Builder 20 Spring 2024

Page 1

Builder 20 | Wichita, KS | Spring

20 24

Table of Contents:

Organization

Size and Change

Core Values

Project Review

Project Breakdown

Project Visuals

Status Update

Highs & Lows

Market Outlook

Design Trends

Finance, Marketing, Operations

Financials

Marketing

Operations

Key Initiatives

Additional Companies

1 - 5 2-3 4-5 6 - 43 6 - 11 12 - 43 44 - 48 44 - 46 47 48 49 - 54 50 51 52 - 54 55 - 61 62 - 65 Builder
20 | Wichita, KS | Spring

ORGANIZATION

Builder 20 | Wichita, KS | Spring

20 24

Organization: TOTAL HEAD COUNT

Builder 20 | Wichita, KS | Spring 49
Organization: Department Admin Architecture Structural Construction Maintenance Interior Design TOTALS Current Count 11 10 0 17 3 8 49 Net Change 0 -4 0 -3 1 1 -5 Anticipated Growth 1 0 0 1 0 0 2 HEAD COUNT ADJ. Builder
20 | Wichita, KS | Spring

Core Values:

Builder 20 | Wichita, KS | Spring

ETHOS

Builder 20 | Wichita, KS | Spring

2024 THEME
Core Values:

PROJECT REVIEW

20 24
Builder
20 | Wichita, KS | Spring

Project Breakdown:

TOTAL PROJECTS Project Title Type Value TF 57 Architecture | ID Construction $55,210,344.06 Hunt Residence Architecture | ID Construction $38,896,165.00 Larsen Residence Architecture | ID Construction $30,000,000.00 Pearson Residence Complete $12,306,529.61 TF41 Architecture | ID Construction $4,500,000.00 The Lab Architecture | ID Construction $3,800,000 Klingenberg Residence Architecture | ID Construction $3,606,825.71 Bateman Xlazy B Architecture Interior Design $2,147,250.00 Bachman Remodel Complete $1,961,404.30 Utah Jazz Delta Center Complete $799,574.74 Bateman Remodel Complete $674,154.50 Bateman Depoe Bay Architecture Interior Design $585,870.00 Greer Home Complete $340,000.00 Thanksgiving Point | Concept Architecture Interior Design $243,905.00 awardco Architecture Interior Design $166,000.00 Bateman POM Architecture Interior Design $55,000.00 AEG Crypto.com Delta Sky360 Club Architecture Interior Design $41,000.00 Deer Crest 126 Architecture | ID Construction SPEC $4,000,000 - $6,000,000 Deer Crest 127 Architecture | ID Construction SPEC $4,000,000 - $6,000,000 SOJO Architecture | ID Construction SPEC Little Lava 1 - 6 Architecture | ID Construction SPEC Nelson Puerto Rico Architecture Interior Design Smith Remodel Architecture Interior Design Kirschner Remodel Architecture | ID Construction $800,000 Nicoll Furniture $500,000 Builder 20 | Wichita, KS | Spring

Project Breakdown: ARCHITECTURE

20 | Wichita, KS | Spring

SD DD CD PERMITTING CA
Riverwoods XLazyB Activity XLazyB XB Carports Jazz Corner Suite
Upper
Nelson XLazyB Clubhouse XLazyB Dairy Barn
Jazz
Bowl
Smith Remodel XLazyB Equipment Garage PACS McReynolds Gazebo XLazyB Bunker oversight The Lab Kirschner XLazyB Boathouse TF57 Nelson (Puerto Rico) XLazyB Food Processing Larsen Vialetto 25 Garage Expansion Greer Barn / Remodel Pearson Fieldhouse SoJo The Village Depoe Bay Little Lava 1-6 XLazyB Ranch Homes Level 4 - Jazz Little Lava 1-6 Lexus Club - Jazz
Builder
TGP Ice Age Creamery Hunt

Project Breakdown:

INTERIOR
SD DD CD
Nelson | PR TGP Deli + Harvest TGP Ice Age Creamery Depoe Bay XLazyB Equipment Garage Lola Blankets | TI TF-41 The Village Kirschner Remodel XLazyB Lake Home XLazyB Food Processing Little Lava XLazyB Clubhouse XLazyB Ranch Homes XLazyB Boathouse XLazyB Activity XLazyB Dairy Barn Hunt Residence Three Falls 57 The Lab Peterson Residence Klingenberg Residence TGP | Garden Room TGP | Amber Room TGP | Rose Room TGP | Velvet Room AwardCo Builder 20 | Wichita, KS | Spring
DESIGN
PERMITTING CA

Project Breakdown: FURNITURE

Builder 20 | Wichita, KS | Spring

DD PROCUREMENT INSTALL READY TO BILL
Nicoll | Residential Delta Sky360 Club AEG | Delta Sky360 Club Hue & Hem

Project Breakdown: CONSTRUCTION

Pre Con Dig - Slabs Framing - 4Way Ins. - Temp CT CounterDelivery 90-Day Warranty 1-Year Warranty Kirschner - PC Rem Larsen TF57 House Hunt Road The Lab Peterson Ash Garage TF 41 - The Village TF57 Out Bldg Klingenberg Pearson Vialetto 24 Bean - Const Only Vialetto 25 Bateman Remodel Swenson Builder 20 | Wichita, KS | Spring

PROJECT VISUALS

Builder 20 | Wichita, KS | Spring

20 24

PROJECTS:

Builder 20 | Wichita, KS | Spring

TF57

PROJECTS:

Builder 20 | Wichita, KS | Spring

HUNT

20 | Wichita, KS | Spring

PROJECTS: THE VILLAGE
Builder

PROJECTS:

LARSEN
Builder 20 | Wichita, KS | Spring

PROJECTS:

KLINGENBERG

Builder 20 | Wichita, KS | Spring

PROJECTS:

Builder 20 | Wichita, KS | Spring

XLAZYB RANCH

PROJECTS:

XLAZYB RANCH CLUBHOUSE

Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH RANCH HOME A
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH RANCH HOME B
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH RANCH HOME C
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH LAKE HOUSE Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH ACTIVITY CENTER
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH BOATHOUSE
Builder 20 | Wichita, KS | Spring
PROJECTS: XLAZYB RANCH FOOD PROCESSING
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH EQUIP GARAGE
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB RANCH DAIRY BARN Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB
OPERATIONS
RANCH
Builder 20 | Wichita, KS | Spring

PROJECTS:

XLAZYB
OPERATIONS
RANCH
Builder 20 | Wichita, KS | Spring

PROJECTS:

Builder 20 | Wichita, KS | Spring

PROJECTS:

20 | Wichita, KS | Spring

DEPOE BAY
Builder

PROJECTS:

20 | Wichita, KS | Spring

GREER REMODEL & BARN Builder

PROJECTS:

THANKSGIVING POINT

Notable Thanksgiving Point Projects

• Ice Cream Shop

• Deli & Harvest Restaurant

• Amber Room

• Rose Room

• Garden Room

• Velvet Room

Builder 20 | Wichita, KS | Spring

PROJECTS:

LAVA Builder 20 | Wichita, KS | Spring

LITTLE LITTLE LAVA SITE OVERALL LITTLE LAVA SITE OVERALL

PROJECTS:

An architectural retreat, 6 single-family residences in Santa Clara, UT. Little Lava is a community driven development with shared landscape and amenity spaces. The project's intent is to be a short-term retreat location for individuals looking for a unique architectural experience in Southern Utah. Each home is designed harmoniously with one another, while also being unique in plan and spatial development.

The design draws from the surrounding red / lava rock landscape, incorporating colors and materials. Each home is designed with a restraint for simple yet strong moves that form the buildings shape and program. The homes are designed with the arid climate in mind. Large overhangs protect windows from harsh summer sun. Heavy mass walls hold in heat during the day and release during the night. Operable windows and doors are used for natural ventilation and night fushing.

Builder
|
LITTLE LAVA
20 | Wichita, KS
Spring

PROJECTS:

POINT OF THE MOUNTAIN

Builder 20 | Wichita, KS | Spring

PROJECTS:

AEG ARENA - DELTA

Builder 20 | Wichita, KS | Spring
PROJECTS: DEER CREST 126
Builder 20 | Wichita, KS | Spring
CREST 127
PROJECTS: DEER
Builder 20 | Wichita, KS | Spring

PROJECTS:

THE LAB
Builder 20 | Wichita, KS | Spring

PROJECTS:

NELSON | PUERTO RICO

Builder 20 | Wichita, KS | Spring

STATUS UPDATE

20 24 Builder 20 | Wichita, KS | Spring

We really have a wonderful team. Great people, great culture. We have really great clients as well.

We have a lot of work on the construction team that will bring on consistent revenue for the near future.

Opening of our furniture store will be late May and I am excited to see that finally come alive.

I’ve been sailing through French Polynesia for that last 7 weeks with my family and that was some really high highs, and some almost disastrous lows, but overall an amazing adventure.

Highs HOW IT’S GOING Builder 20 | Wichita, KS | Spring

We did not get off to a great start for profit in Q1 of this year. Our forecasts say that we will still be able to hit year end goals, but the start of the year due to value engineering of all three of our massive projects have slowed down putting work in place, and is also time consuming and deflating. Budgeting, selections, and price alignment is something we are really wanting to improve. We are pushing to ramp up productivity in construction, which will in turn produce revenue and profitability through the rest of the year. We have enforced efficiency and performance with the Team and have had some people leave. Turnover while can be good is still painful for the surrounding team. Our Architecture Team is working through some of these massive projects, and the Ranch project that has over a dozen structures and we look to be needing to backfill in some more work. I am working on long term hold projects that we are starting on to fill some gaps.

HOW IT”S GOING Builder
Lows
20 | Wichita, KS | Spring

Market Outlook:

The market in our area is tough to understand. The Park City area seems to be strong and still moving. We have been spoiled with some of these massive projects, so now anything under a 10mm project feels like chump change, but I think we are all working on correcting that thought. Overall I think people are still hoping that pricing will drastically come down, which I personally do not believe that will happen that much. We have good leads, but are looking to lock down a few new projects in the near future.

WHAT WE SEE Builder
Spring
20 | Wichita, KS |

Design Trends:

I would still say “timeless” is one of the top requests - which is not to style or era specific, and a good use of natural materials and proven architectural moves. Medium tones in wood. Monochromatic and textural. Soft paint tones. Not nearly as much high contrast. Then more fun in furnishings - vibrant colors, textures, patterns.

WHAT WE SEE Builder 20 | Wichita, KS | Spring

FINANCE, MARKETING, OPS

Builder 20 | Wichita, KS | Spring

20 24
Financials: THE NUMBERS 2019-2023 Builder 20 | Wichita, KS | Spring 2019 2020 2021 2022 2023 2019 2020 2021 2022 2023 2019 2020 2021 2022 2023 2019 2020 2021 2022 2023
Marketing: TEAM & PLATFORMS Channel What Managed by Notes Website Editor X Internal Team Digital Marketing Meta, Google, SEO. Internal Team Creative Graphic Design/Branding Internal Team Content Creation Photo, video, etc. Internal and contracted Social Media later.com Internal Team Sales CRM - Acumatica Internal Team Transitioning to Acumatica Builder 20 | Wichita, KS | Spring
PLATFORMS Accounting Marketing Architecture Interior Design Construction QuickBooks Editor X Flow (Internal Task MGMT) Flow (Internal Task MGMT) Flow (Internal Task MGMT) Harvest later.com Harvest Harvest BuilderTrend Dropbox Houzz BuilderTrend BuilderTrend Build Microsoft Products Social Media Platforms Build Build Synology Expensify Final Cut Pro Revit Revit Dropbox Accumatica (under review) Adobe CC Adobe CC Adobe CC Microsoft Products Google Sheets Synology Fohlio Synology Dropbox Synology Dropbox Microsoft Products Dropbox Microsoft Products Rhino Microsoft Products Lumion 3DS Max Builder 20 | Wichita, KS | Spring
Operations:

Operations:

FLOW
Builder 20 | Wichita, KS | Spring

PERFORMANCE IMPROVEMENT PLAN

Operations:
Builder 20 | Wichita, KS | Spring

KEY INITIATIVES

Builder 20 | Wichita, KS | Spring

20 24

Key Initiatives:

THE FOCUS 2024 THEME Builder 20 | Wichita, KS | Spring

Key Initiatives: THE FOCUS

RUN BY NUMBERS

A. Deliver the nancial plan (EBITDA, cash, etc.)

B. Roll out scorecards, KPIs & OKRs, and track progress against those metrics.

C. Build better dashboards, budgets, and forecasts to enhance organizational decision-making.

SYSTEMATIZE THE ORG.

OPS: “OPERATIONAL EXCELLENCE”

OPERATIONALIZE THE CROSSFUNCTIONS

A. Integrate Acumatica into the company’s DNA.

B. Automate reporting, actions, and dashboards through Acumatica (and other systems).

C. Enhance Accounting controls and Financial Operations through process and systems.

A. Maintain the Architecture Ops approach and build on the foundation (Flow, Coordination, etc.).

B. Roll-out new Interior Design Operations approach and operationalize best practices.

C. Gain Traction with other areas (Structural, Hue and Hem, Nimble, and other special projects)

ADMINISTRATE EFFECTIVELY

A. Provide greater “structure” to the organization (pathways, comms, evals, SOPs, culture, HR, IT).

B. O oad administrative burden and manage ancillary activities to the highest degree of quality.

Builder 20 | Wichita, KS | Spring

2024 THEME

Key Initiatives:

THE FOCUS

RUN BY NUMBERS

A. Consolidate data points into dashboard

B. ROI

C. Sales Pipeline MGMT - CRM

GENERATE CONTRACTED REVENUE

SALES + MARKETING:

“LOOK GOOD, FEEL GOOD, PERFORM GOOD.”

HOST OUR CLIENTS EXPOSE OUR TALENT

A. Once a quarter we engage Key Sales Teams – Promontory, Tuhaye, Marcella, Etc.

B. Engage Past Clientele – Stay top of Mind.

C. Act on all top of funnel sales opportunities.

A. Launch new website

B. Incorporate new tools to develop better tracking and lifecycle

C. Create and deploy digital strategy for lead generation

A. Host 1 event per quarter

B. Create Strategic Partnerships with groups that share similar clientele

C. Hue and Hem Launch – Cross Promotion Builder 20 | Wichita, KS | Spring

2024 THEME

Key Initiatives:

ARCHITECTURE: “INCREDIBLE EFFICIENCY & DESIGN”

BECOME MORE EFFICIENT

STAY WITHIN CONTRACT BUDGETS IMPROVE PROCESESS INSIST ON INCREDIBLE DESIGN

A. Understand and report on dollars and hours allotted per phase

B. Measure results through metrics (hours and Flow against contract amounts)

C. Be accountable for project milestones and tasks given

A. Create concise drawing sets that have better information on fewer sheets

B. Include what is necessary for construction without adding things that do not matter

C. Produce quality renderings using the most e cient methods

D. World-class communication with clients, teams, consultants, and constr to solve problems early

A. Ask if this is our best work and push to make designs better in all areas

B. Be open to innovation, creativity, and originality and be exible in integrating design changes

A. Standardize drawings and train team members to be consistent in drawing sets

B. Update and simplify Flow to capture only important checklist items

C. Update the Revit template and EZDB library to save time in the design process

THE
2024 THEME
FOCUS
Builder 20 | Wichita, KS | Spring

Key Initiatives: THE FOCUS

INTERIOR DESIGN:

“PROFITABILITY & TIME MGMT”

REVIEW ALL DRAWINGS & DESIGNS

PRODUCE DESIGNS ON TIME & UNDER BUDGET AUDIT ALL FEES AT THE END OF EACH PHASE

A. Check in on time spent and progress weekly (Employee + MGMT)

B. Clearly communicate the design fee in hours and by phase (MGMT)

C. Listen – understand – prepare – tell the story through purposeful design

COMMUNICATE CLEARLY TO CLIENTS & CONSTRUCTION

A. Collaborate early and often through design with team and management

B. Conduct page turns with construction before bidding

C. Conduct page turns with the client or reviews to nalize after bidding

A. Set clear expectations about materials and design details with the client + construction

B. Sharing and storing documentation all within ACC

C. World class communication through communicating clear expectations and timelines

A. Complete an audit of fees at the end of each phase. “Lesson’s learned” on fees

B. Document the time suckers in each phase + how to avoid them in the next phase

C. Familiarize yourself with the contracts to understand the appropriate time for change orders

Builder 20 | Wichita, KS | Spring

2024 THEME

Key Initiatives:

THE FOCUS

CONSTRUCTION: “DO IT RIGHT THE FIRST TIME”

BUY-OUT, PROCURE,& BILL EACH JOB IN ADVANCE & WITH PRECISION

A. Plan Rev’s – Assign PM/Super at Struct Eng contract (100% prep’tn/attendance at scheduled plan reviews)

B. Bid Packages – PM runs PTM’s at permit submittal (use PTM to discusses Bid Form content before RFP)

C. Thorough Bid Review & Leveling – Bid 3 subs deep (use Building Connected to level all major categories)

D. Have Firm Schedule at Completion of Estimate (send out prelim schedule w/ Bid set / require sub schedule w/ bids)

A. Develop Detailed Construction & Procurement schedule (prior to footings)

B. Contract Early / Proactive Procurement (0 days lost waiting on sub-contracts or materials)

C. Proactive Tracking of Contracts & Allowances (implement Pay App by April 1 / CO allowances prior to start)

BUILD EACH JOB ONCE

ESTIMATE EACH JOB ACCURATELY INTEGRATE EXISTING & NEW SYSTEMS

A. Identify Each Super’s Weaknesses (Mentoring & Monthly Trainings – Improve Skills Score by 50% remaining)

B. Dissect the Plans & Communicate De ciencies (Monthly Super Review Meeting / Use Build for RFI’s)

C. Job Ready for each subcontractor (Use overall schedule to build Super’s weekly plan between milestones)

D. De ne & Drive Safety (Safety Manual created by 4/30. Weekly safety meetings. Supers lead by example)

A. Commit to FLOW (Update FLOW weekly on every job)

B. Build-out Client interface in Build by 6/30/24 (Dashboard, CO log/approval, selection approval, etc.)

C. Complete integration of Build & Acumatica by EOY 2024

Builder 20 | Wichita, KS | Spring

2024 THEME

ADDITIONAL COMPANIES

Builder 20 | Wichita, KS | Spring

20 24
HUE AND HEM: FURNITURE & DECOR
Builder 20 | Wichita, KS | Spring

Nimble: ORGANIZATION

Builder 20 | Wichita, KS | Spring

THANK YOU

20 24
Builder 20 | Wichita, KS | Spring

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.