INDUSTRY EXCLUSIVE:
NOVEMBER 2021
Compare Over
75
Models
+
RECYCLING & CRUSHING
SPECIAL REPORT
www.ForConstructionPros.com/Asphalt ACON1121_01_Cover_J.indd 1
10/25/21 9:35 AM
You see a mountain of problems. We see a wealth of opportunity. Anova gets you there. ®
G a t C n
Cargill’s Anova Rejuvenator allows increasing the usage of recycled asphalt pavement (RAP) to nearly 100%. Our unique chemistries not only reverse the impact of aging on pavement to help maintain and build better roads, but provide a more sustainable, economically beneficial advantage that is easy to implement. Learn how our bio-based solution can work for you. ®
T
www.cargill.com/asphaltsolutions ©2021 Cargill, Incorporated. All rights reserved.
ACON1121_02-7_TOC_JD.indd 2
10/20/21 1:08 PM
s. y.
A BRAND YOU CAN TRUST! General Combustion® has over five decades of experience in combustion and heat transfer technology. Whether your plant calls for a HY-WAY® thermal Fluid heater system or the latest in burner efficiency, General Combustion® has the experience and the products to meet your plant needs. TOMORROW’S TECHNOLOGY TODAY! Call 407-290-6000 or visit www.gencor.com
ACON1121_02-7_TOC_JD.indd 3
10/20/21 10:35 AM
TABLE OF CONTENTS |
O A
NOVEMBER 2021
COVER STORY Industry Exclusive Asphalt Paver Spec Guide Compare over 75 models of asphalt pavers to find the best fit for your crew. | 34 TECHNOLOGY MATTERS
12 EDC-6 to Impact Asphalt Production Facilities The Federal Highway Administration Every Day Counts initiative adds e-ticketing to their innovation acceleration program.
18 Recycling & Crushing Products Crushers, screens, grinders & more recycling equipment for your asphalt business.
PRODUCTION NOTES
24 Growth During Uncertain Times C.W. Matthews partners with Astec for three new plant installs during the 2020 season.
SPECIAL REPORT: RECYCLING & CRUSHING
14 Mobile Crushing Saves Time & Money
28 Production Products Plants, baghouses, mixers, dryers, automation systems & more to measure the quality of their asphalt.
Recycling of virgin or waste concrete and asphalt on the job site eliminates transportation fees and lowers costs for your projects.
JOBSITE INNOVATIONS
PRESERVATION UPDATE
44 Design Build Project Breaks Records in North Carolina
52 How do Different Environmental Factors Affect Asphalt?
Thompson-Arthur APAC Atlantic teams up with three other companies to construct the 14-mile U.S. 64 expressway, marking their largest project to date.
Over time pavement will deteriorate however, proper maintenance will ensure a longer lifespan.
54 Preservation Products Milling machines, reclaimers, infrared equipment & more.
50 Jobsite Products Pavers, rollers, MTVs & more.
IN EVERY ISSUE 8
Editor’s Perspective
W p p a t y
B
58 The Last Exit
Blaw
4
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_02-7_TOC_JD.indd 4
www.ForConstructionPros.com/Asphalt
10/20/21 10:35 AM
ON THE ROAD AGAIN
t
l per a
With over a century of innovation to its credit, Blaw-Knox pavers have earned a reputation for quality, durability and performance unmatched in the industry. Today, with its new and improved highway-class designs, Blaw-Knox continues to deliver on its promise with all the performance features you’ve come to expect from an industry leader. BLAW-KNOX, THE LEGACY LIVES ON. Blaw-Knox Corporation 1280 Superior Avenue Chambersburg, PA 17201 Tel. 717-400-7900 www.blawknox.com
ACON1121_02-7_TOC_JD.indd 5
10/20/21 10:35 AM
DIGITAL CONNECTION www.ForConstructionPros.com/Asphalt
Report: Construction Optimism High Despite “Severe Challenges”
[VIDEO] Hops & Highways is Back!
Supply chain disruptions, cyber security and increased costs are all contributing to contractor concern. Even with current projects being delayed as a result, Dodge reports 71% of contractors are highly optimistic about projects over the next year Search: 21771916
Hops & Highways is your weekly newscast dedicated to the road building industry. Join us each Friday afternoon as we share the latest industry news, provide contractors with best practices and share your hard work for Build America Friday. Search: ForConstructionPros.com/Videos/ Hops-Highways
Will Construction Workers Need a COVID Vaccine? Due to Biden’s Executive Orders, Federal and State directives will now require contractors working on certain projects to ensure their workers are vaccinated against COVID-19 or tested weekly.
Cameras in Work Zones will Detect Speeding, Issue Tickets
Search: 21722605
The state of New York will soon install cameras in road work zones that will monitor drivers to make sure they’re not speeding. If they are, the camera alone could result in a ticket. Search: 21747547
WWW.FORCONSTRUCTIONPROS.COM/ASPHALT
CONTRACTOR WWW.FORCONSTRUCTIONPROS.COM/ASPHALT WWW.FORCONSTRUCTIONPROS.COM/ASPHALT
Get social with us! Share pictures of what you’re working with over 30,000 other asphalt contractors on our Facebook page: Facebook.com/ Asphalt.Contractor/
CONTRACTOR LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
LATEST INNOVATIONS INNOVATIONS FOR FOR ASPHALT ASPHALT PROFESSIONALS PROFESSIONALS LATEST
ASPHALT ASPHALT
NOVEMBER 2021 Vol. 35, No. 9
CONTRACTOR CONTRACTOR LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS
Published by AC Business Media.
Asphalt
Asphalt CONTRACTOR
CONTRACTOR
201 N. Main Street, Fifth Floor Fort Atkinson, WI 53538 (800) 538-5544 • www.ACBusinessMedia.com LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS www.ForConstructionPros.com/Asphalt LATEST INNOVATIONS INNOVATIONS FOR FOR ASPHALT ASPHALT PROFESSIONALS PROFESSIONALS LATEST
6
Published and copyrighted 2021 by AC Business Media. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage or retrieval system, without written permission from the publisher. Asphalt Contractor (ISSN 1055-9205, USPS 0020-688): is published ten times per year: January, February, March/April, May, June/July, August, September, October, November, December, with an additional Buyer’s Guide issue published in August by AC Business Media, 201 N. Main Street, Fifth Floor, Fort Atkinson, Wisconsin 53538. Periodicals postage paid at Fort Atkinson, Wisconsin and additional entry offices. POSTMASTER: Please send change of address to ASPHALT CONTRACTOR, PO Box 3605, Northbrook, Illinois 60065-3605. Printed in the U.S.A. SUBSCRIPTION POLICY: Individual subscriptions are available without charge only in the USA. The Publisher reserves the right to reject nonqualifying subscribers. One-year subscription to nonqualifying individuals: U.S. $45.00, Canada & Mexico $65.00, and $95.00 all other countries (payable in U.S. funds, drawn on U.S. bank). Single copies available (prepaid only) $10.00 each (U.S., Canada & Mexico), $15.00 each (International).
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_02-7_TOC_JD.indd 6
10/20/21 10:35 AM
N
r ge
00
ACON1121_02-7_TOC_JD.indd 7
10/20/21 10:35 AM
WWW.FORCONSTRUCTIONPROS.COM/ASPHALT WWW.FORCONSTRUCTIONPROS.COM/ASPHALT WWW.FORCONSTRUCTIONPROS.COM/ASPHALT
CONTRACTOR
EDITOR’S PERSPECTIVE
LATEST INNOVATIONS FOR ASPHALT PROFESSIONALS PROFESSIONALS LATEST LATEST INNOVATIONS INNOVATIONS FOR ASPHALT PROFESSIONALS
NOVEMBER 2021 • Vol. 35, No. 9
ASPHALT
Jessica Lombardo, Editor-In-Chief
CONTRACTOR
jLombardo@ACBusinessMedia.com 920.542.1247
LATEST PROFESSIONALS LATEST INNOVATIONS FOR ASPHALTPROFESSIONALS LATEST INNOVATIONS FOR ASPHALT
How to Make Your Employees Feel Valued
T
he labor market is rough right now. Finding good employees is increasingly tough which means it's more important than ever to show the employees you do have, just how much you value them. It doesn't take extravagant gestures to do so either, simple things like communication and acknowledgment of their dedication can go a long way. Studies have shown that valuing employees in the workplace can lead to some fantastic results. Employees who feel valued have increased motivation in the workplace, greater commitment and show greater levels of innovation. Here are three easy things you can start doing today to help your employees feel worthy of their efforts at your company and in their careers.
1. PROVIDE MEANINGFUL WORK Construction jobs are not known for being the most attractive careers out there. Still, there isn't a much better feeling of accomplishment than walking in to a building that you helped wire or driving down a road that you paved. These jobs are meaningful to the communities they serve and the people who use the finished products. Take time to remind your crews that what they are doing matters. Providing meaning will be different for each individual, so it might be helpful to also highlight teams to help others understand the work each group or department does, whether through company e-mails or by talking about achievements during meetings. Look for ways to give meaningful work directly to employees who have expressed the desire for advancement. This can mean little things like providing them the chance to plan an all-company event or giving them the opportunity to participate in training programs that can help crew members better complete and understand their jobs.
8
2. COMMUNICATE CLEARLY & OFTEN Communicating with your crew can be tough when you have several employees spread out over many miles or cities. Still, it's important to keep in touch with your team. While regularly taking time to say hello to employees and check in with them might seem like an unnecessary drain on your productivity, these interactions are valuable points of connection for your employees (and for you). Employees often feel the most valued when spending time directly with a leader or manager outside of normal job responsibilities. Treat them to a coffee break or take them out to lunch to get to know them better and hear their ideas. You'll be surprised at what you learn and how much you enjoy those conversations too. 3. CELEBRATE ACHIEVEMENTS Research shows that most people who quit their jobs cite, “lack of recognition" as their reason for leaving—not boredom, frustration, or to do something new. People will make assumptions about how you view their efforts and you saying nothing doesn’t typically translate in their minds as ‘good job.’ This is why it’s important to keep the positivity and communication flowing. There are numerous ways to show appreciation for both large and small results—a pat on the back, a sincere thank you letter, a small gift, or a monetary bonus. As a business owner, you cannot demand that any employee feels valued. Still, you can provide all of things employees say they want from a leader; a company, and a culture, where they feel valued in their work.
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_08-11_Editor_JD.indd 8
Published by AC Business Media
Asphalt CONTRACTOR
201 N. Main Street | Fort Atkinson, WI 53538 800.538-5544 • www.ACBusinessMedia.com LATEST INNOVATIONS FOR FOR ASPHALT LATEST PROFESSIONALS LATEST INNOVATIONS ASPHALT PROFESSIONALS PROFESSIONALS www.ForConstructionPros.com/Asphalt
Publication Staff Publisher
Amy Schwandt aschwandt@ACBusinessMedia.com
Editor In-Chief
Jessica Lombardo jlombardo@ACBusinessMedia.com
Associate Editor
Dormie Roberts droberts@ACBusinessMedia.com
Ad Production Manager
Cindy Rusch
Art Director
April Van Etten
Audience Development Mgr
Angela Franks
Advertising Sales (800) 538-5544 Kris Flitcroft
kflitcroft@ACBusinessMedia.com
Sean Dunphy
sdunphy@ACBusinessMedia.com
Tadashi Soma
tsoma@ACBusinessMedia.com
ForConstructionPros.com Editor-in-Chief
Wayne Grayson
Editor
Larry Stewart
Change of Address & Subscriptions PO Box 3605, Northbrook, IL 60065-3605, Phone: (877) 201-3915 • Fax: 847-291-4816 circ.AsphaltContractor@omeda.com
Reprint Services For reprints and licensing please contact Tadashi Soma at (800) 538-5544 ext. 1245 tsoma@ACBusinessMedia.com
List Rental Bart Piccirillo, Sr. Account Manager, Data Axle Phone: (518) 339 4511, E-mail: bart.piccirillo@infogroup.com
AC Business Media. Chief Executive Officer
Ron Spink
Chief Financial Officer
JoAnn Breuchel
Chief Digital Officer
Kris Heineman
Chief Revenue Officer
Amy Schwandt
VP Audience Development
Ronda Hughes
Director, Demand Generation & Education
Jim Bagan
Director of Digital Operations & IT
Nick Raether
Group Content Director
Jon Minnick
www.ForConstructionPros.com/Asphalt
10/20/21 10:36 AM
R
SSIONALS SSIONALS SSIONALS
T
R
SIONALS IONALS
t OR
Paving the way for the next GENERATION.
OFESSIONALS OFESSIONALS OFESSIONALS
m
m
Equipped with an extensive list of custom features. Learn More: Leeboy.com/raised-on-blacktop/
Available in USA & Canada.
ACON1121_08-11_Editor_JD.indd 9
10/20/21 10:36 AM
WHATEVER YOU NEED
WE’VE GOT YOU.
It’s a simple approach. We’ve built our business and reputation through our unparalleled focus on equipment durability, attention to detail and the ability to customize our products for each customer. We’ve spent over half of a century building world-class equipment while helping each customer’s unique business grow bigger, faster and more efficient than ever.
We only succeed when you do, so trust the team that’s got your back, no matter what you need.
ACON1121_08-11_Editor_JD.indd 10
10/20/21 10:36 AM
START A CONVERSATION (260) 672-3004
ALmix.com
10106 SMITH ROAD, FORT WAYNE, IN 46809 ACON1121_08-11_Editor_JD.indd 11
10/20/21 10:36 AM
TECHNOLOGY MATTERS |
JESSICA LOMBARDO, EDITOR-IN-CHIEF
EDC-6 to Impact Asphalt Production Facilities The Federal Highway Administration Every Day Counts initiative adds e-Ticketing to their innovation acceleration program
Gallagher Asphalt, Thornton, IL, uses a paperless process for truck planning, scheduling, e-Ticketing, digital timecards and faster invoicing/payment.
S
ince 2009, the Federal Highway Administration (FHWA) has supported new and better ideas to get highways planned, designed, built and maintained with the Every Day Counts (EDC) program. Now in its sixth cycle, EDC-6 Innovations for 2021-2022 includes several initiatives that FHWA feels will positively impact the industry and electronic ticketing is one of them that will directly impact asphalt plant owners and mix producers. "Highway construction projects produce massive amounts of valuable data. Historically, information such as materials tickets were communicated via paper," FHWA says. "Transportation agencies are improving on these paper processes by integrating them into electronic and digital workflows. Electronic ticketing (e-Ticketing) improves the tracking, exchange, and archiving of materials tickets.” More than a dozen state DOTs, including Minnesota, Delaware and Pennsylvania, currently use e-Ticketing for construction contracts with 43 states committing to trying some form of the technology by 2022. Due to the related safety concerns with COVID-19, State DOTs began to introduce specific e-Ticketing guidelines with a greater sense of urgency. Material producers took many steps to transition their scalehouse operations to e-Ticketing to promote social distancing. These
12
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_12-13_Technology_JD.indd 12
regulations are providing a clear path for contractors to implement an e-Ticketing platform, sooner rather than later. Will your plant be ready to comply? STATES TAKE INITIATIVE Because of its benefits, many states have been piloting e-Ticketing platforms since long before COVID and are seeing the benefits. "The state of Delaware (DelDot) right now has all of their hot mix asphalt producers and plants up and running fully digital," Matthew Valle, VP of Industry Relations at HaulHub, Inc. says. "That's 16 plants in Delaware that are now feeding into Delaware DOT's electronic portal." The benefits of e-ticketing for states include: ➊ Increased safety: Removing the need for on-site ticket collection. ➋ Labor savings: Less paperwork and manual tabulation of material costs. ➌ Smoother roads: A paver that is low on material and begins to cool down can leave a bumpy surface. Knowing when new material will arrive allows for a consistent flow to the paver, resulting in smoother roads.
➍ Accurate accounting: Better recordkeeping of material usage improves planning for future projects. ➎ Reduced risk: Mitigates disputes over which plant material came from and whether appropriate routes were used. The entire e-Ticketing process can enhance project delivery for an industry that is struggling with how to keep up with an increasing amount of work. "Right now, 41% of the industry will be retiring from construction over the next 10 years," Valle says. "We need to find ways to bridge that talent gap. We need to start putting pieces in place to help with this massive drain that's occurring in an industry that's not attracting people. Digital tools help." The Minnesota DOT (MnDOT) has been ramping up the use of paperless technology for tracking deliveries of hot mix asphalt since 2018. MnDOT has seen the process improve safety and efficiency on road projects. "MnDOT construction projects require tons of hot mix asphalt each year, with over 188 road and bridge projects in the 2020 construction season alone," the Department said. E-ticketing was used on 29 MnDOT
www.ForConstructionPros.com/Asphalt
10/20/21 10:37 AM
How e-Ticketing Works projects in 2020. MnDOT is facilitating an e-ticketing task force that includes the American Association of State Highway Transportation Officials (AASHTO), contractors, auditors, labor officials, asphalt producers and others. The group is developing recommendations for AASHTO MP39-19, intelligent construction specifications. Once e-ticketing recommendations are defined, they will be voted on by all 50 states and refined over seven years. As a complement to the AASHTO group (which is developing the specifications), The National Construction Materials e-Ticketing Task Force, advised by Former FHWA Administrator Greg Nadeau, is facilitating the discussion on the practical implementation across the US. The Task Force, and public and private sector members, are working together to discuss and tackle the numerous practical challenges that come with moving from a paper-based world to a digital world. RAPID GROWTH EXPECTED With COVID expediting the use of e-Ticketing technology, the changes for the asphalt industry are going to happen very rapidly. "Nobody wanted to be the first one to do it," Valle says. "Now that there are DOTs that have a fairly robust system and framework for success set up, these things are starting to come together extremely rapidly. DOTs are saying, 'okay, there are solutions out there that can then help us get fully up and running and on board in very short order, so let's do it.'" Change in the asphalt industry tends to happen slowly, but states are finding contractors who are willing to collaborate with them to get the process moving. "Pennsylvania has an e-Ticketing portal and are working with companies like Lindy Paving to get that data they need and into the portal in a manner that makes sense for the department," Valle says. "Between the
www.ForConstructionPros.com/Asphalt
ACON1121_12-13_Technology_JD.indd 13
asphalt paving associations, the DOT, e-Ticketing vendors and producers, we're all working together to get that information seamlessly transitioned in an efficient and standardized way." That data is beneficial to the DOT, but also to the producers. "Right now, this structured data lives in a relational database stored at the plant and not all the time is that data even aggregated or accessible," Valle says. "e-Ticketing, facilitates the unlocking of that information and what this does is provides the producers with better insights into their customer base and their productivity. So instead of looking at manual printouts and spreadsheets, they can start to get those productivity insights in real-time to learn what they can be doing better to help service their customers and understand those customer dynamics." With this collaboration, the model is now being set across the country for DOTs to work with associations and contractors to get everyone on the same page. Contractors will begin seeing the impact of this at an extremely rapid pace and they shouldn't be afraid to embrace it. "With technology accelerating rapidly, minds are being opened to the value of new ways of looking at old problems," Valle says, "It's the stuff that can actually help us be more productive and more intelligent by using data to give us better insights into the work. We see this push not only from the DOTs but also from producers who are gaining valuable insight to conduct their business in a more efficient way." PAINLESS IMPLEMENTATION As with any new process, contractors are reluctant to invest because of the cost and time associated with the change. With e-Ticketing, both perceived barriers are easily mitigated. "Change can be hard but once contractors experience how this can streamline their operations, they
Historically, plant mixed asphalt has been weighed, tracked and paid for with computergenerated paper tickets. Paper ticketing isn’t an ideal process for a variety of reasons— on-site ticket collection poses safety risks, tickets can be easily lost, and data must be tabulated manually, just to name a few. e-Ticketing process begins at the asphalt plant, where workers load delivery trucks with hot mix asphalt. Under the traditional system, a computer generates a paper ticket, which includes relevant information such as the weight and cost of the asphalt. With help from GPS tracking, e-Tickets record the amount of asphalt loaded, departure and arrival times and other information, according to MnDOT. Project managers and others can pull up the information in real-time on their smartphones or laptops. The paperless process helps them track labor compliance information, such as prevailing wage monitoring, and improves safety because it eliminates the need to collect paper tickets in a busy work zone. usually will understand this is something they need," Valle says. "It will help make them better communicators, help them get paid faster and help keep everyone safe as well." And once you decide to proceed with implementation, vendors can get your company up and running fast. "We have an implementation team that will work with contractors and producers to get them going and get the information integrated into the necessary systems," Valle says. "Our training teams will work with them and get them trained so they are fully supported. It's a fairly painless process that can be ready to go in a week." As more states ramp up their e-Ticketing requirements, producers need to be ready to comply.
For more information, visit ForConstructionPros. com/21759337.
NOVEMBER 2021 ASPHALT CONTRACTOR
13 10/20/21 10:37 AM
SPECIAL REPORT | JESSICA LOMBARDO, EDITOR-IN-CHIEF
A
Mobile Crushing Saves
TIME & MONEY Recycling of virgin or waste concrete and asphalt on the job site eliminates transportation fees and can lower costs
T
he construction industry is one of the largest recyclers in the country, recycling and reusing asphalt and concrete in massive amounts. Today's mobile crushers are ideal for use in a wide range of applications, including for asphalt and concrete or for mixed construction and demolition waste. For larger road construction or demolition projects, on-site recycling and crushing of materials can be beneficial to the project bottom line. Processing, screening and crushing existing concrete and asphalt on-site eliminates unnecessary transportation costs and hassles. The recycled product may be used on the current project at hand, sold to another job, or transported and stored for future work – saving space in landfills and saving money. Recycling on the jobsite also mitigates the cost of buying virgin aggregate. Other advantages of recycling concrete and asphalt right at your location include: • Eliminating or reducing tipping fees and disposal costs • Eliminating usage demand for much needed landfill space • Eliminating or reducing transportation costs • Helping preserve virgin deposits and protects the environment • Lowering aggregate material cost for your construction project
S V
M
$ • Lowering traffic impact and reduced energy costs HOW MOBILE CRUSHING WORKS Screening and crushing plants receive the material from the initial crushing process and are small enough to be mobile. Additional crushing further reduces large particle sizes, while the screener sorts out material, allowing the right size material to pass through and returning the larger particles back to the crusher for further processing until they are small enough to be used. In order to smooth out the gradation of the crushed particle and ensure a higher quality material, the new aggregate can be fed into the crusher hopper and mixed with the recycled material.
Today’s mobile crushers are ideal for use in a wide range of applications, including as a mobile recovered concrete crusher, or for asphalt and mixed C&D waste.
Recycled aggregate materials offer superior compaction, better yield and greater durability over virgin (quarry or pit) aggregate bases. The use of recycled aggregates are typically authorized by State Transportation Departments for use in roadbeds and drainage projects. To do this, contractors need specialized equipment that they either rent or own. For smaller projects, a crushing attachment or small portable crusher can be useful for turning concrete into usable aggregate.
PE AP ma mi to
W
14
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_14-17_SpecialReport_JD.indd 14
www.ForConstructionPros.com/Asphalt
10/20/21 1:15 PM
A WIRTGEN GROUP COMPANY
STRONG LIKE A SPECIALIST. VERSATILE LIKE AN ALL-ROUNDER. MOBIREX MR 110/130 EVO2
MOBIREX MR 110/130 EVO2
PERFECT FOR HIGH THROUGHPUT PERFORMANCE – IN NATURAL STONE AND FOR RECYCLING APPLICATIONS. The MOBIREX MR 110/130 EVO2 mobile impact crushers feature a state-of-the-art material flow concept and a powerful diesel-directdrive – for high throughput combined with optimised wear and consumption. With their compact design, the plants are easy to transport and as quick to set up as they are to dismantle. The MR 110/130 EVO2 – versatile and ready for high performance. www.wirtgen-group.com
WIRTGEN AMERICA, INC. · 6030 Dana Way · Antioch, TN 37013 · Tel: (615) 501-0600 · Fax: (615) 501- 0691
ACON1121_14-17_SpecialReport_JD.indd 15
10/20/21 10:39 AM
SPECIAL REPORT For larger jobs, mobile crushing units are ideal. The stand-out feature of the mobile crusher or tracked impactor for recycling applications is its mobility, combined with high productivity per hour. Units are fully self-contained on their tracked undercarriage and can easily be driven off a trailer by one operator and quickly put to work, with excellent capability for moving directly to materials. Some models are even capable of tracking (moving about on their tracks) while crushing. Every time material is moved around or off the jobsite, labor and expenses are involved. Mobile crushers bring the machine to the job site, right to the pile and allow for efficient material processing.
Every time material is moved around or off the jobsite, labor and expenses are involved. Mobile crushers bring the machine to the job site, right to the pile, and allow for efficient material processing.
CRUSHERS: RENT VS. OWN When it comes to investing in crushing equipment, buying versus renting can offer distinct trade-offs. Buying crushing equipment usually requires a larger investment than renting. Renting can allow for a smaller initial investment; but depending on the job length and frequency of use, rental costs could add up over time. Larger volumes of material will require a dedicated crusher, which is not only a large capital investment, but a heavy time commitment as well. Crushers require a substantial amount of room. When you fold out a screen plant and set up a jaw crusher, the equipment is not small, so you need to plan for that on project sites. You need room for the stockpiles as well.
Large crushers also require support equipment like a dozer or another excavator to feed the crusher and take away the recycled material to the stockpile. Operating and maintenance costs can also add up over time. Your crew will need to be trained on how to use the equipment and how to troubleshoot the machine in case of a breakdown. For many reasons, renting this equipment or hiring a specialized crushing subcontractor may be beneficial. If you employ well-trained team members, buying and maintaining crusher equipment may be no more costly than renting regularly serviced equipment. However, the unexpected happens, employing team members on site could resolve unexpected more quickly than waiting on service from your rental partner. Carefully consider the economics before committing to on-site crushing. Justifying this expense requires that you have sufficient material to crush. Many say having a crusher on-site is not worth the expense unless there is 3,000 tons of material or more. Ultimately, it will come down to how much you will use the equipment and if you can keep it busy.
For more information on mobile crushing, visit ForConstructionPros. com/21070865
Recycling on the jobsite mitigates the cost of buying virgin stone and it can be stockpiled to build something else on the property. Crushing concrete on-site is one of the most popular forms of recycling.
16
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_14-17_SpecialReport_JD.indd 16
www.ForConstructionPros.com/Asphalt
10/20/21 1:19 PM
ACON1121_14-17_SpecialReport_JD.indd 17
10/20/21 10:39 AM
RECYCLING & CRUSHING PRODUCTS Ammann RSS 120-M Shredder, Iron Separator & Screener
IROCK Tracked & Wheeled Conveyors IROCK Crushers offers wheeled conveyors that are road portable and can be hauled to different locations or relocated on site with the help of a truck; tracked units make maneuvering around a jobsite easy as they can move under their own power and can be folded and loaded onto trailers for relocation from site to site. • For sand and gravel, crushed stone, recycling applications and more ForConstructionPros. com/12144900
Kleemann Mobicone MCO 9i EVO and MCO 9i S EVO Kleemann’s Mobicone MCO 9i EVO and MCO 9i S EVO mobile cone crushers offer aggregate producers secondary or tertiary crushing in a fuel-efficient, Tier 4 Final emissions-compliant machine. • Cone crusher diameter permits a raw feed capacity of 287 tph, with a feed size maximum of 8.25 in. • Diesel-electrical drive provides low fuel consumption in a compact design • Power plant generates 332 hp at 1,500 rpm • S-version provides a discharge conveyor-mounted final classifying screen with oversized aggregate return conveyor ForConstructionPros. com/12228931
18
The Ammann three-in-one RSS 120-M prepares recycled asphalt for use in an asphalt plant. The RSS 120-M functions as a shredder, iron spearator and screener and can recycle asphalt ranging in size from milling to larger pieces/slaps. • Protective processing maintains desired grain sizes • Track mounted • Shredder utilizes two low-speed, electrically driven shredder-rotating shafts • Process up to 198 tons of recycling materials per hour • Dust reduction system ForConstructionPros.com/20973199
KPI-JCI Astec Mobile Screens Fast Pack Aggregate Processing System The Fast Pack system is an innovative, patented combination of crushing, screening and stockpiling equipment. • Self-erecting with the ability to turn moving days into production days with moving times as low as 12 hours • Can operate as a complete system or operate units separately • Drastically reduces downtime and offers 400- to 600-tph capacities • Provides users a savings of at least 20% • Offers self-contained or electric processing ForConstructionPros. com/12314890
Haver & Boecker Niagara Primary Crushing Plants Haver & Boecker Niagara offers rugged primary crushing plants in a wide variety of configurations for pre-crushing, secondary and tertiary crushing in the mining and aggregates industries. • Haver & Boecker Niagara provides crushing plant systems with a variety of components, including impact, jaw, cone or roller crushers, Haver screens or rolling screens, push feeders, apron conveyors and Haver vibrating feeders ForConstructionPros. com/21065589
Evoquip 230 Impact Crusher The Cobra 230 features a rapid setup time and intuitive control system with push-button operation that enable it to be crushing within minutes. • Crusher setting can be easily adjusted via user-friendly hydraulic assist • 3.4-cu.-yd. hopper includes an integrated pre-screen for fines removal, and the feeder speed auto regulates based on load • Impact crusher has a 34” x 24” crusher inlet and 33-in.-wide by 34-in. rotor diameter • Includes a 275-hp Volvo Tier 4 Final engine and fuel-efficient, high-performance direct drive system • Potential output up to 275 tph
Fro for win are
We
ForConstructionPros.com/20992798
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_18-23_CrushingProducts_JD.indd 18
E
10/20/21 1:22 PM
we
r
er
Engineered Innovation. From innovative designs to Caterpillar dealer service and support, Weiler is paving the way to success for contractors across North America. Weiler’s material transfer vehicles, commercial pavers, road wideners, windrow elevators, static split-drum compactors, soil stabilizers, rock drills, tack distributors and front mount screeds are engineered with innovative features to increase productivity while reducing operating costs. Weiler equipment is sold and serviced exclusively at Caterpillar dealers throughout North America.
weilerproducts.com
ACON1121_18-23_CrushingProducts_JD.indd 19
10/20/21 10:40 AM
RECYCLING & CRUSHING PRODUCTS Keestrack R3 Screening and Crushing Plant
Astec Mobile Screens Ranger Compact Track Line Astec Mobile Screens Ranger line of compact track equipment includes a variety of jaw crushers, impact crushers, cone crushers, incline screens and trommels. • These compact units will serve a variety of new markets including building and construction, landscaping, quarry operations and plant and tool hire • The ease-of-use, ease-of-transport, versatility and flexibility of compact, track-mounted units make them ideal for smaller operations ForConstructionPros. com/21105604
Keestrack’s R3 plant is available as dieselhydraulic or fully hybrid “e”-version. • Production rates up to 250 tph • Flexible processing of a large variety of raw and recycling materials • Pre-screening • High-performance impact crusher 48 ICR 10000 with 770 x 960 mm inlet opening • Heavy-duty 920 mm rotor (44-in. diameter) • Optional 9-ft. x 4-ft. single-deck with reciruclation conveyor after screening unit
C
ForConstructionPros.com/21107274
•
Rotochopper FP-66 Horizontal Grinder The FP-66 horizontal grinder from Rotochopper has been updated to increase the capacity of materials that can be processed by the remarkably reliable midsized grinder. • The larger 30-in. feed opening and increased powerfeed lift height allow larger materials into the grinding chamber – increasing productivity and efficiency • Now available with a more aggressive powerfeed and either a 630 or 755 horsepower diesel engine ForConstructionPros.com/21120420
RUGGEDLY BUILT TO OUTPERFORM AND OUTLAST ITS COMPETITORS.
The RC Series Industrial Crusher reduces reclaimed asphalt pavement to any desired output size in a single pass.
Contact us today to find out more! info@hammermills.com | 800.447.4634 www.hammermills.com
Th bu se se an
•
•
F
P C
Th en at 59 3/ •
•
ALLU Demolition and Quarry Crushers
•
The crusher series initially includes three crusher models for excavators in the 10- to 33-ton range. • Reversible crushing reduces potential for jamming, blockages or obstruction with rebar while delivering greater levels of production • Feed plate design built into jaw ensures the feeding function in a fully loaded chamber delivers high rates of production with minimal risk of bridging • Simple mechanical pin adjustment for output size regulation with quick adjustment for various output specifications • Clam-like crusher opening allows for easy, quick replacement of wear parts
•
•
F
Pr of •
•
ForConstructionPros.com/21121513
F
20
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_18-23_CrushingProducts_JD.indd 20
10/20/21 1:30 PM
d
Cedarapids CRC320 Cone Crusher Plant The CRC320 features the TG320 bushing cone crusher that can be easily set up to deliver peak cost per ton by selecting the optimum crushing cavity and eccentric throw to suit the application requirements. • 300-hp, 1,800-rpm motor and crusher are mounted on a rubberisolated frame • Plant combines the cone crusher and a 15-hp, 42-in.-wide discharge conveyor on a portable all-electric chassis • Crusher is fitted with an overflow chute and removable overflow panel so the overflow can buffer feed surges in a closed-circuit application ForConstructionPros.com/21135418
Superior Industries P500 Patriot Cone Crusher The P500 Patriot Cone Crusher is engineered to operate most effectively at 500-hp with a head diameter of 59-in. maximum feed opening of 13.5-in. and closed side settings from 3/8 - 2-in. • Inverted or reverse design of tramp relief cylinders ensure the hydraulic seals are not exposed to contamination during operation • Tramp relief system designed with fewer accumulators for less maintenance. An automatic pressure relief valve means additional protection • Universal crushing chamber design requires no major, timeconsuming change outs when transitioning from secondary to tertiary applications • If loss of clamping pressure, counterclockwise countershaft rotation causes crusher to open rather than turn down, which can cause significant damage • Superior manufactures its full line of Patriot Cone Crushers in 200, 300, 400, 500 and 600 horsepower models ForConstructionPros.com/21111775
Eagle Crusher 1200-25 CC Crushing Plant The Eagle Crusher 1200-CC with Pre-Feeder Screen is designed for larger-sized jobs with high volumes of material at- or near-spec. • Two-deck screen-feed system greatly increases total production as the millings and fines go through the screen to stop wear and tear on the impactor and dramatically increase tonnage • Available in tri- or quad-axle versions, the two-deck inclined screen produces two cubical spec products ForConstructionPros.com/21118085
www.ForConstructionPros.com/Asphalt
ACON1121_18-23_CrushingProducts_JD.indd 21
NOVEMBER 2021 ASPHALT CONTRACTOR
21 10/20/21 1:24 PM
IMAGINE YOU
YOUR BUSINESS STARTED AS A DREAM, TO GROW AND PROFIT. To get the personalized attention you want to help you on your way. The customization you need to meet your business’s specific production goals. Consult with one of our specialists today to help configure just the right asphalt plant for you. Start your custom plant design today.
ACON1121_18-23_CrushingProducts_JD.indd 22
10/20/21 10:40 AM
OUR DREAM
FULFILL YOUR DREAM
260-637-5729 • admasphaltplants.com
ACON1121_18-23_CrushingProducts_JD.indd 23
10/20/21 10:40 AM
PRODUCTION NOTES |
JESSICA LOMBARDO, EDITOR-IN-CHIEF
Growth During
UNCERTAIN TIMES
24
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_24-27_Production_JD.indd 24
10/20/21 10:41 AM
The new Savannah location was right at the approach of a major international airport so C.W. Matthews worked closely with Astec on the building of that plant to avoid any issues.
C.W. Matthews partners with Astec for three new plant installs during the 2020 season
I
n 1946, C.W. Matthews returned from World War II looking for work. While the company's humble beginnings may have started with grading farm ponds, they have grown exponentially, and now complete grading, excavating, concrete and bridge work throughout the state of Georgia. In 1957, the company began to make hot mix asphalt and never looked back. Today, the company operates 27 asphalt plants throughout the state, adding three new in the last year alone. The company broke into a competitive market to better serve their customers and worked with the team at Astec to do so. “Astec has been a great partner for us,” Lee Smith, senior vice president of asphalt plant operations for C.W. Matthews says. “The reliability of the equipment, their proximity to our location and the strength of their engineering and sales teams have solidified our relationship with them over the years." INVESTING IN THE FUTURE 2020 was a year that will go down in history for many reasons. For C.W. Matthews, they will remember it as the year they continued their growth with the purchase of three new Astec Double Barrel plants, installing one in a brand new market for the company - Savannah.
www.ForConstructionPros.com/Asphalt
ACON1121_24-27_Production_JD.indd 25
“We saw an opportunity to grow in Savannah after we were approached by a contractor in the area to do some asphalt paving on the I-16/I-95 job,” Smith says. “There was good potential there for us.” When it came time to install the new plant at the new location, C.W. Matthews encountered a few challenges. “Savannah was a unique location and we had a few hurdles to go through,” Smith says. “We were in a seismic zone. We were in a flood zone being next to the coast. Then the plant location was right at the approach of a major International airport so we had some things to contend with on the building of that plant.” Astec engineers were onsite to assist the C.W. Matthews team in choosing the best options given the site circumstances. “They showed us what obstacles we were facing and gave us different avenues that we could choose from,” Smith says. “We were given several choices for options at the plant that we could choose based on what they came up with.” In Savannah, C.W. Matthews installed three 200-ton silos, versus the 300-ton, because of the height requirements they were up against near the airport. The seismic zone also contributed to the decision. “If we wanted to go with larger silos, we would have had to change our foundation and make some structural steel changes as well,” Smith adds.
NOVEMBER 2021 ASPHALT CONTRACTOR
25 10/20/21 10:41 AM
PRODUCTION NOTES In Macon, the install team was up against a time crunch to get the plant running so C.W. Matthews could provide mix for a large Interstate project in the area.
TWO EXISTING LOCATIONS, TWO NEW PLANTS After the Savannah plant was up and running, C.W. Matthews made the decision to install two other plants in their existing locations to better serve their customers. The work was completed in phases with the install in Villa Rica happening first. “We had an existing facility there that dated probably to the late 90s, an old Gencor plant,” Smith said. “We completely tore it down and built a 100% new Astec plant.” Then the install team moved to the Macon location. In Macon, C.W. Matthews had recently acquired a business who was operating a 1970’s model batch plant. Again, they went in, cleared the site, put in foundations and installed a completely new Astec plant. In Macon, the install team was up against a time crunch to get the plant running. “In the Macon location, we had planned on an upgrade and we were fortunate to be the low bidder on a large Interstate project in the area,” Smith said. “That ramped up the need to speed up the process of preparing the site and putting the plant in. Astec really stepped it up on the manufacturing of the equipment, and the shipping and installation, so we could meet our project deadlines.”
26
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_24-27_Production_JD.indd 26
RELIABILITY TO DEPEND ON C.W. Matthews knew they could count on Astec to move these projects forward because of their long shared history. “On top of the reliability they offer, we've had just a great working relationship with Astec for many years,” Smith says. “We know we can call our sales representative, Jonathan Brown, at any time and he will talk internally with his team, and they will provide us with some different scenarios until we all find what we all feel good with.” At the end of the day, C.W. Matthews invested in these installs to better serve their customers. “When our customers use our facilities, if you have any breakdowns
or delays, it not only costs us as the producer, but there’s a tremendous cost on the customer as well for their truck times, their job times and their schedules,” Smith says. “So for us to upgrade our facilities and give reliable asphalt plants for all of our customers, it's just a tremendous benefit.” And C.W. Matthews has no plans to stop making upgrades for their customers. They are currently upgrading their Dalton facility to better serve their customers in that location while continuing to plan for future growth.
For more information on plant upgrades, visit ForConstructionPros. com/21076330
The existing plant in Villa Rica from the 90s was an old Gencor plant that C.W. Matthews completely tore down and built a 100% new Astec plant
www.ForConstructionPros.com/Asphalt
10/20/21 10:41 AM
DOESN’T MIND THE COLD JUST LIKE YOU With Evotherm®, your paving season doesn’t have to stop when temperatures drop. Using our WMA additive means you can get the job done in even the harshest of weather. Learn more:
EVOTHERM.COM
ACON1121_24-27_Production_JD.indd 27
10/20/21 10:41 AM
PRODUCTION NOTES Maxam Raptor Entry System Maxam's Raptor recycle entry system runs up to 50% RAP without superheating or blue smoke. • Standard on all Maxam drums; retrofits to any counterflow drums or batch plant dryers • RAP is heated in the drum by the direct heat of the flame • Moisture in the RAP is vaporized in the drum and exhausted through the baghouse ForConstructionPros.com/10083936
WEM 4000 BIS The WEM4000 Business Intelligence Server (BIS) is a powerful tool used to collect and display specific production information from all plant locations at one single point. • Production data, customer and job totals, truck haul times, material usage and inventory, current silo inventory plus an abundance of other operational data provide details of an entire operation at your fingertips • .NET technology allows for easy access from anywhere including the paving site, office or on the road through your data phone ForConstructionPros. com/10081116
Process Heating Lo-Density Asphalt Plant Heaters Process Heating's line of asphalt heaters includes Unitized Tank Heaters, Hot Oil Heat Transfer Systems and Fuel Oil Preheaters. The all-inone combination tank/hot oil heater combines immersion heating and heat transfer systems into one package. • Install in any above ground storage tank • Precise UL Listed temperature controls and low watt density elements heat asphalt and emulsion; 24-hour automatic operation of both tank and transfer oil heat • System increases atomization, insures smoother flow and improves accuracy of temperature control ForConstructionPros. com/10089995
28
Rock Systems Cold Feed Plant
Gencor Giraffe Recycle System
Rock Systems offers a portable cold feed plant. • Available in 2-, 3-, 4- or 5-hopper compartments • Accurately feeds different materials • Each hopper measures 14' x 9' 6" with 20-ton storage capacity
The Gencor Giraffe RAP unit combines a bin and feeder, lump breaker, vibrating screen and scale conveyor into a single easily transportable unit. • Unique bin design eliminates material bridging, with steep-sided tapered walls, self-relieving throat and welded beater plates on the sides of the bins • Rack and pinion adjustments allow the bin gates to be easily raised or lowered to maintain the correct amount of RAP being fed for precise material flow • Exclusive double-drum RAP lump breaker can easily reduce RAP material size
• Roller belt feeders with variable speed drives provide precise measuring • Collecting conveyor mounted under feeders and hoppers delivers materials
ForConstructionPros. com/10091574
ForConstructionPros. com/10086140
T
Heatec's Heli-Tank Combination for Portable HMA Plants
Heatec Heli-Tank unit for portable HMA plants Includes a thermal fluid heater, unloading pump, metering system and storage tank on a trailer-type chassis. • Storage tank can have separate compartments for asphalt and fuel • The heater heats the storage tank as well as other components of the HMA plant • Significantly reduces the time and effort to move the plant to a new location • The unit can include a fuel pre-heater, calibration tank, mixers, etc.
ForConstructionPros.com/10776501
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_28-33_ProductionProducts_JD.indd 28
Gi de sy pe sim of co
10/20/21 10:45 AM
SA
Not your father’s automation.
d
s
Times have changed Give your asphalt plants the brainpower they deserve. The MindsTronicTM family of automation systems optimizes production, collects key performance indicators, standardizes workflows, simplifies maintenance, allows the standardization of operator training, and improves workplace collaboration. Drums, Batches, Combos, Emulsion & Liquid terminals Loadout, (e)Ticketing, Cloud-based Desktop & Mobile Apps Proven industrial PC, Fieldbus & sub-concepts technology Professional hotline & remote support
Better data. Increased control. Higher profits. SALES INQUIRIES: 1-866-971-2980 contact@mindsusa.com mindsusa.com
ACON1121_28-33_ProductionProducts_JD.indd 29
10/20/21 10:46 AM
BUILT TO CONNECT
C
In an industry focused on manufacturing powerful equipment, our business remains decidedly human thanks to one simple belief: that our greatest achievement as a company is in mastering the art of connection. Astec helps build the infrastructure that physically connects the world, but the connections we build with people are what make us a true partner to the industry. We know the equipment we build is not our final product, because we’re not really in the business of building equipment. We’re in the business of building connections.
T ro th a T e c e
astecindustries.com
a
ACON1121_28-33_ProductionProducts_JD.indd 30
10/20/21 10:46 AM
Connection is at the heart of everything we do The primary use for asphalt is creating pavement for building the roads that connect goods and services to their markets, people to their communities and families to each other. Astec asphalt plants are essential to building and maintaining these vital connections. That’s what drives us to design, manufacture, and sell innovative, efficient, and reliable equipment. And that’s what inspires us to connect to our customers through knowledgeable sales, receptive engineering and responsive parts and service.
astecindustries.com/asphalt
ACON1121_28-33_ProductionProducts_JD.indd 31
10/20/21 10:46 AM
PRODUCTION NOTES CMI Magnum Series Drum Mixers
ADM EX10248 Asphalt Plant
The CMI Magnum series is designed for both large stationary installations as well as highly mobile paving companies running CMI Super Portable series of asphalt plants. • Part of the family of counter-flow drum mixers that incorporates the latest in counter-flow technology and is capable of meeting the most stringent air quality regulations, providing improved mix quality and lower cost per ton • Available as portable drums in capacities from 225 to 500tph and as relocatable and stationary drums in capacities from 225 to 600tph
The rugged 275 to 350 tph EX10248 Asphalt Plant from ADM meets production capacity demands and strict environmental regulations.
ForConstructionPros.com/12320485
MINDS, Inc. DrumTronic Asphalt Plant Automation & Controls
PlantWise Drum Mix Control System offers advanced automation for asphalt drum mix plants. • Adaptability for retrofit or total plant control of nearly any plant • Extensive use of high-speed networking to increase accuracy and reduce wiring • Integral manual control via software control "panels" • Easy calibration of plant equipment • Real-time trending of key process parameters • Fully graphic operator interface • Instantaneous production rate changes
The Minds Drumtronic asphalt plant automation system is suitable for all makes, models and mechanical configurations. • Drumtronic optimizes production, collects key performance indicators, standardizes workflows, simplifies maintenance, uniformizes operator training and improves workplace communication • The software is engineered to bring the best practices in all production phases but is never opaque or too overriding • Professional hotline and remote support
ForConstructionPros. com/10565024
ForConstructionPros. com/21117830
Libra Systems PlantWise
Astec Voyager 120 Plant Astec 120 MTPH Voyager plant features a compact, highly portable design. • Ability to run up to 30% RAP • Built around a counter flow drum featuring v-fights, which provide greater uniformity of the aggregate veil during the drying process and results in better heat transfer, a reduction of fuel use and increased productivity • Hydraulically driven swing out drag and batcher can ready to go in about 10 minutes • Other features include reverse pulse baghouse, a controls cab with fully automated PLC controls, gravity take-up with direct drive, air ride suspension and up to five cold feed bins and two RAP bins ForConstructionPros.com/11303574
32
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_28-33_ProductionProducts_JD.indd 32
• The plant's single-drum counterflow system uses the latest in innovative technology, resulting in the longest aggregates drying and mixing times in the industry ForConstructionPros. com/20987919
•
•
•
•
• Ammann ABP HRT Asphalt-Mixing Plant The ABP HRT (High Recycling Technology) plant is an ideal fit for asphalt manufacturers who need to incorporate large proportions of RAP without sacrificing production capacity and quality. • The HRT is a “two-in-one” plant featuring both warm and cold recycling systems that can be used in combination • There are two warm recycling systems to choose from; one is the conventional RAP dryer for RAP additions of up to 60 percent and the second is Ammann’s latest development in warm recycling, the RAH100, which can utilize 100 percent RAP • Vertical stacking of the RAP-bearing components reduces wear and sticking and shortens the travel distance of hot RAP material • Production capacity is 440 tph ForConstructionPros. com/20988239
www.ForConstructionPros.com/Asphalt
10/20/21 10:46 AM
w e
2022 Dates • Week 1: January 24-27 • Week 2: January 31- February 3 • Week 3: February 7-10 • Week 4: February 14-17 • Week 5: February 21-24
COME BE A PART OF THE EXPERIENCE
Improving overall plant production and efficiency are all common concerns for plant owners and operators. Having a well-trained technical crew is vital to maintaining plant performance and efficiency. Gencor and its training staff represent the biggest concentration of knowledge and expertise in all the sciences and technologies involved in the production of asphalt plants. Customers who attend these seminars benefit by having the support and focused attention of the best specialists in the asphalt industry. Using Gencor’s state-of-the-art control simulators and actual equipment, our experts take you step-by-step through a comprehensive & intensive concentrated hands-on training program providing the latest techniques on optimizing production efficiency. REGISTRATION
DETAILS
CLASS SIZE IS LIMITED!
Details can be found at www.gencor.com/training or call us at 407-290-6000 ext. 342.
To secure your seat, please register before November 15, 2021
ng
ONE COMPANY
ONE SOURCE
5201 N. Orange Blossom Trail
ACON1121_28-33_ProductionProducts_JD.indd 33
ONE SOLUTION
Orlando, Florida 32810
10/20/21 10:46 AM
W
ith so many options available, purchasing a new piece of equipment that meets your needs is not an easy decision. Researching a piece of new equipment is an important first step to help you decide exactly what you’ll want to rent or buy. If you’re in the market for an asphalt paver, these next few pages are your best resource. Here, we’ve complied the industry’s only Asphalt Paver Spec Guide, featuring equipment specifications for over 75 models. For an even easier way to compare, visit the exclusive, interactive and customizable version of this spec guide at http://www.forconstructionpros.com/specguide/asphalt-paver to sort and compare models based on the specific needs and requirements of your crew.
VÖGELE With the 10-ft. tracked Super 2000-3i and the wheeled Super 2003-3i, and the 8-ft. tracked Super 1700-3i and wheeled Super 1703-3i, Vögele is marketing four advanced technology pavers for North American highway and commercial markets. Now, a new app for smart phones, tablets and PCs helps users understand the intuitive and easy-to-use ErgoPlus 3 operating system via animations and step-by-step videos that provide an easy-to-grasp demonstration of work steps, including setting up the screed, varying pave widths, and comprehensive automatic functions. Download at Google Play or Apple store or search Voegele ErgoPlus 3 app. www.ForConstructionPros.com/10075523
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
10'6"
98 fpm
n/a
2.24 mph
5'11"
13'9"
98 fpm
n/a
2.8 mph
13
8' 0"
15'6"
250 fpm
n/a
7.5 mph
38,140
13
8' 0"
15'6"
250 fpm
n/a
12 mph
22' 6" X 9' 10" X 10' 2"
49,053
15
10' 0"
19'6"
250 fpm
n/a
7.5 mph
250
22' 6" X 9' 10" X 10' 2"
46,848
15
10' 0"
19'6"
250 fpm
n/a
12 mph
Tracked
249
22' 4" X 8' 4" X 10' 2"
48,392
14
8' 4"
16'5"
82 fpm
n/a
2.8 mph
Tracked
173
19' 8" X 8' 4" X 10' 2"
50,287
13
8' 4"
16'5"
79 fpm
n/a
2.8 mph
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Vögele
Super 700i
Tracked
74
14' 5" X 4' 7" X 6' 6"
13,700
5.8
3'11"
Vögele
Super 1300-3i
Tracked
100
16' 3" X 6' 1" X 9' 10"
22,906
11
Vögele
Super 1700-3i
Tracked
173
18' 5" X 8' 6" X 9' 8"
40,345
Vögele
Super 1703-3i
Wheeled
173
19' 7" X 8' 6" X 9' 8"
Vögele
Super 2000-3i
Tracked
250
Vögele
Super 2003-3i
Wheeled
Vögele
Super 2100-3i
Vögele
Super 1800-3i SprayJet
34
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_34-43_PaverSpecGuide_J.indd 34
S TANDARD PAVING WIDTH (FT)
Minimum Maximum
www.ForConstructionPros.com/Asphalt
10/20/21 10:47 AM
Sponsored by
BOMAG BOMAG is dedicated to asphalt and compaction. While other companies supply products for multiple segments; dirt work, mining, agriculture, BOMAG expertise is solely dedicated to your work and what’s important to you. You’ll be able to rest easy knowing that the support you get with BOMAG products is laser focused on what is most important to you. www.ForConstructionPros.com/10072222
Manufacturer
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
BOMAG
Model No.
BOMAG BF 200 C-2 BOMAG BF 300 P-2 BOMAG BF 300 C-2 BOMAG CR 820T BOMAG CR 820W BOMAG CR 1030 T BOMAG CR 1030 W Cedarapdis CR652RX Cedarapdis CR662RM
Undercarriage Type
Engine HP (net)
Track
74
Wheel
75
Track
75
Track
160
Wheel
160
Track
225
Wheel
260
Wheel
260
Track
260
www.ForConstructionPros.com/Asphalt
ACON1121_34-43_PaverSpecGuide_J.indd 35
Shipping Dimensions (LxWxH) (ft.) 14' x 4' 3" x 7' 7" 16' 7" x 6' 2" x 9' 2.5" 16' 7" x 6' 2" x 9' 2.5" 20' 8" x 10' 10" x 9' 2" 20' 8" x 10' 10" x 9' 11" 20' 10" x 10' 10" x 9' 2" 22' 3" x 10' 10" x 9' 11" 19' 11" x 10' 4" x 9' 2" 19' 11" x 10' 4" x 9' 2"
Max Operating Weight (lbs.)
Hopper Capacity (tons)
S tandard Paving Width (ft)
Minimum
Maximum
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
13,228
5
3.6 ft
7.6 ft
95 ft/min
n/a
3 mph
19,400
10
5.6 ft
16.4 ft
425 ft/min
n/a
10 mph
19,400
10
5.6 ft
16.4 ft
66 ft/min
n/a
3.2 mph
36,400
10
8 ft
20 ft
283 ft/min
n/a
9.3 mph
34,500
10
8 ft
20 ft
427 ft/min
n/a
10 mph
42,600
14
10 ft
30 ft
246 ft/min
n/a
9.8 mph
38,280
16.7
10 ft
30 ft
313 ft/min
n/a
12 mph
44,100
16.7
10 ft
30 ft
426 ft/min
n/a
11.2 mph
44,100
16.7
10 ft
30 ft
225 ft/min
n/a
9.6 mph
NOVEMBER 2021 ASPHALT CONTRACTOR
35 10/20/21 10:47 AM
Sponsored by
DYNAPAC NORTH AMERICA Whether on compact city streets or vast highway projects, Dynapac offers solutions to meet all of your paving needs. Dynapac pavers are designed with paving quality, innovation, ergonomics and innovative solutions in focus. Built with robust screed designs, top pre-compaction and solutions such as PaveManager, Truck Assist and BPO. www.ForConstructionPros.com/10072810 Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Dynapac
F1250CS
Steel Track on Poly Pad
74
14 X 4 X 6
13,000
5.5
3.8
7.3
90 ft/min
N/A
2.05 mph
Dynapac
FC1300C-II
Steel Track on Poly Pad
25
9.75 x 8.5 x 5.75
9,700
6
8
13
115 ft/min
N/A
3 mph
Dynapac
FC1400C
Steel Track on Poly Pad
67
11.25 x 8.5 x 5.25
12,500
6.5
8
14
140 ft/min
N/A
3 mph
Dynapac
FC1400C-II
Steel Track on Poly Pad
74
11.25 x 8.5 x 5.25
12,500
6.5
8
14
140 ft/min
N/A
3 mph
Dynapac
FC1700C
Steel Track on Poly Pad
120
13.75 x 8.5 x 6
18,500
9.5
8
15.5
140 ft/min
N/A
3 mph
Dynapac
F1800C
Steel Track on Poly Pad
73
16.5 x 6 x 9.56
23,000
11.5
6
11.5
82 ft/min
82 ft/min
2.5 mph
Dynapac
F1800W
Wheel Drive
73
16.5 x 6 x 9.56
22,530
11.5
6
11.5
82ft/min
82 ft/min
9.3 mph
Dynapac
F800T
High Speed Rubber Track
173
19.41 x 8.2 x 9.42
40,250
13.5
8
15
200 ft/min
N/A
8.5 mph
Dynapac
F800W
High Floatation Wheel Drive
173
20.16 x 8.2 x 9.67
38,150
13.5
8
15
255 ft/min
N/A
11 mph
Dynapac
F1000T
High Speed Rubber Track
225
21.33 x 10 x 8.83
43,000
15
10
19.5
240 ft/min
N/A
10 mph
Dynapac
F1000W
High Floatation Wheel Drive
225
21.83 x 10 x 8.83
41,900
15
10
19.5
285 ft/min
N/A
12 mph
Dynapac
SD2500CS
Steel Track on Poly Pad
200
20.16 x 8.2 x 10.16
40,785
13.5
8
19.5
N/A
92 ft/min
2.5 mph
Dynapac
SD2550CS
Steel Track on Poly Pad
264
21.74 x 8.2 x 10.17
44,000
16
8
19.5
N/A
92 ft/min
2.5 mph
Manufacturer
36
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_34-43_PaverSpecGuide_J.indd 36
S TANDARD PAVING WIDTH (FT) Minimum Maximum
www.ForConstructionPros.com/Asphalt
10/20/21 10:47 AM
0
% for 36 months retail financing available Valid through December 31, 2021, on approved credit.
MF2500CS FEEDER REDEFINING THE TOTAL COST OF OWNERSHIP. Challenging the Status Quo — with the IMIX two stage mixing system
el
OPTIONAL MH2500 MORE PRODUCTIVITY. LESS TIME. Material capacity up to 388 CF (26 ton)
Follow Dynapac North America
Designed to perform, Built to last ACON1121_34-43_PaverSpecGuide_J.indd 37
dynapac.us | 800-651-0033
10/20/21 10:47 AM
Sponsored by
ASTEC Astec has recently rebranded its subsidiary brands to be connected as OneAstec. This rebrand offers a streamlined approach to purchasing highway and commercial pavers more conveniently in one place, with the same training and expert support. The legendary screed technology and design fit both highway and commercial pavers, allowing contractors to achieve greater uptime and exceptional mat quality from driveway projects to large commercial and municipal applications. www.ForConstructionPros.com/10909995
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Minimum Maximum
Astec
RP190e
Rubber Tire Paver
Tier 4F, Cummins®QSB6.7 230 hp 172 kW) @ 1,900 rpm
17'7" x 10'6" x 10'
36,700
13.8 tons
10'
Astec
RP195e
Rubber Track Paver
Tier 4F, Cummins®QSB6.7 230 hp 172 kW) @ 1,900 rpm
16'8" x 10'6" x 10'6"
39,220
13.8 tons
Astec
RP170e
Rubber Tire Paver
Tier 4F, Cummins®QSB6.7 174 hp (130 kW) @ 2,200 rpm
16'3" x 10'1" x 10'
29,280
Astec
RP175e
Rubber Track Paver
Tier 4F, Cummins®QSB6.7 174 hp (130 kW) @ 2,200 rpm
15'7" x 10'1" x 10'
Astec
SP100e
Rubber Tire Paver
Tier 4F, Cummins®QSB6.7 173 hp (129 kW) @ 2,200 rpm
Astec
SP200e
Rubber Track Paver
Astec
RP250e
Astec
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
19'6"
0 - 284 fpm (86 m/min.)
Not applicable
0 - 12 mph (19 k/hr.)
10'
19'6"
0 - 215 fpm (66 m/min.)
Not applicable
0 - 7.5 mph (12 k/hr.)
11.5 tons
8'
15'6"
0 - 300 fpm (91 m/min.)
Not applicable
0 - 10 mph (16 k/hr.)
32,500
10 tons
8'
15'6"
0 - 200 fpm (60 m/min.)
Not applicable
0 - 7 mph (12.8 k/hr.)
16'10" x 11'4" x 10'7"
32,360
11 tons
10'
19'6"
0 - 143 fpm (43.59 m/min.)
Not applicable
0 - 7.6 mph (12.23 k/hr.)
Tier 4F, Cummins®QSB6.7 230 hp (172kW) @ 1,900 rpm
27' x 11'4" x 10'3"
63,800
11 tons
10'
19'6"
0 - 168 fpm (51 m/min.)
Not applicable
0 - 3.6 mph 5.8 k/hr.)
Rubber Tire Paver
Tier 4F, Cummins®QSB6.7 250 hp (186kW) @ 1,900 rpm
23' 4"x 10'6 x 10'1"
39,500
15.8 tons
10'
19'6"
0-233 fpm (71 m/min)
Not applicable
0 - 12 mph (19 k/hr.)
CP75 II
Track
Tier 4F, 74 hp
12'5" x 8'6" x 6'2"
16,950
8 tons
8'
15'
155 fpm
Not applicable
255 fpm
Astec
CP85
Track
Tier 4F, 74 hp
13'11" x 8'6" x 6'3"
19,500
8.5 tons
8'
15'
100 fpm
Not applicable
200 fpm
Astec
CP100 II
Track
Tier 4F, 100 hp
14'6" x 8'6" x 6'8"
22,000
9.5 tons
8'
15' (17' w/ bolt-ons)
155 fpm
Not applicable
255 fpm
Astec
CP130
Track
Tier 4F, 130 hp
14'6" x 8'6" x 7'6"
22,500
9.5 tons
8'
15' (17' w/ bolt-ons)
155 fpm
Not applicable
325 fpm
38
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_34-43_PaverSpecGuide_J.indd 38
S TANDARD PAVING WIDTH (FT)
www.ForConstructionPros.com/Asphalt
10/20/21 10:48 AM
l h)
19
12
16
2.8
5.8
MAULDIN PAVING PRODUCTS Mauldin Paving Product’s line of commercial pavers ensure superior performance due to 3 strategic approaches to design. Proven productivity, screed design and a commitment to quality are the key elements that sets a Mauldin Paver apart. Mauldin Pavers have been trusted for decades by contractors to produce lasting results. www.ForConstructionPros.com/10075446
19 Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
13'
0-115 FPM
n/a
3.2 MPH
8ft
14'
0-140 FPM
n/a
3.5 MPH
9.5
8ft
15'6"
0-140 FPM
n/a
3.5 MPH
6
3'11
7'10'
0-90 FPM
n/a
2 MPH
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Mauldin
650
Tire/Track
24hp
9'10"x7'6"x5'8"
9,700
6
8ft
Mauldin
1560
Track
74hp
11'4"x8'6"x5'4"
12,500
6.5
Mauldin
1860B
Track
110hp
13'9" x 8'6" x 5'11"
19,500
Mauldin
1360
Track
66hp
14' x 3'11" x 6'8"
12,800
www.ForConstructionPros.com/Asphalt
ACON1121_34-43_PaverSpecGuide_J.indd 39
S TANDARD PAVING WIDTH (FT)
Minimum Maximum
NOVEMBER 2021 ASPHALT CONTRACTOR
39 10/20/21 10:48 AM
Sponsored by
R P w LEEBOY LeeBoy pavers feature a broad range of commercial class pavers to meet any contractor’s needs. All pavers are simple to operate, maintain and service while offering top mat quality provided by the Legend Screed.
R
www.ForConstructionPros.com/10075155 S TANDARD PAVING WIDTH (FT) Minimum Maximum
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
LeeBoy
1000G
Track Drive System
49
9' 6" x 8'6" x 7'
11,000
5.5
up to 13'
0-220 fpm
0-220 fpm
LeeBoy
5300
Track Drive System
64
15'5" x 4'5" x 7'8"
12,700
7
up to 7'
0-151 fpm
0-239 fpm
LeeBoy
6150
Wheeled drive system
74
16'6" x 8'6" x 7'8"
17,550
7
up to 15'
0-228 fpm
0-660 fpm
LeeBoy
7000C
Track Drive System
64
11'0" x 8'6" x 7'
13,000
6
up to 13'
0-210 fpm
0-210 fpm
LeeBoy
8500D
Track Drive System
64
12'9" x 8'6" x 7'10"
15,800
7.5
up to 15'
0-140 fpm
0-240 fpm
LeeBoy
8510E
Track Drive System
74
13'5" x 8'6" x 8'
17,720
7.5
up to 15'
0-150 fpm
0-300 fpm
LeeBoy
8515E
Track Drive System
74
13'5" x 8'6" x 8'
17,600
7.5
up to 15'
0-150 fpm
0-300 fpm
LeeBoy
8520B
Track Drive System
106
14'5" x 8'6" x 8'2"
19,760
9
up to 15'
0-150 fpm
0-300 fpm
LeeBoy
8530
Track Drive System
125
15' x 8'6" x 6'8"
22,520
9
up to 15'6"
0-150 fpm
0-300 fpm
LeeBoy
8616D
Track Drive System
127
16'4" x 8'6" x 6'8"
23,450
9
up to 15'6"
0-125 fpm
0-350 fpm
40
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_34-43_PaverSpecGuide_J.indd 40
www.ForConstructionPros.com/Asphalt
10/20/21 10:48 AM
C C
C M
C M
ROAD
TO
T N E M E PAV N O I T A V R E S E R P THE
M AS TI C M AC HI N E
Road Maintenance Products & Equipment with Proven Performance
ROAD SEAL ANTS CRACKMASTER HOT-APPLIED CRACK SEAL ANTS CRACK PRO MELTER/APPLICATORS CRACK PRO MASTIC MACHINES
AD L IQ U ID R O
Discover the full line of SealMaster pavement products & equipment at sealmaster.net
M E LT E R / R A P P L IC A T O
sealmaster.net 800-395-7325
ACON1121_34-43_PaverSpecGuide_J.indd 41
10/20/21 10:48 AM
Sponsored by
CATERPILLAR INC. Cat pavers feature an integrated 70 kW generator that delivers fast 15-minute screed plate heat-up time and reduces noise around the machine. Maneuverability and stability are excellent due to exclusive Cat Mobil-Trac™ rubber track system, while the operator’s environment is very comfortable, featuring dual, pivot-out operating stations, excellent visibility, low noise and minimized fumes. www.ForConstructionPros.com/10075307 Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
S TANDARD PAVING WIDTH (FT) Minimum Maximum
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Cat
AP300F
Wheel
74.8
16.08' x 6.17' x 8.67'
18,078
9.7
5.75'
11.17'
200 fpm
82 fpm
10 mph
Cat
AP355F
Track
74.8
16.08' x 6.17' x 8.67'
19,246
9.7
5.75'
11.17'
210 fpm
82 fpm
7 mph
Cat
AP500F
Wheel
142.0
20.33' x 9.08' x 9.58'
36,715
15.9
8.33'
16.33'
250 fpm
82 fpm
10 mph
Cat
AP555F
Track
142.0
20.5' x 9.08' x 9.58'
38,125
15.9
8.33'
16.33'
210 fpm
82 fpm
7 mph
Cat
AP600F
Wheel
173.0
22.08' x 9.08' x 9.83'
38,217
18.1
8.33'
16.33'
250 fpm
82 fpm
10 mph
Cat
AP655F
Track
173.0
22.08' x 9.08' x 9.58'
44,347
18.1
8.33'
16.33'
210 fpm
82 fpm
9 mph
Cat
AP1000F
Wheel
225.0
22.08' x 10.5' x 9.83'
44,811
20.7
9.83'
19.5'
250 fpm
82 fpm
12 mph
Cat
AP1055F
Track
225.0
22' x 10.5' x 9.42'
47,544
20.7
9.83'
19.5'
210 fpm
82 fpm
9 mph
Max Paving Speed (Vibratory Screed)
Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
VOLVO CONSTRUCTION EQUIPMENT P5110B tracked and P5170B wheeled pavers marry proven technology with latest in design. Simple controls and behind-the-scenes technology help ensure laying a high-quality mat is simple – for both veteran operators and the next generation of road crews. Robust enough to thrive in heavy commercial and light highway tasks, P5110B and P5170B pavers are easy to maintain, deliver high quality mat performance and low total cost of ownership on a range of demanding applications. www.ForConstructionPros.com/10656717
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Volvo
P4410B
Rubber Track
154
17'-10" x 9' x 8'-10"
37,100
Volvo
P5110B
Rubber Track
173
20'-7" x 9' x 9'-11"
Volvo
P7110B
Rubber Track
235
Volvo
P5170B
Wheeled
Volvo
P7170B
Wheeled
42
Minimum
Maximum
11
8'
18'
0-242
n/a
8
41,350
12
8'
18'
0-195
n/a
8
21'-4" x 10'-2" x 10'-7"
50,050
13
10'
26'
0-224
n/a
9
173
20'-7" x 9' x 9'-11"
39,200
12
8'
18'
0-240
n/a
11
235
21'-4" x 10'-2" x 10'-7"
47,369
13
10'
26'
0-297
n/a
12
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_34-43_PaverSpecGuide_J.indd 42
S TANDARD PAVING WIDTH (FT)
www.ForConstructionPros.com/Asphalt
10/20/21 10:48 AM
vel
WEILER The Weiler P385B and P265 bring highway-class paver design to the commercial paver market with complete re-buildable design featuring highway-class chains, slats and bearings, durable components and excellent visibility and control for exceptional mat quality and production. The P195 path paver features of paving range of 3’ 10” to 7’ with foldable hopper and narrow track width for access to tight working environments. Weiler pavers are sold and serviced exclusively at Cat dealers throughout North America. www.ForConstructionPros.com/10075409 Max Paving Speed (Tamper Bar Screed)
Max Travel Speed (mph)
Manufacturer
Model No.
Undercarriage Type
Engine HP (net)
Shipping Dimensions (LxWxH) (ft.)
Max Operating Weight (lbs.)
Hopper Capacity (tons)
Weiler
P395
Steel Track w/ Poly Pads
120 hp
15'4" x 8'6" x 8'4"
24,000 lb
11 ton
7'8"
17'4"
150 fpm
250 fpm
Weiler
P385B
Steel Track w/ Poly Pads
100 hp
14'5" x 8'5" x 6'4"
20,500 lb
9 tons
8'
15'8"
150 fpm
350 fpm
Weiler
P265
Steel Track w/ Poly Pads
74 hp
12'7" x 8'2" x 5'10"
16,200 lb
7 tons
7'8"
14'4"
150 fpm
250 fpm
Weiler
P195
Steel Track w/ Poly Pads
67 hp
15' x 4'7" x 5'9"
13,000 lb
7 tons
3'10"
7' std (9' w/ bolt on ext)
233 fpm
350 fpm
Weiler
P65
Steel Track
49 hp
9' 9" x 8'2" x 5' 10"
12,600 lb
6 tons
7'8"
13'
180 fpm
300 fpm
www.ForConstructionPros.com/Asphalt
ACON1121_34-43_PaverSpecGuide_J.indd 43
S TANDARD PAVING WIDTH (FT)
Minimum Maximum
Max Paving Speed (Vibratory Screed)
NOVEMBER 2021 ASPHALT CONTRACTOR
43 10/20/21 10:48 AM
JOBSITE INNOVATIONS |
JESSICA LOMBARDO, EDITOR-IN-CHIEF
Design Build Project Breaks Records in Thompson-Arthur APAC Atlantic teams up with three other companies to construct the 14-mile U.S. 64 expressway, marking their largest project to date
44
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_44-49_Jobsite_JD.indd 44
NORTH C F
our years is not a lot of time when you're tasked with constructing 14.4 miles of roadway. Add in six interchanges, seven grade crossings and 24 bridges, and you're really asking for a miracle. And that's exactly what Asheboro Bypass Constructors pulled off in North Carolina. This project actually started back in 2011 when the team at ThompsonArthur APAC Atlantic, a CRH
Company, teamed up with the Wright Brothers. They knew the North Carolina Department of Transportation (NCDOT) was planning to improve U.S. 64 in the Asheboro area. The proposed project was a new 14.4-mile freeway bypassing Asheboro to the south. The project also featured a highlyanticipated 1.8 mile Zoo Connector, which would give visitors to the massively popular North Carolina Zoo
www.ForConstructionPros.com/Asphalt
10/20/21 10:49 AM
H CAROLINA
www.ForConstructionPros.com/Asphalt
ACON1121_44-49_Jobsite_JD.indd 45
NOVEMBER 2021 ASPHALT CONTRACTOR
45 10/20/21 10:49 AM
JOBSITE INNOVATIONS
Why Was the Asheboro Bypass Needed? • Existing congestion along U.S. 64 was causing significant travel delays and increases the potential for crashes. Crash rates along U.S. 64 in the area are above the statewide average for similar roadways in North Carolina. This project should relieve the heavy traffic on Dixie Drive in Asheboro. • Existing and projected traffic and land use conditions along existing U.S. 64 through Asheboro diminish the route’s ability to function as an intrastate corridor. • Congestion and backups occur on N.C. 159 (Zoo Parkway) because local traffic mixes with zoo traffic. Visitors experience delays and residents have difficulty getting to and from their property. The project featured a 1.8 mile Zoo connector that provides better access to the North Carolina Zoo, a major tourist attraction and economic engine for the region. • It is integral to NCDOT’s plan to upgrade the U.S. 64 and N.C. 49 corridors from Statesville to Raleigh (U.S. 64) and from Charlotte to Raleigh (N.C. 49 and U.S. 64). better access to the park from the U.S. 64 Bypass straight to the zoo's entrance via a roundabout, instead of through residential areas. Thompson-Arthur and Wright Brothers teamed up with RK&K to design engineer the project and Right-of-Way Consultants to work with appraisals and acquisitions.
The four companies made up the design-build team, Asheboro Bypass Constructors, LLC (ABC). Using a design-build process allowed NCDOT to contract with the team of designers and contractors who would be responsible for the design, right of way acquisition and construction of the massive project.
The project was awarded to this team in 2015 and construction began in 2016. Completed in December of 2020, the North Carolina Department of Transportation’s Asheboro Bypass was the most complex design-build project APAC-Atlantic, Inc., Thompson-Arthur Division, had ever undertaken. The design-build team worked together constructing the 14.4-mile, four-lane, divided highway from U.S. 64 west of Asheboro, through the rolling and rocky hills to the south, and back to U.S. 64 in the east. Here's how it happened. ACQUISITION & RELOCATION A project of this size requires massive amounts of planning and the ThompsonArthur team relied heavily on the team at Right-of-Way Consultants to start everything off right. Right-of-Way is one of North Carolina's most experienced right-of-way firms and they had 40 staff members committed to this project. "The biggest thing at the beginning was the right away acquisition," Jeff W. Saunders, construction projects
Part of the contract included aesthetic features, such as the elephant pictured here, another indication of how important the N.C. Zoo is to Asheboro, Randolph County and the region. With more than 700,000 visiting the zoo each year, this bypass provides easier access to the popular attraction.
46
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_44-49_Jobsite_JD.indd 46
www.ForConstructionPros.com/Asphalt
10/20/21 10:49 AM
ACON1121_44-49_Jobsite_JD.indd 47
10/20/21 10:49 AM
JOBSITE INNOVATIONS
PROJECT TOTALS • • • • • • • • • • •
14.4 Miles 1.8 Mile Zoo Connector Six Interchanges Seven Grade Crossings 24 Bridges 7.8 Million CY Earth/Rock Excavated 112,000 LF Storm 25,000 LF Water & Sewer 575,000 Tons Stone 745,000 Tons Asphalt 50,000 CY of Concrete
manager at Thompson-Arthur said. "We needed to complete all of the utility relocation that was being coordinated before we could start work." ABC had to handle the complexity of connecting to, or crossing through, 17 different existing roadways, each with its distinct utility relocations and traffic control management. Compounding those challenges was the overall acquisition of 460 parcels for right-ofway and impacts to 103 locations on permitted jurisdictional streams.
48
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_44-49_Jobsite_JD.indd 48
To get started, the project team strategically focused the land acquisition and utility relocation in areas of where reinforced concrete box culverts and bridges were needed that would provide early access to areas of mass grading. The sequence of land acquisition, utility relocation and construction was used repeatedly for the first two years before the entire footprint of the project finally took shape. The ABC team had to wait until the right-of-way was acquired and worked
to streamline areas where they wanted to begin the heavy excavating and mainline work. "We did a good job of identifying areas that we could get access to so we were able to get some of the mainline areas started," Saunders said. "We focused on prioritizing those specific right-of-way parcels so we could get to work excavating and grading as quickly as possible."
www.ForConstructionPros.com/Asphalt
10/20/21 10:49 AM
EXCAVATION & GRADING Thompson-Arthur partnered with Wright Brothers for the excavation and grading portion as they are the Southeastern U.S. leader in mass excavation. With the extensive heavy equipment and resources that were needed to complete the project, they were the right choice. "Thompson-Arthur is paving and bridges and Wright Brothers completes excavation and bridges," Larry Brickey, division president at Thompson-Arthur said. "Wright Brothers did all the grading, we did all the paving and stone base work and we split the bridge work in half." And it's a good thing Wright Brothers specializes in excavation with as there were over 500 acres to clear. They removed 8 million cubic yards of earth excavation and 2.75 million cubic yards of only rock excavation. Communication during this process was key to success as the movement of material had to be done in an efficient manner. The ABC team worked diligently to keep each of the three separate sections, five miles long each, progressing on schedule. "We had a very good schedule and a very good sequence operations," Brickey said. "We worked on a two month schedule and Michael Prince, who was the onsite manager for Wright Brothers, did a very good job at managing that." Wright Brothers put a project schedule together pre-bid using the Primavera project scheduler. That allowed the project to continually progress in parts along each section, even as the job was spread out over the 14 miles. "Wright Brothers did a very good job at knowing where the material was and where it had to go," Brickey adds. "One of the first cuts on the West End the job was a 60 foot cut which was pretty much rock the whole way. They would get that cut, get that fill in, get working on a bridge, complete the underground as well all the storm drain. And once that was done, we'd be in there paving." To help streamline the construction schedule and provide a consistent
www.ForConstructionPros.com/Asphalt
ACON1121_44-49_Jobsite_JD.indd 49
pavement subgrade throughout the length of the project, the ABC Team elected to use 8-in. of aggregate base course in conjunction with geotextile stabilization fabric instead of choosing chemical subgrade stabilization. This process removed the need for repetitive and continuous soil sampling and testing, as well as the seasonal limitations for placing chemical stabilization, which extended the allowable time for pavement construction. Chemical stabilization would have switched back and forth from cement stabilization to lime stabilization depending on the many soil types that were encountered along the project stretch. Overall, using aggregate base simplified the process of pavement construction. ASPHALT PAVING The Thompson-Arthur team are experts in asphalt production and paving. They utilized their asphalt plant locations to make the mix for the project. The mix selection was chosen by the NCDOT, a B25-I19, CS 9-1/2-inch in base-bindersurface-laydown pattern. To enhance the safety of the project, specifically during rain events, the team added an asphalt pavement layer to U.S. 64 throughout the project limits. This open-graded friction course asphalt layer has become more prevalent on high-volume, high-speed roadways to proactively combat hydroplaning. This open-graded friction course is a permeable asphalt layer that will allow water on the surface to drain vertically through the layer instead of draining naturally off the roadway. As a result, during rainfall there is an increase in surface drainage, limiting the potential for hydroplaning, and driver visibility due to noticeable reductions in water spray behind vehicles. In all, Thompson-Arthur team members put down 745,000 tons of asphalt from their plant locations. They utilized Weiler material transfer vehicles to keep the flow of material moving to their VOGELE pavers. HAMM rollers were onsite to assist with compaction.
The ABC team kept drone footage of the project throughout the project to keep a historical perspective of the job as it got built.
In all, over 200 employees were working on this jobsite at peak times. The total price tag for the project, including construction costs, design, right-of-way acquisition, utility relocation consulting costs, plan revisions and numerous additions, added up to roughly $264 million. Ultimately, nearly four years and approximately 1,360,029 man-hours later, Asheboro Bypass Constructors delivered the design-build project on schedule, while providing more than $1.4 million in value engineering.
For more information on working through design build projects, visit ForConstructionPros. com/21220082
NOVEMBER 2021 ASPHALT CONTRACTOR
49 10/20/21 10:49 AM
JOBSITE INNOVATIONS HAMM HD+ i-Series Rollers The HD+ i-series line of tandem asphalt compactors come standard with offset capability (close to 7-in.), amplitude and frequency adjustment from the control panel and the Hammtronic machine management system. • 7-ton Hamm HD+ 70i VT combines a smooth drum with pneumatic tires, and the 11.5-ton HD+ 110i VO Oscillation roller combines standard vibration with Oscillation compaction • 13.2-ton HD+ 120i VV HF highfrequency model available with the HCQ intelligent compaction system ForConstructionPros. com/12002721
Volvo PT125C Pneumatic Roller The PT125C nine-wheeled pneumatic tire roller employs a kneading action for the compaction of hot and warm mix asphalt. • Heavy-duty 14-ply tires suited for chip seal applications • 9,826-lb. operating weight (with ROPS) • 68.2-in. drum or rolling width ForConstructionPros. com/12320053
VÖGELE ErgoPlus 3 Operating App This specially developed mobile app and the associated web special enables you to adopt the ErgoPlus 3 operating concept quickly and easily with the aid of numerous animations. • Enables paver operators to know precisely when to use specific operating functions and which automatic functions will make work simpler and faster • Step-by-step videos demonstrate entire work steps as well as comprehensive automatic functions ForConstructionPros. com/21040136
50
Caterpillar AP600F and AP655F Asphalt Pavers The 8-ft. AP600F wheeled paver and AP655F rubber track paver with Mobil-Trac undercarriage come with a standard Eco-mode or an Advanced Eco-mode with automatic engine speed control. • 173-hp C4.4 ACERT Tier 4 Final engine • Feature intuitive touch screen operation, single-button feeder system activation, auto fill feeder system, quick-change heating elements and front wheel assist ForConstructionPros.com/12140296
Sakai SW654ND Oscillatory Roller The SW654ND oscillatory tandem drum roller has a 58-in. drum width for speedier, more profitable compaction. Side clearance is 2.5 in. with a curb clearance of 28-in. • ND-series models have independent dual drum vibration or oscillation capability from twin eccentric shafts • Amplitude and frequency are 0.021-in. at 2,940-vpm • Powered by a Kubota 3.3L, Tier 4-compliant engine coupled with ECO Compaction Mode (ECM) ForConstructionPros. com/12314955
Carlson CP100 II Commercial Paver The next generation of CP100, the Carlson CP100 II features the new, single-slide EZCSS electrically heated screed. • 100-hp Cummins QSF3.8 Tier IV Final engine • Service and accessibility with a one piece forwarding tilting hood , large side doors and access panel in the 9 ton, heavy-duty hopper • Heavy-duty, highway-class wear components, including fully replaceable floor plates, fully sealed auger bearings and exclusive horizontal sliding damper doors ForConstructionPros. com/12305555
Dynapac CC1100/CC1200 VI Rollers The CC1100/CC1200 VI features a cross-mounted engine and large casted forks with built-in flexible lifting/towing/tie-down possibilities. • Sliding seat and engine hood design ensure optimal visibility over the front of the drum • Tapered drum edges result in a smooth surface without marks • Available mechanical adjustable offset function provides up to 2 in. of offset to the rear frame ForConstructionPros.com/20984044
Weiler E2850B Remixing Transfer Vehicle The E2850B Remixing Transfer Vehicle features 25 tons of onboard storage, triple-pitch remix augers and 600-tph discharge capacity for nonstop, non-contact paving with reduced particulate and thermal segregation. • Variable-speed elevator and conveyors allow chain speed to match production, minimizing wear and material segregation • Auto dump and dump assist features optimize truck exchanges for continuous paving • 18-in. shifting operator platform with conveniently located controls ForConstructionPros.com/21047850
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_50-51_JobsiteProducts_JD.indd 50
2
w
10/20/21 10:49 AM
For
,
For information right away, please call 800-257-8163.
We make it easier for you to get a price quote. Visit our web site at eagerbeavertrailers.com, and you're a "click" away from getting all the information you need from our nearest dealer. Simple, Fast... Guaranteed!
25 XPL
• CAPACITY: 50,000 lbs. • Air lift front axle standard
20 XPT
w/ Hydraulic Ramps • CAPACITY: 40,000 lbs.
e
35 GSL/PT • CAPACITY: 70,000 lbs.
75
50 GSL/PT
th
ANNIVERSARY
• CAPACITY: 100,000 lbs.
ng
1946-2021
For a quote on any model, please call
ACON1121_50-51_JobsiteProducts_JD.indd 51
800-257-8163
EagerBeaverTrailers.com
10/20/21 10:49 AM
PRESERVATION UPDATE
How do Different Environmental Factors Affect Asphalt? even further split. When the ice begins to melt, the water will move deeper into the crack, only to freeze and thaw again. This cycle can lead to the beginning of a pothole or other deep cracks.
2. PRECIPITATION
Adobe Stock | milosr
W
hen it comes to pavement, the money and time you spend to make it durable should not go down the drain. Environmental factors can have significant impacts on your pavement performance and cause serious damage. Let’s take a look at the different environmental factors to watch out for.
1. TEMPERATURE Temperature affects pavement in various ways. Hot temperatures cause asphalt to expand, leading to cracks and allowing for water to seep in. This will begin to erode layers of your pavement, making for an unsightly appearance. Meanwhile, in the winter months, the cold temperatures at or below freezing will result in cracking, too. If water seeps into the cracks in the winter, the water will freeze and expand causing an
52
ASPHALT CONTRACTOR NOVEMBER 2021
ACON1121_52-53_Preservation_JD.indd 52
Water can be extremely damaging to asphalt, as moisture will decrease the material’s strength and durability. When water sits on the surface, particularly during heavy precipitation, the oil separates from the asphalt. If this happens, you can expect asphalt shrinkage, water soaking into the cracks to expand in colder temperatures and the development of cracks. Typically, asphalt isn’t affected much by light rain. Where the problem comes is with insufficient drainage and water logging. Each time it rains, the water builds up, making damage and deterioration only increase.
3. TRAFFIC AND VEHICLE LOADS Pavement exposure to heavy loads and traffic can cause pavement fatigue which will bend, stress and eventually break the pavement. If the pavement experiences heavy traffic from large vehicles, the asphalt will have a consistent wheel load that can cause stress. Also, damage is more significant if wheels are moving at a very slow speed. The ongoing stress will eventually damage the asphalt. WHY MAINTENANCE IS SO IMPORTANT Don’t let your time and money go to waste. Stay ahead of your pavement
repair before issues get out of control. Routine maintenance is essential to avoiding severe damage. Some reasons why pavement preservation is so important include: • Safety – Whether it’s your sidewalk, driveway, or the middle of the road, uneven pavement can be dangerous. Avoid risk of injury and potential damage to vehicles with quality asphalt maintenance. • Cost – When the damage is extremely deep or large, the repair can be very expensive. Small cracks, though, only need quick fixes, so you can save a lot of money by staying vigilant. • Increased lifespan – If you continually keep up with your asphalt maintenance, you can keep your surface preserved and protected for a longer amount of time. This will save you time and money, and you will increase the durability of your asphalt. • Curb appeal – Cracks and potholes in your pavement are unattractive. Keep your surrounding pavement welcoming to prevent reduced resale value. Over time, pavement is going to deteriorate – whether through heat, rain, snow, or simply regular use – and potholes, cracks and fractures are inevitable. Proper maintenance will ensure safety of your asphalt, prevent further damage and save you money longterm. This article was contributed by Emma Iammarino with Unique Paving Materials, Cleveland, OH.
For more information on pavement preservation, visit ForConstructionPros. com/21389918
www.ForConstructionPros.com/Asphalt
10/20/21 10:50 AM
2
S
REGISTER NOW!
?
2022 NAPA ANNUAL MEETING
SC TTSDALE ACON1121_52-53_Preservation_JD.indd 53
January 23-26 The Phoenician AsphaltPavement.org/Annual
10/20/21 10:50 AM
PRESERVATION UPDATE Wirtgen WR Series Wheeled Cold Recyclers Wirtgen offers three wheeled recyclers: the WR 200i, WR 200 XLi, WR 240i and WR 250 models. • Equipped with a powerful milling and mixing rotor as well as cutting-edge injection systems, they mill and granulate asphalt pavements, inject binding agents and water in precisely metered quantities and mix it all in a single in-place operation. ForConstructionPros.com/12315450
Caterpillar PM825 Cold Planer The PM820, PM822 and PM825 have operating weights from 79,630 to 82,650-lb. and cutting widths from 79 to 98.6-in. • Three electronically controlled cutting settings to match rotor speed/torque with operating conditions • 755-hp Cat C18 ACERT Tier 4 Final engines iso-mounted to reduce vibration • Hydrostatic drive with two variable-displacement propel pumps supplying a variable-displacement motor at each track • Automatic traction control system minimizes track slip in extreme conditions • Standard four-mode steering with electronic control module
Cimline Durapatcher P5 The DuraPatcher P5 Patching system provides the maximum worksite safety with in-cab, single operator operation.
Roadtec RX-700 Cold Planer
The 600-hp-class 2200/60 cold planer features a Tier 4 Final engine and a reengineered milling chamber that improves the design of the front material depressor.
Astec Industries’ Roadtec cold planers provide asphalt milling for highways, interstates and more. • Built with the Astec focus on balanced weight distribution, the RX-700 is a heavy-duty machine that is user-friendly in both operation and maintenance • Cuts up to 14-in. (35.6 cm) deep • Standard widths are 6-ft. 7-in (201cm), 7-ft. -in. (218 cm), 8-ft. 2-in. and 10-ft (305cm) • Like all Astec cold planers, this model features a 60° front load-out conveyor swing ForConstructionPros. com/21759539
Bobcat Infrared Asphalt Preservation System The Asphalt Preservation Tools (APT) system can repair potholes and other surface defects in streets, highways and parking lots, as well as reclaim driveways, trails and more. • Consists of the 3,760-lb. AH30 infrared asphalt heater and the 995-lb. AP40 asphalt processor, which are compatible with 12 approved Bobcat all-wheel-steer, skid-steer and track loaders • The attachments perform a three-step asphalt preservation process that seamlessly fuses recycled asphalt with surrounding asphalt to create a strong, durable bond • The heater can heat an area as large as 30 sq. ft. to 300° F ForConstructionPros.com/10856899
54
•
•
• One person operation safely from inside the cabin • Improved operator visibility • Intuitive operation requires minimal training • Adjust and store material settings for consistent operation • Lowest cost per ton patch mix
F c
ForConstructionPros. com/20861599
Rio Rubber Track Inc. Carbide Milling Teeth Carbide Milling Teeth help increase proficiency on cold-milling planers and compact milling-head attachments • Structurally designed to last longer and increase material removal rates on equipment • Premium tungsten carbide tip with fortified body brazement • 100% structural wear-life integrity • Heat-treated hardened upper body superstructure • Full body/tip wear-life utilization • Heat–treated hardened retainer ring • Full wear-life tool holder protection ForConstructionPros. com/10942546
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_54-55_PresProducts_JD.indd 54
•
•
BOMAG 2200/60 Cold Planer
ForConstructionPros. com/21094670
K w In a m 6. •
•
ForConstructionPros.com/20980992
• 11.8-in. track width and 67-in. track length provide optimal traction when milling at depths reaching 12.6-in. • Available in a 78.7- or 86.3-in. milling width, and features the BMS 15 milling tooth holder system • Quick-change cutting tool design reduces the time required to change a full set of teeth by up to 75%.
w R
10/20/21 10:51 AM
S P
B Pi Fl sy po w •
•
F c
.
ed
y .
d
g
KM 8000T Hotbox with KM 2-18X Infrared Recycler KM 8000T Hotbox with KM 2-18X Infrared features a 4-ton trailermounted hotbox reclaimer and a 3.5-in. by 6.5-in. infrared recycler. • Triple wall construction with high efficiency insulation for heat retention • Thermostatically controlled heating system for better fuel efficiency • Maintain HMA for up to 48 hours or reclaim bulk stored virgin HMA • Burner and key components mounted above frame and in steel enclosure • Front to back loading doors with cantilevered handles • Diesel or propane fired (two 30-lb. propane cylinders included with propane units) ForConstructionPros. com/20978622
Bergkamp Pivot Tack System for FP5 Pothole Patcher Bergkamp Inc. has engineered a new Pivot Tack/Air Hose System for its FP5 Flameless All-In-One Pothole Patcher. This system keeps hoses suspended, addressing potential issues with tripping hazards and with tack adhering to hoses. • The system locks in place parallel to the patcher during transport and allows 180° pivot capability and 20-ft. of extension during use • A retrofit Pivot Tack/Air Hose System can be mounted on existing FP5 Pothole Patchers ForConstructionPros. com/21066361
www.ForConstructionPros.com/Asphalt
ACON1121_54-55_PresProducts_JD.indd 55
NOVEMBER 2021 ASPHALT CONTRACTOR
55 10/20/21 10:51 AM
CLASSIFIEDS
56
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_56-57_Classifieds.indd 56
10/20/21 10:52 AM
920-542-1267
tsoma@ACBusinessMedia.com
PUMP PACKING Stop your pumps from leaking!
Pre-cut packing sets proven within the Asphalt Industry. Viking®, Roper, Rotan, etc. Call Scott at 1-800-231-4209 www.rainsflo.com
Index Advertiser Index 10-11
Asphalt Drum Mixers Inc. (ADM)
22-23
Astec Inc.
30-31, 59, 60
Cargill Inc.
2
Clarence Richard Co.
57
Dynapac
37
Element Six
55
Gencor Industries Inc.
3, 5, 33
Ingevity
27
KTP Enterprise/Fast Measure
57
LeeBoy, Inc.
9
Minds, Inc.
29
NAPA
53
Phoenix Industries LLC
17
Rains-Flo Mfg.
57
Reliable Asphalt Products
56
Schutte Hammermill
20
SealMaster
41
Systems Equipment
7, 47
Tarmac International, Inc.
21
Weiler Products
19
Wirtgen America Inc.
15
ACON1121_56-57_Classifieds.indd 57
PAGE
ALMix
www.ForConstructionPros.com/Asphalt
Contact Tadashi Soma Print and Digital Advertising
t
CLASSIFIEDS
NOVEMBER 2021 ASPHALT CONTRACTOR
57
10/20/21 10:52 AM
THE LAST EXIT |
BECKY SCHULTZ, CONTRIBUTING EDITOR
Construction Apprenticeships Rival Bachelor's Degrees
AdobeStock/ auremar
Study shows union construction apprenticeship graduates can achieve nearly equal pay and benefits as college grads
J
ust as Congress is considering more than $1 trillion in added infrastructure investment that is expected to increase demand for skilled trade workers, a national study released by the Illinois Economic Policy Institute (ILEPI) has found that graduates of joint labor-management (union) apprenticeship programs in the construction industry achieve nearly equal wages and benefits, on average, as other workers with four-year college degrees. Registered apprenticeships enable participants to "earn while they learn" with no out of pocket expenses for the training provided. The study analyzed 10 years of data from the Current Population Survey’s Annual Social and Economic Supplement released by the U.S. Department of Labor and U.S. Census Bureau. In its examination of core economic, fiscal and social metrics, “Union Apprenticeships: The Bachelor’s Degree of the Construction Industry – Data from the United States 2010-2020" determined
that registered (union) apprenticeship programs can provide the economic security and upward mobility to enable blue-collar workers to achieve middleclass lifestyles comparable to those with bachelor's degrees and associate degrees. “The data reveals that broad stigmas that have long been associated with vocational training alternatives to college are simply not grounded in fact,” said Frank Manzo IV, study ILEPI Policy Director. “Compared with twoand four-year colleges, joint labor-management apprenticeships in construction deliver a more robust training regimen, similar diversity outcomes, competitive wage and benefit levels, and comparable tax revenue for states and local governments, while leaving graduates entirely free of burdensome student loan debt.” Employer-only (non-union) apprenticeship programs, on the other hand, were shown to produce outcomes more on par with national averages for workers with high school diplomas or GEDs. Overall, the study found that non-union construction workers: • Earned an average $18,300 less per year than their unionized counterparts, • Were significantly less likely to have access to health insurance or a retirement plan at work, • Were more than twice as likely to be living in poverty, • Were nearly three times more likely to be reliant on Medicaid, • And were significantly less likely to be married — a metric other research has linked to social stability and upward economic mobility. Based on the findings, Manzo asserted, "It is clear that the most viable such pathway in construction runs through the joint labor-management apprenticeships and the unionized side of the industry.”
Recent studies in Iowa, Wisconsin, Illinois and Oregon have also concluded that construction apprenticeships offer up to 41% more hours of training than bachelor’s programs at public universities, and up to 183% more than associate degrees at community colleges, ILEPI points out. In addition, the programs enrolled a higher share of African American trainees in three of the five states studied, and a higher share of Hispanic trainees in four of the five states. “By providing more people from more backgrounds with the in-demand skills needed to secure good-paying jobs, the data shows that joint labormanagement apprenticeship programs consistently deliver bachelor’s degreelevel outcomes,” Manzo concluded. “That’s great news for workers looking for alternatives to college, and an instructive framework for policymakers looking for ways to grow America’s middle class.” Joint labor-management apprenticeship programs as described in the ILEPI study as the "bachelor's degree of the construction industry,” offering outcomes, and opportunities, rivaling universities and community colleges while enabling "students" to emerge from the programs debt-free. The llinois Economic Policy Institute (ILEPI) is a nonpartisan nonprofit organization which uses advanced statistics and the latest forecasting models to promote thoughtful economic growth for businesses and working families. Information provided by the Illinois Economic Policy Institute (ILEPI) and edited/enhanced by Becky Schultz.
For more information on apprenticeship programs, visit ForConstructionPros. com/21307382
G
W c a a
W c
w 58
ASPHALT CONTRACTOR NOVEMBER 2021 www.ForConstructionPros.com/Asphalt
ACON1121_58-60_LastExit_JD.indd 58
10/20/21 10:52 AM
BUILT TO CONNECT
Guided by a customer-centric approach We help you build the roads that connect goods to markets, people to communities and families to one other. Astec pavers, screeds, mills, stabilizers and MTVs are designed with a customer-centric approach that yields innovative and reliable rock to road solutions that create value and connection. We are inspired to connect with our customers through inventive design that creates safe and reliable roads.
www.astecindustries.com
ACON1121_58-60_LastExit_JD.indd 59
10/20/21 10:52 AM
BUILT TO CONNECT
Efficiency and Productivity Designed with safety and operator comfort in mind, the Shuttle Buggy® SB-3000 material transfer vehicle features adaptive cruise control, bright LED lighting, four-wheel steering for easy transport and groundlevel maintenance access for added convenience. Operators can rely on clear sightlines and the ground operator is safely protected inside the structure of the machine. The Roadtec SB-3000 is the perfect blend of traditional craftsmanship and modern technology.
astecindustries.com
ACON1121_58-60_LastExit_JD.indd 60
10/20/21 10:52 AM