ACON1126_02-7_TOC-jb MM FINAL.indd 2
10/14/26 8:44 AM
GENCOR, A BRAND YOU CAN TRUST
At Gencor®, we’ve led the industry with the most fuel-efficient, environmentally clean and lowest-maintenance design available to the hot mix industry. Gencor Industries remains focused on proactively serving and satisfying its customers from all aspects. Through improved cost-effectiveness, and quality of its products and services, Gencor’s personnel are dedicated to the principle of providing the highest quality to the industry to maintain a sustainable competitive advantage for Gencor®.
One Company. One Source. One Solution Call 407-290-6000 or visit www.gencor.com
ACON1126_02-7_TOC-jb MM FINAL.indd 3
INDUSTRIES INC.
10/14/26 8:44 AM
TABLE OF CONTENTS | NOVEMBER 2026 PRODUCTION GAINS
16 Protecting Construction’s Lone Workers: A Safety Shift Underway Construction companies are rethinking emergency response, heat safety and communication as more employees spend time working independently.
FACE OF THE INDUSTRY
32 From Army Truck Driver to COO: A Voice for Women in Construction From laborer to COO, Mary Schwandt reflects on leadership, breaking barriers and creating a stronger path for women in asphalt and pavement.
JOBSITE INNOVATIONS
36 Paving Priorities and Productivity: Powder River Construction’s Approach in Wyoming
COVER STORY Special Report: Asphalt Paver Spec Guide
More than 75 models from top brands like VÖGELE, Caterpillar and more, providing specs on engine power, dimensions and paving speed. | 20 TECHNOLOGY UPDATE
12 Protect Your Margins: Why AI Must Connect Events, Not Just Summarize Data
PRC’s Owner Matt Walker and Maintenance Supervisor Mike Gross share how they keep paving concrete highways in Wyoming despite the challenges of remote projects.
PRESERVATION & SUSTAINABILITY
38 How RAP Technology Is Turning Circular Ambition Into Reliable Asphalt Production
O la o
Reclaimed asphalt pavement is shifting from niche solution to essential infrastructure strategy worldwide.
WWW.FORCONSTRUCTIONPROS.COM/ASPHALT
Artificial intelligence can connect critical evidence buried in your project documents, so you can prevent potential issues before they become costly disasters.
CONTRACTOR WWW.FORCONSTRUCTIONPROS.COM/ASPHALT WWW.FORCONSTRUCTIONPROS.COM/ASPHALT
CONTRACTOR LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
LATEST INNOVATIONS INNOVATIONS FOR FOR ASPHALT ASPHALT PROFESSIONALS PROFESSIONALS LATEST
ASPHALT ASPHALT
NOVEMBER 2026 Vol. 40 No.8
CONTRACTOR CONTRACTOR LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
Published by IRONMARKETS
Asphalt
Asphalt CONTRACTOR
CONTRACTOR
LATEST INNOVATIONS INNOVATIONS FOR ASPHALT ASPHALT PROFESSIONALS 201 N. Main Street Ste 350, Fort Atkinson, WIFOR 53538 LATEST PROFESSIONALS (800) 538-5544 • WWW.IRON.MARKETS www.ForConstructionPros.com/Asphalt LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
ACON1126_02-7_TOC-jb MM FINAL.indd 4
IN EVERY ISSUE 8 Editor’s Perspective
G B
2
42 Last Exit
Published and copyrighted 2026 by IRONMARKETS. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage or retrieval system, without written permission from the publisher. Asphalt Contractor (ISSN 1055-9205, USPS 0020-688): is published ten times per year: January, February/March, April, May, June/July, August, September, October, November, December by IRONMARKETS, 201 N. Main St. Ste 350, Fort Atkinson, Wisconsin 53538. Periodicals postage paid at Fort Atkinson, Wisconsin and additional entry offices. POSTMASTER: Please send change of address to ASPHALT CONTRACTOR, 201 N. Main St. Ste. 350, Fort Atkinson, WI 53538. Printed in the U.S.A. SUBSCRIPTION POLICY: Individual subscriptions are available without charge only in the USA. The Publisher reserves the right to reject nonqualifying subscribers. One-year subscription to nonqualifying individuals: U.S. $45.00, Canada & Mexico $65.00, and $95.00 all other countries (payable in U.S. funds, drawn on U.S. bank). Single copies available (prepaid only) $10.00 each (U.S., Canada & Mexico), $15.00 each (International).
4 ASPHALT CONTRACTOR NOVEMBER 2026
In d p h fo
www.ForConstructionPros.com/Asphalt
10/14/26 8:44 AM
I
C E
of
E
BLAW-KNOX UNIVERSITY PAVER TRAINING Increase your paving knowledge at the Blaw-Knox University designed for paver operators and foreman looking to improve paving skills. Our proven combination of classroom, and hands-on training instruction, teaches you everything you need for optimum paving performance. Our course instructors share decades of field experience on the latest paving techniques on a variety of topics including proper operation, maintenance and safety fundamentals. Get the most out of your paver this paving season by attending Blaw-Knox University.
e
g
2027 DATES Week 1: January 18 - 21 Week 2: January 25 - 28 Week 3: February 1 - 4
Go to: www.blawknox.com/training
Week 4: February 8 - 11
I
e o
REGISTRATION
INFORMATION Call us at 407-290-6000 ext. 342 Email us at: training@blawknox.com
ACON1126_02-7_TOC-jb MM FINAL.indd 5
RESERVE YOUR SEAT TODAY! CLASS SIZE IS LIMITED! To secure your seat, please register before December 15, 2026.
10/14/26 8:44 AM
DIGITAL CONNECTION www.ForConstructionPros.com/Asphalt
2026 Tandem Roller Spec Guide The Tandem Roller Spec Guide is the industry’s first online and interactive custombuilt guide for asphalt paving professionals. Read more at: https://asph.link/ h81n4mig
How To Identify The Hardest Workers On A Jobsite | Watch FCP The hardest workers on construction jobsites are rarely the ones who talk the most about working hard. Watch more at: https://asph. link/ib7ggx65
Construction’s Financial Blind Spots Are Costing Contractors Time and Money AI, automated reporting and connected workflows are helping contractors reduce manual data work, improve financial visibility and manage project costs. Read more at: https://asph. link/zdf358l6
Under the Stadium Lights: A Perspective On Proficiency Testing In a construction materials testing laboratory, the gap between routine operations and proficiency testing is a tightrope every manager must walk. Read more at: https://asph.link/ wstaozoa
Reducing Struck-By Risk: The Case for Automated Fleets Automated fleet technology can help contractors reduce struckby exposure, improve workforce efficiency and manage heavy equipment more safely. Read more at: https://asph. link/yuq1rebb
Sign up for the Roadbuilding Update, a free bi-monthly newsletter for the most up-to-date asphalt industry news.
6 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_02-7_TOC-jb MM FINAL.indd 6
www.ForConstructionPros.com/Asphalt
10/14/26 8:44 AM
N
A PARTNER THAT SHOWS UP
By
can ckorce y
t:
b
e
Rock to Road solutions backed by real commitment. Astec’s partnership doesn’t start when the order is placed or end when the equipment is delivered. From system design and training to service, parts, and optimization, we stay involved through the life of your operation. Because asphalt plant operators don’t just need machines—they need a partner who’s there when performance matters most.
Scan to learn more
ACON1126_02-7_TOC-jb MM FINAL.indd 7
BUILT TO CONNECT
10/14/26 8:44 AM
EDITOR’S PERSPECTIVE
Jared Bilski, Editor-in-Chief
EDITORIAL Editor-In-Chief ................................................................ Jared Bilski
jbilski@iron.markets
jbilski@iron.markets
I’ve Got a Lot to Learn About This Industry. Can You Help Me Out? As the new editor, my first order of business: Listen, listen and then listen more.
G
reetings, readers. My name is Jared Bilski, and I’m the new editor-in-chief of Asphalt Contractor and Pavement Maintenance & Reconstruction. I’m thrilled to join the team and work on a publication with such a long-standing, well-respected place in the industry. I know I have big shoes to fill as I step into the seat of my predecessor, Brandon Noel. I’m not Brandon, and I’ll never pretend to be. But I promise you this: I will do everything in my power to bring you the same type of relevant, engaging and useful content you’ve come to depend on from Asphalt Contractor and Pavement Maintenance & Reconstruction. I’m not going to lie to you; I have a lot to learn I mean A LOT. I’ll be calling on many of you to help me out in these early months. But I am excited to dig in. I’ve built an entire career around on-the-job learning. My first job out of college was for PGA Magazine, a trade magazine for the club professionals who worked long hours teaching people much wealthier than they were how not to embarrass themselves on the course. I started that job with about as much knowledge of golf as Happy Gilmore when he tackled his caddy for trying to steal his clubs. When I left, I could hold my own in any conversation about the state of the golf industry, and I gained a profound respect for the work the PGA club pros did day in and day out. Even scarier was my introduction to the world of medical publishing, where I started
as an associate editor whose medical experience consisted of the episodes of Grey’s Anatomy I was forced to watch with my wife, a nurse. My first day on the job I interviewed a combative orthopedic surgeon with a touch of a god complex. Instead of pretending I was an expert, I was honest, and a strange thing happened. The minute I revealed my own weaknesses, there was a shift in Dr. God’s brusque tone, and he went out of his way to help me. To this day, I still talk to that surgeon. What I’m trying to say is that I do plan to learn everything I possibly can about the world of asphalt. I’ll devour articles and videos, sign up for a ridiculous number of email newsletters and attend every conference remotely related to what I need to cover. But no matter how much I learn, I will never be the expert here. That role belongs to you. I consider it a privilege to report on the industry in which you make your living. In the upcoming months, I plan to meet up with as many of you as possible at industry events. An old boss, a grizzled former Chicago crime reporter, had a saying about writing that I think applies to almost everything. In a raspy, whiskey-soaked chain-smoker’s voice he’d say: “If you can’t tell me what you’re writing about in one simple sentence, you don’t know what the [bleep] you’re talking about.” I’ll be searching for my simple sentences about this industry now, and I hope I can count on many of you to help me find them.
Content Director, Marketing Services ...........Jessica Lombardo jlombardo@iron.markets
Managing Editor ......................................................Allyson Sherrier asherrier@iron.markets
AUDIENCE Audience Development Director ......................... Angela Franks PRODUCTION Senior Production Manager ...................................... Cindy Rusch crusch@iron.markets
Art Director ............................................................... April Van Etten ADVERTISING/SALES Brand Director ........................................................... Amy Schwandt aschwandt@iron.markets
Brand Manager ..................................................... Megan Perleberg mperleberg@iron.markets
Sales Representative ..................................................Sean Dunphy sdunphy@iron.markets Sales Representative ................................................... Kris Flitcroft kflitcroft@iron.markets IRONMARKETS Chief Executive Officer.................................................. Ron Spink Chief Revenue Officer ............................................Amy Schwandt VP, Finance .......................................................................Greta Teter VP, Operations & IT ....................................................Nick Raether Brand Director, Construction, OEM & IRONPROS .....................................................Sean Dunphy Brand Director, Supply Chain ....................................Brian Hines Director, Content ......................................................Marina Mayer Director, Event Content & Programming........ Jess Lombardo Director, Lead Generation Operations ................. Bailey Acton CIRCULATION & SUBSCRIPTIONS 201 N. Main St. Ste. 350, Fort Atkinson, WI 53538 afranks@iron.markets
LIST RENTAL Sr. Account Manager ....................................Bart Piccirillo | Data Axle (518) 339 4511 | bart.piccirillo@infogroup.com
REPRINT SERVICES Brand Manager ..................................................... Megan Perleberg mperleberg@iron.markets | (800) 538-5544 Published and copyrighted 2026 by IRONMARKETS. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording, or any information storage or retrieval system, without written permission from the publisher.
@ASPHALTCONTRACTOR @ASPHALTCONTRCTR @ASPHALTCONTRACTOR @ASPHALT-CONTRACTOR-MAGAZINE
Published by IRONMARKETS 201 N. Main St. Ste 350, Fort Atkinson, WI 53538 (800) 538-5544 • WWW.IRON.MARKETS
SCAN TO READ MORE
8 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_08-9_Editor_jb MM FINAL.indd 8
www.ForConstructionPros.com/Asphalt
10/14/26 8:47 AM
2026 Mag
ski
ets
do
ets
er
ets
ks
ch
ets
en
dt
ets
rg
ets
hy ts
oft ts
nk dt er er
hy es er do on
xle
om
rg
44
TS. or al, val er.
E
I 53538 TS
DESIGN, DETAILS, AND DURABILITY. We don’t just build asphalt plants—we help contractors build stronger businesses. Every ALmix system is engineered around your operation, combining industry-leading durability, advanced technology, and decades of expertise to maximize productivity for years to come.
10106 Smith Road, Fort Wayne, IN | 260.672.3004 | ALmix.com
2026 Magazine Ad (Q3) - Asphalt Contractor copy.indd 1 ACON1126_08-9_Editor_jb MM FINAL.indd 9
7/14/26 10:27 AM 10/14/26 8:47 AM
NEW PRODUCTS CHECK OUT OUR NEW PRODUCT DIRECTORY
Blue Diamond Extreme Duty Road Saws
Caterpillar AP455 Asphalt Paver The 8-ft. size class AP455 Mobil-trac paver offers a compact size and small footprint to simplify maneuverability in tight spaces. • Standard paving width using the SE47 V screed or SE47 FM ranges from 8 to 15 ft. 6 in. • Paving depth of up to 10 in. supports aggregate paving • 14-in.-diameter augers efficiently move material through the auger chamber at narrow and wide paving widths • Ability to control each material feed sensor when using cut-off shoes or when paving at narrow width
Blue Diamond Attachments introduced Extreme Duty Road Saws for trenching asphalt, concrete and rock. Available in two models with cutting depths ranging from 6-17 in. and 8-24 in., they’re designed for skid steers with up to 65 hp. Interchangeable tooth plate kits provide cutting widths from 2-8 in., while hydraulic depth adjustment helps maintain consistent cuts.
D.E. Gemmill Inc. Tyker Robot Plotter D.E. Gemmill Inc. deployed the Tyker Robot Plotter, which combines LiDAR mapping with automated layout. The process starts with LiDAR scanning to capture existing concrete joint locations after asphalt milling. Once new pavement is placed, the data is uploaded to the robotic plotter, which travels across the pavement and marks transverse-joint locations for the subsequent saw-and-seal operation. The technology is designed to automate a traditionally labor-intensive layout process.
Bergkamp Journeyman Mobile Mix Plant The Bergkamp Journeyman Mobile Mix Plant is designed to extend the reach of agencies and contractors by producing ambient mix asphalt at or
BOMAG BW18 Pneumatic Tire Roller The BW 18 RH offers a broad range of applications in road construction. The machine’s development focused on compacting asphalt base, binder and wearing courses, as the operating weight in these applications is generally below 18 tons. The BOMAG roller can be ballasted using concrete or steel plates, and by filling the ballast compartment with sand, water or steel granulate. Using the interchangeable concrete or steel plates does not reduce the volume of the three-cubic-metre ballast compartment. The maximum operating weight of the pneumatic tyred roller is 18,000 kg, and a threeway pivoting front axle ensures even weight distribution across all tyres.
10 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_10-11_Products-jb MM FINAL.indd 10
near the paving site. All components are mounted on a trailer that doesn’t require special permitting to haul per DOT regulations. Move it to the pave site; position it at the staging area alongside materials. The pugmill blends all input streams.
Vellinga Safetyshoes Asphalt Pro Boots These heat-resistant workshoes are ideal for asphalt workers and hot-work environments. Features include: • Heat resistant up to 300ºC/572ºF • EN ISO 20345 HRO-certified • Patented sealing edge connection system • Heat insulated • Full perforated leather lining • Full-grain exterior leather • Comes with/without steel toe, low cut, stronger versions available
Lytx 360-Degree Camera System for Fleets The 360 Hub Kit is a camera and hub system designed to provide fleets with additional visibility around vehicles and worksites. The system supports up to four HD auxiliary cameras, covering areas such as vehicle sides, rear areas, cargo zones and blind spots. Footage is synchronized with Lytx DriveCam video and can be accessed through Lytx Video Search. The system also supports on-demand video retrieval over LTE. www.ForConstructionPros.com/Asphalt
10/14/26 9:16 AM
2027 GENCOR SERVICE SCHOOL Be prepared to get the most out of your plant this season by attending the 2027 Gencor University Training. Our expert instructors provide step-by-step comprehensive hands-on training through our state-of-the-art control simulators and actual plant equipment. Benefit from decades of industry experience and knowledge in the science of hot mix asphalt production to get the most out of your plant. * Improve plant production * Optimize plant efficiency * Reduce plant maintenance
2027 DATES
• Week 1: January 18 - 21
REGISTRATION
Go to www.gencor.com/training
• Week 2: January 25 - 28 • Week 3: February 1 - 4 • Week 4: February 8 - 11
INFORMATION Call us at: 407-290-6000 ext. 342 Email us at: training@gencor.com CLASS SIZE IS LIMITED! To secure your seat, please register before December 15, 2026.
One Company ACON1126_10-11_Products-jb MM FINAL.indd 11
One Source
One Solution 10/14/26 9:16 AM
TECHNOLOGY MATTERS
AdobeStock_wanakit
F
•
•
PROTECT YOUR MARGINS: Why AI Must Connect Events, Not Just Summarize Data
•
•
Artificial intelligence can connect critical evidence buried in your project documents to prevent potential issues before they become costly disasters.
C
onstruction industry studies consistently show that most major projects experience delays, cost overruns, claims or disputes. The problem is not a lack of information. The problem is that critical evidence is buried across millions of emails, schedules, drawings, RFIs, change orders, site reports, photos and project records that are difficult to connect and analyze before problems become expensive. Construction firms are betting heavily on artificial intelligence, but many are betting on the wrong part of it. Projects are experienced as events but recorded as documents. Margin leaks in the gap between the two. Every week there is another argument about which model is best. ChatGPT. Claude. Gemini. Next month, another name will join the list and somebody will declare the race over. The truth is less exciting: The leading
12 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_12-15_Tech_jb MM FINAL.indd 12
models are already extraordinarily capable. That is not where construction will find a durable advantage. Our industry does not lose margin because somebody needed 11 minutes instead of three to summarize something. Margin erodes through unrecovered change, delayed decisions, lost productivity, procurement slippage and intervention that comes too late. It usually develops quietly, one explainable decision at a time. Imagine the Monday project meeting. Planning says the schedule moved. Procurement says the supplier promised Friday. Site says the sequence change is temporary. Commercial says it is too early to issue a notice. Cost says the forecast will catch up next month. Everyone is technically correct, yet the project is still getting into trouble. I learned this lesson before generative AI existed from Vladimir
Milovanović, Lupa’s co-founder and CEO. He was often brought into projects that were drifting badly enough to need senior attention and support. By the time he arrived, the schedule had moved, the commercial position hardened and management wanted an explanation. The first question was always, “What happened?” The question that mattered more was, “Why did we not know this six months earlier?” Often, the answer was uncomfortable. The project did know, just not in one place or one person’s head. Planning saw schedule movement. Procurement knew a package slipped. Site changed the sequence. Commercial felt the relationship hardening. Cost reports eventually caught up. Everyone was looking at the project. They just were not looking at the same project.
www.ForConstructionPros.com/Asphalt
10/14/26 8:56 AM
se
L
MASTIC MACHINE - 300 G A LLO N C A PACIT Y -
POWERED BY INNOVATION DRIVEN BY SAFETY
FEATURES: •
All diesel power (both burner and engine) for maximum efficiency and performance.
•
Industry’s fastest heat up time - less than 2.5 hours from cold start.
•
Advanced plow-point agitation for faster heat-up and material discharge.
•
Heated discharge chute for uninterupted material applicaton.
CRACK PRO 300 GALLON MASTIC MACHINE
NATIONWIDE SALES, RENTAL & SERVICE
Awarded Contract Contract # 050625-TWK
Mastic is ideal for large cracks, bridge joints, plug joints, manhole cover areas, utility joints and more.
sealmaster.net | 800-395-7325
LOCATIONS NATIONWIDE
ACON1126_12-15_Tech_jb MM FINAL.indd 13
Booth 713 Jan. 25-27, 2027 Savannah, GA
Booth 5437 Mar. 15-17, 2027 New Orleans, LA
10/14/26 8:57 AM
TECHNOLOGY MATTERS CONNECT EARLY AND REACT QUICKLY A project is experienced as a chain of events: late design, restricted access, changed sequence, lost productivity or an instruction that alters the commercial position. But those events are recorded as documents — a drawing register, an RFI, site diaries, meeting minutes, the schedule, labor records, notices and cost reports. The organization operates through document systems, while commercial reality evolves through connected events. The job is not to abandon documents. They remain the evidence. The job is to connect the event layer across them early enough to act. Consider a typical developing loss. A design package is issued four weeks late. Procurement postpones the release of a package. The site team resequences to protect progress. A subcontractor adds labor but loses efficiency. The schedule records movement two updates later. The cost report reflects the impact another month after that. Each function recorded part of the event, but nobody assembled the commercial chain. At which point did the project become distressed? Not when the cost report turned red. That was simply when the loss became impossible to ignore. Construction companies are excellent at explaining losses after the fact. We can reconstruct a chronology, identify affected activities, quantify disruption and assemble the correspondence. On a dispute, that work is essential. On a live project, it is late. Hindsight makes fragmented events look inevitable. Once the chronology has been assembled, the emails make sense, the schedule movement has an explanation and the commercial consequence appears obvious. But projects are not managed in hindsight. They are managed while the chain is still incomplete.
14 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_12-15_Tech_jb MM FINAL.indd 14
SIGNALS PREDICT EVENTS The warning usually appears first as a pattern: the same design issue recurring across meetings, slower progress, defensive correspondence, procurement dates moving again, or subcontractor applications that no longer match the recovery narrative. Each signal is easy to rationalize. Together, they describe an event. More reporting is not automatically the answer. Generative AI may even make the problem worse —another summary, another dashboard and another polished paragraph explaining why the dashboard is green. Summarization is useful, but without connected information, we will industrialize the noise. Giving AI access does not solve the volume problem. It may simply give the machine access to the mess. For construction, useful intelligence sits in relationships. Which drawing revision affected which package? Which RFI preceded the schedule movement? Which instruction changed the sequence? Which correspondence shows what the parties understood before the formal position hardened? Which cost exposure belongs to the same event? Which source supports the conclusion? Let’s say twenty people arrive with twenty reports, then discover they are discussing different versions of the same problem. Now imagine the meeting starts differently. Before anyone opens the slide pack, the team can see that a late design package, procurement slips, a changed sequence, declining productivity and defensive correspondence belong to one commercial event. The current drawing, schedule movements, instruction, assumptions, cost exposure and source records are already linked. Nobody has to guess which folder contains “the latest final version.” That is construction intelligence. It’s an intelligence layer that connects signals across design, schedule, site, procurement, correspondence and cost. It preserves
chronology, surfaces patterns early and keeps conclusions traceable to evidence. It does not replace judgment. It gives experienced contractors something better to exercise judgment on. Technology will not correct weak leadership, poor governance or a culture that suppresses bad news, but it can remove the excuse that the evidence was unavailable, fragmented or impossible to connect. REVIEW PATTERNS, NOT ISOLATED DOCUMENTS The project team should review patterns rather than isolated documents. One late RFI may be noise. The same design issue appearing in RFIs, coordination minutes, a procurement delay and three schedule updates is not noise. That is a developing commercial event, whether or not anybody has formally named it yet. This matters beyond margin. People who spot the issue early become trusted, and people who repeatedly explain it late become exposed. Reputation, job security and promotion depend on seeing the project clearly before the outcome is fixed. If much of your week is spent finding, copying, comparing and summarizing information, you are doing work that will soon be automated, if it isn’t already. Do not try to compete with the machine on repetitive work. Instead, use it to make better decisions. The contractor that learns to connect the event layer while the project is still moving will not eliminate every loss or dispute. Construction is too complex for that. But it will see more problems while choices still exist, negotiate from a stronger factual position, protect the reputations of the people responsible for the project and stop discovering, months later, that the project had been whispering the answer all along. The next competitive advantage in construction will not come from another dashboard or another generalpurpose AI model. The advantage will come from the intelligence layer that turns fragmented project information into commercial foresight. by John Braley, Head of U.S. Operations for Lupa Technology.
www.ForConstructionPros.com/Asphalt
10/14/26 2:16 PM
s
ACON1126_12-15_Tech_jb MM FINAL.indd 15
10/19/26 8:26 AM
PRODUCTION GAINS
Wosunan AdobeStock
Protecting Lone Workers: A Safety Shift Is Underway Construction companies are rethinking emergency response, heat safety and communication as more employees spend time working independently.
C
onstruction safety has never been static. Over the years, the industry has adapted to new regulations, emerging technologies, changing workforce dynamics and evolving jobsite risks. Today, another important shift is underway: a growing recognition that protecting workers means not only preventing incidents but
16 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_16-19_ProductionGains_jb MM FINAL.indd 16
also ensuring they can quickly access help when emergencies occur. As construction companies manage increasingly mobile workforces, labor shortages and more employees working independently across multiple locations, organizations are taking a closer look at how they support workers when supervisors and coworkers are not immediately present. From emergency response and heat-related illnesses to communication protocols and connected safety technology, protecting lone workers is becoming a more prominent part of the broader construction safety conversation. Understanding the risks lone workers face and the steps organizations can take to address them will be critical as the industry continues to build safer, more resilient workplaces.
THE EVOLUTION OF CONSTRUCTION SAFETY FOR SOLO WORKERS Historically, safety initiatives focused heavily on preventing physical injuries through PPE, equipment standards and jobsite compliance. While those fundamentals remain essential, employers are recognizing that worker safety extends beyond visible hazards. Today’s construction workforce is more dispersed than ever. Technicians, inspectors, project managers, utility crews and contractors often spend significant portions of their day working independently. That may mean traveling between sites, operating in remote locations or working in isolated areas of a large jobsite where colleagues may not be immediately nearby. As a result,
www.ForConstructionPros.com/Asphalt
10/14/26 9:06 AM
organizations are paying closer attention to what happens when an incident occurs and no one is immediately available to help. The conversation has shifted from simply preventing accidents to ensuring workers can quickly access support during emergencies. Companies are not only asking, “How do we reduce risk?” but also, “How do we ensure every employee can get help when they need it, wherever they’re working?” The need for that type of support becomes even more important when considering the unique challenges lone workers face during emergencies and unexpected incidents. WHY LONE WORKERS FACE GREATER RISK DURING EMERGENCIES The primary challenge for lone workers is delayed intervention. When coworkers are nearby, a slip, fall, medical event or threatening situation is often quickly noticed. For someone working alone or in an isolated area of a large jobsite, however, an emergency can go undetected for a long period of time. Construction environments also present unique risks. Employees frequently work in changing environments, travel between locations, encounter unfamiliar settings and may be exposed to hazards such as working at heights, operating equipment, extreme weather conditions or interacting with members of the public. Many emergencies aren’t always related to workplace incidents. Heatrelated illnesses, cardiac events, sudden injuries or incapacitation can occur without warning. When someone is isolated, even a short delay in response can significantly impact outcomes. That’s why organizations are placing more emphasis on closing the gap between an incident occurring and help arriving on the scene. HEAT SAFETY AND THE RISKS OF WORKING ALONE One risk that continues to demand greater attention across the construction industry is extreme heat, as it presents both physical and operational
www.ForConstructionPros.com/Asphalt
ACON1126_16-19_ProductionGains_jb MM FINAL.indd 17
challenges for workers. Heat exhaustion and heat stroke can develop rapidly, especially when workers are performing physically demanding tasks outdoors. The danger is amplified for lone workers because the symptoms of heatrelated illness often impair judgment and progress quickly. A worker may become disoriented, dizzy or physically unable to seek help. Without coworkers nearby to recognize the warning signs, a serious medical event can easily escalate before anyone is aware that assistance is needed. Summer conditions contribute to fatigue and dehydration, increasing the likelihood of mistakes, slips, trips and other incidents. For construction companies, heat safety planning should go beyond reminders to drink water. It should include clear procedures around hydration, rest breaks, shaded or cooled recovery areas, training on signs of heat stress and communication expectations for workers who may be alone or moving between sites. As temperatures peak in many regions, heat management is becoming a critical component of construction safety planning. PRACTICAL STEPS TO IMPROVE LONE WORKER PROTECTION Protecting lone workers doesn’t require adding complexity to operations. The most effective strategies are often the easiest to integrate into daily workflows. Organizations should begin by identifying which employees regularly work alone and understanding the specific risks associated with their roles. From there, establishing clear communication protocols, regular check-ins and emergency escalation procedures can significantly improve worker safety. Not all lone worker roles carry the same level of risk. A project manager conducting site visits may face different challenges than a utility worker operating in remote locations or a contractor traveling alone between jobsites. Understanding those differences allows organizations to tailor safety procedures to the realities of each role.
Training is equally important. Workers should know how to recognize signs of heat stress, fatigue, medical emergencies and personal safety concerns, as well as understand the steps to take if assistance is needed. Technology also plays a meaningful role. Connected safety solutions that allow workers to discreetly request help or automatically trigger an alert when someone may be incapacitated can provide an additional layer of protection without disrupting productivity. The goal isn’t to monitor workers; it’s to ensure support is available when they need it most. BEYOND COMPLIANCEDRIVEN PROGRAMS The future of construction safety will be increasingly proactive, connected and worker-centric. Organizations are moving beyond compliancedriven programs and focusing more intentionally on creating environments where employees feel protected, supported and confident while performing their jobs. Connected safety technologies will play an even greater role in that strategy. As construction companies continue to manage labor shortages and more distributed workforces, there is growing recognition that employers need better ways to stay connected with workers who operate independently. Technology will not replace triedand-true traditional safety practices, but it will complement them by providing greater visibility and faster access to support when incidents occur. Ultimately, the strongest safety programs will enable organizations to protect employees not only when supervisors are present, but also when workers are on their own. At its core, the future of construction safety is about ensuring every worker, regardless of where they are or who they’re with, has a reliable way to get help and return home safely at the end of the day. by Stephen Luke, U.S. President of SoloProtect.
NOVEMBER 2026 ASPHALT CONTRACTOR 17
10/14/26 9:06 AM
January 25-27, 2027 | Savannah Convention Center | Savannah, GA
REGISTRATION IS This IMMERSIVE EXPERIENCE is designed to enhance your business through a full three-day schedule. Our agenda covers fun and engaging networking opportunities, ample time on the show floor to view new products and equipment and over 60+ hours of educational offerings to learn from industry experts. The PAVE/X difference starts with education designed to make an impact. The robust program goes beyond traditional conference learning, delivering practical, relevant content across Paving & Compaction, Pavement Preservation, Sweeping, Sealcoating, Technology, Striping and Business Management. With a wide range of sessions to choose from, contractors can build an experience around the topics, challenges and opportunities that matter most to their businesses. In addition to education, Outdoor demos are BACK—and we’re taking them to the extreme. This year, we’re bringing equipment out of the booth and into the action with an expanded outdoor experience where contractors can see machines perform in real-world conditions. Fire up equipment, put it through its paces, and let the product speak for itself. And the excitement doesn’t stop there. The Roller Rodeo and Striping Competition are back, giving contractors a chance to test their skills. With expanded seating, big-screen displays, food trucks, live music and cold beer, the outdoor demo lot becomes the place to be—where contractors stay longer, engage more and discover what the equipment can do. The final leg to the PAVE/X experience is creating meaningful connections. Over the three-day event, there will be ample opportunity for next-level networking that will create and strengthen the relationships that are vital to the success of business owners working to grow. “Every year, our goal is to deliver the best possible experience for contractors. That means listening to their feedback, thinking outside the box, and continually challenging ourselves to create an event that goes beyond expectations,” says Amy Schwandt, Co-Founder of PAVE/X. “This year, we heard loud and clear that contractors want to see equipment in action, so we’re bringing our outdoor demo experience to an entirely new level. We’re creating an immersive space where contractors can experience equipment firsthand, putting PAVE/X in a position to set a new standard for industry events.” We hope you can join us in Savannah, January 25-27, 2027, for an immersive trade show environment you won’t want to miss! Brought to You By:
Previously Known as AC Business Media
ACON1126_16-19_ProductionGains_jb MM FINAL.indd 18
10/14/26 9:06 AM
L
N IS OPEN
Savannah
Savannah Convention Center
Dueling Pianos
LIVE DEMONSTRATIONS
FOR MORE INFORMATION, VISIT:
PAVEXSHOW.COM
ACON1126_16-19_ProductionGains_jb MM FINAL.indd 19
10/14/26 9:06 AM
T
he Asphalt Paver Spec Guide is the industry’s first online, interactive spec’ing tool custom-built for construction equipment owners to find exactly which paver they need for their equipment fleets. Presented by Asphalt Contractor, the Asphalt Paver Spec Guide features more than 75 models and includes manufacturer, model number, engine HP, undercarriage type, shipping dimensions and more. Visit the exclusive, interactive and customizable version at: https://www.forconstructionpros.com/specguide/asphalt-paver/
SCAN HERE
VÖGELE Built on the global success of VÖGELE Dash 5 technology, this next-generation paver has been designed specifically for North American paving operations. Featuring the SUPER 2100-5 X, SUPER 2003-5 X, SUPER 2000-5 X, and SUPER 800-5 P, these advanced pavers combine intuitive ErgoPlus 5 operation, intelligent process automation, and proven paving performance. Technologies such as Auto Grade Plus, Smart Pave, WPT Paving, and EcoPlus help contractors improve productivity, optimize material flow, reduce fuel consumption, and achieve consistent paving results. With enhanced ergonomics, improved visibility, and user-friendly controls, Dash 5 pavers are built to meet today’s jobsite demands and tomorrow’s expectations.
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Manufacturer
Model No.
Undercarriage Type
Vögele
Mini 500
Tracked
14
8' 6" x 2' 11" x 4' 9"
3,175
1.32
2'7"
5'11"
131 fpm
n/a
1.49 mph
Vögele
Super 800-5 P
Tracked
74
16' x 3' 9" x 6' 9"
14,550
6.4
3' 7"
11' 5"
98 fmp
n/a
2.2 mph
Vögele
Super 1300-3i
Tracked
100
16' 3" X 6' 1" X 10'2"
23,480
11
5' 11"
16' 5"
98 fpm
n/a
2.8 mph
Vögele
Super 1700-3i
Tracked
173
18' 5" X 8' 6" X 9' 8"
40,345
14.3
8' 4"
21'
250 fpm
n/a
7.5 mph
Vögele
Super 1703-3i
Wheeled
173
19' 7" X 8' 6" X 9' 8"
38,140
14.3
8' 4"
21'
250 fpm
n/a
12 mph
Vögele
Super 2000-5X
Tracked
250
22' 10" X 9' 10" X 10' 2"
51,370
15.5
10' 0"
25' 11"
250 fpm
n/a
7.5 mph
Vögele
Super 2003-5X
Wheeled
250
22' 10" X 9' 10" X 10' 2"
37,325
15.5
10' 0"
25' 5"
250 fpm
n/a
12 mph
Vögele
Super 2100-5X
Tracked
250
22' 5" x 8' 4" x 10' 2"
51,370
15.4
9' 10"
45' 11"
82 fpm
n/a
2.7 mph
Vögele
Super 1800-3i SprayJet
Tracked
173
19' 8" X 8'4" X 10' 2"
49,360
14.5
10' 0''
19 '8"
79 fpm
n/a
2.8 mph
20 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 20
S TANDARD PAVING WIDTH (FT)
Minimum Maximum
www.ForConstructionPros.com/Asphalt
10/14/26 9:11 AM
Sponsored by
BOMAG Legendary for delivering high-quality, smooth mats, BOMAG pavers are designed for performance, ease of use, durability and efficiency. The CR 1030-2 and CR 820-2 Series highway pavers feature a simplified human-machine interface, large multi-function color displays, outboard auger drives, and BOMAG-exclusive FRAMERAISE and SIDEVIEW. A sloped engine hood design offers clear view into the hopper from the operator’s seat. The choice of rear- or front-mount electric screeds increases application versatility.
Manufacturer
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
Model No.
Undercarriage Type
BOMAG BF
Steel track,
200 C-2
poly pads
BOMAG BF
Steel track,
300 C-2
poly pads
BOMAG BF
Steel track,
350 C-5
poly pads
BOMAG CR 820T BOMAG CR 820W BOMAG CR 1030 T
Engine HP (net)
74
74
100
Rubber track
160
Wheel
160
Rubber track
225
Shipping Dimensions (LxWxH) (ft.) 15' 1" x 4' 3" x 6' 7" 16' 7" x 6' 2" x 8' 10" 16' 7" x 6' 3" x 9' 8" 20' 8" x 8' 11" x 10' 6" 20' 8" x 8' 11" x 10' 20' 10" x 10' 10" x 10'
Max Operating Weight (lbs.)
Hopper Capacity (tons)
13,228
S TANDARD PAVING WIDTH (FT)
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Minimum
Maximum
5
3.5 ft
6.5 ft
95 ft/min
n/a
3 mph
22,708
9
5.6 ft
16.4 ft
102 ft/min
n/a
3.2 mph
22,708
9
5.7 ft
11.2 ft
105 ft/min
n/a
2.8 mph
36,400
10
8 ft
20 ft
283 ft/min
n/a
6 mph
34,500
10
8 ft
20 ft
427 ft/min
n/a
10 mph
44,300
14
10 ft
30 ft
246 ft/min
n/a
9.8 mph
BOMAG
BOMAG CR 1030 W
Wheel
260
22' 3" x 10' 10" x 9' 11"
38,280
16.7
10 ft
30 ft
313 ft/min
n/a
12 mph
BOMAG
BOMAG CR 820 T-2 with VERSA 16
Rubber track
173
20' 8" x 8' 11" x 10' 6"
37,660
10
8 ft
15.6 ft
283 ft/min
n/a
6 mph
BOMAG
BOMAG CR 820 T-2 with STRETCH 16
Rubber track
173
20' 8" x 8' 11" x 10' 6"
37,660
10
8 ft
16 ft
283 ft/min
n/a
6 mph
BOMAG
CR 1030 T-2 with VERSA 20
Rubber track
225
20' 10" x 10' 10" x 10'
45,380
14
10 ft
19 ft
246 ft/min
n/a
9.8 mph
BOMAG
CR 1030 T-2 with STRETCH 20
Rubber track
225
20' 10" x 10' 10" x 10'
45,380
14
10 ft
20 ft
246 ft/min
n/a
9.8 mph
www.ForConstructionPros.com/Asphalt
ACON1126_20-31_PaverSpecGuide MM FINAL.indd 21
NOVEMBER 2026 ASPHALT CONTRACTOR 21
10/14/26 9:11 AM
Sponsored by
DYNAPAC NORTH AMERICA Whether on compact city streets or vast highway projects, Dynapac offers solutions to meet all of your paving needs. Dynapac pavers are designed with paving quality, innovation, ergonomics, and innovative solutions in focus. Built with robust screed designs, top pre-compaction and solutions such as PaveManager, Truck Assist and BPO.
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
S TANDARD PAVING WIDTH (FT) Minimum Maximum
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Dynapac
D25T
High Speed Rubber Track
173
21 x 8.8 x 10.5
37,950
10
8
20
282 ft/min
N/A
9 mph
Dynapac
D30T
High Speed Rubber Track
225
22 x 11 x 9.9
45,200
14
8
30
245 ft/min
N/A
10 mph
Dynapac
D30W
High Floatation Wheel Drive
225
23 x 10.8 x 9.9
41,700
16.5
10
30
305 ft/min
N/A
10 mph
Dynapac
D12C w Remote Control
Steel Track on Poly Pad
74
15 x 4 x 6
13,000
5.5
3.8
7.3
90 ft/min
N/A
2.5 mph
Dynapac
FC1300C-II
Steel Track on Poly Pad
25
9.75 x 8.5 x 5.75
9,700
6
8
13
115 ft/min
N/A
3 mph
Dynapac
D14C
Steel Track on Poly Pad
74
11.25 x 8.5 x 5.25
12,500
6.5
8
14
140 ft/min
N/A
3 mph
Dynapac
D17C
Steel Track on Poly Pad
120
13.75 x 8.5 x 6
19,500
9.5
8
15.5
140 ft/min
N/A
3 mph
Dynapac
SD1800W
High Floatation Wheel Drive
73
16.5 x 6 x 9.56
23,000
10.5
6
15.5
82 ft/min
92 ft/min
9.3 mph
Dynapac
SD1800C
Steel Track on Poly Pad
73
16.5 x 6 x 9.56
23,000
11.5
6
15.5
82 ft/min
N/A
2.5 mph
Dynapac
SD2500C
Steel Track on Poly Pad
173
20.16 x 8.2 x 10.16
40,785
13
8
19.5
N/A
92 ft/min
2.5 mph
Dynapac
SD2500CS
Steel Track on Poly Pad
200
20.16 x 8.2 x 10.16
40,785
13.5
8
19.5
N/A
92 ft/min
2.5 mph
Dynapac
SD2550C
Steel Track on Poly Pad
220
21.74 x 8.2 x 10.17
44,000
16
8
19.5
N/A
92 ft/min
2.5 mph
Dynapac
SD2550CS
Steel Track on Poly Pad
264
21.74 x 8.2 x 10.17
44,000
16
8
19.5
N/A
92 ft/min
2.5 mph
22 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 22
www.ForConstructionPros.com/Asphalt
10/14/26 9:11 AM
avel
A JOHN DEERE COMPANY
We’re an answer while the asphalt‘s still hot
h
ph
close. CLOSE TO OUR CUSTOMERS
Close to our customers means we pick up the phone, troubleshoot the issue, deliver the part, and get you back on track to get the job done. Our elite team of service professionals are here to support maximum machine uptime and performance—when and where you need it.
wirtgen-group.com
WIRTGEN
ACON1126_20-31_PaverSpecGuide MM FINAL.indd 23
VÖGELE
HAMM
KLEEMANN
10/14/26 2:19 PM
ASTEC From highway paving to commercial applications, Astec’s Roadtec and Carlson pavers deliver the power, control, and maneuverability contractors need to produce a consistently high-quality mat. Highway-class models can be paired with a range of proven screed configurations to meet diverse paving and production requirements. Commercialclass pavers provide dependable performance and jobsite agility in a compact platform. Across applications, Astec pavers help crews maintain mat quality, productivity, and control from the first pass to the final lift.
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Minimum Maximum
Astec
RP-190e
Rubber Tire Paver
Tier 4F, Cummins®QSB6.7 230 hp 172 kW) @ 1,900 rpm
27'7" x 10'6" x 10' 1"
45,700
13.8 tons
10'
Astec
RP-195f
Rubber Track Paver
Stage V / Tier 4F Cummins® QSB.6.7 230 hp (172 kW) @ 2,000 rpm
20'8" x 10'2.5" x 10'2.5"
48,130
13.8 tons
Astec
RP-170e
Rubber Tire Paver
Tier 4F, Cummins®QSB6.7 174 hp (130 kW) @ 2,200 rpm
16'3" x 10'1" x 10'
35,630
Astec
RP-175f
Rubber Track Paver
Stage V / Tier 4F Cummins® QSB.4.5 173 hp (127 kW) @ 2,200 rpm
20'8" x 8'10" x 10'1"
Astec
SP-200
Rubber Track Paver
Tier 4F, Cummins®QSB6.7 230 hp (172kW) @ 1,900 rpm
Astec
CP75 II
Track
Astec
CP100 II
Astec
CP130
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
19'6"
0 - 284 fpm (86 m/min.)
Not applicable
0 - 12 mph (19 k/hr.)
10'
19'6"
0 - 210 fpm (64 m/min.)
Not applicable
0 - 7.5 mph (12 k/hr.)
11.5 tons
8'
15'6"
0 - 300 fpm (91 m/min.)
Not applicable
0 - 10 mph (16 k/hr.)
40,775
10 tons
8'
15'6"
0 - 210 fpm (64 m/min.)
Not applicable
0 - 6.5 mph (10.5 k/hr.)
27' x 11'4" x 10'3"
63,800
11 tons
10'
19'6"
0 - 168 fpm (51 m/min.)
Not applicable
0 - 3.6 mph 5.8 k/hr.)
Tier 4F Deutz 2.9 L4 74 hp
12'5" x 8'6" x 6'2"
16,950
8 tons
8'
15'
155 fpm
Not applicable
255 fpm
Track
Tier 4F Cummins QSF 3.8 100 hp (74 kW)
14'6" x 8'6" x 6'8"
22,000
9.5 tons
8'
15' (17' w/ bolt-ons)
155 fpm
Not applicable
255 fpm
Track
Tier 4F Cummins QSF 3.8 130 hp (97 kW)
14'6" x 8'6" x 7'6"
22,500
9.5 tons
8'
15' (17' w/ bolt-ons)
155 fpm
Not applicable
325 fpm
24 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 24
S TANDARD PAVING WIDTH (FT)
www.ForConstructionPros.com/Asphalt
10/14/26 9:11 AM
TRUST THE STRENGTH
l h)
19
12
16
Tackle the toughest crushing applications with the industry’s highest performing equipment—Eagle Crusher, delivering world-class innovation, year after year. Discover E-Plant®, just one of many innovative products from Eagle Crusher.
TRUST THE STRENGTH OF EAGLE CRUSHER®
5.8
800-25-EAGLE www.EagleCrusher.com
JOIN US AT BOOTH 4446
ACON1126_20-31_PaverSpecGuide MM FINAL.indd 25
10/14/26 9:11 AM
L
Sponsored by
WEILER Engineered and built to exceed the demands of commercial paving, Weiler pavers incorporate proven designs with new innovations to provide performance, reliability and outstanding mat quality. Weiler offers six pavers to meet contractor’s needs in a wide range of applications. Weiler equipment is sold and serviced exclusively at Caterpillar dealers throughout North America.
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
17'4"
150 fpm
n/a
250 fpm
8'
15'8"
150 fpm
n/a
350 fpm
9 tons
7'8"
15'
150 fpm
n/a
300 fpm
15,900 lb
7 tons
8'
14'
180 fpm
n/a
300 fpm
15' x 4'7" x 5'9"
13,000 lb
7 tons
3'10"
7' std (9' w/ bolt on ext)
233 fpm
n/a
350 fpm
9' 9" x 8'2" x 5' 10"
12,600 lb
6 tons
7'8"
13'
180 fpm
n/a
300 fpm
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
120 hp
15'4" x 8'6" x 8'4"
24,000 lb
11 ton
7'8"
Steel Track w/ Poly Pads
120 hp
14'5" x 8'5" x 6'4"
22,000 lb
9 tons
P285
Steel Track w/ Poly Pads
74 hp
13' x 8'2" x 6'4"
18,000 lb
Weiler
P275
Steel Track w/ Poly Pads
74 hp
11'8" x 8'4" x 6'4"
Weiler
P195
Steel Track w/ Poly Pads
67 hp
Weiler
P75
Steel Track
60 hp
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Weiler
P395
Steel Track w/ Poly Pads
Weiler
P385C
Weiler
S TANDARD PAVING WIDTH (FT)
Minimum Maximum
MAULDIN PAVING PRODUCTS Mauldin Paving Products’ line of commercial pavers ensure superior performance due to three strategic approaches to its design – proven productibility, screed design and a commitment to quality. Mauldin Pavers have been trusted for decades by contractors to produce lasting results.
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Mauldin
650
Tire/Track
24hp
9'10"x7'6"x5'8"
9,700
6
8ft
13'
0-115 FPM
n/a
3.2 MPH
Mauldin
760
Tire/Track
49hp
9'10"x7'6"x5'8"
9,800
6
8ft
13'
0-115 FPM
n/a
3.2 MPH
Mauldin
1560
Track
74hp
11'4"x8'6"x5'4"
12,500
6.5
8ft
14'
0-140 FPM
n/a
3.5 MPH
Mauldin
1860C
Track
110hp
13'9" x 8'6" x 5'11"
19,500
9.5
8ft
15'6"
0-140 FPM
n/a
3.5 MPH
Mauldin
1360
Track
74hp
14' x 3'11" x 6'8"
12,800
6
3'11
7'10'
0-90 FPM
n/a
2 MPH
26 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 26
S TANDARD PAVING WIDTH (FT)
Minimum Maximum
E12
www.ForConstructionPros.com/Asphalt
10/14/26 9:11 AM
Weiler MT
LEADING THE WAY Weiler Material Transfer Vehicles lead the way with proven innovations to provide the lowest cost per ton of operation.
Variable speed elevator and conveyors meet production requirements while minimizing wear.
Innovative and reliable operator friendly features such as paver hopper management system with distance to paver, storage hopper management and auto chain tensioning.
el
Clam shell doors and full width drop down floors provide unmatched access for cleanout and maintenance.
The multiple, incremental improvements to the 4th generation of chains, sprockets and augers are retrofittable to all machines and provide increased wear life.
l h)
E1250C
E1650A
E2850C
E2860C weilerproducts.com
Weiler MTV Ad_Asphalt Contractor.indd 1 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 27
12/12/2025 7:32:43 AM 10/14/26 9:11 AM
BLAW KNOX The all new Blaw Knox PF-7110C tracked paver combines allaround visibility, ease of operation and a new powerful Cummins 235-hp engine for the ultimate in dependability and efficiency. The turbo-charged diesel engine provides more torque and less weight in a more compact package, letting you power through steep grades with confidence. Coupled with the proven Blaw-Knox durable track and automatic tensioning system, the 7110C ensures smooth and consistent paving power on any terrain.
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Blaw-Knox
PF-4410B
Rubber Track
154
17'-10" x 9' x 8'-10"
37,100
Blaw-Knox
PF-4410X
Rubber Track
165
17'-10" x 9' x 8'-10"
Blaw-Knox
PF-5110B
Rubber Track
173
Blaw-Knox
PF-7110B
Rubber Track
Blaw-Knox
PF-7110C
Blaw-Knox
S tandard Paving Width (ft)
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Minimum
Maximum
11
8'
18'
0-242
n/a
8.5
37,100
11
8'
18'
0-242
n/a
8.5
21'-9" x 8'3" x 9'-11"
41,350
12
8'
18'
0-180
n/a
8.4
235
22'-6" x 10'-2" x 10'
50,050
13
10'
26'
0-224
n/a
9
Rubber Track
225
22'-6" x 10'-2" x 10'
50,050
13
10'
26'
0-224
n/a
9
PF-5170B
Wheeled
173
21'-9" x 8'3" x 9'-11"
39,200
12
8'
18'
0-240
n/a
11
Blaw-Knox
PF-7170B
Wheeled
235
22'-6" x 10'-3" x 10'
47,369
13
10'
26'
0-297
n/a
12
Blaw-Knox
PF-7170C
Wheeled
225
22'-6" x 10'-3" x 10'
47,369
13
10'
26'
0-297
n/a
12
Blaw-Knox
PF-5110C
Rubber Track
188
21'-9"x 9'x9'11"
41,350
11
8'
18'
0-180
n/a
Blaw-Knox
PF5170C
Wheeled
188
21'9"x9'x9'11"
39,200
11
8'
18'
0-240
n/a
28 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 28
8.4
11
www.ForConstructionPros.com/Asphalt
10/14/26 9:11 AM
el
Sponsored by
CATERPILLAR INC. Whether paving pathways or interstates, contractors are expected to deliver quality work. Caterpillar provides a range of paver and screed combinations, industry expertise, and training programs designed to improve performance. Cat dealers offer a single source for parts, sales and service to support paving contractors.
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
S tandard Paving Width (ft) Minimum Maximum
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Cat
AP300
Wheel
74.8
16.1' x 6.33' x 8.75'
17,637
134
5.75
11.17'
200 fpm
82 fpm
10 mph
Cat
AP355
Track
74.8
16.1' x 6.33' x 8.75'
19,246
134
5.75'
11.17'
210 fpm
82 fpm
7 mph
Cat
AP400
Wheel
120
18.1' X 8.5' x 9.3'
30,000
205
8'
15.5'
200 fpm
82 fpm
10 mph
Cat
AP455
Track
120
18.1' x 8.5' x 9.3'
31,533
205
8'
15.5'
200 fpm
82 fpm
7 mph
Cat
AP500
Wheel
148
18.5 x 8.5' x 9.5'
32,012
215
8'
15.5'
200 fpm
82 fpm
10 mph
Cat
AP555
Track
148
18.5 x 8.5' x 9.3'
33,689
215
8'
15.5'
200 fpm
82 fpm
7 mph
Cat
AP600
Wheel
173
20.9' x 9.8' x 9.9'
38,316
250
8'
16.3
250 fpm
82 fpm
10 mph
Cat
AP655
Track
173
20.9' x 9.8' x 9.7'
42,150
250
8'
16.3
210 fpm
82 fpm
9 mph
Cat
AP1000
Wheel
225
20.9' x 11.9' 9.8'
45,263
286
9.8'
19.5
250 fpm
N/A
12 mph
Cat
AP1055
Track
225
21.9' x 9.8' x 9.7'
45,573
286
9.8'
19.5
210 fpm
82 fpm
9 mph
www.ForConstructionPros.com/Asphalt
ACON1126_20-31_PaverSpecGuide MM FINAL.indd 29
NOVEMBER 2026 ASPHALT CONTRACTOR 29
10/14/26 9:11 AM
Sponsored by
For more information visit https://asph.link/514fjr69
LEEBOY LeeBoy features a broad range of commercial class pavers to meet any contractors’ needs. All models are simple to operate, maintain and service while offering top mat quality provided by the Legend Screed.
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
S TANDARD PAVING WIDTH (FT) Minimum Maximum
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
LeeBoy
1000G
Track Drive System
49
9' 6" x 8'6" x 7'
11,000
5.5
n/a
up to 13'
0-220 fpm
n/a
0-220 fpm
LeeBoy
5300
Track Drive System
64
15'5" x 4'5" x 5'9"
12,700
7
n/a
up to 7'
0-151 fpm
n/a
0-239 fpm
LeeBoy
6150
Wheeled drive system
74
16'6" x 8'6" x 7'8"
17,550
7
n/a
up to 15'
0-228 fpm
n/a
0-660 fpm
LeeBoy
7000C
Track Drive System
64
11'0" x 8'6" x 7'
13,000
6
n/a
up to 13'
0-210 fpm
n/a
0-210 fpm
LeeBoy
8500E
Track Drive System
71
12'8" x 8'6" x 6'4"
17,640
7.5
n/a
up to 15'
0-135 fpm
n/a
0-290 fpm
LeeBoy
8515E
Track Drive System
74
13'5" x 8'6" x 8'
18,460
7.5
n/a
up to 15'
0-150 fpm
n/a
0-300 fpm
LeeBoy
8520C
Track Drive System
125
14'5" x 8'6" x 6'10"
21,400
9
n/a
up to 15'
0-150 fpm
n/a
0-300 fpm
LeeBoy
8608
Track Drive System
125
15'3" x 8'6" x 6'10"
21,920
9
n/a
up to 15'
0-164 fpm
n/a
0-316 fpm
LeeBoy
8616D
Track Drive System
127
16'4" x 8'6" x 6'8"
23,450
9
n/a
up to 15'6"
0-125 fpm
n/a
0-350 fpm
LeeBoy
8680
Track Drive System
210
18' x 8'6" x 8'9"
33,000
15
n/a
up to 15'6"
0-300' fpm
n/a
0-528 fpm
30 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_20-31_PaverSpecGuide MM FINAL.indd 30
www.ForConstructionPros.com/Asphalt
10/14/26 9:11 AM
SUPERIOR QUALITY ASPHALT STARTS WITH ADM
Your first stop in the FAYAT GROUP road lifecycle, ADM makes the plants that make the hot mix. When it comes to North American roadbuilding, FAYAT Group brands including ADM, BOMAG, Dynapac, LeeBoy, and Mecalac have you covered.
260-637-5729 admasphaltplants.com
ACON1126_20-31_PaverSpecGuide MM FINAL.indd 31
10/14/26 9:11 AM
FACE OF THE INDUSTRY | By Allyson Sherrier, Managing Editor
A
T
N
From Army Truck Driver to COO: A Voice for Women in Construction From laborer to COO, Mary Schwandt reflects on leadership, breaking barriers and creating a stronger path for women in asphalt and pavement. All Photos: Mary Schwandt
A
t 17, Mary Schwandt took a summer job with a local construction company in Nevada. She wasn’t necessarily looking for a lifelong career, but was looking for work. More than 12 years later, that summer job has taken Schwandt from laborer and foreman to COO of Acha Construction LLC, president of Valor Traffic Control and vice president of Idaho Sheep Company. Along the way, the Army veteran has become a national speaker, writer and advocate for women in construction,
32 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_32-35_Face_jb MM FINAL.indd 32
using her own experience to show others what a career in construction can offer. “I kind of just started a summer job and never left,” Schwandt says. The company where she started exposed her to nearly every aspect of heavy civil construction, including asphalt paving, concrete paving, earthwork and utilities. Rather than becoming narrowly focused on one part of the industry, Schwandt learned by doing, building a foundation that would eventually prepare her to take on increasingly greater responsibilities. “Being in an industry like that, you kind of learn everything along the way,” she says. That willingness to learn has remained a defining part of Schwandt’s career. So has the influence of another formative experience: her time in the U.S. Army. LESSONS IN LEADERSHIP Schwandt joined the Army at 18 and spent more than six years in the military, serving as a truck driver. The experience taught her lessons in discipline, integrity, responsibility and teamwork that she would eventually carry into construction. At 19 and 20 years old, she was helping run missions where the stakes could be as high as getting her team home safely. “It taught me a lot about, you know, leading,” she says. “The military teaches you a lot about integrity, responsibility, and that all does transform back to the construction industry.”
When she left the Army in 2021 and moved into full-time construction, Schwandt brought those lessons with her. She also brought an ambitious goal: to use what she had learned to help grow the business. The company went full union, expanded to more than 50 employees and grew exponentially. “We went from $3 million to $10plus million a year,” she says. “I think we took a lot of what we learned and made a construction company out of it.” MAKING ROOM AT THE TABLE Schwandt’s career hasn’t been without obstacles, particularly as a woman working in a traditionally male-dominated industry. One of the most persistent challenges, she says, is the message — sometimes explicit and sometimes implied — that women do not belong in construction. “I think a lot of women in the industry, especially a lot of young females, deal with the ‘you’re not good enough’ and ‘you don’t need to be here’ face value that men put out there,” Schwandt explains. Overcoming that requires resilience, but Schwandt also believes companies have a responsibility to create cultures where employees can succeed. When she took over running Acha about two years ago, she says the company established clear expectations for how employees would treat one another.
www.ForConstructionPros.com/Asphalt
10/14/26 9:14 AM
W c p T E c m o
x
x
x
x
x
x
W
A v m in re
B
W B c B e re a
B
A H to a h
E in th d w e
Advertisement
The Relentless Innovator:
Not All Steel Is Made Equal
Your Partner for Proven Profitability If your business is in the asphalt industry you need to talk to Gerry.
When EccoFab President, Gerry Bauer realizied that his clients were experiencing shortened wear life on specific parts, we began experimenting with Hardox® steel in 1988. Through 40 years of experience with Hardox® products, EccoFab has developed industry-leading techniques in collaboration with end-users that produce wear parts that meet most OEM standards for wear life and durability, and often exceed those standards using Hardox® 500. x High abrasion resistance x Up to 2X the service life of mild steel components x High reliability and consistency x Excellent material strength and structural integrity x Fabrication versatility and machinability x Suitability for priming and painting
Wear Plates And Liners As expendable elements, Wear Plates and Liners play a vital role in preventing excessive wear or damage to costly machinery. With Hardox® steel wear parts, you can count on increased operational longevity and improved productivity, reducing both downtime and maintenance costs.
Blow Bars While standard OEM parts often fall short, EccoFab’s Blow Bars redefine durability. The wear-resistant material, combined with our expert engineering, ensures that our Blow Bars consistently deliver reliable performance over an extended period. This reduction in the frequency of replacements not only saves you on operational costs but also keeps your aggregate production running smoothly.
Blow Bar Wedges At the heart of our blow bar wedges lies the resilience of Hardox® steel. Recognized for its unrivaled hardness and toughness, Hardox® steel ensures that our blow bar wedges are more than capable of withstanding the most abrasive and high-friction environments.
Industry Expertise
Strongest Wear Parts
Constant Innovation
Every part is custom-made according to client specifications in our production facility. These products are of higher quality, they last longer which means less replacement and less downtime. Beyond just taking orders, EccoFab works directly with the customer in reviewing the designs or giving our expert advice and know-how for maximum efficiency.
ACON1126_32-35_Face_jb MM FINAL.indd 33
10/14/26 9:14 AM
FACE OF THE INDUSTRY
“We don’t let the men treat women [disrespectfully]. We don’t let the women treat men [disrespectfully],” Schwandt says. “It’s hard when you don’t have a structured company that wants that. A safe environment for everybody.” For Schwandt, that environment needs to especially extend to those workers who are just entering the industry. Not everyone arrives as a journeyman. A lot of young people are coming in directly out of high school, and their first experiences can have a lasting effect on whether they see construction as a career or decide it isn’t for them. “Can you guys build an environment that allows kids and young females to come into the industry and want to stay into it?” she asks. The question gets to the heart of what Schwandt sees as one of the industry’s biggest workforce challenges. Companies must create a space that gives those employees a reason to stay.
worked with industry leaders to promote opportunities for women. She also uses her voice to show the everyday realities of construction, from life on a jobsite to practical questions like picking the right work boots or what hairstyles work with a hard hat. The details may seem small, but they’re important for someone considering construction for the first time. When Schwandt entered the industry, she says, she didn’t have someone to look up to or turn to with questions. As her career developed, she realized she wanted to become that person for someone else. “I just don’t think there was enough when I came into the industry,” she says. “There wasn’t anybody talking about it. I didn’t have anybody to look up to and ask questions.” Being visible has its challenges. Schwandt says she has received negative comments on social media, but has learned to move past them and focus on the opportunities that come from having a platform. SHOWING WHAT’S POSSIBLE One of the most important messages Schwandt wants women to hear is that construction can be more than a job. It can provide a career, financial independence and a life for themselves and their families. Her goal is to help the industry do a better job of showing the full range of careers available, from laborers and equipment operators to project managers and superintendents. “We’re not just depending on men to go work construction anymore,” she says. For Schwandt, that message
is rooted in her own experience. She started in construction as a laborer and steadily took on more responsibility, eventually reaching the executive level. She wants other women to see that same potential for themselves and understand that they don’t have to enter the industry already knowing exactly where their careers will take them. A LEGACY IN THE MAKING Schwandt also sees an industry changing rapidly through technology, training, diversity and more. But for her, the future of the industry is ultimately about the people. Her own career is evidence of what can happen when someone gets an opportunity and chooses to keep moving forward. From simply looking for a job at 17 to serving as a COO, Schwandt now helps lead a growing construction company while advocating for the people she hopes will follow. Looking ahead, she knows what she wants her legacy to be. “I hope that I get remembered for standing up for women in the industry and promoting the lifestyle you can have,” she says. For Schwandt, paving the way is not just a metaphor. It is the work she has chosen to do — one job site, one conversation and one future construction worker at a time.
Hear more from Schwandt on Watch FCP: https://asph.link/0hbpdd1j
BECOMING THE PERSON SHE NEEDED Schwandt’s advocacy extends well beyond her own company. She has become a FORCE Female Leader in Pavement and an Asphalt Industry Ambassador, while also speaking at industry events and using social media to reach people who might not otherwise see themselves represented in construction. She was among the early attendees of IGNITE Construction Summit, and has
34 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_32-35_Face_jb MM FINAL.indd 34
www.ForConstructionPros.com/Asphalt
10/14/26 9:14 AM
j
ACON1126_32-35_Face_jb MM FINAL.indd 35
10/14/26 9:14 AM
All photos courtesy of DO Equipment Co.
JOBSITE INNOVATIONS
Paving Priorities and Productivity:
Powder River Construction’s Approach in Wyoming PRC Owner Matt Walker and Maintenance Supervisor Mike Gross keep paving concrete highways in Wyoming despite the challenges of remote projects.
H
ere in the Mountain West, road work must happen fast, clean and when the sun is shining. It allows contractors like Powder River Construction (PRC) — founded in 2004 and based in Gillette, Wyoming — to grow to bigger, more scheduledriven companies where production and uptime matter as much as crew skill. Take PRC’s work on the Northeast Wyoming Regional Airport Runway. The airport closed the runway for only a six-week period, rerouting planes, people and products. The project required concrete panel replacement, joint sealing and crack repair intended to extend pavement life. AIRPORT RUNWAYS AND STRICT REPAIR SCHEDULES Anytime an airport closes a runway, many planes, people and machines must adjust to work around the closure. These
36 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_36-37_Jobsite_jb1 MM FINAL.indd 36
closures are tightly managed, leaving little room for paving rework. On jobs like this, each pass must consistently and effectively resurface concrete to create smooth, strong airport runways and taxiways. These pavements absorb more stress than other roads because of the speed at which aircraft takeoff and land, exerting massive force from the weight of fully loaded aircraft. Environmental conditions, such as high winds, sleet or snow, can further deteriorate pavement if it happens to crack. Uneven slabs, premature cracking or substandard joints can disrupt aircraft movement, increase wear on landing gear and even force airport closures. That’s why the Federal Aviation Administration (FAA) sets such rigorous standards for concrete mix, surface smoothness, curing and long-term durability. The FAA and community at large require contractors to pave quickly and precisely and achieve the target density that engineers set, so that each plane can take off/land without extra hazards. HOW THE FAA SETS, CHECKS STRENGTH The FAA conducts pavement research to refine quality management (QM) processes and acceptance functions. It works in tandem with the Department of Defense (DOD) because any cracks in airport runways create safety risks to
the aircraft and to supply chains critical to health and national security. The FAA’s strict QM requires paving crews to create surfaces with sufficient skid-resistance properties, which is crucial for pilots to safely brake aircraft at varying speeds. The runway needs to be smooth to prevent unnecessary damage to aircraft undercarriages. In addition to specific documentation of the concrete paving process, the FAA and Department of Transportation (DOT) require contractors to core — determine pavement thickness and compressive/flexural strength—their pavement and ensure the concrete is free of defects. CONCRETE’S MIX AND GRADE POWERS STRENGTH Concrete pavement’s mix and grade have a direct relation to the road’s strength
RDO Equipment Co.
www.ForConstructionPros.com/Asphalt
10/14/26 9:17 AM
sy of o.
and potential lifespan. Generally, a higher grade equals a higher density. The concrete mix of aggregates and material will be determined by officials and depend on the environment in which it is placed. Airport runways require high-grade materials to withstand regular impact forces. Depending on the mix, paving concrete requires multiple passes to apply enough force to reach the high-grade standard. Contractors may use machine control, telematics data and real-time density sensors on rollers to periodically monitor the concrete pavement’s grade. Real-time machine data, plus density rates and DOT officials’ specs, help paving crews prevent rework and achieve the accurate grade on schedule. PRECISION PLANNING, PARTS, RELIABLE SERVICE When I spoke to PRC’s owner, Matt Walker, and maintenance supervisor Mike Gross, they called out the Wirtgen Group Slipform paver’s ability to consistently lay concrete with easy access to hydraulics when the machine requires its daily service checks. Slipform paving is built for repeatability: steady forward movement, consistent placement and fewer stops. In practical terms, slipform pavers for concrete paving improve productivity in three major ways — and RDO’s proximity and uptime planning help protect those gains when the schedule tightens. When PRC’s Gross talked about what differentiates modern paving equipment, he didn’t start with horsepower — he started with how quickly the team can get back to pouring when something needs attention.
“A big one was hydraulics — specifically the termination points for hydraulic lines,” Gross said. Modern equipment allows PRC to pull the covers and change hoses in just 15 minutes, instead of needing to chase everything around the back of the machine, he added. That’s direct productivity. Faster service means fewer idle hours, fewer missed production targets and less risk when closure windows are hard. “Wirtgen Group’s Slipform and RDO’s field support help our crews to improve consistency, which cuts down on any extra passes,” Gross said. In heavy civil work, productivity isn’t only “feet per day.” It’s also how much finishing, patching and correction you don’t need to do. Slipform machines are designed to keep placement uniform and controlled — whether the job is mainline paving or monolithic profiles such as curb and gutter, and barrier. PRC lists concrete paving and curb and gutter among its core concrete services and also highlights slipform concrete paving within its Heavy Highway & Aviation capabilities. That overlap is why slipform equipment is so valuable: One approach supports multiple scopes without rebuilding your process every time the project type changes. Automation and machine control options eliminate steps, accelerate setup and improve repeatability — especially on complex grades and profiles. On RDO’s slipform-focused resources, Wirtgen’s slipform pavers are positioned as tools that help contractors cover a wide range of paving needs. Stringless capability has a key productivity advantage because it can reduce time-consuming surveying operations and support safer workflows. Even with a solid productivity plan, schedules are challenged by logistics. That’s where dealer support becomes the difference between “making up time” and “losing the window.” PROTECTED BY PROXIMITY, PRODUCTION HOURS Slipform productivity is only real if the machine is running. Contractors expanding into heavy highway work often discover that output and uptime
www.ForConstructionPros.com/Asphalt
ACON1126_36-37_Jobsite_jb1 MM FINAL.indd 37
Powder River Construction Owner Matt Walker and Maintenance Supervisor Mike Gross.
are inseparable — especially when projects are dictated by short seasons, hard closures and public timelines. In the show “The Track,” Walker emphasized how much confidence comes from knowing support is close when the stakes rise. “It gave us comfort knowing we had parts and service close by — basically on our doorstep,” he said. That’s the practical advantage of working with a dealer that understands production paving; parts/ service proximity reduces downtime risk, and uptime planning (preventive maintenance cadence, wear-part forecasting and quick-turn repairs) helps contractors stay on schedule when the job’s critical path is measured in hours, not weeks. RDO also explicitly positions itself in the slipform space through brands and offerings tied to concrete paving technology, including concrete slipform pavers and curb and gutter machines — the categories contractors rely on when scaling output and expanding scope. CRITICAL FOR WYOMING’S INFRASTRUCTURE PRC’s growth is a familiar arc across the region. As opportunities expand, contractors must accept higher-production projects — and deliver. PRC’s service mix (from concrete paving and curb and gutter to larger-scale heavy civil scopes) is exactly the kind of operation where slipform pavers raise daily production while keeping quality consistent. When schedule pressure happens, like a runway reopening time getting moved up, the contractors who win are the ones with consistent paving production hours and a support plan. by Dennis Howard, Senior Vice President of Roadbuilding and Minerals at RDO Equipment Co., where he also leads RDO’s Wirtgen Group business.
NOVEMBER 2026 ASPHALT CONTRACTOR 37
10/14/26 2:17 PM
S
PRESERVATION & SUSTAINABILITY
How RAP Technology Is Turning Circular Ambition Into Reliable Asphalt Production Why RAP is shifting from niche solution to essential infrastructure strategy worldwide. Lintec & Linnhoff
R Y F T
IG to
A
s sustainability, cost efficiency and resource security rise to the top of infrastructure agendas worldwide, reclaimed asphalt pavement (RAP) is moving from a supplementary option to a core component of modern road construction. Governments, road authorities and contractors are increasingly recognizing RAP as a practical pathway to circularity, reducing reliance on virgin materials while lowering emissions and production costs. While the environmental and economic case for RAP is clear, its successful implementation depends on far more than simply reintroducing reclaimed material into the asphalt mix. Achieving consistent quality, durability and performance requires the right plant technology, robust process control, and a disciplined approach to material management throughout the production and paving process.
38 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_38-41_Pres MM FINAL.indd 38
RAP INTEGRATION RAP integration is a technology challenge as much as a material one. Asphalt plants must be specifically equipped to introduce recycled material safely and efficiently, with the ability to control temperatures, material flow, and mixing conditions accurately. The selection of recycling technology, whether cold recycling or hot recycling, depends on project requirements, desired RAP percentages, and production capacity. In practice, hot recycling systems are often preferred where higher RAP use and consistent output are required. These systems allow reclaimed material to be heated indirectly and blended more precisely with virgin aggregates and binder, reducing the risk of premature binder aging and maintaining asphalt performance. Material handling is equally critical as RAP is inherently variable, with
differences in aggregate grading, binder ageing and moisture content depending on its source. Dedicated storage areas, pre-treatment processes and clearly defined material management protocols are essential to minimize variability and ensure stable production. Without these controls, higher RAP percentages can compromise both quality and consistency. QUALITY CONTROL Laboratory testing and quality assurance are essential for a successful RAP application. Regular analysis of RAP materials allows producers to understand binder content, aging levels and aggregate characteristics, forming the basis for accurate and repeatable mix designs. During production, additional monitoring of temperatures, mixing times and emissions is required, particularly as RAP content increases. When these parameters are carefully managed, RAP
www.ForConstructionPros.com/Asphalt
10/14/26 9:22 AM
Bu br de fin str
No rea pu
D
SAVE $200 WITH CODE: AZVIP26
READY TO TAKE YOUR BUSINESS FROM BETTER TO BEST? IGNITE 2026 is where construction leaders come to get fired up—and get better at business. Built for contractors ready to scale without breaking what made them successful, IGNITE delivers practical leadership, operational clarity, financial discipline, and the strategies to build stronger teams and more resilient companies.
No fluff. No motivational hype. Just real ideas, real conversations, and real tools you can put to work.
GET FIRED UP. BUILD WHAT’S NEXT. DECEMBER 9–11, 2026 | THE PHOENICIAN | SCOTTSDALE, AZ
REGISTER NOW
IGNITECONSTRUCTIONSUMMIT.COM ACON1126_38-41_Pres MM FINAL.indd 39
SAVE
$200
WITH CODE:
AZVIP26
10/14/26 3:03 PM
PRESERVATION & SUSTAINABILITY
asphalt can be produced to the same performance standards as conventional mixtures. On site, the transition to RAP does not require fundamental changes to paving or compaction practices. When produced correctly, RAP mixtures can be laid, compacted, and assessed using the same methods applied to virgin asphalt, helping contractors adopt RAP without disrupting established workflows. RAP TECHNOLOGY EXPERIENCE Rather than adopting a one-size-fits-all approach, RAP integration through configurable recycling systems can be adapted to specific project requirements. This includes adjusting RAP content, production capacity, and plant configuration, as well as optimizing heating, dosing, and mixing parameters to suit material characteristics and local conditions. By combining modular system design with precise process control, operators can manage variability in reclaimed materials while maintaining consistent mix quality and production stability across a wide range of applications. The key to RAP success lies in treating recycling as a systemlevel capability rather than a simple add-on. It is not just about adding recycled material into the mix. To achieve consistent quality and long-term performance, recycling must be engineered into the plant design, the control system and the operating process. When the right technologies and controls are in place, RAP can deliver significant environmental and economic benefits without compromising asphalt performance. RAP’S ROLE IN THE FUTURE OF ROAD CONSTRUCTION As material costs continue to rise and sustainability requirements tighten, RAP is set to become an increasingly standard feature of asphalt production instead of a niche solution. Road authorities are embedding recycled content into specifications, while contractors are seeking proven technologies that allow them to meet these requirements consistently and at scale. Combining recycling technologies with automation, modular plant design and process intelligence helps producers and contractors integrate RAP responsibly while maintaining the performance standards expected of modern road infrastructure. By doing this, RAP becomes more than a sustainability initiative, delivering strategic capabilities that support circular construction, improving resource resilience and shaping the future of road building worldwide. by Jeffrey Ma, Group Chief Operating Officer for Lintec & Linnhoff Holdings Pte. Ltd.
Ba N
Ba
CA
40 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_38-41_Pres MM FINAL.indd 40
www.ForConstructionPros.com/Asphalt
10/14/26 9:22 AM
CLASSIFIEDS
@ PLANT OPERATION AND MAINTENANCE @ PLANT SAFETY
e ee NEW!
PUBLIC OR PRIVATE, IN PERSON CLASSES
On Demand, Online Training
2027 LOCATIONS AND DATES:
Available: Feb 02-Mar 12, 2027
Denver, CO - Jan 26-29 Dallas, TX - Feb 02-05 Chicago, IL - Feb 09-12 Nashville, TN - Feb 16-19 Orlando, Fl - Feb 23-26
Available: 24hrs/day, 7days/week
0 REGISTER TODAY!
Private Workshops available upon request
carrie@clarencerichard.com CLARENCE RICHARD COMPANY
952.939.6000 EzFloWei hin .com
Trench Paver trench paver.com
Front View Hydraulically Adjusted Wings
Rear View Showing Blank Mounting Plates
Lays 1 800 plus tons per day Adjustable for: Mat Depth: 4" max Trench Width: 12" to 60"
R&D Skid Steer Mounts allow for NEXT to Gutter Paving
Base Model No Mounting Plates
Base Price: $15,999.95 CA Companies add sales tax F .0.B. Chico, CA www.ForConstructionPros.com/Asphalt
ACON1126_38-41_Pres MM FINAL.indd 41
1-800-200-4685
R&D Trench Paver 1431 W. 5th St. Chico, CA 95928 email: info@rdhs.com NOVEMBER 2026 ASPHALT CONTRACTOR 41
10/14/26 9:22 AM
THE LAST EXIT NexCourt
Pickleball Boom Fuels Demand for Community Sports Courts Growing interest in pickleball and other recreational activities is driving new amenity investments in residential developments.
I
n a marketplace with stubbornly high mortgage rates, a tightened lending environment and the undeniable issue of affordability, the building of master-planned communities (MPCs) continues unabated in the U.S. Builders of these centralized, carefully crafted neighborhoods have recently become creative to attract buyer interest. How creative? Enter the new world of community-based amenities. Ask your average home buyer what amenities they’d prefer to have access to in a communal living arrangement, and the top answer remains swimming pools or splash parks. But don’t sleep on sport courts. In a head-to-head comparison, pool installations still outmatch sport courts by a 3:1 factor, but the everincreasing appeal of multiuse athletic facilities can’t be denied. Centralized clubhouses, dog parks, hiking trails, fitness centers and putting ranges are being increasingly positioned as key differentiators in what many real estate agents are now referring to as “emotional accelerators.” In fact, recent studies have revealed that MPCs with convenient proximity to amenities can help homes sell as much as 8.2% faster and boost overall property values as much as 20%. For builders, it appears as if the time has come to take advantage of this appeal.
1. THE CURRENT OUTLOOK FOR MPCS According to industry experts, the overall market may have cooled somewhat, with home sales in master-planned communities sagging 6-7% year-overyear. But this has had little effect on the pent-up demand from would-be
42 ASPHALT CONTRACTOR NOVEMBER 2026 ACON1126_42-44_LastExit-jb MM FINAL.indd 42
home buyers anxiously awaiting their opportunity to live in density-optimized areas that offer attractive amenities. One can only imagine what would happen were mortgage rates to drop down a few points in the short term. Among other notable trends, builders are pivoting to smaller lot sizes and houses with slightly less square footage and are shifting into more of a developer role. And that brings us right back to how amenities have become a driving force in the current marketplace. 2. NO LONGER JUST FOR SENIOR LIVING CROWD When it comes to MPCs, amenities such as canasta, shuffleboard and traipsing down to the clubhouse restaurant for the 4:30 p.m. early bird dinner special are no longer reserved for the 55-and-over crowd. In geographic hotspots like Florida and Texas, MPCs are springing up everywhere. In some cases, the only factor that slows this growth is a lack of skilled and unskilled labor to drive the nails and saw the boards. And according to a study from John Burns Research & Consulting, demographics of the current buyer persona are shifting to younger, entrylevel families, many of whom have kids. These parents know that their children desperately need access to engaging amenities — beyond mere pools and parks — to keep them amused, occupied and satisfied. 3. SPORT COURTS CRAZE TAKES HOLD Builders have rightfully taken note of their discerning customers, understanding that buyers want more than square
footage and countertop upgrades. They also desire an emotional and social return on their investment, largely accomplished through attractive amenities such as multiuse sport courts. Using this one amenity as an example, let’s take a look at some numbers. No doubt driven largely by the current pickleball craze, people want access to multiuse sport courts where they can also play basketball, tennis and futsal, a hybrid five-on-five soccer variant played on a hard surface with a smaller ball. New athletic court construction has skyrocketed, with an estimated 14,000 new facilities installed in 2024 alone. According to Pickleheads, there are not enough courts to meet the current demand, and it’ll take $855 million in new builds over the next decade just to meet that demand. Thankfully, sport courts are more economically feasible than swimming pool installations, to say nothing of the drastically lower upkeep and maintenance needs involved. Sports courts are indeed having their moment in the sun as an increasingly preferred amenity. Which dovetails nicely with the steady proliferation of MPCs looking to add the most attractive communal features as centralized gathering places. Thanks to increasing consumer demand for add-ons, featured attractions and countless “emotional accelerators,” it’s clearly a great time to be in the business of building and selling customized amenities.
2
w
by Mark Kundysek, Founder, President and Co-Owner of NexCourt, Inc.
www.ForConstructionPros.com/Asphalt
10/14/26 9:24 AM
For
For information right away, please call 800-257-8163
We make it easier for you to get a price quote. Visit our web site at eagerbeavertrailers.com, and you're a "click" away from getting all the information you need from our nearest dealer. Simple, Fast... Guaranteed!
25 XPL
• CAPACITY: 50,000 lbs. • Air lift front axle standard
20 XPT
w/ Hydraulic Ramps • CAPACITY: 40,000 lbs.
35 GSL/PT
• CAPACITY: 70,000 lbs.
50 GSL/PT
• CAPACITY: 100,000 lbs.
For a quote on any model, please call 800-257-8163
ACON1126_42-44_LastExit-jb MM FINAL.indd 43
EagerBeaverTrailers.com
10/14/26 9:24 AM
MILL CLEANER. PAVE SMARTER. FINISH STRONG. When the job demands precision, productivity, and results you can stand behind, contractors trust Astec Road Construction—powered by Roadtec® and Carlson® equipment. From milling to final mat, these machines are built to meett specs, maximize uptime, and protect your bottom line. Roadtec cold planers deliver accurate cuts and consistent profiles across everything from tight urban jobs to full-lane highway work. Then the powerhouse combination of a Roadtec Shuttle Buggy® MTV feeding a Roadtec highway-class paver paired with and industry leading Carlson screed produces smooth, uniform mats with excellent density and clean edge quality, job after job. Roadtec and Carlson. Built for today’s jobsite. Built to perform. Built to last.
ACON1126_42-44_LastExit-jb MM FINAL.indd 44
10/19/26 8:28 AM