EUAN FISHER
ARCHITECTURE PORTFOLIO
EUAN FISHER
CONTACT
Email: fishereuan@gmail.com
Phone: 07903750525
AWARDS
The Sports Archive Student Design Award 2024 Tutor Nominee Northumbria University Autumn 2023
Awarded ‘honourable Mention’
NAS X NUAS Design competition 2023 Northumbria/Newcastle Universities, Spring 2023
Awarded ‘Best Model’
NAS X NUAS Design competition 2024 Northumbria/Newcastle Universities, Spring 2024
EDUCATION
Northumbria university, newcastle BA (hons) Architecture 2021-24
Bilborough Sixth Form College Art, Design Tech, Physics [A Level]
SKILLS
+ Rhino 3D Modeling - High self taught experience (2 years), with some experience with grasshopper plug-ins.
+ Some Revit, AutoCAD and Sketch-up experience with early university projects.
+ Knowledge of RIBA Plan of Work and relevent design stages.
+ Highly experienced in digital visulisation usuing Lumion
+ Highly proficent in Adobe Creative Suite with the likes of Photoshop, Illustrator and Indesign
+ Architectural Model Making skills with a large variety of materials.
ABOUT
Enthusiastic and focused Architectural student at Northumbria University who excels in adapting to any environment and completing various tasks simultaneously.
I have a likeable personality and have always been respectful to others, and in return found that I was well respected. I possess excellent communication skills with individuals at all levels. I am always eager to learn; I embrace challenges calmly, paying particular attention to detail to allow me to perform to the best of my ability. I am competent at meeting deadlines and working under pressure, and I work well as a team member, on my own or leading others.
I am currently seeking a part-1 architectural assistant role.
INTERESTS
Sustainable travel infrastructure + design
Physical model making
FEATURES
@models_ architecture
NAS X NUAS Design Competition 2024, Best Model Winner
@nu_architecture
NE Heroes Market Interchange
Final Model
Cover Image for REVEAL Exhibition AD
CONTENTS
Market Interchange 1:1000 Massing Model
Balsa on Plaster
NE HEROES MARKET INTERCHANGE 2
WESTGATE COMMUNITY CLIMBING CENTRE
3
CULLERCOATS CORNER ARTIST’S RETREAT 4
COMPETITIONS + AWARDS
5 OTHER WORKS
1
NE HEROES MARKET INTERCHANGE
REBRANDING THE TYNE
Studio Tutors:
Dr. Jiayi Jin
1
Dr. Patrizio M. Martinelli
The NE Heroes Market Interchange borders the northeastern towns Jarrow and Hebburn, on the south side of the river Tyne. The project builds upon the existing transport links of Hebburn while acting as an extension of the Jarrow interchange by developing the current Tyne ferry into a Tyne-wide service from North Shields to Ryton, along with bus services and cycle route 14. Upon Viewing the project, users are met with vast glazing that frames timber cladded archways supporting the expansive pitched roof. Cascading over the building’s envelope is a large overhang of the roof, finished with illuminated yellow perspex.
KEY 1. MARKET SPACE –– FRUIT STALL – VEGETABLE STALL – BAKERY – CHEESEMONGER – FISHMONGER – BUTCHERS –2. RE-USE STORES –– 2ND HAND BOOK STORE – DRY CLEANERS/CLOTHES REPAIR SHOP – CHARITY SHOP –3. RESTAURANTS + BAR 4. TICKET OFFICE 5. RECREATIONAL FLOOR 6. ARRIVAL’S + DEPARTURE’S SEATING 7. FLOATING FOLLY’S FERRY JETTY 8. STORAGE 9. BUS STOP 10. BIKE LOCKS 11. LIFT 12. W/C 13. PLANT 14. RESTAURANT SEATING INTERCHANGE “PLAN” 8 A A Z Z B B C C N 6 3 7 5 2 4 1 9 10 10 11 12 12 13 14 3.0M 3.8M 5.0M 6.9M 8.0M 5.0M 0.0M 0 5 10 20 50M
SECOND-HAND BOOK STORE
RECREATIONAL FLOOR
SECTION B-B]
SECTION C-C NE LOCAL HEROES MARKET SECTION A-A 5 10 30M MARKET INTERCHANGE FLOATING FOLLY PRIVATE VESSEL MOORING SPORTS COURTS CAR PARK SOLAR FARM LEGEND
MARKET INTERCHANGE
INTERCHANGE
CIRCULATION OF ACCOMADATION
FERRY JARROW STAITHE FLOATING JETTY 1 2 3
CAR PARK [200M²] BUS DROP OFF / PICK UP [100M2] BIKE STORAGE PERMINANT MARKET STALLS [75M²]* RECREATIONAL AREA [1000M²] TICKET OFFICE [75M²] SEATING AREA HERITAGE WALKWAY PRIVATE BOAT MOORING WAITNG PURCHASE CONSUMPTION VIEWING EVENING ENTERTAINMENT VIEWING PLATFORM SPORTS COURTS CYCLE TRACK WEST BOUND NORTH BOUND EAST BOUND RESTUARANTS CLOTHES GROCERYS PERSONAL SALES ART & CRAFT ENTERTANMENT W/C STAFF ROOM SECURITY OFFICE
A B C A B C SECTION Z-Z 0 5 10 30M INTERCHANGE LONG SECTION
01 420X150X5(FACADE) SHINGLES & SHAKES 02
TYVEK HOUSEWRAP BREATHER MEMBRANE 03 4500X14 ACRYLIC YELLOW SEMI TRANSLUCENT
04 LIGHTBAR ILLUMINATING NORTH FACADE
05 9(T) OBS BOARD 06 100X50 KILN DRIED
C16 TREATED SPRUCE TIMBER BATTENS 07 1000X500 BAUBUCHE BEECH LAMINADTED VENEER LUMBER PRIMARY STRUCTURE 08
HEAVY WEIGHT BREATHABLE UNDERLAY
09 420X550X5(ROOF) CEDAR SHINGLES & SHAKES 10 730X65 KILN DRIED C16 TREATED SPRUCE TIMBER RAFTER 11 180X65 STEICO FLEX 036 WOODFIBRE RIDGED INSULATION
0.036 W/MK PREFABRICATED 12 ALUMINIUM WINDOW FRAME WITH BUILT-IN EXTERIOR
RAIL BLIND 13 44(T) TRIPLE GLAZED WINDOW 14 500X500 BAUBUCHE BEECH LAMINADTED VENEER LUMBER PRIMARY STRUCTURE
*WITH TEKNOSAFE 2467-00 FIRE RETARDENT COATING EUROCLASS B-S1 FIRE RATING 15 1000X500 BAUBUCHE BEECH LAMINADTED VENEER LUMBER PRIMARY STRUCTURE* 16 AIR GUARD VAPOUR CONTOL LAYER 17 450X140
THERMOFLOC LOOSE FILL CELLULOSE INSULATION 18 450X60 STEICO FLEX 036
WOODFIBRE RIDGED INSULATION 0.036 W/ MK PREFABRICATED 19 18X540X2440 BIRCH
F.R PLYWOOD SHEETS EUROCLASS-B 20
STAINLESS STEEL BI-PODS SUPPORTING ROOF STRUCTURE 21 330X330 BAUBUCHE BEECH LAMINADTED VENEER LUMBER JOISTS 22
NATURAL OAK BOARDS WRAPPING FLOOR AND UNDERSIDE OF F1.1 23 STAINLESS STEEL HIDDEN GUTTERING 24 DOUGLAS FUR TIMBER BOARD CLADDING INTERIOR NON-STRUCTURAL WALLS OF UNITS 25 1600X900X600 STONE ASHLARS JOINED WITH STEEL CABLES RUNNING THROUGH CENTRE BONDED TOGETHER WITH EPOXY CONCRETE CLADDED IN 3(T) BAUBUCHE SHEETS 26
CONCRETE FOOTING FOR STONE ASHLAR ARCHWAYS 27 DPM 28 5(T) EPOXY RESIN ANTI SLIP COATING 29 60(T) CONCRETE SCREED WITH UNDERFLOOR HEATING 30 9(T) OBS BOARD 31 5000X5000X120 VALTED CONCRETE FOUNDATION SLABS 33 167X310 BAUBUCHE BEECH LAMINADTED VENEER LUMBER JOISTS 34 9(T) STEEL CONNECTOR PLATE 35 ALUMINIUM SILL CONNECTING TERMINAL TO STAITHE 36 NEW TIMBER WALKWAY 37 OLD TIMBER STAITHE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 14 15 12 13 14 20 21 22 24 23 25 26 27 28 29 30 31 32 32 33 34 35 36 37 0 1000 2000 5000 10000MM ALL MEASYREMENTS ARE IN MILLIMETRES MM UNLESS STATED
EARTH > FOLLY > FERRY
[1:200 MODEL]
WESTGATE COMMUNITY
CLIMBING CENTRE
THE SPORTS ARCHIVE STUDENT DESIGN AWARD 2024 TUTOR NOMINEE
2
Studio Tutor: Dr. Jiayi Jin
Located in The Cultural Community Zone in Newcastle Upon Tyne, at the intersection of St James Boulevard and Westgate Road. The project sits on a brown site of the former Carlisle Pub, bordering two student accommodation buildings, on either corner. Upon viewing the project vertical terracotta tiles cascade the buildings’ envelope, with a curved corner window that stretches up to the circular roof terrace.
The scheme seeks to strengthen the community culture of sports enthusiasts, through curating a social hub of like-minded individuals with climbing facilities of various types of climbing of different heights, across multiple or singular floors. The climbing walls are made of plywood and consist of protruding angular forms dotted with climbing holds to create interesting dynamics and varying difficulty for the users. This dynamic is continued throughout the building, through vertical circulation - a spiral staircase that contrasts the form of the walls and stairs behind the climbing walls. The design has an open concept with an atrium throughout the entire building.
Towards minimising individual and collective carbon footprints, a Bike Workshop found in the basement provides tools and teachings on bike maintenance for users. Decreasing waste within the bike industry, instead aids the public in prolonging the lifespan of their bikes through gaining knowledge on care. Users are invited to watch the workings within through the atrium.
Exterior Seating & Climbing Apparatus Used for Interior Inspiration 1:20 Sectional Model
User Climbing Connection
Merging Facility Views
Internal Climbing Caves
INDOOR CLIMBING VARIATIONS
Speed climbing is the most competitive variation of the sport and seen in the olymipcs. It involves climbing the wall as fast as possible, often in a race against another climber directly ajacent with exact replica climbing holds, up a 15m wall. Users are attached to a automatic belay which prevents ropes getting in the way.
This method of climbing is more popular with climbers with more experiance, as it involves clibming with a harness and a climbing partner to control the rope slack as you climb up the wall. These walls can be high as possible for as long as the rope can reach.
A form of climbing performed on smaller walls up to 3 metres high without ropes or harnesses. This lack of eqiupment allows for beginners to enjoy climbing beginners, bouldering is also popular in the more experianced climbing comunity with more technical routes up and along the wall.
3: BOULDERING
2: BELAY
1: SPEED
3 2 1
[Section A-A]
ROOF TERRACE
READING THREE
READING TWO
READING ONE
BELAY & SPEED
BOULDER
LOBBY & CAFE
CYCLE REPAIR HUB
Collaborative Bike Workshop Process Sketches
Climbing Core
A Long Way Down
An open design has been curated through angular voids unique to each floor, emphasizing the verticality of the project to reflect on the movement of the users.
Speed Walls
Climbing Caves
Boulder Walls
CULLERCOATS CORNER
ARTIST’S RETREAT
RESIDENCE, GALLERY & CAFE
3
Studio Tutor: William Campbell
Located in the small coastal town of Cullercoats, on an extended portion of landscape stretching into the sea, neighbouring the pier, the Cullercoats corner visitor centre lies embedded within the site looking out to the horizon. The scheme strives towards connecting Cullercoats to a wider audience within the northeast, drawing them to the town and its visitor centre. the public is invited to come and view artwork heavily inspired by the local materiality and views with the comfort of light drinks and snacks from the cafe/bar equipped to the visitor centre. The artists that create said artworks will reside in unique dwellings intricately positioned around the site to maximize Cullercoats’ influence on the artist’s pieces. The boost of people to Cullercoats is part of a broader scheme to provide an expansion of wealth for the small local businesses within the town.
Within the scheme, a Baubchue primary structure is utilised to hold the green wall and viroc shell of the exterior. The structure is spaced in accordance with the width of the plywood sheets that line the interior, aiming for a minimal production of waste when constructing the units , these visible beams also flow through the floor. Due to the contouring of the structure, light is allowed to glide between each Bauchue beam that stretches across the ceiling due to the dwellings skylights that run along the top of each crucifix form. This aim for the maximization of natural light is further assisted by the large, East/South facing glazed facades, that look out to the North Sea.
10 20 22 23 24 26 27 60 25 10 28 23 29 30 33 34 35 36 37 38 39 40 42 46 27 22 23 24 43 61 44 45 46 47 48 49 50 F2 9850 6000 GF FFL -0250 50 51 59 46 48 49 47 19 2112 27 53 30 5455 565758 26 48 49 47 0 500 1000 2000 4000 01 50X90 UC3 PRESSURE TREATED PINE HANDRAIL 02 12X90X750 SINGLE GLAZED PANELS SITUATED WITHIN POSIGLAZE RAIL SYSTEM 03 20X95X2400 NATURAL PINE DECK BOARD AUTOCLAVE TREATED TO PROTECT DECKING FROM FUNGI AND INSECTS IN THE GREEN WALL SYSTEM 04 TYVEK HOUSEWRAP BREATHER MEMBRANE 05 20 D CAVITY TO PROVIDE AIR CIRCULATION UNDER DECKING 06 90X1009 S AND B EPS500E INSULATION BOARD 0.033W/MK MANUFACTURED IN NORTH EAST 07 100X130 KILN DRIED C16 TREATED SPRUCE TIMBER JOISTS 08 50X160 INTUMESCENT EXPANSION JOINT SEAL WITHIN VENT 09 540X540X240 LORIENT INTUMESCENT AIR TRANSFER VENT PROMOTING THE PASSIVE VENTALATION OF AIR THROUGHOUT EACH FLOOR 120 MINUTES OF FIRE RESISTANCE 10 200X1220 STEICO FLEX 036 WOODFIBRE INSULATION 0.036 W/MK PREFABRICATED FOR A SNUG FIT AROUND TIMBER JOISTS AND ALUMINIUM SUBSTRUCTURE 11 10X400 BAUBUCHE BEECH LAMINADTED VENEER LUMBER PRIMARY STRUCTURE WITH TEKNOSAFE 2467-00 FIRE RETARDENT COATING EUROCLASS B-S1 FIRE RATING 12 AIR GUARD VAPOUR CONTOL LAYER 13 22X1220 VIROC CEMENT BONDED PARTICLE BOARD EUROCLASS B-S1,D0 BLACK RAW FINISH FINAL DIMENTION CUT IN SITU TO FIT TRIANGULAR CEILING SHAPE 14 M16X40 FULL THREAD STAINLESS STEEL HEX BOLTS 15 100X110 HEAVY DUTY RAIL FOR SERVICES, ART AND LIGHT FIXTURES 16 LOW POWER CANNON SPOTLIGHT ATTACHED TO HEAVY DUTY RAIL 17 18X540X2440 BIRCH F.R PLYWOOD SHEETS EUROCLASS 18 150 RS PRO STEEL WIRE ROPE MAX LOAD 130KG 19 44 T TRIPLE GLAZED WINDOW 20 30X200 GALVANISED STEEL GATE SWING EYE BOLT 21 18X1220X2440 BIRCH F.R PLYWOOD SHEETS EUROCLASS B 22 M20X110 FULL THREAD STEEL HEX BOLTS 23 5X380 PREFABRICATED GALVINASED STEEL CONNECTOR PLATE CUSTOM SHAPED FOR EACH ANGLE OF JOINING PRIMARY STRUCTURE 24 22X1220X3000 VIROC CEMENT BONDED PARTICLE BOARD GREY POLISHED FINISH 25 20X1020 SOUND INSULATING SCREED 26 18X1020 OBS BOARD 27 10X200 BAUBUCHE BEECH LVL PRIMARY STRUCTURE VISIBLE IN FLOOR WITH TEKNOSAFE 2467-00 FIRE RETARDENT COATING EUROCLASS B-S1 FIRE RATING 28 20 AIR CAVITY 29 HANGING WINE GLASS RACK 30 100X100 BAUBUCHE BEECH LVL 31 1100 H SERVERY 33 60X1220 CONCRETE SCREED WITH UNDERFLOOR HEATING 34 130X1220 STEICO FLEX WOODFIBRE INSULATION 35 20X10 S AND B EPS INSULATION BLOCK ADJUSTABLE HEIGHT ROOM FOR SERVICES UNDERNEATH WHICH RUN AROUND THE PERIMETER 36 STEEL BAR RUNNING DOWN THROUGH FOUNDATIONS FROM CONNECTOR PLATE WHICH LINKS LVL SCTRUCTURE TO FOUNADTIONS AND REBAR CAGES 37 CONCRETE FOUNDATIONS REINFORCED WITH STEEL REBAR CAGES 38 230X180X120 PREFABRICATED CARBON STEEL REBAR CAGE RUNNING UNDERNEATH PRIMARY SCTRUCTURE 39 520X520X120 PREFABRICATED CARBON STEEL REBAR CAGE RUNNING AROUND PERIMETER OF FOUNDATIONS 40 DPM 41 50 SAND BINDING SCREED 42 COMPRESSED HARDCORE 43 PRESSURE TREATED SPRUCE FRAMED RAMP TOPPED WITH 24 T DECK BOARD LAYERED WITH BLACK ANTI SLIP TAPE FOR GRIP AND VISIBLITY 44 50 T CRUSHED ROCK GRAVEL LAYER 45 100 T COMPRESSED HARDCORE 46 DIP TREATED SOFT WOOD LATTICE TRELLIS TO HOUSE CLIMBER PLANTS WHICH HIDE THE TARPAULIN SHEET AND ALUMINUIM SECODARY STRUCTURE 47 100X100 6082T6 ALUMINIUM BEAM RUNNING PERPENDICULAR AND ATTACHED TO PRIMARY LVL STRUCTURE, BEAMS EXTEND BEYOND STRUCTURE TO SUPORT WIND, RAIN AND SUN SHELTER 48 TARPAULIN SHEET SEPERATING TRELLIS FROM GREEN WALL SYSTEM 49 60X100 PRESSURE TREATED PINE RAFTER 50 0.7 T 70/75⁰ GALVINISED STEEL RIDGE FLASHING 51 1000X1000X270 LORIENT INTUMESCENT AIR TRANSFER VENT 120 MINUTES OF FIRE RESISTANCE 53 ALUMINIUM FRAMED DOUBLE GLAZED GLASS DOOR 54 220X1220 S AND B EPS500E INSULATION BOARD 0.033W/MK 55 220X50X2 STEEL BRACKET CONNECTING PLYWOOD SHEET TO ALUMINIUM BEAMS 56 MIXTURE OF SOIL AND COMPOST FILLED POCKETS DEPENDING ON PLANT USED IN POCKET. 57 1000X1000 SCOTSCAPE FYTOTEXTILE PLANTER SYSTEM EUROCLASS -S2,D0 58 VARIETY OF PLANTS WHICH DON’T REQUIRE MUCH SUNLIGHT AND ARE NOT AFFECTED BY HEAVY SHOWERS SUCH AS ASPLENIUM SCOLOPENDRIUM, BUXUS SIMPERVIRENS, EVONYMUS FORTUNE, HEBE PINGUIFOLIA PAGEI, HEDRA, LUZULA SYLVATICA 59 60X50 ALUMINIUM HOUSING FOR GLAZING 60 900X1020 SOUND INSULATING BOARD 61 1962X762 ALUMINIUM FRAMED DOUBLE GLAZED DOUBLE DOORS ALL DIMENSIONS ARE IN MILLIMETRES MM UNLESS SPECIFIED ELEVATION 1:20 PLAN 1:20 SECTION 1:20 INTERIOR INTERIOR INTERIOR EXTERIOR EXTERIOR EXTERIOR 20 22 23 24 26 27 25 23 30 35 36 37 38 40 42 22 23 61 45 46 47 48 49 50 9850 GF -0250 50 51 59 49 49 0 500 1000 2000 4000 50X90 UC3 PRESSURE TREATED PINE HANDRAIL 02 12X90X750 SINGLE GLAZED PANELS SITUATED WITHIN POSIGLAZE RAIL SYSTEM 03 20X95X2400 NATURAL PINE DECK BOARD AUTOCLAVE TREATED TO PROTECT DECKING FROM FUNGI AND INSECTS IN THE GREEN WALL SYSTEM BREATHER MEMBRANE 20 D CAVITY TO PROVIDE AIR CIRCULATION UNDER DECKING 90X1009 EPS500E INSULATION BOARD 0.033W/MK MANUFACTURED IN NORTH EAST 100X130 KILN DRIED C16 TREATED SPRUCE TIMBER JOISTS 08 50X160 INTUMESCENT EXPANSION JOINT SEAL WITHIN VENT 09 540X540X240 LORIENT INTUMESCENT AIR TRANSFER VENT PROMOTING THE PASSIVE VENTALATION OF AIR THROUGHOUT EACH FLOOR 120 MINUTES OF FIRE RESISTANCE 10 200X1220 STEICO FLEX 036 WOODFIBRE INSULATION 0.036 W/MK PREFABRICATED FOR A SNUG FIT AROUND TIMBER JOISTS AND ALUMINIUM SUBSTRUCTURE 11 10X400 BAUBUCHE BEECH LAMINADTED VENEER LUMBER PRIMARY STRUCTURE WITH TEKNOSAFE 2467-00 FIRE RETARDENT COATING EUROCLASS B-S1 FIRE RATING 12 AIR GUARD VAPOUR CONTOL LAYER 13 22X1220 VIROC CEMENT BONDED PARTICLE BOARD EUROCLASS B-S1,D0 BLACK RAW FINISH FINAL DIMENTION CUT IN SITU TO FIT TRIANGULAR CEILING SHAPE 14 M16X40 FULL THREAD STAINLESS STEEL HEX BOLTS 15 100X110 HEAVY DUTY RAIL FOR SERVICES, ART AND LIGHT FIXTURES 16 LOW POWER CANNON SPOTLIGHT ATTACHED TO HEAVY DUTY RAIL 17 18X540X2440 BIRCH F.R PLYWOOD SHEETS EUROCLASS 18 150 RS PRO STEEL WIRE ROPE MAX LOAD 130KG 19 44 T TRIPLE GLAZED WINDOW 30X200 GALVANISED STEEL GATE SWING EYE BOLT 18X1220X2440 BIRCH F.R PLYWOOD SHEETS EUROCLASS B M20X110 FULL THREAD STEEL HEX BOLTS 5X380 PREFABRICATED GALVINASED STEEL CONNECTOR PLATE CUSTOM SHAPED FOR EACH ANGLE OF JOINING PRIMARY STRUCTURE 22X1220X3000 CEMENT BONDED PARTICLE BOARD GREY POLISHED FINISH 25 20X1020 SOUND INSULATING SCREED 26 18X1020 OBS BOARD 27 10X200 BAUBUCHE BEECH LVL PRIMARY STRUCTURE VISIBLE IN FLOOR WITH TEKNOSAFE 2467-00 FIRE RETARDENT COATING EUROCLASS B-S1 FIRE RATING 28 20 AIR CAVITY 29 HANGING WINE GLASS RACK 30 100X100 BAUBUCHE BEECH LVL 31 1100 H SERVERY 33 60X1220 CONCRETE SCREED WITH UNDERFLOOR HEATING 34 130X1220 STEICO FLEX WOODFIBRE INSULATION 35 20X10 S AND B EPS INSULATION BLOCK ADJUSTABLE HEIGHT ROOM FOR SERVICES UNDERNEATH WHICH RUN AROUND THE PERIMETER 36 STEEL BAR RUNNING DOWN THROUGH FOUNDATIONS FROM CONNECTOR PLATE WHICH LINKS LVL SCTRUCTURE TO FOUNADTIONS AND REBAR CAGES 37 CONCRETE FOUNDATIONS REINFORCED WITH STEEL REBAR CAGES 38 230X180X120 PREFABRICATED CARBON STEEL REBAR CAGE RUNNING UNDERNEATH PRIMARY SCTRUCTURE 39 520X520X120 PREFABRICATED CARBON STEEL REBAR CAGE RUNNING AROUND PERIMETER OF FOUNDATIONS 40 DPM 41 50 SAND BINDING SCREED 42 COMPRESSED HARDCORE PRESSURE TREATED SPRUCE FRAMED RAMP TOPPED WITH 24 T DECK BOARD LAYERED WITH BLACK ANTI SLIP TAPE FOR GRIP AND VISIBLITY 50 T CRUSHED ROCK GRAVEL LAYER 100 T COMPRESSED HARDCORE DIP TREATED SOFT WOOD LATTICE TRELLIS TO HOUSE CLIMBER PLANTS WHICH HIDE THE TARPAULIN SHEET AND ALUMINUIM SECODARY STRUCTURE 47 48 TARPAULIN SHEET SEPERATING TRELLIS FROM GREEN WALL SYSTEM 49 60X100 PRESSURE TREATED PINE RAFTER 50 0.7 T 70/75⁰ GALVINISED STEEL RIDGE FLASHING 51 1000X1000X270 LORIENT INTUMESCENT AIR TRANSFER VENT 120 MINUTES OF FIRE RESISTANCE 53 ALUMINIUM FRAMED DOUBLE GLAZED GLASS DOOR 54 220X1220 S AND B EPS500E INSULATION BOARD 0.033W/MK 55 220X50X2 STEEL BRACKET CONNECTING PLYWOOD SHEET TO ALUMINIUM BEAMS 56 MIXTURE OF SOIL AND COMPOST FILLED POCKETS DEPENDING ON PLANT USED IN POCKET. 57 1000X1000 SCOTSCAPE FYTOTEXTILE PLANTER SYSTEM EUROCLASS -S2,D0 58 VARIETY OF PLANTS WHICH DON’T REQUIRE MUCH SUNLIGHT AND ARE NOT AFFECTED BY HEAVY SHOWERS SUCH AS ASPLENIUM SCOLOPENDRIUM, BUXUS SIMPERVIRENS, EVONYMUS FORTUNE, HEBE PINGUIFOLIA PAGEI, HEDRA, LUZULA SYLVATICA 59 60X50 ALUMINIUM HOUSING FOR GLAZING 900X1020 SOUND INSULATING BOARD 1962X762 ALUMINIUM FRAMED DOUBLE GLAZED DOUBLE DOORS ALL DIMENSIONS ARE IN MILLIMETRES MM UNLESS SPECIFIED KA5014 TECHNICAL TRYPTIC EUAN FISHER W21019703 ELEVATION 1:20 PLAN 1:20 SECTION 1:20 INTERIOR INTERIOR EXTERIOR EXTERIOR THE ALUMINIUM SUBSTRUCTURE GIVES THE BAUBUCHE LVL PRIMARY STRUCTURE A LIGHTWEIGHT SUPPORT SYSTEM, IN TURN PROVIDING A ROBUST SUSTAINABLE FOUNDATION FOR THE BUILDING TO BE BUILT ON WHEN COMBINED WITH THE REINFORCED CONCRETE RAFT FOUNDATIONS WHICH OFFERS EXTENDED DURABILITY FOR THE STRUCTURE OF THE BUILDING WHILE PROVIDING GOOD THERMAL MASS. THIS PRIMARY STRUCTURE BEING SPACED TO FIT THE STANDARD WIDTH OF THE PLYWOOD SHEETS ALLOWS FOR EFFICIENT USE OF MATERIAL. THE EXTENSIVE FIRE PROTECTION WITHIN THE STRUCTURE AND INTERIOR CLADDING ENSURES THE BUILDING IS SAFE IN THE EVENT OF A FIRE AND IMPROVES THE GENERAL STRUCTURAL INTEGRITY. THE PASSIVE VENTILATION SYSTEM FITTED WITH INTUMESCENT FIRE STOPPERS AND A LIVING WALL SYSTEM ALSO FURTHERS FIRE SAFETY WHILE FINDING AN ENVIRONMENTALLY FRIENDLY WAY TO VENTILATE AND INSULATE THE BUILDING. THIS LIVING WALL PROVIDES BUILT-IN WATER RETENTION SYSTEM THAT GUIDES RAINWATER THROUGH EACH PLANT ENSURING THEY DON’T DRY OUT AND BECOME FIRE HAZARD, THIS SYSTEM ALSO OVERHANGS OVER THE EAST AND SOUTH-FACING FACADES SHELTERING THE OUTDOOR SEATING FROM WIND AND RAIN WHILE PROTECTING THE INSIDE FROM BLINDING LOW SUN RAYS, AS SEEN IN THE ELEVATION. OVERALL THESE STRATEGIES LEAD TOWARDS LOWERING THE BUILDING’S CARBON FOOTPRINT AND IMPROVING ENERGY EFFICIENCY WHICH WAS ONE OF THE KEY AIMS WHEN DEVISING A DESIGN.
Technical Triptych
Site
HIGH TIDE LOW TIDE 0 10 20 50 100m LEGEND
Plan
4. LANDSCAPE ARTIST’S DWELLING 5. SCULPTOR’S DEWLLING 6. CULLERCOATS CORNER VISITOR CENTER
MOSAIC ARTIST’S DWELLING CO-LIVING SPACE
PUBLIC VENUE
Cullercoats Corner
Artist’s Retreat Salt Model
Large Dwelling
West Facades
Small Dwelling
Upper Gallery
Cafe + Seating
1:100 Interior Model
HIGH TIDE 0 1 2 3 5 10M
B B
Large Dwelling Plan
0 1 2 5 10 20M
Cullercoats Corner Visitor Center
Section B-B
COMPETITIONS + AWARDS
4
NAS X NUAS
Design Competition 2023
Awarded Honorable Mention
ANGELOU WALKWAY
An annual design competition with Northumbria and Newcastle architecture societies. We were given 9 hours to design and curate according to the brief set at 7 am on the day.
females feel very unsafe walking alone after dark, in parks spaces.” (ONS 2021)
This brief guided students to design a structure or installation to benefit one of the given charities.
necessity for safe spaces for women to walk at night is crucial.
Our team’s chosen charity was the Angelou Center -a black-led feminist organisation which offers a safe space for women- given this, our design grew into a timber archway structure to light the dark nighttime path through Exhibition Park, Newcastle, creating a safer environment for anyone walking in the dark.
the Angelou Centre, this project is the driving force a space for traversal back into the city following late the Wylam Brewery. The intimidating concrete path area of vulnerability and makes the night’s empty abyss alarming – particularly in the current spiking crisis with violence against young women.
This entry was given an ‘Honorable Mention’ due to its keen focus on realising the dangers of the dark while aiming to protect the vulnerable.
night, the proposal becomes a safe space for women home following late night events at the Wylam Brewery shelter, light and a positive alternative traversal to contrast the current dark, empty public space. The alternate path creates a journey that aims to emotionally those who feel vulnerable during the night.
proposed scheme celebrates women of all cultures during and from the Wylam Brewery - featuring dedicated for educational and motivational talks, areas for multicultural street vendors and community spaces with seating. the important role of women in society and shines a need for safe spaces.
HELLIER LEWTHWAITE FISHER
Collage
“89% of females feel very unsafe walking alone after dark, in parks and open spaces.” (ONS 2021) The necessity for safe spaces for women to walk at night is crucial. In aid of the Angelou Centre, this project is the driving force in creating a space for traversal back into the city following late events at the Wylam Brewery. The intimidating concrete path creates an area of vulnerability and makes the night’s empty abyss even more alarming – particularly in the current spiking crisis with rising violence against young women. During the night, the proposal becomes a safe space for women to walk home following late night events at the Wylam Brewery – providing shelter, light and a positive alternative traversal experience to contrast the current dark, empty public space. The winding alternate path creates a journey that aims to emotionally benefit those who feel vulnerable during the night. The proposed scheme celebrates women of all cultures during the day, to and from the Wylam Brewery featuring dedicated platforms for educational and motivational talks, areas for multicultural street vendors and community spaces with seating. It reinforces the important role of women in society and shines a light on the need for safe spaces. TOM HELLIER DYLAN LEWTHWAITE EUAN FISHER Collage Plan 1:500 Section 1:500 THE
ANGELOU WALKWAY
The Angelou Walkway Project Montage
NAS X NUAS
Design Competition 2024
Awarded Best Model
Continuing with the same competition layout from the previous year, the 2024 brief aimed students to repurpose one of the circa 1960s sky bridges stretching throughout Newcastle with sustainable trade spaces.
Our team curated an ambitious timber structure attached to the side of said sky bridge to tackle the cost of living crisis with swap shops with limited materials used for quick assembly. This design came from the idea of a temporary extension of the indie Grainger Market.
My model was awarded ‘Best Model’ due to its attention given to a specific section of the design thoroughly assisting with understanding the purpose and function of the project.
Grainger SkyMarket 1:20 Sectional Model Timber & Card
OTHER WORKS 5
Presenting my Techical Triptych of Culllercoats Corner Artist’s Retreat to the Y2 cohort. Specifically selected to present after receiving top marks in the Tech Module.
In my early studies I developed great mix media artistic ability. These skills led me to producing a series of acrilic paintings inspired by my hand crafted oragami shapes
I have a great passion for the art of photography which I developed from a young age. I’ve found this incredibly usful throughout my architectual studies for framing views and perspectives of my projects.