F A
R J M
T A A
F R L
OLIO
EDUCATION

F A J A R A K M A L
I am Fajar Akmal Wihardi, I was graduated from Diponegoro University majoring in Architecture in 2019. Now, I am working as a Design Architect in one of the architectural consultants in Jakarta. I have had architectural activities experience, such as competitions, seminars, training and several projects that had been built and so on, Passionate about learning something new and have the ability to work under pressure and creative thinking to solve various problems.
WORKEXPERIENCE
BLUE ANTZ ARCHITECTS
Architect Designer August 2022 - Present Continue a career in architecture by joining Blue Antz Architect consultants focusing on public buildings and mix used KREA ARCHITECTS
Architect Designer September 2019 - August 2022 After graduating from college, I joined Krea as an architect designer and was directly responsible for the principal handling several projects as the person in charge

STUDIO ARSITEKTROPIS Internship November 2017 - February 2018 June 2018 - August 2018 started a college internship at Studio ArsitektropiS in 2 terms to help architectural designers work on projects
PERSONALEXPERIENCE
MEMBER INAUGURATION IAI JAKARTA November 2021 Join the Association of Indonesian Architects (IAI) Jakarta as an inaugurated member in November 2021
FINAL PROJECT AND TRAINING EDGE AS GREEN APPROACH. JUNE 2019 The final studio used a green building approach with edge tools.
SPEAKER AT BEDAH KARYA HMA AMOGHASIDA 2019 FEBRUARY 2019 HMAAmoghasida hold every year of events to discover selected student’s work to sharing and inspiring other students.
PARTICIPANT AT INTERNATIONAL FIELD FESTIVAL 2018 JUNE 2019 representing Undip to participate in iFEST 2018, an international event with participants from various countries
SUMMARYARCHITECTURALPROJECT
Summary of the list of projects that have been handled directly and responsible for these projects as person in charge from 2019 to 2022
HOSPITALITY
MYZE HOTEL SUMENEP (PAGE 4)
Under Construction 2020-present
HOTEL KUNINGAN (PAGE 8) Competetion Entry 2022
VILLA LABUAN BAJO (PAGE 12) Design Development 2022-present
HOTEL UBUD BALI (PAGE 14) Design Development 2021-present
HOTEL ASTON INN BOYOLALI Postponed 2021-present
HOTEL WAINGAPU Design Development 2021-present
EDUCATION
SCHOOL LAMPUNG (PAGE 18) Physical Building Completed 2019-2020
COMMERCIAL
SENTRALAND MALL (PAGE 22) Postponed 2022
JATIPADANG SPACE Postponed 2021
MASTERPLANNING
DWITUNGGAL CITY (PAGE 24) Competetion Entry for IKN 2019
VINEWOOD CITY MASTERPLANNING
Under Construction Phase 1 2020
OFFICE
JAMKRINDO (PAGE 28) Postponed 2020
CIVICANDINSTITUTIONAL
AL-INSYIRAH MOSQUE (PAGE 30) Design Development 2022
AL-FALAH MOSQUE Postponed 2021
AL-HUDA MOSQUE Postponed 2019
KOMINFO STANDARDIZATION Design Development 2022
BSI BANK STANDARDIZATION Postponed 2021
SINDANG SODONG Postponed 2019
TAJUK LEREN REST AREA Competetion Entry for PUPR 2019
RESIDENTIAL
PERMATA HIJAU HOUSE (PAGE 34) Design Development 2022
PULO MAS HOUSE Design Development 2022
PASAR MINGGU HOUSE Postponed 2021
SUKAMULYA HOUSE Physical Building Completed 2019
HEALTH
MORULA IVF MENTENG (PAGE 38) Design Development 2022




















|HOSPITALITY|
SCOPE
:
ARCHITECTURE, MASTERPLANING
PROJECT COMPANY : KREA
ARCHITECTS
TEAM : RELAN MASATO, FAJAR AKMAL, RIFQI ALTOF, KAYS MULKI, BRIAN
PARTNER/COLLABORATION : -
STATUS : COMPETETION ENTRY FOR IAI WEST JAVA
YEAR : 2022
Double Loaded Corridor
Tipologi hotel secara general menggunaan Double Loaded Corridor karena lebih efektif dari segi struktur dan penggunaan ruang. Namun untuk konteks Hotel Resort Kuningan dengan lahan berkontur kurang memberikan pengalaman & kenyamanan terutama kamar lantai di bawah berpotensi tidak akan mendapatkan view optimal dari dalam kamar.

Single Loaded Corridor
Tipologi hotel Single Loaded Corridor memiliki kelebihan yakni pengalaman ruang yang dialami oleh tamu mulai dari melihat view ketika berjalan di koridor terbuka hingga mendapatkan view yang berbeda ketika masuk ke dalam kamar. Untuk konteks Hotel Resort Kuningan kurang optimal pemanfaatannya untuk view di dalam kamar karena memiliki 2 sisi view potensial (View gunung & city view) yang harus dikorbankan.
Stacking Toilet Position
Tipologi ini bertujuan untuk memaksimalkan potensi view ketika tamu ketika berada di dalam kamar, view terbaik menghadap Gunung Ciremai namun dikarenakan lahan berkontur dan tingginya level pohon di sekitarnya, kamar untuk view Gunung Ciremai ditempatkan pada posisi level atas, sedangkan kamar di level bawah akan mendapatkan city view dan deretan pegunungan, ketika berjalan di koridor tamu akan mendapatkan pengalaman view kebalikan dari view utama di dalam kamar.





















VILLABAJO LABUANBAJO
|HOSPITALITY|
SCOPE : ARCHITECTURE, MASTERPLANING









PROJECT COMPANY : KREA ARCHITECTS

TEAM : RELAN MASATO, FAJAR AKMAL
PARTNER/COLLABORATION : MONOARCH (INTERIOR & DETAILING)
STATUS : DESIGN DEVELOPMENT
YEAR : 2022 - PRESENT










































SENTRALAND SEMARANG
|COMMERCIAL|
SCOPE : ARCHITECTURE, INTERIOR



PROJECT COMPANY : KREA ARCHITECTS



TEAM : RELAN MASATO, FAJAR AKMAL STATUS : POSTPONED YEAR : 2019-2020





























ALINSYIRAH SOUTHTANGERANG
SCOPE : ARCHITECTURE, INTERIOR PROJECT COMPANY : KREA ARCHITECTS
TEAM : RELAN MASATO, FAJAR AKMAL
PARTNER/COLLABORATION :STATUS : DESIGN DEVELOPMENT YEAR : 2022




















































