Battersea : Riverside Odyssey (Technology Exploration)

Page 1

/ BAT T E R SE A : R I V E R SI DE ODYS SE Y / when str uc ture meets water...

WAI WONG 16038448 OXFORD BROOKES UNIVERSITY MArchD (RIBA II) DS7 Remembering the Present


2


In supporting the Battersea: Riverside Odyssey, this documment focuses on develop an innovatice approach to the technology in order to resolved the project itself. This document mainly divided into two sections, research and design in relation to environment, structure and construction.

3


/ PROJECT OV ERV IEW /

4


Battersea : Riverside Odyssey is an experimental project locates the River Thames. There are 8 plots that recreates a series of historic event on the river to testify a new methodology of an archive.

5


/ ENV IONMENTAL ANAL YSIS /

6


The following environmental analysis focuses on different elements on the river including the tide, forseshore, time, etc. Since, tidal movement is key to the site, through the following analysis, from understanding the theory to the ability of the tidal energy. Also, the Thames itself is a dynamic site which is rich in context during different time.

7


/ W H A T

I S

E A RT H

MOON

Due to Gravitational Pull of the Moon

8

Hig h Tide

Hig h Tide

L ow Tide

Due to Centrifugal Force

L ow Tide

T I D E ? /

SU N


T i d al power conver ts the ener gy T I DA L = fr om the natur al r i s e and fal l of ENERGY the ti d es i nto el ectr i ci ty . MH W S

MS L

Hide Tide

ML W S CHART D AT UM >5M MH WS = Me a n H i gh Wa t e r Sp r in g s T h e a v e r a ge h e i g h t o f h ide t ide a b o v e c h a r t d a t um ML WS = M e a n L ow Wa t e r Sp r i ng s T h e a v e r a g e h e i gh t o f lo w t ide a b o v e c h a r t d a t um MSL = M e a n Se a L e v e l , t h e a v e r a g e le v e l o f t h e s e a su r f a c e ov e r a l on g p e r i od , n o r ma lly 1 9 y e a r s , o r t h e av e r a g e l e v e l w h i c h w oul d e x is t in t h e a b s e n c e o f ti de s

Low Tide T I DA L TURBINE

9


/ O N

10

T H E

R I V E R

T H A M E S... /


D ue to the reg ular rotation of Ear th, and moon, the tidal movement has a patter n, u sually two high and t wo low pe r day. Therefore, the strateg y should be resulted in relation to the patter n. Taking the chos en site, in between B atters ea Br idg e and Alber Br idge, the RB 6 i s the only r iver bu s s e r v ice prov ide dur ing the weekday s . By obs er v ing the time pe r iod that of fe r s er v ices , the accessibility of r iver i s al s o re vealed .

11


42

P

02

14

's

05

112

15

18 1 3

1165

22

2

003

05

05

3 5

03

25

26

21

39

Outfall

48

56

Bridge & 145 Granary Wharves

Battersea W harf 144

143

Location of Research Area

EA

34

04

Steps

4

05

S ER

37

12

TT

02

47

16

18

BA

05

17 14 13 002 301

23

21

23

3

24

27

I BR E DG

12

21

24

23

22

18

2

12

15

12

17

15 1153

7

4

24 22

22

16

37Outfall

14

04

02 21

23

22

24

16

02

18

29 41

1

44 147

146

Albion Riverside


RB6 Source : UK HYDROGRAPHIC OFFICE; mbna Thames clipper

Tidal tables and River Bus active time zone

13


1.2

-1.4

-0.4

1.4

2.4

2.1

H IG H T I D E

L OW T I D E

RIVER BED 2.4

-0.5

-1.1

-1.8

-2.1

-2.9

-3.5

-2.1

-1.5

-4.1

-4.4

-2.6

-0.4

-1.1

-1.7

River Sur ve y in between B atters ea Br idge and Albe r t br idg e

14

-3.2

-2.8 -2.5

1.4

-3.7

-3.5


Low Tide

High Tide

Since River Thames is a dynamic site, here is the comparison of the particular watermen stair next to the Battersea Bridge and understand how the tidal movement affects the site.

15


Che ls e a

23 m

L ong s ec tion of the site

16


M HW S 5.6 m

Ba t t e r s e a

2.5 m

MLWS

Ri v e r b e d

17


/ SU N A NA LYSI S /

18


Showdow cast onto the River Thames

19


WINTER

SUM M E R

9AM

20


WINTER

SUM M E R

1PM

21


WINTER

SUM M E R

7 PM

22


/ SUM M A RY /

Since the project takes place on the River Thames, the shadow cast by the surrounding affects the experience within it. With the higher angle of sun during the summer, it allows more outdoor activity to occur. In contrast, winter time is more prefer to use insude the structure.

23


24


/ S T R U C T U R A L

S T R A T E G Y /

Marine structure is highly used throughout project. Four types of dock system has been used based on the specific program or a type of experience that a specific plots aim to offer.

25


26


Gra v it y

m

o b jec t

o b jec t ( de ns i t y of t he ob je c t )

Flu id ( de ns i t y of t he fl ui d)

Bu o ya nc y

In general, Buoyancy (also known as the buoyant force) is the force exerted on an object that is wholly or partly immersed in a fluid. Therefore, the strategy in bringing new structure to the Thames requires different adapation in relation to it.

27


28


FIXED DOCK

The timber fixed dock structure is mainly used for the main circulation of all the plots to ensure accessibility of the project since this structure does not affect by the tidal movement.

29


Steel Wire Balustrade

Composite Decking Board

Floor Joist

Balustrade system example

Timber Bearer

Anchor Bolt

Hermosa Beach Pier / oakes architects

Timber Pile

30


Steel Wire Balustrade

Composite Decking Board

Timber Pile

Timber Bearer

Timber floor joist

1 :2 0 fix ed do c k det a il

31


32


SWIM RAFT

Swim Raft is the a simple floating structure which is weak in providing stability but able to reflect the different condition of the dynamic site.

33


Timber frame

Composite Decking Board

Makoko Floating School / NLE Architects

Anchor chain plate

HDPE Floating Barrel Unit

Stainless Steel Bathing ladder

Nylon Rope

Concrete Deadman (~60 kg)

Galvanized steel Chain

34


F o r c e D is t r ib u t io n

w at e r c ur r e nt T e ns i on For c e Buoyanc y For c e G r avi t y For c e

The swimming raft structure uses gather the tension force towards a single anchor weight to maintain the stability. Since the tension are towards the same direction, the structure is affected by the divergent force from the water current.

35


36


C HA I N & D E A DM E N

Chain and deadmen docking structure is mainly used for the detachable units like the amplitheartre and reading rooms.

37


Clear Polycarbonate Roofing Sheet

Timber column and trust

Corrugated Fiberglass Panels

steel angle brackets with through bolt

Composite Decking Board

HDPE Floating Barrel Unit

Timber Frame Anchor chain corner plate

Concrete Deadman (~60 kg)

Nylon Rope Galvanized steel Chain (Suggested chain legth = 3 x Water Depth) Mooring Ball

38


F o r c e D is t r ibu t io n

wa t e r c u rre n t T e n s io n F o rc e B u o y a n c y F o rc e G ra v it y F o rc e

The diagonal chain and concrete deadmen anchor system use the tension force on the chain to eliminate the force from water current in order to stablize the floating module.

39


Top View of the amphitheater seating

detach aable amph itheater

Buoy

us in ng rm Te hori e c an cabl

Floatation module

Battersea : Riverside Odyssey

P-005

Terminus anchor

/ P L O T /

Section A (n.t.s)

Sec

/ C U L T U R E /

tio

n A

4

5

140 M

Section of the plot of culture which featured with a detachaable amphitheater to provide a new type of performace space. The form of the amphitheater also benefit the acoustic quality, and the river itself enhance the echo level.

6

1 2 3

60 M

/ H E A D Q U A R T E R /

8 7

1 :1 0 0 0

40

Fe ature

S e cond ar y Fe ature

R iverside E lements

Visu a l Interest

Prop osing Fe ature

1 - O utdo or S e at ing 2 - St age 3 - B ack of St age 4 - Temp orar y exhibit ion

5 - Promenade 6 - D o ck for exhibt ion c abins 7 - The main of f ice 8 - D o ck for c ar r i age and st af f


Composite Decking Board Timber Floor Joist

Timber Frame

HDPE Floating Barrel Unit Nylon Rope

1 :5 flo a t ing u nit detai l

Rope knot to stop it move and hold the floating barrel

1 : 2 0 s e ct io n

41


42


PILE GUIDES

The pile guide pontoon structure is used to raise the stability for structure to move along the tidal change.

43


Marine Mooring Bollards / Cleat

Composite Decking Board Timber trust

Timber frame

Rubber Boat Dock Fender

Pile Guide

HDPE Floating Tube Unit

Pontoon Pile with pile cap

44


See Detail xxx

High Tide

Low Tide

45


Marine Mooring Bollards / Cleat Braided polyester dockline

Composite Decking Board Pre-drill the decking prior to fastening buffer Washer

Rubber Boat Dock Fender water level

Anchor Bolt

Support Strip

Stainless steel frame bracket

Timber Frame

1 :5 Ru b b er Fender det a il

46


Stainless steel frame plate for installation

Pile Guide Example

Pontoon Pile

1 :1 0 P ile Gu ide det a il

47


WAI WONG 16038448 OXFORD BROOKES UNIVERSITY MArchD (RIBA II) DS7 Remembering the Present