to be grouted more cleanly
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 3:42:43 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 56 Of 260
2
T345545.1243
lifting eyes to be grouted more cleanly
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 3:42:58 PM 3
T345545.1244
*ALL FLOORS* half landings to be properly cleaned out
Images
11/20/2024 3:43:49 PM 4
T345545.1250
smoke seal to be reinstated
Images
11/20/2024 3:55:06 PM 5
T345545.1252
11/20/2024 3:55:21 PM
lifting eye to be repaired properly
Images
11/20/2024 4:00:23 PM 6
T345545.1254
paint to be removed from stairs
Images
11/20/2024 4:01:25 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 57 Of 260
7
T408928.99
remove filler
11/20/2024
11/25/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
Images
11/20/2024 4:24:12 PM Building A>Fifth Floor>05S04 Stair Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1251
scratches on lift door
11/20/2024
11/27/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/25/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
11/20/2024
11/25/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
11/20/2024 3:56:43 PM 2
T408928.96
11/20/2024 3:57:18 PM
missing bracket for conduit
Images
11/20/2024 3:58:34 PM 3
T408928.97
heater not installed straight
Images
11/20/2024 3:59:23 PM Building A>First Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.77
clean paint off column
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 58 Of 260
Images
11/20/2024 12:13:58 PM Building A>First Floor>0101 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1723
Cleaner socket not level and not fixed properly.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/16/2024 4:19:19 PM
10/16/2024 4:19:30 PM
Comments
Created By
Date
Backbox broken
Brett Pitcher (Halsion )
10/18/2024 1:41:50 PM
If broken should have been raised and not 2nd fixed. Please, address the issue and provide photo evidence,
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 3:51:32 PM
2
T338993.1724
FA call point not secured and not level.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/16/2024 4:30:04 PM 3
T338993.1746
10/16/2024 4:30:12 PM
10/16/2024 4:30:22 PM
PIR not installed. 2nd fix Lighting incomplete. Drawing on this level is missing the PIR.
Images
10/21/2024 9:32:18 AM
12/5/2024 10:39:47 AM
10/21/2024 9:32:24 AM
10/21/2024 9:32:46 AM
Project Name: B5412 Project Honey
Page 59 Of 260
T338993.1749
Sticky cable tie base failed across all the floor.
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/21/2024
10/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 3:11:50 PM 4
T338993.1752
10/21/2024 3:11:56 PM
Light not working.
Images
10/21/2024 3:15:53 PM
10/21/2024 3:15:57 PM
10/24/2024 10:22:53 AM
Comments
Created By
Date
Closing snag photo is taken from the wrong location of snag issued by McLH. Please reissue correct location photo to close out snag properly
James Parker (Halsion )
10/25/2024 8:49:58 AM
5
T338993.1754
Light not working.
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 3:17:00 PM 6
T338993.1755
10/21/2024 3:17:07 PM
Light not working.
10/21/2024 3:19:16 PM
10/21/2024 3:19:20 PM
Images
10/21/2024 3:20:00 PM 7
T338993.1756
10/21/2024 3:20:05 PM
Light not working.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 60 Of 260
Images
10/21/2024 3:20:30 PM 8
T350553.1625
10/21/2024 3:20:34 PM
All screwed rods to be cut short and capped
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
10/28/2024 11:24:40 AM 9
T350553.1628
All gripple wires to be cut short on plenums
Images
10/28/2024 11:40:47 AM 10
T456527.48
10/28/2024 11:40:54 AM
Panel is just placed in with no spacers
Images
11/20/2024 11:00:54 AM 11
T456527.49
Fire stopping required around conduits
Images
11/20/2024 11:03:16 AM Comments
Created By
Date
NOT CMF JOB
Gabriel Luta (CMF)
11/22/2024 3:24:34 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 61 Of 260
12
T456527.50
Larger spacer to be installed
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/20/2024 11:04:37 AM 13
T456527.78
RAF to be completed
Images
11/20/2024 11:47:26 AM 14
T345546.1398
Making good required on perimeter margin
Images
11/20/2024 11:51:48 AM 15
T350553.2059
sprinkler plug missing
Images
11/20/2024 11:56:16 AM 16
T350553.2060
light diffuser/LED missing
Images
11/20/2024 11:59:19 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 62 Of 260
17
T350553.2061
Cover loose on FCU panel
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/20/2024 12:01:03 PM 18
T456527.87
Riser door scratch to be made good
Images
11/20/2024 12:01:46 PM 19
T345546.1408
make good on crack
Images
11/20/2024 12:03:00 PM 20
T408928.74
clean up edge detail
Images
11/20/2024 12:03:13 PM 21
T350553.2062
lagging to be tidied up around draincocks
Images
11/20/2024 12:03:16 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 63 Of 260
22
T350553.2063
cable ties to be removed from pipework
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
11/20/2024 12:04:42 PM 23
T350553.2064
11/20/2024 12:04:52 PM
plenum flex to be tidied up/taped
Images
11/20/2024 12:06:12 PM 24
T350553.2065
FCU felt damaged. To be fixed
Images
11/20/2024 12:07:41 PM 25
T345546.1411
Touchup and finish wall better where it meets the Grey facade
Images
11/20/2024 12:08:02 PM 26
T408928.75
11/20/2024 12:08:09 PM
cracking in plasterboard edge detail
11/20/2024 12:08:14 PM
Images
11/20/2024 12:08:17 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 64 Of 260
27
T350553.2066
Sprinkler pipe to be painted and joints cleaned
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 12:09:10 PM 28
T350553.2067
insulation to be made good around pipework
Images
11/20/2024 12:09:47 PM 29
T456527.97
Hole in perimeter margin to be filled
Images
11/20/2024 12:11:24 PM 30
T345546.1412
finish to edge of the ceiling to be sanded and finished nicely
Images
11/20/2024 12:11:03 PM 31
T456527.98
11/20/2024 12:11:15 PM
Riser door edge damage to be made good
11/20/2024 12:11:24 PM
11/20/2024 12:11:30 PM
Images
11/20/2024 12:14:33 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 65 Of 260
32
T456527.99
Riser door edge damage to be made good
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
11/20/2024 12:14:52 PM 33
T350553.2069
sprinkler plug to be painted various across floor plate
Images
11/20/2024 12:15:53 PM 34
T456527.103
Riser door edge damage to be made good
Images
11/20/2024 12:17:24 PM 35
T456527.104
2 dents to be made good
Images
11/20/2024 12:18:16 PM 36
T408928.79
11/20/2024 12:18:21 PM
edge detail to be improved
Images
11/20/2024 12:20:10 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 66 Of 260
37
T456527.105
Socket to be tighter to wall
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 12:20:19 PM 38
T456527.106
Sprinkler head to be installed
Images
11/20/2024 12:21:38 PM 39
T456527.107
Riser door edge damage to be made good
Images
11/20/2024 12:21:59 PM 40
T456527.108
Riser door edge damage to be made good
Images
11/20/2024 12:22:09 PM 41
T456527.109
Scratched fire alarm button face to be replaced
Images
11/20/2024 12:22:55 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 67 Of 260
42
T456527.110
Fill holes above fire button
11/20/2024
11/27/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 12:23:20 PM 43
T345545.1163
light fitting missing
Images
11/20/2024 12:23:42 PM 44
T456527.111
Touch up poor finished areas on architrave
Images
11/20/2024 12:24:13 PM 45
T345545.1164
11/20/2024 12:24:23 PM
missing screws in symploc tiles
Images
11/20/2024 12:24:34 PM 46
T456527.112
Clean above riser doors
Images
11/20/2024 12:25:00 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 68 Of 260
47
T456527.113
Make good to damage on riser door
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 12:25:23 PM 48
T456527.114
Riser door edge damage to be made good
Images
11/20/2024 12:25:37 PM 48
T456527.115
Riser door edge damage to be made good
Images
11/20/2024 12:25:58 PM 49
T456527.116
Fill damage to wall
Images
11/20/2024 12:26:22 PM 50
T345546.1416
Crack to perimeter margin
Images
11/20/2024 12:26:30 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 69 Of 260
51
T456527.117
Socket to be installed tight against wall
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/20/2024 12:26:45 PM 52
T456527.118
Sprinkler head to be installed
Images
11/20/2024 12:27:38 PM 53
T350553.2124
insulation to be fixed
Images
11/26/2024 4:20:08 PM 54
T350553.2125
11/26/2024 4:20:22 PM
end caps missing from drop rods
Images
11/26/2024 4:23:24 PM 55
T350553.2126
11/26/2024 4:24:03 PM
end cap from diffuser needs fixed in place
Images
11/26/2024 4:25:52 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 70 Of 260
56
T350553.2127
insulation to be fixed
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
11/26/2024 4:26:38 PM 57
T350553.2128
insulation to be fixed
Images
11/26/2024 4:27:12 PM 58
T345545.1316
light with faulty driver and face plate above ceiling tile m
Images
11/29/2024 12:38:55 PM 59
T345545.1319
blanking cap missing on sprinkler valve
Images
11/29/2024 12:41:29 PM 60
T345545.1320
earthing cable is holding up cables
Images
11/29/2024 12:44:34 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 71 Of 260
61
T345545.1321
sensors to be mounted on Same face on each column
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 12:45:19 PM 62
T345545.1323
plasterboard finish to be improved in place of blind box
Images
11/29/2024 12:51:51 PM 63
T350553.2184
11/29/2024 12:52:21 PM
cable ties to be cut short
Images
11/29/2024 12:52:30 PM 64
T345545.1324
plasterboard finish to be improved on the edge of margin
Images
11/29/2024 12:53:03 PM 65
T350553.2185
condensate pump to be fixed to FCU
Images
11/29/2024 12:53:13 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 72 Of 260
66
T350553.2188
cables to be tidied up and tiewraped
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 12:58:09 PM 67
T350553.2198
11/29/2024 12:58:15 PM
All cables to be tucked behind margin so they are not visible
Images
11/29/2024 3:49:13 PM 68
T350553.2199
Lights not in alignment
Images
11/29/2024 3:52:57 PM 69
T350553.2200
External lights not wired
Images
11/29/2024 3:56:48 PM 70
T350553.2201
Insulation to be tidied up
Images
11/29/2024 3:58:41 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 73 Of 260
71
T350553.2202
Backbox lid missing
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 4:09:02 PM 72
T350553.2203
Tierap to be cut
Images
11/29/2024 4:10:09 PM 73
T350553.2204
PIR cabling to be cut short and have round it
Images
11/29/2024 4:11:47 PM 74
T350553.2205
metal ceiling tie to be removed
Images
11/29/2024 4:13:11 PM Comments
Created By
Date
This is a MF Ceiling Hanger that has clearly been unscrewed to fit services. This is Damage.
Richard Butler (AT Jones)
12/4/2024 2:05:03 PM
75
T350553.2206
redundant bracket to be removed
12/5/2024 10:39:47 AM
11/29/2024
Project Name: B5412 Project Honey
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Page 74 Of 260
Images
11/29/2024 4:14:14 PM 76
T350553.2207
All plenum box grilles to be cut short
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/29/2024 4:16:05 PM 77
T350553.2208
11/29/2024 4:16:05 PM
Light to be completed
Images
11/29/2024 4:17:32 PM 78
T350553.2209
supply to FCU too low, needs raised so full air flow gets to unit
Images
11/29/2024 4:19:31 PM 16
T456527.481
Damaged light to be made good
Images
12/4/2024 11:43:17 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 75 Of 260
79
T456527.482
Grill to be adjusted to allow ceiling tiles to run properly
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
12/4/2024 11:48:51 AM 80
T456527.483
Light to be aligned
Images
12/4/2024 11:50:24 AM 81
T456527.484
Sprinkler to be aligned central on 5th row of tiles
Images
12/4/2024 11:54:20 AM 82
T456527.485
Sprinkler head to be installed
Images
12/4/2024 11:59:12 AM 83
T408928.213
torn insulation to ductwork
Images
12/4/2024 12:00:54 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 76 Of 260
84
T456527.486
Lights between columns 23 from the west to be adjusted
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 12:05:57 PM 85
T456527.487
Light before step out is not in line with ceiling tiles
Images
12/4/2024 12:06:40 PM 86
T456527.488
First 4 lights from west elevation is too short and needs aligned with ceiling tiles
Images
12/4/2024 12:07:44 PM 87
T456527.489
12/4/2024 12:08:16 PM
Lights 2,4,5 & 6 from north rightleft to be adjusted to be in line with another and ceiling
Images
12/4/2024 12:10:28 PM 88
T456527.490
Light 4 from left to right north elevation to be aligned along with the others and ceiling tiles
Images
12/4/2024 12:11:19 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 77 Of 260
89
T456527.491
Lights 1 & 2 to be aligned with ceiling tiles as they are both too short
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 12:12:11 PM Building A>First Floor>0102 Lift Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1707
Excess PIR cable! The be shortened.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/16/2024 11:15:16 AM
10/16/2024 11:15:22 AM
Comments
Created By
Date
No photo evidence uploaded, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 4:00:17 PM
T338993.1719
The small section of Basket for the fire curtain cable, should be earth linked with the main containment.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/23/2024
10/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/16/2024 4:03:26 PM 1
T350553.1558
10/16/2024 4:03:34 PM
BMS cabling incomplete
10/16/2024 4:03:42 PM
Images
10/23/2024 11:22:22 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 78 Of 260
2
T350553.1559
BMS cabling to be tidied and tied up neatly
10/23/2024
10/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/23/2024 11:23:49 AM 3
T350553.1690
BMS wiring incomplete
Images
10/30/2024 10:22:30 AM 4
T456527.62
11/6/2024 4:21:20 PM
Make good of bubble in paint
11/14/2024 10:20:55 AM
Images
11/20/2024 11:30:20 AM 5
T456527.65
Marks on lift doors to be made good
Images
11/20/2024 11:32:00 AM 6
T350553.2057
insulation to be made good around valve
Images
11/20/2024 11:34:36 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 79 Of 260
7
T456527.70
general remove all protection from lift doors
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/28/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/20/2024 11:35:54 AM 8
T456527.71
Screw missing
Images
11/20/2024 11:37:41 AM 9
T456527.73
Remove adhesive marks
Images
11/20/2024 11:39:28 AM 10
T345546.1396
Redundant holes to be filled and made good
Images
11/20/2024 11:43:33 AM 11
T350553.2058
11/20/2024 11:43:39 AM
Junction box lid missing
11/20/2024 11:44:20 AM
Images
11/20/2024 11:40:13 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 80 Of 260
Comments
Created By
Date
Lift wiring
Brett Pitcher (Halsion )
12/2/2024 10:15:38 AM
12
T345545.1165
Running man signs to be installed as high as possible to avoid hanging over door frame
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/20/2024 12:25:28 PM 13
T350553.2187
cable ties to be cut short
Images
11/29/2024 12:57:07 PM 14
T345545.1325
scratch on door handle
Images
11/29/2024 12:58:44 PM 15
T350553.2189
seal under door scraping on floor
Images
11/29/2024 12:59:55 PM
11/29/2024 1:00:04 PM
Building A>First Floor>0103 Corridor 02 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 81 Of 260
T338993.1717
Reduce excess fire alarm cable.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/20/2024
11/28/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/25/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
11/20/2024
11/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
10/16/2024 3:52:34 PM 1
T345546.1389
10/16/2024 3:52:43 PM
clean paint of black copex
10/16/2024 3:53:12 PM
Images
11/20/2024 11:29:05 AM 2
T345546.1390
high level board being pushed out
Images
11/20/2024 11:30:40 AM 3
T408928.69
Escape signage to be raised above door line
Images
11/20/2024 11:36:03 AM 4
T345546.1394
remove paint off closure
Images
11/20/2024 11:36:54 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 82 Of 260
5
T345546.1395
improve touch ups and small damages on architraves
11/20/2024
11/27/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 11:39:55 AM
11/20/2024 11:40:01 AM
Building A>First Floor>0104 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1727
Cables below vanity unit not dressed / secured properly
10/17/2024
10/24/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/18/2024 3:09:52 PM
10/18/2024 3:09:58 PM
Comments
Created By
Date
Cable shown in image is water pipe to sink please amend snag to correct discipline.
Brett Pitcher (Halsion )
10/29/2024 2:23:57 PM
This is the cold feed for the tap, not cables
James Parker (Halsion )
11/7/2024 11:03:40 AM
Still Halsion has to secure this pipe! Please, provide photo of the pipe secured.
Vanngel Natso (McLaughlin & Harvey)
11/12/2024 6:43:03 PM
1
T345546.977
Gap is too large from wall to skirting
11/1/2024
11/7/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/1/2024
11/8/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/1/2024 9:15:11 AM 2
T427849.1050
Poor grout finish to be made good
Images
11/1/2024 9:22:15 AM Building A>First Floor>0105 WC Core 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 83 Of 260
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1388
Sprinkler rosette cap missing
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/1/2024
11/8/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Ian Robertson)
Images
10/21/2024 11:13:21 AM 2
T350553.1820
light not working
Images
11/1/2024 9:37:57 AM 3
T350553.1822
sprinkler pipework to be cleaned general
Images
11/1/2024 9:40:29 AM Building A>First Floor>0106 Corridor 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1700
Additional metal cable ties required on FA cable’s drop.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/16/2024 10:40:13 AM
10/16/2024 10:40:19 AM
10/28/2024 8:05:52 PM
Comments
Created By
Date
Photo from different location, not from FA point. Therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 4:05:19 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 84 Of 260
T338993.1705
Cables hanging. Cable management poor.
10/16/2024
10/23/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/16/2024 11:04:57 AM
10/16/2024 11:05:07 AM
Comments
Created By
Date
No photo evidence uploaded, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 4:07:49 PM
1
T350553.1565
Fire alarm cabling to be tidied up/tiewraped neatly
10/23/2024
10/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/23/2024 11:38:53 AM
10/27/2024 7:41:36 PM
Comments
Created By
Date
Snag complete photo is of completely different area
James Parker (Halsion )
11/4/2024 11:25:02 AM
2
T345546.1384
damaged lagging
11/20/2024
11/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 11:19:19 AM 3
T456527.56
11/20/2024 11:19:28 AM
Clean paint off soffit to be instructed at cost to AT Jones
Images
11/20/2024 11:21:56 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 85 Of 260
4
T345546.1385
wrong colour fire alarm
11/20/2024
11/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 11:21:18 AM 5
T345546.1386
Touchup door frame
Images
11/20/2024 11:22:26 AM 6
T456527.58
Make good around riser door
Images
11/20/2024 11:26:33 AM 7
T456527.59
Make good around riser door
Images
11/20/2024 11:26:53 AM
11/20/2024 11:27:02 AM
Building A>First Floor>01R01 LTHW&CHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2086
insulation to be made good around pipework
11/26/2024
12/3/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 86 Of 260
Images
11/26/2024 11:31:24 AM
11/26/2024 11:31:50 AM
11/26/2024 11:31:59 AM
Building A>First Floor>01R03 SV
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.1392
seal on riser door not installed properly
11/20/2024
11/28/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 11:33:46 AM
11/23/2024 9:18:20 AM
Comments
Created By
Date
Seal has been damaged by the others that they use for all this time the riser.
Romulus Topciu (AT Jones)
11/23/2024 9:19:36 AM
Building A>First Floor>01R05 LS
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1689
BMS wiring incomplete
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/30/2024 10:21:51 AM
11/6/2024 4:28:54 PM
11/14/2024 10:20:16 AM
11/20/2024 4:51:55 PM
Building A>First Floor>01R10 MVent Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1166
lagging incomplete
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/20/2024 12:26:39 PM Building A>First Floor>01R15 Riser Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 87 Of 260
1
T408928.76
corner detail to be made good
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
11/20/2024 12:12:06 PM Building A>First Floor>01R17 Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2236
2nd fix incomplete.
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/12/2024 11:29:30 AM T338993.2239
Paint scratches.
Images
11/12/2024 11:41:42 AM
11/12/2024 11:41:48 AM
Building A>First Floor>01S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1764
Cleaner’s socket bottom not at 450mm FFFL. 20mm Lower.
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 4:01:12 PM
12/5/2024 10:39:47 AM
10/21/2024 4:01:18 PM
11/11/2024 7:35:06 PM
Project Name: B5412 Project Honey
Page 88 Of 260
T338993.1765
Light not working.
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 4:04:40 PM
10/21/2024 4:04:57 PM
Comments
Created By
Date
Rewired however still not working , engineer to look at
Brett Pitcher (Halsion )
10/24/2024 8:26:43 AM
Since the below comment confirms that the lights is still not working, why the task is issued as complete?
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 4:11:43 PM
T338993.1766
All Lights missing green led for battery health indication.
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
10/21/2024 4:05:46 PM 1
T345545.1013
10/21/2024 4:05:53 PM
white rail shouldnt be visible. please adjust timber handrail to make flush
Images
11/11/2024 3:37:52 PM
11/14/2024 10:11:39 AM
11/19/2024 1:59:08 PM
Comments
Created By
Date
Can this not be adjusted instead of painted?
Conor Colton (McLaughlin & Harvey)
11/19/2024 1:59:30 PM
2
T456527.411
Improve decoration finish on architrave
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:21:29 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 89 Of 260
3
T345545.1326
light not working
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 12:59:17 PM Building A>First Floor>01S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1669
No coppex to be used to long runs. Metal conduit to be installed.
10/14/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/14/2024 2:47:53 PM 1
T456527.412
10/14/2024 2:48:01 PM
Gap in architrave to be filled
Images
11/27/2024 2:22:13 PM 2
T456527.413
Improve decoration finish
Images
11/27/2024 2:22:38 PM Building A>First Floor>01S03 Stair 02 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 90 Of 260
T338993.1760
Cleaner’s socket bottom not at 450mm FFFL. 20mm Lower.
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 3:37:37 PM T338993.1761
10/21/2024 3:37:47 PM
Light not working.
11/11/2024 8:12:39 AM
Images
10/21/2024 3:43:15 PM
10/21/2024 3:43:23 PM
Comments
Created By
Date
Re wired will need engineer to look
Brett Pitcher (Halsion )
10/24/2024 8:34:59 AM
No photo evidence uploaded of the light working, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 4:12:31 PM
1
T456527.379
Improve decoration finish on architrave
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/27/2024 12:12:47 PM 2
T456527.381
Lifting eye filler to be improved
Images
11/27/2024 12:14:36 PM Building A>First Floor>01S04 Stair lobby Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 91 Of 260
T338993.1656
Cleaner socket’s bottom not at 450mm. 40mm Higher.
10/14/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/14/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
10/14/2024 2:07:15 PM T338993.1657
10/14/2024 2:07:27 PM
No coppex to be used to long runs. Metal conduit to be installed.
Images
10/14/2024 2:08:32 PM 1
T456527.380
10/14/2024 2:08:43 PM
Decoration finish on plasterboard to be improved
Images
11/27/2024 12:13:32 PM Building A>First Floor>1R04 LLLV
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2087
Fire alarm interface lids not fitted
11/26/2024
12/3/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 11:35:26 AM 2
T350553.2088
tie wrap to be cut short
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 92 Of 260
Images
11/26/2024 11:37:03 AM Building A>Fourth Floor>0401 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1476
PIR not installed.
10/1/2024
10/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/1/2024 4:34:37 PM
10/1/2024 4:35:31 PM
10/1/2024 4:36:16 PM
Comments
Created By
Date
No PIR to install. Install is to drawing
James Parker (Halsion )
11/12/2024 4:49:27 PM
All floors have the same layout, therefore if is deemed necessary on the other floors the use of PIR on the area. The same principle should apply on this floor as well. Please, provide photo evidence of the PIR installed.
Vanngel Natso (McLaughlin & Harvey)
11/12/2024 6:33:26 PM
T338993.1486
9 light sections are not working.
10/1/2024
10/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/1/2024 5:01:31 PM
10/1/2024 5:01:52 PM
10/1/2024 5:03:17 PM
10/10/2024 2:38:48 PM
10/1/2024 5:01:57 PM
10/1/2024 5:02:04 PM
10/1/2024 5:02:33 PM
10/1/2024 5:02:53 PM
10/1/2024 5:02:59 PM
10/1/2024 5:03:11 PM
Comments
Created By
Date
Lights have been taken down and wiring checked etc , some have been fixed , some are faulty light fittings and have been marked up
Brett Pitcher (Halsion )
10/10/2024 2:55:20 PM
All lights to be fixed. Photo evidence of lights being operational required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 1:49:00 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 93 Of 260
2
T338993.1524
Light’s end cup not fixed properly.
10/2/2024
10/9/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 2:56:46 PM
10/2/2024 2:56:53 PM
10/8/2024 11:24:44 AM
10/23/2024 1:10:17 PM
Comments
Created By
Date
Still not done.
Vanngel Natso (McLaughlin & Harvey)
10/23/2024 1:10:21 PM
3
T345546.271
Coopers to install Beacon for fire curtain
10/2/2024
10/8/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Dominic Driver)
10/2/2024
10/9/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/15/2024
10/22/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
10/15/2024
10/22/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
10/2/2024 3:35:43 PM 4
T338993.1549
Insulation damaged.
Images
10/2/2024 3:49:48 PM 5
T345545.507
10/2/2024 3:50:00 PM
10/2/2024 3:50:06 PM
misalignment of balustrade between flights can this be fixed?
10/2/2024 3:50:13 PM
10/23/2024 1:17:32 PM
Images
10/15/2024 3:54:23 PM 6
T345545.516
balustrade handrail is bowing slightly / noticeably
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 94 Of 260
Images
10/15/2024 4:01:29 PM
11/7/2024 2:04:17 PM
Comments
Created By
Date
still bowing
Conor Colton (McLaughlin & Harvey)
11/26/2024 8:59:52 AM
7
T338993.1846
Lights not working and Cover damaged.
10/23/2024
10/30/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/23/2024
10/30/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/23/2024 1:11:18 PM 8
T338993.1849
10/23/2024 1:11:24 PM
The End box with no conduit, should be capped.
Images
10/23/2024 1:55:28 PM 9
T338993.1853
10/23/2024 1:55:36 PM
10/23/2024 1:55:43 PM
Cleaner’s socket not level.
Images
10/24/2024 9:08:01 AM 10
T338993.1854
10/24/2024 9:08:01 AM
FA cable passing bellow raft frame, when the tile is installed it will damage the cable. The cable will be squeezed between the frame and the tile. Cable to run on top of the frame instead.
Images
10/24/2024 9:23:47 AM 12/5/2024 10:39:47 AM
10/24/2024 9:23:55 AM
10/24/2024 9:24:01 AM Project Name: B5412 Project Honey
Page 95 Of 260
11
T456527.35
Bend in edge trim to be made good
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/26/2024
11/29/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
11/26/2024
11/29/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
Images
11/20/2024 10:30:35 AM 12
T345545.1146
sprinkler pipe to be repainted
Images
11/20/2024 10:33:43 AM 13
T345545.1154
overhang on the skirting
Images
11/20/2024 10:46:39 AM 14
T408928.117
make good edge around duct
Images
11/26/2024 4:20:02 PM 15
T408928.122
numbers to be cleaned off
Images
11/26/2024 4:39:31 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 96 Of 260
16
T408928.131
missing end cap to light
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
11/29/2024 1:23:29 PM 17
T408928.192
damaged tile
Images
12/4/2024 9:51:57 AM 18
T408928.193
damaged tile
Images
12/4/2024 9:52:32 AM 19
T408928.194
damaged tile
Images
12/4/2024 9:53:04 AM 20
T408928.195
damaged tile
Images
12/4/2024 9:53:36 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 97 Of 260
21
T408928.196
damaged tiles
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
12/4/2024 9:55:17 AM 22
T408928.197
12/4/2024 9:56:31 AM
damaged tile
Images
12/4/2024 9:58:44 AM 23
T408928.198
light not aligned with tiles. confirm this is in line with drawings
Images
12/4/2024 10:00:55 AM 24
T408928.199
light not aligned with tiles. confirm this is in line with drawings
Images
12/4/2024 10:04:33 AM 25
T408928.200
damaged tile
Images
12/4/2024 10:10:42 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 98 Of 260
26
T345545.1354
diffuser too short for light fitting
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
12/4/2024 10:15:22 AM 27
T345545.1355
diffuser needs to be clipped back in to light fitting
Images
12/4/2024 10:16:00 AM 28
T345545.1356
12/4/2024 10:16:13 AM
stickers to be removed from edge of tile
Images
12/4/2024 10:20:52 AM 29
T345545.1357
diffusers to be clipped
Images
12/4/2024 10:26:24 AM 30
T408928.201
12/4/2024 10:26:31 AM
light not aligned with tiles. confirm this is in line with drawings. are lights correct size?
Images
12/4/2024 10:27:21 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 99 Of 260
31
T408928.202
damaged tile
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
12/4/2024 10:28:38 AM 32
T408928.203
damaged tile
Images
12/4/2024 10:29:42 AM 33
T408928.204
damaged tiles
Images
12/4/2024 10:31:02 AM 34
T345545.1358
grille to be clipped in and sprinkler to be realigned and rosette fitted
Images
12/4/2024 10:34:16 AM Building A>Fourth Floor>0402 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.560
missing Lift buttons Lift name/number and call button on Lift 05, 06 and 02
10/17/2024
10/21/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
10/17/2024 3:24:46 PM 12/5/2024 10:39:47 AM
10/17/2024 3:24:52 PM
10/17/2024 3:25:01 PM Project Name: B5412 Project Honey
Page 100 Of 260
2
T350553.1423
BMS cabling to be tidied up and tiewrapped neatly
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 12:24:04 PM 2
T350553.1424
All tiewraps to be cut short
Images
10/21/2024 12:25:39 PM 3
T350553.1425
BMS cabling incomplete
Images
10/21/2024 12:26:51 PM 4
T427849.552
See comments for level 3 in relation to doors
Images
10/22/2024 12:52:23 PM T338993.1858
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/24/2024 10:05:01 AM 12/5/2024 10:39:47 AM
10/24/2024 10:05:07 AM Project Name: B5412 Project Honey
Page 101 Of 260
T338993.1863
Additional metal cable ties required on cable drops and cables running out of containment.
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Jack Monaghan)
Images
10/24/2024 10:28:23 AM T338993.1879
10/24/2024 10:28:27 AM
10/24/2024 10:28:51 AM
10/24/2024 10:29:11 AM
Cleaner’s socket not at correct height. Halsion to reinstall once a new hole is drilled at correct height. Height should be 450mm bottom of the socket FFFL.
Images
10/24/2024 11:13:59 AM T350553.1679
BMS wiring incomplete
Images
10/29/2024 12:06:02 PM 5
T345545.866
11/7/2024 8:48:44 AM
11/7/2024 8:48:53 AM
11/13/2024 4:17:37 PM
screws loose and missing on fire rated doors
11/20/2024 10:44:32 AM 11/1/2024
11/20/2024 10:44:47 AM 11/8/2024
Client Snag
Images
11/1/2024 1:05:32 PM
11/1/2024 1:05:39 PM
11/1/2024 1:05:43 PM
11/1/2024 1:05:54 PM
11/1/2024 1:06:00 PM
Comments
Created By
Date
still incomplete
Dominic Driver (McLaughlin & Harvey)
11/25/2024 3:59:42 PM
6
T345546.1066
General item remove lift protection in the joints of lifts
12/5/2024 10:39:47 AM
11/1/2024
Project Name: B5412 Project Honey
11/6/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
Page 102 Of 260
Images
11/1/2024 1:08:00 PM 7
T427849.1235
11/1/2024 1:08:09 PM
Pack out cover plate to ensure no damages
11/1/2024
11/8/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/1/2024 1:08:31 PM 8
T427849.1237
clean lift door
Images
11/1/2024 1:10:53 PM Building A>Fourth Floor>0403 Corridor 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.544
Fire alarm should be black?
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 12:45:25 PM T338993.1862
Lights not in line between them.
Images
10/24/2024 10:22:14 AM 12/5/2024 10:39:47 AM
10/24/2024 10:22:26 AM
10/24/2024 10:22:45 AM Project Name: B5412 Project Honey
Page 103 Of 260
T338993.1881
Cleaner’s socket not level.
10/25/2024
11/1/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/1/2024
11/6/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
Images
10/25/2024 2:46:29 PM 2
T345545.859
10/25/2024 2:46:29 PM
lift buttons aren’t straight
Images
11/1/2024 12:56:34 PM 3
T345545.862
around riser doors to be improved
Images
11/1/2024 1:00:18 PM 4
T345545.863
around riser doors to be improved catching on drywall when riser opens
Images
11/1/2024 1:01:26 PM 5
T345546.1063
Clean highlevel services
Images
11/1/2024 1:03:45 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 104 Of 260
T338993.2189
Light not working.
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/8/2024 10:16:37 AM Building A>Fourth Floor>0404 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1619
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/10/2024
10/14/2024
Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Vanity plug isn’t scented to the tap. The tap is the correct position at 701 mm but the plug hole is not centred. this is a Swift crafted error but the snag 10/23/2024 will fall to Halsion as per instruction
10/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
10/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
Images
10/3/2024 5:57:25 PM T427849.314
make good of grout under vanity
Images
10/10/2024 4:11:16 PM 1
T345546.804
Images
10/23/2024 12:37:51 PM 2
T345546.806
Not scented to the vanity plug Swift crafteds fault but Halsion issue to move the taps
12/5/2024 10:39:47 AM
10/23/2024
Project Name: B5412 Project Honey
Page 105 Of 260
Images
10/23/2024 12:39:41 PM 3
T345546.813
Finish the boxing detail as the benchmark is to cover the pipes
10/23/2024
10/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
Images
10/23/2024 12:51:26 PM Building A>Fourth Floor>0405 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1615
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/23/2024
10/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
10/23/2024
10/28/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Dominic Driver)
Images
10/3/2024 5:45:34 PM 1
T345546.826
Finished your pipework as per the benchmark
Images
10/23/2024 2:03:25 PM 2
T345546.834
Approved sticker missing
Images
10/23/2024 2:14:44 PM 12/5/2024 10:39:47 AM
10/23/2024 2:14:50 PM Project Name: B5412 Project Honey
Page 106 Of 260
3
T345546.835
First Stopping required entrances to WC
10/23/2024
10/28/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Dominic Driver)
Images
10/23/2024 2:16:47 PM
10/23/2024 2:16:57 PM
Building A>Fourth Floor>0406 Corridor 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1855
Additional metal cable ties required on cable drops and cables running out of containment.
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/1/2024
11/8/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
10/24/2024 9:30:47 AM T338993.1866
10/24/2024 9:30:53 AM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/24/2024 10:37:34 AM 1
T427849.1234
10/24/2024 10:37:49 AM
Make good of damages around riser opening edge
10/24/2024 10:38:37 AM
10/24/2024 10:38:41 AM
Images
11/1/2024 1:06:18 PM
11/1/2024 1:06:25 PM
Comments
Created By
Date
incomplete
Dominic Driver (McLaughlin & Harvey)
11/25/2024 4:03:25 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 107 Of 260
2
T338993.2193
Cable left on the ceiling coiled.
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/8/2024 10:25:59 AM
11/8/2024 10:26:06 AM
Building A>Fourth Floor>04L02 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.551
Lift letter sign to be installed
10/22/2024
10/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
10/22/2024 12:51:16 PM Building A>Fourth Floor>04R01 LTHW&CHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.861
paint to be cleaned off chamfered edge
11/1/2024
11/8/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
11/1/2024 12:59:11 PM
11/1/2024 12:59:18 PM
Building A>Fourth Floor>04R05 LS
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2165
Cable to be clipped and terminated
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/28/2024 4:05:15 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 108 Of 260
2
T350553.2166
Blank plate missing on lighting control box Check all floors
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/28/2024 4:05:38 PM 3
T350553.2167
All fused spurs to be labelled with circuit referance
Images
11/28/2024 4:07:16 PM Building A>Fourth Floor>04R12 Dry Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.432
Fill gap next to architrave
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:36:25 PM Building A>Fourth Floor>04R14 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2163
Blank plate missing on lighting control box Check all floors
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/28/2024 4:02:23 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 109 Of 260
2
T350553.2164
Missing DB schedules All DB boards All floors
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/28/2024 4:03:18 PM Building A>Fourth Floor>04S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1870
All lights are missing green led for the indication of a he emergency battery health.
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
10/24/2024 10:47:47 AM T338993.1871
10/24/2024 10:47:52 AM
Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket 40mm lower.
Images
10/24/2024 10:51:57 AM 1
T345545.1032
10/24/2024 10:51:57 AM
11/21/2024 2:45:55 PM
various pin holes in top rail
Images
11/11/2024 4:01:33 PM
11/11/2024 4:01:52 PM
11/12/2024 2:44:10 PM
11/12/2024 2:44:10 PM
11/26/2024 8:52:03 AM
11/26/2024 8:52:12 AM
Comments
Created By
Date
Still pin holes
Conor Colton (McLaughlin & Harvey)
11/26/2024 8:52:17 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 110 Of 260
2
T345545.1035
various pin holes in top rail
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/11/2024 4:03:51 PM
11/12/2024 2:41:05 PM
11/26/2024 8:50:45 AM
Comments
Created By
Date
still pin holes
Conor Colton (McLaughlin & Harvey)
11/26/2024 8:50:50 AM
3
T345545.1036
snots and pinholes throughout balustrade
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/11/2024 4:04:46 PM
11/12/2024 2:40:11 PM
11/26/2024 8:49:32 AM
Comments
Created By
Date
still snots on railing
Conor Colton (McLaughlin & Harvey)
11/26/2024 8:50:12 AM
Building A>Fourth Floor>04S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1857
Halsion to reinstall the FA call point when ATJ raises the back box at correct height. Top of the equipment 1200mm FFFL.
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/24/2024 9:35:22 AM T338993.1868
10/24/2024 9:35:23 AM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/24/2024 10:44:23 AM
12/5/2024 10:39:47 AM
10/24/2024 10:44:30 AM
Project Name: B5412 Project Honey
Page 111 Of 260
T338993.1874
Cleaner’s socket not at correct height. Halsion to reinstall once ATJ raises the back box. Height should be 450mm bottom of the socket FFFL.
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/24/2024 10:58:23 AM Building A>Fourth Floor>04S03 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.951
snots on paint work to be sanded and touched up
11/5/2024
11/12/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/5/2024 11:30:27 AM
11/26/2024 9:12:17 AM
Comments
Created By
Date
still snots under top rail
Conor Colton (McLaughlin & Harvey)
11/26/2024 9:12:35 AM
2
T408928.90
Damaged wall to righthand side
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
11/20/2024
11/25/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/20/2024 3:33:44 PM 3
T408928.92
damage to corner of step to be made good
Images
11/20/2024 3:42:14 PM Building A>Fourth Floor>04S04 Stair Lobby Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 112 Of 260
1
T345545.1239
clean break glass
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/25/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Francis Hunter (Luke Nurser)
Images
11/20/2024 3:34:05 PM 2
T408928.91
damage to corner of wall
Images
11/20/2024 3:40:01 PM Building A>Ground Floor Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1270
Clean floor finish off of skirting
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
Images
11/4/2024 2:30:33 PM 1
T345545.1265
incomplete handrails on both wings
Images
11/22/2024 10:56:59 AM 2
T345545.1274
flood grilles missing
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 113 Of 260
Images
11/22/2024 11:09:34 AM Comments
Created By
Date
Not CMF job
Gabriel Luta (CMF)
11/29/2024 2:22:38 PM
3
T345545.1292
corner of brick should be glazed
11/29/2024
12/6/2024
Client Snag
Opened
Blockwork
Swift Group UK
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Client Snag
Opened
Blockwork
Swift Group UK
Darling Associates (Robyn Harrison Church)
Images
11/29/2024 11:15:15 AM 4
T345545.1293
cut brick should be glazed
Images
11/29/2024 11:16:28 AM T1.53416333
Fire exit sign missing above Corridor door to main office
12/2/2024
12/9/2024
Client Snag
Opened
M&E
Halsion
Sodexo (Mark Day)
T456527.499
ATJ to be instructed to complete taping and jointing and mist coat
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/4/2024 1:47:05 PM Building A>Ground Floor Mezzanine Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 114 Of 260
1
T456527.535
Fire stopping required in riser
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:58:25 PM 2
T456527.536
Riser door bolts to be fastened
Images
12/4/2024 2:58:56 PM Building A>Ground Floor Mezzanine>0M01 Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.373
Damaged fire stop to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:07:08 PM Building A>Ground Floor Mezzanine>0M02 BOH Storage
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.369
general Fill holes in blockwork and areas that need re mortared
11/27/2024
12/4/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:03:31 PM
12/5/2024 10:39:47 AM
11/27/2024 12:04:49 PM
11/27/2024 12:04:53 PM
Project Name: B5412 Project Honey
Page 115 Of 260
2
T456527.371
Conduit to be installed to wall
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 12:06:09 PM 3
T456527.537
Sprinkler pipe stopping riser door from opening
Images
12/4/2024 2:59:20 PM Building A>Ground Floor Mezzanine>0MS02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.375
Chip in step to be filled
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/27/2024 12:09:11 PM 2
T456527.376
Chip in step to be filled
Images
11/27/2024 12:09:33 PM Building A>Ground Floor>0001 Office Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 116 Of 260
1
T345545.1168
around riser door needs to be repaired
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 1:51:22 PM 2
T345545.1169
11/20/2024 1:51:28 PM
11/20/2024 1:51:33 PM
11/20/2024 1:51:42 PM
riser door doesn’t fully close
Images
11/20/2024 1:52:08 PM 3
T345545.1170
wall to be repaired in various areas
Images
11/20/2024 1:52:30 PM 4
T345545.1186
11/20/2024 1:52:35 PM
11/20/2024 1:52:40 PM
paint to be removed from soffit
Images
11/20/2024 2:09:26 PM 5
T345545.1190
11/20/2024 2:09:33 PM
top of wall is inconsistent. some goes to underside of slab and some stops short. make it consistent
Images
11/20/2024 2:15:33 PM 12/5/2024 10:39:47 AM
11/20/2024 2:15:42 PM Project Name: B5412 Project Honey
Page 117 Of 260
6
T345545.1191
wall to be finished
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/20/2024 2:16:52 PM 7
T345545.1192
lagging to be made good
Images
11/20/2024 2:17:15 PM 8
T345545.1194
paint on damper frame
Images
11/20/2024 2:20:20 PM 9
T345545.1195
damage to riser door
Images
11/20/2024 2:21:06 PM 10
T350553.2114
11/20/2024 2:21:29 PM
end caps missing from drop rods
Images
11/26/2024 3:48:07 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 118 Of 260
11
T350553.2115
plugs missing from vent
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 3:48:44 PM 12
T350553.2116
lagging missing from pipework
Images
11/26/2024 3:49:36 PM 13
T350553.2117
lagging to be tidied up on pipework
Images
11/26/2024 3:50:15 PM 13
T350553.2118
No fire rated sticker on fire batt
Images
11/26/2024 3:51:37 PM 13
T350553.2119
Paint on services to be removed
Images
11/26/2024 3:53:29 PM 12/5/2024 10:39:47 AM
11/26/2024 3:53:36 PM Project Name: B5412 Project Honey
Page 119 Of 260
14
T444645.638
brick not glazed at top of ramp
11/28/2024
12/5/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Ian Robertson)
Images
11/28/2024 10:30:47 AM 15
T345545.1339
11/28/2024 10:31:08 AM
drywall to be tidied up
Images
11/29/2024 2:43:33 PM 16
T350553.2194
Paint to be removed from mullion
Images
11/29/2024 2:46:25 PM 17
T350553.2196
11/29/2024 2:46:40 PM
Fixings and mastic to be removed from ceiling where head track for demo penetration wall was built
Images
11/29/2024 3:09:06 PM Building A>Ground Floor>0002 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.221
Chip in door to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 120 Of 260
Images
11/27/2024 9:45:05 AM 1
T456527.222
Chip in door to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 9:45:21 AM 2
T456527.224
Fire refuge call door not opening
Images
11/27/2024 9:48:29 AM 3
T456527.225
Complete decoration for frame and architrave for double doors
Images
11/27/2024 9:53:59 AM 4
T456527.226
Missing screw at refuge point button plate
Images
11/27/2024 9:54:32 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 121 Of 260
5
T456527.229
Missing screws in top architrave to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/29/2024
Client Snag
Opened
Fire Stopping
OWS
Francis Hunter (Luke Nurser)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 9:56:38 AM 6
T408928.126
damage to door architrave
Images
11/27/2024 9:57:04 AM 7
T456527.230
Damage to architrave to be made good
Images
11/27/2024 9:57:12 AM 7
T456527.233
Damage to architrave to be made good
Images
11/27/2024 10:00:39 AM 8
T456527.234
Complete decoration for frame and architrave for double doors
Images
11/27/2024 10:01:45 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 122 Of 260
8
T456527.235
Scratch on black plate above fire exit sign to be replaced
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:02:18 AM 9
T456527.236
Ensure all ceiling tile frames are aligned
Images
11/27/2024 10:06:12 AM 10
T456527.237
Can instruct be cut shorter above ceiling tiles
Images
11/27/2024 10:07:24 AM 11
T456527.238
Check alignment of floor boxes with floor finish
Images
11/27/2024 10:08:39 AM 12
T456527.240
11/27/2024 10:08:46 AM
Clean ceiling tile frames
Images
11/27/2024 10:10:11 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 123 Of 260
13
T456527.241
Make good to flakey paint on ceiling tile frames
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:10:57 AM 14
T456527.242
Make good to flakey paint on ceiling tile frames
Images
11/27/2024 10:11:19 AM Building A>Ground Floor>0003 Corridor 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.344
Decoration to be completed
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 11:39:44 AM 2
T456527.345
11/27/2024 11:39:51 AM
Fire stopping stickers to be completed
Images
11/27/2024 11:40:25 AM 3
T456527.346
jointing on handrail to be cleaned
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 124 Of 260
Images
11/27/2024 11:41:23 AM 4
T456527.504
Plugs to be removed and holes to be filled
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 1:57:13 PM 5
T456527.527
Scratch in architrave to be made good
Images
12/4/2024 2:42:30 PM Building A>Ground Floor>0004 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.212
Missing FCU for solenoid valve and motorised dumper
5/27/2024
6/3/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
5/27/2024 1:31:58 PM 1
T456527.338
5/27/2024 1:32:12 PM
Scratches on tiles to be made good
Images
11/27/2024 11:35:20 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 125 Of 260
Building A>Ground Floor>0005 WC Core
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2073
Tap/ solenoid not fitted
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/21/2024 11:44:55 AM 2
T456527.292
11/21/2024 11:45:07 AM
Plug in sink to be installed
Images
11/27/2024 11:07:02 AM 3
T456527.294
Paint to be cleaned off alarm
Images
11/27/2024 11:08:32 AM 4
T456527.300
Damage to door handle to be made good
Images
11/27/2024 11:12:52 AM 5
T456527.301
Mastic to be completed around architrave
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 126 Of 260
Images
11/27/2024 11:13:31 AM 6
T456527.303
General Ensure all sprinkler heads are installed
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 11:14:47 AM 7
T456527.306
Damage on tap to be made good
Images
11/27/2024 11:16:28 AM 8
T456527.308
Chip in vanity box to be made good
Images
11/27/2024 11:17:24 AM 9
T456527.310
Make good to damages on door
Images
11/27/2024 11:18:20 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 127 Of 260
10
T456527.313
tap to be aligned correctly
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 11:20:00 AM 11
T456527.314
Clean paint off floor finish
Images
11/27/2024 11:20:27 AM 12
T456527.315
Decoration finishes on hinges to be made good
Images
11/27/2024 11:21:01 AM Building A>Ground Floor>0006 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2071
wiring incomplete
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/21/2024 11:20:55 AM 2
T456527.278
Floor to be cleaned
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 128 Of 260
Images
11/27/2024 10:55:55 AM 3
T456527.279
Finish around door frame to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:56:26 AM 4
T456527.280
Damage to ceiling tiles to be made good
Images
11/27/2024 10:56:56 AM 5
T456527.281
Plate to be aligned with tiles
Images
11/27/2024 10:57:25 AM 6
T456527.282
Smoke detector to be change for a black one
Images
11/27/2024 10:58:09 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 129 Of 260
1
T456527.283
Plate to be aligned with tiles
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:58:41 AM 7
T456527.285
magic man to make good to threshold on riser
Images
11/27/2024 11:00:21 AM 8
T456527.287
Final coat of paint to be completed
Images
11/27/2024 11:01:53 AM Building A>Ground Floor>0009 Reception
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1581
Excessive glue under balustrade to be removed
11/15/2024
11/19/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/15/2024 11:08:13 AM 2
T456527.52
Poor finish to be made good
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 130 Of 260
Images
11/20/2024 11:08:25 AM 3
T456527.53
Should this be finished above boarding to slab edge?
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/20/2024 11:09:13 AM 4
T345545.1200
finish ows door installation
Images
11/20/2024 2:27:33 PM 5
T345545.1201
damages to walls to be repaired
Images
11/20/2024 2:28:03 PM 6
T350553.2197
Paint to be removed from column
Images
11/29/2024 3:11:55 PM Building A>Ground Floor>0011 Service Corridor Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 131 Of 260
1
T350553.1209
Fire alarm wiring incomplete
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/11/2024 10:10:59 AM
10/30/2024 11:18:46 AM
11/6/2024 4:08:59 PM
11/14/2024 11:28:01 AM
11/21/2024 11:30:56 AM
Building A>Ground Floor>0012 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.247
Clean paint off areas it shouldn’t be
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:16:06 AM 2
T456527.496
Complete boarding down the whole way along door
Images
12/4/2024 1:42:07 PM 3
T456527.498
remove floor finish sealer from steps and exposed concrete wall
Images
12/4/2024 1:45:39 PM
12/4/2024 1:45:45 PM
Comments
Created By
Date
There is skirting going/here
Alex Money (Swiftcrafted)
12/5/2024 8:48:14 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 132 Of 260
4
T456527.500
Clean off dirt from exposed concrete finish
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 1:50:36 PM 5
T456527.501
Make good to fire stop
Images
12/4/2024 1:51:11 PM 6
T456527.502
Loose handle to be tightened
Images
12/4/2024 1:52:17 PM Building A>Ground Floor>0019 Refuse Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2123
insulation to be completed
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/26/2024 4:10:15 PM Building A>Ground Floor>0020 Corridor 08 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 133 Of 260
1
T456527.514
Fix down threshold and replace seal
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:27:54 PM 2
T456527.516
Fix down threshold
Images
12/4/2024 2:29:37 PM Building A>Ground Floor>0021 Booster Tank Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1218
Fire alarm interface not wired to sprinkler panel
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/11/2024 10:27:25 AM
10/30/2024 8:27:20 AM
11/14/2024 11:19:22 AM
11/21/2024 11:25:41 AM
Building A>Ground Floor>0023 Telco/LL MER
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.517
Make good to damages in fire stop
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/4/2024 2:31:52 PM Building A>Ground Floor>0024 Life Safety Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 134 Of 260
1
T350553.2122
ventilation requires NRD
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 4:03:35 PM Building A>Ground Floor>0025 Corridor Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2045
2nd fix Fire alarm incomplete
11/14/2024
11/21/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/14/2024
11/21/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/14/2024 11:48:11 AM 1
T350553.2046
2nd fix lighting/PIR incomplete
Images
11/14/2024 11:50:11 AM 2
T456527.462
Plasterboard to be painted and cleaned beforehand to stop mould
Images
11/27/2024 3:08:32 PM 3
T456527.466
Building control measure to be completed
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 135 Of 260
Images
11/27/2024 3:11:33 PM Building A>Ground Floor>0027 BoH / Retail
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.510
clean inside riser
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:21:57 PM 2
T456527.511
screed repairs required in bin stores
Images
12/4/2024 2:22:52 PM Building A>Ground Floor>0028 DHN Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.463
Damage to fire stop to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/27/2024 3:09:30 PM Building A>Ground Floor>0029 Corridor 03 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 136 Of 260
1
T350553.2121
grilles to be cut short on all heaters
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/26/2024 3:59:32 PM 2
T456527.352
11/26/2024 3:59:39 PM
Fill areas with larger gaps
Images
11/27/2024 11:46:08 AM 3
T456527.356
Fill block work holes
Images
11/27/2024 11:48:53 AM 4
T456527.359
Magic man Make good to damages on door
Images
11/27/2024 11:51:02 AM Comments
Created By
Date
Works to proceed once all traffic gone
Alex Money (Swiftcrafted)
11/28/2024 11:47:48 AM
5
T456527.465
Damage to block to be made good
12/5/2024 10:39:47 AM
11/27/2024
Project Name: B5412 Project Honey
12/4/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Conor Colton)
Page 137 Of 260
Images
11/27/2024 3:10:52 PM 6
T456527.512
Make good to damaged fire stop
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:26:10 PM 7
T456527.513
Fire stop where temporary pipe was removed
Images
12/4/2024 2:26:33 PM 8
T456527.515
Replace seal in threshold
Images
12/4/2024 2:28:30 PM Building A>Ground Floor>0031 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.193
General Clean all paint from soffit, doors and all services
11/25/2024
12/29/2024
Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Darling Associates (Robyn Harrison Church)
Images
11/25/2024 3:36:52 PM 12/5/2024 10:39:47 AM
11/25/2024 3:37:05 PM
11/25/2024 3:37:09 PM
11/25/2024 3:37:15 PM Project Name: B5412 Project Honey
Page 138 Of 260
2
T456527.244
Conduit and socket to be installed
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:13:22 AM 2
T456527.245
Make good to damages caused by Halsion
Images
11/27/2024 10:13:49 AM 3
T456527.252
11/27/2024 10:13:55 AM
No fire stop in the area has labels
Images
11/27/2024 10:19:46 AM 4
T456527.253
Damage to plasterboard to be made good
Images
11/27/2024 10:20:19 AM 5
T456527.254
Damage to skirting to be made good
Images
11/27/2024 10:20:51 AM 12/5/2024 10:39:47 AM
12/2/2024 11:17:12 AM Project Name: B5412 Project Honey
Page 139 Of 260
Comments
Created By
Date
Wall to be repaired first
Alex Money (Swiftcrafted)
12/2/2024 11:17:25 AM
6
T456527.255
Finish on door frame to be completed
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
11/29/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
Francis Hunter (Luke Nurser)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:21:30 AM 7
T456527.256
Screw caps missing on door closer
Images
11/27/2024 10:22:09 AM 8
T456527.258
Area at top corner of door to be taped and jointed
Images
11/27/2024 10:23:13 AM 9
T408928.127
labels on fire stopping
Images
11/27/2024 10:30:43 AM 10
T456527.263
11/27/2024 10:30:49 AM
Scratches to be made good on architrave
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 140 Of 260
Images
11/27/2024 10:33:59 AM 11
T456527.533
Make good to skirting damages
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:49:56 PM Comments
Created By
Date
Can only do this once wall is made good by others
Alex Money (Swiftcrafted)
12/5/2024 8:42:26 AM
Building A>Ground Floor>0032 Stair lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.273
Remove adhesive and make good to damages on doors
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:48:11 AM
11/27/2024 10:48:16 AM
11/27/2024 10:48:23 AM
Building A>Ground Floor>0034 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.187
Make good to damages in door
11/25/2024
12/29/2024
Snag
Opened
Fit-out
Swiftcrafted
Darling Associates (Robyn Harrison Church)
Images
11/25/2024 3:28:33 PM
12/5/2024 10:39:47 AM
11/25/2024 3:28:54 PM
Project Name: B5412 Project Honey
Page 141 Of 260
2
T456527.268
Clean paint off conduit
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:39:35 AM 3
T456527.269
Clean paint off dry riser door
Images
11/27/2024 10:40:24 AM Building A>Ground Floor>00L01 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.1070
damage to car panel from inside from BBU use
11/4/2024
11/6/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/6/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/4/2024 1:20:00 PM 1
T345546.1071
Glass mirror to be changed due to scratches
Images
11/4/2024 1:21:47 PM 1
T345546.1072
11/4/2024 1:21:59 PM
car upright panel scratched
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 142 Of 260
Images
11/4/2024 1:23:35 PM 2
T345546.1073
11/4/2024 1:23:49 PM
11/4/2024 1:23:57 PM
Car top transom scratched
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/4/2024 1:26:59 PM T427849.1244
11/4/2024 1:27:08 PM
Light to be brought up to fill gap
11/4/2024 1:27:15 PM
Images
11/4/2024 1:31:24 PM 3
T427849.1245
Damage to corners of lift ceiling tiles
Images
11/4/2024 1:32:47 PM T345546.1074
Clean above lights
Images
11/4/2024 1:33:25 PM
12/5/2024 10:39:47 AM
11/4/2024 1:33:33 PM
Project Name: B5412 Project Honey
Page 143 Of 260
1
T345546.1075
Inconsistent finish to upright panels next to mirrors
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/4/2024 1:34:33 PM T427849.1246
11/4/2024 1:34:41 PM
Damage to corners of lift ceiling tiles
Images
11/4/2024 1:35:33 PM 4
T345546.1076
11/4/2024 1:35:40 PM
inconsistent wall cladding panel spacing
Images
11/4/2024 1:35:58 PM T427849.1247
11/4/2024 1:36:05 PM
Trim cracked at at cop corner
11/4/2024 1:36:22 PM
Images
11/4/2024 1:36:43 PM T427849.1248
Gap in skirting to be made good
Images
11/4/2024 1:37:56 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 144 Of 260
5
T345546.1077
Control panel not sitting evenly flushed both sides
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/4/2024 1:37:03 PM 6
T345546.1101
11/4/2024 1:37:29 PM
damage to vertical panel trim
Images
11/5/2024 11:51:46 AM 7
T427849.1278
Make good to damages to car uprights
Images
11/5/2024 11:52:00 AM 8
T345546.1102
11/5/2024 11:52:07 AM
skirting overlapping
11/5/2024 11:52:12 AM
11/5/2024 11:52:18 AM
Images
11/5/2024 11:52:23 AM 9
T427849.1279
Make good to damages on car transom
Images
11/5/2024 11:52:47 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 145 Of 260
6
T345546.1103
Inconsistent gaps in wall panels
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/12/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/5/2024 11:52:55 AM 10
T427849.1280
re align panels as there are steps in the heights
Images
11/5/2024 11:53:35 AM 11
T427849.1281
11/5/2024 11:53:41 AM
Make good to gap in skirting
11/5/2024 11:53:48 AM
Images
11/5/2024 11:54:26 AM 12
T345546.1104
external car frame damage
Images
11/5/2024 11:55:43 AM 13
T345546.1429
11/5/2024 11:55:53 AM
scratches to top and side panels from inside of doors
Images
11/22/2024 9:16:33 AM 12/5/2024 10:39:47 AM
11/22/2024 9:16:53 AM Project Name: B5412 Project Honey
Page 146 Of 260
14
T456527.127
Loose light to be fitted
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:17:13 AM 15
T345546.1430
chip off the wooden panel trim
Images
11/22/2024 9:17:46 AM 16
T456527.128
Chip in handrail to be made good
Images
11/22/2024 9:17:56 AM 8
T456527.129
Chip in panel to be made good
Images
11/22/2024 9:18:30 AM 16
T456527.130
Chip in panel to be made good
Images
11/22/2024 9:18:50 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 147 Of 260
13
T345546.1431
cables visible above front panel
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:18:53 AM 3
T456527.131
Clean ceiling
Images
11/22/2024 9:19:28 AM 11
T456527.132
Scratch to be made good
Images
11/22/2024 9:19:49 AM 17
T456527.133
Mark in ceiling to be made good
Images
11/22/2024 9:20:32 AM 18
T456527.134
Control panel to be installed tighter as it is bowing against wall
Images
11/22/2024 9:21:33 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 148 Of 260
10
T456527.135
Dents in control panel to be made good
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:23:52 AM 9
T456527.155
Scratch on door to be made good
Images
11/22/2024 9:42:02 AM 9
T456527.158
Clean doors
Images
11/22/2024 9:44:44 AM Building A>Ground Floor>00L02 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1267
Damage to corners of lift ceiling tiles to be made good
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/4/2024 2:26:44 PM 2
T427849.1268
Clean ceiling lights
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 149 Of 260
Images
11/4/2024 2:27:11 PM 3
T427849.1269
Inconsistency in gaps between panels to be made good
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/4/2024 2:28:18 PM 4
T427849.1271
11/4/2024 2:28:24 PM
11/4/2024 2:28:30 PM
Mirror joint gaps are inconsistent and need re aligned
11/4/2024 2:28:36 PM
Images
11/4/2024 2:31:11 PM 5
T427849.1283
Tighten loose handle
Images
11/5/2024 11:57:19 AM 6
T345546.1105
The control panel is not fixed that consistently onto the wall
Images
11/5/2024 11:57:05 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 150 Of 260
6
T345546.1106
Damage to control panel where the Otis logo is
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/5/2024 11:57:52 AM 7
T427849.1284
Bottom of control panel is damaged and to be made good
Images
11/5/2024 11:58:10 AM 8
T345546.1107
inconsistent wall panel joints
Images
11/5/2024 11:59:03 AM 9
T345546.1108
Clean above lights
Images
11/5/2024 11:59:32 AM 10
T345546.1109
Scratches to ceiling soffit
Images
11/5/2024 12:00:47 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 151 Of 260
11
T456527.136
Bubble in screen to be made good
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:24:14 AM 11
T456527.137
Large gap at the top of control panel to be made good
Images
11/22/2024 9:24:41 AM 12
T456527.138
Scratch in ceiling to be made good
Images
11/22/2024 9:25:12 AM 13
T456527.139
Bowing where ceiling meets to be made good
Images
11/22/2024 9:25:43 AM 14
T456527.141
Large gap at the top of control panel to be made good
Images
11/22/2024 9:27:53 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 152 Of 260
14
T456527.142
Damage at the bottom of control panel to be made good
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:28:19 AM 15
T456527.143
Clean floor finish off skirting
Images
11/22/2024 9:28:48 AM 16
T456527.144
Scratch in ceiling to be made good
Images
11/22/2024 9:29:46 AM 17
T456527.145
Vents in lift are circles in this lift and square in all the rest
Images
11/22/2024 9:33:21 AM 17
T456527.156
Scratch on door to be made good
Images
11/22/2024 9:42:47 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 153 Of 260
18
T456527.468
Scratch on lift ceiling to be made good
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 10:47:44 AM 19
T408928.211
12/4/2024 10:47:51 AM
gaps in skirting and wall
Images
12/4/2024 10:52:09 AM 20
T408928.212
scratch on door surround within car
Images
12/4/2024 10:53:08 AM 21
T456527.469
Inconsistency in height of blue panel in different lifts to be made good
Images
12/4/2024 10:56:44 AM
12/4/2024 10:57:13 AM
Building A>Ground Floor>00L03 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1249
Inconsistency in lift ceiling finish above mirror
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 154 Of 260
Images
11/4/2024 1:51:24 PM 2
T427849.1250
Damage to ceiling edges
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/4/2024 1:52:38 PM 1
T427849.1251
11/4/2024 1:52:45 PM
Inconsistency in gaps between mirrors
Images
11/4/2024 1:53:56 PM 3
T345546.1082
11/4/2024 1:54:01 PM
Clean above lights
11/4/2024 1:54:10 PM
Images
11/4/2024 2:00:07 PM 4
T427849.1252
Scratch to be made good on panel
Images
11/4/2024 2:01:23 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 155 Of 260
5
T345546.1083
Control panel not fixed properly and also appears too low
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/4/2024 2:02:01 PM 6
T427849.1254
11/4/2024 2:02:11 PM
Inconsistent gap in ceiling join
Images
11/4/2024 2:03:54 PM 6
T345546.1084
11/4/2024 2:04:03 PM
scratches on car upright
Images
11/4/2024 2:05:37 PM 7
T427849.1256
11/4/2024 2:05:59 PM
Threshold not installed
Images
11/4/2024 2:06:09 PM 8
T345546.1085
Inconsistent heights on wall panels
Images
11/4/2024 2:06:53 PM 12/5/2024 10:39:47 AM
11/4/2024 2:07:03 PM
11/4/2024 2:07:13 PM Project Name: B5412 Project Honey
Page 156 Of 260
9
T345546.1095
Control paddle not fixed properly
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/5/2024 11:43:57 AM 10
T345546.1096
Scratches on control panel
Images
11/5/2024 11:44:55 AM 11
T427849.1275
11/5/2024 11:45:04 AM
Poor cut finish on car upright
Images
11/5/2024 11:46:32 AM 12
T427849.1276
Poor cut finish on car upright
Images
11/5/2024 11:46:53 AM 10
T345546.1098
inconsistent panel finishes to wall
Images
11/5/2024 11:46:59 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 157 Of 260
13
T345546.1099
do the holes require cover caps on handrails
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/5/2024 11:48:56 AM 10
T345546.1100
Inconsistent gaps on control panel unit backs onto wall
Images
11/5/2024 11:50:12 AM 14
T345546.1424
clean ceiling in lights
Images
11/22/2024 9:09:20 AM 15
T345546.1425
lift skirting doesn’t look correct as per other lifts looks too short
Images
11/22/2024 9:10:42 AM 16
T345546.1426
Control panel looks like it is bowing and has inconsistent gaps where the lights down the sides are
Images
11/22/2024 9:12:08 AM 12/5/2024 10:39:47 AM
11/22/2024 9:12:14 AM Project Name: B5412 Project Honey
Page 158 Of 260
17
T345546.1427
scratch to upright panel inside door
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:13:08 AM 1
T456527.125
Dent in ceiling to be made good
Images
11/22/2024 9:15:26 AM 18
T345546.1428
light strips look too low compared to other lifts
Images
11/22/2024 9:15:33 AM 7
T456527.157
Large scratch on both doors to be made good
Images
11/22/2024 9:43:45 AM Building A>Ground Floor>00L04 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1257
Inconsistency in gaps between mirrors
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 159 Of 260
Images
11/4/2024 2:11:30 PM 2
T427849.1258
11/4/2024 2:11:41 PM
Inconsistency in gaps between panels
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/4/2024 2:12:10 PM 3
T427849.1259
11/4/2024 2:12:14 PM
11/4/2024 2:12:21 PM
Damage to corners of lift ceiling tiles
11/4/2024 2:12:29 PM
11/4/2024 2:12:38 PM
11/4/2024 2:12:53 PM
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/4/2024 2:13:17 PM 4
T427849.1260
11/4/2024 2:13:24 PM
Handle loose and needs tightened
11/4/2024 2:13:31 PM
Images
11/4/2024 2:14:26 PM 5
T345546.1087
Clean above lights
Images
11/4/2024 2:16:57 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 160 Of 260
6
T427849.1263
Scratch on cad transom to be made good
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/8/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/4/2024
11/7/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/4/2024
11/11/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/4/2024 2:20:39 PM 7
T345546.1088
Scratches to car uprights
Images
11/4/2024 2:20:44 PM 8
T427849.1264
11/4/2024 2:21:00 PM
Damage on trim to be made good
Images
11/4/2024 2:21:31 PM 9
T427849.1265
Inconsistency to architrave gaps to be made good
Images
11/4/2024 2:24:33 PM 3
T345546.1089
11/4/2024 2:24:38 PM
Damage to black control panel
Images
11/5/2024 11:33:09 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 161 Of 260
10
T345546.1090
Control unit doesn’t appear to be fixed properly
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/5/2024 11:33:47 AM 3
T345546.1091
Inconsistency with wall panels joints
Images
11/5/2024 11:34:16 AM 3
T345546.1092
11/5/2024 11:34:22 AM
Inconsistency with the mirror joints
Images
11/5/2024 11:34:50 AM 3
T345546.1093
Inconsistency in heights of ceiling panels where they join
Images
11/5/2024 11:36:19 AM 3
T345546.1094
Clean above lights
Images
11/5/2024 11:38:08 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 162 Of 260
11
T456527.154
Scratch along both doors to be made good
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
Images
11/22/2024 9:40:57 AM 12
T408928.205
12/4/2024 10:44:42 AM
12/4/2024 10:44:51 AM
control panel has fixings pushing through above screen
Images
12/4/2024 10:38:10 AM 13
T408928.206
gap / inconsistent finish to skirting detail
Images
12/4/2024 10:41:14 AM 13
T408928.207
gap at top of control panel
Images
12/4/2024 10:43:05 AM 14
T408928.208
general deep needed of doors and car
12/4/2024
12/11/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
15
T408928.209
floor indicator is not flush with metal
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
Images
12/4/2024 10:47:09 AM Building A>Ground Floor>00L05 FF/Passenger Lift 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 163 Of 260
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.1110
The external architraves need to be consistent with all other lifts
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/5/2024
11/8/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/5/2024 12:03:30 PM 2
T345546.1111
indicator for which lift it is is not installed
Images
11/5/2024 12:04:37 PM 3
T427849.1441
Improve consistency in the gap size between the panels
Images
11/11/2024 1:59:33 PM 4
T427849.1442
11/11/2024 1:59:39 PM
11/11/2024 1:59:48 PM
Top of panels are stepping which needs to be made good
11/11/2024 1:59:56 PM
Images
11/11/2024 2:00:33 PM 5
T427849.1443
11/11/2024 2:00:37 PM
11/11/2024 2:00:43 PM
Ceilings are two different heights which need to be aligned
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 164 Of 260
Images
11/11/2024 2:01:41 PM 6
T427849.1444
Damage on panel to be made good
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/22/2024
11/28/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/11/2024 2:02:08 PM 7
T456527.126
Floor finish on skirting to be made good
Images
11/22/2024 9:15:58 AM 8
T456527.146
Floor finish to be cleaned off skirting
Images
11/22/2024 9:34:31 AM 9
T456527.147
Floor finish to be made good
Images
11/22/2024 9:35:20 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 165 Of 260
10
T456527.148
Skirting that isn’t flush to be made good
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/22/2024 9:36:56 AM 11
T456527.152
Scratch on door to be made good
Images
11/22/2024 9:39:12 AM 12
T456527.153
Mark on lift upright to be made good
Images
11/22/2024 9:39:59 AM Building A>Ground Floor>00L06 FF/Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.1434
Improve consistency in the gap size between the panels
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
11/11/2024 1:43:23 PM 2
T427849.1436
11/11/2024 1:43:30 PM
Clean floor finish off of skirting
12/5/2024 10:39:47 AM
11/11/2024 1:43:38 PM
Project Name: B5412 Project Honey
Page 166 Of 260
Images
11/11/2024 1:44:29 PM 1
T427849.1437
Improve the consistency in the gap at the top of the panels
11/11/2024
11/18/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/29/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/22/2024
11/28/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/11/2024 1:45:26 PM 3
T456527.149
11/11/2024 1:45:32 PM
Scratches above lift entrance to be made good
Images
11/22/2024 9:37:36 AM 4
T456527.150
Scratches above lift entrance to be made good
Images
11/22/2024 9:38:03 AM 5
T456527.151
Panel alignment to be made good
Images
11/22/2024 9:38:26 AM Building A>Ground Floor>00L07 Evacuation Lift Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 167 Of 260
1
T456527.519
Damages in doors to be made good
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:36:20 PM 2
T456527.520
General clean floor finish off skirting
Images
12/4/2024 2:37:30 PM 3
T456527.521
cap missing in ceiling to be replaced
Images
12/4/2024 2:38:14 PM 4
T456527.522
Remove all protection and clean goods lift
Images
12/4/2024 2:38:39 PM 5
T456527.523
Make good to scratches and marks on hand rail
Images
12/4/2024 2:39:03 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 168 Of 260
6
T456527.524
make good to damages in doors
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:39:26 PM 7
T456527.525
Loud noise to be got rid of behind door
Images
12/4/2024 2:41:14 PM 8
T456527.526
Damages in threshold to be made good
Images
12/4/2024 2:41:56 PM Building A>Ground Floor>00S01 Stair 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1007
white rail shouldnt be visible. please adjust timber handrail
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/11/2024 3:30:57 PM
11/14/2024 10:25:50 AM
11/19/2024 1:57:38 PM
Comments
Created By
Date
Can this be adjusted, gold paint doesn’t look great
Conor Colton (McLaughlin & Harvey)
11/19/2024 1:58:03 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 169 Of 260
2
T456527.408
Run mastic along top of boarding
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:18:02 PM Building A>Ground Floor>00S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1211
cracked precast stair to be repaired
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 2:38:06 PM 2
T456527.365
Lagging to be completed
Images
11/27/2024 11:56:37 AM 3
T456527.366
Clean gap in stair case
Building A>Ground Floor>033 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.220
Damages on architrave to be made good
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 9:44:27 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 170 Of 260
2
T456527.259
Area where conduit comes up through floor is not good enough and needs changed
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:29:18 AM 3
T456527.260
11/27/2024 10:29:25 AM
Door frame decoration to be completed
Images
11/27/2024 10:29:56 AM 4
T456527.261
Decoration walls to be completed
Images
11/27/2024 10:30:45 AM 3
T456527.262
11/27/2024 10:30:56 AM
Fire exit sign should be above fire exit
Images
11/27/2024 10:33:15 AM 5
T456527.264
Scratches to be made good on architrave
Images
11/27/2024 10:34:15 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 171 Of 260
6
T456527.265
Scratches to be made good on architrave
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 10:34:52 AM 7
T456527.266
Scratches to be made good on architrave
Images
11/27/2024 10:35:08 AM 5
T456527.267
Magic man to make good to damages on doors
Images
11/27/2024 10:38:36 AM 8
T345545.1353
handle missing on door
Images
11/29/2024 3:16:31 PM 9
T456527.529
Damages to architrave to be made good
Images
12/4/2024 2:45:36 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 172 Of 260
10
T456527.530
Missing handle to be installed
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:46:01 PM 11
T456527.531
Missing floor plates to be installed
Images
12/4/2024 2:46:25 PM Building A>Roof Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1937
PV system incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 10:32:55 AM T350553.2032
11/13/2024 10:33:01 AM
11/19/2024 5:01:50 PM
General comment external lighting needed at back of plant for escape route
11/19/2024 5:02:43 PM
Images
11/13/2024 12:51:05 PM T350553.2033
11/13/2024 12:51:13 PM
Nipple to be painted on lthw/chw
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 173 Of 260
Images
11/13/2024 12:52:46 PM T350553.2092
insulation to be made good
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/26/2024 2:10:56 PM T350553.2093
Differential pressure switch requires insulation
Images
11/26/2024 2:12:16 PM T350553.2094
general tidy required on roof
Images
11/26/2024 2:12:55 PM T350553.2095
11/26/2024 2:20:58 PM
tie wraps to be cut
Images
11/26/2024 2:13:48 PM Building A>Roof>Roof Plan Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 174 Of 260
T350553.1664
Insulation incomplete to LTHW/ CHW pipework
10/29/2024
11/5/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 10:31:14 AM
11/13/2024 10:31:26 AM
11/13/2024 10:31:40 AM
11/13/2024 10:31:54 AM
11/19/2024 4:59:58 PM
11/19/2024 5:00:16 PM
11/19/2024 5:00:33 PM
11/19/2024 5:00:53 PM
1
T350553.1860
All condensates to be ran into shingle
11/13/2024 10:32:02 AM
11/13/2024 10:32:15 AM
11/13/2024 10:32:22 AM
11/19/2024 4:59:27 PM
11/4/2024
11/11/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/4/2024 11:37:35 AM 2
T427849.1459
Lagging missing throughout
Images
11/11/2024 4:23:24 PM 3
T345545.1048
11/11/2024 4:24:44 PM
11/11/2024 4:24:52 PM
chipped paintwork at joint
Images
11/11/2024 4:27:16 PM
11/14/2024 12:44:14 PM
11/19/2024 1:41:47 PM
Comments
Created By
Date
Redo not good enough
Conor Colton (McLaughlin & Harvey)
11/19/2024 1:42:10 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 175 Of 260
4
T350553.1966
insulation incomplete
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 10:21:50 AM 5
T350553.1967
11/12/2024 10:22:07 AM
trace heating wiring incomplete
11/12/2024 10:22:19 AM
11/12/2024 10:22:28 AM
11/12/2024 10:22:54 AM
Images
11/12/2024 10:24:37 AM 6
T350553.1968
fire alarm sounder not secured
Images
11/12/2024 10:29:14 AM 7
T350553.1969
external lighting not live
Images
11/12/2024 10:30:00 AM 8
T350553.1970
11/12/2024 10:30:15 AM
smoke pressure pipe to be tidied up and secured
Images
11/12/2024 10:31:30 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 176 Of 260
9
T350553.1971
fp cables incomplete
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 10:32:57 AM 10
T350553.1972
Bms cable tray damaged needs replaced
Images
11/12/2024 10:34:23 AM 11
T350553.1973
11/12/2024 10:34:37 AM
tiewraps to be cut short
11/12/2024 10:35:02 AM
Images
11/12/2024 10:35:57 AM 12
T350553.1974
chiller supply cable to be properly supported
Images
11/12/2024 10:36:58 AM 13
T350553.1975
PV cabling to be completed
Images
11/12/2024 10:39:59 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 177 Of 260
14
T350553.1976
smoke vent panels to be properly labelled
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/18/2024
Snag
Opened
Roofing
Aym (Services) Limited
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 10:41:26 AM 15
T345546.1282
11/12/2024 10:41:31 AM
replacing slabs
Images
11/12/2024 12:37:44 PM
11/12/2024 12:37:49 PM
11/12/2024 12:38:04 PM
Comments
Created By
Date
STATUS CHANGE: No pictures
Dominic Driver (McLaughlin & Harvey)
12/4/2024 9:07:18 AM
16
T345546.1283
Condensed pipes to angle back over the shingle
11/12/2024
11/18/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/12/2024 12:38:54 PM 17
T350553.2028
11/12/2024 12:39:01 PM
Lights not working and reference required on switch
Images
11/13/2024 12:45:16 PM 18
T350553.2029
11/13/2024 12:45:23 PM
metal clips required on armours
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 178 Of 260
Images
11/13/2024 12:46:49 PM 19
T350553.2030
metal clips required on armours
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/18/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Dominic Driver)
Images
11/13/2024 12:47:44 PM 20
T350553.2031
11/13/2024 12:49:54 PM
references on all plant and electrical panelsASHP AHU etc
Images
11/13/2024 12:48:55 PM 21
T350553.2034
Containment to carry on to vertical run
Images
11/13/2024 12:57:01 PM 22
T345546.1360
Cut the bottom of metal door so it doesn’t crash with the PTSG harness line
Images
11/13/2024 3:05:14 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 179 Of 260
23
T345546.1362
put bends on the condense pipes so water lands over the ballast and not slabs
11/13/2024
11/18/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 3:09:04 PM 24
T350553.2089
11/13/2024 3:09:10 PM
insulation incomplete
Images
11/26/2024 2:01:00 PM 25
T350553.2090
11/26/2024 2:01:06 PM
11/26/2024 2:28:56 PM
combing required to all units
11/26/2024 2:29:05 PM
11/26/2024 2:29:11 PM
11/26/2024 2:29:22 PM
11/26/2024 2:29:32 PM
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 2:02:32 PM 26
T350553.2091
11/26/2024 2:02:37 PM
valve handle doesn’t shut tray to be cut back
11/26/2024 2:02:42 PM
Images
11/26/2024 2:04:51 PM 27
T350553.2096
drop rod bent and bracket not taking any weight
Images
11/26/2024 2:17:40 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 180 Of 260
28
T350553.2097
tray needs secured
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 2:18:35 PM 29
T350553.2098
references required on all spurs and isolators
Images
11/26/2024 2:19:38 PM 30
T350553.2099
11/26/2024 2:22:36 PM
can ASHP be maintained with door not opening all the way
Images
11/26/2024 2:23:56 PM 31
T350553.2100
PV panels to be cleaned
Images
11/26/2024 2:26:07 PM 32
T350553.2101
BMS wiring incomplete
Images
11/26/2024 2:37:08 PM 12/5/2024 10:39:47 AM
11/26/2024 2:37:37 PM Project Name: B5412 Project Honey
Page 181 Of 260
33
T456527.457
Decoration to be completed
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:56:13 PM
11/27/2024 2:56:22 PM
Building A>Second Floor>0201 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T383078.171
Joints in LED strip lighting are inconsistent throughout and need to be reviewed (General Snag)
10/2/2024
10/9/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Murphy McCutcheon)
Images
10/2/2024 11:37:00 AM
10/15/2024 11:14:33 AM
10/23/2024 10:44:54 AM
Comments
Created By
Date
Still not fully addressed.
Vanngel Natso (McLaughlin & Harvey)
10/23/2024 10:45:18 AM
2
T338993.1832
The fire curtain point should be with breaking glass to prevent people from pressing it.
10/23/2024
10/30/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Vanngel Natso)
10/23/2024
10/30/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/23/2024 9:24:41 AM T338993.1835
10/23/2024 9:24:45 AM
Light not 2nd fixed.
Images
10/23/2024 9:28:38 AM
10/23/2024 9:28:43 AM
10/24/2024 11:01:14 AM
Comments
Created By
Date
Closing snag photo is taken from the wrong location of snag issued by McLH. Please reissue correct location photo to close out snag properly
James Parker (Halsion )
10/25/2024 9:23:10 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 182 Of 260
3
T345546.757
Improve preparation work for screw holes on frame – not a great finish
10/23/2024
10/28/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
10/23/2024
10/30/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
10/23/2024 9:39:04 AM 4
T345545.639
10/23/2024 9:39:11 AM
10/23/2024 9:39:37 AM
core wall adjacent to ductwork to be sanded and decorated
Images
10/23/2024 10:20:41 AM 5
T345545.1158
fire curtain escape button not fixed
Images
11/20/2024 10:51:59 AM 6
T456527.44
Ensure all uni strut is filled around with fire stop
Images
11/20/2024 10:52:29 AM 7
T456527.45
Welds on the outside at corner not consistent with other floors
Images
11/20/2024 10:53:40 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 183 Of 260
8
T345545.1161
magic man to make good to feature stair opening
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Post PC Defect
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Vanngel Natso)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/20/2024 10:58:00 AM 9
T345545.1360
lights are not aligned with ceilings
Images
12/4/2024 11:44:29 AM 10
T345545.1361
end cap missing on light
Images
12/4/2024 11:45:13 AM 11
T338993.2329
Red paint from the tile to be cleaned.
Images
12/4/2024 12:06:10 PM 12
T338993.2330
12/4/2024 12:06:17 PM
12/4/2024 12:06:25 PM
Lights not in line.
Images
12/4/2024 12:07:50 PM 12/5/2024 10:39:47 AM
12/4/2024 12:08:01 PM
12/4/2024 12:08:19 PM
12/4/2024 12:08:29 PM
12/4/2024 12:08:45 PM Project Name: B5412 Project Honey
Page 184 Of 260
13
T338993.2331
Lights not in line.
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 12:09:31 PM 14
T456527.492
12/4/2024 12:09:48 PM
Light with end hanging out to be aligned
Images
12/4/2024 12:18:25 PM 15
T345545.1362
grille to be clipped in and sprinkler to be realigned and rosette fitted
Images
12/4/2024 12:22:35 PM 16
T456527.493
Frosted diffuser to be installed in light 2
Images
12/4/2024 12:24:21 PM 17
T456527.494
Make good of damage to grill opening
Images
12/4/2024 12:26:18 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 185 Of 260
Building A>Second Floor>0202 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.525
Otis to install missing Lift numbers/letters and push buttons and indicators on Lifts 02, 05 and 06
10/17/2024
10/21/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/17/2024 1:48:29 PM 2
T350553.1402
10/17/2024 1:48:36 PM
10/17/2024 1:48:46 PM
10/17/2024 1:48:55 PM
All BMS cabling to be tidied up and tiewrapped neatly
Images
10/21/2024 11:39:02 AM T338993.1786
10/21/2024 11:41:35 AM
Light not alined between them.
Images
10/22/2024 9:54:00 AM
10/22/2024 9:54:20 AM
11/13/2024 11:33:00 AM
11/13/2024 11:33:10 AM
11/13/2024 11:33:21 AM
Comments
Created By
Date
Missing photos from the lights not aligned.
Vanngel Natso (McLaughlin & Harvey)
11/19/2024 7:15:49 PM
Photo evidence has been provided of snag complete
James Parker (Halsion )
11/20/2024 10:14:38 AM
Photos of the 2 small lights which are not in line, are not provided on the attached photos.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 2:08:38 PM
T338993.1788
Additional metal cable ties required on cable drops and cables not run within containment.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 9:58:13 AM
12/5/2024 10:39:47 AM
10/22/2024 9:58:20 AM
Project Name: B5412 Project Honey
Page 186 Of 260
3
T345545.538
fire curtains to be checked for compliance. gaps at wings look to be different sizes
10/22/2024
10/29/2024
Snag
Opened
Fire Curtains
Coopers Fire
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Liana Maltezou)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
10/22/2024 11:32:59 AM 4
T345545.541
10/22/2024 11:33:21 AM
indicator not fitted correctly
Images
10/22/2024 11:39:22 AM 5
T345545.542
indicator not fitted
Images
10/22/2024 11:39:41 AM 6
T350553.1695
BMS wiring incomplete
Images
10/30/2024 10:36:00 AM 7
T345545.953
11/6/2024 4:39:33 PM
cables in basket to be tidied up
11/14/2024 10:08:41 AM
Images
11/8/2024 9:16:45 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 187 Of 260
8
T345545.954
flow meter resting on tiles to be removed
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 9:17:14 AM 9
T345545.956
cables above ceiling to be tidied up
Images
11/8/2024 9:19:57 AM 10
T345545.958
caps missing from fire curtain framing
Images
11/8/2024 9:21:37 AM 11
T427849.1298
11/8/2024 9:21:42 AM
Make good of damage on architrave
Images
11/8/2024 9:28:28 AM 12
T427849.1299
Make good of damage on door handle
Images
11/8/2024 9:29:15 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 188 Of 260
12
T427849.1301
Put something under neath plate to avoid future damages
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 9:30:31 AM 13
T427849.1302
Architrave not a consistent distance from fire curtain frame
Images
11/8/2024 9:31:18 AM 14
T427849.1303
Remove tap around fire curtain
Images
11/8/2024 9:44:56 AM 15
T427849.1304
Damage on door to be made good
Images
11/8/2024 9:52:11 AM 16
T345546.1127
General item lift letters missing
Images
11/8/2024 9:51:40 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 189 Of 260
17
T345546.1128
Call button not fixed on wall properly
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 9:56:09 AM Building A>Second Floor>0203 Corridor 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.349
Improve finish to architrave and remove snots of paint
10/17/2024
10/21/2024
Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Murphy McCutcheon)
Images
10/17/2024 1:25:40 PM 2
T383078.250
10/17/2024 1:25:47 PM
High level paint finish to be improved
10/17/2024 1:25:54 PM
10/17/2024 1:26:06 PM
10/17/2024 1:26:14 PM 10/17/2024
10/17/2024 1:26:23 PM 10/19/2024
Snag
Images
10/17/2024 1:28:54 PM
11/5/2024 3:36:16 PM
Comments
Created By
Date
still hopes to be filled
Conor Colton (McLaughlin & Harvey)
11/5/2024 3:36:30 PM
3
T345546.517
Missing architrave
10/17/2024
10/21/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
Images
10/17/2024 1:33:02 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 190 Of 260
4
T350553.1397
cover to be removed from smoke head
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/22/2024
10/28/2024
Snag
Opened
Painting & Decorating
AC Beck
Darling Associates (Liana Maltezou)
10/22/2024
10/27/2024
Snag
Opened
Painting & Decorating
AC Beck
Darling Associates (Liana Maltezou)
11/8/2024
11/12/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
10/21/2024 11:29:18 AM T338993.1768
Cleaner socket not level.
Images
10/22/2024 8:58:57 AM 5
T345546.682
10/22/2024 8:59:15 AM
Improved decoration to the architraves
Images
10/22/2024 11:16:07 AM 6
T345546.684
10/22/2024 11:16:21 AM
Improve finish to corners of architraves
10/22/2024 11:16:28 AM
10/22/2024 11:16:38 AM
Images
10/22/2024 11:21:59 AM 7
T345546.1112
Improve finish around Firestopping
Images
11/8/2024 9:16:00 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 191 Of 260
8
T345546.1117
General item – Missing for the Unistrut rods
11/8/2024
11/12/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 9:20:59 AM Comments
Created By
Date
Could I please have some further information as cannot see what is missing from the description or the comment
Brett Pitcher (Halsion )
11/20/2024 9:29:32 AM
9
T345546.1118
realignment required for ceiling bays not lined up with ceiling heater properly
11/8/2024
11/12/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 9:21:47 AM Building A>Second Floor>0204 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1584
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/3/2024 4:29:47 PM Comments
Created By
Date
duplicate snag F1.3028633
Brett Pitcher (Halsion )
10/27/2024 8:24:52 PM
The snags are raised on different toilets.
Vanngel Natso (McLaughlin & Harvey)
11/19/2024 7:19:20 PM
Building A>Second Floor>0205 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1587
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 192 Of 260
Images
10/3/2024 4:42:46 PM Building A>Second Floor>0206 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T383078.259
Remove redundant drop top from soffit
10/17/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Murphy McCutcheon)
10/17/2024
10/20/2024
Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/17/2024 2:00:24 PM 2
T427849.360
Repaint damaged architrave
Images
10/17/2024 2:03:11 PM 3
T350553.1410
10/17/2024 2:03:18 PM
BMS cabling incomplete
10/17/2024 2:03:36 PM
10/17/2024 2:03:42 PM
Images
10/21/2024 11:53:42 AM T338993.1782
PIR cable not run properly, too long.
Images
10/22/2024 9:45:36 AM 12/5/2024 10:39:47 AM
10/22/2024 9:45:44 AM Project Name: B5412 Project Honey
Page 193 Of 260
T338993.1789
Additional metal cable ties required on cable drops and cables not run within containment.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/22/2024
10/28/2024
Snag
Opened
Painting & Decorating
AC Beck
Darling Associates (Liana Maltezou)
10/22/2024
10/28/2024
Snag
Opened
Painting & Decorating
AC Beck
Darling Associates (Liana Maltezou)
10/22/2024
10/28/2024
Snag
Opened
Painting & Decorating
AC Beck
Darling Associates (Robyn Harrison Church)
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
Images
10/22/2024 10:06:58 AM 4
T345546.695
10/22/2024 10:07:04 AM
Make good on the door frame
Images
10/22/2024 11:42:27 AM 2
T345546.699
10/22/2024 11:42:35 AM
10/22/2024 11:42:42 AM
10/22/2024 11:42:48 AM
make good And decorate behind conduitabove staircase entrance
Images
10/22/2024 11:51:28 AM 5
T427849.511
Fill damages and repaint around door frame
Images
10/22/2024 11:51:40 AM 2
T427849.1295
10/22/2024 11:51:45 AM
Make good go wall around fire exit sign
10/22/2024 11:51:54 AM
10/22/2024 11:52:03 AM
10/22/2024 11:52:09 AM 11/8/2024
11/19/2024 10:03:26 AM 11/15/2024
Client Snag
Images
11/8/2024 9:23:43 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 194 Of 260
1
T427849.1297
Re do fire stop once cable removed
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 9:27:41 AM Building A>Second Floor>0207 CC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1413
Sprinkler rosette missing
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/21/2024 12:04:23 PM Building A>Second Floor>02L05 FF/Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.959
hole to be infilled
11/8/2024
11/15/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
11/8/2024 9:22:37 AM Building A>Second Floor>02L07 Evacuation Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.525
missing architrave on goodslift
10/22/2024
10/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Liana Maltezou)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/22/2024 11:14:45 AM Building A>Second Floor>02R05 LS Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 195 Of 260
T350553.1693
wiring incomplete
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/30/2024 10:34:21 AM T350553.1694
11/6/2024 4:38:52 PM
11/14/2024 10:07:59 AM
11/14/2024 10:08:08 AM
BMS wiring incomplete
11/21/2024 10:58:53 AM
Images
10/30/2024 10:34:55 AM
11/6/2024 4:38:35 PM
11/14/2024 10:06:23 AM
11/21/2024 10:58:21 AM
Building A>Second Floor>02R17 Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2244
2nd fix incomplete.
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/12/2024 2:05:40 PM T338993.2250
11/12/2024 2:05:58 PM
Schedule is missing and Labels on circuits.
Images
11/12/2024 2:22:59 PM T338993.2251
11/12/2024 2:22:59 PM
Missing screws from the panel’s cover.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 196 Of 260
Images
11/12/2024 2:23:53 PM Building A>Second Floor>02S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1777
Cleaner’s socket bottom not at 450mm FFFL. 20mm Lower.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 9:30:30 AM
10/22/2024 9:30:31 AM
11/4/2024 9:20:45 AM
11/11/2024 7:37:22 PM
Comments
Created By
Date
Snag complete photo has been taken from the wrong location. Please attach photo in correct location showing the snag has been complete
James Parker (Halsion )
11/6/2024 7:58:10 AM
This is the correct location
Brett Pitcher (Halsion )
11/6/2024 8:23:06 AM
No its not!
James Parker (Halsion )
11/7/2024 7:42:46 AM
1
T456527.185
Make good to damages in plasterboard
11/25/2024
12/29/2024
Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Darling Associates (Robyn Harrison Church)
11/27/2024
12/4/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/25/2024 3:26:05 PM 2
T456527.416
Clean paint off concrete finish
Images
11/27/2024 2:25:28 PM Building A>Second Floor>02S02 Stair Lobby Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 197 Of 260
T338993.1673
Cleaner socket’s not flash with the wall.
10/14/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
10/14/2024 2:59:29 PM 1
T456527.417
10/14/2024 2:59:39 PM
Fill gap next to lift architrave
Images
11/27/2024 2:26:09 PM 2
T456527.418
Make good to damages under in plasterboard
Images
11/27/2024 2:26:46 PM 3
T456527.419
Cover miss for fire alarm
Images
11/27/2024 2:27:22 PM 4
T456527.420
Socket is loose
Images
11/27/2024 2:27:49 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 198 Of 260
Building A>Second Floor>02S03 Stair 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1769
Cleaner’s socket bottom not at 450mm FFFL. 15mm Lower.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 9:05:06 AM
10/22/2024 9:05:06 AM
11/4/2024 9:22:29 AM
11/11/2024 8:14:54 AM
Comments
Created By
Date
Snag complete photo has been taken from the wrong location. Please attach photo in correct location showing the snag has been complete
James Parker (Halsion )
11/6/2024 7:56:50 AM
T338993.1771
All Lights missing green led for battery health indication.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/20/2024
11/25/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
10/22/2024 9:11:33 AM 1
T408928.85
10/22/2024 9:11:42 AM
level 2/3 light damaged
Images
11/20/2024 3:09:05 PM Building A>Second Floor>02S04 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1682
Cleaner socket’s bottom not at 450mm. 30mm lower.
10/14/2024
10/21/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 8:25:44 AM Comments
Created By
Date
No photo evidence attached, therefore task is rejected.
Vanngel Natso (McLaughlin & Harvey)
11/4/2024 8:35:14 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 199 Of 260
1
T427849.350
Improve finish of caulk around architrave
10/17/2024
10/21/2024
Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
10/17/2024 1:28:40 PM 2
T408928.83
10/17/2024 1:28:48 PM
hole in twin wall above door
10/17/2024 1:28:55 PM
Images
11/20/2024 2:59:39 PM 3
T345545.1218
cellophane to be removed from heater
Images
11/20/2024 3:00:29 PM 4
T345545.1219
paint on junction boxes
Images
11/20/2024 3:01:01 PM 5
T345545.1220
paint to be cleaned off walls
Images
11/20/2024 3:01:30 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 200 Of 260
6
T345545.1221
splatter to be cleaned off walls
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 3:02:33 PM
11/20/2024 3:02:44 PM
Building A>Seventh Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T383078.325
RAF infills to be complete once glazing installed
10/25/2024
11/1/2024
Incomplete Works
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Murphy McCutcheon)
11/8/2024
11/15/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
10/25/2024 3:29:54 PM T427849.1370
Floor finish not going under architrave
Images
11/8/2024 11:37:52 AM T427849.1374
Mitre joint on ceiling has large gap to be rectified
Images
11/8/2024 11:41:19 AM T427849.1375
Mitre joint on ceiling has large gap to be rectified
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 201 Of 260
Images
11/8/2024 11:41:31 AM Building A>Seventh Floor>0701 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1643
valve plugs missing from air points
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/30/2024
11/1/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
10/30/2024
11/1/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
10/30/2024
11/1/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Robyn Harrison Church)
Images
10/28/2024 2:31:10 PM 2
T427849.936
Door architraves not aligned correctly
Images
10/30/2024 11:16:52 AM 3
T427849.947
Damage to door to be made good
Images
10/30/2024 11:25:36 AM 4
T427849.949
Door architraves are not aligned up
Images
10/30/2024 11:26:33 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 202 Of 260
5
T345545.881
alignment of balustrades to be improved
11/4/2024
11/11/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/12/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Groundworks
Mitchellson
Francis Hunter (Luke Nurser)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Images
11/4/2024 11:25:04 AM 6
T345546.1216
replace rusty slabs
Images
11/8/2024 3:22:44 PM 7
T345546.1219
Tile needs to be replaced
Images
11/8/2024 3:30:27 PM 8
T408928.46
make good column edge
Images
11/8/2024 3:31:49 PM 9
T444645.611
pipe to be raised approx 30mm to clear ceiling height
Images
11/8/2024 3:43:09 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 203 Of 260
10
T444645.612
RAF quite severely scratched
11/8/2024
11/15/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (James McKeever)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/13/2024
11/18/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 3:45:09 PM 11
T350553.2000
insulation to be made good
Images
11/13/2024 12:11:22 PM 12
T427849.1515
Paint touch up required on door
Images
11/13/2024 1:59:32 PM 13
T345546.1323
paint on duct work and high level compex please check all
Images
11/13/2024 1:59:52 PM 12
T427849.1516
11/13/2024 2:00:15 PM
Adhesive to be removed from door
Images
11/13/2024 2:00:12 PM 12/5/2024 10:39:47 AM
11/13/2024 2:00:31 PM
11/13/2024 2:00:43 PM Project Name: B5412 Project Honey
Page 204 Of 260
14
T427849.1517
Fire stopping to be completed
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/15/2024
11/19/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
Images
11/13/2024 2:01:34 PM 15
T427849.1519
Fire stopping to be completed
Images
11/13/2024 2:03:08 PM 16
T427849.1521
Paint touch up required on areas with tape
Images
11/13/2024 2:04:55 PM 16
T427849.1523
11/13/2024 2:05:00 PM
Paint by king at corner to be made good
Images
11/13/2024 2:06:56 PM 17
T427849.1568
11/13/2024 2:07:03 PM
Fill gap in floor board
Images
11/15/2024 10:41:28 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 205 Of 260
Comments
Created By
Date
STATUS CHANGE: No picture
Dominic Driver (McLaughlin & Harvey)
12/4/2024 8:54:47 AM
18
T427849.1569
Step chip at edge to be made good
11/15/2024
11/19/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
Images
11/15/2024 10:42:34 AM
11/19/2024 8:38:18 AM
Comments
Created By
Date
STATUS CHANGE: Doesnt look particularly great needs to be touched up better
Dominic Driver (McLaughlin & Harvey)
12/4/2024 8:54:25 AM
19
T456527.12
general clean white trim around edge and the inside of balustarde and floor where dust is collecting
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 9:15:32 AM 20
T456527.14
11/20/2024 9:15:42 AM
Clean paint between joint
11/20/2024 9:16:05 AM
Images
11/20/2024 9:18:25 AM 21
T456527.15
Alignment to be made good
Images
11/20/2024 9:20:13 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 206 Of 260
22
T456527.16
Gaps between you angel are inconsistent and two equal spacers
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/25/2024
Client Snag
Opened
Floors raised access
Kingspan
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/26/2024
11/29/2024
Client Snag
Opened
Floors raised access
Kingspan
Francis Hunter (Luke Nurser)
11/26/2024
11/29/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
11/20/2024 9:24:11 AM 23
T345546.1366
11/20/2024 9:24:19 AM
floor tiles are not sitting under the edge trim of feature stairs
Images
11/20/2024 9:35:57 AM 24
T456527.17
Different shade of wood on balustrade handle to be changed
Images
11/20/2024 9:36:52 AM 25
T408928.113
tile need screwing down
Images
11/26/2024 3:43:44 PM 26
T408928.116
pipes too low to achieve 2.8m with margin. both need raising
Images
11/26/2024 3:57:02 PM
12/5/2024 10:39:47 AM
11/26/2024 3:57:08 PM
Project Name: B5412 Project Honey
Page 207 Of 260
27
T456527.205
Pipe is too low
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 3:57:55 PM 28
T350553.2159
SVP too low, should be 2860, currently at 2470
Images
11/27/2024 11:37:30 AM 29
T350553.2160
11/27/2024 11:37:36 AM
future use condensate to be capped
Images
11/27/2024 11:39:45 AM 30
T350553.2161
RWP installed too low, should be 2860, currently at 2760 as it passers through wall
Images
11/27/2024 11:41:28 AM 31
T350553.2162
11/27/2024 11:41:43 AM
RWP installed too low, should be 2860, currently at 2760 as it passers through wall
Images
11/27/2024 11:42:28 AM 12/5/2024 10:39:47 AM
11/27/2024 11:42:34 AM Project Name: B5412 Project Honey
Page 208 Of 260
Building A>Seventh Floor>0702 Lift Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1996
Additional bracket / support required on services close to fire stopping to eliminate the weight on fire stopping, as per building control comments.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 2:05:32 PM T338993.1997
10/29/2024 2:05:45 PM
Fire curtain’s basket not earth linked with the rest of the containments.
Images
10/29/2024 2:06:43 PM T338993.2049
10/29/2024 2:06:50 PM
10/29/2024 2:07:13 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/30/2024 4:03:01 PM T338993.2050
10/30/2024 4:03:05 PM
10/30/2024 4:03:10 PM
All the emergency lights missing the green led, indicating the health of the battery.
Images
10/30/2024 4:03:58 PM T338993.2216
Lift indicators not installed.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 209 Of 260
Images
11/8/2024 11:13:55 AM 1
T427849.1380
11/8/2024 11:14:04 AM
Make good of damaged paint on door
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/11/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 11:45:26 AM 2
T427849.1381
Make good of damaged paint on door
Images
11/8/2024 11:46:08 AM 3
T427849.1383
Make good of damaged architrave
Images
11/8/2024 11:48:03 AM 4
T345546.1186
instructed works need to be complete for the fire curtain lifts finish
Images
11/8/2024 11:47:10 AM Comments
Created By
Date
Not instructed yet
Sam Heath (AC Beck )
11/19/2024 1:48:13 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 210 Of 260
5
T427849.1384
general fit all lift signs
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/12/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 11:48:29 AM 5
T427849.1385
Make good to dent on lift door
Images
11/8/2024 11:48:53 AM 6
T427849.1386
Make good of scratches on lift door
Images
11/8/2024 11:49:17 AM 7
T427849.1387
11/8/2024 11:49:23 AM
Remove packers under architraves
Images
11/8/2024 11:50:04 AM 8
T345546.1188
scratches black fire curtains instruction required for Serna
Images
11/8/2024 11:52:59 AM 12/5/2024 10:39:47 AM
11/8/2024 11:53:13 AM
11/8/2024 11:53:24 AM
11/8/2024 11:53:31 AM
11/8/2024 11:53:45 AM Project Name: B5412 Project Honey
Page 211 Of 260
9
T427849.1522
Paint by king at corner to be made good
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/13/2024 2:06:22 PM Building A>Seventh Floor>0703 Corridor 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2005
Additional metal cable ties required on cable drops and cables running out of containment.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 3:10:12 PM T338993.2039
10/29/2024 3:10:18 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/30/2024 11:37:57 AM T338993.2052
10/30/2024 11:38:01 AM
All the emergency lights missing the green led, indicating the health of the battery.
Images
10/30/2024 4:06:05 PM T338993.2214
Exit Light not working.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 212 Of 260
Images
11/8/2024 11:10:00 AM 1
T427849.1362
Check height of futue use pipe
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 11:25:05 AM Building A>Seventh Floor>0704 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1999
Basket bended.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 2:19:34 PM T338993.2003
10/29/2024 2:19:40 PM
10/29/2024 2:19:48 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/29/2024 3:07:10 PM T338993.2015
10/29/2024 3:07:17 PM
Light not in line between them.
Images
10/30/2024 10:18:25 AM 12/5/2024 10:39:47 AM
10/30/2024 10:18:30 AM Project Name: B5412 Project Honey
Page 213 Of 260
Building A>Seventh Floor>0705 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2018
Additional metal cable ties required on cable drops and cables running out of containment.
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/31/2024
11/7/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
11/26/2024
12/29/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
10/30/2024 10:27:51 AM 1
T345546.960
10/30/2024 10:27:55 AM
Fire alarm to be changed to black fitting
Images
10/31/2024 10:53:19 AM 2
T427849.1391
Conduit bracket loose
Images
11/8/2024 12:00:40 PM 3
T427849.1402
Make good around pipe work
Images
11/8/2024 12:09:37 PM 4
T408928.112
light layout doesn’t look correct
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 214 Of 260
Images
11/26/2024 3:40:36 PM Building A>Seventh Floor>0706 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1161
Water meter not connected to BMS
10/10/2024
10/17/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/10/2024 2:08:55 PM T338993.2051
11/7/2024 10:50:14 AM
11/13/2024 11:38:09 AM
11/20/2024 10:28:39 AM
All the emergency lights missing the green led, indicating the health of the battery.
Images
10/30/2024 4:05:20 PM T338993.2059
Cables not run and dressed properly. Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/30/2024 4:23:09 PM 2
T338993.2220
10/30/2024 4:23:14 PM
10/30/2024 4:23:23 PM
Cable not properly dressed. Below ceiling level.
10/30/2024 4:23:30 PM
10/30/2024 4:23:36 PM 11/8/2024
10/30/2024 4:23:41 PM 11/15/2024
Client Snag
Images
11/8/2024 11:19:10 AM 12/5/2024 10:39:47 AM
11/8/2024 11:19:21 AM
11/8/2024 11:19:48 AM Project Name: B5412 Project Honey
Page 215 Of 260
3
T338993.2221
Exposed PIR singles / cables on connection.
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/12/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 11:21:05 AM 4
T338993.2222
11/8/2024 11:21:17 AM
Sprinkler’s lagging missing foil on the end of the lagging.
Images
11/8/2024 11:23:43 AM 5
T338993.2223
11/8/2024 11:23:49 AM
Duct to be more presentable since we have open ceilings. The white past to be cleaned where not needed.
Images
11/8/2024 11:26:18 AM 6
T345546.1172
11/8/2024 11:26:24 AM
skirting is not straight assuming because of the wall please remove skirting so atjones can do works
Images
11/8/2024 11:29:21 AM 7
T345546.1173
ATjones to improve wall finish behind skirting so it fits flush
Images
11/8/2024 11:30:00 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 216 Of 260
8
T345546.1175
Remedial works to the Firestopping warehouse and have pulled cables through a ruin it
11/8/2024
11/12/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/15/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/25/2024
12/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 11:32:49 AM 9
T345546.1176
general item at the end remove and clean above service tiles
Images
11/8/2024 11:33:23 AM 10
T345546.1177
damage to socket face plate
Images
11/8/2024 11:34:06 AM 11
T345546.1178
general paint on unistruts
Images
11/8/2024 11:35:32 AM 12
T456527.174
Light to be fitted and aligned properly
Images
11/25/2024 2:47:38 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 217 Of 260
13
T456527.175
Light to be aligned more centre of ceiling tiles
11/25/2024
12/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/25/2024 2:49:01 PM Building A>Seventh Floor>07L07 Evacuation Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.518
Ensure all protection is removed from outer door of lift
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:35:35 PM Building A>Seventh Floor>07R01 LTHW&CHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2111
insulation to be tidied up
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 3:26:06 PM
11/26/2024 3:26:13 PM
11/26/2024 3:26:19 PM
Building A>Seventh Floor>07R05 LS Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1929
BMS wiring incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/7/2024 10:56:06 AM
11/13/2024 11:41:41 AM
11/20/2024 10:35:53 AM
Building A>Seventh Floor>07R09 MVent Riser Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 218 Of 260
1
T350553.2112
plug missing from vent
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/26/2024 3:31:14 PM 2
T350553.2113
insulation to be tidied up
Images
11/26/2024 3:31:55 PM
11/26/2024 3:32:01 PM
Building A>Seventh Floor>07R14 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.114
all drainage pipes below 2.8m
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
11/26/2024 3:46:04 PM
11/26/2024 3:46:11 PM
11/26/2024 3:46:18 PM
Building A>Seventh Floor>07R17 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T383078.291
Core holes within riser to be fire stopped
10/25/2024
11/28/2024
Incomplete Works
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Murphy McCutcheon)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/25/2024 10:47:58 AM
10/25/2024 10:48:15 AM
Building A>Seventh Floor>07S01 Stair 01 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 219 Of 260
T338993.1995
Missing saddle’s clips / conduit not secured.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 1:50:19 PM T338993.2064
10/29/2024 1:50:28 PM
10/29/2024 1:50:35 PM
Cleaner’s socket bottom should be at 450mm FFFL. Socket 30mm lower.
Images
10/30/2024 4:29:38 PM
10/30/2024 4:29:38 PM
10/30/2024 4:29:38 PM
10/30/2024 4:30:42 PM
Comments
Created By
Date
Also, socket back box is broken.
Vanngel Natso (McLaughlin & Harvey)
10/30/2024 4:30:34 PM
Building A>Seventh Floor>07S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2045
All the emergency lights missing the green led, indicating the health of the battery.
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/25/2024
12/2/2024
Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
Darling Associates (Robyn Harrison Church)
Images
10/30/2024 3:51:08 PM 1
T456527.176
Clean all paint from exposed concrete in both stair cores
Images
11/25/2024 3:01:16 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 220 Of 260
2
T456527.446
Fill gap next to architrave
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:48:07 PM Building A>Seventh Floor>07S03 Stair 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2025
Fire alarm cable not secured properly with no combustible support.
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/30/2024 10:48:53 AM T338993.2028
10/30/2024 10:48:58 AM
Cleaner’s socket not level.
Images
10/30/2024 10:59:06 AM
10/30/2024 10:59:07 AM
Building A>Seventh Floor>07S04 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2001
Basket not sufficiently supported.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 2:29:38 PM Comments
Created By
Date
basket has been moved / redesigned due to ceiling being replaced
Brett Pitcher (Halsion )
11/21/2024 10:15:51 AM
Containment should be secured and works confirmed.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 2:57:44 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 221 Of 260
T338993.2026
Lighting cable not secured properly with no combustible support.
10/30/2024
11/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/30/2024 10:51:26 AM Comments
Created By
Date
cabling redesigned and restructured due to replacement ceiling put in
Brett Pitcher (Halsion )
11/21/2024 11:05:06 AM
Building A>Sixth Floor>0601 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.573
incomplete fire curtain
10/22/2024
10/29/2024
Snag
Opened
Fire Curtains
Coopers Fire
Darling Associates (Liana Maltezou)
11/1/2024
11/6/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Dominic Driver)
11/1/2024
11/6/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Dominic Driver)
Images
10/22/2024 12:38:03 PM 2
T345546.1022
Gasket not correct
Images
11/1/2024 11:30:25 AM 3
T345546.1023
11/1/2024 11:30:34 AM
11/1/2024 11:30:38 AM
Paintwork needs touching up
Images
11/1/2024 11:31:37 AM
12/5/2024 10:39:47 AM
11/1/2024 11:31:52 AM
11/1/2024 11:32:10 AM
Project Name: B5412 Project Honey
Page 222 Of 260
4
T345545.887
alignment to be corrected
11/4/2024
11/11/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/28/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
11/4/2024 11:30:41 AM 5
T456527.19
Can larger spacers be put in to make it more consistent
Images
11/20/2024 9:43:05 AM 6
T456527.20
Can larger spacers be put in to make it more consistent
Images
11/20/2024 9:44:27 AM 7
T345546.1369
11/20/2024 9:44:32 AM
top rail dented
Images
11/20/2024 9:49:03 AM 8
T456527.23
General Bend in top rail to be made good Different levels on slab
Images
11/20/2024 9:51:52 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 223 Of 260
9
T345546.1370
steel top hand rail is bent
11/20/2024
11/28/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
11/26/2024
12/3/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 9:52:49 AM 10
T345546.1373
clean tops of fire curtains on all levels
Images
11/20/2024 9:58:09 AM 11
T345546.1375
11/20/2024 9:58:15 AM
Clean/ smooth the edging see a to complete and Dom to sign off on sheet
Images
11/20/2024 10:03:08 AM 12
T456527.27
Fire stopping to be completed around conduit
Images
11/20/2024 10:06:41 AM 13
T456527.206
Make good to concrete and reposition flashing so it is flush with the rest of flashing
Images
11/26/2024 4:10:10 PM 12/5/2024 10:39:47 AM
11/26/2024 4:10:19 PM Project Name: B5412 Project Honey
Page 224 Of 260
14
T345545.1294
making good repairs to be sanded
11/29/2024
12/6/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 11:22:04 AM 15
T345545.1295
making good repairs to be sanded and improved
Images
11/29/2024 11:23:29 AM 16
T345545.1300
pipe to be moved to allow pipework to be boxed in
Images
11/29/2024 11:49:40 AM 17
T350553.2177
general snag All paving slabs to be secured and stop from rocking All areas
Images
11/29/2024 12:16:08 PM 18
T345545.1309
paving to be cut into the door threshold gap is too large
Images
11/29/2024 12:20:37 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 225 Of 260
Building A>Sixth Floor>0602 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.578
Black paint has come off the door
10/17/2024
10/21/2024
Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Dominic Driver)
10/25/2024
11/28/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/17/2024 4:09:09 PM 2
T345546.936
Changing call button throughout to different colour
Images
10/25/2024 11:11:36 AM T338993.1931
Additional bracket required. As per building control comment, services to be supported close to the penetrations and to avoid weight supported on fire stopping.
Images
10/28/2024 4:26:16 PM T338993.1933
10/28/2024 4:26:27 PM
Fire curtain Basket not earth linked with the rest of the systems.
Images
10/28/2024 4:29:16 PM T338993.1944
10/28/2024 4:29:32 PM
Additional metal cable ties required on cable drops and cables running out of containment.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 226 Of 260
Images
10/29/2024 8:54:30 AM T338993.1974
10/29/2024 8:54:35 AM
10/29/2024 8:54:53 AM
Light not in line between them.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/1/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 10:28:20 AM 3
T427849.976
10/29/2024 10:28:50 AM
Damage to lift control door to be made good
Images
10/30/2024 11:53:08 AM 4
T345546.1150
10/30/2024 11:53:13 AM
General lifts perfect line scratch around architrave
Images
11/8/2024 10:59:28 AM T338993.2210
Lift indicators not secured.
Images
11/8/2024 11:02:03 AM
12/5/2024 10:39:47 AM
11/8/2024 11:02:12 AM
11/8/2024 11:02:18 AM
11/8/2024 11:02:25 AM
Project Name: B5412 Project Honey
Page 227 Of 260
T338993.2211
Raft hanger to move because it does not allow for the valve to fully open.
11/8/2024
11/15/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 11:04:37 AM 5
T427849.1351
11/8/2024 11:04:44 AM
Damage on door to be made good
11/8/2024 11:05:19 AM
Images
11/8/2024 11:10:09 AM 6
T427849.1352
Damages on architrave to be made good or cleaned
Images
11/8/2024 11:10:56 AM 7
T427849.1353
Damages in door to be made good
Images
11/8/2024 11:11:52 AM 7
T427849.1354
11/8/2024 11:12:01 AM
Paint peeling off door to be made good
Images
11/8/2024 11:12:28 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 228 Of 260
6
T427849.1355
Damages in door to be made good
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/12/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 11:12:48 AM 1
T427849.1356
Paint peeling off door to be made good
Images
11/8/2024 11:13:06 AM 8
T427849.1359
Lift sign damage to be made good and made straight
Images
11/8/2024 11:17:56 AM 9
T345546.1168
Chip to black areas on doors
Images
11/8/2024 11:20:10 AM
11/8/2024 11:20:16 AM
11/8/2024 11:20:30 AM
10
T345546.1169
Control unit not shutting properly
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11
T345546.1170
Control unit not shutting properly
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 229 Of 260
Images
11/8/2024 11:21:30 AM Building A>Sixth Floor>0603 Corridor 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.824
Timber to be removed from lift opening
10/25/2024
11/28/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/30/2024
11/1/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
Images
10/25/2024 10:37:40 AM T338993.1938
Additional bracket required. Long run of basket without support.
Images
10/28/2024 4:44:09 PM T338993.1978
10/28/2024 4:44:14 PM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/29/2024 10:54:14 AM 2
T427849.987
10/29/2024 10:54:50 AM
Architrave to be installed around lift
Images
10/30/2024 12:02:40 PM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 230 Of 260
3
T345546.1143
check future use pipe hole height appears low across all floors
11/8/2024
11/12/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/16/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 10:48:50 AM 4
T345546.1145
General item Cover cap missing on unistrut rods
Images
11/8/2024 10:51:37 AM 5
T345546.1157
Scuffs to the cool buttons on the good Lift
Images
11/8/2024 11:06:59 AM 6
T345546.1160
Misaligned ceiling tiles – to be completed at the very end and realigned
Images
11/8/2024 11:09:48 AM Building A>Sixth Floor>0604 WC Core
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.813
Smoke detectors in WC corridors should be black
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 231 Of 260
Images
10/24/2024 12:48:37 PM T338993.1987
Light not in line between them.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 11:34:56 AM 2
T338993.1988
10/29/2024 11:35:03 AM
10/29/2024 11:35:18 AM
Light not working.
Images
10/29/2024 11:35:36 AM 3
T338993.1989
10/29/2024 11:35:51 AM
Light not working.
Images
10/29/2024 11:36:14 AM T338993.1990
10/29/2024 11:36:19 AM
Additional metal cable ties required on cable drops and cables running out of containment.
Images
10/29/2024 11:36:57 AM
12/5/2024 10:39:47 AM
10/29/2024 11:37:02 AM
Project Name: B5412 Project Honey
Page 232 Of 260
4
T345545.1119
no sink plug
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/13/2024
11/18/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
11/13/2024 1:13:27 PM 5
T345546.1292
General item – clean services of paint throughout example pictures attached
Images
11/13/2024 1:17:31 PM 2
T427849.1489
11/13/2024 1:17:38 PM
No light working in cubicle
Images
11/13/2024 1:18:18 PM 6
T345546.1293
General item – clean services of paint throughout example pictures attached
11/13/2024
11/20/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
7
T345546.1296
screw holes coming through the plasterboard
11/13/2024
11/18/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Dominic Driver)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/13/2024 1:20:55 PM Building A>Sixth Floor>0605 WC Core Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 233 Of 260
T338993.1733
Additional metal cable ties required on cable drops and cables not run within containment.
10/18/2024
10/25/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/18/2024 2:28:57 PM 1
T427849.814
10/18/2024 2:29:02 PM
10/18/2024 2:29:27 PM
Smoke detectors in WC corridors should be black
10/18/2024 2:29:45 PM
Images
10/24/2024 12:50:04 PM T350553.1638
Plug missing from sprinkler drain valve
Images
10/28/2024 2:15:17 PM Building A>Sixth Floor>0606 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1536
FSD cabling to be tidied up and tie wrapped neatly
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/22/2024 4:25:13 PM 1
T350553.1540
10/22/2024 4:25:43 PM
water meter not wired
12/5/2024 10:39:47 AM
10/22/2024 4:25:51 PM
Project Name: B5412 Project Honey
Page 234 Of 260
Images
10/22/2024 4:29:03 PM 2
T427849.815
Smoke detector should be black in east corridor
10/24/2024
10/31/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
10/25/2024
11/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/24/2024 12:50:49 PM 3
T427849.847
Screw not in fully around conduit
Images
10/25/2024 11:12:25 AM T338993.1962
Cables not dressed / secured properly.
Images
10/29/2024 9:59:05 AM T338993.1963
10/29/2024 9:59:09 AM
10/29/2024 9:59:32 AM
10/29/2024 9:59:36 AM
Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket is 15mm higher and not level.
Images
10/29/2024 10:03:32 AM
12/5/2024 10:39:47 AM
10/29/2024 10:03:32 AM
10/29/2024 10:03:32 AM
Project Name: B5412 Project Honey
Page 235 Of 260
T338993.1973
Additional metal cable ties required on cable drops and cables running out of containment.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/29/2024 10:23:11 AM
10/29/2024 10:23:48 AM
10/29/2024 10:24:08 AM
Building A>Sixth Floor>0613 Terrace
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.979
lightning protection to be completed
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
11/8/2024 12:21:48 PM 2
T345545.985
lightning protection to be completed
Images
11/8/2024 12:25:51 PM 3
T345545.994
no lightning protection south side of west riser
Images
11/8/2024 12:32:18 PM
11/8/2024 12:32:23 PM
Comments
Created By
Date
Please remove tiles, we requested these were left up until our install was complete and our request was ignored.
robert buchan (Halsion )
11/12/2024 7:28:15 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 236 Of 260
4
T427849.1558
Remove tiles for Clarkes to cut shims
11/14/2024
11/21/2024
Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Conor Colton)
Images
11/14/2024 12:08:29 PM Comments
Created By
Date
Tiles removed nothing ,no action from Clarke
Dariusz Grzelka (Aym (Services) Limited)
11/21/2024 1:11:37 PM
Complete
Dariusz Grzelka (Aym (Services) Limited)
11/30/2024 1:01:08 PM
STATUS CHANGE: Left opened until clarkes have cut shims.
Dominic Driver (McLaughlin & Harvey)
12/4/2024 9:02:54 AM
AYM will need to reinstate tiles without the cut outs Building A>Sixth Floor>06L07 Evacuation Lift Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.981
Repair denting to door frame from inside the cubicle
11/1/2024
11/8/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Dominic Driver)
Images
11/1/2024 9:18:01 AM Building A>Sixth Floor>06R05 LS
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2036
disabled refuge cabling incomplete
11/13/2024
11/20/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/13/2024 3:46:19 PM
11/20/2024 6:05:13 PM
Building A>Sixth Floor>06R12 Dry Riser Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 237 Of 260
1
T456527.441
Fill gap next to architrave
11/27/2024
12/4/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:43:21 PM Building A>Sixth Floor>06S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1935
Cut down basket to remove the pinch points.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/28/2024 4:35:57 PM T338993.1942
10/28/2024 4:36:10 PM
FA call point at wrong height, to reinstall when ATJ moves the top of back box at 1200mm FFFL.
Images
10/29/2024 8:47:41 AM T338993.1965
10/29/2024 8:47:41 AM
Cleaner’s socket not level.
Images
10/29/2024 10:07:44 AM Building A>Sixth Floor>06S03 Stair 02 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 238 Of 260
T338993.1985
Light missing internal clip to secure the cover.
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Images
10/29/2024 11:14:18 AM 1
T345545.1257
10/29/2024 11:19:21 AM
lifting eyes to be repaired
Images
11/20/2024 4:03:44 PM Building A>Sixth Floor>06S04 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1939
Cut down basket to remove the pinch points.
10/28/2024
11/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/29/2024
11/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/28/2024 4:46:21 PM T338993.1951
10/28/2024 4:46:32 PM
Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket is 30mm lower.
Images
10/29/2024 9:20:30 AM T338993.1983
10/29/2024 9:20:30 AM
Not copex to be used for long runs, change to conduit.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 239 Of 260
Images
10/29/2024 11:10:31 AM 1
T345545.1259
10/29/2024 11:10:37 AM
grout to be cleaned off wall
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/25/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
Images
11/20/2024 4:06:24 PM 2
T408928.98
mastic gap between lift and wall
Images
11/20/2024 4:06:57 PM Building A>Third Floor>0301 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.122
fire escape signal protruding over the frame North core wall
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
10/1/2024
10/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/25/2024 3:44:25 PM 2
T338993.1444
PIR not installed.
Images
10/1/2024 1:39:59 PM 12/5/2024 10:39:47 AM
10/1/2024 1:40:12 PM
10/1/2024 1:40:39 PM
10/4/2024 2:55:05 PM
10/4/2024 2:55:43 PM Project Name: B5412 Project Honey
Page 240 Of 260
Comments
Created By
Date
PIR installed and connected, waiting on the correct ceiling tile to be installed so the pir can go in the tile.
Brett Pitcher (Halsion )
10/4/2024 2:56:41 PM
Halsion should raise that is missing a service tile and not let the PIR hiding in the ceiling. Photo of the issue being resolved is required.
Vanngel Natso (McLaughlin & Harvey)
11/5/2024 4:24:58 PM
T338993.1453
Not correct light lengths used.
10/1/2024
10/8/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/8/2024
Client Snag
Opened
Structural Engineer
Robert Bird Group
McLaughlin & Harvey (Dominic Driver)
10/2/2024
10/9/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/28/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Liana Maltezou)
Images
10/1/2024 2:08:57 PM 3
T345546.191
With slightly blown concrete be structurally ok? the visual is fine just want confirmation on structural integrity
Images
10/2/2024 10:35:25 AM 4
T350553.968
fire stopping insulation to be taped at fibre ends
Images
10/2/2024 10:38:26 AM 5
T345546.716
10/2/2024 10:38:37 AM
Scratched external architrave office side
Images
10/22/2024 12:19:12 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 241 Of 260
6
T338993.1842
Lights not in line!
10/23/2024
10/30/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/23/2024
10/30/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/5/2024
11/12/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
Images
10/23/2024 11:50:17 AM 7
T338993.1843
10/23/2024 11:50:30 AM
Light’s aluminium rim is damaged/bended.
Images
10/23/2024 12:00:44 PM 8
T345545.917
10/23/2024 12:00:50 PM
balustrade and handrail return should be aligned
10/23/2024 12:01:04 PM
Images
11/5/2024 10:32:41 AM 9
T345545.1150
sprinkler pipe to be repainted
Images
11/20/2024 10:39:46 AM 10
T345545.1151
damage to lining wall
Images
11/20/2024 10:42:12 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 242 Of 260
11
T345545.1152
feature stair lights not working
11/20/2024
11/27/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 10:42:47 AM 12
T456527.39
Remove packers
Images
11/20/2024 10:43:03 AM 13
T345545.1153
fire curtain escape button not fixed
Images
11/20/2024 10:44:42 AM 14
T345545.1155
hit and miss welds on outside of balustrade, the rest of them the welds are not visible
Images
11/20/2024 10:48:24 AM 15
T456527.42
Gap at trim joint to be made good
Images
11/20/2024 10:49:35 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 243 Of 260
16
T345545.1157
edge of timber is chamfered so rubber nosing protrudes further than others
11/20/2024
11/27/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/25/2024
Client Snag
Opened
Metalwork
CMF
Francis Hunter (Luke Nurser)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
11/26/2024
12/3/2024
Client Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 10:51:23 AM 17
T408928.66
make good gap in timber riser to tread
Images
11/20/2024 10:55:32 AM 18
T456527.212
Cages to protect sprinklers to be installed around feature stair
Images
11/26/2024 4:53:49 PM 19
T456527.213
Cable hanging to be resolved
Images
11/26/2024 5:00:09 PM 20
T456527.216
Excessive metal to be cut back flush
Images
11/26/2024 5:11:17 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 244 Of 260
21
T456527.470
2 lights not working
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 11:02:09 AM 22
T456527.471
Ensure all lights are aligned with each other and aligned with ceiling tiles
Images
12/4/2024 11:06:41 AM 23
T456527.472
Gal in light frame to be made good
Images
12/4/2024 11:08:29 AM 24
T456527.473
Are these lights on two different switches or are they supposed to be on?
Images
12/4/2024 11:09:54 AM 25
T456527.474
12/4/2024 11:10:00 AM
Light not working
Images
12/4/2024 11:11:12 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 245 Of 260
26
T456527.475
First light to be aligned with ceiling tiles
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 11:13:22 AM 27
T456527.476
Second light to be aligned with ceiling
Images
12/4/2024 11:14:47 AM 28
T456527.477
Missing full tile to be installed
Images
12/4/2024 11:15:48 AM 29
T456527.478
first light after second round column to be adjusted to it is lined up with the others
Images
12/4/2024 11:20:35 AM 30
T456527.479
Third row of lights at first column from the east to be made good
Images
12/4/2024 11:22:03 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 246 Of 260
31
T345545.1359
remove cable tie
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
Images
12/4/2024 11:33:01 AM Building A>Third Floor>0302 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345546.543
Missing items for the Lift including buttons control units and Lift name on Lift 05, 06 and 02 as per the pictures
10/17/2024
10/21/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
10/17/2024
10/21/2024
Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/17/2024 2:33:12 PM 2
T345546.544
10/17/2024 2:33:22 PM
10/17/2024 2:33:49 PM
Disabled refuge call button is not on straight
Images
10/17/2024 2:34:26 PM 3
T350553.1435
BMS cabling to be tidied up and tiewrapped neatly
Images
10/21/2024 2:54:57 PM T338993.1792
10/21/2024 2:55:09 PM
Basket for Fire curtain power supply not earth linked with the rest of the sytsem.
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 247 Of 260
Images
10/22/2024 11:20:09 AM 4
T345545.561
indicator not fitted
10/22/2024
10/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Lifts
Otis
Darling Associates (Robyn Harrison Church)
10/22/2024
10/28/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Liana Maltezou)
10/22/2024
10/28/2024
Snag
Opened
Fire Stopping
OWS
Darling Associates (Liana Maltezou)
Images
10/22/2024 12:09:02 PM 5
T427849.519
10/22/2024 12:09:08 PM
General item remove protection from lift openings
Images
10/22/2024 12:13:12 PM 6
T345546.713
10/22/2024 12:13:18 PM
scratches to black doors
10/22/2024 12:13:24 PM
Images
10/22/2024 12:14:47 PM 7
T345546.714
10/22/2024 12:14:53 PM
screws not flush
Images
10/22/2024 12:16:03 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 248 Of 260
T338993.1827
Additional metal cable ties required on cable drops and cables not run within containment.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/8/2024
11/15/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
Images
10/22/2024 4:01:17 PM 8
T350553.1915
10/22/2024 4:01:23 PM
BMS wiring incomplete
Images
11/7/2024 8:15:59 AM 9
T427849.1319
11/14/2024 9:25:56 AM
Rub down frame before finish
Images
11/8/2024 10:20:09 AM 10
T427849.1320
Damage on architrave to be made good
Images
11/8/2024 10:21:04 AM 11
T427849.1321
Cut protection under architrave
Images
11/8/2024 10:23:55 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 249 Of 260
11
T427849.1323
Make good to paint damages on door
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 10:25:26 AM 12
T427849.1324
Damages at top architrave to be made good
Images
11/8/2024 10:26:22 AM 13
T427849.1330
Damages on door architrave to be made good
Images
11/8/2024 10:33:36 AM 14
T427849.1332
Damages on door architrave to be made good
Images
11/8/2024 10:34:42 AM 14
T427849.1333
Damages on door to be made good
Images
11/8/2024 10:35:05 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 250 Of 260
15
T427849.1334
Screw missing on architrave
11/8/2024
11/15/2024
Client Snag
Opened
Fire Stopping
OWS
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/12/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
12/4/2024
12/11/2024
Client Snag
Opened
Lifts
Otis
Francis Hunter (Luke Nurser)
Images
11/8/2024 10:35:47 AM 16
T427849.1337
Missing face plates to be installed
Images
11/8/2024 10:38:53 AM 17
T345546.1141
Cable is redundant and can be pushed back and hole filled
Images
11/8/2024 10:39:41 AM 18
T345546.1142
General item perfect line scratch around architraves
Images
11/8/2024 10:43:28 AM 19
T408928.210
call point not level
Images
12/4/2024 10:48:57 AM Building A>Third Floor>0303 Corridor 02 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 251 Of 260
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.522
Improve decoration finish around emergency exit sign
10/22/2024
10/28/2024
Snag
Opened
Painting & Decorating
AC Beck
Darling Associates (Robyn Harrison Church)
Images
10/22/2024 12:24:51 PM
11/5/2024 4:14:10 PM
Comments
Created By
Date
Still visible areas of making good required
Conor Colton (McLaughlin & Harvey)
11/5/2024 4:14:28 PM
T338993.1819
Additional metal cable ties required on cable drops and cables not run within containment.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/12/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
Images
10/22/2024 2:16:04 PM 2
T345546.1131
10/22/2024 2:16:16 PM
improve finish and socket
10/22/2024 2:16:20 PM
Images
11/8/2024 10:22:11 AM 3
T345546.1133
Socket face plate scratched
Images
11/8/2024 10:23:50 AM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 252 Of 260
4
T345546.1136
Glass Polisher – Magic Man required scratches to riser doors on goods lift
11/8/2024
11/12/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
11/8/2024 10:29:40 AM 5
T345546.1137
11/8/2024 10:29:49 AM
Small dent to wall
Images
11/8/2024 10:32:08 AM Building A>Third Floor>0304 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1603
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/4/2024
10/11/2024
Snag
Opened
M&E
Halsion
Darling Associates (Liana Maltezou)
Images
10/3/2024 5:22:41 PM 1
T345545.442
lagging to be improved. is there a more aesthetic lagging that can be used?
Images
10/4/2024 12:23:35 PM Comments
Created By
Date
Lagging installed to spec
James Parker (Halsion )
10/8/2024 7:08:29 AM
STATUS CHANGE: This needs to be completed to the bench mark
Dominic Driver (McLaughlin & Harvey)
10/22/2024 5:21:19 PM
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 253 Of 260
2
T345546.795
Finish around pipework to be completed as per benchmark
10/23/2024
10/28/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Dominic Driver)
Images
10/23/2024 12:20:28 PM Building A>Third Floor>0305 WC Core Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1602
Green led indicator missing on Emergency lights.
10/3/2024
10/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/3/2024 5:18:24 PM Building A>Third Floor>0306 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1441
FSD cabling to be tidied up and tiewrapped neatly
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/21/2024 2:59:47 PM T338993.1794
Cables not dressed and secured properly. Additional metal cable ties required.
Images
10/22/2024 11:25:57 AM
12/5/2024 10:39:47 AM
10/22/2024 11:26:10 AM
10/22/2024 11:26:27 AM
Project Name: B5412 Project Honey
Page 254 Of 260
T338993.1813
Lights not in line between them.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/8/2024
11/15/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/15/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Conor Colton)
11/8/2024
11/12/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Dominic Driver)
Images
10/22/2024 1:56:36 PM 2
T427849.1315
10/22/2024 1:56:58 PM
Rub down architrave
Images
11/8/2024 10:15:15 AM 3
T427849.1316
Fill riser door edge damages
Images
11/8/2024 10:16:47 AM 4
T427849.1317
11/8/2024 10:16:53 AM
Clean paint off ceiling tile
Images
11/8/2024 10:17:43 AM 5
T345546.1130
small damage to wall
Images
11/8/2024 10:18:21 AM 12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 255 Of 260
Building A>Third Floor>03R05 LS
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1916
BMS wiring incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/7/2024 8:17:34 AM 2
T350553.2171
11/14/2024 9:23:50 AM
Blank plate missing on lighting control box Check all floors
Images
11/28/2024 4:13:28 PM 3
T350553.2172
DB schedules required on all boards All floors
Images
11/28/2024 4:13:51 PM 3
T350553.2173
All fused spurs to be labelled with circuit referance
Images
11/28/2024 4:14:14 PM 3
T350553.2174
Sub mains reference on all armours All floors
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 256 Of 260
Images
11/28/2024 4:14:55 PM Building A>Third Floor>03R14 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.123
improve edge detail both sides of riser
11/26/2024
11/29/2024
Client Snag
Opened
Painting & Decorating
AC Beck
Francis Hunter (Luke Nurser)
Images
11/26/2024 5:06:53 PM
11/26/2024 5:06:59 PM
Building A>Third Floor>03R17 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2168
DB schedules required on all boards All floors
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/28/2024 4:10:36 PM 2
T350553.2169
Redundant cable to be removed
Images
11/28/2024 4:11:34 PM Building A>Third Floor>03S01 Stair 01 Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 257 Of 260
1
T345545.1027
various pin holes in top rail
11/11/2024
11/18/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Jack Monaghan)
Images
11/11/2024 3:55:30 PM
11/12/2024 2:50:41 PM
11/26/2024 8:47:53 AM
Comments
Created By
Date
still pin holes that can be seen when walking up stairs
Conor Colton (McLaughlin & Harvey)
11/26/2024 8:48:16 AM
2
T456527.425
Make good to damages on door
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:31:08 PM
11/27/2024 2:31:13 PM
Building A>Third Floor>03S02 Stair Lobby Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1798
Halsion to re install the socket when ATJ moves the back box.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 11:34:05 AM T338993.1829
10/22/2024 11:34:05 AM
Call point for be reinstall when ATJ raise the back box.
Images
10/22/2024 4:11:54 PM
12/5/2024 10:39:47 AM
10/22/2024 4:11:55 PM
Project Name: B5412 Project Honey
Page 258 Of 260
1
T456527.426
Improve finish to entire wall
11/27/2024
12/4/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (Conor Colton)
Images
11/27/2024 2:32:09 PM 2
T456527.427
Make good to damages on door
Images
11/27/2024 2:32:27 PM Building A>Third Floor>03S03 Stair 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1823
All Lights missing green led for battery health indication.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/20/2024
11/27/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Jack Monaghan)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/22/2024 2:25:10 PM 1
T345545.1224
10/22/2024 2:25:15 PM
paint on wall to be cleaned
Images
11/20/2024 3:08:54 PM Building A>Third Floor>03S04 Stair Lobby Reference
Description
12/5/2024 10:39:47 AM
Project Name: B5412 Project Honey
Page 259 Of 260
T338993.1826
Additional metal cable ties required on the tube measuring pressure.
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 3:55:28 PM
10/22/2024 3:55:33 PM
10/28/2024 8:29:49 PM
Comments
Created By
Date
Snag complete photo has been taken from the wrong location. Please upload photo of snag completed from the correct location!
James Parker (Halsion )
11/4/2024 12:55:57 PM
1
T408928.89
Cleanup around fire stopping penetration at highlevel
11/20/2024
11/25/2024
Client Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
11/20/2024
11/27/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 3:16:58 PM 2
T345545.1228
mastic to be installed beside architrave all levels
Images
11/20/2024 3:19:56 PM
12/5/2024 10:39:47 AM
11/20/2024 3:20:04 PM
Project Name: B5412 Project Honey
Page 260 Of 260
Project Honey – Building B Snag Report 05.12.24
FH090-151015
Building B>Eighth Floor>0801 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.776
2nd fix Lighting / commissioning not completed. Lighting not fully 2nd fixed / lighting sections don’t work.
8/18/2024
8/25/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/18/2024 12:33:12 PM
8/18/2024 12:33:18 PM
8/18/2024 12:36:03 PM
8/18/2024 12:36:09 PM
Comments
Created By
Date
Faulty Drivers.
Brett Pitcher (Halsion )
9/20/2024 8:19:21 AM
T338993.985
Lights not working.
8/30/2024
9/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/30/2024 11:17:20 AM
8/30/2024 11:17:45 AM
8/30/2024 11:17:45 AM
8/30/2024 11:17:45 AM
Comments
Created By
Date
Faulty drivers.
Brett Pitcher (Halsion )
9/20/2024 8:18:43 AM
2
T338993.996
Lights not in line. Wrong light lengths used.
8/30/2024
9/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/30/2024 12:06:46 PM
8/30/2024 12:06:51 PM
8/30/2024 12:07:17 PM
Comments
Created By
Date
This is an architectural/design snag.
Brett Pitcher (Halsion )
9/3/2024 10:12:01 AM
Lights inspected against Halsion drawings. Halsion to address this issue.
Vanngel Natso (McLaughlin & Harvey)
10/22/2024 4:55:47 PM
3
T444645.569
rosette not flush. sprinkler head may need adjusted
12/5/2024 10:39:26 AM
11/6/2024
Project Name: B5412 Project Honey
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Page 1 Of 41
Images
11/6/2024 10:36:53 AM Building B>Eighth Floor>0802 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T421799.65
lift indicators to be replaced for black
8/31/2024
9/7/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (sam peach)
Images
8/31/2024 8:10:11 AM Building B>Eighth Floor>0803 WC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.571
grout needs taken out before mastic
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 10:49:05 AM T338993.2140
Sprinkler’s lagging missing foil on the end of the lagging.
Images
11/6/2024 12:49:37 PM
11/6/2024 12:49:55 PM
Building B>Eighth Floor>0806 Stair Lobby 01 Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 2 Of 41
1
T444645.425
all protection to be removed
10/16/2024
10/23/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
Images
10/16/2024 1:27:14 PM Building B>Eighth Floor>08R01 LTHW/CHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1882
lagging to be tidied up/made good
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/6/2024 12:32:07 PM 2
T350553.1883
11/6/2024 12:33:08 PM
meter touchpad to be secured and not left hanging
Images
11/6/2024 12:34:24 PM Building B>Eighth Floor>08R05 Life Safety
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2138
Smoke Ventilation system’s panel is not labelled.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 12:29:47 PM
11/6/2024 12:29:54 PM
Building B>Eighth Floor>08R06 Mec. Equipment Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 3 Of 41
1
T350553.1881
lagging to be tidied up/made good
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/6/2024 12:29:00 PM
11/6/2024 12:29:10 PM
11/6/2024 12:29:22 PM
11/6/2024 12:29:37 PM
11/6/2024 12:29:57 PM
Building B>Fifth Floor>0501 Office Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.753
Lighting’s section not working.
8/18/2024
8/25/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/18/2024 11:45:13 AM
8/18/2024 11:45:19 AM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:36:51 AM
1
T338993.1010
Lights not working.
8/30/2024
9/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/30/2024 4:24:17 PM
8/30/2024 4:24:21 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:35:18 AM
2
T338993.1012
Lights not working.
8/30/2024
9/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/30/2024 4:26:58 PM
8/30/2024 4:27:03 PM
Comments
12/5/2024 10:39:26 AM
Created By
Project Name: B5412 Project Honey
Date
Page 4 Of 41
Faulty driver 3
T338993.1015
Brett Pitcher (Halsion ) Lights not in line. Wrong light lengths used.
8/30/2024
9/6/2024
Snag
Opened
M&E
9/20/2024 8:34:09 AM Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/30/2024 4:42:26 PM
8/30/2024 4:42:32 PM
Comments
Created By
Date
This is an architectural/design snag.
Brett Pitcher (Halsion )
9/3/2024 10:51:14 AM
4
T419146.474
broken light
9/4/2024
9/11/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Images
9/4/2024 11:53:20 AM Comments
Created By
Date
Light fitting damaged by nonHalsion operatives. Damaged fitting/part needs replacing. Instruction required to return and replace.
Brett Pitcher (Halsion )
9/20/2024 8:25:55 AM
Building B>Fifth Floor>0502 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.498
joint colour inconsistency
10/23/2024
10/30/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (James McKeever)
Images
10/23/2024 3:48:19 PM Building B>Fifth Floor>0503 WC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.588
dent to edge trim on light
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 5 Of 41
Images
11/6/2024 12:24:49 PM 2
T444645.590
edge needs tidied up and paint removed
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 12:28:21 PM Building B>Fifth Floor>0505 Stair Lobby 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.381
pipes to be cleaned
10/16/2024
10/23/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (James McKeever)
Images
10/16/2024 11:26:52 AM Building B>First Floor>0103 WC Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2175
Barcodes still on ductwork, to be removed.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 4:34:57 PM 1
T338993.2176
11/6/2024 4:35:07 PM
Sprinkler’s lagging missing foil on the end of the lagging.
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 6 Of 41
Images
11/6/2024 4:36:53 PM
11/6/2024 4:36:59 PM
Building B>First Floor>0109 Life Safety Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1391
Black mimic line missing.
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/25/2024 3:08:51 PM T338993.1394
10/21/2024 7:40:06 AM
Fire fitters and EVAC lifts compartment cover should be red as the FA Panel’s compartment.
Images
9/25/2024 3:17:34 PM
9/25/2024 3:17:39 PM
Comments
Created By
Date
There is no requirement for these to be red.
Brett Pitcher (Halsion )
9/26/2024 11:33:47 AM
T338993.1395
Fire proofing required for the coppex.
9/25/2024
10/2/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/25/2024 3:18:54 PM T338993.1397
9/25/2024 3:19:00 PM
Black mimic line missing.
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 7 Of 41
Images
9/25/2024 3:21:17 PM Comments
Created By
Date
Duplicate snag
James Parker (Halsion )
9/26/2024 1:02:49 PM
Building B>First Floor>01S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1031
Light’s clips broken
9/2/2024
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/2/2024 5:32:12 PM
9/2/2024 5:33:11 PM
Comments
Created By
Date
Photo of the light clipped is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:51:37 AM
Building B>First Floor>01S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.604
making good required
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 2:58:58 PM Building B>Fourth Floor>0401 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.744
Lighting’s section not working.
8/18/2024
8/25/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 8 Of 41
8/18/2024 11:24:43 AM Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 9:01:07 AM
2
T350553.716
All lights to be reviews for length, lights aren’t consistent in length and stop short from perimeter margin
8/28/2024
9/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
8/28/2024 12:15:56 PM
8/28/2024 12:16:07 PM
Comments
Created By
Date
Lights are installed as per architects detail
James Parker (Halsion )
8/29/2024 1:52:31 PM
3
T338993.1020
Light section not working.
9/2/2024
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/2/2024 3:21:03 PM
9/2/2024 3:21:11 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:56:48 AM
4
T338993.1021
Light section not working.
9/2/2024
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/2/2024 3:21:51 PM
9/2/2024 3:21:56 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:56:34 AM
5
T338993.1022
Light section not bright as the rest of the lights.
12/5/2024 10:39:26 AM
9/2/2024
Project Name: B5412 Project Honey
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Page 9 Of 41
Images
9/2/2024 3:22:49 PM
9/2/2024 3:23:01 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:56:18 AM
6
T338993.1024
Light section not working.
9/2/2024
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/2/2024 3:25:47 PM
9/2/2024 3:25:53 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:54:30 AM
7
T444645.593
wall requires repairing
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 12:39:29 PM Building B>Fourth Floor>0405 Stair Lobby 02 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T1.51626033
Light not working.
8/29/2024
9/2/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
8/29/2024 1:25:55 PM Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:59:53 AM
Building B>Fourth Floor>04R06 Mec. Equipment 12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 10 Of 41
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.592
temporary cables and lighting to be removed
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (James McKeever)
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 12:38:19 PM Building B>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
T459973.33
Threshold and bottom detail requires review
12/3/2024
12/10/2024
Observation
Opened
McLaughlin & Harvey
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Observation
Opened
McLaughlin & Harvey
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Observation
Opened
McLaughlin & Harvey
McLaughlin & Harvey (James McKeever)
Issued Date
Target Date
Task Type
Status
Issued To Organisation
Issued By Organisation
Images
12/3/2024 10:24:58 AM 2
T459973.34
12/3/2024 10:25:06 AM
Threshold and bottom detail requires review
12/3/2024 10:25:12 AM
Images
12/3/2024 10:25:54 AM 3
T444645.685
infill required to flood grille
Images
12/3/2024 10:41:46 AM Building B>Ground Floor>0001 Reception Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Issued To Package
Page 11 Of 41
1
T345545.1333
RWP will clash with margin due to height
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 2:20:56 PM 2
T350553.2192
Unable to box in SVP as it is too close to mullion
Images
11/29/2024 2:28:11 PM
11/29/2024 2:28:20 PM
Building B>Ground Floor>0002 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1584
scratches on lift A
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Ian Robertson)
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
Images
10/23/2024 4:22:12 PM 2
T444645.520
10/23/2024 4:22:20 PM
scratches on door
10/23/2024 4:22:33 PM
Images
10/23/2024 4:22:23 PM 3
T444645.521
scratches on door
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 12 Of 41
Images
10/23/2024 4:23:02 PM Building B>Ground Floor>0007 BOH Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1088
fire stopping to have foil finish around fibres
10/2/2024
10/9/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
Images
10/2/2024 4:17:02 PM
10/2/2024 4:17:27 PM
Building B>Ground Floor>0010 CSW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1093
redundant material to be removed
10/2/2024
10/9/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/2/2024
10/9/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/2/2024 4:36:58 PM 2
T350553.1095
10/8/2024 8:13:46 AM
fire stopping to be completed
11/6/2024 5:24:43 PM
Images
10/2/2024 4:39:01 PM T350553.1900
10/2/2024 4:39:17 PM
Alarm on UV panel
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 13 Of 41
Images
11/6/2024 5:25:32 PM
11/6/2024 5:25:38 PM
Building B>Ground Floor>0012 Tank Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1089
fire stopping to have foil finish around fibres
10/2/2024
10/9/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
Images
10/2/2024 4:18:41 PM Building B>Ground Floor>0013 Bin Store Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1897
isolator to be labelled
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 5:15:42 PM 1
T350553.1898
Temp cables to be removed
Images
11/6/2024 5:16:44 PM
11/6/2024 5:16:51 PM
Building B>Ground Floor>0015 Office Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 14 Of 41
1
T345545.1327
paint on high level transom
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Dry Lining / Partitions / Ceilings
AT Jones
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 2:13:37 PM 2
T345545.1328
firestopping to be repaired
Images
11/29/2024 2:14:54 PM Building B>Ground Floor>00L01 Passenger Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1569
Ceiling light not cleaned.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 4:31:41 PM 1
T338993.1571
10/2/2024 4:31:46 PM
2 plugs missing on ceiling.
Images
10/2/2024 4:33:13 PM 1
T338993.1572
10/2/2024 4:33:20 PM
10/2/2024 4:33:26 PM
Morris not in line/ flash between them. One section is more forward from the rest.
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 15 Of 41
Images
10/2/2024 4:34:40 PM 1
T338993.1573
10/2/2024 4:34:55 PM
10/2/2024 4:35:11 PM
Flooring not consistent around edges.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/2/2024 4:35:40 PM 1
T338993.1574
10/2/2024 4:35:55 PM
10/2/2024 4:36:04 PM
Ceiling protection to be removed.
Images
10/2/2024 4:36:52 PM 1
T338993.1575
10/2/2024 4:36:59 PM
10/2/2024 4:37:05 PM
The back of the lift wall is not fully painted on the edges which is reflected on the mirror.
Images
10/2/2024 4:37:40 PM 1
T338993.1576
10/2/2024 4:38:09 PM
Hand rail not secured and scratched.
10/2/2024 4:38:14 PM
Images
10/2/2024 4:39:38 PM
10/2/2024 4:39:44 PM
Building B>Ground Floor>00L02 Passenger Lift Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 16 Of 41
1
T338993.1561
Ceiling light not cleaned.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 4:20:23 PM 1
T338993.1563
10/2/2024 4:20:28 PM
Lift walls, wall’s gaps and heights not consistent.
Images
10/2/2024 4:21:44 PM T338993.1564
10/2/2024 4:22:00 PM
Flooring not consistent around edges.
Images
10/2/2024 4:23:40 PM T338993.1565
10/2/2024 4:23:49 PM
10/2/2024 4:24:03 PM
The back of the lift wall is not fully painted on the edges which is reflected on the mirror.
Images
10/2/2024 4:25:37 PM T338993.1566
10/2/2024 4:25:48 PM
10/2/2024 4:26:14 PM
Lift walls not fully secured and one section is further out of the rest of the wall.
Images
10/2/2024 4:28:19 PM 12/5/2024 10:39:26 AM
10/2/2024 4:28:31 PM Project Name: B5412 Project Honey
Page 17 Of 41
T338993.1567
Hand rails screws not fully screwed.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 4:29:40 PM T338993.1568
10/2/2024 4:29:50 PM
10/2/2024 4:29:58 PM
Skirting damaged.
10/2/2024 4:30:05 PM
Images
10/2/2024 4:30:48 PM
10/2/2024 4:30:53 PM
10/2/2024 4:31:01 PM
Building B>Ground Floor>00L05 FF Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1551
Section of the protection not removed.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 4:03:33 PM 2
T338993.1552
10/2/2024 4:03:39 PM
Flooring not consistent around edges.
Images
10/2/2024 4:04:57 PM 3
T338993.1553
10/2/2024 4:05:07 PM
Door either scratched or not clean.
12/5/2024 10:39:26 AM
10/2/2024 4:05:18 PM
Project Name: B5412 Project Honey
Page 18 Of 41
Images
10/2/2024 4:08:04 PM 3
T338993.1554
10/2/2024 4:08:14 PM
Lift walls, wall’s gaps not consistent.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 4:10:27 PM 3
T338993.1555
10/2/2024 4:10:35 PM
Lift walls not in line with the mirror. Small gap in the bottom while the gap at the top is quite bigger.
Images
10/2/2024 4:12:11 PM T338993.1556
10/2/2024 4:12:18 PM
Ceiling scratched.
10/2/2024 4:12:26 PM
Images
10/2/2024 4:14:43 PM T338993.1557
10/2/2024 4:14:52 PM
Ceiling scratched.
Images
10/2/2024 4:15:14 PM
12/5/2024 10:39:26 AM
10/2/2024 4:15:22 PM
Project Name: B5412 Project Honey
Page 19 Of 41
T338993.1559
Ceiling scratched.
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
10/2/2024
10/9/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Vanngel Natso)
Images
10/2/2024 4:16:51 PM T338993.1560
10/2/2024 4:16:57 PM
Ceiling scratched.
Images
10/2/2024 4:18:10 PM
10/2/2024 4:18:24 PM
10/2/2024 4:18:33 PM
Building B>Ground Floor>00R02 LV Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1198
Cable should run on comma basket.
9/21/2024
9/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/21/2024 1:31:16 PM
9/21/2024 1:31:25 PM
9/21/2024 1:31:33 PM
Building B>Ground Floor>00R06 Mec. Equipment
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1893
smoke vent system in failure
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 5:07:40 PM Building B>Ground Floor>00S01 Stair 01 Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 20 Of 41
T338993.1420
Light not working and some covers not clipped.
9/27/2024
10/4/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/27/2024 3:13:13 PM
9/27/2024 3:13:44 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
10/21/2024 8:21:17 AM
Photo of the light working is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:50:23 AM
Building B>Ground Floor>00S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2193
Fire curtain paint to be touched up and made good
11/29/2024
12/6/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 2:31:21 PM
11/29/2024 2:31:32 PM
Building B>Ninth Floor>0902 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.14
lights not working
10/8/2024
10/15/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Images
10/8/2024 10:08:12 AM
10/15/2024 8:27:00 AM
Comments
Created By
Date
Faulty fitting
Brett Pitcher (Halsion )
10/15/2024 8:26:31 AM
2
T350553.1293
Light not working
12/5/2024 10:39:26 AM
10/16/2024
Project Name: B5412 Project Honey
10/23/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Page 21 Of 41
Images
10/16/2024 10:13:26 AM Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
10/21/2024 8:15:29 AM
3
T444645.477
joint to be filled
10/23/2024
10/30/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (James McKeever)
Images
10/23/2024 3:13:16 PM
10/23/2024 3:13:22 PM
Building B>Ninth Floor>0903 WC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1875
DDA reset button not fitted
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 11:48:41 AM 2
T350553.1879
foil finish required on insulation fibres
Images
11/6/2024 11:54:30 AM Building B>Ninth Floor>09L05 FF Lift Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 22 Of 41
1
T444645.480
scratches to doors
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
Images
10/23/2024 3:19:16 PM Building B>Ninth Floor>09R01 LTHW/CHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.880
insulation to be tidied up taped
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
9/25/2024 2:22:04 PM
9/30/2024 3:07:10 PM
11/6/2024 11:54:35 AM
11/6/2024 11:58:31 AM
11/6/2024 11:58:48 AM
Comments
Created By
Date
done
Rafal Szewczyk (Halsion )
9/30/2024 3:07:19 PM
Insulation missing from Chw pipework at GRP
Ian Robertson (McLaughlin & Harvey)
11/6/2024 11:58:51 AM
Building B>Ninth Floor>09R08 Elec. Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1386
Opening between DB and wall/containment 600mm which is not complained with regulations. All Floors Landlord Riser.
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/25/2024 2:34:09 PM
9/25/2024 2:34:31 PM
9/25/2024 2:34:43 PM
Building B>Ninth Floor>09S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1382
Is PIR too close with the heater? What is the manufacturer’s recommendation.
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 23 Of 41
Images
9/25/2024 2:16:46 PM Comments
Created By
Date
PIR is not too close to the heater.
Brett Pitcher (Halsion )
9/26/2024 10:38:36 AM
can this be demonstrated that the lights actually go off with the heater on
Ian Robertson (McLaughlin & Harvey)
11/6/2024 11:25:31 AM
2
T444645.347
concrete edge to be sanded flush
10/16/2024
10/23/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (James McKeever)
Images
10/16/2024 9:54:31 AM Building B>Roof Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T419146.649
3nr broken lights
10/1/2024
10/8/2024
Snag
Opened
M&E
Halsion
Darling Associates (Liana Maltezou)
Images
10/1/2024 10:56:57 AM Comments
Created By
Date
Light fittings damaged by nonHalsion operatives. Damaged fittings/parts need replacing. Instruction required to return and replace.
James Parker (Halsion )
10/1/2024 2:20:39 PM
Unless damage can be proved by a specific individual/company to allow costs to be recovered this remains a Halsion snag as per all other snags. Please ensure this is addressed as a matter of urgency
sam peach (McLaughlin & Harvey)
11/8/2024 10:34:05 AM
Building B>Roof>Roof Plant
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1343
Missing BMS panel tag.
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 24 Of 41
9/25/2024 12:22:00 PM
9/30/2024 2:43:07 PM
9/30/2024 2:43:16 PM
Comments
Created By
Date
BMS panels were done. Please close
Rafal Szewczyk (Halsion )
9/30/2024 2:43:37 PM
This requires clear tag identifying it as building B BMS Panel.
Ian Robertson (McLaughlin & Harvey)
10/16/2024 4:42:44 PM
The photos Raff added to the snag clearly state building B
James Parker (Halsion )
10/17/2024 7:14:34 AM
Panel not tagged / labelled yet.
Vanngel Natso (McLaughlin & Harvey)
11/6/2024 9:32:40 AM
T338993.1368
External lights not energised.
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/25/2024 1:10:30 PM
9/25/2024 1:10:35 PM
10/17/2024 8:22:41 AM
11/6/2024 9:53:31 AM
Comments
Created By
Date
Faulty RCBO to replace.
Brett Pitcher (Halsion )
9/30/2024 11:37:12 AM
When will this be replaced?
Ian Robertson (McLaughlin & Harvey)
10/16/2024 5:12:45 PM
It has.
Brett Pitcher (Halsion )
10/17/2024 8:23:05 AM
Still not working one of the external lights.
Vanngel Natso (McLaughlin & Harvey)
11/6/2024 9:55:22 AM
2
T350553.863
Faults on Bms panel to be cleared
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/1/2024
11/8/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (James McKeever)
Images
9/25/2024 1:32:58 PM 3
T444645.549
rust to flashing high level
Images
11/1/2024 3:01:33 PM
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 25 Of 41
T338993.2123
Cables not secured properly.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 9:39:02 AM 4
T350553.1862
11/6/2024 9:39:09 AM
differential pressure switch pipework to be trace heated and lagged
Images
11/6/2024 10:08:44 AM T338993.2127
Exit sign should display the man on the left and the arrow on the right pointing upwards.
Images
11/6/2024 10:09:38 AM
11/6/2024 10:09:39 AM
Building B>Second Floor>0201 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2173
Exit was not working when we came in the room while the other was working. Wrong programming.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 4:33:07 PM Building B>Second Floor>0202 Lift Lobby Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 26 Of 41
T338993.1113
Light not working.
9/5/2024
9/12/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/5/2024 4:34:21 PM
9/5/2024 4:34:24 PM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 9:07:27 AM
Photo of the light working is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:46:47 AM
1
T444645.134
lights not working
10/8/2024
10/15/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Images
10/8/2024 3:47:53 PM
10/8/2024 3:47:58 PM
Comments
Created By
Date
Faulty fitting.
Brett Pitcher (Halsion )
10/10/2024 3:08:31 PM
2
T444645.510
scratches to door
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/23/2024 4:07:23 PM 3
T338993.2170
Sprinkler missing lagging.
Images
11/6/2024 4:26:08 PM
11/6/2024 4:26:13 PM
Building B>Second Floor>0203 WC Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 27 Of 41
1
T444645.602
skirting needs tidied up
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 2:50:06 PM Building B>Second Floor>0205 Stair Lobby 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.456
damage to door
10/16/2024
10/23/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
Images
10/16/2024 2:03:44 PM Building B>Second Floor>02R06 Mec. Equipment
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.600
missing support, there is a lot of flex in the grp
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Risers
Dura Composites
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 2:45:12 PM Building B>Second Floor>02R08 Elec. Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1297
Additional metal cable ties required.
9/23/2024
9/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/23/2024 11:49:14 AM
9/23/2024 11:49:21 AM
Comments
Created By
Date
There are services which are not secured with metal cable ties.
Vanngel Natso (McLaughlin & Harvey)
9/23/2024 11:49:05 AM
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 28 Of 41
please direct this to Compass
Damian Dobson (Halsion )
10/29/2024 2:23:27 PM
The Fibre Optic cables are secured with metal cable ties. There were cables run by Halsion which were missing metal cable ties. Please, confirm that additional cable ties are installed.
Vanngel Natso (McLaughlin & Harvey)
11/19/2024 6:48:29 PM
Building B>Second Floor>02S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1033
Light’s clips broken or not secured.
9/2/2024
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/2/2024 5:45:09 PM
9/2/2024 5:45:29 PM
9/2/2024 5:46:40 PM
Comments
Created By
Date
Photo of the light clipped is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:43:36 AM
T338993.2167
Sprinkler missing lagging.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 4:23:40 PM Building B>Seventh Floor Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.573
can copex be replaced?
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 11:03:09 AM Building B>Seventh Floor>0701 Office Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 29 Of 41
1
T408928.2
light below ceiling height
8/13/2024
8/20/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
8/13/2024 2:27:56 PM
9/10/2024 10:49:36 AM
Comments
Created By
Date
Light fitting is blocked by pipework
Brett Pitcher (Halsion )
9/10/2024 10:49:45 AM
2
T338993.1165
Light’s section not working
9/18/2024
9/25/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/18/2024 10:31:36 AM
9/18/2024 10:31:41 AM
Comments
Created By
Date
Faulty driver
Brett Pitcher (Halsion )
9/20/2024 8:23:42 AM
3
T338993.1166
Light’s section not working
9/18/2024
9/25/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/18/2024 10:32:02 AM
9/18/2024 10:32:07 AM
Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 8:23:19 AM
4
T338993.1169
Light’s lengths not correct. Shorter than drawing.
9/18/2024
9/25/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/18/2024 10:47:24 AM
9/18/2024 10:47:33 AM
Comments
Created By
Date
This is an architectural/design snag.
Brett Pitcher (Halsion )
9/20/2024 8:20:33 AM
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 30 Of 41
5
T444645.574
can copex be replaced?
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/11/2024
11/18/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 11:03:30 AM 6
T444645.576
grill needs to be fixed flush with dry lining
Images
11/6/2024 11:08:38 AM 7
T338993.2145
Lagging incomplete.
Images
11/6/2024 2:39:39 PM 8
T444645.613
11/6/2024 2:39:44 PM
missing diffuser
11/6/2024 2:42:00 PM
11/6/2024 2:42:08 PM
Images
11/11/2024 12:09:33 PM Building B>Seventh Floor>0702 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.489
scratch to door
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 31 Of 41
Images
10/23/2024 3:36:17 PM 2
T444645.491
signage not fixed
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
Images
10/23/2024 3:38:17 PM Building B>Seventh Floor>0703 WC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T419146.445
temp fixings to be removed
9/4/2024
9/11/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (James McKeever)
9/4/2024
9/11/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Ian Robertson)
Images
9/4/2024 10:21:40 AM 2
T350553.791
redundant eyelet fixings to be removed
Images
9/4/2024 10:22:37 AM Building B>Seventh Floor>07L03 Passenger Lift 03
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.490
signage not fixed
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 32 Of 41
Images
10/23/2024 3:36:49 PM Building B>Seventh Floor>07R01 LTHW/CHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2146
Controller not secured and prob not fixed.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 2:40:55 PM
11/6/2024 2:41:09 PM
11/6/2024 2:41:19 PM
Building B>Seventh Floor>07S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1041
Light not working.
9/3/2024
9/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/3/2024 11:01:52 AM
9/3/2024 11:01:58 AM
Comments
Created By
Date
Faulty Driver
Brett Pitcher (Halsion )
9/10/2024 5:43:45 PM
Snag will be closed when the faulty driver is changed and light is working.
Vanngel Natso (McLaughlin & Harvey)
9/30/2024 6:25:30 PM
Building B>Sixth Floor>0602 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.492
hole visable
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
Images
10/23/2024 3:40:45 PM Building B>Sixth Floor>06S02 Stair 02 12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 33 Of 41
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.375
inconsistent gaps
10/16/2024
10/23/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
10/16/2024 11:15:53 AM T338993.2147
10/16/2024 11:16:02 AM
Saddle clip not secured.
Images
11/6/2024 2:45:51 PM
11/6/2024 2:46:00 PM
Building B>Tenth Floor>1001 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T419146.618
lightning tape to be relocated to the back of the column
9/25/2024
10/2/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (James McKeever)
9/25/2024
10/2/2024
Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
9/25/2024 1:11:18 PM 2
T350553.872
redundant brackets to be removed
Images
9/25/2024 1:56:22 PM
9/25/2024 1:56:28 PM
Building B>Tenth Floor>1002 Lift Lobby Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 34 Of 41
T444645.469
needs to be centered and straight
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
10/23/2024
10/30/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Ian Robertson)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Vanngel Natso)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/23/2024 2:51:40 PM T444645.473
tidy up antenna cable
Images
10/23/2024 3:03:10 PM T350553.1872
10/23/2024 3:03:17 PM
Metal cable ties required on lift antenna cabling
Images
11/6/2024 11:12:32 AM T338993.2133
11/6/2024 11:12:46 AM
Temporary clips to be removed.
Images
11/6/2024 11:13:46 AM 1
T350553.1873
11/6/2024 11:13:56 AM
sprinkler support not on pipework to be fixed
Images
11/6/2024 11:14:09 AM 12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 35 Of 41
Building B>Tenth Floor>1006 Stair Lobby 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.28
damaged fire stopping
10/8/2024
10/15/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
Images
10/8/2024 10:37:31 AM 2
T350553.1864
Fire stopping to be made good
Images
11/6/2024 10:25:53 AM
11/6/2024 10:26:03 AM
Building B>Tenth Floor>10L04 Evacuation Lift
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.26
damaged fire stopping
10/8/2024
10/15/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (James McKeever)
Images
10/8/2024 10:36:20 AM Building B>Tenth Floor>10R03 DHW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1868
damaged insulation to be replaced
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/6/2024 10:58:57 AM
11/6/2024 10:59:06 AM
11/6/2024 10:59:15 AM
Building B>Tenth Floor>10S01 Stair 01 Reference
Description
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 36 Of 41
T338993.1018
Broken Light’s clips and covers.
9/2/2024
9/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/2/2024 3:03:44 PM
9/2/2024 3:04:05 PM
9/2/2024 3:04:59 PM
9/2/2024 3:05:16 PM
9/2/2024 3:05:55 PM
Comments
Created By
Date
Photo of the light clipped is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:42:42 AM
Building B>Tenth Floor>10S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1285
stair landing screed to be infilled,
10/16/2024
10/23/2024
Client Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Ian Robertson)
10/16/2024
10/23/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (Ian Robertson)
10/16/2024
10/23/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (Ian Robertson)
Images
10/16/2024 9:32:16 AM 2
T350553.1287
plug infill to be buffed down as per benchmark on all floors
Images
10/16/2024 9:37:19 AM 3
T350553.1288
tie to be removed from concrete soffit
Images
10/16/2024 9:39:05 AM
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 37 Of 41
4
T444645.342
general comment to be sanded down
10/16/2024
10/23/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (James McKeever)
10/16/2024
10/23/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Ian Robertson)
10/16/2024
10/23/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (James McKeever)
Images
10/16/2024 9:44:13 AM 5
T350553.1289
sprinkler fire stopping coil to be installed as per other floors
Images
10/16/2024 9:43:52 AM 6
T444645.345
10/16/2024 9:44:04 AM
difference in gaps from top of bottom
Images
10/16/2024 9:49:49 AM
10/16/2024 9:49:55 AM
Building B>Third Floor>0301 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T332172.51
damage tocolumn
5/23/2024
5/30/2024
Client Snag
Opened
Groundworks
Mitchellson
Francis Hunter (Luke Nurser)
5/23/2024
5/30/2024
Client Snag
Opened
Risers
Dura Composites
Francis Hunter (Luke Nurser)
Images
5/23/2024 3:16:28 PM 2
T332172.52
damaged riser door
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 38 Of 41
Images
5/23/2024 3:20:19 PM 3
T332172.53
damaged riser door
5/23/2024
5/30/2024
Client Snag
Opened
Risers
Dura Composites
Francis Hunter (Luke Nurser)
Images
5/23/2024 3:20:45 PM Building B>Third Floor>0303 WC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2165
Sprinkler’s lagging missing foil on the end of the lagging.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 4:16:48 PM
11/6/2024 4:16:55 PM
Building B>Third Floor>0306 Stair Lobby 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1067
Light not working.
9/3/2024
9/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/3/2024 4:27:45 PM Comments
Created By
Date
Faulty driver.
Brett Pitcher (Halsion )
9/20/2024 9:05:25 AM
12/5/2024 10:39:26 AM
Project Name: B5412 Project Honey
Page 39 Of 41
1
T338993.2166
Light not working and remove smoke detector’s cover.
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/6/2024 4:20:08 PM
11/6/2024 4:20:53 PM
11/8/2024 7:39:07 AM
Building B>Third Floor>03R08 Elec. Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1291
Additional metal cable ties required.
9/23/2024
9/30/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/23/2024 11:38:55 AM
9/23/2024 11:39:17 AM
11/12/2024 8:51:16 AM
11/12/2024 8:51:25 AM
Comments
Created By
Date
The black cables are compass
Damian Dobson (Halsion )
10/29/2024 2:24:42 PM
The Fibre Optic cables are secured with metal cable ties. There were cables run by Halsion which were missing metal cable ties. Please, confirm that additional cable ties are installed.
Vanngel Natso (McLaughlin & Harvey)
11/19/2024 6:49:05 PM
Building B>Third Floor>03S01 Stair 01 Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.1047
Light’s clips broken or not secured.
9/3/2024
9/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
9/3/2024 11:59:52 AM
9/3/2024 12:00:03 PM
9/3/2024 12:00:11 PM
Comments
Created By
Date
Photo of the light clipped is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:41:42 AM
T338993.1048
Light’s clips broken or not secured.
12/5/2024 10:39:26 AM
9/3/2024
Project Name: B5412 Project Honey
9/10/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Page 40 Of 41
Images
9/3/2024 12:00:56 PM
9/3/2024 12:01:10 PM
9/3/2024 12:01:27 PM
Comments
Created By
Date
Photo of the light clipped is required.
Vanngel Natso (McLaughlin & Harvey)
12/4/2024 9:41:07 AM
Building B>Third Floor>03S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.405
joint to be made good
10/16/2024
10/23/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (James McKeever)
10/16/2024
10/23/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (James McKeever)
Images
10/16/2024 11:56:16 AM 2
T444645.406
differences in panel gaps to be rectified
Images
10/16/2024 11:57:36 AM
12/5/2024 10:39:26 AM
10/16/2024 11:57:45 AM
Project Name: B5412 Project Honey
Page 41 Of 41
Project Honey – Building C Snag Report 05.12.24
FH090-151015
Building C Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1279
Dry riser doors not installed all floors
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/31/2024
11/7/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/11/2024 6:29:38 PM T350553.1785
Smoke vent grilles incomplete All floors
Images
10/31/2024 11:49:11 AM Building C>Fifth Floor Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.107
Magic man to cover exposed lifting eye
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:05:56 AM Building C>Fifth Floor>Core 1 Lobby L05
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.6
Architraves to be installed
11/4/2024
11/11/2024
Incomplete Works
Opened
Lifts
Otis
McLaughlin & Harvey (Farron O'Hare)
Images
11/4/2024 10:00:37 AM
12/5/2024 10:42:41 AM
11/4/2024 10:00:43 AM
Project Name: B5412 Project Honey
Page 1 Of 87
2
T353957.108
Damage to door to be touched up
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:06:29 AM Building C>Fifth Floor>Core 1 Lobby L05Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T349466.13
Fire exit sign missing
12/3/2024
12/10/2024
Snag
Opened
M&E
Halsion
Halsion (James Parker)
Images
12/3/2024 12:57:21 PM Building C>Fifth Floor>Core 1 Riser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.8
Plasterboard to be Taped / jointed and painted
11/4/2024
11/11/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
11/4/2024
11/11/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/4/2024 10:02:53 AM 2
T452415.9
Expanding foam to be cut back and joints to be mastic
Images
11/4/2024 10:06:00 AM
11/4/2024 10:06:06 AM
Building C>Fifth Floor>Core 1 Riser B Reference
Description
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 2 Of 87
1
T452415.10
Expanding foam to be cut back and joints to be mastic
11/4/2024
11/11/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Images
11/4/2024 10:07:01 AM Building C>Fifth Floor>Core 2 Lobby L05Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.262
Excess neoprene to be cut
11/13/2024
11/20/2024
Client Snag
Opened
PreCast Structure
FP McCann
McLaughlin & Harvey (Farron O'Hare)
Images
11/13/2024 11:56:17 AM Building C>Fifth Floor>Fifth Floor (Mezz) Parking
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.18
Paint on Aco to be cleaned off
11/6/2024
11/13/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
11/6/2024
11/13/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
Images
11/6/2024 11:41:25 AM 2
T452415.19
11/6/2024 11:41:30 AM
Chalk Lines to be cleaned off
Images
11/6/2024 11:42:08 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 3 Of 87
3
T452415.20
inbetween unistrut to be painted
11/6/2024
11/13/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
11/6/2024
11/13/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
11/6/2024
11/13/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
11/6/2024
11/13/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
Images
11/6/2024 11:43:29 AM 4
T452415.21
Paint sprayed on parapet to be cleaned
Images
11/6/2024 11:44:26 AM 5
T452415.22
Poor finish / coordination in line marking
Images
11/6/2024 11:46:01 AM 6
T452415.24
Poor finish / coordination in line marking
Images
11/6/2024 12:40:50 PM 7
T452415.125
Two lights not working
Images
11/8/2024 11:23:19 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 4 Of 87
8
T350553.1963
water damaged trunken to be replaced
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/11/2024 5:16:01 PM 9
T350553.1964
11/11/2024 5:18:11 PM
11/11/2024 5:18:17 PM
metal tiewraped to be cut short on all EV charger cabling
11/11/2024 5:18:45 PM
11/11/2024 5:18:52 PM
11/11/2024 5:19:16 PM
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
Images
11/11/2024 5:17:42 PM 10
T350553.1965
bracket to me tightened and uni strut the be straightened
Images
11/11/2024 5:20:34 PM 11
T452415.258
11/11/2024 5:20:47 PM
Clips to be removed
Images
11/13/2024 11:49:50 AM 12
T452415.259
Containment with water damage to be replaced
Images
11/13/2024 11:53:49 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 5 Of 87
13
T452415.260
PIR at 2090, needs to be 2100
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
Images
11/13/2024 11:54:33 AM 14
T452415.261
Clips to be removed
Images
11/13/2024 11:55:01 AM Building C>Fifth Floor>Fifth Floor Parking
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1961
metal tiewraped to be cut short on all EV charger cabling
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/11/2024 5:10:41 PM 2
T350553.1962
11/11/2024 5:10:49 PM
back box lids missing
11/11/2024 5:10:59 PM
11/11/2024 5:11:07 PM
11/11/2024 5:11:15 PM
Images
11/11/2024 5:12:38 PM 3
T338993.2312
11/11/2024 5:12:48 PM
Missing conduit box cover.
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 6 Of 87
Images
11/13/2024 11:38:33 AM 4
T338993.2313
11/13/2024 11:38:38 AM
11/13/2024 11:38:42 AM
Some EVC are not secured properly. They are shaking. Across levels.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 11:40:48 AM Building C>Fifth Floor>Stair 1 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.3
Temp lighting clips to be removed
11/4/2024
11/11/2024
Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
11/4/2024
11/11/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
11/4/2024
11/11/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Images
11/4/2024 9:51:22 AM 2
T452415.4
Protection from painter to be removed
Images
11/4/2024 9:52:30 AM 3
T452415.5
Paint on closer to be removed
Images
11/4/2024 9:59:24 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 7 Of 87
Building C>First Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.177
Lightning protection incomplete
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 10:57:00 AM Building C>First Floor>Core 1 Lobby L01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.121
Scrapes on handle + bead in glass to be improved
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:40:13 AM
11/26/2024 11:40:20 AM
11/26/2024 11:40:42 AM
Building C>First Floor>Core 1 Lobby L01Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.117
Containment to be complete
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:33:05 AM Building C>First Floor>Core 2 Lobby L01Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.81
Doors not closing correctly. All doors to be checked and adjusted.
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:30:11 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 8 Of 87
Building C>First Floor>First Floor (Mezz) Parking Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.374
Trunking damaged
7/29/2024
8/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
Darling Associates (Robyn Harrison Church)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
7/29/2024 4:45:50 PM 1
T452415.172
7/29/2024 4:45:51 PM
Pipe leaking
7/29/2024 4:45:51 PM
Images
11/12/2024 10:50:45 AM 2
T452415.173
Paint flaking
11/12/2024 10:50:52 AM
Images
11/12/2024 10:52:10 AM 3
T353957.118
Damaged light
Images
11/26/2024 11:36:26 AM 4
T353957.119
Damaged light
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 9 Of 87
Images
11/26/2024 11:37:28 AM Building C>First Floor>First Floor Parking
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.175
complete all firestopping
11/12/2024
11/19/2024
Snag
Opened
Fire Stopping
Middlesex Limited
Darling Associates (Robyn Harrison Church)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/12/2024 10:54:22 AM 2
T353957.123
Conduit to be replaced
Images
11/26/2024 11:43:26 AM 3
T353957.124
Conduit to be replaced
Images
11/26/2024 11:43:49 AM 4
T353957.125
Conduit to be replaced
Images
11/26/2024 11:45:13 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 10 Of 87
Building C>First Floor>Stair 1 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.120
Magic man to repair
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:38:24 AM Building C>First Floor>Stair 2 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.77
General clean required
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:24:17 AM 2
T353957.78
General clean
Images
11/26/2024 9:25:16 AM 3
T353957.79
Touching up to be complete
Images
11/26/2024 9:25:55 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 11 Of 87
4
T353957.80
General clean
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:26:43 AM Building C>Fourth Floor>Core 1 Riser B
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T349466.3
Repair lagging
11/21/2024
11/28/2024
Snag
Opened
M&E
Halsion
Halsion (James Parker)
Images
11/21/2024 2:38:26 PM Building C>Fourth Floor>Core 2 Lobby L04
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.250
Clips to be removed
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
Images
11/13/2024 11:13:54 AM Building C>Fourth Floor>Core 2 Lobby L04Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1960
bracket to me tightened and uni strut the be straightened
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/11/2024 3:55:02 PM
11/11/2024 3:55:10 PM
Building C>Fourth Floor>Fourth Floor (Mezz) Parking Reference
Description
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 12 Of 87
T338993.385
Trunking, Tray and support damaged / rusty
7/30/2024
8/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
7/30/2024
8/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Farron O'Hare)
Images
7/30/2024 11:39:43 AM T338993.386
7/30/2024 11:39:52 AM
7/30/2024 11:42:02 AM
Screw not compliance with other the product
7/30/2024 11:42:10 AM
Images
7/30/2024 11:43:14 AM 1
T350553.1959
7/30/2024 11:43:22 AM
7/30/2024 11:43:32 AM
metal tiewraped to be cut short on EV charger cabling
Images
11/11/2024 3:53:13 PM 2
T452415.253
11/11/2024 3:53:47 PM
Two faulty lights to be replaced
Images
11/13/2024 11:25:11 AM 3
T452415.254
Bollard to be installed (MCLH to confirm)
Images
11/13/2024 11:27:36 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 13 Of 87
4
T452415.255
Separation lines to be installed (MCLH to confirm)
11/13/2024
11/20/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Across all levels. PIR should be minimum 2100mm FFFL. In some cases is between 5mm to 10mm lower. Also. head loose, anyone can rotate them. 11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 11:28:33 AM 5
T338993.2310
Some lights not working across floors.
Images
11/13/2024 11:32:04 AM 5
T338993.2311
Images
11/13/2024 11:35:18 AM Building C>Fourth Floor>Fourth Floor Parking Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.382
Trunking and Tray damaged / rusty
7/30/2024
8/6/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
7/30/2024 11:20:58 AM
7/30/2024 11:21:05 AM
7/30/2024 11:21:20 AM
7/30/2024 11:21:34 AM
7/30/2024 11:22:44 AM
7/30/2024 11:22:59 AM
7/30/2024 11:23:12 AM
7/30/2024 11:27:23 AM
7/30/2024 11:27:27 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 14 Of 87
1
T350553.1954
light not working and diffuser missing
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/11/2024
11/18/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/11/2024 3:45:51 PM 2
T350553.1955
light not working
Images
11/11/2024 3:46:33 PM 3
T452415.251
Lightning protection to be fixed
Images
11/13/2024 11:15:51 AM 4
T338993.2304
Missing reference on sockets.
Images
11/13/2024 11:17:35 AM 4
T338993.2305
Building control to confirm if the exit light should be on top of the door as mandatory requirement.
Images
11/13/2024 11:19:25 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 15 Of 87
4
T338993.2306
Missing green led indication on all emergency lights.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
PreCast Structure
FP McCann
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 11:21:09 AM 4
T338993.2307
11/13/2024 11:21:25 AM
Additional metal cable ties required on all EVC cable drops.
Images
11/13/2024 11:22:13 AM 5
T452415.252
11/13/2024 11:22:21 AM
Excess neoprene to be cut
Images
11/13/2024 11:23:52 AM 4
T338993.2308
All EV points to be labelled with number and state if they are slow or fast charge. Also, cables should be referenced as well.
Images
11/13/2024 11:24:27 AM 4
T338993.2309
11/13/2024 11:26:50 AM
11/13/2024 11:27:22 AM
All lighting cover clips to be checked. Some are missing or broken.
Images
11/13/2024 11:28:33 AM 12/5/2024 10:42:41 AM
11/13/2024 11:28:47 AM
11/13/2024 11:28:58 AM Project Name: B5412 Project Honey
Page 16 Of 87
Building C>Fourth Floor>Stair 2 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345609.13
General construction writing on walls to be cleaned.
11/15/2024
11/22/2024
Snag
Opened
Cleaning
Serna Cleaning
Darling Associates (Robyn Harrison Church)
Issued To Package
Issued To Organisation
Issued By Organisation
Mitchellson
McLaughlin & Harvey (Farron O'Hare)
Images
11/15/2024 11:33:22 AM Building C>Ground Floor Reference
Description
Issued Date
Target Date
Task Type
Status
T1.51198935
A gully has been installed and the head has not been installed.
8/7/2024
8/14/2024
Incomplete Works
Opened
Firestopping to be complete + flashing to be installed around extract
11/26/2024
12/3/2024
Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
Images
8/7/2024 5:19:26 PM 1
T345609.26
Images
11/26/2024 2:45:18 PM 2
T345609.27
Mastic joint colour mismatch with mortar
Images
11/26/2024 2:46:36 PM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 17 Of 87
3
T345609.28
Firestopping to be finished in secure manner
11/26/2024
12/3/2024
Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 2:48:37 PM 4
T345609.29
Gap to be filled with green brick
Images
11/26/2024 2:52:03 PM 5
T345609.30
Firestopping to properly secured at door head
Images
11/26/2024 3:03:33 PM Building C>Ground Floor>Accessible WC Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1590
CCTV cabling incomplete
10/24/2024
10/31/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/24/2024 12:46:11 PM 1
T350553.2135
11/7/2024 4:12:51 PM
light and PIR to be installed
12/5/2024 10:42:41 AM
11/21/2024 1:39:17 PM
Project Name: B5412 Project Honey
Page 18 Of 87
Images
11/27/2024 9:43:52 AM 1
T350553.2136
punka louvre insert to be installed
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 9:44:33 AM Building C>Ground Floor>Changing Circulation
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1733
2nd fix small power incomplete cleaners sockets missing
10/31/2024
11/7/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/31/2024 8:32:47 AM 2
T353957.48
10/31/2024 8:32:59 AM
Check seam position on vinyl as per?
11/7/2024 2:10:05 PM
11/7/2024 2:10:16 PM
11/21/2024 1:36:12 PM
11/21/2024 1:36:17 PM
11/21/2024 1:36:28 PM
11/21/2024 1:36:33 PM
11/13/2024
11/20/2024
Observation
Opened
Client
Francis Hunter
McLaughlin & Harvey (Connor Casey)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 9:40:40 AM 3
T338993.2262
Fire stopping missing.
Images
11/13/2024 9:49:46 AM 12/5/2024 10:42:41 AM
11/13/2024 9:49:52 AM Project Name: B5412 Project Honey
Page 19 Of 87
4
T338993.2263
Remove redundant cable ties.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 9:50:51 AM 5
T338993.2264
11/13/2024 9:50:59 AM
Door has scratches.
11/13/2024 9:51:06 AM
11/13/2024 9:53:20 AM
11/13/2024 9:53:31 AM
11/13/2024 9:54:51 AM
11/13/2024 9:54:57 AM
11/13/2024 10:50:38 AM
11/13/2024
11/20/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
Images
11/13/2024 9:52:43 AM T338993.2265
11/13/2024 9:52:49 AM
Lights not working.
Images
11/13/2024 9:55:38 AM 6
T452415.199
11/13/2024 9:55:45 AM
All stickers to be removed
Images
11/13/2024 9:56:03 AM 7
T452415.201
Temp cables to be removed
Images
11/13/2024 10:00:04 AM 12/5/2024 10:42:41 AM
11/13/2024 10:00:14 AM Project Name: B5412 Project Honey
Page 20 Of 87
8
T452415.207
Screw and chain to be removed
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 10:07:38 AM T338993.2289
No earth links between containment which are not connected.
Images
11/13/2024 10:53:08 AM 9
T338993.2299
11/13/2024 10:53:13 AM
Cable reference missing on all cables.
Images
11/13/2024 11:04:33 AM 10
T338993.2300
11/13/2024 11:04:48 AM
Missing reference on lighting control panel and blanks.
Images
11/13/2024 11:06:55 AM T338993.2301
11/13/2024 11:07:14 AM
Missing schedule, circuit references and blanks on DB panel. Also, screw on covers missing.
Images
11/13/2024 11:10:30 AM 12/5/2024 10:42:41 AM
11/13/2024 11:10:36 AM
11/13/2024 11:10:45 AM
11/13/2024 11:10:54 AM
11/13/2024 11:11:12 AM Project Name: B5412 Project Honey
Page 21 Of 87
T338993.2302
Spur not 2nd fixed.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 11:12:07 AM T338993.2303
11/13/2024 11:12:12 AM
Missing exit light.
Images
11/13/2024 11:12:25 AM 11
T350553.2142
cable ties to be removed
Images
11/27/2024 9:49:05 AM 12
T350553.2143
11/27/2024 9:52:10 AM
2 x lights not working
11/27/2024 9:54:06 AM
11/27/2024 9:54:11 AM
11/27/2024 9:54:17 AM
Images
11/27/2024 9:50:28 AM 13
T350553.2144
fire exit signage should point up
Images
11/27/2024 9:51:00 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 22 Of 87
14
T350553.2145
lid on back box missing
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 9:51:40 AM 15
T350553.2146
11/27/2024 9:56:00 AM
lagging to be tidied up on ductwork and not around rod/ unistrut
Images
11/27/2024 9:53:16 AM 16
T350553.2147
DB wiring incomplete
Images
11/27/2024 9:57:17 AM 16
T350553.2148
DB schedules missing from all boards
Images
11/27/2024 9:58:38 AM 17
T350553.2149
Rubber matts required under Distribution boards
Images
11/27/2024 10:02:00 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 23 Of 87
18
T350553.2150
trace heating power incomplete
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 10:02:37 AM Building C>Ground Floor>Cleaner's Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2133
insulation to be completed
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 9:42:49 AM Building C>Ground Floor>Cold Water Tank
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.141
Fire stopping to be complete confirm requirement for coating system
11/26/2024
12/3/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
Building C>Ground Floor>Core 1 CL00 Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.128
Magic man required
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:49:29 AM 2
T353957.130
Temp fire door to be replaced at later date
Images
11/26/2024 11:50:23 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 24 Of 87
Building C>Ground Floor>Core 1 L00 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1246
2nd fix fire alarm/smoke head/call point incomplete
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/11/2024 12:34:56 PM T350553.2076
10/11/2024 12:34:56 PM
CCTV wiring incomplete
10/30/2024 2:20:26 PM
10/30/2024 2:20:39 PM
11/7/2024 4:15:01 PM
11/14/2024 2:11:46 PM
11/21/2024 1:40:26 PM
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/21/2024 1:40:53 PM
11/21/2024 1:42:27 PM
Building C>Ground Floor>Core 2 Final Exit (External) Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2080
CCTV wiring incomplete
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/21/2024 2:08:34 PM 1
T353957.75
Floor finish to be carried to wall
Images
11/26/2024 9:18:35 AM Building C>Ground Floor>Core 2 Lobby L00Mezz Reference
Description
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 25 Of 87
1
T353957.76
Cleaning to complete
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:21:16 AM 2
T353957.132
11/26/2024 9:21:31 AM
Temp fire door to be replaced at later date
Images
11/26/2024 11:53:03 AM Building C>Ground Floor>Entrance/Exit Ramp
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1938
2nd fix CCTV wiring incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Curtains
Coopers Fire
McLaughlin & Harvey (Connor Casey)
Images
11/7/2024 3:17:16 PM 2
T353957.134
11/7/2024 3:17:35 PM
Temporary tray to be removed
11/7/2024 3:17:42 PM
Images
11/26/2024 11:55:20 AM 3
T353957.136
Damaged fire curtain
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 26 Of 87
Images
11/26/2024 11:59:03 AM Building C>Ground Floor>Female Changing
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1488
Cabling incomplete
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/31/2024
11/7/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
Images
10/22/2024 10:21:45 AM 2
T350553.1489
Smoke head missing
Images
10/22/2024 10:23:48 AM 3
T350553.1734
2nd fix small power incomplete cleaners sockets missing
Images
10/31/2024 8:35:34 AM 4
T452415.100
11/7/2024 2:06:21 PM
PIR / fire alarm to be installed
11/14/2024 1:56:06 PM
11/21/2024 1:32:21 PM
11/21/2024 1:32:27 PM 11/8/2024
11/21/2024 1:32:40 PM 11/15/2024
Snag
Images
11/8/2024 10:57:51 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 27 Of 87
5
T452415.102
water pooling at gully
11/8/2024
11/15/2024
Snag
Opened
Screed Flooring
UK SubFloors
Darling Associates (Robyn Harrison Church)
11/8/2024
11/15/2024
Snag
Opened
Joinery
Original Joinery
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/8/2024 11:00:11 AM 6
T452415.106
Bin missing
Images
11/8/2024 11:03:25 AM 7
T338993.2266
End and rod cups missing.
Images
11/13/2024 10:08:05 AM 7
T338993.2268
11/13/2024 10:08:14 AM
Missing Smoke detector head.
11/13/2024 10:08:41 AM
11/13/2024 10:15:34 AM
11/13/2024 10:15:41 AM
11/13/2024 10:16:10 AM
11/13/2024 10:16:16 AM
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 10:15:00 AM T338993.2297
11/13/2024 10:15:05 AM
Additional cable tie required.
Images
11/13/2024 11:02:37 AM 12/5/2024 10:42:41 AM
11/13/2024 11:02:41 AM Project Name: B5412 Project Honey
Page 28 Of 87
T338993.2298
Fire stopping incomplete.
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 11:03:15 AM 8
T350553.2151
11/13/2024 11:03:22 AM
tap missing
Images
11/27/2024 10:07:46 AM 9
T350553.2152
all sockets to be labelled
Images
11/27/2024 10:08:31 AM
11/27/2024 10:08:39 AM
Building C>Ground Floor>Front Lobby & Office Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1942
2nd fix small power /FA wiring incomplete MSFD wiring incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/14/2024
11/21/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/7/2024 4:11:56 PM T350553.2048
11/14/2024 2:03:38 PM
2nd fix Fire alarm wiring incomplete
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 29 Of 87
Images
11/14/2024 2:04:20 PM T350553.2075
CCTV wiring incomplete
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Architect
Darling Associates
McLaughlin & Harvey (Connor Casey)
Images
11/21/2024 1:38:09 PM 1
T353957.72
Signage colour unreadable colour to be changed or backing installed
Images
11/26/2024 9:02:08 AM
11/26/2024 9:02:24 AM
2
T408928.125
shower symbol etc shouldn’t be here nor sign
11/26/2024
11/29/2024
Client Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
3
T350553.2129
Fire alarm panel wiring incomplete
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 9:38:42 AM 4
T350553.2130
CCTV wiring incomplete
Images
11/27/2024 9:39:38 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 30 Of 87
5
T350553.2131
door access wiring incomplete
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 9:40:41 AM 6
T350553.2132
all sockets to be labelled
Images
11/27/2024 9:41:50 AM 7
T350553.2137
lagging to be tidied up on ductwork
Images
11/27/2024 9:45:08 AM 8
T350553.2138
lid on back box missing
Images
11/27/2024 9:45:49 AM 9
T350553.2139
spur faceplate to be fixed
Images
11/27/2024 9:46:31 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 31 Of 87
10
T350553.2140
rod caps to be fitted
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 9:47:12 AM 11
T350553.2141
light and PIR to be installed
Images
11/27/2024 9:47:54 AM Building C>Ground Floor>Generator/Life Safety Switch Room Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1729
2nd fix Fire alarm incomplete interface to generator fuel tank
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/30/2024 4:36:39 PM T350553.1730
10/30/2024 4:36:48 PM
10/30/2024 4:37:06 PM
11/7/2024 3:44:22 PM
2nd lighting wiring incomplete
11/14/2024 4:49:55 PM 10/30/2024
11/21/2024 2:19:51 PM 11/6/2024
Incomplete Works
Images
10/30/2024 4:37:34 PM T350553.1940
10/30/2024 4:37:50 PM
2nd fix CCTV wiring incomplete
12/5/2024 10:42:41 AM
10/30/2024 4:38:06 PM
11/7/2024 3:41:42 PM
11/7/2024 3:41:56 PM 11/7/2024
Project Name: B5412 Project Honey
11/14/2024 4:48:10 PM 11/14/2024
Incomplete Works
11/21/2024 2:18:53 PM Opened
11/21/2024 2:19:05 PM M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Page 32 Of 87
Images
11/7/2024 3:42:41 PM 1
T353957.138
11/14/2024 4:47:48 PM
11/14/2024 4:47:54 PM
Fire stopping to be complete on windposts
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:02:57 PM 2
T353957.139
Fire stopping to be complete
Images
11/26/2024 12:03:53 PM Building C>Ground Floor>Ground Floor (Mezz) Parking Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1260
2nd fix lighting PIRs incomplete
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/11/2024 2:32:09 PM
10/31/2024 9:06:13 AM
10/31/2024 9:06:22 AM
10/31/2024 9:06:36 AM
10/31/2024 9:06:45 AM
11/7/2024 3:22:43 PM
11/14/2024 2:15:54 PM
11/14/2024 2:16:03 PM
11/14/2024 2:16:15 PM
11/21/2024 3:02:28 PM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
11/7/2024 3:22:00 PM
11/7/2024 3:22:06 PM
11/7/2024 3:22:22 PM
Page 33 Of 87
1
T353957.129
Temp fire door to be replaced at later date
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:50:05 AM 2
T353957.131
Fire signage to be installed
Images
11/26/2024 11:51:22 AM 3
T353957.133
Movement joint to be complete
Images
11/26/2024 11:54:37 AM Building C>Ground Floor>Male Changing
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.241
additional ID required on domestic pipework insulation.
8/2/2024
8/9/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
8/2/2024 11:09:48 AM 2
T350553.1516
8/2/2024 11:09:48 AM
Insulation to be made good around pipework
12/5/2024 10:42:41 AM
11/7/2024 8:49:46 AM
Project Name: B5412 Project Honey
Page 34 Of 87
Images
10/22/2024 3:31:34 PM 3
T350553.1523
10/22/2024 3:31:49 PM
Smoke head missing
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/8/2024
11/15/2024
Snag
Opened
Joinery
Original Joinery
Darling Associates (Robyn Harrison Church)
11/8/2024
11/15/2024
Snag
Opened
Joinery
Original Joinery
Darling Associates (Robyn Harrison Church)
Images
10/22/2024 3:39:33 PM 4
T350553.1524
10/22/2024 3:40:17 PM
All fire alarm sounders missing in cubicles
Images
10/22/2024 3:40:44 PM 5
T452415.113
Bin missing
Images
11/8/2024 11:08:45 AM 6
T452415.117
Bin missing
Images
11/8/2024 11:11:00 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 35 Of 87
7
T452415.120
PIR / fire alarm to be installed
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/8/2024 11:13:46 AM 8
T338993.2259
End and rod cups missing.
Images
11/13/2024 9:42:24 AM
11/13/2024 9:42:30 AM
11/13/2024 9:43:10 AM
11/13/2024 9:43:43 AM
11/13/2024 9:43:50 AM
11/13/2024 9:44:56 AM
11/13/2024 9:45:01 AM
11/13/2024 9:45:02 AM
11/21/2024 1:35:06 PM 9
T338993.2260
Missing Smoke detector head.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 9:45:52 AM 10
T338993.2261
11/13/2024 9:45:57 AM
Additional metal cable ties required.
Images
11/13/2024 9:46:47 AM
12/5/2024 10:42:41 AM
11/13/2024 9:46:52 AM
11/13/2024 9:47:16 AM
Project Name: B5412 Project Honey
Page 36 Of 87
11
T452415.197
All stickers to be removed from PIR
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 9:52:54 AM 12
T350553.2154
light to be installed
Images
11/27/2024 10:17:53 AM 13
T350553.2155
spur faceplate to be fixed
Images
11/27/2024 10:20:38 AM 14
T350553.2156
all sockets to be labelled
Images
11/27/2024 10:21:48 AM Building C>Ground Floor>Plant Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.140
Fire stopping to be complete
11/26/2024
12/3/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 37 Of 87
Images
11/26/2024 12:05:02 PM Building C>Ground Floor>Stair 1 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.126
Magic man required
11/26/2024
12/3/2024
Client Snag
Opened
Client
Francis Hunter
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:47:57 AM Building C>Ground Floor>Switch Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.135
Door threshold to be installed
11/26/2024
12/3/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:58:04 AM Building C>Ground Floor>Thermal Stores
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2081
Earth wiring incomplete
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/21/2024 2:16:10 PM Building C>Ground Floor>Unisex Changing Reference
Description
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 38 Of 87
1
T350553.1508
Smoke head missing
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Vanngel Natso)
Images
10/22/2024 10:44:19 AM 2
T338993.2252
Missing conduit box cover.
Images
11/13/2024 9:23:41 AM 3
T338993.2253
11/13/2024 9:23:48 AM
11/13/2024 9:27:27 AM
11/13/2024 9:27:35 AM
Rod cups missing.
11/21/2024 1:37:16 PM
Images
11/13/2024 9:25:03 AM 4
T338993.2254
11/13/2024 9:25:11 AM
Rod cups missing.
Images
11/13/2024 9:25:46 AM 5
T338993.2257
11/13/2024 9:25:53 AM
Door not fully painted.
11/13/2024 9:34:30 AM
11/13/2024 9:34:35 AM
Images
11/13/2024 9:36:13 AM 12/5/2024 10:42:41 AM
11/13/2024 9:36:23 AM Project Name: B5412 Project Honey
Page 39 Of 87
6
T338993.2290
Excess cable to be clipped.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 10:54:14 AM 7
T338993.2291
11/13/2024 10:54:21 AM
Lagging incomplete.
Images
11/13/2024 10:54:53 AM 5
T338993.2293
11/13/2024 10:54:59 AM
Fire stopping incomplete.
Images
11/13/2024 10:57:20 AM 8
T338993.2294
11/13/2024 10:57:31 AM
Lagging incomplete.
Images
11/13/2024 10:58:00 AM 9
T350553.2153
11/13/2024 10:58:18 AM
toilet water discoloured when flushing
Images
11/27/2024 10:11:18 AM 12/5/2024 10:42:41 AM
11/27/2024 10:11:46 AM Project Name: B5412 Project Honey
Page 40 Of 87
Building C>Ground Floor>Unisex Changing (Large)
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T327871.663
Screed has left room for vinyl to be feathered into shower gully on one side, however on other the screed has just gone flush with gully. this is on all screeded shower cubicles
5/22/2024
5/29/2024
Incomplete Works
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
Images
5/22/2024 12:25:45 PM 2
T327871.665
5/22/2024 12:25:45 PM
5/22/2024 12:25:45 PM
5/22/2024 12:25:45 PM
5/22/2024 12:25:45 PM
Screed has left room for vinyl to be feathered into shower gully on one side, however on other the screed has just gone flush with gully. this is on all screeded shower cubicles
5/22/2024 12:25:45 PM
5/22/2024 12:25:45 PM
5/23/2024
5/29/2024
Incomplete Works
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
5/23/2024 7:53:57 AM 3
T350553.1469
5/23/2024 7:53:57 AM
BMS cabling to be tidied up and tiewrapped neatly
Images
10/21/2024 4:20:34 PM 4
T350553.1476
PIR missing
Images
10/21/2024 4:36:09 PM 5
T350553.1477
cabling to be tidied up and tiewrapped neatly
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 41 Of 87
Images
10/21/2024 4:36:48 PM 6
T350553.1478
Smoke head missing
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/22/2024
10/29/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/25/2024
11/1/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (sam peach)
Images
10/21/2024 4:37:25 PM 7
T350553.1479
All tiewraps to be cut short
Images
10/21/2024 4:38:14 PM 8
T350553.1480
back box lids missing
Images
10/22/2024 10:02:34 AM 9
T450445.4
10/22/2024 10:02:52 AM
cut should have been installed high level. joint to be touched up black
Images
10/25/2024 12:14:55 PM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 42 Of 87
10
T450445.6
basket should have been ordered to suit niche size
10/25/2024
11/1/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (sam peach)
Images
10/25/2024 12:17:11 PM
11/11/2024 3:41:33 PM
Comments
Created By
Date
oder new size basket
Stephen O'Hara (Original Joinery)
11/11/2024 3:42:50 PM
11
T449040.77
Acoustic stopping to be made good / painting
10/25/2024
11/1/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Images
10/25/2024 12:26:31 PM
11/4/2024 2:23:15 PM
Comments
Created By
Date
Acoustic stopping is poor
Farron O'Hare (McLaughlin & Harvey)
11/6/2024 3:00:51 PM
12
T449040.84
Hole to be filled
10/25/2024
11/1/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Images
10/25/2024 12:38:44 PM Comments
Created By
Date
Unable to reach due M&E design, please advise
Stephen O'Hara (Original Joinery)
11/12/2024 4:46:54 PM
13
T450445.15
making good required around access panel
10/25/2024
11/1/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (sam peach)
Images
10/25/2024 12:40:10 PM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 43 Of 87
14
T449040.86
Poor finish to board joint to be filled with mastic
10/25/2024
11/1/2024
Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Images
10/25/2024 12:40:02 PM Comments
Created By
Date
Unable to reach due M&E design, please advise
Stephen O'Hara (Original Joinery)
11/12/2024 4:46:02 PM
15
T350553.1738
2nd fix small power incomplete cleaners sockets missing
10/31/2024
11/7/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/31/2024 8:53:58 AM
10/31/2024 8:54:05 AM
10/31/2024 8:59:44 AM
10/31/2024 8:59:57 AM
10/31/2024 9:00:21 AM
11/7/2024 1:53:57 PM
11/21/2024 1:23:31 PM
11/21/2024 1:23:37 PM
11/21/2024 1:23:50 PM
11/21/2024 1:23:58 PM
11/21/2024 1:24:07 PM
11/21/2024 1:24:13 PM
16
T452415.68
PIR to be installed
11/7/2024 1:54:08 PM
11/7/2024 1:54:27 PM
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/8/2024 10:20:30 AM 17
T353957.58
Finish around door frame to be improved
Images
11/13/2024 10:04:42 AM
12/5/2024 10:42:41 AM
11/13/2024 10:04:53 AM
Project Name: B5412 Project Honey
Page 44 Of 87
18
T452415.214
Painting / Plasterboard to be made good
11/13/2024
11/20/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 10:19:02 AM 19
T338993.2269
Lights should be in the centre, is this as per drawing?
Images
11/13/2024 10:18:46 AM 20
T338993.2270
Where is the spur for me his FCU?
Images
11/13/2024 10:22:11 AM 21
T338993.2271
11/13/2024 10:22:19 AM
Should the PIRs, have red, green or not lights indication?
Images
11/13/2024 10:24:25 AM 22
T338993.2272
11/13/2024 10:24:34 AM
Isolator not labelled.
Images
11/13/2024 10:25:11 AM 12/5/2024 10:42:41 AM
11/13/2024 10:25:19 AM Project Name: B5412 Project Honey
Page 45 Of 87
23
T338993.2273
Missing Smoke detector head.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
Architect
Darling Associates
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/13/2024 10:26:34 AM 24
T338993.2274
11/13/2024 10:26:41 AM
Cover for Smoke detector head to be removed on changing village area.
Images
11/13/2024 10:27:55 AM 25
T338993.2276
Solenoid valve not connected.
Images
11/13/2024 10:30:26 AM 26
T338993.2279
11/13/2024 10:30:31 AM
How you can removed this man hole to inspect the chamber?
Images
11/13/2024 10:34:57 AM 27
T338993.2280
11/13/2024 10:35:02 AM
11/13/2024 10:35:50 AM
No labels with circuit reference on all equipments in change village.
Images
11/13/2024 10:37:38 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 46 Of 87
T338993.2281
Cables hanging on ceiling across change village.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Conor Colton)
Images
11/13/2024 10:39:41 AM 28
T338993.2284
11/13/2024 10:39:57 AM
Lagging incomplete around duct.
Images
11/13/2024 10:44:37 AM 29
T338993.2285
11/13/2024 10:44:44 AM
Screw securing the Saddle failed.
Images
11/13/2024 10:45:52 AM 30
T452415.244
11/13/2024 10:46:02 AM
Split in shower gully to be welded at joint as risk of cut
Images
11/13/2024 10:54:43 AM 31
T456527.219
Make good to fire stop
Images
11/26/2024 6:16:09 PM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 47 Of 87
Building C>Ground Floor>Unisex WC
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1444
Pipework to be insulated
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/21/2024 3:51:23 PM 2
T350553.1445
10/21/2024 3:51:38 PM
Light missing
Images
10/21/2024 3:52:57 PM 1
T350553.1446
Reset button to be fixed to wall
Images
10/21/2024 3:57:25 PM 3
T350553.1452
Light missing
Images
10/21/2024 4:03:00 PM 4
T350553.1455
Light missing
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 48 Of 87
Images
10/21/2024 4:04:34 PM 5
T350553.1457
Light missing
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/21/2024
10/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/21/2024 4:05:37 PM 6
T350553.1461
All mess to be removed from ceiling tiles
Images
10/21/2024 4:08:49 PM 7
T350553.1462
10/21/2024 4:08:54 PM
cabling incomplete
Images
10/21/2024 4:09:59 PM 8
T350553.1463
Smoke head missing
Images
10/21/2024 4:10:29 PM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 49 Of 87
9
T350553.1739
2nd lighting incomplete
10/31/2024
11/7/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/31/2024 8:55:03 AM
10/31/2024 8:56:06 AM
10/31/2024 8:56:15 AM
10/31/2024 8:56:27 AM
11/7/2024 1:59:29 PM
11/7/2024 2:02:31 PM
11/14/2024 1:47:37 PM
11/14/2024 1:47:44 PM
11/14/2024 1:47:54 PM
11/21/2024 1:25:50 PM
11/21/2024 1:27:00 PM
11/21/2024 1:27:18 PM
10
T452415.63
Temp cables to be removed
11/7/2024 2:02:37 PM
11/14/2024 1:47:28 PM
11/8/2024
11/15/2024
Snag
Opened
M&E
Trident Electrical
Darling Associates (Robyn Harrison Church)
11/8/2024
11/15/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
Images
11/8/2024 10:16:46 AM 11
T452415.71
Shower curtain missing
Images
11/8/2024 10:23:47 AM Comments
Created By
Date
Not Halsion, please revert snag to relevant trade
James Parker (Halsion )
11/11/2024 9:46:04 AM
Halsion are down to provide free issue DDA fit out to our fitout contractor, please provide this imminently
Farron O'Hare (McLaughlin & Harvey)
11/12/2024 6:01:58 PM
Shower curtain has now been free issued to contractor
James Parker (Halsion )
11/19/2024 9:47:48 AM
12
T452415.80
Bins missing in sinks
12/5/2024 10:42:41 AM
11/8/2024
Project Name: B5412 Project Honey
11/15/2024
Snag
Opened
Joinery
Original Joinery
Darling Associates (Robyn Harrison Church)
Page 50 Of 87
Images
11/8/2024 10:29:48 AM 13
T452415.216
Pipe layout to be reviewed similar to Building B
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Farron O'Hare)
Images
11/13/2024 10:24:39 AM 14
T452415.220
Mastic colour to be confirmed by MCLH
Images
11/13/2024 10:31:26 AM 6
T338993.2277
Missing Smoke detector head.
Images
11/13/2024 10:31:39 AM 15
T452415.222
11/13/2024 10:31:44 AM
Edge of vinyl / coving to be made good
Images
11/13/2024 10:32:59 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 51 Of 87
2
T338993.2282
Light and reset button not installed.
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/14/2024
11/21/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/13/2024 10:41:21 AM 16
T338993.2283
11/13/2024 10:41:25 AM
11/13/2024 10:41:31 AM
Should this Spur be in this room? The steam could cause a fault.
Images
11/13/2024 10:43:09 AM 17
T338993.2286
11/13/2024 10:43:27 AM
Light not installed on all this area.
Images
11/13/2024 10:47:15 AM 18
T350553.2047
11/13/2024 10:47:21 AM
insulation on Pipework incomplete
Images
11/14/2024 1:48:50 PM T350553.2074
11/21/2024 1:25:34 PM
cleaners socket wiring incomplete
Images
11/21/2024 1:28:09 PM 12/5/2024 10:42:41 AM
11/21/2024 1:29:32 PM
11/21/2024 1:29:37 PM Project Name: B5412 Project Honey
Page 52 Of 87
19
T350553.2157
lights to be installed in cubicles
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/27/2024
12/4/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/27/2024 10:28:06 AM 20
T350553.2158
11/27/2024 10:28:19 AM
11/27/2024 10:28:44 AM
insulation required on pipework
Images
11/27/2024 10:29:23 AM Building C>Ground Floor>Woodland Walk Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1243
2nd fix fire alarm/smoke head/call point incomplete
10/11/2024
10/18/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/7/2024 4:18:12 PM 2
T350553.1732
11/21/2024 1:43:10 PM
CCTV wiring incomplete
Images
10/30/2024 4:45:36 PM 3
T353957.127
11/7/2024 4:15:49 PM
Magic man required
12/5/2024 10:42:41 AM
11/21/2024 1:42:54 PM
Project Name: B5412 Project Honey
Page 53 Of 87
Images
11/26/2024 11:48:45 AM Building C>Lower Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.147
Manhole finish to be improved
11/26/2024
12/3/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Groundworks
Mitchellson
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:21:19 PM 2
T353957.149
Finish around extract to be complete
Images
11/26/2024 12:24:14 PM 3
T353957.155
Covers missing containment to be complete
Images
11/26/2024 12:29:19 PM 3
T353957.158
Manhole fixings missing to be replaced
Images
11/26/2024 12:33:37 PM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 54 Of 87
4
T353957.164
Damaged fire stopping
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
PreCast Structure
FP McCann
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:44:03 PM 5
T353957.165
Magic man required
Images
11/26/2024 12:44:26 PM 6
T353957.166
Rebar to be cut and protected
Images
11/26/2024 12:45:56 PM 7
T353957.167
Bracket through corridor has sharp edge. To be raised above head height.
Images
11/26/2024 12:48:02 PM 8
T353957.168
11/26/2024 12:48:07 PM
Magic man required
Images
11/26/2024 12:48:19 PM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 55 Of 87
9
T353957.169
Magic man required
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:48:31 PM 10
T353957.170
Temp fire door to be replaced at later date.
Images
11/26/2024 12:49:06 PM 11
T345609.31
Firestopping to be properly secured
Images
11/26/2024 3:04:20 PM
11/26/2024 3:07:29 PM
Building C>Lower Ground Floor>Core 2 Lobby LG
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T327871.950
Screed not completed tight to corner
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
7/31/2024 1:21:02 PM T350553.1721
7/31/2024 1:21:02 PM
2nd lighting incomplete no lights/PIRs installed
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 56 Of 87
Images
10/30/2024 4:17:59 PM
11/14/2024 4:35:22 PM
11/21/2024 2:03:33 PM
Building C>Lower Ground Floor>Cycle Entrance (External) Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2078
CCTV wiring incomplete
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
Images
11/21/2024 1:53:23 PM 1
T353957.144
External fire stopping to be reviewed if secondary coat required
Images
11/26/2024 12:18:41 PM 2
T353957.145
Floor damaged repairs needed
Images
11/26/2024 12:19:28 PM Building C>Lower Ground Floor>Cycle Stacker Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T327871.952
Edges of access hatches have been screened over. not allowing access to tanks below
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 57 Of 87
Images
7/31/2024 1:26:14 PM 2
T327871.953
7/31/2024 1:26:14 PM
7/31/2024 1:26:14 PM
Edges of access hatches have been screened over. not allowing access to tanks below
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
Images
7/31/2024 1:27:00 PM 3
T327871.954
7/31/2024 1:27:00 PM
Poor finish on exposed screed at joint
Images
7/31/2024 1:28:08 PM 4
T327871.955
7/31/2024 1:28:08 PM
7/31/2024 1:28:08 PM
7/31/2024 1:28:08 PM
Edges / Screws of access hatches have been screened over. not allowing access to tanks below
7/31/2024 1:28:08 PM
Images
7/31/2024 1:30:13 PM 5
T327871.956
7/31/2024 1:30:13 PM
7/31/2024 1:30:13 PM
Screws of access hatches have been screened over. not allowing access to tanks below
Images
7/31/2024 1:31:00 PM
12/5/2024 10:42:41 AM
7/31/2024 1:31:00 PM
Project Name: B5412 Project Honey
Page 58 Of 87
6
T327871.957
Poor finish on exposed screed at joint
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
Images
7/31/2024 1:32:22 PM 7
T327871.958
7/31/2024 1:32:22 PM
7/31/2024 1:32:22 PM
7/31/2024 1:32:22 PM
Gullies screeded in off plumb
Images
7/31/2024 1:33:27 PM 8
T327871.959
Screws of access hatches have been screened over. not allowing access to tanks below
Images
7/31/2024 1:34:12 PM 9
T327871.960
7/31/2024 1:34:12 PM
Edges / Screws of access hatches have been screened over. not allowing access to tanks below
Images
7/31/2024 1:34:41 PM 10
T327871.961
Edges / Screws of access hatches have been screened over. not allowing access to tanks below
Images
7/31/2024 1:35:50 PM 12/5/2024 10:42:41 AM
7/31/2024 1:35:50 PM
7/31/2024 1:35:50 PM Project Name: B5412 Project Honey
Page 59 Of 87
T350553.2077
ID labels required on insulation to rain water harvesting room
11/21/2024
11/28/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Blockwork
Swift Group UK
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/21/2024 1:49:38 PM 11
T353957.148
11/21/2024 1:49:45 PM
Damaged block work
Images
11/26/2024 12:22:09 PM 12
T353957.150
Mastic to be complete
Images
11/26/2024 12:25:38 PM 13
T353957.151
Junction boxes missing caps
Images
11/26/2024 12:26:15 PM 14
T353957.152
Protection required around cables. Anti tamper installed to pump?
Images
11/26/2024 12:27:09 PM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 60 Of 87
15
T353957.153
General clean required + magic man
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Painting & Decorating
AC Beck
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:27:56 PM 16
T353957.154
Fire stopping to be repaired
Images
11/26/2024 12:28:26 PM 17
T353957.156
Red bike stands to be redone to green
Images
11/26/2024 12:31:38 PM 18
T353957.157
Bike stand bent to be repaired
Images
11/26/2024 12:32:32 PM 19
T353957.159
Each bike rack to be checked for functionality
Images
11/26/2024 12:34:55 PM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 61 Of 87
20
T353957.160
Covers to be installed and cables tidied
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Architect
Darling Associates
McLaughlin & Harvey (Conor Colton)
Images
11/26/2024 12:37:12 PM 21
T456527.218
Cycle rack getting stuck when coming out
Images
11/26/2024 6:04:08 PM Building C>Lower Ground Floor>Single Tier Cycle Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T327871.951
Screed not completed flush with block work
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
7/31/2024 1:23:28 PM T350553.1717
2nd lighting incomplete
Images
10/30/2024 4:09:59 PM T350553.1718
10/30/2024 4:11:39 PM
2nd fix Fire alarm incomplete
12/5/2024 10:42:41 AM
11/14/2024 4:33:43 PM
11/21/2024 2:02:50 PM
Project Name: B5412 Project Honey
Page 62 Of 87
Images
10/30/2024 4:12:11 PM 2
T353957.143
10/30/2024 4:12:17 PM
11/14/2024 4:29:58 PM
Grilles to be installed and area cleaned
11/21/2024 1:54:56 PM 11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Building C>Lower Ground Floor>Stair 2 Shaft Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T1.50501543
Screed underneath stair core 2 has not been fully completed.
7/10/2024
7/19/2024
Incomplete Works
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/9/2024
Incomplete Works
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
Images
7/10/2024 12:16:24 PM T327871.946
7/10/2024 12:16:26 PM
Screed Incomplete underneath stair landing
Images
7/31/2024 1:16:20 PM 1
T327871.947
Poor finish of screed to back of steps
Images
7/31/2024 1:17:17 PM 2
T327871.948
Styrofoam to be removed
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 63 Of 87
Images
7/31/2024 1:18:13 PM 3
T327871.949
Poor finish on exposed screed at joint
7/31/2024
8/7/2024
Snag
Opened
Screed Flooring
UK SubFloors
McLaughlin & Harvey (Farron O'Hare)
Images
7/31/2024 1:19:46 PM Building C>Lower Ground Floor>Woodland Walk Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1714
2nd lighting/PIR incomplete
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/30/2024 2:29:05 PM
10/30/2024 2:29:19 PM
10/30/2024 2:29:31 PM
11/7/2024 4:20:58 PM
11/7/2024 4:21:06 PM
11/14/2024 4:25:15 PM
11/14/2024 4:25:34 PM
11/14/2024 4:25:59 PM
11/21/2024 1:47:13 PM 2
T350553.1715
2nd fix Fire alarm incomplete
10/30/2024
11/6/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
10/30/2024 2:30:40 PM
12/5/2024 10:42:41 AM
10/30/2024 2:30:54 PM
11/7/2024 4:20:35 PM
11/14/2024 4:24:04 PM
11/14/2024 4:24:42 PM
Project Name: B5412 Project Honey
11/21/2024 1:45:47 PM
Page 64 Of 87
3
T353957.161
Temp fire door to be installed at later date
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Architect
Darling Associates
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:38:28 PM 4
T353957.162
Light install to be complete
Images
11/26/2024 12:39:58 PM 5
T353957.163
Signage to be reviewed
Images
11/26/2024 12:42:05 PM Building C>Roof (L7)
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.147
Fire alarm missing
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/12/2024 10:27:47 AM T338993.2317
Missing cable references all roof cables.
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 65 Of 87
Images
11/28/2024 10:03:31 AM T338993.2318
11/28/2024 10:03:37 AM
11/28/2024 10:24:13 AM
11/28/2024 10:24:19 AM
Missing equipment references on Green roof. Panels, isolators, etc.
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/28/2024 10:04:17 AM T338993.2319
11/28/2024 10:04:21 AM
11/28/2024 10:04:25 AM
Lightning rod protection is not fixed properly, not stable.
11/28/2024 10:11:35 AM
11/28/2024 10:23:48 AM
Images
11/28/2024 10:06:37 AM T338993.2320
11/28/2024 10:06:37 AM
Cables not secured properly, needs tied up.
Images
11/28/2024 10:09:01 AM T338993.2321
11/28/2024 10:09:14 AM
Cables not secured properly, needs tied up and clipped properly.
Images
11/28/2024 10:10:38 AM
12/5/2024 10:42:41 AM
11/28/2024 10:10:45 AM
Project Name: B5412 Project Honey
Page 66 Of 87
T338993.2322
Water proofing required.
11/28/2024
12/5/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/28/2024 10:14:13 AM T338993.2323
Lightning protection is not connected with the PVE panels.
Images
11/28/2024 10:14:51 AM T338993.2327
11/28/2024 10:14:51 AM
Lights not secured properly, moving a lot.
Images
11/28/2024 10:20:35 AM T338993.2328
Waterproof connection needed.
Images
11/28/2024 10:22:17 AM
11/28/2024 10:22:26 AM
11/28/2024 10:22:43 AM
Building C>Roof (L7)>2dr Lift Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.93
Water leakage from joint into core
11/26/2024
12/3/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Connor Casey)
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 67 Of 87
Images
11/26/2024 10:22:25 AM Building C>Roof (L7)>Core 1 Lobby L07
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.124
fire escape sign missing
11/26/2024
12/29/2024
Client Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
11/26/2024
12/3/2024
Client Snag
Opened
Lifts
Otis
McLaughlin & Harvey (Conor Colton)
Images
11/26/2024 5:32:15 PM 2
T456527.217
Lift sign to say 7b not m7 as with car park signs
Images
11/26/2024 5:32:58 PM Building C>Roof (L7)>Core 1 Lobby L07Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.49
Where slot drain has been damaged to be made good
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/7/2024 11:07:46 AM
11/7/2024 11:07:55 AM
Building C>Roof (L7)>PV Array Roof L07 Reference
Description
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 68 Of 87
1
T350553.1950
2nd fix external lighting incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Trident Electrical
Darling Associates (Robyn Harrison Church)
Images
11/7/2024 5:42:21 PM T350553.1951
11/7/2024 5:44:31 PM
2nd fix fire alarm incomplete
11/7/2024 5:44:41 PM
11/14/2024 5:18:37 PM
11/14/2024 5:18:46 PM
Images
11/7/2024 5:45:17 PM 2
T452415.141
11/14/2024 5:18:03 PM
Lightning protection to be completed
Images
11/12/2024 10:21:30 AM 3
T452415.142
Tap to be lagged
Images
11/12/2024 10:22:10 AM 4
T452415.143
Clip to be removed
Images
11/12/2024 10:22:35 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 69 Of 87
5
T452415.145
Panel numbers to be removed
11/12/2024
11/19/2024
Snag
Opened
PreCast Structure
FP McCann
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/21/2024
11/28/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/12/2024 10:23:55 AM 6
T452415.146
Cabelling to solar panels to be completed
Images
11/12/2024 10:27:18 AM T350553.2082
BMS wiring incomplete
Images
11/21/2024 6:19:23 PM T350553.2083
Small power wiring incomplete Outdoor socket not installed
Images
11/21/2024 6:20:41 PM 7
T353957.88
Dry riser glass missing
Images
11/26/2024 10:09:46 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 70 Of 87
8
T353957.96
Lightning protection to secured correctly
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
12/3/2024
12/10/2024
Client Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
11/26/2024 10:33:53 AM 9
T353957.100
11/26/2024 10:34:00 AM
Damaged fins for condenser units
Images
11/26/2024 10:47:10 AM 10
T408928.132
11/26/2024 10:47:17 AM
lock to be put on door.
11/26/2024 10:47:27 AM
Building C>Roof (L7)>Roof Garden L07 Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.31
Soil has sunk, to be brought back flush with resin
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
Images
11/7/2024 10:50:09 AM 2
T452415.32
Area to be deweeded
Images
11/7/2024 10:50:55 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 71 Of 87
3
T452415.33
Bolts rusting
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/18/2024
Snag
Opened
Architect
Darling Associates
McLaughlin & Harvey (Connor Casey)
Images
11/7/2024 10:52:47 AM 4
T452415.34
chipped paint to be touched up
Images
11/7/2024 10:53:10 AM 5
T452415.35
Resin to be removed
Images
11/7/2024 10:53:32 AM 6
T452415.36
Area to be deweeded
Images
11/7/2024 10:53:51 AM 7
T345609.1
11/7/2024 10:53:56 AM
Door threshold to be raised approx. 18mm level with gully track. small slope to be added internal with floor finish.
Images
11/7/2024 10:53:38 AM 12/5/2024 10:42:41 AM
11/7/2024 10:53:45 AM
11/7/2024 10:53:53 AM Project Name: B5412 Project Honey
Page 72 Of 87
8
T452415.37
Seedum to be touched up
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/18/2024
Snag
Opened
Architect
Darling Associates
McLaughlin & Harvey (Connor Casey)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
Images
11/7/2024 10:54:18 AM 9
T452415.38
Area to be deweeded / hole to be filled
Images
11/7/2024 10:55:05 AM 10
T345609.2
11/7/2024 10:57:10 AM
bolts to be painted
Images
11/7/2024 10:54:51 AM 11
T452415.39
Patches of seedum to be filled
Images
11/7/2024 10:56:59 AM 12
T452415.40
Spec of tree to be confirmed not correct height
Images
11/7/2024 10:58:16 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 73 Of 87
13
T452415.41
Dead rosemary to be cut off or replaced
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
Images
11/7/2024 10:59:16 AM 14
T452415.42
Area where bark is too high
Images
11/7/2024 10:59:45 AM 15
T452415.43
Area to be deweeded
Images
11/7/2024 11:00:26 AM 16
T452415.44
11/7/2024 11:00:33 AM
Final clean to be completed
Images
11/7/2024 11:04:32 AM 17
T452415.45
Rough edge to be removed
Images
11/7/2024 11:04:57 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 74 Of 87
18
T452415.46
Area to be deweeded
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
Images
11/7/2024 11:06:02 AM 19
T452415.47
split timbers
Images
11/7/2024 11:06:35 AM 20
T452415.48
Is this plant required
Images
11/7/2024 11:07:00 AM 21
T452415.50
Water trapped at top of frame
Images
11/7/2024 11:09:20 AM 22
T452415.51
Knots to be touched up with paint
Images
11/7/2024 11:11:11 AM 12/5/2024 10:42:41 AM
11/7/2024 11:11:31 AM Project Name: B5412 Project Honey
Page 75 Of 87
23
T452415.52
Joint in bench to be flush
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/7/2024
11/14/2024
Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
Images
11/7/2024 11:12:53 AM 24
T452415.53
Bead size to be confirmed
Images
11/7/2024 11:13:44 AM 25
T452415.54
seedum to be removed
Images
11/7/2024 11:14:42 AM 26
T452415.55
Excess ducts to be removed
Images
11/7/2024 11:15:23 AM 27
T452415.265
Excess ducts to be cut
Images
11/13/2024 12:02:28 PM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 76 Of 87
28
T452415.266
Exposed cable to be tidied / pull cords to be removed in all areas on roof garden
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
Roof Landscaping
Frosts Landscape Construction
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Farron O'Hare)
11/13/2024
11/20/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Farron O'Hare)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/13/2024 12:04:06 PM 29
T452415.267
Electrical boxes to be bwckfiled
Images
11/13/2024 12:06:03 PM 25
T452415.268
Halsion to advise whether cable is to be buried or surface ran
Images
11/13/2024 12:07:10 PM 30
T452415.271
Tempcable clips to be removed
Images
11/13/2024 12:08:58 PM 31
T353957.91
Lagging to be complete
Images
11/26/2024 10:17:06 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 77 Of 87
Building C>Roof (L7)>Stair 1 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.97
Balustrade to be cleaned
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
Roofing
Aym (Services) Limited
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 10:36:15 AM 2
T353957.98
Water through joints
Images
11/26/2024 10:36:52 AM Comments
Created By
Date
design issues
Dariusz Grzelka (Aym (Services) Limited)
11/28/2024 4:41:51 PM
Building C>Roof (L7)>Stair 2 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345609.11
Construction writing to be removed from walls.
11/15/2024
11/22/2024
Snag
Opened
Cleaning
Serna Cleaning
Darling Associates (Robyn Harrison Church)
Images
11/15/2024 11:29:13 AM Building C>Second Floor>Core 2 Lobby L02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.82
General clean
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:36:46 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 78 Of 87
2
T353957.83
Temp fixings to be removed.
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Trident Electrical
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:38:01 AM Building C>Second Floor>Electrical Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.2314
Missing cable references on risers.
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/28/2024 9:55:21 AM
11/28/2024 9:55:26 AM
11/28/2024 9:55:31 AM
T338993.2315
Missing schedules and circuit labels on all Dabs.
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
T338993.2316
Additional metal clips on cables, especially when are bending.
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/28/2024 9:57:18 AM
11/28/2024 9:57:23 AM
11/28/2024 9:57:46 AM
Building C>Second Floor>Second Floor (Mezz) Parking Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.379
Trunking damaged
7/29/2024
8/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
7/29/2024 5:13:00 PM
12/5/2024 10:42:41 AM
7/29/2024 5:13:05 PM
7/29/2024 5:13:24 PM
7/29/2024 5:13:29 PM
Project Name: B5412 Project Honey
Page 79 Of 87
1
T452415.160
complete all firestopping
11/12/2024
11/19/2024
Snag
Opened
Fire Stopping
Middlesex Limited
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Cleaning
Serna Cleaning
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Trident Electrical
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Halsion
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 10:39:41 AM 2
T452415.161
Area to be cleaned
Images
11/12/2024 10:40:23 AM 3
T452415.162
Containment lid missing
Images
11/12/2024 10:40:55 AM 4
T452415.165
Containment that has oxidised to be cleaned and repainted / replaced
Images
11/12/2024 10:42:56 AM 5
T452415.166
Pipe leaking
Images
11/12/2024 10:43:35 AM 12/5/2024 10:42:41 AM
11/12/2024 10:43:43 AM Project Name: B5412 Project Honey
Page 80 Of 87
6
T353957.113
Containment to be replaced
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:21:27 AM 7
T353957.114
11/26/2024 11:21:33 AM
Damaged light
Images
11/26/2024 11:23:53 AM 8
T353957.115
Damaged clip on light
Images
11/26/2024 11:25:27 AM Building C>Second Floor>Second Floor Parking Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T338993.376
Saddle damaged
7/29/2024
8/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
7/29/2024
8/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
7/29/2024 4:54:37 PM T338993.377
7/29/2024 4:54:45 PM
Saddle damaged
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 81 Of 87
Images
7/29/2024 4:56:07 PM T338993.378
7/29/2024 4:56:12 PM
Trunking damaged
7/29/2024
8/5/2024
Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/12/2024
11/19/2024
Snag
Opened
Fire Stopping
Middlesex Limited
Darling Associates (Robyn Harrison Church)
11/20/2024
11/27/2024
Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
Images
7/29/2024 4:57:34 PM 1
T452415.167
7/29/2024 4:57:41 PM
7/29/2024 4:57:48 PM
7/29/2024 4:57:53 PM
complete all firestopping
Images
11/12/2024 10:44:57 AM 2
T345609.24
Paint not finished to an acceptable level around aco channel. Remedial to be carried out
Images
11/20/2024 6:06:25 PM
11/20/2024 6:07:23 PM
11/20/2024 6:07:35 PM
11/20/2024 6:07:40 PM
Building C>Second Floor>Stair 2 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.71
Handrail misaligned + touched up
11/14/2024
11/21/2024
Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Connor Casey)
Images
11/14/2024 8:40:06 AM 12/5/2024 10:42:41 AM
11/14/2024 8:41:11 AM Project Name: B5412 Project Honey
Page 82 Of 87
2
T345609.18
Stair misalignment to be reviewed railings secured correctly.
11/15/2024
11/22/2024
Snag
Opened
Metalwork
CMF
Darling Associates (Robyn Harrison Church)
11/26/2024
12/3/2024
Client Snag
Opened
Metalwork
CMF
McLaughlin & Harvey (Connor Casey)
Images
11/15/2024 11:43:20 AM 3
T353957.84
11/15/2024 11:43:27 AM
Balustrade improved but still out of tolerance
Images
11/26/2024 9:40:39 AM
11/26/2024 9:40:46 AM
11/26/2024 9:40:51 AM
Building C>Sixth Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.106
Damaged flashing
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 10:58:37 AM Building C>Sixth Floor>Electrical Riser Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.1945
power cabling incomplete
11/7/2024
11/14/2024
Incomplete Works
Opened
M&E
Halsion
McLaughlin & Harvey (Ian Robertson)
Images
11/7/2024 5:11:27 PM
12/5/2024 10:42:41 AM
11/14/2024 5:08:13 PM
11/21/2024 3:17:43 PM
Project Name: B5412 Project Honey
Page 83 Of 87
T338993.2324
Cables not secured properly, needs a unistrut to support the cables.
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
11/28/2024
12/5/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Vanngel Natso)
Images
11/28/2024 10:15:25 AM T338993.2325
11/28/2024 10:15:33 AM
Truncking incomplete.
Images
11/28/2024 10:17:33 AM T338993.2326
11/28/2024 10:17:37 AM
Additional containment required for cable handing.
11/28/2024 10:17:45 AM
Images
11/28/2024 10:18:40 AM
11/28/2024 10:18:44 AM
Building C>Sixth Floor>Sixth Floor (Mezz) Parking
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.151
Writing to be removed
11/12/2024
11/19/2024
Snag
Opened
PreCast Structure
FP McCann
Darling Associates (Robyn Harrison Church)
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/12/2024 10:31:26 AM 2
T353957.101
Fire exit signage to be installed
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 84 Of 87
Images
11/26/2024 10:49:11 AM Building C>Sixth Floor>Sixth Floor Parking
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T452415.157
complete all firestopping
11/12/2024
11/19/2024
Snag
Opened
Fire Stopping
Middlesex Limited
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
M&E
Trident Electrical
Darling Associates (Robyn Harrison Church)
11/26/2024
12/3/2024
Client Snag
Opened
Fire Stopping
Middlesex Limited
McLaughlin & Harvey (Connor Casey)
11/26/2024
12/3/2024
Client Snag
Opened
PreCast Structure
FP McCann
McLaughlin & Harvey (Connor Casey)
Images
11/12/2024 10:35:47 AM 2
T452415.158
Clips to be removed
Images
11/12/2024 10:36:17 AM 3
T353957.102
Damaged fire stopping to be repaired
Images
11/26/2024 10:51:14 AM 4
T353957.104
Cracks in beam to be monitored and checked within tolerance
Images
11/26/2024 10:53:51 AM 12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 85 Of 87
5
T353957.105
Door to replaced at later date
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 10:57:05 AM Building C>Third Floor>Core 1 Lobby L03
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.111
Magic man to repair
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:16:53 AM Building C>Third Floor>Core 1 Lobby L03Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.109
All Doors to be inspected for damage and touched up
11/26/2024
12/3/2024
Client Snag
Opened
Joinery
Original Joinery
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:15:11 AM
11/26/2024 11:15:19 AM
Building C>Third Floor>Stair 1 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.110
Magic man to repair
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:15:57 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 86 Of 87
2
T353957.112
Magic man to repair
11/26/2024
12/3/2024
Client Snag
Opened
Cleaning
Serna Cleaning
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 11:18:22 AM Building C>Third Floor>Stair 2 Shaft
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.86
Floor finish to complete
11/26/2024
12/3/2024
Client Snag
Opened
Floor Waterproofing
4M Floors UK Ltd
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:50:08 AM Building C>Third Floor>Third Floor (Mezz) Parking
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.85
Missing labels on sockets all to be checked
11/26/2024
12/3/2024
Client Snag
Opened
M&E
Halsion
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 9:47:40 AM
12/5/2024 10:42:41 AM
Project Name: B5412 Project Honey
Page 87 Of 87
Project Honey – External Works Snag Report 05.12.24
FH090-151015
B5412 Project Honey Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.614
back in quite thin layer, could do with being topped up
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:13:10 PM T444645.615
11/27/2024 1:13:20 PM
General clean required
Images
11/27/2024 1:15:45 PM T444645.616
positioning of plants to be reviewed
Images
11/27/2024 1:16:56 PM T444645.617
general comment planting & shingle around edges to be complete
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
T444645.618
capping bolts required to bench bases
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:29:12 PM
12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 1 Of 7
T444645.619
paving shouldn’t be exposed, soil to run to edging
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:31:12 PM T444645.620
soil to be reduced around edges prior to bark being installed
Images
11/27/2024 1:32:43 PM T444645.621
11/27/2024 1:32:48 PM
11/27/2024 1:32:53 PM
could this not be rotated?
Images
11/27/2024 1:36:27 PM T444645.622
branches to be released on all trees
Images
11/27/2024 1:39:45 PM T444645.623
very poor finish on this one bench. looks like it’s molding unlike the rest
Images
11/27/2024 1:41:03 PM 12/5/2024 10:46:20 AM
11/27/2024 1:41:09 PM Project Name: B5412 Project Honey
Page 2 Of 7
T444645.624
resin to be cleaned out prior to tree bark
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:43:34 PM T444645.625
11/27/2024 1:43:50 PM
aco to be cleaned out
Images
11/28/2024 9:51:38 AM T444645.626
finishes to be reviewed where there is discoloration
Images
11/28/2024 9:57:54 AM T444645.627
concrete to be taken back to ensure correct depth of shingle
Images
11/28/2024 10:00:05 AM T444645.628
concrete to be faced off as will be visible
Images
11/28/2024 10:06:03 AM 12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 3 Of 7
T444645.629
shingle to be above concrete upstand locally
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/28/2024 10:07:41 AM T444645.630
fillet to be tidied up brook street planter
Images
11/28/2024 10:09:11 AM T444645.631
broken paver gaps around portal frame to be reviewed. brook street ramp
Images
11/28/2024 10:10:17 AM T444645.632
metal edging to be cleaned down
Images
11/28/2024 10:11:36 AM
11/28/2024 10:11:53 AM
Building A>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1262
make good to flood grille upstand
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 4 Of 7
Images
11/22/2024 10:50:50 AM 2
T345545.1263
11/22/2024 10:50:55 AM
make good to flood grille upstand
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 10:52:14 AM 3
T345545.1276
11/22/2024 10:52:18 AM
detail behind brickwork and against facade to be confirmed and completed
Images
11/22/2024 11:22:37 AM 4
T345545.1288
make good to wall ahead of flood grille install
Images
11/22/2024 11:49:40 AM Building A>Ground Floor>0001 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.634
how will this be finished ?
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/28/2024 10:20:17 AM 12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 5 Of 7
2
T444645.712
paving cuts to be improved
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:24:21 AM Building B>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1279
one row of tactiles missing
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/22/2024 11:25:28 AM 2
T459973.21
Resin left too low leaving excessive step and visible packers
Images
12/3/2024 10:06:18 AM 3
T444645.672
12/3/2024 10:06:23 AM
Resin to be cleaned from bottom of equitone panels
Images
12/3/2024 10:16:12 AM
12/3/2024 10:16:17 AM
12/3/2024 10:16:24 AM
Building B>Ground Floor>0001 Reception Reference
Description
12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 6 Of 7
1
T459973.4
Shingle/gravel to be completed
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (sam peach)
Images
12/3/2024 9:49:03 AM Building B>Ground Floor>0015 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1283
under flood grilles to be made good
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 11:30:46 AM Building C>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1289
landscaping around edgings incomplete
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 11:50:27 AM Building C>Ground Floor>Entrance/Exit Ramp
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.137
Aco channel to be replaced
11/26/2024
12/3/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:01:14 PM
12/5/2024 10:46:20 AM
11/26/2024 12:01:24 PM
Project Name: B5412 Project Honey
Page 7 Of 7
Project Honey – Façade Snag Report 05.12.24
FH090-151015
Building A>Eighth Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1099
handrail joint is too far apart and to be adjusted
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:01:52 PM
11/21/2024 1:34:25 PM
12/4/2024 9:28:24 AM
Comments
Created By
Date
completed
Bartosz Markowski (Clarke Facades)
11/21/2024 1:34:22 PM
still step in joint
Conor Colton (McLaughlin & Harvey)
12/4/2024 9:28:37 AM
2
T456527.197
External curve trim to be aligned better
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/26/2024 2:57:47 PM Building A>Eighth Floor>0801 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.101
end cap needed or improved detail
11/26/2024
12/29/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/26/2024
12/29/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/26/2024 2:46:39 PM 2
T408928.103
misaligned joints above glazing
Images
11/26/2024 2:52:12 PM
11/26/2024 2:52:19 PM
11/26/2024 2:52:28 PM
Building A>Eighth Floor>0805 Corridor 01
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 1 Of 136
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.161
Gaps under door to be filled
11/25/2024
12/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/25/2024 2:10:08 PM Comments
Created By
Date
STATUS CHANGE: Photo required
Dominic Driver (McLaughlin & Harvey)
12/4/2024 8:26:55 AM
Building A>Eighth Floor>0808 Plant Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1116
opening to be weathered?
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/12/2024 12:32:16 PM 2
T345546.1356
Clarkes to complete weathering externally on render to open holes as per pictures
Images
11/13/2024 2:55:44 PM 3
T345546.1358
11/13/2024 2:55:50 PM
clean metal panel and far Northeast corner
11/13/2024 2:55:56 PM
Images
11/13/2024 2:58:44 PM Building A>Eighth Floor>Terrace Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 2 Of 136
1
T427849.1446
Joint in glazing starter track not good and needs to be made good
11/11/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/11/2024 3:23:48 PM
11/11/2024 3:23:55 PM
11/22/2024 3:46:33 PM
12/4/2024 9:26:35 AM
12/4/2024 9:26:39 AM
Comments
Created By
Date
redo, not good enough
Conor Colton (McLaughlin & Harvey)
12/4/2024 9:26:41 AM
2
T427849.1448
Joint of balustrade on top of glazing not good enough and needs to be made good
11/11/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/11/2024 3:27:37 PM
11/22/2024 3:49:07 PM
12/4/2024 9:33:34 AM
Comments
Created By
Date
completed
Bartosz Markowski (Clarke Facades)
11/22/2024 3:49:04 PM
1
T345545.1096
misalignment in balustrade channel
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:00:03 PM
11/22/2024 3:45:49 PM
12/4/2024 9:26:00 AM
Comments
Created By
Date
still not aligned correctly
Conor Colton (McLaughlin & Harvey)
12/4/2024 9:26:14 AM
3
T345545.1097
glass panel is chipped
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:00:25 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 3 Of 136
4
T345545.1101
gaps in glazing are inconsistent on adjacent panels
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:03:22 PM
11/12/2024 12:03:29 PM
11/12/2024 12:03:48 PM
Comments
Created By
Date
glass has been adjusted
Bartosz Markowski (Clarke Facades)
11/21/2024 1:35:16 PM
still inconsistencies in the gaps
Conor Colton (McLaughlin & Harvey)
12/4/2024 9:30:34 AM
5
T427849.1474
Scratch on facade to be made good
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:04:22 PM 6
T345546.1270
Could we move the panel over to cover the open patch
Images
11/12/2024 12:04:41 PM 7
T345545.1102
glass panel is chipped
Images
11/12/2024 12:04:33 PM
12/5/2024 10:27:35 AM
11/12/2024 12:04:50 PM
Project Name: B5412 Project Honey
Page 4 Of 136
8
T427849.1475
Dent on panel to be made good
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:05:08 PM 9
T345545.1103
glass panel is chipped
Images
11/12/2024 12:06:34 PM 10
T345545.1104
roughened joint of handrail to be made good
Images
11/12/2024 12:07:24 PM
11/22/2024 3:48:07 PM
12/4/2024 9:32:38 AM
Comments
Created By
Date
completed
Bartosz Markowski (Clarke Facades)
11/22/2024 3:48:05 PM
still not good enough
Conor Colton (McLaughlin & Harvey)
12/4/2024 9:32:49 AM
11
T345545.1106
glass panel is damaged
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:08:35 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 5 Of 136
12
T345545.1109
gaps in glazing are inconsistent on adjacent panels
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 12:11:14 PM
11/12/2024 12:11:21 PM
Comments
Created By
Date
glass has been adjusted
Bartosz Markowski (Clarke Facades)
11/21/2024 1:38:49 PM
still inconsistent
Conor Colton (McLaughlin & Harvey)
12/4/2024 9:36:21 AM
13
T345545.1110
scratch on facade panel high level
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/12/2024 12:12:09 PM 14
T408928.60
damaged glass balustrade
Images
11/13/2024 2:25:08 PM
11/22/2024 3:46:07 PM
Comments
Created By
Date
completed
Bartosz Markowski (Clarke Facades)
11/22/2024 3:46:04 PM
still an issue. neeeds to be replaced
Luke Nurser (Francis Hunter)
11/26/2024 2:54:31 PM
15
T345546.1341
damage curved glass
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
11/13/2024 2:27:36 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 6 Of 136
16
T408928.62
damaged glass balustrade
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/13/2024 2:30:48 PM 17
T408928.63
glass balustrade damaged on 3 curved glass panels on south west corner .
Images
11/13/2024 2:31:39 PM 18
T345546.1344
11/13/2024 2:32:01 PM
Damage to highlevel panel
11/13/2024 2:32:21 PM
Images
11/13/2024 2:33:21 PM 19
T345546.1345
Damage to glass on south elevation
Images
11/13/2024 2:35:26 PM 20
T408928.64
damaged glass balustrade
Images
11/13/2024 2:35:42 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 7 Of 136
21
T345546.1448
scratch to upper panels
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/5/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/26/2024
12/29/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/26/2024 2:48:35 PM 22
T345546.1449
Brie solei alignment inconsistent throughout
Images
11/26/2024 2:50:48 PM 23
T408928.104
11/26/2024 2:50:56 PM
damaged spandrel
Images
11/26/2024 3:02:32 PM 24
T456527.198
Scratches in black plastic to be made good
Images
11/26/2024 3:03:56 PM 25
T408928.130
missing screws
11/26/2024 3:04:01 PM
Images
11/29/2024 1:10:24 PM Building A>First Floor 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 8 Of 136
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.70
dent in transom
11/20/2024
11/25/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/20/2024 11:54:29 AM Building A>First Floor>0101 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.79
Gap in transom edge to be made good
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/20/2024 11:48:06 AM 2
T456527.80
Gap in transom edge to be made good
Images
11/20/2024 11:49:23 AM 3
T456527.81
Panel is undersized and screws showing
Images
11/20/2024 11:50:07 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 9 Of 136
4
T456527.82
White panel is bent
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/25/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/20/2024 11:51:00 AM 5
T456527.83
Is there a reason for such a large gap
Images
11/20/2024 11:51:53 AM 6
T345546.1399
damage to Mullion
Images
11/20/2024 11:53:04 AM 7
T345546.1400
11/20/2024 11:53:45 AM
damage to top transom
Images
11/20/2024 11:54:24 AM 8
T408928.71
scratch in top transom
Images
11/20/2024 11:55:13 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 10 Of 136
9
T345546.1401
damage to mullion
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 11:55:26 AM 10
T345546.1402
Damage on white panel and Mullion as per the picture
Images
11/20/2024 11:56:11 AM 11
T345546.1403
Scratches to Mullion all the way up from top to bottom
Images
11/20/2024 11:56:55 AM 11
T345546.1404
Damage to white panel next to column
Images
11/20/2024 11:57:24 AM 12
T345546.1405
Damage to Mullion from top to bottom
Images
11/20/2024 11:58:28 AM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 11 Of 136
13
T408928.72
damage to top corner of mullion
11/20/2024
11/25/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 11:59:08 AM 14
T345546.1406
damages on all millions, transoms (top and bottom) and white panels all need respraying. we will highlight big damages only as individual snags
Images
11/20/2024 12:00:09 PM 15
T345546.1407
11/20/2024 12:00:15 PM
white panel is flapping too much
Images
11/20/2024 12:01:47 PM 16
T345546.1409
What panels are not taped and are flapping too much
Images
11/20/2024 12:04:56 PM 17
T345546.1410
transom badly damaged
Images
11/20/2024 12:05:50 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 12 Of 136
18
T456527.94
Chip in million to be made good
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 12:08:09 PM 19
T345545.1317
detail to be improved, glue is evident and panel is easily removed
Images
11/29/2024 12:39:50 PM 20
T345545.1318
11/29/2024 12:39:55 PM
detail to be improved, glue is evident and panel is easily removed
Images
11/29/2024 12:40:39 PM T345545.1322
side rise shouldnt be visible on a CAT A floor. to be covered with a backing panel
Images
11/29/2024 12:48:37 PM
11/29/2024 12:48:42 PM
Building A>Fourth Floor>0401 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.208
Metal plate is not flush against facade
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 13 Of 136
Images
11/26/2024 4:30:53 PM 2
T456527.209
General Metal plate is not flush against facade in highlighted area
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/26/2024 4:36:33 PM
11/26/2024 4:36:41 PM
11/26/2024 4:36:57 PM
Building A>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1208
damaged transom
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/20/2024 2:31:40 PM 2
T345545.1261
crack in glass balustrade
Images
11/22/2024 10:49:10 AM 3
T345545.1268
metal flashing missing
Images
11/22/2024 10:59:57 AM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 14 Of 136
4
T345545.1269
grout on plinths is different to brickwork is it as per spec?
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 11:00:41 AM Comments
Created By
Date
grout on plinths as per spec, we have no access to see spec from brickworks
Bartosz Markowski (Clarke Facades)
11/28/2024 1:49:37 PM
5
T345545.1270
metal flashing missing / EPDM to be tidied up
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 11:02:23 AM 6
T345545.1277
GRC column incomplete
Images
11/22/2024 11:23:33 AM 7
T345545.1278
metal flashing missing
Images
11/22/2024 11:24:02 AM 8
T345545.1282
damage to portal cladding
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 15 Of 136
Images
11/22/2024 11:28:58 AM 9
T345545.1287
incomplete works what fills gap in plinths
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/27/2024
12/4/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/27/2024
12/4/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/22/2024 11:40:33 AM 10
T456527.246
Make good to damages on upper transom
Images
11/27/2024 10:14:58 AM 11
T456527.250
Damages to end of plate
Images
11/27/2024 10:18:32 AM 12
T444645.642
11/27/2024 10:18:38 AM
General comment making good to GRC to be completed
Images
11/29/2024 10:37:36 AM
12/5/2024 10:27:35 AM
11/29/2024 10:37:42 AM
Project Name: B5412 Project Honey
Page 16 Of 136
13
T444645.646
rails behind equitone visable, to be painted black or be consistent with the rest
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 10:47:08 AM 14
T444645.654
grc making good to be completed
Images
11/29/2024 11:00:40 AM 15
T345545.1291
11/29/2024 11:00:47 AM
inconsistent finishing
Images
11/29/2024 11:13:50 AM 16
T444645.662
what is the detail around the bottom of the glass? incomplete
Images
11/29/2024 11:13:47 AM 17
T345545.1346
11/29/2024 11:13:52 AM
right hand door doesn’t open
Images
11/29/2024 3:03:04 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 17 Of 136
Building A>Ground Floor>0001 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.80
scratched transom
11/20/2024
11/25/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 1:49:04 PM 2
T345546.1418
tidy up side rise insulation high level
Images
11/20/2024 1:49:01 PM 3
T345545.1167
damage to edge of transom
Images
11/20/2024 1:49:16 PM 4
T345546.1419
General item – respray all damaged transoms, mullions and white panels throughout. we will record large damage as a separate specific item
Images
11/20/2024 1:50:02 PM 5
T345546.1420
11/20/2024 1:50:11 PM
Remove protection on upper transoms throughout
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 18 Of 136
Images
11/20/2024 1:50:40 PM 6
T345546.1421
11/20/2024 1:50:47 PM
Cut in white panel has a poor finish we meeting the column
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 1:51:57 PM 7
T345545.1171
11/20/2024 1:52:05 PM
11/20/2024 1:52:21 PM
damage to transom to be made good throughout after material has been fully cleared
11/20/2024 1:52:35 PM
Images
11/20/2024 1:53:27 PM 8
T345545.1173
11/20/2024 1:53:34 PM
damaged transom
Images
11/20/2024 1:55:13 PM 9
T345545.1174
joints to be cleaned up on transom
Images
11/20/2024 1:55:58 PM
12/5/2024 10:27:35 AM
11/20/2024 1:56:05 PM
Project Name: B5412 Project Honey
Page 19 Of 136
10
T345545.1175
damaged transom
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/28/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
11/20/2024 1:56:18 PM 11
T456527.120
11/20/2024 1:56:24 PM
Complete detail above all doors
Images
11/20/2024 1:56:36 PM 12
T345545.1176
damaged transom
Images
11/20/2024 1:57:01 PM 13
T345545.1177
damaged mullion (front face)
Images
11/20/2024 1:57:41 PM 14
T345546.1423
Corner detail to be completed mastic required
Images
11/20/2024 1:57:12 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 20 Of 136
15
T345545.1178
damaged transom
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 1:58:04 PM 16
T345545.1179
damaged transom
Images
11/20/2024 1:59:07 PM 17
T345545.1180
damaged mullion (left face)
Images
11/20/2024 2:00:08 PM 18
T345545.1181
damaged transom
Images
11/20/2024 2:00:38 PM 19
T345545.1182
damaged mullion (front face)
Images
11/20/2024 2:01:09 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 21 Of 136
20
T345545.1183
damaged transom
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 2:01:23 PM 21
T444645.633
flashing to be installed here? visible steel
11/28/2024
12/5/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
22
T444645.651
insulation not be visable
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 10:56:18 AM 23
T444645.653
touch ups required to GRC General comment
Images
11/29/2024 10:59:04 AM 24
T444645.655
excessive gap behind brick plinth and side rise tape visable
Images
11/29/2024 11:03:36 AM 25
T444645.656
11/29/2024 11:04:23 AM
area incomplete and not ready for snagging
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 22 Of 136
Images
11/29/2024 11:06:14 AM 26
T444645.657
11/29/2024 11:06:19 AM
11/29/2024 11:06:24 AM
exposed obex, what is the detail here?
11/29/2024 11:06:29 AM
11/29/2024 11:06:35 AM 11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 11:07:13 AM 27
T444645.658
exposed edges in some places but not others profile to be reviewed
Images
11/29/2024 11:08:16 AM 28
T444645.659
11/29/2024 11:08:20 AM
excessive gap obex visable
Images
11/29/2024 11:09:54 AM 29
T444645.660
epdm to be sealed fully water ingress concerns
Images
11/29/2024 11:10:43 AM
12/5/2024 10:27:35 AM
11/29/2024 11:10:52 AM
11/29/2024 11:10:57 AM
Project Name: B5412 Project Honey
Page 23 Of 136
30
T444645.661
capping to balustrades to be installed
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 11:12:52 AM 31
T444645.663
callings required to balustrade rails
Images
11/29/2024 11:15:20 AM 32
T444645.664
inconsistency in soffit cladding to be reviewed
Images
11/29/2024 11:16:47 AM 33
T345545.1341
rubber seal missing at bottom of panel
Images
11/29/2024 2:47:41 PM 34
T444645.665
soffit Joint alignment to be improved
Images
11/29/2024 2:48:20 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 24 Of 136
35
T345545.1342
mastic at bottom corner of joint to be improved
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 2:53:33 PM 36
T350553.2195
Scratches on internal mullion to be painted good
Images
11/29/2024 2:53:47 PM 37
T345545.1343
11/29/2024 2:53:53 PM
incomplete mastic joint
11/29/2024 2:54:00 PM
Images
11/29/2024 2:57:48 PM 38
T345545.1344
incomplete head detail at door
Images
11/29/2024 2:58:44 PM 39
T345545.1345
scratch on million
Images
11/29/2024 3:00:21 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 25 Of 136
40
T345545.1347
backing panel popping off
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 3:04:43 PM 41
T345545.1348
black film to be removed from underside of high level transoms
Images
11/29/2024 3:05:46 PM 42
T345545.1349
joint between drywall and facade to be cleaned up
Images
11/29/2024 3:06:39 PM Building A>Ground Floor>0006 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.505
This item hanging down to be fixed properly
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/4/2024 2:06:52 PM Building A>Ground Floor>0009 Reception Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 26 Of 136
1
T345545.1202
finish high level insulation
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/25/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 2:28:36 PM 2
T345545.1203
transom and millions are battered where the window was left off for so long. to be repaired
Images
11/20/2024 2:29:14 PM 3
T345545.1204
11/20/2024 2:29:20 PM
damaged transom
11/20/2024 2:29:25 PM
Images
11/20/2024 2:29:46 PM 4
T408928.82
11/20/2024 2:29:51 PM
scratch externally on glass
Images
11/20/2024 2:29:53 PM 5
T345545.1205
damaged mullion (front face)
Images
11/20/2024 2:30:29 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 27 Of 136
6
T345545.1206
damaged transom
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/20/2024
11/27/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/20/2024 2:30:45 PM 7
T345545.1207
11/20/2024 2:30:52 PM
damaged mullion (front face)
Images
11/20/2024 2:31:20 PM 8
T345545.1209
damaged mullion (front face)
Images
11/20/2024 2:32:05 PM 9
T345545.1210
damaged transom
Images
11/20/2024 2:34:02 PM 10
T345545.1336
aluprof tape to be removed
Images
11/29/2024 2:37:41 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 28 Of 136
11
T345545.1337
scratch on mullion
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 2:38:17 PM 12
T345545.1338
scratch on mullion
Images
11/29/2024 2:38:40 PM Building A>Ground Floor>0012 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.495
Sealing to be improved around the door opening
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/4/2024 1:41:33 PM 2
T456527.497
Should above entrance have insulation in large opening
Images
12/4/2024 1:44:18 PM Building A>Ground Floor>0018 Service Yard Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 29 Of 136
1
T456527.506
Filler required along joint
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
12/4/2024 2:14:22 PM 2
T456527.507
All damages to be made good to render
Images
12/4/2024 2:15:13 PM 3
T456527.508
12/4/2024 2:15:20 PM
Door latch to be installed
Images
12/4/2024 2:15:29 PM Building A>Ground Floor>0019 Refuse Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.640
General Snag GRC gaps to be consistent
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 10:34:23 AM 2
T444645.641
FH to confirm acceptance of inconsistency in mastic joints General Comments
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 30 Of 136
Images
11/29/2024 10:35:59 AM 3
T444645.643
11/29/2024 10:36:05 AM
general comment anywhere where you can see internally behind the GRC columns to receive insect mesh
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/29/2024 10:39:27 AM 4
T444645.644
11/29/2024 10:39:35 AM
all pressure plate capping to be flipped in correctly
Images
11/29/2024 10:40:44 AM 5
T444645.645
joints to high level cladding inconsistent and to be reviewed/improved
Images
11/29/2024 10:44:50 AM 6
T456527.509
11/29/2024 10:45:04 AM
11/29/2024 10:45:28 AM
Make good to dents in door
Images
12/4/2024 2:18:10 PM
12/4/2024 2:18:15 PM
12/4/2024 2:18:19 PM
Building A>Ground Floor>0025 Corridor Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 31 Of 136
1
T444645.650
touch ups to external door required
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 10:52:47 AM 2
T444645.652
11/29/2024 10:52:55 AM
inconsistent gaps underside of grc columns
Images
11/29/2024 10:58:02 AM
11/29/2024 10:58:08 AM
Building A>Ground Floor>0027 BoH / Retail
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.647
these are grouted on some areas and not others these need to be grouted and consistent
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 10:49:14 AM 2
T444645.648
11/29/2024 10:49:22 AM
view behind GRC cladding to receive mesh
Images
11/29/2024 10:50:59 AM 3
T444645.649
view to window flashing grouting required to top of brick
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 32 Of 136
Images
11/29/2024 10:51:48 AM
11/29/2024 10:51:52 AM
Building A>Ground Floor>0031 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.191
Damaged transom to be made good
11/25/2024
12/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/25/2024
12/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/27/2024
12/4/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/25/2024 3:34:00 PM 2
T456527.192
Detail above door to be finished
Images
11/25/2024 3:34:38 PM 3
T456527.248
Complete foil above door
Images
11/27/2024 10:17:00 AM Building A>Second Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T456527.480
Coping to be install on reception roof
12/4/2024
12/11/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 33 Of 136
Images
12/4/2024 11:34:22 AM Building A>Second Floor>0201 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T427849.139
Rust on external facade edge needs attention
10/2/2024
10/9/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
10/2/2024 12:57:28 PM Comments
Created By
Date
external acces needed
Weifeng Su (Clarke Facades)
10/11/2024 2:34:13 PM
Building A>Seventh Floor>0701 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.115
in fill piece needs re doing. should be aligned with rest of panel, and joint filled. shouldn’t be gap at chamfer
11/26/2024
12/29/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/26/2024 3:51:08 PM Building A>Sixth Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.983
corner detail at west riser is inconsistent at each side, and neither side looks to be a correct design. please address
11/8/2024
11/15/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/8/2024 12:24:21 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 34 Of 136
2
T345545.987
corner detail at west riser is inconsistent at each side, and neither side looks to be a correct design. currently there is exposed insulation on south which cannot be correctplease address
11/8/2024
11/15/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/13/2024
11/20/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/8/2024 12:26:34 PM 3
T345545.1134
residue from stickers on outside of balustrade glazing
Images
11/13/2024 1:41:53 PM 4
T345545.1297
millions are scratched
Images
11/29/2024 11:39:15 AM Building A>Sixth Floor>0601 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.589
external gasket missing all 4 sides of this panel
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
Images
10/22/2024 12:52:51 PM 2
T345545.628
10/22/2024 12:53:27 PM
external gasket to be fixed
12/5/2024 10:27:35 AM
10/22/2024 12:53:34 PM
Project Name: B5412 Project Honey
Page 35 Of 136
Images
10/22/2024 1:29:55 PM 3
T345545.629
external gasket to be fixed
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
Images
10/22/2024 1:30:20 PM 4
T345545.630
external gasket to be fixed
Images
10/22/2024 1:30:40 PM 5
T345545.633
external gasket to be fixed
Images
10/22/2024 1:33:13 PM 6
T345545.634
external gasket to be fixed
Images
10/22/2024 1:33:57 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 36 Of 136
7
T345545.635
external gasket to be fixed
10/22/2024
10/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Liana Maltezou)
11/8/2024
11/12/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/8/2024
11/15/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/8/2024
11/12/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/8/2024
11/12/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
10/22/2024 1:34:16 PM 8
T408928.24
scratch make good
Images
11/8/2024 2:24:06 PM 9
T408928.28
11/8/2024 2:24:44 PM
gasket external loose. make good
Images
11/8/2024 2:31:46 PM 10
T408928.29
11/8/2024 2:31:52 PM
11/8/2024 2:32:03 PM
general when doing external clean . fix external gaskets
Images
11/8/2024 2:33:46 PM 11
T345546.1204
poor finish to edge of the mullion as per pic
Images
11/8/2024 2:42:55 PM
12/5/2024 10:27:35 AM
11/8/2024 2:43:12 PM
Project Name: B5412 Project Honey
Page 37 Of 136
12
T345546.1209
Cover on closure not on
11/8/2024
11/12/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/8/2024
11/12/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/13/2024
11/20/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/13/2024
11/20/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/8/2024 2:58:42 PM 13
T345546.1211
closure missing
Images
11/8/2024 3:03:16 PM 14
T427849.1463
chip in glass to be made good
Images
11/12/2024 11:38:25 AM 15
T427849.1499
Scratch in panel to be made good
Images
11/13/2024 1:37:14 PM 16
T427849.1509
11/13/2024 1:37:20 PM
Low level gasket and trim to be installed
Images
11/13/2024 1:49:47 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 38 Of 136
17
T345545.1296
capping on actuator is missing
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/29/2024 11:24:28 AM 18
T350553.2175
Scratches on internal mullion
Images
11/29/2024 11:38:53 AM 19
T345545.1298
11/29/2024 11:39:00 AM
millions are scratched
11/29/2024 11:39:07 AM
Images
11/29/2024 11:39:45 AM 20
T350553.2176
11/29/2024 11:39:50 AM
Scratches on internal mullion
Images
11/29/2024 11:41:20 AM 21
T345545.1299
11/29/2024 11:41:30 AM
white speckles on mullions
Images
11/29/2024 11:42:14 AM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 39 Of 136
22
T345545.1301
townhall steel to be made good
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 11:51:37 AM 23
T345545.1302
11/29/2024 11:51:43 AM
transom is scratched and very off colour
Images
11/29/2024 11:53:24 AM 24
T345545.1303
hole in corners of panels to be filled
Images
11/29/2024 11:54:52 AM 25
T345545.1304
transom is heavily scratched
Images
11/29/2024 11:56:54 AM 26
T350553.2178
All stickers on glass to be cleared and cleaned
Images
11/29/2024 12:16:46 PM 12/5/2024 10:27:35 AM
11/29/2024 12:16:53 PM Project Name: B5412 Project Honey
Page 40 Of 136
27
T345545.1308
fillet piece missing in the door gap is too large
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 12:18:42 PM 26
T350553.2179
Scratches on facade door frame to be painted good
Images
11/29/2024 12:23:49 PM 28
T345545.1311
11/29/2024 12:23:58 PM
11/29/2024 12:24:07 PM
gasket missing
11/29/2024 12:24:17 PM
Images
11/29/2024 12:26:53 PM 29
T345545.1312
mitres have opened up on the glazing panel above the door right side only
Images
11/29/2024 12:27:50 PM 30
T345545.1313
scratch on and above door to be made good
Images
11/29/2024 12:28:34 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 41 Of 136
31
T345545.1314
mitre joint is protruding
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 12:28:58 PM 32
T350553.2183
Scratches on facade door frame to be painted good
Images
11/29/2024 12:33:25 PM
11/29/2024 12:33:31 PM
11/29/2024 12:33:44 PM
Building A>Sixth Floor>0613 Terrace
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.992
Perimeter copings to be cleaned
11/8/2024
11/15/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/8/2024 12:29:48 PM 2
T345546.1253
Glass chipped externally
Images
11/12/2024 11:30:16 AM 3
T345545.1062
gasket to continue around corner
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 42 Of 136
Images
11/12/2024 11:30:21 AM 4
T345546.1255
copings missing
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
11/12/2024 11:31:46 AM 5
T345545.1065
spandrel panel and facade to be made good
Images
11/12/2024 11:32:17 AM 6
T427849.1464
chip in glass to be made good
Images
11/12/2024 11:39:12 AM 7
T427849.1465
chip in glass to be made good
Images
11/12/2024 11:40:13 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 43 Of 136
7
T427849.1466
Chip in glass to be made good
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/18/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/12/2024
11/19/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
Images
11/12/2024 11:40:41 AM 8
T345546.1262
damage to glass
Images
11/12/2024 11:40:59 AM 9
T345545.1083
scratch on grey panel
Images
11/12/2024 11:44:03 AM 10
T408928.53
damaged glass
Images
11/13/2024 1:35:38 PM 11
T345546.1306
Damage to glass
Images
11/13/2024 1:35:57 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 44 Of 136
12
T427849.1498
Damage to hinge to be made good
11/13/2024
11/20/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/20/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
11/13/2024 1:36:32 PM 13
T408928.54
scratch on outside face of glass
Images
11/13/2024 1:37:58 PM 14
T408928.55
damaged glass
Images
11/13/2024 1:40:46 PM 15
T345545.1133
crack in glazing
Images
11/13/2024 1:41:03 PM 16
T408928.56
damaged glass
Images
11/13/2024 1:41:53 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 45 Of 136
17
T345546.1315
Metal capping for balustrade has been cut with angle grinder
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/20/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
Images
11/13/2024 1:47:55 PM 18
T345546.1316
chip to glass
Images
11/13/2024 1:48:32 PM 19
T345546.1317
Chip glass
Images
11/13/2024 1:51:05 PM 20
T408928.58
damaged glass
Images
11/13/2024 1:52:50 PM 21
T427849.1512
Damages on unitised to be made good
Images
11/13/2024 1:55:27 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 46 Of 136
22
T408928.59
damaged glass on south corner multiple locations
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
11/13/2024
11/18/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Dominic Driver)
11/14/2024
11/21/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/14/2024
11/21/2024
Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Conor Colton)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/13/2024 1:55:31 PM 23
T345546.1322
11/13/2024 1:55:39 PM
Low level trim needs replacing
Images
11/13/2024 1:55:31 PM 24
T427849.1559
Bottom track different colour and needs replaced
Images
11/14/2024 12:09:10 PM 25
T427849.1560
Bottom track with hole to be filled
Images
11/14/2024 12:10:00 PM 26
T345545.1306
scratches in mullions
Images
11/29/2024 12:11:17 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 47 Of 136
27
T345545.1307
cap to go on low level
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/29/2024 12:12:48 PM 28
T345545.1310
scratches in transom on L7 panel
Images
11/29/2024 12:22:09 PM 29
T350553.2180
Scratches on facade door frame to be painted good
Images
11/29/2024 12:27:12 PM 30
T350553.2181
11/29/2024 12:27:20 PM
Scratches on facade to be made good
Images
11/29/2024 12:29:26 PM 31
T345545.1315
cap to be installed at the end of the balustrade
Images
11/29/2024 12:30:33 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 48 Of 136
32
T350553.2182
Beading missing from facade
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 12:30:52 PM
11/29/2024 12:30:59 PM
Building B Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.2190
Scratches on internal mullion to be painted good
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
11/29/2024
12/6/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
Images
11/29/2024 2:23:57 PM T350553.2191
11/29/2024 2:24:05 PM
Glass cracked
11/29/2024 2:24:11 PM
Images
11/29/2024 2:26:27 PM Building B>Eighth Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T419146.534
damage to flashing
9/18/2024
9/25/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
9/18/2024 11:32:31 AM
9/18/2024 11:32:31 AM
Building B>Fifth Floor Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 49 Of 136
1
T444645.584
screws to be hidden
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 12:11:08 PM
11/6/2024 12:11:17 PM
Building B>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1285
portal cladding strip incomplete
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
11/22/2024 11:35:32 AM 2
T459973.1
Size of gap to be reviewed
Images
12/3/2024 9:45:01 AM 3
T459973.2
Grout or mastic to bottom of brick
Images
12/3/2024 9:47:00 AM 4
T459973.3
Scratch or clean to spandrel
Images
12/3/2024 9:47:43 AM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 50 Of 136
5
T459973.5
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 9:49:49 AM 6
T459973.6
Damaged brick
Images
12/3/2024 9:50:10 AM 7
T459973.7
Damaged brick
Images
12/3/2024 9:50:38 AM 8
T459973.8
Flashing required
Images
12/3/2024 9:52:12 AM 9
T459973.9
Grout or mastic to bottom of brick
Images
12/3/2024 9:54:48 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 51 Of 136
10
T459973.10
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 9:55:32 AM 11
T459973.11
Damaged brick
Images
12/3/2024 9:55:46 AM 11
T459973.12
Tape to be removed
Images
12/3/2024 9:56:41 AM 9
T459973.13
Tape to be removed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12
T459973.14
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 9:58:11 AM 13
T459973.15
Damaged brick
Images
12/3/2024 9:58:56 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 52 Of 136
14
T459973.16
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:00:21 AM T444645.668
infill flashing required. Please confirm detail
Images
12/3/2024 10:01:15 AM 15
T459973.17
Insulation to be painted
Images
12/3/2024 10:03:26 AM 16
T459973.18
Clean paint
Images
12/3/2024 10:03:49 AM 17
T459973.19
Remove pencil marks
Images
12/3/2024 10:04:24 AM 18
T459973.20
Clean paint
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 53 Of 136
19
T444645.669
full clean required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:04:40 AM 20
T459973.22
Broken glass to be replaced
Images
12/3/2024 10:06:45 AM 21
T444645.670
full clean down of equitone required at low level
Images
12/3/2024 10:06:02 AM 22
T459973.23
12/3/2024 10:06:19 AM
Cleaning required
12/3/2024 10:06:49 AM
12/3/2024 10:06:57 AM
Images
12/3/2024 10:08:11 AM 23
T459973.25
Cleaning required
Images
12/3/2024 10:13:54 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 54 Of 136
24
T444645.671
insulation needs to be hidden
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:13:23 AM 25
T459973.26
12/3/2024 10:15:45 AM
Packers to be removed
Images
12/3/2024 10:16:46 AM 26
T444645.673
Making good required to grc panel
Images
12/3/2024 10:17:15 AM 26
T459973.27
Gap to be sealed
Images
12/3/2024 10:18:38 AM 27
T459973.28
Gap to be sealed
Images
12/3/2024 10:19:09 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 55 Of 136
28
T459973.29
Threshold gasket to be resolved
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:19:32 AM 29
T459973.30
Gap to be sealed
Images
12/3/2024 10:20:21 AM 30
T459973.31
Paint repair requires improvement
Images
12/3/2024 10:21:10 AM 31
T459973.32
End cap missing
Images
12/3/2024 10:21:33 AM 32
T444645.675
peckers to be cut be cut back or removed
Images
12/3/2024 10:26:24 AM
12/5/2024 10:27:35 AM
12/3/2024 10:26:32 AM
Project Name: B5412 Project Honey
Page 56 Of 136
33
T459973.35
Damaged brick
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:27:07 AM 32
T459973.36
Missing handle
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
34
T459973.37
Insulation to be tidied up or flashing installed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:31:33 AM 35
T459973.38
Gap to be resolved
Images
12/3/2024 10:32:55 AM 36
T459973.39
GRC Remedial consistency to be improved
Images
12/3/2024 10:34:05 AM 37
T444645.683
timber to be removed, flood stop refitted
Images
12/3/2024 10:37:05 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 57 Of 136
38
T459973.40
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:37:56 AM 37
T444645.684
fin missing
Images
12/3/2024 10:38:07 AM 37
T459973.41
Inconsistent gap
Images
12/3/2024 10:39:44 AM 39
T459973.42
Mesh to be tidied up
Images
12/3/2024 10:41:09 AM 40
T459973.43
Damaged brick
Images
12/3/2024 10:41:31 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 58 Of 136
41
T459973.44
Mesh to be tidied up
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:46:55 AM 42
T459973.45
Damaged brick
Images
12/3/2024 10:47:57 AM 42
T459973.46
Grout or mastic to bottom of brick
Images
12/3/2024 10:48:48 AM 43
T459973.62
Additional fixings required (colour matched)
Images
12/3/2024 11:03:53 AM 43
T459973.63
Gap requires remedial
Images
12/3/2024 11:04:26 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 59 Of 136
44
T444645.704
infill required to portal around grc
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
Images
12/3/2024 11:07:30 AM 45
T444645.708
incomplete flashing
Images
12/3/2024 11:11:27 AM 46
T1.53440170
Replace damaged Glass to CW 40
Building B>Ground Floor>0001 Reception
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1334
aluprof tape to be removed
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/29/2024 2:27:07 PM 2
T444645.666
GRC column to be made good
Images
12/3/2024 9:56:45 AM
12/5/2024 10:27:35 AM
12/3/2024 9:56:57 AM
Project Name: B5412 Project Honey
Page 60 Of 136
3
T444645.667
bottom of panel to receive mastic
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 9:59:20 AM 4
T444645.698
column to be cleaned
Images
12/3/2024 10:59:35 AM 5
T459973.59
Damaged brick
Images
12/3/2024 11:00:07 AM 6
T459973.60
Mastic to be infilled
Images
12/3/2024 11:01:10 AM 7
T444645.700
insulation to be hidden, flashing required
Images
12/3/2024 11:01:30 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 61 Of 136
8
T459973.61
Cleaning and touch ups required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:02:18 AM 9
T444645.701
GRC column repair to be completed/painted
Images
12/3/2024 11:04:14 AM 10
T444645.702
colour matched fixings required and missing fixings installed
Images
12/3/2024 11:04:55 AM 11
T444645.703
GRC column repair to be completed/painted
Images
12/3/2024 11:06:21 AM 12
T459973.64
Grout or mastic to bottom of brick
Images
12/3/2024 11:06:39 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 62 Of 136
13
T459973.65
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:07:18 AM 14
T459973.66
GRC repairs required
Images
12/3/2024 11:07:59 AM 15
T459973.67
Grout or mastic to bottom of brick
Images
12/3/2024 11:08:43 AM 16
T444645.705
general cleaning of grc
Images
12/3/2024 11:08:47 AM 17
T444645.706
grc painting to be complete
Images
12/3/2024 11:09:12 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 63 Of 136
18
T459973.68
GRC repairs required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:09:44 AM 19
T444645.707
mastic to underside of column
Images
12/3/2024 11:09:54 AM 20
T459973.69
Foil visible and cleaning required
Images
12/3/2024 11:10:11 AM
12/3/2024 11:10:17 AM
Building B>Ground Floor>0008 UK PN
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.674
Louvre doors to be cleaned down
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/3/2024 10:24:08 AM
12/3/2024 10:24:32 AM
Building B>Ground Floor>0009 Reception Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 64 Of 136
1
T345545.1280
grouting to green tiles incomplete
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
11/22/2024 11:27:14 AM 2
T345545.1281
incomplete works to glass
Images
11/22/2024 11:28:09 AM 3
T459973.70
Grout or mastic to panel
Images
12/3/2024 11:11:09 AM 4
T459973.71
12/3/2024 11:11:22 AM
Base detail required
Images
12/3/2024 11:12:28 AM 5
T459973.72
Finishing to be improved
Images
12/3/2024 11:12:59 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 65 Of 136
6
T459973.73
Tape to be removed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:14:19 AM 7
T459973.74
Closer piece required
Images
12/3/2024 11:14:48 AM Building B>Ground Floor>0010 CSW
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.682
query regarding how concrete will be finished
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:35:50 AM Building B>Ground Floor>0011 DHN Room
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.676
flashing to be repaired
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:28:01 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 66 Of 136
2
T444645.677
brick infill required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:28:39 AM 3
T444645.678
flashing to be fixed tight to GRC column
Images
12/3/2024 10:29:48 AM 2
T444645.679
chipped brick work to be repaired
Images
12/3/2024 10:31:10 AM 1
T444645.680
12/3/2024 10:31:17 AM
12/3/2024 10:31:52 AM
chipped brickwork to be repaired
Images
12/3/2024 10:32:58 AM 4
T444645.681
12/3/2024 10:33:08 AM
12/3/2024 10:33:31 AM
flashing required on one side. Other side requires flashing to be tight to back of column
Images
12/3/2024 10:34:11 AM 12/5/2024 10:27:35 AM
12/3/2024 10:34:23 AM Project Name: B5412 Project Honey
Page 67 Of 136
Building B>Ground Floor>0015 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1284
foil is visible behind GRC
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
11/29/2024
12/6/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Jack Monaghan)
Images
11/22/2024 11:31:33 AM 2
T345545.1286
bottom GRC is a different colour to the top 2
Images
11/22/2024 11:36:48 AM 3
T345545.1329
backing panel is peeling off at the bottom
Images
11/29/2024 2:15:41 PM 4
T345545.1330
backing panel is missing
Images
11/29/2024 2:16:01 PM 5
T345545.1332
backing panel is too far off
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 68 Of 136
Images
11/29/2024 2:20:22 PM 6
T444645.686
chipped brickwork
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:43:03 AM 7
T444645.687
grc column repair to be completed
Images
12/3/2024 10:44:02 AM 8
T444645.688
GRC column repair to be completed/painted
Images
12/3/2024 10:45:28 AM 9
T444645.689
GRC column repair to be completed/painted
Images
12/3/2024 10:46:19 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 69 Of 136
10
T444645.690
mastic required to underside of column
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:46:54 AM 11
T444645.691
chipped/broken GRC column to be repaired
Images
12/3/2024 10:47:53 AM 12
T459973.47
Grout or mastic to bottom of brick
Images
12/3/2024 10:49:19 AM 13
T444645.692
grc column repair required
Images
12/3/2024 10:49:24 AM 14
T444645.693
grc alignment required
Images
12/3/2024 10:50:14 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 70 Of 136
12
T459973.48
GRC notches to be filled
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:51:00 AM 15
T459973.49
12/3/2024 10:51:22 AM
GRC notches to be filled
Images
12/3/2024 10:51:52 AM 16
T459973.50
12/3/2024 10:52:00 AM
Mastic to edge of column
Images
12/3/2024 10:52:30 AM 17
T444645.694
mastic required
Images
12/3/2024 10:52:56 AM 18
T459973.51
GRC consistency to be improved
Images
12/3/2024 10:53:20 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 71 Of 136
19
T444645.695
GRC column repair to be completed/painted
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 10:53:50 AM 20
T459973.52
Insulation to be pushed up
Images
12/3/2024 10:54:33 AM 21
T459973.53
Grout or mastic to bottom of brick
Images
12/3/2024 10:55:15 AM 22
T459973.54
Damaged brick
Images
12/3/2024 10:55:34 AM 23
T444645.696
GRC column repair to be completed/painted
Images
12/3/2024 10:55:41 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 72 Of 136
24
T459973.55
GRC notches to be filled and mastic not continuous
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:56:13 AM 25
T459973.56
Infill to be swapped with replacement GRC
Images
12/3/2024 10:57:27 AM 26
T444645.697
bolt to be removed
Images
12/3/2024 10:57:21 AM 27
T459973.57
Damaged brick
Images
12/3/2024 10:57:53 AM 28
T459973.58
Grout or mastic to bottom of brick
Images
12/3/2024 10:58:59 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 73 Of 136
29
T444645.699
repair required to brickwork
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:00:44 AM Building B>Ground Floor>00S02 Stair 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T459973.24
Insulation to be pushed in
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 10:12:34 AM Building B>Ninth Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T1.53440215
Replace Damaged Glass (UPB14TGL1)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
Building B>Ninth Floor>0901 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T350553.888
Anchor points to be removed
9/25/2024
10/2/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Ian Robertson)
Images
9/25/2024 2:37:55 PM Building B>Roof>Roof Plant
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.555
panel not sitting correctly
11/1/2024
11/8/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 74 Of 136
11/1/2024 3:21:49 PM Building B>Second Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T1.53440166
Replace damaged pane of Glass
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
Building B>Sixth Floor>0601 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.582
deep scratches to million
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 11:50:13 AM 2
T444645.583
scratches to reveal
Images
11/6/2024 11:50:58 AM Building B>Tenth Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T450445.20
balustrade requires improvement
10/29/2024
11/5/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
10/29/2024 11:31:17 AM 2
T1.53440216
Replace Damaged Glass (UPB20GL1)
Building B>Tenth Floor>1001 Office Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 75 Of 136
1
T419146.605
joint in flashing above FFL please change
9/25/2024
10/2/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
9/25/2024
10/2/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
9/25/2024 12:42:39 PM 2
T419146.616
powered access door in wrong location
Images
9/25/2024 1:08:32 PM 3
T444645.566
missing screws, screws to be colour matched
Images
11/6/2024 10:17:15 AM
11/6/2024 10:17:23 AM
Building B>Tenth Floor>Terrace
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T421799.70
poor finish to balustrade top rail. sharp edges, complete misalignment on some visible scrorch marks
8/31/2024
9/7/2024
Incomplete Works
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
8/31/2024
9/7/2024
Incomplete Works
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
8/31/2024 8:25:52 AM 2
T421799.71
poor finish to balustrade base rail. inconsistent gaps, internal/external misaligned, some overlapping escorted (all areas)
Building B>Third Floor>0301 Office Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 76 Of 136
T444645.596
black mastic required behind acoustic plate to fill gap
11/6/2024
11/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
11/6/2024 2:26:25 PM Building C>Lower Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.171
Door to be finished.
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:49:34 PM
11/26/2024 12:49:38 PM
Building C>Lower Ground Floor>Cycle Entrance (External)
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.146
Door to be finished.
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:19:52 PM Building C>Lower Ground Floor>Single Tier Cycle Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.142
Door to be finished. Head detail to be confirmed
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Connor Casey)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/26/2024 12:10:46 PM Building C>Roof (L7)>Core 2 Lobby L07 Reference
Description
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 77 Of 136
1
T353957.87
Actuator for door to be complete + fire beacon to be complete
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 10:08:29 AM
11/26/2024 10:08:39 AM
Building C>Roof (L7)>Core 2 Lobby L07Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345609.9
External door mastic to be applied around fire door.
11/15/2024
11/22/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
11/26/2024
12/3/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (Connor Casey)
Images
11/15/2024 11:26:38 AM 1
T353957.89
Actuator for door to be complete + fire beacon to be complete
Images
11/26/2024 10:10:58 AM Elevations>Building A>East
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T459973.75
Base detail required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:16:34 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 78 Of 136
2
T459973.76
Broken glass
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:17:16 AM 3
T444645.709
flashing infill required
Images
12/3/2024 11:18:14 AM 4
T459973.77
GRC Remedials to be complete
Images
12/3/2024 11:18:31 AM 5
T459973.78
Inconsistent gap
Images
12/3/2024 11:19:31 AM 6
T459973.79
Joint requires improvement
Images
12/3/2024 11:20:52 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 79 Of 136
7
T444645.710
weep holes required to underside of portal
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:21:10 AM 8
T459973.80
Colour matched fixings and missing fixings
Images
12/3/2024 11:22:55 AM 9
T444645.711
12/3/2024 11:23:00 AM
exposed bracket
Images
12/3/2024 11:23:06 AM 10
T459973.81
Bottom requires improvement
Images
12/3/2024 11:23:31 AM 11
T459973.82
Solution required to close void
Images
12/3/2024 11:25:06 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 80 Of 136
12
T444645.713
mastic to be complete
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:25:30 AM 13
T459973.83
Colour match fixings required and gap closed
Images
12/3/2024 11:26:19 AM 14
T444645.714
12/3/2024 11:26:31 AM
grc repaired to be completed
Images
12/3/2024 11:26:54 AM 15
T459973.84
GRC Remedials to be complete
Images
12/3/2024 11:27:14 AM 16
T459973.85
Mastic required
Images
12/3/2024 11:28:05 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 81 Of 136
17
T444645.715
grc repaired to be completed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:28:08 AM 18
T459973.86
Flashing or mastic required
Images
12/3/2024 11:28:44 AM 19
T444645.716
joint alignment to be improved
Images
12/3/2024 11:29:05 AM 20
T444645.717
scratches to cladding panel
Images
12/3/2024 11:31:09 AM 21
T459973.88
Colour match fixings
Images
12/3/2024 11:31:43 AM 22
T459973.89
Insulation and rails to be painted
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 82 Of 136
23
T459973.90
Alignment of panel
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:33:10 AM 24
T459973.91
Bottom aluminium to be cut flush
Images
12/3/2024 11:33:50 AM 25
T459973.92
Damaged equities panel
Images
12/3/2024 11:34:34 AM 26
T444645.718
vertical rails to be cut flush with the equitone
Images
12/3/2024 11:36:30 AM 27
T459973.94
12/3/2024 11:36:38 AM
Green brick grout missing
Images
12/3/2024 11:39:20 AM
12/5/2024 10:27:35 AM
12/3/2024 11:39:36 AM
Project Name: B5412 Project Honey
Page 83 Of 136
28
T459973.95
GRC Remedials to be complete
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:41:02 AM 29
T459973.96
Mastic required
Images
12/3/2024 11:41:47 AM 30
T444645.719
grc repairs to be completed
Images
12/3/2024 11:41:38 AM 31
T444645.720
grc to be complete
Images
12/3/2024 11:42:14 AM 32
T459973.97
Joints to be improved for consistency
Images
12/3/2024 11:42:35 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 84 Of 136
33
T459973.98
Corner joint to be improved
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:42:55 AM 34
T459973.99
12/3/2024 11:43:03 AM
Mastic required
Images
12/3/2024 11:43:22 AM 35
T459973.100
Mastic required
Images
12/3/2024 11:43:39 AM 36
T444645.721
grc repairs to be completed
Images
12/3/2024 11:43:15 AM 37
T444645.722
grc repairs to be completed
Images
12/3/2024 11:44:03 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 85 Of 136
38
T459973.101
Grout or mastic to panel
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:44:02 AM 39
T459973.102
Alignment of cover caps
Images
12/3/2024 11:45:34 AM 40
T444645.724
flashing required to both sides of column
Images
12/3/2024 11:45:40 AM 41
T459973.103
12/3/2024 11:45:46 AM
Interface requires improvement
12/3/2024 11:45:53 AM
Images
12/3/2024 11:46:26 AM 42
T459973.104
12/3/2024 11:46:32 AM
Flashing or mastic required
Images
12/3/2024 11:47:12 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 86 Of 136
43
T444645.725
Clarkes to provide detail for closing this gap
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:46:48 AM 44
T459973.105
Grout or mastic to panel
Images
12/3/2024 11:48:12 AM 45
T444645.726
grc column to be repaired
Images
12/3/2024 11:47:57 AM 46
T459973.106
Interface requires improvement. Suggested this is mastic’s
Images
12/3/2024 11:48:24 AM 47
T444645.727
capping required
Images
12/3/2024 11:48:51 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 87 Of 136
48
T459973.107
Flashing or mastic required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:49:32 AM 49
T444645.728
grc column to be repaired and mesh or flashing installed
Images
12/3/2024 11:49:39 AM 50
T408928.155
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:07:46 PM 51
T444645.792
alignment to cprofile to be reviewed
Images
12/3/2024 3:07:12 PM 52
T459973.198
Joint between GRC units too large. Panel to be replaced
Images
12/3/2024 3:08:10 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 88 Of 136
53
T408928.156
check if alignment is within +/4 mm tolerance.
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 3:08:51 PM 54
T459973.199
Consistency of C profile gap to be checked
Images
12/3/2024 3:09:00 PM 55
T408928.157
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:09:29 PM 56
T444645.793
alignment to cprofile to be reviewed
Images
12/3/2024 3:09:46 PM 57
T408928.158
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:10:00 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 89 Of 136
58
T459973.200
Cover caps to be installed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:10:04 PM 59
T459973.201
Cover caps to be installed
Images
12/3/2024 3:10:48 PM 60
T444645.794
vertical alignment of brick columns
Images
12/3/2024 3:10:40 PM 61
T459973.202
Cover caps to be installed
Images
12/3/2024 3:11:43 PM 62
T459973.203
Cover caps to be installed
Images
12/3/2024 3:12:01 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 90 Of 136
63
T459973.204
Cover caps to be installed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 3:13:09 PM 64
T444645.795
gap to spandrel and equitone
Images
12/3/2024 3:13:19 PM 65
T459973.205
Cover caps to be installed
Images
12/3/2024 3:13:37 PM 66
T459973.206
Cover caps to be installed
Images
12/3/2024 3:14:07 PM 67
T408928.159
check alignment of brise soleil
Images
12/3/2024 3:14:28 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 91 Of 136
68
T459973.207
Cover caps to be installed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:14:30 PM 69
T444645.796
gap inconsistent with other equitone panels
Images
12/3/2024 3:14:48 PM 70
T408928.160
check alignment of brise soleil
Images
12/3/2024 3:16:09 PM 71
T459973.208
Grout repair following remedial
Images
12/3/2024 3:16:20 PM 72
T459973.209
Grout repair following remedial
Images
12/3/2024 3:17:04 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 92 Of 136
73
T444645.797
is this mastic ? missing
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:17:02 PM 74
T459973.210
Grout repair following remedial
Images
12/3/2024 3:17:39 PM 75
T444645.798
mastic missing
Images
12/3/2024 3:18:10 PM 76
T444645.799
mastic missing
Images
12/3/2024 3:18:28 PM 77
T459973.211
Grout repair following remedial
Images
12/3/2024 3:18:49 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 93 Of 136
78
T408928.161
check if alignment is within +/4 mm tolerance.
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:19:19 PM 77
T408928.162
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:20:20 PM 79
T444645.800
grout to brick
Images
12/3/2024 3:20:37 PM 80
T408928.163
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:21:13 PM 81
T459973.214
Check tortion between brick panels
Images
12/3/2024 3:22:03 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 94 Of 136
82
T444645.801
cprofile alignment
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 3:22:10 PM Elevations>Building A>North
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T459973.108
Alignment of cover caps
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:50:22 AM 2
T444645.729
grc column to be repaired and mesh or flashing installed to close gaps
Images
12/3/2024 11:51:20 AM 3
T459973.109
Flashing or mastic required
Images
12/3/2024 11:53:26 AM 4
T444645.730
grc column to be repaired and mesh or flashing installed to close gaps
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 95 Of 136
Images
12/3/2024 11:53:20 AM 5
T459973.110
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:54:05 AM 6
T459973.111
Base flashing to be installed
Images
12/3/2024 11:55:45 AM 7
T444645.731
grc column alignment
Images
12/3/2024 11:56:02 AM 8
T459973.112
Soffit panels to be levelled
Images
12/3/2024 11:56:16 AM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 96 Of 136
9
T459973.113
Damaged brick
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 11:57:09 AM 10
T444645.732
grc making good required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
11
T459973.114
Alignment of GRC
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:58:16 AM 12
T444645.733
grc making good required
Images
12/3/2024 11:58:50 AM 13
T459973.115
Alignment of GRC
Images
12/3/2024 11:58:54 AM 14
T444645.734
glazed brick to be repaired
Images
12/3/2024 12:00:00 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 97 Of 136
15
T444645.735
gap requires infill
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:00:32 PM 16
T444645.736
grc making good required
Images
12/3/2024 12:00:56 PM 17
T444645.737
grc making good required
Images
12/3/2024 12:01:11 PM 18
T459973.116
Concrete repairs and paint required
Images
12/3/2024 12:01:19 PM 19
T444645.738
grc plinth to be made good
Images
12/3/2024 12:01:47 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 98 Of 136
20
T459973.117
Base detail to be reviewed
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:02:00 PM 21
T444645.739
grc plinth to be made good & joints consistent
Images
12/3/2024 12:02:12 PM 22
T444645.740
grc plinth to be made good & joints consistent
Images
12/3/2024 12:02:41 PM 15
T459973.118
Bracket to be removed and silicone finished
Images
12/3/2024 12:02:37 PM 23
T444645.741
grc plinth to be made good & joints consistent
Images
12/3/2024 12:03:03 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 99 Of 136
24
T459973.119
Step in base flashing
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:03:09 PM 25
T444645.742
grc plinth to be made good & joints consistent
Images
12/3/2024 12:03:17 PM 26
T444645.743
grc plinth to be made good & joints consistent
Images
12/3/2024 12:03:31 PM 27
T444645.744
grc plinth to be made good & joints consistent
Images
12/3/2024 12:03:59 PM 28
T444645.745
grc plinth to be made good & joints consistent
Images
12/3/2024 12:04:14 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 100 Of 136
29
T444645.746
grc making good required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:05:18 PM 30
T444645.747
grc making good required
Images
12/3/2024 12:05:31 PM 31
T444645.748
grc making good required
Images
12/3/2024 12:05:46 PM 32
T459973.120
Gap at head to be resolved
Images
12/3/2024 12:05:48 PM 33
T444645.749
grc making good required
Images
12/3/2024 12:06:00 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 101 Of 136
34
T444645.750
grc making good required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:06:15 PM 35
T444645.751
grc making good required
Images
12/3/2024 12:06:35 PM 36
T459973.121
Joint of soffit panels to remain consistent with glass
Images
12/3/2024 12:06:42 PM 37
T444645.752
grc making good required
Images
12/3/2024 12:06:57 PM 38
T444645.753
grc making good required
Images
12/3/2024 12:07:17 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 102 Of 136
39
T444645.754
grc to be made good
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:07:29 PM 40
T459973.122
Damaged glass to be replaced
Images
12/3/2024 12:07:52 PM 41
T444645.755
grc to be made good
Images
12/3/2024 12:08:27 PM 42
T444645.756
grc to be made good
Images
12/3/2024 12:08:59 PM 43
T459973.123
Silicone improvement required
Images
12/3/2024 12:09:13 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 103 Of 136
44
T459973.124
End cap missing
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:09:32 PM 45
T459973.125
End cap missing
Images
12/3/2024 12:09:53 PM 46
T444645.757
cladding infill required
Images
12/3/2024 12:12:30 PM 47
T459973.127
12/3/2024 12:13:12 PM
Base detail to be reviewed
Images
12/3/2024 12:13:58 PM 48
T444645.758
cladding infill required
Images
12/3/2024 12:14:15 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 104 Of 136
49
T408928.134
check if alignment is within +/4 mm tolerance
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:42:03 PM 50
T459973.177
Missing cover caps
Images
12/3/2024 2:41:56 PM 51
T444645.782
grc sits proud
Images
12/3/2024 2:43:21 PM 52
T408928.135
alignment of csection right panel sits proud of left panel. confirm tolerance
Images
12/3/2024 2:43:59 PM 53
T459973.178
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:44:29 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 105 Of 136
54
T459973.179
Check if vertical alignment is within +/4mm tolerance
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 2:46:29 PM 55
T408928.136
check consistency of gaps
Images
12/3/2024 2:46:54 PM 56
T459973.180
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:47:25 PM 57
T408928.137
check consistency of gaps
Images
12/3/2024 2:47:49 PM 58
T408928.138
check consistency of gaps
Images
12/3/2024 2:48:20 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 106 Of 136
59
T444645.783
no gap between grc on one side but gap on the other side
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:47:36 PM 60
T408928.139
12/3/2024 2:47:56 PM
check consistency of gaps
Images
12/3/2024 2:48:39 PM 61
T459973.181
Consistency of C profile gap to be checked
Images
12/3/2024 2:48:55 PM 62
T408928.140
check if alignment is within +/4 mm tolerance
Images
12/3/2024 2:50:37 PM 63
T459973.182
Grout repair following remedial
Images
12/3/2024 2:50:27 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 107 Of 136
64
T408928.141
check if alignment is within +/4 mm tolerance
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 2:51:10 PM 65
T459973.183
Grout repair following remedial
Images
12/3/2024 2:51:10 PM 66
T444645.784
gaps inconsistent
Images
12/3/2024 2:51:22 PM 67
T459973.184
Grout repair following remedial
Images
12/3/2024 2:51:34 PM 68
T408928.142
check consistency of gaps
Images
12/3/2024 2:51:56 PM 69
T408928.143
check consistency of gaps
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 108 Of 136
70
T459973.185
Consistency of C profile gap to be checked
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:53:17 PM 71
T408928.144
check if alignment is within +/4 mm tolerance
Images
12/3/2024 2:53:37 PM 72
T444645.785
alignment of brick column to be improved. Pointing to be reviewed
Images
12/3/2024 2:52:39 PM 73
T444645.786
cchannel joints inconsistent
Images
12/3/2024 2:54:06 PM 74
T459973.186
12/3/2024 2:54:13 PM
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:54:38 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 109 Of 136
75
T408928.145
check consistency of gaps
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:55:31 PM 76
T459973.187
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:55:27 PM 77
T408928.146
check if alignment is within +/4 mm tolerance
Images
12/3/2024 2:55:54 PM 78
T459973.188
Consistency of C profile gap to be checked
Images
12/3/2024 2:56:46 PM 79
T459973.189
Check consistency of GRC C profile
Images
12/3/2024 2:58:06 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 110 Of 136
80
T408928.147
check if alignment is within +/4 mm tolerance.
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:58:48 PM 81
T444645.787
cchannel joints inconsistent
Images
12/3/2024 2:59:08 PM 82
T408928.148
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 2:59:17 PM 83
T459973.190
Check if vertical alignment is within +/4mm tolerance. Also check tortion of panel
Images
12/3/2024 2:59:47 PM 84
T459973.191
Packers or material to be removed
Images
12/3/2024 3:00:59 PM
12/5/2024 10:27:35 AM
12/3/2024 3:01:09 PM
Project Name: B5412 Project Honey
Page 111 Of 136
85
T444645.788
cprofile joints inconsistent
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:01:18 PM 86
T459973.192
Grout repair following remedial
Images
12/3/2024 3:01:38 PM 87
T408928.149
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:02:06 PM 88
T408928.150
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:02:22 PM 89
T459973.193
Grout repair following remedial
Images
12/3/2024 3:02:34 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 112 Of 136
90
T444645.789
spandrel joints excessive and inconsistent
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:02:24 PM 91
T459973.194
Grout repair following remedial
Images
12/3/2024 3:02:56 PM 92
T408928.151
check consistency of gaps
Images
12/3/2024 3:03:42 PM 93
T408928.152
check consistency of gaps
Images
12/3/2024 3:03:59 PM 94
T459973.195
Grout repair following remedial
Images
12/3/2024 3:04:02 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 113 Of 136
95
T408928.153
check consistency of gaps
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:04:38 PM 96
T444645.790
alignment to brick column to be reviewed
Images
12/3/2024 3:04:36 PM 97
T444645.791
alignment to brick column to be reviewed
Images
12/3/2024 3:05:02 PM 98
T459973.196
Cover cap missing
Images
12/3/2024 3:05:02 PM 99
T459973.197
Consistency of C profile gap to be checked
Images
12/3/2024 3:06:03 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 114 Of 136
100 T408928.154
check consistency of gaps
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 3:06:19 PM Elevations>Building A>South
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T459973.128
GRC to be replaced
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:17:23 PM 2
T459973.129
GRC Remedials to be complete
Images
12/3/2024 12:18:06 PM 3
T444645.759
flashing required insulation to be hidden
Images
12/3/2024 12:18:03 PM 4
T444645.760
grc to be made good
Images
12/3/2024 12:18:41 PM 12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 115 Of 136
5
T444645.761
grc to be made good
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Observation
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:19:09 PM 6
T459973.130
Gap to GRC and flashing to be closed
Images
12/3/2024 12:19:24 PM 7
T444645.762
grc to be made good
Images
12/3/2024 12:20:01 PM 8
T444645.763
flashing required insulation to be hidden
Images
12/3/2024 12:20:15 PM 9
T459973.131
Base detail to be reviewed
Images
12/3/2024 12:21:24 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 116 Of 136
10
T444645.764
grc to be made good and cleaned
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:21:31 PM 11
T444645.765
grc plinth to be made good and cleaned
Images
12/3/2024 12:22:06 PM 12
T444645.766
missing fin and handle
Images
12/3/2024 12:23:22 PM 13
T444645.767
missing fin
Images
12/3/2024 12:23:56 PM 14
T459973.133
Base detail to be tidied
Images
12/3/2024 12:24:10 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 117 Of 136
15
T459973.134
Remove brace
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:25:10 PM 16
T459973.135
Protection to be removed
Images
12/3/2024 12:26:03 PM 17
T459973.136
Top profile to be raised in middle section
Images
12/3/2024 12:26:39 PM 18
T444645.768
protection to be removed
Images
12/3/2024 12:27:20 PM 19
T459973.137
Bottom blades missing
Images
12/3/2024 12:27:26 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 118 Of 136
20
T444645.769
handle missing
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:27:40 PM 21
T444645.770
grc to be made good and cleaned
Images
12/3/2024 12:28:12 PM 22
T459973.138
Top flashing missing
Images
12/3/2024 12:28:42 PM 23
T459973.139
Protection to be removed
Images
12/3/2024 12:29:14 PM 24
T444645.771
flashing required insulation to be hidden
Images
12/3/2024 12:29:26 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 119 Of 136
25
T459973.140
Protection to be removed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:29:40 PM 26
T459973.141
Top flashing required
Images
12/3/2024 12:30:32 PM 27
T444645.772
mastic to be continuous
Images
12/3/2024 12:30:39 PM 28
T444645.773
12/3/2024 12:30:48 PM
grc to be made good and cleaned and painting to be completed
Images
12/3/2024 12:31:16 PM 29
T459973.142
12/3/2024 12:31:21 PM
Flashings to be installed and gap to be closed
Images
12/3/2024 12:32:37 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 120 Of 136
30
T459973.143
Flashing required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:33:16 PM 31
T459973.144
Visible gap to be reviewed
Images
12/3/2024 12:34:18 PM 32
T459973.145
12/3/2024 12:34:38 PM
Mastic missing
Images
12/3/2024 12:35:24 PM 33
T444645.775
12/3/2024 12:35:34 PM
flashing required to both sides of column
Images
12/3/2024 12:35:29 PM 34
T459973.147
Gaps between plinth and panel to be closed
Images
12/3/2024 12:36:34 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 121 Of 136
35
T459973.148
bottom flashing to be swapped
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 12:37:19 PM 36
T459973.149
Corner piece to be swapped
Images
12/3/2024 12:38:32 PM 37
T444645.776
mastic required to plinth
Images
12/3/2024 12:39:00 PM 38
T459973.150
Infill piece required (both sides)
Images
12/3/2024 12:39:31 PM 39
T444645.777
12/3/2024 12:41:48 PM
cladding required
Images
12/3/2024 12:39:59 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 122 Of 136
40
T459973.151
Mastic required
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:40:00 PM 41
T444645.778
gap to be infilled
Images
12/3/2024 12:40:33 PM 42
T459973.152
Glass to be replaced
Images
12/3/2024 12:41:13 PM 43
T444645.779
infill required to top of unitised
Images
12/3/2024 12:41:26 PM 44
T459973.153
Curved panel to be replaced to close gap
Images
12/3/2024 12:43:20 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 123 Of 136
45
T459973.154
Repairs required to aluminium
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 12:43:57 PM 46
T459973.155
Colour matched fixings
Images
12/3/2024 12:47:11 PM 47
T459973.215
Damaged GRC profile to be replaced
Images
12/3/2024 3:23:17 PM 48
T459973.216
Interface requires improving
Images
12/3/2024 3:26:42 PM 49
T459973.218
Mock up to be removed
Images
12/3/2024 3:29:08 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 124 Of 136
50
T408928.164
check if alignment is within +/4 mm tolerance.
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 3:29:16 PM 51
T459973.219
Mock up to be removed
Images
12/3/2024 3:29:28 PM 52
T459973.220
Mock up to be removed
Images
12/3/2024 3:29:52 PM 53
T408928.165
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:31:33 PM 54
T459973.221
Check if vertical alignment is within +/4mm tolerance. Also check tortion of panel
Images
12/3/2024 3:31:29 PM 55
T408928.166
damage to top of Csection panel
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 125 Of 136
56
T459973.222
Check if vertical alignment is within +/4mm tolerance. Also check tortion of panel
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 3:31:58 PM 57
T459973.223
Consistency of C profile gap to be checked
Images
12/3/2024 3:32:46 PM 58
T459973.224
Check if vertical alignment is within +/4mm tolerance. Also check tortion of panel
Images
12/3/2024 3:33:34 PM 59
T459973.225
Check if vertical alignment is within +/4mm tolerance. Also check tortion of panel
Images
12/3/2024 3:35:14 PM 60
T408928.167
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:36:01 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 126 Of 136
61
T459973.226
Mastic to underside of GRC to be removed
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/3/2024 3:36:04 PM 62
T408928.168
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:37:10 PM 63
T408928.169
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:37:45 PM 64
T408928.170
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:38:27 PM 65
T408928.171
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:38:49 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 127 Of 136
66
T408928.172
check if alignment is within +/4 mm tolerance.
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:39:09 PM 67
T408928.173
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:39:37 PM 68
T459973.227
Check if vertical alignment is within +/4mm tolerance. Also check tortion of panel
Images
12/3/2024 3:39:59 PM 69
T408928.174
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:40:26 PM 70
T459973.228
Grout repair following remedial
Images
12/3/2024 3:40:32 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 128 Of 136
71
T408928.175
check if alignment is within +/4 mm tolerance.
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 3:40:44 PM 72
T408928.176
check if alignment is within +/4 mm tolerance.
Images
12/3/2024 3:40:59 PM 73
T459973.229
Grout repair following remedial
Images
12/3/2024 3:41:01 PM 74
T459973.230
Grout repair following remedial
Images
12/3/2024 3:41:36 PM 75
T1.53440202
Replace Damaged Glass (CW07 Field 09)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
76
T1.53440209
Replace Damaged Glass (CW24 Field 03)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
Elevations>Building A>West
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T459973.156
Pointing to be complete
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 129 Of 136
Images
12/3/2024 2:23:41 PM 2
T459973.157
Mastic to side of panel
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:24:14 PM 3
T459973.158
Grout repair following remedial
Images
12/3/2024 2:25:04 PM 4
T459973.159
Grout repair following remedial
Images
12/3/2024 2:25:25 PM 5
T459973.160
Grout repair following remedial
Images
12/3/2024 2:25:51 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 130 Of 136
6
T459973.161
Grout repair following remedial
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:26:10 PM 7
T459973.162
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:27:18 PM 8
T459973.163
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:27:46 PM 9
T459973.164
Alignment of corner units
Images
12/3/2024 2:28:19 PM 10
T459973.165
Gap to be reduced
Images
12/3/2024 2:29:48 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 131 Of 136
11
T459973.166
Gap to be reduced
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:30:18 PM 12
T459973.167
Cavity barrier more visible in this area than others
Images
12/3/2024 2:31:39 PM 13
T459973.168
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:32:41 PM 14
T459973.169
Grout repair following remedial
Images
12/3/2024 2:33:24 PM 15
T459973.170
Glass to be swapped with panel
Images
12/3/2024 2:34:32 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 132 Of 136
16
T459973.171
Check if vertical alignment is within +/4mm tolerance
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
Images
12/3/2024 2:35:55 PM 17
T459973.172
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:36:29 PM 18
T444645.780
confirm spacing is consistent
Images
12/3/2024 2:35:49 PM 19
T459973.173
12/3/2024 2:36:32 PM
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:36:59 PM 20
T459973.174
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:37:51 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 133 Of 136
21
T408928.133
check if alignment is within +/4 mm tolerance
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (James McKeever)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
Images
12/3/2024 2:38:18 PM 22
T444645.781
confirm spacing is consistent and within tolerance
Images
12/3/2024 2:38:04 PM 23
T459973.175
Check if vertical alignment is within +/4mm tolerance
Images
12/3/2024 2:38:19 PM 24
T459973.176
Gap to be opened one side and closed the other
Images
12/3/2024 2:39:46 PM 25
T1.53440199
Replace broken Glass CW03 (Field 03)
Elevations>Building B>North
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T459973.212
Missing cover caps
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 134 Of 136
Images
12/3/2024 3:20:16 PM 2
T459973.213
Missing cover caps
12/3/2024
12/10/2024
Client Snag
Opened
Facade
Clarke Facades
McLaughlin & Harvey (sam peach)
3
T1.53440207
Replace damaged Glass (CW39 Field 01)
12/4/2024
12/11/2024
Snag
Opened
Facade
Clarke Facades
Clarke Facades (Jordan Anderson)
External works>External Works
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T1.53416383
Missing louvre
12/2/2024
12/9/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
12/2/2024
12/9/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
12/2/2024
12/9/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
12/2/2024
12/9/2024
Snag
Opened
Facade
Clarke Facades
Darling Associates (Robyn Harrison Church)
Images
12/2/2024 12:07:18 PM 2
T1.53416387
Column requires painting, made good
Images
12/2/2024 12:11:59 PM 3
T1.53416394
Gap between brick and column requires interface detail
Images
12/2/2024 12:13:42 PM 1
T1.53416433
Flashing detail required
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 135 Of 136
Images
12/2/2024 12:22:26 PM
12/5/2024 10:27:35 AM
Project Name: B5412 Project Honey
Page 136 Of 136
Project Honey – Tenant Snag Report 09.12.24
FH090-151015
Building A>Eighth Floor>0801 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.238
concrete up stand needs cover piece on levels eight and six up to top of raised Access floor
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:47:44 PM Building A>Eighth Floor>Terrace
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.239
scratch on mullion at high level
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:49:21 PM 2
T408928.240
detail at base of glass not acceptable
Images
12/6/2024 1:50:12 PM Building A>First Floor>01S01 Stair 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.236
skirting to be cut back as other floors
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
Francis Hunter (Luke Nurser)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/6/2024 1:43:20 PM
12/6/2024 1:43:26 PM
Building A>Ground Floor>0002 Lift Lobby Reference
Description
12/10/2024 9:02:54 AM
Project Name: B5412 Project Honey
Page 1 Of 7
1
T408928.235
light not installed as drawing. should be one light
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:40:32 PM Building A>Ground Floor>0003 Corridor 02
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.230
make good damage around lift call point
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
12/6/2024
12/13/2024
Mace Post PC Snag
Completed
Fit-out
Swiftcrafted
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:29:00 PM 2
T408928.231
fil gaps below skirting
Images
12/6/2024 1:31:20 PM Comments
Created By
Date
Due to floor tolerance levels, instruction required
Alex Money (Swiftcrafted)
12/9/2024 10:22:59 AM
Building A>Ground Floor>0006 Corridor 01
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.232
paint on ceiling raft
12/6/2024
12/13/2024
Mace Post PC Snag
Completed
Fit-out
Swiftcrafted
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:33:24 PM Comments
Created By
Date
This is not SCL. Decoration works outside of WCs not in SCL scope
Alex Money (Swiftcrafted)
12/9/2024 10:28:24 AM
12/10/2024 9:02:54 AM
Project Name: B5412 Project Honey
Page 2 Of 7
2
T408928.233
thumb turn on wrong side and no fire escape sign
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Fit-out
Swiftcrafted
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:36:15 PM Building A>Ground Floor>0027 BoH / Retail
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.229
bolts on frame. is this correct and there should be a cap colour matched
12/6/2024
12/13/2024
Mace Post PC Snag
Completed
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:27:39 PM Comments
Created By
Date
Installation is correct as per detail EDCMCFAXX001ZZDRX3017. Due to height of concrete upstand at this location, bolt could not be hidden below transom line. Colour cap not indicated in design thus not included.
Jordan Anderson (Clarke Facades)
12/6/2024 4:08:55 PM
Building A>Ground Floor>033 Corridor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.234
edges to be finished and skirting to be completed.
12/6/2024
12/13/2024
Mace Post PC Snag
Completed
Fit-out
Swiftcrafted
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:38:06 PM Comments
Created By
Date
Not sure what is required. Don’t believe this is SCL works. Dry lining and glass doors not in SCL scope
Alex Money (Swiftcrafted)
12/9/2024 10:25:52 AM
Building A>Second Floor>02R07 TRiser
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.237
general skirting in building B is capped and cover. which is correct
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:44:53 PM 12/10/2024 9:02:54 AM
Project Name: B5412 Project Honey
Page 3 Of 7
Building A>Sixth Floor>0601 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.243
concrete up stand needs cover up to raised access floor level
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:58:23 PM Building A>Sixth Floor>0605 WC Core
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.242
missing hatch
12/6/2024
12/13/2024
Mace Post PC Snag
Completed
Fit-out
Swiftcrafted
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:57:33 PM Comments
Created By
Date
Hatches are not by SCL please reissue
Alex Money (Swiftcrafted)
12/9/2024 10:20:42 AM
Building C>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.228
grill detail not accepted.
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:23:47 PM Building C>Ground Floor>Core 1 CL00 Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.248
clean concrete of muck
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
Images
12/6/2024 2:16:23 PM 12/10/2024 9:02:54 AM
12/6/2024 2:16:28 PM Project Name: B5412 Project Honey
Page 4 Of 7
2
T408928.249
is this insulation the correct detail
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
M&E
Halsion
Francis Hunter (Luke Nurser)
Images
12/6/2024 2:17:18 PM 3
T408928.250
light not working
Images
12/6/2024 2:18:04 PM Building C>Ground Floor>Core 1 L00 Lift Lobby
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.244
how is the finished ?
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
12/6/2024 2:03:54 PM 2
T408928.245
finish around edges required
Images
12/6/2024 2:04:58 PM Building C>Ground Floor>Front Lobby & Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.246
general clean off concrete and any mess from coring . remove exposed screws etc
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
12/10/2024 9:02:54 AM
Project Name: B5412 Project Honey
Page 5 Of 7
Images
12/6/2024 2:06:59 PM
12/6/2024 2:07:00 PM
12/6/2024 2:08:11 PM
Building C>Ground Floor>UKPN Ring Main Unit
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.227
damage to bottom of door
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Architect
Darling Associates
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:22:27 PM Building C>Lower Ground Floor>Cycle Stacker Store
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.251
oil all bike racks and confirm each moves easily
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Cleaning
Serna Cleaning
Francis Hunter (Luke Nurser)
Images
12/6/2024 2:21:09 PM Building C>Roof (L7)>Core 1 Lobby L07Mezz
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T408928.247
roof leaks still clearly evident
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Roofing
Aym (Services) Limited
Francis Hunter (Luke Nurser)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
12/6/2024 2:10:36 PM
12/6/2024 2:10:46 PM
Elevations>Building B>North Reference
Description
12/10/2024 9:02:54 AM
Project Name: B5412 Project Honey
Page 6 Of 7
1
T408928.241
gap to be made good
12/6/2024
12/13/2024
Mace Post PC Snag
Opened
Facade
Clarke Facades
Francis Hunter (Luke Nurser)
Images
12/6/2024 1:52:10 PM
12/10/2024 9:02:54 AM
Project Name: B5412 Project Honey
Page 7 Of 7
B5412 Project Honey Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.614
back in quite thin layer, could do with being topped up
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:13:10 PM T444645.615
11/27/2024 1:13:20 PM
General clean required
Images
11/27/2024 1:15:45 PM T444645.616
positioning of plants to be reviewed
Images
11/27/2024 1:16:56 PM T444645.617
general comment planting & shingle around edges to be complete
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
T444645.618
capping bolts required to bench bases
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:29:12 PM
12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 1 Of 7
T444645.619
paving shouldn’t be exposed, soil to run to edging
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:31:12 PM T444645.620
soil to be reduced around edges prior to bark being installed
Images
11/27/2024 1:32:43 PM T444645.621
11/27/2024 1:32:48 PM
11/27/2024 1:32:53 PM
could this not be rotated?
Images
11/27/2024 1:36:27 PM T444645.622
branches to be released on all trees
Images
11/27/2024 1:39:45 PM T444645.623
very poor finish on this one bench. looks like it’s molding unlike the rest
Images
11/27/2024 1:41:03 PM 12/5/2024 10:46:20 AM
11/27/2024 1:41:09 PM Project Name: B5412 Project Honey
Page 2 Of 7
T444645.624
resin to be cleaned out prior to tree bark
11/27/2024
12/4/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/27/2024 1:43:34 PM T444645.625
11/27/2024 1:43:50 PM
aco to be cleaned out
Images
11/28/2024 9:51:38 AM T444645.626
finishes to be reviewed where there is discoloration
Images
11/28/2024 9:57:54 AM T444645.627
concrete to be taken back to ensure correct depth of shingle
Images
11/28/2024 10:00:05 AM T444645.628
concrete to be faced off as will be visible
Images
11/28/2024 10:06:03 AM 12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 3 Of 7
T444645.629
shingle to be above concrete upstand locally
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/28/2024 10:07:41 AM T444645.630
fillet to be tidied up brook street planter
Images
11/28/2024 10:09:11 AM T444645.631
broken paver gaps around portal frame to be reviewed. brook street ramp
Images
11/28/2024 10:10:17 AM T444645.632
metal edging to be cleaned down
Images
11/28/2024 10:11:36 AM
11/28/2024 10:11:53 AM
Building A>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1262
make good to flood grille upstand
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 4 Of 7
Images
11/22/2024 10:50:50 AM 2
T345545.1263
11/22/2024 10:50:55 AM
make good to flood grille upstand
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 10:52:14 AM 3
T345545.1276
11/22/2024 10:52:18 AM
detail behind brickwork and against facade to be confirmed and completed
Images
11/22/2024 11:22:37 AM 4
T345545.1288
make good to wall ahead of flood grille install
Images
11/22/2024 11:49:40 AM Building A>Ground Floor>0001 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T444645.634
how will this be finished ?
11/28/2024
12/5/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
11/28/2024 10:20:17 AM 12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 5 Of 7
2
T444645.712
paving cuts to be improved
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Images
12/3/2024 11:24:21 AM Building B>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1279
one row of tactiles missing
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (sam peach)
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (James McKeever)
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
Images
11/22/2024 11:25:28 AM 2
T459973.21
Resin left too low leaving excessive step and visible packers
Images
12/3/2024 10:06:18 AM 3
T444645.672
12/3/2024 10:06:23 AM
Resin to be cleaned from bottom of equitone panels
Images
12/3/2024 10:16:12 AM
12/3/2024 10:16:17 AM
12/3/2024 10:16:24 AM
Building B>Ground Floor>0001 Reception Reference
Description
12/5/2024 10:46:20 AM
Project Name: B5412 Project Honey
Page 6 Of 7
1
T459973.4
Shingle/gravel to be completed
12/3/2024
12/10/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (sam peach)
Images
12/3/2024 9:49:03 AM Building B>Ground Floor>0015 Office
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1283
under flood grilles to be made good
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 11:30:46 AM Building C>Ground Floor
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T345545.1289
landscaping around edgings incomplete
11/22/2024
11/29/2024
Snag
Opened
Groundworks, Externals & Demolition
Riney
Darling Associates (Robyn Harrison Church)
Images
11/22/2024 11:50:27 AM Building C>Ground Floor>Entrance/Exit Ramp
1
Reference
Description
Issued Date
Target Date
Task Type
Status
Issued To Package
Issued To Organisation
Issued By Organisation
T353957.137
Aco channel to be replaced
11/26/2024
12/3/2024
Client Snag
Opened
Groundworks, Externals & Demolition
Riney
McLaughlin & Harvey (Connor Casey)
Images
11/26/2024 12:01:14 PM
12/5/2024 10:46:20 AM
11/26/2024 12:01:24 PM
Project Name: B5412 Project Honey
Page 7 Of 7
Project Honey – Water Management
FH090-151015
15 Trench Road Newtownabbey Co. Antrim BT36 4TY
T. 028 9034 2777 info@mclh.co.uk www.mclh.co.uk
Issued by Email 5412 – Project Honey, Kington Upon Thames
28th November 2024
Water Quality and Management Dear Sirs, As discussed, we confirm that until full and acceptable water quality results are provided, i.e. two clean sets of trend logs confirming cleanliness of systems returned from UKAS accredited test laboratories, achieving parameters and tolerances as detailed and stipulated within BSRIA BG29/2021, any required mitigations and remedials to clean system(s) and achieve the BSRIA requirements will be the responsibility of MCLH. This is on the basis that from the point of practical completion no additional works are carried out on the systems by others with exception to ongoing water management of these systems.
Yours faithfully
Andrew Doherty Operations Manager
McLaughlin & Harvey Holdings Limited is a company registered in Northern Ireland. Registered number: NI 633962. Registered office: 15 Trench Road, Newtownabbey, Co. Antrim, BT36 4TY
Project Honey – Car Park Water Management
FH090-151015
15 Trench Road Newtownabbey Co. Antrim BT36 4TY T. 028 9034 2777 info@mclh.co.uk www.mclh.co.uk
Mason Navarro Pledge The Foundry 5 Baldwin Terrace London N1 7RU
To Steve Vernon We MCLH, agree to monitor water seepage in the Precast slabs within the carpark until such a time that the structure is free of unmanaged/trapped water.
Regards
Andrew Doherty Operations Manager
McLaughlin & Harvey Ltd is a company registered in Northern Ireland. Registered number: NI27864. Registered office: 15 Trench Road, Newtownabbey, Co. Antrim, BT36 4TY
Project Honey – Key Re-inspections post PC R3
FH090-151015
key re-inspections post PC project:
Surrey House Island Site (10372)
client:
Globe Kingston Ltd/Cube Advisers Ltd
date:
06 December 2024
In addition to the snagging works listed within the PC Certificate, the below list identifies works to be carried out post Practical Completion: •
Re-snagging of the ground and first floor façade, external entrances and link portal to Building A. To be re-inspected on completion of MCLH snagging works. Knight Frank and Mace to be invited and EOC to re-inspect in January.
•
Re-snagging of the woodland walk and back of house areas of Building A. To be reinspected on completion of MCLH snagging works. Knight Frank and Mace to be invited and DAA to re-inspect in January.
•
Car Park Reception and pedestrian corridor finishes to be reviewed and re-inspected following post-Contract cosmetic remedial works. (walls, ceiling, lights and protection of low-level services)
•
Installation of additional door to south fire exit to car park to be carried out for compliance with SBD.
•
Issuing of Final BIM model to Occupier for final verification
•
Re-snagging of lifts in Building A to be carried out and demonstration of lift speeds/ wait time being achieved in line with minimum performance criteria.
David Lunt Director
FH057-151015
https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/16 PC & EoD/16.1 PC/New folder/10372 key re-inspections Post PC.docx