Skip to main content

Asphalt Contractor September 2026

Page 1

THE EQUIPMENT THAT HELPED BUILD AN INDUSTRY

T I A

RENTALS SALES AND SERVICE

SELF-PROPELLED MACHINES

ZERO DOWN

MASTIC MACHINES

FINANCING FOR QUALIFIED BUYERS

Awarded Contract

*Subject to approval

Contract # 050625-TWK

At m pr

S P R AY M AST E R T R A I L E R S

Th ar co TRUCK MOUNT UNITS

C

OIL-JACKETED M E LT E R / A P P L I C AT O R S

O

LOCATIONS NATIONWIDE

52

sealmaster.net 800-395-7325

ACON0926_02-7_TOC_BN_BN.indd 2

8/27/26 9:25 AM


THE LEADER IN PERFORMANCE AND EFFICIENCY!

K

At Gencor®, we’ve led the industry with the most fuel-efficient, environmentally clean and lowestmaintenance design available to the hot mix industry. Gencor Industries remains focused on proactively serving and satisfying its customers from all aspects. Through improved cost-effectiveness, and quality of its products and services, Gencor’s personnel are dedicated to the principle of providing the highest quality to the industry to maintain a sustainable competitive advantage for Gencor®. Call 407-290-6000 or visit www.gencor.com

One Company.One Source.One Solution 5201 N. Orange Blossom Trail Orlando, Florida 32810

ACON0926_02-7_TOC_BN_BN.indd 3

INDUSTRIES INC.

8/27/26 9:25 AM


TABLE OF CONTENTS | SEPTEMBER 2026

COVER STORY The 2026 Tandem Roller Spec Guide

Exclusive comparison matrix covering all the specifications needed for selecting your next jobsite workhorse. Check out our abreviated selection here, and all models at ForConstructionPros.com | 20 TECHNOLOGY UPDATE

12 The 3 Phases Of Technology Adoption Hear from industry experts on how tech can intelligently shape the world with the data to prove it.

PRODUCTION GAINS

JOBSITE INNOVATIONS

14 A Perspective On Proficiency Testing

32 Quality Control Doesn’t End When Asphalt Is Installed

When a proficiency sample box arrives, most labs clear a senior technician’s schedule and treat it like game night.

FACE OF THE INDUSTRY

People are increasingly asking a harder question, and it isn’t about how the job looked at handoff, it’s about how it will look in ten or twenty years.

PRESERVATION & SUSTAINABILITY

34 Rethinking Fog Seals As Strategic Pavement Preservation Over the last decade, fog sealing has changed in ways that haven’t fully caught up with how the industry talks about it.

30 Cold Recycling’s Biggest Champion WWW.FORCONSTRUCTIONPROS.COM/ASPHALT

Jessie Boone makes it her mission to help contractors and road owners rethink pavement rehabilitation.

CONTRACTOR WWW.FORCONSTRUCTIONPROS.COM/ASPHALT WWW.FORCONSTRUCTIONPROS.COM/ASPHALT

CONTRACTOR LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS

36 Last Exit

LATEST INNOVATIONS INNOVATIONS FOR FOR ASPHALT ASPHALT PROFESSIONALS PROFESSIONALS LATEST

ASPHALT ASPHALT

SEPTEMBER 2026 Vol. 40 No.8

CONTRACTOR CONTRACTOR LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS

LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS

Published by IRONMARKETS

Asphalt

Asphalt CONTRACTOR

CONTRACTOR

LATEST INNOVATIONS INNOVATIONS FOR ASPHALT ASPHALT PROFESSIONALS 201 N. Main Street Ste 350, Fort Atkinson, WIFOR 53538 LATEST PROFESSIONALS (800) 538-5544 • WWW.IRON.MARKETS www.ForConstructionPros.com/Asphalt LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS

Published and copyrighted 2026 by IRONMARKETS. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage or retrieval system, without written permission from the publisher. Asphalt Contractor (ISSN 1055-9205, USPS 0020-688): is published ten times per year: January, February/March, April, May, June/July, August, September, October, November, December by IRONMARKETS, 201 N. Main St. Ste 350, Fort Atkinson, Wisconsin 53538. Periodicals postage paid at Fort Atkinson, Wisconsin and additional entry offices. POSTMASTER: Please send change of address to ASPHALT CONTRACTOR, 201 N. Main St. Ste. 350, Fort Atkinson, WI 53538. Printed in the U.S.A. SUBSCRIPTION POLICY: Individual subscriptions are available without charge only in the USA. The Publisher reserves the right to reject nonqualifying subscribers. One-year subscription to nonqualifying individuals: U.S. $45.00, Canada & Mexico $65.00, and $95.00 all other countries (payable in U.S. funds, drawn on U.S. bank). Single copies available (prepaid only) $10.00 each (U.S., Canada & Mexico), $15.00 each (International).

4 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_02-7_TOC_BN_BN.indd 4

IN EVERY ISSUE 8 Editor’s Perspective

www.ForConstructionPros.com/Asphalt

8/27/26 9:25 AM


ON TRACK PERFORMANCE

& Y

c

g

E

e

g

With over a century of innovation to its credit, Blaw-Knox® pavers have earned a reputation for quality, durability, and performance unmatched in the industry. Our continued focus on innovation is what drives our product engineering with designs that improve performance while maintaining user-friendly, ergonomic comfort and reliability for the operator. Contact your Blaw-Knox dealer or visit www.blawknox.com for more information. BLAW-KNOX, THE LEGACY LIVES ON.

I

e o

Blaw-Knox Corporation 1280 Superior Avenue Chambersburg, PA 17201 Tel. 717-400-7900

ACON0926_02-7_TOC_BN_BN.indd 5

8/27/26 9:25 AM


DIGITAL CONNECTION www.ForConstructionPros.com/Asphalt

How Jake Hoefert Went From Laborer To Owner | Watch FCP

S

This is a candid, tactical conversation for contractors thinking about what comes after the first few good years: How to grow without breaking the bank, and how to strategize your branding to suit your customers.

,,

Watch the video at: https://asph.link/ flkmmjvk

LiuGong Launches Battery-Electric Equipment Lineup in North America

Midyear Check: Construction Risks Worth Revisiting in 2026

BA250 Gets A Lifeline In Senate’s Highway Bill Stopgap

The lineup of new equipment includes wheel loaders, excavators and material handling equipment.

Six months after Sentry’s 2026 risk outlook, rising costs, workforce shortages, litigation and severe weather remain top concerns for contractors.

The new surface transportation bill gets an extension, but theres still a long road ahead before it gets passed.

Read more at: https://asph. link/i7scrjyb

Read more at: https://asph. link/geqbt2w9

Read more at: https://asph.link/ eloti69d

ABC: Construction Unemployment Rate Rises to 4.7% in June National construction unemployment reached 4.7% in June, while higher labor costs, insurance premiums, tariffs and energy prices continue to weigh on construction activity. Read more at: https://asph.link/ htftgujf

Signup for the Roadbuilding Update, a free bi-monthly newsletter for the most up-to-date DOT, FHWA, asphalt, and other industry news

6 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_02-7_TOC_BN_BN.indd 6

www.ForConstructionPros.com/Asphalt

8/27/26 9:25 AM

Industry Wind


N

n te une

% in ts, and eigh

t: ink/

e,

SYSTEMS

ii11u111 iii1A r11u1a1:.=a=a 1.u111ru 1-1:.11 Reputable and reliable ADP-1 00 asphalt blending system

,, �>

Globally Known For Reliable Automation Systems!

Industry comme Windows-based Graphics Enhanced User Int

lm�roveo �ro�ortionin� accurac� rro�er tim e se�uencin� of events Accurate oata recoroation

ave een 1n ed into in over 22 countries on 6 continents!

Keeping the Peace Between Management & Labor, Contractors & Quality Control.

Designed to proportion aggregates and additives according to prescribed mix formulas as well as measure and control liquid asphalt mass flow rate so blends are accurately interlocked to the measured aggregate.

Alarm an□ oeviation annunciation �im�le multi-�oint calioration ACON0926_02-7_TOC_BN_BN.indd 7

8/27/26 9:25 AM


EDITOR’S PERSPECTIVE Brandon Noel, Editor-in-Chief

EDITORIAL

bNoel@iron.markets 234-600-8983

Editor-In-Chief ........................................................... Brandon Noel bnoel@iron.markets

I’ll See You On The Road

Content Director, Marketing Services ...........Jessica Lombardo

Let’s talk about it.

Art Director ............................................................... April Van Etten

asherrier@iron.markets

AUDIENCE Audience Development Director ......................... Angela Franks PRODUCTION Senior Production Manager ...................................... Cindy Rusch crusch@iron.markets

aschwandt@iron.markets

Brand Manager ..................................................... Megan Perleberg mperleberg@iron.markets

Sales Representative ..................................................Sean Dunphy sdunphy@iron.markets Sales Representative ................................................... Kris Flitcroft kflitcroft@iron.markets

Creativity. Community. Labor rights. Safety. Sustainability. Policy and public infrastructure. No small items, to be sure. I had a suspicion, one that has proved accurate, that what the asphalt industry does touches every life in this country. It connects us all, though most never notice. Objectively, I don’t know how successful I’ve be in any of these aims—that is something only others can speak to—but along the way I have been fundamentally changed by my experiences these past four years. So, it is with a heavy hear that I tell you that my time as your Editor-in-Chief is coming to a close. That’s the bad news. The good news is that I won’t be far away. Where I go next is to the contractor side of our industry, and really, where my heart has always been: With those who are doing the work. Thank you all for embracing me, teaching me, and making me feel like one of your own. I’ll see you on the road.

IRONMARKETS Chief Executive Officer.................................................. Ron Spink Chief Revenue Officer ............................................Amy Schwandt VP, Finance .......................................................................Greta Teter VP, Operations & IT ....................................................Nick Raether Brand Director, Construction, OEM & IRONPROS .....................................................Sean Dunphy Brand Director, Supply Chain ....................................Brian Hines Director, Content ......................................................Marina Mayer Director, Event Content & Programming........ Jess Lombardo Director, Lead Generation Operations ................. Bailey Acton CIRCULATION & SUBSCRIPTIONS 201 N. Main St. Ste. 350, Fort Atkinson, WI 53538 afranks@iron.markets

LIST RENTAL Sr. Account Manager ....................................Bart Piccirillo | Data Axle (518) 339 4511 | bart.piccirillo@infogroup.com

REPRINT SERVICES Brand Manager ..................................................... Megan Perleberg mperleberg@iron.markets | (800) 538-5544 Published and copyrighted 2026 by IRONMARKETS. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording, or any information storage or retrieval system, without written permission from the publisher.

@ASPHALTCONTRACTOR @ASPHALTCONTRCTR @ASPHALTCONTRACTOR @ASPHALT-CONTRACTOR-MAGAZINE

Published by IRONMARKETS 201 N. Main St. Ste 350, Fort Atkinson, WI 53538 (800) 538-5544 • WWW.IRON.MARKETS

E12

SCAN TO READ MORE

8 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_08-9_Editor_BN.indd 8

jlombardo@iron.markets

Managing Editor ......................................................Allyson Sherrier

ADVERTISING/SALES Brand Director ........................................................... Amy Schwandt

I

have a confession to make. Four years ago, when I started as your editor, I didn’t know anything. I’m not just talking about asphalt or pavement. I didn’t know how to be a “professional” editor either. I was a published author and I had been the editor for a poetry and art magazine, far from the sort of rigor and rules of being a “B2B” editor in a corporate work environment. Because of this, since day one, I have been on a mission. My first mission was to learn everything I could about the asphalt industry, about pavement maintenance, about mix design, rolling, paving, aggregates, QC, etc. The more I learned, the more areas of the job there seemed to be, and quickly I discovered that being in the field was the only real way to properly educate myself. So, I got out into the field as much as possible, and that, my friends, was where I fell in love with the industry. My second mission was as visible as it was glamorous: learning how to be a professional editor. This journey wasn’t posted online as content, funny videos, or podcasts – this played almost entirely behind the scenes as my boss (The great Marina Mayer) helped me through all of the growing pains. I hustled as much as I could, and only one time did I have to scrap an article because it wasn’t up to muster. Only the closest of readers might have noticed my growth in this regard through the quality of my articles over the last four years. For me, when I look back at my earlier pieces, it’s kind of shocking. But I had a third mission, an unspoken one. I secretly wanted to see if I could get away with being able to bring into my work here some of what I am passionate about.

L

www.ForConstructionPros.com/Asphalt

8/18/26 8:41 AM

Weiler MT


oel

ets

do

ets

er

LEADING THE WAY Weiler Material Transfer Vehicles lead the way with proven innovations to provide the lowest cost per ton of operation.

ets

ks

ch

ets

Variable speed elevator and conveyors meet production requirements while minimizing wear.

Innovative and reliable operator friendly features such as paver hopper management system with distance to paver, storage hopper management and auto chain tensioning.

en

dt

ets

rg .

ets

hy ts

oft ts

nk dt er er

hy es er do on

xle

om

rg

44

TS. or al, val er.

Clam shell doors and full width drop down floors provide unmatched access for cleanout and maintenance.

The multiple, incremental improvements to the 4th generation of chains, sprockets and augers are retrofittable to all machines and provide increased wear life.

E

I 53538 TS

E1250C

E1650A

E2850C

E2860C weilerproducts.com

Weiler MTV Ad_Asphalt Contractor.indd 1 ACON0926_08-9_Editor_BN.indd 9

12/12/2025 7:32:43 AM 8/18/26 8:41 AM


NEW PRODUCTS

A

T

S A

Aesco-Madsen Eco-Foam 2 Additive System ALmix INSIGNIA VISION ALmix IV bridges the gap via the Insignia Cloud, giving your management team a live look at the facility’s health and output. In the high-stakes world of asphalt production, information is the lifeblood of your business. Insignia Vision, or ALmix IV, is designed to deliver a continuous, high-speed infusion of plant data directly into the heart of your headquarters. It provides a constant stream of operational intelligence, ensuring your leadership team has the “vision” to lead with precision. ALmix IV bridges the gap via the Insignia Cloud, giving your management team a live look at the facility’s health and output.

Growing rapidly in popularity over recent years has been a practice known as warm mix, which involves the injecting of water into hot asphalt cement (A/C) just before it reaches the aggregate with which it is to coat. When the A/C and water mix, a unique foam is produced which can effectively bind with aggregate material that has been heated to temperatures notably lower than the aggregate temperatures required for traditional hot mix asphalt. The many benefits of this process include saving on fuel consumption as well as reducing greenhouse gas emissions. It is hence no surprise that one of Aesco Madsen’s most popular additive systems is their Eco-Foam II warm mix system equipped with it’s static inline vortex mixer. As it’s name suggests, the static inline vortex mixer is placed inline with the asphalt cement piping so that the A/C flows through the mixer. This stationary component is considered static because it is able to effectively mix the asphalt cement and water without the use of moving parts.

Troxler Moisture Measurement System Model 3630 Measures moisture content as the aggregate moves through the plant. The MMS Model 3630 uses proven nuclear technology to continuously monitor moisture in your aggregate mix. The moisture measurement occurs as the mix moves through the plant on the conveyor belt. There is no physical contact with the aggregate mix or belt. The system provides a continuous reading of the moisture content. The moisture content, combined with the knowledge of the mass proportions of the other components in the mix, provides you with a precise and reliable moisture content of the aggregate.

CASE 856D Motor Grader

Dynapac CP28 Pneumatic Roller The CP28 pneumatic tire roller, the largest in its class, capable of ballasting from 21,000 to 62,000 pounds. It features three ballast sections and water-sealed tanks. The roller is versatile, used in various applications like chip seal, soil compaction, and asphalt compaction in the “intermediate zone” temps between 180-220 degrees. It offers static compaction, which differs from vibratory methods by exerting pressure from the bottom up, akin to kneading bread. New features include an operator station similar to other Dynapac models and an “air on the run” system for individual tire inflation and deflation.

10 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_10-11_Products_BN.indd 10

The new CASE 856D motor grader, along with the hefty 173 hp engine and nimble design, has one of the most intelligent, load-sensing hydraulic circuits around plus an innovative moldboard design to provide reliable traction and balanced blade performance on challenging underfoot conditions. It’s now available with electro-hydraulic controls via joysticks for smooth, responsive handling and operation. It comes in 4WD/AWD and is ready for machine control. Service points are easily accessible, quick work can continue until you’re done.

E b w p R u w b P

B t

E s th th o w in

E SAKAI America SV544-1 Series 84” Soil Compactor The SV544-1 soil compactor delivers enhanced performance without sacrificing simplicity—more power, less fuel, zero complicated screens. The SV544-1 Series vibratory single drum soil compactor is the latest update to the best-selling 84” SV544 line introduces targeted powertrain enhancements aimed at boosting overall performance and efficiency on the job site. The primary modification to the SV544-1 is the integration of the Cummins F3.8 Performance Series engine, which now generates 148 horsepower (110 kilowatts).

www.ForConstructionPros.com/Asphalt

8/18/26 8:41 AM

In re H a g ri re

W is p s s o a

W m d c th to


Advertisement

The Relentless Innovator:

Superior Durability for Your Asphalt Operations

Your Partner for Proven Profitability If your business is in the asphalt industry you need to talk to Gerry.

This asphalt bucket has processed 1.2 million tons of material, is 4 years old and will get up to 8 years before replacement.

EccoFab President, Gerry Bauer is constantly pushing the boundaries of design, engineering, and innovation to create wear parts that not only withstand the toughest conditions but provide superior durability and exceptional heat resistance. Realizing that clients were experiencing shortened wear life using traditional OEM wear parts, he began experimenting with Hardox® steel in 1988. In 2000, EccoFab was invited to be part of the launch of the domestic U.S. Hardox® Wear Parts Network where Gerry has been the leading expert.

Bringing Unparalleled Durability and Less Downtime to Your Asphalt Operations EccoFab’s asphalt drum flights, crafted from Hardox® HiTemp steel, exemplify the robustness and reliability that is critical in the asphalt industry. Subject to continual friction and heat, these components are critical to the overall efficiency of your operation. EccoFab drum flights, renowned for their heat and wear resistance, make them the perfect choice for your highintensity asphalt production.

Extended Lifespan Equals Cost-Efficiency In contrast to conventional OEM flights that require replacement within two years on average, EccoFab’s Hardox® HiTemp steel drum flights offer significantly longer life. Even after 4 years and 1.2 million tons of material our flights are still going strong and we estimate at least another four years of rigorous use. This extended lifespan means fewer replacements, reducing your operating costs over time. With EccoFab's Hardox® HiTemp steel drum flights, strength isn't just a feature – it's the foundation. This isn't just any wear plate; it's a 375 Brinell fortress against wear, thriving in scorching conditions up to 500°C (932°F). Forget buckling, say goodbye to cracks. In the world of asphalt production, only the strong survive. Welcome to the era of unstoppable asphalt production.

Industry Expertise

Strongest Wear Parts ­

Constant Innovation

Whether you’re ramping up production or aiming for smoother, more efficient operations, EccoFab’s Hardox® steel asphalt drum flights are the smart choice. By focusing on durability, cost-efficiency, and temperature resilience, we ensure you get the best value out of your production process. Trust EccoFab to elevate your asphalt operations to the next level.

ACON0926_10-11_Products_BN.indd 11

8/18/26 8:41 AM


TECHNOLOGY MATTERS

The 3 Phases of Technology Adoption: Understand, Adjust and Integrate Vögele’s Dash 3 pavers include a mobile feeder and additional screed. When the Vögele paver operator receives real-time survey info, they can adjust feeder speed or screed level. Fleet managers partner with operators to review datasets and identify where they can make changes. RDO Equipment Co.

Many contractors embrace the latest solutions to optimize machine performance.

W

e’re in a new era — not an entirely digital era where the type or size of iron doesn’t matter, but an era of adoption. Whether a contractor integrates machine control or optimizes their fleet by mining machine datasets, contractors are looking to gain an edge on efficiency by onboarding a total jobsite solution, including software and hardware advancements. After meeting with WIRTGEN GROUP, other original equipment manufacturers (OEMs) and contractors, it’s clear that we have the skill, iron and technology to revitalize the nearly 70-plus-year-old interstate

12 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_12-13_Tech_BN.indd 12

highway system, despite any unforeseen challenges. As many crews start work on mega highway projects, we in the industry recognize we’re entering a transitional period as AI machine learning progresses. Many of us are watching these developments, dreaming about the Jetsons-like capabilities — perhaps the ability to pave with the precise mix at the right time based on previous models? However, we’ll only be able to harness this information if we follow an adoption strategy to prepare today for tomorrow’s data and machine learning tools. I’ve learned from contractors that the successful adoption of a total jobsite solution happens in phases: understand, adjust and integrate. By going through the phases, crews move from dreaming to doing when it comes to innovative equipment hardware and software solutions. Let’s review what each phase entails.

1

UNDERSTAND DATA WITH A FLEET MANAGEMENT SYSTEM Nearly a quarter of a century ago, OEMs like John Deere added JDLink Connectivity to collect GPS data points and feed them into a fleet management system (FMS) like John Deere Operations Center. “The first use case of telematics was monitoring the location and production hours,” said Larry Herman Jr., RDO Equipment Co.’s telematics support manager. “During the last 20 years, telematics data has expanded to include Expert Alerts, optimizing preventative maintenance scheduling and keeping machines working when needed.” Since John Deere and the WIRTGEN GROUP joined forces, they’ve been transitioning WITOS FleetView into the Operations Center so

www.ForConstructionPros.com/Asphalt

8/18/26 9:05 AM


fleet managers view data from all their machines — pavers, wheel loaders or skid steers — all in one FMS. Today, most Wirtgen machines are built with the Operations Center, a user-friendly software with various applications, such as Machine Analyzer or Wirtgen Performance Tracker. The Operations Center’s applications can complement surveying equipment from other OEMs, like Topcon Positioning Systems. In reality, most projects include mixed fleets, so a total jobsite solution consists of many iron colors but one data collection system. Equipment fleet managers make data-informed decisions every day. When they view their equipment fleet’s data in a consolidated dashboard, they can pinpoint iron insights — like an opportunity to swap a larger wheel loader for a smaller one on a particular job to use less fuel while removing asphalt or concrete debris.

2

REVIEW DATA, PERFORMANCE, THEN ADJUST IRON Herman Jr. said every contractor wants to monitor their machines’ performance and plan preventative maintenance as much as possible. “A user-friendly FMS like the Operations Center helps fleet managers to understand how many miles were paved and the total cost of inputs at the end of each week,” Herman Jr. said. When data such as GPS, compaction, or fuel consumption is recorded in the contractor’s preferred FMS, the fleet manager can review the various datasets, including grading information. “Surveying equipment like lidar (light detecting and ranging) captures real-time grading GPS data points each week,” said Cody Wagner, RDO’s roadbuilding technologies product manager. Like dirt, precision in roadwork requires experience, datasets and familiarity with the necessary machinery. To do this, contractors create a finely tuned survey and data collection system through their FMS and add the right equipment model for their projects. For example, Vögele’s Dash 3 pavers

www.ForConstructionPros.com/Asphalt

ACON0926_12-13_Tech_BN.indd 13

include a mobile feeder and additional screed. When the Vögele paver operator receives real-time survey info, they can adjust feeder speed or screed level. Fleet managers partner with operators to review datasets and identify where they can make changes. A paver’s mix can cool for many reasons, including inconsistent speeds, screeds or stops. Wagner shared that one Minnesota contractor used a Pavermounted Thermal Profiling (PMTP) method to record the mat’s surface temperature behind their paver immediately. They fed this data into their online reporting system and partnered with Department of Transportation (DOT) officials to determine its realtime pavement segregation. With this information, this contractor was able to reduce rework and fuel costs. A BRIEF TIMELINE OF MACHINES AND TELEMATICS • Early 2000s: Rise of Telematics Adoption • 2010s: Fleet Management Software (FMS) Unlocks New Opportunities • 2020s: Digital Twins FutureProof Paving

3

INTEGRATE SOFTWARE APPLICATIONS WITH AN EQUIPMENT PARTNER Fleet managers, operators and technicians partner to develop machine monitoring technology solutions for the contractor’s equipment fleet. “RDO developed its telematics team to partner with contractors and drive a collective understanding of WITOS and Operations Center solutions,” said Jake Livingston, RDO’s director of connected support. “With so much data flowing in from connected machines, we’re always working to shed light on the opportunities to turn data into action.” Some dealers, like RDO, offer 3D modeling services or training. Data points can be fed into a CAD (computer-aided design) system to create a digital twin of the paving project. DOT quality inspectors often

review the digital twin of the road’s progress to discuss optimal compaction. After a paver’s initial pass, DOT officials and contractors determine if the mat requires another pass to increase compaction. Fleet managers may opt for vibrating (VV) oscillation (VO), combination (VT), or pneumatic-tire (TT) drums on a Hamm tandem roller, depending on the required impaction force. Rollers like these, plus integration with GPS and surveying data, allow operators to change compaction force periodically. Additionally, support teams train fleet managers and their operators to enable automated field service requests. Contractors discuss machine health monitoring solutions with their trusted dealer, so remote support professionals monitor Hamm roller’s hydraulic pumps or vibration motors’ calibration. This ability becomes even more valuable when contractors work on remote jobsites and field technicians require advanced notice to travel and perform preventative maintenance. Depending on the project, like a tollway road restoration, the DOT may require in the bid for the contractor to maintain the road up to 10 years after the initial project is completed. Also, many state or countyfunded projects can have bonuses for accurate density. With the datasets, models and machine monitoring data, contractors have the information to illustrate that their highway restoration will last for years. Adopting a total jobsite solution for your jobsite will require time, team members and trusted experts. However, when contractors understand their equipment fleet’s data, they can adjust machines based on its performance and then integrate machine monitoring and modeling software. Contractors who adopt a total jobsite solution prepare their team for futuristic machinelearning solutions that may be closer than we think. by Dennis Howard is senior vice president of Roadbuilding and Minerals at RDO Equipment Co., where he also leads RDO’s Wirtgen Group business.

SEPTEMBER 2026 ASPHALT CONTRACTOR 13

8/18/26 9:05 AM


PRODUCTION GAINS

UNDER THE STADIUM LIGHTS: A Perspective On Proficiency Testing

AdobeStock_andrew_shots

When a proficiency sample box arrives, most labs clear a senior technician’s schedule and treat it like game night.

I

was on a plane the other day, chatting with a high school soccer coach who happened to be sitting next to me. His excitement to talk about coaching seemed palpable, so I listened. He described an interesting difference between practice sessions and game day. During routine practice sessions, players sometimes go through the motions while completing repetitive drills. However, when the stadium lights come on, the same players often play with remarkable precision. They hadn’t suddenly become different players; the spotlight simply changed their operational environment. As I listened to the coach, I realized laboratories face a similar challenge.

14 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_14-19_Production_BN.indd 14

A proficiency sample is the laboratory equivalent of game day. But what happens if a laboratory prepares differently for the game than it does for practice? In a construction materials testing laboratory, this gap between routine operations and proficiency testing is a tightrope every manager must walk. Daily practice represents the routine high-volume testing of aggregate and asphalt samples from various projects while game night represents the proficiency sample used to evaluate laboratory performance. The challenge comes from balancing two competing priorities: routine testing demands and mandatory compliance work.

Like the soccer team, technicians are not necessarily underperforming because they lack discipline or competence. Instead, the shift in focus and attention can affect how they approach the task. Although lab managers dread seeing low z-scores, they can provide valuable opportunity to identify hidden process weaknesses before they grow into larger problems and begin to affect accreditation. Repeated low ratings may ultimately result in the suspension of a laboratory’s credentials until the issues are resolved. Because the stakes are so high, the arrival of a proficiency sample box creates a major logistical crossroads.

www.ForConstructionPros.com/Asphalt

8/18/26 8:43 AM


SUPERIOR QUALITY ASPHALT STARTS WITH ADM

shots

Your first stop in the FAYAT GROUP road lifecycle, ADM makes the plants that make the hot mix. When it comes to North American roadbuilding, FAYAT Group brands including ADM, BOMAG, Dynapac, LeeBoy, and Mecalac have you covered.

260-637-5729 admasphaltplants.com

ACON0926_14-19_Production_BN.indd 15

8/18/26 8:43 AM


PRODUCTION GAINS Created by Jayanth Rayapeddi

GAME NIGHT OR JUST ANOTHER SAMPLE? When a proficiency sample box arrives, the temptation to treat it as a highstakes championship game is understandable. Laboratory managers are inclined to assign the work to a senior technician by clearing their schedule of all daily work and letting them focus only on the proficiency sample. This approach would likely result in a favorable z-score, but it may be capturing the laboratory’s optimized performance rather than normal operating capability. The other option is to add the proficiency sample into the daily workflow along with the truckloads of samples waiting to be tested. This does not mean treating it casually. It means applying the same documented procedures, quality controls, and equipment requirements that should exist for every other sample tested in the laboratory. The difference is that technicians must work on proficiency samples while managing the daily demands of routine testing. This choice of how the proficiency sample is handled raises an important question: what exactly is proficiency testing supposed to measure? Is it intended to demonstrate the laboratory’s absolute best performance under ideal conditions, or its ability to consistently produce reliable results through its established processes? WHY LOW SCORES HAPPEN IN A BUSY LAB When a low performance rating occurs in this everyday environment, it is rarely a sign of subpar work or technicians intentionally taking shortcuts. Instead, a low z-score may reflect the influence of normal operational conditions, competing deadlines, shared resources, workflow limitations, and so on.

16 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_14-19_Production_BN.indd 16

A good example of this is a proficiency sample that may come with instructions to condition an asphalt mix sample in accordance with AASHTO R30. On game night, the oven is exclusively used for proficiency sample testing and the door stays shut for the entire duration. However, in a busy lab with technicians performing multiple tests, the same oven is often shared for other tasks. As technicians open and close the door, the temperature stability may be affected, potentially influencing the final test results. This illustrates that the issue is not necessarily technical competency. Instead, it reveals how the design of a laboratory’s scheduling and operating system can influence the consistency of test results. In other words, the proficiency sample did not create this vulnerability; it exposed a vulnerability that existed within the laboratory’s existing workflow. THREE PLACES TO LOOK FOR ROOT CAUSE A low z-score is a valuable indicator that can reveal weaknesses within a lab’s processes. To uncover the source of the problem, a lab should conduct a thorough root cause analysis by examining three categories of potential causes. • Technical causes include issues such as using out-of-calibration equipment or procedural errors. • Operational causes include issues such as shared equipment, staffing issues, workflow issues, or scheduling conflicts. • Human causes include issues such as training gaps, fatigue, or communication breakdowns. COACH THE SYSTEM, NOT THE PLAYER When a root cause analysis uncovers an issue like a fluctuating oven temperature,

a manager has a choice. Some managers might simply focus on the technician performance and issue a generic reminder to “follow the spec.” Others may use the opportunity to examine whether there is an underlying issue that is contributing to the low rating. A good coach does not simply criticize a player for missing a pass. They examine whether practice conditions, communication, positioning, or training methods contributed to the outcome and restructure practice sessions to create better habits. Similarly, an effective manager addresses the systemic bottlenecks. Perhaps designating a single, undisturbed oven exclusively for critical conditioning windows is the way to go. The goal is not to assign or apportion blame, but to identify and remove obstacles that can make achieving consistent results easier. At the end of the day, both a coach and a laboratory manager share the same goal, which is to close the gap between daily practice and game night. A proficiency sample should not become a special event to achieve a favorable z-score. Instead, it should provide insight into whether laboratory’s established processes can produce reliable and repeatable results. At the same time, daily testing shouldn’t be vulnerable to poor workflow and impossible deadlines that can influence test results. A strong quality system doesn’t expect technicians to suddenly elevate their performance just because the stakes are higher. Instead, it creates conditions that allow them to perform at that same high level every day. Just as great coaches build winning habits during practice, great laboratory managers build systems that make reliable performance routine – both during everyday testing and when the stadium lights come on. Jayanth Kumar Rayapeddi Kumar is a quality control engineer at Jas. W. Glover Ltd. in Hawaii and a licensed professional engineer in the state of Hawaii. He has over 14 years of experience in the asphalt industry and is an active member of ASTM Committees D04 (Road and Paving Materials) and E36 (Accreditation and Certification).

www.ForConstructionPros.com/Asphalt

8/18/26 8:43 AM


ACON0926_14-19_Production_BN.indd 17

8/18/26 8:43 AM


DESIGN, DETAILS, AND DURABILITY.

10106 SMITH ROAD, FORT WAYNE, IN 46809 | (260) 672-3004 | ALmix.com

Asphalt Contractor - 2026 Full Page Spread Ad 2 - Q4.indd 1 ACON0926_14-19_Production_BN.indd 18

8/18/26 8:43 AM


We don’t just build asphalt plants—we help contractors build stronger businesses. Every ALmix system is engineered around your operation, combining industry-leading durability, advanced technology, and decades of expertise to maximize productivity for years to come. ACON0926_14-19_Production_BN.indd 19

8/13/26 11:28 AM 8/18/26 8:43 AM


HA

W

VIEW COMPLETE LIST HERE

ith so many options available, purchasing a new piece of equipment that meets your needs is not an easy decision. If you’re in the market for a tandem roller, however, this is your best resource. Here, we’ve complied the industry’s only Tandem Roller Spec Guide. We had so many makes/models this year this list had to be abbreiated. Forthe FULL LIST visit the exclusive, interactive and customizable version of this spec guide at http://www.forconstructionpros.com/specguide/roller to sort and compare models based on your requirements.

Ham VIOsyst offe Sma

HD

DYNAPAC NORTH AMERICA

HD

Dynapac tandem asphalt rollers are built for consistent uniform compaction on the job and consistently achieving required density. The operators station is safe, comfortable and have all needed controls easy to access and use. SEISMIC Asphalt for the heavy tandem roller segment is a game changer with automatic adjustable vibration frequency to insure optimal compaction, fuel savings and operator comfort with quieter operation.

HD

Model No.

Engine HP (net)

Operating

Drum

Drum Diameter

Weight (lbs.)

Width (in.)

(in.)

Amplitude (in.)

HD

HD

HD

Frequency (vpm)

Centrifugal Force (lbs.)

HD

HD

CC800

24

3,400

31

23

0.016

4,200

3,800

HD

CC900

24

3,500

35

23

0.016

4,200

3,800

HD

CC900G

19

2,800

35

23

0.016

4,200

3,800

HD

CC900 e

10 kw drive motor, 8.4 kw vibe motor

3,730

35

23

0.016

3,600

3,060

HD

CC900S

24

3,600

35

23

0.013

4,200

3,800

HD

CC950

20

3,000

35

23

0.016

4,200

3,800

HD

CC1000

24

3,700

40

23

0.013

4,200

3,800

HD

CC1000 e

10 kw drive motor, 8.4 kw vibe motor

3,910

39

23

0.014

3,600

3,060

HD

CC1100 VI

35

5,300

42

27

0.02

3,660 / 3,960

5,600 / 6,500

HD

CC1200 VI

35

5,700

47

27

0.02

3,660 / 3,960

6,500 / 7,600

HD

CC1300 VI

50

8,600

51

35

0.008 / 0.020

3,240 / 3,660

4,700 / 8,500

HD

CC1400 VI

50

9,500

54

35

0.008 / 0.020

3,240 / 3,660

4,950 / 9,675

HD

CC2200 VI

74

17,400

59

45

0.01 / 0.03

2,880 / 4,020

15,060 / 17,540

HD

CC2300 VI

74

18,800

59

45

0.008 / 0.02

2,880 / 4,020

13,260 / 16,190

HD

CC3200 VI

74

17,000

68

45

0.01 / 0.03

2,880 / 4,020

16,880 / 20,250

HD

CC3300 VI

74

19,800

68

45

0.01 / 0.02

2,880 / 4,020

16,190 / 18,440

HD

CC4200 VI

130

22,000

66

51

0.012 / 0.031

3,060 / 4,020

18,880 / 28,780

HD

CC5200 VI

130

26,000

77

51

0.012 / 0.031

3,060 / 4,020

20,910 / 32,370

HD

CC6200 VI

130

27,300

84

51

0.012 / 0.031

3,060 / 4,020

23,160 / 35,300

HD

CO2200 VI

74

17,200

59

45

0.011 / 0.027 (0.06 - Oscillation Drum)

2,880 / 4,020 (2,400 osc)

15,060 / 17,540 (23,100 Oscillation Drum)

HD

CO4200 VI

130

21,775

66

51

0.012 / 0.031 (0.06 - Osillcation Drum)

3,060 / 4,020 (2,400 osc)

18,880/ 28,780 (27,450 Osillation Drum)

0.012 / 0.031 (0.06 - Osillcation Drum)

3,060 / 4,020 (2,400 osc)

20,910 / 32,370 (27,450-Osillation Drum)

3,060 / 4,020

23,150 / 35,300

(2,400 osc)

(34,400-Osillation Drum)

CO5200 VI

130

25,800

77

51

CO6200 VI

130

27,300

84

51

0.012 / 0.031 (0.06 - Osillcation Drum)

CC7000 VI

154

32,300

84

55

0.012 / 0.032

2,700 / 2,880

15,512 / 36,419

CC1100C VI

35

4,900

42

28

0.02

3,660 / 3,960

5,600 / 6,500

CC1200C VI

35

5,100

47

28

0.02

3,660 / 3,960

6,500 / 7,600

CC1300C VI

50

8,200

51

35

0.008 / 0.02

3,240 / 3,660

4,700 / 8,500

CC1400C VI

50

8,600

54

35

0.008 / 0.02

3,240 / 3,660

4,950 / 9,675

CC2200C VI

74

16,300

59

45

0.012 / 0.028

2,880 / 4,020

15,060 / 17,540

CC2300C VI

74

16,800

59

45

0.008 / 0.02

2,880 / 4,020

13,260 / 16,190

CC3200C VI

74

17,000

68

45

0.012 / 0.028

2,880 / 4,020

16,880 / 20,250

CC3300C VI

74

17,400

68

45

0.01 / 0.02

2,880 / 4,020

16,190 / 18,440

CC4200C VI

130

20,700

66

51

0.012 / 0.031

3,060 / 4,020

18,800 / 28,780

CC5200C VI

130

22,700

77

51

0.012 / 0.031

3,060 / 4,020

20,910 / 32,370

20 ASPHALT CONTRACTOR SEPTEMBER 2026

ACON0926_20-27_RollerSpecGuideFull.indd 20

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

HD

www.ForConstructionPros.com/Asphalt

8/27/26 9:15 AM


ETE

s.)

-

HAMM (WIRTGEN GROUP) Hamm compaction technology boosts paving contractor productivity and profitability. The HD+ 120i VIO-2 HF rollers come with double VIO compaction which combines vibration and oscillation all into one system – allowing the operator to switch easily between the two while in motion. In addition, Hamm offers automated compaction with real-time density for maximum efficiency and quality on the job with Smart Compact Pro. This results in higher quality compaction, reduced number of passes, Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

Centrifugal Force (lbs.)

HD 8 VV

21.9

3,506

31.5

24.4

0.017 / 0.017

2,880 / 3,660

2,475/ 3,825

vibration-vibration

HD 9 VV

21.9

3,682

35.4

24.4

0.015 / 0.015

2,880 / 3,660

2,475/ 3,825

vibration-vibration

HD 10 C VV

21.9

3,704

39.4

24.4

0.015 / 0.015

2,880 / 3,660

2,475/ 3,825

vibration-vibration

Model No.

HD 10e VV

5,766

39.4

28.3

0.02 / 0.021

3,060 / 3,900

4,950 / 8,078

vibration-vibration

HD 10 P VV

24.8

5,457

39.4

28.3

0.018 / 0.018

3,060 / 3,900

4,500 / 7,425

vibration-vibration

HD 10i VV

33.4

5,457

39.4

28.3

0.018 / 0.018

3,060 / 3,900

5,850 / 9,675

vibration-vibration

5,898

39.4

28.3

0.02 / 0.021

3,060 / 3,900

4,972 / 8,078

vibration-oscillation

HD 10e VO HD 10 P VO

24.8

5,568

39.4

28.3

0.018 / 0.018

3,060 / 3,900

4,500 / 7,425

vibration-oscillation

HD 10i VO

33.4

5,568

39.4

28.3

0.018 / 0.018

3,060 / 3,900

5,850 / 9,675

vibration-oscillation

HD 12 P VV

24.8

5,942

47.2

28.3

0.018 / 0.018

3,060 / 3,900

5,175 / 8,550

vibration-vibration

6,075

47.2

28.3

0.02 / 0.02

3,060 / 3,900

5,625 / 9,158

vibration-vibration

5,942

47.2

28.3

0.018 / 0.018

3,060/3,900

6,750/11,025

vibration-vibration

6,196

47.2

28.3

0.02 / 0.02

3,060 / 3,900

5,625 / 9,158

vibration-oscillation

HD 12e VV HD 12i VV

33.4

HD 12e VO

*sp

Notes

HD 12 P VO

24.8

6,075

47.2

28.3

0.018 / 0.018

3,060 / 3,900

5,175 / 8,550

vibration-oscillation

HD 12i VO

33.4

6,075

47.2

28.3

0.018 / 0.018

3,060 / 3,900

6,750 / 11,025

vibration-oscillation

HD 13i VV

50

9,184

51.2

35.4

0.012 / 0.02

3,060 / 3,600

8,775 / 14,400

vibration-vibration

HD 13i VO

50

9,338

51.2

35.4

0.012 / 0.02

3,060 / 3,600

8,775 / 14,400

vibration-oscillation

HD 14i VV

50

9,779

54.3

35.4

0.012 / 0.02

3,060 / 3,600

8,775 / 14,400

vibration-vibration

HD 14i VO

50

10,000

54.3

35.4

0.012 / 0.02

3,060 / 3,600

8,775 / 14,400

vibration-oscillation

HD+ 70i VV

75.3

16,019

59.1

44.9

0.014 / 0.024

2,880 / 3,480

14,625 / 18,000

vibration-vibration

HD+ 70i VV HF

75.3

16,019

59.1

44.9

0.014 / 0.024

2,700 / 4,020

15,750 / 19,125

high-frequency vibration

HD+ 70i VO

75.3

16,416

59.1

44.9

0.014 / 0.024

2,880 / 3,480

14,625 / 18,000

vibration-oscillation

HD+ 80i VV

75.3

16,791

66.1

44.9

0.012 / 0.022

2,880 / 3,480

14,625 / 18,000

vibration-vibration

HD+ 80i VV HF

75.3

16,791

66.1

44.9

0.012 / 0.022

2,700 / 4,020

15,750 / 19,125

high-frequency vibration

HD+ 80i VV-S

75.3

17,453

66.1

44.9

0.016 / 0.022

2,520 / 3,000

14,625 / 14,625

vibration with split drums

HD+ 80i VO

75.3

17,188

66.1

44.9

0.012 / 0.022

2,880 / 3,480

14,625 / 18,000

vibration-oscillation

HD+ 80i VO-S

75.3

17,519

66.1

44.9

0.016 / 0.022

2,520 / 3000

14,625 / 14,625

vibration-oscillation with split drums

HD+ 90i VV

115.6

20,462

66.1

47.2

0.014 / 0.026

2,520 / 3,000

13,500 / 18,000

vibration-vibration

HD+ 90i PH VV

75.3

19,955

66.1

47.2

0.013 / 0.024

2,520 / 3,000

13,500 / 16,875

vibration with hydraulic hybrid drive

HD+ 90i VV HF

115.6

20,462

66.1

47.2

0.012 / 0.02

2,700 / 4,020

15,075 / 19,125

high-frequency vibration

HD+ 90i VV-S

115.6

21,609

66.1

47.2

0.016 / 0.024

2,520 / 3,000

18,000 / 19,125

vibration with split drums

HD+ 90i VO

115.6

20,540

66.1

47.2

0.014 / 0.026

2,520 / 3,000

13,500 / 18,000

vibration-oscillation

HD+ 90i PH VO

75.3

19,955

66.1

47.2

0.013 / 0.024

2,520 / 3,000

13,500 / 16,875

vibration-oscillation with hydraulic hybrid drive

HD+ 90i VO-S

115.6

21,113

66.1

47.2

0.016 / 0.024

2,520 / 3,000

18,000 / 19,125

vibration-oscillation with split drum

HD+ 90i PH VV-S

75.3

21,014

66.1

47.2

0.016 / 0.024

2,520 / 3,000

17,550 / 18,900

vibration hydraulic hybrid drive with split drum

HD+ 90i PH VO-S

75.3

20,484

66.1

47.2

0.016 / 0.024

2,520 / 3,000

17,550 / 18,900

vibration-oscillation hydraulic hybrid drive with split drum

HD+ 110i VV

115.6

22,535

66.1

47.2

0.02 / 0.035

2,520 / 3,000

22,275 / 27,000

vibration-vibration

HD+ 110i VV HF

115.6

22,535

66.1

47.2

0.012 / 0.028

2,700 / 4,020

24,750 / 24,750

high-frequency vibration

HD+ 110i VO

115.6

21,995

66.1

47.2

0.02 / 0.035

2,520 / 3,000

22,500 / 27,000

vibration-oscillation

HD+ 120i VV

156.4

27,188

78

55.1

0.014 / 0.037

2,400 / 3,000

21,375 / 36,000

vibration-vibration

HD+ 120i VV HF

156.4

28,753

78

55.1

0.008 / 0.028

2,700 / 4,020

23,625 / 36,000

high-frequency vibration

HD+ 120i V-VIO

156.4

27,959

78

55.1

0.014 / 0.037

2,400 / 3,000

21,375 / 36,000

vibration-oscillation

HD+ 120i VIO-2-HF

156.4

29,459

78

55.1

0.008 / 0.042

2,160 / 4,020

24,750 / 41,400

high frequency vibration-oscillation

HD+ 120i VO

156.4

27,618

78

55.1

0.014 / 0.037

2,400 / 3,000

21,375 / 36,000

vibration-oscillation

Continued on page 22 www.ForConstructionPros.com/Asphalt

ACON0926_20-27_RollerSpecGuideFull.indd 21

SEPTEMBER 2026 ASPHALT CONTRACTOR

21

8/27/26 9:15 AM


HD+ 140i VV

156.4

28,003

84.3

55.1

0.014 / 0.035

2,400 / 3,000

21,375 / 36,000

vibration-vibration

HD+ 140i VV-HF

156.4

29,790

84.3

55.1

0.008 / 0.026

2,700 / 4,020

23,625 / 36,000

high-frequency vibration

HD+ 140i VO

156.4

28,422

84.3

55.1

0.014 / 0.035

2,400 / 3,000

21,375 / 36,000

vibration-oscillation

HX 70i VV-S

74.3

17,574

59.1

44.9

0.016 / 0.023

2,520 / 3,000

14,078 / 14,227

vibration with split drum

HX 70i VO-S

74.3

17,728

59.1

44.9

0.016 / 0.023

2,520 / 3,000

14,078 / 14,227

vibration-oscillation with split drum

HX 70i VS-OS

74.3

18,522

59.1

44.9

0.016 / 0.023

2,520 / 3,000

14,078 / 14,227

vibration-oscillation with split drum

HX 90i VV

101.2

20,540

66.1

47.2

0.017 / 0.027

2,520 / 3,000

17,498 / 18,929

vibration-vibration

HX 90i VO-S

101.2

21,102

66.1

47.2

0.016 / 0.025

2,520 / 3,000

17,498 / 18,929

vibration-oscillation with split drum

HX 90i VS-OS

101.2

22,248

66.1

47.2

0.016 / 0.025

2,520 / 3,000

17,498 / 18,929

vibration-oscillation with split drum

HX 90i VV-S

101.2

21,179

66.1

47.2

0.017 / 0.025

2,520 / 3,000

17,498 / 18,929

vibration with split drum

SAKAI SAKAI specializes in asphalt rollers, soil compactors, and light compaction. The storied 100-year-old Japanese manufacturer is known for reliability, durability, and operating simplicity of its machines. Long-life drum isolators, high-capacity reliable water system and gear-driven oscillatory drums limit down time. SAKAI also offers the Guardman auto brake assist system which detects personnel or equipment in the path of the roller and automatically stops if needed. All SAKAI equipment is built in Japan and USA. Engine HP (net)

Model No.

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

Centrifugal Force (lbs.)

SW354

24

6,525

47

27

0.012

4,000

6,520

SW354W

24

6,745

51

27

0.011

4,000

6,520

TW354 Combi

24

5,865

47

27

0.014

3,120

4,630

SW504

43

8,955

51

31

0.011 / 0.014

3,300 / 3,300

5,955 / 7,710

SW504W

43

9,260

54

31

0.010 / 0.013

3,300 / 3,300

5,955 / 7,710

TW504 Combi

24

7,740

51

31

0.012 / 0.016

3,100

5,955 / 7,710

SW654

73

15,585

58

42

0.011 / 0.021

3,000 / 4,000

13,940 / 15,510

SW654ND

73

16,250

58

42

0.020 vibe / 0.030 osc

2,940 / 2,940

15,285 vibe / 27,875 osc

SW774

110

22,090

66

49

0.012 / 0.020

2,500 / 4,000

9,665 / 23,155

SW774ND

110

23,270

66

49

0.020 vibe / 0.024 osc

3,000 / 3,000

25,180 vibe / 30,800 osc

SW884

130

28,415

79

55

0.013 / 0.025

2,500 / 4,000

14,160 / 39,790

SW884ND

130

29,165

79

54

0.022 vibe / 0.024 osc

3,000 vibe / 2,800 osc

35,585 vibe / 38,600 osc

SW994

130

29,255

84

55

0.013 / 0.026

2,500 / 4,000

15,285 / 41,590

SW994ND

130

29,960

84

54

0.021 vibe / 0.022 osc

3,000 vibe / 2,800 osc

35,585 vibe / 38,600 osc

CR271

20.8

3,245

35

22

0.014

4,000

2,965

R2H-4

73

30,955

83 (combined)

64

Static

Static

Static

GW754 Vib. Tire

110

19,510

77 (overall)

38

0.004-0.029

2,400

1,350-13,040

TS160-4 (PTR)

21

6,515

51 (overall)

Static

Static

Static

WEILER When static compaction is required, the Weiler C310A and C307A perform in a wide range of applications with a split front drum that enables the outer half of the drum to rotate faster than the inner half resulting in quick work on corners and curves, without mat tearing.

Model No.

Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

Centrifugal Force (lbs.)

C307A

74

20,500

50

40/53

N/A

N/A

N/A

C310A

74

26,580

50

40/53

N/A

N/A

N/A

22 ASPHALT CONTRACTOR SEPTEMBER 2026

ACON0926_20-27_RollerSpecGuideFull.indd 22

www.ForConstructionPros.com/Asphalt

8/27/26 9:16 AM


ACON0926_20-27_RollerSpecGuideFull.indd 23

8/27/26 9:16 AM


PR VIEW COMPLETE LIST HERE

BOMAG AMERICAS, INC. BOMAG offers a diverse range of tandem asphalt rollers, designed with a focus on durability, productivity, and efficiency. The heavy tandem range offers three choices in vibration: standard, TanGO oscillation, and Asphalt Manager. The Asphalt Manager system integrates fully automated amplitude control to achieve density faster while preventing over-compaction, and also features an oscillation-only mode. BOMAG has a solution to fit your needs.

Standard (circular excited) vibration

Model No.

Engine HP (net)

Operating Weight (lbs.)

Operating Weight (lbs.) w/ ROPS

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

TanGO Oscillation

Str

Centrifugal Force (lbs.)

BW 900-50

20.0

-

2,646

35.4

22.0

0.020

4,200

3,372

BW 80 AD-5

20.2

-

3,417

31.5

22.8

0.020

2,520 / 3,780

1,686 / 3,867

BW 90 AD-5

20.2

-

3,527

35.4

22.8

0.020

2,520 / 3,780

1,776 / 3,867

BW 100 ADM-5

20.2

-

3,748

39.4

22.8

0.016

2,520 / 3,780

1,776 / 3,867

BW 100 SC-5

20.2

-

3,740

41.7

22.8

0.020

2,520 / 3,780

1,843 / 4,226

BW 100 SL-5

24.8

-

5,181

39.4

27.6

0.020

4,320

7,644

BW 120 SL-5

24.8

-

5,512

47.2

27.6

0.020

4,320

8,992

BW 100 AD-5

33.0

-

5,512

39.4

27.6

0.020

3,780 / 4,020

6,699 / 7,576

BW 120 AD-5

33.0

-

5,953

47.2

27.6

0.020

3,780 / 4,020

8,093 / 9,172

BW 135 AD-5

44.7

-

8,819

51.2

35.4

0.020

3,000 / 3,360

8,700 / 10,858

BW 138 AD-5

44.7

-

9,811

54.3

35.4

0.020

3,000 / 3,360

10,116 / 12,814

BW 141 AD-5 *

72.1

15,212

15,014

59.1

43.3

0.009 / 0.028

4,200 / 2,700

11,911 / 14,388

16,755

16,557

66.1

43.3

0.009 / 0.026

4,200 / 2,700

11,911 / 14,388

BW 151 AD-5 *

72.1

BW 154 AD-5

72.1

18,298

18,100

66.1

43.3

0.012 / 0.024

3,300 / 2,700

14,613 / 20,008

BW 161 AD-5 *

127

22,046

21,848

66.1

48.0

0.016 / 0.031

4,020 / 2,400

16,411 / 24,046

BW 190 AD-5 *

127

26,566

26,368

78.3

48.0

0.012 / 0.034

4,200 / 2,400

22,481 / 23,822

BW 191 AD-5 *

141

29,763

29,565

78.7

55.1

0.010 / 0.029

4,200 / 2,400

22,481 / 23,822

BW 206 AD-5 *

141

31,085

30,887

84.1

55.1

0.010 / 0.028

4,200 / 2,400

22,481 / 23,822

Asp

Ma

* w/ High Frequency option BW 161 ADO-5 *

127

21,826

21,628

66.1

48.0

0.016 / 0.031

4,020 / 2,400

16,411 / 24,046

BW 190 ADO-5 *

127

26,015

25,817

78.3

48.0

0.012 / 0.034

4,200 / 2,400

22,481 / 23,822

BW 191 ADO-5 *

141

29,322

29,124

78.7

55.1

0.010 / 0.029

4,200 / 2,400

22,481 / 23,822

BW 206 ADO-5 *

141

30,203

30,005

84.1

55.1

0.010 / 0.028

4,200 / 2,400

22,481 / 23,822

Effi

* w/ High Frequency option Asphalt Manager

S

Pas

BW 151 AD-5 AM

72.1

17,417

-

66.1

43.3

0 - 0.035

2,760

0 - 31,922

QC

BW 161 AD-5 AM *

127

22,487

22,289

66.1

48.0

0 - 0.036

2,760

0 - 34,170

Resu

BW 191 AD-5 AM *

141

30,644

30,446

78.7

55.1

0 - 0.034

2,760

0 - 26,977

BW 206 AD-5 AM *

141

31,967

31,769

84.1

55.1

0 - 0.033

2,760

0 - 26,977

* w/ High Frequency option BW 174 AP-5

99.6

20,724

-

66.1

47.2

0.014 / 0.024

3,600 / 2,820

19,334 / 22,706

BW 174 APO-5

99.6

21,385

-

66.1

47.2

0.014 / 0.024

2,820 / 2,820

11,915 / 22,706

BW 174 AP-5 AM

99.6

21,385

-

66.1

47.2

0 - 0.033

2,820

0 - 35,744

24 ASPHALT CONTRACTOR SEPTEMBER 2026

ACON0926_20-27_RollerSpecGuideFull.indd 24

www.ForConstructionPros.com/Asphalt

COM

Users ✓ In ✓ B ✓ F ✓ Im

Visi

8/27/26 9:16 AM BOMAG AM2 Asph


TE

PRESCRIBE BETTER

Get your stiffness back with

STIFFNESS. Stronger Asphalt. Healthier Roads.

e

LAB RESULTS

ASPHALT STIFFNESS OVER TIME

Independent field testing shows measurable improvement after treatment with ASPHALT MANAGER 2.

TEST

BEFORE AM2

AFTER AM2

Asphalt Stiffness

Low

Excellent

Mat Density

Fair

Optimal

Pass Count

High

Low

Efficiency

Low

High

QC Satisfaction

Fair

Very High

Results may vary depending on jobsite conditions.

COMMON SIDE EFFECTS

Users may experience: ✓ Increased productivity ✓ Better ride quality ✓ Fewer roller passes ✓ Improved density consistency

One dose. Big results.

Scan here to learn more

Visit www.densitydoctors.com. 25 BOMAG ACON0926_20-27_RollerSpecGuideFull.indd AM2 Asphalt Dysfunction Ad.indd 1

8/27/26 9:16 AM AM 7/28/2026 10:02:55


CATERPILLAR, INC. Cat rollers are designed to help customers be more successful. Support from the extensive Cat dealer network allows contractors to get the most out of their equipment, so they can focus on getting the job done. Caterpillar builds the machines that build a better world. For more information, visit www.Cat.com Engine HP (net)

Operating Weight (lbs.)

Rolling Width (in.)

Drum Diameter (in.)

CB1.7

24.7

3,538

35

22.5

CB1.8

24.7

3,825

39

CB2.5

48.2

5,546

CB2.5 GC

24.7

CB2.7

VIEW COMPLETE LIST HERE

Frequency (vpm)

Centrifugal Force (lbs.)

0.019

3,420

3,057

Single Amplitude, Single Frequency vibratory system

22.5

0.019

3,420

3,057

Single Amplitude, Single Frequency vibratory system

39

28

0.020

3180/3840

4,592/6,697

Single Amplitude, Two Frequency vibratory system

5,546

39

28

0.020

3000/3720

3,925/5,885

Single Amplitude, Two Frequency vibratory system

48.2

5,936

47

28

0.020

3180/3840

5,437/7,929

Single Amplitude, Two Frequency vibratory system

CB2.7 GC

24.7

5,936

47

28

0.020

3000/3720

4,646/6,968

Single Amplitude, Two Frequency vibratory system

CB2.9

48.2

6,415

51

28

0.020

3180/3840

5,559/8,109

Single Amplitude, Two Frequency vibratory system

CC2.7

48.2

5,718

47

28

0.020

3180/3840

5,437/7,929

Single Amplitude, Two Frequency vibratory system

CC2.7 GC

24.7

5,718

47

28

0.020

3000/3720

4,646/6,968

Single Amplitude, Two Frequency vibratory system

CB4.0

48.2

7,971

51

32

0.020

2700/3300

5,037/7,524

Single Amplitude, Two Frequency vibratory system

CB4.4

48.2

8,362

59

32

0.019

2700/3300

5,240/7,828

Single Amplitude, Two Frequency vibratory system

CC4.0

48.2

7,889

51

32

0.020

2700/3300

5,037/7,524

Single Amplitude, Two Frequency vibratory system

0.012/0.026

3,200 / 3,800

11,982 / 17,602

100

"ROPS/FOPS: 19,015 Cab: 19,588"

59

Two Amplitude, Two Frequency vibratory system

0.052

2,400

---

Rear Drum Oscillation System

"ROPS/FOPS: 20,006 Cab: 20,580"

67

0.012/0.026

3,200 / 3,800

11,285 / 17,018

Two Amplitude, Two Frequency vibratory system

0.028/0.034

2,400

17041 / 19491

Versa-Vibe vibratory system operating on low frequency

0.010/0.015

3,800

13084 / 14185

Versa-Vibe vibratory system operating on high frequency

0.044

2,400

---

Rear Drum Oscillation System

0.026/0.030

2,520

16,950 / 19,963

Versa-Vibe vibratory system operating on low frequency

0.012/0.016

3,800

17,422 / 23,222

Versa-Vibe vibratory system operating on high frequency

0.051

2,400

---

Rear Drum Oscillation System

0.022/0.026

2,520

16,950 / 19,963

Versa-Vibe vibratory system operating on low frequency

0.010/0.013

3,800

17,422 / 23,222

Versa-Vibe vibratory system operating on high frequency

0.051

2,400

---

Rear Drum Oscillation System

0.022/0.026

2,520

16,950 / 19,963

Versa-Vibe vibratory system operating on low frequency

0.010/0.013

3,800

17,422 / 23,222

Versa-Vibe vibratory system operating on high frequency

0.051

2,400

---

Rear Drum Oscillation System

Model No.

CB7

CB8

CB10

CB13

CB15

CB16

100

120

142

142

142

"ROPS/FOPS: 21,642 Cab: 22,255"

"ROPS/FOPS: 27,557 Cab: 28,440"

"ROPS/FOPS: 28,958 Cab: 29,840"

"ROPS/FOPS: 31,941 Cab: 32,959"

67

79

84

84

44

44

47

51

51

51

26 ASPHALT CONTRACTOR SEPTEMBER 2026

ACON0926_20-27_RollerSpecGuideFull.indd 26

Amplitude (in.)

Notes

www.ForConstructionPros.com/Asphalt

8/27/26 9:16 AM


ACON0926_20-27_RollerSpecGuideFull.indd 27

8/27/26 9:16 AM


H E

T b w

VOLVO CONSTRUCTION EQUIPMENT Volvo Construction Equipment’s double-drum asphalt compactors boost productivity and precision on every job. Select models offer an optional 8-amplitude system for maximum control, and the zero-emission DD25 Electric delivers performance equal to or greater than its diesel counterpart. To optimize paving, Compact Assist provides real-time density along with pass and temperature mapping. Plus, the ActiveCare Direct telematics monitoring service cuts through the noise, delivering simple case alerts instead of confusing fault codes. Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

24.8

5,776

47.2

27.6

0.0197

3,300/4,000

6,227/9,127

24.8

5,545

39.4

27.6

0.021

3,300/4,000

5,732/8,430

DD30B

49.6

6,839

49.2

29

0.015

4,000

7,500

DD35B

49.6

8,185

54.1

29

0.013

4,000

7,500

DD110C

148

24,355

67

51

0.01/0.025

3,800

16,240/41,170

148

27,700

79

55

.014/.0349

3,000/4,000

30,020/42,070

148

27,700

79

55

.0149 / .0276

3,400

22,980 / 42,680

148

28,430

79

55

.0033/.03

3,000/4,800

11,680/41,790

148

30,486

84

55

.0139/.0346

2,700 / 4,000

36,680/41,720

148

30,486

84

55

.0129 / .0249

3,200

21,810 / 42,170

Model No. DD25B (wide configuration) DD25B (narrow configuration)

DD120C - 2 amplitudes DD120C - 8 amplitudes DD128C DD140C - 2 amplitudes DD140C - 8 amplitudes

Amplitude (in.)

Frequency (vpm)

Centrifugal Force (lbs.)

Electric Model No.

Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.) Low/High

Frequency (vpm) Low/High

Battery Voltage

Battery Capacity

Volvo CE

DD25B Electric (wide configuration)

32.9

6,140

47.2

27.6

0.0197

3,300/4,000

6,227/9,127

Volvo CE

DD25B Electric (narrow configuration)

32.9

5,899

39.4

27.6

0.021

3,300/4,000

5,732/8,430

LEEBOY The BR36 + BR48 Asphalt Rollers were designed for smaller paving and pavement maintenance projects, the SR48 Soil Roller for your soil compaction needs and the BR48R is built to handle the toughest compaction jobs. Trust the LeeBoy rollers to deliver superior compaction results, setting a new standard in asphalt technology. Model No.

Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

Centrifugal Force (lbs.)

BR48R

24.4

5,546

60

N/A

N/A

N/A

N/A

BR36

20.8

2,640

35.5

22

0.02

4,000

3,825

BR48

43.5

6,115

47.2

27.6

0.02

4,200

SR48

47

7,250

47.2

47.2

28 ASPHALT CONTRACTOR SEPTEMBER 2026

ACON0926_20-27_RollerSpecGuideFull.indd 28

0.03 Low. 0.06 High

2,460

Minimum: 5,170 lbf. Maximum: 8,540 lbf Minimum: 9,667 lbf. Maximum: 19,109 lbf

www.ForConstructionPros.com/Asphalt

8/27/26 9:16 AM

W

W e a a


HYUNDAI CONSTRUCTION EQUIPMENT AMERICAS The Hyundai HR series tandem-drum rollers offer hydrostatic vibration system at both drums and automatic vibration mode (double / single vibration) – combined with front and rear scrapers to keep the drums free of material buildup. Model No.

VIEW COMPLETE LIST HERE

Engine HP

Operating Weight

Drum Width

Drum Diameter

Amplitude

(net)

(lbs.) (with ballast)

(in.)

(in.)

(in.)

Frequency (vpm)

Centrifugal Force (lbs.)

HR25T-9

31

5,952

39

30

0.02

3,180 / 3,660

4,833 / 6,295

HR26T-9

31

6,393

47

30

0.02

3,180 / 3,660

5,620 / 7,644

HR30T-9

31

6,614

49

30

0.02

3,120 / 3,480

6,519 / 8,318

CASE CONSTRUCTION EQUIPMENT CASE E Series vibratory rollers feature a completely redesigned operator interface for intuitive operation and improved ergonomics. New control features include an electronic travel lever with an extended range of functions right at the operator’s fingertips, including RPM settings, drive settings, sprinkler system controls, parking brake and more. Model No.

Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

Centrifugal Force (lbs.)

DV23E

33.5

4,960

39.4

27.4

0.02

3,480 / 3,960

9,217

DV26E

33.5

5,490

47.2

27.4

0.02

3,480 / 3,960

10,566

DV36E

43.9

8,290

51.2

33.5

.016 - .024

2,460 / 3,300

11,668

DV45E

43.9

10,252

54.3

33.5

.016 - .024

2,460 / 3,300

12,949

DV36E

43.9

8,290

51.2

33.5

.014 - .022

2,700 / 3,420

11,240

DV45E

43.9

10,340

54.3

33.5

.014 - .022

2,700 / 3,420

12,364

DV209D

100

21,080

66

48

.013 - .0276

2,520 / 3,300

15,737 / 18,884

DV210D

100

22,930

66

48

.014 - .032

2,520 / 3,120

17,535 / 26,977

WACKER NEUSON Wacker Neuson’s Pro-roller family includes the RD45 which offers a variety of operator-friendly features including an ergonomic work platform designed for low vibration and comfortable operation, excellent line of sight to the drums and work site, intuitive operator’s display with all functions clearly labeled and activated with the push of a button, and dual operator control lever for right or left hand operation of drive and activation of vibration/oscillation energy. Model No.

Engine HP (net)

Operating Weight (lbs.)

Drum Width (in.)

Drum Diameter (in.)

Amplitude (in.)

Frequency (vpm)

RD12L-90

20.8

2,964

35.4

22

0.043

4,200

3,400

RD18-80

19.8

3,483

31.5

24.4

0.02

3,900

5,620

RD18-100

19.8

3,681

39.5

24.4

0.02

3,900

5,620

RD24-100

24.8

5,456

39.5

28.4

0.02

4,020

10,341

RD24-100o*

24.8

5,566

39.5

28.4

--

2,340

10,341 / 9,000**

RD28-120

24.8

5,941

47.3

28.4

0.02

4,020

11,690

RD28-120o*

24.8

6,073

47.3

28.4

--

2,340

11,690 / 9,000**

RD40-130

49.3

8,741

51.2

35.5

0.02

3,600

14,400

RD40-130o*

49.3

8,851

51.2

35.5

--

2,340

14,000 / 16,200**

RD45-140

49.3

9,579

54.4

35.5

0.02

3,600

14,387

RD45-140o

49.3

9,777

54.4

35.5

--

2,340

14,000 / 16,200**

ACON0926_20-27_RollerSpecGuideFull.indd 29

Centrifugal Force (lbs.)

8/27/26 9:16 AM


FACE OF THE INDUSTRY | By Allyson Sherrier, Managing Editor

Cold Recycling’s Biggest Champion Wants To Change How Roads Are Rebuilt After discovering cold recycling nearly a decade ago, Jessie Boone made it her mission to help contractors and road owners rethink pavement rehabilitation.

F

or more than a decade, Jessie Boone has been on a mission to change how the industry thinks about rebuilding roads. Whether she’s speaking to contractors, transportation agencies or engineers, her message is consistent: there are better, more sustainable ways to rehabilitate pavements, and the industry can’t afford to ignore them. As Market Development Manager for Recycling Products at Wirtgen Group, Boone travels throughout the United States and Canada promoting cold recycling technologies and helping road owners understand their long-term benefits. Her enthusiasm for the technology is contagious, but her journey into the asphalt industry was anything but conventional. For Boone, the road to becoming one of the asphalt industry’s most passionate advocates for cold recycling was anything but planned. “I was actually going to school to be a dentist,” Boone said. After deciding dentistry was not the right fit, a friend encouraged her to look into the Concrete Industry Management (CIM) program at Middle Tennessee State University. Boone quickly discovered a field that combined science, engineering and business in a way that resonated with her. “It was a really good foundation to build a career on,” she said. After graduating during the economic downturn of 2008, Boone worked in quality control and sales in the ready mix industry and then in the cement industry before finding her true calling in pavement rehabilitation.

30 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_28-29_Face_BN_AS.indd 30

Jessie Boone

“One thing led to another, and somehow I fell into recycling asphalt pavements back in 2015,” she said. “I really fell in love with the whole technology.” That passion has only grown over the last decade. Today, Boone spends roughly half the year on the road promoting cold recycling technologies, including Full Depth Reclamation (FDR), Cold In-Place Recycling and Cold Central Plant Recycling. Her work ranges from presentations and workshops to jobsite demonstrations and open houses. “Every day is different,” she said. “My job is like a snowflake. Not one day is the same.” LEARNING THROUGH CHALLENGES Boone credits much of her professional growth to the challenges she faced early in her career. Graduating during the recession meant competing for limited opportunities. Working in technical,

male-dominated environments often required proving herself repeatedly. “There were times when I was belittled and talked down to, and downright disrespected,” Boone said. “But I would think to myself, this too shall pass.” Those experiences helped develop the resilience she now shares with younger women entering the industry. Boone encourages them to stand up for themselves, recognize their value and refuse to accept inappropriate treatment. “It is so easy as a female in this industry to dismiss some of the behavior that you encounter,” she said. “Sometimes you’ve got to put your foot down and say enough is enough.” At the same time, she believes the industry offers tremendous opportunities for women willing to step outside traditional career expectations. “Don’t dismiss construction just because you think that’s a man’s job,” Boone said. “I’m here to tell you, you can do it.”

www.ForConstructionPros.com/Asphalt

8/27/26 9:16 AM


A PASSION FOR RECYCLING Ask Boone what excites her most about pavement recycling, and the answer comes quickly. “The equipment is badass,” she said with a laugh. She vividly remembers her first encounter with a piece of equipment during a project in 2015. Seeing the machine in action sparked immediate fascination. “I’ll never forget pulling up on that jobsite and seeing that Wirtgen reclaimer,” Boone said. “I’d never seen one before in my life, and I was taken aback by just the scale of it.” The appeal goes beyond the machines themselves. Boone emphasizes that cold recycling offers a practical solution to many of the industry’s infrastructure and sustainability challenges. “They need to be in every DOT toolbox in some shape or fashion.” OVERCOMING BARRIERS According to Boone, the greatest obstacle facing wider adoption of cold recycling is not technology — it’s education. Most civil engineering programs still devote little attention to recycling technologies, leaving graduates unfamiliar with the applications. Boone also sees hesitation among transportation agencies that may be reluctant with new approaches, even those with long-term benefits. “What cold recycling does is address the cause of the symptoms, not just the symptoms,” Boone said. Through Wirtgen’s partnership with organizations like the Asphalt Recycling and Reclaiming Association (ARRA) and The Southeast Cement Promotion Association, Boone continues pushing for greater awareness of these technologies across North America. INSPIRING THE NEXT GENERATION Beyond her professional responsibilities, Boone is committed to helping young women discover careers in construction materials and engineering. She has helped organize outreach events through MTSU’s CIM program, introducing middle school and high school students to everything from concrete placement to welding. The goal is simple: expose students to career paths they may never have considered. “There are more girls just like me, they’ve just not been challenged to explore other careers,” Boone said. She has seen encouraging growth in the number of women entering the CIM program and hopes that trend continues. CHANGING THE CONVERSATION As Boone considers the future of the industry, she remains optimistic. She believes younger generations are increasingly aware of the importance of resource conservation and sustainable construction practices. She hopes that awareness will help drive innovation and broader acceptance of technologies that make better use of existing materials. “We’ve got to start doing better than previous generations,” Boone said. “Sustainable construction is a great place to start.” That future starts with education, advocacy and a willingness to challenge the status quo. For more information, visit ColdRecyclingInfo.com.

www.ForConstructionPros.com/Asphalt

ACON0926_28-29_Face_BN_AS.indd 31

SEPTEMBER 2026 ASPHALT CONTRACTOR 31

8/27/26 9:16 AM


JOBSITE INNOVATIONS

Quality Control Doesn’t End When Asphalt Is Installed People are increasingly asking a harder question, and it isn’t about how the job looked at handoff, it’s about how it will look in ten or twenty years.

T

en years ago, project quality was largely measured by what happened on the day construction ended: whether the pavement had a smooth surface, properly placed asphalt, acceptable density, strong compaction numbers and clean joints. If a project met specifications and looked good at handoff, it was generally considered a quality job. No one has abandoned that standard. However, today, the conversation around quality has expanded toward whether the pavement actually holds up. REDEFINING “QUALITY CONTROL” Owners, facility managers and contractors are increasingly evaluating pavement based on its life cycle costs rather than its initial installation price. A parking lot or roadway that still performs 15-20 years after installation is complete is the result of quality workmanship during construction, combined with planning, preservation and consistent maintenance throughout the pavement lifecycle. Many contractors understand how pavement fails but still leave owners without a clear maintenance plan once construction is complete. Not only is it a part of the job that gets skipped too often, but it is a missed opportunity. A simple maintenance schedule—sealcoat this year, crack fill by this date, watch for these warning signs—can significantly extend pavement life. Another key is selecting the right asphalt mix based on a thorough understanding of existing site conditions. That’s why the definition of quality control has expanded.

WHY CHOOSING THE RIGHT MIX IS ESSENTIAL Choosing a lower-cost mix may reduce upfront costs, but it can also result in pavement that deteriorates prematurely if the material isn’t suited for the application. In that respect, quality control means making informed decisions upfront that maximize long-term pavement performance. It is also important to have appropriate testing and planning before starting the work. Having a full understanding of the pavement by gathering data through coring existing pavement to determine its condition as well as its thickness is important. Testing and planning at a site influence decisions ranging from milling depth to overlay design. The more information collected upfront, the better prepared a project team is to communicate realistic expectations, find the correct solution and deliver a pavement that will have lasting performance.

better understand the entire scope. Being honest about the things that aren’t known is also an important part of the process. Even with detailed planning, there are conditions beneath the surface that often can’t be confirmed until the work begins. That type of conversation shouldn’t be avoided just to win the work. Being AdobeStock_95434784

TRANSPARENCY IS PART OF QUALITY Quality control also depends on transparent conversations before work begins. Sometimes that means explaining why one mix is more expensive than another, or why one proposal might come in higher than a competitor’s bid because it specifies a premium mix versus a lowercost alternative. On paper, it may be difficult for an owner to justify that difference. If the owner’s goal is to have the pavement perform over time, and there is a transparent conversation explaining why those decisions matter, it can help the customer

32 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_30-31_Jobsite_Bn.indd 32

8/27/26 9:22 AM


upfront about potential issues and encouraging owners to budget for unforeseen conditions helps prepare them for what may happen once construction begins. DON’T IGNORE WARNING SIGNS Asphalt pavement rarely fails without warning. Traffic, weather and water infiltration leave visible signs that can help provide owners with insight into how the pavement is performing below the surface. Sometimes, the smallest defects deserve the most attention. A crack, for example, may not look like much, but it gives water a path into the pavement structure. Once water reaches the base, the deterioration below the surface has already started, even if the actual surface still looks good.

www.ForConstructionPros.com/Asphalt

ACON0926_30-31_Jobsite_Bn.indd 33

Waiting until a pothole appears and creates a liability risk almost always means the problem has been developing for months or even years. At that point, what could have been a simple low-cost crack sealing or drainage correction often becomes a much larger repair. Preventive maintenance is part of quality control. It involves addressing early warning signs before they become real structural problems, and before they lead to a complete overlay or full rebuild. It includes performing routine inspections, crack sealing and sealcoating done at the right time and correcting drainage issues to keep water out of the pavement. The industry is shifting toward greater accountability for long-term pavement performance, not simply whether a project met specifications on the day it was completed.

Pavement management software is becoming more common among private owners, not just public agencies. Contractors are going to be expected to hand over maintenance guidance as part of the job, not as an add-on service. Data drives a lot of this. The easier it gets to track how pavement holds up, the harder it will get for contractors to hide behind that idea that it looked fine when they left. Quality is no longer defined by how pavement looks on the day construction ends. It’s measured by how well that pavement performs years later. Contractors who embrace that mindset will be better positioned to deliver lasting value and build stronger relationships with their customers. by Marc Navetta, Vice President of Customer Engagement, ASI Paving

SEPTEMBER 2026 ASPHALT CONTRACTOR 33

8/27/26 9:22 AM


PRESERVATION & SUSTAINABILITY

AdobeStock_Tatonka

Rethinking Fog Seals

Over the last decade, fog sealing has changed in big ways.

N

ew rejuvenators and polymermodified emulsions are improving performance. At the same time, owners are using fog seals differently – earlier in the pavement life cycle, on repeat intervals, and as part of a broader preservation plan instead of a one-off treatment. The result is a shift worth paying attention to. Fog seals are moving from a low-end maintenance option to a more deliberate tool for extending pavement life and smoothing out maintenance budgets.

THE OUTDATED PERCEPTION Use of fog seals, along with other asphalt surface sealing concepts, gained momentum after the oil crisis of the 1970s. Maintaining rather than replacing pavements became a priority as the cost of asphalt used in pavements soared. Long viewed as a low-cost surface treatment for low-volume pavement, perceived fog seal product limitations have persisted over time even as formulations, applications and pavement preservation philosophies advanced. The reputation comes, in part, from how fog sealing previously was applied – to structurally failed pavement (not an ideal candidate), under poor weather conditions (overcast or humid day with high moisture takes longer to cure) or without essential traffic control (necessary to keep traffic from driving through the application before it has time to cure). Financial and industry culture issues may play a role in the perception problem as well. Fog sealing is inexpensive compared to overlays or mill-and-fill work, so it can be dismissed as low-tech or less important, favoring treatments that are more visible, capital-intensive or structurally oriented. A philosophy shift, from fixing failed pavement cheaply to preserving newer pavement before deterioration accelerates,

34 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_32-33_Pres_BN.indd 34

is gradually overcoming misconceptions about fog sealing performance today. Like sunscreen, fog sealing should be applied before too much pavement damage has occurred. In fact, to be cost-effective, it should be applied before most project decision makers typically consider its use. It does not add structure or enhance a pavement’s load-bearing capacity as its function is to prevent the pavement surface from oxidizing – drying up and creating micro cracks which lead to bigger cracks, allowing more water to come into the pavement matrix and break down its components. The initial black color of fog sealing can fade in as little as six months, but the protective layer of emulsion continues to do its job of keeping the surface moist over a much longer period of time. A CHEMISTRY-DRIVEN PRESERVATION TREATMENT In the continuum of pavement preservation, rehabilitation and reconstruction, fog sealing lands squarely in the preservation category. No longer thought of as just a surface-sealing solution, developments in the last 10-15 years have revolutionized fog sealing as an engineered pavement-preservation system focused on oxidation control, binder chemistry restoration and lifecycle extension. Today, users recognize the difference between conventional and rejuvenating fog seals that are designed to penetrate oxidized binder, restore viscoelastic properties, slow oxidation, improve flexibility and reduce brittle cracking. While rejuvenating fog seals still use asphalt emulsion technology, they also have agents designed to penetrate aged asphalt binder and restore flexibility and often include polymer modification to improve durability, adhesion and traffic performance, especially on highervolume roads.

With improvements in formulation came higher standards in application discipline with tighter guidelines on nozzle configuration, distributor calibration, pavement temperature, curing conditions and traffic reopening. The most recent innovations in fog sealing have led to faster-curing, trackless formulations and friction-conscious designs with standard application methods now using GPS-guided distributor calibration, precise spray bars, lane-by-lane traffic staging and friction monitoring. MEETING ESG GOALS Some fog seal attributes have not changed since the early days – it can be applied quickly as a lower cost preventative maintenance technique. Coupled with all its modern innovations, this application meets several core asset management objectives: • extending pavement service life • delaying overlays and reconstruction • improving lifecycle cost efficiency • smoothing long-term capital spending • preserving pavement cond. indexes • reduce deferred maintenance backlogs For ESG initiatives, compared to reconstruction fog sealing has a relatively small material and carbon footprint because it works with the existing pavement structure instead of replacing it. This requires less asphalt binder, fuel, virgin aggregate, trucking, construction equipment and demolition. Applied correctly and at the right pavement condition, fog sealing can help delay more expensive overlays and rehabilitation. Applied too heavily or after major distress develops and it can reinforce the old industry complaints about slickness, tracking and short-lived performance.

2

w

Andrea Blanchette, PE, is a National Manager for Terracon’s Pavement Consulting Services.

www.ForConstructionPros.com/Asphalt

8/27/26 9:23 AM

For


For information right away, please call 800-257-8163

We make it easier for you to get a price quote. Visit our web site at eagerbeavertrailers.com, and you're a "click" away from getting all the information you need from our nearest dealer. Simple, Fast... Guaranteed!

25 XPL

• CAPACITY: 50,000 lbs. • Air lift front axle standard

20 XPT

w/ Hydraulic Ramps • CAPACITY: 40,000 lbs.

35 GSL/PT

• CAPACITY: 70,000 lbs.

50 GSL/PT

• CAPACITY: 100,000 lbs.

For a quote on any model, please call 800-257-8163

ACON0926_32-33_Pres_BN.indd 35

EagerBeaverTrailers.com

8/27/26 9:23 AM


THE LAST EXIT N Felixpeopleimages.com_AdobeStock

Stronger Workforce Planning Recent immigration policy confusion is a reminder that contractors benefit from diversified hiring.

F

ew industries understand unpredictability better than construction. That’s why recent confusion from the U.S. Citizenship and Immigration Services (USCIS) over an “adjustment of status” memo is important to break down and understand. It’s not just an immigration policy issue, for construction companies it reveals the critical nature of workforce planning and strategies that can survive the most confusing moments. When it comes to employing foreign workers, understanding how lawful tools like the EB-3 visa can be leveraged to fill hard-to-fill, year-round roles, long-term planning becomes even more important. USCIS issued their memo in May, advising that adjustment of status should be granted only in “extraordinary circumstances.” As written, that suggested some foreign workers already in the United States could be pushed out of the country to pursue green cards through consular processing in their

CLASSIFIEDS

home countries instead. Then, a week later, the Department of Homeland Security (DHS), which oversees USCIS, tried to clear up the confusion through media statements rather than putting out a clear follow-up version of the memo, further confusing industry leaders. Those statements left employers, workers and immigration lawyers trying to sort out what had actually changed, adding more uncertainty to an industry that already has more than enough. CONFUSION IS A PLANNING PROBLEM If a lawful workforce pathway suddenly becomes harder to predict, contractors are left trying to plan around more instability. It raises concern over whether a worker will be able to remain in the country and continue the same path, or if that person will have to leave and complete the process abroad. It also leaves industry professionals wondering whether the process will become more or less predictable. Labor is already tight, so more uncertainty around legal workforce pipelines can be felt quickly throughout an operation. We see it in hiring slowdowns, more cautious managers and long-term staffing plans being disrupted. This recent “adjustment-of-status” miscommunication does not mean the broader pipelines for foreign workers, like the EB-3 visa, have been closed. They remain very viable options employers can and should continue to consider. The most affected group is that of the workers already in the U.S. who hoped to gain their green card stateside using adjustment-of-status. That’s different from saying the broader employment-based immigration path has been closed, because it hasn’t. For many workers, especially those planning to use consular processing abroad, it remains intact. A STRONGER WORKFORCE PLAN A solid plan should combine stronger domestic recruiting, better retention mechanisms, apprenticeships and training, more clear pathways for advancement, along with lawful immigration tools, together into one broad model. The goal is not to replace domestic hiring, but to make the workforce strategy as comprehensive as possible, helping to reduce the uncertainty that is already part of doing business. The reality is that builders cannot control the uncertainty coming out of Washington, but they can control how prepared they are to absorb it. With labor shortages already hitting the industry hard, it puts businesses in a better spot to have more resilient and broad staffing strategies instead of waiting for a single pipeline to hold it all together. by John Dorer is CEO of EB3.Work

36 ASPHALT CONTRACTOR SEPTEMBER 2026 ACON0926_34-36_LastExit_BN.indd 36

www.ForConstructionPros.com/Asphalt

8/27/26 9:24 AM

TRMB-011


Connec tion | Work f low | Possibilit y

At Dimensions 2026, discover how to connect your people, data and technology into one powerful ecosystem. Learn from industry leaders, gain expert advice and practical insights from peers and explore innovative solutions that help you deliver better outcomes, every time. Immerse yourself in the trends, technologies and conversations shaping your industry and discover new ways to get an edge. November 9–11, 2026 The Venetian Resort Las Vegas

Trimble.com/Dimensions Register now and secure the best available rate.

ACON0926_34-36_LastExit_BN.indd 37 TRMB-011-ROAD_Dims26_Media ads_Asphalt Contractor_7.875x10.75in_0826.indd 2

8/27/26 9:24 AM 6/08/2026 5:31:14 pm


SHUTTLE BUGGY® SB-3000

PAVING REVOLUTIONIZED

Roadtec Shuttle Buggy® SB-3000 Astec revolutionized the paving industry with the introduction of the Shuttle Buggy, and now the SB-3000 sets a new standard in material transfer vehicles. Effortless maintenance, unmatched performance, and four steering modes for ultimate agility keep paving seamless. Experience groundbreaking innovation with the patented Ground Crew Control Station for the ultimate user experience and protection. The SB-3000 isn’t a machine, it’s a revolution in material transfer, built on Astec’s legacy of industry firsts.

BUILT TO CONNECT astecindustries.com

ACON0926_34-36_LastExit_BN.indd 38

8/27/26 9:24 AM


Turn static files into dynamic content formats.

Create a flipbook
Asphalt Contractor September 2026 by ForConstructionPros.com - Issuu