Skip to main content

Amenity solutions

Page 1

Amenity solutions

1


2


Table of Contents About Fleetwood Australia

5

How we reduce build time

7

Advantages of Modular

8

1. 6x3 Female and male toilet

11

2. 6x3 Male toilet

13

3. 2.5x3 Accessible toilet

17

5. Standard amenities block

18

6. 6x3 Changeroom

20

7. 12x3 Changeroom

23

8. 12x3 Female and male changeroom

24

9. 12x6 Female ablution changeroom

27

10. 12x6 Male ablution changeroom

28

11. 12x9 Changeroom complex

30

12. Case study: End of Trip facility

32

3


600+

EMPLOYEES

AUSTRALIAN SUPPLY CHAIN

4

55+

YEARS EXPERIENCE

LARGEST MANUFACTURING CAPACITY

ASX

LISTED


About Fleetwood Australia Fleetwood Australia offers innovative solutions to address community needs head-on. For over three decades, we have been at the forefront of delivering prefabricated amenities that contributes to an efficient and effective network of quality and accessible facilities that is essential to the health, social and economic wellbeing of communities. As a trusted partner of the public and private sector, we understand the importance of designing and delivering smarter, purpose-built spaces. Our range and capability include permanent and temporary modular toilets, ablutions blocks, amenities, and changing rooms. With manufacturing facilities across Australia, we offer clients certainty, ensuring our tailored solutions meet timelines and budgets. At Fleetwood Australia, we take pride in leading the way in providing safe and healthy built environments for communities nationwide. Whether it’s accommodating changing demographics or increasing population growth, we have the expertise to deliver highquality solutions. Ready to explore how our solutions can meet your specific needs? Contact us today at 1300 132 272 or via sales@fleetwood.com.au.

5


6


How we reduce build time by up to 50%

Traditional construction

Site set up Planning and design

3

6

Foundations

Handover

Onsite construction

9

Construction over-run

Offsite manufacturing

on

tallati ns

ns

un

2

Faster delivery

3D volumetric 4

20 - 50% faster

On

d atio

3

e

1

Traditional

M an ufa ctur

Plan ni

an d d

esig n

ng

O ffsite

months

site i

Fo

1

2

3

4

In-house architects expedite upfront design process, design phase shortens as designs are repeated

Offsite manufacture begins in parallel with foundations

Enhanced productivity in factory allows fast module build 20 – 50% faster

Fast assembly because no MEP and finishing personnel required

Source: McKinsey & Company Modular construction: From projects to products, June 2019

7


Advantages of modular over traditional construction

8

Faster delivery Our modular buildings are manufactured and delivered up to 50% faster than traditional construction methods

Eco-friendly Our solutions are environmentally responsive, producing less waste and lower carbon emissions

Non-disruptive Our smaller construction footprint require less space for workers, heavy traffic and material storage resulting in less noise and air pollution and disruption to the community

Quality control Our buildings are manufactured in a protected and controlled factory environment

Cost-effective Save money from shorter construction time and reduced labour costs

In-stock and ready to go With seven factories across Australia, our buildings can be easily delivered and installed to cater to growing populations


9


10


1. 6x3 Female and male toilet

A

B 6000

1

3000

Specifications: 6m x 3m Female and male toilet

C

FEMALE

MALE

C

2

B

COATES HIRE - 6.0m x 3.0m MALE / FEMALE TOIL PROJECT NO.:

PROJECT CLIENT

J004278-02

SA CAPEX

11 PROJECT STATUS

PROJECT ADDRESS:


A

A

A

A

A

2. 6x3 Male toilet

A

B

3000

6000 ?

Specifications: 6m x 3m Male toilet

MALE

1

FW FW

A

A

A

A

A

FW

50 Litre HWS

C PTD C

C PTD

3000

2

FW ?

MALE FW

50 Litre HWS

2

12

C PTD C

C PTD

FW


13


14


TWC-01

DISABLED TOILET SUITES CAROMA CARE 800 CLEANFLUSH WALL FACED SUITE WITH BACKREST AND CARAVELLE CARE SINGLE FLAP SEAT CARE 800 BACK ENTRY CISTERN 4.5/3L, CONCEALED 'S' TRAP CARAVELLE CARE SINGLE FLAP SEAT 'BLUE' OR EQUIVALENT

TMV

TOMSON THERMOSTATIC MIXING VA MIXING VALVE SET TO 43°C +/- 2°C, F IN WALL WITH S/STEEL HOUSING AND S/STEEL COVER

XPA-01

PAPER TOWEL DISPENSER METLAM ML727W_MKII WHITE POWD SLIMLINE DISPENSER

3. 2.5x3 Accessible toilet Specifications: 2.5m x 3mB DDA compliant accessible toilet

A

B

2500 EQ

1

EQ

EQ

WASTE P.O.C. WATER P.O.C.

3000

EF

400

EQ

THD

2

3 A03.01

ELECTRICAL LAYOUT 1 : 50

15


16


4. 8x4 Custom DDA compliant toilet block 1

2 8148 OVERALL LENGTH

RAINWATER TANK

Specifications: 8m x 4m plus ramps Accessible toilet Unisex toilet Female and male toilets

C

AMBULANT / STAFF

CLEANERS ROOM

STUDENT WC 1

2 m² FVI

STUDENT WC 2 2 m² FVI

2 m² FVI

UNISEX ACC WC

3930

2 m² FVI

11 m² FVI

B

VERANDAH 13 m² FTM-02

A

UP

UP

UP

PROJECT NO.:

PROJECT:

J003252

KAPUNDA HIGH SCHOOL - TOILET BLOCK

PROJECT STATUS

SHEET

MARKETING PLAN

AS BUILTS This document and any of the documents ’ information, ideas and concepts are the property of Fleetwood Australia and may not be used, copied or reproduced without express written permission. © Copyright Fleetwood Australia. All rights reserved. ABN: 78 114 678 349

GENERAL NOTES

1

ISSUED FOR CONSTRUCTION

NO. DESCRIPTION

03/08/22

DATE

AS

BY

KJ

CHK'D

1. ALL DIMENSIONS TO BE VERIFIED ON SITE PRIOR TO COMMENCEMENT OF WORKS. 2. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE DRAWINGS. 3. READ IN CONJUNCTION WITH OTHER DRAWINGS, SPECIFICATIONS & CONSULTANTS DOCUMENTATION. 4. REFER ANY DISCREPANCIES IMMEDIATELY TO THE DESIGNER & AWAIT WRITTEN INSTRUCTION.

PROJECT CLIENT

PROJECT ADDRESS

DEPARTMENT FOR EDUCATION

WEST TERRACE, KAPUNDA SA 5373

DRAWN

MC

CHECKED

SCALE

Checker

1 : 50

DRAWING NO.

SIZ

A3

RE

A00.04

DC SIGN OFF:

C:\Users\MariliaC\OneDrive - Fleetwood Corporation Ltd\Documents\J004028_Lake Wangary PS Toilet_B1_AR_non conforming_R22_detached.rvt

17


5. Standard amenity facilities Specifications: 8.6m x 4m Accessible toilet Female and male toilets

A

B 8860

1

4000

ACCESS TOILET A

FEMALE TOILET B

MALE TOILET C

2

A

B 8400

1

FEMALE TOILET

MALE TOILET

3600

A

B PROJECT NO.:

QUOTE NO.:

PROJECT:

JXX01_02

JXXXX

1 MODULE MALE / FEMALE / ACC AMENITIES

PROJECT STATUS

PRELIMINARY Level 3, 246 Bourke Street, Melbourne VIC 3000 | (03 8600 1800)

PROJECT CLIENT

PROJECT ADDRESS

This document and any of the documents ’ information, ideas and concepts are the property of Fleetwood Australia and may not be used, copied or reproduced without express written permission. © Copyright Fleetwood Australia. All rights reserved. ABN: 78 114 678 349

DEPARTMENT OF EDUCATION AND EARLY CHILDHOOD DEVELOPMENT

VICTORIA

GENERAL NOTES

NO. DESCRIPTION

Specifications 8.4m x 3.6m Accessible toilet Female and male toilets

18

DATE

BY

CHK'D

Autodesk Docs://FWD_Standard Offer Projects_R2022/JXX01_01 - MALE_FEMALE_ACCESS - AR_R22.rvt

2

1. ALL DIMENSIONS TO BE VERIFIED ON SITE PRIOR TO COMMENCEMENT OF WORKS. 2. USE WRITTEN DIMENSIONS ONLY, DO NOT SCALE DRAWINGS. 3. READ IN CONJUNCTION WITH OTHER DRAWINGS, SPECIFICATIONS & CONSULTANTS DOCUMENTATION. 4. REFER ANY DISCREPANCIES IMMEDIATELY TO THE DESIGNER & AWAIT WRITTEN INSTRUCTION.

NORTH


19


6. 6x3 Changeroom Specifications 6m x 3m Shell

LEGEND A

B 6000

1

PROJECT

132 WARREN RD, SMITHFIELD TEL: 1800 217 131 FAX: (02) 8718 2599 www.MBS.com.au

2

20

B60 -2164 6X3 NSW D: (02) 8718 2500

SIGNATURE

3000

CLIENT APPROVAL

NAME ................................................... DATE

...................................................

DATE

COATES HIRE 6.0x3.0m SHELL

TITLE

13.03.2020 DRAWN BY

Author CHECKED BY

© COPYRIGHT.THE INFORMATION IDEAS AND CONCEPTS CONTAINED IN THIS DOCUMENT ARE CONFIDENTIAL. THE RECIPIENT(S) OF THIS DOCUMENT IS/ARE PROHIBITED FROM DISCLOSING SUCH INFORMATION, IDEAS AND CONCEPTS TO ANY PERSON WITHOUT THE PRIOR WRITTEN CONSENT OF MODULAR BUILDING SYSTEMS Pty. Ltd O:\00-Job-Quotes\J004278 - SA Capex Immediate Sales\3-Design\1. Architectural\5. REVIT\COATES - B60 - 6 x 3m - [D].rvt

Checker SCALE:As indicated

DRAWING NUMBER

MS-200570

QUOTATION NUMBER


21


22


A

7. 12x3 Changeroom 1

LEGEND

B 12000

A

B 12000

1

B66 - 12 X 3

B66 - 12 X 3

3000

3000

Specifications: 12m x 3m Shell

2

2

23

A


A

1

COATES - 12 X 3

2

24

B

3000

2

Specifications: 12m x 3m Shell with two doors

12000

3000

8. 12x3 Female and male changeroom COATES - 12 X 3


25


26


9. 12x6 Female ablution and changeroom A

B 12000

Specifications: 12m x 6m Ablutions and change room

1 A

B 12000

01 FEMALE AMENITIES

1

01 FEMALE AMENITIES

6000

33 m²

2

02 FEMALE SHOWER

2

6000

33 m²

03 FEMALE CHANGE

11 m²

02 FEMALE SHOWER 11 m²

22 m²

03 FEMALE CHANGE 22 m²

3

3

27 PROJECT NO.:

QUOTE NO.:

PROJECT:

J002658

-

COATES HIRE 12 x 6m FEMALE ABLUTIONS & CHANGE

PROJECT STATUS

SHEET

MARKETING PLAN


04 MALE CHANGE 2

MALE SHOWER 18 m²

14 m²

10. 12x6 Male ablution and changeroom A

B 12000

Specifications: 12m x 6m Ablutions and changeroom

1 02 MALE CHANGE 1 14 m²

01 MALE AMENITIES 2

6000

19 m²

03 MALE SHOWER 18 m²

3

28

04 MALE CHANGE 2 14 m²


29


LEGEND B

12000

11. 12x9 Changeroom complex

A

B

12000

A

1

1

Specifications: 12m x 9m Complex

2

2 3 - 12 X 9 B175

9000

9000

B175 - 12 X 9

3 4

4

30

PRELIMINA CLIENT APPROVAL

PROJECT

DATE

TITLE


31


12. Case study: End of trip facilities Overview Fleetwood was engaged to deliver a full turnkey solution to support the wellbeing of their workforce. The proposed end-of-trip (EOT) and ablution facilities would encourage staff to cycle, jog or walk to work rather than driving or taking public transport.

Solution The EOT facility and ablution block design features a bright yellow entry statement to match the existing style of the client’s main building. After passing through the security turnstiles and spacious entry hall, visitors are welcomed by clean, modern amenities including lockers, showers and plenty of bench space. Large floor to ceiling windows provide ample natural light through the main corridor. In accordance with the client’s brief, the facilities were seamlessly integrated with the main site structures, linked via the existing walkway shelter and pathways. The building is comprised of 10 modules, totalling 530 square meters. The amenities include: • • • • • • •

32

221 lockers Bike racks security turnstiles 16 showers (4 female, 12 male) 9 toilets universal access toilet; and cleaners store

The project site featured a sloping block, requiring additional site works to remove and level the concrete driveway. The client also wanted the building to rest against the retaining wall and blend seamlessly with the existing walkway shelter.


33


34


12. Case study: End of trip facilities Benefits Fleetwood worked closely with the client from the very beginning of the process to quote, detail specifications, design and provide options to assist with their overall planning and budgeting process. The turnstiles provide increased security and seamlessly integrate with the client’s building access control systems. The resulting product now provides their workforce with a high-quality facility that encourages healthier habits within their workforce, as well as reducing the demand for car parking.

35


Our locations VIC

99 Studley Court Derrimut VIC 3026

NSW

nsw@fleetwood.com.au (02) 8718 2500

9-11 Wood Street Bendigo VIC 3552 15-35 Fairview Road Kangaroo Flat VIC 3555

QLD

1202 Abernethy Road Perth Airport WA 6105 wa@fleetwood.com.au (08) 9281 7500

36 200923r2

41-55 Platinum Street Crestmead QLD 4132

Use your phone or tablet to find out more about Fleetwood’s extensive range of solutions.

qld@fleetwood.com.au (07) 3489 5000

vic@fleetwood.com.au (03) 8600 1800

WA

2 Percival Road Smithfield NSW 2164

SA

1253 Main Nth Rd, Para Hills West SA 5096 sa@fleetwood.com.au (08) 7077 7700

Nationwide: sales@fleetwood.com.au 1300 123 272


Turn static files into dynamic content formats.

Create a flipbook
Amenity solutions by Fleetwood Australia - Issuu