President’s Message Safety: Let’s keep the Momentum Going!

W

hen it comes to Building our Safety

c o m p i l i n g them when all of the meetings are concluded. These

Culture, it is up to guys like me to get the

ideas for improvement will form the basis of a plan on how

ball rolling. But (and more importantly) it is

best to move forward. You will all be informed of our plans as

EVERYONE’S job to KEEP the ball rolling.

they pro g ress. The safety journey that we have started is not a

At the time of this writing, I am about

75% through attending all of the Branch Annual Safety Meetings.

So, for those of you that have attended the meeting in your

sprint – it is a Marathon, with one big diff e rence; there is no finish line. We must always strive for continuous improvement, and I

a rea, you know that we are serious about ensuring “ S a fe ty is

p romise you all that we will. I really believe that our Safety Culture

T RU LY our # 1 Cultu ral Pri o ri ty ” – all of the time and in

has taken the first step beyond “Compliance” – let’s keep the

e v e rything we do.

momentum going!

There has been one huge side benefit of these meetings that I

I want to thank all of you for your strong participation, your

must admit I didn’t see coming, and I would like to share that with

thoughts and your opinions so far. For those of you who have not

you. This benefit has to do with the information that we have

attended the annual meeting yet, I thank you in advance for your

g a t h e re d as a result of ASKING what our front line workers think.

ideas, and I look forward to seeing you all as the dates for the

For those of you who have attended the Annual Safety Meeting,

remaining meetings approach.

you know that a good deal of time was dedicated to asking you

A couple of other things that I have been reminded of is how

what your opinions are with 1) what you think we do well in safety,

much talent we have in our company, and how youthful our

2) what you think we do not do well in safety, and 3) what are you

wo r k f o rce is. There is obviously a great deal of mentoring

ideas of how to improve on what we don’t do well.

h a p p e n i n g. We are certainly the Leader in the Industries that we

What I have observed in every single meeting so far, is that if you ask people what they think, and it is a safe environment to say what they think, you better brace yourself for a ton of great ideas!

operate in, and the reasons for this were quite evident to me at each and every office’s Annual Safety Meeting. Finally, I refer you to the back page of this Flynn Flash. This was

And that is exactly what we have gathered – a ton of great ideas, from

something that was shared with me by one of our long serving

the people who are exposed on a daily basis to our inefficiencies. I

Superintendant’s and veteran Construction man – Rick Lacey.

know we are pretty good compared to our competitors, but we are

This captures the essence of where we want and need to be; I

not perfect and can always improve.

encourage you to clip this and post it where you think it will do the

In fact, what I have learned through this process perhaps

most good.

most of all is that if Management ever wants to improve, just ASK those who are on the front lines for their ideas. Sounds so simple…………… We are of course gathering all of these ideas and will be 2

Sincerely, Doug Flynn


FLYNN LAUNCHES NEW PHILANTHROPY PROGRAM FOR CHARITIES IN YOUR COMMUNITY!

I

n addition to continued fundraising efforts for the Canadian Diabetes Association, Flynn Canada Ltd. has

committed to donating $100,000 annually to charities, causes and organizations that directly support the communities of the employees! Each month, the Committee will select an organization to receive a donation from Flynn Canada Ltd. and be

featured on the portal and in upcoming editions of the Flynn Flash. Nominations are open to all registered people-based charities which help or support people in the community. If you are interested in nominating a cause or charity, please complete the Nomination Application form which can be picked up from your regional HR rep or can be accessed through the portal by choosing the link on the homepage.

SEARCHING FOR A SPONSOR FOR YOUR LOCAL SPORTS TEAM OR ASSOCIATION?

A

s most of you are aware, Flynn Canada Ltd. has developed

the personal development opportunities that they bring.

a community Sports Sponsorship Program as an initiative

If you know of a team or association that you feel would

to help support and develop the communities in which

benefit from a community sponsorship, please complete the

we work. By targeting amateur grassroots athletics, the goal is to

s p o rts sponsorship form in the same manner as listed above.

ensure that more people have access to sports and recreation and

3


HALTON CONDO CORPORATION SELECTS FLYNN FOR SHORELINE RETROFIT The Hamilton Branch worked with General Contractor, Wal-Tech on this Condo retrofit project located right on the shores of Lake Ontario in Burlington. Branch crews successfully completed the roof replacement on the multi-story structure of approximately 13,300 square feet with new modified-bitumen installed. In addition to the roofing scope, Flynn crews took on some 2,400 square feet of wall modifications as well as the removal and salvage of an existing 700 square feet of copper roof. This roof was replaced with mechanically fastened dens-deck, a self-adhered base sheet and new copper roof sheets. The crew is shown on the left while working on the roof re t ro f i t and includes Foreman C a rlos Costa, Antonio Loure n c o, Agostino Medeiro s, Carlos Graca, Jeremiah Deze e u w, Foreman Peter Costa, Jun Palma, Jose Melo, and John Barbosa.

THE ABBOTSFORD BRANCH HAS MOVED

W

ith no physical presence in the interior region of BC Flynn Canada Ltd. has re l o c a t e d the branch from the Abbotsford

location to Kelowna. 75% of both the office and field staff have made the choice to move with the branch

and take on the new endeavor...it has been a group effort from the team to make it happen but we did it and had the doors opened for January. Thanks to all for the sacrifice and effort made from those that have been involved. With the move into the Interior of BC, this will strengthen Flynn's position in the BC region and open doors that have not been available before.

COLCHESTER REGIONAL HOSPITAL REPLACEMENT ALMOST COMPLETE Halifax Branch metals crews are shown left at the site of the new Colchester Regional Hospital Replacement Project. The facility is fast approaching completion and is this region’s newest health care facility. Crews have been fortunate to have had a relatively easy winter during this project; a welcome change from our usual cold and snowy seasons of the past. Working with General Contractor Ellis Don, Greg Nickerson and his team have made good progress with the contract that includes supplying and installing more than 90,000 square feet of metal cladding. The contract is expected to be completed early in the spring of 2010. The hospital is expected to be open sometime in 2012. The crew members performing the work are shown left, from left to right, and include Travis Barrett, Marc Knight, Foreman Greg Nickerson, Danny Breau, Wojchiech Glawenda and Pawel Wyrwiak Great work guys! 4


CREWS COMPETE ON CALGARY BUSINESS CONDOS RE-ROOF

O

ANOTHER JOCELYN ROOF CONSULTANTS PROJECT ON THE ST. LAWRENCE SEAWAY

ccasionally crews can see their co- workers from one job-site to another but in this case they

could almost reach out and shake each

o t h e r ’s hands. Working across the p a r k i n g lot from each other, crews were able to see how the other guys were doing on their respective full built-up roof replacement projects. B rian McCaghre n and his group tore off 13,500 square feet while James Pyykonen and his crew worked their way through a 19,200 square foot roof. Both roofs were difficult but in addition to the roofing tear-off, James and his men had to strip away 5,500 square feet of Stramit deck as well!

General Contractor Jocelyn Roof Consultants contracted Flynn’s Hamilton Branch on yet another Niagara re-roof project. This time almost 50,000 square feet of roofing and related sheet metal flashings were required to complete the multi-level roof areas on the Maintenance Building for the St. Lawrence Seaway Authority. The site is located right next to the historic Welland Canal in St. Catharines. Hamilton roofing employees who successfully completed the project are shown above while on site and include from left to right David Crossley, Andy Paulino, Mike Palma, Foreman Ricky Fernandes, Jason Pavao and Dominic Girard.

MOUNT PEARL HIGH – A STIMULATING JOB

James’ crew is shown above and included, from left to right, Fore m a n James Pyyko n e n, S teve Camponero, Wayne Thompson, Greg Kliszowski, Peter Wozniak and Erik Pyykonen. Brian’s crew is shown below and included, from left to right, Foreman Brian McCaghren, Jason Bloch, Cory Boudreau, Robert Ordish and Cory White.

S

t John’s Branch has benefited from the provincial government's $800-million economic stimulus plan, by successfully obtaining a great deal of im p rovement work to the pro v i n c e ’s aging infrastructure including this latest school re-roof project. Allan Squires and his crew are re-covering the existing BUR roof with a new 2-ply MB membrane. The original plan was to mechanically fasten the protection board through the existing ro o f , b u t A l l a n successfully lobbied for it to be adhered in cold adhesive

instead, to avoid striking the many electrical conduits below. Roofing employees who perf o rmed the work are shown on site above and include from left to right Frank Poole, Andrew Stone, Allan Squire s, Mike Bradbu ry, Ken Petersen and James Frizzell. Good job, guys!

5


PRODUCTIVITY NEVER STOPS AS BRANCH HOLDS INTENSIVE TRAINING SEMINAR

Back Row: Andrej Milosz, Chris Mikolowski, Willi Struemer, Dmytriv Mykhalo, Wade Simard, Chris Karlsson, Ruslan Stefanyshyn, Wieslaw Jezak, Antoni Kortschewski. Front Row: Justin Vandale, Joe Thomkins, Kirk Pascal, Vasyl Karchevskyy, Oleh Palyna, Milton Thomas.

Back Row: Waldemar Brend, Keith Karlsson, John Bonany, Sean Ducharme, Hans Dell, Jerzy Rozak. Front Row: Roger Gingras, Cody Johnson, Joel Nozick, Nazar Kukharskyy, Doug Gunson, Volodymyr Knap.

F

lynn Winnipeg Branch stayed productive even during inclement weather by putting on an in-house training program which took place over a three day period. The program covered a variety of different roofing systems and gave all employees partaking a chance to gain valuable experience, knowledge and hands on training. 4 Ply, Single Ply (EPDM, Sarnafil and Tremco) and 2 Ply (Cold Applied) systems were the main ingredients of this training. All courses also incorporated the necessary safety set ups required for each system i.e. kettles, guard-rails, bump lines, fall protection restraint/arrest and PPE. The idea was brought forth by Derrick Harrison (Service Manager) with direction from Mike Johnson (Branch Manager) and was organized by Derrick Harrison and Clarence Poworoznik (Roofing Manager).

Back Row: Taras Kukharskyy, Reg Hoogervoost, Darren McLennan, Wayne Maki, Patrick Janczak, Karel Harrison, Mike Snadden, Tom Hotson. Front Row: Antoni Flacht, Shane Connolly, Luis Esperanza, Arlan Matula.

Special thanks go out to all the instructors who took time out of their busy schedules to provide the Branch’s up and comers with knowledge, experience and hands on training. The instructors who shared their wealth of knowledge were M i t ch Ko t (Roofing Superintendent), Trevor March a k (Roofing Superintendent), Bogdan Nowak (Service Superintendent), Jarek Rze d z i a n (Roofing Foreman), Marek Mikolowski (Roofing Foreman), Paul Gravito (Roofing Foreman), Wieslaw Jezak (Roofing Foreman) and Ted Mikolajczyk (Service Foreman). At the conclusion of the In-House Training all employees were given a survey to complete, so alterations and changes can be made to improve the experience of all participants in future training sessions. All responses were very positive. An example of comments received, read as follows "This was a great idea, and as an employee of Flynn I appreciate the training courses I had an opportunity to participate in. The training and methods I learned and received the last couple of days will no doubt make me a better roofer. Thanks to all the instructors who took the time to teach and demonstrate. They all know their stuff. You don't know how much I appreciate this. I would never get to show people how to do this while on a job site". Paul Gravito, Foreman and Instructor. 6

Back Row: Jarek Rzedzian, Mitch Kot, Marek Mikolowski, Bogdan Nowak Middle Row: Trevor Marchak, Ted Mikolajczyk, Wieslaw Jezak. Front Row: Paul Gravito.


FLYNN REPAIRS LEAKS IN AREA SWIMMING POOLS

A

service crew from the Victo ria Branch recently completed repairs to the expansion joints at the bottom of two local swimming pools in Victoria and Nanaimo. The pools w e re losing thousands of gallons of water a day due to faulty expansion joints

a round and across the bottom of the pools. Due to the extreme conditions it was necessary to complete it in the summer months when schools are out and the pools are at their busiest. A tight schedule was put in place for the pools needed to be drained, the repairs completed and the pools refilled. Foreman Rick Miller and his crew worked together to strip out the old material and clean and prepare the surface for installation of the new Belzona expansion joint materials. Allan Austin, a Belzona representative, was on site for training and the mixing of the quick setting expansion joint materials. With a good organization and a hard working team, these projects were completed on schedule and there were no delays in re-opening the pools to the public. Victoria Branch Service Employees performing the feat included from left to right Steffan McInnes, Jeff Thul, Rick Miller and Ryan Fuller. Missing from photo is Allan Crowfoot and Ben Verhagen. Well done crew!

CREWS RE-UNITE AT PARKSIDE PLACE TO ‘GET’R DONE’

GOLD AND SILVER – CAN’T DO MUCH BETTER THAN THAT!

Victoria Branch Shingle crews worked long hours over the winter months to help our metals and roofing departments keep on schedule at the new Parkside Place project. The Shingle crew was recently re-united and immediately began work on a 32,000 square foot cedar conversion project courtesy of Wells Klein Consulting. The project stayed right on schedule and was completed in mid-March. In addition, we would like to acknowledge three young men who have risen to the challenge of running the crews. Together Dean Craggs, Brian Aitken and Jordan Cooke have made an outstanding impression on all in their new leadership roles. Victoria Branch employees who performed the work are shown below and include from left to right, Jordan Cooke, Ethan Cotterell, Reynaldo Garcia, Scott Jenkin, Geoff Myers, Brian Aitken, Wenefredo (Jun) Manzon, Dean Craggs, Mike Samchuk, Josh Braithwaite, Jim Muir, and Ross MacKay.

G

A big THANK YOU goes out to the entire Victoria Branch Shingle crew for your patience and extreme efforts. Keep up the good work guys.

eneral Contractor Z.W Group awarded this 2 building roofing project, called The Metcalfe and The Argyle buildings to the O tt a wa Bra n ch. These two, low rise aff o rdable housing developments a re seeking a Silver and Gold LEED cert i f i c a t i o n , re s p e c t i v e l y. The combined projects total some 29,000 square feet with roof areas that have a combination of green roofs, solar collectors, water retention and light solar reflection materials. The roof will comprise of paving slabs, ballast and high performance membranes. Thanks to the Gardens in the Sky team, notably Dennis Ta ves for assisting with the green roof portion of this project. The roofing employees completing the work are shown above and include from left to right M i ran Sko f,

Kevin Riley, Pam Ouimette, S tephane Beland, Foreman Al Ouimette, John Riley, Dean Hill and M a rc e l La ro c q u e in f ro n t . 7


CALGARY'S BEHIND THE SCENES TEAM MEMBERS

M

THE TORONTO INTERNATIONAL FILM FESTIVAL - BELL LIGHTBOX

any times the folks who work behind the scenes never get the same recognition in the Flash for their eff o rt s , so we decided to feature one such group. These

C a l g a ry Bra n ch employees work diligently everyday to ensure t hat field crews have the necessary materials and tools that they need; that the equipment is maintained; that the metal is f a b r icated as re q u i red and that the branch vehicles are safe and ro a d w o rthy!

Toronto Branch Roofing Division and Ontario Architectural Metals Division joined forces to complete the TIFF Bell Light Box project at the corner of King and John Street in downtown To ronto. Featured in a previous Flynn Flash e d ition, the multi scope contract consisted of glass curtain wall, metal panels and roofing. General Contractor PCL Constructors Canada Inc.had awarded the contract to Flynn in September 2008 and has now acquired substantial

The Calgary employees that make all this happen are shown above from left to right and include Shop Foreman Norm Toulouse, Fleet Manager/mechanic Bep Van Klaveren, Stores Manager Trevor Geddes and Metal fabricators Derek Kuzek and Henadi Andryianets. “Thanks guys” - we appreciate all you do!!

completion as of April 2010. Crew members as shown above include from left to right Jon Cochrane, Joe Lee, Andy Molka, Steve Hewitt, Greg Co rn i ck, La rry Dawe, G reg Mich a e l s, Ed Dix, To m Fa rdy, G reg Wa d swo rt h, F o re m a n C h ris Burrow s, Lucas Macphers o n, S c o tt Mart i n, Ian Tro u g h to n, Kev i n M c C a rther, Paul Myers and Ken Miller.

NICE PANEL PROJECT AT RQHR ADDICTIONS CENTER General Contractor PCL Constructors Canada Inc. chose Flynn’s Re g i n a Bra n ch to supply and install the composite aluminum panels on this new facility in Regina. Regina Branch Metals employees who performed the work including F o re m a n John Krys a k, Adam Kuntz and Rya n M c A fe e a re pictured left from left to right.

8


SASKATOON BAGS MASSIVE RONA STORE Saskatoon Branch was successful in negotiating

ANOTHER CLASS DEALERSHIP FOR TOYOTA COCHRANE

another multi-scope products contract on a new Rona Home Centre at the Preston Crossing Shopping Centre in Saskatoon. The latest for the building supply chain is being constructed by Quorex Construction. A number of Flynn crews were on site through most of the winter months to accomplish the task. Metals crews installed more than 33,400 square feet of 3" foam panel as well as an additional 17,000 plus square feet of metal cladding in Rona White and Grey. The Branch was also awarded the TPO roofing. However due to the winter work, the Branch suggested that a Soprafix System would be a much better way to go, and the architect agreed. With more than 105,000 square feet and 3 months of hard work behind them, the Soprafix System was finally completed.

G Thanks go out to Roofing Division employees Len Ginter, James Lathlin, John Fast, James Bignose, Levis Lightfoot, Mathew Tomyn, Brad Laliberte and Foreman Matt Davies. And thanks as well to Metal Division crews including Foreman Kevin Bereza, Tyler Brown, Mike Franks, Georden Wilson, Chris Quiring, Tyler Walls, and Bart Kucher shown above from left to right.

eneral Contractor Barjac Construction of Calgary chose Flynn’s Calgary Branch once again as their preferred exterior wall contractor

for the new Toyota Dealership in Cochrane, Alberta. At press time, Alex Adams and his crew were well on their way to completing another dealership building for the prestigious automaker. With insulated metal panels, metal cladding and composite aluminum panels, Cochrane Toyota will be yet another great showcase demonstrating the diverse installations and quality workmanship that Flynn crews provide. This particular crew consisted of, from left to right. Byron Sheppard, Terry Kavanagh, Phillip Sheppard, Jay Meszaros, Guy Cotterhill, Wilfe Evans, Corey Greenside, and Site Foreman Alex Adams. Nice job, fellas!

CREWS TURN UP THE HEAT AT CARLETON CIVIC CENTRE

M

oncton Branch Service crews received an emergency leak call at the Carleton Civic Centre in Woodstock, New Brunswick recently and upon their arrival at site, Service Foreman Leo Cormier and his partner Dennis Cormier found that a section of roof had blown over in a wind storm. Leo was able to flip the damaged section of roof back over and make it water tight until Ryan Baisley (Foremen) and his partner Brad Inder could return to site and replace the damaged section. The men ripped out a 400 square foot section of roof at the corner of the building and replaced it. A new metal gravel-stop also had to be installed. The work was all done using cold applied materials. It’s amazing what a heat gun can do. Excellent service work fellas!!! 9


CHILLING OUT AT U OF A COOLING PLANT

E

ven though the winter in Edmonton hasn’t been as harsh as n o rmal, it still received its share of cool weather. General Contractor Chandos Construction put its faith in the Edmonton

Branch metals group by offering Flynn the contract to supply and install the exterior façade on the new Cooling Plant project at the University of

Alberta. This large and somewhat complicated project features glazing, architectural louvres, metal cladding and Laminati wood panels.

‘COMPLEXITY’ THE WORD AT SARNIA BLUE WATER BRIDGE General Contractor McKay-Cocker Construction Ltd. selected the London Branch of Flynn Canada Ltd. to perform the roofing contract on this complex p ro j e ct in Sarnia, Ontario. After recently completing work on the London Recreation Centre the crew immediately left town to begin work on the Blue Water Bridge Authority Complex. The project consisted of more than 13,000 square feet of inverted modified bitumen roofing; more than 46,000 square feet of PVC roofing and 8,200 square feet of fully adhered roofing. In addition, almost 38,000 square feet of mechanically fastened PVC roof was laid by the experienced crews from London .The pro j e c t c o n s i s t e d of multiple roof levels and terraces as well

The metals employees who are doing a bang up job are shown above and consist of, from left to right; Jason Kehoe, Rock Langevin, Roddy Okimow, Tyler Vestby, Michel Jean, Scott McCurdy, Gerard Nixon, Jim Wade, Jason Fraser and Foreman Ardie Van Buuren. Keep up the good work, guys!

MEMBERTOU BUSINESS CENTRE HELPS AID SELF-SUSTAINABILITY

H

alifax Bra n ch Metals Foreman John Fleming and his crew are putting the finishing touches on the new Membertou Business Centre on the

M e m b e rtou Reservation in Cape Breton, Nova Scotia. The

p roject contract included more than 18,000 square feet of metal cladding, over 33,000 square feet of metal roofing and some 4,500 square feet of composite aluminum panels. Dora Construction is the General Contractor on the new re t a i l development which will help in keeping the Membert o u Reservation a self-sustained community. Pictured on site to the right, and from left to right, are Gerard McNeil, Foreman John Fleming and Cory Donovan. Missing from the photo are Mark Davidson, Harris Stubbert, Derek Legge, Corey Bradbury and Keith Boutlier. Nice work men! 10

as a fully adhered barrel roof. Shown above are the roofing employees who successfully completed the work and include from left to right Manual DaPonte,Daniel Bush, Eduardo Camara, Danny Camara, Antero Furtado and Foreman Jeremias Furtado. Great job, guys!


CREWS COMPLETE ENMAX DISTRICT ENERGY BUILDING IN DOWNTOWN CALGARY Calgary Branch Foreman Keith Foster and his crew are completing yet another successful composite panel and cladding project with Graham Construction & Engineering Inc. in the downtown area of Calgary. Metal crew members are shown on site and consist of, from left to right, A l D ow n ey, D e rek Dow n ey, Keith Fo s te r and J e re my Pe p p e r. Keep up the good wo rk guys !

HAMILTON PRESENTS 2009 SAFETY AWARDS

T

he 2009 Safety Aw a rds were p resented to H a m i l ton Bra n ch employees re c e n t l y. Pro d u c t i o n

Winners were Foreman Mike Rodrigues, Peter Bendyk, Gilberto Fernandes, Rui Limas, Jose Corderio, Joe Pereira, Stephen Lewis and Amadeo Lara. Sheet

Metal Winners shown above from left to right included G a ry Heap and B i l l Fi s ch e r. We congratulate all the winners on making sure everybody goes home safely after a day of hard work. Way to go, men!

OXBOW K12 SCHOOL – ANOTHER LEED PROJECT General Contractor Westridge Construction contracted the Regina Bra n ch to install appro x i m a t e l y 62,300 square feet of Soprastar white SBS high pe rf o rmance membrane system on this prestigious p roject which is seeking LEED cer t i f i c a t i o n . To get the pro j ect started, a Winnipeg crew led by Glen Ka u s was brought in. With numero u s roof areas on many diff e rent roof slopes, the p ro ject presented plenty of challenges. With about t w o- t h i rds of the vapor barrier in place, at Flash print time, crews still have a long way to go but a re confident that the project will be completed on time. Roofing Employees crew left to right are Chris Mikolowski, Stephen Sequin, Glen Kaus (Foreman), D a rren McLennan, Tom Watcher, and Wayne (Chico) Maki.

11


EV LOGISTICS NOT AN “EAVY” PROJECT Vancouver Branch was recently awarded a contract on the new EV Logistics project on the BC mainland. The company is constructing

SYSCO EXPANSION WAS A CO-ORDINATED EFFORT FOR SUCCESS

an integrated multi-temperature warehouse and transportation facility that distributes goods to 125 grocery stores throughout B.C. and Alberta. EV Logistics is the very first freezer building tackled by Beedie Construction and Flynn was chosen as their preferred contractor to supply and install the metal deck and 300,000 square feet of loose laid and ballasted EPDM roofing. Thanks to Ray Vincenzi (Superintendent, Roofing), Dave W (Foreman, Roofing), Annette Scarth (Project Manager, Metals), Christian Snead (Superintendent, Metals) and Brian Zahorejko (Foreman, Metals) for their close communication to maintain the schedule and kept the project running smoothly.

V

ancouver Branch Roofing successfully negotiated the roofing subcontract with General Contractor Wales McLelland Construction on the new Sysco Expansion in Vancouver’s lower

mainland. The new 120,000 square foot facility consisted of nearly

60,000 square feet of freezer building with an extremely tight schedule. But thanks to Superintendent Ray Vincenzi for coordinating the thre e p roduction crews on site including Lead Foreman Don Kri s te n s e n a n d his cre w, Foremen Alan Sorll and To ny Shorlemer ( f rom Kelowna Branch) and their crews, the company was able to meet the General Vancouver Branch roofing employees who installed the roof are shown above and include from left to right Marek Chudy,

C o n t r a c t o r ’s deadline. Roofing employees who perf o rmed the work are shown above and a re from left to right Phung Nguye n, Thinh Pham, Quang Thanh Tra n,

Johnny Nguyen, Percious Henderson,

M a rk Ke n n e dy, G u rd ev Chizar, F o re m a n Alan Sorre l, F o re m a n D o n

Tyler Manweiler, Robin Moench, Foreman

K ri s te n s e n, Te rry Stinson, Giang Truong Pham and Justin Dowd.

Dave Willey, Dave Duncan, Paul Duong, Carlos Gomez and Neil Saunders.

EXPERIENCE REQUIRED ON NORTH SIDE ELEMENTARY SCHOOL North Sydney, Nova Scotia will soon have a bright new addition to its school board with the opening of the North Side Elementary School. The Halifax Branch is completing the installation of 11,000 square feet of composite aluminum metal panels and 4,000 square feet of metal cladding. While working under contract with General Contractor Maxim Construction on the project, the Branch anticipates a successful completion in the very near future. Special thanks on this project go out to Robert MacKinnon, whose expertise was required to provide some tricky field dimensions for the panels. On site and pictured left, from left to right, are Foreman Fernando Richard, Gerard McNeil and John Fleming. Missing from the picture are Lester Carey and Harris Stubbert. Nice looking project, guys!!! 12


RE-ROOF COMPLETED AT NIAGARA PENINSULA ENERGY

G

eneral Contractor Engineering Concepts Niagara recently contracted Flynn Canada’s Hamilton B ra n ch to re - roof more than 10,500 square feet

on the Niagara Falls facility of the Niagara Peninsula

Energy Company. The project included a 4-ply built up roof system complete with the necessary ballast. The new roof was complicated by a tie-in to existing roofing on two sides. The project was overseen by Jocelyn Roof Consultants. Flynn crews, at the left, who performed the work included roofing employees from left to right Foreman Carlos Costa, Jose Leal, Antonio Lourenco, Jeremiah DeZeeuw, Carlos Graca, Hugo Costa and Agostino Medeiros.

CREWS ‘BRIDGE THE GAP’ TO R E - ROOF GIENOW W I N D OWS IN CALGARY The Calgary Branch was once again called upon by General Contractor and Roof Consultants Pro-Spec and ING Real Estate to help with a re-roof project for important customer Gienow Windows. In order to gain access to the roof area, the Calgary roofing team worked with the owner and Canadian Pacific Railways on this difficult project that had virtually no access. Eventually it was concluded that a bridge would have to be constructed over the existing CP rail line at the

GOVERNMENT OF CANADA BUILDING UNINTERUPTED BY RE-ROOF CREWS

F

ynn’s Moncton Branch was successful in securing this 9,000 square foot re-roof on the Government of Canada building in St. Stephen New Brunswick through SNC

Lavalin ProFac. Crews worked on the project while the building

was still occupied, being careful not to interf e re with staff operations at the facility. Foreman Graham Cole and his crew have been working hard through winter conditions to complete six different roof areas using a 2-ply modified roof system.

rear of the building to gain access to the roof and allow Mike Munro and his crew to perform the work. The 20,000 square foot built-up roof was completely replaced to the complete satisfaction of yet another Flynn customer.

Calgary roofing employees who performed this work are shown above and include, from left to right in the back row; Foreman Mike Munro, Brian Combden, Jim Munro, William Lavers and Bill Barry while Larry Hornby, Joseph Mattie and

Roofing employees to perform the work are shown from left to right and include Foreman Graham Cole, Jason Grasse, Dwayne Phillips and Patrick Nason. Missing from the photo is Dustin Jenkins. Great job guys!

Zdenek Nemek kneel in front. Well done guys! 13


LARGEST PROJECT TO DATE FOR VICTORIA BRANCH AT UPTOWN SHOPPING CENTRE

U

ptown Shopping Centre is the largest single project undertaken by the Victoria Branch. Along with

a significant flat roofing component, this

project includes 29,700 square feet of foam panel, 21,000 square feet of corrugated cladding and 30,000 square feet of Dry Design wall panel system. Flynn's contract for the above work is spread over 7 b u i l d i n gs with a second phase planned. Due to extreme site conditions some unique and innovative equipment had to be employed to aid in the installation of the horizontal foam panels. Our crews have dedicated many hours to this project both in training on the new equipment and working within an extremely tight construction schedule as dictated by General Contractor Vanbots Construction / Magil - Joint Venture. A joint-venture of crews from both Victoria and Vancouver created an awesome 30-person team. Flynn Lead Site Foreman Shawn Mason and crew foremen Kelly Brown, Uwe Krieger, Jason O'Hanley, Damian Nancarrow, Marco Taccarelli and Darryl Wallace have worked diligently to ensure all aspects of this demanding project are addressed with due diligence and professionalism. Their accomplishments to date will no doubt have some weight when the owner decides on the contractor for the next phase. The Flynn employees who worked on the project are gathered above and include: Standing Top Row: Shawn Mason, Mark Vandenberg, York Dennis, Sebastien Grenier, Aaron Andrews, Josh Stoesz, Matt Pringle, Albert Cotterell, Manfred Krings, Andrew the Crane Guy, Uwe Krieger, Pete Visscher, Rey Garcia, Grant Schwabe, Marco Taccarelli, Adam Hotti, Kyle Wakely, Derek Bargen, Dusty Maksymchuk, Dan Cavers and Gerard Lane. Kneeling Front Row: Micha Schaeffe r, Heinz Obermann, Damian Nancarrow, Jesse McRae, Wenefredo (Jun) Manzon and G a ry Stride. Missing from Photo: Jason O'Hanley, Markus Retzbach and Kelly Brown. Once again, our field staff shows their commitment and ability to maintain the highest quality output under difficult conditions.

LONG AWAITED BRANDON #1 FIRE HALL COMPLETE The Winnipeg Branch of Flynn Canada was awarded yet another contract from Bird construction on the long awaited #1 Fire Hall in Brandon, Manitoba. The project included a complex application of Swisspearl panels. Ryan Renout and his crew will take their experiences and lessons learned from the previous Swisspearl project at the Institute for Advanced Medicine at the Winnipeg Health Science Centre to install almost 20,000 square feet of Swisspearl on the new firehall. The Branch Metals employees who are performing the work are shown left and include from left to right Steven Nobiss, Brad Penner, Robert Ironstand, Dale Borrowman, Foreman Ryan Renout and Ben Henry. 14


CANA CONSTRUCTION COMMENDS FLYNN AT TAYLOR FAMILY DIGITAL LIBRARY

A

fter months of work, the Calgary Branch of Flynn Canada

Martin Behman, Robert Tyres, Kevin Brown, Buddy McGaffey,

is nearing completion on the TFDL project - one of the

Matt Franzen and Archie Campbell. Missing from the photo was

largest building envelope projects the branch has completed

Earnest Colson and Rainer Jacobs.

to date. As a result of the efforts of many, the following email was received by Project Manager Jon White from Pierre Champness of

Congratulations to the entire Flynn team both in Calgary and

Cana Construction Calgary.

To ronto for making this a successful roofing, panel and glazing p roject. EXCELLENT!

“To: Jon White Subject: TFDL Pre Glazed Envelope

But wait there’s more!

Good morning;

Below is another ‘Congratulatory” email received by Monty Hill of

Well the guys have just dropped the last panel into place on the

the Calgary Branch, from one of our panel suppliers regarding the

TFDL completing the major glazing install on the project. It is a

quality of the product’s installation performed by Cliff McIntyre’s

significant achievement for the TFDL, one we are all proud of. I just

crew.

wanted to take the opportunity to say “Thanks” for the hard work that has gone into getting us to this point. We have enjoyed working

“Monty,

with Flynn on site - specifically the site crew. Scott and you have

Confirming our site visit today with Ryley Koch and as I expected,

been key players in getting us to where we are today. It has been

the installation is perfect. Again the Calgary office of Flynn proves

an enjoyable project.

itself to be one of the best. I could not find a screw or joint out of alignment. Well done.

Thank you

Good luck with the rest of the project and thanks for making us

Pierre Champness”

look so good.

Glazing crews installed the pre-glazed 2500 series system while

Andrew Rogers – Sound Solutions”

holding the schedule and meeting all deadlines presented by Cana, the Construction Manager. The Calgary Branch is currently wrapping up the remainder of the interior glass contract as well as some minor items on the exterior. The project is an outstanding example of how a successful design assist project from start to finish can be achieved as well as a strong testament to establishment and maintaining of long-standing relationships with our customers at the same time.

Above is the Flynn crew who performed this installation. They include from left to right Foreman Cliff McIntyre, Tim Mack i e, The glazing crew, shown above, that completed the work included,

Stephan Fry, Landon Neufeld, Quinton McIntyre, Liam Boam,

from left to right, Foreman Scott Tanner, Rimantas Brazinskas,

Rhydian Davies and Jason Pike. Another well deserved “BRAVO!”

15


PARADISE ELEMENTARY SCHOOL – A HIGH POINT FOR ST. JOHN’S CREWS

S

MASSIVE ROOF REPLACEMENT AT REAL CANADIAN SUPER STORE The Calgary Branch of Flynn Canada Ltd. was successful in negotiating a contract tendered by owner, the Loblaws Group, for the re-roof of their store

t. John’s Branch was selected by General

on McLeod Trail South West in Calgary. The work was overseen by the IRC

Contractor Olympic Construction as their

Building Group and called for a complete replacement of the 157,825 square

preferred roofing subcontractor to install a 2

ply MB roof to the new 40,000 square foot Paradise

foot EPDM roof system originally constructed in 1988. A Flynn crew led by Paul L e ger tackled this sizable re-roof project and battled through the elements to

Elementary school. Will Kennedy and crew worked

install an insulated SBS system. The work was done without any disruption or

hard through the winter months on the project that is

inconvenience to the many thousands of customers who frequent this location.

located on a high point of land, where the wind is a constant foe. However the men persevered and did a great job!

Roofing Employees responsible for the successful completion are shown above on site and include from left to right Jonathan Stagg, Lance Wicks, Foreman Will Kennedy, Zeb Waldner, Mike Carlson and Mike Saunders.

Calgary Branch roofing employees who performed the work included from left to right Fern Melanson, Kurtis McKenlay, Gerret Jensen, Matt Richard, Re i n h a rt Hoenacke r, F o re m a n Paul Lege r, M i ke Lege r, Ethan Dang a n d Don Boyc e.

CREWS TAKE CHARGE AT EDMONTON REMAND CENTRE

A

s re p o rted in the last issue of the Flynn Flash, the Edmonton Branch of Flynn

Canada successfully negotiated the entire building envelope contract for the new Edmonton Remand Centre project with Edmonton based General Contractor Stuart Olson. The multi-scope

contract includes metal panels, cladding, glazing and roofing with a schedule that is expected to be c o m p l e te in 2012. Currently all hands are on deck as crews, from all four disciplines, are seen on-site left including, from left to right, Kirk Brown, Mike Wiggins, Skyler Lovelock, John Burrell, Brian Andres, Mathieu Page, Dan Pearce, Sam Larone, Mike N. Johnson, Tobias Robinson, Jason Andres, Andrew Kinsman, Kelly Schmuland, Rob Leitch and Terry Pitts. 16


CENTER FOR MOTHER BABY CARE AT REGINA GENERAL HOSPITAL

G

eneral Contractor PCL Constructors Canada Inc. selected Flynn’s Regina Branch as their metal wall

subcontractors on this prestigious new facility.

With some help from Edmonton the Branch was able to complete its work in a timely fashion so other trades could continue with their work. Metal employees who worked on the project are shown right from left to right Eric Brass, Jon Pelle t i e r, Glenn Hobre g Ryan Camero n. Missing is Spencer Saye r. Thanks to Edmonton workers Keith Bake r, D a ve Geddes, James Grodin and Dan Prefontaine.

Then it was on to yet another phase of the ongoing work at Regina’s main medical facility as ro o f i n g crews laid approximately 10,000 square feet of new and re - roof EPDM. Foreman Rob Jo h n s to n and his c rew have been on and off the site on a number of occasions over the past two years. One of their challenges has been dealing with the ever changing weather with snow and ice every w h e re. It was a l o n g time coming but crews could finally see the end in sight. Shown left is the Regina roofing cre w responsible for completing the work. From left to right, are B rad A rt h u rs o n, Ryan Fi n l a ys o n, M a tt M a rt i n, Jason Callow and F o re m a n Rob Jo h n s to n. Thanks fe l l a s !

MCMASTER-DEGROOTE SCHOOL OF BUSINESS INTRODUCES THE NEW RON JOYCE CENTRE The Hamilton Branch was successful in negotiating the roofing contract with General Contractor Cooper Construction on the new and highly prestigious Ron Joyce Centre at McMaster’s Degroote Business Centre. The LEED certified project, named in honour of area entrepreneur Ron Joyce, of Tim Horton’s fame, consists of more than 20,000 square feet of new roofing. The contract is split into three parts including almost 13,000 square feet of 2-ply modified bitumen on a concrete deck, 5,400 square feet of 2-ply mod-bit on a metal deck and 2,000 square feet of inverted 2-ply mod-bit on several balconies. Roofing employees who performed the work are shown right from left to right and include Foreman Peter Costa, Jun Palma, Welson Carvalho, John Barbosa, Ryan Iniba and Jose Melo. Good job, men! 17


ST. JOSEPH PRINT PROJECT A LOGISTICAL CHALLENGE

T

oronto Branch Roofing Division were contracted to remove more than 180,000 square feet of EPDM roofing and replace it with a new 4 Ply roof over some of one of the largest

p r i n t i n g presses in To ronto. No dust or debris is allowed to fall as this could spell disaster for the presses below. The logistics and

co - o rdination of this immense challenge has been handled a m a z i n g l y by the Flynn crews. The installation of tarps and roofing

is going without a hitch with no incidents or accidents to date. Roofing Employees who performed the work included, from left to right C h ris DaSilva, Billy Hutchinson, Owen Doucette, Wayne Moniz, Francisco Ondas, Filipe Cunha, Robert Hann, Luis Devezas, Jorge Figueiredo, Robert Hann, Martinho Meireis, Fernando Celestino, Jamie Francisco, Manuel Ondas, and Foreman Martihno (Chico) Ondas.

WINTER IN WOODSTOCK ONTARIO DIDN’T ‘SNOW DOWN’ THIS CREW!

The London Branch of Flynn Canada Ltd. was selected recently by General Contractor Ellis Don Construction to supply and install a new roof at Woodstock General Hospital. With many challenges ahead, Foreman Rui Medeiros and his crew took on this difficult project, again, smack in the middle of Southern Ontario's snow-belt. The pressure was on to get the building watertight as snow began to hit the area. The Hospital project, seeking LEED certification, consisted of more 116,000 square feet of a hot-applied 3 ply roof system with calcite aggregate into the adhesive. Flynn employees who completed the work include from left to right, standing; Rui Medeiros, Jansen Eichler, Nathan Medeiros, Jeff Gare and Rob Monk. Those kneeling, from left to right, are Jeff Mowry, Gord Dennis, Sergio Martinez and Kenny Williams. Keep up the great work, guys!

ECOLE SAINTE THERESE – A GREEN, LEED INITIATIVE

T

he M o n c ton Bra n ch was awarded the 32,000 square foot new 2-ply modified roofing contract on this modern, new phase 2 facility. Our roofing crew endure d the harsh winter conditions to keep this project moving along and on schedule. As part of the Government of New Brunswick's Green Buildings Program, the improvements at École Sainte-Thérèse have been designed to achieve a LEED Silver rating. General Contractor Foulem Construction oversaw the work. The Branch roofing employees who completed the work are shown right and include from left to right Martin Bourque, Norm Cyr, Allain Bouchard, Yves Robichaud, Foreman Roger (Manou) Leblanc Jr., Roger LeBlanc Sr. and Pierre Breau. Thanks for all the hard work and dedication to get this job done guys!

18


6 YEARS AND COUNTING AT PARKSIDE EXTENDICARE

A TRUE ‘BUILD,THEN DESIGN’ PROJECT

Over the past 6 years, Regina Branch has acted as General Contractor on this project as crews have been performing roofing work section by section. The building has had its own issues as crews remove a Stramit decking with a drywall ceiling only inches below. With care and caution, crews installed approximately 7,500 square feet of re - roof using Soprema's high perf o rmance SBS system as well as a new 3/4 " plywood deck. Slow and steady and with years of experience has helped the Branch successfully complete the various phases.

An Edmonton Branch roofing crew is seen above on the site of the new hospital in Fort Saskatchewan, Alberta. Ellis-Don Construction Corporation awarded Flynn the 95,500 square foot roofing contract be f o re most of the drawings were even complete. The 2-ply SBS project is seeking LEED Silver certification and required the installation of the new Soprastar (white reflective) cap sheet. Even the large mechanical units covering over 5,500 square feet, with breezeways in between, will be covered in this reflective cap sheet. An extra effort had to be made to get the roof watertight over the

Regina Branch roofing employees who performed this years’ work include from left to right Russell Pine, Darren Ironchild, Foreman Perry Morrisseau, Brian Manhas, Albert Belhemeure and Donald Obey.

winter. Not only did Tom Little and his crew impress Ellis Don with their rates of production, but he was also awarded the Annual Safety Award for Roofing! From the start, a true - Build; then Design, project!! Great job Tommy and well deserved fellas! Tom’s roofing crew is shown above and consisted of, from left to right, back row Jeff Whalen, Denis Cote, Pierre Beauregard, Gord Suvee and Foreman Tom Little. The front row has Kevin Sunshine, Wade Gallant, John Clow and Tanisha Clark.

KEN LITTLEPROUD RETURNS TO SCHOOL

W

hen Lake Cowichan Secondary School needed a seismic upgrade and envelope remediation, who better to call than Roofing Superintendent Ken Littleproud from the Victoria Branch? Ken actually worked on the school as an apprentice in 1991 during his first years with Armour Roofing and Sheet Metal prior to its purchase by Flynn Canada Ltd. Things have come full circle as Ken is now the superintendent managing three disciplines for us. Waterproofing, built in gutters and 2-ply SBS flat roofing were installed by Roofing Foreman Jack Marsh and his crew of Nick Wilson, John Kulczycki, Ron Hill, Jim Muir and Geoff Myers. Metal fascia panels, metal wall cladding, and standing seam metal roofing was installed by Sheet Metal Foreman Sean Williams and his crew shown right from left to right including Derrick Wilsher, Doug Jackson, Nick Wilson, Glyn Williams, Sean Williams, Jack Marsh and Derek Matthews. Asphalt shingles were installed by Shingle Foreman Dean Craggs and his crew of Jordan Cooke and Brian Aitken. The project is under the direction of Yellowridge Construction Ltd. and RDH Building Sciences. Due to the nature of this project it requires a great amount of teamwork throughout the disciplines and this project would not have been a success without the crews working together. Way to go, guys! 19


2009 OTTAWA SAFETY AWARDS PRESENTED Ottawa Branch Safety Awards for Ottawa Production roofing

recipients of these 2009 Awards. On the same note Luc made

were handed out recently and winners included Foreman Al

special mention of the fine job the entire Ottawa Branch has

Ouimette, Pam Ouimette CHSR, Marcel Larocque, Gilles

done in achieving outstanding safety performances for 2009.

Lavoie, Jeff Nelson, Eric Gauthier, James Bourgoyne

Moving forward with Flynn’s dedicated safety culture, Luc is

Service, Dave McIsaac, Foreman Keith McLean, Ken Roy,

confident that this branch, as a Team, will bring safety to next

Hector Prevo s t, Rick Carrière, Sefton Brown, WSIB certified

level. “Prevention” is always the key word! Let’s all have a safe

CHSR, Jason Flanagan Metals, Paul Boucher, Ross Kenney

and Healthy year 2010. Everyone’s goal - zero incidents!

and Hugh O`Donnell. Luc Guilbeault congratulated all

EDMONTON EMPLOYEES RECEIVE SERVICE AWARDS

E

dmonton Branch Manager Fred Thom (left in left, middle, right below) and Roofing Superintendent Fred Kucher (right, left and middle below) offer their congratulations to Roger Farkes (middle, left) and Tom Farkes (middle below) in recognition of their 20 years of service with Flynn Canada Ltd. Edmonton Roofing.

Fred Thom also presented a 10 Year Award to Robert Parsons (below right). Congratulations to all!

CONGRATULATORY NOTES And talking about good work, the following is an excerpt

lot about your company and shows the true measure of customer

f rom a letter that was recently received by E d m o n to n

service one can expect when engaging your services.

Branch Estimator D a ve Murp hy f rom the City of We t a s k i w i n , Alberta.

I have enjoyed our dealings to date and look forward to continued dealings in the future. I would not hesitate to re c o m mend your Company and services.

“Re: Wetaskiwin Curling Rink

Sincerely,

I would like to take this opportunity to thank you and Flynn

Rick Stasiuk

Canada Ltd. for standing behind your work and your commit-

Facilities Foreman

ment in providing superior customer service.

City of Wetaskiwin”

In this fast paced world you rarely find a corporation that would come to the plate after 7 years had passed. This says a 20

Now that's what it's all about! Great job, people!


ANOTHER GREEN PROJECT AT DALHOUSIE UNIVERSITY FOR FLYNN

DALHOUSIE’S LIFE SCIENCES RESEARCH INSTITUTE – ALSO A FLYNN PROJECT The Halifax Branch was also awarded yet another contract at Dalhousie; this one with General Contractor PCL Constructors Canada Inc. The Branch has already started supplying and installing composite metal panels on the University’s Life Sciences Research Centre. There are some 38,000 square feet of panels and 19,000 square feet of metal cladding. The building is slated to open in 2011.

G

eneral Contractor AECON chose Flynn Canada’s Halifax Branch to participate in a unique and technologically advanced project at Dalhousie University. The aging campus buildings are slowly but

surely being replaced by modern and efficient structures and one of these is the new Academic Building. The structure will house such faculties as the School of Social Work, Computer Science Labs and the Campus Computer Store. As a Green project, the building will boast some of the most leading-edge resource saving products available. And that’s exactly where Flynn comes in. In addition to approximately 3,000 square feet of cladding, there is some 2,700 square feet of Solar Wall, a cladding system that harnesses the energy of

Robert MacKinnon and his crew proudly stand in front of the approved mock-up for the panels, and now have the green light to proceed. Pictured, from left to right, is Robert’s crew consisting of Clayton Organ, Adam Kelly, Mark Davidson and of course Foreman Robert MacKinnon. Missing from the photo is Mike Kenney.

the sun and uses it to heat the interior of a building in winter and helps cool it in summer. This of course will help reduce heating and cooling costs and energy consumption. Our crew, about to begin the installation of the Solar Wall, is pictured above from left to right including Matthew Splett, Jared Swinemar, Foreman Brian Decker and Jeff Doane. This high profile project is expected to be ready for occupancy in September. Good luck, guys!

VANCOUVER’S HISTORIC UNITED ME MORIAL CHURCH

T

he Vancouver Branch Roofing Division was recently awarded the re-roof contract on the 88 year old Canadian United Memorial Church. A complete set of scaffolding including a temporary roof was installed for ease of access and to protect this historic church. The work consisted of removing and handling the 88 year old asbestos tiles with continuous air quality testing to insure safe working conditions. More than 10,400 square feet of shingles on the pitched roof were installed. In addition more than 800 square feet of 2 Ply SBS

flat roof was laid and all new flashings had to be supplied and installed as well. Roofing Employees who performed the work included, from left to right, Rene Pastor Castro, Eddie Temones, Foreman David Hood and Isidro Bautista Ojendiz.

21


IN THE HEARTLAND OF THE SNOW BELT CREWS TACKLE LOBLAWS JOB The London Branch Service Department was recently selected by General Contractor IRC Consultants to take on a 9,000 square foot total replacement roof in Petrolia, Ontario. Showing a great patience to get to the site, approximately 90 minutes west of the London Branch shop, crews had to travel through the heart of one Canada’s toughest snow-belts! Led by foreman Eddy Medeiros, the whole crew worked together to complete five diff e rent roof sections in splendid fashion. The Service Employees, shown right, who performed the work included, from left to right, Eddy Medeiros, Matt Regier, Tom McHugh, Chris Mcburney and Gerald Gowers. A job well done indeed!

OTTAWA BRANCH EMPLOYEES ATTEND ROOFING COURSE

O

ttawa Branch employees Jitka Rezacova (Roofing Estimator) & Laura Busby (Branch administrator) attended an intensive 1 week course that examined various new and old types of roofing systems.

The Class instructor George Wilson gave hands-on demonstrations of all types of roofing systems complete with inspections, cut tests and membrane examinations and proper repair techniques. Other participants who attended are shown below from left to right. Back Row: Nick (Hydro),Mark Nederland (RMIS), Andy, Rob Hitchon, George Wilson (Cindott), Jitka Rezacova (Flynn), Roni George (Soprema), Peter Zahradnik (Bldg.Env.Tech.). Front Row: Steve Lucas (DEL), Frank Cabral (Atlas),

La u ra Busby (Fly n n ), Matt (Hydro), Gus, Gord Bendus (Banerjee & Assoc)

22


SIMON FRASER UNIVERSITY CONVOCATION HALL

G

eneral Contractor Manley Construction awarded the Vancouver Branch Service Department a special project for Simon

Fraser University. With the project duration of a couple of months, some logistical hurdles had to be overcome.

Co o rdination of the work with the University was n e c e s s a ry as concerns over the odours from our kettles that had been set up onsite as well as pedestrian access through the worksite had to be addressed. Work included tearing off the old membrane down to the concrete underneath, mopping down TRA sheets, then capping off the system with wall flashings and termination bars. The job was completed in a timely manner and the Branch looks forward to dealing with the University again in the near future.

MINE SITE PROJECT AT MOSAIC POTASH TURNS THE CORNER

T

EXTRA MAN SAVES TIME AND MONEY

he Regina Branch successfully negotiated the contract with General

The Moncton Branch Service Department

Contractor JV Driver to supply and install approximately 2,200 square

reported to site to investigate a collapsed

feet of new SBS roofing on this Saskatchewan mine site project for the

section of roof at the Connors Brothers plant

138 KV sub-station at Mosaic Potash. Working at any mine site can be trying

in Blacks Harbour, New Brunswick. On their

and from the start there were delays in getting the project off the ground. Once

way, the crew, led by Foreman Terry Walker

the delay issues were sorted out and crews got rolling, it didn't take long to

stopped in Saint John to pick up some extra

complete the membrane on the project.

manpower. The Production department kindly loaned the help of Dustin Jenkins so that the service department could get their project completed in one day. The men removed a section of collapsed insulation and decking, replaced the deck and installed new insulation and cold applied built-up roof. The repair was a success and the plant was able to keep their main p roduction line running.

Above Terry Walker is shown working on the repairs. Not in the photo were Dustin Regina Branch roofing employees are shown above from left to right and include Dave Denis, Foreman Adrian O'brien and Luke Elles. Nice job crew!

Jenkins and Trevor Arbeau. Nice work Terry, Trevor and Dustin! 23


PARADISE TOWN HALL NEXT ON THE LIST

S

t John’s Bra n ch Service employees B rian Hendry, left and Justin Foss, right can be seen right installing metal flashings to a difficult to access roof on the new Paradise Town Hall. The initial specifications

called for a torch applied system on the wooden canopy, but Flynn was

s u c c e s s f u l in changing it to a fully adhered EPDM, pointing out the obvious safety issues. General Contractor Redwood Construction oversaw the work. Great thinking guys! Safety First!

WHAT WOULD WE DO WITHOUT THEM? Halifax Branch Metal Shop employees shown left from left to right Shawne Bowers, Kevin Ingram (FSF) and David Bowers (Shop Foreman) have had an extremely busy year. Once again special thanks go out to our shop /yard crew who look after all the needs of the metals, roofing and service division crews, along with the flashing requirements of our Moncton Branch. David and Shawne are always busy fabricating bars and flashings and Kevin continues to deliver materials to our sites in a timely m a n n e r. When not on the road, Kevin takes care of the yard and the fleet of v e h i c l es for the Branch. Thanks for the g reat wo rk people – we all appre c i a te your effo rts!

MONCTON BRANCH HOSTS SOPREMA SERVICE TRAINING

T

he Atlantic Provinces kicked off the New Year with cold applied training by Soprema. Service technicians

from the three Atlantic offices attended the event in the Hub city. The training was a definite hit and the men gained a lot of “Cold Applied” knowledge with both

c l a s s ro o m and hands on training. Some of the roofing employees who attended are shown right and include from left to right Jenita Jarvis, Paula Webber, (unidentified), Alex Mattie, Leo Cormier, Dennis Cormier, Jesse Bunyan, Dean Snow, Allan Brush and Charles P h i l b e rt of Soprema. Thanks to all the attendees for a positive and professional attitude towards this important training session. 24


TOUGH ACCESS AT AUTO EXCELLENCE Toronto Branch roofers meet challenges

SAFETY FIRST AT RIVERVIEW PARK ELEMENTARY SCHOOL

on every job, but the main issue on this one was access. With the site being on a school property, there was virtually no room to set up or store anything – except on the roof. All materials or equipment that came to site had to be hoisted to the roof immediately upon arrival making this area extremely congested. All other trades had to use the roof as well including Flynn’s own glazing division. Trade crews had to work very closely together to co-ordinate their efforts.

V

ancouver Branch Service has recently completed a special and difficult re-roofing project on the mainland. Crews needed to work off scaffolding and under hoarding around Riverview Park Elementary School as they removed the old EPDM gutters.

They then re-installed new TPO membrane and more than 900 lineal feet of new metal fascia

Above are Toronto Branch roofing

flashing. Under Darren Matherson's supervision, the crew completed the job in good time

employees, from left to right, John Tabares,

while maintaining safety around the children. General Contractor on the project was Peak

Harvey Hann, Kevin Germaine, Foreman

Construction. Service employees who performed the work are shown above and are from left to right

Frank Kraus, Travis Hann and German Rodriguez who installed the more than 40,000 square feet of 4 ply built up roofing. Good job, people!

Julio Hernendes, Supervisor Darren Matherson and Terry Dondaneau. Earl Anonby, not in the photo, did his usual great work installing the custom metal fascia. Thanks guys for all your effort in bringing this challenging project to completion.

SAINT JOHN HOSPITAL PHASE 5 Moncton Branch roofing crews have worked hard through the winter months to complete this 40,000 square foot project. When Avondale Construction called on Flynn to accelerate installation of the roof, Halifax Branch did not hesitate to help Moncton's forces with a roofing crew to meet the general contractor's construction schedule. Once the final touch-ups have been completed, the Moncton crew will set-up on another ro o f i n g p ro j e c t , which is located on the same site! Moncton Branch roofing employees who are on site include from left to right Steve Hilliard, Chris Moore, Jim Gillies, Paul Harron, Randy Taylor and Foreman Roger Savoie. Keep up the good work guys; you'll be off that site someday! 25


SOPREMA TRAINING DAY IN SASKATOON

SASKATOON FIREHALL # 8 – A DONE DEAL Saskatoon Branch was successful in obtaining the subcontract to supply and install more than 3,400 squ a re feet of hidden fastener cladding and an a d d i t i o n a l 6,400 square feet of corrugated metal cladding on this project. In addition crews installed m o re than 9,700 square feet of Bueskin SA vapour barrier and Styrofoam SM insulation.General Contractor on the project was Quorex Construction.

S

askatoon Regina Branch Service employees are seen above on a cold January day participating in a Soprema training day on all phases of torch-less field applications. Attendance was great and the personnel

showed a great deal interest and participation.

From left to right, Metals employees Frank Bond, Brad Turner and Ross Edwards are shown on site.

A BEHEMOTH ROOF ON SHOPPERS DRUG MART CORNWALL

T

he Toronto Ottawa Branch Roofing Divisions began this

project in January and is projected to complete the work early in the spring. The project is an excellent example of teamwork as Toronto and Ottawa crews work together on the 550,000 square foot mechanically fastened TPO behemoth in Cornwall, Ontario. The lead foreman is Luis Martins, a master applicator, and his 10 man crew, are working alongside the 5 man crew from Ottawa led by foreman Aaron Cri b b. Despite the winter elements, they push

26

forward to complete this major project - as one. As long as our men continue to make safety our first priority we can accomplish any task. Above are Toronto Branch roofing employees, from left to right, Johnathan Aragon, Pat ONeall, Greg Phillips, Adam Cooper, Toronto Foreman Luis Martins, Marco Adriano, Mark Martins, Manuel Neiva, Jose Lima Sr., Victor Modesto, Fred Deira, Pedro Soares, Ken Thomson, and Jose Lima Jr., Ottawa Foreman Arron Cribb not in photo. Great job guys!


CONGRATULATORY NOTES

I

t ’s always nice to be recognized by customers for the efforts put forth by employees of Flynn. You may recall that in a previous Flynn Flash edition we featured the work performed

by our crews at the Vancouver International Airport that had an extremely ag g ressive schedule. Well those efforts did not go un-noticed as

Ken Smith from the Vancouver Branch Metals Division re c e i v e d the following ‘Letter of Thanks’ from General Contractor PCL Constructors Canada Inc. It read: “Dear Mr. Smith: PCL would like to take this opportunity to express our appreciation for the outstanding contributions of your team on the YVR Pier C Expansion project. Your team’s commitment to the project was consistent with PCL’s vision of aspiring to provide excellence, l ead e r s h i p and unsurpassed value to the Owner. The efforts of your project team towards completing the Dry-Design panels and cladding associated with the YVR Pier C Expansion project were greatly appreciated. Your site supervisor, Matt Pringle, consistently demonstrated a proactive approach during all phases of the project and this contributed to its successful completion. We look forward to future opportunities where your company employees can be a part of our team and, as such, we would not hesitate to recommend your company to others at PCL in the future. Thank you again for your hard work and dedication. If there are any questions please do not hesitate to call the undersigned. Yours truly, Melissa Houle Project Manager PCL CONSTRUCTORS WESTCOAST INC.” Congratulations to all those who participated in the success of this airport project! ‘Congratulatory’ emails were also received, first from Michael Katz, Architect and secondly from Jerry Kammermayer, Project Manager at Ledcor Design-Build (B.C.) Inc. on a project called L41 Home For All and read as follows: “Dear Blake, Now that the prototype of L41 is safely settled in its temporary home at Concord Place, Janet and I want to invite you to visit us. But first, we want to thank you so much. You and your i n c redible Company, Flynn Canada, have been genero u s beyond generous in what you have donated, organized and done. Your unfailing support, generosity and graciousness has touched us more than we can properly express. The quality of your materials, workmanship and attitude of all the people who helped put everything together was simply of the very highest order and just never ceased to amaze us. Flynn Canada has raised the level of L41 to new heights. Please give a special thanks to Azmir and his great Zinc team. Your Glass Team also did an astounding job and my next email will be to specially thank Brian for that…………….. Kind regards, Michael Katz”

From: Jerry Kammermayer “Well, WE MADE IT!!!........YOU MADE IT!!!” It goes on to say……. “To simply say "Thank you" to all of you who have made the L41 house possible seems woefully inadequate. The response that you've made and the generosity of your donations of time, money and expertise is truly amazing. Without your generosity and hard work this project could not have been achieved.” Further it read……. “On a personal level, it was a joy for me to work with each and every one of you. This project was certainly different from most, from the contractual arrangements (there really weren't any besides handshakes) to the financial arrangements (there weren't many of those either besides generosity) all of you pitched in to provide your particular expertise to the effort. I think you all deserve to be proud of what you do and proud of what you have contributed to this project and to society. Hopefully this project will inspire others to contribute their special expertise and their special efforts to making this world a better place to live. Like you did. And now your work is on display for the World to see. The work and ingenuity of Canadians!! The work and ingenuity of skilled craftspeople, suppliers, consultants, business owners and concerned citizens.” Jerry Kammermayer, These are the effo rts that separa te Flynn Canada from the c o m p e t i t i on……Congratulations All! 27


Turn static files into dynamic content formats.

Create a flipbook
Flynn Flash 2010 Vol. 2 by Flynn Group of Companies - Issuu