Surrey House Project Honey (10372) practical completion statement rev 1 prepared for

Globe Kingston Limited 09 December 2024


practical completion statement Surrey House Island Site – Project Honey (10372)

contents 1.

Practical completion statement and PC Checklist

2.

McLH Practical Completion pack

appendices appendix a – Final Certificate Letter – Buildings A, B and C appendix b – Mecserve Validation Report appendix c – DAA Statement of Practical Completion appendix d – MNP Statement of Practical Completion appendix e – Aecom Statement of Practical Completion appendix f– EOC Statement of Practical Completion appendix g – ACS Technical Audit Remediation Tracker appendix h – Chartplan Planning Conditions Tracker appendix i– Warranty Tracker appendix j – Guarantee Tracker appendix k – Snag Reports and related supporting documents •

Project Honey - Building A Snag Report 05.12.24

•

Project Honey – Building B Snag Report 05.12.24

•

Project Honey – Building C Snag Report 05.12.24

•

Project Honey – External Works Snag Report 05.12. 24

•

Project Honey – Façade Snag Report 05.12. 24

•

Project Honey – Tenant Snag Report 09.12.24

•

Project Honey – Water Management

•

Project Honey – Car Park Water Management

•

Key Re-inspections post PC R3

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/16 PC & EoD/16.1 PC/PC pack documents/contents page 241209 r2.docx


Practical Completion Statement and PC Checklist

.

FH090-151015


McLH Practical Completion Pack

FH090-151015


PRACTICAL COMPLETION Eden Campus Kingston Upon Thames, KT1

29 NOVEMBER 2024 TH


CONTENTS 1

Eden Campus Overview

3

2

Building A - GAs

7

3

Building B - GAs

14

4

Building C - GAs

22

5

EPC Certificates

28

6

BREEAM

32

7

O&M

34

8

Health and safety

43

9

Conformity Certificates

47

10

Wired Certificates

52

11

Key schedules

54

12

Completion photos

57

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

2


1

EDEN CAMPUS OVERVIEW

This document represents a package of design information forming an overview of the redevelopment of the Surrey House Island site – Eden Campus, Kingston Upon Thames.

The following information summarises achievements, certificates and images of the Eden Campus at Practical Completion.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

3


UP

UP

UP

Eden Campus oVERVIEW 1.1 The Eden Campus Site plan

UP

REET BROOK ST WHEA TFIELD

WAY

HO GS MIL L

RIV ER

EDEN STREET

Retail

Residential Lobby

Air Intake 7.67 m² 82.6 ft²

B3 A Core

-

Retail

UP

UP

OUTLINE OF EXISTING LEVER HOUSE BUILDING

Retail

UP

Corridor

B3 B Core -

OAD S'S R AME ST J

raised

Eden Campus, Kingston Upon Thames KT1 GENERAL NOTES Practical Completion document

shared

surface

NOTES

1. Drawing to be read in conjunction with ' ITEMS TO BE DEVELOPED AS PART OF STAGE 3/4 ' schedule 2. For Landscape design refer to Landscape Architect documentation 3. For Structural elements refer to Structural Engineer's documentation. 4. For M&E elements refer to Services Engineer's documentation.

KEY PLAN

Ownership Boundary Line Orange line denotes the demarcation between the McLH

REV

NOTES

DATE

BY

AUTH

DRAWING STATUS

4

For Information TITLE

SK

ISO SHEE

S4


Eden Campus oVERVIEW 1.2 Key Design Drivers: The Eden Campus

As a team we have aspired to deliver a design led, commercially aware, environmentally responsible architectural proposal that will provide a vibrant and productive workplace setting.

Design for Place-making Implementing a first class place-making strategy is key to grounding the scheme. By reinvigorating this underused area of Kingston, activating the street frontages and encouraging permeability across the island site, creating a greater sense of place and purpose. Landscaping elements widen the street scape and create opportunities for urban greening, with enhancements to the public realm and street level planting. The landscape design acts both as a visual marker for the site whilst setting the

Design for Future Flexibility With high quality design and adaptability placed firmly at the heart of the new buildings, Eden Campus has delivered some of the largest floor plates in the borough. With the floors offering a multitude of flexible workplace options centred on a dynamic reception and social hub at 6th floor level, it will provide an inspiring environment for its future occupants. The M&E proposals also allow the services to operate as separate entities in case of potential subdivision of floorplates and multioccupancy for future tenants.

buildings apart from its competitors. Both building users & members of the public

The structural design of the beekeepers car park has future proofed its functionality,

can enjoy the delights of the Woodland Walk, Green Street and numerous rooftop

should vehicle demands reduce and/or needs arise for further uses it can be retro-

terraces, all of which create opportunity of spacial variation and access to high

fitted to suit.

quality outdoor spaces.

Design for Sustainability Implementing a forward thinking strategy and innovative technologies to optimise the energy functionality of the buildings, whilst reducing their carbon emissions and impact on the surrounding environment. The design team has sought to achieve

Design for Wellbeing The office design helps to promote health and wellbeing aspects relating to flexible office working; through open plan layouts, maximising natural light and views out whilst optimising circulation.

a pragmatic and achievable balance between social, economic and environmental issues and their relationship to a commercial building. From the outset mitigating the environmental impact of the building has been a key consideration. The result is achieving a BREEAM rating of EXCELLENT and an EPC rating of A - both of which were required by the funding team as a key deliverable.

Design for Activity The dynamic reception and feature staircase are the focus and heart of the commercial office buildings, these have been conceived as the social hubs for the buildings & these spaces have been designed with a multitude of potential informal meeting points for those passing through the spaces.

Design for Low Carbon Travel The Eden Campus development enhances the sites connectivity to the surrounding public transport infrastructure and responds to the increase in cycling demand to provide a more sustainable and low-carbon travel to and from work and the town

The proposed retail space & active frontages across the site will engage both the local community, passersby & the building occupants. The proposed high quality retail spaces will attract top high street/boutique brands for all to enjoy.

centre.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

5


de

Eden Campus oVERVIEW

fa

ça

Commercial HQ Office pu

bl

ic

The Honey and The Hive buildings are the focal point of the Eden Campus Scheme. The brief for the Office Buildings was to provide the

Brook Street

following key functions:

The Hive Office

Create a BREAAM excellent CAT A Office facility to serve a world leading occupier, Unilever.

Reception

To incorporate a high level of sustainability pub

embodied in the design- reflecting the climate

lic f

emergency.

aça

New quality green space for private and public use

de

on a site currently lacking external public amenity. Create a more generous public realm through the widening of Eden Street. Attract positive interaction through active frontage along Eden Street.

Eden

retail

The Honey Office

woodland walk

Street

Encompass the key needs of the occupier whilst

publ

addressing the need for flexibility in future use and adaptations of the building.

ic faç

ade

St James’s Road Creating Architectural Presence & Identity The two offices harmoniously compliment each other whilst having a defined and unique identity which distinguishes them. The buildings appearance takes cues from the site context within Kingston, combined with the aspiration to create a HQ building with grandeur and architectural presence.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

6


2

BUILDING A GA S

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

7


Building A GAs 2.1 Building A - GF plan

A-1a

A-1

A-2

A-2a

3600

A-3

4050

4950

A-3a

A-4

2700

6300

A-4a

A-5

1350

A-6a

7650

7650

A-6

A-7a

1350

6300

A-7

A-8a

2700

4950

A-8 4050

A-9a 3600

A-9 5400

N

A-A 1

Eden Street

AXX001-ZZ-DR-A-0301

Ownership Boundary Line

FFL 8.400 m Raised Entrance

A-B

CAT A omitted area to be shell and core only. RAF removed.

00-001

9000

Office

A-C

00-R14

Riser

7.600 m

Entrance Lift Lobby

Corridor

00-L03

00-L01

00-010

00-025

1:21

Passenger Lift

Passenger Lift

00-R09

WC Core 00-L07

Corridor 03 7.200 m

9000

00-034

Lobby

Domestic Hot Water 00-002

Corridor 01

FFL 8.400 m 00-R03

Refuse Store

Office

AXX001-ZZ-DR-A-0306

Stair 01

Service Corridor

00-S02

Corridor 08 7.200 m

1

00-001

00-007

Cleaners

00-S01

00-011

00-020

00-019

AXX001-ZZ-DR-A-0302

00-R04

Landlords Low 00-R06 Smoke Vent Voltage Riser

00-R05

Smoke Vent Life Safety

A-D

1

00-006

Lift Lobby

Corridor 02

00-028

A-0304 -ZZ-DRAXX001

00-R02

Low Temperature Hot Water

00-003

AXX001-ZZ-DR-A-0308

Passenger Lift

00-R01

7.200 m

1

00-L04

Passenger Lift

District Heat Network

00-026

1

00-L02

Evacuation Lift

00-027

Back Of House

Mechanical Ventilation Riser

00-005

00-004

WC Core

Stair 02

00-L06

00-L05

FF/Passenger Lift

FF/Passenger Lift

00-R07

00-031

Tenant Riser

Stair Lobby

Brook Street

00-R11

Drainage requirement to be confirmed

00-029

7.200 m

00-022

Store

9000

Lobby

00-018

Service Yard

Booster Tank Room

00-024

Telecommunications

Life Safety Switch

Dry Riser

Corridor 00-030

Corridor

00-023

00-021

00-033

Corridor

00-032

Dry Riser

Fire Command Center

00-012

Service Yard St James's Road

FFL 8.400 m

00-R12

00-013

Corridor

00-014

FFL 7.750 m

Potential Expansion

FFL 7.200 m

Subject to occupier's CAT A fit out

A-E FFL 8.400 m

4950

FFL 7.200 m 00-017

UK Power Networks FFL 7.550 m

8.250 m

00-015

00-016

Low Voltage Switch

Low Voltage Transformer

00-R15

Dry Riser

FFL 7.550 m

FFL 7.550 m

00-R16

A-F

Dry Riser

1

Woodland Walk

AXX001-ZZ-DR-A-0303

1

AXX001-ZZ-DR-A-0307

1

IXX001-ZZ-DR-A-0300

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

0m

1m

3 IXX001-ZZ-DR-A-0301

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed  Building A - GA Ground Floor Plan

8

PROJECT

Eden Campus SCALE AT A1:

1 : 100

DRAWING

SCALE AT A3:

1: 200

DAA JOB NO.

19064 REV.


Building A GAs 2.2 Building A - L01-04

A-1a

A-1

A-2

A-2a

3600

A-A

4050

A-3 4950

A-3a

A-4

2700

6300

A-4a

A-5

1350

A-6a

7650

7650

A-6

A-7a

1350

6300

A-7

A-8a

2700

4950

A-8

A-9a

4050

A-9

3600

A-1a

A-1

5400

A-2

A-2a

A-3

A-3a

A-4

A-4a

A-5

1

A-6a

A-6

A-7a

A-7

A-8a

A-8

A-9a

A-9

AXX001-ZZ-DR-A-0301

A-A

N

1

A-A

3600

4050

4950

2700

6300

1350

7650

7650

1350

6300

2700

4950

4050

3600

N

5400

A-A

AXX001-ZZ-DR-A-0301

Floor finishes to be protected when temporary works installed

A-B

A-B Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.

01-001

Office

02-001

Office FFL 16.350 m 9000

9000

FFL 12.600 m

A-C

A-C 01-L01

Mechanical Ventilation Riser

Riser

Riser

01-L07

9000

01-L02

01-L04

Passenger Lift

Passenger Lift 01-R02

01-R01

01-002

Lift Lobby

01-003

Corridor 02

01-R03

Riser

A-D

01-R11

01-S03

Extract Riser

Landlords Low Smoke Vent Voltage Riser

01-L06

01-L05

01-R18

02-R01

Domestic Hot Water 02-002

Lift Lobby

02-003

Corridor 02

02-R03

02-R11

02-S03

Extract Riser

02-S04

Stair 02

Tenant Riser

Stair Lobby

02-R06

Landlords Low Smoke Vent Voltage Riser

Smoke VentLife Safety

A-D

1 AXX001-ZZ-DR-A-0302

1

02-007

Cleaners

02-S02

Stair Lobby

02-L06

AXX001-ZZ-DR-A-0306

02-S01

02-L05

FF/Passenger Lift

Riser

02-006

02-R04

02-R05

AXX001-ZZ-DR-A-0308

02-R14

Corridor 01

FFL 16.350 m

Riser

1

CAT A omitted area to be shell and core only

02-R02

Low Temperature Hot Water

01-R07

FF/Passenger Lift

Passenger Lift

Passenger Lift

02-R16

01-S01

Stair 01

Mechanical Ventilation Riser

02-L04

02-L02

Evacuation Lift

Stair 01

FF/Passenger Lift

02-R07

Tenant Riser

758

FF/Passenger Lift

1

AXX001-ZZ-DR-A-0306

Cleaners 01-S02

Stair Lobby

02-L07

CAT A omitted area to be shell and core only

1

02-R09

02-005

WC Core

WC Core

0304 ZZ-DR-AAXX001-

AXX001-ZZ-DR-A-0302

01-R06

Smoke Vent Life Safety

Stair Lobby

1

01-006

01-R04

01-R05

01-S04

Stair 02

Riser

Corridor 01

FFL 12.600 m

01-R16

1

AXX001-ZZ-DR-A-0308

01-R14

02-L03

Passenger Lift

Passenger Lift

02-004

Riser

Domestic Hot Water

Low Temperature Hot Water

0304 ZZ-DR-AAXX001-

02-R17

CAT A omitted area to be shell and core only but RAF to be installed

Mechanical Ventilation Riser

02-L01

Mechanical Ventilation Riser

Riser

01-R09

01-005

WC Core Evacuation Lift

02-R10

02-R15

Passenger Lift

WC Core

CAT A omitted area to be shell and core only

1

01-L03

Passenger Lift

01-004

01-R17

9000

01-R10

01-R15

02-R12

02-R13

01-R12

01-R13

Dry Riser

Dry Riser

Dry Riser 9000

9000

Dry Riser

Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.

A-E

Feature Stair

Feature Stair

A-E

Void

4950

4950

Feature Stair

Curtain wall mullion and floor finishes to be protected when temporary works installed

A-F

A-F 1

Reception Entrance Roof

AXX001-ZZ-DR-A-0307

1

1

AXX001-ZZ-DR-A-0303

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

1m

5m

10m

12m

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

Indicative bleacher arrangement aligned with SE loading zones

A-1a

A-2

A-2a

3600

A-A

4050

4950

A-3a 2700

A-4 6300

P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06 C07

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

A-3

P01

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

1:100

A-1

REV

KEY PLAN

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

A-5

AXX001-ZZ-DR-A-0301

1350

DATE

BY

AUTH

03/12/21

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

GENERAL NOTES

CONSTR. RECORD CR 03-Proposed Building A - GA First Floor Plan PROJECT

Eden Campus SCALE AT A1:

19064

1: 200

DRAWING

REV.

A-6a

7650

7650

A-6

A-7a

1350

6300

A-7

© Darling Associates Ltd.

A-8a

2700

4950

A-8

4050

A-9a

3600

0m

C07

1m

5m

10m

12m

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

1:100

A-9

A-1a

A-1

5400

N

A-A

A-2

A-A

A-B

A-2a

3600

REV

KEY PLAN

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

DAA JOB NO.

SCALE AT A3:

1 : 100

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

TITLE

EDC-DAA-AXX001-01-DR-A-0300

1

A-4a

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD

4050

A-3 4950

A-3a 2700

A-4 6300

A-5

AXX001-ZZ-DR-A-0301

1350

P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05

NOTES

DATE

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

BY

AUTH

03/12/21

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA Second Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

DAA JOB NO.

SCALE AT A3:

19064

1: 200

DRAWING

REV.

EDC-DAA-AXX001-02-DR-A-0300

1

A-4a

P01

A-6a

7650

7650

A-6

A-7a

1350

6300

A-7

A-8a

2700

4950

© Darling Associates Ltd.

A-8 4050

A-9a

3600

C05

A-9

N

5400

A-A

A-B

03-001

04-001

Office

Office

FFL 23.850 m 9000

9000

FFL 20.100 m

A-C

A-C 03-R10

03-L01

Mechanical Ventilation Riser

03-R15

Riser

03-R17

03-L07

9000

03-L02

Evacuation Lift

03-R01

03-R02

Domestic Hot Water 03-002

Lift Lobby FFL 20.100 m

03-003

Corridor 02 03-R16

Riser

03-R03

03-R11

03-S03

Extract Riser

Stair 02

03-S04

Stair Lobby

03-L06

03-L05

FF/Passenger Lift

1 AXX001-ZZ-DR-A-0302

03-006

FF/Passenger Lift

Cleaners 03-S02

Stair Lobby

1

04-R01

AXX001-ZZ-DR-A-0306

04-R11

04-S03

Extract Riser

Stair 02

04-S04

Stair Lobby

Tenant Riser

04-L06

04-L05

FF/Passenger Lift

FF/Passenger Lift

AXX001-ZZ-DR-A-0302

1

04-007

Cleaners 04-S02

Stair Lobby

AXX001-ZZ-DR-A-0306

04-S01

Stair 01

04-R07

Tenant Riser

Dry Riser

9000

Dry Riser

9000

1

04-008

04-R13

Dry Riser

Riser

04-006

04-R04

Landlords Low04-R06 Smoke Vent Voltage Riser

Smoke Vent Life Safety

A-D

AXX001-ZZ-DR-A-0308

04-R14

Corridor 01

FFL 23.850 m 04-R05

04-R03

03-R12

03-R13

Dry Riser

04-002

Lift Lobby

04-003

1

CAT A omitted area to be shell and core only

04-R02

Domestic Hot Water

Corridor 02

03-R07

Mechanical Ventilation Riser

04-L04

Passenger Lift

Low Temperature Hot Water

Riser

03-S01

Stair 01

04-L02

Passenger Lift

04-R16

1

03-007

04-R09

04-005

WC Core 04-L07

Evacuation Lift

0304 ZZ-DR-AAXX001-

03-R06

Landlords LowSmoke Vent Voltage Riser

Smoke VentLife Safety

A-D

Riser

Passenger Lift

WC Core

CAT A omitted area to be shell and core only

AXX001-ZZ-DR-A-0308

03-R14

Corridor 01 03-R04

03-R05

1

CAT A omitted area to be shell and core only

Passenger Lift

04-L03

Passenger Lift

04-004

Riser

03-L04

Passenger Lift

Low Temperature Hot Water

0304 ZZ-DR-AAXX001-

04-R17

Mechanical Ventilation Riser

WC Core

WC Core

04-L01

Mechanical Ventilation Riser

Riser

03-R09

03-005

CAT A omitted area to be shell and core only

04-R10

04-R15

Passenger Lift

03-004

Riser

1

03-L03

Passenger Lift

9000

0m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

AXX001-ZZ-DR-A-0307

Feature Stair

Feature Stair

Feature Stair

A-E

A-E

4950

4950

Void

A-F

A-F

1

1 AXX001-ZZ-DR-A-0303

1

AXX001-ZZ-DR-A-0307

AXX001-ZZ-DR-A-0303

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

Eden Campus, Kingston Upon Thames KT1 Practical Completion document GENERAL NOTES

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m 1:100

1m

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

1

AXX001-ZZ-DR-A-0307

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

GENERAL NOTES

CONSTR. RECORD CR 03-Proposed Building A - GA Third Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

DRAWING

EDC-DAA-AXX001-03-DR-A-0300 © Darling Associates Ltd.

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

TITLE

DAA JOB NO.

19064 REV.

C05

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m 1:100

1m

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

9

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA Fourth Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

DRAWING

EDC-DAA-AXX001-04-DR-A-0300 © Darling Associates Ltd.

DAA JOB NO.

19064 REV.

C05


Building A GAs 2.3 Building A - L05-08

A-1a

A-1

A-2

A-A

A-2a

3600

4050

A-3 4950

A-3a

A-4

2700

6300

1

A-4a

A-5

AXX001-ZZ-DR-A-0301

1350

A-6a

7650

7650

A-6

Floor finishes to be protected when temporary works installed

1350

A-7a

6300

A-7

A-8a

2700

4950

A-8 4050

A-9a 3600

A-9

A-1a

A-1

N

5400

A-A

A-2

A-A

A-2a

3600

4050

A-3 4950

A-3a

A-4

2700

6300

1

A-4a

A-5

AXX001-ZZ-DR-A-0301

1350

A-6a

7650

7650

A-6

A-7a

1350

6300

A-7

A-8a

2700

A-8

4950

4050

A-9a 3600

A-9

N

5400

A-A

06-013

Terrace

A-B

A-B

Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.

05-001

A-C

A-C

05-R10

9000

05-L07

05-L02

Evacuation Lift

Passenger Lift

05-R01

Domestic Hot Water 05-002

Lift Lobby FFL 27.600 m

05-003

Corridor 02 05-R16

05-R03

Riser

05-S03

05-S04

Stair 02

FF/Passenger Lift

Evacuation Lift

1

Passenger Lift

06-R01

06-R02

06-R11

06-S03

Extract Riser

1

Domestic Hot Water 06-002

Landlords Low 06-R06 Smoke Vent Voltage Riser

06-S04

Stair 02

06-R13

05-R12

06-R07

Tenant Riser

06-R12

Dry Riser

Dry Riser

9000

Dry Riser

AXX001-ZZ-DR-A-0306

06-S01

Stair 01

FF/Passenger Lift

FF/Passenger Lift

Tenant Riser

Stair Lobby

06-L05

06-L06

1

06-007

Cleaners 06-S02

Stair Lobby

AXX001-ZZ-DR-A-0302

06-006

Corridor 01 06-R04

06-R05

Smoke VentLife Safety

A-D

9000

1

AXX001-ZZ-DR-A-0308

06-R14

Lift Lobby FFL 31.513 m

06-003

Corridor 02

06-R03

AXX001-ZZ-DR-A-0306

Mechanical Ventilation Riser

06-L04

Passenger Lift

Riser

05-R07

FF/Passenger Lift

05-R13

Dry Riser

06-L02

Low Temperature Hot Water

05-S01

06-R09

06-004

WC Core 06-L07

0304 ZZ-DR-AAXX001-

Stair 01

06-L03

Passenger Lift

WC Core

Riser

1

05-007

Stair Lobby

05-L05

06-L01

Passenger Lift

06-005

06-R17

1 AXX001-ZZ-DR-A-0302

Cleaners 05-S02

05-L06

Stair Lobby

Riser

05-006

05-R06

Landlords Low Smoke Vent Voltage Riser

Smoke Vent Life Safety 05-R11

Extract Riser

AXX001-ZZ-DR-A-0308

05-R14

Corridor 01 05-R04

05-R05

CAT A omitted area to be shell and core only

Terrace

1

CAT A omitted area to be shell and core only

05-R02

Low Temperature Hot Water

1

0304 ZZ-DR-AAXX001-

A-D

Mechanical Ventilation Riser

05-L04

Passenger Lift

06-013

05-R09

05-005

WC Core

WC Core

Riser

06-R10

Mechanical Ventilation Riser

Passenger Lift

05-004

05-R17

CAT A omitted area to be shell and core only but RAF to be installed

05-L03

05-L01

Passenger Lift

Riser

9000

Mechanical Ventilation Riser

05-R15

06-001

Office

Void projection to level above

9000

9000

Office

Feature Stair

Temporary partition required to close off & seal omitted area of floor. Inclusion of additional partitioning subject to formal client instruction + inclusion of additional Floor fire barriers to be determined by Fire consultant.

A-E

4950

4950

Feature Stair

A-E

A-F

A-F

1

1

1

AXX001-ZZ-DR-A-0307

AXX001-ZZ-DR-A-0303

1

AXX001-ZZ-DR-A-0303

2

AXX001-ZZ-DR-A-0307 Floor finishes and curtain wall mullion to be protected when temporary works installed

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

NOTES

REV

KEY PLAN

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Acoustic Report and Glare report. Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. read in conjunction with all Stage A-1a Other specialist A-2 5. Drawing to beA-2a A-3 5 DAA A-3a OtherA-1 specialist design consultant's requirements as appointed by the Main Contractor. design sub-contractor's requirements as appointed by the Main Contractor. documentation. P = Preliminary C = Contractual 6. GA 4050 Elevations and Sections 4950 to be read in conjuction 3600 2700 with A-A 0m 1m 5m 10m 12m Facade Consultants' drawings

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

Indicative bleacher arrangement aligned with SE loading zones

A-4 6300

P01

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

1

A-4a

A-5

A-6a

Water Tank AXX001-ZZ-DR-A-0301 Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. 7650 7650

Indicative commercial kitchen equipment aligned with SE loading zones 1350

IXX001-ZZ-DR-A-0300

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

A-6

A-7a

1350

6300

P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06 C07

A-7 2700

NOTES

DATE

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD

A-8a

4950

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC AC

A-8

4050

DRAWING STATUS

ISO SHEET STATUS

GENERAL NOTES

CONSTR. RECORD CR 03-Proposed Building A - GA Fifth Floor Plan PROJECT

Eden Campus

A-9a 1 : 100

SCALE AT A1:

3600 DRAWING

SCALE AT A3:

A-9

DAA JOB NO.

19064

NREV.

5400

EDC-DAA-AXX001-05-DR-A-0300

1:100

NOTES

C07

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Acoustic Report and Glare report. Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. read in conjunction with all Stage A-1a Other specialist A-2 5. Drawing to beA-2a A-3 5 DAA A-3a OtherA-1 specialist design consultant's requirements as appointed by the Main Contractor. design sub-contractor's requirements as appointed by the Main Contractor. documentation. P = Preliminary C = Contractual 6. GA 4050 Elevations and Sections 4950 to be read in conjuction 3600 2700 with A-A 0m 1m 5m 10m 12m Facade Consultants' drawings

REV

KEY PLAN

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

TITLE

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

Indicative bleacher arrangement aligned with SE loading zones

A-4 6300

P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

1

A-4a

A-5

A-6a

Water Tank AXX001-ZZ-DR-A-0301 Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. 7650 7650

Indicative commercial kitchen equipment aligned with SE loading zones 1350

A-6

A-7a

1350

6300

A-7 2700

NOTES

DATE

BY

AUTH

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

03/12/21

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

4950

4050

A-8a

A-8

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA Sixth Floor Plan PROJECT

Eden Campus

A-9a 1 : 100

SCALE AT A1:

3600 DRAWING

SCALE AT A3:

1: 200

A-9

DAA JOB NO.

19064

© Darling Associates Ltd.

NREV. A-A

5400

EDC-DAA-AXX001-06-DR-A-0300

1:100

C05

© Darling Associates Ltd.

Terrace Below Terrace Below

Projection line of Canopy Over 8th Floor Terrace

A-B

A-B Projection line of Grillage Flooring from level 09.

07-001

Office

CAT A omitted area to be shell and core only

9000

9000

FFL 35.263 m

Subject to occupier's fit out

08-001

Office

Additional means of escape

A-C

A-C

07-R10

Mechanical Ventilation Riser

07-L01

08-R07

Passenger Lift

WC Core

Riser

07-L07

07-L02

Evacuation Lift

Passenger Lift

Passenger Lift

07-R01

07-R02

07-R03

07-S04

Stair Lobby

07-L05

07-007

FF/Passenger Lift

Stair Lobby

08-L04

Stair 03

08-R02

Cleaners

Low Temperature Hot Water

Terrace Below

A-D

Domestic Hot Water 08-002

08-R05

Tenant Riser

1

08-R06

Smoke Vent Life Safety

Landlords Low Smoke Vent Voltage Riser

08-L06

08-L05

AXX001-ZZ-DR-A-0306 08-S02

FF/Passenger Lift

1 AXX001-ZZ-DR-A-0302

08-005

Corridor 01 08-R04

08-R08

M-Vent Riser

07-R07

1

AXX001-ZZ-DR-A-0308

08-010

Lift Lobby FFL 39.176 m

08-003

Corridor 02

08-R03

AXX001-ZZ-DR-A-0306

07-S01

Stair 01

FF/Passenger Lift

07-R13

1

1

Cleaners 07-S02

07-L06

Passenger Lift

08-R01

Terrace

0304 ZZ-DR-AAXX001-

Landlords Low Smoke Vent Voltage Riser

Smoke VentLife Safety

07-S03

Stair 02

07-R11

Extract Riser

AXX001-ZZ-DR-A-0302

07-006

08-S03

Passenger Lift

08-L02

Evacuation Lift

AXX001-ZZ-DR-A-0308

Corridor 01

07-R06

08-004

WC Core 08-L07

1

07-002

07-R04

08-008

Plant Room

08-S04

Stair Lobby

Riser

07-R14

Lift Lobby

07-R05

Passenger Lift

08-R10

1

Domestic Hot Water

Low Temperature Hot Water 07-003

Corridor 02

A-D

07-R09

Mechanical Ventilation Riser

07-L04

Riser

Terrace Below

0304 ZZ-DR-AAXX001-

WC Core

07-004

07-R17

9000

9000

1

Void

08-L01

M-Vent Riser 07-005

CAT A omitted area to be shell and core only

FF/Passenger Lift

Stair Lobby

08-S01

Stair 01

08-R09

Dry Riser

07-R12

Dry Riser

Projection line of Canopy Over 8th Floor Terrace

9000

9000

Dry Riser

08-007

Plant Room Feature Stair

A-E

A-E

4950

4950

Feature Stair

A-F

Terrace

A-F Bridge Link Roof

1

1 AXX001-ZZ-DR-A-0303

AXX001-ZZ-DR-A-0303

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m

1m

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

1:100

AXX001-ZZ-DR-A-0307

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

1

1

AXX001-ZZ-DR-A-0307

KEY PLAN

CAT A work Omitted in these highlighted areas.

Indicative bleacher arrangement aligned with SE loading zones

Indicative commercial kitchen equipment aligned with SE loading zones

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

GENERAL NOTES

CONSTR. RECORD CR 03-Proposed Building A - GA Seventh Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

DRAWING

EDC-DAA-AXX001-07-DR-A-0300

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

TITLE

DAA JOB NO.

19064 REV.

C05

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m

1m

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES 03 CAT A omission FINAL ISSUE RECORD

BY

AUTH AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA Eighth Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

1: 200

DRAWING

EDC-DAA-AXX001-08-DR-A-0300

1:100

© Darling Associates Ltd.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

DATE 03/12/21

DAA JOB NO.

19064 REV.

C05

© Darling Associates Ltd.

10


Building A GAs 2.4 Building A - Roof & Mezzanine

A-1a

A-1

A-2

A-2a

3600

A-A

4050

A-3 4950

A-3a

A-4

2700

6300

1

A-4a

AXX001-ZZ-DR-A-0301

1350

A-5

A-6a

7650

7650

A-6

A-7a

1350

6300

A-7 2700

A-8a 4950

A-8 4050

A-9a 3600

A-9

A-1a

A-1

5400

N

A-A

A-2

A-2a

3600

A-A

4050

A-3 4950

A-3a 2700

A-4 6300

1

A-4a

AXX001-ZZ-DR-A-0301

A-5

1350

A-6a 7650

1350

A-6

A-7a 6300

A-7 2700

A-8a

A-8

4950

4050

A-9a 3600

A-9 5400

N

7650

A-A

1 AXX001-ZZ-DR-A-0301

Feature Canopy Over 8th Floor Terrace FFL 8.400 m

A-B Biodiverse Roof with inclined PVs over

A-B

Roof

Edge of biodiverse roof

9000

9000

Plant screen min height 3000mm

09-001

Roof Plant Room Note Refer to drawing EDC-DAA-AXX001-00-DRA-0300 for Ground Floor Plan.

AOV

A-C

A-C Void

Lift Overrun

Lift Overrun

1

Roof

Plant Room below

1

Void

1

0304 ZZ-DR-AAXX001-

AXX001-ZZ-DR-A-0302

1

M0-002

1

Back of House Storage

0304 ZZ-DR-AAXX001-

FFL 43.341 m

FFL 43.341 m

AXX001-ZZ-DR-A-0308

9000

9000

Terrace L08

1

M0-L07

Evacuation Lift

AXX001-ZZ-DR-A-0308

Terrace L06

AXX001-ZZ-DR-A-0302

1

AXX001-ZZ-DR-A-0306

A-D Lift Overrun

Lift Overrun

1

AXX001-ZZ-DR-A-0302

M0-001

Lift Lobby FFL 9.900 m

1

AXX001-ZZ-DR-A-0306

A-D

09-S01

M0-S02

Stair 01 FFL 43.281 m

Stair 02

AOV M0-003

Corridor FFL 9.900 m

M0-R01

FFL 9.056 m

9000

9000

Double height

Dry Riser M0-004

A6 - Wired Room

FFL 9.900 m

Plant screen min height 3000mm

Edge of biodiverse roof

Roof

Mansafe to perimeter

A-E Note Refer to drawing EDC-DAA-AXX001-00-DRA-0300 for Ground Floor Plan.

4950

4950

A-E

Feature Canopy Over 8th Floor Terrace A-F

A-F

1

1 AXX001-ZZ-DR-A-0303

AXX001-ZZ-DR-A-0303

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m

1m

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

1:100

AXX001-ZZ-DR-A-0307

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

1

1

AXX001-ZZ-DR-A-0307

KEY PLAN

CAT A work Omitted in these highlighted areas.

Indicative bleacher arrangement aligned with SE loading zones

Indicative commercial kitchen equipment aligned with SE loading zones

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation. Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

GENERAL NOTES

CONSTR. RECORD CR 03-Proposed Building A - GA Roof Plant Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

DRAWING

EDC-DAA-AXX001-09-DR-A-0300

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

TITLE

DAA JOB NO.

19064 REV.

C04

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m

1m

3 IXX001-ZZ-DR-A-0301

5m

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04

NOTES

DATE

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATES CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD

AUTH AC

10/12/21 11/02/22 11/03/22 18/03/22 22/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA Ground Floor Mezzanine Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

DRAWING

EDC-DAA-AXX001-M0-DR-A-0300

1:100

© Darling Associates Ltd.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

BY

03/12/21

DAA JOB NO.

19064 REV.

C04

© Darling Associates Ltd.

11


GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

Building A GAs 2.5 Building A - Elevations

The drawing is copyright of Da unless otherwise stated. All di discrepancies to be reported t building regulations and other relevant British Standard spec planning permission, it shall n Associates. This drawing may accept responsibility for the in are required appertaining to s appointment representative.

Drawings, specifications and s Employer's Requirements doc specifications, Civil Engineer' Other specialist design consu design sub-contractor's requir P = Preliminary C = Contrac

A-F

A-E

A-D

1

1

AXX001-ZZ-DR-A-0306

AXX001-ZZ-DR-A-0308

A-C

A-B

0m

1m

1:100

1

A-1a

A-2

A-2a9000

7650

A-3

A-3a

A-4

9000

7650

A-4a

AXX001-ZZ-DR-A-0307

A-5

9000

7650

9000 - Structure Grid

7650

A-6a

A-6

7650 - Facade Grid

9000

A-7

A-7a

7650

A-8a

A-8

9000 7650

A-9a 9000

KEY PLAN

31950

A-9

4950

7650

A-R9

9000

9000 - Structure Grid

9000

A-R9

+46.681 m

3400

3400

3400

+46.681 m

A-09

A-09

+43.281 m

Top of Balustrade +40.376 m

4105

4105

4105

+43.281 m

A-08

NOTES

Top of Balustrade +40.376 m

1. For Landscape design re documentation 2. For Structural elements a Structural Engineer's doc 3. For M&E elements refer t 4. Drawing to be read in con Acoustic Report and Glare 5. Drawing to be read in con documentation. 6. GA Elevations and Sectio Facade Consultants' draw

A-08

+39.176 m

+39.176 m

3913

3913

3913

1

IXX001-ZZ-DR-A-0302

A-07

A-07

+35.263 m

06-001

3750

Top of Balustrade +32.713 m

3750

3750

+35.263 m

Top of Balustrade +32.713 m

Bridge Link

A-06

A-06

+31.513 m

3913

3913

3913

+31.513 m

A-05

A-05

+27.600 m

3750

3750

3750

+27.600 m

A-04

A-04

+23.850 m

3750

3750

3750

+23.850 m

A-03

C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01

A-03

+20.100 m

3750

3750

3750

+20.100 m

A-02

REV

A-02

+16.350 m

FINAL ISSUE RECO External lighting, Lou CONSTRUCTION IS FIRST CONTRUCTIO STAGE 4 UPDATES STAGE 4 FIRST ISS CONTRACT ISSUE U FINAL CONTRACT IS CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRAC DRAFT ISSUE FOR

3750

3750

3750

+16.350 m

A-01

A-01

+12.600 m

+12.600 m Brook Street

2700

2700

MAXIMUM HEIGHT: 3.9m

2700

St James's Road

DRAWING STATUS

A-M0

CONSTR.

A-M0

+9.900 m

A-00

+8.400 m

FFL 7.550 m

TITLE

A-00

FFL 7.900 m

FFL 7.550 m

1500

1500

1500

+9.900 m

FFL 8.400 m

+8.400 m

FFL 7.250 m

FFL 7.550 m

03-Proposed Building A - GA E

FFL 7.200 m

PROJECT GENERAL NOTES

Facade louvres - for further details refer to Clarke's drawings

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. 9000 Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. A-R9 P = Preliminary C = Contractual +46.681 m

A-9

0m

1m

5m

P01

A-9a

10m

REV

KEY PLAN

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, 9000 Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA 7650 documentation.

A-8

A-8a

A-7

A-7a

A-6 9000

7650

A-6a

1

AXX001-ZZ-DR-A-0307

A-5

A-4a

9000 7650

A-4

A-3a

9000 15300

P02 P03 P04 P05 P06 P07 P08 C01 C02 C03

9000 7650

6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

C04

Eden Campus

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, for- Services and Clarke for Facade design FacadeHAL louvres for further details

The drawing is copyright of Darling unless otherwise stated. All dimen discrepancies to beA1: reported to Da SCALE AT building regulations and other statu relevant British Standard specifica planning permission, it shall not be Associates. This drawing may inco DRAWING accept responsibility for the integri are required appertaining to such i appointment representative.

1 : 100

refer to Clarke's drawings

NOTES

DATE

BY

AUTH

DRAFT ISSUE FOR INFORMATION 03/12/21 PURPOSES ONLY STAGE 3 CONTRACT ISSUE 10/12/21 STAGE 3 UPDATE 03/03/22 CONTRACT ISSUE 11/03/22 FINAL CONTRACT ISSUE 18/03/22 CONTRACT ISSUE UPDATED 06/04/22 STAGE 4 FIRST ISSUE 16/08/22 STAGE 4 UPDATES 03/10/22 FIRST CONTRUCTION ISSUE 9000 09/11/22 CONSTRUCTION ISSUE UPDATES 26/05/23 External lighting, Louvres and Equitone panels 11/06/24 division added 7650 FINAL ISSUE RECORD 25/10/24

A-3

DRAWING STATUS

A-2a

AC

ISO SHEET STATUS

0m

03-Proposed Building A - GA South Elevation A-2 A-1a

A-B

PROJECT

7650

Eden Campus SCALE AT A1:

1 : 100

1m

1:100

TITLE

A-C 9000

DAA JOB NO.

SCALE AT A3:

19064

1: 1 : 200

DRAWING

12m

EDC-DAA-AXX001-ZZ-DR-A-0303

1:100

© specifications Darling Assoc Drawings, and sche Employer's Requirements docume specifications, Civil Engineer's dra Other specialist design consultant' design sub-contractor's requireme P = Preliminary C = Contractual

CONSTR. RECORD CR

AC AC AC AC AC AC AC AC AC AC AC

EDC-DAA-A

1

1

AXX001-ZZ-DR-A-0308

AXX001-ZZ-DR-A-0306

9000 - Structural Grid

KEY PLAN

A-D

A-E 9000

A-F 4950

A-R9

+46.681 m

REV.

C04

3400

Provision for security shutter across service yard.

3400

© Darling Associates Ltd. A-09

A-09

+43.281 m

NOTES

4105

4105

+43.281 m

Top of Balustrade +40.376 m

Top of Balustrade +40.376 m

1. For Landscape design refer to documentation 2. For Structural elements and flo Structural Engineer's documen 3. For M&E elements refer to Se 4. Drawing to be read in conjunc Acoustic Report and Glare repo 5. Drawing to be read in conjunc documentation. 6. GA Elevations and Sections to Facade Consultants' drawings

A-08

A-08

+39.176 m

3913

3913

+39.176 m

A-07

A-07

+35.263 m

3750

3750

+35.263 m

Top of Balustrade +32.713 m

Top of Balustrade +32.713 m

A-06

A-06

+31.513 m

3913

3913

+31.513 m

A-05

A-05

+27.600 m

3750

3750

+27.600 m

A-04

A-04

+23.850 m

3750

3750

+23.850 m

C04 C03 C02 C01 P06 P05 P04 P03 P02 P01

A-03

A-03

+20.100 m

3750

3750

+20.100 m

REV

A-02

A-02

FINAL ISSUE RECORD External lighting, Louvres CONSTRUCTION ISSUE FIRST CONTRUCTION IS STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDA CONTRACT ISSUE UPDA FINAL CONTRACT ISSU STAGE 3 CONTRACT IS

+16.350 m

3750

3750

+16.350 m

A-01

A-01

+12.600 m

2700

2700

+12.600 m

DRAWING STATUS

CONSTR. R

A-M0

A-M0

+9.900 m 1500

1500

+9.900 m

A-00

TITLE

A-00

FFL 8.400 m

+8.400 m

+8.400 m

03-Proposed Building A - GA Wes

FFL 7.600 m

PROJECT

Eden Campus SCALE AT A1:

1 : 100

DRAWING

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued.

Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design Eden Campus, Kingston Upon Thames KT1 Practical Completion document GENERAL NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist

NOTES

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with

KEY PLAN

REV

NOTES

DATE

P01

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES External lighting, Louvres and Equitone panels division added FINAL ISSUE RECORD

03/12/21

AC

10/12/21 03/03/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 26/05/23 11/06/24

AC AC AC AC AC AC AC AC AC AC

25/10/24

AC

P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04

BY

AUTH

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA North Elevation PROJECT

Eden Campus SCALE AT A1:

SCALE AT A3:

DAA JOB NO.

12

EDC-DAA-AX

© Darling Associa


Building A GAs 2.6 Building A - Sections

GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

A-F

7650

7650

A-4

A-3a

1350

A-3

6300

A-2a

2700

A-2

4950

4050

3600

A-R9

A-09

950

01-L02

Passenger Lift

01-L07

01-004

Evacuation Lift

WC Core

01-001

A-01

1000

WC Core

Passenger Lift

3200

00-L04

2700

00-005

Office

00-002

Lift Lobby

00-L02

Passenger Lift

A-M0

+9.900 m 00-028

Corridor 03

+8.400 m

00-027

4105 2800 1113

3913 2800 2800

3750

950

1200

1113

3913 950 2800

950

950

01-001

Water Ta Indicativ Any asso base sch

Office

C04 C03 C02 C01 P09 P08 P07 P06 P05 P04 P03 P02 P01

01-002

Lift Lobby

Services zone

01-001

Office

Eden Street

FINAL ISSUE RECO CONSTRUCTION IS CONTRUCTION ISS FIRST CONTRUCTIO STAGE 4 UPDATES STAGE 4 FIRST ISS STAGE 4 UPDATES CONTRACT ISSUE U FINAL CONTRACT IS CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRAC DRAFT ISSUE FOR

REV

Back Of House

A-00

00-009

+8.400 m

Reception

A-M0

+9.900 m

00-026

District Heat Network

02-001

Seconda Indicativ aligned w integratio variation

03-001

Office

A-01

Back of House Storage

00-L07

Evacuation Lift

Services zone

02-002

Lift Lobby

+12.600 m

M0-002

2700

1500

00-001

Riser

2400

00-R13

A-00

03-002

Lift Lobby

2700

1500

M0-L07

Evacuation Lift

4200

A-M0

+9.900 m

+12.600 m

2700

2700

1800

+12.600 m

02-001

Office

Woodland Walk

Office

A-01

Services zone

Main Eq Indicativ area alig space/va deviating

A-02

+16.350 m

3750

01-002

Lift Lobby

A-02

+16.350 m Services zone

2800

01-L04

Passenger Lift

2800

950

1050

1350

WC Core

Office

2700

01-005

01-001

Riser

2400

3750

3750

01-R14

Services zone

Office

02-001

Office

A-02

+16.350 m

2800

Services zone

950

02-004

WC Core

2800

02-L07

Evacuation Lift

3750

02-L02

Passenger Lift

03-001

950

950

02-002

Lift Lobby

Services zone

Indicativ kitchen e with SE

04-001

A-03

+20.100 m

2800

Passenger Lift

2800

950

1050

1350

Office

02-L04

2700

Riser

02-005

WC Core

02-001

2400

950 2800

3750

Services zone

+20.100 m

Office

Fire curtain to feature stair

Office

03-001

Office A-03

02-R14

Services zone

04-002

Lift Lobby

2800

03-004

WC Core

04-001

Office

4200

03-L07

Evacuation Lift

Indicativ arrangem SE loadi

A-04

+23.850 m

3750

03-L02

Passenger Lift

2800

03-002

Lift Lobby

Services zone

A-03

+20.100 m

Fire curtain to feature stair

Services zone

2800

+23.850 m

950

950

1050

03-L04

Passenger Lift

2800

WC Core

03-001

Office

2700

Riser

2400

950

03-005

2800

3750

03-R14

1350

A-04

Services zone

05-001

Office

950

04-001

Office

A-04

+23.850 m

Services zone

Lift Lobby

2800

04-004

WC Core

Top of Balustrade +32.713 m

1000

04-L07

Evacuation Lift

06-013

Terrace

06-001

Office

A-05

+27.600 m

3750

04-L02

Passenger Lift

Services zone

2800

04-002

Lift Lobby

2800

950

950 2800

950

1050

04-L04

Passenger Lift

2700

WC Core

Office

2400

04-005

04-001

2800

3750

1350

A-05

Services zone

05-001

Office

Office +27.600 m

05-002

Fire curtain to feature stair

05-001

950

WC Core

2800

05-004

Evacuation Lift

3913

05-L07

3913

05-L02

Passenger Lift

06-002

Lift Lobby

A-06

+31.513 m Services zone

05-002

Lift Lobby

A-05

+27.600 m

06-001

Office

+31.513 m

1113

05-L04

Passenger Lift

Fire curtain to feature stair

950

Office

1213

1513

WC Core

2800

2800

Riser

05-005

05-001

2700

Services zone

3913

05-R14

2400

1113

+31.513 m

A-06

950

06-001

Office

A-06

+35.263 m

Top of Balustrade +32.713 m

06-013

Terrace

1. For Landscape documentation 2. For Structural e Structural Engin 3. For M&E eleme 4. Drawing to be r Acoustic Report 5. Drawing to be r documentation. 6. GA Elevations Facade Consul

A-07

2800

06-005

WC Core

NOTES 07-001

Office

950

06-L07

Evacuation Lift

07-002

Lift Lobby

3200

06-L02

Passenger Lift

1200

06-002

Lift Lobby

3750

2800

Passenger Lift

Office

2800

+35.263 m

950

1050

1350

Office

06-L04

2700

Riser

WC Core

2400

3750

3750

06-004

06-001

07-001

Office A-07

06-R14

Fire curtain to feature stair

Office

A-07

+35.263 m

08-001

Lift Lobby

2800

07-001

WC Core

08-002

08-001

Office

3750

07-004

3913

07-L07

Evacuation Lift

Terrace

+39.176 m

3913

1200

07-L02

Passenger Lift

A-08

3913

07-002

Lift Lobby

Top of Balustrade +40.376 m 08-009

A-08

+39.176 m

4105

Top of Balustrade +40.376 m

1113

08-001

Office

2800

08-L07

Evacuation Lift

1113

Passenger Lift

2800

1513

1213

07-L04

2700

WC Core

Office

2400

3913

3913

07-005

07-001

Riser

A-09

+43.341 m

+43.281 m

4105

08-L02

Passenger Lift

4105

08-002

Lift Lobby

A-08

07-R14

Roof Plant Room 1305

1305 2800

1705

1405 2700

2400

4105

4105

08-L04

+44.837 m 09-001

+43.281 m

Passenger Lift

+44.837 m

Roof

3400

09-002

+43.281 m

08-004

Drawings, specifications and s Employer's Requirements doc specifications, Civil Engineer' Other specialist design consu design sub-contractor's requir P = Preliminary C = Contrac

+46.681 m

A-R9

3400

09-001

Roof Plant Room +43.341 m

WC Core

A-B

9000

1

AXX001-ZZ-DR-A-0308

KEY PLAN

09-001

Roof Plant Room +43.341 m

08-008

A-C

9000

+46.681 m

3400

3400

3400

+46.681 m

+44.837 m

Plant Room

A-D

9000

1

+46.981 m

+39.176 m

A-E

AXX001-ZZ-DR-A-0306

+46.681 m

A-09

4950

A-1a

3400

1350

A-4a

950

6300

A-5

AXX001-ZZ-DR-A-0307

2800

2700

1

A-6a

950

4950

+46.681 m

A-R9

A-6

2800

4050

A-7a

4200

3600

A-7

1200

5400

A-8a

3750

A-8

38281

A-9a

1500

A-9

The drawing is copyright of Da unless otherwise stated. All di discrepancies to be reported t building regulations and other relevant British Standard spec planning permission, it shall n Associates. This drawing may accept responsibility for the in are required appertaining to s appointment representative.

00-001

Office

00-002

Lift Lobby

A-00

+8.400 m

+7.400 m DRAWING STATUS

CONSTR. TITLE

03-Proposed Building A - GA S

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

PROJECT

Eden Campus SCALE AT A1:

1 : 100

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

A-9

A-9a

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, 5400 Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor.

3600

P = Preliminary C = Contractual A-R9

A-7a

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a AXX001-ZZ-DR-A-0307 variation.

1350 Indicative commercial kitchen equipment aligned with SE loading zones

7650 Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

A-6

6300

1

A-6a

P01 P02 C01 C02 C03 C04

A-5

A-4a 7650

A-4

NOTES

DATE

STAGE 4 UPDATES STAGE 4 FIRST ISSUE FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD

A-3a

1350

BY

AUTH

10/08/22 16/08/22 09/11/22 20/01/23 26/05/23 25/10/24

A-3

6300

DRAWING STATUS

AC AC AC AC AC AC

ISO SHEET STATUS

CONSTR. RECORD CR

DRAWING

TITLE

© Darling Assoc

EDC-DAA-A

03-Proposed Building A - GA Section C-C PROJECT

A-2a

2700

A-2 Eden Campus A-1a

4950

4050

3600 SCALE AT A1:

DAA JOB NO.

SCALE AT A3:

1 : 100

19064

1: 200

A-R9

DRAWING

3400

EDC-DAA-AXX001-ZZ-DR-A-0308

3400

3400

+46.681 m

REV

KEY PLAN

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing with Fire Strategy A-7 Report, A-8 to be read in conjunction A-8a Acoustic Report and Glare report. 2700 5. Drawing to be4050 read in conjunction with 4950 all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

09-S01

09-001

Stair 01

A-09

+46.681 m REV.

C04

3400

GENERAL NOTES

© Darling Associates Ltd.

09-002

Roof Plant Room

Roof

A-09

+43.281 m

08-R06

08-R04

08-002

Lift Lobby

08-R05

08-R03

Life SafetySmoke Vent

08-R08

M-Vent Riser

08-001

08-009

Office

A-08

+39.176 m

Riser

Stair 01

07-R06

07-R04

07-002

Stair Lobby Smoke VentLandlords Low Lift Lobby Voltage Riser

07-R05

07-R03

Life SafetySmoke Vent

07-S04

07-S03

Stair Lobby

Stair 02

06-S04

06-S03

07-R11

3913

07-007

Cleaners

07-S02

3913

07-001

Office

07-R14

07-S01

2800

4040

1113

+39.176 m

Top of Balustrade +40.376 m 1200

Terrace

8018

A-08

08-S02

Stair Lobby Smoke VentLandlords Low Voltage Riser

4105

08-S01

Stair 01

4105

08-S01

Stair 01

08-008

Plant Room

2800

3978

1305

+43.281 m

07-001

Extract Riser

Office

A-07

A-07

+35.263 m

06-007

Stair 01

Cleaners

06-R04

Stair Lobby Smoke VentLandlords Low Voltage Riser

06-002

Lift Lobby

06-R05

06-R03

Life SafetySmoke Vent

Stair Lobby

Stair 02

06-R11

Extract Riser

06-001

06-013

Office

Terrace

Top of Balustrade +32.713 m

A-06

Riser

2800

05-007

Stair 01

Cleaners

05-R06

05-R04

Stair Lobby Smoke VentLandlords Low Voltage Riser

05-002

Lift Lobby

05-R05

05-R03

Life SafetySmoke Vent

05-S04

Stair Lobby

05-S03

Stair 02

05-R11

3913

05-001

Office

05-S02

3913

3913

05-S01

05-R14

A-06

+31.513 m

1113

Services zone

05-001

Extract Riser

2800

1113

+31.513 m

3750

Office

06-R06

1200

Riser

06-S02

2800

06-001

06-R14

3750

3750

06-S01

3750

950

+35.263 m

Office

Riser

04-007

Cleaners

04-R06

04-R04

04-002

Lift Lobby

04-R05

04-R03

Life SafetySmoke Vent

04-S04

Stair Lobby

+27.600 m Services zone

04-S03

Stair 02

04-R11

Extract Riser

3750

04-001

Office

04-S02

Stair Lobby Smoke VentLandlords Low Voltage Riser

04-001

2800

04-R14

2800

3750

04-S01

Stair 01

2800

Services zone

950

950

A-05

38281

+27.600 m

950

A-05

Office

A-04

Riser

03-001

Office

03-007

Cleaners

03-S02

03-R06

03-R04

Stair Lobby Smoke VentLandlords Low Voltage Riser

03-002

Lift Lobby

+23.850 m

950

03-R05

03-R03

Life SafetySmoke Vent

03-S04

Stair Lobby

Services zone

03-S03

Stair 02

03-R11

Extract Riser

3750

03-R14

2800

3750

03-S01

Stair 01

03-001

Office

2800

Services zone

2800

950

950

A-04

+23.850 m

A-03

Riser

02-001

02-007

Office

Cleaners

01-001

01-R18

Stair 01

02-S02

02-R06

02-R04

Stair Lobby Smoke VentLandlords Low Voltage Riser

02-002

Lift Lobby

+20.100 m

950

02-R05

02-R03

Life SafetySmoke Vent

02-S04

Stair Lobby

Services zone

02-S03

Stair 02

02-R11

Extract Riser

3750

02-R14

2800

3750

02-S01

02-001

Office

2800

Services zone

2800

950

950

A-03

+20.100 m

A-02

A-02

01-R06

01-R04

01-002

Lift Lobby

+16.350 m

950

01-R05

01-R03

Life SafetySmoke Vent

01-S04

Stair Lobby

Services zone

01-S03

Stair 02

01-R11

Extract Riser

3750

Cleaners

Riser

01-S02

Stair Lobby Smoke VentLandlords Low Voltage Riser

01-001

Office

2800

Office

01-S01

Stair 01

2800

01-R14

3750

3750

950

+16.350 m

A-01

A-01

00-001

Office

00-002

Lift Lobby

+12.600 m

00-R05

00-R03

00-011

Life SafetySmoke Vent Service Corridor

M0-S02

Stair 02

2700

00-R04

2700

00-R06

M0-002

Back of House FFL 9.900 m Storage

A-M0

+9.900 m

1500

00-007

Cleaners

A-00

Woodland Walk

1500

A-M0

+9.900 m

00-031

Stair Lobby Smoke VentLandlords Low Voltage Riser

A-00

2700

4200

00-S01

Stair 01

3200

2700

Brook Street

1000

+12.600 m

+8.400 m

+8.400 m

FFL 7.200 m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued.

Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design Eden Campus, Kingston Upon Thames KT1 Practical Completion document GENERAL NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist

NOTES

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial

Water Tank

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 04/03/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building A - GA Section A-A PROJECT

Eden Campus SCALE AT A1:

SCALE AT A3:

DAA JOB NO.

13


3

BUILDING B GA S

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

14


952

B-B

B-C

7223

B-D

7425

B-E

9000

1

B-A B-Aa

9000

7425

BXX001-ZZ-DR-A-0302

N

Building B GAs 3.1 Building B - GF Plan

B-F

B-Ga 7223

B-G

952

Brook Street Projection line of Portal above.

820

B-1 B-2

CAT A omitted area to be shell and core only

1

Subject to occupier's CAT A fit out

1

Green Street

00-014

Telecommunications

00-012

BXX001-ZZ-DR-A-0306

Tank Room

00-009

Reception FFL 7.750 m

00-001

Reception

FFL 8.250 m

Low Voltage Riser 00-005 Stair Lobby 02

00-R05

Sprinkler Riser

Cleaners

Life Safety 00-R04

Smoke Vent

00-L05

FF Lift

00-R01

Low Temperature Hot Water

FFL 8.400 m

00-R07

00-004

00-R02

00-003

00-006

Stair Lobby 01 FFL 8.400 m

WC

00-R10

Tenant Riser

1

B-3

FFL 8.400 m FFL 8.400 m

00-L04

Evacuation Lift 00-S02

00-R09

Dry Riser

00-007

Passenger Lift 03

Electrical Riser FFL 8.100 m

710

00-R03

FFL 7.650 mDomestic Hot Water

B-4

00-L02

00-L01

FFL 8.150 m

B-5 FFL 8.100 m

1

BXX001-ZZ-DR-A-0304

IXX001-ZZ-DR-A-0301

FFL 7.650 m

3

00-009

UK Power Networks

Low Voltage Transformer FFL 7.400 m

1:40

00-011

District Heat Network FFL 7.400 m

FFL 7.400 m

Passenger Lift 02

Passenger Lift 01

Project line of Portal above.

FFL 7.400 m

00-008

1:16

00-R08

00-010

Back Of House Corridor

00-L03

00-R06

Lift Lobby FFL 8.400 m

00-S01

Stair 01 FFL 8.400 m

00-002

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

00-013

Bin Store

Cold Water Storage

Mechanical Equipment

9740

Stair 02 FFL 8.400 m

BXX001-ZZ-DR-A-0303

1

BXX001-ZZ-DR-A-0301

9760

IXX001-ZZ-DR-A-0300

1050mm deep cable trench with GRP ventilated covers supported on steel anglesrefer to UKPN spec drawings

Woodland Walk 1

BXX001-ZZ-DR-A-0307

1

BXX001-ZZ-DR-A-0305

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

Eden Campus, Kingston Upon Thames KT1 0m 1m 5m 1:100 Practical Completion document

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06 C07

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission CONSTRUCTION UPDATES FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 09/11/22 20/01/23 26/05/23 11/09/23 05/10/23 26/01/24 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building B - GA Ground Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

1: 200

DRAWING

EDC-DAA-BXX001-00-DR-A-0300 © Darling Associates Ltd.

DAA JOB NO.

19064 REV.

C07

15


952

7223

B-D

7425

B-E

9000

9000

B-F

B-Ga

7425

7223

B-G

B-A

B-Aa

952

952

B-B

7223

B-C

B-D

7425

B-E

9000

1

B-C

9000

BXX001-ZZ-DR-A-0302

B-B

1

B-A B-Aa

BXX001-ZZ-DR-A-0302

N

Building B GAs 3.2 Building B - L01-L04

B-F

B-Ga

7425

7223

B-G

952

Brook Street Projection line of Portal above.

B-1

CAT A omitted area to be shell and core only but RAF to be installed

B-2

820

820

B-1

B-2

CAT A omitted area to be shell and core only but RAF to be installed

01-001

Office 9760

1

1

BXX001-ZZ-DR-A-0301

BXX001-ZZ-DR-A-0301

Reception Entrance Roof

1

BXX001-ZZ-DR-A-0306

Low Temperature Hot Water WC

Stair 02

9740

Back Of House Corridor

01-R09

Dry Riser 01-S01 Stair 01

01-002

Lift Lobby FFL 12.600 m

01-009

Life Safety

01-L03

02-005

Stair Lobby 01

02-R10

Tenant Riser

WC

02-S02

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

02-L04

Evacuation Lift

02-003

Stair 02

02-R09

02-002

Dry Riser 02-S01 Stair 01

Lift Lobby FFL 16.350 m

02-L03

Passenger Lift 03 02-R08

Electrical Riser

Electrical Switch

01-L02

Passenger Lift 02

02-L02

02-L01

01-R03

710

Domestic Hot Water

B-5

B-4

1

02-R04

Smoke Vent

01-010

01-L01

Passenger Lift 01 710

02-R01

Low Temperature Hot Water

Life Safety

02-L05

FF Lift

01-R06

01-R08

Electrical Riser

B-4

Cleaners

Low Voltage Riser 02-006 Stair Lobby 02

02-R05

02-R07

Sprinkler Riser

02-004

02-R02

Reception Entrance Skylight

Mechanical Equipment

Passenger Lift 03

B-3

Green Street

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

01-L04

Evacuation Lift

01-003 01-S02

Wired Equipment Room

01-011

BXX001-ZZ-DR-A-0303

01-006

Stair Lobby 01

02-R06

01-R04

Smoke Vent

01-L05

FF Lift

01-R01

01-008

Mechanical Equipment

Low Voltage Riser 01-005 Stair Lobby 02

01-R05

Life Safety

9740

Cleaners

1

Reception Entrance Double Height

01-R07

Sprinkler Riser

01-004

01-R02

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306

B-3

02-R03

Passenger Lift 02

Passenger Lift 01

Domestic Hot Water

B-5

1

1

1

BXX001-ZZ-DR-A-0307

BXX001-ZZ-DR-A-0305

1

1

BXX001-ZZ-DR-A-0307

BXX001-ZZ-DR-A-0305

N

1

Woodland Walk

BXX001-ZZ-DR-A-0304

Projection line of Portal above

BXX001-ZZ-DR-A-0304

1

9760

02-001

Office

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

5m

10m

B-1 820

1:100

12m

9000

9000 Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

7425

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06 C07

NOTES

DATE

B-Ga

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE 7223 FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD

952

BY

AUTH

03/12/21 B-G

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS GENERAL NOTES

TITLE

unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

03-Proposed Building B - GA First Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

DRAWING

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and DAA JOB NO. SCALE AT A3: specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual REV.

19064

1: 200

0m 1m 5m EDC-DAA-BXX001-01-DR-A-0300 1:100

B-1

C07

10m

© Darling Associates Ltd.

B-2

NOTES

CONSTR. RECORD CRof Darling Associates. This drawing shall not be scaled. All dimensions are in mm The drawing is copyright

CAT A omitted area to be shell and core only

12m

B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

B-C

7425

9000

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

B-F

REV P01 P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06 C07

7425

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE 7223 ISSUE CONTRACT FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD

B-Ga

952

DATE

B-G

BY

AUTH

03/12/21

AC

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building B - GA Second Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

DAA

SCALE AT A3:

19

1: 200

DRAWING

EDC-DAA-BXX001-02-DR-A-0300 © Darling Associates Ltd.

B-2

03-001

04-001

9760

9760

Office

1

1

FFL 23.850 m

BXX001-ZZ-DR-A-0301

BXX001-ZZ-DR-A-0301

1

BXX001-ZZ-DR-A-0306

Smoke Vent 03-006

B-3

04-R01

Stair Lobby 01

03-R10 Low Temperature Tenant Riser Hot Water

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

03-L04

Evacuation Lift

WC

03-S02

03-R09

03-002

Stair 02

Dry Riser

Lift Lobby FFL 20.100 m

03-S01

03-L03

Stair 01

Passenger Lift 03

03-R06

03-003

04-R07

Low Temperature Hot Water

Cleaners

Stair Lobby 01

04-R10

Tenant Riser

WC

04-S02

FFL 23.850 m

04-S01

04-L03

Stair 01

04-R08

04-L02

04-L01

Passenger Lift 02

Domestic Hot Water

710

B-4

04-R03

Passenger Lift 02

Passenger Lift 01

Domestic Hot Water

1

1

BXX001-ZZ-DR-A-0304

B-5

1

BXX001-ZZ-DR-A-0307

1

BXX001-ZZ-DR-A-0305

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

Eden Campus, Kingston Upon Thames KT1 Practical Completion document 1. For Landscape design refer to Landscape Architect's

1

BXX001-ZZ-DR-A-0307

1

BXX001-ZZ-DR-A-0305

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

NOTES

documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA

BXX001-ZZ-DR-A-0304

710

Dry Riser

Lift Lobby Passenger Lift 03

B-5

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist

04-R09

04-002

Stair 02

03-L02

Passenger Lift 01

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

04-L04

Evacuation Lift

04-003

Electrical Riser

03-L01

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

04-R04

Smoke Vent 04-006

Electrical Riser

03-R03

Life Safety

04-L05

FF Lift

03-R08

B-4

04-R05

Sprinkler Riser

04-004

04-R02

Low Voltage Riser 04-005 Stair Lobby 02

1

03-R04

03-L05

FF Lift

03-R01

9740

Life Safety

1

Cleaners

04-R06

Sprinkler Riser

03-004

03-R02

Low Voltage Riser 03-005 Stair Lobby 02

Mechanical Equipment

B-3

03-R05

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306 03-R07

9740

1

B-E

9000

Indicative bleacher arrangement aligned with SE loading zones

Office

GENERAL NOTES

KEY PLAN

B-D

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

1

REV

B-F

BXX001-ZZ-DR-A-0303

1m

7425

B-E

Mechanical Equipment

0m

B-D

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

820

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

KEY PLAN

B-C

BXX001-ZZ-DR-A-0302

B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

1

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

BXX001-ZZ-DR-A-0302

GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial

Water Tank

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23

AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS GENERAL NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD unless otherwiseCR stated. All dimensions shall be checked on site prior to commencing the works and any TITLE

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

03-Proposed Building B - GA Third Floor Plan PROJECT

Eden Campus SCALE AT A1:

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist

NOTES

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial

Water Tank

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23

AC AC AC AC AC AC AC AC AC AC AC AC

16 DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building B - GA Fourth Floor Plan PROJECT

Eden Campus SCALE AT A1:

SCALE AT A3:

DA


952

7223

B-C

B-D

7425

B-E

9000

9000

B-F

B-Ga

7425

7223

B-A B-Aa

B-G

952

952

7223

B-C

B-D

7425

9000

9000

820

B-2

B-2

B-F

B-Ga

7425

7223

B-G

952

CAT A omitted area to be shell and core only but RAF to be installed 06-001

05-001

Office 9760

1

BXX001-ZZ-DR-A-0301

FFL 27.600 m

BXX001-ZZ-DR-A-0301

9760

Office

FFL 31.350 m

2

IXX001-ZZ-DR-A-0300

1

1

05-006

9740

05-R09

05-002

Dry Riser

Lift Lobby FFL 27.600 m

05-S01

Stair 01

05-L03

WC

06-S02

Dry Riser 06-S01 Stair 01

Lift Lobby FFL 31.350 m

06-L03

Passenger Lift 03 06-R08

Electrical Riser 06-L02

06-L01

Passenger Lift 02

Passenger Lift 01

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

06-R09

06-002

Stair 02

05-L02

05-L01

Domestic Hot Water

710

710

Bridge Link

05-R06

05-R08

Electrical Riser

05-R03

Stair Lobby 01 06-L04

Evacuation Lift

06-003

Mechanical Equipment

Passenger Lift 03

06-R04

Smoke Vent 06-006

06-R10

06-R01

06-R05

Life Safety

06-L05

FF Lift

06-001

9740

WC

05-S02

Stair 02

Cleaners

Low Temperature Tenant Riser Hot Water

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

05-L04

Evacuation Lift

05-003

06-R07

Sprinkler Riser

06-004

06-R02

Low Voltage Riser 06-005 Stair Lobby 02

Stair Lobby 01

Low Temperature Tenant Riser Hot Water

B-4

B-3

1

05-R04

Smoke Vent

05-R10

05-R01

05-R05

Life Safety

05-L05

FF Lift

06-R06

Cleaners

Mechanical Equipment

05-R07

Sprinkler Riser

05-004

05-R02

Low Voltage Riser 05-005 Stair Lobby 02

1

B-3

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306

B-4

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306

06-R03

Passenger Lift 02

Passenger Lift 01

Domestic Hot Water

B-5 1

1

BXX001-ZZ-DR-A-0305

1

BXX001-ZZ-DR-A-0307

1

1

BXX001-ZZ-DR-A-0307

BXX001-ZZ-DR-A-0305

N

1

BXX001-ZZ-DR-A-0304

B-5

BXX001-ZZ-DR-A-0304

1

B-E

B-1

B-1 820

B-B

1

B-B

BXX001-ZZ-DR-A-0302

B-Aa

1

B-A

BXX001-ZZ-DR-A-0302

N

Building B GAs 3.3 Building B - L05-L08

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 5m

10m

12m

B-1 820

1:100

7425

Indicative bleacher arrangement aligned with SE loading zones

B-D

9000

B-E

9000 Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

7425

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

REV

B-F

P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED 7223 STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD

DATE

B-Ga

952

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

B-G

DRAWING STATUS

GENERAL NOTES

NOTES

ISO SHEET STATUS

drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR.The RECORD CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

03-Proposed Building B - GA Fifth Floor Plan PROJECT

specifications and schedules are to be read in conjunction with the following where applicable: Eden CampusDrawings, Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and

1 : 100

specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA NO. SCALE AT A3:consultant's requirements as appointed by Other specialist design the JOB Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

DRAWING

0m

SCALE AT A1:

19064

1: 200 1m

REV.

5m

EDC-DAA-BXX001-05-DR-A-0300 1:100

10m

C06

Indicative bleacher arrangement aligned with SE loading zones

7425

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

B-D

9760

DATE

BY

03/12/21

B-Ga

952

AUTH

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR

AC

B-G

10/12/21 17/01/22 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC AC

TITLE

03-Proposed Building B - GA Sixth Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

SCALE AT A3:

1: 200

DRAWING

EDC-DAA-BXX001-06-DR-A-0300 © Darling Associates Ltd.

B-2

9760

1

FFL 38.850 m

BXX001-ZZ-DR-A-0301

1

WC

07-S02

08-R01

Dry Riser

Lift Lobby FFL 35.100 m

07-S01

07-L03

Stair 01

WC

08-S02

Dry Riser

Lift Lobby

08-S01

08-L03

Stair 01

07-R06

Mechanical Equipment

Passenger Lift 03 Electrical Riser

Passenger Lift 02

08-L02

08-L01

Domestic Hot Water

B-4

1

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

08-R09

08-002

Stair 02

08-R08

710

710

Stair Lobby 01 08-L04

Evacuation Lift

08-003

B-5

08-R03

Passenger Lift 02

Passenger Lift 01

Domestic Hot Water

1

BXX001-ZZ-DR-A-0305

1

1

BXX001-ZZ-DR-A-0304

B-5 1

BXX001-ZZ-DR-A-0307

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

Eden Campus, Kingston Upon Thames KT1 1. For Landscape design refer to Landscape Architect's documentation Structural elements and flood void details refer to Practical Completion2. Fordocument

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 12m

Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

1

BXX001-ZZ-DR-A-0307

1

BXX001-ZZ-DR-A-0305

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

10m

08-R04

Smoke Vent 08-006

08-R10

07-L02

07-L01

Passenger Lift 01

08-R05

Life Safety

08-L05

FF Lift

FFL 38.850 m

Passenger Lift 03 07-R08

Electrical Riser

07-R03

Cleaners

Low Temperature Tenant Riser Hot Water

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

07-R09

07-002

Stair 02

08-R07

Sprinkler Riser

08-004

08-R02

Low Voltage Riser 08-005 Stair Lobby 02

Stair Lobby 01 07-L04

Evacuation Lift

07-003

B-4

B-3

9740

07-R10 Low Temperature Tenant Riser Hot Water Bridge Link Roof

9740

07-R04

Smoke Vent 07-006

08-R06

07-L05

FF Lift

07-R01

1

Cleaners

Low Voltage Riser 07-005 Stair Lobby 02

07-R05

Life Safety

BXX001-ZZ-DR-A-0303

07-R07

Sprinkler Riser

07-004

07-R02

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306

B-3

BXX001-ZZ-DR-A-0304

1

BXX001-ZZ-DR-A-0301

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED 7223 STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD

08-001

1

5m

7425

P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06

Office

FFL 35.100 m

BXX001-ZZ-DR-A-0306

1m

P01

B-F

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

07-001

0m

B-E

Secondary Equipment Room (SER) 9000 Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

9000

Office

GENERAL NOTES

REV

KEY PLAN

B-C

B-1

© Darling Associates Ltd.

B-2

12m

1. For Landscape design refer to Landscape Architect's B-A B-Aa B-B documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 952 elements refer to Services 7223 3. For M&E Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

1

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

CAT A work Omitted in these highlighted areas.

Mechanical Equipment

1m

KEY PLAN

B-C

820

0m

1. B-A For Landscape B-Aa design refer to Landscape Architect's B-B documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 952 7223 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

BXX001-ZZ-DR-A-0302

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

1

GENERAL NOTES

BXX001-ZZ-DR-A-0302

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS

GENERAL NOTES

ISO SHEET STATUS

NOTES

drawing is copyright of Darling CR Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR.The RECORD unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

03-Proposed Building B - GA Seventh Floor Plan PROJECT

Eden CampusDrawings, specifications and schedules are to be read in conjunction with the following where applicable: SCALE AT A1:

1 : 100

DRAWING

Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. SCALECivil AT Engineer's A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

19064

1: 200

0m

1m

5m

REV.

10m

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions 03 CAT A omission FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 22/09/23 05/10/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC AC AC

17

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building B - GA Eighth Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

DRAWING

SCALE AT A3:

1: 200


952

7223

B-C

B-D

7425

B-E

9000

9000

B-F

B-Ga

7425

7223

N

B-G

B-A

952

952

B-B

B-C

7223

B-D

7425

B-2

B-E

9000

9000

B-1 820

B-1 820

B-Aa

1

B-B

BXX001-ZZ-DR-A-0302

B-Aa

1

B-A

BXX001-ZZ-DR-A-0302

N

Building B GAs 3.4 Building B - L09- LR11

B-F

B-Ga

7425

7223

B-G

952

Terrace

B-2

FFL 46.513 m

CAT A omitted area to be shell and core only 09-001

10-001

Office 9760

1

1

CAT A omitted area to be shell and core only

BXX001-ZZ-DR-A-0301

1

09-R04

Smoke Vent 09-006

09-R09

09-002

Dry Riser

Lift Lobby

09-S01

FFL 42.600 m

Stair 01

09-L03

Evacuation Lift

WC

10-R09

10-002

Dry Riser10-S01 Stair 01

Lift Lobby 10-L03

Passenger Lift 03

09-R06

10-R08

Electrical Riser

10-L02

10-L01

Passenger Lift 02

Passenger Lift 01

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

10-L04

10-003 10-S02

09-L02

09-L01

09-R03

10-006

Stair Lobby 01

Mechanical Equipment

Electrical Riser

10-R04

Smoke Vent

10-R10

FFL 46.513 m

Passenger Lift 03 09-R08

10-R05

Life Safety

10-L05

FF Lift

Stair 02

9740

WC

Cleaners

Low Temperature Tenant Riser Hot Water

For Phase 1, an element of the South Façade of Building B needs to be FR90 fire rated due to the proximity to Lever House. Refer to Fire Strategy Report and Drawings

Evacuation Lift

09-003 09-S02

Domestic Hot Water

710

710

10-R01

10-R07

Sprinkler Riser

10-004

10-R02

Low Voltage Riser 10-005 Stair Lobby 02

Stair Lobby 01 09-L04

Stair 02

B-4

B-3

10-R06

09-R01

09-R10 Low Temperature Tenant Riser Hot Water

9740

Life Safety

09-L05

FF Lift

Mechanical Equipment

Cleaners

10-R03

Passenger Lift 02

Passenger Lift 01

Domestic Hot Water

1

1

BXX001-ZZ-DR-A-0305

1

BXX001-ZZ-DR-A-0307

1

1

BXX001-ZZ-DR-A-0307

BXX001-ZZ-DR-A-0305

1m

5m

10m

B-1

12m

9000

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

9000

7425

B-F

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04 C05 C06 C07

NOTES

DATE

DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE 7223 CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CAT A Omissions CAT A ommisions update 03 CAT A omission FINAL ISSUE RECORD

BY

B-Ga B-G 03/12/21 10/12/21 11/02/22 11/03/22 18/03/22 952 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 11/09/23 15/09/23 05/10/23 25/10/24

AUTH

DRAWING STATUS GENERAL NOTES

ISO SHEET STATUS

NOTES

AC AC AC AC AC AC AC AC AC AC AC AC AC AC

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

TITLE

03-Proposed Building B - GA Ninth Floor Plan PROJECT

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Eden Campus Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and

1 : 100

specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. Other specialist SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

DRAWING

0m

SCALE AT A1:

19064

1: 200

1m

REV.

5m

820

EDC-DAA-BXX001-09-DR-A-0300 1:100

C07

B-1

10m

12m

B-C CAT A work Omitted in

7425

KEY PLAN

B-D

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

these highlighted areas.

9000

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

9000

1

7425

11-R01

Sprinkler Riser

Smoke Vent

ISO SHEET STATUS

CONSTR. RECORD CR

AC AC AC AC AC AC AC AC AC AC AC AC AC AC

TITLE

03-Proposed Building B - GA Tenth Floor Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

Roof Plant

DAA JOB NO.

SCALE AT A3:

19064

1: 200

REV.

C06

Plant Screen

FFL 50.503 m

B-3

AOV 9740

9740

11-S01

Lift Overrun

Riser Overrun

Riser Overrun

Lift overrun

710

B-5

Plant screen

1

BXX001-ZZ-DR-A-0304

Plant screen

1

BXX001-ZZ-DR-A-0307

Plant screen

BXX001-ZZ-DR-A-0305

Mansafe/Fall arrest barrier

1

BXX001-ZZ-DR-A-0307

Mansafe/Fall arrest barrier

1

BXX001-ZZ-DR-A-0305

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

NOTES

4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

Mansafe/Fall arrest barrier

1

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

1. For Landscape design refer to Landscape Architect's Eden Campus, Kingston Upon Thames KT1 documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. Practical Completion document 3. For M&E elements refer to Services Engineer's documentation.

Plant screen

Riser Overrun

Stair 01 Overrun

Lift Overrun

1

B-5

B-4

BXX001-ZZ-DR-A-0304

Lift overrun

710

Riser Overrun

1:100

DRAWING STATUS

AC

EDC-DAA-BXX001-10-DR-A-0300

Refer to M&E engineers documentation

Lift overrun

12m

AUTH

© Darling Associates Ltd.

Stair 01

Riser Overrun

10m

BY

10/12/21 17/01/22 11/02/22 95211/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 21/07/23 22/09/23 25/10/24

DRAWING

Lift overrun

5m

DATE

B-Ga 03/12/21 B-G

Stair Lobby 01

Riser Overrun

1m

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE KEY DIMENSIONS ADDED STAGE 3 UPDATE CONTRACT7223 ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES CONSTRUCTION ISSUE UPDATES CAT A Omissions FINAL ISSUE RECORD

BXX001-ZZ-DR-A-0306

11-001

0m

P02 P03 P04 P05 P06 P07 P08 P09 C01 C02 C03 C04 C05 C06

1

11-R02

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

P01

1

FFL 50.503 m

FFL 50.503 m

Lift overrun

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

REV

Terrace L10

FFL 50.503 m

BXX001-ZZ-DR-A-0303

FFL 50.503 m

B-3

GENERAL NOTES

B-F

B-2

BXX001-ZZ-DR-A-0301

1

BXX001-ZZ-DR-A-0306

B-4

B-E

9760

9760

© Darling Associates Ltd.

BXX001-ZZ-DR-A-0301

1

B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. unlessRECORD otherwise stated. All dimensionsCR shall be checked on site prior to commencing the works and any

AC

Terrace L10

1:100

B-2

B-E

1

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

1

0m

7425

KEY PLAN

B-D

these highlighted areas.

BXX001-ZZ-DR-A-0303

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

B-CCAT A work Omitted in

BXX001-ZZ-DR-A-0302

B-A B-Aa B-B 1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to 952 7223 Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

820

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

BXX001-ZZ-DR-A-0302

GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

1

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

N

N

1

B-5 BXX001-ZZ-DR-A-0304

B-5

B-4

1

Sprinkler Riser

09-004

09-R02

Low Voltage Riser 09-005 Stair Lobby 02

1

B-3

09-R05

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306 09-R07

BXX001-ZZ-DR-A-0303

BXX001-ZZ-DR-A-0306

BXX001-ZZ-DR-A-0304

1

BXX001-ZZ-DR-A-0301

9760

Office

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC

DRAWING STATUS GENERAL NOTES

ISO SHEET STATUS

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

03-Proposed Building B - GA Roof Plant Floor Plan PROJECT

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Eden Campus SCALE AT A1:

1 : 100

Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. AT A3: requirements as appointed by the Main Other specialistSCALE design consultant's Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

DRAWING

0m

19064

1: 200

1m

5m

EDC-DAA-BXX001-11-DR-A-0300 1:100

REV. 10m

C04

12m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

KEY PLAN

CAT A work Omitted in these highlighted areas.

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative bleacher arrangement aligned with SE loading zones

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Indicative commercial kitchen equipment aligned with SE loading zones

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

REV P01 P02 P03 P04 P05 P06 P07 P08 C01 C02 C03 C04

NOTES DRAFT ISSUE FOR INFORMATION PURPOSES ONLY STAGE 3 CONTRACT ISSUE STAGE 3 UPDATE CONTRACT ISSUE FINAL CONTRACT ISSUE CONTRACT ISSUE UPDATED STAGE 4 FIRST ISSUE STAGE 4 UPDATES FIRST CONTRUCTION ISSUE CONTRUCTION ISSUE CONSTRUCTION ISSUE UPDATES FINAL ISSUE RECORD

DATE

BY

AUTH

03/12/21

AC

10/12/21 11/02/22 11/03/22 18/03/22 06/04/22 16/08/22 03/10/22 09/11/22 20/01/23 26/05/23 25/10/24

AC AC AC AC AC AC AC AC AC AC AC

18

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03-Proposed Building B - GA Roof Plan PROJECT

Eden Campus SCALE AT A1:

1 : 100

DRAWING

SCALE AT A3:

1: 200

DAA JOB

EDC-DAA-BXX001-R11-DR-A-0300

190

R

C0


Building B GAs 3.5 Building B - Elevations

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

1

1

BXX001-ZZ-DR-A-0305

B-G

B-Ga 952

B-F 7223

BXX001-ZZ-DR-A-0307

B-E 7425

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

B-D 9000

B-C 9000

B-B 7425

7223

952

Structure Grid

B-R2-Building B Roof

B-1 B-2

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual B-R2-Building B Roof

B-Aa B-A

B-3

B-4

B-5

1

BXX001-ZZ-DR-A-0306 820

9760

9740

710

+54.068 m

+54.068 m

0m

1m

5m

10m

12m

3600

3600

1:100

KEY PLAN

B-11-Eleventh Floor

B-11-Eleventh Floor

+50.468 m

3955

3955

+50.468 m

Top of Balustrade +47.713 m

Balustrade +47.713 m

B-10-Tenth Floor

B-10-Tenth Floor

+46.513 m

3913

3913

+46.513 m

NOTES

B-09-Ninth Floor

B-09-Ninth Floor

+42.600 m

+42.600 m

B-08-Eighth Floor

B-08-Eighth Floor

+38.850 m

3

1

3750

3750

+38.850 m

3750

3750

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

IXX001-ZZ-DR-A-0302

IXX001-ZZ-DR-A-0302 Hatch area denotes area to be fire rated with a FR90 shaft wall installed behind glazing to extents shown as per Fire engineer's advice.

B-07-Seventh Floor

3

IXX001-ZZ-DR-A-0302

B-07-Seventh Floor

+35.100 m

3750

3750

+35.100 m

06-001

Bridge Link

B-06-Sixth Floor

B-06-Sixth Floor

+31.350 m

3750

3750

+31.350 m

B-05-Fifth Floor

B-05-Fifth Floor

+27.600 m

3750

3750

+27.600 m

B-04-Fourth Floor

B-04-Fourth Floor

3750

4

IXX001-ZZ-DR-A-0302

FINAL ISSUE RECORD External lighting, Louvres and Equitone panels division added CONSTRUCTION ISSUE UPDATES FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDATED FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY

REV

NOTES

25/10/24 11/06/24 26/05/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 03/03/22 10/12/21 03/12/21

DATE

AC AC AC AC AC AC AC AC B-03-Third Floor AC +20.100 m AC AC AC

BY AUTH

3750

3750

B-03-Third Floor

+20.100 m

C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01

3750

+23.850 m

+23.850 m

B-02

B-02

+16.350 m

3750

3750

+16.350 m

B-01

DRAWING STATUS

+12.600 m

ISO SHEET STATUS

CONSTR. RECORD CR

B-01

+12.600 m

4200

PROJECT

B-00

FFL 7.250 m

SCALE AT A1:

1 : 100

00-009

Reception B-00

Eden Campus

+8.400 m

+8.400 m SCALE AT A3:

1: 200

DRAWING

EDC-DAA-BXX001-ZZ-DR-A-0302

4

IXX001-ZZ-DR-A-0310

4200

TITLE

03-Proposed Building B - GA East Elevation

FFL 7.900 m

DAA JOB NO.

19064 REV.

C04

© Darling Associates Ltd.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

19


Building B GAs 3.6 Building B -Elevations

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

B-A B-Aa

B-B

B-C

B-D

B-E

7223

7425

9000

B-Ga

BXX001-ZZ-DR-A-0305

BXX001-ZZ-DR-A-0307 952

B-F

1

1

9000

7425

Structure Grid

7223

952

B-G

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

B-5

B-3

B-2

1

B-1

BXX001-ZZ-DR-A-0306

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

B-R2-Building B Roof

B-4

710

9740

9760

820

Structure Grid

B-R2-Building B Roof

+54.068 m

0m

1m

5m

10m

12m

+54.068 m

3600

3600

1:100

KEY PLAN

B-11-Eleventh Floor

B-11-Eleventh Floor

+50.468 m

3955

3955

+50.468 m

B-10-Tenth Floor

Top of Balustrade +47.713 m

B-10-Tenth Floor

+46.513 m

3913

3913

+46.513 m

NOTES

B-09-Ninth Floor

B-09-Ninth Floor

+42.600 m

3750

3750

B-08-Eighth Floor

+38.850 m

B-08-Eighth Floor

+38.850 m

3

3750

3750

+42.600 m

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

IXX001-ZZ-DR-A-0302 Hatch area denotes area to be fire rated with a FR90 shaft wall installed behind glazing to extents shown as per Fire engineer's advice.

B-07-Seventh Floor

B-07-Seventh Floor

+35.100 m

3750

3750

+35.100 m

B-06-Sixth Floor

B-06-Sixth Floor

+31.350 m

3750

3750

+31.350 m

B-05-Fifth Floor

B-05-Fifth Floor

+27.600 m

3750

3750

+27.600 m

B-04-Fourth Floor

B-04-Fourth Floor

3750

C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01

B-03-Third Floor

+20.100 m

FINAL ISSUE RECORD External lighting, Louvres and Equitone panels division added CONSTRUCTION ISSUE UPDATES FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDATED FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY

NOTES

DATE

AC AC AC AC AC AC AC AC AC AC AC AC

+23.850 m

B-03-Third Floor

+20.100 m

BY AUTH

4

3750

3750

REV

25/10/24 11/06/24 26/05/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 03/03/22 10/12/21 03/12/21

3750

+23.850 m

IXX001-ZZ-DR-A-0302

B-02

B-02

+16.350 m

3750

3750

+16.350 m

B-01

DRAWING STATUS

+12.600 m

B-01

ISO SHEET STATUS

CONSTR. RECORD CR

+12.600 m

TITLE

4200

4200

03-Proposed Building B - GA West Elevation PROJECT

B-00

+8.400 m

FFL 7.900 m

FFL 7.650 m

FFL 7.875 m

FFL 8.100 m

FFL 8.150 m

Eden Campus SCALE AT A1:

1 : 100

B-00

SCALE AT A3:

1: 200

DRAWING

EDC-DAA-BXX001-ZZ-DR-A-0304

DAA JOB NO.

+8.400 m

19064 REV.

C04

© Darling Associates Ltd.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

20


Building B GAs 3.7 Building B - Sections

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design GENERAL NOTES

B-5

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

B-G

B-Ga 952

B-F 7223

B-E

B-D

7425

9000

B-R2-Building B Roof

+53.724 m

B-B

B-Aa

7425

7223

B-A 952

1

BXX001-ZZ-DR-A-0307

B-3

BXX001-ZZ-DR-A-0305

1

B-2

B-5

B-1

B-4

B-3

B-2 B-1 1

BXX001-ZZ-DR-A-0306

9760

710

820

9740

9760

820 0m

+54.068 m

B-R2-Building B Roof

REV

DATE

Office

Flood void

Sprinkler Tank

3600 3955 3913 950 2800 950 2800 3750 950 2800 950 2800

950

3750

2800 1400

00-001

Reception

TITLE

3750

02-001

Lift Lobby

01-001

Office

Eden Campus 1: 200

DRAWING

EDC-DAA-BXX001-ZZ-DR-A-0306

ISO SHEET STATUS

TITLE

03-Proposed Building B - GA Section A-A

00-002

Lift Lobby

00-001

Reception

PROJECT

Eden Campus 1 : 100

B-00

+8.400 m Flood void

SCALE AT A3:

DRAWING STATUS

CONSTR. RECORD CR Services Zone

SCALE AT A1:

FFL 8.400 m

+8.400 m PROJECT Woodland Walk

1 : 100

SCALE AT A3:

1: 200

DRAWING

Brook Street

EDC-DAA-BXX001-ZZ-DR-A-0305

DAA JOB NO.

© Darling Associates Ltd.

19064 REV.

C04

© Darling Associates Ltd.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

BY AUTH

Services Zone

01-002

4200

00-006

Stair Lobby 01

4200

00-S01

Stair 01

03-Proposed Building BB-00 - GA Section B-B

SCALE AT A1:

DATE

AC AC AC AC AC AC AC AC AC AC AC AC

Office

2800

00-009

Reception

02-002

Lift Lobby

ISO SHEET STATUS

4200

00-001

Reception FFL 8.400 m

+8.400 m

950 3750

3750

3750

01-001

+12.600 m

4200

00-001

Reception

NOTES

25/10/24 26/05/23 20/01/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 04/03/22 10/12/21 03/12/21

Services Zone

B-01

CONSTR. RECORD CR

4200

4200

4200

00-014

Telecommunications

03-001

Office

FINAL ISSUE RECORD CONSTRUCTION ISSUE UPDATES CONTRUCTION ISSUE FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE CONTRACT ISSUE UPDATED FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY

01-006

Stair Lobby 01 Office

DRAWING STATUS

00-012

03-002

Lift Lobby

C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01

B-02

+16.350 m

B-01

Tank Room

950

02-001

+12.600 m

FFL 8.400 m

04-001

Office

Services Zone

REV

Office

Office

+12.600 m

04-002

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Services Zone

02-005

Stair Lobby 01

Stair 01 01-001

Services Zone

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

05-001

Office

B-03-Third Floor

+20.100 m

BY AUTH

3750

01-001

3750

3750

3750

01-001

2800

3750 3750

03-001

Office

01-S01

Office

950 3750

950

Stair Lobby 01 3750

AC AC AC AC AC AC AC AC AC 02-S01 AC Stair 01 AC AC

+16.350 m

B-01

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

Services Zone

03-006

Stair 01

B-02

+16.350 m

2800

950

NOTES

05-002

Lift Lobby

3750

02-001

Office

Services Zone

4200

Office

Indicative commercial kitchen equipment aligned with SE loading zones

06-001

Office

Lift Lobby

3750

02-001

3750

3750

3750

02-001

Office B-02

25/10/24 26/05/23 20/01/23 09/11/22 03/10/22 16/08/22 06/04/22 18/03/22 11/03/22 04/03/22 10/12/21 03/12/21

3750

B-03-Third Floor

+20.100 m

FINAL ISSUE RECORD CONSTRUCTION ISSUE UPDATES CONTRUCTION ISSUE FIRST CONTRUCTION ISSUE STAGE 4 UPDATES STAGE 4 FIRST ISSUE B-03-Third Floor CONTRACT ISSUE UPDATED +20.100 m FINAL CONTRACT ISSUE CONTRACT ISSUE STAGE 3 UPDATE STAGE 3 CONTRACT ISSUE DRAFT ISSUE FOR INFORMATION PURPOSES ONLY

3750

C04 C03 C02 C01 P08 P07 P06 P05 P04 P03 P02 P01

03-001

Office

3750

3750

3750

3750

03-001

Office

06-002

Lift Lobby

B-04-Fourth Floor

+23.850 m 03-S01

03-001

04-001

Office

Water Tank Indicative location for water tank area aligned with SE drawings. Any associated B-04-Fourth Floorcosts for design and integration deviating from the +23.850base m scheme will be subject to a variation.

B-04-Fourth Floor

+23.850 m

Office

Services Zone

04-006

Stair Lobby 01 2800

Office

2800

3750

+27.600 m 04-S01

Stair 01

3750

04-001

Indicative bleacher arrangement aligned with SE loading zones

B-05-Fifth Floor

3750

950

Secondary Equipment Room (SER) Indicative location for occupier SER Room/additional loading area aligned with SE drawings. Any associated costs for design and integration deviating from the base scheme will be subject to a variation.

05-001

Office

3750

Office

Stair Lobby 01

3750

Office

2800

950

04-001

2800

04-001

Services Zone

Services Zone

05-006

Main Equipment Room (MER) Indicative location for occupier MER Room/additional loading area aligned with SE drawings. Location identified for future space/variation. Any associated costs for design and integration B-05-Fifth Floor deviating from the base scheme will be subject to a variation. +27.600 m

B-05-Fifth Floor

+27.600 m

3750

05-S01

3750

2800

05-001

Office

07-001

Office

B-06-Sixth Floor

+31.350 m

commercial +31.350Indicative m kitchen equipment aligned with SE loading zones

950

950 2800

3750

05-001

Office

1200 2800

06-001

Office

2800

3750

3750

3750

Stair Lobby 01

Stair 01 05-001

Office

950

Lift Lobby

B-06-Sixth Floor

Services Zone

07-002

Services Zone

Services Zone

1. For Landscape design refer to Landscape Architect's documentation 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. 4. Drawing to be read in conjunction with Fire Strategy Report, Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

06-006

Stair 01

3750

3750

3750

3750

B-06-Sixth Floor

+31.350 m

Top of Balustrade +47.713 m

B-07-Seventh Floor

Indicative bleacher arrangement aligned with SE loading zones

06-001

Office

950

Office +35.100 m

06-S01

06-001

Office

Services Zone

08-001

Office

2800

07-001

B-07-Seventh Floor

06-001

2800

3750

07-006

Stair Lobby 01

+35.100 m

Office

1155 3913

3913 950 2800

Lift Lobby

2800

+35.430 m

08-002

Services Zone

950

Office

Services Zone

950

3750

3750

Office

B-07-Seventh Floor

+35.100 m

09-001

Office

B-08-Eighth Floor

+38.850 m

2800

Office

07-001

Office

Services Zone 3750

950

07-001

2800

3750

07-001

08-001

950

Office

Services Zone

Services Zone

08-006

Stair Lobby 01

3750

3750

3750

Office

B-08-Eighth Floor

+38.850 m

+42.600 m

+42.600 m

1. For Landscape design refer to Landscape Architect's 08-S01 documentation Stair 01 2. For Structural elements and flood void details refer to Structural Engineer's documentation. 3. For M&E elements refer to Services Engineer's documentation. B-08-Eighth Floor in conjunction with Fire Strategy Report, 4. Drawing to be read +38.850 m Acoustic Report and Glare report. 5. Drawing to be read in conjunction with all Stage 5 DAA07-S01 Stair 01 documentation. 6. GA Elevations and Sections to be read in conjuction with Facade Consultants' drawings

2800

Office

08-001

09-002

Lift Lobby

B-09-Ninth Floor

B-09-Ninth Floor

3750

950

08-001

2800

3750

Services Zone

Terrace

NOTES

09-001

Office NOTES

08-001

Stair Lobby 01

Office

B-09-Ninth Floor

+42.600 m

3913

09-001

Services Zone

10-007

10-001

Office

09-006

Stair 01

3913

09-001

Office

Lift Lobby

B-10-Tenth Floor

+46.513 m

3913

3913

3913

09-001

10-002

2800

Top of Balustrade +47.713 m

10-007

Terrace

+46.513 m

Office

Services Zone

1113

3955

10-001

Office B-10-Tenth Floor

09-S01

B-00

3955

3955

10-001

Office

+46.513 m

Woodland Walk

Stair Lobby 01

1200

10-001

Office

12m

10-006

Stair 01

3955

3955

4005

3955

10-001

Office B-10-Tenth Floor

10m

B-11-Eleventh Floor

+50.468 m

10-S01

5m

11-001

Stair Lobby 01

KEY PLAN B-11-Eleventh Floor +50.468 m

+50.468 m

3600

12m

11-S01

Stair 01

3600

10m

3600

5m

1:100

B-11-Eleventh Floor

1m

1:100

+54.068 m

KEY PLAN

2648

1m

3600

0m

3600

3600

3550

+52.524 m

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

BXX001-ZZ-DR-A-0306

953

+54.068 m

B-C 9000

1

B-4

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. 710 9740 Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. B Roof Other specialistB-R2-Building design consultant's requirements as appointed by the Main Contractor. Other specialist +54.068 mrequirements as appointed by the Main Contractor. design sub-contractor's P = Preliminary C = Contractual

GENERAL NOTES

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG for Structure, HAL for Services and Clarke for Facade design

21

DAA JOB NO.

19064 REV.

C04


4

BUILDING C GA S

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

22


1

CXX001-ZZ-DR-A-0304

N

Building C GAs 4.1 Building C - GF Plan

1

CXX001-ZZ-DR-A-0302 Parking Schedule ALL Cars Description 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 22KW Electric Parking Bay Regular Parking Bay Regular Parking Bay Regular Parking Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay Regular Parking Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay 7KW Electric Wheelchair Accessible Bay 22KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay 7KW Electric Parking Bay Regular Parking Bay Wheelchair Accessible Bay Regular Parking Bay Grand total: 355

03

C-E

Ground Floor (Mezz) Parking

FFL 10.271 m

1:80

1:80

1:80

1:80

1:22

AXX00

1

1-ZZ -DR-A -03

Woodland Walk Lobby FFL 7.700 m

Core 1 Lobby

C-D

1:13

1:13

1:12

FFL 10.244 m

FFL 10.244 m

1192

FFL 10.065 m

1:12

FFL 10.237 m

Woodland Walk Lobby

FFL 10.220 m

1200

1:80

FFL 10.037 m

1:80

Core 2 Lobby Service shaft 2

Void over Cycle Store

C-C 1

1

Stair 1 Shaft

FFL 7.710 m

1:6

1:6

Core 1 - L00 Lift Lobby FFL 7.980 m

Unisex WC

Thermal Stores

1020

CXX001-ZZ-DR-A-0305

1

FFL 7.710 m

FFL 8.010 m

FFL 7.960 m

Stair 2 Shaft

Plant Corridor

CXX001-ZZ-DR-A-0306

Cold Water Tank

CXX001-ZZ-DR-A-0301

Level C-01 C-01 C-01 C-01 C-01 C-02 C-02 C-02 C-02 C-02 C-03 C-03 C-03 C-03 C-03 C-04 C-04 C-04 C-04 C-04 C-05 C-05 C-05 C-06 C-M0 C-M1 C-M1 C-M1 C-M2 C-M2 C-M2 C-M2 C-M2 C-M3 C-M3 C-M3 C-M3 C-M4 C-M4 C-M4 C-M4 C-M4 C-M5 C-M5 C-M5 C-M6

Count 7 1 4 15 2 7 1 2 18 2 7 1 2 17 2 7 1 2 17 2 10 2 18 30 2 8 1 21 9 1 2 15 2 9 1 17 2 9 1 4 13 2 12 14 3 30

FFL 8.492 m

Unisex Changing

FFL 7.985 m

FFL 8.310 m

1:25

FFL 7.960 m

1220

IRON

C-B

FFL 7.710 m

Life Safety Switch Room

Core 2 - Final Exit (External)

Switch Room

FFL 8.350 m

Changing Circulation

Changing Circulation

Entrance / Exit Ramp

1:13

Front Lobby

1:13

FFL 8.310 m FFL 7.960 m

[No Slope]

[No Slope] FFL 7.710 m

Store room

1400

IRON

UKPN Ring Main Unit

1935

Unisex Changing

1425

FFL 7.745 m 1:16

C-A

C-2

C-3

C-4

CXX001-ZZ-DR-A-0303

1

FFL 7.728 m

C-1

Generator Room

Female Changing

Male Changing FFL 7.750 m

FFL 7.750 m

Up

FFL 7.710 m

1:16

Comms room

Cleaner's Store

Transformer Room

IRON

1:14

1:14

1120

C-5

C-6

C-7

C-8

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

GENERAL NOTES

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

Eden Campus, Kingston Upon Thames KT10m 1m 1:100 Practical Completion document

5m

10m

12m

KEY PLAN

REV

NOTES

DATE

P01 P02

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue, incorporating minor layout amendments First Construction Issue & GFL Revision to show amended parking layout Stage 5 Upates FINAL ISSUE RECORD

19/08/22 23/09/22

AC AC

13/10/22

AC

P03 P04 C01 C02 C03 C04

BY

AUTH

DRAWING STATUS

ISO SHEET STATUS

CONSTR. RECORD CR TITLE

03/11/22

AC

16/01/23

AC

03-Proposed Building C-Ground Floor Plan & Mezzanine

25/01/23

AC

PROJECT

05/10/23 25/10/24

AC

Eden Campus SCALE AT A1:

1 : 100

DAA JOB NO.

SCALE AT A3:

1: 200

DRAWING

23

EDC-DAA-CXX001-00-DR-A-0300 © Darling Associates Ltd.

19064 REV.

C04


2

C-E

7kW EV - Accessible

01-Z

1:80

1:80

1:12

1:12

FFL 15.925 m

Core 2 Lobby Service shaft 2

Regular

AXX0

Regular

FFL 14.533 m

7kW EV - Regular 22kW EV - Regular

CXX001-ZZ-DR-A-0306

FFL 14.531 m

Service shaft 1

C-B

Motorcycle, Regular

Flue

1:6

1 FFL 14.532 m

Stair 2 Shaft

1:12

Core 1 Lift Lobby

4

1:12

1:12

1

CXX001-ZZ-DR-A-0305

Stair 1 Shaft

FFL 14.550 m

22KW Electric Parking Bay

Core 2 Lobby FFL 14.550 m

Second Floor Parking

1:80

FFL 11.800 m

1:6

Riser

CXX001-ZZ-DR-A-0301

Motorcycle, Regular

Core 2 Lobby 1:80

1

15

Motorcyle Space Types

Service shaft 1

FFL 11.778 m

First Floor Parking

1:6

C-C

1:80

FFL 11.786 m

1:80

FFL 15.906 m

36

7KW Electric Parking Bay

22kW EV - Regular

1 FFL 11.779 m

CXX001-ZZ-DR-A-0306

Stair 2 Shaft

1:12

1:12

1:12

Regular Parking Bay

7kW EV - Regular

1:6

1:6

CXX001-ZZ-DR-A-0305

Stair 1 Shaft

C-B

1:12

1:12

FFL 13.175 m

FFL 15.907 m

Riser

CXX001-ZZ-DR-A-0301

Core 1 Lift Lobby FFL 11.800 m

Core 1 Lift Lobby FFL 15.925 m

Core 2 Lobby

1:6

1

Riser

1

7kW EV - Accessible

Regular Car Parking Space Types

1:12

1:12

Riser

Second Floor Mezz Parking

FFL 15.904 m

FFL 13.154 m

Service shaft 2

C-C

2

C-D

FFL 13.154 m

FFL 13.154 m

Core 1 Lift Lobby FFL 13.175 m

7KW Electric Wheelchair Accessible Bay

1:80

1:80

First Floor (Mezz) Parking

Z-DRA-03

03

1

Z-DRA-03

01-Z AXX0

C-D

1

Standard - Accesible

1 Wheelchair Accessible Bay

1

CXX001-ZZ-DR-A-0302

03

C-E

CXX001-ZZ-DR-A-0304

Wheelchair Accessible Car Parking Space Types

1

CXX001-ZZ-DR-A-0302

Standard - Accesible

1

CXX001-ZZ-DR-A-0304

N

Building C GAs 4.2 Building C - L01 - L04

Flue

Grand total: 59

Electrical riser

C-3

C-4

C-6

C-7

C-1

C-8

C-5

C-6

C-7

C-8

19/08/22 23/09/22

Z-DRA-03

C02

TITLE

Wheelchair 4 building regulations and otherAccessible statutory Bay requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

13/10/22

AC

03/11/22

AC

25/01/23

AC

03-Proposed Building C-First Floor Plan & Mezzanine

25/10/24

AC

PROJECT

Eden Campus

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

As indicated

0m

DRAWING

01-Z

AXX0

SCALE AT A1:

12m

REV

KEY PLAN

NOTES

DATE

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue & GFL Revision to show amended parking layout C02 FINAL ISSUE RECORD

C-E

BY

AUTH

1: 200

0m

REV.

5m

10m

AC AC

13/10/22

AC

03/11/22

AC

25/01/23

AC

03-Proposed Building C-Second Flo

25/10/24

AC

PROJECT

Eden Campus SCALE AT A1:

Core 2 Lobby

1:80

1:12

Regular 7kW EV - Regular

1:6

25

22kW EV - Regular

Stair 2 Shaft

CXX001-ZZ-DR-A-0306

1 FFL 22.782 m

FFL 22.781 m

FFL 22.779 m

Service shaft 1

C-B

1500

Fifth Floor Parking

Motorcycle, Regular

Flue

1:6

1:6

Core 1 Lift Lobby FFL 22.800 m

1:12

1

Stair 1 Shaft

2

1:12

CXX001-ZZ-DR-A-0305

22KW Electric Parking Bay

Motorcycle, Regular

Core 2 Lobby FFL 17.300 m

1:80

1:80

C-B

Riser

1

CXX001-ZZ-DR-A-0301

Motorcyle Space Types

Service shaft 1

Third Floor Parking

16

1:80

FFL 17.281 m

C-C

7KW Electric Parking Bay

1:80

FFL 17.283 m

22kW EV - Regular

1 1:12

1:12 FFL 17.282 m

Stair 2 Shaft

CXX001-ZZ-DR-A-0306

Stair 1 Shaft 1:12

1

CXX001-ZZ-DR-A-0301

Core 1 Lift Lobby FFL 17.300 m

Service shaft 2

1:12

Regular 7kW EV - Regular

1:6

Riser

FFL 24.175 m

Core 2 Lobby

34

Riser

1:6

1:6

Riser

C-C

Regular Parking Bay

FFL 24.154 m

FFL 24.157 m

FFL 24.175 m

Service shaft 2

CXX001-ZZ-DR-A-0305

Core 1 Lift Lobby

1:12

Regular Car Parking Space Types

FFL 18.675 m

1:12

1:12

1:12

1:12

FFL 24.157 m

FFL 18.656 m

FFL 18.675 m

1

Fifth Floor Mezz Parking

C-D

FFL 18.657 m

1:

EDC-DAA-CXX

C02

1:80

1:80 FFL 18.654 m

Core 1 Lift Lobby

SC

DRAWING

12m

© Darling Associates

1:80

Third Floor Mezz Parking

TITLE

As indicated

© Darling Associates Ltd.

C-D

CONSTR. RE

19/08/22 23/09/22

P03

19064

1m

DRAWING STATUS

P01 P02

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, 7KW Electric Wheelchair Accessible Bay 2Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

EDC-DAA-CXX001-01-DR-A-0300 1:100

1:100

1

CXX001-ZZ-DR-A-0302

03

03

C01

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm

1

P04

GENERAL NOTES ISO SHEET STATUS

unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any CONSTR. RECORD CR discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the

01-Z

P03

AC AC

DRAWING STATUS

Standard - Accesible

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD

AUTH

7kW EV - Accessible

P01 P02

BY

1

DATE

CXX001-ZZ-DR-A-0304

N

NOTES

Z-DRA-03

REV

Standard - Accesible

KEY PLAN

C-E

10m

C-4

Wheelchair Accessible Car Parking Space Types

1

CXX001-ZZ-DR-A-0302

7kW EV - Accessible

1

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

5m

C-3

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services CXX001-ZZ-DR-A-0304

GENERAL NOTES

C-2

CXX001-ZZ-DR-A-0303

1 C-5

AXX0

C-2

CXX001-ZZ-DR-A-0303

1 C-1

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

1

NO

C-A

C-A

1m

Electrical riser

NOTE: Refer to HALSION drawings for EV Chargers Type and positioning

Core 2 Lobby

FFL 22.800 m

Flue

Grand total: 58

NO

NOTE: Refer to HALSION drawings for EV Chargers Type and positioning

Electrical riser

Electrical riser

C-2

C-3

C-4

1 C-5

C-6

C-7

C-1

C-8

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and

NOTES

C-3

C-4

C-5

C-6

C-7

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

GENERAL NOTES

C-2

CXX001-ZZ-DR-A-0303

CXX001-ZZ-DR-A-0303

1 C-1

0

C-A

C-A

KEY PLAN

REV

NOTES

DATE

P01 P02

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD

19/08/22 23/09/22

AC AC

CONSTR. RECORD CR

13/10/22

AC

TITLE

03/11/22

AC

25/01/23

AC

03-Proposed Building C-Third Floor Plan & Mezzanine

25/10/24

AC

PROJECT

P03 P04 C01 C02

BY

AUTH

DRAWING STATUS

Eden Campus

GENERAL NOTES ISO SHEET STATUS

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and

NOTES

C-8

KEY PLAN

REV P01 P02

NOTES

24

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location P03 Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue & GFL Revision to show amended parking layout C02 FINAL ISSUE RECORD

DATE

BY

AUTH

DRAWING STATUS

CONSTR. RE

19/08/22 23/09/22

AC AC

13/10/22

AC

03/11/22

AC

25/01/23

AC

03-Proposed Building C-Fifth Floor P

25/10/24

AC

PROJECT

TITLE

Eden Campus


1 C-E

AXX0

01-Z

1

7kW EV - Accessible

Sixth Floor Mezz Parking

FFL 26.907 m

FFL 26.900 m

Regular Car Parking Space Types

FFL 26.925 m

1:12

1:12

FFL 25.531 m

FFL 25.529 m

1 Service shaft 1

Motorcycle, Regular

1:80

1:80

Sixth Floor Parking

Stair 2 Shaft

FFL 28.300 m

Motorcyle Space Types

Service shaft 1

C-B

Stair 1 Shaft Core 1 Lift Lobby

Core 2 Lobby FFL 25.550 m Flue

Core 2 Lobby FFL 28.300 m

C-B

Flue

Grand total: 60

PV Array Roof L07 Electrical riser

Electrical riser

1

1

C-5

C-6

C-7

C-4

C-5

C-6

C-7

C-8

1 19/08/22 23/09/22

AC AC

CONSTR. RECORD CR

13/10/22

AC

TITLE

1

66 66

L LL L

H HH

L LL L

HH H

66 66

L LL L

HH H

HH H

L LL L

HH H

L LL L

HH H

66 66

L LL L

L LL L

HH H

L LL L

HH H

L LL L

HH H

HH H

66 66

L LL L

H HH

L LL L

66 66

L LL L

L LL L

HH H

HH H

HH H

66 66

L LL L

L LL L

HH H

L LL L

L LL L

HH H

HH H

66 66

L LL L

L LL L

L LL L

HH H

H HH

HH H

66 66

L LL L

HH H

HH H

L LL L

HH H

66 66

L LL L

HH H

L LL L

L LL L

HH H

L LL L

HH H

66 66

L LL L

L LL L

L LL L

HH H

H HH

66 66

L LL L

L LL L

HH H

HH H

55 55

L LL L

L LL L

HH H

CORE - 12

CORE - 10

L LL L

L LL L

CORE - 12

AXX0

HH H

HH H

CORE - 12

HH H

CORE - 12

HH H

HH H

CORE - 12

CORE - 10

AC

PROJECT

Eden Campus

SC

1:

22 22

L LL L

HH HH

66 66

HH HH

L LL L

HH HH

L LL L

HH HH

L LL L

HH HH

66 66

L LL L

HH HH

L LL L

HH HH

L LL L

HH HH

66 66

HH HH

HH

L LL L

HH HH

L LL L

22 22 HH

L LL L

HH HH

66 66

L LL L

HH HH

L LL L

HH HH

HH HH

L LL L

66 66

L LL L

L LL L

HH HH

L LL L

HH HH

66 66

L LL L

L LL L

HH HH

HH HH

66 66

L LL L

L LL L

L LL L

HH HH

HH HH

L LL L

66 66

L LL L

L LL L

HH HH

HH HH

L LL L

66 66

HH HH

CORE - 12

L LL L

HH HH

CORE - 12

HH HH

CORE - 12

L LL L

HH HH

CORE - 12

HH HH

CORE - 12

CORE - 12

66 66

HH HH

CORE - 12

CORE - 12

CORE - 12

L LL L

CORE - 12

HH HH

HH HH

CORE - 12

L LL L

CORE - 12

HH HH

L LL L

CORE - 12

L LL L

CORE - 12

HH HH

CORE - 4

CORE - 4

CORE - 12

L LL L

CORE - 12

66 66

L LL L

CORE - 12

CORE - 12

L LL L

CORE - 12

CORE - 12

HH HH

CORE - 12

L LL L

940 940

CORE - 12

Single Tier Cycle Store

Core 2 Lobby - LG FFL 7.200 m

Service shaft 2

FFL 6.635 m SSL 35.425 m

TOC 4.865 m

Rainwater Harvesting

Stair 1 Shaft

SSL 7.200 m

(Flood void grille)

FFL 7.200 m

C-C

Stair 2 Shaft

CXX001-ZZ-DR-A-0305

1

TOC 6.215 m

CXX001-ZZ-DR-A-0301

1

FLOOD VOID

SSL 7.200 m

SSL 7.200 m

CXX001-ZZ-DR-A-0306

1

1

25/10/24

TITLE

CORE - 4

HH HH

CORE - 4

940 940

(Flood void grille)

CXX001-ZZ-DR-A-0306

AC

Bike Repair Station & Pump

Single Tier Cycle Store

FFL 6.648 m

1

25/01/23

03-Proposed Building C-Seventh Flo

© Darling Associates FFL 7.200 m

Core 1 Lift Lobby FFL 6.635 m

CXX001-ZZ-DR-A-0305

AC

Bike Repair Station Bike Repair Station && Pump Pump

Woodland Walk Lobby

CXX001-ZZ-DR-A-0301

03/11/22

EDC-DAA-CXX

1:102

FFL 6.635 m FFL 6.635 m

1

CONSTR. RE

AC

SINGLE TIER BIKE ROOM TOTAL: 74

C-D

C-C

DRAWING STATUS

AC AC

DRAWING

30no. Shef f ield Stand (60no. s paces) 2no. Sheff ield Stand with Rail 12no. Secure Vertical 1no. Bike Repair Station + Pump

C-D

AUTH

150 150

C02

© Darling Associates Ltd.

Cycle Entrance (External)

BY

13/10/22

1 : 100

12m

CORE - 12

10m

CORE - 12

REV. 5m

CORE - 12

1m

CORE - 12

0m

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue & GFL Revision to show amended parking layout C02 FINAL ISSUE RECORD

Cycle Stacker Store

CORE - 12

03

03

Z-DRA-03

01-Z

FFL 7.200 m

DATE 19/08/22 23/09/22

P03

SCALE AT A1:

19064

CORE - 12

1: 200

CORE - 12

Z-DRA-03

1:27

NOTES

P01 P02

1:109

FFL 6.635 m

CORE - 12

01-Z

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAA JOB NO. as appointed by the Main Contractor. Other specialist Other specialist design consultant's requirements design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

CORE - 12

AXX0

55 55

HH H

CORE - 10

LL L

HH H

LL L

66 66

HH H

HH H

66 66

6 66

6 6

6 6

6 6

6 6

6 6

6 6

6 6

66 66

HH

LL

HH

LL

HH

LL

HH

HH

HH

LL

LL

HH

HH

LL

HH

LL

LL

HH

LL

LL

HH

LL

HH

LL

HH

HH

LL

HH

LL

HH

LL

HH

LL

HH

LL

HH

LL

HH

HH

LL

LL

LL

HH

HH

HH

LL

LL L

CORE - 12

FFL 6.905 m

CORE - 10

LL L

CORE - 12

HH H

CORE - 12

HH H

CORE - 12

LL L

CORE - 12

LL L

CORE - 12

HH H

CORE - 12

HH H

CORE - 12

LL L

CORE - 12

LL

HH

HH

HH

LL

LL

SCALE AT A3:

EDC-DAA-CXX001-06-DR-A-0300 1:100

1:100

CORE - 12

LL

DRAWING

12m

6 6

0m

HH

Eden Campus As indicated

LL

PROJECT

CORE - 12

LL

AC

HH

25/10/24

REV

KEY PLAN

CORE - 12 CORE - 12

LL

AC

HH

AC

25/01/23

1

CXX001-ZZ-DR-A-0302

C-E

LL

03/11/22

03-Proposed Building C-Sixth Floor Plan & Mezzanine

SCALE AT A1:

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that Woodland Walk Lobby are required appertaining to such information should be sought from the relevant profession or their FFL 6.590 m appointment representative.

HH

C02

DRAWING STATUS

LL L

P04 C01

AUTH

CORE - 12

1

CXX001-ZZ-DR-A-0304

N

DATE

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD

CORE - 12

CXX001-ZZ-DR-A-0304

NOTES

P01 P02 P03

BY

GENERAL NOTES ISO SHEET STATUS

REV

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 10m

C-3

CORE - 12

KEY PLAN

C-E

5m

C-2

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

CORE - 12

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

1

C-1

C-8

CORE - 12

GENERAL NOTES

CXX001-ZZ-DR-A-0303

C-4

CORE - 12

C-3

CORE - 12

C-2

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

CORE - 12

C-1

CXX001-ZZ-DR-A-0303

C-A

C-A

1m

CXX001-ZZ-DR-A-0306

1:12

1:12

1:12 FFL 25.532 m

Stair 2 Shaft

Riser

CXX001-ZZ-DR-A-0301

1

1

Stair 1 Shaft Core 1 Lift Lobby

1

22kW EV - Regular

CXX001-ZZ-DR-A-0305

CXX001-ZZ-DR-A-0301

CXX001-ZZ-DR-A-0306

Riser

FFL 25.550 m

60

C-C

7kW EV - Regular

1:6

1:6

1

Regular Parking Bay

Riser

1:6

Riser

Core 2 Lobby

Roof garden

Service shaft 2

Regular

Service shaft 2

C-C

FFL 30.150 m

Core 1 Lift Lobby FFL 30.150 m

Core 2 Lobby

CXX001-ZZ-DR-A-0305

1:12

FFL 26.900 m

Core 1 Lift Lobby FFL 26.925 m

C-D

1:80

1:80

C-D

Z-DRA-03

03 Z-DRA-03

AXX0

01-Z

1

1

CXX001-ZZ-DR-A-0302

03

C-E

1

CXX001-ZZ-DR-A-0304

Wheelchair Accessible Car Parking Space Types

1

CXX001-ZZ-DR-A-0302

Standard - Accesible

1

CXX001-ZZ-DR-A-0304

N

Building C GAs 4.3 Building C - L05 - L07, LG

FLOOD VOID

C-B

Flood flow structural openings/ detail to be considered

SSL 7.200 m

C-B

FLOOD VOID Capacity Here to be explored with detail design of ramp

SSL 6.645 m

C-1

C-2

C-3

C-4

1 C-5

C-6

C-7

C-8

C-1

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

NOTES

C-3

C-4

C-5

C-6

C-7

KEY PLAN

REV

NOTES

DATE

P01 P02

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location Revised to show resolved Riser Plan & Lift Shaft Abeyance Issued to show revised levels, and agreed riser & lift well sizes. FINAL ISSUE RECORD

19/08/22 23/09/22

AC AC

13/10/22

AC

03/11/22

AC

25/10/24

AC

P03 P04 C01

BY

AUTH

DRAWING STATUS

GENERAL NOTES

ISO SHEET STATUS

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD CRshall be checked on site prior to commencing the works and any unless otherwise stated. All dimensions TITLE

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

03-Proposed Building C-Roof Plan PROJECT

NOTES

C-8

25

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

GENERAL NOTES

C-2

CXX001-ZZ-DR-A-0303

CXX001-ZZ-DR-A-0303

C-A

1

C-A

FLOOD VOID

KEY PLAN

REV P01 P02

NOTES

Initial Stage 3 Issue Drawings Revised to Show Revised Plant Layouts, Cycle Store & Dry-riser location P03 Revised to show resolved Riser Plan & Lift Shaft Abeyance P04 Issued to show revised levels, and agreed riser & lift well sizes. C01 First Construction Issue, incorporating minor layout amendments C02 Stage 5 Upates

DATE

BY

AUTH

19/08/22 23/09/22

AC AC

13/10/22

AC

03/11/22

AC

16/01/23

AC

05/10/23

DRAWING STATUS

ISO

CONSTR. RECORD C TITLE

03-Proposed Building C-Lower Ground Floor Plan PROJECT


Building C GAs 4.4 Building C - Elevations

C-8

C-7

C-6

C-5

C-4

C-3

C-2

C-E

C-1

C-D

C-C

C-B

C-A

Parapet +35.375 m

32.765 m

C-R7-Building C Roof

C-R7-Building C Roof

+32.500 m

C-R7-Building C Roof

+32.500 m

C-R7-Building C Roof

+32.500 m

+32.500 m

C-M7-Mezzanine above Seventh Floor

C-M7-Mezzanine above Seventh Floor

+30.150 m

+30.150 m

C-07-Seventh Floor

C-07-Seventh Floor

+28.300 m

+28.300 m

C-M6-Mezzanine above Sixth Floor

C-M6-Mezzanine above Sixth Floor

+26.925 m

+26.925 m

C-06-Sixth Floor

C-06-Sixth Floor

+25.550 m

+25.550 m

C-M5-Mezzanine above Fifth Floor

C-M5-Mezzanine above Fifth Floor

+24.175 m

+24.175 m

C-05-Fifth Floor

C-05-Fifth Floor

+22.800 m

+22.800 m

C-M4-Mezzanine above Fourth Floor

C-M4-Mezzanine above Fourth Floor

+21.425 m

+21.425 m

C-04-Fourth Floor

C-04-Fourth Floor

+20.050 m

+20.050 m

C-M3-Mezzanine above Third Floor

C-M3-Mezzanine above Third Floor

+18.675 m

+18.675 m

C-03-Third Floor

C-03-Third Floor

+17.300 m

+17.300 m

C-M2-Mezzanine above Second Floor

C-M2-Mezzanine above Second Floor

+15.925 m

+15.925 m

C-02-Second Floor

C-02-Second Floor

+14.550 m

+14.550 m

C-M1-Mezzanine above First Floor

C-M1-Mezzanine above First Floor

+13.175 m

+13.175 m

C-01-First Floor

C-01-First Floor

+11.800 m

+11.800 m

C-M0-Mezzanine above Ground Floor

C-M0-Mezzanine above Ground Floor

+10.040 m

+10.040 m

C-00-Ground Floor

C-00-Ground Floor

+8.310 m

+8.310 m

TOF +7.710 m

TOF +7.560 m

TOF +7.560 m

C-LG-Lower Ground

+6.635 m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

GENERAL NOTES

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

1m

5m

10m

REV

KEY PLAN

C01 C02 C03 C04

C-1

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 0m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

C-2

C-3

C-4

C-5

C-6

NOTES

DATE

STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD

C-7

BY

12/06/23 18/07/23 12/10/23 25/10/24

AUTH AC AC AC AC

C-8

DRAWING STATUS

ISO SHEET STATUS GENERAL NOTES

TITLE

03-Proposed Building C - East Elevation - GA PROJECT

Eden Campus SCALE AT A1:

Parapet +35.425 m

SCALE AT A3:

1 : 100

1: 200

DRAWING

12m

1:100

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

REV

KEY PLAN

C-A

C-B

C-C

C-D

C01 C02 C03 C04

C-E

NOTES STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD

DATE

BY

12/06/23 18/07/23 12/10/23 25/10/24

AUTH AC AC AC AC

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. DAArequirements JOB NO. as appointed by the Main Contractor. Other specialist Other specialist design consultant's design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

19064

0m

1m

EDC-DAA-CXX001-ZZ-DR-A-0304 1:100

Parapet +32.740 m

NOTES

drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD The CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any

REV. 5m

10m

C04

12m

© Darling Associates Ltd.

C-R7-Building C Roof

C-R7-Building C Roof

+32.500 m

C-R7-Building C Roof

+32.500 m

C-R7-Building C Roof

+32.500 m

+32.500 m

Parapet +30.850 m

C-M7-Mezzanine above Seventh Floor

C-M7-Mezzanine above Seventh Floor

+30.150 m

+30.150 m

C-07-Seventh Floor

C-07-Seventh Floor

+28.300 m

+28.300 m

C-M6-Mezzanine above Sixth Floor

C-M6-Mezzanine above Sixth Floor

+26.925 m

+26.925 m

C-06-Sixth Floor

C-06-Sixth Floor

+25.550 m

+25.550 m

C-M5-Mezzanine above Fifth Floor

C-M5-Mezzanine above Fifth Floor

+24.175 m

+24.175 m

C-05-Fifth Floor

C-05-Fifth Floor

+22.800 m

+22.800 m

C-M4-Mezzanine above Fourth Floor

C-M4-Mezzanine above Fourth Floor

+21.425 m

+21.425 m

C-04-Fourth Floor

C-04-Fourth Floor

+20.050 m

+20.050 m

C-M3-Mezzanine above Third Floor

C-M3-Mezzanine above Third Floor

+18.675 m

+18.675 m

C-03-Third Floor

C-03-Third Floor

+17.300 m

+17.300 m

C-M2-Mezzanine above Second Floor

C-M2-Mezzanine above Second Floor

+15.925 m

+15.925 m

C-02-Second Floor

C-02-Second Floor

+14.550 m

+14.550 m

C-M1-Mezzanine above First Floor

C-M1-Mezzanine above First Floor

+13.175 m

+13.175 m

C-01-First Floor

C-01-First Floor

+11.800 m

C-01-First Floor

+11.800 m

+11.800 m

C-M0-Mezzanine above Ground Floor

C-M0-Mezzanine above Ground Floor

+10.040 m

+10.040 m

C-00-Ground Floor

C-00-Ground Floor

+8.310 m

C-LG-Lower Ground

+6.635 m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued.

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and

C-LG-Lower Ground

+6.635 m

Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services Eden Campus, Kingston Upon Thames KT1 Practical Completion document

GENERAL NOTES

+8.310 m

C-LG-Lower Ground

NOTES

+6.635 m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

KEY PLAN

REV C01 C02 C03 C04

NOTES STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD

DATE 12/06/23 18/07/23 12/10/23 25/10/24

BY

AUTH AC AC AC AC

DRAWING STATUS

ISO SHEET STATUS GENERAL NOTES

drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm CONSTR. RECORD The CR unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any TITLE

03-Proposed Building C - West Elevation - GA PROJECT

Eden Campus

discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and

NOTES

KEY PLAN

26

REV C01 C02 C03 C04

NOTES

STAGE 5 INITIAL ISSUE Revised to show Levels & Grids CHANGE TO BRICK BANDING FINAL ISSUE RECORD

DATE 12/06/23 18/07/23 12/10/23 25/10/24

BY

AUTH AC AC AC AC


Building C GAs 4.5 Building C - Sections

C-1

C-2

C-3

C-4

C-5

C-6

C-7

C-8 C-E

SSL 35.350 m

C-D

C-C

C-B

C-A

USL 35.100 m SSL 32.600 m

Flowcrete screed to falls SSL 32.600 m

Flowcrete screed to falls

TOU 32.750 m

4950

C-R7-Building C Roof

225

C-M7-Mezzanine above Seventh Floor

C-M7-Mezzanine above Seventh Floor TOS +29.785 m

+30.150 m

+30.150 m

Ramp Down Route

Core 1 Riser A

Ramp Up and Down Routes

Fourth Floor Parking

Fourth Floor Parking

C-M4-Mezzanine above Fourth Floor

+21.425 m

Ramp Down Route

+20.050 m

Third Floor Parking

Third Floor Parking

C-M3-Mezzanine above Third Floor

+18.675 m

Ramp Down Route

+17.300 m

Second Floor Parking

C-M2-Mezzanine above Second Floor

C-M1-Mezzanine above First Floor DryRiser-1

Ramp Up Route

First Floor Parking

Ramp Up and Down Routes

First Floor Parking

Unisex WC

Unisex Changing

Unisex Changing

Entrance / Exit Ramp

Unisex Changing

SSL 8.010 m

Stair 1 Shaft

C-M0-Mezzanine above Ground Floor Thermal Stores SSL 8.310 m

+10.040 m

Flood Void

Flood Void

Flood Void

C-LG-Lower Ground

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services

NOTES

The drawing is copyright of Darling Associates. This drawing shall not be scaled. All dimensions are in mm unless otherwise stated. All dimensions shall be checked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the building regulations and other statutory requirements. All materials and workmanship shall conform with the relevant British Standard specifications and codes of practice. If this drawing forms part of an application for planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative.

Heights (Above Ordnance Datum) Key: TOS = Top of Slab / Top of Structural Screed TOU = Top of Upstand TOW = Top of Wall SSL = Structural Slab Level USL = Underside Soffit Level FFL = Finished Floor Level

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual 5m

10m

12m

1:100

?

2750

1:80

+14.531 m

C-02-Second Floor

+14.550 m

+13.156 m

1:12

1:6

First Floor Parking 1:80

C-01-First Floor

+11.800 m

+10.244 m

1:13

Entrance / Exit Ramp 1:12

+8.350 m

1:16

Flood Void

Flood Void

C-00-Ground Floor

+7.875 m

+8.310 m

C-LG-Lower Ground

+6.635 m

GENERAL NOTES

C-03-Third Floor

+17.300 m

+15.906 m

1:6

Cycle Store

3405

Stair 2 Shaft FFL 7.155 m FFL 6.635 m

1m

Ground Floor (Mezz) Parking 1:80

C-M0-Mezzanine above Ground Floor

+10.040 m

Cold Water Tank

C-00-Ground Floor Flood Void

1:80

+17.281 m

1:12 +11.785 m

+8.310 m

0m

1:80

3135

Core 1 - L00 Lift Lobby FFL 7.960 m

C-04-Fourth Floor

+20.050 m

+13.175 m

+11.800 m

C-05-Fifth Floor

+22.800 m

First Floor (Mezz) Parking

C-M1-Mezzanine above First Floor

+13.175 m

Ramp Down Route

+20.031 m

Fourth Floor Parking 1:80

+15.925 m

+14.550 m

C-01-First Floor

+18.656 m

Fifth Floor Parking 1:80

Third Floor Parking

C-M2-Mezzanine above Second Floor

+15.925 m

Ramp Down Route

Third (Mezz) Floor Parking 1:80

Second Floor (Mezz) Parking 1:80

2750

Ramp Up Route

C-02-Second Floor

Second Floor Parking

Ramp Up and Down Routes

+21.406 m

+22.781 m

+18.675 m

2750

Ramp Up Route

C-03-Third Floor

C-M3-Mezzanine above Third Floor

Ramp Up and Down Routes

Fourth Floor (Mezz) Parking 1:80

+21.425 m

2750

Ramp Up Route

+25.550 m

+24.175 m

C-M4-Mezzanine above Fourth Floor

C-06-Sixth Floor

+24.156 m

2750

+24.175 m

1:80

2750

C-M5-Mezzanine above Fifth Floor

2750

Fifth Floor Parking

Sixth Floor Parking +25.531 m

Fifth Floor (Mezz) Parking

2750

C-M5-Mezzanine above Fifth Floor

Ramp Up and Down Routes

Fifth Floor Parking

+28.300 m

+26.925 m

1:80

C-07-Seventh Floor

2750

Ramp Down Route

TOS +28.295 m

+26.906 m

2750

Sixth Floor Parking

Sixth Floor Parking

C-M6-Mezzanine above Sixth Floor

+26.925 m

+22.800 m

C-04-Fourth Floor

PV Array Roof L07 1:80

Sixth Floor (Mezz) Parking 1:80

2750

Ramp Up and Down Routes

Ramp Up Route

TOS +29.585 m

2655

C-M6-Mezzanine above Sixth Floor

+25.550 m

C-05-Fifth Floor

1:80

3490

3225

+28.300 m

Ramp Up Route

Intensive Planters +30.250 m

PV Array Roof L07

C-07-Seventh Floor

C-06-Sixth Floor

Roof Garden L07 Mezz

1675

PV Array Roof L07

+32.500 m

TOU 30.375 m

2350

2200

2200

Stair 2 Shaft

4525

DryRiser-1

Stair 1 Shaft

C-R7-Building C Roof

TOU 30.375 m

+32.500 m

1dr Lift Shaft

4200

250 250

C-R7-Building C Roof

+32.500 m

225

SSL 32.600 m

2747

250

SSL 33.075 m

+6.635 m

FINAL ISSUE RECORD Record of latest DAA design information - no further revisions to be issued. Not to be read as detailed survey 'As Built Record'. Refer to RBG/FPM for Structure and HAL for services KEY PLAN

REV P01 P02 C01 C02

NOTES GENERAL NOTES DATE

BY

AUTH

DRAWING STATUS

ISO SHEET STATUS NOTES

KEY PLAN

(Above Ordnance Datum) Key: CONSTR. RECORDHeights CR TOS = Top of Slab / Top of Structural Screed

The drawing is copyright19/08/22 of Darling Associates.AC This drawing shall not be scaled. All dimensions are in mm Initial Stage 3 Issue unless otherwise stated.23/11/22 All dimensions shall be INITIAL FORMAL ISSUE ACchecked on site prior to commencing the works and any discrepancies to be reported to Darling Associates. All works shall conform to the current edition of the First Construction Issue & GFL Revision to show 25/01/23 AC building regulations and other statutory requirements. All materials and workmanship shall conform with the amended parking layout TITLE relevant British Standard specifications and codes of practice. If this drawing forms part of an application for FINAL ISSUE RECORD 25/10/24 AC

03-Proposed Building C - GA Section A-A

planning permission, it shall not be used for any other purpose without the express permission of Darling Associates. This drawing may incorporate information from other professionals. Darling Associates cannot accept responsibility for the integrity and accuracy of such information. Any clarification and/or additions that are required appertaining to such information should be sought from the relevant profession or their appointment representative. PROJECT

TOU = Top of Upstand TOW = Top of Wall SSL = Structural Slab Level USL = Underside Soffit Level FFL = Finished Floor Level

REV

NOTES

D

P01 C01

INITIAL FORMAL ISSUE First Construction Issue & GFL Revision to show amended parking layout FINAL ISSUE RECORD

23 25

C02

Eden Campus

Drawings, specifications and schedules are to be read in conjunction with the following where applicable: Employer's Requirements documents, Agreements to Lease, Structural Engineer's drawings and specifications, Civil Engineer's drawings and specifications, Survey Drawings, Party Wall/ Boundary Awards. SCALE AT A1: SCALE AT A3: Other specialist design consultant's requirements as appointed by the Main Contractor. Other specialist design sub-contractor's requirements as appointed by the Main Contractor. P = Preliminary C = Contractual

1 : 100

0m 1:100

1m

5m

DRAWING

1: 200

10m

12m

EDC-DAA-CXX001-ZZ-DR-A-0301

DAA JOB NO.

19064 REV.

C02

© Darling Associates Ltd.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

27

25


5

EPC CERTIFICATE

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

28


EPC Certificate 5.1 Building A

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

29


EPC Certificate 5.2 Building B

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

30


EPC Certificate 5.3 Building C

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

31


6

BREEAM CERTIFICATE

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

32


BREEAM Certificate 6.1 BREEAM EXCELLENT

BREEAM New Construction 2018

Pre-assessment : Design (Interim) : Project Honey (Honey) BREEAM Rating Credits available

Credits achieved

Credits targeted

% Credits achieved

Weighting

Category score

Target score

Man

18.0

16.0

16.0

88.89%

11.00%

9.77%

9.77%

Hea

11.0

8.0

8.0

72.73%

8.00%

5.81%

5.81%

Ene

21.0

13.0

13.0

61.90%

14.00%

8.66%

8.66%

Tra

12.0

11.0

11.0

91.67%

11.50%

10.54%

10.54%

Wat

9.0

7.0

7.0

77.78%

7.00%

5.44%

5.44%

Mat

14.0

8.0

8.0

57.14%

17.50%

10.00%

10.00%

Wst

11.0

9.0

9.0

81.82%

7.00%

5.72%

5.72%

LE

13.0

12.0

12.0

92.31%

15.00%

13.84%

13.84%

Pol

12.0

9.0

9.0

75.00%

9.00%

6.75%

6.75%

Inn

10.0

3.0

3.0

30.00%

10.00%

3.00%

3.00%

Total

131.0

96.0

96.0

73.28%

-

79.57%

79.57%

Rating

-

-

-

-

-

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

Excellent

Excellent

33


7

O&M

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

34


O&M 7.1 McLaughlin & Harvey Building A

BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames

BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames

TABLE OF CONTENTS

REVISION REGISTER Revision Number

Status

Author

Date

BUILDING FABRIC MANUAL ACCEPTANCE FORM 1.0

INTRODUCTION

1.1

General

1.2

How to Use your Building Fabric Manual

1.3

Technical Author

1.4

Other Key Documents

2.0

THE CONTRACT WORKS AND PROJECT DIRECTORIES

2.1

Description of Works

2.2

Building Ownership Details

2.3

Project Directory

2.4

Contractors / Sub Contractors

3.0

STATUTORY CONSENTS AND THIRD-PARTY CERTIFICATION

3.1

Planning Consents

3.2

Building Control Consents

4.0

DESIGN CRITERIA & INFORMATION

4.1

Key Structural Principles

4.2

Insulation Values

4.3

Fire Ratings

4.4

Surveys / Reports

5.0

BUILDING FABRIC

5.1

Construction Methods & Materials

6.0

GUARANTEES / CERTIFICATES & TEST CERTIFICATES

6.1

Guarantees

6.2

Certificates of Compliance

6.3

Test/Commissioning Certificates

7.0

OPERATIONAL & MAINTENANCE INFORMATION

7.1

Maintenance Contracts & Contractors

7.2

Building Fabric Maintenance

8.0

SUB-CONTRACTOR & DIRECT SUPPLIER O&M INFORMATION

8.1

Architectural Metalwork – CMF Ltd

8.2

Brick/Block Work – Swift Brickwork

8.3

Cutting GRP – Dura Composites

8.4

Dry Lining / Ceilings – AT Jones London

8.5

Façade – Clarkes

8.6

Fire Curtain – Coopers Fire Ltd

8.7

Fire Stopping - Middlesex

8.8

Flood Grills – Flood Stop Ltd

8.9

Glazed Doors – OWS

Rev A

Draft

Suzi Berry

17.01.24

Rev B

Draft

Neil Christie

19.09.24

Rev C

Draft

Neil Christie

04.11.24

BUILDING FABRIC MANUAL Incorporating Health & Safety File Information UNILEVER HEADQUARTERS, BUILDING A BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER

NOVEMBER 2024

___________________________________________________________________________________________

Prepared for McLaughlin & Harvey by Riddell Project Management Buchan House, Carnegie Campus, Dunfermline, Fife, KY11 8PL Web: www.riddellpm.co.uk Email: admin@riddellpm.co.uk Tel: 01383 622 500

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

_________________________________________________________________________________________

© 2024 Riddell PM

_________________________________________________________________________________________

© 2024 Riddell PM

35


O&M 7.2 McLaughlin & Harvey Building A

BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames 8.10 Groundworks & Frame – Mitchellson

BUILDING FABRIC MANUAL Unilever Headquarters, Building A, Kingston Upon Thames

BUILDING FABRIC MANUAL ACCEPTANCE FORM

8.11 Joinery – Swift Crafted Ltd 8.12 Landscape – Frosts

Project

Unilever Headquarters, Building CA

Principal Contractor Project Manager

Andrew Finnegan

Return to Address:

McLaughlin & Harvey

Tel:

15 Trench Road Mallusk Newtownabbey BT36 4TY

Email

Andrew.finnegan@mclh.co.uk

Web

www.mclh.co.uk

8.25 Waterproofing & Roofing (Hard & Soft) – AYM Services Ltd

Client Address:

Cube Retail Estate

9.0

HEALTH & SAFETY FILE INFORMATION

Tel:

9.1

Residual Hazards

9.2

Hazardous Materials Used

21A Kingly Street London W1B 5QA

Email

9.3

Removal and Dismantling of Plant and Equipment

jonathan@cube-re.com

9.4

Nature and Location of Significant Services

Web

www.cube-re.com

9.5

Fire Strategy

9.6

Emergency Contacts

9.7

Cleaning Access & Maintenance

8.13 Lifts – Otis Elevator Company 8.14 Mansafe Systems - PTSG 8.15 MSCP Pre-Cast – F P McCann 8.16 Painting – AC Beck & Son 8.17 Piling – Van Elle 8.18 Raised Access Flooring - Kingspan 8.19 Screed – UK Subfloors 8.20 Service Yard Gate – Charter Global 8.21 Signage - Norsign 8.22 Solar Shading / Car Park Envelope – Maple Sunscreening 8.23 Sunray Doors - Sunray 8.24 UKPN Ceiling Durasteel - Invicta

10.0 AS BUILT DRAWINGS 10.1 Architect – Darling Associates Architects 10.2 Structural Engineer – Robert Bird Group 10.3 Landscape Architect – McIlwaine Landscape Architect

We confirm having received the complete Building Fabric Manual for this Project. Signed:

On behalf of Globe Kingston Ltd:

10.4 Groundworks and Frame – Mitchellson 10.5 Fire Curtain – Coopers Fire Ltd

………………………………………………………….

Name:

………………………………………………………….

Date:

………………………………………………………….

10.6 Architectural Metalwork – CMF Ltd 10.7 Dry Lining / Ceilings – AT Jones London 10.8 Service Yard Gate – Charter Global 10.9 Lifts – Otis Elevator Company

_________________________________________________________________________________________

© 2024 Riddell PM

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

_________________________________________________________________________________________

© 2024 Riddell PM

36


O&M 7.3 McLaughlin & Harvey Building B

BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames

BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames

TABLE OF CONTENTS

REVISION REGISTER Revision Number

Status

Author

Date

BUILDING FABRIC MANUAL ACCEPTANCE FORM 1.0

INTRODUCTION

1.1

General

1.2

How to Use your Building Fabric Manual

1.3

Technical Author

1.4

Other Key Documents

2.0

THE CONTRACT WORKS AND PROJECT DIRECTORIES

2.1

Description of Works

2.2

Building Ownership Details

2.3

Project Directory

2.4

Contractors / Sub Contractors

3.0

STATUTORY CONSENTS AND THIRD PARTY CERTIFICATION

3.1

Planning Consents

3.2

Building Control Consents

4.0

DESIGN CRITERIA & INFORMATION

4.1

Key Structural Principles

4.2

Insulation Values

4.3

Fire Ratings

4.4

Surveys / Reports

5.0

BUILDING FABRIC

5.1

Construction Methods & Materials

6.0

GUARANTEES / CERTIFICATES & TEST CERTIFICATES

6.1

Guarantees

6.2

Certificates of Compliance

6.3

Test/Commissioning Certificates

7.0

OPERATIONAL & MAINTENANCE INFORMATION

7.1

Maintenance Contracts & Contractors

7.2

Building Fabric Maintenance

8.0

SUB-CONTRACTOR & DIRECT SUPPLIER O&M INFORMATION

8.1

Architectural Metalwork – CMF Ltd

8.2

Brick/Block Work – Swift Brickwork

8.3

Cutting GRP – Dura Composites

8.4

Dry Lining / Ceilings – AT Jones London

8.5

Façade – Clarkes

8.6

Fire Curtain – Coopers Fire Ltd

8.7

Fire Stopping - Middlesex

8.8

Flood Grills – Flood Stop Ltd

8.9

Glazed Doors – OWS

Rev A

Draft

Suzi Berry

17.01.24

Rev B

Draft

Neil Christie

02.08.24

Rev C

Draft

Neil Christie

04.11.24

BUILDING FABRIC MANUAL Incorporating Health & Safety File Information UNILEVER HEADQUARTERS, BUILDING B BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER

NOVEMBER 2024

___________________________________________________________________________________________

Prepared for McLaughlin & Harvey by Riddell Project Management Buchan House, Carnegie Campus, Dunfermline, Fife, KY11 8PL Web: www.riddellpm.co.uk Email: admin@riddellpm.co.uk Tel: 01383 622 500

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

_________________________________________________________________________________________

© 2024 Riddell PM

_________________________________________________________________________________________

© 2024 Riddell PM

37


O&M 7.4 McLaughlin & Harvey Building B

BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames 8.10 Groundworks & Frame – Mitchellson

BUILDING FABRIC MANUAL Unilever Headquarters, Building B, Kingston Upon Thames

BUILDING FABRIC MANUAL ACCEPTANCE FORM

8.11 Joinery – Swift Crafted Ltd 8.12 Landscape – Frosts 8.13 Lifts – Otis Elevator Company 8.14 Mansafe Systems - PTSG 8.15 MSCP Pre-Cast – F P McCann 8.16 Painting – AC Beck & Son (Contracts) Ltd 8.17 Piling – Van Elle 8.18 Raised Access Flooring - Kingspan 8.19 Screed – UK Subfloors

Project

Unilever Headquarters, Building C B

Principal Contractor Project Manager

Andrew Finnegan

Return to Address:

McLaughlin & Harvey

Tel:

15 Trench Road Mallusk Newtownabbey BT36 4TY

Email

Andrew.finnegan@mclh.co.uk

Web

www.mclh.co.uk

8.20 Solar Shading / Car Park Envelope – Maple Sunscreening 8.21 Sunray Doors - Sunray 8.22 UKPN Ceiling Durasteel - Invicta 8.23 Waterproofing & Roofing (Hard & Soft) – AYM Services Ltd 9.0

HEALTH & SAFETY FILE INFORMATION

9.1

Residual Hazards

Client Address:

Cube Retail Estate

9.2

Hazardous Materials Used

Tel:

9.3

Removal and Dismantling of Plant and Equipment

9.4

Nature and Location of Significant Services

21A Kingly Street London W1B 5QA

Email

9.5

Fire Strategy

jonathan@cube-re.com

9.6

Emergency Contacts

Web

www.cube-re.com

9.7

Cleaning Access & Maintenance

10.0 AS BUILT DRAWINGS 10.1 Architect – Darling Associates Architects 10.2 Structural Engineer – Robert Bird Group 10.3 Landscape Architect – McIlwaine Landscape Architect 10.4 Groundworks and Frame – Mitchellson 10.5 Fire Curtain – Coopers Fire Ltd

We confirm having received the complete Building Fabric Manual for this Project. Signed:

On behalf of Globe Kingston Ltd:

10.6 Architectural Metalwork – CMF Ltd 10.7 Dry Lining / Ceilings – AT Jones London

………………………………………………………….

Name:

………………………………………………………….

Date:

………………………………………………………….

10.8 Lifts – Otis Elevator Company

_________________________________________________________________________________________

© 2024 Riddell PM

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

_________________________________________________________________________________________

© 2024 Riddell PM

38


O&M 7.5 McLaughlin & Harvey Building C

BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames

BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames

TABLE OF CONTENTS

REVISION REGISTER Revision Number

Status

Author

Date

BUILDING FABRIC MANUAL ACCEPTANCE FORM 1.0

INTRODUCTION

1.1

General

1.2

How to Use your Building Fabric Manual

1.3

Technical Author

1.4

Other Key Documents

2.0

THE CONTRACT WORKS AND PROJECT DIRECTORIES

2.1

Description of Works

2.2

Building Ownership Details

2.3

Project Directory

2.4

Contractors / Sub Contractors

3.0

STATUTORY CONSENTS AND THIRD PARTY CERTIFICATION

3.1

Planning Consents

3.2

Building Control Consents

4.0

DESIGN CRITERIA & INFORMATION

4.1

Key Structural Principles

4.2

Insulation Values

4.3

Fire Ratings

4.4

Surveys / Reports

5.0

BUILDING FABRIC

5.1

Construction Methods & Materials

6.0

GUARANTEES / CERTIFICATES & TEST CERTIFICATES

6.1

Guarantees

6.2

Certificates of Compliance

6.3

Test/Commissioning Certificates

7.0

OPERATIONAL & MAINTENANCE INFORMATION

7.1

Maintenance Contracts & Contractors

7.2

Building Fabric Maintenance

8.0

SUB-CONTRACTOR & DIRECT SUPPLIER O&M INFORMATION

8.1

Architectural Metalwork – CMF Ltd

8.2

Bicycle Parking – Turvec

8.3

Block C Louvres – Contrasol

8.4

Brick/Block Work – Swift Brickwork

8.5

CarPark Fitout – Original Joinery

8.6

Cutting GRP – Dura Composites

8.7

Dry Lining / Ceilings – AT Jones London

8.8

Façade – Clarkes

8.9

Fire Curtain – Coopers Fire Ltd

Rev A

Draft

Suzi Berry

17.01.24

Rev B

Draft

Neil Christie

19.09.24

Rev C

Draft

Neil Christie

04.11.24

BUILDING FABRIC MANUAL Incorporating Health & Safety File Information UNILEVER HEADQUARTERS, BUILDING C BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER

NOVEMBER 2024

___________________________________________________________________________________________

Prepared for McLaughlin & Harvey by Riddell Project Management Buchan House, Carnegie Campus, Dunfermline, Fife, KY11 8PL Web: www.riddellpm.co.uk Email: admin@riddellpm.co.uk Tel: 01383 622 500

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

_________________________________________________________________________________________

© 2024 Riddell PM

_________________________________________________________________________________________

© 2024 Riddell PM

39


O&M 7.6 McLaughlin & Harvey Building C

BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames

BUILDING FABRIC MANUAL Unilever Headquarters, Building C, Kingston Upon Thames

8.10 Fire Stopping - Middlesex 8.11 Flood Grills – Flood Stop Ltd

BUILDING FABRIC MANUAL ACCEPTANCE FORM

8.12 Glazed Doors – OWS 8.13 Groundworks & Frame – Mitchellson

Project

Unilever Headquarters, Building C

Principal Contractor Project Manager

Andrew Finnegan

Return to Address:

McLaughlin & Harvey

Tel:

15 Trench Road Mallusk Newtownabbey BT36 4TY

Email

Andrew.finnegan@mclh.co.uk

Web

www.mclh.co.uk

8.26 UKPN Ceiling Durasteel - Invicta

Client Address:

Cube Retail Estate

8.27 Waterproofing & Roofing (Hard & Soft) – AYM Services Ltd

Tel:

21A Kingly Street London W1B 5QA

8.14 Joinery – Swift Crafted Ltd 8.15 Landscape – Frosts 8.16 Lifts – Otis Elevator Company 8.17 Mansafe Systems - PTSG 8.18 MSCP Pre-Cast – F P McCann 8.19 Painting – AC Beck 8.20 Piling – Van Elle 8.21 Raised Access Flooring - Kingspan 8.22 Screed – UK Subfloors 8.23 Service Yard Gate – Charter Global 8.24 Solar Shading / Car Park Envelope – Maple Sunscreening 8.25 Sunray Doors - Sunray

9.0

HEALTH & SAFETY FILE INFORMATION

9.1

Residual Hazards

Email

jonathan@cube-re.com

9.2

Hazardous Materials Used

Web

9.3

Removal and Dismantling of Plant and Equipment

www.cube-re.com

9.4

Nature and Location of Significant Services

9.5

Fire Strategy

9.6

Emergency Contacts

9.7

Cleaning Access & Maintenance

We confirm having received the complete Building Fabric Manual for this Project. Signed:

………………………………………………………….

10.0 AS BUILT DRAWINGS 10.1 Architect – Darling Associates Architects 10.2 Structural Engineer – Robert Bird Group 10.3 Landscape Architect – McIlwaine Landscape Architect 10.4 Groundworks and Frame – Mitchellson

On behalf of Globe Kingston Ltd:

Name:

………………………………………………………….

Date:

………………………………………………………….

10.5 Fire Curtain – Coopers Fire Ltd 10.6 Architectural Metalwork – CMF Ltd 10.7 Dry Lining / Ceilings – AT Jones London 10.8 Car Park Fitout – Original Joinery 10.9 Service Yard Gate – Charter Global 10.10 Lifts – Otis Elevator Company 10.11 Block C Louvres – Contrasol 10.12 Bicycle Parking – Turvec _________________________________________________________________________________________

© 2024 Riddell PM

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

_________________________________________________________________________________________

© 2024 Riddell PM

40


O&M 7.7 Halsion Mechanical Services ________________________________________

______________________

____________

MECHANICAL SERVICES OPERATING & MAINTENANCE MANUAL Project Honey

2-1 General 2-2 The Electricity At Work Regulations 2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Road Transport On Site 2-8 Specialist Waste Regulations 2014 2-9 Fire Precautions 2-9 Moving and Rotating Machinery 2-10 Further Legislation

6. EQUIPMENT AND SUPPLIERS SCHEDULES

3. GENERAL DESCRIPTION 3-1 Mechanical Scope of Works 3-2 Design Criteria 3-3 Outline Description 3-4 Above Ground Drainage, Rainwater (Including Rainwater Harvesting) & Car Park 3-5 Cold Water Services 3-6 Hot Water Services 3-7 Heating and Cooling 3-8 Ventilation 3-9 Sprinkler 3-10 BMS

AT 4. OPERATING PROCEDURES

3 St James’s Road Kingston Upon Thames London KT1 2BA

1. INTRODUCTION AND GUIDE 1-1 Introduction 1-2 Scope 1-3 Contents 1-4 The Manual Users 1-5 Contractual & Legal Information 1-6 Project Directory 1-7 Emergency Information 1-8 Users Own Emergency Contacts 1-9 Document History 1-9-1 Initial Document Information 1-9-2 Distribution List 1-9-3 Document Status & History

2. HEALTH AND SAFETY 2-1 General 2-2 The Electricity At Work Regulations 2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Road Transport On Site 2-8 Specialist Waste Regulations 2014 2-9 Fire Precautions 2-9 Moving and Rotating Machinery 2-10 Further Legislation

Eden Campus, KingstonDESCRIPTION Upon Thames KT1 3. GENERAL Practical Completion document 3-1 Mechanical Scope of Works 3-2 Design Criteria 3-3 Outline Description 3-4 Above Ground Drainage, Rainwater (Including Rainwater Harvesting) & Car Park

4-1 General 4-2 Introduction 4-3 Automatic Operation 4-3-1 Controls 4-4 Cold Water Services 4-5 Domestic Hot Water Services 4-6 Low Temperature Hot Water Heating Services 4-7 Chilled Water Service 5. MAINTENANCE PROCEDURES 4-8 Ventilation Systems

5-1 Introduction 5-2 Maintenance Matrix 5-3 Air Cooled Condensing Units 5-4 Air Filters (Panel/Bag Type Cells) 5-5 Air Handling Units Including Centrifugal Supply Fan Units 5-6 Air Venting 5-7 Atmospheric Electric Hot Water Heaters 5-8 Automatic Controls 5-9 Axial Fans 5-10 Belt Drives 5-11 Boilers 5-12 Boiler Flues 5-13 Centrifugal Water Circulation Pumps 5-14 Controls Panels 5-15 Convectors (Fans) 5-16 Cold Water Storage Tanks 5-17 Cold Water Booster Pump Sets 5-18 Gas System 5-19 General Pipework Systems 5-20 HWS Electric Water Heaters 5-21 Ductwork 5-22 Dampers and Fire Dampers 5-23 Drainage and Rainwater Systems 5-24 DX Split Systems 5-25 Electric Motors 5-26 Float Operated Lever Valves 5-27 Gauges 5-28 Insulation 5-29 Insurance Inspections 5-30 Extract Hoods 5-31 Overhead Door Fan Convectors 5-32 Radiators 5-33 Roof Extract Fans 5-34 Safety Valves 5-35 Strainers 5-36 Temperature Tests 5-37 Motor Control Gear 5-38 Mountings 5-39 Pressurisation Unit 5-40 Thermostatic Radiator Valves 5-41 Twin Fan Toilet Extract Unit 5-42 Unvented Electric Hot Water Heaters 5-43 Water Analysis Tests 5-44 Water Maintenance 5-45 Water Treatment for Heating and Chilled Water Closed Systems 5-46 Legionella Control 5-47 Water Chillers 5-48 Fault Finding

7. MANUFACTURERS LITERATURE 7-1 Fan Coil Units 7-2 Attenuators 7-3 Rainwater Harvesting 7-4 Pulsed Water Meters 7-5 Fire Dampers 7-6 Shower Channels 7-7 X Pots 7-8 Thermal Stores / Hot Water Calorifiers 7-9 Dominator Sets 7-10 CAT 5 Booster 7-11 Electric Radiant Panels 7-12 Grilles 7-13 Pumps / Pressurisation Units / Booster Sets 7-14 UV Treatment 7-15 ASHP / Chillers / QAVH Units 7-16 Thermostatic Mixing Valves 7-17 Extract Fans / VAVs / MSFDs 7-18 MVHRs / CAVs 7-19 Cold Water Storage Tanks 7-20 AHUs 7-21 Sanitaryware

8. COMMISSIONING DATA 8-1 ASHP / Chiller & WSHP Commissioning Certificates 8-2 AHU Commissioning Certificates 8-3 LTHW System Commissioning Certificates 8-4 CHW System Commissioning Certificates 8-5 Cold Water Booster Set Commissioning Certificate 8-6 Tap Temperatures 8-7 Drainage and Rainwater Stack Test Certificates 8-8 Chlorination Certificates 8-9 Extract Fans Commissioning Certificates 8-10 BMS Commissioning Certificates 8-11 Sprinkler Pressure Test Certificates 8-12 Dry Riser Pressure Test Certificates 8-13 Smoke Ventilation Certificates 8-14 Trace Heating Commissioning Certificates 8-15 CAT 5 Booster Set Commissioning Certificates 8-16 UV Filter Certificates 8-17 FCU Secondary Air Certificates 8-18 Motorised Fire Smoke Damper Certificates 8-19 Fire Damper Certificates 8-20 Toilet Extract Venilation Certificate

9. DRAWINGS 9-1 Schematics 9-2 Plantrooms 9-3 Drainage 9-4 Domestics 9-5 Piped Services 9-6 Ventilation 9-7 Sprinklers

10. SPRINKLER SYSTEM

11. BUILDING MANAGEMENT SYSTEM

41


O&M 7.8 Halsion Electrical Services

2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Regulatory Reform (Fire Safety) Order 2005 2-7-1 Responsible Persons 2-8 Road Transport on site 2-9 Special Waste Regulations 2014 2-10 Further Legislation

________________________________________ 3. GENERAL DESCRIPTION

______________________

____________

ELECTRICAL SERVICES OPERATING & MAINTENANCE MANUAL PROJECT HONEY &

3 St James’s Road Kingston Upon Thames London KT1 2BA

3-1 Main Supply & LV Distribution 3-2 General Lighting, Emergency Lighting & Controls 3-3 General LV Power (Small Power) 3-4 Facilities For The Disabled 3-5 CCTV 3-6 Data Transmission 3-7 Fire Detection & Alarm 3-8 Earthing, Bonding, EMC Measures & Surge Protection 3-9 Lightning Protection 4. OPERATING PROCEDURES

4-1 General 4-2 State of Plant (Checklist) 4-3 Main LV Switchboard 4-4 Distribution Boards 4-5 Lighting and Small Power Circuits 4-6 Emergency Lighting System 4-7 External Lighting System 4-8 Mechanical Installation 4-9 Lightning Protection 4-10 Miscellaneous Equipment

5. MAINTENANCE PROCEDURES

1. INTRODUCTION AND GUIDE 1-1 Introduction 1-2 Scope 1-3 Contents 1-4 The Manual Users 1-5 Contractual & Legal Information 1-6 Project Directory 1-7 Emergency Information 1-8 Users Own Emergency Contacts 1-9 Document History 1-9-1 Initial Document Information 1-9-2 Distribution List 1-9-3 Document Status & History

5-1 Introduction 5-2 Maintenance Matrix 5-3 Specialist Maintenance 5-4 Monitoring of Electrical services 5-5 Periodic Testing & Inspection 5-6 Routine & Preventative Maintenance 5-6-1 General Introduction 5-6-2 Maintenance Requirements 5-6-3 Preventative Maintenance 5-6-4 Maintenance Programme 5-6-5 Maintenance Records 5-6-6 Switchboards & Switchgear 5-6-7 Distribution Boards 5-6-8 Light Fittings 5-6-9 Emergency Lighting Installation 5-6-10 Switch Socket Outlets & Spur Outlets 5-6-11 Contactor/Time Switches 5-6-12 External Lighting Fittings

7. MANUFACTURERS LITERATURE 7-1 Transformers & Ring Main Units 7-2 Switchboards 7-3 Distribution Boards 7-4 Automatic Transfer Switches 7-5 Generator 7-6 Internal & External Lighting 7-7 Lighting Control 7-8 Fire Alarm 7-9 Disabled Refuge 7-10 Disabled WC Alarms 7-11 CCTV 7-12 Data 7-13 Lightning Protection 7-14 PV 7-15 Electric Vehicle Chargers 7-16 Wiring Accessories

8. COMMISSIONING DATA 8-1 NIC Installation Certificates 8-2 NIC Emergency Lighting Certificates 8-3 Distribution Board Test Sheets 8-4 Fire Alarm Commissioning Certificates 8-5 Fire Alarm Cause and Effect sign off 8-6 Disabled Refuge Commissioning Certificate 8-7 HV Test Sheets 8-8 Lighting Control Commissioning Certificates 8-9 Lighting Protection Commissioning Certificates 8-10 PV Commissioning Certificates 8-11 EVC Commissioning Certificates 8-12 CCTV Commissioning Certificates 8-13 Substation Earthing Certificates 8-14 Data Fluke Test Results

9. DRAWINGS 9-1 Schematics 9-2 Containment 9-3 Small Power 9-4 Lighting 9-5 Fire Alarm & Disabled Refuge 9-6 Lightning Protection 9-7 Externals

6. EQUIPMENT AND SUPPLIERS SCHEDULES

2. HEALTH AND SAFETY 2-1 General 2-2 The Electricity At Work Regulations 2-3 Automatic Plant Operation 2-4 COSHH 2-5 Risk Assessments 2-6 Working At Height 2-7 Regulatory Reform (Fire Safety) Order 2005 2-7-1 Responsible Persons 2-8 Road Transport on site 2-9 Special Waste Regulations 2014 2-10 Further Legislation

Eden Campus, Kingston Upon Thames KT1 Practical Completion document 3. GENERAL DESCRIPTION

3-1 Main Supply & LV Distribution 3-2 General Lighting, Emergency Lighting & Controls

42


8

HEALTH & SAFETY FILE

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

43


health & safety file 8.1 Building A

0.0 DOCUMENT VERIFICATION

CONTENTS

Job Title

Project Honey Eden Campus

Job Number

2800

5.0 TRADE PACKAGE INFORMATION .............................................................................. 21

Document Title

H&S file

File Reference

PD16 ORSA PD_H&S File May 2023.docx

APPENDIX 1 RISK REGISTER ............................................................................................ 21

Document Information

0.0 DOCUMENT VERIFICATION ......................................................................................... 4 1.0 THIS HEALTH & SAFETY FILE .......................................................................................5

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024.docx

HEALTH & SAFETY FILE

4.3.13 External Cleaning ....................................................................................... 20

Revision

Issue Date

Filename

A

04/10/24

Description

1.1 Key H&S File Content & Format .................................................................. 6 1.2 Key H&S File Issues ..............................................................................................7

Name

2.0 GENERAL PROJECT INFORMATION ........................................................................... 9

Signature

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB041024 H&S file Building A rev 0 Prepared By

Approved By

James Bucknall

Chris Bracewell

04/10/24

2.1 Client............................................................................................................................. 9 2.2 Project ........................................................................................................................ 9 2.3 Site location............................................................................................................ 9 2.4 Responsibilities of the Owner .................................................................... 9 2.5 Details of parties ............................................................................................... 10

Date

04/10/24

Revision

Issue Date

Filename

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB171024

B

17/10/24

Description

H&S file Building A rev 1

2.6 Compliance Considerations ..................................................................... 10 2.7 Existing Site Information .............................................................................. 10 2.8 Asbestos, Deleterious Materials and COSSH.................................. 11 2.9 Significant Site Services ................................................................................ 11

Name

2.10 Emergency Contacts .................................................................................... 12

Prepared By

Approved By

James Bucknall

Chris Bracewell

17/10/24

Signature

3.0 CONSULTANT INFORMATION .................................................................................... 13 3.1 Architect ................................................................................................................... 13 3.2 Landscape Architect ...................................................................................... 13

Date

17/10/24

Revision

Issue Date

Filename

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024

C

31/10/24

Description

3.3 Mechanical and Electrical............................................................................ 13 3.4 Statutory Consents..........................................................................................14 3.5 Fire ..............................................................................................................................14 3.6 Cleaning Access and Maintenance ......................................................15 3.7 Plant Replacement ........................................................................................... 16 3.8 Structural and Civil .......................................................................................... 16

Name

4.0 SIGNIFICANT RESIDUAL HAZARDS........................................................................... 18

H&S file Building A rev 2 Prepared By

Approved By

James Bucknall

Chris Bracewell

31/10/24

31/10/24

Signature

4.1 Residual Hazards and Significant Risks to be considered .....18 4.2 Significant Residual Hazards ......................................................................18 4.2.1 Definitions ............................................................................................................18 4.2.2 “Suitable and Sufficient” Risk Assessment Risk Assessment ...................................................................................................................18

HEALTH & SAFETY FILE

Date

4.3 Residual Hazards ............................................................................................... 19 4.3.1 Any Work at Height ...................................................................................... 19 4.3.2 Any Works in occupied areas .............................................................. 19 4.3.3 Access to roofs, roof mounted plant & equipment etc. ... 19 4.3.4 Cleaning of windows, window frames, cladding, signage etc........................................................................................................................................ 19 4.3.5 Access to plant rooms/areas and equipment ......................... 19

Eden Campus – Project Honey UNILEVER HEADQUARTERS, BUILDING A BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER

4.3.6 Hot-Work and any work involving the risk of fire .................. 19 4.3.7 Work on Services .......................................................................................... 19 4.3.8 Replacement of ‘high level’ lights etc. ........................................... 19

Cube Real Estate

4.3.9 Internal painting, spraying, decorating etc. ................................ 19

31 October 2024

4.3.10 Alterations to Fire Protection ........................................................... 20 4.3.11 Work in confined spaces, hazardous atmospheres etc... 20 4.3.12 Any work involving fumes, noise, dust etc. .............................. 20

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

2

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024

3

44


health & safety file 8.2 Building B

0.0 DOCUMENT VERIFICATION

CONTENTS

Job Title

Project Honey Eden Campus

Job Number

2800

5.0 TRADE PACKAGE INFORMATION .............................................................................. 21

Document Title

H&S file

File Reference

PD16 ORSA PD_H&SFile May 2023.docx

APPENDIX 1 RISK REGISTER ............................................................................................ 21

Document Information

0.0 DOCUMENT VERIFICATION ......................................................................................... 4 1.0 THIS HEALTH & SAFETY FILE .......................................................................................5

2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB171024.docx

HEALTH & SAFETY FILE

4.3.13 External Cleaning ....................................................................................... 20

Revision

Issue Date

Filename

2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB260924

A

26/09/24

Description

H&S file Building B

1.1 Key H&S File Content & Format .................................................................. 6 1.2 Key H&S File Issues ..............................................................................................7

Name

2.0 GENERAL PROJECT INFORMATION ........................................................................... 9

Prepared By

Approved By

James Bucknall

Chris Bracewell

26/09/24

Signature

2.1 Client............................................................................................................................. 9 2.2 Project ........................................................................................................................ 9 2.3 Site location............................................................................................................ 9 2.4 Responsibilities of the Owner .................................................................... 9

Date

26/09/24

Revision

Issue Date

Filename

2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB260924

B

17/10/24

Description

H&S file Building B

2.5 Details of parties ............................................................................................... 10 2.6 Compliance Considerations ..................................................................... 10 2.7 Existing Site Information .............................................................................. 10 2.8 Asbestos, Deleterious Materials and COSSH.................................. 11 2.9 Significant Site Services ................................................................................ 11

Prepared By

2.10 Emergency Contacts .................................................................................... 12

Name

3.0 CONSULTANT INFORMATION .................................................................................... 13

Checked By

James Bucknall

Approved By Chris Bracewell

Signature

3.1 Architect ................................................................................................................... 13 3.2 Landscape Architect ...................................................................................... 13 3.3 Mechanical and Electrical............................................................................ 13 3.4 Statutory Consents..........................................................................................14

Date

17/10/24

dd/mm/yy

17/10/24

Prepared By

Checked By

Approved By

dd/mm/yy

dd/mm/yy

dd/mm/yy

3.5 Fire ..............................................................................................................................14

Revision

3.6 Cleaning Access and Maintenance ......................................................15 3.7 Plant Replacement ........................................................................................... 16 3.8 Structural and Civil .......................................................................................... 16

4.0 SIGNIFICANT RESIDUAL HAZARDS........................................................................... 18

Issue Date

Filename

dd/mm/yy

Description

Name

4.1 Residual Hazards and Significant Risks to be considered .....18

Signature

4.2 Significant Residual Hazards ......................................................................18 4.2.1 Definitions ............................................................................................................18

Date

4.2.2 “Suitable and Sufficient” Risk Assessment Risk Assessment ...................................................................................................................18

HEALTH & SAFETY FILE

4.3 Residual Hazards ............................................................................................... 19 4.3.1 Any Work at Height ...................................................................................... 19 4.3.2 Any Works in occupied areas .............................................................. 19 4.3.3 Access to roofs, roof mounted plant & equipment etc. ... 19 4.3.4 Cleaning of windows, window frames, cladding, signage etc........................................................................................................................................ 19 4.3.5 Access to plant rooms/areas and equipment ......................... 19

Eden Campus – Project Honey UNILEVER HEADQUARTERS, BUILDING B BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER

4.3.6 Hot-Work and any work involving the risk of fire .................. 19 4.3.7 Work on Services .......................................................................................... 19 4.3.8 Replacement of ‘high level’ lights etc. ........................................... 19

Cube Real Estate

4.3.9 Internal painting, spraying, decorating etc. ................................ 19

17 October 2024

4.3.10 Alterations to Fire Protection ........................................................... 20 4.3.11 Work in confined spaces, hazardous atmospheres etc... 20 4.3.12 Any work involving fumes, noise, dust etc. .............................. 20

2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB171024

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

2

2800_Unilever Headquarters Building B_ORSA PD_H&SFile_JEB171024

3

45


health & safety file 8.3 Building C

0.0 DOCUMENT VERIFICATION

CONTENTS

Job Title

Project Honey Eden Campus

Job Number

2800

5.0 TRADE PACKAGE INFORMATION .............................................................................. 21

Document Title

H&S file

File Reference

PD16 ORSA PD_H&S File May 2023.docx

APPENDIX 1 RISK REGISTER ............................................................................................ 21

Document Information

0.0 DOCUMENT VERIFICATION ......................................................................................... 4 1.0 THIS HEALTH & SAFETY FILE .......................................................................................5

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024.docx

HEALTH & SAFETY FILE

4.3.13 External Cleaning ....................................................................................... 20

Revision

Issue Date

Filename

A

04/10/24

Description

1.1 Key H&S File Content & Format .................................................................. 6 1.2 Key H&S File Issues ..............................................................................................7

Name

2.0 GENERAL PROJECT INFORMATION ........................................................................... 9

Signature

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB041024 H&S file Building A rev 0 Prepared By

Approved By

James Bucknall

Chris Bracewell

04/10/24

2.1 Client............................................................................................................................. 9 2.2 Project ........................................................................................................................ 9 2.3 Site location............................................................................................................ 9 2.4 Responsibilities of the Owner .................................................................... 9 2.5 Details of parties ............................................................................................... 10

Date

04/10/24

Revision

Issue Date

Filename

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB171024

B

17/10/24

Description

H&S file Building A rev 1

2.6 Compliance Considerations ..................................................................... 10 2.7 Existing Site Information .............................................................................. 10 2.8 Asbestos, Deleterious Materials and COSSH.................................. 11 2.9 Significant Site Services ................................................................................ 11

Name

2.10 Emergency Contacts .................................................................................... 12

Prepared By

Approved By

James Bucknall

Chris Bracewell

17/10/24

Signature

3.0 CONSULTANT INFORMATION .................................................................................... 13 3.1 Architect ................................................................................................................... 13 3.2 Landscape Architect ...................................................................................... 13

Date

17/10/24

Revision

Issue Date

Filename

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024

C

31/10/24

Description

3.3 Mechanical and Electrical............................................................................ 13 3.4 Statutory Consents..........................................................................................14 3.5 Fire ..............................................................................................................................14 3.6 Cleaning Access and Maintenance ......................................................15 3.7 Plant Replacement ........................................................................................... 16 3.8 Structural and Civil .......................................................................................... 16

Name

4.0 SIGNIFICANT RESIDUAL HAZARDS........................................................................... 18

H&S file Building A rev 2 Prepared By

Approved By

James Bucknall

Chris Bracewell

31/10/24

31/10/24

Signature

4.1 Residual Hazards and Significant Risks to be considered .....18 4.2 Significant Residual Hazards ......................................................................18 4.2.1 Definitions ............................................................................................................18 4.2.2 “Suitable and Sufficient” Risk Assessment Risk Assessment ...................................................................................................................18

HEALTH & SAFETY FILE

Date

4.3 Residual Hazards ............................................................................................... 19 4.3.1 Any Work at Height ...................................................................................... 19 4.3.2 Any Works in occupied areas .............................................................. 19 4.3.3 Access to roofs, roof mounted plant & equipment etc. ... 19 4.3.4 Cleaning of windows, window frames, cladding, signage etc........................................................................................................................................ 19 4.3.5 Access to plant rooms/areas and equipment ......................... 19

Eden Campus – Project Honey UNILEVER HEADQUARTERS, BUILDING A BROOK STREET KINGSTON UPON THAMES SURREY KT1 1ER

4.3.6 Hot-Work and any work involving the risk of fire .................. 19 4.3.7 Work on Services .......................................................................................... 19 4.3.8 Replacement of ‘high level’ lights etc. ........................................... 19

Cube Real Estate

4.3.9 Internal painting, spraying, decorating etc. ................................ 19

31 October 2024

4.3.10 Alterations to Fire Protection ........................................................... 20 4.3.11 Work in confined spaces, hazardous atmospheres etc... 20 4.3.12 Any work involving fumes, noise, dust etc. .............................. 20

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

2

2800_Unilever Headquarters Building A_ORSA PD_H&SFile_JEB311024

3

46


9

CONFORMITY LETTERS

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

47


CONFORMITY letters 9.1 Darling Associates Architects Building A, B, C

Delivery: e-mail

27th November 2024

To wh o m it m ay c o n c er n R E: L e t t e r of C on f or m it y – UL C am p u s _ B u il di n gs A + C To date & throughout the construction phase we have checked the works for quality, completeness and compliance with the Employer’s Requirements and have checked the completion documentation as it relates to our design discipline and hereby confirm there are no significant items to be raised which could potentially prevent the issue of the Sectional Completion Statement. Throughout the construction phase, there have been a number of instructed occupier variations which have resulted in deviations away from the Employer’s Requirements. All variations have been formally approved and instructed by the client’s representative.

Delivery: e-mail

8th November 2024

To wh o m it m ay c o n c er n R E: L e t t e r of C on f or m it y – UL C am p u s _ B u il di n g B To date & throughout the construction phase we have checked the works for quality, completeness and compliance with the Employer’s Requirements and have checked the completion documentation as it relates to our design discipline and hereby confirm there are no significant items to be raised which could potentially prevent the issue of the Sectional Completion Statement. Throughout the construction phase, there have been a number of instructed occupier variations which have resulted in deviations away from the Employer’s Requirements. All variations have been formally approved and instructed by the client’s representative.

We have prepared and provided our lists of minor outstanding works. The snagging process is currently ongoing & in line with the McLH design programme. Yours sincerely,

Alexander Cook RIBA Associate

Founder + Chair Chris Darling RIBA Managing Director Alastair Roberts RIBA Directors Gareth Watkins RIBA  Tomas Pierce RIBA  Julie Pears MRICS (non-exec) Project Directors Thomas Bartram RIBA  Rupert Calvert RIBA  David Hurst RIBA  Vania Piccioli RIBA  Laura Podda RIBA  Carolina Rodriguez Associates Alexander Cook RIBA  Pedro Guinapo ARB  James Le Ball RIBA  Fabrizio Maiorano ARB Consultant Richard Houghton FRICS Darling Associates Ltd. Registered Company No: 4717408. 1 Greencoat Row, London SW1P 1PQ

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

Yours sincerely,

Alexander Cook RIBA Associate

Founder + Chair Chris Darling RIBA Managing Director Alastair Roberts RIBA Directors Gareth Watkins RIBA  Tomas Pierce RIBA  Julie Pears MRICS (non-exec) Project Directors Thomas Bartram RIBA  Rupert Calvert RIBA  David Hurst RIBA  Vania Piccioli RIBA  Laura Podda RIBA  Carolina Rodriguez Associates Alexander Cook RIBA  Pedro Guinapo ARB  James Le Ball RIBA  Fabrizio Maiorano ARB Consultant Richard Houghton FRICS Darling Associates Ltd. Registered Company No: 4717408. 1 Greencoat Row, London SW1P 1PQ

48


CONFORMITY letters 9.2 Halsion Building A, B, C

11th November 2024

11th November 2024

241111-KPC-02

241111-KPC-01

Allen Nash MCLH 15 Trench Road Newtownabbey County Antrim BT36 4TY

Allen Nash MCLH 15 Trench Road Newtownabbey County Antrim BT36 4TY

Dear Allen,

Dear Allen,

RE: Project Honey Kingston Upon Thames. MEPH Installation – Building A & C

RE: Project Honey Kingston Upon Thames. MEPH Installation – Building B

Please take this letter as confirmation that the Mechanical, Electrical and Public Health services have been designed and constructed in accordance with relative legislation, Employers Requirements, Contractors proposals, Services specifications, Services design layouts issued and the local planning authorities requirements.

Please take this letter as confirmation that the Mechanical, Electrical and Public Health services have been designed and constructed in accordance with relative legislation, Employers Requirements, Contractors proposals, Services specifications, Services design layouts issued and the local planning authorities requirements.

Yours sincerely,

Yours sincerely,

Kevin Cambridge Design Manager

Kevin Cambridge Design Manager

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

49


CONFORMITY letters 9.3 RBG Building A, B, C

ROBERT BIRD GROUP [RBG company number(s) will be inserted automatically]

ROBERT BIRD GROUP [RBG company number(s) will be inserted automatically]

Reference: 4881-RBG-ZZ-XX-CO-ST-00002-LG:LG 241107

Reference: 4881-RBG-ZZ-XX-CO-ST-00001-LG:LG 241108

08 November 2024

08 November 2024

Sam Peach Mclaughlin & Harvey Griffin Court Farringdon LONDON EC1A 9PN

Sam Peach Mclaughlin & Harvey Griffin Court Farringdon LONDON EC1A 9PN

Dear Sam

Dear Sam

RE: BUILDING A & C – CONSULTANT STATEMENT ON COMPLETION OF STRUCTURE & CIVIL WORKS

RE: BUILDING B – CONSULTANT STATEMENT ON COMPLETION OF STRUCTURE & CIVIL WORKS

In accordance with our Deed of Appointment and to the extent required by the scope of our services under that Deed, we visited site over the course of the civil and structural works to review the progress of the works and quality of the workmanship.

In accordance with our Deed of Appointment and to the extent required by the scope of our services under that Deed, we visited site over the course of the civil and structural works to review the progress of the works and quality of the workmanship.

As far as can be ascertained from a visual inspection of the works and using the standard of reasonable skill and care referred to in the Deed of Appointment, the works appear to be: constructed generally in accordance with our design documents, good engineering practice and to the best our knowledge in accordance with the ER’s.

As far as can be ascertained from a visual inspection of the works and using the standard of reasonable skill and care referred to in the Deed of Appointment, the works appear to be: constructed generally in accordance with our design documents, good engineering practice and to the best our knowledge in accordance with the ER’s.

Our inspection was limited to those parts of the works which were reasonably accessible at the time of the visit, no opening works have been undertaken to ascertain the quality of the workmanship.

Our inspection was limited to those parts of the works which were reasonably accessible at the time of the visit, no opening works have been undertaken to ascertain the quality of the workmanship.

This letter is for the sole benefit of the client and shall not be relied upon by any third party except those who we have provided collateral warranties.

This letter is for the sole benefit of the client and shall not be relied upon by any third party except those who we have provided collateral warranties.

Yours faithfully

Yours faithfully

ROBERT BIRD GROUP

ROBERT BIRD GROUP

Simon Cloherty Operations Director Europe

Simon Cloherty Operations Director Europe

LONDON OFFICE

LONDON OFFICE

4881-RBG-ZZ-XX-CO-ST-00002-LGLG 241108 - Building A & C PC Letter

LEAD. CREATE. DELIVER. SUSTAIN

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

Level 01 Harling House 47-51 Great Suffollk Street LONDON SE1 0BS United Kingdom p: +44 20 7633 2880

| w: robertbird.com

4881-RBG-ZZ-XX-CO-ST-00001-LGLG 241108 - Building B PC Letter

LEAD. CREATE. DELIVER. SUSTAIN

Level 01 Harling House 47-51 Great Suffollk Street LONDON SE1 0BS United Kingdom p: +44 20 7633 2880

| w: robertbird.com

50


CONFORMITY letters 9.4 Fire Safety Building A, B, C

Title: Revision: Date: Author:

Title: Revision: Date: Author:

Project Honey – Building A Fire Safety Compliance Statement 00 29th November 2024 Daniel Taylor BSc(Hons) AIFireE

Project Honey – Fire Safety Compliance Statement 01 8th November 2024 Daniel Taylor BSc(Hons) AIFireE

Title: Revision: Date: Author:

Sam Peach

Sam Peach

Sam Peach

McLaughin & Harvey 15 Trench Road, Mallusk, Newtownabbey, Co. Antrim, BT36 4TY

McLaughin & Harvey 15 Trench Road, Mallusk, Newtownabbey, Co. Antrim, BT36 4TY

McLaughin & Harvey 15 Trench Road, Mallusk, Newtownabbey, Co. Antrim, BT36 4TY

Project Honey – Building C Fire Safety Compliance Statement 00 29th November 2024 Daniel Taylor BSc(Hons) AIFireE

29th November 2024

8th November 2024

29th November 2024

Project Honey – Building A Part B Compliance Statement

Project Honey – Building B Part B Compliance Statement

Project Honey – Building C Part B Compliance Statement

Dear Sam,

Dear Sam,

Dear Sam,

Further to the information provided in relation to developing the fire strategy report and other works such as CFD modelling, plus the implementation site visits carried out to the proposed development known as Project Honey (for Building A), and that we have been involved with and have reviewed against the requirements of Part B to the Building Regulations we confirm acceptance of the standard of work and the intent proposed, have coordinated design team meetings and coordination with other parties during the design phase and construction phase to reach completion of works.

Further to the information provided in relation to developing the fire strategy report and other works such as CFD modelling, plus the implementation site visits carried out to the proposed development known as Project Honey (for Building B), and that we have been involved with and have reviewed against the requirements of Part B to the Building Regulations we confirm acceptance of the standard of work and the intent proposed, have coordinated design team meetings and coordination with other parties during the design phase and construction phase to reach completion of works.

Guidance is taken from BS 9999: 2017 as the primary design code. Where necessary, CFD and other technical assessments have been carried out to support the design intent and have been 3rd party reviewed.

Guidance is taken from BS 9999: 2017 as the primary design code. Where necessary, CFD and other technical assessments have been carried out to support the design intent and have been 3rd party reviewed.

Further to the information provided in relation to developing the fire strategy report and other works such as CFD modelling, external fire spread analaysis, cladding surface spread of flame assessment, plus the implementation site visits carried out to the proposed development known as Project Honey (for Building C), and that we have been involved with and have reviewed against the requirements of Part B to the Building Regulations we confirm acceptance of the standard of work and the intent proposed, having coordinated design team meetings and coordination with other parties during the design phase and construction phase to reach completion of works.

Having reviewed the design proposals, and various design data sheets relating to Part B provided to us we consider that the materials proposed will achieve the minimum performance requirements required in current guidance at the time of construction.

Having reviewed the design proposals, and various design data sheets relating to Part B provided to us we consider that the materials proposed will achieve the minimum performance requirements required in current guidance at the time of construction.

Conclusion

Conclusion

By virtue of meeting the requirements noted above it is considered that they comply with Part B of the Building Regulations.

By virtue of meeting the requirements noted above it is considered that they comply with Part B of the Building Regulations.

Conclusion

Should you have any queries on the above please do not hesitate to get in touch.

Should you have any queries on the above please do not hesitate to get in touch.

By virtue of meeting the requirements noted above it is considered that they comply with Part B of the Building Regulations.

Yours sincerely,

Yours sincerely,

Should you have any queries on the above please do not hesitate to get in touch.

Guidance is taken from Approved Document B 2019, 2020& 2022 as the primary design code. Where necessary other technical assessments have been carried out to support the design intent and have been 3rd party reviewed/accepted by the Approving Authorities. Having reviewed the design proposals, and various design data sheets relating to Part B provided to us we consider that the materials proposed will achieve the minimum performance requirements required in current guidance at the time of construction.

Yours sincerely,

Daniel Taylor BSc (Hons) AIFireE Senior Fire Engineer

Daniel Taylor BSc (Hons) AIFireE Senior Fire Engineer

Marshall Fire Ltd Weston Business Centres, Parsonage Road, Takeley, Essex, CM22 6PU

Marshall Fire Ltd Weston Business Centres, Parsonage Road, Takeley, Essex, CM22 6PU

M: +44 (0) 7710589610 E: dtaylor@marshallfire.co.uk

M: +44 (0) 7710589610 E: dtaylor@marshallfire.co.uk

Registered Address: Weston Business Centres Parsonage Road Takeley Essex CM22 6PU Registration Number: 13143461 VAT number: 379 1699 35

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

Daniel Taylor BSc (Hons) AIFireE Senior Fire Engineer Marshall Fire Ltd Weston Business Centres, Parsonage Road, Takeley, Essex, CM22 6PU M: +44 (0) 7710589610 E: dtaylor@marshallfire.co.uk

Registered Address: Weston Business Centres Parsonage Road Takeley Essex CM22 6PU Registration Number: 13143461 VAT number: 379 1699 35

Registered Address: Weston Business Centres Parsonage Road Takeley Essex CM22 6PU Registration Number: 13143461 VAT number: 379 1699 35

51


10

WIRED CERTIFICATES

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

52


WIRED CERTIFICATES 10.1 Building A, B

Project Honey - Building A

Project Honey - Building B

has achieved WiredScore Platinum rating

has achieved WiredScore Platinum rating

for its digital connectivity

for its digital connectivity

Arie Barendrecht Founder & CEO

WiredScore champions the modern day necessity for cutting-edge technology in real estate by providing the definitive standards for the digital connectivity of commercial and residential buildings. Visit wiredscore.com to learn more.

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

John Meko Global Director of Operations

3 Saint James's Road, Kingston upon Thames KT1 2DH, United Kingdom Certification ID: 34598 WiredScore - V3 - Office Certification valid until: May 30, 2025

Arie Barendrecht Founder & CEO

WiredScore champions the modern day necessity for cutting-edge technology in real estate by providing the definitive standards for the digital connectivity of commercial and residential buildings.

John Meko Global Director of Operations

3 Saint James's Road, Kingston upon Thames KT1 2DH, United Kingdom Certification ID: 34599 WiredScore - V3 - Office Certification valid until: June 27, 2025

Visit wiredscore.com to learn more.

53


11

KEY SCHEDULES

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

54


Key Schedules 11.1 Door schedule

TIMBER DOOR - MASTER KEY SCHEDULE Revision: Status: Document No.

Line No.

DOOR DETAIL

CYLINDER DETAIL

1 2 3 4 7 9 12 13 14 15 17 22 23 24 26 27 28 29 34 35 40 42 43 44 47 49 52 53 54 55 59 62 63 64 65 71 72 73 74 75 78 82 83

Door No. D-00-003 D-00-004 D-00-006 D-00-008 D-00-025 D-00-042 D-00-052 D-00-064 D-01-007 B D-01-010 B D-01-023 A D-01-083 D-01-088 D-02-005 B D-02-012 D-02-019 D-02-022 B D-02-025 A D-03-012 B D-03-019 B D-03-025 A D-03-093 D-03-098 D-04-015 B D-04-022 B D-04-025 D-04-103 D-04-108 D-05-013 B D-05-015 B D-05-029 A D-05-113 D-05-118 D-06-008 D-06-010 B D-06-025 D-06-123 D-06-128 D-07-006 B D-07-010 B D-07-014 A D-07-133 D-07-138

Location 00-003 - WC 00-005 - WC Core 00-017 - BOH 00-016 - BOH 00-004 - Cleaners 00-004 - WC Core 00-006 - Corridor 01 01-031 Stair Lobby 01-003 - WC 01-004 - Cleaners 01-R18 - Cleaners 01-004 - WC Core 01-005 - WC Core 02-003 - WC 02-005 - WC Core 02-004 - WC Core 02-004 - Cleaners 02-007 - Cleaners 03-004 - Cleaners 03-003 - WC 03-007 - Cleaners 03-004 - WC Core 03-005 - WC Core 04-004 - Cleaners 04-003 - WC 04-007 - Cleaners 04-004 - WC Core 04-005 - WC Core 05-004 - Cleaners 05-003 - WC 05-007 - Cleaners 05-004 - WC Core 05-005 - WC Core 06-004 - Cleaners 06-003 - WC 06-007 - Cleaners 06-005 - WC Core 06-004 - WC Core 07-004 - Cleaners 07-003 - WC 07-007 - Cleaners 07-004 - WC Core 07-005 - WC Core

Door Description FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60

Thickness 54 54 44 44 44 54 54 54 54 44 54 54 54 54 54 54 44 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54

84 85 91 92 93 95 98 100 6 8 9 14 16 17 25 26 27 30 31 32 37 39 41 46 47 49 54 55 56 62 63 65 70 71 76 79

D-08-002 B D-08-004 B D-08-032 D-08-143 D-09-004 D-09-023 D-10-009 D-10-022 D-00-029 D-00-044 D-00-048 D-01-012 B D-01-029 A D-01-030 D-02-030 D-02-031 A D-02-032 A D-03-022 A D-03-023 A D-03-024 B D-04-022 A D-04-023 D-04-028 D-05-026 D-05-027 D-05-029 B D-06-019 B D-06-022 D-06-023 A D-07-011 D-07-012 A D-07-021 D-08-024 B D-08-029 A D-09-031 D-10-031

08-004 - Cleaners 08-003 - WC 08-010 - Cleaners 08-004 - WC Core 09-003 - WC 09-004 - Cleaners 10-004 - Cleaners 10-003 - WC M-00-005 - Stair Lobby 02 M-00-005 - WC Core M-00-031 - Stair Lobby M-1-005 - Stair Lobby 02 M-01-004 - WC Core M-01-005 - WC Core M-02-006 - Stair Lobby 02 M-02-004 WC Core M-02-005 - WC Core M-03-005 - WC Core M-03-004 - WC Core M-03-005 - Stair Lobby 02 M-04-005 - WC Core M-04-004 - WC Core M-04-005 - Stair Lobby 02 M-05-005 - WC Core M-05-004 - WC Core M-05-005 - Stair Lobby 02 M-06-005 - Stair Lobby 02 M-06-004 - WC Core M-06-005 - WC Core M-07-005 - WC Core M-07-004 - WC Core M-07-005 - Stair Lobby 02 M-08-005 - Stair Lobby 02 M-08-004 - WC Core M-09-005 - Stair Lobby 02 M-10-005 - Stair Lobby 02

FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60S

44 54 54 54 54 44 44 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 44 54 54

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

Screw Position

Iron. Set Ref. Product Code 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008a 1621.70.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 008b 1621.80.BLK 009Ab 4nr 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK

008a 009Ab 008b 009Ab 009Ab 4nr 008a 008a 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Ab 009Aa 009Ab 009Ab

1621.70.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.70.BLK 1621.70.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK 1621.80.BLK

Cylinder Length 80 80 70 70 70 80 80 80 80 70 80 80 80 80 80 80 70 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80

70 80 80 80 80 70 70 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Description 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K

70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K GMK (General Master) Building A WC Core Entrances Building A Cleaners Cupboards Building A BOH Building B WC Core Entrances Building B Cleaners Cupboards Building B BOH Builing B Stair Lobby 02

LOCKING PLAN Cylinder Marking

Finish Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black

Cylinder Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Key Qty 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3

DOOR DETAIL Francis Hunter MCLH Acceptance Acceptance

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

x

x

x

x x

x x

x

x

x

x x

x x

x x

x x

x

x x

x

x

x

x x

x

x

x

x

x

x

x

x

x

x

x

x

x

x x

x

x

x

x

x

Door No. D-00-003 D-00-004 D-00-006 D-00-008 D-00-025 D-00-042 D-00-052 D-00-064 D-01-007 B D-01-010 B D-01-023 A D-01-083 D-01-088 D-02-005 B D-02-012 D-02-019 D-02-022 B D-02-025 A D-03-012 B D-03-019 B D-03-025 A D-03-093 D-03-098 D-04-015 B D-04-022 B D-04-025 D-04-103 D-04-108 D-05-013 B D-05-015 B D-05-029 A D-05-113 D-05-118 D-06-008 D-06-010 B D-06-025 D-06-123 D-06-128 D-07-006 B D-07-010 B D-07-014 A D-07-133 D-07-138

Location 00-003 - WC 00-005 - WC Core 00-017 - BOH 00-016 - BOH 00-004 - Cleaners 00-004 - WC Core 00-006 - Corridor 01 01-031 Stair Lobby 01-003 - WC 01-004 - Cleaners 01-R18 - Cleaners 01-004 - WC Core 01-005 - WC Core 02-003 - WC 02-005 - WC Core 02-004 - WC Core 02-004 - Cleaners 02-007 - Cleaners 03-004 - Cleaners 03-003 - WC 03-007 - Cleaners 03-004 - WC Core 03-005 - WC Core 04-004 - Cleaners 04-003 - WC 04-007 - Cleaners 04-004 - WC Core 04-005 - WC Core 05-004 - Cleaners 05-003 - WC 05-007 - Cleaners 05-004 - WC Core 05-005 - WC Core 06-004 - Cleaners 06-003 - WC 06-007 - Cleaners 06-005 - WC Core 06-004 - WC Core 07-004 - Cleaners 07-003 - WC 07-007 - Cleaners 07-004 - WC Core 07-005 - WC Core

Door Description FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD30 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Kraft Paper, Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60 FSC, Single Leaf, Oak VQC (2021.12), Lining, FD60

CYLINDER DETAIL Thickness 54 54 44 44 44 54 54 54 54 44 54 54 54 54 54 54 44 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54 44 54 54 54 54

Screw Position

Iron. Set Ref. Product Code 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008a 1621.70.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 008b 1621.80.BLK 009Ab 4nr 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 008b 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK 008a 1621.70.BLK 009Ab 1621.80.BLK 008b 1621.80.BLK 009Ab 1621.80.BLK 009Ab 1621.80.BLK

Cylinder Length 80 80 70 70 70 80 80 80 80 70 80 80 80 80 80 80 70 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80 70 80 80 80 80

Description 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 70mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K 80mm 5-Pin Euro Cylinder & Turn M/K

Builing B Stair Lobby 02

Building B BOH

Building B Cleaners Cupboards

Building B WC Core Entrances

LOCKING PLAN Cylinder Marking

Finish Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black

Cylinder Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Francis Hunter MCLH Acceptance Acceptance

Key Qty 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

x

x

x

x x

x x

x

x

x

x

x

x x

x x

x x

x x

x

x

x x

x x

x x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x x x

x

x

x x

x

x x x x

x

x x

x

x x

x x

x x x x

x x

x

x

1 2 3 4 7 9 12 13 14 15 17 22 23 24 26 27 28 29 34 35 40 42 43 44 47 49 52 53 54 55 59 62 63 64 65 71 72 73 74 75 78 82 83

x

x x

Cylinder face (visible) Cylinder body (concealed)

Building A BOH

Project Honey (McLaughlin & Harvey Site) 3 St James' Road Kingston Upon Thames Surrey KT1 2BA

Authorised Signature to be registered (Tick Box) : Yes No Cylinder identify marking instructions (Tick Box) : Yes No Differ number to be marked on (Tick Box) :

Building A WC Core Entrances

Project Address :

GMK (General Master)

Project Name : Project Honey

Building A Cleaners Cupboards

Customer Address : 2 Epsom Downs

Metro Centre Tadworth Surrey KT20 5LR

Contact Name : Alex Money

Builing B Stair Lobby 02

Building B BOH

Building B Cleaners Cupboards

Cylinder face (visible) Cylinder body (concealed)

Building B WC Core Entrances

Project Honey (McLaughlin & Harvey Site) 3 St James' Road Kingston Upon Thames Surrey KT1 2BA

Building A BOH

Project Address :

Authorised Signature to be registered (Tick Box) : Yes No Cylinder identify marking instructions (Tick Box) : Yes No Differ number to be marked on (Tick Box) :

Building A WC Core Entrances

Project Name : Project Honey

DESCRIPTION

Contact Name : Alex Money

Building A Cleaners Cupboards

Name of Suite Owner : Swift Crafted Ltd

C03 CR EDC-SWI-ZXX001-ZZ-SH-X-3201

DESCRIPTION

Customer Address : 2 Epsom Downs

Metro Centre Tadworth Surrey KT20 5LR

GMK (General Master)

Name of Suite Owner : Swift Crafted Ltd

TIMBER DOOR - MASTER KEY SCHEDULE

C03 CR EDC-SWI-ZXX001-ZZ-SH-X-3201

Line No.

Revision: Status: Document No.

x x

x

x

x

x

x

x

55


Key Schedules 11.2 Electrical keys Building A Electrical keys Electrical Keys Fire Alarm Panel Refuge Alarm panel Disabled Alarm Distribution Board LV panel Castel lock Keys Generator Fuel tank Lighting control Data cabs ATS Smoke vent EVC PV Fire Alarm Panel key switch Refuge Alarm Panel key switch MSFD Panel key switch Building A GRP enclosure

Type

Quantity

Accessories

KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY

2 2 2 50 2 3 2 2 10 10 10 2 10 2 2 2 2 2

MCP key

Type

Quantity

MCCP ASHP AHU Sprinkler Trace Heating

KEY KEY KEY KEY KEY

4 6 4 4 2

Accessories

Type

Quantity

Accessories

KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY

2 2 2 50 2 3 N/A N/A 10 10 10 2 10 2

MCP key

Francis Hunter Acceptance

Electrical Keys Fire Alarm Panel Refuge Alarm panel Disabled Alarm Distribution Board LV panel Castel lock Keys Generator Fuel tank Lighting control Data cabs ATS Smoke vent EVC PV Fire Alarm Panel key switch Refuge Alarm Panel key switch MSFD Panel key switch Building A GRP enclosure

Type

Quantity

Accessories

KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY KEY

2 2 2 50 2 3 2 2 10 10 10 2 10 2

MCP key

KEY

2

KEY

2

KEY

2

KEY

2

KEY

2

KEY

2

KEY

2

KEY

2

Type

Quantity

KEY KEY KEY KEY KEY KEY

4 6 4 4 2 2

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

MCLH Acceptance

Francis Hunter Acceptance

Mechanical Keys MCCP ASHP AHU Sprinkler Trace Heating Rain water harvesting

Type

Quantity

KEY KEY KEY KEY KEY KEY

4 6 4 N/A 2 2

Item

Flood Barriers Manhole Keys Mansafe PPE (Harness, Lanyard, Transfastener) Portable Davit Arms Davit Arm Accessories Rail Travellers Davit Storage Boxes New Haden Pump Key

Accessories

MCLH Acceptance

MCLH Acceptance

Francis Hunter Acceptance

Accessories

Quantity

All Areas Free Issued Material Item

Mirror Tiles Wall Grab Rails (620mm) Pull Down Rail Paper Towel Dispenser Doc M Shelf Loose Sanitary Bin Wall Hooks Doc M Sink Doc M Pan Sink Plub and trap Downlights Linear Light Fittings Drapes Drapes MVHR

MCP key

All Areas Equipment

MCP key

Building B Mechanical Keys Mechanical Keys MCCP ASHP AHU Sprinkler Trace Heating Sprinkler Tank

MCLH Acceptance

Building C Electrical keys

Building C Mechanical Keys

Building B Electrical keys Electrical Keys Fire Alarm Panel Refuge Alarm panel Disabled Alarm Distribution Board LV panel Castel lock Keys Generator Fuel tank Lighting control Data cabs ATS Smoke vent panel EVC PV Fire Alarm Panel key switch Refuge Alarm Panel key switch MSFD Panel key switch Building A GRP enclosure

Francis Hunter Acceptance

MCP key

Building A Mechanical Keys Mechanical Keys

MCLH Acceptance

MCLH Acceptance

Francis Hunter Acceptance

MCLH Acceptance

Francis Hunter Acceptance

Quantity

Area

1 20 boxes 3 1 1 1 1 2 1 1 1 3 TBC 4 5 1

Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC Block B GF WC CAT A Areas L01, L02, L03, L04 L01, L02, L03, L04, L07 A

MCLH Acceptance

Francis Hunter Acceptance

TBC 2 5 4 6 2 1

Francis Hunter Acceptance

56


12

COMPLETION PHOTOS

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

57


Completion photos

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

58


Completion photos

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

59


Completion photos

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

60


Completion photos 12.1 Site wide - Building A

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

61


Completion photos 12.2 Building B

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

62


Completion photos 12.3 Building B

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

63


Completion photos 12.4 Building B

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

64


Completion photos 12.5 Building A

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

65


Completion photos 12.6 Building A

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

66


Completion photos 12.7 Building A

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

67


Completion photos 12.8 Building A

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

68


Completion photos 12.9 Building C

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

69


Completion photos 12.10 Building C

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

70


Completion photos 12.11 Building C

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

71


Completion photos 12.12 Building C

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

72


Completion photos

Eden Campus, Kingston Upon Thames KT1 Practical Completion document

73


Eden Campus, Kingston Upon Thames KT1 Practical Completion document

74


appendix a Final Certificate Letter – Buildings A, B and C

FH090-151015


David Lunt Francis Hunter Limited 21a Kingly Street London W1B 5QA

Sweco Building Control Limited Eldon House 2 - 3 Eldon Street (Gated entrance via Wilson Street) London, EC2M 7LS +44 2030 021 210

5 December 2024 Project Reference: 66101102

New mixed use development, Project Honey, Surrey House, Kingston upon Thames, London, KT1 Dear David We refer to the above project and confirm that part of the works relating to the Initial Notice comply with the Building Regulations. We enclose a copy of our Final Certificate for Buildings A and B (Office) and Building C (Multistorey Car Park) and advise that we have also forwarded the same to the Local Authority Building Control and the Fire Authority in accordance with the Regulations. Please do not hesitate to contact us should you require any further information or if we can be of help in any other way. Yours sincerely

Gregory Kypri Class 3G/H - Specialist Building Inspector Registration Number: RBCP03881C5R +44 2030 021 210 +44 7824 140 350 gregory.kypri@sweco.co.uk Enclosed

Reg. Office Address: Sweco Building Control Limited, Grove House, Mansion Gate Drive, Leeds, LS7 4DN +44 113 262 0000 | info@sweco.co.uk | www.sweco.co.uk Sweco Building Control Limited, a company incorporated in England & Wales (Reg. No.: 02891295)


appendix b Mecserve Validation Report

FH090-151015


02nd December 2024 Project Honey Kingston Unilever Campus

Dear David, PC COMPLETION – PROJECT COMPLETION BUILDINGS A, B AND C We hereby confirm, exercising the standard of reasonable skill and care required by our Appointment (“the Appointment”) and subject to the terms and conditions of the Appointment, that the MINIMUM DESIGN CRITERIA Rev 03 dated 26/11/20 ,’Minimum Acceptable Standards’ have been met across buildings A, B and C of the Unilever Campus, Kingston. Mecserve is satisfied the commissioning has been satisfactorily completed to building A, B and C in accordance with the approved commissioning plan. Evidence has been collated for each item to show compliance.

Yours sincerely

Peter Kirk Director On behalf of Mecserve Enclosed – Minimum Design Criteria Rev 03 (26/11/2020)


appendix c DAA Statement of Practical Completion

FH090-151015


appendix d MNP Statement of Practical Completion

FH090-151015


Our Ref:

SV/lb/220051.c.A01

27th November 2024 Mr David Lunt Francis Hunter Ltd 115 Southwark St, London SE1 0JF By email <david.lunt@francishunter.co.uk>

Dear David, PROJECT HONEY (EDEN CAMPUS) - CLIENT MONITORING ROLE – BLOCK A COMPLETION Mason Navarro Pledge has been commissioned to provide a Civil and Structural Engineering Client Monitoring Role (CMR) in connection with the above project. Our scope of services was defined in our fee letter reference SV/lb/220055.c.01 dated 15th November 2021 and our project Appointment. Building A is at a point of Practical Completion. We confirm that our monitoring role is complete and that we have no outstanding comments to be addressed before Practical Completion can be accepted. Buildings B and C will be covered by separate statements of completion. Yours Sincerely,

STEPHEN VERNON For Mason Navarro Pledge Ltd


Our Ref:

SV/lb/220051.c.B01

14th November 2024 Mr David Lunt Francis Hunter Ltd 115 Southwark St, London SE1 0JF By email <david.lunt@francishunter.co.uk>

Dear David, PROJECT HONEY (EDEN CAMPUS) - CLIENT MONITORING ROLE – BLOCK B COMPLETION Mason Navarro Pledge has been commissioned to provide a Civil and Structural Engineering Client Monitoring Role (CMR) in connection with the above project. Our scope of services was defined in our fee letter reference SV/lb/220055.c.01 dated 15th November 2021 and our project Appointment. Building B is at a point of Practical Completion. We confirm that our monitoring role is complete and that we have no outstanding comments to be addressed before Practical Completion can be accepted. Buildings A and C will be covered by separate statements of completion. Yours Sincerely,

STEPHEN VERNON For Mason Navarro Pledge Ltd


Our Ref:

SV/lb/220051.c.C01

28th November 2024 Mr David Lunt Francis Hunter Ltd 115 Southwark St, London SE1 0JF By email <david.lunt@francishunter.co.uk>

Dear David, PROJECT HONEY (EDEN CAMPUS) - CLIENT MONITORING ROLE – BLOCK C COMPLETION Mason Navarro Pledge has been commissioned to provide a Civil and Structural Engineering Client Monitoring Role (CMR) in connection with the above project. Our scope of services was defined in our fee letter reference SV/lb/220055.c.01 dated 15th November 2021 and our project Appointment. Block C is an open sided car park structure that is designed to accommodate rain water ingress through the open facade. Surface water within the car park is managed through a series of cross falls on car park slabs to internal channels, which discharge to the below ground drainage network. During construction, rain water became trapped in the hollow precast floor units and has been seeping out as the structure dries. The majority of the structure is now complete dry but in some limited and local areas, water seepage is still active at the point of Practical Completion. Water trapped within the structure is unmanaged and could be from construction or could be associated with live water ingress through the façade. To enact PC, the contractor shall agree to monitor water seepage until such a time that the structure is free of unmanaged water. During this period, the contractor shall put in place measures to prevent water seepage damaging vehicles within the car park. Water damage to surfaces or fittings during the period of monitoring shall be repaired at the contractor’s cost. Buildings A and B will be covered by separate statements of completion. Yours Sincerely,

STEPHEN VERNON For Mason Navarro Pledge Ltd


appendix e Aecom Statement of Practical Completion

FH090-151015


AECOM Limited Aldgate Tower 2 Leman Street London E1 8FA United Kingdom aecom.com

Our Ref: 60627560/dte/r2

Date: 06/12/24

GLOBE KINGSTON LIMITED NFU Mutual Tiddington Road, Stratford upon Avon, Warwickshire CV37 7BJ

Dear Employer Surrey House Island Site, Kingston on Thames, Surrey - Building A&C Notwithstanding anything to the contrary contained in this letter, this statement is prepared for AECOM Limited’s (“AECOM”) client, Globe Kingston Limited (the “Employer”), and is subject to the terms of AECOM’s appointment with that Employer dated 14th January 2022 (the Appointment) in relation to services performed at the project limited to the Surrey House Island Site, Kingston on Thames, Surrey – Building A&C and AECOM shall not be construed as owing any greater duty or obligation than the exercise of reasonable skill and care in accordance with the Appointment. In carrying out our Services using reasonable and care in accordance terms of Appointment AECOM has, undertaken inspections and, confirm that the works are in accordance with the project requirements (Employer’s Requirements/Contractor’s Proposal) for the Surrey House Island Site, Kingston on Thames, Surrey – Building A&C, (in so far as such requirements have been provided to AECOM), and with due professional regard to the approved plans and building control compliance (if any) so as to enable practical completion of Building A&C. We have prepared and provided to the Employer Agent our list of outstanding items and snags as stated with the following documents below; -

Completion Key Issues_Bldg A_C Project Honey – Building A Snag Report 05.12.24 Project Honey – Building C Snag Report 05.12.24 Project Honey – External Works Snag Report 05.12.24 Project Honey – Facade Snag Report 05.12.24

Yours sincerely

David Emerson Regional Director AECOM Limited T: M:07803 599698 E: david.emerson@aecom.com Encs

Completion Key Issues_Bldg A_C Via link Project Honey – Building A Snag Report 05.12.24 Project Honey – Building C Snag Report 05.12.24 Project Honey – External Works Snag Report 05.12.24 Project Honey – Facade Snag Report 05.12.24

AECOM Limited registered in England & Wales, Company number 1846493. Aldgate Tower, 2 Leman Street, London, E1 8FA aecom.com

1/1


Project Honey - Kingston Practical Completion – Key issues

60627560/dte 06/12/24

Building A&C 1.

Walkround 29/11/24 a. General valve tags to be fitted throughout b. External wireways in courtyard to be cut back to ground level c. A number of illuminated exit signs missing from car park exit doors to stairs & final exit d. MCLH ongoing water quality management & testing of sealed mech LTHW/CHW systems until BSRIA BG 29/2021 compliance achieved e. Clear all rubbish off site f. Protection to Bldg C lobby plastic smoke vent louvres

2. 3.

O&M manuals to be updated from draft Issues from Cause & Effect 28/11/24 Any remedial works to equipment to resolve C&E demo should be annotated on final test certificates

a.

During L8/9 tests - EVAC lift door sticking on GF. OTIS removed from service until resolved.

b.

Fire and Refuge panels not networked with main reception/fireman entrance panels.

c.

L6 link bridge fire curtain not operational at time of witness (supplied/controlled from building A)

Lifts Building A – 1.

Block A L1 – 78N14B709 – Note suggesting that this is not the original DoC. Suggest that Otis confirm when the tests were undertaken that align with this certificate. This is dated now but should be stated when put into use in July as that would be when the tests as statement as to compliance were on the test sheet, or were they repeated. Whilst we have a DoC for PC the lift can only have one DoC issued and this should be the one from July 2024, not a reissued one.

2.

Block A Lift 7 – Is an evacuation Lift but indicated as compliant with EN81-72, as opposed to BS9999 Annex G. They are not the same Code. This lift has evacuation intercoms adjacent to it. Otis to clarify.

\\na.aecomnet.com\lfs\EMEA\London-UKLON06\Legacy\UKLON06PFPSW001\UFI\Jobs\PR469433_Project_Honey\300_Communications\310_Client\Completion Key Issues_Bldg A_C.docx


\\na.aecomnet.com\lfs\EMEA\London-UKLON06\Legacy\UKLON06PFPSW001\UFI\Jobs\PR469433_Project_Honey\300_Communications\310_Client\Completion Key Issues_Bldg A_C.docx


AECOM Limited Aldgate Tower 2 Leman Street London E1 8FA United Kingdom aecom.com

Our Ref: 60627560/dte/r1

Date: 11/11/24

GLOBE KINGSTON LIMITED NFU Mutual Tiddington Road, Stratford upon Avon, Warwickshire CV37 7BJ

Dear Employer Surrey House Island Site, Kingston on Thames, Surrey - Building B Notwithstanding anything to the contrary contained in this letter, this statement is prepared for AECOM Limited’s (“AECOM”) client, Globe Kingston Limited (the “Employer”), and is subject to the terms of AECOM’s appointment with that Employer dated 14th January 2022 (the Appointment) in relation to services performed at the project limited to the Surrey House Island Site, Kingston on Thames, Surrey – Building B and AECOM shall not be construed as owing any greater duty or obligation than the exercise of reasonable skill and care in accordance with the Appointment. In carrying out our Services using reasonable and care in accordance terms of Appointment AECOM has, undertaken inspections and, confirm that the works are in accordance with the project requirements (Employer’s Requirements/Contractor’s Proposal) for the Surrey House Island Site, Kingston on Thames, Surrey – Building B, (in so far as such requirements have been provided to AECOM), and with due professional regard to the approved plans and building control compliance (if any) so as to enable sectional completion of Building B. We have prepared and provided to the Employer Agent our list of outstanding items and snags as stated with the following documents below; -

Completion key issue Bldg B_final Project Honey – Building B Snag Report 05.12.24

Yours sincerely

David Emerson Regional Director AECOM Limited T: M:07803 599698 E: david.emerson@aecom.com Encs

-

Completion key issue Bldg B_final Project Honey – Building B Snag Report 05.12.24 (by link)

AECOM Limited registered in England & Wales, Company number 1846493. Aldgate Tower, 2 Leman Street, London, E1 8FA aecom.com

1/1


Project Honey - Kingston Sectional Completion – Key issues

60627560/dte 11/11/24

Building B 1.

MCLH ongoing water quality management & testing of sealed mech LTHW/CHW systems until BSRIA BG 29/2021 compliance achieved

2.

O&M manuals to be updated from draft in period allocated

\\na.aecomnet.com\lfs\EMEA\London-UKLON06\Legacy\UKLON06PFPSW001\UFI\Jobs\PR469433_Project_Honey\300_Communications\310_Client\Completion Key Issues_Bldg B_final.docx


appendix f EOC Statement of Practical Completion

FH090-151015


David Lunt Francis Hunter 3rd Floor, 115 Southwark Street, London SE1 0JF

20215/PC-1-1 Date:06/12/2024

Dear David, Surrey House Island Site, Kingston on Thames – EOC Statement of Completion In carrying out our services following the scope of our terms of appointment as facade engineers, we have made periodic site visits to review the progress and quality of the works and commented on the compliance of the Contractors’ Proposals against the Employer’s Requirements. Insofar as the information we have received, the facade site water testing was conducted in accordance with the CWCT standard and the project performance specification We confirm that to the best of our knowledge, as far as we could reasonably review on site, and notwithstanding the Project Honey – Façade Snag Report dated 05/12/2024 and review of O&M manual, the works have been undertaken in accordance with the facade ERs, or to agreed divergences from the facade ERs, and have been completed to reasonable general standard. On this basis, in so far as we have been able to ascertain, we have not adverse comment to the issue of Practical Completion Certificate. Yours sincerely,

Kevin Yin Façade Technical Director


appendix g ACS Technical Audit Remediation Tracker

FH090-151015


TECHNICAL AUDIT REMEDIATION TRACKER Buildzone Ref BZ9084931 Number: Address: Project Honey Eden Street Kingston KT1 1ER Surveyor:

Ahmet Ozcagli

Key:

Urgent Remediation Informative Remediation Resolved

No.

Remediation 1.00

Observations / Remediation / Comments

1.01

Client is advised to provide below information for works before site visit: •Provide images of works before visit including pile caps, foundations before concrete pour, floor slab before concrete pour, Core twin wall installations •Provide pile integrity tests certificates. •Provide pre-pour QA inspection records for foundations, slabs, columns and core wall installations.

1.02

Provide images of drainage works before backfilling.

1.05

Provide structural engineer’s solution or approval for the low concrete coverage for steel over precast slab at Block A ground floor.

1.07

Provide structural engineer’s solution or approval for the low concrete coverage for steel over precast slab at Block B ground floor.

1.08

Provide structural engineer’s solution or approval for the low concrete coverage for steel over precast slab at Block C ground floor.

1.11

For Block B, provide structural engineer’s written approval of fire door opening core wall cutting works.

1.13

Provide repair method statement and images of repairs at Block C precast elements. Method statement provided. Repairs observed on site. Provide images of Block C car park floors before concrete pours.

1.14 1.17

Client is advised to provide repair methodology of repair applications to floor concrete at Block C roof level.

1.18

Client is advised to provide repair methodology of repair applications to floor concrete at Block C 1st level.

1.20

Provide waterproofing leak tests for Block A.

1.21

Provide waterproofing leak tests for Block B.

1.23

Provide waterproofing leak tests for Block C.

1.32

Block A level 8 moisture damaged plasterboard observed. Client is advised to provide images of changed plasterboards.

1.35 1.36

Provide images of completed façade cladding works at Block B ground floor.

Observed on site

Block B level 10 terrace parapet capping works ongoing at he time of inspection. Client is advised to provide images of completed parapets.

Approved Consultant Services

Inspections Required: 27 (Twentyseven) Inspection No: 23 of 27 Date of Inspection: 22.11.2024 Updated: 03.12.2024 LP

Current Status

2.05 Duplicate 2.01 Duplicate


2.00

Technical Submissions

2.01

Pre-pour QA inspection reports

2.02

Building control inspection records

2.03

Full RIBA Stage 5 Architectural Drawings

2.04

Full RIBA Stage 5 Structural Drawings and Calcs

2.05

Pile integrity test results

2.06

Cube test results

2.07

Heat soak and impact test glass specifications

2.08

Terrace and flat roof IBG

2.09

List of full cladding materials proposed

2.10

Windows & external door manufacture guarantees

2.11

Provide QA records for precast elements from manufacturer

3.00

Other matters arising (at time of inspection)

3.01

Provide all statutory and certification documentation at project completion inline with technical reporting

Bauder Guarantee for all blocks provided.

Fire consultant QA records Bolt checking QA records Basement waterproofing QA records Weld test certs Static load test certs BBA certification for any rainscreen cladding or brick slips Building Control Completion Cert(s) EPC Mechanical Ventilation certification Chlorination certs Gas/water/elec certs No Gas Fire door compliance commissioning Fire suppression, alarm commissioning Sound tests Air tests Lift Commissioning Drainage pressure testing (written confirmation from AI) & or CCTV

Approved Consultant Services

BZSS to review

N/A


appendix h Chartplan Planning Conditions Tracker

FH090-151015


Detail Planning Application No: 22/02905/FUL – Consented 11/01/2023 Updated 29/11/2024 Surrey House, 34 Eden Street NCP Car Park, St James Road Former Hippodrome, Eden Street And Bo Concept, The Roundhouse 20 Eden Street PROPOSAL: Application under S73 of the Town & Country Planning Act 1990 to carry out development without compliance with condition 1 (Approved plans) of planning permission ref: 21/04022/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans) of Planning Permission ref: 20/02495/FUL (Full Planning application for the demolition of Surrey House, Multi Storey Car Park, Hippodrome and Bo Concept and the erection of 2 (two) Office buildings [Use Class - E(g)(i)] Building A and Building B: Building A 9 storeys (22,144 (GEA) sqms) Building B 11 storeys (11,587 (GEA) sqms). The erection of a replacement multi storey car park of 354 spaces plus cycle parking (for use as a public car park at weekends) landscaping, public realm upgrades, servicing, pedestrian and vehicular access) dated 02/12/2021. Variations to include alterations to bridge link, elevations, floorplates, ground floor level access, rooftop plant and screen, service yard, reduction to height of Buildings A and B, alterations to landscaping/public realm, removal of basements and stairs on sides of Building A. T This application is accompanied by an Environmental Statement. Taking into account the Environmental Information contained within the Environmental Statement and addenda thereto, which was submitted under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 and subject to a ‘Legal Agreement’, PERMIT subject to the following conditions: This application is accompanied by an Environmental Statement. BRIEF OUTLINE OF CONDITIONS (See Notice of Decision of Planning Application 22/02905/FUL for Full Specification) 1

The approved development shall be carried out in accordance with the following drawings/details: (See consent for full list of drawings)

TIME LINE SENSITIVITY Informative

TO BE ACTIONE D BY

APPLICATION SUBMISSION

PROGRESS Response to questions posed by fund

NMA App deposited re cladding deposited and validated 27/04/23

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

APPROVAL DATE


Ref: 23/01117/NMA Consented 25/05/23 NMA Re Spandrel changes Deposited 09/08/23 Ref: 23/02182/NMA Validated 09/08/23 Consented 07/09/23 Louvre NMA App deposited validated 03/01/24 Ref: 24/00017/NMA Consented 23/04/24 2

3

Informative The development hereby permitted shall begin before the nd nd expiration of three years from 2 December 2021 (2 December 2024) . The development shall be completed in accordance with samples above for all facing materials including fenestration and boundary Pre treatments (gates, fences / walls, other) including details of ground works manufacturing specification which shall be submitted to and condition approved in writing by the Local Planning Authority before above ground works on site are commenced. The development shall then be built in accordance with these approved samples and completed prior to occupation.

MCLH

11th 2022

November

Validation details 22/03576/CLC NMA Deposited re Facing Material amendments Deposited 25/09/23 Validated 27/09/23 23/02623/NMA Consented 23/04/24

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 30/01/23 22/03576/CLC


1 4

5

6

Notwithstanding the details shown on the approved plans additional architectural detailing plans at scale 1:10/ 1:5 showing all openings and key elements of the building / landscape (windows, doors, facade glazing, fins and parapets, spandrel panels, entrance and associated publicly visible features, signage, lighting in publicly accessible areas, vents / intakes / exhausts, grilles / louvres, rooftop plant, other elevational features shall be submitted to and approved in writing by the Local Planning Authority before the relevant element is commenced on site. The development shall be constructed in accordance with the approved details. Prior to any occupation an updated full and detailed landscape and planting plan, including details of additional tree planting on Brook Street shall have been submitted to and approved in writing by the local planning authority. The Strategy shall include the details of the 6 trees to be planted in Brook Street along with the proposed locations and details of the tree pits and tree grilles. The Trees planted on Brook Street shall comprise of 3no. Fastigiate Hornbeam (Carpinus betulus ‘Fastigiata’) planted at a minimum of 550cm tall with a minimum single clear stem of 200cm and a girth of 30-35cm, and 3no. Fastigiate Hornbeam (Pyrus calleryana ‘Chanticleer’) planted at a minimum of 450cm tall with a minimum single clear stem of 200cm and a girth of 25-30cm. The Strategy shall be implemented within the first planting season following completion of the development and the landscape and planting shall thereafter be maintained for five years to the satisfaction of the Local Planning Authority. Any trees or planting that die during this period shall be replaced during the following planting season, and the areas shown to be landscaped shall be permanently retained for that purpose. No above ground development shall take place until details of all external lighting have been submitted to and approved in writing by the Local Planning Authority. The external lighting shall be installed in accordance with the approved details and thereby retained as such unless a variation is subsequently submitted to and approved in writing by the Local Planning Authority.

Pre development condition, relevant to each section

MCLH

Application deposited 15/08/23 Ref: 23/02245/CLC Validated 22/08/23

Consented 10/10/23

Pre-occupation condition

MCLH

Application deposited 11/06/24 Ref: 24/01446/CLC

Consented 06/08/24

Pre above groundworks condition

MCLH

Application deposited 31/10/22 Validated Ref: 22/03480/CLC

Consented 23/01/23

Pre above ground development

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

22/03480/CLC


7

Notwithstanding the provisions of the Town and Country Planning Informative (General Permitted Development) (England) Order 2015 (or any Order revoking or re-enacting this Order) No fans, louvres, ducts, external lighting or other external plant other than those shown on the drawings hereby approved shall be installed without the prior written approval of the Local Planning Authority.

8

All works on site shall take place in accordance with the details approved pursuant to 22/00273/CLC (Details of Demolition and Construction Environmental Management Plan)

9

10

11

Informative The development shall be carried out in accordance with details approved by 22/00759/CLC (Levels). The development shall be carried out in accordance with details approved under 22/00371/CLC pursuant to Condition 10 (Site Waste Management Plan). Within 6 months of above ground works a Public Realm Management Plan, including measures to minimise any adverse microclimatic impacts of the development have been submitted to and approved in writing by the Local Planning Authority. Prior to the beneficial occupation of the development hereby approved the hard and soft landscaping shall be fully implemented and made available for all residents and thereafter maintained for the lifetime of the development.

12

13

Informative

Informative

Within 6 months of commenceme nt of above ground works

MCLH

Application deposited 10/05/24 Ref 24/01192/CLC Decision due 05/07/24

Consented 28/10/24

by

Informative The development hereby permitted shall be carried out in accordance with the approved Transport Statement. Prior to the commencement of any development above ground level, details of secure cycle parking facilities to serve the development to which this permission relates shall be submitted to and approved in writing by the local planning authority. The cycle parking facilities as shown in the approved details shall be provided prior to beneficial occupation of the development to

Pre development condition (above ground)

MCLH

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 30/01/23 Ref: 22/03841/CLC


which this permission relates and shall be permanently retained for that purpose and kept free from obstruction thereafter. 14

15

The hard surfaces hereby approved shall be made of porous materials and retained thereafter or provision shall be made and retained thereafter to direct run-off water from the hard surface to a permeable or porous area or surface within the /curtilage of the property. The revised energy strategy as approved by 22/00683/CLC on 3rd January 2023 shall be implemented throughout the development of the site.

16

Informative

Informative

Informative Any flat roofed area that is not identified as communal or private amenity space or roof terrace shall not be converted or used as a balcony or sitting out area, and no access shall be gained except for maintenance purposes.

17 A public art and way-finding strategy should be submitted to the local planning authority for approval prior to commencement of above ground works. The public art and wayfinding strategy shall identify proposed public art and way-finding works to be installed as part of the detailed landscaping strategy. The Strategy shall detail the mechanism for selecting the public art and way-finding works and the maintenance and management of the art works. The works of art shall be installed prior to the beneficial use of the car park or in accordance with the timeframe set out in the public art and wayfinding strategy and thereafter retained in accordance with the agreed maintenance and management plan. 18

Prior to the occupation of the development hereby approved, details of the works relating to highway works required in connection with the proposed bus stop and bus stand, including any relocation of services and pedestrian crossings, shall be submitted to and approved by the Local Planning Authority or by the Council as Highway Authority pursuant to Section 278 of the Highways Act 1980, and carried out in accordance with the approved details. Such details shall include the agreement of levels and construction details.

Pre above groundworks condition

MCLH

Consented 21/03/23 Ref:

22/03873/C LC

Pre occupation condition

MCLH

Application deposited 23/05/24 Ref: 24/01313/CLC Decision due: 18/07/24

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

DOC Consented 05/09/24


19

All works are to be to the Council's adoptable highway standards and shall include any associated drainage works, lighting improvements, landscaping, street furniture, road markings, signage, traffic orders, and any necessary alterations to statutory undertakers equipment. Any widening to the public footways shall be retained permanently available for pedestrian circulation and the widened areas dedicated as highway pursuant to the Highways Act 1980. The development shall be carried out in accordance with the details approved on 25.02.2022 Reference 22/02595/CLC (Written Scheme of Investigation WSI - Archaeology). No development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works. If heritage assets of archaeological interest are identified by stage 1 then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/ development shall take place other than in accordance with the agreed stage 2 WSI which shall include: A. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works; B. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI.

20

NMA to change wording to ‘within 12 months of occupation’.

Pre demolition condition

NMA application deposited 28/06/24 Ref: 24/01621/NMA

FHPM/Ch art Plan

Awaiting imminent response to the signing off of the various matters regarding this condition through an NMA, to include transport welfare facilities.

Decision due by 26/07/24

DOC app deposited 31.12.21 App validated 05/01/22 Ref: 21/04117/CLC

Consented 25/02/22

Additional Archaeology report submitted to LPA, validated 10/08/22 Ref: 22/02595/CLC

Consented 23/09/22

Application deposited 17/06/24 Ref:

Consented 21/08/24

Informative The servicing of commercial unit(s) hereby permitted shall only take place between 0700 and 2000 on any day, including Sundays and Bank Holidays.

21

Prior to occupation a Pedestrian Environment Review Study (PERS), considering the ten Healthy Streets indicators, as set out in the Mayor’s Transport Strategy, 2018 shall be submitted to and agreed in writing by the Local Planning Authority, the findings of which shall be implemented in accordance with timeframes

Pre occupation condition

Milestone

24/01511/CLC

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


agreed with the Local Planning Authority and thereafter permanently retained. 22

Decision 12/08/24

Prior to the occupation of the office, details as to how the approved Pre occupation development has been designed to connect to a future District condition Heating Network in the surrounding area and provision for the development’s connection shall be submitted to and agreed in writing by the Local Planning Authority and thereafter permanently retained.

23

The development shall be carried out in accordance with details Informative approved pursuant to 22/00463/CLC in relation to Condition 23 (Ecological Management Plan)

24

Prior to the occupation of development a Delivery and Servicing Management Plan shall be submitted to and approved in writing by the Local Planning Authority.

Pre occupation condition

The rating level of the noise determined by the cumulative sound emissions of the plant hereby permitted shall be at least 5dBA lower than the existing background noise level at any given time of operation. The noise levels shall be measured or predicted 1m externally to any window at the nearest residential facade. Measurements and assessment shall be made according to British Standard 4142:2014. The site and building works required to implement the development shall be only carried out between the hours of 08.00 and 18.00 Mondays to Fridays and between 08.00 and 13.00 on Saturdays and not at all on Bank Holidays and Sundays. The demolition secured through demolition PD Consent 20/02696/PRA and construction works shall be implemented in

Informative

25

26

27

MCLH

Application deposited and validated 23/11/23 Ref: 23/03103/CLC Decision 16.01.24

Chart Plan/Unilv er/MIlest one

due

due

Consented 08/11/24

by

Application deposited 17/06/24 Ref: 24/01510/CLC Decision due: 12/08/24

Informative

Informative

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 11/09/24


accordance with details approved pursuant to Condition 27 (Section 61 of Control of Pollution Act 1974). 28

29

30

31

32

33

34

The Development shall be carried out in accordance with the details approved on 08.03.2022 Reference 22/00411/CLC (Air Quality Technical Note Technical Note J13011 F1) All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA’s supplementary planning guidance “Control of Dust and Emissions During Construction and Demolition” dated July 2014 (SPG), or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not, without the prior written consent of the local planning authority. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register. Prior to commencement of above ground works on the development hereby permitted, a Damage Cost Assessment in line with the requirements of the GLA Sustainable Design and Construction Practice must be submitted to and approved in writing by the local authority. The development shall be implemented in accordance with the Fire Statement approved under 22/00557/CLC and retained as such for the lifetime of the development. The development shall be carried out in accordance with details approved by 22/03872/CLC on 5th January 2023 regarding the exhaust point to ensure the health and safety of residents nearby. The Development shall be carried out in accordance with the details approved 11.03.2022 Reference 22/00359/CLC (Contamination Ground Investigation Report).

Informative

Should remedial works be required in relation to contaminated land, the remedial strategy shall be submitted to and agreed in writing by the Local Planning Authority, prior to the commencement of the development works and remedial works.

Informative Remedial works condition

Informative

Pre above ground works condition

AQ Consultan ts / Chart Plan

App deposited 25/10/22 PP-11645457 Validated Ref: . 22/03432/CLC

Informative

Informative

Informative

-

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 23/01/23 22/03432/CLC


35

36

On completion of the agreed remedial works, a closure report and certificate of compliance endorsed by the interested party/parties, shall be submitted to and agreed in writing by the Local Planning Authority, prior to the occupation of the site by end users. If during implementation of this development, contamination is encountered which has not previously been identified, the additional contamination shall be fully assessed and a specific contaminated land assessment and associated remedial strategy shall be submitted to and agreed in writing by the Local Planning Authority before the additional remediation works are carried out. The agreed strategy shall be implemented in full prior to completion of the development hereby approved. Prior to commencement of groundworks (excluding site investigations and demolition), a final detailed drainage design, including drawings, supporting calculations, SuDS Statement and Drainage Assessment Form shall be submitted to and approved in writing by the local planning authority. A detailed management plan confirming routine maintenance tasks for all drainage components must also be submitted to demonstrate how the drainage system is to be maintained for the lifetime of the development. The system shall be implemented and thereafter managed and maintained in accordance with the approved details

Informative Contamination condition

Pre above groundworks condition

MCLH

Application deposited and validated 22/09/22 Ref: 22/03000/CLC

37

No building hereby permitted shall be occupied until evidence Pre occupation (photographs and installation contracts) is submitted to condition demonstrate that the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components

MCLH

Application deposited 25/07/24 Validated 30/07/24 24/01842/CLC Decision due by 19/09/24

38

Within 6 months of the commencement of any development above ground level, details of waste and recycling facilities to serve the development to which this permission relates shall be submitted to and approved in writing by the local planning authority.

Within 6 months of commencemen t of above groundworks condition

MCLH

Application deposited with LPA 07/08/23 Ref:

Consented 09/05/23

As part of the consultation process questions have been raised by the project engineer and circulated for their sign off on the 27th November. Planning authority and engineer now being chased.

23/02158/CLC Validated 09/08/23

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 11/10/23


39

The development (including any works of demolition) shall be carried out in accordance with details approved under 22/00306/CLC (Arboricultural Report and Drawings).

Informative

40

The approved protection scheme (Condition 39) shall be implemented prior to commencement of any work on site including demolition, and be maintained to the reasonable satisfaction of the Local Planning Authority until the completion of the development or until such stage as detailed within the approved AMS.

Informative

41

The development shall be carried out in accordance with the submitted Flood Risk Assessment (FRA) by Cole Easdon Consultants Limited (dated November 2022; issue no. 2; job no. 8922) and the Design Note by Robert Bird Group titled ‘Flood Volume Attenuation Strategy Clarifications – Updated MSCP’ (dated 02/09/2022; project no. 4881; document no. 4881-RBG-ZZ-XX-DN-CV-87002, issue 02) and the following mitigation measures it details:

Informative

To be provided by the applicable consultant referencing the criteria referred to in the condition.

Finished floor levels shall be set no lower than 8.8mAOD for more vulnerable residential uses • Finished floor levels shall be set no lower than 8.4mAOD for less vulnerable commercial uses • Finished floor levels shall be set no lower than 7.9mAOD for the commercial reception area • Flood storage mitigation shall be provided • Flood voids shall be installed These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme’s timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. 42

The development shall be carried out in accordance with the submitted Interim Flood Storage Scheme detailed within the letter from MNP to the Environment Agency (SV/ib/220051-04; dated 15

Informative

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


February 2021), with the location of the temporary storage amended in the Design Note by Robert Bird Group titled ‘Flood Volume Attenuation Strategy Clarifications – Updated MSCP’ (dated 02/09/2022; project no. 4881; document no. 4881-RBG-ZZXX-DN-CV-87002, issue 02). The car park ramp tank will be implemented at the trigger points specified and remain in perpetuity until the demolition of Lever House is complete. 43

Prior to occupation, a maintenance plan to manage the flood voids and grilles over the lifetime of the development will be submitted to, and approved in writing by, the local planning authority in consultation with the Environment Agency. The Plan should cover general maintenance and inspection as well as maintenance after a flood event. The approved management plan will then be implemented in full throughout the lifetime of the development.

Pre occupation condition

MCLH

44

Prior to occupation, a scheme detailing the flood resistance measures must be submitted to, and approved in writing by, the local planning authority with guidance from the Environment Agency. The scheme should include details on the passive flood barriers up to 8.31 metres above Ordnance Datum (mAOD) to protect: The shared reception of the Hive and Honey Buildings The car park basement access ramp, stairwell and lift lobbies The scheme shall be fully implemented and subsequently maintained, in accordance with the scheme’s timing/phasing arrangements, or within any other period as may subsequently be agreed, in writing, by the local planning authority.

Pre occupation condition

MCLH

45

Surface water draining from areas of car park hardstanding shall be passed through an oil separator or series of oil separators, prior to being discharged into any watercourse, soakaway or surface water sewer. The separator(s) shall be designed and constructed to have a capacity compatible with the area being drained, shall be installed prior to the occupation of the development and shall thereafter be retained and maintained throughout the lifetime of the development.

Informative

Application resubmitted 17/09/24 Validated 17/09/24 24/02292/CLC

DOC submitted Ref: 24/02707/CLC Decision due 26/12/24

Consented 18/11/24

Consented 29/11/24

To be provide by applicable engineer.

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 29/11/24


Clean roof water or vehicle washdowns and detergents shall not pass through the separator(s) and should be drained instead to foul sewer or sealed system. 46

47

A Car Park Management Plan demonstrating how the use of the car Pre occupation park will be controlled, including any restrictions and detailing the condition signage necessary within the site to direct pedestrians and vehicles shall be submitted to and approved in writing by the local planning authority before the first occupation of the development. The development shall be carried out in accordance with the approved details. By the time the development hereby permitted is substantially Informative complete, pedestrian/vehicular intervisibility splays of 2.8 m x 3.3 m shall have been provided in each direction where the access meets the back edge of footway, and shall be permanently retained free from any obstruction to visibility higher than 1.0m above ground level.

48

49

'Within six months of the commencement of the above ground development' details regarding the relocated bus driver welfare facilities on Brook Street, have been submitted to and agreed in writing by the Local Planning Authority. The relocated bus driver welfare facilities shall be delivered in accordance with time frames agreed with the Local Planning Authority prior to development, other than demolition and thereafter permanently retained. Bus driver welfare facilities will be retained throughout development. A. The development hereby permitted shall incorporate security measures to minimise the risk of crime and disorder and meet the specific security needs of this development in accordance with Secured by Design Commercial 2015 or its equivalent required security standards. Details of these measures shall be submitted to and approved in writing by the local planning authority prior to commencement of the development and shall

MCLH / Occupier

Within 6 months of commencemen t of above groundworks condition

MCLH

Pre development condition

MCLH FHPM Kabsec

DOC deposited 08/11/24 24/02804/CLC Decision due 03/01/25

Ongoing - statutory consultation responses expected w/c 9th December NMA application applicable.

Application deposited 03/04/23 Ref:

no

longer

Consented 31/05/23

23/00892/CLC

/ /

App deposited 21/02/22 Validated 22/02/22 Ref: 22/00558/CLC (Originally submitted under Planning Consent

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

(TRANSIT APPLICATION )* Consented 28/04/22


20/02499 /FUL – App form sent to LPA to request transfer to this app 19/04/2022)

be implemented in accordance with the approved details prior to occupation.

B.

As the proposed development is in close proximity to Kingston Town Centre, a crowded place, I would seek that that a blast assessment be completed by a member of the Register of Security Engineers & Specialists (RSES); this is order to determine the appropriate glazing specification for the building(s).

TO BE REVISED AS BELOW

C.

Prior to occupation of the offices a Secured by Design accreditation certificate or its equivalent from the Metropolitan Police Design Out Crime Office shall be submitted to and approved by the Local Planning Authority. D) Prior to the functioning of the multi-story carpark Park Mark Certification is achieved. 49

REVISED . A. The development hereby permitted shall incorporate security measures to minimise the risk of crime and disorder and meet the specific security needs of this development in accordance with Secured by Design details approved under 22/00558/CLC (other than the car park/ cycle parking proposed in Building C which is superseded by this permission.) Details of the car park/ cycle parking measures shall be submitted to and approved in writing by the local planning authority within 3 months of commencement of above ground works of the car park. The development shall be implemented in accordance with the approved details prior to occupation.

DOC 49a deposited Ref: 24/02744/CLC Decision due: 30/12/24

49a Consented 29/11/24

Within 3 months post commenceme nt of ground works.

B. As the proposed development is in close proximity to Kingston Town Centre, a crowded place, I would seek that a blast assessment be completed by a member of the Register of Security Engineers & Specialists (RSES); this is in order to determine the appropriate glazing specification for the building(s). C. Prior to occupation of the offices a Secured by Design accreditation certificate or its equivalent from the Metropolitan Police Design Out Crime Office shall be submitted to and approved by the Local Planning Authority.

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 29/11/24


D. Prior to the functioning of the multi-storey car park, Park Mark Certification is achieved. The development shall be implemented in accordance with the approved details.

50

51

52 53

54

A retail management plan to include opening hours and the link to the wider occupation of the site shall be submitted to the local planning authority for approval prior to commencement of the use of the Eden St retail units. The retail units shall operate in accordance with the approved management plan. Prior to occupation of the new office building, the woodland walk shall be made available to members of the public in accordance with hours of access and a management plan to be submitted to the local planning authority for approval. The woodland walk shall operate in accordance with the approved details. The car park shall be implemented in accordance with the details approved under 22/03504/CLC dated 29th December 2022. The development shall be implemented in accordance with the details approved on 07.03.2022 under reference 22/00292/CLC (Water re-use/harvesting).

Pre condition

use

Occupier

Application deposited 26/06/24 Ref: 24/01603/CLC Decision due: 21/08/24

Consented 28/10/24

Pre occupation condition

Occupier

Application deposited 17/06/24 Ref: 24/01509/CLC Decision Due: 12/08/24

Consented 11/09/24

Details shall be submitted to the local planning authority prior to commencement of development to demonstrate how the comprehensive landscaping strategy would achieve the proposed Urban Greening Factor of at least 0.3 within the site. The development shall be carried out in accordance with the approved details prior to occupation of the development.

Pre development condition

MCLH

Application deposited 03/04/23 Ref:

Consented 22/05/23

Informative Informative

23/00893/CLC

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


55

56

The minimum water consumption targets as per The London Plan 2021, i.e. 105 l/person/day for residential units and a BREEAM rating of ‘Excellent’ for the Wat 01 credits for non-residential uses. It should be stressed that these are the minimum requirements and need to be improved upon where possible . Air Quality Neutral Assessment: A Damage Cost Assessment using the most up to date damage cost toolkit from Defra and the most recent version of the EFT must be submitted to and approved in writing by the local planning authority within 3 months of commencement of development.

Informative

Within 3 months of commencemen t of development condition Informative

AQ Consultan ts

MCLH

57

The development must be carried out in accordance with the Dust Management Plan Reference approved on 07.03.2022. The applicant must install PM10 monitoring equipment at the site boundary, with exact locations to be determined through discussion with the local authority Environmental Health department.

58

No construction shall take place within 5m of the water main. Information detailing how the developer intends to divert the asset / align the development, so as to prevent the potential for damage to subsurface potable water infrastructure, must be submitted to and approved in writing by the local planning authority in consultation with Thames Water. Any construction must be undertaken in accordance with the terms of the approved information. Unrestricted access must be available at all times for the maintenance and repair of the asset during and after the construction works. Any piling must be undertaken in accordance with the terms of the approved piling method statement approved under 22/00390/CLC.

Report to be submitted – No time constraint specified.

In order to demonstrate compliance with the ‘be seen’ postconstruction monitoring requirement of Policy SI 2 of the London Plan, the legal Owner shall at all times and all in all respects comply with the energy monitoring requirements set out in points a, b and c below. In the case of non-compliance the legal Owner shall upon written notice from the Local Planning Authority immediately take all steps reasonably required to remedy noncompliance.

Various submissions

59

60

App deposited 25/10/22 PP-11645457

Consented 23/01/23 22/03432/CLC

Application deposited 05/08/24 Ref: 24/01921/CLC Decision due 02/10/24

Consented 12/09/24

Informative

Francis Hunter to provide response

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


a. Within eight weeks of planning permission being issued by the Local Planning Authority, the Owner is required to submit to the GLA accurate and verified estimates of the ‘be seen’ energy performance indicators, as outlined in Chapter 3 ‘Planning stage’ of the GLA ‘Be seen’ energy monitoring guidance document, for the consented development. This should be submitted to the GLA's monitoring portal in accordance with the ‘Be seen’ energy monitoring guidance.

61

62

b. Once the as-built design has been completed (upon commencement of RIBA Stage 6) and prior to the building(s) being occupied (or handed over to a new legal owner, if applicable), the legal Owner is required to provide updated accurate and verified estimates of the ‘be seen’ energy performance indicators for each reportable unit of the development, as per the methodology outlined in Chapter 4 ‘As-built stage’ of the GLA ‘Be seen’ energy monitoring guidance. All data and supporting evidence should be uploaded to the GLA’s monitoring portal. The owner should also confirm that suitable monitoring devices have been installed and maintained for the monitoring of the in-use energy performance indicators, as outlined in Chapter 5 ‘In-use stage’ of the GLA ‘Be seen’ energy monitoring guidance document. c. Upon completion of the first year of occupation following the end of the defects liability period (DLP) and for the following four years, the legal Owner is required to provide accurate and verified annual in-use energy performance data for all relevant indicators under each reportable unit of the development as per the methodology outlined in Chapter 5 ‘In-use stage’ of the GLA ‘Be seen’ energy monitoring guidance document. All data and supporting evidence should be uploaded to the GLA’s monitoring portal. This condition will be satisfied after the legal Owner has reported on all relevant indicators included in Chapter 5 ‘In-use stage’ of the GLA ‘Be Seen’ energy monitoring guidance document for at least five years. . The development shall be carried out in accordance with the approved details ref. 22/00622/CLC and maintained as such in perpetuity. The development shall be carried out in accordance with the plans and details approved under 22/03626/CLC (Drinking Water

Informative

Informative

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


63

64

65

66

Infrastructure) approved 30/12/22, and drinking water made available to the public for free in accordance with the plans and details prior to occupation of the development, and in perpetuity. The measures set out in the Air Quality Positive Statement AQPS approved on 08.03.2022 under reference 22/00412/CLC shall be implemented in accordance with the details so approved, and thereafter retained, unless otherwise agreed in writing by the local planning authority.

Informative

Prior to the occupation of each building the post-construction tab of the GLA’s whole life carbon assessment template should be completed accurately and in its entirety in line with the GLA’s Whole Life Carbon Assessment Guidance. The post-construction assessment should provide an update of the information submitted at planning submission stage, including the whole life carbon emission figures for all life-cycle modules based on the actual materials, products and systems used. This should be submitted to the GLA at: ZeroCarbonPlanning@london.gov.uk. along with any supporting evidence as per the guidance. Confirmation of submission to the GLA shall be submitted to, and approved in writing by, the local planning authority, prior to occupation of the relevant building The development shall be carried out in accordance with the Ducting Space for Full Fibre Connectivity Infrastructure Plans approved on 07.03.2022 under reference 22/00681/CLC these plans shall be implemented prior to occupation and maintained as such in perpetuity.

Pre occupation condition

Prior to the occupation any building, a Post Completion Report setting out the predicted and actual performance against all numerical targets in the relevant Circular Economy Statement shall be submitted to the GLA at: circulareconomystatements@london.gov.uk along with any supporting evidence as per the GLA’s Circular Economy Statement Guidance. The Post Completion Report shall provide updated versions of Tables 1 and 2 of the Circular Economy Statement, the Recycling and Waste Reporting form and Bill of Materials. Confirmation of submission to the GLA shall be submitted to, and

Pre occupation condition

MCLH

Now post occupation condition post approval of NMA

Timeline NMA deposited 05/08/24 (see NMA table below)

NMA Consent now received

Consented 18/11/24

Deposited 05/08/24 Decision due by 02/09/24 Ref: 24/01919/NMA

Informative

Now post occupation condition post approved NMA

MCLH

Timeline NMA deposited 05/08/24 (See NMA table below)

NMA Consent now received

Deposited 05/08/24 Decision due by 03/09/24 Ref: 24/01931/NMA

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk

Consented 18/11/24


67

approved in writing by, the local planning authority, prior to occupation. Notwithstanding the submitted details, prior to commencement of any above ground development (excluding demolition), details of a plant screen on top of Block A and Block B shall have been submitted to and approved in writing by the local planning authority. The approved plant screen shall be installed in accordance with the approved details prior to the occupation of the development hereby approved.

Prior to commencemen t of above ground works

MCLH/ DAA

App deposited 25/10/22 PP-11631141

Consented 26/01/23 22/03431/CLC

NMA APPLICATIONS

Application submission

Progress Response to posed by fund

NMA Application deposited re amendments to Building A and B Spandrel Panels

Deposited with LPA 09/08/23 Ref: 23/02182/NMA

Consent questions Consented 07/09/23

Validated 09/08/23 Consented 07/09/23 NMA Condition 3 (Facing Materials)

Deposited 25/09/23 Validated 27/09/23

Consented 23/04/24

23/02623/NMA Foot Bridge Link

Deposited and 03/10/23 Ref: 23/02702/NMA

validated

Consented 23/04/24

NMA Condition 1 – Louvre NMA

Application validated 03/01/24 Ref: 24/00017/NMA Consented 23/04/24 Application deposited 28/06/24 Decision due by 26/07/24 Ref: 24/01621/NMA

Consented 23/04/24

NMA Condition 18 (Highways)

Awaiting imminent response to the signing off of the various matters

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


regarding this condition through an NMA, to include transport welfare facilities. NMA Condition 64 (Carbon Assessment – Timeline change)

NMA Condition 66 (Economy Statement – Timeline change)

NMA Condition 46 (Car Park Management Plan – Timeline Change)

NMA Condition 44 – Flood Resistance, change wording from passive to active

Application deposited 05/08/24 Decision due by 02/09/24 Ref@ 24/01919/NMA Application deposited 05/08/24 Decision due by 03/09/24 Ref: 24/01920/NMA Application deposited 06/08/24 Decision due by 03/09/24 Ref: 24/01931/NMA Application deposited 31/10/24 Decision due: 28/11/24 Ref: 24/02705/NMA

Consented 18/11824

Consented 18/11/24

Replaced with application Consent received

DOC

Consented 26/11/24

Section 106 Obligations No.

Item

Description

1

Affordable Workspace contribution

2

Kingston Employment Support Services Contribution

3

Skills Employment and Apprenticeship Plan Contribution.

The Owner covenants to pay the Affordable Workspace Contribution to the Council prior to Occupation of the Development. Kingston Employment Support Services Contribution" means the sum of £232,000 Index Linked to be paid by the Owner to the Council towards the Council's work match brokerage initiative; Skills Employment and Apprenticeship Plan Contribution" means the sum of £50,000 Index Linked to be paid by the Owner to the Council towards implementation of the

Value percentage £250,000

/

Timescale

Latest Status

Prior to Occupation of the development

Paid

£232,000,

Prior to Commencement of the development.

Paid - 6th February 2023

£50,000

Prior to Commencement of the development

Paid - 6th February 2023 Pre-Construction SEP & Stakeholder Allocation sent to LPA 03.07.23

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


Skills Employment and Apprenticeship Plan. 4

5

The Owner covenants to submit to the Council for approval a Skills Employment and Apprenticeship Plan – Construction Phase within 3 months of Commencement of the Development to include the following provisions:

Skills Employment and Apprenticeship Plan – Operational phase

•

70 employment opportunities for residents of the South London Partnership Boroughs or students and graduates of the Mayor's Construction Academy. • 20 apprenticeships for Local Residents. • Two Local Businesses to be invited to quote for contracts less than £150,000 in value; and • Not less than 15% of the total value of goods and services procured throughout the construction phase to be procured from Local Businesses or businesses based in Neighbouring Boroughs The Owner covenants to use its best endeavours to comply with the Skills Employment and Apprenticeship Plan – Construction Phase during the construction of the Development PROVIDED THAT the Owner and the Council may agree amendments to the Skills Employment and Apprenticeship Plan – Construction Phase in writing from time to time. Skills Employment and Apprenticeship Plan – Operational Phase" means a plan setting out targets for local employment, skills and training and detailing mechanisms for

Within 3 month of commencement of the development (Clause 2.3 of S106)

Submitted to the Council approval 04/11/24 24/02800/LEG Decision due 31/12/24

for

Variation submitted 21/11/24 to accommodate shortfall in requirement Ref: 24/02933/DOV Decision due by 16/01/25

Within 18 months of commencement of the development. (Clause 2.6 of S106)

Report sent to LPA 24/09/24 Validated 21/10/24 24/02371/LEG Decision due 03/01/25

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


6

Carbon Dioxide Emissions Target

7

Carbon Dioxide Offsetting Contribution

8

Energy Monitoring Portal

9

Construction Environmental Management Plan

delivering such opportunities during the operational phase of the Development Carbon Dioxide Emissions Target” means a 35% carbon reduction against Part L2a of the Building Regulations 2013.

Carbon Dioxide Offsetting Contribution" means a sum of money (Index Linked) calculated on the basis of £60 per tonne for 30 years to be agreed between the Council and Owner (both parties acting reasonably) and paid by the Owner to the Council in the event that the Development cannot achieve the Carbon Dioxide Emissions Target and the shortfall in emissions reduction has not been offset through an accredited scheme or alternative off site off setting has not been agreed with the Council, to be used if payable towards the Council's Carbon Offset Fund which seeks the delivery of carbon dioxide emissions reductions projects within the Royal Borough of Kingston Upon Thames inter alia through retrofit of social housing, schools and civic buildings, investment in renewable energy projects and low-carbon lighting projects; “Energy Monitoring Portal” means the ‘Be seen’ webpage of the GLA’s website and the email address ZeroCarbonPlanning@london.gov.uk, or any other such method of submission that may replace this Construction Environmental Management Plan” means the plan to be submitted by the Owner to the Council for approval in accordance with paragraph 15 of Schedule 1;

35% carbon reduction against part L2a of the Building Regulations 2013 £60 per tonne for 30 years to be agreed

Following practical completion

N/A

To be submitted within 8 weeks of the grant of the Planning Permission

Completed

N/A

Prior to Commencement of the Development the Owner shall submit the Construction Environmental Management Plan

Submitted and approved

Following practical completion

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


10

Construction Phase Flood Management Plan

11

Rooftop Garden Management Plan

12

Car Park Management Plan

13

Delivery and Service Management Plan

14

District Heating Network

15

Highway and Public Realm Enhancement Works

16

TFL Works

Construction Phase Flood Management Strategy" means the measures set out in the flood risk assessment prepared by Cole Easdon Consultants Limited dated November 2020 (issue 5) submitted with the Planning Application and the supplementary letter issued by Mason Navarro Pledge Limited dated February 2021 attached to this deed at Appendix 2 as the same relate to the Land; Rooftop Garden Management Plan" means the plan for the provision of managed public access to the Rooftop Garden as may be varied from time to time in writing; "Car Park Management Plan" means a management plan detailing measures for the management of the use of the car park within the Development including restrictions on use of the car park by users other than the occupier(s) of the offices within the Development. Delivery and Servicing Management Plan” means the plan to be submitted by the Owner to the Council for approval in accordance with paragraph 16 of Schedule 1; “District Heating Network" means a third party district heating network to be developed within the Council's area and which is capable of providing electricity to the Development; “Highway and Public Realm Enhancement Works" means the highway and public realm enhancements identified for indicative purposes only on the Highway and Public Realm Enhancements Plan TfL Works" means the relocation of Transport for London's welfare facility from Brook Street near the corner of Eden Street

N/A

The Development shall be constructed and completed in accordance with the approved Construction Phase Flood Management Strategy.

Ongoing

N/A

Prior to Occupation of the Development (Tenant obligation)

Rooftop Management submitted to LPA 19/06/24

N/A

Prior to Occupation of the Development

N/A

Prior to Occupation of the Development

N/A

Plan

Action for Unilever

DHN rooms provided within Building A and B.

N/A

Following an agreement pursuant to section 278 of the Highways Act 1980

Discussions ongoing (Planning condition approved).

N/A

Within 12 months following first Occupation of the Development

Will form part of S278 works

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


17

Travel Plan

18

Woodland Walk Management Plan

as shown for indicative purposes only on the Highway and Public Realm Enhancements Plan; Travel Plan” means a full travel plan to be submitted to the Council for approval in consultation with Transport for London pursuant to paragraph 14 of the First Schedule; Woodland Walk Management Plan” means a management plan to be submitted to and agreed by the Council in accordance with paragraph 8 of the First Schedule which shall contain arrangements for management of the Woodland Walk including the management of public access to the Woodland Walk;

N/A

Prior to Occupation of the Development (Clause 14)

N/A

Application sent to LPA 18/10/24 24/02801/LEG Decision due 13/12/24

Action for Unilever Prior to Occupation of the Development

Suite 21, High Cedars, 20 Wray Park Road, Reigate RH2 0DD – Registered in England: 5204488 T: 01883 730 877 M: 07843 661 054 E: barry@chartplan.co.uk


appendix i Warranty Tracker

FH090-151015


warranty schedule project: Surrey House date:

19/11/24

consultant

ref

redacted order sent

employer

tenant

fund

lender

primary warranties 1.00

main consultants

1.01

Employers Agent

FHPM

COMPLETED

COMPLETED

COMPLETED

COMPLETED

1.02

Monitoring Architect

DAA

COMPLETED

N/A

COMPLETED

COMPLETED

1.03

Monitoring Civil and Structural Engineer (main and monitoring)

MNP

COMPLETED

COMPLETED

COMPLETED

COMPLETED

1.04

MEP Engineer

Aecom

COMPLETED

COMPLETED

COMPLETED

COMPLETED

1.05

Cost Consultant

G&T

COMPLETED

N/A

COMPLETED

COMPLETED

1.06

Main Contractor

MCLH

COMPLETED

COMPLETED

COMPLETED

COMPLETED

1.07

Demolition Contractor

Shorts

COMPLETED

N/A

COMPLETED

COMPLETED

1.08

s278 Works

FHPM

Returned to Gwlng 24/10/24…sent to BCLP for comment.

N/A

To be issued with appointment

To be issued with appointment

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

19/11/24

consultant

redacted order sent

ref 2.00 2.01

tenant

fund

lender

Warranties/LoR within 12 months of unconditional or no more drawdowns for relevant trades Architect Novated x 3 appointments DAA COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.02

Contractors Engineer

COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.03

Cladding consultant x 3 appointments

COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.04

Right of light consultant

COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.05

Measurement Surveyor consultant

Plowman & Craven

COMPLETED

COMPLETED

2.06

Validation Engineer

Mecserve

Signed by consultant….sent to Tenant. Agreed with Consultant. Reliance letter to be Updated reliance letter issued once details are with Consultant for provided. approval.

2.07

Environmental consultant

GEA

N/A

COMPLETED

COMPLETED

COMPLETED

2.08A

Landscape Architect

Gillespies

COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.08B

Landscape Architect - Contractor Appointment

McIIlwaine

2.09

Principal Designer x 3 appointments

ORSA

Received, certified copy Signed by Consultant and Signed by consultant, to be Signed by consultant, required. contractor…...arranging sent to tenant. arranging signature by signature by funder. lender. COMPLETED COMPLETED COMPLETED COMPLETED

Robert Bird (RBG) Eckersley O'Callaghan (EOC) Point2

employer

COMPLETED

Reliance letter to be issued Reliance letter to be issued once details are provided. once details are provided.

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

19/11/24

consultant

redacted order sent

employer

tenant

fund

lender

Fire Strategy Consultant SWECO Fire Strategy Consultant x 2 (one Marshall direct/retained and one with contractor) ….see below for contractor appointment

N/A COMPLETED

N/A COMPLETED

N/A COMPLETED

N/A COMPLETED

2.10C

Fire Strategy Consultant- Contractor Appointment

Marshall

Received, certified copy Issued to consultant for required. signature

Awaiting confirmation from funder to date.

Signed by consultant and contractor, arranging signature by lender.

2.11

Piling Bored.Sheet subcontractor

Van Elle

Received

COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.12

Concrete frame subcontractor

Mitchellson

Received

COMPLETED

COMPLETED

COMPLETED

COMPLETED.

2.13

Roofing subcontractor

AYM

Received

COMPLETED

Signed by the subcontractor and sent to Tenant

COMPLETED

Signed by sub-contractor and contractor. Arranging signature by the Lender.

2.14

MEPH subcontractor

Halsion

Received

COMPLETED

COMPLETED

COMPLETED

COMPLETED

2.15

Façade, cladding and curtain walling

Clarkes

Received

COMPLETED

COMPLETED

COMPLETED

Signed by the subcontractor and contractor. Arranging signature by the Lender.

ref 2.10A 2.10B

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

ref 2.16

19/11/24

consultant Acoustic consultant- Contractor Appointment

Hann Tucker

2.17

Lift subcontractor

Otis

2.18

Car Park Contractor (if separate)

2.19

Architectural metalwork/secondary steelwork

2.20

Plant screens and Louvres (if separate) Clarkes - See 2.15 Soffit cladding (if appropriate) Clarkes See 2.15 Steelwork connections (if appropriate) Mitchellson See 2.12

2.21 2.22

redacted order sent

employer

tenant

fund

lender

Received, certified copy Signed by the consultant, Awaiting confirmation required. to be sent to tenant from funder to date

Signed by consultant and contractor, arranging signature by the Lender.

Received

COMPLETED

COMPLETED

COMPLETED

Signed by sub-contractor and contractor. Arranging signature by Lender.

FP McCann

Received

COMPLETED

COMPLETED

COMPLETED

Signed by sub-contractor and contrator…arranging lender signature.

CMF Limited

Received

COMPLETED

COMPLETED

COMPLETED

COMPLETED

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

ref 2.23

19/11/24

consultant

redacted order sent

Design, supply and installation and commissioning of feature stair fire curtain etc.

Coopers Fire Limited

2.24

Feature staircase

2.25

Mansafe system

CMF Limited See 2.19 PTSG Received

2.26

Glazed doors and screens

OWS Fire Received Rated Limited

2.28

Flood protection equipment

2.29

Car park cladding (if separate)

RBG warranty See 2.02 Maple Received Sunscreening Limited

3.01

Sent in link 26/09/24

3 Secondary consultants supporting Planning Application only Acoustic consultant Hann Tucker

3.02

Air Quality consultant

3.03

Arboriculture consultants

AQ Consultants Landmark Trees

employer COMPLETED

COMPLETED

tenant Signed by the subcontractor. Sent to Tenant

COMPLETED

Signed by the subcontractor and contractor, arranging signature by Employer.

Signed by the subcontractor, sent to Tenant

COMPLETED

Signed by sub-contractor. Sent to Tenant.

fund

lender

COMPLETED

Signed by the subcontractor and contractor. Arranging signature by the Lender.

COMPLETED

COMPLETED

Signed by the subSigned by sub-contractor contractor and contractor, and contractor, arranging arranging signature by signature by lender. funder.

COMPLETED

Signed by contractor and sub-contractor. Arranging signature by Lender.

Appointment completed N/A

Funder warranty completed

N/A

Appointment completed N/A

Funder warranty completed Funder warranty completed

N/A

Appointment completed N/A

N/A

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

19/11/24

fund

lender

Archeological consultants

RPS Consultancy

Appointment completed N/A

Funder warranty completed

N/A

3.05

Asbestos consultant

Search Environmental

Appointment completed N/A

Funder warranty completed

N/A

3.06

Ecological consultant

Appointment completed N/A

Planning consultant

3.08

Security consultant

Kabsec

N/A

N/A

3.09

Blast consultant

Aibara

COMPLETED

N/A

Funder warranty completed Funder warranty completed COMPLETED (reliance letter) COMPLETED

N/A

3.07

Ecology Practice Chart Plan

3.10

Cladding Access consultant

Agreed with FHPM and N/A KF

Agreed with FHPM and KF N/A

3.11

Transport consultant

PTSG (Through MCLH) Milestone

COMPLETED

N/A

COMPLETED

N/A

3.12

Environmental Impact Statement consultant

Stantec

COMPLETED

N/A

COMPLETED

COMPLETED

Approved Inspector

Sweco

3.13 4.00

4.01 4.02

consultant

redacted order sent

ref 3.04

employer

tenant

Appointment completed N/A

N/A... statutory service

N/A... statutory service

N/A... statutory service

N/A N/A N/A

N/A... statutory service

Other Wind and microclimte consultant

BRE

N/A

N/A

N/A

N/A

Heritage and Townscape Consultant

Peter Stewart Consultancy

Completed

N/A

N/A

N/A

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

19/11/24

consultant

4.03 4.04 4.05

redacted order sent

employer

tenant

fund

lender

Viability study

Housing Expectations

Completed

N/A

N/A

N/A

Building Control

MLM (Sweco)

Completed

N/A

N/A

N/A

PC Validation Consultant

Colliers

Issued for signature to Consultant

Issued for signature to Consultant

Issued for signature to Consultant

Issued for signature to Consultant

Signed by the subcontrator…sent to the Tenant.

COMPLETED

Signed by the subcontractor and contractor, arranging signature by lender

ref

Building C roof landscape package and Frost associated works. 4.06

6.00 6.01

Sub-sub- contractor warranties Design and supply of twin wall (Mitchelson sub-sub contractor)

6.02

Kilsaran

Received dated COMPLETED copy…certified copy provided 30/9/24

Received

Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature

Issued to sub-sub contractor for signature

N/A

Design of PT slabs (Mitchelson sub-sub CCL contractor)

Received

Signed by sub-subcontractor

Signed by sub-subcontractor

N/A

6.03

Design, manufacture, installation (Mitchelson sub-sub contractor)

Intersteel

Received

Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature

Issued to sub-sub contractor for signature

N/A

6.04

Design and manufacture (Mitchelson sub-sub contractor)

Creagh

Received

Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature

Issued to sub-sub contractor for signature

N/A

Signed by sub-subcontractor

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


warranty schedule project: Surrey House date:

19/11/24

consultant

redacted order sent

fund

lender

Design and manufacture(Mitchelson sub-sub contractor)

FP McCann

Awaited

Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature

Issued to sub-sub contractor for signature

N/A

6.06

Sub-sub-contractor (Halsion)

Carbon3

Received, certified copy required

Issued to sub-sub Issued to sub-sub contractor for signature contractor for signature

Issued to sub-sub contractor for signature

N/A

6.07

Sub-sub-contractor (Halsion)

Issued to sub-sub contractor for signature

N/A

6.08

Sub-sub-contractor (Halsion)

Issued to sub-sub contractor for signature

N/A

6.09

Sub-sub-contractor (Halsion)

Safe and Sound Received, certified Issued to sub-sub Issued to sub-sub Control copy required contractor for signature contractor for signature Systems Limited Novenco Received, certified Issued to sub-sub Issued to sub-sub Building and copy required contractor for signature contractor for signature Industry UK Ltd Argus Fire Received, certified Issued to sub-sub Issued to sub-sub Protection copy required contractor for signature contractor for signature Company Limited

Issued to sub-sub contractor for signature

N/A

D2 Integrated Systems Ltd

Issued to sub-sub contractor for signature

N/A

ref 6.05

Sub-sub-contractor (Halsion)

employer

tenant

Received, certified Issued to sub-sub Issued to sub-sub copy required contractor for signature contractor for signature

6.10

https://francishunter.sharepoint.com/sites/FH/Shared Documents/Projects/03 current/10372 - Project Honey/01 Appts Contracts & Proc/Warranty & LOR tracker/Warranty and PI ScheduleTracker/Honey Warranty Schedule 241119


appendix j Guarantee Schedule

FH090-151015


PROJECT HONEY PRODUCT GUARANTEE SCHEDULE Manufacturer / Product Guarantees Description

Name

Type

Wicona extrusion warranty

Clarkes

Product guarantee

Uplocated to Centrodoc

Clarkes ATJ (Buildings A and B), OJL (Building C) Swiftcrafted (Buildings A and B) OJL (Building C)

OJL (Building C) Clarkes AYM Clarkes Charter Global A1S Coopers Flood stop Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion Halsion

Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee

Sprinkler system storage tank and ancillaries

Halsion

Product guarantee

Sprinkler systems e.g. sprinkler heads ASHP FCU Lighting Manufacturer

Halsion Halsion Halsion Halsion

Product guarantee Product guarantee Product guarantee Product guarantee

Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc. Please note the below ground tank is formed as part of the structure so is not covered by Argus, however the tank liner is. Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc

PPC colour coat warranty Ceiling raft panels Ceiling raft panels Internal doors (Timber) Internal doors (Timber) Internal doors (Glazed) Internal doors (Glazed) Internal ironmongery Internal ironmongery Glass Roofing material Revolving doors Roller Shutter Fire Curtains Feature Stair Fire Curtains Flood Protection Equipment Chillers Fire alarm system e.g. panels, detectors and sounders Domestic cold water tanks CAT 5 break tanks Electric radiant heater panels CHW and LTHW thermal stores CHW and LTHW ancillary equipment e.g. pressurisation units Electrical transformers Electrical switchboards and switchgear Electrical distribution boards Electrical meters Electrical isolators and outlets Heat meters and water meters All ductwork and accessories e.g. dampers All pipework and accessories e.g. valves Duct mounted attenuators BMS controls system MVHR units Air grilles and diffusers Lighting devices e.g. PIRs

OWS (Buildings A and B)

OJL (Building C) Swiftcrafted (Buildings A and B)

Comments


Lighting Controls Generators Air Handling Units EV Chargers External Lights Pumps & Fans Roof PV Panels

Halsion Halsion Halsion Halsion Halsion Halsion Halsion

Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee Product guarantee

Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc Uplocated to Centrodoc


appendix k Snag Reports and Related Supporting Documents Project Honey - Building A Snag Report 05.12.24 Project Honey – Building B Snag Report 05.12.24 Project Honey – Building C Snag Report 05.12.24 Project Honey – External Works Snag Report 05.12. 24 Project Honey – Façade Snag Report 05.12. 24 Project Honey – Tenant Snag Report Project Honey – Water Management Project Honey – Car Park Water Management Key Re-inspections post PC R2

FH090-151015


Project Honey – Building A Snag Report 05.12.24

.

FH090-151015


Building A Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T1.53382707

test 2

11/27/2024

12/4/2024

Post PC Defect

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Zak Diaby)

Building A>Eighth Floor Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.1432

Wall damage low level

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/6/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 2:03:19 PM T345546.1434

Damage to riser. Requires knocking the dent out and touching up

Images

11/26/2024 2:08:54 PM T345546.1436

Wall is flexing too much behind the column

Images

11/26/2024 2:15:08 PM T350553.2102

insulation/jackets missing from pipework

Images

11/26/2024 2:48:35 PM

12/5/2024 10:39:47 AM

11/26/2024 2:48:45 PM

11/26/2024 2:50:38 PM

Project Name: B5412 Project Honey

Page 1 Of 260


T350553.2103

box to be removed

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 2:52:57 PM 1

T350553.2106

pooling to be fixed on top of riser

Images

11/26/2024 3:02:12 PM Comments

Created By

Date

SI to be raise for additional work

Dariusz Grzelka (Aym (Services) Limited)

11/27/2024 8:18:10 PM

Building A>Eighth Floor>08­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.920

Damage to million to be made good

10/30/2024

11/1/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/30/2024 10:49:32 AM 2

T350553.2002

insulation to be made good around duct

Images

11/13/2024 12:14:13 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 2 Of 260


3

T350553.2005

spur to have circuit reference

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 12:16:19 PM 4

T350553.2006

redundant bracket to be removed

Images

11/13/2024 12:17:07 PM Comments

Created By

Date

Not Halsion's, this was used for the site temps drainage, please revert snag to relevant trade

James Parker (Halsion )

11/15/2024 1:18:14 PM

This is Halsions, this was for a svp pipe that was removed from design. Please action asap!!

Ian Robertson (McLaughlin & Harvey)

11/19/2024 6:16:38 PM

5

T350553.2007

metal clips required on armours

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/18/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Images

11/13/2024 12:20:16 PM 6

T345546.1350

paint on copex’s and duct work

Images

11/13/2024 2:44:09 PM

12/5/2024 10:39:47 AM

11/13/2024 2:44:18 PM

11/13/2024 2:44:39 PM

Project Name: B5412 Project Honey

Page 3 Of 260


7

T345545.1136

firestopping incomplete

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Jack Monaghan)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Jack Monaghan)

11/13/2024

11/18/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

Images

11/13/2024 2:45:08 PM 8

T345545.1137

firestopping incomplete

Images

11/13/2024 2:45:25 PM 9

T345546.1351

Firestopping incomplete

Images

11/13/2024 2:45:32 PM 10

T345546.1438

Extend conduit and tidy cables

Images

11/26/2024 2:19:22 PM Building A>Eighth Floor>08­02 Lift Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2067

Basket not earth linked with the rest of the system.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 4 Of 260


Images

11/1/2024 4:15:49 PM T338993.2068

11/1/2024 4:15:55 PM

11/1/2024 4:16:04 PM

11/1/2024 4:16:10 PM

Missing rod cups and end cups.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/1/2024 4:20:24 PM T338993.2069

11/1/2024 4:20:30 PM

Containment install is incomplete. Missing containment form the lift supplies.

Images

11/1/2024 4:21:17 PM

11/1/2024 4:21:22 PM

11/1/2024 5:03:52 PM

11/1/2024 5:04:09 PM

11/13/2024 3:24:22 PM

11/13/2024 3:24:32 PM

11/13/2024 3:24:38 PM

11/13/2024 3:25:17 PM

11/13/2024 3:25:48 PM Comments

Created By

Date

No photo evidence attached of the work done.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 2:02:03 PM

T338993.2082

2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat and spur.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/1/2024 5:01:41 PM

12/5/2024 10:39:47 AM

11/1/2024 5:01:46 PM

Project Name: B5412 Project Honey

Page 5 Of 260


T338993.2097

Additional metal cable ties required on cable drops and cables running out of containment.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/1/2024 5:44:20 PM T338993.2098

11/1/2024 5:44:25 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

11/1/2024 5:50:58 PM T338993.2099

Cable not run / secured properly.

Images

11/1/2024 5:51:55 PM T338993.2101

All the emergency lights missing the green led, indicating the health of the battery.

Images

11/1/2024 5:53:43 PM 1

T350553.1989

insulation damaged and incomplete

Images

11/12/2024 11:22:01 AM 12/5/2024 10:39:47 AM

11/12/2024 11:22:10 AM

11/12/2024 11:22:36 AM Project Name: B5412 Project Honey

Page 6 Of 260


2

T456527.1

Mastic to be tidied up behind architrave

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 8:57:15 AM 3

T456527.2

11/20/2024 8:57:23 AM

Damages on door to be made good

Images

11/20/2024 8:58:07 AM 4

T456527.3

11/20/2024 8:58:13 AM

Make good to adhesive on door frame

Images

11/20/2024 8:59:34 AM 2

T456527.4

Protection to be removed at bottom of architrave

Images

11/20/2024 9:00:07 AM 5

T456527.7

Raise doors as rubbing against floor

Images

11/20/2024 9:04:38 AM 12/5/2024 10:39:47 AM

11/20/2024 9:04:43 AM

11/20/2024 9:04:49 AM Project Name: B5412 Project Honey

Page 7 Of 260


6

T456527.165

PAR to be installed

11/25/2024

12/29/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/25/2024

12/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/25/2024 2:13:23 PM 5

T456527.166

Damage to floor finish to be made good

Images

11/25/2024 2:14:33 PM

11/28/2024 10:49:34 AM

Comments

Created By

Date

Floor has been patched but cable is still in floor

Alex Money (Swiftcrafted)

11/28/2024 10:49:50 AM

7

T456527.168

Raise doors to avoid any more damage to floor finish

11/25/2024

12/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/25/2024

12/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Images

11/25/2024 2:15:35 PM 8

T456527.169

11/25/2024 2:15:41 PM

Large gal between architrave and concrete wall to be made smaller

Images

11/25/2024 2:16:39 PM 9

T345546.1440

Realign tiles and ceiling bays

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 8 Of 260


Images

11/26/2024 2:29:52 PM 10

T345546.1441

Damage to ceiling raft bars ­ damaged by Halsion

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/26/2024 2:31:21 PM 11

T345546.1444

General review on installation

Images

11/26/2024 2:35:57 PM 12

T345546.1446

11/26/2024 2:36:08 PM

11/26/2024 2:36:15 PM

Containment doesn’t look right and is slanted. requires straightening up

11/26/2024 2:36:25 PM

Images

11/26/2024 2:44:08 PM 13

T456527.199

11/26/2024 2:44:14 PM

why is there a fire exit sign here as there is no exit? should it be the other side of the door

Images

11/26/2024 3:07:46 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 9 Of 260


14

T408928.107

fire escape sign missing

11/26/2024

12/29/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

11/26/2024 3:10:03 PM Building A>Eighth Floor>08­03 Corridor 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2066

Basket not earth linked with the rest of the system.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/1/2024 4:13:55 PM T338993.2074

11/1/2024 4:14:02 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

11/1/2024 4:40:44 PM T338993.2075

Missing lighting cable for the exit sign on the office plate. Not wired.

Images

11/1/2024 4:43:48 PM

11/1/2024 4:43:53 PM

11/1/2024 4:44:05 PM

12/2/2024 11:08:51 AM

Comments

Created By

Date

Missing exit sign is from west side while Halsion attached photo from north side.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 3:05:30 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 10 Of 260


T338993.2079

2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat and spur.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/25/2024

12/29/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/25/2024

12/29/2024

Snag

Opened

Fit-out

Swiftcrafted

Darling Associates (Robyn Harrison­ Church)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/1/2024 4:50:05 PM T350553.1932

11/1/2024 4:50:10 PM

2nd fix power incomplete ­ electric heater not wired

Images

11/13/2024 11:28:51 AM 1

T456527.170

11/19/2024 5:29:06 PM

Can back up generator be raised further up as it is too visable

Images

11/25/2024 2:18:21 PM 2

T456527.171

Damaged glass in door to be replaced

Images

11/25/2024 2:19:29 PM 3

T456527.384

Fill lifting eyes that are halved due to wall

Images

11/27/2024 12:22:04 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 11 Of 260


4

T456527.385

White smoke detector to be changed to black

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:22:31 PM 5

T456527.386

Sprinkler head to be installed

Images

11/27/2024 12:22:55 PM Building A>Eighth Floor>08­04 WC Core

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.457

smoke head missing

10/5/2024

10/12/2024

Snag

Opened

M&E

Halsion

Darling Associates (Liana Maltezou)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/5/2024 11:21:50 AM 2

T350553.1658

back box cover missing from containment

Images

10/29/2024 8:56:19 AM 1

T350553.1659

tiewraps to be cut short

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 12 Of 260


Images

10/29/2024 8:56:59 AM 3

T345546.970

Black fire alarm required

10/31/2024

11/6/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/4/2024

11/11/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/4/2024

11/11/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Vanngel Natso)

Images

10/31/2024 11:12:30 AM T338993.2111

Additional metal cable ties required on cable drops and cables running out of containment.

Images

11/4/2024 9:18:36 AM T338993.2120

11/4/2024 9:18:44 AM

Conduit coupler failed.

11/4/2024 9:19:08 AM

Images

11/4/2024 10:24:54 AM 4

T338993.2228

11/4/2024 10:25:01 AM

Vanity not cleaned.

Images

11/8/2024 11:39:10 AM

12/5/2024 10:39:47 AM

11/8/2024 11:39:15 AM

Project Name: B5412 Project Honey

Page 13 Of 260


3

T338993.2230

Socket not labelled.

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/8/2024 11:43:44 AM Building A>Eighth Floor>08­05 Corridor 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2070

Additional support required in line with building control comments that services should be supported as close as possible before and after fire stopping to prevent the weight falling on it.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/1/2024 4:26:48 PM T338993.2086

11/1/2024 4:26:53 PM

2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat.

Images

11/1/2024 5:21:27 PM T338993.2087

2nd Fix Small Power / Commissioning incomplete. FD not 2nd fixed.

Images

11/1/2024 5:21:58 PM T338993.2088

11/1/2024 5:22:03 PM

2nd Fix Small Power / Commissioning incomplete. Solenoid valve not 2nd fixed.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 14 Of 260


Images

11/1/2024 5:22:48 PM T338993.2089

11/1/2024 5:22:53 PM

Cleaner’s socket not fixed flash on the wall.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/22/2024

11/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/1/2024 5:24:41 PM T338993.2105

11/1/2024 5:24:53 PM

2nd Fix Lighting / Commissioning incomplete.

Images

11/1/2024 5:59:22 PM T350553.1933

11/1/2024 5:59:34 PM

11/1/2024 5:59:41 PM

2nd fix power incomplete ­ electric heater not installed

Images

11/13/2024 11:27:35 AM 1

T350553.2085

11/19/2024 5:27:57 PM

Sprinkler plug missing

Images

11/22/2024 9:50:48 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 15 Of 260


2

T456527.159

Redundant holes created by Halsion to be filled

11/25/2024

12/29/2024

Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Darling Associates (Robyn Harrison­ Church)

11/25/2024

12/29/2024

Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Darling Associates (Robyn Harrison­ Church)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/25/2024 2:08:51 PM 3

T456527.163

Make good around riser door edge

Images

11/25/2024 2:11:55 PM 4

T456527.388

Can plasterboard be brought down to floor

Images

11/27/2024 12:25:17 PM 5

T456527.389

Damages in plasterboard to be made good

Images

11/27/2024 12:25:41 PM 6

T456527.391

Socket to be installed flush

Images

11/27/2024 12:26:43 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 16 Of 260


7

T456527.392

Damages in wall to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:27:22 PM 8

T456527.393

White smoke detector to be changed to black

Images

11/27/2024 12:28:13 PM 9

T456527.394

Sprinkler cap to be made good

Images

11/27/2024 12:28:40 PM Building A>Eighth Floor>08­07 Plant Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1990

All isolators to be properly labelled

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 11:25:13 AM 2

T350553.1992

11/12/2024 11:25:18 AM

dosing pot wiring to be tidied up and tiewrapped

12/5/2024 10:39:47 AM

11/12/2024 11:25:23 AM

Project Name: B5412 Project Honey

Page 17 Of 260


Images

11/12/2024 11:29:21 AM 3

T350553.1993

11/12/2024 11:29:37 AM

trace heating wiring incomplete

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 11:30:24 AM 4

T350553.1994

heat meter box to be secured and cabling tidied

Images

11/12/2024 11:31:18 AM 5

T350553.2025

All isolators/spurs missing reference

Images

11/13/2024 12:41:20 PM 6

T350553.2026

heat meter probes to be connected

Images

11/13/2024 12:42:08 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 18 Of 260


7

T350553.2107

all heat meter probes and panel to fix

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 3:06:38 PM Building A>Eighth Floor>08­08 Plant Room Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1154

pipework metal cadding incomplete to LTHW CHW in cylinder room

10/10/2024

10/17/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/23/2024

10/30/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/23/2024

10/30/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 11:13:02 AM 1

T350553.1567

11/13/2024 11:13:15 AM

11/19/2024 5:12:17 PM

11/19/2024 5:12:28 PM

Fire alarm interface to BMS enclosure incomplete

11/19/2024 5:12:39 PM

Images

10/23/2024 2:11:28 PM T350553.1568

11/19/2024 5:16:57 PM

11/19/2024 5:17:08 PM

Insulation incomplete to LTHW/CHW on plant terrace

Images

11/13/2024 11:00:18 AM 2

T350553.1569

11/13/2024 11:00:40 AM

Cabling incomplete in plant terrace

12/5/2024 10:39:47 AM

11/13/2024 11:00:47 AM

11/13/2024 11:01:03 AM

11/19/2024 5:18:15 PM 10/23/2024

Project Name: B5412 Project Honey

11/19/2024 5:18:32 PM 10/30/2024

Incomplete Works

11/19/2024 5:18:58 PM Opened

11/19/2024 5:19:05 PM M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Page 19 Of 260


Images

11/13/2024 10:59:42 AM 3

T345546.948

11/13/2024 2:37:48 PM

repaired damages to tank room cladding

11/19/2024 5:22:37 PM 10/25/2024

10/28/2024

Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Dominic Driver)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/25/2024 6:30:40 PM 4

T350553.1977

metal clad insulation incomplete

Images

11/12/2024 11:10:52 AM 5

T350553.1978

11/12/2024 11:11:00 AM

electrical tray damaged ­ to be replaced

Images

11/12/2024 11:11:39 AM 6

T350553.1979

tiewraps to be cut short

Images

11/12/2024 11:12:18 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 20 Of 260


7

T350553.1980

insulation to be made good

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 11:13:11 AM 8

T350553.1981

smoke head to be fitted

Images

11/12/2024 11:13:38 AM 9

T350553.1983

pumps to be properly labelled

Images

11/12/2024 11:15:23 AM 10

T350553.1984

11/12/2024 11:15:28 AM

water heaters to be properly labelled

Images

11/12/2024 11:16:04 AM 11

T350553.1985

All isolators to be properly labelled

Images

11/12/2024 11:17:00 AM 12/5/2024 10:39:47 AM

11/12/2024 11:17:04 AM

11/12/2024 11:17:10 AM Project Name: B5412 Project Honey

Page 21 Of 260


12

T350553.1986

pressure switch to be piped

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

Roofing

Aym (Services) Limited

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Roofing

Aym (Services) Limited

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 11:17:48 AM 13

T350553.1987

wshp to be properly labelled

Images

11/12/2024 11:20:18 AM 14

T350553.1988

Booster set to be properly labelled

Images

11/12/2024 11:21:21 AM 15

T345545.1112

damage to plant enclosure

Images

11/12/2024 12:23:34 PM 16

T345545.1113

drip from top of plant enclosure ­ is there a fall to the down pipe?

Images

11/12/2024 12:24:31 PM 12/5/2024 10:39:47 AM

11/12/2024 12:24:38 PM Project Name: B5412 Project Honey

Page 22 Of 260


17

T345545.1114

fire exit signs to be installed in all plant areas

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/18/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/18/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 12:25:58 PM 18

T427849.1478

Improve lagging

Images

11/12/2024 12:27:41 PM 2

T427849.1479

General ­ Make good of ripped lagging in plant area

Images

11/12/2024 12:31:10 PM 19

T350553.2009

11/12/2024 12:31:16 PM

Lights not working and reference required on switch

Images

11/13/2024 12:22:53 PM 20

T350553.2010

Cable tray over loaded for amount of cables it has on it­ no spare capacity

Images

11/13/2024 12:24:07 PM 12/5/2024 10:39:47 AM

11/13/2024 12:24:15 PM Project Name: B5412 Project Honey

Page 23 Of 260


21

T350553.2011

Cable tray over loaded for amount of cables it has on it­ no spare capacity

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 12:54:39 PM 22

T350553.2012

11/13/2024 12:54:55 PM

Cable tray not earthed to main cable tray

Images

11/13/2024 12:26:32 PM 23

T350553.2013

Metal clips required on vertical cables

Images

11/13/2024 12:27:07 PM 24

T350553.2014

lighting insufficient for emergency egress

Images

11/13/2024 12:30:25 PM 25

T350553.2015

excess cable to be pulled above tray neatly

Images

11/13/2024 12:31:04 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 24 Of 260


26

T350553.2016

metal clips required on armours

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 12:31:31 PM 27

T350553.2017

All isolators/spurs missing reference

Images

11/13/2024 12:32:19 PM 28

T350553.2018

Remove redundant box

Images

11/13/2024 12:33:16 PM 29

T350553.2021

Missing black plates in DB and DB schedules missing

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

30

T350553.2022

Tray missing or uni strut required to support cables

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 12:38:35 PM 31

T350553.2023

metal clips and sub main reference required

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 25 Of 260


Images

11/13/2024 12:39:17 PM 32

T345546.1357

Damage to tank room cladding

11/13/2024

11/18/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Dominic Driver)

Images

11/13/2024 2:56:37 PM Comments

Created By

Date

damage by other trades ( SI required for reparation )

Dariusz Grzelka (Aym (Services) Limited)

11/25/2024 7:47:00 AM

33

T350553.2053

extra emergency light required at emergency exit route ­ dark spot where you need to duck under ductwork

11/19/2024

11/26/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/19/2024 5:24:32 PM 34

T350553.2104

11/19/2024 5:24:43 PM

Condense to be trapped and pointed to pebbles

Images

11/26/2024 2:58:06 PM 35

T350553.2105

insulation lids to be fitted to top of buffers

Images

11/26/2024 2:59:01 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 26 Of 260


Building A>Eighth Floor>08­L01 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2008

redundant ties and wire removed from tray

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 12:20:58 PM

11/13/2024 12:21:05 PM

Building A>Eighth Floor>08­R05 LS

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.395

Make good to damages under riser door

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:29:06 PM Building A>Eighth Floor>08­R10 M­Vent Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2108

plug missing from vent

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 3:18:03 PM Building A>Eighth Floor>08­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1668

small power incomplete ­ heaters/thermostats not wired

10/29/2024

11/5/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 11:33:58 AM 12/5/2024 10:39:47 AM

11/19/2024 5:34:16 PM Project Name: B5412 Project Honey

Page 27 Of 260


T338993.2115

2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat.

11/4/2024

11/11/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/4/2024

11/11/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/4/2024 9:40:22 AM T338993.2119

11/4/2024 9:40:27 AM

2nd Fix Small Power / Commissioning incomplete. Heater not 2nd fixed, missing thermostat.

Images

11/4/2024 10:05:48 AM 1

T456527.390

11/4/2024 10:05:48 AM

Fill holes that were created by Halsion but are no longer required

Images

11/27/2024 12:26:18 PM 2

T456527.449

Make good to lifting eye holes filler

Images

11/27/2024 2:50:39 PM Building A>Eighth Floor>08­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2092

Containment install is incomplete for Lift supply.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 28 Of 260


Images

11/1/2024 5:30:41 PM T338993.2108

11/1/2024 5:30:51 PM

All the emergency lights missing the green led, indicating the health of the battery.

11/1/2024

11/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/1/2024 6:07:22 PM 1

T456527.450

Fill gap next to architrave

Images

11/27/2024 2:51:41 PM 2

T456527.455

Damages to architrave to be made good

Images

11/27/2024 2:54:26 PM

11/27/2024 2:54:31 PM

Building A>Eighth Floor>08­S03 Stair 03

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.398

Fill chips in edges of steps

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:32:26 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 29 Of 260


2

T456527.400

Mastic gap in plasterboard

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:33:43 PM 3

T456527.401

Painting to be completed

Images

11/27/2024 12:34:29 PM 4

T456527.402

Another coat of paint required

Images

11/27/2024 12:34:51 PM 5

T456527.403

Clean steps

Images

11/27/2024 12:35:21 PM 6

T456527.407

Ensure all covers are placed on junction box

Images

11/27/2024 12:37:16 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 30 Of 260


Building A>Eighth Floor>08­S04 Stair Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.397

Fill holes in concrete

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:31:14 PM Building A>Eighth Floor>Terrace

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1562

finish between last slab and balustrade has a gap that is too big ­ no more than 5mm

11/14/2024

11/18/2024

Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Conor Colton)

Images

11/14/2024 12:39:23 PM

11/14/2024 12:39:28 PM

Comments

Created By

Date

AYM working following drawing ,any extra details, please rise SI

Dariusz Grzelka (Aym (Services) Limited)

11/28/2024 4:43:15 PM

2

T408928.105

general ­ damaged tiles from lock in screws

11/26/2024

12/29/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

Francis Hunter (Luke Nurser)

Images

11/26/2024 3:03:55 PM

11/26/2024 3:04:05 PM

11/26/2024 3:04:15 PM

Comments

Created By

Date

Tiles damaged by other trades ,SI needed for replacement

Dariusz Grzelka (Aym (Services) Limited)

11/28/2024 2:22:44 PM

Building A>Fifth Floor>05­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1640

FA call point not 2nd fixed.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 31 Of 260


Images

10/3/2024 6:50:22 PM T338993.1645

10/3/2024 6:50:25 PM

Lights not in line between them and with rafts.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/3/2024 7:00:54 PM T338993.1652

10/3/2024 7:01:00 PM

10/3/2024 7:01:08 PM

Additional metal cable ties required on light cables drop.

10/3/2024 7:01:14 PM

10/3/2024 7:03:35 PM

10/3/2024 7:04:12 PM

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/17/2024

10/24/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/3/2024 7:16:25 PM T338993.1654

Wrong Light lengths used.

Images

10/3/2024 7:18:52 PM 2

T350553.1326

10/3/2024 7:19:14 PM

Fire Curtain cabling to be clipped to ceiling

10/3/2024 7:19:42 PM

Images

10/17/2024 5:18:50 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 32 Of 260


3

T345546.891

Realign socket on South core wall

10/24/2024

10/28/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

10/24/2024

10/31/2024

Snag

Opened

Floors ­ raised access

Kingspan

Darling Associates (Liana Maltezou)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/24/2024 12:02:42 PM 4

T345545.756

RAF to be fixed down around feature stair fire curtain where underfloor firestopping was installed

Images

10/24/2024 12:10:13 PM 5

T350553.1835

light not working

Images

11/1/2024 10:36:09 AM 6

T350553.1836

11/1/2024 10:36:21 AM

CO2 sensor missing

Images

11/1/2024 10:40:04 AM 7

T350553.1843

PIR missing from ceiling tile

Images

11/1/2024 11:01:31 AM

12/5/2024 10:39:47 AM

11/21/2024 3:18:56 PM

Project Name: B5412 Project Honey

Page 33 Of 260


Comments

Created By

Date

Not on drawing, please could the tile be changed

Brett Pitcher (Halsion )

11/21/2024 3:18:14 PM

8

T345545.827

making good required to OWS door

11/1/2024

11/8/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/6/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

11/1/2024

11/8/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/1/2024 11:56:07 AM 9

T345546.1049

Realign and refit raised access Floring – for reference purposes Clarkes remove them to complete for fade works

Images

11/1/2024 12:15:05 PM 8

T345545.834

11/1/2024 12:15:11 PM

screws missing on door connector making it wonky

Images

11/1/2024 12:16:51 PM 10

T427849.1197

Riser edge damage to be made good

Images

11/1/2024 12:18:46 PM 11

T427849.1198

11/1/2024 12:18:54 PM

Riser edge damage to be made good

12/5/2024 10:39:47 AM

11/1/2024 12:19:01 PM

Project Name: B5412 Project Honey

Page 34 Of 260


Images

11/1/2024 12:24:06 PM 12

T427849.1199

11/1/2024 12:24:13 PM

Riser edge damage to be made good

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/6/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

11/1/2024 12:24:31 PM 13

T345546.1058

11/1/2024 12:24:37 PM

Crack in ceiling

11/1/2024 12:24:45 PM

Images

11/1/2024 12:24:43 PM 14

T427849.1204

Blind box needs aligning

Images

11/1/2024 12:29:33 PM 15

T345545.845

light missing insert

Images

11/1/2024 12:36:38 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 35 Of 260


16

T345545.847

light not working

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/4/2024

11/11/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/1/2024 12:37:36 PM 17

T427849.1210

Riser door edge to be made good

Images

11/1/2024 12:38:34 PM 18

T345545.851

11/1/2024 12:38:41 PM

magic man to attend to riser doors

Images

11/1/2024 12:44:16 PM 19

T345545.852

11/1/2024 12:44:23 PM

magic man to attend to riser doors

Images

11/1/2024 12:46:33 PM 20

T345545.900

alignment to be corrected

Images

11/4/2024 11:39:14 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 36 Of 260


21

T427849.1571

RAF tile too short and should go all the way into the stair

11/15/2024

11/19/2024

Snag

Opened

Floors ­ raised access

Kingspan

Darling Associates (Robyn Harrison­ Church)

11/15/2024

11/19/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

Images

11/15/2024 10:52:30 AM 22

T427849.1572

Consecutive steps too short and gaps inconsistent

Images

11/15/2024 10:53:51 AM

11/15/2024 10:53:57 AM

Comments

Created By

Date

Design/manufacturing­installation tolerances

Gabriel Luta (CMF)

11/19/2024 11:47:55 AM

Design/manufacturing/installation tolerance

Gabriel Luta (CMF)

11/19/2024 3:33:59 PM

STATUS CHANGE: There may be a gap tolerance but this should still be consistent ­ please rectify

Dominic Driver (McLaughlin & Harvey)

12/4/2024 8:49:49 AM

23

T427849.1573

Gap from step to edge too large and to be made good

11/15/2024

11/19/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

Images

11/15/2024 10:54:55 AM Comments

Created By

Date

Design/ manufacturing­installation tolerances

Gabriel Luta (CMF)

11/18/2024 12:15:08 PM

STATUS CHANGE: Please confirm the tolerance detail to confirm your comment

Dominic Driver (McLaughlin & Harvey)

12/4/2024 8:48:49 AM

24

T456527.31

Larger spacers to be installed to make it more consistent

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 10:13:14 AM 12/5/2024 10:39:47 AM

11/20/2024 10:13:25 AM Project Name: B5412 Project Honey

Page 37 Of 260


25

T345546.1379

Scews missing

11/20/2024

11/28/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 10:14:04 AM 24

T456527.32

11/20/2024 10:14:21 AM

Welds are on the outside at this corner but on the inside of the others

Images

11/20/2024 10:15:09 AM 26

T456527.33

Missing screws to be installed

Images

11/20/2024 10:15:57 AM 27

T345545.1141

11/20/2024 10:16:03 AM

rebar label to be removed from soffit

Images

11/20/2024 10:18:31 AM 28

T456527.34

Fire­stopping to be completed where conduit has been removed

Images

11/20/2024 10:19:04 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 38 Of 260


29

T345546.1380

RAF ­ is high than feature stair angle

11/20/2024

11/28/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/28/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/28/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 10:21:33 AM 30

T345545.1142

skirting stops too shy of feature stair, to be extended

Images

11/20/2024 10:22:39 AM 31

T345546.1381

Fire curtain doesn’t appear to be full raised. On the picture the LHS is flush and the RHS is sitting slightly under he boxing

Images

11/20/2024 10:22:49 AM 32

T345545.1143

fire curtain to be cleaned ­ can you confirm if this is corroded and affected the warranty?

Images

11/20/2024 10:24:20 AM 33

T345546.1382

change RAF

Images

11/20/2024 10:24:40 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 39 Of 260


34

T345546.1383

Gap is too big where meets feature stairs

11/20/2024

11/28/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/20/2024 10:27:19 AM 35

T345545.1145

skirting stops too shy of feature stair, to be extended

Images

11/20/2024 10:31:21 AM 36

T350553.2212

light not working

Images

11/29/2024 4:33:48 PM 37

T350553.2213

light end cap needs fixing

Images

11/29/2024 4:36:32 PM 38

T350553.2214

All cables to be tucked behind margin so they are not visible

Images

11/29/2024 4:38:14 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 40 Of 260


39

T350553.2215

light dips below ceiling, needs lifted

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 4:40:08 PM 40

T350553.2216

cable to be tied up

Images

11/29/2024 4:41:10 PM 41

T350553.2217

rods to be capped

Images

11/29/2024 4:42:06 PM 42

T350553.2218

light not working

Images

11/29/2024 4:42:43 PM 43

T350553.2219

light is brighter than all the rest.

Images

11/29/2024 4:43:56 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 41 Of 260


44

T350553.2220

lights do not align

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

11/29/2024 4:45:28 PM 45

T350553.2221

all sockets to be referenced

Images

11/29/2024 4:46:16 PM 46

T408928.177

remove black insulation for tile edge and close gap

Images

12/4/2024 9:24:56 AM 47

T408928.178

damage to tile edge

Images

12/4/2024 9:25:32 AM 48

T408928.179

ensure tiles are properly aligned

Images

12/4/2024 9:26:13 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 42 Of 260


49

T408928.180

number of panels misaligned on row. re align

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

12/4/2024 9:27:19 AM 50

T408928.181

general ­ clean dirty ceiling tiles before re alignment takes place

Images

12/4/2024 9:29:17 AM 51

T408928.182

ensure tiles are properly aligned

Images

12/4/2024 9:30:53 AM 52

T408928.183

ensure tiles are properly aligned

Images

12/4/2024 9:31:41 AM 53

T408928.184

ensure tiles are properly aligned

Images

12/4/2024 9:32:17 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 43 Of 260


54

T408928.185

realign row and ensure no visible black cloth

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

12/4/2024 9:34:17 AM 55

T408928.186

light not aligned with tiles. confirm this is in line with drawings

Images

12/4/2024 9:35:54 AM 56

T408928.187

damage to tile edge

Images

12/4/2024 9:37:15 AM 57

T408928.188

realign row and ensure no visible black cloth

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

58

T408928.189

damaged tile to replace

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

12/4/2024 9:40:51 AM 59

T408928.190

faulty light

Images

12/4/2024 9:45:33 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 44 Of 260


60

T408928.191

damaged tile

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

12/4/2024 9:47:56 AM Building A>Fifth Floor>05­02 Lift lobby

7

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1180

BMS cabling incomplete

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/17/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

10/23/2024

10/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/24/2024

10/28/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

Images

10/11/2024 8:47:21 AM 1

T345546.599

10/29/2024 11:28:10 AM

11/7/2024 9:03:01 AM

11/13/2024 3:59:27 PM

11/20/2024 11:12:09 AM

Running man sign isn’t positioned correctly.Installed as per drawing but the the actual sign is overlapping the architrave which isn’t right

Images

10/17/2024 5:05:11 PM 2

T350553.1549

BMS cabling to be tidied and tied up neatly

Images

10/23/2024 10:31:07 AM 3

T345546.875

Scratch to the top of black frame

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 45 Of 260


Images

10/24/2024 11:40:49 AM T338993.1892

Additional bracket required. Long run of basket without support.

10/25/2024

11/1/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/25/2024 3:36:13 PM T338993.1898

10/25/2024 3:36:18 PM

10/25/2024 3:36:23 PM

10/25/2024 3:36:32 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/28/2024 9:50:52 AM

10/28/2024 9:51:06 AM

10/31/2024 3:22:33 PM

Comments

Created By

Date

No photo evidence uploaded confirming task is addressed, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 5:35:15 PM

T338993.1916

Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket is 50mm lower.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 2:30:54 PM

10/28/2024 2:30:54 PM

11/11/2024 8:33:53 AM

Comments

Created By

Date

Still 15mm to low, please raise to 450mm to bottom of socket

James Parker (Halsion )

11/12/2024 7:50:05 AM

4

T427849.1003

Lift refuge point call to be installed

12/5/2024 10:39:47 AM

10/30/2024

Project Name: B5412 Project Honey

11/1/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Page 46 Of 260


Images

10/30/2024 12:14:58 PM 5

T427849.1007

Lift call button to be installed

10/30/2024

11/1/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

10/30/2024

11/1/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/1/2024

11/8/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/6/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Dominic Driver)

Images

10/30/2024 12:17:51 PM 6

T427849.1008

Lift letter sign to be installed

Images

10/30/2024 12:18:27 PM 7

T427849.1183

Scratches along lift door to be made good

Images

11/1/2024 11:50:36 AM 8

T345546.1033

11/1/2024 11:50:43 AM

Paint scuffed to be rectified on doors

Images

11/1/2024 11:50:22 AM

12/5/2024 10:39:47 AM

11/1/2024 11:50:30 AM

Project Name: B5412 Project Honey

Page 47 Of 260


9

T427849.1184

Take entire protection off lift door and architrave

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/6/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/1/2024

11/8/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/1/2024 11:52:15 AM 10

T427849.1185

Protection on lift to be removed

Images

11/1/2024 11:55:26 AM 11

T427849.1187

11/1/2024 11:55:32 AM

Remove protection around lift doors

Images

11/1/2024 11:57:24 AM 12

T345546.1037

11/1/2024 11:57:31 AM

Give another clean to the fire curtains

Images

11/1/2024 11:58:14 AM 13

T427849.1195

11/1/2024 11:58:20 AM

Architrave damage to be made good

Images

11/1/2024 12:16:57 PM 12/5/2024 10:39:47 AM

11/1/2024 12:17:03 PM Project Name: B5412 Project Honey

Page 48 Of 260


Building A>Fifth Floor>05­03 Corridor 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1919

Additional metal cable ties required on cable drops and cables running out of containment.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/1/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 3:25:36 PM 1

T427849.1014

10/28/2024 3:25:54 PM

Lift architrave to be installed

Images

10/30/2024 12:22:28 PM 2

T427849.1178

Damage on radiator to be made good

Images

11/1/2024 11:40:48 AM 3

T345545.821

floor to be cleaned

Images

11/1/2024 11:43:45 AM 4

T338993.2197

Sprinkler’s lagging missing foil on the end of the lagging.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 49 Of 260


Images

11/8/2024 10:31:34 AM

11/8/2024 10:31:39 AM

Building A>Fifth Floor>05­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1635

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

10/3/2024 6:37:54 PM 1

T427849.713

10/3/2024 6:38:17 PM

Halsion to change pipe work as per bench mark

Images

10/24/2024 11:15:00 AM 2

T427849.1127

Face plate not sitting on flush

Images

11/1/2024 10:38:21 AM 3

T427849.1131

Face plate not sitting on flush

Images

11/1/2024 10:41:59 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 50 Of 260


4

T345545.797

face plate not flush

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/8/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Jack Monaghan)

Images

11/1/2024 10:50:30 AM 5

T345545.798

firestopping sticker to be replaced

Images

11/1/2024 10:52:32 AM Building A>Fifth Floor>05­05 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1631

Lights not in line.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

Images

10/3/2024 6:24:41 PM T338993.1632

10/3/2024 6:24:46 PM

Green led indicator missing on Emergency lights.

Images

10/3/2024 6:25:12 PM 1

T427849.663

Toilet seat not installed

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 51 Of 260


Images

10/24/2024 10:24:20 AM 2

T345546.846

complete the boxing and pipework detail as per the benchmark

10/24/2024

10/28/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/24/2024 10:35:41 AM 3

T350553.1832

copex to be tidied up and cover exposed cables

Images

11/1/2024 10:12:47 AM Building A>Fifth Floor>05­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1553

FSD cabling to be tidied up/tiewraped neatly

10/23/2024

10/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/25/2024

11/1/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/23/2024 10:56:49 AM T338993.1891

Additional bracket required. Long run of basket without support.

Images

10/25/2024 3:33:01 PM 12/5/2024 10:39:47 AM

10/25/2024 3:33:07 PM Project Name: B5412 Project Honey

Page 52 Of 260


T338993.1893

Remove excess cable tie.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 9:33:06 AM

10/28/2024 9:33:12 AM

10/28/2024 9:33:31 AM

10/28/2024 9:34:17 AM

Comments

Created By

Date

No photo evidence uploaded, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 5:17:26 PM

T338993.1899

Light not working.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 1:47:15 PM

10/31/2024 2:42:33 PM

Comments

Created By

Date

Photo evidence uploaded form corridor 02 while the light in question is on corridor 01.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 5:15:43 PM

T338993.1901

Additional metal cable ties required on cable drops and cables running out of containment.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 1:48:33 PM T338993.1914

10/28/2024 1:48:39 PM

10/28/2024 1:48:49 PM

Cables not dressed / secured properly.

Images

10/28/2024 2:25:10 PM

10/28/2024 2:25:16 PM

10/28/2024 2:25:31 PM

10/28/2024 2:25:44 PM

10/31/2024 3:50:27 PM

Comments

Created By

Date

Cables not properly secured, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 5:20:53 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 53 Of 260


2

T427849.993

Smoke detector to be changed to black

10/30/2024

11/1/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

10/30/2024

11/1/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/30/2024 12:08:41 PM 3

T427849.1009

Gasket peeling off door to be made good

Images

10/30/2024 12:19:03 PM 1

T350553.1852

gripple wire to be cut short

Images

11/1/2024 11:17:55 AM 1

T338993.2206

Cut down heaters grips.

Images

11/8/2024 10:51:19 AM

11/8/2024 10:51:26 AM

Building A>Fifth Floor>05­L01 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2211

insufficient aces to air point on Chw return

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 54 Of 260


Images

11/29/2024 4:32:50 PM Building A>Fifth Floor>05­R09 M­Vent Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.831

paint to be cleaned off damper plate

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

11/1/2024 12:11:45 PM Building A>Fifth Floor>05­R12 Dry riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.437

fill gap next to lift architrave

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:40:19 PM Building A>Fifth Floor>05­R15 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1209

Riser door edge I o be made good

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/1/2024 12:37:41 PM Building A>Fifth Floor>05­S01 Stair 01 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 55 Of 260


1

T345545.1040

snots throughout balustrade

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/11/2024 4:09:39 PM

11/12/2024 2:26:53 PM

Comments

Created By

Date

still snots throughout railings and top rail

Conor Colton (McLaughlin & Harvey)

11/26/2024 9:51:18 AM

Building A>Fifth Floor>05­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1895

Halsion to reinstall the FA call point when ATJ raises the back box at correct height. Top of the equipment 1200mm FFFL.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 9:37:26 AM Building A>Fifth Floor>05­S03 Stair 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1921

Remove label from PIR.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 3:32:00 PM

10/28/2024 3:32:06 PM

10/31/2024 3:51:46 PM

Comments

Created By

Date

Photo evidence uploaded from Stair Lobby, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 5:25:29 PM

1

T345545.1242

lifting eyes to be grouted more cleanly

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 3:42:43 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 56 Of 260


2

T345545.1243

lifting eyes to be grouted more cleanly

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 3:42:58 PM 3

T345545.1244

*ALL FLOORS* half landings to be properly cleaned out

Images

11/20/2024 3:43:49 PM 4

T345545.1250

smoke seal to be reinstated

Images

11/20/2024 3:55:06 PM 5

T345545.1252

11/20/2024 3:55:21 PM

lifting eye to be repaired properly

Images

11/20/2024 4:00:23 PM 6

T345545.1254

paint to be removed from stairs

Images

11/20/2024 4:01:25 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 57 Of 260


7

T408928.99

remove filler

11/20/2024

11/25/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

Images

11/20/2024 4:24:12 PM Building A>Fifth Floor>05­S04 Stair Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1251

scratches on lift door

11/20/2024

11/27/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/25/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

11/20/2024

11/25/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

11/20/2024 3:56:43 PM 2

T408928.96

11/20/2024 3:57:18 PM

missing bracket for conduit

Images

11/20/2024 3:58:34 PM 3

T408928.97

heater not installed straight

Images

11/20/2024 3:59:23 PM Building A>First Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.77

clean paint off column

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 58 Of 260


Images

11/20/2024 12:13:58 PM Building A>First Floor>01­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1723

Cleaner socket not level and not fixed properly.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/16/2024 4:19:19 PM

10/16/2024 4:19:30 PM

Comments

Created By

Date

Backbox broken

Brett Pitcher (Halsion )

10/18/2024 1:41:50 PM

If broken should have been raised and not 2nd fixed. Please, address the issue and provide photo evidence,

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 3:51:32 PM

2

T338993.1724

FA call point not secured and not level.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/16/2024 4:30:04 PM 3

T338993.1746

10/16/2024 4:30:12 PM

10/16/2024 4:30:22 PM

PIR not installed. 2nd fix Lighting incomplete. Drawing on this level is missing the PIR.

Images

10/21/2024 9:32:18 AM

12/5/2024 10:39:47 AM

10/21/2024 9:32:24 AM

10/21/2024 9:32:46 AM

Project Name: B5412 Project Honey

Page 59 Of 260


T338993.1749

Sticky cable tie base failed across all the floor.

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/21/2024

10/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 3:11:50 PM 4

T338993.1752

10/21/2024 3:11:56 PM

Light not working.

Images

10/21/2024 3:15:53 PM

10/21/2024 3:15:57 PM

10/24/2024 10:22:53 AM

Comments

Created By

Date

Closing snag photo is taken from the wrong location of snag issued by McLH. Please reissue correct location photo to close out snag properly

James Parker (Halsion )

10/25/2024 8:49:58 AM

5

T338993.1754

Light not working.

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 3:17:00 PM 6

T338993.1755

10/21/2024 3:17:07 PM

Light not working.

10/21/2024 3:19:16 PM

10/21/2024 3:19:20 PM

Images

10/21/2024 3:20:00 PM 7

T338993.1756

10/21/2024 3:20:05 PM

Light not working.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 60 Of 260


Images

10/21/2024 3:20:30 PM 8

T350553.1625

10/21/2024 3:20:34 PM

All screwed rods to be cut short and capped

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

10/28/2024 11:24:40 AM 9

T350553.1628

All gripple wires to be cut short on plenums

Images

10/28/2024 11:40:47 AM 10

T456527.48

10/28/2024 11:40:54 AM

Panel is just placed in with no spacers

Images

11/20/2024 11:00:54 AM 11

T456527.49

Fire stopping required around conduits

Images

11/20/2024 11:03:16 AM Comments

Created By

Date

NOT CMF JOB

Gabriel Luta (CMF)

11/22/2024 3:24:34 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 61 Of 260


12

T456527.50

Larger spacer to be installed

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/20/2024 11:04:37 AM 13

T456527.78

RAF to be completed

Images

11/20/2024 11:47:26 AM 14

T345546.1398

Making good required on perimeter margin

Images

11/20/2024 11:51:48 AM 15

T350553.2059

sprinkler plug missing

Images

11/20/2024 11:56:16 AM 16

T350553.2060

light diffuser/LED missing

Images

11/20/2024 11:59:19 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 62 Of 260


17

T350553.2061

Cover loose on FCU panel

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/20/2024 12:01:03 PM 18

T456527.87

Riser door scratch to be made good

Images

11/20/2024 12:01:46 PM 19

T345546.1408

make good on crack

Images

11/20/2024 12:03:00 PM 20

T408928.74

clean up edge detail

Images

11/20/2024 12:03:13 PM 21

T350553.2062

lagging to be tidied up around draincocks

Images

11/20/2024 12:03:16 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 63 Of 260


22

T350553.2063

cable ties to be removed from pipework

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

11/20/2024 12:04:42 PM 23

T350553.2064

11/20/2024 12:04:52 PM

plenum flex to be tidied up/taped

Images

11/20/2024 12:06:12 PM 24

T350553.2065

FCU felt damaged. To be fixed

Images

11/20/2024 12:07:41 PM 25

T345546.1411

Touchup and finish wall better where it meets the Grey facade

Images

11/20/2024 12:08:02 PM 26

T408928.75

11/20/2024 12:08:09 PM

cracking in plasterboard edge detail

11/20/2024 12:08:14 PM

Images

11/20/2024 12:08:17 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 64 Of 260


27

T350553.2066

Sprinkler pipe to be painted and joints cleaned

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 12:09:10 PM 28

T350553.2067

insulation to be made good around pipework

Images

11/20/2024 12:09:47 PM 29

T456527.97

Hole in perimeter margin to be filled

Images

11/20/2024 12:11:24 PM 30

T345546.1412

finish to edge of the ceiling to be sanded and finished nicely

Images

11/20/2024 12:11:03 PM 31

T456527.98

11/20/2024 12:11:15 PM

Riser door edge damage to be made good

11/20/2024 12:11:24 PM

11/20/2024 12:11:30 PM

Images

11/20/2024 12:14:33 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 65 Of 260


32

T456527.99

Riser door edge damage to be made good

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

11/20/2024 12:14:52 PM 33

T350553.2069

sprinkler plug to be painted ­ various across floor plate

Images

11/20/2024 12:15:53 PM 34

T456527.103

Riser door edge damage to be made good

Images

11/20/2024 12:17:24 PM 35

T456527.104

2 dents to be made good

Images

11/20/2024 12:18:16 PM 36

T408928.79

11/20/2024 12:18:21 PM

edge detail to be improved

Images

11/20/2024 12:20:10 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 66 Of 260


37

T456527.105

Socket to be tighter to wall

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 12:20:19 PM 38

T456527.106

Sprinkler head to be installed

Images

11/20/2024 12:21:38 PM 39

T456527.107

Riser door edge damage to be made good

Images

11/20/2024 12:21:59 PM 40

T456527.108

Riser door edge damage to be made good

Images

11/20/2024 12:22:09 PM 41

T456527.109

Scratched fire alarm button face to be replaced

Images

11/20/2024 12:22:55 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 67 Of 260


42

T456527.110

Fill holes above fire button

11/20/2024

11/27/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 12:23:20 PM 43

T345545.1163

light fitting missing

Images

11/20/2024 12:23:42 PM 44

T456527.111

Touch up poor finished areas on architrave

Images

11/20/2024 12:24:13 PM 45

T345545.1164

11/20/2024 12:24:23 PM

missing screws in symploc tiles

Images

11/20/2024 12:24:34 PM 46

T456527.112

Clean above riser doors

Images

11/20/2024 12:25:00 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 68 Of 260


47

T456527.113

Make good to damage on riser door

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 12:25:23 PM 48

T456527.114

Riser door edge damage to be made good

Images

11/20/2024 12:25:37 PM 48

T456527.115

Riser door edge damage to be made good

Images

11/20/2024 12:25:58 PM 49

T456527.116

Fill damage to wall

Images

11/20/2024 12:26:22 PM 50

T345546.1416

Crack to perimeter margin

Images

11/20/2024 12:26:30 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 69 Of 260


51

T456527.117

Socket to be installed tight against wall

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/20/2024 12:26:45 PM 52

T456527.118

Sprinkler head to be installed

Images

11/20/2024 12:27:38 PM 53

T350553.2124

insulation to be fixed

Images

11/26/2024 4:20:08 PM 54

T350553.2125

11/26/2024 4:20:22 PM

end caps missing from drop rods

Images

11/26/2024 4:23:24 PM 55

T350553.2126

11/26/2024 4:24:03 PM

end cap from diffuser needs fixed in place

Images

11/26/2024 4:25:52 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 70 Of 260


56

T350553.2127

insulation to be fixed

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

11/26/2024 4:26:38 PM 57

T350553.2128

insulation to be fixed

Images

11/26/2024 4:27:12 PM 58

T345545.1316

light with faulty driver and face plate above ceiling tile m

Images

11/29/2024 12:38:55 PM 59

T345545.1319

blanking cap missing on sprinkler valve

Images

11/29/2024 12:41:29 PM 60

T345545.1320

earthing cable is holding up cables

Images

11/29/2024 12:44:34 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 71 Of 260


61

T345545.1321

sensors to be mounted on Same face on each column

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 12:45:19 PM 62

T345545.1323

plasterboard finish to be improved in place of blind box

Images

11/29/2024 12:51:51 PM 63

T350553.2184

11/29/2024 12:52:21 PM

cable ties to be cut short

Images

11/29/2024 12:52:30 PM 64

T345545.1324

plasterboard finish to be improved on the edge of margin

Images

11/29/2024 12:53:03 PM 65

T350553.2185

condensate pump to be fixed to FCU

Images

11/29/2024 12:53:13 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 72 Of 260


66

T350553.2188

cables to be tidied up and tiewraped

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 12:58:09 PM 67

T350553.2198

11/29/2024 12:58:15 PM

All cables to be tucked behind margin so they are not visible

Images

11/29/2024 3:49:13 PM 68

T350553.2199

Lights not in alignment

Images

11/29/2024 3:52:57 PM 69

T350553.2200

External lights not wired

Images

11/29/2024 3:56:48 PM 70

T350553.2201

Insulation to be tidied up

Images

11/29/2024 3:58:41 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 73 Of 260


71

T350553.2202

Backbox lid missing

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 4:09:02 PM 72

T350553.2203

Tierap to be cut

Images

11/29/2024 4:10:09 PM 73

T350553.2204

PIR cabling to be cut short and have round it

Images

11/29/2024 4:11:47 PM 74

T350553.2205

metal ceiling tie to be removed

Images

11/29/2024 4:13:11 PM Comments

Created By

Date

This is a MF Ceiling Hanger that has clearly been unscrewed to fit services. This is Damage.

Richard Butler (AT Jones)

12/4/2024 2:05:03 PM

75

T350553.2206

redundant bracket to be removed

12/5/2024 10:39:47 AM

11/29/2024

Project Name: B5412 Project Honey

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Page 74 Of 260


Images

11/29/2024 4:14:14 PM 76

T350553.2207

All plenum box grilles to be cut short

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/29/2024 4:16:05 PM 77

T350553.2208

11/29/2024 4:16:05 PM

Light to be completed

Images

11/29/2024 4:17:32 PM 78

T350553.2209

supply to FCU too low, needs raised so full air flow gets to unit

Images

11/29/2024 4:19:31 PM 16

T456527.481

Damaged light to be made good

Images

12/4/2024 11:43:17 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 75 Of 260


79

T456527.482

Grill to be adjusted to allow ceiling tiles to run properly

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

12/4/2024 11:48:51 AM 80

T456527.483

Light to be aligned

Images

12/4/2024 11:50:24 AM 81

T456527.484

Sprinkler to be aligned central on 5th row of tiles

Images

12/4/2024 11:54:20 AM 82

T456527.485

Sprinkler head to be installed

Images

12/4/2024 11:59:12 AM 83

T408928.213

torn insulation to ductwork

Images

12/4/2024 12:00:54 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 76 Of 260


84

T456527.486

Lights between columns 2­3 from the west to be adjusted

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 12:05:57 PM 85

T456527.487

Light before step out is not in line with ceiling tiles

Images

12/4/2024 12:06:40 PM 86

T456527.488

First 4 lights from west elevation is too short and needs aligned with ceiling tiles

Images

12/4/2024 12:07:44 PM 87

T456527.489

12/4/2024 12:08:16 PM

Lights 2,4,5 & 6 from north right­left to be adjusted to be in line with another and ceiling

Images

12/4/2024 12:10:28 PM 88

T456527.490

Light 4 from left to right north elevation to be aligned along with the others and ceiling tiles

Images

12/4/2024 12:11:19 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 77 Of 260


89

T456527.491

Lights 1 & 2 to be aligned with ceiling tiles as they are both too short

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 12:12:11 PM Building A>First Floor>01­02 Lift Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1707

Excess PIR cable! The be shortened.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/16/2024 11:15:16 AM

10/16/2024 11:15:22 AM

Comments

Created By

Date

No photo evidence uploaded, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 4:00:17 PM

T338993.1719

The small section of Basket for the fire curtain cable, should be earth linked with the main containment.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/23/2024

10/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/16/2024 4:03:26 PM 1

T350553.1558

10/16/2024 4:03:34 PM

BMS cabling incomplete

10/16/2024 4:03:42 PM

Images

10/23/2024 11:22:22 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 78 Of 260


2

T350553.1559

BMS cabling to be tidied and tied up neatly

10/23/2024

10/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/23/2024 11:23:49 AM 3

T350553.1690

BMS wiring incomplete

Images

10/30/2024 10:22:30 AM 4

T456527.62

11/6/2024 4:21:20 PM

Make good of bubble in paint

11/14/2024 10:20:55 AM

Images

11/20/2024 11:30:20 AM 5

T456527.65

Marks on lift doors to be made good

Images

11/20/2024 11:32:00 AM 6

T350553.2057

insulation to be made good around valve

Images

11/20/2024 11:34:36 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 79 Of 260


7

T456527.70

general ­ remove all protection from lift doors

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/28/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/20/2024 11:35:54 AM 8

T456527.71

Screw missing

Images

11/20/2024 11:37:41 AM 9

T456527.73

Remove adhesive marks

Images

11/20/2024 11:39:28 AM 10

T345546.1396

Redundant holes to be filled and made good

Images

11/20/2024 11:43:33 AM 11

T350553.2058

11/20/2024 11:43:39 AM

Junction box lid missing

11/20/2024 11:44:20 AM

Images

11/20/2024 11:40:13 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 80 Of 260


Comments

Created By

Date

Lift wiring

Brett Pitcher (Halsion )

12/2/2024 10:15:38 AM

12

T345545.1165

Running man signs to be installed as high as possible to avoid hanging over door frame

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/20/2024 12:25:28 PM 13

T350553.2187

cable ties to be cut short

Images

11/29/2024 12:57:07 PM 14

T345545.1325

scratch on door handle

Images

11/29/2024 12:58:44 PM 15

T350553.2189

seal under door scraping on floor

Images

11/29/2024 12:59:55 PM

11/29/2024 1:00:04 PM

Building A>First Floor>01­03 Corridor 02 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 81 Of 260


T338993.1717

Reduce excess fire alarm cable.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/20/2024

11/28/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/25/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

11/20/2024

11/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

10/16/2024 3:52:34 PM 1

T345546.1389

10/16/2024 3:52:43 PM

clean paint of black copex

10/16/2024 3:53:12 PM

Images

11/20/2024 11:29:05 AM 2

T345546.1390

high level board being pushed out

Images

11/20/2024 11:30:40 AM 3

T408928.69

Escape signage to be raised above door line

Images

11/20/2024 11:36:03 AM 4

T345546.1394

remove paint off closure

Images

11/20/2024 11:36:54 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 82 Of 260


5

T345546.1395

improve touch ups and small damages on architraves

11/20/2024

11/27/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 11:39:55 AM

11/20/2024 11:40:01 AM

Building A>First Floor>01­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1727

Cables below vanity unit not dressed / secured properly

10/17/2024

10/24/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/18/2024 3:09:52 PM

10/18/2024 3:09:58 PM

Comments

Created By

Date

Cable shown in image is water pipe to sink ­ please amend snag to correct discipline.

Brett Pitcher (Halsion )

10/29/2024 2:23:57 PM

This is the cold feed for the tap, not cables

James Parker (Halsion )

11/7/2024 11:03:40 AM

Still Halsion has to secure this pipe! Please, provide photo of the pipe secured.

Vanngel Natso (McLaughlin & Harvey)

11/12/2024 6:43:03 PM

1

T345546.977

Gap is too large from wall to skirting

11/1/2024

11/7/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/1/2024

11/8/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/1/2024 9:15:11 AM 2

T427849.1050

Poor grout finish to be made good

Images

11/1/2024 9:22:15 AM Building A>First Floor>01­05 WC Core 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 83 Of 260


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1388

Sprinkler rosette cap missing

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/1/2024

11/8/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Ian Robertson)

Images

10/21/2024 11:13:21 AM 2

T350553.1820

light not working

Images

11/1/2024 9:37:57 AM 3

T350553.1822

sprinkler pipework to be cleaned ­ general

Images

11/1/2024 9:40:29 AM Building A>First Floor>01­06 Corridor 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1700

Additional metal cable ties required on FA cable’s drop.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/16/2024 10:40:13 AM

10/16/2024 10:40:19 AM

10/28/2024 8:05:52 PM

Comments

Created By

Date

Photo from different location, not from FA point. Therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 4:05:19 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 84 Of 260


T338993.1705

Cables hanging. Cable management poor.

10/16/2024

10/23/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/16/2024 11:04:57 AM

10/16/2024 11:05:07 AM

Comments

Created By

Date

No photo evidence uploaded, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 4:07:49 PM

1

T350553.1565

Fire alarm cabling to be tidied up/tiewraped neatly

10/23/2024

10/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/23/2024 11:38:53 AM

10/27/2024 7:41:36 PM

Comments

Created By

Date

Snag complete photo is of completely different area

James Parker (Halsion )

11/4/2024 11:25:02 AM

2

T345546.1384

damaged lagging

11/20/2024

11/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 11:19:19 AM 3

T456527.56

11/20/2024 11:19:28 AM

Clean paint off soffit to be instructed at cost to AT Jones

Images

11/20/2024 11:21:56 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 85 Of 260


4

T345546.1385

wrong colour fire alarm

11/20/2024

11/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 11:21:18 AM 5

T345546.1386

Touchup door frame

Images

11/20/2024 11:22:26 AM 6

T456527.58

Make good around riser door

Images

11/20/2024 11:26:33 AM 7

T456527.59

Make good around riser door

Images

11/20/2024 11:26:53 AM

11/20/2024 11:27:02 AM

Building A>First Floor>01­R01 LTHW&CHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2086

insulation to be made good around pipework

11/26/2024

12/3/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 86 Of 260


Images

11/26/2024 11:31:24 AM

11/26/2024 11:31:50 AM

11/26/2024 11:31:59 AM

Building A>First Floor>01­R03 SV

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.1392

seal on riser door not installed properly

11/20/2024

11/28/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 11:33:46 AM

11/23/2024 9:18:20 AM

Comments

Created By

Date

Seal has been damaged by the others that they use for all this time the riser.

Romulus Topciu (AT Jones)

11/23/2024 9:19:36 AM

Building A>First Floor>01­R05 LS

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1689

BMS wiring incomplete

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/30/2024 10:21:51 AM

11/6/2024 4:28:54 PM

11/14/2024 10:20:16 AM

11/20/2024 4:51:55 PM

Building A>First Floor>01­R10 M­Vent Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1166

lagging incomplete

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/20/2024 12:26:39 PM Building A>First Floor>01­R15 Riser Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 87 Of 260


1

T408928.76

corner detail to be made good

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

11/20/2024 12:12:06 PM Building A>First Floor>01­R17 Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2236

2nd fix incomplete.

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/12/2024 11:29:30 AM T338993.2239

Paint scratches.

Images

11/12/2024 11:41:42 AM

11/12/2024 11:41:48 AM

Building A>First Floor>01­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1764

Cleaner’s socket bottom not at 450mm FFFL. 20mm Lower.

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 4:01:12 PM

12/5/2024 10:39:47 AM

10/21/2024 4:01:18 PM

11/11/2024 7:35:06 PM

Project Name: B5412 Project Honey

Page 88 Of 260


T338993.1765

Light not working.

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 4:04:40 PM

10/21/2024 4:04:57 PM

Comments

Created By

Date

Rewired however still not working , engineer to look at

Brett Pitcher (Halsion )

10/24/2024 8:26:43 AM

Since the below comment confirms that the lights is still not working, why the task is issued as complete?

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 4:11:43 PM

T338993.1766

All Lights missing green led for battery health indication.

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

10/21/2024 4:05:46 PM 1

T345545.1013

10/21/2024 4:05:53 PM

white rail shouldnt be visible. please adjust timber handrail to make flush

Images

11/11/2024 3:37:52 PM

11/14/2024 10:11:39 AM

11/19/2024 1:59:08 PM

Comments

Created By

Date

Can this not be adjusted instead of painted?

Conor Colton (McLaughlin & Harvey)

11/19/2024 1:59:30 PM

2

T456527.411

Improve decoration finish on architrave

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:21:29 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 89 Of 260


3

T345545.1326

light not working

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 12:59:17 PM Building A>First Floor>01­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1669

No coppex to be used to long runs. Metal conduit to be installed.

10/14/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/14/2024 2:47:53 PM 1

T456527.412

10/14/2024 2:48:01 PM

Gap in architrave to be filled

Images

11/27/2024 2:22:13 PM 2

T456527.413

Improve decoration finish

Images

11/27/2024 2:22:38 PM Building A>First Floor>01­S03 Stair 02 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 90 Of 260


T338993.1760

Cleaner’s socket bottom not at 450mm FFFL. 20mm Lower.

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 3:37:37 PM T338993.1761

10/21/2024 3:37:47 PM

Light not working.

11/11/2024 8:12:39 AM

Images

10/21/2024 3:43:15 PM

10/21/2024 3:43:23 PM

Comments

Created By

Date

Re wired will need engineer to look

Brett Pitcher (Halsion )

10/24/2024 8:34:59 AM

No photo evidence uploaded of the light working, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 4:12:31 PM

1

T456527.379

Improve decoration finish on architrave

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/27/2024 12:12:47 PM 2

T456527.381

Lifting eye filler to be improved

Images

11/27/2024 12:14:36 PM Building A>First Floor>01­S04 Stair lobby Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 91 Of 260


T338993.1656

Cleaner socket’s bottom not at 450mm. 40mm Higher.

10/14/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/14/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

10/14/2024 2:07:15 PM T338993.1657

10/14/2024 2:07:27 PM

No coppex to be used to long runs. Metal conduit to be installed.

Images

10/14/2024 2:08:32 PM 1

T456527.380

10/14/2024 2:08:43 PM

Decoration finish on plasterboard to be improved

Images

11/27/2024 12:13:32 PM Building A>First Floor>1­R04 LL­LV

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2087

Fire alarm interface lids not fitted

11/26/2024

12/3/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 11:35:26 AM 2

T350553.2088

tie wrap to be cut short

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 92 Of 260


Images

11/26/2024 11:37:03 AM Building A>Fourth Floor>04­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1476

PIR not installed.

10/1/2024

10/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/1/2024 4:34:37 PM

10/1/2024 4:35:31 PM

10/1/2024 4:36:16 PM

Comments

Created By

Date

No PIR to install. Install is to drawing

James Parker (Halsion )

11/12/2024 4:49:27 PM

All floors have the same layout, therefore if is deemed necessary on the other floors the use of PIR on the area. The same principle should apply on this floor as well. Please, provide photo evidence of the PIR installed.

Vanngel Natso (McLaughlin & Harvey)

11/12/2024 6:33:26 PM

T338993.1486

9 light sections are not working.

10/1/2024

10/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/1/2024 5:01:31 PM

10/1/2024 5:01:52 PM

10/1/2024 5:03:17 PM

10/10/2024 2:38:48 PM

10/1/2024 5:01:57 PM

10/1/2024 5:02:04 PM

10/1/2024 5:02:33 PM

10/1/2024 5:02:53 PM

10/1/2024 5:02:59 PM

10/1/2024 5:03:11 PM

Comments

Created By

Date

Lights have been taken down and wiring checked etc , some have been fixed , some are faulty light fittings and have been marked up

Brett Pitcher (Halsion )

10/10/2024 2:55:20 PM

All lights to be fixed. Photo evidence of lights being operational required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 1:49:00 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 93 Of 260


2

T338993.1524

Light’s end cup not fixed properly.

10/2/2024

10/9/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 2:56:46 PM

10/2/2024 2:56:53 PM

10/8/2024 11:24:44 AM

10/23/2024 1:10:17 PM

Comments

Created By

Date

Still not done.

Vanngel Natso (McLaughlin & Harvey)

10/23/2024 1:10:21 PM

3

T345546.271

Coopers to install Beacon for fire curtain

10/2/2024

10/8/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Dominic Driver)

10/2/2024

10/9/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/15/2024

10/22/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

10/15/2024

10/22/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

10/2/2024 3:35:43 PM 4

T338993.1549

Insulation damaged.

Images

10/2/2024 3:49:48 PM 5

T345545.507

10/2/2024 3:50:00 PM

10/2/2024 3:50:06 PM

misalignment of balustrade between flights can this be fixed?

10/2/2024 3:50:13 PM

10/23/2024 1:17:32 PM

Images

10/15/2024 3:54:23 PM 6

T345545.516

balustrade handrail is bowing slightly / noticeably

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 94 Of 260


Images

10/15/2024 4:01:29 PM

11/7/2024 2:04:17 PM

Comments

Created By

Date

still bowing

Conor Colton (McLaughlin & Harvey)

11/26/2024 8:59:52 AM

7

T338993.1846

Lights not working and Cover damaged.

10/23/2024

10/30/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/23/2024

10/30/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/23/2024 1:11:18 PM 8

T338993.1849

10/23/2024 1:11:24 PM

The End box with no conduit, should be capped.

Images

10/23/2024 1:55:28 PM 9

T338993.1853

10/23/2024 1:55:36 PM

10/23/2024 1:55:43 PM

Cleaner’s socket not level.

Images

10/24/2024 9:08:01 AM 10

T338993.1854

10/24/2024 9:08:01 AM

FA cable passing bellow raft frame, when the tile is installed it will damage the cable. The cable will be squeezed between the frame and the tile. Cable to run on top of the frame instead.

Images

10/24/2024 9:23:47 AM 12/5/2024 10:39:47 AM

10/24/2024 9:23:55 AM

10/24/2024 9:24:01 AM Project Name: B5412 Project Honey

Page 95 Of 260


11

T456527.35

Bend in edge trim to be made good

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/26/2024

11/29/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

11/26/2024

11/29/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

Images

11/20/2024 10:30:35 AM 12

T345545.1146

sprinkler pipe to be repainted

Images

11/20/2024 10:33:43 AM 13

T345545.1154

overhang on the skirting

Images

11/20/2024 10:46:39 AM 14

T408928.117

make good edge around duct

Images

11/26/2024 4:20:02 PM 15

T408928.122

numbers to be cleaned off

Images

11/26/2024 4:39:31 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 96 Of 260


16

T408928.131

missing end cap to light

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

11/29/2024 1:23:29 PM 17

T408928.192

damaged tile

Images

12/4/2024 9:51:57 AM 18

T408928.193

damaged tile

Images

12/4/2024 9:52:32 AM 19

T408928.194

damaged tile

Images

12/4/2024 9:53:04 AM 20

T408928.195

damaged tile

Images

12/4/2024 9:53:36 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 97 Of 260


21

T408928.196

damaged tiles

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

12/4/2024 9:55:17 AM 22

T408928.197

12/4/2024 9:56:31 AM

damaged tile

Images

12/4/2024 9:58:44 AM 23

T408928.198

light not aligned with tiles. confirm this is in line with drawings

Images

12/4/2024 10:00:55 AM 24

T408928.199

light not aligned with tiles. confirm this is in line with drawings

Images

12/4/2024 10:04:33 AM 25

T408928.200

damaged tile

Images

12/4/2024 10:10:42 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 98 Of 260


26

T345545.1354

diffuser too short for light fitting

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

12/4/2024 10:15:22 AM 27

T345545.1355

diffuser needs to be clipped back in to light fitting

Images

12/4/2024 10:16:00 AM 28

T345545.1356

12/4/2024 10:16:13 AM

stickers to be removed from edge of tile

Images

12/4/2024 10:20:52 AM 29

T345545.1357

diffusers to be clipped

Images

12/4/2024 10:26:24 AM 30

T408928.201

12/4/2024 10:26:31 AM

light not aligned with tiles. confirm this is in line with drawings. are lights correct size?

Images

12/4/2024 10:27:21 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 99 Of 260


31

T408928.202

damaged tile

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

12/4/2024 10:28:38 AM 32

T408928.203

damaged tile

Images

12/4/2024 10:29:42 AM 33

T408928.204

damaged tiles

Images

12/4/2024 10:31:02 AM 34

T345545.1358

grille to be clipped in and sprinkler to be realigned and rosette fitted

Images

12/4/2024 10:34:16 AM Building A>Fourth Floor>04­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.560

missing Lift buttons Lift name/number and call button on Lift 05, 06 and 02

10/17/2024

10/21/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

10/17/2024 3:24:46 PM 12/5/2024 10:39:47 AM

10/17/2024 3:24:52 PM

10/17/2024 3:25:01 PM Project Name: B5412 Project Honey

Page 100 Of 260


2

T350553.1423

BMS cabling to be tidied up and tiewrapped neatly

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 12:24:04 PM 2

T350553.1424

All tiewraps to be cut short

Images

10/21/2024 12:25:39 PM 3

T350553.1425

BMS cabling incomplete

Images

10/21/2024 12:26:51 PM 4

T427849.552

See comments for level 3 in relation to doors

Images

10/22/2024 12:52:23 PM T338993.1858

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/24/2024 10:05:01 AM 12/5/2024 10:39:47 AM

10/24/2024 10:05:07 AM Project Name: B5412 Project Honey

Page 101 Of 260


T338993.1863

Additional metal cable ties required on cable drops and cables running out of containment.

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Jack Monaghan)

Images

10/24/2024 10:28:23 AM T338993.1879

10/24/2024 10:28:27 AM

10/24/2024 10:28:51 AM

10/24/2024 10:29:11 AM

Cleaner’s socket not at correct height. Halsion to reinstall once a new hole is drilled at correct height. Height should be 450mm bottom of the socket FFFL.

Images

10/24/2024 11:13:59 AM T350553.1679

BMS wiring incomplete

Images

10/29/2024 12:06:02 PM 5

T345545.866

11/7/2024 8:48:44 AM

11/7/2024 8:48:53 AM

11/13/2024 4:17:37 PM

screws loose and missing on fire rated doors

11/20/2024 10:44:32 AM 11/1/2024

11/20/2024 10:44:47 AM 11/8/2024

Client Snag

Images

11/1/2024 1:05:32 PM

11/1/2024 1:05:39 PM

11/1/2024 1:05:43 PM

11/1/2024 1:05:54 PM

11/1/2024 1:06:00 PM

Comments

Created By

Date

still incomplete

Dominic Driver (McLaughlin & Harvey)

11/25/2024 3:59:42 PM

6

T345546.1066

General item ­ remove lift protection in the joints of lifts

12/5/2024 10:39:47 AM

11/1/2024

Project Name: B5412 Project Honey

11/6/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

Page 102 Of 260


Images

11/1/2024 1:08:00 PM 7

T427849.1235

11/1/2024 1:08:09 PM

Pack out cover plate to ensure no damages

11/1/2024

11/8/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/1/2024 1:08:31 PM 8

T427849.1237

clean lift door

Images

11/1/2024 1:10:53 PM Building A>Fourth Floor>04­03 Corridor 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.544

Fire alarm should be black?

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 12:45:25 PM T338993.1862

Lights not in line between them.

Images

10/24/2024 10:22:14 AM 12/5/2024 10:39:47 AM

10/24/2024 10:22:26 AM

10/24/2024 10:22:45 AM Project Name: B5412 Project Honey

Page 103 Of 260


T338993.1881

Cleaner’s socket not level.

10/25/2024

11/1/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/1/2024

11/6/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

Images

10/25/2024 2:46:29 PM 2

T345545.859

10/25/2024 2:46:29 PM

lift buttons aren’t straight

Images

11/1/2024 12:56:34 PM 3

T345545.862

around riser doors to be improved

Images

11/1/2024 1:00:18 PM 4

T345545.863

around riser doors to be improved catching on drywall when riser opens

Images

11/1/2024 1:01:26 PM 5

T345546.1063

Clean high­level services

Images

11/1/2024 1:03:45 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 104 Of 260


T338993.2189

Light not working.

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/8/2024 10:16:37 AM Building A>Fourth Floor>04­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1619

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/10/2024

10/14/2024

Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Vanity plug isn’t scented to the tap. The tap is the correct position at 701 mm but the plug hole is not centred. this is a Swift crafted error but the snag 10/23/2024 will fall to Halsion as per instruction

10/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

10/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

Images

10/3/2024 5:57:25 PM T427849.314

make good of grout under vanity

Images

10/10/2024 4:11:16 PM 1

T345546.804

Images

10/23/2024 12:37:51 PM 2

T345546.806

Not scented to the vanity plug ­ Swift crafteds fault but Halsion issue to move the taps

12/5/2024 10:39:47 AM

10/23/2024

Project Name: B5412 Project Honey

Page 105 Of 260


Images

10/23/2024 12:39:41 PM 3

T345546.813

Finish the boxing detail as the benchmark is to cover the pipes

10/23/2024

10/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

Images

10/23/2024 12:51:26 PM Building A>Fourth Floor>04­05 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1615

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/23/2024

10/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

10/23/2024

10/28/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Dominic Driver)

Images

10/3/2024 5:45:34 PM 1

T345546.826

Finished your pipework as per the benchmark

Images

10/23/2024 2:03:25 PM 2

T345546.834

Approved sticker missing

Images

10/23/2024 2:14:44 PM 12/5/2024 10:39:47 AM

10/23/2024 2:14:50 PM Project Name: B5412 Project Honey

Page 106 Of 260


3

T345546.835

First Stopping required entrances to WC

10/23/2024

10/28/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Dominic Driver)

Images

10/23/2024 2:16:47 PM

10/23/2024 2:16:57 PM

Building A>Fourth Floor>04­06 Corridor 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1855

Additional metal cable ties required on cable drops and cables running out of containment.

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/1/2024

11/8/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

10/24/2024 9:30:47 AM T338993.1866

10/24/2024 9:30:53 AM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/24/2024 10:37:34 AM 1

T427849.1234

10/24/2024 10:37:49 AM

Make good of damages around riser opening edge

10/24/2024 10:38:37 AM

10/24/2024 10:38:41 AM

Images

11/1/2024 1:06:18 PM

11/1/2024 1:06:25 PM

Comments

Created By

Date

incomplete

Dominic Driver (McLaughlin & Harvey)

11/25/2024 4:03:25 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 107 Of 260


2

T338993.2193

Cable left on the ceiling coiled.

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/8/2024 10:25:59 AM

11/8/2024 10:26:06 AM

Building A>Fourth Floor>04­L02 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.551

Lift letter sign to be installed

10/22/2024

10/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

10/22/2024 12:51:16 PM Building A>Fourth Floor>04­R01 LTHW&CHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.861

paint to be cleaned off chamfered edge

11/1/2024

11/8/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

11/1/2024 12:59:11 PM

11/1/2024 12:59:18 PM

Building A>Fourth Floor>04­R05 LS

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2165

Cable to be clipped and terminated

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/28/2024 4:05:15 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 108 Of 260


2

T350553.2166

Blank plate missing on lighting control box ­ Check all floors

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/28/2024 4:05:38 PM 3

T350553.2167

All fused spurs to be labelled with circuit referance

Images

11/28/2024 4:07:16 PM Building A>Fourth Floor>04­R12 Dry Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.432

Fill gap next to architrave

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:36:25 PM Building A>Fourth Floor>04­R14 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2163

Blank plate missing on lighting control box ­ Check all floors

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/28/2024 4:02:23 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 109 Of 260


2

T350553.2164

Missing DB schedules ­ All DB boards ­ All floors

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/28/2024 4:03:18 PM Building A>Fourth Floor>04­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1870

All lights are missing green led for the indication of a he emergency battery health.

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

10/24/2024 10:47:47 AM T338993.1871

10/24/2024 10:47:52 AM

Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket 40mm lower.

Images

10/24/2024 10:51:57 AM 1

T345545.1032

10/24/2024 10:51:57 AM

11/21/2024 2:45:55 PM

various pin holes in top rail

Images

11/11/2024 4:01:33 PM

11/11/2024 4:01:52 PM

11/12/2024 2:44:10 PM

11/12/2024 2:44:10 PM

11/26/2024 8:52:03 AM

11/26/2024 8:52:12 AM

Comments

Created By

Date

Still pin holes

Conor Colton (McLaughlin & Harvey)

11/26/2024 8:52:17 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 110 Of 260


2

T345545.1035

various pin holes in top rail

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/11/2024 4:03:51 PM

11/12/2024 2:41:05 PM

11/26/2024 8:50:45 AM

Comments

Created By

Date

still pin holes

Conor Colton (McLaughlin & Harvey)

11/26/2024 8:50:50 AM

3

T345545.1036

snots and pinholes throughout balustrade

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/11/2024 4:04:46 PM

11/12/2024 2:40:11 PM

11/26/2024 8:49:32 AM

Comments

Created By

Date

still snots on railing

Conor Colton (McLaughlin & Harvey)

11/26/2024 8:50:12 AM

Building A>Fourth Floor>04­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1857

Halsion to reinstall the FA call point when ATJ raises the back box at correct height. Top of the equipment 1200mm FFFL.

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/24/2024 9:35:22 AM T338993.1868

10/24/2024 9:35:23 AM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/24/2024 10:44:23 AM

12/5/2024 10:39:47 AM

10/24/2024 10:44:30 AM

Project Name: B5412 Project Honey

Page 111 Of 260


T338993.1874

Cleaner’s socket not at correct height. Halsion to reinstall once ATJ raises the back box. Height should be 450mm bottom of the socket FFFL.

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/24/2024 10:58:23 AM Building A>Fourth Floor>04­S03 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.951

snots on paint work to be sanded and touched up

11/5/2024

11/12/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/5/2024 11:30:27 AM

11/26/2024 9:12:17 AM

Comments

Created By

Date

still snots under top rail

Conor Colton (McLaughlin & Harvey)

11/26/2024 9:12:35 AM

2

T408928.90

Damaged wall to right­hand side

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

11/20/2024

11/25/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/20/2024 3:33:44 PM 3

T408928.92

damage to corner of step to be made good

Images

11/20/2024 3:42:14 PM Building A>Fourth Floor>04­S04 Stair Lobby Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 112 Of 260


1

T345545.1239

clean break glass

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/25/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Francis Hunter (Luke Nurser)

Images

11/20/2024 3:34:05 PM 2

T408928.91

damage to corner of wall

Images

11/20/2024 3:40:01 PM Building A>Ground Floor Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1270

Clean floor finish off of skirting

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

Images

11/4/2024 2:30:33 PM 1

T345545.1265

incomplete handrails on both wings

Images

11/22/2024 10:56:59 AM 2

T345545.1274

flood grilles missing

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 113 Of 260


Images

11/22/2024 11:09:34 AM Comments

Created By

Date

Not CMF job

Gabriel Luta (CMF)

11/29/2024 2:22:38 PM

3

T345545.1292

corner of brick should be glazed

11/29/2024

12/6/2024

Client Snag

Opened

Blockwork

Swift Group UK

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Client Snag

Opened

Blockwork

Swift Group UK

Darling Associates (Robyn Harrison­ Church)

Images

11/29/2024 11:15:15 AM 4

T345545.1293

cut brick should be glazed

Images

11/29/2024 11:16:28 AM T1.53416333

Fire exit sign missing above Corridor door to main office

12/2/2024

12/9/2024

Client Snag

Opened

M&E

Halsion

Sodexo (Mark Day)

T456527.499

ATJ to be instructed to complete taping and jointing and mist coat

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/4/2024 1:47:05 PM Building A>Ground Floor Mezzanine Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 114 Of 260


1

T456527.535

Fire stopping required in riser

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:58:25 PM 2

T456527.536

Riser door bolts to be fastened

Images

12/4/2024 2:58:56 PM Building A>Ground Floor Mezzanine>0M­01 Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.373

Damaged fire stop to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:07:08 PM Building A>Ground Floor Mezzanine>0M­02 BOH Storage

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.369

general ­ Fill holes in blockwork and areas that need re mortared

11/27/2024

12/4/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:03:31 PM

12/5/2024 10:39:47 AM

11/27/2024 12:04:49 PM

11/27/2024 12:04:53 PM

Project Name: B5412 Project Honey

Page 115 Of 260


2

T456527.371

Conduit to be installed to wall

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 12:06:09 PM 3

T456527.537

Sprinkler pipe stopping riser door from opening

Images

12/4/2024 2:59:20 PM Building A>Ground Floor Mezzanine>0M­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.375

Chip in step to be filled

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/27/2024 12:09:11 PM 2

T456527.376

Chip in step to be filled

Images

11/27/2024 12:09:33 PM Building A>Ground Floor>00­01 Office Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 116 Of 260


1

T345545.1168

around riser door needs to be repaired

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 1:51:22 PM 2

T345545.1169

11/20/2024 1:51:28 PM

11/20/2024 1:51:33 PM

11/20/2024 1:51:42 PM

riser door doesn’t fully close

Images

11/20/2024 1:52:08 PM 3

T345545.1170

wall to be repaired in various areas

Images

11/20/2024 1:52:30 PM 4

T345545.1186

11/20/2024 1:52:35 PM

11/20/2024 1:52:40 PM

paint to be removed from soffit

Images

11/20/2024 2:09:26 PM 5

T345545.1190

11/20/2024 2:09:33 PM

top of wall is inconsistent. some goes to underside of slab and some stops short. make it consistent

Images

11/20/2024 2:15:33 PM 12/5/2024 10:39:47 AM

11/20/2024 2:15:42 PM Project Name: B5412 Project Honey

Page 117 Of 260


6

T345545.1191

wall to be finished

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/20/2024 2:16:52 PM 7

T345545.1192

lagging to be made good

Images

11/20/2024 2:17:15 PM 8

T345545.1194

paint on damper frame

Images

11/20/2024 2:20:20 PM 9

T345545.1195

damage to riser door

Images

11/20/2024 2:21:06 PM 10

T350553.2114

11/20/2024 2:21:29 PM

end caps missing from drop rods

Images

11/26/2024 3:48:07 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 118 Of 260


11

T350553.2115

plugs missing from vent

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 3:48:44 PM 12

T350553.2116

lagging missing from pipework

Images

11/26/2024 3:49:36 PM 13

T350553.2117

lagging to be tidied up on pipework

Images

11/26/2024 3:50:15 PM 13

T350553.2118

No fire rated sticker on fire batt

Images

11/26/2024 3:51:37 PM 13

T350553.2119

Paint on services to be removed

Images

11/26/2024 3:53:29 PM 12/5/2024 10:39:47 AM

11/26/2024 3:53:36 PM Project Name: B5412 Project Honey

Page 119 Of 260


14

T444645.638

brick not glazed at top of ramp

11/28/2024

12/5/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Ian Robertson)

Images

11/28/2024 10:30:47 AM 15

T345545.1339

11/28/2024 10:31:08 AM

drywall to be tidied up

Images

11/29/2024 2:43:33 PM 16

T350553.2194

Paint to be removed from mullion

Images

11/29/2024 2:46:25 PM 17

T350553.2196

11/29/2024 2:46:40 PM

Fixings and mastic to be removed from ceiling where head track for demo penetration wall was built

Images

11/29/2024 3:09:06 PM Building A>Ground Floor>00­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.221

Chip in door to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 120 Of 260


Images

11/27/2024 9:45:05 AM 1

T456527.222

Chip in door to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 9:45:21 AM 2

T456527.224

Fire refuge call door not opening

Images

11/27/2024 9:48:29 AM 3

T456527.225

Complete decoration for frame and architrave for double doors

Images

11/27/2024 9:53:59 AM 4

T456527.226

Missing screw at refuge point button plate

Images

11/27/2024 9:54:32 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 121 Of 260


5

T456527.229

Missing screws in top architrave to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/29/2024

Client Snag

Opened

Fire Stopping

OWS

Francis Hunter (Luke Nurser)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 9:56:38 AM 6

T408928.126

damage to door architrave

Images

11/27/2024 9:57:04 AM 7

T456527.230

Damage to architrave to be made good

Images

11/27/2024 9:57:12 AM 7

T456527.233

Damage to architrave to be made good

Images

11/27/2024 10:00:39 AM 8

T456527.234

Complete decoration for frame and architrave for double doors

Images

11/27/2024 10:01:45 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 122 Of 260


8

T456527.235

Scratch on black plate above fire exit sign to be replaced

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:02:18 AM 9

T456527.236

Ensure all ceiling tile frames are aligned

Images

11/27/2024 10:06:12 AM 10

T456527.237

Can instruct be cut shorter above ceiling tiles

Images

11/27/2024 10:07:24 AM 11

T456527.238

Check alignment of floor boxes with floor finish

Images

11/27/2024 10:08:39 AM 12

T456527.240

11/27/2024 10:08:46 AM

Clean ceiling tile frames

Images

11/27/2024 10:10:11 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 123 Of 260


13

T456527.241

Make good to flakey paint on ceiling tile frames

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:10:57 AM 14

T456527.242

Make good to flakey paint on ceiling tile frames

Images

11/27/2024 10:11:19 AM Building A>Ground Floor>00­03 Corridor 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.344

Decoration to be completed

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 11:39:44 AM 2

T456527.345

11/27/2024 11:39:51 AM

Fire stopping stickers to be completed

Images

11/27/2024 11:40:25 AM 3

T456527.346

jointing on handrail to be cleaned

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 124 Of 260


Images

11/27/2024 11:41:23 AM 4

T456527.504

Plugs to be removed and holes to be filled

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 1:57:13 PM 5

T456527.527

Scratch in architrave to be made good

Images

12/4/2024 2:42:30 PM Building A>Ground Floor>00­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.212

Missing FCU for solenoid valve and motorised dumper

5/27/2024

6/3/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

5/27/2024 1:31:58 PM 1

T456527.338

5/27/2024 1:32:12 PM

Scratches on tiles to be made good

Images

11/27/2024 11:35:20 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 125 Of 260


Building A>Ground Floor>00­05 WC Core

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2073

Tap/ solenoid not fitted

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/21/2024 11:44:55 AM 2

T456527.292

11/21/2024 11:45:07 AM

Plug in sink to be installed

Images

11/27/2024 11:07:02 AM 3

T456527.294

Paint to be cleaned off alarm

Images

11/27/2024 11:08:32 AM 4

T456527.300

Damage to door handle to be made good

Images

11/27/2024 11:12:52 AM 5

T456527.301

Mastic to be completed around architrave

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 126 Of 260


Images

11/27/2024 11:13:31 AM 6

T456527.303

General ­ Ensure all sprinkler heads are installed

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 11:14:47 AM 7

T456527.306

Damage on tap to be made good

Images

11/27/2024 11:16:28 AM 8

T456527.308

Chip in vanity box to be made good

Images

11/27/2024 11:17:24 AM 9

T456527.310

Make good to damages on door

Images

11/27/2024 11:18:20 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 127 Of 260


10

T456527.313

tap to be aligned correctly

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 11:20:00 AM 11

T456527.314

Clean paint off floor finish

Images

11/27/2024 11:20:27 AM 12

T456527.315

Decoration finishes on hinges to be made good

Images

11/27/2024 11:21:01 AM Building A>Ground Floor>00­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2071

wiring incomplete

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/21/2024 11:20:55 AM 2

T456527.278

Floor to be cleaned

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 128 Of 260


Images

11/27/2024 10:55:55 AM 3

T456527.279

Finish around door frame to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:56:26 AM 4

T456527.280

Damage to ceiling tiles to be made good

Images

11/27/2024 10:56:56 AM 5

T456527.281

Plate to be aligned with tiles

Images

11/27/2024 10:57:25 AM 6

T456527.282

Smoke detector to be change for a black one

Images

11/27/2024 10:58:09 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 129 Of 260


1

T456527.283

Plate to be aligned with tiles

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:58:41 AM 7

T456527.285

magic man to make good to threshold on riser

Images

11/27/2024 11:00:21 AM 8

T456527.287

Final coat of paint to be completed

Images

11/27/2024 11:01:53 AM Building A>Ground Floor>00­09 Reception

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1581

Excessive glue under balustrade to be removed

11/15/2024

11/19/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/15/2024 11:08:13 AM 2

T456527.52

Poor finish to be made good

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 130 Of 260


Images

11/20/2024 11:08:25 AM 3

T456527.53

Should this be finished above boarding to slab edge?

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/20/2024 11:09:13 AM 4

T345545.1200

finish ows door installation

Images

11/20/2024 2:27:33 PM 5

T345545.1201

damages to walls to be repaired

Images

11/20/2024 2:28:03 PM 6

T350553.2197

Paint to be removed from column

Images

11/29/2024 3:11:55 PM Building A>Ground Floor>00­11 Service Corridor Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 131 Of 260


1

T350553.1209

Fire alarm wiring incomplete

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/11/2024 10:10:59 AM

10/30/2024 11:18:46 AM

11/6/2024 4:08:59 PM

11/14/2024 11:28:01 AM

11/21/2024 11:30:56 AM

Building A>Ground Floor>00­12 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.247

Clean paint off areas it shouldn’t be

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:16:06 AM 2

T456527.496

Complete boarding down the whole way along door

Images

12/4/2024 1:42:07 PM 3

T456527.498

remove floor finish sealer from steps and exposed concrete wall

Images

12/4/2024 1:45:39 PM

12/4/2024 1:45:45 PM

Comments

Created By

Date

There is skirting going/here

Alex Money (Swiftcrafted)

12/5/2024 8:48:14 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 132 Of 260


4

T456527.500

Clean off dirt from exposed concrete finish

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 1:50:36 PM 5

T456527.501

Make good to fire stop

Images

12/4/2024 1:51:11 PM 6

T456527.502

Loose handle to be tightened

Images

12/4/2024 1:52:17 PM Building A>Ground Floor>00­19 Refuse Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2123

insulation to be completed

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/26/2024 4:10:15 PM Building A>Ground Floor>00­20 Corridor 08 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 133 Of 260


1

T456527.514

Fix down threshold and replace seal

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:27:54 PM 2

T456527.516

Fix down threshold

Images

12/4/2024 2:29:37 PM Building A>Ground Floor>00­21 Booster Tank Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1218

Fire alarm interface not wired to sprinkler panel

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/11/2024 10:27:25 AM

10/30/2024 8:27:20 AM

11/14/2024 11:19:22 AM

11/21/2024 11:25:41 AM

Building A>Ground Floor>00­23 Telco/LL MER

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.517

Make good to damages in fire stop

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/4/2024 2:31:52 PM Building A>Ground Floor>00­24 Life Safety Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 134 Of 260


1

T350553.2122

ventilation requires NRD

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 4:03:35 PM Building A>Ground Floor>00­25 Corridor Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2045

2nd fix Fire alarm incomplete

11/14/2024

11/21/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/14/2024

11/21/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/14/2024 11:48:11 AM 1

T350553.2046

2nd fix lighting/PIR incomplete

Images

11/14/2024 11:50:11 AM 2

T456527.462

Plasterboard to be painted and cleaned beforehand to stop mould

Images

11/27/2024 3:08:32 PM 3

T456527.466

Building control measure to be completed

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 135 Of 260


Images

11/27/2024 3:11:33 PM Building A>Ground Floor>00­27 BoH / Retail

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.510

clean inside riser

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:21:57 PM 2

T456527.511

screed repairs required in bin stores

Images

12/4/2024 2:22:52 PM Building A>Ground Floor>00­28 DHN Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.463

Damage to fire stop to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/27/2024 3:09:30 PM Building A>Ground Floor>00­29 Corridor 03 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 136 Of 260


1

T350553.2121

grilles to be cut short on all heaters

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/26/2024 3:59:32 PM 2

T456527.352

11/26/2024 3:59:39 PM

Fill areas with larger gaps

Images

11/27/2024 11:46:08 AM 3

T456527.356

Fill block work holes

Images

11/27/2024 11:48:53 AM 4

T456527.359

Magic man ­ Make good to damages on door

Images

11/27/2024 11:51:02 AM Comments

Created By

Date

Works to proceed once all traffic gone

Alex Money (Swiftcrafted)

11/28/2024 11:47:48 AM

5

T456527.465

Damage to block to be made good

12/5/2024 10:39:47 AM

11/27/2024

Project Name: B5412 Project Honey

12/4/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Conor Colton)

Page 137 Of 260


Images

11/27/2024 3:10:52 PM 6

T456527.512

Make good to damaged fire stop

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:26:10 PM 7

T456527.513

Fire stop where temporary pipe was removed

Images

12/4/2024 2:26:33 PM 8

T456527.515

Replace seal in threshold

Images

12/4/2024 2:28:30 PM Building A>Ground Floor>00­31 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.193

General­ Clean all paint from soffit, doors and all services

11/25/2024

12/29/2024

Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Darling Associates (Robyn Harrison­ Church)

Images

11/25/2024 3:36:52 PM 12/5/2024 10:39:47 AM

11/25/2024 3:37:05 PM

11/25/2024 3:37:09 PM

11/25/2024 3:37:15 PM Project Name: B5412 Project Honey

Page 138 Of 260


2

T456527.244

Conduit and socket to be installed

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:13:22 AM 2

T456527.245

Make good to damages caused by Halsion

Images

11/27/2024 10:13:49 AM 3

T456527.252

11/27/2024 10:13:55 AM

No fire stop in the area has labels

Images

11/27/2024 10:19:46 AM 4

T456527.253

Damage to plasterboard to be made good

Images

11/27/2024 10:20:19 AM 5

T456527.254

Damage to skirting to be made good

Images

11/27/2024 10:20:51 AM 12/5/2024 10:39:47 AM

12/2/2024 11:17:12 AM Project Name: B5412 Project Honey

Page 139 Of 260


Comments

Created By

Date

Wall to be repaired first

Alex Money (Swiftcrafted)

12/2/2024 11:17:25 AM

6

T456527.255

Finish on door frame to be completed

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

11/29/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

Francis Hunter (Luke Nurser)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:21:30 AM 7

T456527.256

Screw caps missing on door closer

Images

11/27/2024 10:22:09 AM 8

T456527.258

Area at top corner of door to be taped and jointed

Images

11/27/2024 10:23:13 AM 9

T408928.127

labels on fire stopping

Images

11/27/2024 10:30:43 AM 10

T456527.263

11/27/2024 10:30:49 AM

Scratches to be made good on architrave

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 140 Of 260


Images

11/27/2024 10:33:59 AM 11

T456527.533

Make good to skirting damages

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:49:56 PM Comments

Created By

Date

Can only do this once wall is made good by others

Alex Money (Swiftcrafted)

12/5/2024 8:42:26 AM

Building A>Ground Floor>00­32 Stair lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.273

Remove adhesive and make good to damages on doors

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:48:11 AM

11/27/2024 10:48:16 AM

11/27/2024 10:48:23 AM

Building A>Ground Floor>00­34 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.187

Make good to damages in door

11/25/2024

12/29/2024

Snag

Opened

Fit-out

Swiftcrafted

Darling Associates (Robyn Harrison­ Church)

Images

11/25/2024 3:28:33 PM

12/5/2024 10:39:47 AM

11/25/2024 3:28:54 PM

Project Name: B5412 Project Honey

Page 141 Of 260


2

T456527.268

Clean paint off conduit

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:39:35 AM 3

T456527.269

Clean paint off dry riser door

Images

11/27/2024 10:40:24 AM Building A>Ground Floor>00­L01 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.1070

damage to car panel from inside from BBU use

11/4/2024

11/6/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/6/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/4/2024 1:20:00 PM 1

T345546.1071

Glass mirror to be changed due to scratches

Images

11/4/2024 1:21:47 PM 1

T345546.1072

11/4/2024 1:21:59 PM

car upright panel scratched

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 142 Of 260


Images

11/4/2024 1:23:35 PM 2

T345546.1073

11/4/2024 1:23:49 PM

11/4/2024 1:23:57 PM

Car top transom scratched

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/4/2024 1:26:59 PM T427849.1244

11/4/2024 1:27:08 PM

Light to be brought up to fill gap

11/4/2024 1:27:15 PM

Images

11/4/2024 1:31:24 PM 3

T427849.1245

Damage to corners of lift ceiling tiles

Images

11/4/2024 1:32:47 PM T345546.1074

Clean above lights

Images

11/4/2024 1:33:25 PM

12/5/2024 10:39:47 AM

11/4/2024 1:33:33 PM

Project Name: B5412 Project Honey

Page 143 Of 260


1

T345546.1075

Inconsistent finish to upright panels next to mirrors

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/4/2024 1:34:33 PM T427849.1246

11/4/2024 1:34:41 PM

Damage to corners of lift ceiling tiles

Images

11/4/2024 1:35:33 PM 4

T345546.1076

11/4/2024 1:35:40 PM

inconsistent wall cladding panel spacing

Images

11/4/2024 1:35:58 PM T427849.1247

11/4/2024 1:36:05 PM

Trim cracked at at cop corner

11/4/2024 1:36:22 PM

Images

11/4/2024 1:36:43 PM T427849.1248

Gap in skirting to be made good

Images

11/4/2024 1:37:56 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 144 Of 260


5

T345546.1077

Control panel not sitting evenly flushed both sides

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/4/2024 1:37:03 PM 6

T345546.1101

11/4/2024 1:37:29 PM

damage to vertical panel trim

Images

11/5/2024 11:51:46 AM 7

T427849.1278

Make good to damages to car uprights

Images

11/5/2024 11:52:00 AM 8

T345546.1102

11/5/2024 11:52:07 AM

skirting overlapping

11/5/2024 11:52:12 AM

11/5/2024 11:52:18 AM

Images

11/5/2024 11:52:23 AM 9

T427849.1279

Make good to damages on car transom

Images

11/5/2024 11:52:47 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 145 Of 260


6

T345546.1103

Inconsistent gaps in wall panels

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/12/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/5/2024 11:52:55 AM 10

T427849.1280

re align panels as there are steps in the heights

Images

11/5/2024 11:53:35 AM 11

T427849.1281

11/5/2024 11:53:41 AM

Make good to gap in skirting

11/5/2024 11:53:48 AM

Images

11/5/2024 11:54:26 AM 12

T345546.1104

external car frame damage

Images

11/5/2024 11:55:43 AM 13

T345546.1429

11/5/2024 11:55:53 AM

scratches to top and side panels from inside of doors

Images

11/22/2024 9:16:33 AM 12/5/2024 10:39:47 AM

11/22/2024 9:16:53 AM Project Name: B5412 Project Honey

Page 146 Of 260


14

T456527.127

Loose light to be fitted

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:17:13 AM 15

T345546.1430

chip off the wooden panel trim

Images

11/22/2024 9:17:46 AM 16

T456527.128

Chip in handrail to be made good

Images

11/22/2024 9:17:56 AM 8

T456527.129

Chip in panel to be made good

Images

11/22/2024 9:18:30 AM 16

T456527.130

Chip in panel to be made good

Images

11/22/2024 9:18:50 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 147 Of 260


13

T345546.1431

cables visible above front panel

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:18:53 AM 3

T456527.131

Clean ceiling

Images

11/22/2024 9:19:28 AM 11

T456527.132

Scratch to be made good

Images

11/22/2024 9:19:49 AM 17

T456527.133

Mark in ceiling to be made good

Images

11/22/2024 9:20:32 AM 18

T456527.134

Control panel to be installed tighter as it is bowing against wall

Images

11/22/2024 9:21:33 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 148 Of 260


10

T456527.135

Dents in control panel to be made good

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:23:52 AM 9

T456527.155

Scratch on door to be made good

Images

11/22/2024 9:42:02 AM 9

T456527.158

Clean doors

Images

11/22/2024 9:44:44 AM Building A>Ground Floor>00­L02 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1267

Damage to corners of lift ceiling tiles to be made good

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/4/2024 2:26:44 PM 2

T427849.1268

Clean ceiling lights

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 149 Of 260


Images

11/4/2024 2:27:11 PM 3

T427849.1269

Inconsistency in gaps between panels to be made good

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/4/2024 2:28:18 PM 4

T427849.1271

11/4/2024 2:28:24 PM

11/4/2024 2:28:30 PM

Mirror joint gaps are inconsistent and need re aligned

11/4/2024 2:28:36 PM

Images

11/4/2024 2:31:11 PM 5

T427849.1283

Tighten loose handle

Images

11/5/2024 11:57:19 AM 6

T345546.1105

The control panel is not fixed that consistently onto the wall

Images

11/5/2024 11:57:05 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 150 Of 260


6

T345546.1106

Damage to control panel where the Otis logo is

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/5/2024 11:57:52 AM 7

T427849.1284

Bottom of control panel is damaged and to be made good

Images

11/5/2024 11:58:10 AM 8

T345546.1107

inconsistent wall panel joints

Images

11/5/2024 11:59:03 AM 9

T345546.1108

Clean above lights

Images

11/5/2024 11:59:32 AM 10

T345546.1109

Scratches to ceiling soffit

Images

11/5/2024 12:00:47 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 151 Of 260


11

T456527.136

Bubble in screen to be made good

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:24:14 AM 11

T456527.137

Large gap at the top of control panel to be made good

Images

11/22/2024 9:24:41 AM 12

T456527.138

Scratch in ceiling to be made good

Images

11/22/2024 9:25:12 AM 13

T456527.139

Bowing where ceiling meets to be made good

Images

11/22/2024 9:25:43 AM 14

T456527.141

Large gap at the top of control panel to be made good

Images

11/22/2024 9:27:53 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 152 Of 260


14

T456527.142

Damage at the bottom of control panel to be made good

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:28:19 AM 15

T456527.143

Clean floor finish off skirting

Images

11/22/2024 9:28:48 AM 16

T456527.144

Scratch in ceiling to be made good

Images

11/22/2024 9:29:46 AM 17

T456527.145

Vents in lift are circles in this lift and square in all the rest

Images

11/22/2024 9:33:21 AM 17

T456527.156

Scratch on door to be made good

Images

11/22/2024 9:42:47 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 153 Of 260


18

T456527.468

Scratch on lift ceiling to be made good

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 10:47:44 AM 19

T408928.211

12/4/2024 10:47:51 AM

gaps in skirting and wall

Images

12/4/2024 10:52:09 AM 20

T408928.212

scratch on door surround within car

Images

12/4/2024 10:53:08 AM 21

T456527.469

Inconsistency in height of blue panel in different lifts to be made good

Images

12/4/2024 10:56:44 AM

12/4/2024 10:57:13 AM

Building A>Ground Floor>00­L03 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1249

Inconsistency in lift ceiling finish above mirror

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 154 Of 260


Images

11/4/2024 1:51:24 PM 2

T427849.1250

Damage to ceiling edges

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/4/2024 1:52:38 PM 1

T427849.1251

11/4/2024 1:52:45 PM

Inconsistency in gaps between mirrors

Images

11/4/2024 1:53:56 PM 3

T345546.1082

11/4/2024 1:54:01 PM

Clean above lights

11/4/2024 1:54:10 PM

Images

11/4/2024 2:00:07 PM 4

T427849.1252

Scratch to be made good on panel

Images

11/4/2024 2:01:23 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 155 Of 260


5

T345546.1083

Control panel not fixed properly and also appears too low

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/4/2024 2:02:01 PM 6

T427849.1254

11/4/2024 2:02:11 PM

Inconsistent gap in ceiling join

Images

11/4/2024 2:03:54 PM 6

T345546.1084

11/4/2024 2:04:03 PM

scratches on car upright

Images

11/4/2024 2:05:37 PM 7

T427849.1256

11/4/2024 2:05:59 PM

Threshold not installed

Images

11/4/2024 2:06:09 PM 8

T345546.1085

Inconsistent heights on wall panels

Images

11/4/2024 2:06:53 PM 12/5/2024 10:39:47 AM

11/4/2024 2:07:03 PM

11/4/2024 2:07:13 PM Project Name: B5412 Project Honey

Page 156 Of 260


9

T345546.1095

Control paddle not fixed properly

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/5/2024 11:43:57 AM 10

T345546.1096

Scratches on control panel

Images

11/5/2024 11:44:55 AM 11

T427849.1275

11/5/2024 11:45:04 AM

Poor cut finish on car upright

Images

11/5/2024 11:46:32 AM 12

T427849.1276

Poor cut finish on car upright

Images

11/5/2024 11:46:53 AM 10

T345546.1098

inconsistent panel finishes to wall

Images

11/5/2024 11:46:59 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 157 Of 260


13

T345546.1099

do the holes require cover caps on handrails

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/5/2024 11:48:56 AM 10

T345546.1100

Inconsistent gaps on control panel unit backs onto wall

Images

11/5/2024 11:50:12 AM 14

T345546.1424

clean ceiling in lights

Images

11/22/2024 9:09:20 AM 15

T345546.1425

lift skirting doesn’t look correct as per other lifts ­ looks too short

Images

11/22/2024 9:10:42 AM 16

T345546.1426

Control panel looks like it is bowing and has inconsistent gaps where the lights down the sides are

Images

11/22/2024 9:12:08 AM 12/5/2024 10:39:47 AM

11/22/2024 9:12:14 AM Project Name: B5412 Project Honey

Page 158 Of 260


17

T345546.1427

scratch to upright panel inside door

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:13:08 AM 1

T456527.125

Dent in ceiling to be made good

Images

11/22/2024 9:15:26 AM 18

T345546.1428

light strips look too low compared to other lifts

Images

11/22/2024 9:15:33 AM 7

T456527.157

Large scratch on both doors to be made good

Images

11/22/2024 9:43:45 AM Building A>Ground Floor>00­L04 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1257

Inconsistency in gaps between mirrors

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 159 Of 260


Images

11/4/2024 2:11:30 PM 2

T427849.1258

11/4/2024 2:11:41 PM

Inconsistency in gaps between panels

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/4/2024 2:12:10 PM 3

T427849.1259

11/4/2024 2:12:14 PM

11/4/2024 2:12:21 PM

Damage to corners of lift ceiling tiles

11/4/2024 2:12:29 PM

11/4/2024 2:12:38 PM

11/4/2024 2:12:53 PM

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/4/2024 2:13:17 PM 4

T427849.1260

11/4/2024 2:13:24 PM

Handle loose and needs tightened

11/4/2024 2:13:31 PM

Images

11/4/2024 2:14:26 PM 5

T345546.1087

Clean above lights

Images

11/4/2024 2:16:57 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 160 Of 260


6

T427849.1263

Scratch on cad transom to be made good

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/8/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/4/2024

11/7/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/4/2024

11/11/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/4/2024 2:20:39 PM 7

T345546.1088

Scratches to car uprights

Images

11/4/2024 2:20:44 PM 8

T427849.1264

11/4/2024 2:21:00 PM

Damage on trim to be made good

Images

11/4/2024 2:21:31 PM 9

T427849.1265

Inconsistency to architrave gaps to be made good

Images

11/4/2024 2:24:33 PM 3

T345546.1089

11/4/2024 2:24:38 PM

Damage to black control panel

Images

11/5/2024 11:33:09 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 161 Of 260


10

T345546.1090

Control unit doesn’t appear to be fixed properly

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/5/2024 11:33:47 AM 3

T345546.1091

Inconsistency with wall panels joints

Images

11/5/2024 11:34:16 AM 3

T345546.1092

11/5/2024 11:34:22 AM

Inconsistency with the mirror joints

Images

11/5/2024 11:34:50 AM 3

T345546.1093

Inconsistency in heights of ceiling panels where they join

Images

11/5/2024 11:36:19 AM 3

T345546.1094

Clean above lights

Images

11/5/2024 11:38:08 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 162 Of 260


11

T456527.154

Scratch along both doors to be made good

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

Images

11/22/2024 9:40:57 AM 12

T408928.205

12/4/2024 10:44:42 AM

12/4/2024 10:44:51 AM

control panel has fixings pushing through above screen

Images

12/4/2024 10:38:10 AM 13

T408928.206

gap / inconsistent finish to skirting detail

Images

12/4/2024 10:41:14 AM 13

T408928.207

gap at top of control panel

Images

12/4/2024 10:43:05 AM 14

T408928.208

general deep needed of doors and car

12/4/2024

12/11/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

15

T408928.209

floor indicator is not flush with metal

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

Images

12/4/2024 10:47:09 AM Building A>Ground Floor>00­L05 FF/Passenger Lift 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 163 Of 260


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.1110

The external architraves need to be consistent with all other lifts

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/5/2024

11/8/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/5/2024 12:03:30 PM 2

T345546.1111

indicator for which lift it is is not installed

Images

11/5/2024 12:04:37 PM 3

T427849.1441

Improve consistency in the gap size between the panels

Images

11/11/2024 1:59:33 PM 4

T427849.1442

11/11/2024 1:59:39 PM

11/11/2024 1:59:48 PM

Top of panels are stepping which needs to be made good

11/11/2024 1:59:56 PM

Images

11/11/2024 2:00:33 PM 5

T427849.1443

11/11/2024 2:00:37 PM

11/11/2024 2:00:43 PM

Ceilings are two different heights which need to be aligned

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 164 Of 260


Images

11/11/2024 2:01:41 PM 6

T427849.1444

Damage on panel to be made good

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/28/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/11/2024 2:02:08 PM 7

T456527.126

Floor finish on skirting to be made good

Images

11/22/2024 9:15:58 AM 8

T456527.146

Floor finish to be cleaned off skirting

Images

11/22/2024 9:34:31 AM 9

T456527.147

Floor finish to be made good

Images

11/22/2024 9:35:20 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 165 Of 260


10

T456527.148

Skirting that isn’t flush to be made good

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/22/2024 9:36:56 AM 11

T456527.152

Scratch on door to be made good

Images

11/22/2024 9:39:12 AM 12

T456527.153

Mark on lift upright to be made good

Images

11/22/2024 9:39:59 AM Building A>Ground Floor>00­L06 FF/Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.1434

Improve consistency in the gap size between the panels

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

11/11/2024 1:43:23 PM 2

T427849.1436

11/11/2024 1:43:30 PM

Clean floor finish off of skirting

12/5/2024 10:39:47 AM

11/11/2024 1:43:38 PM

Project Name: B5412 Project Honey

Page 166 Of 260


Images

11/11/2024 1:44:29 PM 1

T427849.1437

Improve the consistency in the gap at the top of the panels

11/11/2024

11/18/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/29/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/22/2024

11/28/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/11/2024 1:45:26 PM 3

T456527.149

11/11/2024 1:45:32 PM

Scratches above lift entrance to be made good

Images

11/22/2024 9:37:36 AM 4

T456527.150

Scratches above lift entrance to be made good

Images

11/22/2024 9:38:03 AM 5

T456527.151

Panel alignment to be made good

Images

11/22/2024 9:38:26 AM Building A>Ground Floor>00­L07 Evacuation Lift Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 167 Of 260


1

T456527.519

Damages in doors to be made good

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:36:20 PM 2

T456527.520

General ­ clean floor finish off skirting

Images

12/4/2024 2:37:30 PM 3

T456527.521

cap missing in ceiling to be replaced

Images

12/4/2024 2:38:14 PM 4

T456527.522

Remove all protection and clean goods lift

Images

12/4/2024 2:38:39 PM 5

T456527.523

Make good to scratches and marks on hand rail

Images

12/4/2024 2:39:03 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 168 Of 260


6

T456527.524

make good to damages in doors

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:39:26 PM 7

T456527.525

Loud noise to be got rid of behind door

Images

12/4/2024 2:41:14 PM 8

T456527.526

Damages in threshold to be made good

Images

12/4/2024 2:41:56 PM Building A>Ground Floor>00­S01 Stair 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1007

white rail shouldnt be visible. please adjust timber handrail

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/11/2024 3:30:57 PM

11/14/2024 10:25:50 AM

11/19/2024 1:57:38 PM

Comments

Created By

Date

Can this be adjusted, gold paint doesn’t look great

Conor Colton (McLaughlin & Harvey)

11/19/2024 1:58:03 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 169 Of 260


2

T456527.408

Run mastic along top of boarding

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:18:02 PM Building A>Ground Floor>00­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1211

cracked precast stair to be repaired

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 2:38:06 PM 2

T456527.365

Lagging to be completed

Images

11/27/2024 11:56:37 AM 3

T456527.366

Clean gap in stair case

Building A>Ground Floor>0­33 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.220

Damages on architrave to be made good

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 9:44:27 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 170 Of 260


2

T456527.259

Area where conduit comes up through floor is not good enough and needs changed

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:29:18 AM 3

T456527.260

11/27/2024 10:29:25 AM

Door frame decoration to be completed

Images

11/27/2024 10:29:56 AM 4

T456527.261

Decoration walls to be completed

Images

11/27/2024 10:30:45 AM 3

T456527.262

11/27/2024 10:30:56 AM

Fire exit sign should be above fire exit

Images

11/27/2024 10:33:15 AM 5

T456527.264

Scratches to be made good on architrave

Images

11/27/2024 10:34:15 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 171 Of 260


6

T456527.265

Scratches to be made good on architrave

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 10:34:52 AM 7

T456527.266

Scratches to be made good on architrave

Images

11/27/2024 10:35:08 AM 5

T456527.267

Magic man to make good to damages on doors

Images

11/27/2024 10:38:36 AM 8

T345545.1353

handle missing on door

Images

11/29/2024 3:16:31 PM 9

T456527.529

Damages to architrave to be made good

Images

12/4/2024 2:45:36 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 172 Of 260


10

T456527.530

Missing handle to be installed

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:46:01 PM 11

T456527.531

Missing floor plates to be installed

Images

12/4/2024 2:46:25 PM Building A>Roof Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1937

PV system incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 10:32:55 AM T350553.2032

11/13/2024 10:33:01 AM

11/19/2024 5:01:50 PM

General comment­ external lighting needed at back of plant for escape route

11/19/2024 5:02:43 PM

Images

11/13/2024 12:51:05 PM T350553.2033

11/13/2024 12:51:13 PM

Nipple to be painted on lthw/chw

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 173 Of 260


Images

11/13/2024 12:52:46 PM T350553.2092

insulation to be made good

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/26/2024 2:10:56 PM T350553.2093

Differential pressure switch requires insulation

Images

11/26/2024 2:12:16 PM T350553.2094

general tidy required on roof

Images

11/26/2024 2:12:55 PM T350553.2095

11/26/2024 2:20:58 PM

tie wraps to be cut

Images

11/26/2024 2:13:48 PM Building A>Roof>Roof Plan Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 174 Of 260


T350553.1664

Insulation incomplete to LTHW/ CHW pipework

10/29/2024

11/5/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 10:31:14 AM

11/13/2024 10:31:26 AM

11/13/2024 10:31:40 AM

11/13/2024 10:31:54 AM

11/19/2024 4:59:58 PM

11/19/2024 5:00:16 PM

11/19/2024 5:00:33 PM

11/19/2024 5:00:53 PM

1

T350553.1860

All condensates to be ran into shingle

11/13/2024 10:32:02 AM

11/13/2024 10:32:15 AM

11/13/2024 10:32:22 AM

11/19/2024 4:59:27 PM

11/4/2024

11/11/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/4/2024 11:37:35 AM 2

T427849.1459

Lagging missing throughout

Images

11/11/2024 4:23:24 PM 3

T345545.1048

11/11/2024 4:24:44 PM

11/11/2024 4:24:52 PM

chipped paintwork at joint

Images

11/11/2024 4:27:16 PM

11/14/2024 12:44:14 PM

11/19/2024 1:41:47 PM

Comments

Created By

Date

Redo not good enough

Conor Colton (McLaughlin & Harvey)

11/19/2024 1:42:10 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 175 Of 260


4

T350553.1966

insulation incomplete

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 10:21:50 AM 5

T350553.1967

11/12/2024 10:22:07 AM

trace heating wiring incomplete

11/12/2024 10:22:19 AM

11/12/2024 10:22:28 AM

11/12/2024 10:22:54 AM

Images

11/12/2024 10:24:37 AM 6

T350553.1968

fire alarm sounder not secured

Images

11/12/2024 10:29:14 AM 7

T350553.1969

external lighting not live

Images

11/12/2024 10:30:00 AM 8

T350553.1970

11/12/2024 10:30:15 AM

smoke pressure pipe to be tidied up and secured

Images

11/12/2024 10:31:30 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 176 Of 260


9

T350553.1971

fp cables incomplete

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 10:32:57 AM 10

T350553.1972

Bms cable tray damaged ­ needs replaced

Images

11/12/2024 10:34:23 AM 11

T350553.1973

11/12/2024 10:34:37 AM

tiewraps to be cut short

11/12/2024 10:35:02 AM

Images

11/12/2024 10:35:57 AM 12

T350553.1974

chiller supply cable to be properly supported

Images

11/12/2024 10:36:58 AM 13

T350553.1975

PV cabling to be completed

Images

11/12/2024 10:39:59 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 177 Of 260


14

T350553.1976

smoke vent panels to be properly labelled

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/18/2024

Snag

Opened

Roofing

Aym (Services) Limited

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 10:41:26 AM 15

T345546.1282

11/12/2024 10:41:31 AM

replacing slabs

Images

11/12/2024 12:37:44 PM

11/12/2024 12:37:49 PM

11/12/2024 12:38:04 PM

Comments

Created By

Date

STATUS CHANGE: No pictures

Dominic Driver (McLaughlin & Harvey)

12/4/2024 9:07:18 AM

16

T345546.1283

Condensed pipes to angle back over the shingle

11/12/2024

11/18/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/12/2024 12:38:54 PM 17

T350553.2028

11/12/2024 12:39:01 PM

Lights not working and reference required on switch

Images

11/13/2024 12:45:16 PM 18

T350553.2029

11/13/2024 12:45:23 PM

metal clips required on armours

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 178 Of 260


Images

11/13/2024 12:46:49 PM 19

T350553.2030

metal clips required on armours

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/18/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Dominic Driver)

Images

11/13/2024 12:47:44 PM 20

T350553.2031

11/13/2024 12:49:54 PM

references on all plant and electrical panelsASHP AHU etc

Images

11/13/2024 12:48:55 PM 21

T350553.2034

Containment to carry on to vertical run

Images

11/13/2024 12:57:01 PM 22

T345546.1360

Cut the bottom of metal door so it doesn’t crash with the PTSG harness line

Images

11/13/2024 3:05:14 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 179 Of 260


23

T345546.1362

put bends on the condense pipes so water lands over the ballast and not slabs

11/13/2024

11/18/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 3:09:04 PM 24

T350553.2089

11/13/2024 3:09:10 PM

insulation incomplete

Images

11/26/2024 2:01:00 PM 25

T350553.2090

11/26/2024 2:01:06 PM

11/26/2024 2:28:56 PM

combing required to all units

11/26/2024 2:29:05 PM

11/26/2024 2:29:11 PM

11/26/2024 2:29:22 PM

11/26/2024 2:29:32 PM

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 2:02:32 PM 26

T350553.2091

11/26/2024 2:02:37 PM

valve handle doesn’t shut ­ tray to be cut back

11/26/2024 2:02:42 PM

Images

11/26/2024 2:04:51 PM 27

T350553.2096

drop rod bent and bracket not taking any weight

Images

11/26/2024 2:17:40 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 180 Of 260


28

T350553.2097

tray needs secured

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 2:18:35 PM 29

T350553.2098

references required on all spurs and isolators

Images

11/26/2024 2:19:38 PM 30

T350553.2099

11/26/2024 2:22:36 PM

can ASHP be maintained with door not opening all the way

Images

11/26/2024 2:23:56 PM 31

T350553.2100

PV panels to be cleaned

Images

11/26/2024 2:26:07 PM 32

T350553.2101

BMS wiring incomplete

Images

11/26/2024 2:37:08 PM 12/5/2024 10:39:47 AM

11/26/2024 2:37:37 PM Project Name: B5412 Project Honey

Page 181 Of 260


33

T456527.457

Decoration to be completed

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:56:13 PM

11/27/2024 2:56:22 PM

Building A>Second Floor>02­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T383078.171

Joints in LED strip lighting are inconsistent throughout and need to be reviewed (General Snag)

10/2/2024

10/9/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Murphy McCutcheon)

Images

10/2/2024 11:37:00 AM

10/15/2024 11:14:33 AM

10/23/2024 10:44:54 AM

Comments

Created By

Date

Still not fully addressed.

Vanngel Natso (McLaughlin & Harvey)

10/23/2024 10:45:18 AM

2

T338993.1832

The fire curtain point should be with breaking glass to prevent people from pressing it.

10/23/2024

10/30/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Vanngel Natso)

10/23/2024

10/30/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/23/2024 9:24:41 AM T338993.1835

10/23/2024 9:24:45 AM

Light not 2nd fixed.

Images

10/23/2024 9:28:38 AM

10/23/2024 9:28:43 AM

10/24/2024 11:01:14 AM

Comments

Created By

Date

Closing snag photo is taken from the wrong location of snag issued by McLH. Please reissue correct location photo to close out snag properly

James Parker (Halsion )

10/25/2024 9:23:10 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 182 Of 260


3

T345546.757

Improve preparation work for screw holes on frame – not a great finish

10/23/2024

10/28/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

10/23/2024

10/30/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

10/23/2024 9:39:04 AM 4

T345545.639

10/23/2024 9:39:11 AM

10/23/2024 9:39:37 AM

core wall adjacent to ductwork to be sanded and decorated

Images

10/23/2024 10:20:41 AM 5

T345545.1158

fire curtain escape button not fixed

Images

11/20/2024 10:51:59 AM 6

T456527.44

Ensure all uni strut is filled around with fire stop

Images

11/20/2024 10:52:29 AM 7

T456527.45

Welds on the outside at corner not consistent with other floors

Images

11/20/2024 10:53:40 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 183 Of 260


8

T345545.1161

magic man to make good to feature stair opening

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Post PC Defect

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Vanngel Natso)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/20/2024 10:58:00 AM 9

T345545.1360

lights are not aligned with ceilings

Images

12/4/2024 11:44:29 AM 10

T345545.1361

end cap missing on light

Images

12/4/2024 11:45:13 AM 11

T338993.2329

Red paint from the tile to be cleaned.

Images

12/4/2024 12:06:10 PM 12

T338993.2330

12/4/2024 12:06:17 PM

12/4/2024 12:06:25 PM

Lights not in line.

Images

12/4/2024 12:07:50 PM 12/5/2024 10:39:47 AM

12/4/2024 12:08:01 PM

12/4/2024 12:08:19 PM

12/4/2024 12:08:29 PM

12/4/2024 12:08:45 PM Project Name: B5412 Project Honey

Page 184 Of 260


13

T338993.2331

Lights not in line.

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 12:09:31 PM 14

T456527.492

12/4/2024 12:09:48 PM

Light with end hanging out to be aligned

Images

12/4/2024 12:18:25 PM 15

T345545.1362

grille to be clipped in and sprinkler to be realigned and rosette fitted

Images

12/4/2024 12:22:35 PM 16

T456527.493

Frosted diffuser to be installed in light 2

Images

12/4/2024 12:24:21 PM 17

T456527.494

Make good of damage to grill opening

Images

12/4/2024 12:26:18 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 185 Of 260


Building A>Second Floor>02­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.525

Otis to install missing Lift numbers/letters and push buttons and indicators on Lifts 02, 05 and 06

10/17/2024

10/21/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/17/2024 1:48:29 PM 2

T350553.1402

10/17/2024 1:48:36 PM

10/17/2024 1:48:46 PM

10/17/2024 1:48:55 PM

All BMS cabling to be tidied up and tiewrapped neatly

Images

10/21/2024 11:39:02 AM T338993.1786

10/21/2024 11:41:35 AM

Light not alined between them.

Images

10/22/2024 9:54:00 AM

10/22/2024 9:54:20 AM

11/13/2024 11:33:00 AM

11/13/2024 11:33:10 AM

11/13/2024 11:33:21 AM

Comments

Created By

Date

Missing photos from the lights not aligned.

Vanngel Natso (McLaughlin & Harvey)

11/19/2024 7:15:49 PM

Photo evidence has been provided of snag complete

James Parker (Halsion )

11/20/2024 10:14:38 AM

Photos of the 2 small lights which are not in line, are not provided on the attached photos.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 2:08:38 PM

T338993.1788

Additional metal cable ties required on cable drops and cables not run within containment.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 9:58:13 AM

12/5/2024 10:39:47 AM

10/22/2024 9:58:20 AM

Project Name: B5412 Project Honey

Page 186 Of 260


3

T345545.538

fire curtains to be checked for compliance. gaps at wings look to be different sizes

10/22/2024

10/29/2024

Snag

Opened

Fire Curtains

Coopers Fire

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Liana Maltezou)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

10/22/2024 11:32:59 AM 4

T345545.541

10/22/2024 11:33:21 AM

indicator not fitted correctly

Images

10/22/2024 11:39:22 AM 5

T345545.542

indicator not fitted

Images

10/22/2024 11:39:41 AM 6

T350553.1695

BMS wiring incomplete

Images

10/30/2024 10:36:00 AM 7

T345545.953

11/6/2024 4:39:33 PM

cables in basket to be tidied up

11/14/2024 10:08:41 AM

Images

11/8/2024 9:16:45 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 187 Of 260


8

T345545.954

flow meter resting on tiles to be removed

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 9:17:14 AM 9

T345545.956

cables above ceiling to be tidied up

Images

11/8/2024 9:19:57 AM 10

T345545.958

caps missing from fire curtain framing

Images

11/8/2024 9:21:37 AM 11

T427849.1298

11/8/2024 9:21:42 AM

Make good of damage on architrave

Images

11/8/2024 9:28:28 AM 12

T427849.1299

Make good of damage on door handle

Images

11/8/2024 9:29:15 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 188 Of 260


12

T427849.1301

Put something under neath plate to avoid future damages

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 9:30:31 AM 13

T427849.1302

Architrave not a consistent distance from fire curtain frame

Images

11/8/2024 9:31:18 AM 14

T427849.1303

Remove tap around fire curtain

Images

11/8/2024 9:44:56 AM 15

T427849.1304

Damage on door to be made good

Images

11/8/2024 9:52:11 AM 16

T345546.1127

General item ­ lift letters missing

Images

11/8/2024 9:51:40 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 189 Of 260


17

T345546.1128

Call button not fixed on wall properly

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 9:56:09 AM Building A>Second Floor>02­03 Corridor 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.349

Improve finish to architrave and remove snots of paint

10/17/2024

10/21/2024

Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Murphy McCutcheon)

Images

10/17/2024 1:25:40 PM 2

T383078.250

10/17/2024 1:25:47 PM

High level paint finish to be improved

10/17/2024 1:25:54 PM

10/17/2024 1:26:06 PM

10/17/2024 1:26:14 PM 10/17/2024

10/17/2024 1:26:23 PM 10/19/2024

Snag

Images

10/17/2024 1:28:54 PM

11/5/2024 3:36:16 PM

Comments

Created By

Date

still hopes to be filled

Conor Colton (McLaughlin & Harvey)

11/5/2024 3:36:30 PM

3

T345546.517

Missing architrave

10/17/2024

10/21/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

Images

10/17/2024 1:33:02 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 190 Of 260


4

T350553.1397

cover to be removed from smoke head

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/22/2024

10/28/2024

Snag

Opened

Painting & Decorating

AC Beck

Darling Associates (Liana Maltezou)

10/22/2024

10/27/2024

Snag

Opened

Painting & Decorating

AC Beck

Darling Associates (Liana Maltezou)

11/8/2024

11/12/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

10/21/2024 11:29:18 AM T338993.1768

Cleaner socket not level.

Images

10/22/2024 8:58:57 AM 5

T345546.682

10/22/2024 8:59:15 AM

Improved decoration to the architraves

Images

10/22/2024 11:16:07 AM 6

T345546.684

10/22/2024 11:16:21 AM

Improve finish to corners of architraves

10/22/2024 11:16:28 AM

10/22/2024 11:16:38 AM

Images

10/22/2024 11:21:59 AM 7

T345546.1112

Improve finish around Firestopping

Images

11/8/2024 9:16:00 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 191 Of 260


8

T345546.1117

General item – Missing for the Unistrut rods

11/8/2024

11/12/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 9:20:59 AM Comments

Created By

Date

Could I please have some further information as cannot see what is missing from the description or the comment

Brett Pitcher (Halsion )

11/20/2024 9:29:32 AM

9

T345546.1118

realignment required for ceiling bays ­ not lined up with ceiling heater properly

11/8/2024

11/12/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 9:21:47 AM Building A>Second Floor>02­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1584

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/3/2024 4:29:47 PM Comments

Created By

Date

duplicate snag F1.3028633

Brett Pitcher (Halsion )

10/27/2024 8:24:52 PM

The snags are raised on different toilets.

Vanngel Natso (McLaughlin & Harvey)

11/19/2024 7:19:20 PM

Building A>Second Floor>02­05 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1587

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 192 Of 260


Images

10/3/2024 4:42:46 PM Building A>Second Floor>02­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T383078.259

Remove redundant drop top from soffit

10/17/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Murphy McCutcheon)

10/17/2024

10/20/2024

Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/17/2024 2:00:24 PM 2

T427849.360

Repaint damaged architrave

Images

10/17/2024 2:03:11 PM 3

T350553.1410

10/17/2024 2:03:18 PM

BMS cabling incomplete

10/17/2024 2:03:36 PM

10/17/2024 2:03:42 PM

Images

10/21/2024 11:53:42 AM T338993.1782

PIR cable not run properly, too long.

Images

10/22/2024 9:45:36 AM 12/5/2024 10:39:47 AM

10/22/2024 9:45:44 AM Project Name: B5412 Project Honey

Page 193 Of 260


T338993.1789

Additional metal cable ties required on cable drops and cables not run within containment.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/22/2024

10/28/2024

Snag

Opened

Painting & Decorating

AC Beck

Darling Associates (Liana Maltezou)

10/22/2024

10/28/2024

Snag

Opened

Painting & Decorating

AC Beck

Darling Associates (Liana Maltezou)

10/22/2024

10/28/2024

Snag

Opened

Painting & Decorating

AC Beck

Darling Associates (Robyn Harrison­ Church)

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

Images

10/22/2024 10:06:58 AM 4

T345546.695

10/22/2024 10:07:04 AM

Make good on the door frame

Images

10/22/2024 11:42:27 AM 2

T345546.699

10/22/2024 11:42:35 AM

10/22/2024 11:42:42 AM

10/22/2024 11:42:48 AM

make good And decorate behind conduitabove staircase entrance

Images

10/22/2024 11:51:28 AM 5

T427849.511

Fill damages and repaint around door frame

Images

10/22/2024 11:51:40 AM 2

T427849.1295

10/22/2024 11:51:45 AM

Make good go wall around fire exit sign

10/22/2024 11:51:54 AM

10/22/2024 11:52:03 AM

10/22/2024 11:52:09 AM 11/8/2024

11/19/2024 10:03:26 AM 11/15/2024

Client Snag

Images

11/8/2024 9:23:43 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 194 Of 260


1

T427849.1297

Re do fire stop once cable removed

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 9:27:41 AM Building A>Second Floor>02­07 CC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1413

Sprinkler rosette missing

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/21/2024 12:04:23 PM Building A>Second Floor>02­L05 FF/Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.959

hole to be infilled

11/8/2024

11/15/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

11/8/2024 9:22:37 AM Building A>Second Floor>02­L07 Evacuation Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.525

missing architrave on goodslift

10/22/2024

10/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Liana Maltezou)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/22/2024 11:14:45 AM Building A>Second Floor>02­R05 LS Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 195 Of 260


T350553.1693

wiring incomplete

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/30/2024 10:34:21 AM T350553.1694

11/6/2024 4:38:52 PM

11/14/2024 10:07:59 AM

11/14/2024 10:08:08 AM

BMS wiring incomplete

11/21/2024 10:58:53 AM

Images

10/30/2024 10:34:55 AM

11/6/2024 4:38:35 PM

11/14/2024 10:06:23 AM

11/21/2024 10:58:21 AM

Building A>Second Floor>02­R17 Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2244

2nd fix incomplete.

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/12/2024 2:05:40 PM T338993.2250

11/12/2024 2:05:58 PM

Schedule is missing and Labels on circuits.

Images

11/12/2024 2:22:59 PM T338993.2251

11/12/2024 2:22:59 PM

Missing screws from the panel’s cover.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 196 Of 260


Images

11/12/2024 2:23:53 PM Building A>Second Floor>02­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1777

Cleaner’s socket bottom not at 450mm FFFL. 20mm Lower.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 9:30:30 AM

10/22/2024 9:30:31 AM

11/4/2024 9:20:45 AM

11/11/2024 7:37:22 PM

Comments

Created By

Date

Snag complete photo has been taken from the wrong location. Please attach photo in correct location showing the snag has been complete

James Parker (Halsion )

11/6/2024 7:58:10 AM

This is the correct location

Brett Pitcher (Halsion )

11/6/2024 8:23:06 AM

No its not!

James Parker (Halsion )

11/7/2024 7:42:46 AM

1

T456527.185

Make good to damages in plasterboard

11/25/2024

12/29/2024

Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Darling Associates (Robyn Harrison­ Church)

11/27/2024

12/4/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/25/2024 3:26:05 PM 2

T456527.416

Clean paint off concrete finish

Images

11/27/2024 2:25:28 PM Building A>Second Floor>02­S02 Stair Lobby Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 197 Of 260


T338993.1673

Cleaner socket’s not flash with the wall.

10/14/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

10/14/2024 2:59:29 PM 1

T456527.417

10/14/2024 2:59:39 PM

Fill gap next to lift architrave

Images

11/27/2024 2:26:09 PM 2

T456527.418

Make good to damages under in plasterboard

Images

11/27/2024 2:26:46 PM 3

T456527.419

Cover miss for fire alarm

Images

11/27/2024 2:27:22 PM 4

T456527.420

Socket is loose

Images

11/27/2024 2:27:49 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 198 Of 260


Building A>Second Floor>02­S03 Stair 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1769

Cleaner’s socket bottom not at 450mm FFFL. 15mm Lower.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 9:05:06 AM

10/22/2024 9:05:06 AM

11/4/2024 9:22:29 AM

11/11/2024 8:14:54 AM

Comments

Created By

Date

Snag complete photo has been taken from the wrong location. Please attach photo in correct location showing the snag has been complete

James Parker (Halsion )

11/6/2024 7:56:50 AM

T338993.1771

All Lights missing green led for battery health indication.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/20/2024

11/25/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

10/22/2024 9:11:33 AM 1

T408928.85

10/22/2024 9:11:42 AM

level 2/3 light damaged

Images

11/20/2024 3:09:05 PM Building A>Second Floor>02­S04 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1682

Cleaner socket’s bottom not at 450mm. 30mm lower.

10/14/2024

10/21/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 8:25:44 AM Comments

Created By

Date

No photo evidence attached, therefore task is rejected.

Vanngel Natso (McLaughlin & Harvey)

11/4/2024 8:35:14 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 199 Of 260


1

T427849.350

Improve finish of caulk around architrave

10/17/2024

10/21/2024

Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

10/17/2024 1:28:40 PM 2

T408928.83

10/17/2024 1:28:48 PM

hole in twin wall above door

10/17/2024 1:28:55 PM

Images

11/20/2024 2:59:39 PM 3

T345545.1218

cellophane to be removed from heater

Images

11/20/2024 3:00:29 PM 4

T345545.1219

paint on junction boxes

Images

11/20/2024 3:01:01 PM 5

T345545.1220

paint to be cleaned off walls

Images

11/20/2024 3:01:30 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 200 Of 260


6

T345545.1221

splatter to be cleaned off walls

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 3:02:33 PM

11/20/2024 3:02:44 PM

Building A>Seventh Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T383078.325

RAF infills to be complete once glazing installed

10/25/2024

11/1/2024

Incomplete Works

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Murphy McCutcheon)

11/8/2024

11/15/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

10/25/2024 3:29:54 PM T427849.1370

Floor finish not going under architrave

Images

11/8/2024 11:37:52 AM T427849.1374

Mitre joint on ceiling has large gap to be rectified

Images

11/8/2024 11:41:19 AM T427849.1375

Mitre joint on ceiling has large gap to be rectified

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 201 Of 260


Images

11/8/2024 11:41:31 AM Building A>Seventh Floor>07­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1643

valve plugs missing from air points

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/30/2024

11/1/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

10/30/2024

11/1/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

10/30/2024

11/1/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Robyn Harrison­ Church)

Images

10/28/2024 2:31:10 PM 2

T427849.936

Door architraves not aligned correctly

Images

10/30/2024 11:16:52 AM 3

T427849.947

Damage to door to be made good

Images

10/30/2024 11:25:36 AM 4

T427849.949

Door architraves are not aligned up

Images

10/30/2024 11:26:33 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 202 Of 260


5

T345545.881

alignment of balustrades to be improved

11/4/2024

11/11/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/12/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Groundworks

Mitchellson

Francis Hunter (Luke Nurser)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Images

11/4/2024 11:25:04 AM 6

T345546.1216

replace rusty slabs

Images

11/8/2024 3:22:44 PM 7

T345546.1219

Tile needs to be replaced

Images

11/8/2024 3:30:27 PM 8

T408928.46

make good column edge

Images

11/8/2024 3:31:49 PM 9

T444645.611

pipe to be raised approx 30mm to clear ceiling height

Images

11/8/2024 3:43:09 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 203 Of 260


10

T444645.612

RAF quite severely scratched

11/8/2024

11/15/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (James McKeever)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/13/2024

11/18/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 3:45:09 PM 11

T350553.2000

insulation to be made good

Images

11/13/2024 12:11:22 PM 12

T427849.1515

Paint touch up required on door

Images

11/13/2024 1:59:32 PM 13

T345546.1323

paint on duct work and high level compex ­ please check all

Images

11/13/2024 1:59:52 PM 12

T427849.1516

11/13/2024 2:00:15 PM

Adhesive to be removed from door

Images

11/13/2024 2:00:12 PM 12/5/2024 10:39:47 AM

11/13/2024 2:00:31 PM

11/13/2024 2:00:43 PM Project Name: B5412 Project Honey

Page 204 Of 260


14

T427849.1517

Fire stopping to be completed

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/15/2024

11/19/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

Images

11/13/2024 2:01:34 PM 15

T427849.1519

Fire stopping to be completed

Images

11/13/2024 2:03:08 PM 16

T427849.1521

Paint touch up required on areas with tape

Images

11/13/2024 2:04:55 PM 16

T427849.1523

11/13/2024 2:05:00 PM

Paint by king at corner to be made good

Images

11/13/2024 2:06:56 PM 17

T427849.1568

11/13/2024 2:07:03 PM

Fill gap in floor board

Images

11/15/2024 10:41:28 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 205 Of 260


Comments

Created By

Date

STATUS CHANGE: No picture

Dominic Driver (McLaughlin & Harvey)

12/4/2024 8:54:47 AM

18

T427849.1569

Step chip at edge to be made good

11/15/2024

11/19/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

Images

11/15/2024 10:42:34 AM

11/19/2024 8:38:18 AM

Comments

Created By

Date

STATUS CHANGE: Doesnt look particularly great ­ needs to be touched up better

Dominic Driver (McLaughlin & Harvey)

12/4/2024 8:54:25 AM

19

T456527.12

general ­ clean white trim around edge and the inside of balustarde and floor where dust is collecting

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 9:15:32 AM 20

T456527.14

11/20/2024 9:15:42 AM

Clean paint between joint

11/20/2024 9:16:05 AM

Images

11/20/2024 9:18:25 AM 21

T456527.15

Alignment to be made good

Images

11/20/2024 9:20:13 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 206 Of 260


22

T456527.16

Gaps between you angel are inconsistent and two equal spacers

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/25/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/26/2024

11/29/2024

Client Snag

Opened

Floors ­ raised access

Kingspan

Francis Hunter (Luke Nurser)

11/26/2024

11/29/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

11/20/2024 9:24:11 AM 23

T345546.1366

11/20/2024 9:24:19 AM

floor tiles are not sitting under the edge trim of feature stairs

Images

11/20/2024 9:35:57 AM 24

T456527.17

Different shade of wood on balustrade handle to be changed

Images

11/20/2024 9:36:52 AM 25

T408928.113

tile need screwing down

Images

11/26/2024 3:43:44 PM 26

T408928.116

pipes too low to achieve 2.8m with margin. both need raising

Images

11/26/2024 3:57:02 PM

12/5/2024 10:39:47 AM

11/26/2024 3:57:08 PM

Project Name: B5412 Project Honey

Page 207 Of 260


27

T456527.205

Pipe is too low

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 3:57:55 PM 28

T350553.2159

SVP too low, should be 2860, currently at 2470

Images

11/27/2024 11:37:30 AM 29

T350553.2160

11/27/2024 11:37:36 AM

future use condensate to be capped

Images

11/27/2024 11:39:45 AM 30

T350553.2161

RWP installed too low, should be 2860, currently at 2760 as it passers through wall

Images

11/27/2024 11:41:28 AM 31

T350553.2162

11/27/2024 11:41:43 AM

RWP installed too low, should be 2860, currently at 2760 as it passers through wall

Images

11/27/2024 11:42:28 AM 12/5/2024 10:39:47 AM

11/27/2024 11:42:34 AM Project Name: B5412 Project Honey

Page 208 Of 260


Building A>Seventh Floor>07­02 Lift Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1996

Additional bracket / support required on services close to fire stopping to eliminate the weight on fire stopping, as per building control comments.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 2:05:32 PM T338993.1997

10/29/2024 2:05:45 PM

Fire curtain’s basket not earth linked with the rest of the containments.

Images

10/29/2024 2:06:43 PM T338993.2049

10/29/2024 2:06:50 PM

10/29/2024 2:07:13 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/30/2024 4:03:01 PM T338993.2050

10/30/2024 4:03:05 PM

10/30/2024 4:03:10 PM

All the emergency lights missing the green led, indicating the health of the battery.

Images

10/30/2024 4:03:58 PM T338993.2216

Lift indicators not installed.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 209 Of 260


Images

11/8/2024 11:13:55 AM 1

T427849.1380

11/8/2024 11:14:04 AM

Make good of damaged paint on door

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/11/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 11:45:26 AM 2

T427849.1381

Make good of damaged paint on door

Images

11/8/2024 11:46:08 AM 3

T427849.1383

Make good of damaged architrave

Images

11/8/2024 11:48:03 AM 4

T345546.1186

instructed works need to be complete for the fire curtain lifts finish

Images

11/8/2024 11:47:10 AM Comments

Created By

Date

Not instructed yet

Sam Heath (AC Beck )

11/19/2024 1:48:13 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 210 Of 260


5

T427849.1384

general ­ fit all lift signs

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/12/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 11:48:29 AM 5

T427849.1385

Make good to dent on lift door

Images

11/8/2024 11:48:53 AM 6

T427849.1386

Make good of scratches on lift door

Images

11/8/2024 11:49:17 AM 7

T427849.1387

11/8/2024 11:49:23 AM

Remove packers under architraves

Images

11/8/2024 11:50:04 AM 8

T345546.1188

scratches black fire curtains ­ instruction required for Serna

Images

11/8/2024 11:52:59 AM 12/5/2024 10:39:47 AM

11/8/2024 11:53:13 AM

11/8/2024 11:53:24 AM

11/8/2024 11:53:31 AM

11/8/2024 11:53:45 AM Project Name: B5412 Project Honey

Page 211 Of 260


9

T427849.1522

Paint by king at corner to be made good

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/13/2024 2:06:22 PM Building A>Seventh Floor>07­03 Corridor 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2005

Additional metal cable ties required on cable drops and cables running out of containment.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 3:10:12 PM T338993.2039

10/29/2024 3:10:18 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/30/2024 11:37:57 AM T338993.2052

10/30/2024 11:38:01 AM

All the emergency lights missing the green led, indicating the health of the battery.

Images

10/30/2024 4:06:05 PM T338993.2214

Exit Light not working.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 212 Of 260


Images

11/8/2024 11:10:00 AM 1

T427849.1362

Check height of futue use pipe

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 11:25:05 AM Building A>Seventh Floor>07­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1999

Basket bended.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 2:19:34 PM T338993.2003

10/29/2024 2:19:40 PM

10/29/2024 2:19:48 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/29/2024 3:07:10 PM T338993.2015

10/29/2024 3:07:17 PM

Light not in line between them.

Images

10/30/2024 10:18:25 AM 12/5/2024 10:39:47 AM

10/30/2024 10:18:30 AM Project Name: B5412 Project Honey

Page 213 Of 260


Building A>Seventh Floor>07­05 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2018

Additional metal cable ties required on cable drops and cables running out of containment.

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/31/2024

11/7/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

11/26/2024

12/29/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

10/30/2024 10:27:51 AM 1

T345546.960

10/30/2024 10:27:55 AM

Fire alarm to be changed to black fitting

Images

10/31/2024 10:53:19 AM 2

T427849.1391

Conduit bracket loose

Images

11/8/2024 12:00:40 PM 3

T427849.1402

Make good around pipe work

Images

11/8/2024 12:09:37 PM 4

T408928.112

light layout doesn’t look correct

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 214 Of 260


Images

11/26/2024 3:40:36 PM Building A>Seventh Floor>07­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1161

Water meter not connected to BMS

10/10/2024

10/17/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/10/2024 2:08:55 PM T338993.2051

11/7/2024 10:50:14 AM

11/13/2024 11:38:09 AM

11/20/2024 10:28:39 AM

All the emergency lights missing the green led, indicating the health of the battery.

Images

10/30/2024 4:05:20 PM T338993.2059

Cables not run and dressed properly. Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/30/2024 4:23:09 PM 2

T338993.2220

10/30/2024 4:23:14 PM

10/30/2024 4:23:23 PM

Cable not properly dressed. Below ceiling level.

10/30/2024 4:23:30 PM

10/30/2024 4:23:36 PM 11/8/2024

10/30/2024 4:23:41 PM 11/15/2024

Client Snag

Images

11/8/2024 11:19:10 AM 12/5/2024 10:39:47 AM

11/8/2024 11:19:21 AM

11/8/2024 11:19:48 AM Project Name: B5412 Project Honey

Page 215 Of 260


3

T338993.2221

Exposed PIR singles / cables on connection.

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/12/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 11:21:05 AM 4

T338993.2222

11/8/2024 11:21:17 AM

Sprinkler’s lagging missing foil on the end of the lagging.

Images

11/8/2024 11:23:43 AM 5

T338993.2223

11/8/2024 11:23:49 AM

Duct to be more presentable since we have open ceilings. The white past to be cleaned where not needed.

Images

11/8/2024 11:26:18 AM 6

T345546.1172

11/8/2024 11:26:24 AM

skirting is not straight assuming because of the wall ­ please remove skirting so atjones can do works

Images

11/8/2024 11:29:21 AM 7

T345546.1173

ATjones to improve wall finish behind skirting so it fits flush

Images

11/8/2024 11:30:00 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 216 Of 260


8

T345546.1175

Remedial works to the Firestopping warehouse and have pulled cables through a ruin it

11/8/2024

11/12/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/15/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/25/2024

12/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 11:32:49 AM 9

T345546.1176

general item at the end ­ remove and clean above service tiles

Images

11/8/2024 11:33:23 AM 10

T345546.1177

damage to socket face plate

Images

11/8/2024 11:34:06 AM 11

T345546.1178

general ­ paint on unistruts

Images

11/8/2024 11:35:32 AM 12

T456527.174

Light to be fitted and aligned properly

Images

11/25/2024 2:47:38 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 217 Of 260


13

T456527.175

Light to be aligned more centre of ceiling tiles

11/25/2024

12/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/25/2024 2:49:01 PM Building A>Seventh Floor>07­L07 Evacuation Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.518

Ensure all protection is removed from outer door of lift

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:35:35 PM Building A>Seventh Floor>07­R01 LTHW&CHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2111

insulation to be tidied up

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 3:26:06 PM

11/26/2024 3:26:13 PM

11/26/2024 3:26:19 PM

Building A>Seventh Floor>07­R05 LS Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1929

BMS wiring incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/7/2024 10:56:06 AM

11/13/2024 11:41:41 AM

11/20/2024 10:35:53 AM

Building A>Seventh Floor>07­R09 M­Vent Riser Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 218 Of 260


1

T350553.2112

plug missing from vent

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/26/2024 3:31:14 PM 2

T350553.2113

insulation to be tidied up

Images

11/26/2024 3:31:55 PM

11/26/2024 3:32:01 PM

Building A>Seventh Floor>07­R14 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.114

all drainage pipes below 2.8m

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

11/26/2024 3:46:04 PM

11/26/2024 3:46:11 PM

11/26/2024 3:46:18 PM

Building A>Seventh Floor>07­R17 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T383078.291

Core holes within riser to be fire stopped

10/25/2024

11/28/2024

Incomplete Works

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Murphy McCutcheon)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/25/2024 10:47:58 AM

10/25/2024 10:48:15 AM

Building A>Seventh Floor>07­S01 Stair 01 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 219 Of 260


T338993.1995

Missing saddle’s clips / conduit not secured.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 1:50:19 PM T338993.2064

10/29/2024 1:50:28 PM

10/29/2024 1:50:35 PM

Cleaner’s socket bottom should be at 450mm FFFL. Socket 30mm lower.

Images

10/30/2024 4:29:38 PM

10/30/2024 4:29:38 PM

10/30/2024 4:29:38 PM

10/30/2024 4:30:42 PM

Comments

Created By

Date

Also, socket back box is broken.

Vanngel Natso (McLaughlin & Harvey)

10/30/2024 4:30:34 PM

Building A>Seventh Floor>07­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2045

All the emergency lights missing the green led, indicating the health of the battery.

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/25/2024

12/2/2024

Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

Darling Associates (Robyn Harrison­ Church)

Images

10/30/2024 3:51:08 PM 1

T456527.176

Clean all paint from exposed concrete in both stair cores

Images

11/25/2024 3:01:16 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 220 Of 260


2

T456527.446

Fill gap next to architrave

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:48:07 PM Building A>Seventh Floor>07­S03 Stair 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2025

Fire alarm cable not secured properly with no combustible support.

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/30/2024 10:48:53 AM T338993.2028

10/30/2024 10:48:58 AM

Cleaner’s socket not level.

Images

10/30/2024 10:59:06 AM

10/30/2024 10:59:07 AM

Building A>Seventh Floor>07­S04 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2001

Basket not sufficiently supported.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 2:29:38 PM Comments

Created By

Date

basket has been moved / redesigned due to ceiling being replaced

Brett Pitcher (Halsion )

11/21/2024 10:15:51 AM

Containment should be secured and works confirmed.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 2:57:44 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 221 Of 260


T338993.2026

Lighting cable not secured properly with no combustible support.

10/30/2024

11/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/30/2024 10:51:26 AM Comments

Created By

Date

cabling redesigned and restructured due to replacement ceiling put in

Brett Pitcher (Halsion )

11/21/2024 11:05:06 AM

Building A>Sixth Floor>06­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.573

incomplete fire curtain

10/22/2024

10/29/2024

Snag

Opened

Fire Curtains

Coopers Fire

Darling Associates (Liana Maltezou)

11/1/2024

11/6/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Dominic Driver)

11/1/2024

11/6/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Dominic Driver)

Images

10/22/2024 12:38:03 PM 2

T345546.1022

Gasket not correct

Images

11/1/2024 11:30:25 AM 3

T345546.1023

11/1/2024 11:30:34 AM

11/1/2024 11:30:38 AM

Paintwork needs touching up

Images

11/1/2024 11:31:37 AM

12/5/2024 10:39:47 AM

11/1/2024 11:31:52 AM

11/1/2024 11:32:10 AM

Project Name: B5412 Project Honey

Page 222 Of 260


4

T345545.887

alignment to be corrected

11/4/2024

11/11/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/28/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

11/4/2024 11:30:41 AM 5

T456527.19

Can larger spacers be put in to make it more consistent

Images

11/20/2024 9:43:05 AM 6

T456527.20

Can larger spacers be put in to make it more consistent

Images

11/20/2024 9:44:27 AM 7

T345546.1369

11/20/2024 9:44:32 AM

top rail dented

Images

11/20/2024 9:49:03 AM 8

T456527.23

General ­ Bend in top rail to be made good ­ Different levels on slab

Images

11/20/2024 9:51:52 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 223 Of 260


9

T345546.1370

steel top hand rail is bent

11/20/2024

11/28/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

11/26/2024

12/3/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 9:52:49 AM 10

T345546.1373

clean tops of fire curtains on all levels

Images

11/20/2024 9:58:09 AM 11

T345546.1375

11/20/2024 9:58:15 AM

Clean/ smooth the edging ­ see a to complete and Dom to sign off on sheet

Images

11/20/2024 10:03:08 AM 12

T456527.27

Fire stopping to be completed around conduit

Images

11/20/2024 10:06:41 AM 13

T456527.206

Make good to concrete and reposition flashing so it is flush with the rest of flashing

Images

11/26/2024 4:10:10 PM 12/5/2024 10:39:47 AM

11/26/2024 4:10:19 PM Project Name: B5412 Project Honey

Page 224 Of 260


14

T345545.1294

making good repairs to be sanded

11/29/2024

12/6/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 11:22:04 AM 15

T345545.1295

making good repairs to be sanded and improved

Images

11/29/2024 11:23:29 AM 16

T345545.1300

pipe to be moved to allow pipework to be boxed in

Images

11/29/2024 11:49:40 AM 17

T350553.2177

general snag ­ All paving slabs to be secured and stop from rocking ­ All areas

Images

11/29/2024 12:16:08 PM 18

T345545.1309

paving to be cut into the door threshold ­ gap is too large

Images

11/29/2024 12:20:37 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 225 Of 260


Building A>Sixth Floor>06­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.578

Black paint has come off the door

10/17/2024

10/21/2024

Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Dominic Driver)

10/25/2024

11/28/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/17/2024 4:09:09 PM 2

T345546.936

Changing call button throughout to different colour

Images

10/25/2024 11:11:36 AM T338993.1931

Additional bracket required. As per building control comment, services to be supported close to the penetrations and to avoid weight supported on fire stopping.

Images

10/28/2024 4:26:16 PM T338993.1933

10/28/2024 4:26:27 PM

Fire curtain Basket not earth linked with the rest of the systems.

Images

10/28/2024 4:29:16 PM T338993.1944

10/28/2024 4:29:32 PM

Additional metal cable ties required on cable drops and cables running out of containment.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 226 Of 260


Images

10/29/2024 8:54:30 AM T338993.1974

10/29/2024 8:54:35 AM

10/29/2024 8:54:53 AM

Light not in line between them.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/1/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 10:28:20 AM 3

T427849.976

10/29/2024 10:28:50 AM

Damage to lift control door to be made good

Images

10/30/2024 11:53:08 AM 4

T345546.1150

10/30/2024 11:53:13 AM

General lifts ­ perfect line scratch around architrave

Images

11/8/2024 10:59:28 AM T338993.2210

Lift indicators not secured.

Images

11/8/2024 11:02:03 AM

12/5/2024 10:39:47 AM

11/8/2024 11:02:12 AM

11/8/2024 11:02:18 AM

11/8/2024 11:02:25 AM

Project Name: B5412 Project Honey

Page 227 Of 260


T338993.2211

Raft hanger to move because it does not allow for the valve to fully open.

11/8/2024

11/15/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 11:04:37 AM 5

T427849.1351

11/8/2024 11:04:44 AM

Damage on door to be made good

11/8/2024 11:05:19 AM

Images

11/8/2024 11:10:09 AM 6

T427849.1352

Damages on architrave to be made good or cleaned

Images

11/8/2024 11:10:56 AM 7

T427849.1353

Damages in door to be made good

Images

11/8/2024 11:11:52 AM 7

T427849.1354

11/8/2024 11:12:01 AM

Paint peeling off door to be made good

Images

11/8/2024 11:12:28 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 228 Of 260


6

T427849.1355

Damages in door to be made good

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/12/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 11:12:48 AM 1

T427849.1356

Paint peeling off door to be made good

Images

11/8/2024 11:13:06 AM 8

T427849.1359

Lift sign damage to be made good and made straight

Images

11/8/2024 11:17:56 AM 9

T345546.1168

Chip to black areas on doors

Images

11/8/2024 11:20:10 AM

11/8/2024 11:20:16 AM

11/8/2024 11:20:30 AM

10

T345546.1169

Control unit not shutting properly

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11

T345546.1170

Control unit not shutting properly

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 229 Of 260


Images

11/8/2024 11:21:30 AM Building A>Sixth Floor>06­03 Corridor 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.824

Timber to be removed from lift opening

10/25/2024

11/28/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/30/2024

11/1/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

Images

10/25/2024 10:37:40 AM T338993.1938

Additional bracket required. Long run of basket without support.

Images

10/28/2024 4:44:09 PM T338993.1978

10/28/2024 4:44:14 PM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/29/2024 10:54:14 AM 2

T427849.987

10/29/2024 10:54:50 AM

Architrave to be installed around lift

Images

10/30/2024 12:02:40 PM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 230 Of 260


3

T345546.1143

check future use pipe hole height ­ appears low across all floors

11/8/2024

11/12/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/16/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 10:48:50 AM 4

T345546.1145

General item ­ Cover cap missing on unistrut rods

Images

11/8/2024 10:51:37 AM 5

T345546.1157

Scuffs to the cool buttons on the good Lift

Images

11/8/2024 11:06:59 AM 6

T345546.1160

Misaligned ceiling tiles – to be completed at the very end and realigned

Images

11/8/2024 11:09:48 AM Building A>Sixth Floor>06­04 WC Core

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.813

Smoke detectors in WC corridors should be black

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 231 Of 260


Images

10/24/2024 12:48:37 PM T338993.1987

Light not in line between them.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 11:34:56 AM 2

T338993.1988

10/29/2024 11:35:03 AM

10/29/2024 11:35:18 AM

Light not working.

Images

10/29/2024 11:35:36 AM 3

T338993.1989

10/29/2024 11:35:51 AM

Light not working.

Images

10/29/2024 11:36:14 AM T338993.1990

10/29/2024 11:36:19 AM

Additional metal cable ties required on cable drops and cables running out of containment.

Images

10/29/2024 11:36:57 AM

12/5/2024 10:39:47 AM

10/29/2024 11:37:02 AM

Project Name: B5412 Project Honey

Page 232 Of 260


4

T345545.1119

no sink plug

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/13/2024

11/18/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

11/13/2024 1:13:27 PM 5

T345546.1292

General item – clean services of paint throughout ­ example pictures attached

Images

11/13/2024 1:17:31 PM 2

T427849.1489

11/13/2024 1:17:38 PM

No light working in cubicle

Images

11/13/2024 1:18:18 PM 6

T345546.1293

General item – clean services of paint throughout ­ example pictures attached

11/13/2024

11/20/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

7

T345546.1296

screw holes coming through the plasterboard

11/13/2024

11/18/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Dominic Driver)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/13/2024 1:20:55 PM Building A>Sixth Floor>06­05 WC Core Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 233 Of 260


T338993.1733

Additional metal cable ties required on cable drops and cables not run within containment.

10/18/2024

10/25/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/18/2024 2:28:57 PM 1

T427849.814

10/18/2024 2:29:02 PM

10/18/2024 2:29:27 PM

Smoke detectors in WC corridors should be black

10/18/2024 2:29:45 PM

Images

10/24/2024 12:50:04 PM T350553.1638

Plug missing from sprinkler drain valve

Images

10/28/2024 2:15:17 PM Building A>Sixth Floor>06­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1536

FSD cabling to be tidied up and tie wrapped neatly

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/22/2024 4:25:13 PM 1

T350553.1540

10/22/2024 4:25:43 PM

water meter not wired

12/5/2024 10:39:47 AM

10/22/2024 4:25:51 PM

Project Name: B5412 Project Honey

Page 234 Of 260


Images

10/22/2024 4:29:03 PM 2

T427849.815

Smoke detector should be black in east corridor

10/24/2024

10/31/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

10/25/2024

11/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/24/2024 12:50:49 PM 3

T427849.847

Screw not in fully around conduit

Images

10/25/2024 11:12:25 AM T338993.1962

Cables not dressed / secured properly.

Images

10/29/2024 9:59:05 AM T338993.1963

10/29/2024 9:59:09 AM

10/29/2024 9:59:32 AM

10/29/2024 9:59:36 AM

Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket is 15mm higher and not level.

Images

10/29/2024 10:03:32 AM

12/5/2024 10:39:47 AM

10/29/2024 10:03:32 AM

10/29/2024 10:03:32 AM

Project Name: B5412 Project Honey

Page 235 Of 260


T338993.1973

Additional metal cable ties required on cable drops and cables running out of containment.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/29/2024 10:23:11 AM

10/29/2024 10:23:48 AM

10/29/2024 10:24:08 AM

Building A>Sixth Floor>06­13 Terrace

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.979

lightning protection to be completed

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

11/8/2024 12:21:48 PM 2

T345545.985

lightning protection to be completed

Images

11/8/2024 12:25:51 PM 3

T345545.994

no lightning protection south side of west riser

Images

11/8/2024 12:32:18 PM

11/8/2024 12:32:23 PM

Comments

Created By

Date

Please remove tiles, we requested these were left up until our install was complete and our request was ignored.

robert buchan (Halsion )

11/12/2024 7:28:15 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 236 Of 260


4

T427849.1558

Remove tiles for Clarkes to cut shims

11/14/2024

11/21/2024

Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Conor Colton)

Images

11/14/2024 12:08:29 PM Comments

Created By

Date

Tiles removed nothing ,no action from Clarke

Dariusz Grzelka (Aym (Services) Limited)

11/21/2024 1:11:37 PM

Complete

Dariusz Grzelka (Aym (Services) Limited)

11/30/2024 1:01:08 PM

STATUS CHANGE: Left opened until clarkes have cut shims.

Dominic Driver (McLaughlin & Harvey)

12/4/2024 9:02:54 AM

AYM will need to reinstate tiles without the cut outs Building A>Sixth Floor>06­L07 Evacuation Lift Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.981

Repair denting to door frame from inside the cubicle

11/1/2024

11/8/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Dominic Driver)

Images

11/1/2024 9:18:01 AM Building A>Sixth Floor>06­R05 LS

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2036

disabled refuge cabling incomplete

11/13/2024

11/20/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/13/2024 3:46:19 PM

11/20/2024 6:05:13 PM

Building A>Sixth Floor>06­R12 Dry Riser Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 237 Of 260


1

T456527.441

Fill gap next to architrave

11/27/2024

12/4/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:43:21 PM Building A>Sixth Floor>06­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1935

Cut down basket to remove the pinch points.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/28/2024 4:35:57 PM T338993.1942

10/28/2024 4:36:10 PM

FA call point at wrong height, to re­install when ATJ moves the top of back box at 1200mm FFFL.

Images

10/29/2024 8:47:41 AM T338993.1965

10/29/2024 8:47:41 AM

Cleaner’s socket not level.

Images

10/29/2024 10:07:44 AM Building A>Sixth Floor>06­S03 Stair 02 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 238 Of 260


T338993.1985

Light missing internal clip to secure the cover.

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Images

10/29/2024 11:14:18 AM 1

T345545.1257

10/29/2024 11:19:21 AM

lifting eyes to be repaired

Images

11/20/2024 4:03:44 PM Building A>Sixth Floor>06­S04 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1939

Cut down basket to remove the pinch points.

10/28/2024

11/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/29/2024

11/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/28/2024 4:46:21 PM T338993.1951

10/28/2024 4:46:32 PM

Cleaner’s socket not at correct height, 450mm bottom of the socket FFFL. Socket is 30mm lower.

Images

10/29/2024 9:20:30 AM T338993.1983

10/29/2024 9:20:30 AM

Not copex to be used for long runs, change to conduit.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 239 Of 260


Images

10/29/2024 11:10:31 AM 1

T345545.1259

10/29/2024 11:10:37 AM

grout to be cleaned off wall

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/25/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

Images

11/20/2024 4:06:24 PM 2

T408928.98

mastic gap between lift and wall

Images

11/20/2024 4:06:57 PM Building A>Third Floor>03­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.122

fire escape signal protruding over the frame ­ North core wall

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

10/1/2024

10/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/25/2024 3:44:25 PM 2

T338993.1444

PIR not installed.

Images

10/1/2024 1:39:59 PM 12/5/2024 10:39:47 AM

10/1/2024 1:40:12 PM

10/1/2024 1:40:39 PM

10/4/2024 2:55:05 PM

10/4/2024 2:55:43 PM Project Name: B5412 Project Honey

Page 240 Of 260


Comments

Created By

Date

PIR installed and connected, waiting on the correct ceiling tile to be installed so the pir can go in the tile.

Brett Pitcher (Halsion )

10/4/2024 2:56:41 PM

Halsion should raise that is missing a service tile and not let the PIR hiding in the ceiling. Photo of the issue being resolved is required.

Vanngel Natso (McLaughlin & Harvey)

11/5/2024 4:24:58 PM

T338993.1453

Not correct light lengths used.

10/1/2024

10/8/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/8/2024

Client Snag

Opened

Structural Engineer

Robert Bird Group

McLaughlin & Harvey (Dominic Driver)

10/2/2024

10/9/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/28/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Liana Maltezou)

Images

10/1/2024 2:08:57 PM 3

T345546.191

With slightly blown concrete be structurally ok? the visual is fine just want confirmation on structural integrity

Images

10/2/2024 10:35:25 AM 4

T350553.968

fire stopping insulation to be taped at fibre ends

Images

10/2/2024 10:38:26 AM 5

T345546.716

10/2/2024 10:38:37 AM

Scratched external architrave office side

Images

10/22/2024 12:19:12 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 241 Of 260


6

T338993.1842

Lights not in line!

10/23/2024

10/30/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/23/2024

10/30/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/5/2024

11/12/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

Images

10/23/2024 11:50:17 AM 7

T338993.1843

10/23/2024 11:50:30 AM

Light’s aluminium rim is damaged/bended.

Images

10/23/2024 12:00:44 PM 8

T345545.917

10/23/2024 12:00:50 PM

balustrade and handrail return should be aligned

10/23/2024 12:01:04 PM

Images

11/5/2024 10:32:41 AM 9

T345545.1150

sprinkler pipe to be repainted

Images

11/20/2024 10:39:46 AM 10

T345545.1151

damage to lining wall

Images

11/20/2024 10:42:12 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 242 Of 260


11

T345545.1152

feature stair lights not working

11/20/2024

11/27/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 10:42:47 AM 12

T456527.39

Remove packers

Images

11/20/2024 10:43:03 AM 13

T345545.1153

fire curtain escape button not fixed

Images

11/20/2024 10:44:42 AM 14

T345545.1155

hit and miss welds on outside of balustrade, the rest of them the welds are not visible

Images

11/20/2024 10:48:24 AM 15

T456527.42

Gap at trim joint to be made good

Images

11/20/2024 10:49:35 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 243 Of 260


16

T345545.1157

edge of timber is chamfered so rubber nosing protrudes further than others

11/20/2024

11/27/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/25/2024

Client Snag

Opened

Metalwork

CMF

Francis Hunter (Luke Nurser)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

11/26/2024

12/3/2024

Client Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 10:51:23 AM 17

T408928.66

make good gap in timber riser to tread

Images

11/20/2024 10:55:32 AM 18

T456527.212

Cages to protect sprinklers to be installed around feature stair

Images

11/26/2024 4:53:49 PM 19

T456527.213

Cable hanging to be resolved

Images

11/26/2024 5:00:09 PM 20

T456527.216

Excessive metal to be cut back flush

Images

11/26/2024 5:11:17 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 244 Of 260


21

T456527.470

2 lights not working

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 11:02:09 AM 22

T456527.471

Ensure all lights are aligned with each other and aligned with ceiling tiles

Images

12/4/2024 11:06:41 AM 23

T456527.472

Gal in light frame to be made good

Images

12/4/2024 11:08:29 AM 24

T456527.473

Are these lights on two different switches or are they supposed to be on?

Images

12/4/2024 11:09:54 AM 25

T456527.474

12/4/2024 11:10:00 AM

Light not working

Images

12/4/2024 11:11:12 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 245 Of 260


26

T456527.475

First light to be aligned with ceiling tiles

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 11:13:22 AM 27

T456527.476

Second light to be aligned with ceiling

Images

12/4/2024 11:14:47 AM 28

T456527.477

Missing full tile to be installed

Images

12/4/2024 11:15:48 AM 29

T456527.478

first light after second round column to be adjusted to it is lined up with the others

Images

12/4/2024 11:20:35 AM 30

T456527.479

Third row of lights at first column from the east to be made good

Images

12/4/2024 11:22:03 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 246 Of 260


31

T345545.1359

remove cable tie

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

Images

12/4/2024 11:33:01 AM Building A>Third Floor>03­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345546.543

Missing items for the Lift including buttons control units and Lift name on Lift 05, 06 and 02 as per the pictures

10/17/2024

10/21/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

10/17/2024

10/21/2024

Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/17/2024 2:33:12 PM 2

T345546.544

10/17/2024 2:33:22 PM

10/17/2024 2:33:49 PM

Disabled refuge call button is not on straight

Images

10/17/2024 2:34:26 PM 3

T350553.1435

BMS cabling to be tidied up and tiewrapped neatly

Images

10/21/2024 2:54:57 PM T338993.1792

10/21/2024 2:55:09 PM

Basket for Fire curtain power supply not earth linked with the rest of the sytsem.

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 247 Of 260


Images

10/22/2024 11:20:09 AM 4

T345545.561

indicator not fitted

10/22/2024

10/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Lifts

Otis

Darling Associates (Robyn Harrison­ Church)

10/22/2024

10/28/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Liana Maltezou)

10/22/2024

10/28/2024

Snag

Opened

Fire Stopping

OWS

Darling Associates (Liana Maltezou)

Images

10/22/2024 12:09:02 PM 5

T427849.519

10/22/2024 12:09:08 PM

General item ­ remove protection from lift openings

Images

10/22/2024 12:13:12 PM 6

T345546.713

10/22/2024 12:13:18 PM

scratches to black doors

10/22/2024 12:13:24 PM

Images

10/22/2024 12:14:47 PM 7

T345546.714

10/22/2024 12:14:53 PM

screws not flush

Images

10/22/2024 12:16:03 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 248 Of 260


T338993.1827

Additional metal cable ties required on cable drops and cables not run within containment.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/8/2024

11/15/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

Images

10/22/2024 4:01:17 PM 8

T350553.1915

10/22/2024 4:01:23 PM

BMS wiring incomplete

Images

11/7/2024 8:15:59 AM 9

T427849.1319

11/14/2024 9:25:56 AM

Rub down frame before finish

Images

11/8/2024 10:20:09 AM 10

T427849.1320

Damage on architrave to be made good

Images

11/8/2024 10:21:04 AM 11

T427849.1321

Cut protection under architrave

Images

11/8/2024 10:23:55 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 249 Of 260


11

T427849.1323

Make good to paint damages on door

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 10:25:26 AM 12

T427849.1324

Damages at top architrave to be made good

Images

11/8/2024 10:26:22 AM 13

T427849.1330

Damages on door architrave to be made good

Images

11/8/2024 10:33:36 AM 14

T427849.1332

Damages on door architrave to be made good

Images

11/8/2024 10:34:42 AM 14

T427849.1333

Damages on door to be made good

Images

11/8/2024 10:35:05 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 250 Of 260


15

T427849.1334

Screw missing on architrave

11/8/2024

11/15/2024

Client Snag

Opened

Fire Stopping

OWS

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/12/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

12/4/2024

12/11/2024

Client Snag

Opened

Lifts

Otis

Francis Hunter (Luke Nurser)

Images

11/8/2024 10:35:47 AM 16

T427849.1337

Missing face plates to be installed

Images

11/8/2024 10:38:53 AM 17

T345546.1141

Cable is redundant and can be pushed back and hole filled

Images

11/8/2024 10:39:41 AM 18

T345546.1142

General item ­ perfect line scratch around architraves

Images

11/8/2024 10:43:28 AM 19

T408928.210

call point not level

Images

12/4/2024 10:48:57 AM Building A>Third Floor>03­03 Corridor 02 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 251 Of 260


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.522

Improve decoration finish around emergency exit sign

10/22/2024

10/28/2024

Snag

Opened

Painting & Decorating

AC Beck

Darling Associates (Robyn Harrison­ Church)

Images

10/22/2024 12:24:51 PM

11/5/2024 4:14:10 PM

Comments

Created By

Date

Still visible areas of making good required

Conor Colton (McLaughlin & Harvey)

11/5/2024 4:14:28 PM

T338993.1819

Additional metal cable ties required on cable drops and cables not run within containment.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/12/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

Images

10/22/2024 2:16:04 PM 2

T345546.1131

10/22/2024 2:16:16 PM

improve finish and socket

10/22/2024 2:16:20 PM

Images

11/8/2024 10:22:11 AM 3

T345546.1133

Socket face plate scratched

Images

11/8/2024 10:23:50 AM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 252 Of 260


4

T345546.1136

Glass Polisher – Magic Man required ­ scratches to riser doors on goods lift

11/8/2024

11/12/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

11/8/2024 10:29:40 AM 5

T345546.1137

11/8/2024 10:29:49 AM

Small dent to wall

Images

11/8/2024 10:32:08 AM Building A>Third Floor>03­04 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1603

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/4/2024

10/11/2024

Snag

Opened

M&E

Halsion

Darling Associates (Liana Maltezou)

Images

10/3/2024 5:22:41 PM 1

T345545.442

lagging to be improved. is there a more aesthetic lagging that can be used?

Images

10/4/2024 12:23:35 PM Comments

Created By

Date

Lagging installed to spec

James Parker (Halsion )

10/8/2024 7:08:29 AM

STATUS CHANGE: This needs to be completed to the bench mark

Dominic Driver (McLaughlin & Harvey)

10/22/2024 5:21:19 PM

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 253 Of 260


2

T345546.795

Finish around pipework to be completed as per benchmark

10/23/2024

10/28/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Dominic Driver)

Images

10/23/2024 12:20:28 PM Building A>Third Floor>03­05 WC Core Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1602

Green led indicator missing on Emergency lights.

10/3/2024

10/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/3/2024 5:18:24 PM Building A>Third Floor>03­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1441

FSD cabling to be tidied up and tiewrapped neatly

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/21/2024 2:59:47 PM T338993.1794

Cables not dressed and secured properly. Additional metal cable ties required.

Images

10/22/2024 11:25:57 AM

12/5/2024 10:39:47 AM

10/22/2024 11:26:10 AM

10/22/2024 11:26:27 AM

Project Name: B5412 Project Honey

Page 254 Of 260


T338993.1813

Lights not in line between them.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/8/2024

11/15/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/15/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Conor Colton)

11/8/2024

11/12/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Dominic Driver)

Images

10/22/2024 1:56:36 PM 2

T427849.1315

10/22/2024 1:56:58 PM

Rub down architrave

Images

11/8/2024 10:15:15 AM 3

T427849.1316

Fill riser door edge damages

Images

11/8/2024 10:16:47 AM 4

T427849.1317

11/8/2024 10:16:53 AM

Clean paint off ceiling tile

Images

11/8/2024 10:17:43 AM 5

T345546.1130

small damage to wall

Images

11/8/2024 10:18:21 AM 12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 255 Of 260


Building A>Third Floor>03­R05 LS

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1916

BMS wiring incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/7/2024 8:17:34 AM 2

T350553.2171

11/14/2024 9:23:50 AM

Blank plate missing on lighting control box ­ Check all floors

Images

11/28/2024 4:13:28 PM 3

T350553.2172

DB schedules required on all boards ­ All floors

Images

11/28/2024 4:13:51 PM 3

T350553.2173

All fused spurs to be labelled with circuit referance

Images

11/28/2024 4:14:14 PM 3

T350553.2174

Sub mains reference on all armours ­ All floors

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 256 Of 260


Images

11/28/2024 4:14:55 PM Building A>Third Floor>03­R14 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.123

improve edge detail both sides of riser

11/26/2024

11/29/2024

Client Snag

Opened

Painting & Decorating

AC Beck

Francis Hunter (Luke Nurser)

Images

11/26/2024 5:06:53 PM

11/26/2024 5:06:59 PM

Building A>Third Floor>03­R17 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2168

DB schedules required on all boards ­ All floors

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/28/2024 4:10:36 PM 2

T350553.2169

Redundant cable to be removed

Images

11/28/2024 4:11:34 PM Building A>Third Floor>03­S01 Stair 01 Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 257 Of 260


1

T345545.1027

various pin holes in top rail

11/11/2024

11/18/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Jack Monaghan)

Images

11/11/2024 3:55:30 PM

11/12/2024 2:50:41 PM

11/26/2024 8:47:53 AM

Comments

Created By

Date

still pin holes that can be seen when walking up stairs

Conor Colton (McLaughlin & Harvey)

11/26/2024 8:48:16 AM

2

T456527.425

Make good to damages on door

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:31:08 PM

11/27/2024 2:31:13 PM

Building A>Third Floor>03­S02 Stair Lobby Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1798

Halsion to re install the socket when ATJ moves the back box.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 11:34:05 AM T338993.1829

10/22/2024 11:34:05 AM

Call point for be reinstall when ATJ raise the back box.

Images

10/22/2024 4:11:54 PM

12/5/2024 10:39:47 AM

10/22/2024 4:11:55 PM

Project Name: B5412 Project Honey

Page 258 Of 260


1

T456527.426

Improve finish to entire wall

11/27/2024

12/4/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (Conor Colton)

Images

11/27/2024 2:32:09 PM 2

T456527.427

Make good to damages on door

Images

11/27/2024 2:32:27 PM Building A>Third Floor>03­S03 Stair 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1823

All Lights missing green led for battery health indication.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/20/2024

11/27/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Jack Monaghan)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/22/2024 2:25:10 PM 1

T345545.1224

10/22/2024 2:25:15 PM

paint on wall to be cleaned

Images

11/20/2024 3:08:54 PM Building A>Third Floor>03­S04 Stair Lobby Reference

Description

12/5/2024 10:39:47 AM

Project Name: B5412 Project Honey

Page 259 Of 260


T338993.1826

Additional metal cable ties required on the tube measuring pressure.

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 3:55:28 PM

10/22/2024 3:55:33 PM

10/28/2024 8:29:49 PM

Comments

Created By

Date

Snag complete photo has been taken from the wrong location. Please upload photo of snag completed from the correct location!

James Parker (Halsion )

11/4/2024 12:55:57 PM

1

T408928.89

Cleanup around fire stopping penetration at high­level

11/20/2024

11/25/2024

Client Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

11/20/2024

11/27/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 3:16:58 PM 2

T345545.1228

mastic to be installed beside architrave ­ all levels

Images

11/20/2024 3:19:56 PM

12/5/2024 10:39:47 AM

11/20/2024 3:20:04 PM

Project Name: B5412 Project Honey

Page 260 Of 260


Project Honey – Building B Snag Report 05.12.24

FH090-151015


Building B>Eighth Floor>08­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.776

2nd fix Lighting / commissioning not completed. Lighting not fully 2nd fixed / lighting sections don’t work.

8/18/2024

8/25/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/18/2024 12:33:12 PM

8/18/2024 12:33:18 PM

8/18/2024 12:36:03 PM

8/18/2024 12:36:09 PM

Comments

Created By

Date

Faulty Drivers.

Brett Pitcher (Halsion )

9/20/2024 8:19:21 AM

T338993.985

Lights not working.

8/30/2024

9/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/30/2024 11:17:20 AM

8/30/2024 11:17:45 AM

8/30/2024 11:17:45 AM

8/30/2024 11:17:45 AM

Comments

Created By

Date

Faulty drivers.

Brett Pitcher (Halsion )

9/20/2024 8:18:43 AM

2

T338993.996

Lights not in line. Wrong light lengths used.

8/30/2024

9/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/30/2024 12:06:46 PM

8/30/2024 12:06:51 PM

8/30/2024 12:07:17 PM

Comments

Created By

Date

This is an architectural/design snag.

Brett Pitcher (Halsion )

9/3/2024 10:12:01 AM

Lights inspected against Halsion drawings. Halsion to address this issue.

Vanngel Natso (McLaughlin & Harvey)

10/22/2024 4:55:47 PM

3

T444645.569

rosette not flush. sprinkler head may need adjusted

12/5/2024 10:39:26 AM

11/6/2024

Project Name: B5412 Project Honey

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Page 1 Of 41


Images

11/6/2024 10:36:53 AM Building B>Eighth Floor>08­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T421799.65

lift indicators to be replaced for black

8/31/2024

9/7/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (sam peach)

Images

8/31/2024 8:10:11 AM Building B>Eighth Floor>08­03 WC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.571

grout needs taken out before mastic

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 10:49:05 AM T338993.2140

Sprinkler’s lagging missing foil on the end of the lagging.

Images

11/6/2024 12:49:37 PM

11/6/2024 12:49:55 PM

Building B>Eighth Floor>08­06 Stair Lobby 01 Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 2 Of 41


1

T444645.425

all protection to be removed

10/16/2024

10/23/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

Images

10/16/2024 1:27:14 PM Building B>Eighth Floor>08­R01 LTHW/CHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1882

lagging to be tidied up/made good

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/6/2024 12:32:07 PM 2

T350553.1883

11/6/2024 12:33:08 PM

meter touchpad to be secured and not left hanging

Images

11/6/2024 12:34:24 PM Building B>Eighth Floor>08­R05 Life Safety

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2138

Smoke Ventilation system’s panel is not labelled.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 12:29:47 PM

11/6/2024 12:29:54 PM

Building B>Eighth Floor>08­R06 Mec. Equipment Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 3 Of 41


1

T350553.1881

lagging to be tidied up/made good

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/6/2024 12:29:00 PM

11/6/2024 12:29:10 PM

11/6/2024 12:29:22 PM

11/6/2024 12:29:37 PM

11/6/2024 12:29:57 PM

Building B>Fifth Floor>05­01 Office Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.753

Lighting’s section not working.

8/18/2024

8/25/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/18/2024 11:45:13 AM

8/18/2024 11:45:19 AM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:36:51 AM

1

T338993.1010

Lights not working.

8/30/2024

9/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/30/2024 4:24:17 PM

8/30/2024 4:24:21 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:35:18 AM

2

T338993.1012

Lights not working.

8/30/2024

9/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/30/2024 4:26:58 PM

8/30/2024 4:27:03 PM

Comments

12/5/2024 10:39:26 AM

Created By

Project Name: B5412 Project Honey

Date

Page 4 Of 41


Faulty driver 3

T338993.1015

Brett Pitcher (Halsion ) Lights not in line. Wrong light lengths used.

8/30/2024

9/6/2024

Snag

Opened

M&E

9/20/2024 8:34:09 AM Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/30/2024 4:42:26 PM

8/30/2024 4:42:32 PM

Comments

Created By

Date

This is an architectural/design snag.

Brett Pitcher (Halsion )

9/3/2024 10:51:14 AM

4

T419146.474

broken light

9/4/2024

9/11/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Images

9/4/2024 11:53:20 AM Comments

Created By

Date

Light fitting damaged by non­Halsion operatives. Damaged fitting/part needs replacing. Instruction required to return and replace.

Brett Pitcher (Halsion )

9/20/2024 8:25:55 AM

Building B>Fifth Floor>05­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.498

joint colour inconsistency

10/23/2024

10/30/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (James McKeever)

Images

10/23/2024 3:48:19 PM Building B>Fifth Floor>05­03 WC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.588

dent to edge trim on light

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 5 Of 41


Images

11/6/2024 12:24:49 PM 2

T444645.590

edge needs tidied up and paint removed

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 12:28:21 PM Building B>Fifth Floor>05­05 Stair Lobby 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.381

pipes to be cleaned

10/16/2024

10/23/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (James McKeever)

Images

10/16/2024 11:26:52 AM Building B>First Floor>01­03 WC Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2175

Barcodes still on ductwork, to be removed.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 4:34:57 PM 1

T338993.2176

11/6/2024 4:35:07 PM

Sprinkler’s lagging missing foil on the end of the lagging.

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 6 Of 41


Images

11/6/2024 4:36:53 PM

11/6/2024 4:36:59 PM

Building B>First Floor>01­09 Life Safety Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1391

Black mimic line missing.

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/25/2024 3:08:51 PM T338993.1394

10/21/2024 7:40:06 AM

Fire fitters and EVAC lifts compartment cover should be red as the FA Panel’s compartment.

Images

9/25/2024 3:17:34 PM

9/25/2024 3:17:39 PM

Comments

Created By

Date

There is no requirement for these to be red.

Brett Pitcher (Halsion )

9/26/2024 11:33:47 AM

T338993.1395

Fire proofing required for the coppex.

9/25/2024

10/2/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/25/2024 3:18:54 PM T338993.1397

9/25/2024 3:19:00 PM

Black mimic line missing.

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 7 Of 41


Images

9/25/2024 3:21:17 PM Comments

Created By

Date

Duplicate snag

James Parker (Halsion )

9/26/2024 1:02:49 PM

Building B>First Floor>01­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1031

Light’s clips broken

9/2/2024

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/2/2024 5:32:12 PM

9/2/2024 5:33:11 PM

Comments

Created By

Date

Photo of the light clipped is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:51:37 AM

Building B>First Floor>01­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.604

making good required

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 2:58:58 PM Building B>Fourth Floor>04­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.744

Lighting’s section not working.

8/18/2024

8/25/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 8 Of 41


8/18/2024 11:24:43 AM Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 9:01:07 AM

2

T350553.716

All lights to be reviews for length, lights aren’t consistent in length and stop short from perimeter margin

8/28/2024

9/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

8/28/2024 12:15:56 PM

8/28/2024 12:16:07 PM

Comments

Created By

Date

Lights are installed as per architects detail

James Parker (Halsion )

8/29/2024 1:52:31 PM

3

T338993.1020

Light section not working.

9/2/2024

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/2/2024 3:21:03 PM

9/2/2024 3:21:11 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:56:48 AM

4

T338993.1021

Light section not working.

9/2/2024

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/2/2024 3:21:51 PM

9/2/2024 3:21:56 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:56:34 AM

5

T338993.1022

Light section not bright as the rest of the lights.

12/5/2024 10:39:26 AM

9/2/2024

Project Name: B5412 Project Honey

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Page 9 Of 41


Images

9/2/2024 3:22:49 PM

9/2/2024 3:23:01 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:56:18 AM

6

T338993.1024

Light section not working.

9/2/2024

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/2/2024 3:25:47 PM

9/2/2024 3:25:53 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:54:30 AM

7

T444645.593

wall requires repairing

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 12:39:29 PM Building B>Fourth Floor>04­05 Stair Lobby 02 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T1.51626033

Light not working.

8/29/2024

9/2/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

8/29/2024 1:25:55 PM Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:59:53 AM

Building B>Fourth Floor>04­R06 Mec. Equipment 12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 10 Of 41


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.592

temporary cables and lighting to be removed

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (James McKeever)

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 12:38:19 PM Building B>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

T459973.33

Threshold and bottom detail requires review

12/3/2024

12/10/2024

Observation

Opened

McLaughlin & Harvey

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Observation

Opened

McLaughlin & Harvey

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Observation

Opened

McLaughlin & Harvey

McLaughlin & Harvey (James McKeever)

Issued Date

Target Date

Task Type

Status

Issued To Organisation

Issued By Organisation

Images

12/3/2024 10:24:58 AM 2

T459973.34

12/3/2024 10:25:06 AM

Threshold and bottom detail requires review

12/3/2024 10:25:12 AM

Images

12/3/2024 10:25:54 AM 3

T444645.685

infill required to flood grille

Images

12/3/2024 10:41:46 AM Building B>Ground Floor>00­01 Reception Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Issued To Package

Page 11 Of 41


1

T345545.1333

RWP will clash with margin due to height

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 2:20:56 PM 2

T350553.2192

Unable to box in SVP as it is too close to mullion

Images

11/29/2024 2:28:11 PM

11/29/2024 2:28:20 PM

Building B>Ground Floor>00­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1584

scratches on lift A

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Ian Robertson)

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

Images

10/23/2024 4:22:12 PM 2

T444645.520

10/23/2024 4:22:20 PM

scratches on door

10/23/2024 4:22:33 PM

Images

10/23/2024 4:22:23 PM 3

T444645.521

scratches on door

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 12 Of 41


Images

10/23/2024 4:23:02 PM Building B>Ground Floor>00­07 BOH Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1088

fire stopping to have foil finish around fibres

10/2/2024

10/9/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

Images

10/2/2024 4:17:02 PM

10/2/2024 4:17:27 PM

Building B>Ground Floor>00­10 CSW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1093

redundant material to be removed

10/2/2024

10/9/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/2/2024

10/9/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/2/2024 4:36:58 PM 2

T350553.1095

10/8/2024 8:13:46 AM

fire stopping to be completed

11/6/2024 5:24:43 PM

Images

10/2/2024 4:39:01 PM T350553.1900

10/2/2024 4:39:17 PM

Alarm on UV panel

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 13 Of 41


Images

11/6/2024 5:25:32 PM

11/6/2024 5:25:38 PM

Building B>Ground Floor>00­12 Tank Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1089

fire stopping to have foil finish around fibres

10/2/2024

10/9/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

Images

10/2/2024 4:18:41 PM Building B>Ground Floor>00­13 Bin Store Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1897

isolator to be labelled

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 5:15:42 PM 1

T350553.1898

Temp cables to be removed

Images

11/6/2024 5:16:44 PM

11/6/2024 5:16:51 PM

Building B>Ground Floor>00­15 Office Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 14 Of 41


1

T345545.1327

paint on high level transom

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Dry Lining / Partitions / Ceilings

AT Jones

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 2:13:37 PM 2

T345545.1328

firestopping to be repaired

Images

11/29/2024 2:14:54 PM Building B>Ground Floor>00­L01 Passenger Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1569

Ceiling light not cleaned.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 4:31:41 PM 1

T338993.1571

10/2/2024 4:31:46 PM

2 plugs missing on ceiling.

Images

10/2/2024 4:33:13 PM 1

T338993.1572

10/2/2024 4:33:20 PM

10/2/2024 4:33:26 PM

Morris not in line/ flash between them. One section is more forward from the rest.

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 15 Of 41


Images

10/2/2024 4:34:40 PM 1

T338993.1573

10/2/2024 4:34:55 PM

10/2/2024 4:35:11 PM

Flooring not consistent around edges.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/2/2024 4:35:40 PM 1

T338993.1574

10/2/2024 4:35:55 PM

10/2/2024 4:36:04 PM

Ceiling protection to be removed.

Images

10/2/2024 4:36:52 PM 1

T338993.1575

10/2/2024 4:36:59 PM

10/2/2024 4:37:05 PM

The back of the lift wall is not fully painted on the edges which is reflected on the mirror.

Images

10/2/2024 4:37:40 PM 1

T338993.1576

10/2/2024 4:38:09 PM

Hand rail not secured and scratched.

10/2/2024 4:38:14 PM

Images

10/2/2024 4:39:38 PM

10/2/2024 4:39:44 PM

Building B>Ground Floor>00­L02 Passenger Lift Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 16 Of 41


1

T338993.1561

Ceiling light not cleaned.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 4:20:23 PM 1

T338993.1563

10/2/2024 4:20:28 PM

Lift walls, wall’s gaps and heights not consistent.

Images

10/2/2024 4:21:44 PM T338993.1564

10/2/2024 4:22:00 PM

Flooring not consistent around edges.

Images

10/2/2024 4:23:40 PM T338993.1565

10/2/2024 4:23:49 PM

10/2/2024 4:24:03 PM

The back of the lift wall is not fully painted on the edges which is reflected on the mirror.

Images

10/2/2024 4:25:37 PM T338993.1566

10/2/2024 4:25:48 PM

10/2/2024 4:26:14 PM

Lift walls not fully secured and one section is further out of the rest of the wall.

Images

10/2/2024 4:28:19 PM 12/5/2024 10:39:26 AM

10/2/2024 4:28:31 PM Project Name: B5412 Project Honey

Page 17 Of 41


T338993.1567

Hand rails screws not fully screwed.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 4:29:40 PM T338993.1568

10/2/2024 4:29:50 PM

10/2/2024 4:29:58 PM

Skirting damaged.

10/2/2024 4:30:05 PM

Images

10/2/2024 4:30:48 PM

10/2/2024 4:30:53 PM

10/2/2024 4:31:01 PM

Building B>Ground Floor>00­L05 FF Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1551

Section of the protection not removed.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 4:03:33 PM 2

T338993.1552

10/2/2024 4:03:39 PM

Flooring not consistent around edges.

Images

10/2/2024 4:04:57 PM 3

T338993.1553

10/2/2024 4:05:07 PM

Door either scratched or not clean.

12/5/2024 10:39:26 AM

10/2/2024 4:05:18 PM

Project Name: B5412 Project Honey

Page 18 Of 41


Images

10/2/2024 4:08:04 PM 3

T338993.1554

10/2/2024 4:08:14 PM

Lift walls, wall’s gaps not consistent.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 4:10:27 PM 3

T338993.1555

10/2/2024 4:10:35 PM

Lift walls not in line with the mirror. Small gap in the bottom while the gap at the top is quite bigger.

Images

10/2/2024 4:12:11 PM T338993.1556

10/2/2024 4:12:18 PM

Ceiling scratched.

10/2/2024 4:12:26 PM

Images

10/2/2024 4:14:43 PM T338993.1557

10/2/2024 4:14:52 PM

Ceiling scratched.

Images

10/2/2024 4:15:14 PM

12/5/2024 10:39:26 AM

10/2/2024 4:15:22 PM

Project Name: B5412 Project Honey

Page 19 Of 41


T338993.1559

Ceiling scratched.

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

10/2/2024

10/9/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Vanngel Natso)

Images

10/2/2024 4:16:51 PM T338993.1560

10/2/2024 4:16:57 PM

Ceiling scratched.

Images

10/2/2024 4:18:10 PM

10/2/2024 4:18:24 PM

10/2/2024 4:18:33 PM

Building B>Ground Floor>00­R02 LV Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1198

Cable should run on comma basket.

9/21/2024

9/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/21/2024 1:31:16 PM

9/21/2024 1:31:25 PM

9/21/2024 1:31:33 PM

Building B>Ground Floor>00­R06 Mec. Equipment

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1893

smoke vent system in failure

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 5:07:40 PM Building B>Ground Floor>00­S01 Stair 01 Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 20 Of 41


T338993.1420

Light not working and some covers not clipped.

9/27/2024

10/4/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/27/2024 3:13:13 PM

9/27/2024 3:13:44 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

10/21/2024 8:21:17 AM

Photo of the light working is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:50:23 AM

Building B>Ground Floor>00­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2193

Fire curtain paint to be touched up and made good

11/29/2024

12/6/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 2:31:21 PM

11/29/2024 2:31:32 PM

Building B>Ninth Floor>09­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.14

lights not working

10/8/2024

10/15/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Images

10/8/2024 10:08:12 AM

10/15/2024 8:27:00 AM

Comments

Created By

Date

Faulty fitting

Brett Pitcher (Halsion )

10/15/2024 8:26:31 AM

2

T350553.1293

Light not working

12/5/2024 10:39:26 AM

10/16/2024

Project Name: B5412 Project Honey

10/23/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Page 21 Of 41


Images

10/16/2024 10:13:26 AM Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

10/21/2024 8:15:29 AM

3

T444645.477

joint to be filled

10/23/2024

10/30/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (James McKeever)

Images

10/23/2024 3:13:16 PM

10/23/2024 3:13:22 PM

Building B>Ninth Floor>09­03 WC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1875

DDA reset button not fitted

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 11:48:41 AM 2

T350553.1879

foil finish required on insulation fibres

Images

11/6/2024 11:54:30 AM Building B>Ninth Floor>09­L05 FF Lift Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 22 Of 41


1

T444645.480

scratches to doors

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

Images

10/23/2024 3:19:16 PM Building B>Ninth Floor>09­R01 LTHW/CHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.880

insulation to be tidied up taped

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

9/25/2024 2:22:04 PM

9/30/2024 3:07:10 PM

11/6/2024 11:54:35 AM

11/6/2024 11:58:31 AM

11/6/2024 11:58:48 AM

Comments

Created By

Date

done

Rafal Szewczyk (Halsion )

9/30/2024 3:07:19 PM

Insulation missing from Chw pipework at GRP

Ian Robertson (McLaughlin & Harvey)

11/6/2024 11:58:51 AM

Building B>Ninth Floor>09­R08 Elec. Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1386

Opening between DB and wall/containment 600mm which is not complained with regulations. All Floors Landlord Riser.

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/25/2024 2:34:09 PM

9/25/2024 2:34:31 PM

9/25/2024 2:34:43 PM

Building B>Ninth Floor>09­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1382

Is PIR too close with the heater? What is the manufacturer’s recommendation.

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 23 Of 41


Images

9/25/2024 2:16:46 PM Comments

Created By

Date

PIR is not too close to the heater.

Brett Pitcher (Halsion )

9/26/2024 10:38:36 AM

can this be demonstrated that the lights actually go off with the heater on

Ian Robertson (McLaughlin & Harvey)

11/6/2024 11:25:31 AM

2

T444645.347

concrete edge to be sanded flush

10/16/2024

10/23/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (James McKeever)

Images

10/16/2024 9:54:31 AM Building B>Roof Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T419146.649

3nr broken lights

10/1/2024

10/8/2024

Snag

Opened

M&E

Halsion

Darling Associates (Liana Maltezou)

Images

10/1/2024 10:56:57 AM Comments

Created By

Date

Light fittings damaged by non­Halsion operatives. Damaged fittings/parts need replacing. Instruction required to return and replace.

James Parker (Halsion )

10/1/2024 2:20:39 PM

Unless damage can be proved by a specific individual/company to allow costs to be recovered this remains a Halsion snag as per all other snags. Please ensure this is addressed as a matter of urgency

sam peach (McLaughlin & Harvey)

11/8/2024 10:34:05 AM

Building B>Roof>Roof Plant

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1343

Missing BMS panel tag.

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 24 Of 41


9/25/2024 12:22:00 PM

9/30/2024 2:43:07 PM

9/30/2024 2:43:16 PM

Comments

Created By

Date

BMS panels were done. Please close

Rafal Szewczyk (Halsion )

9/30/2024 2:43:37 PM

This requires clear tag identifying it as building B BMS Panel.

Ian Robertson (McLaughlin & Harvey)

10/16/2024 4:42:44 PM

The photos Raff added to the snag clearly state building B

James Parker (Halsion )

10/17/2024 7:14:34 AM

Panel not tagged / labelled yet.

Vanngel Natso (McLaughlin & Harvey)

11/6/2024 9:32:40 AM

T338993.1368

External lights not energised.

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/25/2024 1:10:30 PM

9/25/2024 1:10:35 PM

10/17/2024 8:22:41 AM

11/6/2024 9:53:31 AM

Comments

Created By

Date

Faulty RCBO to replace.

Brett Pitcher (Halsion )

9/30/2024 11:37:12 AM

When will this be replaced?

Ian Robertson (McLaughlin & Harvey)

10/16/2024 5:12:45 PM

It has.

Brett Pitcher (Halsion )

10/17/2024 8:23:05 AM

Still not working one of the external lights.

Vanngel Natso (McLaughlin & Harvey)

11/6/2024 9:55:22 AM

2

T350553.863

Faults on Bms panel to be cleared

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/1/2024

11/8/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (James McKeever)

Images

9/25/2024 1:32:58 PM 3

T444645.549

rust to flashing high level

Images

11/1/2024 3:01:33 PM

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 25 Of 41


T338993.2123

Cables not secured properly.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 9:39:02 AM 4

T350553.1862

11/6/2024 9:39:09 AM

differential pressure switch pipework to be trace heated and lagged

Images

11/6/2024 10:08:44 AM T338993.2127

Exit sign should display the man on the left and the arrow on the right pointing upwards.

Images

11/6/2024 10:09:38 AM

11/6/2024 10:09:39 AM

Building B>Second Floor>02­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2173

Exit was not working when we came in the room while the other was working. Wrong programming.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 4:33:07 PM Building B>Second Floor>02­02 Lift Lobby Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 26 Of 41


T338993.1113

Light not working.

9/5/2024

9/12/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/5/2024 4:34:21 PM

9/5/2024 4:34:24 PM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 9:07:27 AM

Photo of the light working is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:46:47 AM

1

T444645.134

lights not working

10/8/2024

10/15/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Images

10/8/2024 3:47:53 PM

10/8/2024 3:47:58 PM

Comments

Created By

Date

Faulty fitting.

Brett Pitcher (Halsion )

10/10/2024 3:08:31 PM

2

T444645.510

scratches to door

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/23/2024 4:07:23 PM 3

T338993.2170

Sprinkler missing lagging.

Images

11/6/2024 4:26:08 PM

11/6/2024 4:26:13 PM

Building B>Second Floor>02­03 WC Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 27 Of 41


1

T444645.602

skirting needs tidied up

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 2:50:06 PM Building B>Second Floor>02­05 Stair Lobby 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.456

damage to door

10/16/2024

10/23/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

Images

10/16/2024 2:03:44 PM Building B>Second Floor>02­R06 Mec. Equipment

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.600

missing support, there is a lot of flex in the grp

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Risers

Dura Composites

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 2:45:12 PM Building B>Second Floor>02­R08 Elec. Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1297

Additional metal cable ties required.

9/23/2024

9/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/23/2024 11:49:14 AM

9/23/2024 11:49:21 AM

Comments

Created By

Date

There are services which are not secured with metal cable ties.

Vanngel Natso (McLaughlin & Harvey)

9/23/2024 11:49:05 AM

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 28 Of 41


please direct this to Compass

Damian Dobson (Halsion )

10/29/2024 2:23:27 PM

The Fibre Optic cables are secured with metal cable ties. There were cables run by Halsion which were missing metal cable ties. Please, confirm that additional cable ties are installed.

Vanngel Natso (McLaughlin & Harvey)

11/19/2024 6:48:29 PM

Building B>Second Floor>02­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1033

Light’s clips broken or not secured.

9/2/2024

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/2/2024 5:45:09 PM

9/2/2024 5:45:29 PM

9/2/2024 5:46:40 PM

Comments

Created By

Date

Photo of the light clipped is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:43:36 AM

T338993.2167

Sprinkler missing lagging.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 4:23:40 PM Building B>Seventh Floor Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.573

can copex be replaced?

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 11:03:09 AM Building B>Seventh Floor>07­01 Office Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 29 Of 41


1

T408928.2

light below ceiling height

8/13/2024

8/20/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

8/13/2024 2:27:56 PM

9/10/2024 10:49:36 AM

Comments

Created By

Date

Light fitting is blocked by pipework

Brett Pitcher (Halsion )

9/10/2024 10:49:45 AM

2

T338993.1165

Light’s section not working

9/18/2024

9/25/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/18/2024 10:31:36 AM

9/18/2024 10:31:41 AM

Comments

Created By

Date

Faulty driver

Brett Pitcher (Halsion )

9/20/2024 8:23:42 AM

3

T338993.1166

Light’s section not working

9/18/2024

9/25/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/18/2024 10:32:02 AM

9/18/2024 10:32:07 AM

Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 8:23:19 AM

4

T338993.1169

Light’s lengths not correct. Shorter than drawing.

9/18/2024

9/25/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/18/2024 10:47:24 AM

9/18/2024 10:47:33 AM

Comments

Created By

Date

This is an architectural/design snag.

Brett Pitcher (Halsion )

9/20/2024 8:20:33 AM

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 30 Of 41


5

T444645.574

can copex be replaced?

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/11/2024

11/18/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 11:03:30 AM 6

T444645.576

grill needs to be fixed flush with dry lining

Images

11/6/2024 11:08:38 AM 7

T338993.2145

Lagging incomplete.

Images

11/6/2024 2:39:39 PM 8

T444645.613

11/6/2024 2:39:44 PM

missing diffuser

11/6/2024 2:42:00 PM

11/6/2024 2:42:08 PM

Images

11/11/2024 12:09:33 PM Building B>Seventh Floor>07­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.489

scratch to door

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 31 Of 41


Images

10/23/2024 3:36:17 PM 2

T444645.491

signage not fixed

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

Images

10/23/2024 3:38:17 PM Building B>Seventh Floor>07­03 WC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T419146.445

temp fixings to be removed

9/4/2024

9/11/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (James McKeever)

9/4/2024

9/11/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Ian Robertson)

Images

9/4/2024 10:21:40 AM 2

T350553.791

redundant eyelet fixings to be removed

Images

9/4/2024 10:22:37 AM Building B>Seventh Floor>07­L03 Passenger Lift 03

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.490

signage not fixed

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 32 Of 41


Images

10/23/2024 3:36:49 PM Building B>Seventh Floor>07­R01 LTHW/CHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2146

Controller not secured and prob not fixed.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 2:40:55 PM

11/6/2024 2:41:09 PM

11/6/2024 2:41:19 PM

Building B>Seventh Floor>07­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1041

Light not working.

9/3/2024

9/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/3/2024 11:01:52 AM

9/3/2024 11:01:58 AM

Comments

Created By

Date

Faulty Driver

Brett Pitcher (Halsion )

9/10/2024 5:43:45 PM

Snag will be closed when the faulty driver is changed and light is working.

Vanngel Natso (McLaughlin & Harvey)

9/30/2024 6:25:30 PM

Building B>Sixth Floor>06­02 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.492

hole visable

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

Images

10/23/2024 3:40:45 PM Building B>Sixth Floor>06­S02 Stair 02 12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 33 Of 41


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.375

inconsistent gaps

10/16/2024

10/23/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

10/16/2024 11:15:53 AM T338993.2147

10/16/2024 11:16:02 AM

Saddle clip not secured.

Images

11/6/2024 2:45:51 PM

11/6/2024 2:46:00 PM

Building B>Tenth Floor>10­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T419146.618

lightning tape to be relocated to the back of the column

9/25/2024

10/2/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (James McKeever)

9/25/2024

10/2/2024

Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

9/25/2024 1:11:18 PM 2

T350553.872

redundant brackets to be removed

Images

9/25/2024 1:56:22 PM

9/25/2024 1:56:28 PM

Building B>Tenth Floor>10­02 Lift Lobby Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 34 Of 41


T444645.469

needs to be centered and straight

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

10/23/2024

10/30/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Ian Robertson)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Vanngel Natso)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/23/2024 2:51:40 PM T444645.473

tidy up antenna cable

Images

10/23/2024 3:03:10 PM T350553.1872

10/23/2024 3:03:17 PM

Metal cable ties required on lift antenna cabling

Images

11/6/2024 11:12:32 AM T338993.2133

11/6/2024 11:12:46 AM

Temporary clips to be removed.

Images

11/6/2024 11:13:46 AM 1

T350553.1873

11/6/2024 11:13:56 AM

sprinkler support not on pipework ­ to be fixed

Images

11/6/2024 11:14:09 AM 12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 35 Of 41


Building B>Tenth Floor>10­06 Stair Lobby 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.28

damaged fire stopping

10/8/2024

10/15/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

Images

10/8/2024 10:37:31 AM 2

T350553.1864

Fire stopping to be made good

Images

11/6/2024 10:25:53 AM

11/6/2024 10:26:03 AM

Building B>Tenth Floor>10­L04 Evacuation Lift

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.26

damaged fire stopping

10/8/2024

10/15/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (James McKeever)

Images

10/8/2024 10:36:20 AM Building B>Tenth Floor>10­R03 DHW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1868

damaged insulation to be replaced

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/6/2024 10:58:57 AM

11/6/2024 10:59:06 AM

11/6/2024 10:59:15 AM

Building B>Tenth Floor>10­S01 Stair 01 Reference

Description

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 36 Of 41


T338993.1018

Broken Light’s clips and covers.

9/2/2024

9/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/2/2024 3:03:44 PM

9/2/2024 3:04:05 PM

9/2/2024 3:04:59 PM

9/2/2024 3:05:16 PM

9/2/2024 3:05:55 PM

Comments

Created By

Date

Photo of the light clipped is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:42:42 AM

Building B>Tenth Floor>10­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1285

stair landing screed to be infilled,

10/16/2024

10/23/2024

Client Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Ian Robertson)

10/16/2024

10/23/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (Ian Robertson)

10/16/2024

10/23/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (Ian Robertson)

Images

10/16/2024 9:32:16 AM 2

T350553.1287

plug infill to be buffed down as per benchmark on all floors

Images

10/16/2024 9:37:19 AM 3

T350553.1288

tie to be removed from concrete soffit

Images

10/16/2024 9:39:05 AM

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 37 Of 41


4

T444645.342

general comment to be sanded down

10/16/2024

10/23/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (James McKeever)

10/16/2024

10/23/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Ian Robertson)

10/16/2024

10/23/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (James McKeever)

Images

10/16/2024 9:44:13 AM 5

T350553.1289

sprinkler fire stopping coil to be installed as per other floors

Images

10/16/2024 9:43:52 AM 6

T444645.345

10/16/2024 9:44:04 AM

difference in gaps from top of bottom

Images

10/16/2024 9:49:49 AM

10/16/2024 9:49:55 AM

Building B>Third Floor>03­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T332172.51

damage tocolumn

5/23/2024

5/30/2024

Client Snag

Opened

Groundworks

Mitchellson

Francis Hunter (Luke Nurser)

5/23/2024

5/30/2024

Client Snag

Opened

Risers

Dura Composites

Francis Hunter (Luke Nurser)

Images

5/23/2024 3:16:28 PM 2

T332172.52

damaged riser door

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 38 Of 41


Images

5/23/2024 3:20:19 PM 3

T332172.53

damaged riser door

5/23/2024

5/30/2024

Client Snag

Opened

Risers

Dura Composites

Francis Hunter (Luke Nurser)

Images

5/23/2024 3:20:45 PM Building B>Third Floor>03­03 WC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2165

Sprinkler’s lagging missing foil on the end of the lagging.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 4:16:48 PM

11/6/2024 4:16:55 PM

Building B>Third Floor>03­06 Stair Lobby 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1067

Light not working.

9/3/2024

9/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/3/2024 4:27:45 PM Comments

Created By

Date

Faulty driver.

Brett Pitcher (Halsion )

9/20/2024 9:05:25 AM

12/5/2024 10:39:26 AM

Project Name: B5412 Project Honey

Page 39 Of 41


1

T338993.2166

Light not working and remove smoke detector’s cover.

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/6/2024 4:20:08 PM

11/6/2024 4:20:53 PM

11/8/2024 7:39:07 AM

Building B>Third Floor>03­R08 Elec. Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1291

Additional metal cable ties required.

9/23/2024

9/30/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/23/2024 11:38:55 AM

9/23/2024 11:39:17 AM

11/12/2024 8:51:16 AM

11/12/2024 8:51:25 AM

Comments

Created By

Date

The black cables are compass

Damian Dobson (Halsion )

10/29/2024 2:24:42 PM

The Fibre Optic cables are secured with metal cable ties. There were cables run by Halsion which were missing metal cable ties. Please, confirm that additional cable ties are installed.

Vanngel Natso (McLaughlin & Harvey)

11/19/2024 6:49:05 PM

Building B>Third Floor>03­S01 Stair 01 Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.1047

Light’s clips broken or not secured.

9/3/2024

9/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

9/3/2024 11:59:52 AM

9/3/2024 12:00:03 PM

9/3/2024 12:00:11 PM

Comments

Created By

Date

Photo of the light clipped is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:41:42 AM

T338993.1048

Light’s clips broken or not secured.

12/5/2024 10:39:26 AM

9/3/2024

Project Name: B5412 Project Honey

9/10/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Page 40 Of 41


Images

9/3/2024 12:00:56 PM

9/3/2024 12:01:10 PM

9/3/2024 12:01:27 PM

Comments

Created By

Date

Photo of the light clipped is required.

Vanngel Natso (McLaughlin & Harvey)

12/4/2024 9:41:07 AM

Building B>Third Floor>03­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.405

joint to be made good

10/16/2024

10/23/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (James McKeever)

10/16/2024

10/23/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (James McKeever)

Images

10/16/2024 11:56:16 AM 2

T444645.406

differences in panel gaps to be rectified

Images

10/16/2024 11:57:36 AM

12/5/2024 10:39:26 AM

10/16/2024 11:57:45 AM

Project Name: B5412 Project Honey

Page 41 Of 41


Project Honey – Building C Snag Report 05.12.24

FH090-151015


Building C Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1279

Dry riser doors not installed ­ all floors

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/31/2024

11/7/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/11/2024 6:29:38 PM T350553.1785

Smoke vent grilles incomplete ­ All floors

Images

10/31/2024 11:49:11 AM Building C>Fifth Floor Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.107

Magic man to cover exposed lifting eye

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:05:56 AM Building C>Fifth Floor>Core 1 Lobby L05

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.6

Architraves to be installed

11/4/2024

11/11/2024

Incomplete Works

Opened

Lifts

Otis

McLaughlin & Harvey (Farron O'Hare)

Images

11/4/2024 10:00:37 AM

12/5/2024 10:42:41 AM

11/4/2024 10:00:43 AM

Project Name: B5412 Project Honey

Page 1 Of 87


2

T353957.108

Damage to door to be touched up

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:06:29 AM Building C>Fifth Floor>Core 1 Lobby L05­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T349466.13

Fire exit sign missing

12/3/2024

12/10/2024

Snag

Opened

M&E

Halsion

Halsion (James Parker)

Images

12/3/2024 12:57:21 PM Building C>Fifth Floor>Core 1 Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.8

Plasterboard to be Taped / jointed and painted

11/4/2024

11/11/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

11/4/2024

11/11/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/4/2024 10:02:53 AM 2

T452415.9

Expanding foam to be cut back and joints to be mastic

Images

11/4/2024 10:06:00 AM

11/4/2024 10:06:06 AM

Building C>Fifth Floor>Core 1 Riser ­ B Reference

Description

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 2 Of 87


1

T452415.10

Expanding foam to be cut back and joints to be mastic

11/4/2024

11/11/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Images

11/4/2024 10:07:01 AM Building C>Fifth Floor>Core 2 Lobby L05­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.262

Excess neoprene to be cut

11/13/2024

11/20/2024

Client Snag

Opened

Pre­Cast Structure

FP McCann

McLaughlin & Harvey (Farron O'Hare)

Images

11/13/2024 11:56:17 AM Building C>Fifth Floor>Fifth Floor (Mezz) Parking

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.18

Paint on Aco to be cleaned off

11/6/2024

11/13/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

11/6/2024

11/13/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

Images

11/6/2024 11:41:25 AM 2

T452415.19

11/6/2024 11:41:30 AM

Chalk Lines to be cleaned off

Images

11/6/2024 11:42:08 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 3 Of 87


3

T452415.20

inbetween unistrut to be painted

11/6/2024

11/13/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

11/6/2024

11/13/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

11/6/2024

11/13/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

11/6/2024

11/13/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

Images

11/6/2024 11:43:29 AM 4

T452415.21

Paint sprayed on parapet to be cleaned

Images

11/6/2024 11:44:26 AM 5

T452415.22

Poor finish / coordination in line marking

Images

11/6/2024 11:46:01 AM 6

T452415.24

Poor finish / coordination in line marking

Images

11/6/2024 12:40:50 PM 7

T452415.125

Two lights not working

Images

11/8/2024 11:23:19 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 4 Of 87


8

T350553.1963

water damaged trunken to be replaced

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/11/2024 5:16:01 PM 9

T350553.1964

11/11/2024 5:18:11 PM

11/11/2024 5:18:17 PM

metal tiewraped to be cut short on all EV charger cabling

11/11/2024 5:18:45 PM

11/11/2024 5:18:52 PM

11/11/2024 5:19:16 PM

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

Images

11/11/2024 5:17:42 PM 10

T350553.1965

bracket to me tightened and uni strut the be straightened

Images

11/11/2024 5:20:34 PM 11

T452415.258

11/11/2024 5:20:47 PM

Clips to be removed

Images

11/13/2024 11:49:50 AM 12

T452415.259

Containment with water damage to be replaced

Images

11/13/2024 11:53:49 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 5 Of 87


13

T452415.260

PIR at 2090, needs to be 2100

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

Images

11/13/2024 11:54:33 AM 14

T452415.261

Clips to be removed

Images

11/13/2024 11:55:01 AM Building C>Fifth Floor>Fifth Floor Parking

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1961

metal tiewraped to be cut short on all EV charger cabling

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/11/2024 5:10:41 PM 2

T350553.1962

11/11/2024 5:10:49 PM

back box lids missing

11/11/2024 5:10:59 PM

11/11/2024 5:11:07 PM

11/11/2024 5:11:15 PM

Images

11/11/2024 5:12:38 PM 3

T338993.2312

11/11/2024 5:12:48 PM

Missing conduit box cover.

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 6 Of 87


Images

11/13/2024 11:38:33 AM 4

T338993.2313

11/13/2024 11:38:38 AM

11/13/2024 11:38:42 AM

Some EVC are not secured properly. They are shaking. Across levels.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 11:40:48 AM Building C>Fifth Floor>Stair 1 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.3

Temp lighting clips to be removed

11/4/2024

11/11/2024

Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

11/4/2024

11/11/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

11/4/2024

11/11/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Images

11/4/2024 9:51:22 AM 2

T452415.4

Protection from painter to be removed

Images

11/4/2024 9:52:30 AM 3

T452415.5

Paint on closer to be removed

Images

11/4/2024 9:59:24 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 7 Of 87


Building C>First Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.177

Lightning protection incomplete

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 10:57:00 AM Building C>First Floor>Core 1 Lobby L01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.121

Scrapes on handle + bead in glass to be improved

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:40:13 AM

11/26/2024 11:40:20 AM

11/26/2024 11:40:42 AM

Building C>First Floor>Core 1 Lobby L01­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.117

Containment to be complete

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:33:05 AM Building C>First Floor>Core 2 Lobby L01­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.81

Doors not closing correctly. All doors to be checked and adjusted.

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:30:11 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 8 Of 87


Building C>First Floor>First Floor (Mezz) Parking Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.374

Trunking damaged

7/29/2024

8/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

7/29/2024 4:45:50 PM 1

T452415.172

7/29/2024 4:45:51 PM

Pipe leaking

7/29/2024 4:45:51 PM

Images

11/12/2024 10:50:45 AM 2

T452415.173

Paint flaking

11/12/2024 10:50:52 AM

Images

11/12/2024 10:52:10 AM 3

T353957.118

Damaged light

Images

11/26/2024 11:36:26 AM 4

T353957.119

Damaged light

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 9 Of 87


Images

11/26/2024 11:37:28 AM Building C>First Floor>First Floor Parking

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.175

complete all firestopping

11/12/2024

11/19/2024

Snag

Opened

Fire Stopping

Middlesex Limited

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/12/2024 10:54:22 AM 2

T353957.123

Conduit to be replaced

Images

11/26/2024 11:43:26 AM 3

T353957.124

Conduit to be replaced

Images

11/26/2024 11:43:49 AM 4

T353957.125

Conduit to be replaced

Images

11/26/2024 11:45:13 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 10 Of 87


Building C>First Floor>Stair 1 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.120

Magic man to repair

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:38:24 AM Building C>First Floor>Stair 2 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.77

General clean required

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:24:17 AM 2

T353957.78

General clean

Images

11/26/2024 9:25:16 AM 3

T353957.79

Touching up to be complete

Images

11/26/2024 9:25:55 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 11 Of 87


4

T353957.80

General clean

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:26:43 AM Building C>Fourth Floor>Core 1 Riser ­ B

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T349466.3

Repair lagging

11/21/2024

11/28/2024

Snag

Opened

M&E

Halsion

Halsion (James Parker)

Images

11/21/2024 2:38:26 PM Building C>Fourth Floor>Core 2 Lobby L04

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.250

Clips to be removed

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

Images

11/13/2024 11:13:54 AM Building C>Fourth Floor>Core 2 Lobby L04­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1960

bracket to me tightened and uni strut the be straightened

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/11/2024 3:55:02 PM

11/11/2024 3:55:10 PM

Building C>Fourth Floor>Fourth Floor (Mezz) Parking Reference

Description

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 12 Of 87


T338993.385

Trunking, Tray and support damaged / rusty

7/30/2024

8/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

7/30/2024

8/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Farron O'Hare)

Images

7/30/2024 11:39:43 AM T338993.386

7/30/2024 11:39:52 AM

7/30/2024 11:42:02 AM

Screw not compliance with other the product

7/30/2024 11:42:10 AM

Images

7/30/2024 11:43:14 AM 1

T350553.1959

7/30/2024 11:43:22 AM

7/30/2024 11:43:32 AM

metal tiewraped to be cut short on EV charger cabling

Images

11/11/2024 3:53:13 PM 2

T452415.253

11/11/2024 3:53:47 PM

Two faulty lights to be replaced

Images

11/13/2024 11:25:11 AM 3

T452415.254

Bollard to be installed (MCLH to confirm)

Images

11/13/2024 11:27:36 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 13 Of 87


4

T452415.255

Separation lines to be installed (MCLH to confirm)

11/13/2024

11/20/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Across all levels. PIR should be minimum 2100mm FFFL. In some cases is between 5mm to 10mm lower. Also. head loose, anyone can rotate them. 11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 11:28:33 AM 5

T338993.2310

Some lights not working across floors.

Images

11/13/2024 11:32:04 AM 5

T338993.2311

Images

11/13/2024 11:35:18 AM Building C>Fourth Floor>Fourth Floor Parking Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.382

Trunking and Tray damaged / rusty

7/30/2024

8/6/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

7/30/2024 11:20:58 AM

7/30/2024 11:21:05 AM

7/30/2024 11:21:20 AM

7/30/2024 11:21:34 AM

7/30/2024 11:22:44 AM

7/30/2024 11:22:59 AM

7/30/2024 11:23:12 AM

7/30/2024 11:27:23 AM

7/30/2024 11:27:27 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 14 Of 87


1

T350553.1954

light not working and diffuser missing

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/11/2024

11/18/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/11/2024 3:45:51 PM 2

T350553.1955

light not working

Images

11/11/2024 3:46:33 PM 3

T452415.251

Lightning protection to be fixed

Images

11/13/2024 11:15:51 AM 4

T338993.2304

Missing reference on sockets.

Images

11/13/2024 11:17:35 AM 4

T338993.2305

Building control to confirm if the exit light should be on top of the door as mandatory requirement.

Images

11/13/2024 11:19:25 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 15 Of 87


4

T338993.2306

Missing green led indication on all emergency lights.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

Pre­Cast Structure

FP McCann

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 11:21:09 AM 4

T338993.2307

11/13/2024 11:21:25 AM

Additional metal cable ties required on all EVC cable drops.

Images

11/13/2024 11:22:13 AM 5

T452415.252

11/13/2024 11:22:21 AM

Excess neoprene to be cut

Images

11/13/2024 11:23:52 AM 4

T338993.2308

All EV points to be labelled with number and state if they are slow or fast charge. Also, cables should be referenced as well.

Images

11/13/2024 11:24:27 AM 4

T338993.2309

11/13/2024 11:26:50 AM

11/13/2024 11:27:22 AM

All lighting cover clips to be checked. Some are missing or broken.

Images

11/13/2024 11:28:33 AM 12/5/2024 10:42:41 AM

11/13/2024 11:28:47 AM

11/13/2024 11:28:58 AM Project Name: B5412 Project Honey

Page 16 Of 87


Building C>Fourth Floor>Stair 2 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345609.13

General construction writing on walls to be cleaned.

11/15/2024

11/22/2024

Snag

Opened

Cleaning

Serna Cleaning

Darling Associates (Robyn Harrison­ Church)

Issued To Package

Issued To Organisation

Issued By Organisation

Mitchellson

McLaughlin & Harvey (Farron O'Hare)

Images

11/15/2024 11:33:22 AM Building C>Ground Floor Reference

Description

Issued Date

Target Date

Task Type

Status

T1.51198935

A gully has been installed and the head has not been installed.

8/7/2024

8/14/2024

Incomplete Works

Opened

Firestopping to be complete + flashing to be installed around extract

11/26/2024

12/3/2024

Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

Images

8/7/2024 5:19:26 PM 1

T345609.26

Images

11/26/2024 2:45:18 PM 2

T345609.27

Mastic joint colour mismatch with mortar

Images

11/26/2024 2:46:36 PM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 17 Of 87


3

T345609.28

Firestopping to be finished in secure manner

11/26/2024

12/3/2024

Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 2:48:37 PM 4

T345609.29

Gap to be filled with green brick

Images

11/26/2024 2:52:03 PM 5

T345609.30

Firestopping to properly secured at door head

Images

11/26/2024 3:03:33 PM Building C>Ground Floor>Accessible WC Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1590

CCTV cabling incomplete

10/24/2024

10/31/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/24/2024 12:46:11 PM 1

T350553.2135

11/7/2024 4:12:51 PM

light and PIR to be installed

12/5/2024 10:42:41 AM

11/21/2024 1:39:17 PM

Project Name: B5412 Project Honey

Page 18 Of 87


Images

11/27/2024 9:43:52 AM 1

T350553.2136

punka louvre insert to be installed

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 9:44:33 AM Building C>Ground Floor>Changing Circulation

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1733

2nd fix small power incomplete ­ cleaners sockets missing

10/31/2024

11/7/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/31/2024 8:32:47 AM 2

T353957.48

10/31/2024 8:32:59 AM

Check seam position on vinyl ­ as per?

11/7/2024 2:10:05 PM

11/7/2024 2:10:16 PM

11/21/2024 1:36:12 PM

11/21/2024 1:36:17 PM

11/21/2024 1:36:28 PM

11/21/2024 1:36:33 PM

11/13/2024

11/20/2024

Observation

Opened

Client

Francis Hunter

McLaughlin & Harvey (Connor Casey)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 9:40:40 AM 3

T338993.2262

Fire stopping missing.

Images

11/13/2024 9:49:46 AM 12/5/2024 10:42:41 AM

11/13/2024 9:49:52 AM Project Name: B5412 Project Honey

Page 19 Of 87


4

T338993.2263

Remove redundant cable ties.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 9:50:51 AM 5

T338993.2264

11/13/2024 9:50:59 AM

Door has scratches.

11/13/2024 9:51:06 AM

11/13/2024 9:53:20 AM

11/13/2024 9:53:31 AM

11/13/2024 9:54:51 AM

11/13/2024 9:54:57 AM

11/13/2024 10:50:38 AM

11/13/2024

11/20/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

Images

11/13/2024 9:52:43 AM T338993.2265

11/13/2024 9:52:49 AM

Lights not working.

Images

11/13/2024 9:55:38 AM 6

T452415.199

11/13/2024 9:55:45 AM

All stickers to be removed

Images

11/13/2024 9:56:03 AM 7

T452415.201

Temp cables to be removed

Images

11/13/2024 10:00:04 AM 12/5/2024 10:42:41 AM

11/13/2024 10:00:14 AM Project Name: B5412 Project Honey

Page 20 Of 87


8

T452415.207

Screw and chain to be removed

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 10:07:38 AM T338993.2289

No earth links between containment which are not connected.

Images

11/13/2024 10:53:08 AM 9

T338993.2299

11/13/2024 10:53:13 AM

Cable reference missing on all cables.

Images

11/13/2024 11:04:33 AM 10

T338993.2300

11/13/2024 11:04:48 AM

Missing reference on lighting control panel and blanks.

Images

11/13/2024 11:06:55 AM T338993.2301

11/13/2024 11:07:14 AM

Missing schedule, circuit references and blanks on DB panel. Also, screw on covers missing.

Images

11/13/2024 11:10:30 AM 12/5/2024 10:42:41 AM

11/13/2024 11:10:36 AM

11/13/2024 11:10:45 AM

11/13/2024 11:10:54 AM

11/13/2024 11:11:12 AM Project Name: B5412 Project Honey

Page 21 Of 87


T338993.2302

Spur not 2nd fixed.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 11:12:07 AM T338993.2303

11/13/2024 11:12:12 AM

Missing exit light.

Images

11/13/2024 11:12:25 AM 11

T350553.2142

cable ties to be removed

Images

11/27/2024 9:49:05 AM 12

T350553.2143

11/27/2024 9:52:10 AM

2 x lights not working

11/27/2024 9:54:06 AM

11/27/2024 9:54:11 AM

11/27/2024 9:54:17 AM

Images

11/27/2024 9:50:28 AM 13

T350553.2144

fire exit signage should point up

Images

11/27/2024 9:51:00 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 22 Of 87


14

T350553.2145

lid on back box missing

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 9:51:40 AM 15

T350553.2146

11/27/2024 9:56:00 AM

lagging to be tidied up on ductwork and not around rod/ unistrut

Images

11/27/2024 9:53:16 AM 16

T350553.2147

DB wiring incomplete

Images

11/27/2024 9:57:17 AM 16

T350553.2148

DB schedules missing from all boards

Images

11/27/2024 9:58:38 AM 17

T350553.2149

Rubber matts required under Distribution boards

Images

11/27/2024 10:02:00 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 23 Of 87


18

T350553.2150

trace heating power incomplete

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 10:02:37 AM Building C>Ground Floor>Cleaner's Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2133

insulation to be completed

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 9:42:49 AM Building C>Ground Floor>Cold Water Tank

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.141

Fire stopping to be complete ­ confirm requirement for coating system

11/26/2024

12/3/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

Building C>Ground Floor>Core 1 ­ C­L00 Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.128

Magic man required

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:49:29 AM 2

T353957.130

Temp fire door to be replaced at later date

Images

11/26/2024 11:50:23 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 24 Of 87


Building C>Ground Floor>Core 1 ­ L00 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1246

2nd fix fire alarm/smoke head/call point incomplete

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/11/2024 12:34:56 PM T350553.2076

10/11/2024 12:34:56 PM

CCTV wiring incomplete

10/30/2024 2:20:26 PM

10/30/2024 2:20:39 PM

11/7/2024 4:15:01 PM

11/14/2024 2:11:46 PM

11/21/2024 1:40:26 PM

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/21/2024 1:40:53 PM

11/21/2024 1:42:27 PM

Building C>Ground Floor>Core 2 ­ Final Exit (External) Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2080

CCTV wiring incomplete

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/21/2024 2:08:34 PM 1

T353957.75

Floor finish to be carried to wall

Images

11/26/2024 9:18:35 AM Building C>Ground Floor>Core 2 Lobby L00­Mezz Reference

Description

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 25 Of 87


1

T353957.76

Cleaning to complete

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:21:16 AM 2

T353957.132

11/26/2024 9:21:31 AM

Temp fire door to be replaced at later date

Images

11/26/2024 11:53:03 AM Building C>Ground Floor>Entrance/Exit Ramp

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1938

2nd fix CCTV wiring incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Curtains

Coopers Fire

McLaughlin & Harvey (Connor Casey)

Images

11/7/2024 3:17:16 PM 2

T353957.134

11/7/2024 3:17:35 PM

Temporary tray to be removed

11/7/2024 3:17:42 PM

Images

11/26/2024 11:55:20 AM 3

T353957.136

Damaged fire curtain

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 26 Of 87


Images

11/26/2024 11:59:03 AM Building C>Ground Floor>Female Changing

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1488

Cabling incomplete

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/31/2024

11/7/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

Images

10/22/2024 10:21:45 AM 2

T350553.1489

Smoke head missing

Images

10/22/2024 10:23:48 AM 3

T350553.1734

2nd fix small power incomplete ­ cleaners sockets missing

Images

10/31/2024 8:35:34 AM 4

T452415.100

11/7/2024 2:06:21 PM

PIR / fire alarm to be installed

11/14/2024 1:56:06 PM

11/21/2024 1:32:21 PM

11/21/2024 1:32:27 PM 11/8/2024

11/21/2024 1:32:40 PM 11/15/2024

Snag

Images

11/8/2024 10:57:51 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 27 Of 87


5

T452415.102

water pooling at gully

11/8/2024

11/15/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

Darling Associates (Robyn Harrison­ Church)

11/8/2024

11/15/2024

Snag

Opened

Joinery

Original Joinery

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/8/2024 11:00:11 AM 6

T452415.106

Bin missing

Images

11/8/2024 11:03:25 AM 7

T338993.2266

End and rod cups missing.

Images

11/13/2024 10:08:05 AM 7

T338993.2268

11/13/2024 10:08:14 AM

Missing Smoke detector head.

11/13/2024 10:08:41 AM

11/13/2024 10:15:34 AM

11/13/2024 10:15:41 AM

11/13/2024 10:16:10 AM

11/13/2024 10:16:16 AM

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 10:15:00 AM T338993.2297

11/13/2024 10:15:05 AM

Additional cable tie required.

Images

11/13/2024 11:02:37 AM 12/5/2024 10:42:41 AM

11/13/2024 11:02:41 AM Project Name: B5412 Project Honey

Page 28 Of 87


T338993.2298

Fire stopping incomplete.

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 11:03:15 AM 8

T350553.2151

11/13/2024 11:03:22 AM

tap missing

Images

11/27/2024 10:07:46 AM 9

T350553.2152

all sockets to be labelled

Images

11/27/2024 10:08:31 AM

11/27/2024 10:08:39 AM

Building C>Ground Floor>Front Lobby & Office Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1942

2nd fix small power /FA wiring incomplete­ MSFD wiring incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/14/2024

11/21/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/7/2024 4:11:56 PM T350553.2048

11/14/2024 2:03:38 PM

2nd fix Fire alarm wiring incomplete

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 29 Of 87


Images

11/14/2024 2:04:20 PM T350553.2075

CCTV wiring incomplete

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Architect

Darling Associates

McLaughlin & Harvey (Connor Casey)

Images

11/21/2024 1:38:09 PM 1

T353957.72

Signage colour unreadable­ colour to be changed or backing installed

Images

11/26/2024 9:02:08 AM

11/26/2024 9:02:24 AM

2

T408928.125

shower symbol etc shouldn’t be here ­ nor sign

11/26/2024

11/29/2024

Client Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

3

T350553.2129

Fire alarm panel wiring incomplete

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 9:38:42 AM 4

T350553.2130

CCTV wiring incomplete

Images

11/27/2024 9:39:38 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 30 Of 87


5

T350553.2131

door access wiring incomplete

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 9:40:41 AM 6

T350553.2132

all sockets to be labelled

Images

11/27/2024 9:41:50 AM 7

T350553.2137

lagging to be tidied up on ductwork

Images

11/27/2024 9:45:08 AM 8

T350553.2138

lid on back box missing

Images

11/27/2024 9:45:49 AM 9

T350553.2139

spur faceplate to be fixed

Images

11/27/2024 9:46:31 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 31 Of 87


10

T350553.2140

rod caps to be fitted

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 9:47:12 AM 11

T350553.2141

light and PIR to be installed

Images

11/27/2024 9:47:54 AM Building C>Ground Floor>Generator/Life Safety Switch Room Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1729

2nd fix Fire alarm incomplete ­ interface to generator fuel tank

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/30/2024 4:36:39 PM T350553.1730

10/30/2024 4:36:48 PM

10/30/2024 4:37:06 PM

11/7/2024 3:44:22 PM

2nd lighting wiring incomplete

11/14/2024 4:49:55 PM 10/30/2024

11/21/2024 2:19:51 PM 11/6/2024

Incomplete Works

Images

10/30/2024 4:37:34 PM T350553.1940

10/30/2024 4:37:50 PM

2nd fix CCTV wiring incomplete

12/5/2024 10:42:41 AM

10/30/2024 4:38:06 PM

11/7/2024 3:41:42 PM

11/7/2024 3:41:56 PM 11/7/2024

Project Name: B5412 Project Honey

11/14/2024 4:48:10 PM 11/14/2024

Incomplete Works

11/21/2024 2:18:53 PM Opened

11/21/2024 2:19:05 PM M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Page 32 Of 87


Images

11/7/2024 3:42:41 PM 1

T353957.138

11/14/2024 4:47:48 PM

11/14/2024 4:47:54 PM

Fire stopping to be complete on windposts

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:02:57 PM 2

T353957.139

Fire stopping to be complete

Images

11/26/2024 12:03:53 PM Building C>Ground Floor>Ground Floor (Mezz) Parking Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1260

2nd fix lighting PIRs incomplete

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/11/2024 2:32:09 PM

10/31/2024 9:06:13 AM

10/31/2024 9:06:22 AM

10/31/2024 9:06:36 AM

10/31/2024 9:06:45 AM

11/7/2024 3:22:43 PM

11/14/2024 2:15:54 PM

11/14/2024 2:16:03 PM

11/14/2024 2:16:15 PM

11/21/2024 3:02:28 PM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

11/7/2024 3:22:00 PM

11/7/2024 3:22:06 PM

11/7/2024 3:22:22 PM

Page 33 Of 87


1

T353957.129

Temp fire door to be replaced at later date

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:50:05 AM 2

T353957.131

Fire signage to be installed

Images

11/26/2024 11:51:22 AM 3

T353957.133

Movement joint to be complete

Images

11/26/2024 11:54:37 AM Building C>Ground Floor>Male Changing

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.241

additional ID required on domestic pipework insulation.

8/2/2024

8/9/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

8/2/2024 11:09:48 AM 2

T350553.1516

8/2/2024 11:09:48 AM

Insulation to be made good around pipework

12/5/2024 10:42:41 AM

11/7/2024 8:49:46 AM

Project Name: B5412 Project Honey

Page 34 Of 87


Images

10/22/2024 3:31:34 PM 3

T350553.1523

10/22/2024 3:31:49 PM

Smoke head missing

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/8/2024

11/15/2024

Snag

Opened

Joinery

Original Joinery

Darling Associates (Robyn Harrison­ Church)

11/8/2024

11/15/2024

Snag

Opened

Joinery

Original Joinery

Darling Associates (Robyn Harrison­ Church)

Images

10/22/2024 3:39:33 PM 4

T350553.1524

10/22/2024 3:40:17 PM

All fire alarm sounders missing in cubicles

Images

10/22/2024 3:40:44 PM 5

T452415.113

Bin missing

Images

11/8/2024 11:08:45 AM 6

T452415.117

Bin missing

Images

11/8/2024 11:11:00 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 35 Of 87


7

T452415.120

PIR / fire alarm to be installed

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/8/2024 11:13:46 AM 8

T338993.2259

End and rod cups missing.

Images

11/13/2024 9:42:24 AM

11/13/2024 9:42:30 AM

11/13/2024 9:43:10 AM

11/13/2024 9:43:43 AM

11/13/2024 9:43:50 AM

11/13/2024 9:44:56 AM

11/13/2024 9:45:01 AM

11/13/2024 9:45:02 AM

11/21/2024 1:35:06 PM 9

T338993.2260

Missing Smoke detector head.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 9:45:52 AM 10

T338993.2261

11/13/2024 9:45:57 AM

Additional metal cable ties required.

Images

11/13/2024 9:46:47 AM

12/5/2024 10:42:41 AM

11/13/2024 9:46:52 AM

11/13/2024 9:47:16 AM

Project Name: B5412 Project Honey

Page 36 Of 87


11

T452415.197

All stickers to be removed from PIR

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 9:52:54 AM 12

T350553.2154

light to be installed

Images

11/27/2024 10:17:53 AM 13

T350553.2155

spur faceplate to be fixed

Images

11/27/2024 10:20:38 AM 14

T350553.2156

all sockets to be labelled

Images

11/27/2024 10:21:48 AM Building C>Ground Floor>Plant Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.140

Fire stopping to be complete

11/26/2024

12/3/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 37 Of 87


Images

11/26/2024 12:05:02 PM Building C>Ground Floor>Stair 1 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.126

Magic man required

11/26/2024

12/3/2024

Client Snag

Opened

Client

Francis Hunter

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:47:57 AM Building C>Ground Floor>Switch Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.135

Door threshold to be installed

11/26/2024

12/3/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:58:04 AM Building C>Ground Floor>Thermal Stores

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2081

Earth wiring incomplete

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/21/2024 2:16:10 PM Building C>Ground Floor>Unisex Changing Reference

Description

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 38 Of 87


1

T350553.1508

Smoke head missing

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Vanngel Natso)

Images

10/22/2024 10:44:19 AM 2

T338993.2252

Missing conduit box cover.

Images

11/13/2024 9:23:41 AM 3

T338993.2253

11/13/2024 9:23:48 AM

11/13/2024 9:27:27 AM

11/13/2024 9:27:35 AM

Rod cups missing.

11/21/2024 1:37:16 PM

Images

11/13/2024 9:25:03 AM 4

T338993.2254

11/13/2024 9:25:11 AM

Rod cups missing.

Images

11/13/2024 9:25:46 AM 5

T338993.2257

11/13/2024 9:25:53 AM

Door not fully painted.

11/13/2024 9:34:30 AM

11/13/2024 9:34:35 AM

Images

11/13/2024 9:36:13 AM 12/5/2024 10:42:41 AM

11/13/2024 9:36:23 AM Project Name: B5412 Project Honey

Page 39 Of 87


6

T338993.2290

Excess cable to be clipped.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 10:54:14 AM 7

T338993.2291

11/13/2024 10:54:21 AM

Lagging incomplete.

Images

11/13/2024 10:54:53 AM 5

T338993.2293

11/13/2024 10:54:59 AM

Fire stopping incomplete.

Images

11/13/2024 10:57:20 AM 8

T338993.2294

11/13/2024 10:57:31 AM

Lagging incomplete.

Images

11/13/2024 10:58:00 AM 9

T350553.2153

11/13/2024 10:58:18 AM

toilet water discoloured when flushing

Images

11/27/2024 10:11:18 AM 12/5/2024 10:42:41 AM

11/27/2024 10:11:46 AM Project Name: B5412 Project Honey

Page 40 Of 87


Building C>Ground Floor>Unisex Changing (Large)

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T327871.663

Screed has left room for vinyl to be feathered into shower gully on one side, however on other the screed has just gone flush with gully. this is on all screeded shower cubicles

5/22/2024

5/29/2024

Incomplete Works

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

Images

5/22/2024 12:25:45 PM 2

T327871.665

5/22/2024 12:25:45 PM

5/22/2024 12:25:45 PM

5/22/2024 12:25:45 PM

5/22/2024 12:25:45 PM

Screed has left room for vinyl to be feathered into shower gully on one side, however on other the screed has just gone flush with gully. this is on all screeded shower cubicles

5/22/2024 12:25:45 PM

5/22/2024 12:25:45 PM

5/23/2024

5/29/2024

Incomplete Works

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

5/23/2024 7:53:57 AM 3

T350553.1469

5/23/2024 7:53:57 AM

BMS cabling to be tidied up and tiewrapped neatly

Images

10/21/2024 4:20:34 PM 4

T350553.1476

PIR missing

Images

10/21/2024 4:36:09 PM 5

T350553.1477

cabling to be tidied up and tiewrapped neatly

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 41 Of 87


Images

10/21/2024 4:36:48 PM 6

T350553.1478

Smoke head missing

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/22/2024

10/29/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/25/2024

11/1/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (sam peach)

Images

10/21/2024 4:37:25 PM 7

T350553.1479

All tiewraps to be cut short

Images

10/21/2024 4:38:14 PM 8

T350553.1480

back box lids missing

Images

10/22/2024 10:02:34 AM 9

T450445.4

10/22/2024 10:02:52 AM

cut should have been installed high level. joint to be touched up black

Images

10/25/2024 12:14:55 PM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 42 Of 87


10

T450445.6

basket should have been ordered to suit niche size

10/25/2024

11/1/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (sam peach)

Images

10/25/2024 12:17:11 PM

11/11/2024 3:41:33 PM

Comments

Created By

Date

oder new size basket

Stephen O'Hara (Original Joinery)

11/11/2024 3:42:50 PM

11

T449040.77

Acoustic stopping to be made good / painting

10/25/2024

11/1/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Images

10/25/2024 12:26:31 PM

11/4/2024 2:23:15 PM

Comments

Created By

Date

Acoustic stopping is poor

Farron O'Hare (McLaughlin & Harvey)

11/6/2024 3:00:51 PM

12

T449040.84

Hole to be filled

10/25/2024

11/1/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Images

10/25/2024 12:38:44 PM Comments

Created By

Date

Unable to reach due M&E design, please advise

Stephen O'Hara (Original Joinery)

11/12/2024 4:46:54 PM

13

T450445.15

making good required around access panel

10/25/2024

11/1/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (sam peach)

Images

10/25/2024 12:40:10 PM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 43 Of 87


14

T449040.86

Poor finish to board joint to be filled with mastic

10/25/2024

11/1/2024

Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Images

10/25/2024 12:40:02 PM Comments

Created By

Date

Unable to reach due M&E design, please advise

Stephen O'Hara (Original Joinery)

11/12/2024 4:46:02 PM

15

T350553.1738

2nd fix small power incomplete ­ cleaners sockets missing

10/31/2024

11/7/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/31/2024 8:53:58 AM

10/31/2024 8:54:05 AM

10/31/2024 8:59:44 AM

10/31/2024 8:59:57 AM

10/31/2024 9:00:21 AM

11/7/2024 1:53:57 PM

11/21/2024 1:23:31 PM

11/21/2024 1:23:37 PM

11/21/2024 1:23:50 PM

11/21/2024 1:23:58 PM

11/21/2024 1:24:07 PM

11/21/2024 1:24:13 PM

16

T452415.68

PIR to be installed

11/7/2024 1:54:08 PM

11/7/2024 1:54:27 PM

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/8/2024 10:20:30 AM 17

T353957.58

Finish around door frame to be improved

Images

11/13/2024 10:04:42 AM

12/5/2024 10:42:41 AM

11/13/2024 10:04:53 AM

Project Name: B5412 Project Honey

Page 44 Of 87


18

T452415.214

Painting / Plasterboard to be made good

11/13/2024

11/20/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 10:19:02 AM 19

T338993.2269

Lights should be in the centre, is this as per drawing?

Images

11/13/2024 10:18:46 AM 20

T338993.2270

Where is the spur for me his FCU?

Images

11/13/2024 10:22:11 AM 21

T338993.2271

11/13/2024 10:22:19 AM

Should the PIRs, have red, green or not lights indication?

Images

11/13/2024 10:24:25 AM 22

T338993.2272

11/13/2024 10:24:34 AM

Isolator not labelled.

Images

11/13/2024 10:25:11 AM 12/5/2024 10:42:41 AM

11/13/2024 10:25:19 AM Project Name: B5412 Project Honey

Page 45 Of 87


23

T338993.2273

Missing Smoke detector head.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

Architect

Darling Associates

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/13/2024 10:26:34 AM 24

T338993.2274

11/13/2024 10:26:41 AM

Cover for Smoke detector head to be removed on changing village area.

Images

11/13/2024 10:27:55 AM 25

T338993.2276

Solenoid valve not connected.

Images

11/13/2024 10:30:26 AM 26

T338993.2279

11/13/2024 10:30:31 AM

How you can removed this man hole to inspect the chamber?

Images

11/13/2024 10:34:57 AM 27

T338993.2280

11/13/2024 10:35:02 AM

11/13/2024 10:35:50 AM

No labels with circuit reference on all equipments in change village.

Images

11/13/2024 10:37:38 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 46 Of 87


T338993.2281

Cables hanging on ceiling across change village.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Conor Colton)

Images

11/13/2024 10:39:41 AM 28

T338993.2284

11/13/2024 10:39:57 AM

Lagging incomplete around duct.

Images

11/13/2024 10:44:37 AM 29

T338993.2285

11/13/2024 10:44:44 AM

Screw securing the Saddle failed.

Images

11/13/2024 10:45:52 AM 30

T452415.244

11/13/2024 10:46:02 AM

Split in shower gully to be welded at joint as risk of cut

Images

11/13/2024 10:54:43 AM 31

T456527.219

Make good to fire stop

Images

11/26/2024 6:16:09 PM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 47 Of 87


Building C>Ground Floor>Unisex WC

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1444

Pipework to be insulated

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/21/2024 3:51:23 PM 2

T350553.1445

10/21/2024 3:51:38 PM

Light missing

Images

10/21/2024 3:52:57 PM 1

T350553.1446

Reset button to be fixed to wall

Images

10/21/2024 3:57:25 PM 3

T350553.1452

Light missing

Images

10/21/2024 4:03:00 PM 4

T350553.1455

Light missing

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 48 Of 87


Images

10/21/2024 4:04:34 PM 5

T350553.1457

Light missing

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/21/2024

10/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/21/2024 4:05:37 PM 6

T350553.1461

All mess to be removed from ceiling tiles

Images

10/21/2024 4:08:49 PM 7

T350553.1462

10/21/2024 4:08:54 PM

cabling incomplete

Images

10/21/2024 4:09:59 PM 8

T350553.1463

Smoke head missing

Images

10/21/2024 4:10:29 PM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 49 Of 87


9

T350553.1739

2nd lighting incomplete

10/31/2024

11/7/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/31/2024 8:55:03 AM

10/31/2024 8:56:06 AM

10/31/2024 8:56:15 AM

10/31/2024 8:56:27 AM

11/7/2024 1:59:29 PM

11/7/2024 2:02:31 PM

11/14/2024 1:47:37 PM

11/14/2024 1:47:44 PM

11/14/2024 1:47:54 PM

11/21/2024 1:25:50 PM

11/21/2024 1:27:00 PM

11/21/2024 1:27:18 PM

10

T452415.63

Temp cables to be removed

11/7/2024 2:02:37 PM

11/14/2024 1:47:28 PM

11/8/2024

11/15/2024

Snag

Opened

M&E

Trident Electrical

Darling Associates (Robyn Harrison­ Church)

11/8/2024

11/15/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

Images

11/8/2024 10:16:46 AM 11

T452415.71

Shower curtain missing

Images

11/8/2024 10:23:47 AM Comments

Created By

Date

Not Halsion, please revert snag to relevant trade

James Parker (Halsion )

11/11/2024 9:46:04 AM

Halsion are down to provide free issue DDA fit out to our fitout contractor, please provide this imminently

Farron O'Hare (McLaughlin & Harvey)

11/12/2024 6:01:58 PM

Shower curtain has now been free issued to contractor

James Parker (Halsion )

11/19/2024 9:47:48 AM

12

T452415.80

Bins missing in sinks

12/5/2024 10:42:41 AM

11/8/2024

Project Name: B5412 Project Honey

11/15/2024

Snag

Opened

Joinery

Original Joinery

Darling Associates (Robyn Harrison­ Church)

Page 50 Of 87


Images

11/8/2024 10:29:48 AM 13

T452415.216

Pipe layout to be reviewed similar to Building B

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Farron O'Hare)

Images

11/13/2024 10:24:39 AM 14

T452415.220

Mastic colour to be confirmed by MCLH

Images

11/13/2024 10:31:26 AM 6

T338993.2277

Missing Smoke detector head.

Images

11/13/2024 10:31:39 AM 15

T452415.222

11/13/2024 10:31:44 AM

Edge of vinyl / coving to be made good

Images

11/13/2024 10:32:59 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 51 Of 87


2

T338993.2282

Light and reset button not installed.

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/14/2024

11/21/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/13/2024 10:41:21 AM 16

T338993.2283

11/13/2024 10:41:25 AM

11/13/2024 10:41:31 AM

Should this Spur be in this room? The steam could cause a fault.

Images

11/13/2024 10:43:09 AM 17

T338993.2286

11/13/2024 10:43:27 AM

Light not installed on all this area.

Images

11/13/2024 10:47:15 AM 18

T350553.2047

11/13/2024 10:47:21 AM

insulation on Pipework incomplete

Images

11/14/2024 1:48:50 PM T350553.2074

11/21/2024 1:25:34 PM

cleaners socket wiring incomplete

Images

11/21/2024 1:28:09 PM 12/5/2024 10:42:41 AM

11/21/2024 1:29:32 PM

11/21/2024 1:29:37 PM Project Name: B5412 Project Honey

Page 52 Of 87


19

T350553.2157

lights to be installed in cubicles

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/27/2024

12/4/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/27/2024 10:28:06 AM 20

T350553.2158

11/27/2024 10:28:19 AM

11/27/2024 10:28:44 AM

insulation required on pipework

Images

11/27/2024 10:29:23 AM Building C>Ground Floor>Woodland Walk Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1243

2nd fix fire alarm/smoke head/call point incomplete

10/11/2024

10/18/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/7/2024 4:18:12 PM 2

T350553.1732

11/21/2024 1:43:10 PM

CCTV wiring incomplete

Images

10/30/2024 4:45:36 PM 3

T353957.127

11/7/2024 4:15:49 PM

Magic man required

12/5/2024 10:42:41 AM

11/21/2024 1:42:54 PM

Project Name: B5412 Project Honey

Page 53 Of 87


Images

11/26/2024 11:48:45 AM Building C>Lower Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.147

Manhole finish to be improved

11/26/2024

12/3/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Groundworks

Mitchellson

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:21:19 PM 2

T353957.149

Finish around extract to be complete

Images

11/26/2024 12:24:14 PM 3

T353957.155

Covers missing containment to be complete

Images

11/26/2024 12:29:19 PM 3

T353957.158

Manhole fixings missing to be replaced

Images

11/26/2024 12:33:37 PM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 54 Of 87


4

T353957.164

Damaged fire stopping

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Pre­Cast Structure

FP McCann

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:44:03 PM 5

T353957.165

Magic man required

Images

11/26/2024 12:44:26 PM 6

T353957.166

Rebar to be cut and protected

Images

11/26/2024 12:45:56 PM 7

T353957.167

Bracket through corridor has sharp edge. To be raised above head height.

Images

11/26/2024 12:48:02 PM 8

T353957.168

11/26/2024 12:48:07 PM

Magic man required

Images

11/26/2024 12:48:19 PM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 55 Of 87


9

T353957.169

Magic man required

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:48:31 PM 10

T353957.170

Temp fire door to be replaced at later date.

Images

11/26/2024 12:49:06 PM 11

T345609.31

Firestopping to be properly secured

Images

11/26/2024 3:04:20 PM

11/26/2024 3:07:29 PM

Building C>Lower Ground Floor>Core 2 Lobby ­ LG

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T327871.950

Screed not completed tight to corner

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

7/31/2024 1:21:02 PM T350553.1721

7/31/2024 1:21:02 PM

2nd lighting incomplete ­ no lights/PIRs installed

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 56 Of 87


Images

10/30/2024 4:17:59 PM

11/14/2024 4:35:22 PM

11/21/2024 2:03:33 PM

Building C>Lower Ground Floor>Cycle Entrance (External) Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2078

CCTV wiring incomplete

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

Images

11/21/2024 1:53:23 PM 1

T353957.144

External fire stopping to be reviewed if secondary coat required

Images

11/26/2024 12:18:41 PM 2

T353957.145

Floor damaged ­ repairs needed

Images

11/26/2024 12:19:28 PM Building C>Lower Ground Floor>Cycle Stacker Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T327871.952

Edges of access hatches have been screened over. not allowing access to tanks below

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 57 Of 87


Images

7/31/2024 1:26:14 PM 2

T327871.953

7/31/2024 1:26:14 PM

7/31/2024 1:26:14 PM

Edges of access hatches have been screened over. not allowing access to tanks below

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

Images

7/31/2024 1:27:00 PM 3

T327871.954

7/31/2024 1:27:00 PM

Poor finish on exposed screed at joint

Images

7/31/2024 1:28:08 PM 4

T327871.955

7/31/2024 1:28:08 PM

7/31/2024 1:28:08 PM

7/31/2024 1:28:08 PM

Edges / Screws of access hatches have been screened over. not allowing access to tanks below

7/31/2024 1:28:08 PM

Images

7/31/2024 1:30:13 PM 5

T327871.956

7/31/2024 1:30:13 PM

7/31/2024 1:30:13 PM

Screws of access hatches have been screened over. not allowing access to tanks below

Images

7/31/2024 1:31:00 PM

12/5/2024 10:42:41 AM

7/31/2024 1:31:00 PM

Project Name: B5412 Project Honey

Page 58 Of 87


6

T327871.957

Poor finish on exposed screed at joint

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

Images

7/31/2024 1:32:22 PM 7

T327871.958

7/31/2024 1:32:22 PM

7/31/2024 1:32:22 PM

7/31/2024 1:32:22 PM

Gullies screeded in off plumb

Images

7/31/2024 1:33:27 PM 8

T327871.959

Screws of access hatches have been screened over. not allowing access to tanks below

Images

7/31/2024 1:34:12 PM 9

T327871.960

7/31/2024 1:34:12 PM

Edges / Screws of access hatches have been screened over. not allowing access to tanks below

Images

7/31/2024 1:34:41 PM 10

T327871.961

Edges / Screws of access hatches have been screened over. not allowing access to tanks below

Images

7/31/2024 1:35:50 PM 12/5/2024 10:42:41 AM

7/31/2024 1:35:50 PM

7/31/2024 1:35:50 PM Project Name: B5412 Project Honey

Page 59 Of 87


T350553.2077

ID labels required on insulation to rain water harvesting room

11/21/2024

11/28/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Blockwork

Swift Group UK

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/21/2024 1:49:38 PM 11

T353957.148

11/21/2024 1:49:45 PM

Damaged block work

Images

11/26/2024 12:22:09 PM 12

T353957.150

Mastic to be complete

Images

11/26/2024 12:25:38 PM 13

T353957.151

Junction boxes missing caps

Images

11/26/2024 12:26:15 PM 14

T353957.152

Protection required around cables. Anti tamper installed to pump?

Images

11/26/2024 12:27:09 PM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 60 Of 87


15

T353957.153

General clean required + magic man

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Painting & Decorating

AC Beck

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:27:56 PM 16

T353957.154

Fire stopping to be repaired

Images

11/26/2024 12:28:26 PM 17

T353957.156

Red bike stands to be redone to green

Images

11/26/2024 12:31:38 PM 18

T353957.157

Bike stand bent to be repaired

Images

11/26/2024 12:32:32 PM 19

T353957.159

Each bike rack to be checked for functionality

Images

11/26/2024 12:34:55 PM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 61 Of 87


20

T353957.160

Covers to be installed and cables tidied

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Architect

Darling Associates

McLaughlin & Harvey (Conor Colton)

Images

11/26/2024 12:37:12 PM 21

T456527.218

Cycle rack getting stuck when coming out

Images

11/26/2024 6:04:08 PM Building C>Lower Ground Floor>Single Tier Cycle Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T327871.951

Screed not completed flush with block work

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

7/31/2024 1:23:28 PM T350553.1717

2nd lighting incomplete

Images

10/30/2024 4:09:59 PM T350553.1718

10/30/2024 4:11:39 PM

2nd fix Fire alarm incomplete

12/5/2024 10:42:41 AM

11/14/2024 4:33:43 PM

11/21/2024 2:02:50 PM

Project Name: B5412 Project Honey

Page 62 Of 87


Images

10/30/2024 4:12:11 PM 2

T353957.143

10/30/2024 4:12:17 PM

11/14/2024 4:29:58 PM

Grilles to be installed and area cleaned

11/21/2024 1:54:56 PM 11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Building C>Lower Ground Floor>Stair 2 Shaft Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T1.50501543

Screed underneath stair core 2 has not been fully completed.

7/10/2024

7/19/2024

Incomplete Works

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/9/2024

Incomplete Works

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

Images

7/10/2024 12:16:24 PM T327871.946

7/10/2024 12:16:26 PM

Screed Incomplete underneath stair landing

Images

7/31/2024 1:16:20 PM 1

T327871.947

Poor finish of screed to back of steps

Images

7/31/2024 1:17:17 PM 2

T327871.948

Styrofoam to be removed

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 63 Of 87


Images

7/31/2024 1:18:13 PM 3

T327871.949

Poor finish on exposed screed at joint

7/31/2024

8/7/2024

Snag

Opened

Screed Flooring

UK Sub­Floors

McLaughlin & Harvey (Farron O'Hare)

Images

7/31/2024 1:19:46 PM Building C>Lower Ground Floor>Woodland Walk Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1714

2nd lighting/PIR incomplete

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/30/2024 2:29:05 PM

10/30/2024 2:29:19 PM

10/30/2024 2:29:31 PM

11/7/2024 4:20:58 PM

11/7/2024 4:21:06 PM

11/14/2024 4:25:15 PM

11/14/2024 4:25:34 PM

11/14/2024 4:25:59 PM

11/21/2024 1:47:13 PM 2

T350553.1715

2nd fix Fire alarm incomplete

10/30/2024

11/6/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

10/30/2024 2:30:40 PM

12/5/2024 10:42:41 AM

10/30/2024 2:30:54 PM

11/7/2024 4:20:35 PM

11/14/2024 4:24:04 PM

11/14/2024 4:24:42 PM

Project Name: B5412 Project Honey

11/21/2024 1:45:47 PM

Page 64 Of 87


3

T353957.161

Temp fire door to be installed at later date

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Architect

Darling Associates

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:38:28 PM 4

T353957.162

Light install to be complete

Images

11/26/2024 12:39:58 PM 5

T353957.163

Signage to be reviewed

Images

11/26/2024 12:42:05 PM Building C>Roof (L7)

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.147

Fire alarm missing

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/12/2024 10:27:47 AM T338993.2317

Missing cable references all roof cables.

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 65 Of 87


Images

11/28/2024 10:03:31 AM T338993.2318

11/28/2024 10:03:37 AM

11/28/2024 10:24:13 AM

11/28/2024 10:24:19 AM

Missing equipment references on Green roof. Panels, isolators, etc.

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/28/2024 10:04:17 AM T338993.2319

11/28/2024 10:04:21 AM

11/28/2024 10:04:25 AM

Lightning rod protection is not fixed properly, not stable.

11/28/2024 10:11:35 AM

11/28/2024 10:23:48 AM

Images

11/28/2024 10:06:37 AM T338993.2320

11/28/2024 10:06:37 AM

Cables not secured properly, needs tied up.

Images

11/28/2024 10:09:01 AM T338993.2321

11/28/2024 10:09:14 AM

Cables not secured properly, needs tied up and clipped properly.

Images

11/28/2024 10:10:38 AM

12/5/2024 10:42:41 AM

11/28/2024 10:10:45 AM

Project Name: B5412 Project Honey

Page 66 Of 87


T338993.2322

Water proofing required.

11/28/2024

12/5/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/28/2024 10:14:13 AM T338993.2323

Lightning protection is not connected with the PVE panels.

Images

11/28/2024 10:14:51 AM T338993.2327

11/28/2024 10:14:51 AM

Lights not secured properly, moving a lot.

Images

11/28/2024 10:20:35 AM T338993.2328

Waterproof connection needed.

Images

11/28/2024 10:22:17 AM

11/28/2024 10:22:26 AM

11/28/2024 10:22:43 AM

Building C>Roof (L7)>2dr Lift Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.93

Water leakage from joint into core

11/26/2024

12/3/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Connor Casey)

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 67 Of 87


Images

11/26/2024 10:22:25 AM Building C>Roof (L7)>Core 1 Lobby L07

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.124

fire escape sign missing

11/26/2024

12/29/2024

Client Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

11/26/2024

12/3/2024

Client Snag

Opened

Lifts

Otis

McLaughlin & Harvey (Conor Colton)

Images

11/26/2024 5:32:15 PM 2

T456527.217

Lift sign to say 7b not m7 as with car park signs

Images

11/26/2024 5:32:58 PM Building C>Roof (L7)>Core 1 Lobby L07­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.49

Where slot drain has been damaged to be made good

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/7/2024 11:07:46 AM

11/7/2024 11:07:55 AM

Building C>Roof (L7)>PV Array Roof L07 Reference

Description

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 68 Of 87


1

T350553.1950

2nd fix external lighting incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Trident Electrical

Darling Associates (Robyn Harrison­ Church)

Images

11/7/2024 5:42:21 PM T350553.1951

11/7/2024 5:44:31 PM

2nd fix fire alarm incomplete

11/7/2024 5:44:41 PM

11/14/2024 5:18:37 PM

11/14/2024 5:18:46 PM

Images

11/7/2024 5:45:17 PM 2

T452415.141

11/14/2024 5:18:03 PM

Lightning protection to be completed

Images

11/12/2024 10:21:30 AM 3

T452415.142

Tap to be lagged

Images

11/12/2024 10:22:10 AM 4

T452415.143

Clip to be removed

Images

11/12/2024 10:22:35 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 69 Of 87


5

T452415.145

Panel numbers to be removed

11/12/2024

11/19/2024

Snag

Opened

Pre­Cast Structure

FP McCann

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/21/2024

11/28/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/12/2024 10:23:55 AM 6

T452415.146

Cabelling to solar panels to be completed

Images

11/12/2024 10:27:18 AM T350553.2082

BMS wiring incomplete

Images

11/21/2024 6:19:23 PM T350553.2083

Small power wiring incomplete Outdoor socket not installed

Images

11/21/2024 6:20:41 PM 7

T353957.88

Dry riser glass missing

Images

11/26/2024 10:09:46 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 70 Of 87


8

T353957.96

Lightning protection to secured correctly

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

12/3/2024

12/10/2024

Client Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

11/26/2024 10:33:53 AM 9

T353957.100

11/26/2024 10:34:00 AM

Damaged fins for condenser units

Images

11/26/2024 10:47:10 AM 10

T408928.132

11/26/2024 10:47:17 AM

lock to be put on door.

11/26/2024 10:47:27 AM

Building C>Roof (L7)>Roof Garden L07 Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.31

Soil has sunk, to be brought back flush with resin

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

Images

11/7/2024 10:50:09 AM 2

T452415.32

Area to be deweeded

Images

11/7/2024 10:50:55 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 71 Of 87


3

T452415.33

Bolts rusting

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/18/2024

Snag

Opened

Architect

Darling Associates

McLaughlin & Harvey (Connor Casey)

Images

11/7/2024 10:52:47 AM 4

T452415.34

chipped paint to be touched up

Images

11/7/2024 10:53:10 AM 5

T452415.35

Resin to be removed

Images

11/7/2024 10:53:32 AM 6

T452415.36

Area to be deweeded

Images

11/7/2024 10:53:51 AM 7

T345609.1

11/7/2024 10:53:56 AM

Door threshold to be raised approx. 18mm level with gully track. small slope to be added internal with floor finish.

Images

11/7/2024 10:53:38 AM 12/5/2024 10:42:41 AM

11/7/2024 10:53:45 AM

11/7/2024 10:53:53 AM Project Name: B5412 Project Honey

Page 72 Of 87


8

T452415.37

Seedum to be touched up

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/18/2024

Snag

Opened

Architect

Darling Associates

McLaughlin & Harvey (Connor Casey)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

Images

11/7/2024 10:54:18 AM 9

T452415.38

Area to be deweeded / hole to be filled

Images

11/7/2024 10:55:05 AM 10

T345609.2

11/7/2024 10:57:10 AM

bolts to be painted

Images

11/7/2024 10:54:51 AM 11

T452415.39

Patches of seedum to be filled

Images

11/7/2024 10:56:59 AM 12

T452415.40

Spec of tree to be confirmed not correct height

Images

11/7/2024 10:58:16 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 73 Of 87


13

T452415.41

Dead rosemary to be cut off or replaced

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

Images

11/7/2024 10:59:16 AM 14

T452415.42

Area where bark is too high

Images

11/7/2024 10:59:45 AM 15

T452415.43

Area to be deweeded

Images

11/7/2024 11:00:26 AM 16

T452415.44

11/7/2024 11:00:33 AM

Final clean to be completed

Images

11/7/2024 11:04:32 AM 17

T452415.45

Rough edge to be removed

Images

11/7/2024 11:04:57 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 74 Of 87


18

T452415.46

Area to be deweeded

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

Images

11/7/2024 11:06:02 AM 19

T452415.47

split timbers

Images

11/7/2024 11:06:35 AM 20

T452415.48

Is this plant required

Images

11/7/2024 11:07:00 AM 21

T452415.50

Water trapped at top of frame

Images

11/7/2024 11:09:20 AM 22

T452415.51

Knots to be touched up with paint

Images

11/7/2024 11:11:11 AM 12/5/2024 10:42:41 AM

11/7/2024 11:11:31 AM Project Name: B5412 Project Honey

Page 75 Of 87


23

T452415.52

Joint in bench to be flush

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/7/2024

11/14/2024

Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

Images

11/7/2024 11:12:53 AM 24

T452415.53

Bead size to be confirmed

Images

11/7/2024 11:13:44 AM 25

T452415.54

seedum to be removed

Images

11/7/2024 11:14:42 AM 26

T452415.55

Excess ducts to be removed

Images

11/7/2024 11:15:23 AM 27

T452415.265

Excess ducts to be cut

Images

11/13/2024 12:02:28 PM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 76 Of 87


28

T452415.266

Exposed cable to be tidied / pull cords to be removed in all areas on roof garden

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

Roof Landscaping

Frosts Landscape Construction

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Farron O'Hare)

11/13/2024

11/20/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Farron O'Hare)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/13/2024 12:04:06 PM 29

T452415.267

Electrical boxes to be bwckfiled

Images

11/13/2024 12:06:03 PM 25

T452415.268

Halsion to advise whether cable is to be buried or surface ran

Images

11/13/2024 12:07:10 PM 30

T452415.271

Temp­cable clips to be removed

Images

11/13/2024 12:08:58 PM 31

T353957.91

Lagging to be complete

Images

11/26/2024 10:17:06 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 77 Of 87


Building C>Roof (L7)>Stair 1 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.97

Balustrade to be cleaned

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Roofing

Aym (Services) Limited

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 10:36:15 AM 2

T353957.98

Water through joints

Images

11/26/2024 10:36:52 AM Comments

Created By

Date

design issues

Dariusz Grzelka (Aym (Services) Limited)

11/28/2024 4:41:51 PM

Building C>Roof (L7)>Stair 2 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345609.11

Construction writing to be removed from walls.

11/15/2024

11/22/2024

Snag

Opened

Cleaning

Serna Cleaning

Darling Associates (Robyn Harrison­ Church)

Images

11/15/2024 11:29:13 AM Building C>Second Floor>Core 2 Lobby L02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.82

General clean

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:36:46 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 78 Of 87


2

T353957.83

Temp fixings to be removed.

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Trident Electrical

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:38:01 AM Building C>Second Floor>Electrical Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.2314

Missing cable references on risers.

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/28/2024 9:55:21 AM

11/28/2024 9:55:26 AM

11/28/2024 9:55:31 AM

T338993.2315

Missing schedules and circuit labels on all Dabs.

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

T338993.2316

Additional metal clips on cables, especially when are bending.

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/28/2024 9:57:18 AM

11/28/2024 9:57:23 AM

11/28/2024 9:57:46 AM

Building C>Second Floor>Second Floor (Mezz) Parking Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.379

Trunking damaged

7/29/2024

8/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

7/29/2024 5:13:00 PM

12/5/2024 10:42:41 AM

7/29/2024 5:13:05 PM

7/29/2024 5:13:24 PM

7/29/2024 5:13:29 PM

Project Name: B5412 Project Honey

Page 79 Of 87


1

T452415.160

complete all firestopping

11/12/2024

11/19/2024

Snag

Opened

Fire Stopping

Middlesex Limited

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Cleaning

Serna Cleaning

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Trident Electrical

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Halsion

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 10:39:41 AM 2

T452415.161

Area to be cleaned

Images

11/12/2024 10:40:23 AM 3

T452415.162

Containment lid missing

Images

11/12/2024 10:40:55 AM 4

T452415.165

Containment that has oxidised to be cleaned and repainted / replaced

Images

11/12/2024 10:42:56 AM 5

T452415.166

Pipe leaking

Images

11/12/2024 10:43:35 AM 12/5/2024 10:42:41 AM

11/12/2024 10:43:43 AM Project Name: B5412 Project Honey

Page 80 Of 87


6

T353957.113

Containment to be replaced

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:21:27 AM 7

T353957.114

11/26/2024 11:21:33 AM

Damaged light

Images

11/26/2024 11:23:53 AM 8

T353957.115

Damaged clip on light

Images

11/26/2024 11:25:27 AM Building C>Second Floor>Second Floor Parking Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T338993.376

Saddle damaged

7/29/2024

8/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

7/29/2024

8/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

7/29/2024 4:54:37 PM T338993.377

7/29/2024 4:54:45 PM

Saddle damaged

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 81 Of 87


Images

7/29/2024 4:56:07 PM T338993.378

7/29/2024 4:56:12 PM

Trunking damaged

7/29/2024

8/5/2024

Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/12/2024

11/19/2024

Snag

Opened

Fire Stopping

Middlesex Limited

Darling Associates (Robyn Harrison­ Church)

11/20/2024

11/27/2024

Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

Images

7/29/2024 4:57:34 PM 1

T452415.167

7/29/2024 4:57:41 PM

7/29/2024 4:57:48 PM

7/29/2024 4:57:53 PM

complete all firestopping

Images

11/12/2024 10:44:57 AM 2

T345609.24

Paint not finished to an acceptable level around aco channel. Remedial to be carried out

Images

11/20/2024 6:06:25 PM

11/20/2024 6:07:23 PM

11/20/2024 6:07:35 PM

11/20/2024 6:07:40 PM

Building C>Second Floor>Stair 2 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.71

Handrail misaligned + touched up

11/14/2024

11/21/2024

Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Connor Casey)

Images

11/14/2024 8:40:06 AM 12/5/2024 10:42:41 AM

11/14/2024 8:41:11 AM Project Name: B5412 Project Honey

Page 82 Of 87


2

T345609.18

Stair misalignment to be reviewed ­ railings secured correctly.

11/15/2024

11/22/2024

Snag

Opened

Metalwork

CMF

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/3/2024

Client Snag

Opened

Metalwork

CMF

McLaughlin & Harvey (Connor Casey)

Images

11/15/2024 11:43:20 AM 3

T353957.84

11/15/2024 11:43:27 AM

Balustrade improved but still out of tolerance

Images

11/26/2024 9:40:39 AM

11/26/2024 9:40:46 AM

11/26/2024 9:40:51 AM

Building C>Sixth Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.106

Damaged flashing

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 10:58:37 AM Building C>Sixth Floor>Electrical Riser Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.1945

power cabling incomplete

11/7/2024

11/14/2024

Incomplete Works

Opened

M&E

Halsion

McLaughlin & Harvey (Ian Robertson)

Images

11/7/2024 5:11:27 PM

12/5/2024 10:42:41 AM

11/14/2024 5:08:13 PM

11/21/2024 3:17:43 PM

Project Name: B5412 Project Honey

Page 83 Of 87


T338993.2324

Cables not secured properly, needs a unistrut to support the cables.

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

11/28/2024

12/5/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Vanngel Natso)

Images

11/28/2024 10:15:25 AM T338993.2325

11/28/2024 10:15:33 AM

Truncking incomplete.

Images

11/28/2024 10:17:33 AM T338993.2326

11/28/2024 10:17:37 AM

Additional containment required for cable handing.

11/28/2024 10:17:45 AM

Images

11/28/2024 10:18:40 AM

11/28/2024 10:18:44 AM

Building C>Sixth Floor>Sixth Floor (Mezz) Parking

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.151

Writing to be removed

11/12/2024

11/19/2024

Snag

Opened

Pre­Cast Structure

FP McCann

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/12/2024 10:31:26 AM 2

T353957.101

Fire exit signage to be installed

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 84 Of 87


Images

11/26/2024 10:49:11 AM Building C>Sixth Floor>Sixth Floor Parking

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T452415.157

complete all firestopping

11/12/2024

11/19/2024

Snag

Opened

Fire Stopping

Middlesex Limited

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

M&E

Trident Electrical

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/3/2024

Client Snag

Opened

Fire Stopping

Middlesex Limited

McLaughlin & Harvey (Connor Casey)

11/26/2024

12/3/2024

Client Snag

Opened

Pre­Cast Structure

FP McCann

McLaughlin & Harvey (Connor Casey)

Images

11/12/2024 10:35:47 AM 2

T452415.158

Clips to be removed

Images

11/12/2024 10:36:17 AM 3

T353957.102

Damaged fire stopping to be repaired

Images

11/26/2024 10:51:14 AM 4

T353957.104

Cracks in beam to be monitored and checked within tolerance

Images

11/26/2024 10:53:51 AM 12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 85 Of 87


5

T353957.105

Door to replaced at later date

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 10:57:05 AM Building C>Third Floor>Core 1 Lobby L03

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.111

Magic man to repair

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:16:53 AM Building C>Third Floor>Core 1 Lobby L03­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.109

All Doors to be inspected for damage and touched up

11/26/2024

12/3/2024

Client Snag

Opened

Joinery

Original Joinery

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:15:11 AM

11/26/2024 11:15:19 AM

Building C>Third Floor>Stair 1 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.110

Magic man to repair

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:15:57 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 86 Of 87


2

T353957.112

Magic man to repair

11/26/2024

12/3/2024

Client Snag

Opened

Cleaning

Serna Cleaning

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 11:18:22 AM Building C>Third Floor>Stair 2 Shaft

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.86

Floor finish to complete

11/26/2024

12/3/2024

Client Snag

Opened

Floor Waterproofing

4M Floors UK Ltd

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:50:08 AM Building C>Third Floor>Third Floor (Mezz) Parking

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.85

Missing labels on sockets ­ all to be checked

11/26/2024

12/3/2024

Client Snag

Opened

M&E

Halsion

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 9:47:40 AM

12/5/2024 10:42:41 AM

Project Name: B5412 Project Honey

Page 87 Of 87


Project Honey – External Works Snag Report 05.12.24

FH090-151015


B5412 Project Honey Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.614

back in quite thin layer, could do with being topped up

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:13:10 PM T444645.615

11/27/2024 1:13:20 PM

General clean required

Images

11/27/2024 1:15:45 PM T444645.616

positioning of plants to be reviewed

Images

11/27/2024 1:16:56 PM T444645.617

general comment ­ planting & shingle around edges to be complete

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

T444645.618

capping bolts required to bench bases

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:29:12 PM

12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 1 Of 7


T444645.619

paving shouldn’t be exposed, soil to run to edging

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:31:12 PM T444645.620

soil to be reduced around edges prior to bark being installed

Images

11/27/2024 1:32:43 PM T444645.621

11/27/2024 1:32:48 PM

11/27/2024 1:32:53 PM

could this not be rotated?

Images

11/27/2024 1:36:27 PM T444645.622

branches to be released on all trees

Images

11/27/2024 1:39:45 PM T444645.623

very poor finish on this one bench. looks like it’s molding unlike the rest

Images

11/27/2024 1:41:03 PM 12/5/2024 10:46:20 AM

11/27/2024 1:41:09 PM Project Name: B5412 Project Honey

Page 2 Of 7


T444645.624

resin to be cleaned out prior to tree bark

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:43:34 PM T444645.625

11/27/2024 1:43:50 PM

aco to be cleaned out

Images

11/28/2024 9:51:38 AM T444645.626

finishes to be reviewed where there is discoloration

Images

11/28/2024 9:57:54 AM T444645.627

concrete to be taken back to ensure correct depth of shingle

Images

11/28/2024 10:00:05 AM T444645.628

concrete to be faced off as will be visible

Images

11/28/2024 10:06:03 AM 12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 3 Of 7


T444645.629

shingle to be above concrete upstand locally

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/28/2024 10:07:41 AM T444645.630

fillet to be tidied up ­ brook street planter

Images

11/28/2024 10:09:11 AM T444645.631

broken paver ­ gaps around portal frame to be reviewed. brook street ramp

Images

11/28/2024 10:10:17 AM T444645.632

metal edging to be cleaned down

Images

11/28/2024 10:11:36 AM

11/28/2024 10:11:53 AM

Building A>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1262

make good to flood grille upstand

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 4 Of 7


Images

11/22/2024 10:50:50 AM 2

T345545.1263

11/22/2024 10:50:55 AM

make good to flood grille upstand

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 10:52:14 AM 3

T345545.1276

11/22/2024 10:52:18 AM

detail behind brickwork and against facade to be confirmed and completed

Images

11/22/2024 11:22:37 AM 4

T345545.1288

make good to wall ahead of flood grille install

Images

11/22/2024 11:49:40 AM Building A>Ground Floor>00­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.634

how will this be finished ?

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/28/2024 10:20:17 AM 12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 5 Of 7


2

T444645.712

paving cuts to be improved

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:24:21 AM Building B>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1279

one row of tactiles missing

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/22/2024 11:25:28 AM 2

T459973.21

Resin left too low leaving excessive step and visible packers

Images

12/3/2024 10:06:18 AM 3

T444645.672

12/3/2024 10:06:23 AM

Resin to be cleaned from bottom of equitone panels

Images

12/3/2024 10:16:12 AM

12/3/2024 10:16:17 AM

12/3/2024 10:16:24 AM

Building B>Ground Floor>00­01 Reception Reference

Description

12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 6 Of 7


1

T459973.4

Shingle/gravel to be completed

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (sam peach)

Images

12/3/2024 9:49:03 AM Building B>Ground Floor>00­15 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1283

under flood grilles to be made good

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 11:30:46 AM Building C>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1289

landscaping around edgings incomplete

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 11:50:27 AM Building C>Ground Floor>Entrance/Exit Ramp

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.137

Aco channel to be replaced

11/26/2024

12/3/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:01:14 PM

12/5/2024 10:46:20 AM

11/26/2024 12:01:24 PM

Project Name: B5412 Project Honey

Page 7 Of 7


Project Honey – Façade Snag Report 05.12.24

FH090-151015


Building A>Eighth Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1099

handrail joint is too far apart and to be adjusted

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:01:52 PM

11/21/2024 1:34:25 PM

12/4/2024 9:28:24 AM

Comments

Created By

Date

completed

Bartosz Markowski (Clarke Facades)

11/21/2024 1:34:22 PM

still step in joint

Conor Colton (McLaughlin & Harvey)

12/4/2024 9:28:37 AM

2

T456527.197

External curve trim to be aligned better

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/26/2024 2:57:47 PM Building A>Eighth Floor>08­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.101

end cap needed or improved detail

11/26/2024

12/29/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/26/2024

12/29/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/26/2024 2:46:39 PM 2

T408928.103

misaligned joints above glazing

Images

11/26/2024 2:52:12 PM

11/26/2024 2:52:19 PM

11/26/2024 2:52:28 PM

Building A>Eighth Floor>08­05 Corridor 01

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 1 Of 136


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.161

Gaps under door to be filled

11/25/2024

12/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/25/2024 2:10:08 PM Comments

Created By

Date

STATUS CHANGE: Photo required

Dominic Driver (McLaughlin & Harvey)

12/4/2024 8:26:55 AM

Building A>Eighth Floor>08­08 Plant Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1116

opening to be weathered?

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/12/2024 12:32:16 PM 2

T345546.1356

Clarkes to complete weathering externally on render to open holes as per pictures

Images

11/13/2024 2:55:44 PM 3

T345546.1358

11/13/2024 2:55:50 PM

clean metal panel and far Northeast corner

11/13/2024 2:55:56 PM

Images

11/13/2024 2:58:44 PM Building A>Eighth Floor>Terrace Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 2 Of 136


1

T427849.1446

Joint in glazing starter track not good and needs to be made good

11/11/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/11/2024 3:23:48 PM

11/11/2024 3:23:55 PM

11/22/2024 3:46:33 PM

12/4/2024 9:26:35 AM

12/4/2024 9:26:39 AM

Comments

Created By

Date

redo, not good enough

Conor Colton (McLaughlin & Harvey)

12/4/2024 9:26:41 AM

2

T427849.1448

Joint of balustrade on top of glazing not good enough and needs to be made good

11/11/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/11/2024 3:27:37 PM

11/22/2024 3:49:07 PM

12/4/2024 9:33:34 AM

Comments

Created By

Date

completed

Bartosz Markowski (Clarke Facades)

11/22/2024 3:49:04 PM

1

T345545.1096

misalignment in balustrade channel

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:00:03 PM

11/22/2024 3:45:49 PM

12/4/2024 9:26:00 AM

Comments

Created By

Date

still not aligned correctly

Conor Colton (McLaughlin & Harvey)

12/4/2024 9:26:14 AM

3

T345545.1097

glass panel is chipped

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:00:25 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 3 Of 136


4

T345545.1101

gaps in glazing are inconsistent on adjacent panels

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:03:22 PM

11/12/2024 12:03:29 PM

11/12/2024 12:03:48 PM

Comments

Created By

Date

glass has been adjusted

Bartosz Markowski (Clarke Facades)

11/21/2024 1:35:16 PM

still inconsistencies in the gaps

Conor Colton (McLaughlin & Harvey)

12/4/2024 9:30:34 AM

5

T427849.1474

Scratch on facade to be made good

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:04:22 PM 6

T345546.1270

Could we move the panel over to cover the open patch

Images

11/12/2024 12:04:41 PM 7

T345545.1102

glass panel is chipped

Images

11/12/2024 12:04:33 PM

12/5/2024 10:27:35 AM

11/12/2024 12:04:50 PM

Project Name: B5412 Project Honey

Page 4 Of 136


8

T427849.1475

Dent on panel to be made good

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:05:08 PM 9

T345545.1103

glass panel is chipped

Images

11/12/2024 12:06:34 PM 10

T345545.1104

roughened joint of handrail to be made good

Images

11/12/2024 12:07:24 PM

11/22/2024 3:48:07 PM

12/4/2024 9:32:38 AM

Comments

Created By

Date

completed

Bartosz Markowski (Clarke Facades)

11/22/2024 3:48:05 PM

still not good enough

Conor Colton (McLaughlin & Harvey)

12/4/2024 9:32:49 AM

11

T345545.1106

glass panel is damaged

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:08:35 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 5 Of 136


12

T345545.1109

gaps in glazing are inconsistent on adjacent panels

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 12:11:14 PM

11/12/2024 12:11:21 PM

Comments

Created By

Date

glass has been adjusted

Bartosz Markowski (Clarke Facades)

11/21/2024 1:38:49 PM

still inconsistent

Conor Colton (McLaughlin & Harvey)

12/4/2024 9:36:21 AM

13

T345545.1110

scratch on facade panel high level

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/12/2024 12:12:09 PM 14

T408928.60

damaged glass balustrade

Images

11/13/2024 2:25:08 PM

11/22/2024 3:46:07 PM

Comments

Created By

Date

completed

Bartosz Markowski (Clarke Facades)

11/22/2024 3:46:04 PM

still an issue. neeeds to be replaced

Luke Nurser (Francis Hunter)

11/26/2024 2:54:31 PM

15

T345546.1341

damage curved glass

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

11/13/2024 2:27:36 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 6 Of 136


16

T408928.62

damaged glass balustrade

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/13/2024 2:30:48 PM 17

T408928.63

glass balustrade damaged on 3 curved glass panels on south west corner .

Images

11/13/2024 2:31:39 PM 18

T345546.1344

11/13/2024 2:32:01 PM

Damage to high­level panel

11/13/2024 2:32:21 PM

Images

11/13/2024 2:33:21 PM 19

T345546.1345

Damage to glass on south elevation

Images

11/13/2024 2:35:26 PM 20

T408928.64

damaged glass balustrade

Images

11/13/2024 2:35:42 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 7 Of 136


21

T345546.1448

scratch to upper panels

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/5/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/26/2024

12/29/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/26/2024 2:48:35 PM 22

T345546.1449

Brie solei alignment inconsistent throughout

Images

11/26/2024 2:50:48 PM 23

T408928.104

11/26/2024 2:50:56 PM

damaged spandrel

Images

11/26/2024 3:02:32 PM 24

T456527.198

Scratches in black plastic to be made good

Images

11/26/2024 3:03:56 PM 25

T408928.130

missing screws

11/26/2024 3:04:01 PM

Images

11/29/2024 1:10:24 PM Building A>First Floor 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 8 Of 136


1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.70

dent in transom

11/20/2024

11/25/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/20/2024 11:54:29 AM Building A>First Floor>01­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.79

Gap in transom edge to be made good

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/20/2024 11:48:06 AM 2

T456527.80

Gap in transom edge to be made good

Images

11/20/2024 11:49:23 AM 3

T456527.81

Panel is undersized and screws showing

Images

11/20/2024 11:50:07 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 9 Of 136


4

T456527.82

White panel is bent

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/25/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/20/2024 11:51:00 AM 5

T456527.83

Is there a reason for such a large gap

Images

11/20/2024 11:51:53 AM 6

T345546.1399

damage to Mullion

Images

11/20/2024 11:53:04 AM 7

T345546.1400

11/20/2024 11:53:45 AM

damage to top transom

Images

11/20/2024 11:54:24 AM 8

T408928.71

scratch in top transom

Images

11/20/2024 11:55:13 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 10 Of 136


9

T345546.1401

damage to mullion

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 11:55:26 AM 10

T345546.1402

Damage on white panel and Mullion as per the picture

Images

11/20/2024 11:56:11 AM 11

T345546.1403

Scratches to Mullion all the way up from top to bottom

Images

11/20/2024 11:56:55 AM 11

T345546.1404

Damage to white panel next to column

Images

11/20/2024 11:57:24 AM 12

T345546.1405

Damage to Mullion from top to bottom

Images

11/20/2024 11:58:28 AM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 11 Of 136


13

T408928.72

damage to top corner of mullion

11/20/2024

11/25/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 11:59:08 AM 14

T345546.1406

damages on all millions, transoms (top and bottom) and white panels ­ all need respraying. we will highlight big damages only as individual snags

Images

11/20/2024 12:00:09 PM 15

T345546.1407

11/20/2024 12:00:15 PM

white panel is flapping too much

Images

11/20/2024 12:01:47 PM 16

T345546.1409

What panels are not taped and are flapping too much

Images

11/20/2024 12:04:56 PM 17

T345546.1410

transom badly damaged

Images

11/20/2024 12:05:50 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 12 Of 136


18

T456527.94

Chip in million to be made good

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 12:08:09 PM 19

T345545.1317

detail to be improved, glue is evident and panel is easily removed

Images

11/29/2024 12:39:50 PM 20

T345545.1318

11/29/2024 12:39:55 PM

detail to be improved, glue is evident and panel is easily removed

Images

11/29/2024 12:40:39 PM T345545.1322

side rise shouldnt be visible on a CAT A floor. to be covered with a backing panel

Images

11/29/2024 12:48:37 PM

11/29/2024 12:48:42 PM

Building A>Fourth Floor>04­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.208

Metal plate is not flush against facade

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 13 Of 136


Images

11/26/2024 4:30:53 PM 2

T456527.209

General ­ Metal plate is not flush against facade in highlighted area

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/26/2024 4:36:33 PM

11/26/2024 4:36:41 PM

11/26/2024 4:36:57 PM

Building A>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1208

damaged transom

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/20/2024 2:31:40 PM 2

T345545.1261

crack in glass balustrade

Images

11/22/2024 10:49:10 AM 3

T345545.1268

metal flashing missing

Images

11/22/2024 10:59:57 AM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 14 Of 136


4

T345545.1269

grout on plinths is different to brickwork ­ is it as per spec?

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 11:00:41 AM Comments

Created By

Date

grout on plinths as per spec, we have no access to see spec from brickworks

Bartosz Markowski (Clarke Facades)

11/28/2024 1:49:37 PM

5

T345545.1270

metal flashing missing / EPDM to be tidied up

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 11:02:23 AM 6

T345545.1277

GRC column incomplete

Images

11/22/2024 11:23:33 AM 7

T345545.1278

metal flashing missing

Images

11/22/2024 11:24:02 AM 8

T345545.1282

damage to portal cladding

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 15 Of 136


Images

11/22/2024 11:28:58 AM 9

T345545.1287

incomplete works ­ what fills gap in plinths

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/27/2024

12/4/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/27/2024

12/4/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/22/2024 11:40:33 AM 10

T456527.246

Make good to damages on upper transom

Images

11/27/2024 10:14:58 AM 11

T456527.250

Damages to end of plate

Images

11/27/2024 10:18:32 AM 12

T444645.642

11/27/2024 10:18:38 AM

General comment ­ making good to GRC to be completed

Images

11/29/2024 10:37:36 AM

12/5/2024 10:27:35 AM

11/29/2024 10:37:42 AM

Project Name: B5412 Project Honey

Page 16 Of 136


13

T444645.646

rails behind equitone visable, to be painted black or be consistent with the rest

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 10:47:08 AM 14

T444645.654

grc making good to be completed

Images

11/29/2024 11:00:40 AM 15

T345545.1291

11/29/2024 11:00:47 AM

inconsistent finishing

Images

11/29/2024 11:13:50 AM 16

T444645.662

what is the detail around the bottom of the glass? incomplete

Images

11/29/2024 11:13:47 AM 17

T345545.1346

11/29/2024 11:13:52 AM

right hand door doesn’t open

Images

11/29/2024 3:03:04 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 17 Of 136


Building A>Ground Floor>00­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.80

scratched transom

11/20/2024

11/25/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 1:49:04 PM 2

T345546.1418

tidy up side rise insulation high level

Images

11/20/2024 1:49:01 PM 3

T345545.1167

damage to edge of transom

Images

11/20/2024 1:49:16 PM 4

T345546.1419

General item – re­spray all damaged transoms, mullions and white panels throughout. we will record large damage as a separate specific item

Images

11/20/2024 1:50:02 PM 5

T345546.1420

11/20/2024 1:50:11 PM

Remove protection on upper transoms throughout

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 18 Of 136


Images

11/20/2024 1:50:40 PM 6

T345546.1421

11/20/2024 1:50:47 PM

Cut in white panel has a poor finish we meeting the column

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 1:51:57 PM 7

T345545.1171

11/20/2024 1:52:05 PM

11/20/2024 1:52:21 PM

damage to transom to be made good throughout ­ after material has been fully cleared

11/20/2024 1:52:35 PM

Images

11/20/2024 1:53:27 PM 8

T345545.1173

11/20/2024 1:53:34 PM

damaged transom

Images

11/20/2024 1:55:13 PM 9

T345545.1174

joints to be cleaned up on transom

Images

11/20/2024 1:55:58 PM

12/5/2024 10:27:35 AM

11/20/2024 1:56:05 PM

Project Name: B5412 Project Honey

Page 19 Of 136


10

T345545.1175

damaged transom

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/28/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

11/20/2024 1:56:18 PM 11

T456527.120

11/20/2024 1:56:24 PM

Complete detail above all doors

Images

11/20/2024 1:56:36 PM 12

T345545.1176

damaged transom

Images

11/20/2024 1:57:01 PM 13

T345545.1177

damaged mullion (front face)

Images

11/20/2024 1:57:41 PM 14

T345546.1423

Corner detail to be completed ­ mastic required

Images

11/20/2024 1:57:12 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 20 Of 136


15

T345545.1178

damaged transom

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 1:58:04 PM 16

T345545.1179

damaged transom

Images

11/20/2024 1:59:07 PM 17

T345545.1180

damaged mullion (left face)

Images

11/20/2024 2:00:08 PM 18

T345545.1181

damaged transom

Images

11/20/2024 2:00:38 PM 19

T345545.1182

damaged mullion (front face)

Images

11/20/2024 2:01:09 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 21 Of 136


20

T345545.1183

damaged transom

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 2:01:23 PM 21

T444645.633

flashing to be installed here? visible steel

11/28/2024

12/5/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

22

T444645.651

insulation not be visable

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 10:56:18 AM 23

T444645.653

touch ups required to GRC ­ General comment

Images

11/29/2024 10:59:04 AM 24

T444645.655

excessive gap behind brick plinth and side rise tape visable

Images

11/29/2024 11:03:36 AM 25

T444645.656

11/29/2024 11:04:23 AM

area incomplete and not ready for snagging

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 22 Of 136


Images

11/29/2024 11:06:14 AM 26

T444645.657

11/29/2024 11:06:19 AM

11/29/2024 11:06:24 AM

exposed obex, what is the detail here?

11/29/2024 11:06:29 AM

11/29/2024 11:06:35 AM 11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 11:07:13 AM 27

T444645.658

exposed edges in some places but not others ­ profile to be reviewed

Images

11/29/2024 11:08:16 AM 28

T444645.659

11/29/2024 11:08:20 AM

excessive gap ­ obex visable

Images

11/29/2024 11:09:54 AM 29

T444645.660

epdm to be sealed fully ­ water ingress concerns

Images

11/29/2024 11:10:43 AM

12/5/2024 10:27:35 AM

11/29/2024 11:10:52 AM

11/29/2024 11:10:57 AM

Project Name: B5412 Project Honey

Page 23 Of 136


30

T444645.661

capping to balustrades to be installed

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 11:12:52 AM 31

T444645.663

callings required to balustrade rails

Images

11/29/2024 11:15:20 AM 32

T444645.664

inconsistency in soffit cladding to be reviewed

Images

11/29/2024 11:16:47 AM 33

T345545.1341

rubber seal missing at bottom of panel

Images

11/29/2024 2:47:41 PM 34

T444645.665

soffit Joint alignment to be improved

Images

11/29/2024 2:48:20 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 24 Of 136


35

T345545.1342

mastic at bottom corner of joint to be improved

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 2:53:33 PM 36

T350553.2195

Scratches on internal mullion to be painted good

Images

11/29/2024 2:53:47 PM 37

T345545.1343

11/29/2024 2:53:53 PM

incomplete mastic joint

11/29/2024 2:54:00 PM

Images

11/29/2024 2:57:48 PM 38

T345545.1344

incomplete head detail at door

Images

11/29/2024 2:58:44 PM 39

T345545.1345

scratch on million

Images

11/29/2024 3:00:21 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 25 Of 136


40

T345545.1347

backing panel popping off

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 3:04:43 PM 41

T345545.1348

black film to be removed from underside of high level transoms

Images

11/29/2024 3:05:46 PM 42

T345545.1349

joint between drywall and facade to be cleaned up

Images

11/29/2024 3:06:39 PM Building A>Ground Floor>00­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.505

This item hanging down to be fixed properly

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/4/2024 2:06:52 PM Building A>Ground Floor>00­09 Reception Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 26 Of 136


1

T345545.1202

finish high level insulation

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/25/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 2:28:36 PM 2

T345545.1203

transom and millions are battered where the window was left off for so long. to be repaired

Images

11/20/2024 2:29:14 PM 3

T345545.1204

11/20/2024 2:29:20 PM

damaged transom

11/20/2024 2:29:25 PM

Images

11/20/2024 2:29:46 PM 4

T408928.82

11/20/2024 2:29:51 PM

scratch externally on glass

Images

11/20/2024 2:29:53 PM 5

T345545.1205

damaged mullion (front face)

Images

11/20/2024 2:30:29 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 27 Of 136


6

T345545.1206

damaged transom

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/20/2024

11/27/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/20/2024 2:30:45 PM 7

T345545.1207

11/20/2024 2:30:52 PM

damaged mullion (front face)

Images

11/20/2024 2:31:20 PM 8

T345545.1209

damaged mullion (front face)

Images

11/20/2024 2:32:05 PM 9

T345545.1210

damaged transom

Images

11/20/2024 2:34:02 PM 10

T345545.1336

aluprof tape to be removed

Images

11/29/2024 2:37:41 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 28 Of 136


11

T345545.1337

scratch on mullion

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 2:38:17 PM 12

T345545.1338

scratch on mullion

Images

11/29/2024 2:38:40 PM Building A>Ground Floor>00­12 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.495

Sealing to be improved around the door opening

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/4/2024 1:41:33 PM 2

T456527.497

Should above entrance have insulation in large opening

Images

12/4/2024 1:44:18 PM Building A>Ground Floor>00­18 Service Yard Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 29 Of 136


1

T456527.506

Filler required along joint

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

12/4/2024 2:14:22 PM 2

T456527.507

All damages to be made good to render

Images

12/4/2024 2:15:13 PM 3

T456527.508

12/4/2024 2:15:20 PM

Door latch to be installed

Images

12/4/2024 2:15:29 PM Building A>Ground Floor>00­19 Refuse Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.640

General Snag ­ GRC gaps to be consistent

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 10:34:23 AM 2

T444645.641

FH to confirm acceptance of inconsistency in mastic joints ­ General Comments

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 30 Of 136


Images

11/29/2024 10:35:59 AM 3

T444645.643

11/29/2024 10:36:05 AM

general comment ­ anywhere where you can see internally behind the GRC columns to receive insect mesh

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/29/2024 10:39:27 AM 4

T444645.644

11/29/2024 10:39:35 AM

all pressure plate capping to be flipped in correctly

Images

11/29/2024 10:40:44 AM 5

T444645.645

joints to high level cladding inconsistent and to be reviewed/improved

Images

11/29/2024 10:44:50 AM 6

T456527.509

11/29/2024 10:45:04 AM

11/29/2024 10:45:28 AM

Make good to dents in door

Images

12/4/2024 2:18:10 PM

12/4/2024 2:18:15 PM

12/4/2024 2:18:19 PM

Building A>Ground Floor>00­25 Corridor Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 31 Of 136


1

T444645.650

touch ups to external door required

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 10:52:47 AM 2

T444645.652

11/29/2024 10:52:55 AM

inconsistent gaps underside of grc columns

Images

11/29/2024 10:58:02 AM

11/29/2024 10:58:08 AM

Building A>Ground Floor>00­27 BoH / Retail

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.647

these are grouted on some areas and not others ­ these need to be grouted and consistent

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 10:49:14 AM 2

T444645.648

11/29/2024 10:49:22 AM

view behind GRC cladding ­ to receive mesh

Images

11/29/2024 10:50:59 AM 3

T444645.649

view to window flashing ­ grouting required to top of brick

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 32 Of 136


Images

11/29/2024 10:51:48 AM

11/29/2024 10:51:52 AM

Building A>Ground Floor>00­31 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.191

Damaged transom to be made good

11/25/2024

12/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/25/2024

12/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/27/2024

12/4/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/25/2024 3:34:00 PM 2

T456527.192

Detail above door to be finished

Images

11/25/2024 3:34:38 PM 3

T456527.248

Complete foil above door

Images

11/27/2024 10:17:00 AM Building A>Second Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T456527.480

Coping to be install on reception roof

12/4/2024

12/11/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 33 Of 136


Images

12/4/2024 11:34:22 AM Building A>Second Floor>02­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T427849.139

Rust on external facade edge needs attention

10/2/2024

10/9/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

10/2/2024 12:57:28 PM Comments

Created By

Date

external acces needed

Weifeng Su (Clarke Facades)

10/11/2024 2:34:13 PM

Building A>Seventh Floor>07­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.115

in fill piece needs re doing. should be aligned with rest of panel, and joint filled. shouldn’t be gap at chamfer

11/26/2024

12/29/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/26/2024 3:51:08 PM Building A>Sixth Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.983

corner detail at west riser is inconsistent at each side, and neither side looks to be a correct design. please address

11/8/2024

11/15/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/8/2024 12:24:21 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 34 Of 136


2

T345545.987

corner detail at west riser is inconsistent at each side, and neither side looks to be a correct design. currently there is exposed insulation on south which cannot be correctplease address

11/8/2024

11/15/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/13/2024

11/20/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/8/2024 12:26:34 PM 3

T345545.1134

residue from stickers on outside of balustrade glazing

Images

11/13/2024 1:41:53 PM 4

T345545.1297

millions are scratched

Images

11/29/2024 11:39:15 AM Building A>Sixth Floor>06­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.589

external gasket missing ­ all 4 sides of this panel

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

Images

10/22/2024 12:52:51 PM 2

T345545.628

10/22/2024 12:53:27 PM

external gasket to be fixed

12/5/2024 10:27:35 AM

10/22/2024 12:53:34 PM

Project Name: B5412 Project Honey

Page 35 Of 136


Images

10/22/2024 1:29:55 PM 3

T345545.629

external gasket to be fixed

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

Images

10/22/2024 1:30:20 PM 4

T345545.630

external gasket to be fixed

Images

10/22/2024 1:30:40 PM 5

T345545.633

external gasket to be fixed

Images

10/22/2024 1:33:13 PM 6

T345545.634

external gasket to be fixed

Images

10/22/2024 1:33:57 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 36 Of 136


7

T345545.635

external gasket to be fixed

10/22/2024

10/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Liana Maltezou)

11/8/2024

11/12/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/8/2024

11/15/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/8/2024

11/12/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/8/2024

11/12/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

10/22/2024 1:34:16 PM 8

T408928.24

scratch ­ make good

Images

11/8/2024 2:24:06 PM 9

T408928.28

11/8/2024 2:24:44 PM

gasket external loose. make good

Images

11/8/2024 2:31:46 PM 10

T408928.29

11/8/2024 2:31:52 PM

11/8/2024 2:32:03 PM

general­ when doing external clean . fix external gaskets

Images

11/8/2024 2:33:46 PM 11

T345546.1204

poor finish to edge of the mullion as per pic

Images

11/8/2024 2:42:55 PM

12/5/2024 10:27:35 AM

11/8/2024 2:43:12 PM

Project Name: B5412 Project Honey

Page 37 Of 136


12

T345546.1209

Cover on closure not on

11/8/2024

11/12/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/8/2024

11/12/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/20/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/13/2024

11/20/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/8/2024 2:58:42 PM 13

T345546.1211

closure missing

Images

11/8/2024 3:03:16 PM 14

T427849.1463

chip in glass to be made good

Images

11/12/2024 11:38:25 AM 15

T427849.1499

Scratch in panel to be made good

Images

11/13/2024 1:37:14 PM 16

T427849.1509

11/13/2024 1:37:20 PM

Low level gasket and trim to be installed

Images

11/13/2024 1:49:47 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 38 Of 136


17

T345545.1296

capping on actuator is missing

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/29/2024 11:24:28 AM 18

T350553.2175

Scratches on internal mullion

Images

11/29/2024 11:38:53 AM 19

T345545.1298

11/29/2024 11:39:00 AM

millions are scratched

11/29/2024 11:39:07 AM

Images

11/29/2024 11:39:45 AM 20

T350553.2176

11/29/2024 11:39:50 AM

Scratches on internal mullion

Images

11/29/2024 11:41:20 AM 21

T345545.1299

11/29/2024 11:41:30 AM

white speckles on mullions

Images

11/29/2024 11:42:14 AM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 39 Of 136


22

T345545.1301

townhall steel to be made good

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 11:51:37 AM 23

T345545.1302

11/29/2024 11:51:43 AM

transom is scratched and very off colour

Images

11/29/2024 11:53:24 AM 24

T345545.1303

hole in corners of panels to be filled

Images

11/29/2024 11:54:52 AM 25

T345545.1304

transom is heavily scratched

Images

11/29/2024 11:56:54 AM 26

T350553.2178

All stickers on glass to be cleared and cleaned

Images

11/29/2024 12:16:46 PM 12/5/2024 10:27:35 AM

11/29/2024 12:16:53 PM Project Name: B5412 Project Honey

Page 40 Of 136


27

T345545.1308

fillet piece missing in the door ­ gap is too large

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 12:18:42 PM 26

T350553.2179

Scratches on facade door frame to be painted good

Images

11/29/2024 12:23:49 PM 28

T345545.1311

11/29/2024 12:23:58 PM

11/29/2024 12:24:07 PM

gasket missing

11/29/2024 12:24:17 PM

Images

11/29/2024 12:26:53 PM 29

T345545.1312

mitres have opened up on the glazing panel above the door ­ right side only

Images

11/29/2024 12:27:50 PM 30

T345545.1313

scratch on and above door to be made good

Images

11/29/2024 12:28:34 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 41 Of 136


31

T345545.1314

mitre joint is protruding

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 12:28:58 PM 32

T350553.2183

Scratches on facade door frame to be painted good

Images

11/29/2024 12:33:25 PM

11/29/2024 12:33:31 PM

11/29/2024 12:33:44 PM

Building A>Sixth Floor>06­13 Terrace

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.992

Perimeter copings to be cleaned

11/8/2024

11/15/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/8/2024 12:29:48 PM 2

T345546.1253

Glass chipped externally

Images

11/12/2024 11:30:16 AM 3

T345545.1062

gasket to continue around corner

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 42 Of 136


Images

11/12/2024 11:30:21 AM 4

T345546.1255

copings missing

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

11/12/2024 11:31:46 AM 5

T345545.1065

spandrel panel and facade to be made good

Images

11/12/2024 11:32:17 AM 6

T427849.1464

chip in glass to be made good

Images

11/12/2024 11:39:12 AM 7

T427849.1465

chip in glass to be made good

Images

11/12/2024 11:40:13 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 43 Of 136


7

T427849.1466

Chip in glass to be made good

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/18/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/12/2024

11/19/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

Images

11/12/2024 11:40:41 AM 8

T345546.1262

damage to glass

Images

11/12/2024 11:40:59 AM 9

T345545.1083

scratch on grey panel

Images

11/12/2024 11:44:03 AM 10

T408928.53

damaged glass

Images

11/13/2024 1:35:38 PM 11

T345546.1306

Damage to glass

Images

11/13/2024 1:35:57 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 44 Of 136


12

T427849.1498

Damage to hinge to be made good

11/13/2024

11/20/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/20/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

11/13/2024 1:36:32 PM 13

T408928.54

scratch on outside face of glass

Images

11/13/2024 1:37:58 PM 14

T408928.55

damaged glass

Images

11/13/2024 1:40:46 PM 15

T345545.1133

crack in glazing

Images

11/13/2024 1:41:03 PM 16

T408928.56

damaged glass

Images

11/13/2024 1:41:53 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 45 Of 136


17

T345546.1315

Metal capping for balustrade has been cut with angle grinder

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/20/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

Images

11/13/2024 1:47:55 PM 18

T345546.1316

chip to glass

Images

11/13/2024 1:48:32 PM 19

T345546.1317

Chip glass

Images

11/13/2024 1:51:05 PM 20

T408928.58

damaged glass

Images

11/13/2024 1:52:50 PM 21

T427849.1512

Damages on unitised to be made good

Images

11/13/2024 1:55:27 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 46 Of 136


22

T408928.59

damaged glass on south corner multiple locations

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

11/13/2024

11/18/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Dominic Driver)

11/14/2024

11/21/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/14/2024

11/21/2024

Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Conor Colton)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/13/2024 1:55:31 PM 23

T345546.1322

11/13/2024 1:55:39 PM

Low level trim needs replacing

Images

11/13/2024 1:55:31 PM 24

T427849.1559

Bottom track different colour and needs replaced

Images

11/14/2024 12:09:10 PM 25

T427849.1560

Bottom track with hole to be filled

Images

11/14/2024 12:10:00 PM 26

T345545.1306

scratches in mullions

Images

11/29/2024 12:11:17 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 47 Of 136


27

T345545.1307

cap to go on low level

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/29/2024 12:12:48 PM 28

T345545.1310

scratches in transom on L7 panel

Images

11/29/2024 12:22:09 PM 29

T350553.2180

Scratches on facade door frame to be painted good

Images

11/29/2024 12:27:12 PM 30

T350553.2181

11/29/2024 12:27:20 PM

Scratches on facade to be made good

Images

11/29/2024 12:29:26 PM 31

T345545.1315

cap to be installed at the end of the balustrade

Images

11/29/2024 12:30:33 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 48 Of 136


32

T350553.2182

Beading missing from facade

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 12:30:52 PM

11/29/2024 12:30:59 PM

Building B Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.2190

Scratches on internal mullion to be painted good

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

11/29/2024

12/6/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

Images

11/29/2024 2:23:57 PM T350553.2191

11/29/2024 2:24:05 PM

Glass cracked

11/29/2024 2:24:11 PM

Images

11/29/2024 2:26:27 PM Building B>Eighth Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T419146.534

damage to flashing

9/18/2024

9/25/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

9/18/2024 11:32:31 AM

9/18/2024 11:32:31 AM

Building B>Fifth Floor Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 49 Of 136


1

T444645.584

screws to be hidden

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 12:11:08 PM

11/6/2024 12:11:17 PM

Building B>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1285

portal cladding strip incomplete

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

11/22/2024 11:35:32 AM 2

T459973.1

Size of gap to be reviewed

Images

12/3/2024 9:45:01 AM 3

T459973.2

Grout or mastic to bottom of brick

Images

12/3/2024 9:47:00 AM 4

T459973.3

Scratch or clean to spandrel

Images

12/3/2024 9:47:43 AM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 50 Of 136


5

T459973.5

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 9:49:49 AM 6

T459973.6

Damaged brick

Images

12/3/2024 9:50:10 AM 7

T459973.7

Damaged brick

Images

12/3/2024 9:50:38 AM 8

T459973.8

Flashing required

Images

12/3/2024 9:52:12 AM 9

T459973.9

Grout or mastic to bottom of brick

Images

12/3/2024 9:54:48 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 51 Of 136


10

T459973.10

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 9:55:32 AM 11

T459973.11

Damaged brick

Images

12/3/2024 9:55:46 AM 11

T459973.12

Tape to be removed

Images

12/3/2024 9:56:41 AM 9

T459973.13

Tape to be removed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12

T459973.14

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 9:58:11 AM 13

T459973.15

Damaged brick

Images

12/3/2024 9:58:56 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 52 Of 136


14

T459973.16

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:00:21 AM T444645.668

infill flashing required. Please confirm detail

Images

12/3/2024 10:01:15 AM 15

T459973.17

Insulation to be painted

Images

12/3/2024 10:03:26 AM 16

T459973.18

Clean paint

Images

12/3/2024 10:03:49 AM 17

T459973.19

Remove pencil marks

Images

12/3/2024 10:04:24 AM 18

T459973.20

Clean paint

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 53 Of 136


19

T444645.669

full clean required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:04:40 AM 20

T459973.22

Broken glass to be replaced

Images

12/3/2024 10:06:45 AM 21

T444645.670

full clean down of equitone required at low level

Images

12/3/2024 10:06:02 AM 22

T459973.23

12/3/2024 10:06:19 AM

Cleaning required

12/3/2024 10:06:49 AM

12/3/2024 10:06:57 AM

Images

12/3/2024 10:08:11 AM 23

T459973.25

Cleaning required

Images

12/3/2024 10:13:54 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 54 Of 136


24

T444645.671

insulation needs to be hidden

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:13:23 AM 25

T459973.26

12/3/2024 10:15:45 AM

Packers to be removed

Images

12/3/2024 10:16:46 AM 26

T444645.673

Making good required to grc panel

Images

12/3/2024 10:17:15 AM 26

T459973.27

Gap to be sealed

Images

12/3/2024 10:18:38 AM 27

T459973.28

Gap to be sealed

Images

12/3/2024 10:19:09 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 55 Of 136


28

T459973.29

Threshold gasket to be resolved

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:19:32 AM 29

T459973.30

Gap to be sealed

Images

12/3/2024 10:20:21 AM 30

T459973.31

Paint repair requires improvement

Images

12/3/2024 10:21:10 AM 31

T459973.32

End cap missing

Images

12/3/2024 10:21:33 AM 32

T444645.675

peckers to be cut be cut back or removed

Images

12/3/2024 10:26:24 AM

12/5/2024 10:27:35 AM

12/3/2024 10:26:32 AM

Project Name: B5412 Project Honey

Page 56 Of 136


33

T459973.35

Damaged brick

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:27:07 AM 32

T459973.36

Missing handle

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

34

T459973.37

Insulation to be tidied up or flashing installed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:31:33 AM 35

T459973.38

Gap to be resolved

Images

12/3/2024 10:32:55 AM 36

T459973.39

GRC Remedial consistency to be improved

Images

12/3/2024 10:34:05 AM 37

T444645.683

timber to be removed, flood stop refitted

Images

12/3/2024 10:37:05 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 57 Of 136


38

T459973.40

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:37:56 AM 37

T444645.684

fin missing

Images

12/3/2024 10:38:07 AM 37

T459973.41

Inconsistent gap

Images

12/3/2024 10:39:44 AM 39

T459973.42

Mesh to be tidied up

Images

12/3/2024 10:41:09 AM 40

T459973.43

Damaged brick

Images

12/3/2024 10:41:31 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 58 Of 136


41

T459973.44

Mesh to be tidied up

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:46:55 AM 42

T459973.45

Damaged brick

Images

12/3/2024 10:47:57 AM 42

T459973.46

Grout or mastic to bottom of brick

Images

12/3/2024 10:48:48 AM 43

T459973.62

Additional fixings required (colour matched)

Images

12/3/2024 11:03:53 AM 43

T459973.63

Gap requires remedial

Images

12/3/2024 11:04:26 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 59 Of 136


44

T444645.704

infill required to portal around grc

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

Images

12/3/2024 11:07:30 AM 45

T444645.708

incomplete flashing

Images

12/3/2024 11:11:27 AM 46

T1.53440170

Replace damaged Glass to CW 40

Building B>Ground Floor>00­01 Reception

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1334

aluprof tape to be removed

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/29/2024 2:27:07 PM 2

T444645.666

GRC column to be made good

Images

12/3/2024 9:56:45 AM

12/5/2024 10:27:35 AM

12/3/2024 9:56:57 AM

Project Name: B5412 Project Honey

Page 60 Of 136


3

T444645.667

bottom of panel to receive mastic

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 9:59:20 AM 4

T444645.698

column to be cleaned

Images

12/3/2024 10:59:35 AM 5

T459973.59

Damaged brick

Images

12/3/2024 11:00:07 AM 6

T459973.60

Mastic to be infilled

Images

12/3/2024 11:01:10 AM 7

T444645.700

insulation to be hidden, flashing required

Images

12/3/2024 11:01:30 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 61 Of 136


8

T459973.61

Cleaning and touch ups required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:02:18 AM 9

T444645.701

GRC column repair to be completed/painted

Images

12/3/2024 11:04:14 AM 10

T444645.702

colour matched fixings required and missing fixings installed

Images

12/3/2024 11:04:55 AM 11

T444645.703

GRC column repair to be completed/painted

Images

12/3/2024 11:06:21 AM 12

T459973.64

Grout or mastic to bottom of brick

Images

12/3/2024 11:06:39 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 62 Of 136


13

T459973.65

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:07:18 AM 14

T459973.66

GRC repairs required

Images

12/3/2024 11:07:59 AM 15

T459973.67

Grout or mastic to bottom of brick

Images

12/3/2024 11:08:43 AM 16

T444645.705

general cleaning of grc

Images

12/3/2024 11:08:47 AM 17

T444645.706

grc painting to be complete

Images

12/3/2024 11:09:12 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 63 Of 136


18

T459973.68

GRC repairs required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:09:44 AM 19

T444645.707

mastic to underside of column

Images

12/3/2024 11:09:54 AM 20

T459973.69

Foil visible and cleaning required

Images

12/3/2024 11:10:11 AM

12/3/2024 11:10:17 AM

Building B>Ground Floor>00­08 UK PN

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.674

Louvre doors to be cleaned down

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/3/2024 10:24:08 AM

12/3/2024 10:24:32 AM

Building B>Ground Floor>00­09 Reception Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 64 Of 136


1

T345545.1280

grouting to green tiles incomplete

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

11/22/2024 11:27:14 AM 2

T345545.1281

incomplete works to glass

Images

11/22/2024 11:28:09 AM 3

T459973.70

Grout or mastic to panel

Images

12/3/2024 11:11:09 AM 4

T459973.71

12/3/2024 11:11:22 AM

Base detail required

Images

12/3/2024 11:12:28 AM 5

T459973.72

Finishing to be improved

Images

12/3/2024 11:12:59 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 65 Of 136


6

T459973.73

Tape to be removed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:14:19 AM 7

T459973.74

Closer piece required

Images

12/3/2024 11:14:48 AM Building B>Ground Floor>00­10 CSW

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.682

query regarding how concrete will be finished

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:35:50 AM Building B>Ground Floor>00­11 DHN Room

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.676

flashing to be repaired

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:28:01 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 66 Of 136


2

T444645.677

brick infill required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:28:39 AM 3

T444645.678

flashing to be fixed tight to GRC column

Images

12/3/2024 10:29:48 AM 2

T444645.679

chipped brick work to be repaired

Images

12/3/2024 10:31:10 AM 1

T444645.680

12/3/2024 10:31:17 AM

12/3/2024 10:31:52 AM

chipped brickwork to be repaired

Images

12/3/2024 10:32:58 AM 4

T444645.681

12/3/2024 10:33:08 AM

12/3/2024 10:33:31 AM

flashing required on one side. Other side requires flashing to be tight to back of column

Images

12/3/2024 10:34:11 AM 12/5/2024 10:27:35 AM

12/3/2024 10:34:23 AM Project Name: B5412 Project Honey

Page 67 Of 136


Building B>Ground Floor>00­15 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1284

foil is visible behind GRC

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

11/29/2024

12/6/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Jack Monaghan)

Images

11/22/2024 11:31:33 AM 2

T345545.1286

bottom GRC is a different colour to the top 2

Images

11/22/2024 11:36:48 AM 3

T345545.1329

backing panel is peeling off at the bottom

Images

11/29/2024 2:15:41 PM 4

T345545.1330

backing panel is missing

Images

11/29/2024 2:16:01 PM 5

T345545.1332

backing panel is too far off

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 68 Of 136


Images

11/29/2024 2:20:22 PM 6

T444645.686

chipped brickwork

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:43:03 AM 7

T444645.687

grc column repair to be completed

Images

12/3/2024 10:44:02 AM 8

T444645.688

GRC column repair to be completed/painted

Images

12/3/2024 10:45:28 AM 9

T444645.689

GRC column repair to be completed/painted

Images

12/3/2024 10:46:19 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 69 Of 136


10

T444645.690

mastic required to underside of column

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:46:54 AM 11

T444645.691

chipped/broken GRC column to be repaired

Images

12/3/2024 10:47:53 AM 12

T459973.47

Grout or mastic to bottom of brick

Images

12/3/2024 10:49:19 AM 13

T444645.692

grc column repair required

Images

12/3/2024 10:49:24 AM 14

T444645.693

grc alignment required

Images

12/3/2024 10:50:14 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 70 Of 136


12

T459973.48

GRC notches to be filled

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:51:00 AM 15

T459973.49

12/3/2024 10:51:22 AM

GRC notches to be filled

Images

12/3/2024 10:51:52 AM 16

T459973.50

12/3/2024 10:52:00 AM

Mastic to edge of column

Images

12/3/2024 10:52:30 AM 17

T444645.694

mastic required

Images

12/3/2024 10:52:56 AM 18

T459973.51

GRC consistency to be improved

Images

12/3/2024 10:53:20 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 71 Of 136


19

T444645.695

GRC column repair to be completed/painted

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 10:53:50 AM 20

T459973.52

Insulation to be pushed up

Images

12/3/2024 10:54:33 AM 21

T459973.53

Grout or mastic to bottom of brick

Images

12/3/2024 10:55:15 AM 22

T459973.54

Damaged brick

Images

12/3/2024 10:55:34 AM 23

T444645.696

GRC column repair to be completed/painted

Images

12/3/2024 10:55:41 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 72 Of 136


24

T459973.55

GRC notches to be filled and mastic not continuous

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:56:13 AM 25

T459973.56

Infill to be swapped with replacement GRC

Images

12/3/2024 10:57:27 AM 26

T444645.697

bolt to be removed

Images

12/3/2024 10:57:21 AM 27

T459973.57

Damaged brick

Images

12/3/2024 10:57:53 AM 28

T459973.58

Grout or mastic to bottom of brick

Images

12/3/2024 10:58:59 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 73 Of 136


29

T444645.699

repair required to brickwork

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:00:44 AM Building B>Ground Floor>00­S02 Stair 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T459973.24

Insulation to be pushed in

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 10:12:34 AM Building B>Ninth Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T1.53440215

Replace Damaged Glass (UP­B­14T­GL1)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

Building B>Ninth Floor>09­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T350553.888

Anchor points to be removed

9/25/2024

10/2/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Ian Robertson)

Images

9/25/2024 2:37:55 PM Building B>Roof>Roof Plant

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.555

panel not sitting correctly

11/1/2024

11/8/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 74 Of 136


11/1/2024 3:21:49 PM Building B>Second Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T1.53440166

Replace damaged pane of Glass

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

Building B>Sixth Floor>06­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.582

deep scratches to million

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 11:50:13 AM 2

T444645.583

scratches to reveal

Images

11/6/2024 11:50:58 AM Building B>Tenth Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T450445.20

balustrade requires improvement

10/29/2024

11/5/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

10/29/2024 11:31:17 AM 2

T1.53440216

Replace Damaged Glass (UP­B­20­GL1)

Building B>Tenth Floor>10­01 Office Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 75 Of 136


1

T419146.605

joint in flashing above FFL please change

9/25/2024

10/2/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

9/25/2024

10/2/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

9/25/2024 12:42:39 PM 2

T419146.616

powered access door in wrong location

Images

9/25/2024 1:08:32 PM 3

T444645.566

missing screws, screws to be colour matched

Images

11/6/2024 10:17:15 AM

11/6/2024 10:17:23 AM

Building B>Tenth Floor>Terrace

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T421799.70

poor finish to balustrade top rail. sharp edges, complete misalignment on some visible scrorch marks

8/31/2024

9/7/2024

Incomplete Works

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

8/31/2024

9/7/2024

Incomplete Works

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

8/31/2024 8:25:52 AM 2

T421799.71

poor finish to balustrade base rail. inconsistent gaps, internal/external misaligned, some overlapping escorted (all areas)

Building B>Third Floor>03­01 Office Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 76 Of 136


T444645.596

black mastic required behind acoustic plate to fill gap

11/6/2024

11/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

11/6/2024 2:26:25 PM Building C>Lower Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.171

Door to be finished.

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:49:34 PM

11/26/2024 12:49:38 PM

Building C>Lower Ground Floor>Cycle Entrance (External)

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.146

Door to be finished.

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:19:52 PM Building C>Lower Ground Floor>Single Tier Cycle Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.142

Door to be finished. Head detail to be confirmed

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Connor Casey)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/26/2024 12:10:46 PM Building C>Roof (L7)>Core 2 Lobby L07 Reference

Description

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 77 Of 136


1

T353957.87

Actuator for door to be complete + fire beacon to be complete

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 10:08:29 AM

11/26/2024 10:08:39 AM

Building C>Roof (L7)>Core 2 Lobby L07­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345609.9

External door ­ mastic to be applied around fire door.

11/15/2024

11/22/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

11/26/2024

12/3/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (Connor Casey)

Images

11/15/2024 11:26:38 AM 1

T353957.89

Actuator for door to be complete + fire beacon to be complete

Images

11/26/2024 10:10:58 AM Elevations>Building A>East

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T459973.75

Base detail required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:16:34 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 78 Of 136


2

T459973.76

Broken glass

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:17:16 AM 3

T444645.709

flashing infill required

Images

12/3/2024 11:18:14 AM 4

T459973.77

GRC Remedials to be complete

Images

12/3/2024 11:18:31 AM 5

T459973.78

Inconsistent gap

Images

12/3/2024 11:19:31 AM 6

T459973.79

Joint requires improvement

Images

12/3/2024 11:20:52 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 79 Of 136


7

T444645.710

weep holes required to underside of portal

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:21:10 AM 8

T459973.80

Colour matched fixings and missing fixings

Images

12/3/2024 11:22:55 AM 9

T444645.711

12/3/2024 11:23:00 AM

exposed bracket

Images

12/3/2024 11:23:06 AM 10

T459973.81

Bottom requires improvement

Images

12/3/2024 11:23:31 AM 11

T459973.82

Solution required to close void

Images

12/3/2024 11:25:06 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 80 Of 136


12

T444645.713

mastic to be complete

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:25:30 AM 13

T459973.83

Colour match fixings required and gap closed

Images

12/3/2024 11:26:19 AM 14

T444645.714

12/3/2024 11:26:31 AM

grc repaired to be completed

Images

12/3/2024 11:26:54 AM 15

T459973.84

GRC Remedials to be complete

Images

12/3/2024 11:27:14 AM 16

T459973.85

Mastic required

Images

12/3/2024 11:28:05 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 81 Of 136


17

T444645.715

grc repaired to be completed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:28:08 AM 18

T459973.86

Flashing or mastic required

Images

12/3/2024 11:28:44 AM 19

T444645.716

joint alignment to be improved

Images

12/3/2024 11:29:05 AM 20

T444645.717

scratches to cladding panel

Images

12/3/2024 11:31:09 AM 21

T459973.88

Colour match fixings

Images

12/3/2024 11:31:43 AM 22

T459973.89

Insulation and rails to be painted

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 82 Of 136


23

T459973.90

Alignment of panel

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:33:10 AM 24

T459973.91

Bottom aluminium to be cut flush

Images

12/3/2024 11:33:50 AM 25

T459973.92

Damaged equities panel

Images

12/3/2024 11:34:34 AM 26

T444645.718

vertical rails to be cut flush with the equitone

Images

12/3/2024 11:36:30 AM 27

T459973.94

12/3/2024 11:36:38 AM

Green brick grout missing

Images

12/3/2024 11:39:20 AM

12/5/2024 10:27:35 AM

12/3/2024 11:39:36 AM

Project Name: B5412 Project Honey

Page 83 Of 136


28

T459973.95

GRC Remedials to be complete

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:41:02 AM 29

T459973.96

Mastic required

Images

12/3/2024 11:41:47 AM 30

T444645.719

grc repairs to be completed

Images

12/3/2024 11:41:38 AM 31

T444645.720

grc to be complete

Images

12/3/2024 11:42:14 AM 32

T459973.97

Joints to be improved for consistency

Images

12/3/2024 11:42:35 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 84 Of 136


33

T459973.98

Corner joint to be improved

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:42:55 AM 34

T459973.99

12/3/2024 11:43:03 AM

Mastic required

Images

12/3/2024 11:43:22 AM 35

T459973.100

Mastic required

Images

12/3/2024 11:43:39 AM 36

T444645.721

grc repairs to be completed

Images

12/3/2024 11:43:15 AM 37

T444645.722

grc repairs to be completed

Images

12/3/2024 11:44:03 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 85 Of 136


38

T459973.101

Grout or mastic to panel

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:44:02 AM 39

T459973.102

Alignment of cover caps

Images

12/3/2024 11:45:34 AM 40

T444645.724

flashing required to both sides of column

Images

12/3/2024 11:45:40 AM 41

T459973.103

12/3/2024 11:45:46 AM

Interface requires improvement

12/3/2024 11:45:53 AM

Images

12/3/2024 11:46:26 AM 42

T459973.104

12/3/2024 11:46:32 AM

Flashing or mastic required

Images

12/3/2024 11:47:12 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 86 Of 136


43

T444645.725

Clarkes to provide detail for closing this gap

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:46:48 AM 44

T459973.105

Grout or mastic to panel

Images

12/3/2024 11:48:12 AM 45

T444645.726

grc column to be repaired

Images

12/3/2024 11:47:57 AM 46

T459973.106

Interface requires improvement. Suggested this is mastic’s

Images

12/3/2024 11:48:24 AM 47

T444645.727

capping required

Images

12/3/2024 11:48:51 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 87 Of 136


48

T459973.107

Flashing or mastic required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:49:32 AM 49

T444645.728

grc column to be repaired and mesh or flashing installed

Images

12/3/2024 11:49:39 AM 50

T408928.155

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:07:46 PM 51

T444645.792

alignment to c­profile to be reviewed

Images

12/3/2024 3:07:12 PM 52

T459973.198

Joint between GRC units too large. Panel to be replaced

Images

12/3/2024 3:08:10 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 88 Of 136


53

T408928.156

check if alignment is within +/­4 mm tolerance.

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 3:08:51 PM 54

T459973.199

Consistency of C profile gap to be checked

Images

12/3/2024 3:09:00 PM 55

T408928.157

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:09:29 PM 56

T444645.793

alignment to c­profile to be reviewed

Images

12/3/2024 3:09:46 PM 57

T408928.158

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:10:00 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 89 Of 136


58

T459973.200

Cover caps to be installed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:10:04 PM 59

T459973.201

Cover caps to be installed

Images

12/3/2024 3:10:48 PM 60

T444645.794

vertical alignment of brick columns

Images

12/3/2024 3:10:40 PM 61

T459973.202

Cover caps to be installed

Images

12/3/2024 3:11:43 PM 62

T459973.203

Cover caps to be installed

Images

12/3/2024 3:12:01 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 90 Of 136


63

T459973.204

Cover caps to be installed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 3:13:09 PM 64

T444645.795

gap to spandrel and equitone

Images

12/3/2024 3:13:19 PM 65

T459973.205

Cover caps to be installed

Images

12/3/2024 3:13:37 PM 66

T459973.206

Cover caps to be installed

Images

12/3/2024 3:14:07 PM 67

T408928.159

check alignment of brise soleil

Images

12/3/2024 3:14:28 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 91 Of 136


68

T459973.207

Cover caps to be installed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:14:30 PM 69

T444645.796

gap inconsistent with other equitone panels

Images

12/3/2024 3:14:48 PM 70

T408928.160

check alignment of brise soleil

Images

12/3/2024 3:16:09 PM 71

T459973.208

Grout repair following remedial

Images

12/3/2024 3:16:20 PM 72

T459973.209

Grout repair following remedial

Images

12/3/2024 3:17:04 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 92 Of 136


73

T444645.797

is this mastic ? missing

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:17:02 PM 74

T459973.210

Grout repair following remedial

Images

12/3/2024 3:17:39 PM 75

T444645.798

mastic missing

Images

12/3/2024 3:18:10 PM 76

T444645.799

mastic missing

Images

12/3/2024 3:18:28 PM 77

T459973.211

Grout repair following remedial

Images

12/3/2024 3:18:49 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 93 Of 136


78

T408928.161

check if alignment is within +/­4 mm tolerance.

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:19:19 PM 77

T408928.162

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:20:20 PM 79

T444645.800

grout to brick

Images

12/3/2024 3:20:37 PM 80

T408928.163

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:21:13 PM 81

T459973.214

Check tortion between brick panels

Images

12/3/2024 3:22:03 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 94 Of 136


82

T444645.801

c­profile alignment

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 3:22:10 PM Elevations>Building A>North

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T459973.108

Alignment of cover caps

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:50:22 AM 2

T444645.729

grc column to be repaired and mesh or flashing installed to close gaps

Images

12/3/2024 11:51:20 AM 3

T459973.109

Flashing or mastic required

Images

12/3/2024 11:53:26 AM 4

T444645.730

grc column to be repaired and mesh or flashing installed to close gaps

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 95 Of 136


Images

12/3/2024 11:53:20 AM 5

T459973.110

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:54:05 AM 6

T459973.111

Base flashing to be installed

Images

12/3/2024 11:55:45 AM 7

T444645.731

grc column alignment

Images

12/3/2024 11:56:02 AM 8

T459973.112

Soffit panels to be levelled

Images

12/3/2024 11:56:16 AM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 96 Of 136


9

T459973.113

Damaged brick

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 11:57:09 AM 10

T444645.732

grc making good required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

11

T459973.114

Alignment of GRC

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:58:16 AM 12

T444645.733

grc making good required

Images

12/3/2024 11:58:50 AM 13

T459973.115

Alignment of GRC

Images

12/3/2024 11:58:54 AM 14

T444645.734

glazed brick to be repaired

Images

12/3/2024 12:00:00 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 97 Of 136


15

T444645.735

gap requires infill

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:00:32 PM 16

T444645.736

grc making good required

Images

12/3/2024 12:00:56 PM 17

T444645.737

grc making good required

Images

12/3/2024 12:01:11 PM 18

T459973.116

Concrete repairs and paint required

Images

12/3/2024 12:01:19 PM 19

T444645.738

grc plinth to be made good

Images

12/3/2024 12:01:47 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 98 Of 136


20

T459973.117

Base detail to be reviewed

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:02:00 PM 21

T444645.739

grc plinth to be made good & joints consistent

Images

12/3/2024 12:02:12 PM 22

T444645.740

grc plinth to be made good & joints consistent

Images

12/3/2024 12:02:41 PM 15

T459973.118

Bracket to be removed and silicone finished

Images

12/3/2024 12:02:37 PM 23

T444645.741

grc plinth to be made good & joints consistent

Images

12/3/2024 12:03:03 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 99 Of 136


24

T459973.119

Step in base flashing

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:03:09 PM 25

T444645.742

grc plinth to be made good & joints consistent

Images

12/3/2024 12:03:17 PM 26

T444645.743

grc plinth to be made good & joints consistent

Images

12/3/2024 12:03:31 PM 27

T444645.744

grc plinth to be made good & joints consistent

Images

12/3/2024 12:03:59 PM 28

T444645.745

grc plinth to be made good & joints consistent

Images

12/3/2024 12:04:14 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 100 Of 136


29

T444645.746

grc making good required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:05:18 PM 30

T444645.747

grc making good required

Images

12/3/2024 12:05:31 PM 31

T444645.748

grc making good required

Images

12/3/2024 12:05:46 PM 32

T459973.120

Gap at head to be resolved

Images

12/3/2024 12:05:48 PM 33

T444645.749

grc making good required

Images

12/3/2024 12:06:00 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 101 Of 136


34

T444645.750

grc making good required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:06:15 PM 35

T444645.751

grc making good required

Images

12/3/2024 12:06:35 PM 36

T459973.121

Joint of soffit panels to remain consistent with glass

Images

12/3/2024 12:06:42 PM 37

T444645.752

grc making good required

Images

12/3/2024 12:06:57 PM 38

T444645.753

grc making good required

Images

12/3/2024 12:07:17 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 102 Of 136


39

T444645.754

grc to be made good

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:07:29 PM 40

T459973.122

Damaged glass to be replaced

Images

12/3/2024 12:07:52 PM 41

T444645.755

grc to be made good

Images

12/3/2024 12:08:27 PM 42

T444645.756

grc to be made good

Images

12/3/2024 12:08:59 PM 43

T459973.123

Silicone improvement required

Images

12/3/2024 12:09:13 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 103 Of 136


44

T459973.124

End cap missing

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:09:32 PM 45

T459973.125

End cap missing

Images

12/3/2024 12:09:53 PM 46

T444645.757

cladding infill required

Images

12/3/2024 12:12:30 PM 47

T459973.127

12/3/2024 12:13:12 PM

Base detail to be reviewed

Images

12/3/2024 12:13:58 PM 48

T444645.758

cladding infill required

Images

12/3/2024 12:14:15 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 104 Of 136


49

T408928.134

check if alignment is within +/­4 mm tolerance

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:42:03 PM 50

T459973.177

Missing cover caps

Images

12/3/2024 2:41:56 PM 51

T444645.782

grc sits proud

Images

12/3/2024 2:43:21 PM 52

T408928.135

alignment of c­section ­ right panel sits proud of left panel. confirm tolerance

Images

12/3/2024 2:43:59 PM 53

T459973.178

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:44:29 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 105 Of 136


54

T459973.179

Check if vertical alignment is within +/­4mm tolerance

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 2:46:29 PM 55

T408928.136

check consistency of gaps

Images

12/3/2024 2:46:54 PM 56

T459973.180

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:47:25 PM 57

T408928.137

check consistency of gaps

Images

12/3/2024 2:47:49 PM 58

T408928.138

check consistency of gaps

Images

12/3/2024 2:48:20 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 106 Of 136


59

T444645.783

no gap between grc on one side but gap on the other side

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:47:36 PM 60

T408928.139

12/3/2024 2:47:56 PM

check consistency of gaps

Images

12/3/2024 2:48:39 PM 61

T459973.181

Consistency of C profile gap to be checked

Images

12/3/2024 2:48:55 PM 62

T408928.140

check if alignment is within +/­4 mm tolerance

Images

12/3/2024 2:50:37 PM 63

T459973.182

Grout repair following remedial

Images

12/3/2024 2:50:27 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 107 Of 136


64

T408928.141

check if alignment is within +/­4 mm tolerance

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 2:51:10 PM 65

T459973.183

Grout repair following remedial

Images

12/3/2024 2:51:10 PM 66

T444645.784

gaps inconsistent

Images

12/3/2024 2:51:22 PM 67

T459973.184

Grout repair following remedial

Images

12/3/2024 2:51:34 PM 68

T408928.142

check consistency of gaps

Images

12/3/2024 2:51:56 PM 69

T408928.143

check consistency of gaps

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 108 Of 136


70

T459973.185

Consistency of C profile gap to be checked

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:53:17 PM 71

T408928.144

check if alignment is within +/­4 mm tolerance

Images

12/3/2024 2:53:37 PM 72

T444645.785

alignment of brick column to be improved. Pointing to be reviewed

Images

12/3/2024 2:52:39 PM 73

T444645.786

c­channel joints inconsistent

Images

12/3/2024 2:54:06 PM 74

T459973.186

12/3/2024 2:54:13 PM

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:54:38 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 109 Of 136


75

T408928.145

check consistency of gaps

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:55:31 PM 76

T459973.187

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:55:27 PM 77

T408928.146

check if alignment is within +/­4 mm tolerance

Images

12/3/2024 2:55:54 PM 78

T459973.188

Consistency of C profile gap to be checked

Images

12/3/2024 2:56:46 PM 79

T459973.189

Check consistency of GRC C profile

Images

12/3/2024 2:58:06 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 110 Of 136


80

T408928.147

check if alignment is within +/­4 mm tolerance.

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:58:48 PM 81

T444645.787

c­channel joints inconsistent

Images

12/3/2024 2:59:08 PM 82

T408928.148

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 2:59:17 PM 83

T459973.190

Check if vertical alignment is within +/­4mm tolerance. Also check tortion of panel

Images

12/3/2024 2:59:47 PM 84

T459973.191

Packers or material to be removed

Images

12/3/2024 3:00:59 PM

12/5/2024 10:27:35 AM

12/3/2024 3:01:09 PM

Project Name: B5412 Project Honey

Page 111 Of 136


85

T444645.788

c­profile joints inconsistent

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:01:18 PM 86

T459973.192

Grout repair following remedial

Images

12/3/2024 3:01:38 PM 87

T408928.149

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:02:06 PM 88

T408928.150

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:02:22 PM 89

T459973.193

Grout repair following remedial

Images

12/3/2024 3:02:34 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 112 Of 136


90

T444645.789

spandrel joints excessive and inconsistent

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:02:24 PM 91

T459973.194

Grout repair following remedial

Images

12/3/2024 3:02:56 PM 92

T408928.151

check consistency of gaps

Images

12/3/2024 3:03:42 PM 93

T408928.152

check consistency of gaps

Images

12/3/2024 3:03:59 PM 94

T459973.195

Grout repair following remedial

Images

12/3/2024 3:04:02 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 113 Of 136


95

T408928.153

check consistency of gaps

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:04:38 PM 96

T444645.790

alignment to brick column to be reviewed

Images

12/3/2024 3:04:36 PM 97

T444645.791

alignment to brick column to be reviewed

Images

12/3/2024 3:05:02 PM 98

T459973.196

Cover cap missing

Images

12/3/2024 3:05:02 PM 99

T459973.197

Consistency of C profile gap to be checked

Images

12/3/2024 3:06:03 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 114 Of 136


100 T408928.154

check consistency of gaps

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 3:06:19 PM Elevations>Building A>South

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T459973.128

GRC to be replaced

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:17:23 PM 2

T459973.129

GRC Remedials to be complete

Images

12/3/2024 12:18:06 PM 3

T444645.759

flashing required ­ insulation to be hidden

Images

12/3/2024 12:18:03 PM 4

T444645.760

grc to be made good

Images

12/3/2024 12:18:41 PM 12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 115 Of 136


5

T444645.761

grc to be made good

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Observation

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:19:09 PM 6

T459973.130

Gap to GRC and flashing to be closed

Images

12/3/2024 12:19:24 PM 7

T444645.762

grc to be made good

Images

12/3/2024 12:20:01 PM 8

T444645.763

flashing required ­ insulation to be hidden

Images

12/3/2024 12:20:15 PM 9

T459973.131

Base detail to be reviewed

Images

12/3/2024 12:21:24 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 116 Of 136


10

T444645.764

grc to be made good and cleaned

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:21:31 PM 11

T444645.765

grc plinth to be made good and cleaned

Images

12/3/2024 12:22:06 PM 12

T444645.766

missing fin and handle

Images

12/3/2024 12:23:22 PM 13

T444645.767

missing fin

Images

12/3/2024 12:23:56 PM 14

T459973.133

Base detail to be tidied

Images

12/3/2024 12:24:10 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 117 Of 136


15

T459973.134

Remove brace

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:25:10 PM 16

T459973.135

Protection to be removed

Images

12/3/2024 12:26:03 PM 17

T459973.136

Top profile to be raised in middle section

Images

12/3/2024 12:26:39 PM 18

T444645.768

protection to be removed

Images

12/3/2024 12:27:20 PM 19

T459973.137

Bottom blades missing

Images

12/3/2024 12:27:26 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 118 Of 136


20

T444645.769

handle missing

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:27:40 PM 21

T444645.770

grc to be made good and cleaned

Images

12/3/2024 12:28:12 PM 22

T459973.138

Top flashing missing

Images

12/3/2024 12:28:42 PM 23

T459973.139

Protection to be removed

Images

12/3/2024 12:29:14 PM 24

T444645.771

flashing required ­ insulation to be hidden

Images

12/3/2024 12:29:26 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 119 Of 136


25

T459973.140

Protection to be removed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:29:40 PM 26

T459973.141

Top flashing required

Images

12/3/2024 12:30:32 PM 27

T444645.772

mastic to be continuous

Images

12/3/2024 12:30:39 PM 28

T444645.773

12/3/2024 12:30:48 PM

grc to be made good and cleaned and painting to be completed

Images

12/3/2024 12:31:16 PM 29

T459973.142

12/3/2024 12:31:21 PM

Flashings to be installed and gap to be closed

Images

12/3/2024 12:32:37 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 120 Of 136


30

T459973.143

Flashing required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:33:16 PM 31

T459973.144

Visible gap to be reviewed

Images

12/3/2024 12:34:18 PM 32

T459973.145

12/3/2024 12:34:38 PM

Mastic missing

Images

12/3/2024 12:35:24 PM 33

T444645.775

12/3/2024 12:35:34 PM

flashing required to both sides of column

Images

12/3/2024 12:35:29 PM 34

T459973.147

Gaps between plinth and panel to be closed

Images

12/3/2024 12:36:34 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 121 Of 136


35

T459973.148

bottom flashing to be swapped

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 12:37:19 PM 36

T459973.149

Corner piece to be swapped

Images

12/3/2024 12:38:32 PM 37

T444645.776

mastic required to plinth

Images

12/3/2024 12:39:00 PM 38

T459973.150

Infill piece required (both sides)

Images

12/3/2024 12:39:31 PM 39

T444645.777

12/3/2024 12:41:48 PM

cladding required

Images

12/3/2024 12:39:59 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 122 Of 136


40

T459973.151

Mastic required

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:40:00 PM 41

T444645.778

gap to be infilled

Images

12/3/2024 12:40:33 PM 42

T459973.152

Glass to be replaced

Images

12/3/2024 12:41:13 PM 43

T444645.779

infill required to top of unitised

Images

12/3/2024 12:41:26 PM 44

T459973.153

Curved panel to be replaced to close gap

Images

12/3/2024 12:43:20 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 123 Of 136


45

T459973.154

Repairs required to aluminium

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 12:43:57 PM 46

T459973.155

Colour matched fixings

Images

12/3/2024 12:47:11 PM 47

T459973.215

Damaged GRC profile to be replaced

Images

12/3/2024 3:23:17 PM 48

T459973.216

Interface requires improving

Images

12/3/2024 3:26:42 PM 49

T459973.218

Mock up to be removed

Images

12/3/2024 3:29:08 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 124 Of 136


50

T408928.164

check if alignment is within +/­4 mm tolerance.

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 3:29:16 PM 51

T459973.219

Mock up to be removed

Images

12/3/2024 3:29:28 PM 52

T459973.220

Mock up to be removed

Images

12/3/2024 3:29:52 PM 53

T408928.165

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:31:33 PM 54

T459973.221

Check if vertical alignment is within +/­4mm tolerance. Also check tortion of panel

Images

12/3/2024 3:31:29 PM 55

T408928.166

damage to top of C­section panel

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 125 Of 136


56

T459973.222

Check if vertical alignment is within +/­4mm tolerance. Also check tortion of panel

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 3:31:58 PM 57

T459973.223

Consistency of C profile gap to be checked

Images

12/3/2024 3:32:46 PM 58

T459973.224

Check if vertical alignment is within +/­4mm tolerance. Also check tortion of panel

Images

12/3/2024 3:33:34 PM 59

T459973.225

Check if vertical alignment is within +/­4mm tolerance. Also check tortion of panel

Images

12/3/2024 3:35:14 PM 60

T408928.167

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:36:01 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 126 Of 136


61

T459973.226

Mastic to underside of GRC to be removed

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/3/2024 3:36:04 PM 62

T408928.168

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:37:10 PM 63

T408928.169

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:37:45 PM 64

T408928.170

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:38:27 PM 65

T408928.171

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:38:49 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 127 Of 136


66

T408928.172

check if alignment is within +/­4 mm tolerance.

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:39:09 PM 67

T408928.173

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:39:37 PM 68

T459973.227

Check if vertical alignment is within +/­4mm tolerance. Also check tortion of panel

Images

12/3/2024 3:39:59 PM 69

T408928.174

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:40:26 PM 70

T459973.228

Grout repair following remedial

Images

12/3/2024 3:40:32 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 128 Of 136


71

T408928.175

check if alignment is within +/­4 mm tolerance.

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 3:40:44 PM 72

T408928.176

check if alignment is within +/­4 mm tolerance.

Images

12/3/2024 3:40:59 PM 73

T459973.229

Grout repair following remedial

Images

12/3/2024 3:41:01 PM 74

T459973.230

Grout repair following remedial

Images

12/3/2024 3:41:36 PM 75

T1.53440202

Replace Damaged Glass (CW07 Field 09)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

76

T1.53440209

Replace Damaged Glass (CW24 Field 03)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

Elevations>Building A>West

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T459973.156

Pointing to be complete

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 129 Of 136


Images

12/3/2024 2:23:41 PM 2

T459973.157

Mastic to side of panel

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:24:14 PM 3

T459973.158

Grout repair following remedial

Images

12/3/2024 2:25:04 PM 4

T459973.159

Grout repair following remedial

Images

12/3/2024 2:25:25 PM 5

T459973.160

Grout repair following remedial

Images

12/3/2024 2:25:51 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 130 Of 136


6

T459973.161

Grout repair following remedial

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:26:10 PM 7

T459973.162

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:27:18 PM 8

T459973.163

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:27:46 PM 9

T459973.164

Alignment of corner units

Images

12/3/2024 2:28:19 PM 10

T459973.165

Gap to be reduced

Images

12/3/2024 2:29:48 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 131 Of 136


11

T459973.166

Gap to be reduced

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:30:18 PM 12

T459973.167

Cavity barrier more visible in this area than others

Images

12/3/2024 2:31:39 PM 13

T459973.168

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:32:41 PM 14

T459973.169

Grout repair following remedial

Images

12/3/2024 2:33:24 PM 15

T459973.170

Glass to be swapped with panel

Images

12/3/2024 2:34:32 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 132 Of 136


16

T459973.171

Check if vertical alignment is within +/­4mm tolerance

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

Images

12/3/2024 2:35:55 PM 17

T459973.172

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:36:29 PM 18

T444645.780

confirm spacing is consistent

Images

12/3/2024 2:35:49 PM 19

T459973.173

12/3/2024 2:36:32 PM

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:36:59 PM 20

T459973.174

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:37:51 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 133 Of 136


21

T408928.133

check if alignment is within +/­4 mm tolerance

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (James McKeever)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

Images

12/3/2024 2:38:18 PM 22

T444645.781

confirm spacing is consistent and within tolerance

Images

12/3/2024 2:38:04 PM 23

T459973.175

Check if vertical alignment is within +/­4mm tolerance

Images

12/3/2024 2:38:19 PM 24

T459973.176

Gap to be opened one side and closed the other

Images

12/3/2024 2:39:46 PM 25

T1.53440199

Replace broken Glass ­ CW03 (Field 03)

Elevations>Building B>North

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T459973.212

Missing cover caps

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 134 Of 136


Images

12/3/2024 3:20:16 PM 2

T459973.213

Missing cover caps

12/3/2024

12/10/2024

Client Snag

Opened

Facade

Clarke Facades

McLaughlin & Harvey (sam peach)

3

T1.53440207

Replace damaged Glass (CW39 Field 01)

12/4/2024

12/11/2024

Snag

Opened

Facade

Clarke Facades

Clarke Facades (Jordan Anderson)

External works>External Works

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T1.53416383

Missing louvre

12/2/2024

12/9/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

12/2/2024

12/9/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

12/2/2024

12/9/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

12/2/2024

12/9/2024

Snag

Opened

Facade

Clarke Facades

Darling Associates (Robyn Harrison­ Church)

Images

12/2/2024 12:07:18 PM 2

T1.53416387

Column requires painting, made good

Images

12/2/2024 12:11:59 PM 3

T1.53416394

Gap between brick and column requires interface detail

Images

12/2/2024 12:13:42 PM 1

T1.53416433

Flashing detail required

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 135 Of 136


Images

12/2/2024 12:22:26 PM

12/5/2024 10:27:35 AM

Project Name: B5412 Project Honey

Page 136 Of 136


Project Honey – Tenant Snag Report 09.12.24

FH090-151015


Building A>Eighth Floor>08­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.238

concrete up stand needs cover piece on levels eight and six up to top of raised Access floor

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:47:44 PM Building A>Eighth Floor>Terrace

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.239

scratch on mullion at high level

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:49:21 PM 2

T408928.240

detail at base of glass not acceptable

Images

12/6/2024 1:50:12 PM Building A>First Floor>01­S01 Stair 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.236

skirting to be cut back as other floors

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

Francis Hunter (Luke Nurser)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/6/2024 1:43:20 PM

12/6/2024 1:43:26 PM

Building A>Ground Floor>00­02 Lift Lobby Reference

Description

12/10/2024 9:02:54 AM

Project Name: B5412 Project Honey

Page 1 Of 7


1

T408928.235

light not installed as drawing. should be one light

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:40:32 PM Building A>Ground Floor>00­03 Corridor 02

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.230

make good damage around lift call point

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

12/6/2024

12/13/2024

Mace Post PC Snag

Completed

Fit-out

Swiftcrafted

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:29:00 PM 2

T408928.231

fil gaps below skirting

Images

12/6/2024 1:31:20 PM Comments

Created By

Date

Due to floor tolerance levels, instruction required

Alex Money (Swiftcrafted)

12/9/2024 10:22:59 AM

Building A>Ground Floor>00­06 Corridor 01

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.232

paint on ceiling raft

12/6/2024

12/13/2024

Mace Post PC Snag

Completed

Fit-out

Swiftcrafted

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:33:24 PM Comments

Created By

Date

This is not SCL. Decoration works outside of WCs not in SCL scope

Alex Money (Swiftcrafted)

12/9/2024 10:28:24 AM

12/10/2024 9:02:54 AM

Project Name: B5412 Project Honey

Page 2 Of 7


2

T408928.233

thumb turn on wrong side and no fire escape sign

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Fit-out

Swiftcrafted

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:36:15 PM Building A>Ground Floor>00­27 BoH / Retail

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.229

bolts on frame. is this correct and there should be a cap colour matched

12/6/2024

12/13/2024

Mace Post PC Snag

Completed

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:27:39 PM Comments

Created By

Date

Installation is correct as per detail EDC­MCF­AXX001­ZZ­DR­X­3017. Due to height of concrete upstand at this location, bolt could not be hidden below transom line. Colour cap not indicated in design thus not included.

Jordan Anderson (Clarke Facades)

12/6/2024 4:08:55 PM

Building A>Ground Floor>0­33 Corridor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.234

edges to be finished and skirting to be completed.

12/6/2024

12/13/2024

Mace Post PC Snag

Completed

Fit-out

Swiftcrafted

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:38:06 PM Comments

Created By

Date

Not sure what is required. Don’t believe this is SCL works. Dry lining and glass doors not in SCL scope

Alex Money (Swiftcrafted)

12/9/2024 10:25:52 AM

Building A>Second Floor>02­R07 T­Riser

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.237

general ­ skirting in building B is capped and cover. which is correct

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:44:53 PM 12/10/2024 9:02:54 AM

Project Name: B5412 Project Honey

Page 3 Of 7


Building A>Sixth Floor>06­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.243

concrete up stand needs cover up to raised access floor level

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:58:23 PM Building A>Sixth Floor>06­05 WC Core

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.242

missing hatch

12/6/2024

12/13/2024

Mace Post PC Snag

Completed

Fit-out

Swiftcrafted

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:57:33 PM Comments

Created By

Date

Hatches are not by SCL ­ please reissue

Alex Money (Swiftcrafted)

12/9/2024 10:20:42 AM

Building C>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.228

grill detail not accepted.

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:23:47 PM Building C>Ground Floor>Core 1 ­ C­L00 Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.248

clean concrete of muck

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

Images

12/6/2024 2:16:23 PM 12/10/2024 9:02:54 AM

12/6/2024 2:16:28 PM Project Name: B5412 Project Honey

Page 4 Of 7


2

T408928.249

is this insulation the correct detail

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

M&E

Halsion

Francis Hunter (Luke Nurser)

Images

12/6/2024 2:17:18 PM 3

T408928.250

light not working

Images

12/6/2024 2:18:04 PM Building C>Ground Floor>Core 1 ­ L00 Lift Lobby

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.244

how is the finished ?

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

12/6/2024 2:03:54 PM 2

T408928.245

finish around edges required

Images

12/6/2024 2:04:58 PM Building C>Ground Floor>Front Lobby & Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.246

general ­ clean off concrete and any mess from coring . remove exposed screws etc

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

12/10/2024 9:02:54 AM

Project Name: B5412 Project Honey

Page 5 Of 7


Images

12/6/2024 2:06:59 PM

12/6/2024 2:07:00 PM

12/6/2024 2:08:11 PM

Building C>Ground Floor>UKPN Ring Main Unit

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.227

damage to bottom of door

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Architect

Darling Associates

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:22:27 PM Building C>Lower Ground Floor>Cycle Stacker Store

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.251

oil all bike racks and confirm each moves easily

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Cleaning

Serna Cleaning

Francis Hunter (Luke Nurser)

Images

12/6/2024 2:21:09 PM Building C>Roof (L7)>Core 1 Lobby L07­Mezz

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T408928.247

roof leaks still clearly evident

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Roofing

Aym (Services) Limited

Francis Hunter (Luke Nurser)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

12/6/2024 2:10:36 PM

12/6/2024 2:10:46 PM

Elevations>Building B>North Reference

Description

12/10/2024 9:02:54 AM

Project Name: B5412 Project Honey

Page 6 Of 7


1

T408928.241

gap to be made good

12/6/2024

12/13/2024

Mace Post PC Snag

Opened

Facade

Clarke Facades

Francis Hunter (Luke Nurser)

Images

12/6/2024 1:52:10 PM

12/10/2024 9:02:54 AM

Project Name: B5412 Project Honey

Page 7 Of 7


B5412 Project Honey Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.614

back in quite thin layer, could do with being topped up

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:13:10 PM T444645.615

11/27/2024 1:13:20 PM

General clean required

Images

11/27/2024 1:15:45 PM T444645.616

positioning of plants to be reviewed

Images

11/27/2024 1:16:56 PM T444645.617

general comment ­ planting & shingle around edges to be complete

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

T444645.618

capping bolts required to bench bases

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:29:12 PM

12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 1 Of 7


T444645.619

paving shouldn’t be exposed, soil to run to edging

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:31:12 PM T444645.620

soil to be reduced around edges prior to bark being installed

Images

11/27/2024 1:32:43 PM T444645.621

11/27/2024 1:32:48 PM

11/27/2024 1:32:53 PM

could this not be rotated?

Images

11/27/2024 1:36:27 PM T444645.622

branches to be released on all trees

Images

11/27/2024 1:39:45 PM T444645.623

very poor finish on this one bench. looks like it’s molding unlike the rest

Images

11/27/2024 1:41:03 PM 12/5/2024 10:46:20 AM

11/27/2024 1:41:09 PM Project Name: B5412 Project Honey

Page 2 Of 7


T444645.624

resin to be cleaned out prior to tree bark

11/27/2024

12/4/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/27/2024 1:43:34 PM T444645.625

11/27/2024 1:43:50 PM

aco to be cleaned out

Images

11/28/2024 9:51:38 AM T444645.626

finishes to be reviewed where there is discoloration

Images

11/28/2024 9:57:54 AM T444645.627

concrete to be taken back to ensure correct depth of shingle

Images

11/28/2024 10:00:05 AM T444645.628

concrete to be faced off as will be visible

Images

11/28/2024 10:06:03 AM 12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 3 Of 7


T444645.629

shingle to be above concrete upstand locally

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/28/2024 10:07:41 AM T444645.630

fillet to be tidied up ­ brook street planter

Images

11/28/2024 10:09:11 AM T444645.631

broken paver ­ gaps around portal frame to be reviewed. brook street ramp

Images

11/28/2024 10:10:17 AM T444645.632

metal edging to be cleaned down

Images

11/28/2024 10:11:36 AM

11/28/2024 10:11:53 AM

Building A>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1262

make good to flood grille upstand

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 4 Of 7


Images

11/22/2024 10:50:50 AM 2

T345545.1263

11/22/2024 10:50:55 AM

make good to flood grille upstand

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 10:52:14 AM 3

T345545.1276

11/22/2024 10:52:18 AM

detail behind brickwork and against facade to be confirmed and completed

Images

11/22/2024 11:22:37 AM 4

T345545.1288

make good to wall ahead of flood grille install

Images

11/22/2024 11:49:40 AM Building A>Ground Floor>00­01 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T444645.634

how will this be finished ?

11/28/2024

12/5/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

11/28/2024 10:20:17 AM 12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 5 Of 7


2

T444645.712

paving cuts to be improved

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Images

12/3/2024 11:24:21 AM Building B>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1279

one row of tactiles missing

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (sam peach)

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (James McKeever)

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

Images

11/22/2024 11:25:28 AM 2

T459973.21

Resin left too low leaving excessive step and visible packers

Images

12/3/2024 10:06:18 AM 3

T444645.672

12/3/2024 10:06:23 AM

Resin to be cleaned from bottom of equitone panels

Images

12/3/2024 10:16:12 AM

12/3/2024 10:16:17 AM

12/3/2024 10:16:24 AM

Building B>Ground Floor>00­01 Reception Reference

Description

12/5/2024 10:46:20 AM

Project Name: B5412 Project Honey

Page 6 Of 7


1

T459973.4

Shingle/gravel to be completed

12/3/2024

12/10/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (sam peach)

Images

12/3/2024 9:49:03 AM Building B>Ground Floor>00­15 Office

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1283

under flood grilles to be made good

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 11:30:46 AM Building C>Ground Floor

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T345545.1289

landscaping around edgings incomplete

11/22/2024

11/29/2024

Snag

Opened

Groundworks, Externals & Demolition

Riney

Darling Associates (Robyn Harrison­ Church)

Images

11/22/2024 11:50:27 AM Building C>Ground Floor>Entrance/Exit Ramp

1

Reference

Description

Issued Date

Target Date

Task Type

Status

Issued To Package

Issued To Organisation

Issued By Organisation

T353957.137

Aco channel to be replaced

11/26/2024

12/3/2024

Client Snag

Opened

Groundworks, Externals & Demolition

Riney

McLaughlin & Harvey (Connor Casey)

Images

11/26/2024 12:01:14 PM

12/5/2024 10:46:20 AM

11/26/2024 12:01:24 PM

Project Name: B5412 Project Honey

Page 7 Of 7


Project Honey – Water Management

FH090-151015


15 Trench Road Newtownabbey Co. Antrim BT36 4TY

T. 028 9034 2777 info@mclh.co.uk www.mclh.co.uk

Issued by Email 5412 – Project Honey, Kington Upon Thames

28th November 2024

Water Quality and Management Dear Sirs, As discussed, we confirm that until full and acceptable water quality results are provided, i.e. two clean sets of trend logs confirming cleanliness of systems returned from UKAS accredited test laboratories, achieving parameters and tolerances as detailed and stipulated within BSRIA BG29/2021, any required mitigations and remedials to clean system(s) and achieve the BSRIA requirements will be the responsibility of MCLH. This is on the basis that from the point of practical completion no additional works are carried out on the systems by others with exception to ongoing water management of these systems.

Yours faithfully

Andrew Doherty Operations Manager

McLaughlin & Harvey Holdings Limited is a company registered in Northern Ireland. Registered number: NI 633962. Registered office: 15 Trench Road, Newtownabbey, Co. Antrim, BT36 4TY


Project Honey – Car Park Water Management

FH090-151015


15 Trench Road Newtownabbey Co. Antrim BT36 4TY T. 028 9034 2777 info@mclh.co.uk www.mclh.co.uk

Mason Navarro Pledge The Foundry 5 Baldwin Terrace London N1 7RU

To Steve Vernon We MCLH, agree to monitor water seepage in the Precast slabs within the carpark until such a time that the structure is free of unmanaged/trapped water.

Regards

Andrew Doherty Operations Manager

McLaughlin & Harvey Ltd is a company registered in Northern Ireland. Registered number: NI27864. Registered office: 15 Trench Road, Newtownabbey, Co. Antrim, BT36 4TY


Project Honey – Key Re-inspections post PC R3

FH090-151015


key re-inspections post PC project:

Surrey House Island Site (10372)

client:

Globe Kingston Ltd/Cube Advisers Ltd

date:

06 December 2024

In addition to the snagging works listed within the PC Certificate, the below list identifies works to be carried out post Practical Completion: •

Re-snagging of the ground and first floor façade, external entrances and link portal to Building A. To be re-inspected on completion of MCLH snagging works. Knight Frank and Mace to be invited and EOC to re-inspect in January.

•

Re-snagging of the woodland walk and back of house areas of Building A. To be reinspected on completion of MCLH snagging works. Knight Frank and Mace to be invited and DAA to re-inspect in January.

•

Car Park Reception and pedestrian corridor finishes to be reviewed and re-inspected following post-Contract cosmetic remedial works. (walls, ceiling, lights and protection of low-level services)

•

Installation of additional door to south fire exit to car park to be carried out for compliance with SBD.

•

Issuing of Final BIM model to Occupier for final verification

•

Re-snagging of lifts in Building A to be carried out and demonstration of lift speeds/ wait time being achieved in line with minimum performance criteria.

David Lunt Director

FH057-151015