Construction process:
- Metal formwork is delivered to the site
- External walls erected
- Internal panels are erected
- Door/windows frames are positioned
- 4 labourers to manually fill the walls
- Formwork is removed
- Timber or metal roof structure
- Paint, touch-up
- Plumbing, electrical fittings, completions
The walls are 2.0 mPa strong with an ultimate strength of 10 to 20 mPa, achieved in 28 days,