Brochure LeParc Old

Page 1

Awaken the beat of life

21/11/2015 DEVELOPER LAUNCHING FOR LEASE EXISTING CATEGORY 56 150 8,998 sqm BLOCKS (214 UNITS) LAKE FRONT & STREET FRONT SHOPS FOR RETAIL TOTAL LAND AREA CAR PARKING SLOTS 300 BIKE PARKING SLOTS F&B, showroom, outdoor & indoor studio, o ice Residential And Commercial Complex Building Gamuda Land Vietnam

METRO MAP

MAIN ROAD

To Noi Bai Airport

Bus station

To city center

To Bac Ninh Industrial

Gamuda Central Gamuda Central Gamuda Central

60 minutes 30 minutes 30 minutes

Noi Bai Airport

Hoan Kiem Lake Bac Ninh Industrial Zone VSIP

Ring Road 2 Ring Road 2.5 Ring Road 3

Metro station

Giap Bat bus station Nuoc Ngam bus station Yen So metro station

Metro lines

15 minutes 12 minutes 0 minutes

2 4 8

Line 2 (Ha Dong - Noi Bai)

Line 3 (Troi - Nhon - Hoang Mai) 3

Line 4 (Lien Ha North Thang Long)

Line 8 (Co Nhue - Trau Quy)

Up to now, the metro line no. 3 from Nhon to Hanoi Station has basically been completed. The next section from Hanoi station to Hoang Mai district (Yen So station) is expected to be started in 2022 and completed in 2028 as planned. Line no.3 is also connected with line no. 2 at Hang Bai station (old CBD); no. 4 at Ring Road 2.5 and no. 8 at Ring Road 3, creating the cohesion of the metro network. With a prime location right next to Yen So station, future residents of Gamuda City in general and Gamuda Central in particular can move to key locations in inner and outer suburbs quickly and easily.

* Dimensions, area and information related to the project & product mentioned here are only for reference at the time of printing. This information is subject to adjustment based on final approval by the competence authorities.

Giap
Bus
Hoan Kiem Lake Yen So Metro
Nuoc
Bus
Noi Bai International Airport 3 8 8 8 3 2 2 2 2 2 2 4 4 4 4 4 4 2 3 3
Bat
station
Station LONG BIEN DISTRICT HA DONG DISTRICT
Ngam
station
3 km Gamuda Gardens
a p
C au G i e
CGV Linh
Dam Linh
Dam
Residential Thang Long University Times City Hateco Aeon Mall Giap Bat Bach Mai Hospital Mega Market National Economics University Giap Bat Tam Trinh Minh Khai Ngoc Hoi Ring Road 3 NguyenTrai HighwayPh
Van

ACCESSIBILITY MAP

RING ROAD 3 to existing major highway 2 CONNECTIONS

running parallel with Le Parc

2 km

to national highway 1A

10

km

36

km to CBD and Old Quater

to Noi Bai International Airport

Residential Area

Shopping Center

Hospital

School

Cinema

Central Residence 0 min 0 min 0 min

International Shopping Mall Yen So Park

Gamuda Gardens

Linh Dam Residential Area Times City Hateco

Aeon Mall Giap Bat

Vincom Mega Mall Times City

Mega Market Hoang Mai

10 mins 15 mins 15 mins 05 mins

15 mins 15 mins 10 mins

Vimec Times City Bach Mai Hospital National Hospital of Endorcrinology

Singapore International School

Yen So Primary School

Thang Long University

National Economics University

CGV Linh Dam

CGV Truong Dinh

Beta Giai Phong

15 mins 20 mins 15 mins

10 mins 10 mins 15 mins 20 mins

15 mins 15 mins 15 mins

5km
Amenities
External
Internal Amenities

PLACEMAKING MAP

Camping Area Pet Park Donut Boat Solar Express Carousel Heritage Village Red Bridge
BBQ
Site
Main 1. Gate Entrance

TARGET CUSTOMERS

50 %

About 50% of the people around the area are young families with young children. They tend to prioritize using Le Parc's facilities.

% Family members

Young customers 35 % Office (local & international)

Customers between the ages of 16-24 account for more than 35% of the total customers. They tend to hang out at least once a week and love outdoor activities.

15

About 15% of customers are company employees in the region (including Vietnamese and foreigners).

Pedestrian Path Bicycle Path

Area
Entrance
Electric Charging Station Parking
Music Pavilion Main
Cultural Gallery

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Brochure LeParc Old by Đỗ Hiếu - Issuu