Skip to main content

Environmental Science & Engineering Magazine | November/December 2026

Page 1

NOVEMBER/DECEMBER 2026 WWW.ESEMAG.COM

Evaluating Toronto’s Cherry Street Stormwater Treatment Facility Jasper wastewater lagoon restoration supports post-wildfire rebuilding Canada introduces water and electricity principles for proposed data centres Are the design and presentation tools we use shaping how engineers think? PM40065446


THE

DICE

THE EVOLUTION OF THE CHEMICAL METERING SYSTEM BEFORE

complex. cluttered.

AFTER simple. intuitive.

Made in Canada!

Up to 50% reduction in mechanical room space required 90% fewer joints = 90% less risk of leakage Simple, consolidated operation

Support Canadian Industry - Buy DICE #20 – 220 Industrial Parkway S. Aurora, Ontario L4G 3V6 Tel: 1 (905) 841-4073 Fax: 1 (905) 841-4018

www.VissersSales.com


Leader in Wastewater Innovation

For over a century, engineers, contractors, builders, and developers have trusted Barnes wastewater pumps and pressure sewer systems for their reliability and durability. Offering everything from sump pumps to powerful grinder and chopper pumps, Barnes provides innovative, cost-effective solutions with industry-leading delivery times.

LEARN MORE TODAY: CRANEPUMPS.COM


CONTENTS

November/December 2026 • Vol. 39 No. 6 • ISSN-0835-605X

Editor and Publisher STEVE DAVEY steve@esemag.com Managing Editor PETER DAVEY peter@esemag.com Contributing Editor DAVID NESSETH david@esemag.com Sales Director PENNY DAVEY penny@esemag.com Sales Representative DENISE SIMPSON denise@esemag.com

8

Accounting SANDRA DAVEY sandra@esemag.com

FEATURES

Design & Production MIGUEL AGAWIN miguel@esemag.com

6 Debate over data centre construction continues the tradition of NIMBYism 8 Evaluating two years of operating Toronto’s Cherry Street Stormwater Treatment Facility 13 The case for moving from analog to digital controls 16 Engineers develop 3D-printed filter that removes up to 90% of microplastics from wastewater 18 Jasper wastewater lagoon restoration supports post-wildfire rebuilding 20 EPA launches study to screen drinking water for more than 1,000 contaminants 22 The power of redundant technology in wet-weather flow tracking 25 Indigenous-led partnership to advance oilsands process water treatment research 41 Preventive maintenance of expansion joints prevent failures 42 Canada introduces water and electricity principles for data centres amid AI boom 44 Modernizing water-level monitoring for flood preparedness 46 Continuous nitrate monitoring system implemented at Brantford’s Holmedale WTP 48 Transforming a southern Alberta landfill into a modern, regional waste management system

Circulation BRIAN GILLETT ese@mysubscription.ca

TECHNICAL ADVISORY BOARD Archis Ambulkar, Toledo Technology Academy of Engineering Patrick Coleman, Stantec Bill De Angelis, Metrolinx Mohammed Elenany, Urban Systems William Fernandes, City of Toronto Tony Petrucci, Black & Veatch Environmental Science & Engineering is a bi‑monthly business publication of Environmental Science & Engineering Publications Inc. An all Canadian publication, ES&E provides authoritative editorial coverage of Canada’s municipal and industrial environmental control systems and drinking water treatment and distribution. Readers include consulting engineers, industrial plant managers and engineers, key municipal, provincial and federal environmental officials, water and wastewater plant operators and contractors. Information contained in ES&E has been compiled from sources believed to be correct. ES&E cannot be responsible for the accuracy of articles or other editorial matter. Articles in this magazine are intended to provide information rather than give legal or other professional advice. Canadian Publications Mail Sales Second Class Mail Product Agreement No. 40065446 Registration No. 7750 Subscription Changes? Please email reader subscription changes to ese@mysubscription.ca, or call 705-502-0024. ADVERTISING Penny Davey Sales Director 416-807-3812 penny@esemag.com

Denise Simpson Sales Representative 905-960-4064 denise@esemag.com

Environmental Science & Engineering 220 Industrial Pkwy. S., Unit 30 Aurora, Ontario L4G 3V6 Tel: (905) 727-4666 www.esemag.com

Digital Edition Sponsored by

4 | November/December 2026

13

52 Turning dairy processing residuals into resources for healthier soils 54 Moose Jaw breaks ground on $73M wastewater headworks facility CONSULTANTS’ FORUM

26 Are the design and presentation tools we use shaping how engineers think? 29 CIMA+ wins ACEC Project of the Year for Ottawa SCADA modernization 30 Recognizing the pioneers of Ontario’s groundwater consulting industry 33 Carollo Engineers executive takes helm of the Water Environment Federation 34 ACEC awards recognize wastewater innovation, flood recovery and northern projects 36 The everyday decisions that shape an engineering firm’s risk 39 How technology and policy have changed the development of data centres DEPARTMENTS

Product Showcase...........................49 Professional Cards...........................53 Ad Index...........................................54 Cover photo courtesy of Graham Construction.


Process Equipment for Wastewater, Biosolids & Biogas Pro Aqua, Inc. carries a complete range of market leading and innovative products. Let us show you We Are The Exclusive Suppliers For:

Let's Solve Water

Providing treatment solutions for more than 30 years. • Archimedes Screw Pumps • Screens – Multi-Rake, Perf Plate, Drum, Travelling Band, Step, Climber, Vertical Pump Station Screens, Screenings Washer /Compactors • Grit Separation, Washing & Dewatering • Conveyors – Shafted & Shaftless Screw, Belt • Blowers – Rotary Screw, Rotary Lobe, Single Stage and Multistage Centrifugal, Turbo, Integrally Geared, Advance Control, Rebuilds • Aeration – Surface, Membrane & Ceramic, Fine & Coarse Bubble, Gas & Liquid Cleaning, DO Control, AlphaMeter • Mixers – Anoxic & Swing Zones, Sludge Holding, Digester; Mechanical, Hydraulic and Gas Bubble • Tank Components – Decanters, Swivel Joints, Telescoping Covers, Watertight Doors •

• Rotary Lobe Pumps & Grinders • Disinfection – UV, Ozone • Tertiary Filters – Travelling Bridge, Disk, Membrane • Sludge Thickening & Dewatering – Disk Thickener, Gravity Thickener, Filter Press, Screw Press, Centrifuge • Anaerobic Digesters – Sludge Conditioning, In-line Screening, Degritting, Membrane Gas Holders, Liquid Mixing, Nutrient Recovery • Sludge Drying – Belt, Fluid Bed and Solar • Septage Receiving – Screens, Dump Stations, Truck Access & ID, data gathering & equipment control • Sludge Treatment, Transport & Storage – Cake Pumps, Silos, Sliding Frames, Live Bottom Hoppers, Push Floors, Truck Loading, Alkaline Stabilization • Odour Control – Tank Covers, Chemical & Biological Treatment, Activated Carbon • CSO, Stormwater & Pump Stations – Tipping Buckets, Bending Weirs, Flushing Gates, Flow Regulating, Vortex Valves, Storm Screens

Primary & Secondary, Circular, Chain & Flight, Inclined Plate Settlers, Weir Washing • • Biological – SBR, MBR, RBC, MBBR, MABR, Oxidation Ditch, BioMag, CoMag • Polymer – Liquid and Dry Systems

Digester Gas – Gas Holders, Gas Conditioning: chilling; compressing; and removal of moisture, sulphur, carbon dioxide and siloxane, complete Co-Generation facilities

T: (905) 864-9311 F: (905) 864-8469 www.proaquasales.com 7-264 Bronte St. S., Milton, ON L9T 5A3 04.16


EDITORIAL COMMENT BY STEVE DAVEY

Debate over data centre construction continues the tradition of NIMBYism

B

ack in the 1980s, the term ““NIMBY” (Not in My Backyard) began to be used to describe public opposition to projects with any perceived environmental consequences. This type of opposition continues today, especially when it comes to the construction of massive data centres, which are the topic of two articles in this issue. In “How technology and policy have changed the development of data centres” (p39), author Michel Chartier explains that modern data centres are being designed to cut water and power consumption needs, as well as reduce noise emissions. The goal is to transform data centres from being infrastructure assets that are nice to have, to ones we need to have, “creating hubs that can not only house the data but protect it in the region where it is needed.” In his article “Canada introduces water and electricity principles for data centres amid AI boom” (p42), contributing editor David Nesseth reports that the federal government has introduced new national principles encouraging data centre developers to minimize water consumption and environmental impacts, as Canada prepares for a major expansion of energy-intensive artificial intelligence (AI) infrastructure. On November 12, millions were reportedly unable to use various Microsoft 365 services, which affected emails, file sharing, and video conferencing at personal, business, institutional and government levels. Then, in the afternoon of November 13, the U.S. Federal Aviation Administration issued a nationwide ground stop for several hours, causing chaos at airports and delaying hundreds of thousands of passengers. Transportation officials cited “extraordinary circumstances” caused by communications issues at regional air traffic control centres for the stoppage.

6 | November/December 2026

Credit: valmedia, stock.adobe.com

On November 17, Apple experienced a widespread service disruption impacting the App Store, Apple Music, AppleCare, iCloud sign-ins, and Apple Pay. The previous day, several major U.S. financial institutions, including JPMorgan Chase, Bank of America, Wells Fargo, and U.S. Bank, faced online banking delays and transaction glitches. These seemingly unrelated but back-to-back events should serve as a stark reminder to everyone just how reliant we are on digital technology, and the information it transmits and stores continually for us all. Like it or not, massive data centres are the backbone of our digital age. Like society did when it embraced the automobile and all the environmental issues it caused, we will need to strike a cost-benefit balance with this latest NIMBY issue. This issue of Environmental Science & Engineering Magazine also contains our 31st annual focus on challenges, trends and opportunities facing consulting engineers. In his latest article “Are design and presentation tools shaping how engineers think?” (p26), Patrick Coleman, PhD, P.Eng., who is a principal wastewater process engineer with Stantec, provides a historical look at the development of project presentation platforms and how the now ubiquitous use of PowerPoint is confining the thinking of engineers. John Vogan, Steve Shikaze, Kristian Doerken, and John Weeraratne

did considerable research for their article “Recognizing the pioneers of Ontario’s groundwater consulting industry” (p30). Of their own volition, they undertook to document the founding and evolution of several noteworthy engineering firms, “by interviewing former key employees, and documenting the technical innovations and advancements involved in their initial projects.” The authors concluded that collaborative approaches with academia and international experts across disciplines are still very relevant when addressing today’s groundwater issues and that they may be of particular use in the field of emerging groundwater contaminants, and in studying the effects of climate change on aquifer behaviour. Society owes much to these pioneers and other engineers who helped make our world what it is today, and we thank our contributing authors in this issue for helping document our industry’s history. I wonder which contemporary engineers, scientists or inventions will be remembered by future generations that study how AI and other rapidly developing technologies changed the way we live, work and co-exist with each other. As the American economist, historian, and social theorist Thomas Sowell once said, “It was not our enlightened crusaders who brought light to the masses, it was Thomas Edison. It was not our intellectuals who ended the insularity of isolated communities, it was Henry Ford and the Wright brothers. For the people in the street, Kodak did more to make them aware of pictures than Rembrandt and all the museums put together!” Steve Davey is the editor and publisher of ES&E Magazine. Email: steve@esemag.com

Environmental Science & Engineering Magazine


Optimum Performance

Chemical Dosing Pumps & Skid Systems

FLEXFLO® M3 PERISTALTIC METERING PUMP

CHEM-FEED® COMPLETE METERING SYSTEMS

Fully equipped and assembled systems for drop in place install and fast startup. One, two or three pump models.

Smooth, consistent chemical dosing with no vapour lock and no loss of prime.

ENHANCED CHEM-FEED® MD1

Dual diaphragm design with hyper drive technology for unequalled performance. Pressure rating 12.4 Bar. Output capability 13.2 to 26.5 LPH.

Fluid Metering Solutions Made Simple® Learn about our Skid Systems, M3 and MD1 at www.blue-white.com


STORMWATER

Evaluating two years of operating Toronto’s Cherry Street Stormwater Treatment Facility

Chelsey Yang

E

Benjamin Cooper

Bernardo Majano

very stormwater treatment facility is designed around a set of assumptions about influent loading, chemistry and hydraulics. At Toronto’s Cherry Street Stormwater Treatment Facility (SWF), the 2024–2026 operating period showed that real wet-weather conditions can diverge sharply from those design-stage assumptions, particularly in a facility fed by deep-tunnel hydraulics. Because the design engineering team oversaw the facility through its initial seasonal cycles, deviations were identified early, traced to root causes and resolved through targeted corrective actions. Over that period, the facility met its effluent target during scour events, carrying roughly 40 times the design-basis peak influent total suspended solids (TSS). It ran continuously for 12 months, including a full winter, before handover. After a restart in December 2025, it reached on-spec effluent results in about 10 minutes.

The Cherry Street Stormwater Treatment Facility serves the West Don Lands and East Bayfront catchments. Credit: gh3* / Adrian Ozimek

catchments, with a future connection to North Keating. The treatment train consists of an upstream hydrodynamic oil and grit separator (OGS) with a peak design flow of 10 m³/s, four wedge wire gravity screens rated at 250 L/s each, and two high-rate ballasted flocculation and clarification trains (Actiflo) rated at 375 L/s each, for a combined treatment capacity of 750 L/s. UV disinfection follows, prior to discharge into Lake Ontario. The facility is designed to come online rapidly for a storm, treat extreme and fast-changing loads, and return to standby once flows recede. What makes this difficult is the deep tunnel itself. It delivers bimodal loading, which means near-clean flow, or scour-driven spikes far beyond the design basis. Long periods of inactivTHE FACILITY ity between storms can lead to the accuThe Cherry Street SWF treats high-vol- mulation of fats, oils, grease and debris, ume, highly variable wet-weather flows the development of septic conditions, and captured from the upstream deep tunnel extended periods of equipment idleness. and combined sewer network. It serves the West Don Lands and East Bayfront 8 | November/December 2026

WHEN THE FACILITY WAS ACTUALLY RUNNING

Construction ran from 2018 to 2020. Commissioning was deferred, pending control wiring and programming updates, and the facility was largely inactive through 2021 and 2022. Site acceptance testing (SAT) in the fall of 2023 comprised more than 30 on-site verification sessions, followed by intermittent operation through 2024 and the first half of 2025. Continuous operation began in July 2025 and ran through the 2025–26 winter, with training and handover in 2026. Nearly every finding described in this article was made in that sustained operating window. Table 1 compares the governing design criteria with performance observed over 2024–2026. Once dose pacing and the microsand ratio were field-tuned, effluent TSS was consistently below 2.0 mg/L against a 20 mg/L target. UV transmittance (UVT) was consistently 80–90% against a 57% target. continued overleaf…

Environmental Science & Engineering Magazine


STORMWATER

Table 1: Design basis versus observed performance, 2024–2026.

SCOUR-DRIVEN TSS SPIKES

The ballasted flocculation specification sets influent TSS at an average of 133 mg/L and a minimum of 10 mg/L. Peaks of 500 mg/L are flagged as not to be treated. During deep-tunnel scour, influent TSS reached approximately 20,000 mg/L. Deep-tunnel networks accumulate sediment between storms. Once flow velocity exceeds a threshold, that sediment mobilizes in bulk, producing a sudden spike rather than a gradual rise. The design-basis dosing table, a ten-point TSS-to-coagulant-dose lookup spanning readings from below 10 mg/L to 500 mg/L with doses from 40 to 115 µL/L, was not calibrated for scour of this magnitude. Dose pacing at extreme loadings was tuned iteratively in the field. The control design also includes a useful safety fallback. If the influent TSS reading falls outside its calibrated range, the PLC forces flow-paced dosing rather than freezing at the last table value. Combined with field-tuned dose pacing, this is a meaningful part of why effluent remained within compliance. Future designs should budget for a post-commissioning dose-pacing tuning phase and specify the out-of-range fallback. THE POLYMER SKID

The polymer make-down and dosing system was the facility’s most persistent operational challenge. During winter and early spring startups, effluent turbidity crept upward during storms, even though coagulant dosing and microsand recirculation appeared normal. Floc looked visibly weaker than in 10 | November/December 2026

Cross-section of the Cherry Street SWF tunnel and shaft system, showing the oil/grit separator, major storm inlet, main tunnel shaft (storage and pump station) beneath the treatment building, and the Keating Channel shaft.

warmer months, and clarifier settling was degraded. The root cause was unheated dilution water running below the manufacturer’s recommended activation temperature. Polymer chains need adequate thermal energy to uncoil into the extended chains that bridge coagulated particles. When they only partially uncoil, they produce weak micro-floc that settles poorly, regardless of coagulant dose or microsand ratio. The resulting turbidity breakthrough reduced UV transmittance, forcing higher lamp output. The same investigation found the SCADA polymer-aging expiry setpoint configured at 96 hours, while the process design documentation specifies that prepared polymer effectiveness drops off after 48 hours. Dilution water is now thermally controlled to 24–34°C from a dedicated hot water tank and verified during seasonal startup. The aging setpoint is being aligned to the 48-hour basis. A priming and hot-water flushing procedure, with clog detection, via the downstream flowmeters, restored reliable dosing.

TUNING THE POLYMER DOSING LOOP

Sustained operation also showed that the polymer dosing proportional-integral-derivative (PID) loop was too aggressive. The dosing pump would not settle. The process variable swung continuously and never held setpoint, and the controller output hunted across almost its full range. The loop was reacting to noise on the polymer flow signal, not to real process change. The instinct is to add gain to force the process onto setpoint. Here the opposite was true. Proportional gain was reduced from 0.50 to 0.30, and the derivative term was halved from 0.60 to 0.30 seconds, with integral unchanged at 0.100 repeats per second. The result was a calm, stable loop that tracks setpoint. This was an equipment-life issue, not just a control-quality one. Constant output swings drove the drive and pump up and down, pushing the pump toward low-flow, low-media operation. An independent vendor inspection in May 2025 found rotor and stator wear consistent with dry running. All three pumps were rebuilt with new rotors, stators continued overleaf…

Environmental Science & Engineering Magazine


STORMWATER

and O-rings, with the rotor upgraded to solid AISI 316. Dosing loops should be commissioned with conservative gains and minimal derivative, with as-found and as-left tuning values documented in the O&M package. LAYERED CONTROL AND A VERIFIED RESTART

The facility is automated by three remote processing units on an Ethernet control network, integrated with plant SCADA, with an operator interface terminal (OIT) in the electrical room. Control is layered. Local hand control at the equipment, local control panels, the OIT in remote-manual or remote-auto, and SCADA in remote-manual or remote-auto, with SCADA-automatic as the default. An unattended OIT reverts to SCADA after a preset interval. Mode transfers are bumpless, and a treatment system home position returns all equipment to a treatment-ready state. Every stage of the project used a different layer. Manual valve line-ups during verification, remote-manual operation during site acceptance testing (SAT) and startup testing and remote-automatic operation for storm response. That flexibility allowed issues to be found, isolated safely and corrected, without taking the facility out of service. The automation also kept changing. Contract directives after substantial completion updated control wiring and programming. SAT findings were consolidated into a master issue list by equipment tag. Sustained operation required further refinements. Commissioning schedules on facilities of this complexity should anticipate a controls finalization phase, rather than assume the program is frozen at installation. Following SAT, the facility was returned to service through a structured verification program, rather than an ad-hoc restart. A pump permutation test confirmed check valves were holding, polymer pumps were primed and flushed, analyzers were deflection-tested, and that the air handling unit and UV wipers were verified. The program concluded with a whole-facility demonstration in remote-automatic mode. The shaft was filled and pumped 12 | November/December 2026

at the design stage, including full-train backup, a defined safe state, or clearly bounded emergency conveyance. MICROSAND HANDLING AND OPERATOR TRAINING

Microsand is replenished in-house using the facility’s three-tonne overhead bridge crane and 900 kg bulk bags, rather than as a contracted rigging activity. This eliminated contractor mobilization costs and allowed replenishment to be scheduled around storm timing by a small, consistently trained team. Operator training deliberately followed the optimization period, so the curriculum came from procedures proven at the facility. Treated effluent over the clarifier weirs. After a site orientation in October 2025 and a training matrix defined with down with all chemical systems dosing the city in December 2025, the process supplier’s optimization campaign douautomatically. The check-valve test had a history. bled as pre-training. In April 2026, eight shadowing sesDuring SAT, per-pump flowmeters showed water flowing backwards from sions walked operators up the control the gravity screens through a stopped hierarchy, from observing automatic pump. The check valves had fouled operation to supervised manual control. during the extended inactive period. Vendor training began in June 2026. Until they were cleaned, unattended automatic operation had to be constrained, LESSONS FOR FUTURE FACILITIES The Cherry Street Stormwater Treatbecause reverse flow at low shaft levels ment Facility experience suggests that risked draining the flocculation tanks. Automation was also extended beyond design-stage assumptions for influent the fence. A permissive handshake chemistry, loading and hydraulics in with the East Bayfront stormwater shaft high-rate wet-weather facilities should allows stormwater to be conveyed to be treated as provisional hypotheses, Cherry Street under normal conditions. rather than fixed boundary conditions. Three lessons stand out. Keep the BACKUP CONTROL AT A design team involved through the first TREATMENT FACILITY seasonal cycles, so deviations are caught The facility includes a hardwired early and corrected. Retain full multifloat-based backup panel as a safeguard level control flexibility, which allows against PLC or level-transmitter failure. verification, testing, tuning and training This is sound practice at pumping sta- without taking the plant out of service. tions, where the priority under a control Train from the plant, not the information failure is to keep conveying water. At a binder, sequencing it after optimization treatment facility, however, the panel with a structured shadowing phase. starts the feed pumps, but cannot initiate chemical dosing, ballasted floccula- Chelsey Yang and Benjamin Cooper are tion or UV disinfection. Water pumped with R.V. Anderson Associates Limited. forward would meet the closed valves of Bernardo Majano is a co‑author. an un-started treatment train, creating a For more information, email: bcooper@rvanderson.com risk of flooding within the facility. For treatment facilities, the backup philosophy should be defined explicitly Environmental Science & Engineering Magazine


INSTRUMENTATION

The case for moving from analog to digital controls in water plants

I

By Patrick Murphy

n the water treatment sector, significant institutional knowledge is being lost as many veteran operators retire. As these experienced workers depart, they take with them decades of tacit knowledge and understanding of legacy analog systems, such as chemical metering systems. To offset the loss of undocumented expertise, water plants are increasingly moving from reactive, manual adjustments to predictive, automated digital control loops. But future-proofing a True automation readiness requires real-time, bidirectional data flow between the pump and the facility is not about buying new hard- SCADA system. ware. It is about specifying field equipment today that can communicate with evolving SCADA and industrial network back. This less-is-more approach reduces AVOIDING INTEGRATION architecture. wiring complexity, while significantly BOTTLENECKS Some lower-cost equipment options curbing the risk of signal interference. lack native digital communication capaFROM ANALOG LOOPS TO ETHERNET NETWORKS BIDIRECTIONAL DIAGNOSTIC DATA bilities. Integrating these units into a True automation readiness requires modernized SCADA framework may The 4-20mA analog control loop has long been the industry standard. While real-time, bidirectional data flow between require external protocol conversion reliable for simple tasks, these systems the pump and the SCADA system. When hardware, adding complexity, cost, and are limited in capability. An analog sig- smart pumps are integrated into a mod- additional potential failure points. Specifying smart pump units with nal can generally only communicate one ern digital architecture, they provide critpiece of data, such as pump motor speed. ical diagnostic data that prevents chemi- built-in digital capabilities can offer lifeFor the pump to receive a command, a cal overdosing and curbs regulatory risk. cycle advantages, even if the plant is not Advanced diagnostic data points yet ready to fully utilize them. A pump second 4-20mA connection is needed. equipped with both 4-20mA and EthAdditionally, these systems are highly include: susceptible to noise, or electrical inter- • Tube and diaphragm life counters, ernet/IP can function as an immediate, ference from other equipment, which which track revolutions to provide an scalable asset. An operator can install the can lead to false readings and opera- early warning for maintenance before a pump using legacy analog signals now failure occurs. and simply plug in the Ethernet when the tional disruptions. In contrast, modern industrial net- • Specific alarm states, rather than a plant’s digital transformation is complete. works (including Modbus TCP and PRO- generic pump failure light, mean the sysFIBUS) offer a massive increase in data tem can identify exactly what is wrong, PRECISION THROUGH BRUSHLESS DC TECHNOLOGY density through a single jack. Moving to such as a failed tube or a clogged valve. While communication protocols hana digital protocol allows a single connec- • Real-time self-correction, so when raw tion to transmit dozens of data points water quality changes, or chlorine resid- dle the data, it is the physical motor that simultaneously, including motor speed, ual levels are too high, the system can executes the actions of the pump. Tracontinued overleaf… alarm status, and speed reference feed- respond within 2 to 200 milliseconds. www.esemag.com

November/December 2026 | 13


INSTRUMENTATION ditional brush motors lack the accuracy required for high-level systemic automation. Brushless DC motors provide approximately ten times the precision of their brush-style counterparts. This allows them to respond accurately to the specific commands sent via SCADA. This precision helps maintain constant chemical flow. It also helps avoid repetitive ramp-up/ramp-down cycles, which can lead to excess chemical usage and premature wear and tear. Efficient, brushless motors not only aid in precise dosing, they also support the broader industry goal of reducing energy consumption and moving toward more environmentally friendly operations. THE HYBRID TRANSITION

One major hesitation to automating is the fear the system might fail during the transition. However, modern intelligent interfaces allow for a hybrid approach, where both 4-20mA and Ethernet/IP are connected simultaneously. This allows operators to compare the signals and

PROTECTING CAPITAL INVESTMENT

Chemical metering pumps like the Blue-White FLEXFLO® M3 peristaltic pump offer both 4-20mA and Ethernet-based communication, allowing plants to upgrade to new protocols as needed.

verify system performance, before fully transitioning to digital control. Once the plant is confident, they can switch the entire system to Ethernet IP with less disruption to existing operations.

Specifying future-proof technology, like Blue-White’s intelligent digital interfaces, can help extend the useful life of a facility’s capital investment. By standardizing with smart, modular equipment that offers native industrial protocols and brushless DC precision, plant managers can increase the flexibility and long-term value of their equipment investments. Ultimately, automation is not just about replacing human effort. Rather, it is about creating standardized, repeatable, and reliable processes that make the transition easier for the next generation of water professionals. By choosing equipment that functions as a scalable asset, facilities can move toward a modernized, automated setup, that is prepared for whatever the future of the water sector holds. Patrick Murphy is Blue-White’s VP of Operations. For more information, visit: www.blue-white.com.

Annual Convention d ~an ~Expo

2027

KEYNOTE SPEAKERS

March 07 - 09, 2027 Deerhurst Resort, Huntsville

Ben Kele

Registration Now Open! Get more info at: https://www.oowa.org/events/2027-annual-convention-expo/

Managing Director of Arris Pty Ltd

View Online

300+ Attendees

20+ Sessions

34+ Exhibitors

Networking

Industry Awards

Trivia

Equipment Rodeo

Alan Mallory Performance Partner, Keynote Speaker, Author

The OOWA conference fosters a strong sense of community. Bringing together like-minded individuals and companies creates opportunities for collaboration, knowledge sharing, and long-term industry growth.

14 | November/December 2026

Environmental Science & Engineering Magazine


2027 CONFERENCE & TRADE SHOW JANUARY 27-29, 2027 Casino Rama Resort Rama, Ontario CONNECT • SHARE • ADVOCATE

For Ontario’s septic, hauled sewage & portable sanitation sectors.

REGISTER NOW oasisontario.on.ca

ATTEND / EXHIBIT / SPONSOR

Industry & regulatory sessions Equipment exhibits & networking Awards banquet & social events

SCAN TO REGISTER


WASTEWATER

UWaterloo engineers develop 3D-printed filter that removes up to 90% of microplastics By ES&E Staff

U

niversity of Waterloo engineers have developed a customizable 3D-printed filter capable of removing up to 90% of microplastics from wastewater, with potential applications ranging from household water systems to industrial treatment plants. The research team created filtration columns using stacked 3D-printed disks made primarily from polylactic acid (PLA), a biodegradable polymer. Researchers say the relatively low-cost filters can be easily produced and customized for different applications. “We explored using between eight and 20 filters stacked together,” said Dr. Tizazu Mekonnen, a chemical engineering professor at the university. “With 20 filters, we removed 90% of microplastics, a marked improvement over current filtering technologies.” To improve capture, researchers combined PLA with polyethylene glycol (PEG), a water-soluble additive that can be washed out of the material with hot water after printing. Removing the PEG creates micro- and nano-scale pores on the filter surface, increasing its surface area and ability to trap plastic particles. “Excellent stiffness, high strength, low thermal expansion, and low ductility allow PLA to create high-resolution 3D prints that maintain their desired shape while maintaining their biodegradability, making it very desirable for such applications,” their study states. Researchers designed the disk filters to maximize contact with water flowing through the filtration column. They then applied pressure-sensitive adhesive coatings made with polydopamine (PDA) and poly(2-ethylhexyl acrylate) to strengthen physical interactions between microplastics and the filter surface without blocking its pores. 16 | November/December 2026

(Left) The offset filter grid design. (Right) The holder used to ensure the proper orientation of the grid during filtration. Credit: ScienceDirect

The approach is intended to increase surface roughness and provide more opportunities for tiny plastic particles to become lodged in irregularities on the filter. Testing showed that relatively large microplastics were captured almost completely, while particles smaller than 10 micrometres were more difficult to remove. Improving the capture of those smaller particles will be a focus of future research, which also involves engineering graduate student Ethan Crawford. Microplastics, which are fragments smaller than five millimetres, have increasingly been detected in water supplies and can originate from numerous sources, including synthetic clothing. “Our clothes are mostly a mix of polyethylene terephthalate (PET) in the form of polyester and cotton or pure polyester,” said Mekonnen. “When you pull out the dryer filter, you can see how much fibre it captures. Those are all microplastics and that filter can capture only a portion of them.”

Washing clothes can also release large numbers of microscopic fibres, as agitation causes them to separate from fabrics and enter household wastewater. Following filtration tests, researchers examined both the wastewater and the 3D-printed filters to better understand how the microplastics interacted with and adhered to the filter surfaces. Mekonnen said the technology could eventually be incorporated into household drinking water systems, as well as industrial water treatment applications, where conventional filtration technologies, such as activated carbon, may only partially remove microplastics. For more information, email: editor@esemag.com

Environmental Science & Engineering Magazine


MYERS

HERE TO HELP STREAMLINE YOUR WASTEWATER OPERATION Learn how one Public Works team wins against modern flushables

When a Public Works Department in Texas needed a new solution in their most challenging lift station, dealing with debris from multiple hotels and businesses, they installed a Pentair Myers® MNG Series Next-Gen Submersible Pump. Six months later, the crew nearly forgot it was even there because they didn’t need to unclog it.

How can Myers MNG Series Pumps help protect your municipality?

READ THE CASE STUDY

Learn more at pentair.com/pasadena

All indicated Pentair trademarks and logos are property of Pentair. Third party registered and unregistered trademarks and logos are the property of their respective owners. ©2025 Pentair. All Rights Reserved.

HYD25025 MY25225 (04-09-25) (10-29-25)


WASTEWATER

Jasper wastewater lagoon restoration supports post-wildfire rebuilding By ES&E Staff

T

he devastating 2024 wildfire that swept through Jasper National Park destroyed nearly one-third of the structures in the town of Jasper and damaged critical infrastructure across the national park. It left the community with a massive rebuilding effort that continues more than two years later. As homes, businesses and municipal services are restored, Jasper is also looking to strengthen infrastructure against future emergencies. A key part of that work will be the restoration of a decommissioned wastewater lagoon, through a new joint investment of more than $7.9 million from the federal, Alberta and municipal governments. The wildfire burned approximately 32,700 hectares and destroyed 30% of structures in the town. It is also estimated to have damaged or destroyed 20% of the assets in Jasper National Park, including campgrounds, staff housing, utilities buildings, highways and roadways. More than $385 million in federal funding has been directed toward Jasper wildfire response and recovery efforts over the past two years. According to the federal government, the work has included providing interim housing for more than 415 families, clearing debris from all affected lots and advancing reconstruction, with work underway at 118 properties. In June 2026, the federal government announced another $520 million to accelerate rebuilding in Jasper National Park, including critical infrastructure repairs and continued interim housing for displaced residents. The wastewater lagoon project is intended to make Jasper’s wastewater system more resilient during emergencies and other disruptions by providing additional storage during peak flows, extended power outages, infrastructure failures and maintenance events. The federal government is contributing more than $3.9 million through the Direct Delivery stream of the $51-billion Build 18 | November/December 2026

The 2024 wildfire burned approximately 32,700 hectares and destroyed 30% of structures in the town of Jasper. Credit: Parks Canada

Communities Strong Fund. The remaining project costs will be supported by the Alberta government and the Municipality of Jasper. The project involves restoring and relining an existing decommissioned lagoon that is already being used to receive untreated sewage when extended power outages affect the wastewater treatment plant, during wildfires, or when the plant is taken offline for maintenance. Municipal council documents indicate the lagoon has been used for emergency wastewater storage several times in recent years. Local officials have also identified the need to reline the lagoon, because an unlined facility can allow wastewater to seep into the ground, potentially affecting the nearby Athabasca River. Once restored, the lagoon is expected to provide critical storage capacity during peak-flow periods and emergencies, helping prevent wastewater overflows and maintain service, while protecting the surrounding watershed.

The additional capacity is also intended to support Jasper’s longer-term rebuilding and housing strategy as development proceeds following the wildfire. “Jasper’s experience has underscored how essential resilient infrastructure is to the safety and well-being of all communities,” said Jasper Mayor Richard Ireland in a statement. “As we rebuild, we have an opportunity to both restore what was here, and to strengthen the systems and infrastructure our community relies upon to better prepare for the challenges of the future.” For more information, email: editor@esemag.com

Environmental Science & Engineering Magazine


WATER

EPA launches study to screen drinking water for more than 1,000 contaminants By ES&E Staff

T

The EPA said information generated through the study could ultimately help it prioritize future drinking water research and actions. Credit: ggw, stock.adobe.com

2025 JUNE OM AG.C .ESEM MAG WWW @ESE

WW W.EAUGUST SEMAG. 2024 @ES COM EMA G

n lkerto the Wa rs later bering yea Remem Crisis 25 ling Water ter Coo and e Wa p Lak expansion ry s rsa o’s Dee Toront celebrateyear annive y 20System ps pla dge pum tment Repa ted slu ter trea irinact wa g iva Return roleCa in wa lgaste ry’s fee l Mopiv ncota ton de

PM40

06544

6

pilots r main techn Spec brea k ology ial Fo cus: to co Resil mbat ES&E ient wa cyan ’s obac Gove Annual stewa teria Guide rnme ter inf nt Of rastr fices to Environ uctur and As menta e socia l tions

PM4

0065

446

Get noticed. Get specified! Get your products and services noticed by the professionals in Canada’s water, wastewater and environmental protection industries.

Create a basic listing for FREE at: esemag.com/get-listed

20 | November/December 2026

he U.S. Environmental Protection Agency (EPA) is launching a new study that will use non-targeted analysis to screen drinking water for pharmaceuticals, PFAS and more than 1,000 other potential contaminants. The research is intended to give EPA scientists a broader picture of chemicals that may be present in drinking water, including substances that could be missed by conventional testing methods designed to look for specific compounds. Non-targeted analysis (NTA) uses advanced analytical techniques to scan samples for large numbers of chemical signatures, without researchers having to specify every substance they are looking for in advance. Traditional targeted methods, by comparison, generally test for a predetermined list of contaminants, the agency said. The EPA said the resulting data could help identify previously unrecognized pollutants and determine where additional research, monitoring or regulatory attention may be warranted. The agency did not provide details in its announcement about how many drinking water systems or samples will be included in the study, or when results are expected. The research will complement the EPA’s existing processes for investigating contaminants that are not federally regulated under the Safe Drinking Water Act. Earlier this year, the EPA released its draft Sixth Contaminant Candidate List (CCL 6), which identifies contaminants that are not currently subject to national primary drinking water regulations, but may warrant further investigation. For the first time, the draft list identifies microplastics and pharmaceuticals as priority contaminant groups. EPA also proposed its Sixth Unregulated Contaminant Monitoring Rule (UCMR 6) in June. If finalized, the rule would require participating public water systems to monitor for 30 unregulated contaminants using approved analytical methods. Unlike those targeted programs, the new NTA study is designed to cast a wider analytical net and potentially identify substances that are not included on predetermined contaminant lists. “Americans have a right to know what is in the water they drink,” U.S. Health and Human Services Secretary Robert F. Kennedy Jr. said in the announcement. “EPA is going to search for pharmaceuticals, PFAS, and other contaminants that have gone undetected.” The EPA said information generated through the study could ultimately help the agency prioritize future drinking water research and actions. For more information, email: editor@esemag.com

Environmental Science & Engineering Magazine


Join One of Canada’s Top 100 Employers

Recognized as one of Canada’s Top 100 Employers, Associated Engineering fosters a collaborative and caring workplace, professional and personal growth, hybrid work environment with flexible work arrangements, and opportunities for employee-ownership. Our approach is to work with our clients to develop creative solutions, so we can shape a better world. We continue to experience growth in all our offices across Canada, and have the following immediate openings: • Biologist - Saskatchewan • Civil Engineers & Technologists - Across Canada • Climate Resilience Advisor - Vancouver • Contaminated Sites Professional - Vancouver • Conveyance Engineer - Vancouver • Ecologist - Edmonton • Electrical & Automation Engineers - Across Canada • Environmental Planner - Calgary, Yellowknife • Environmental Scientist - Edmonton • Manager, Geosciences - Edmonton • Process Mechanical CAD Designers & Technologists - Across Canada • Project Managers/Engineers - Across Canada • Pumping Specialist - Alberta • Senior Water Modeller - Across Canada • Stormwater Engineer - Calgary • Structural Engineers - Alberta • Water Quality Scientist - Vernon • Water & Wastewater Process Engineers - Across Canada

To apply and for information on these and other opportunities in our offices across Canada, visit www.ae.ca/careers.

www.ae.ca


STORMWATER

The power of redundant technology in wet-weather flow tracking method. A sensor, mounted in the pipe, collects depth and velocity data, and the continuity equation Q=VA is applied to calculate flow (Q). V represents average velocity and A represents the wetted area. To verify sensor data accuracy, By Brie Mazalek field crews typically verify pipe dimensions and take depth and velocity meahanging precipitation patterns surements throughout the monitoring and storm intensity across period. Canada are increasing the The conventional field method of verimportance of reliable wet- ifying depth and velocity poses a sigweather flow monitoring. As munici- nificant challenge for wet-weather flow palities and utilities develop strategies monitoring, as safe access to storm, comto improve climate resilience, accurate bined or outfall pipes often takes place flow data are essential for understand- during dry weather, when little to no flow ing collection system performance and is moving. Access to these pipes typically involves a hazard assessment, confined planning infrastructure improvements. A popular method for collecting open space entry, and in many cases coordichannel flow data is the area/velocity nating with third-party traffic control.

C

22 | November/December 2026

Targeting field verifications during high flows can prove highly unsafe and logistically impractical. The result is datasets that are well verified during shallow flow, with little insight into data accuracy during the target wet weather events. USING REDUNDANT TECHNOLOGY TO IMPROVE DATA CONFIDENCE

Redundant depth and velocity data can provide valuable insight into equipment performance and hydraulic characteristics. Some area velocity sensors, including the AV|GATED , AV|Max and ParaFlow are equipped with redundant depth channels that utilize different technology. Depth is measured through ultrasonic and pressure technology and velocity through gated, continuous wave or surface doppler technology.

™

™

™

Environmental Science & Engineering Magazine


If pressure depth and ultrasonic depth agree, you now have repeatable data achieved through two different types of technology. The same goes for velocity. Double sensor arrangements have been gaining popularity as a means to prevent against data downtime in pipes with access limitations, or susceptibility to sensor damage. An additional benefit is the availability of independent datasets that can be compared for evaluating measurement consistency and identifying potential performance issues. When repeatable results are achieved using multiple technology sources on multiple sensors, data confidence increases significantly. GAINING INSIGHT WHEN DATA ARE NOT REPEATABLE

A massive amount of valuable insight can also be uncovered when redundant data channels prove unrepeatable. Data discrepancies can indicate poor hydraulics for flow data accuracy, damaged A massive amount of valuable insight can also be uncovered when redundant data channels continued overleaf…

www.esemag.com

prove unrepeatable.

November/December 2026 | 23


STORMWATER

These AV | GATED, AV | Max and ParaFlow area velocity sensors are equipped with redundant depth channels.

they opted to relocate to an alternate flow monitoring location. Identifying and communicating potential data concerns early in a flow monitoring contract is key to producing the desired data results. Discrepancies in data channels can also highlight when a sensor is damaged or not performing optimally. When a single data channel suddenly deviates from other redundant data channels, this may signify a damaged or shifted sensor. Redundant data channels that start separating gradually may indicate a gradual accumulation of silt, debris or another form of slow sensor degradation. Having redundant data channels to compare helps the hydraulic data analyst identify data issues early, facilitating a quick response to fix the damage. A skilled hydraulic data analyst can use redundant data channels to identify patterns that may signify a lower confidence dataset or damaged equipment. However, not every discrepancy between data channels signifies a hydraulic or equipment issue. Technological limitations must also be considered. For example, if a sensor installed within a pipe is equipped with both ultrasonic and pressure depth channels, the ultrasonic channel will not capture depth above full pipe, but the pressure one can measure the full range of surcharge depth. Conversely the pressure depth channel may exhibit low bias under high velocity flow conditions where the Bernoulli effect introduces an artificial pressure drop that underestimates true depth. Gated doppler velocity may provide valuable insight into the velocity profile of an irregularly shaped pipe. Continuous wave doppler surcharge velocity may prove more appropriate in a surcharged slow-moving pipe, where silt and debris may degrade gated doppler velocity data. There is no one-size-fits-all when it comes to depth and velocity measurement technology. By understanding the benefits and limitations of the different types of measurement technology, a hydraulic data analyst can select the most appropriate data channel, under a range of hydraulic conditions. Redundant measurement technologies do not eliminate the need for field verification. Manual measurements of pipe dimensions, flow depth, and velocity remain essential elements of quality assurance in area/velocity flow monitoring. However, redundant data channels do complement the process by providing a powerful insight into hydraulic and equipment performance during the full range of monitoring conditions. These can range from dry weather to torrential storms. By combining complementary measurement technologies with skilled hydraulic data analysis, utilities and monitoring professionals can identify potential data-quality concerns earlier, make better-informed decisions about monitoring locations, and develop more reliable datasets across a wider range of flow conditions. Ultimately, the value of redundant technology extends beyond equipment backup. It provides an additional layer of data validation and diagnostic insight that strengthens confidence in wet-weather flow monitoring results.

equipment, technological limitations and many other useful insights into data quality and confidence. Not every pipe is conducive to accurate flow data. High-quality area/velocity flow data can be achieved when flow is stable, and a predictable velocity profile exists across the measurement cross section. However, uneven, turbulent, surging, transitional or wavy flow can severely impact data quality. These conditions are not always predictable in storm, combined or outfall pipes when site selection and installations take place during low flow, safe access windows. Redundant data channels using different technology can provide valuable insight into these conditions. For example, a recently installed wet-weather flow site exhibited repeatability in pressure depth, wetted ultrasonic depth and surface ultrasonic depth data during low flow conditions. However, the first wet weather event revealed significant discrepancies between the three depth channels. Pressure was unstable, wetted ultrasonic was low or dropping out and surface ultrasonic was significantly higher. On their own, any of these depth channels may not signify a data quality concern, but together, their deviation from the repeatable pattern becomes a red flag. A hydraulic data analyst observing this phenomenon may interpret that the event is exhibiting signs of turbulence and spray. These data trends provide a means to facilitate a meaningful conversation with the client about lower data confidence at this location. Then, the client can make an educated decision regarding the location’s suitability. Brie Mazalek is with ADS Environmental Technologies Inc. in In one case, a client required a high-confidence dataset, so B.C. Email: bmazalek@idexcorp.com 24 | November/December 2026

Environmental Science & Engineering Magazine


MINING WASTEWATER

Indigenous-led partnership to advance oilsands process water treatment research in Alberta By ES&E Staff

A

n Indigenous-led water treatment venture in northern Alberta has secured a conditional grant commitment from Emissions Reduction Alberta to support commercial trials and testing of technologies designed to better treat oilsands process-affected water found in tailings ponds in the Athabasca region. Tũ Nipi Water Solutions Ltd. is a partnership between BioLargo Canada and Fort McKay Oil Services, a registered First Nation company. The grant will support a $4.6-million project to test BioLargo’s advanced water treatment technologies, with commercial trials already underway in northern Alberta. The partnership comes as Alberta moves toward developing treatment technologies and science-based standards for oilsands process water. The province’s oilsands Mine Water Steering Committee has reported that Alberta’s tailings ponds contain more than 1.4 billion m³ of fluid tailings. The provincial government has accepted the committee’s recommendations to develop and pilot treatment technologies and establish standards for treated water. BioLargo’s involvement in oilsands water treatment dates to 2011, when it became a founding industrial partner in the NSERC Industrial Research Chair in Oilsands Tailings Water Treatment at the University of Alberta. The research program, which included oilsands producers, EPCOR, COSIA, Alberta Innovates and Alberta Environment, examined treatment approaches for persistent organic contaminants in oilsands process-affected water. Through the new partnership, BioLargo Canada said it plans to combine multiple advanced water treatment technologies into treatment trains designed for complex wastewater streams. Beyond oilsands applications, the partners have identified potential clients and an initial wastewater project involving BioLargo’s PFAS treatment and odour control technologies, which are under development for the proposed application. BioLargo Canada, a wholly owned subsidiary of U.S. based BioLargo Inc., is headquartered in Edmonton and develops water treatment technologies for industrial, municipal and environmental remediation applications. Tũ Nipi Water Solutions is based in Fort McKay First Nation, near the confluence of the Athabasca and MacKay rivers. Fort McKay Oil Services and Tũ Nipi Water Solutions noted in a press release that they are not owned, operated, controlled by, www.esemag.com

More than 1.4 billion m³ of oilsands fluid tailings and over 380 million m³ of water are currently stored in ponds across northern Alberta. Credit: spotmatik, stock.adobe.com

or affiliated with Fort McKay First Nation. The partners planned a formal launch event in Fort McMurray with representatives from Indigenous communities, government and industry expected to participate. Additional project details will be announced as the venture advances. For more information, email: editor@esemag.com

November/December 2026 | 25


SPECIAL FOCUS: CONSULTANTS’ FORUM

Edward Tufte, an author on data visualization, criticizes PowerPoint’s default format as inadequate for presenting complex evidence. Credit: john, stock.adobe.com

Are design and presentation tools shaping how engineers think?

T

By Patrick Coleman

his project was different. Two stakeholders, alongside the client, had a role in developing the design basis. I could picture their relationship, but I could not express it in PowerPoint slides without bending my thinking to fit PowerPoint’s sparse, linear format. I gave up and made a cup of tea. Then I remembered assembling a tripod to support a tipi. A friend and I bought a tipi kit from the Whole Earth Catalog and sewed it together. We cut poles in a fire-killed forest, read the instructions, and pitched the tipi in his backyard. Three poles form the tripod that supports the remaining poles and the tipi skin. The tops of two poles are laid over 26 | November/December 2026

the head of the third pole and lashed together. The poles are lifted into a V, then the third pole is “walked” around to form the tripod. Together, the three poles support the tipi. For this project, I thought that the client and two stakeholders could do the same thing and support a robust design basis. The walking pole represents the client in the lead role. They tighten the lashing that holds the relationship together. I brought three short bamboo poles to the meeting and built the tripod as I talked. The meeting attendees understood what I was thinking. Afterwards, I left wondering, ‘is our use of PowerPoint confining our thinking as engineers?’ The question matters because we need to ask this of the other tools we use. For the purposes of this article, PowerPoint means Microsoft’s software. In the late 1990s, PowerPoint accounted for 95% of the presentation software market. Therefore, the term “PowerPoint event” became the new term for a slide deck-driven meeting.

®

Many sources on this topic refer to two seminal works. 1. Tufte, Edward R. 2006. The Cognitive Style of PowerPoint: Pitching Out Corrupts Within. 2nd ed. Cheshire, CT: Graphics Press. 2. Knoblauch, Hubert. 2013. PowerPoint, Communication, and the Knowledge Society. New York: Cambridge University Press. Edward Tufte, an author on data visualization, criticizes PowerPoint’s default format as inadequate for presenting complex evidence. Sociologist Hubert Knoblauch takes a broader view, examining the presentation as a communication event involving a slide deck, a presenter and an audience. Knoblauch describes a “PowerPoint event” as three connected elements. Communication breakdown occurs when one of these is faulty. • Knowledge is recorded in a document: the slide deck. • Knowledge is interpreted by the presenter. • Knowledge is received by an audience, which may be passive or active. HOW DID POWERPOINT EVENTS BECOME UBIQUITOUS?

A PowerPoint event brings a presenter, projected slides and an audience together. However, the event’s roots predate the introduction of presentation software. The “deck-driven” meeting began with the invention of the overhead projector. James Earl Bancroft patented the overhead projector in 1947. Bancroft, who worked for the American Bowling and Billiard corporation, needed a method to project scores where everyone could see them. In the late 1950s, 3M repurposed transparency film from their obsolete Thermo-Fax-color-copying process for overheads. The “deck-driven” meeting soon entered business and military meetings. In the 1940s, the U.S. Strategic Air Command went through 20,000 transparencies per month. By the 1990s, IBM meetings became deck-driven rituals. Louis Gerstner, the new IBM CEO, went up to an overhead projector in a meeting and turned it off after the first slide. He then said, “Let’s just talk about your business.” He later asked executives to write out their busiEnvironmental Science & Engineering Magazine


ness strategies in longhand and complete sentences. Perhaps he was one of the first leaders to see the problem for what it was. A perfect storm occurred in the 1990s when presentation software, laptop computers and portable projectors entered the market at about the same time: • In 1987, Robert Gaskins, Tom Rudkin and Dennis Austin developed software on the Macintosh computer that created files that could be sent out for slide production. Microsoft bought their company and the product was renamed PowerPoint due to a copyright issue. PowerPoint was bundled with Microsoft Office. • In 1984, Gene Dolgoff made the LCD projector technology practical. The market took off in the 1990s with laptop-friendly projectors. A few thousand were shipped in the late 1990s and peaked at about 10 million per year in the years 2010 to 2015. • The laptop overtook sales of desktop computers in 2008. Cheaper hardware, cloud storage, Wi-Fi and the entry of employees (digital natives) who grew up with digital technology established the laptop’s dominance by the 2020s. Gaskins delivered the first PowerPoint presentation using a laptop on February 25, 1992, at a Microsoft meeting at the Regina Hotel in Paris. Deck-driven “PowerPoint” events fol-

PowerPoint squeezes ideas into a preconceived format, organizing and condensing not only your material but—inevitably, it seems—your way of thinking about and looking at that material.

lowed the path of overhead projectors into meeting rooms, conference halls, churches and classrooms. They became ubiquitous, partly because computers and projectors were affordable and PowerPoint came with Microsoft Office.

®

WHY THE PUSHBACK?

Tufte reminds us that both the Columbia Accident Investigation Board and the Return to Flight Task Group examined hundreds of PowerPoint presentations after the Columbia Space Shuttle Disaster. Both groups concluded that PowerPoint is an inappropriate tool for engineering reports, presentations, documentation and that technical reports were superior forms of communication compared with PowerPoint slide decks. Tufte’s criticism of “PowerPoint” focuses on the following points: • Content is forced into a format that is rigid, sequential, inhibiting non-linear

interconnected thinking. • Complex ideas, arguments and data are presented as short bullet points, relying on the speaker to communicate the important details. • Slides are sparse, replacing rigorous evidence with flash. • The information and the accompanying narrative are confined to a slide, providing little for the audience to evaluate. • The format benefits the speaker but not the audience’s efforts to comprehend what is being said. Tufte argues that PowerPoint enhances the effectiveness of the top 10% of presenters, while its default structure lifts presentations by the bottom 10%. The remaining 80%, however, fall into the cognitive trap described by Beth Keller (2014). “PowerPoint squeezes ideas into a preconceived format, organizing and concontinued overleaf…

RELIABLE FLUID HANDLING HANDING SOLUTIONS SOLUTIONSFOR FOR DEMANDING WASTEWATER APPLICATIONS. Enhance efficiency and reduce downtime with Boerger Rotary Lobe Pumps and Macerating Technology. + Space-Saving Solutions + For Sludge, Biosolids, Grease, Sewage, Scum, Slurries, Polymers, etc

+ Maintenance In Place (MIP®) Municipal Representatives: More information visit boerger.com

www.esemag.com

November/December 2026 | 27


SPECIAL FOCUS: CONSULTANTS’ FORUM

densing not only your material but—inevitably, it seems— • U.S. Marine Corps General James Mattis summed up the your way of thinking about and looking at that material.” criticism in his 2019 book, Call Sign Chaos: Learning to Lead: “PowerPoint is the scourge of critical thinking. It encourages WHO PUSHED BACK AND WHY? fragmented logic by the briefer and passivity in the listener.” Several leaders followed in Louis Gerstner’s footsteps and “turned the projector off:” WHAT SHOULD WE DO? • Amazon CEO Jeff Bezos wrote a 2004 email to staff about PowerPoint events persist because we are comfortable with PowerPoint, which was later featured in the 2021 book Work- the tool and expect meetings to follow this format. The risk is ing Backwards: Insights, Stories, and Secrets from Inside Ama- that familiarity influences how we frame a problem and seek zon: “PowerPoint-style presentations somehow give permis- a solution. This is a manifestation of Abraham Kaplan’s “Law sion to gloss over ideas, flatten out any sense of relative impor- of the Instrument”, or Maslow’s Hammer. “If the only tool you tance, and ignore the interconnectedness of ideas.” have is a hammer, everything looks like a nail.” The temptation • In Walter Isaacson’s 2011 biography, Steve Jobs, the Apple is to reach for the familiar tool before defining the problem. As Inc. co-founder said, “People would confront a problem by such, a pattern forms: creating a presentation. I want them to engage, to hash things • The meeting format is a presentation. out at the table, rather than show a bunch of slides. People • Preparation focuses on making slides. who know what they are talking about don’t need PowerPoint.” • Participants listen, clarify and react. • In Jill O’Neill’s 2010 History News Network article, H.R. • The slide deck becomes the record of the meeting. McMaster’s War Against PowerPoint, she reports the U.S. • The next meeting is another presentation. Army Brigadier General as noting that the true danger of PowThe problem is not that deck-driven meetings are bad. It is erPoint is the program’s basic tendency to deconstruct all con- that they are the default. Do we understand the alternatives, cepts into mere bullet points. McMaster said it was a danger- their advantages and risks, and how they change the relationous trend that does not take into account military situations ship between the material, the presenter and the audience? that will undoubtedly have political, ethnic and economic Alternatives include: implications. • Face-to-face discussion: Immediate discussion following a flexible agenda. • Shared whiteboards: Compile the discussion on shared whiteboards, where everyone has agency to make a change. Barrie, Ontario • A briefing memo followed by a face-to-face meeting. The memo lays out the questions, recommendations, evidence and assumptions that set the meeting’s scope and that attendees read and digest before the meeting. • Use design software to present information. Simulations are • run live to answer attendee’s questions. • Walk through a 3D model. It can be a structured operation • and maintenance, or an unstructured walkthrough. • Slide share software, like PowerPoint, is one tool that changed how we do our work. Our discussion on “PowerPoint • / events” illustrates that these changes can be good, present • challenges, and can come with risks. • Our tools influence how we think. We need to understand • what we gain, what we lose and what risks we take on when we adopt them. We need to ask ourselves how our tools are Canadian Distributor/Dealer influencing the way we frame problems and seek solutions, Vertical Turbine Products and how much control over our thinking we are surrendering FAIRBANKS NIJHUIS for convenience. Supply of Legacy Layne, Fairbanks and We could ask the same questions about Microsoft Teams, Layne Vertiline equipment Nidec-USEM motors process simulators, computer-aided design platforms or genGrundfos, Franklin pumps/motors erative artificial intelligence. A licensed professional engineer 342 Bayview Drive should be able to answer these two questions about all the Barrie, ON L4N 8X9 tools they use. Tel. 705-733-0111 Fax. 705-721-0138 Email: iws@iws.ca www.iws.ca

Serving the Groundwater Industry for 93 Years

28 | November/December 2026

Patrick Coleman, PhD, P.Eng., is a Principal Process Engineer, Wastewater with Stantec. Email: pat.coleman@stantec.com. Complete references are available upon request. Environmental Science & Engineering Magazine


SPECIAL FOCUS: CONSULTANTS’ FORUM

CIMA+ wins ACEC Project of the Year for Ottawa SCADA modernization By ES&E Staff

A

project to modernize the monitoring and control systems for the City of Ottawa’s drinking water network has earned two national engineering awards, including the Association of Consulting Engineering Companies – Canada’s (ACEC) Project of the Year Award. Led by engineering consulting firm CIMA+, the SCADA and Human-Machine Interface Upgrades in Ottawa’s Drinking Water System project received both an Award of Excellence and the Project of the Year Award at the 2026 Canadian Consulting Engineering Awards gala, held recently in Ottawa. The project involved upgrading the supervisory control and data acquisition (SCADA) systems and operator interfaces used to monitor and control Ottawa’s two water purification plants and approximately 40 remote water distribution sites. The Ottawa modernization project replaced an aging sys- A project to modernize the monitoring and control systems for the tem that relied on large, stationary operator consoles requiring City of Ottawa’s drinking water network has earned two national individual updates at each location with a centralized archi- engineering awards. Credit: paulmckinnon, stock.adobe.com tecture using lightweight terminals. The new system simplifies maintenance, strengthens cybersecurity and improves the reliability and efficiency of drinking water operations. Sienna Geodynamics CIMA+ also redesigned the human-machine interface www.sienna-geo.com (HMI) to provide operators with clearer information, more intuitive graphics and improved alarm management. Rather Modernizing Geochemical Simulators than relying primarily on reactive responses to alarms, the From equilibrium to disequilibrium, upgraded interface emphasizes proactive situational awarebuilt for complex reactive systems ness, allowing operators to identify emerging issues and make more informed decisions, while reducing operational stress. A key challenge was implementing the new technology without interrupting drinking water services. Through a careManganite fully planned pilot program and close collaboration with City of Ottawa staff, CIMA+ tested and refined the upgraded sysMagnetite tems alongside existing operations, before completing the transition. Extensive operator training and engagement were Siderite also incorporated into the implementation process. Pyrolusite According to the project team, the upgrades are expected to deliver long-term operational benefits, including streamlined maintenance, improved equipment performance, reduced energy consumption and greater reliability across the drinkEh 0.3 Volts ing water network. Redox solutes (log10) The ACEC awards jury recognized the project for its techniFe++/Fe+++ : -6 to 2 cal excellence, innovation and contribution to resilient municMn++/Mn+++ : -8 to 8 ipal infrastructure. Jurors also highlighted its emphasis on the Fe and Mn Disequilibrium Redox System relationship between technology and the people responsible for operating it, particularly the seamless transition to the new Sym8.EQ Equilibrium speciation simulator system. Now available for licensing For more information, email: editor@esemag.com

www.esemag.com

Batch-kinetic system simulator

Sym8.BK In final development

November/December 2026 | 29


SPECIAL FOCUS: CONSULTANTS’ FORUM

Recognizing the pioneers of Ontario’s groundwater consulting industry

John Vogan

Steve Shikaze

Kristian Doerken

John Weeraratne

A

small number of firms exerted a great influence on the development of the groundwater consulting industry in Ontario. The history outlined in this article is based on interviews with the first generation of groundwater professionals involved with these companies, who are now into retirement. We chose firms established during the mid-1960s through the late 1970s. We obtained information by interviewing former key employees, and documented the technical innovations and advancements involved in their initial projects. INTERNATIONAL WATER SUPPLY/INTERNATIONAL WATER CONSULTANTS LTD.

International Water Supply Ltd. (IWS) began operations in the early to mid1920s as the Layne Canadian Co. It was re-organized as International Water Supply Ltd. in 1933 and became wholly owned by its employees in 1961. Headquartered in Barrie, Ontario, IWS performed many desktop water supply studies (e.g., examination of relevant water well records, cross-sections, etc.) as part of its well development work for many years. It moved more ‘formally’ into consulting with the formation of its International Water Consultants (IWC) division in 1973 with Vern Dixon as its 30 | November/December 2026

Evolving water sampling technologies have improved the reliability of water sample data. Credit: adwo, stock.adobe.com

first employee. Dixon was formerly one of the first hydrogeologists at the Ontario Water Resources Commission (OWRC). IWS/IWC led many of the major municipal groundwater supply projects in Ontario, including production wells for York, Halton and Durham Regions, the Regional Municipality of Waterloo, and the Cities of Barrie and Guelph (including the Arkell Springs shallow collector system). The firm also completed large landfill studies, including the Keele Valley landfill in Vaughan, and international projects. Aspects of water supply technology implemented by IWS/IWC came from the oil and gas industry. This included the use of downhole geophysics to assist in screen placement and to track leachate plume migration. Other innovative approaches adopted by IWS/IWC and its successor company Dixon Hydrogeology Ltd. (DHL) included: • The design and operation of largediameter purge well containment systems for landfill leachate collection; • Recognition of meltwater erosion pro-

cesses in the creation of ‘tunnel channel’ aquifers, in collaboration with the Ontario Geological Survey; and • Support of research at the University of Saskatchewan and elsewhere on leachate and methane generation, and in modelling by the University of Waterloo (UW). IWS continues to this day, focusing on the assessment, engineering design, construction, management and maintenance of groundwater supplies. Dixon left IWC in 1985 to form DHL, largely on the strength of the landfill work initiated at IWC, as well as regional groundwater supply development. DHL was sold to Golder Associates Ltd. in 2004, which was later sold to WSP Inc. in 2021. HYDROLOGY CONSULTANTS LTD.

Hydrology Consultants Ltd. (HCL) was established in 1967 by John Nunan, who previously worked at the OWRC. HCL specialized in groundwater assessment and municipal water supply development for most of its first decade. In the late 1970s and early 1980s, HCL expanded its services to include landfill Environmental Science & Engineering Magazine


design and permit acquisition, and contaminated site redevelopment. HCL consulted on major projects, such as the realignment of the Welland Canal at Thorold and the construction of hydroelectric dams in Quebec. HCL supported the approval of a hazardous waste landfill near Sarnia, Ontario. It also led investigations to support Canada’s first aquifer storage and recovery project for the Regional Municipality of Waterloo, beginning in 1973, which involved collaborative modelling efforts with UW. HCL staff identified the following approaches that facilitated the company’s early success: • In addition to modelling studies, UW’s research concerning sampling methods to improve the reliability of water sample data, and studies on the movement of trace contaminants from landfill sites, were incorporated into HCL’s projects. • Adapting technologies from the oil and gas industry, including methods for the construction and development of artesian wells and depth-specific packer testing. • Incorporation of hydraulic containment designs in landfill projects, where hydraulic heads were manipulated by design to control flow regimes. • Prioritizing the evaluation of natural attenuation processes as part of landfill and contaminated site assessment. • International collaboration, specifically during the ASR project and projects involving landfill gas investigation and collection. • Collaboration with geotechnical engineers when dealing with groundwater issues on large infrastructure projects. HCL was acquired by Trow in 1980 and operated as Trow Hydrology Consultants Ltd. until 1988. That year, Trow formed a joint venture with Dames & Moore Inc. and became known as Trow Dames & Moore. This would later become Dames & Moore Canada. Dames and Moore was subsequently acquired by URS Inc. in 1999.

as a company that provided engineering geology services for planning and engineering projects across Ontario. Through its early years, GLL’s focus was on geosciences and hydrogeology, mostly as a sub-consultant to engineering firms. Early projects focused on land-use development, infrastructure route alignments, aggregate resources, landfill siting studies, contaminated site assessments, groundwater supply and radioactive waste management. Key clients included Atomic Energy of Canada Limited, who retained GLL to study options for the deep disposal of nuclear waste. GLL's assignments with the Ontario Waste Management Corporation involved the siting and design of potentially hazardous waste management facilities. GLL completed the first-ever three-dimensional leachate plume mapping at the Camp Borden Landfill, using a company-designed hollow-stem auger sample head, in collaboration with Dr. John Cherry of UW. In 2007, GLL was acquired by AECOM. Keys to the company’s growth included: • Collaboration with researchers at leading academic institutions such as the UW, Queen's University, University of Toronto, University of British Columbia, and Memorial University; • Modification of oil industry technology; in particular, drill stem testing tools for low permeability evaluation of Canadian Shield rocks; and • Expanding and diversifying the company’s service lines beyond their core practice. CONESTOGA ROVERS AND ASSOCIATES

Safe water means more time learning, growing, living, and working. Invest in more moments.

enviroscience_ad_3.375x10.indd 1

4/1/15 11:08 AM

Conestoga Rovers and Associates (CRA) was formed in 1976 as a five-person firm through the amalgamation of Frank A. Rovers and Associates and Conestoga Engineering. The former was focused on environmental engineering continued overleaf…

GARTNER LEE ASSOCIATES LTD.

Gartner Lee Associates Ltd., which was later renamed Gartner Lee Limited (GLL), was established in 1972 by John Gartner and Pat Lee, who previously worked at Terra Scan Ltd. GLL began www.esemag.com

November/December 2026 | 31


SPECIAL FOCUS: CONSULTANTS’ FORUM

centred on solid waste and landfill design. The latter was centred on civil engineering and municipal infrastructure, including water treatment. Founders Frank Rovers and Don Haycock were UW engineering graduates, while founder Ron Schwark was a graduate of Ryerson, now Toronto Metropolitan University, and Wilfrid Laurier University. Early Ontario work included water supply projects for municipalities and numerous private developments. Their work also included landfill investigations and methane gas collection system design and installation at several sites, including the Ottawa Street Landfill in Kitchener. The project foundational to CRA’s early success came through connections made during Rovers’ teaching sessions at the University of Buffalo. This was leading the engineering design and project management for the remediation of Love Canal in Niagara Falls, New York. Growth of the company was in part driven by the success of this project and led to CRA’s involvement in many of the initial Superfund projects in the U.S. Technical approaches supporting CRA’s growth included: • Observations of groundwater contaminant behaviour, such as volatile organic compounds, which had not been comprehensively studied previously. Information on contaminant occurrence and movement at one site was applied to subsequent assessments completed for other sites; • Applying key learnings from wastewater treatment and infrastructure projects to groundwater treatment issues; • Statistical interpretation of environmental data, and • Advances in the design of pump and treat technologies for capture of contaminant plumes. GOLDER ASSOCIATES LTD.

Golder Associates Ltd. (Golder) was established in 1960 by Hugh Golder, Victor Milligan and Larry Soderman (originally as H.Q. Golder and Associates). In its early years, Golder focused on geotechnical engineering. Specifically dewatering, soil mechanics and ground engineering projects. While continuing with dewatering and other physical groundwater proj32 | November/December 2026

ects, Golder began focusing on contaminant hydrogeology in the late 1970s and early 1980s. Key early hydrogeology projects included work in mining and oil and gas, as well as the hydrogeologic and geochemical aspects of mine tailings management at a uranium mine expansion in Elliot Lake. This involved the design and construction of tailings basins, which included grouting of the bedrock at the tailings dam. Golder was also involved in decommissioning refineries for Shell in Oakville and for Texaco in Port Credit, and the Smithville site on the Niagara Peninsula that involved off-site migration of PCBs.

Groundwater innovation was built on collaboration across disciplines.

ground for many groundwater professionals, who subsequently worked for these firms. The OWRC’s hydrogeological reports and their database of water-well records provided the initial foundation for many of the projects described herein. Academic collaboration, in particular with UW, was highly influential in technological advancement and knowledge sharing. Many of these firms incorporated UW’s internationally recognized expertise in such areas as groundwater modelling and organic contaminants. Integrating knowledge from related disciplines was very important to project success. The modification of oil well technologies for groundwater resource assessment and collaborations with experts from fields, such as geotechnical engineering and water treatment, played key roles in positive project outcomes. The value of incorporating international expertise and lessons from other jurisdictions was mentioned by several interviewees. Many of these firms leveraged their Canadian expertise to win work and expand their consulting businesses internationally. It also allowed them to build a network of senior groundwater scientists and engineers in various countries, whose experience was brought to bear in their Canadian work. These collaborative approaches with academia, and international experts, across disciplines, are still very relevant when addressing today’s groundwater issues. They may be of particular use in the field of emerging groundwater contaminants, and on the effect of climate change on aquifer behaviour. We would like to thank those who we interviewed for this article. Information obtained from them and other third parties was not independently verified. Therefore, we would appreciate being advised of any content errors.

Golder also conducted municipal waste projects, including clay liner instrumentation at the Keele Valley landfill. In 2021, Golder was acquired by WSP Global Inc. Significant knowledge was gained in: • Developing an understanding of the impacts of dense non-aqueous phase liquids (DNAPLs) and their behaviour in the subsurface in unconsolidated materials and fractured bedrock. This was based on the research and investigations initiated by UW in the early to mid-1980s. • Extending collaboration with UW at refineries to investigate the behaviour of petroleum hydrocarbons; and • Mine site assessments, such as the Elliot Lake site, where Golder was an early user of a multi-level groundwater monitoring system developed at the UW. John Vogan is a retired hydrogeologist. COMMON THREADS BEHIND THE SUCCESS OF THESE FIRMS

In the course of our interviews, several commonalties emerged in the early growth and success of these companies. Firstly, the OWRC served as a training

Steve Shikaze is a semi-retired hydrogeologist. John Weeraratne, P.Eng., is a retired civil engineer. Kristian Doerken, M.A.Sc., PE (Va), works at Watermark Environmental, based in Toronto. For more information, email: ljvogan@rogers.com

Environmental Science & Engineering Magazine


SPECIAL FOCUS: CONSULTANTS’ FORUM

Carollo Engineers executive takes helm of the Water Environment Federation By ES&E Staff

C

arollo Engineers senior vice president Paul J. Schuler began his oneyear term as president of the Water Environment Federation (WEF) following WEFTEC 2026 in New Orleans. Schuler has more than three decades of water sector experience and began his career at Carollo as a project engineer. After holding senior executive positions with several water technology and infrastructure organizations, he returned to Carollo in 2024 as senior vice president and strategic advisor. A licensed professional engineer, Schuler has been involved with WEF for 30 years, including serving as vice president and president-elect on its Board of Trustees. He is also a past president of the Pacific Northwest Clean Water Association and an elected com-

missioner of the West Slope Water District in Portland, Oregon. As WEF president, Schuler plans to promote the organization’s One Water vision through its Circular Water Economy framework, with an emphasis on technical innovation, resource recovery and collaboration across the water sector. “The water sector continues to face both significant challenges and tremendous opportunities for innovation,” said Schuler. “I look forward to helping advance WEF’s mission and supporting the professionals who are working every day to protect public health and the environment.” WEF is a non-profit organization, representing more than 31,000 individual members and Paul J. Schuler 77 affiliated member associations worldwide.

CONTROL CONFIDENTLY

IQ SensorNet Process Monitoring

Worry less with AlarmAgent.info

®

Remotely and Securely Monitor critical Infrastructure. Int Integrate real-time data from AlarmAgent.com with control syst systems and other third-party applications. It’s a cost-effective solu solution for individual and corporate users, and the perfect tool for OEMs to create their own HMI/SCADA applications.

RACO OPC Client

AlarmAgent.com Server

AlarmAgent.info Cloud Server

HMI / SCADA Applications

RACO OPC Client

Reliable ISE sensors with individually replaceable electrodes

OPC Client RACO

Features & Benefits 1 Supports OPC connectivity for fast, reliable data transfer 2 Allows for data sharing with third-party OPC clients/servers over WAN or LAN 3 Displays real-time data on a convenient dashboard

Improve nutrient removal with continuous online measurements of BOD, COD, ammonium, nitrate, nitrite, UVT, and more.

Accurate UV/VIS sensors with built-in ultrasonic cleaning

YSI.com/IQSN

4 Monitor your facilities and receive voice, text, and email notification 5 Make configuration changes from anywhere.

3230B American Drive Mississauga, ON, L4V 1B3 1-800-811-2811 | info@SPDSales.com www.spdsales.com

www.esemag.com

Official Distributor

905.678.2882 | spdsales.com © 2022 Xylem Inc.

November/December 2026 | 33


SPECIAL FOCUS: CONSULTANTS’ FORUM

ACEC awards recognize wastewater innovation, flood recovery and northern projects By ES&E Staff

F

our Canadian engineering projects involving wastewater treatment, climate resilience and northern infrastructure were among the winners at the 2026 Association of Consulting Engineering Companies – Canada (ACEC) National Awards, highlighting innovative approaches to environmental protection and sustainable infrastructure development. Among the recipients was Dillon Consulting Limited, which received an Award of Excellence alongside GHD for the Sanofi B99 Wastewater Treatment and Reuse Plant in Toronto. The facility was developed to manage wastewater generated at Sanofi’s vaccine research and manufacturing campus, which produces up to 100 million vaccine doses annually. Designed by GHD, with Dillon serving as the owner’s engineer and Bird Construction as the construction contractor, the plant recycles approximately 500 m³ of treated effluent daily for use in the campus’ utility systems. This reduced demand for municipal drinking water by an equivalent amount. The project also incorporates green roofs and advanced odour control systems to minimize its environmental footprint. Construction and commissioning were completed with more than 300,000 hours worked without a recordable safety incident, according to the project submission. Dillon Consulting also received an Award of Excellence for its work upgrading the Main Pumping Station and Lagoons at Constance Lake First Nation in northern Ontario. The project involved modernizing aging wastewater infrastructure to accommodate community growth over the next 20 years and address operational challenges associated with spring runoff. As prime consultant, Dillon designed upgrades to the community’s main lift station and incorporated a submerged attached-growth reactor system to improve wastewater treatment and protect surrounding water sources. In Nunavut, CBCL Limited received an Award of Excellence for the Clyde River Harbour Development project, delivered through a joint venture with Canadrill. Developed for Public Services and Procurement Canada and Fisheries and Oceans Canada’s Small Craft Harbours program, the project established new commercial harbour infrastructure for the community of more than 1,400 residents. The work included a fixed wharf designed for a 50-year service life, along with roads and access ramps to accommodate seasonal sealift operations, which provide essential supplies and materials to remote northern communities. 34 | November/December 2026

Four award-winning projects: (top left to right) Constance Lake First Nation Main Pumping Station and Lagoons Upgrades, Clyde River Harbour Development, Sanofi B99 Wastewater Treatment and Reuse Plant, and Silver Skagit Road Flood Recovery. Credit: Courtesy of ACEC National Awards

The project required extensive environmental permitting, archaeological assessment and community consultation, alongside marine, civil, geotechnical, coastal and electrical engineering. In B.C., R.F. Binnie and Associates received both an Award of Excellence and the Breton Environmental Stewardship Award for the $35-million Silver Skagit Road Flood Recovery project. The project followed the November 2021 atmospheric river that caused extensive damage to the roadway between Hope and the U.S. border, including washouts at more than 20 locations. As lead engineering consultant, Binnie developed emergency response and restoration designs under tight timelines and with limited survey data. The rehabilitation work included roadway realignments, culvert replacements, temporary creek diversions, riprap reinstatement and fish habitat offsetting measures. The project enabled partial reopening for industrial access in 2022, with full corridor recovery completed in 2025. The rebuilt infrastructure also incorporated measures intended to improve resilience against future extreme weather events. For more information, email: editor@esemag.com

Environmental Science & Engineering Magazine


27

ENVIRONMENTAL COMPLIANCE AND DUE DILIGENCE TRAINING EVENT

SAVE THE DATE! April 27–29, 2027 THE VENETIAN BANQUET & HOSPITALITY CENTRE

VAUGHAN, ON CANECT’s practical professional development courses are designed to help you meet your environmental compliance and regulatory responsibilities. Receive a Certificate of Attendance featuring Continuing Education Credits (CECs). Access leading experts for one-on-one compliance problems. Demonstrate your organization’s commitment to environmental due diligence. Take home valuable reference and guidance materials. Connect with technology and service providers. Update your knowledge of new and changing regulations.

A great event for environmental professionals, with technical discussions of applicable regulations. — Ontario Power Generation

VISIT WWW.CANECT.NET FOR MORE INFO


SPECIAL FOCUS: CONSULTANTS’ FORUM

A consulting engineer engaged to provide a defined professional service, for example, may gradually become much more involved in construction coordination, or project oversight. If something goes wrong, it may no longer be clear where the engineer’s responsibility began and ended. Consider a commonly experienced scenario, whereby an engineering firm is retained to design a building’s structural components, with construction review excluded from its scope. During construction, the client asks the engineer to “take a quick look” at a proposed field change. The engineer reviews it and provides comments, but the agreement is never updated to define that additional work or its limitations. If a problem later arises, the client may Professional liability insurance remains an essential backstop for consulting engineering firms, argue that the engineer also accepted but it shouldn’t be the entire risk management strategy. Credit: emiliezhang, stock.adobe.com responsibility for reviewing the installation. What began as a small favour can turn into a disagreement over responsibilities. That’s why scope changes should trigger a practical conversation. Is the added work within the firm’s expertise? Does it change the firm’s responsibility on the project? Does the contract need you are truly doing? Are important deci- to change? Does someone more senior sions being reviewed and documented? need to review the decision? These don’t Do you know where your responsibili- have to be complicated processes, but ties begin and end? If a claim occurred, they do need to happen. would you have the records to show how Before taking on additional work, key decisions were made? even in response to an informal request, By Tyler Dunsmore Insurance remains an important part firms should document the revised of the equation, but managing risk starts scope and clarify what remains excluded. or consulting engineering firms, a well before a claim. They should also confirm how the addifavourable insurance market can tional responsibilities align with their be easy to mistake for a favourable RISK CAN BUILD AS THE contract and insurance coverage. If the risk environment. Professional SCOPE CHANGES work changes in a meaningful way, the liability insurance pricing moves in cycles, One of the biggest areas firms should documentation should change with it. and firms may see more competition, pay attention to is scope. A project may capacity or attractive terms at renewal. begin with a clearly defined set of ser- DOCUMENTATION SHOULD But those conditions do not mean the vices, but projects evolve. A client asks for HELP TELL THE STORY risks behind the policy have disappeared. something added. Someone on the team Documentation is more than an Project disputes can turn into profes- agrees to help solve a problem. The engi- administrative responsibility. It is also sional liability claims; defence costs can neer becomes more involved in coordi- an important risk management tool. On accumulate before responsibility has nating contractors, or making decisions a complex project with many people and been determined and multiple parties outside the original scope. Before long, roles, a lot can change over the course may become involved when something the firm’s actual role on the project may of the work. People move on, memories goes wrong. look different from the one set out in the differ and decisions that seemed obvious That is why I encourage firms to look original agreement. at the time can become much harder to beyond what they are paying for insurBeing responsive and collaborative reconstruct months, or even years, later. ance and consider how risk is being is good business. The risk comes when The goal isn’t to document every managed throughout the business. Do firms take on more responsibilities, with- minor interaction simply to create a your contracts clearly reflect the work out stopping to consider the implications. paper trail, but to make sure there is a

The everyday decisions that shape an engineering firm’s risk

F

36 | November/December 2026

Environmental Science & Engineering Magazine


clear record of the decisions and changes that could materially affect the firm. If a client requests a meaningful change in scope, there should be a record of it. If the engineering team identifies a concern and provides a recommendation, that advice should be documented. If the firm makes a decision that changes its responsibilities or creates a significant exposure, there should be a clear record of how and why that decision was made. The same thinking should apply internally. Firms should determine which decisions a project leader can reasonably make independently and which ones should involve added expertise or approval. A decision with significant financial or professional implications should not necessarily rest with one person, simply because that individual happens to be closest to the project. For larger decisions, a defined review process can involve senior team members and ensure the right expertise is at the table.

PAY ATTENTION TO THE RISK YOU SHARE WITH OTHERS

carrying an exposure it did not intend to retain. It is important to understand Subcontracting is another area where who handles what, make deliberate decia relatively straightforward business sions about that responsibility and docpractice can have important risk impli- ument those decisions clearly. cations. Consulting engineering firms regularly work with specialists, because CONTRACTS DESERVE MORE a particular aspect of a project falls out- THAN A SIGNATURE side their own ability. Contracts can sometimes become Before bringing another firm onto a a means to an end. There is work to be project, look carefully at its qualifica- done, schedules are tight and everyone tions, experience and insurance, as well wants to get the project moving. But signas exactly what it is being retained to do. ing the agreement should not be treated The agreement with the subcontractor as an administrative step. It is one of the is equally important. Responsibilities points where your firm is deciding what should be clearly defined, particularly risk it is prepared to accept. where the engineering firm has already Before signing, firms need to undermade commitments to its client. stand the scope they are committing to, This is where the different contracts the responsibilities they are accepting on a project need to work together. If an and whether those obligations reflect engineering firm assumes an obligation the services they actually provide. Parin its agreement with a client, but does ticular attention should be paid to lannot appropriately address the corre- guage that extends the firm’s responsibilsponding responsibility in its agreement ity beyond its normal expertise or role. with a subconsultant, the firm may be left continued overleaf…

π QUALITY PRODUCTS YOU CAN TRUST • Huge Selection of Safety Products ALWAYS IN STOCK • Order by 6 PM for SAME DAY SHIPPING • 15 North American Locations Mean SHIPPING SAVINGS and FAST DELIVERY

1-800-295-5510 uline.ca

www.esemag.com

November/December 2026 | 37


SPECIAL FOCUS: CONSULTANTS’ FORUM

Firms should also consider whether the agreement appropriately limits their liability and whether the obligations they are accepting align with the protection provided by their insurance coverage. This is also an area where the right advisors can be useful. An insurance broker with risk control capabilities can work with insurers and, where appropriate, provide legal counsel to help identify provisions that may create unintended exposures or insurance concerns. Timing is everything. Contract review is far more useful before an agreement is signed than after a dispute has already happened.

on, whether it has the right expertise to perform the work and what responsibilities it is prepared to accept. From there, good risk management becomes part of normal project management. Scope is clearly defined at the beginning and revisited when the work changes. Contracts are reviewed before they are signed. Subconsultants are appropriately vetted, and their responsibilities are documented. Significant decisions receive the level of internal review they warrant. Important recommendations, changes and approvals are recorded while the information is still fresh. None of that needs to make it harder to do business. Clear processes give project teams a framework for recognizing INSURANCE SHOULD SUPPORT THE STRATEGY, NOT REPLACE IT when something needs more attention. Professional liability insurance remains Employees should know when they can an essential backstop for consulting engi- decide, when they need another opinion neering firms, but it shouldn’t be the entire and when a request from a client calls risk management strategy. The strongest for a more formal conversation. approach begins much earlier, with decisions about which projects the firm takes

bert@northvault.ca

38 | November/December 2026

A SOFT MARKET IS NOT A REASON TO BECOME LESS DISCIPLINED

There is an understandable tendency to pay more attention to risk management when insurance becomes expensive, or harder to acquire. When pricing improves or more options become available, some of that urgency can disappear. But the insurance market and the firm’s underlying risk are two different things. A softer market can be a good opportunity to step back from the annual focus on premium and take a closer look at how the business is operating. Good risk management means putting sensible processes around the decisions that can materially affect the business and making sure those processes are followed consistently. Tyler Dunsmore is a senior vice president and western regional leader at NFP, an Aon company. Email: tyler.dunsmore@nfp.ca.

519-709-0681

Environmental Science & Engineering Magazine


SPECIAL FOCUS: CONSULTANTS’ FORUM

own power plant and uses a dual-cycle gas turbine to generate the power it needs. POWERING THE SERVERS

Finding communities with enough spare energy resources to power a data centre is rare, as the electrification of the Canadian economy has increased demand for clean energy resources. Data centres need ample energy resources. When you consider what it takes to power the apps on a typical consumer cellphone, and multiply that by the size of a city or region, the need for substantial power can be appreciated. Many municipalities express concerns over how a data centre will impact energy rates and availability. To prevent data centres from driving up commuAs the growth in big data continues, and more operations rely on it for day-to-day operations, nity energy rates, operators often invest the need for data centres also grows. Credit: motionpixxlestudio, stock.adobe.com in energy efficiency measures and renewable energy sources. Techniques such as optimizing server utilization, using energy-efficient hardware, energy storage and implementing advanced cooling systems help reduce overall power consumption. Some asset owners are exploring alternatives to taking energy from the existing grid. These include the development of new energy resources, including natfuel our digital growth. But to do this, ural gas and emerging technologies like we need to make sure that everyone has small modular nuclear and hydrogen. There are also instances where data accurate information, so informed decisions can be made. centre owners enter into agreements with utility companies to secure dediUNDERSTANDING WATER USAGE cated power supplies, minimizing their By Michel Chartier One of the greatest misconceptions effect on local energy pricing, or even concerns the use of water. There are exam- become co-generators by exporting surhe exponential growth of big ples of municipalities that have rejected plus electricity to the grid when required. data and artificial intelligence discussions on developing data centres By investing in innovative technol(AI) has led to the emergence based on what they have been told about ogies and dedicated power resources, of a new infrastructure indus- the volume of water used in operations. data centre developers are working to try involving data centres. Across CanAlthough data centres have tradition- minimize the impact these structures ada, communities and governments are ally been known for using significant have on local taxpayers. looking at the potential of adding these amounts of water for cooling, many modstructures to service the growing appe- ern facilities are shifting toward alterna- NOISE CONCERNS tite for digital information. tive cooling technologies. These include The servers running within a data cenAs the demand for data centres grows, air-cooled systems, liquid immersion tre, along with the building’s HVAC sysso does the volume of information on cooling, and advanced heat exchangers, tem, emit a level of noise that has been how they are built, operated and main- which reduce, or eliminate, the need for an issue for some communities. These tained. However, not all of the informa- water. The adoption of these technologies concerns are legitimate, especially due tion has been accurate. Presumptions helps decrease environmental impact to the operation of cooling equipment have been made, based on earlier itera- and conserve local water resources. and backup generators. tions of the technology, or policies in one Depending on the energy source used To address this, newer data centres are jurisdiction that don’t apply to another. to power the facility, water will still be designed with enhanced soundproofing, The fact is, we need data centres to used if the data centre operator has its continued overleaf…

How technology and policy have changed the development of data centres

T

www.esemag.com

November/December 2026 | 39


SPECIAL FOCUS: CONSULTANTS’ FORUM

improved building materials, and strategic placement of noisy equipment away from residential areas. These changes have helped mitigate noise issues and improve community relations. However, since there is existing content online criticizing earlier design issues, not all of the impacted general public is aware of the advancements that have been made to address the problems.

narrative that is often missing in the dialogue between the asset developers and the community. If you want to have data storage capability that can be protected by specific laws and/or regulations, you need to find locations for that physical infrastructure. This is where coordinated plans at the provincial, territorial, or national level are beneficial. Data centres are not perfect. No piece of infrastructure is from an economic, CREATING EFFECTIVE POLICIES social, environmental and governance Effective government policy can help DATA IN DEMAND perspective. But they are necessary, and streamline how data centres are designed As the growth in big data continues, they can be developed responsibly. The and operated with the community in and more operations rely on it for day- more we can ensure decision-makers mind. However, with negative or outdated to-day operations, the need for data have accurate and up-to-date informainformation, it can also lead to missed centres also grows. There is a finite stor- tion about how they are built, operated, opportunities for data centres being age capacity that needs to grow, and be and maintained, the stronger the oppordeveloped in areas where demand is high. closer to where the demand is generated. tunity we have to meet our data needs At the policy level, several governmenData centres then transform from with local solutions. tal considerations can affect data centre being infrastructure assets that are nice development. Streamlining permitting to have, to ones we need to have, creating Michel Chartier is the national processes, updating zoning regulations, hubs that can not only house the data but market leader, Data Centres, and ensuring access to reliable energy and protect it in the region where it is needed. at WSP in Canada. Email: water infrastructure are important factors. This is another important part of the michel.chartier@wsp.com

40 | November/December 2026

Policymakers may need to address these areas to support responsible and efficient data centre expansion, while balancing community and environmental interests. When accurate and up-to-date information is used to inform the structuring of policies around data centre development, these structures can be built, operated and maintained in line with the needs and expectations of the communities they serve.

Environmental Science & Engineering Magazine


PIPING

Preventive maintenance of expansion joints helps prevent failures By Dave Genna

E

xpansion joints absorb thermal movement, isolate vibration, and accommodate misalignment in piping systems. They are installed at connections between equipment and piping, at transitions between dissimilar materials, and wherever the system requires controlled flexibility. Because they are flexible by design, they degrade differently than rigid pipe components and require a maintenance approach suited to that distinction. A failed expansion joint can release hazardous materials, damage adjacent equipment, and trigger unplanned shutdowns. In applications involving abrasive slurries, high-cycle vibration, or extreme temperature swings, the window between early degradation and functional failure narrows. A formal preventive maintenance program, with scheduled professional survey inspections that document protocols and provide clear criteria for replacement, will significantly reduce failure events. Rubber joints in standard industrial service typically achieve a service life of five to seven years. Actual life depends on the quality of the product, installation, and operating history. Effective maintenance starts with understanding what causes expansion joints to fail, so that operators know where and what to look for. Key failure factors include material degradation, installation driven stress, and operational overload. Inspection frequency should be proportional to the severity of the operating environment and should include quarterly visual checks and condition assessment surveys. For higher risk environments with abrasive media, shorter intervals may be appropriate. For facilities with over 40 rubber or PTFE expansion joints, particularly process industries, semiconductor facilities, steel mills, power generation and wastewater treatment plants, a professional survey provides the most reliable baseline for maintenance planning. Common inspection findings include excessive lateral offset, cracking and tearing at the flange, cover damage and delamination and overextension. A completed survey should produce a prioritized replacement list, a recommended spares inventory, and an updated inspection schedule. The spares inventory is especially important for facilities where joint sizes are non-standard, or where lead times for custom fabrication could extend downtime during an unplanned failure. Size verification should be performed against the as-installed dimension, not the original catalog specification. Settlement, bolt load, and pressure elongation can cause installed joints to differ from nominal values. Measuring actual faceto-face length at four circumferential points during the survey establishes the correct replacement dimension and avoids fitting problems at installation. www.esemag.com

This expansion joint shows some overextension, so it needs to be monitored.

For non-standard sizes, procuring a standard joint with a dedicated spacer is often faster and less costly than custom fabrication, provided the configuration is verified for the service pressure and movement requirements. Material compatibility should be confirmed against current operating parameters, not the original design basis. Fluid chemistry, temperature range, and any abrasive content should all be reviewed and accounted for in the manufacturer’s elastomer selection guide before specifying a replacement. Expansion joints are designed to fail first to prevent damage to more expensive or critical piping and equipment. But the goal is to avoid failure entirely. Knowing what to look for in a facility, along with what to expect from an expert survey, will ensure a strong preventive maintenance and repair program, helping avoid failure events. Dave Genna is with Proco Products Inc. For more information, visit www.procoproducts.com. November/December 2026 | 41


DATA CENTRES

Canada introduces water and electricity principles for data centres amid AI boom

T

By David Nesseth

he federal government has introduced new national principles encouraging data centre developers to minimize water consumption and environmental impacts, as Canada prepares for a major expansion of energy-intensive artificial intelligence (AI) infrastructure. Announced by Innovation, Science and Economic Development Canada, the Responsible Data Centre Development Principles establish five expectations for new facilities, including protecting local water resources, preventing electricity costs from being passed on to consumers, and ensuring communities receive lasting economic benefits. The voluntary framework also calls for greater transparency about local impacts and requires participating companies to demonstrate how their projects will provide strategic value to Canada. “These principles set a clear national standard: If you build in Canada, you must build responsibly and transparently and you must build for Canadians,” said Evan Solomon, Minister of Artificial Intelligence and Digital Innovation, in a statement. The announcement comes as the country faces a surge in hyperscale data centre construction. According to research from York University, Canada currently has five hyperscale facilities, with another 96 announced or under development. Hyperscale data centres are currently in British Columbia, Ontario, Quebec and New Brunswick. Alberta, too, has emerged as a major destination for proposed developments, supported by available energy resources, streamlined regulations and a provincial government seeking to attract investment. eStruxture, 42 | November/December 2026

Digital Realty Toronto YYZ11 is a data centre operated by Digital Realty in Vaughan, Ontario. The facility is currently operational. Credit: David Nesseth

a Montreal-based company, is already building its third data centre in the province in a rural area just north of Calgary. While data centres have existed for decades, hyperscale data centres are different, and necessary to provide the computing capacity needed for advanced AI applications. These centres can require millions of litres of water annually for cooling systems. As such, they can place significant pressure on municipal drinking water supplies, particularly if water-intensive cooling systems are to be used to prevent servers and other computing equipment from overheating. A planned $10-billion EverWind data centre project near Point Tupper, Nova Scotia, drew protesters throughout October. Holding signs with statements like, “You can’t drink data”, many in the community have been skeptical about the environmental impact of the project, as well as its future transparency. Nova Scotia Premier Tim Houston recently held a press conference at the build site, noting that, “Canada doesn’t

have enough computing power for the data we use every day in our health care systems, for all of our banking needs, and everything on our phones. Businesses run on this data. Governments run on it. We need more secure data infrastructure,” Houston said. At least two Microsoft data centres in southern Ontario have received municipal approval for substantial drinking water consumption. Both facilities have completed construction, including Microsoft’s data centre in Vaughan’s West Woodbridge Industrial Area, which was mostly completed this summer. Teams will continue internal and external equipment installation, testing, and preparation at the site through early 2028. Microsoft’s YTO40 data centre on Lowes Place in Etobicoke, a two-storey technology and office facility spanning approximately 278,000 to 289,450 square feet, was approved to use up to 39.75 litres of municipal water per second for cooling, according to planning documents submitted to the City of Toronto. That permitted rate is equivalent to approxiEnvironmental Science & Engineering Magazine


mately 3.4 million litres per day if maintained continuously. However, actual consumption may be considerably lower. Microsoft, which opened its first Canadian office in Toronto in 1985, has said Canada’s colder climate helps reduce the need for artificial cooling at data centres to less than 5% of the year. The company maintains that its newer Canadian facilities are designed to use substantially less water than conventional data centres by taking advantage of outdoor air and recycled rainwater. Microsoft released its own nearly identical AI infrastructure principles for Canada just months before those released by the federal government. “Canada’s AI ambition depends on building the capacity to power it,” announced Microsoft Canada President Matt Milton as a signatory to the Canada framework. The Ontario government also recently released its own AI infrastructure framework called a Data Centre Playbook. In terms of water conservation guidance, the playbook states: “Ontario will only advance data centre projects that meet Ontario’s strict environmental standards around water consumption and noise, prioritizing projects with closed-loop systems that use virtually no water during operation.” In the U.S., data centre construction has also led to fear of water contamination. Officials in Cheyenne, Wyoming, have linked wastewater discharges from construction of Meta’s $800-million artificial intelligence data centre to contamination of the city’s wastewater treatment and recycled water systems. Canada’s new AI infrastructure principles also address concerns about the potential impact of data centres on electricity rates, stating that developers must not shift electricity costs onto Canadian consumers. According to the International Energy Agency, a typical hyperscale data centre can require approximately 100 megawatts of electricity, comparable to the consumption of 100,000 households. In Ontario, the provincial government estimates that the data centre industry, including AI and cloud computing facilities, will account for 13% of new electricity demand by 2035. A Bloomberg analysis found that elecwww.esemag.com

tricity prices in U.S. areas with high concentrations of data centres had increased by as much as 267% over five years, highlighting concerns about the infrastructure and energy costs associated with rapidly expanding computing capacity. According to the Ontario Data Centre Playbook, new data centres above 1 megawatt in size would pay a higher rate than the industrial rate program for large electricity users. Beyond water conservation and electricity ratepayer protection, the federal framework establishes three additional expectations. Data centres must create lasting local benefits, be transparent about their impacts on surrounding communities, and deliver strategic value to Canada.

Ontario municipalities like Oakville and Mississauga have imposed one-year moratoriums on new data centres, as they continue to study the issue. Recent polling from Angus Reid found that 68% of Canadians would oppose construction of a large AI data centre within a few blocks of their homes. Opposition was slightly higher among rural respondents, at 73%, compared with 67% among urban residents. Tim Tierney, president of the Federation of Canadian Municipalities, said municipalities are increasingly being asked to evaluate complex proposals with potentially significant local consequences. “Municipal leaders need clear and complete information to make informed decisions,” he said in a statement.

The framework is intended to complement existing provincial, territorial, municipal and Indigenous regulatory processes, rather than replace them.

Major technology companies are already committing substantial investments to Canadian AI infrastructure. In December 2025, Microsoft announced a $19-billion investment in Canada, focused on expanding its cloud computing and AI infrastructure, illustrating the scale of capital being directed toward the sector. The federal principles do not establish specific water consumption limits, or mandatory efficiency targets. The framework is intended to complement existing provincial, territorial, municipal and Indigenous regulatory processes, rather than replace them. Local governments will continue to make development decisions based on regional priorities, infrastructure capacity and regulatory requirements. The announcement also comes amid public concerns about the expansion of AI infrastructure. While Ottawa recently approved the development of a data centre in the National Capital Region, other

He added that the federation welcomes commitments from industry leaders to work with local governments, mitigate impacts and ensure host communities benefit from development. The federal government says expanding domestic data centre capacity is necessary to reduce Canada’s reliance on foreign computing and cloud infrastructure while supporting AI research, innovation and economic development. The new principles have attracted support from 23 companies across the technology, cloud computing and data centre sectors, including Amazon Web Services, Google, Microsoft, Meta, OpenAI, Bell Canada, TELUS and Equinix. David Nesseth is a contributing editor with Environmental Science & Engineering Magazine. Email: david@esemag.com.

November/December 2026 | 43


STORMWATER

Modernizing water-level monitoring for flood preparedness

Bradley Taylor

W

Graeme Wattie

ater levels in rivers, lakes and reservoirs can change quickly, particularly during periods of snowmelt or severe weather. Municipalities responsible for monitoring these waterways require timely information to protect infrastructure, prepare for floods and support public safety. Historically, municipal staff often had to travel to monitoring locations and manually record water levels. These inspections provided operators with information from a specific point in time, but offered limited visibility into what happened between readings. During periods of rapidly changing conditions, those gaps could delay the identification of rising water levels. Municipalities across Canada are increasingly turning to automated monitoring to close those information gaps. One approach combines wireless, non-contact radar instruments with cellular or LoRaWAN communications and centralized data-management software. Together, these technologies allow operators to monitor levels remotely and receive notifications when measurements reach predetermined thresholds.

MOVING MEASUREMENT AWAY FROM WATER

Several Canadian municipalities have installed wireless radar sensors on bridges to monitor water levels. Credit: michal, stock.adobe.com

This approach can simplify installation at locations where accessing the water is difficult, or where changing environmental conditions present challenges for equipment. Radar technology is particularly well suited for outdoor water level monitoring, because its measurements are largely unaffected by common environmental challenges, such as dirt, debris and spider webs. By measuring from above the water surface, the sensor avoids direct contact with sediment, floating materials and other obstructions that can interfere with conventional submerged measurement technologies. The sensors communicate data through cellular or LoRaWAN networks. They can transmit measurements to the VEGA Inventory System (VIS) and municipal SCADA platforms, connecting field-level measurements with the systems already in use to monitor water infrastructure.

Several Canadian municipalities have installed VEGAPULS AIR wireless radar sensors at strategic locations along water bodies, including on bridges and other infrastructure. The instruments continuously measure water levels from TURNING MEASUREMENTS INTO above the surface, without making phys- ACTIONABLE INFORMATION Increasing measurement frequency ical contact with the water. 44 | November/December 2026

represents only one part of modernizing water-level monitoring. The information must also reach those responsible for identifying and responding to changing conditions. In these applications, municipal personnel can access water-level data remotely through VIS. Operators can review conditions from computers and mobile devices, instead of relying exclusively on visits to individual monitoring locations. Municipalities can also incorporate the information into existing SCADA environments. Automated notifications add another layer to the monitoring strategy. Operators can establish thresholds for individual measurement points and receive alerts when water rises beyond a defined level. SMS, email and push notifications can draw attention to these changes. Rather than requiring employees to continually review every monitoring point, the system can identify locations where conditions warrant further assessment. This capability becomes particularly Environmental Science & Engineering Magazine


important when a municipality manages numerous waterways or monitoring sites across a large geographic area. Remote measurement does not eliminate the need for personnel in the field, but it can help municipalities direct those resources toward locations that require closer attention. During a developing flood event, earlier awareness can give municipal teams additional time to assess conditions and determine an appropriate response. Depending on the severity of the event, that response Through REST API connectivity, municipalities can make water-level information contained could include deploying flood barriers, within VIS available through regional websites. modifying drainage strategies, issuing public advisories, closing roads or coordinating evacuation measures. MAKING WATER DATA MORE ACCESSIBLE

The same infrastructure used for operational monitoring can also support public communication. Through REST API connectivity, municipalities can make water-level information contained within VIS available through regional websites. This approach allows them to provide residents with current local water conditions, while using the same underlying measurement data for internal monitoring. The result is a change in how information moves through the water-management process. Data collected at a river or lake can travel through a wireless network to centralized monitoring software, integrate with municipal systems and, where appropriate, become available to the public. This connectivity becomes particularly relevant when conditions change quickly. Traditional monitoring may require a manual inspection, followed by internal reporting and public communication. Connected measurement and data-sharing systems can shorten the time between a change in field conditions and the distribution of that information to the people who need it.

Moving from periodic manual readings to continuous, connected monitoring gives municipalities a more complete picture of changing water conditions and a stronger foundation for flood preparedness.

physical infrastructure, maintain equipment and evaluate changing site conditions. Automated instrumentation does not replace those responsibilities. Instead, it changes the availability of information between site visits. Continuous water-level measurement gives municipalities a more complete record of changes over time, while automated notifications help operators identify when conditions move outside established parameters. Integration with SCADA systems and centralized data platforms also gives personnel multiple ways to access and use the information. For Canadian municipalities managing seasonal water fluctuations, the transition from periodic manual readings to connected measurement represents a broader change in flood preparedness. A SHIFT TOWARD CONTINUOUS Municipal teams can increasingly base MONITORING decisions on continuously updated field Manual inspection will continue to data, rather than isolated observations. play a role in municipal water manageThe use of VEGAPULS AIR sensors ment. Personnel still need to examine and the VEGA Inventory System prowww.esemag.com

vides one example of how municipalities can combine radar measurement, wireless communications and centralized data management to support this approach. Ultimately, technology represents only one part of flood management. The more significant change is the availability of timely data. When municipal teams can monitor changing water levels as they occur, they have a stronger basis for determining when conditions require closer investigation or intervention. When water conditions can change within hours, reducing the time between measurement, analysis and response can become as important as the measurement itself. Bradley Taylor and Graeme Wattie are with VEGA Instruments Canada. Email: b.taylor@vega.com

November/December 2026 | 45


WATER

Continuous nitrate monitoring system implemented at Brantford’s WTP

Patrick Halevy

T

Niranjana Babu

Vedant Patel

he City of Brantford, Ontario, draws its drinking water from the Grand River. Its watershed is one of Ontario’s most intensively farmed regions, with agricultural land accounting for over 70% of total watershed land use. Fertilizer application across cropland, manure spreading, and tile drainage make nitrate a chronic and variable presence in the river’s raw water. Seasonal field runoff, spring snowmelt, and post-storm drainage events all contribute to elevated and rapidly shifting nitrate levels at the intake for the Holmedale Water Treatment Plant (WTP). In January 2025, nitrate levels in the Grand River peaked at 9.8 mg/L, prompting the city to close intake gates and draw from storage reservoirs. Conventional water treatment processes cannot remove nitrate. Only advanced processes, such as reverse osmosis (RO) or ion exchange, can achieve meaningful nitrate removal. For communities relying on conventional treatment, source water monitoring and strategic mitigation are the primary tools available. The IQ Sensor Net module and YSI cleaning air box mounted at the Holmedale WTP river intake, MOVING FROM DAILY GRAB SAMPLES TO CONTINUOUS ONLINE MONITORING

For years, the standard approach at the Holmedale WTP was frequent manual grab sampling, followed by laboratory analysis. While thorough, this approach placed a significant and unsustainable burden on plant staff. Sampling, transport, lab processing, and result interpretation consumed considerable operator time and resources, and still left gaps in the data record between 46 | November/December 2026

overlooking the Grand River.

sampling events. A rapid change in river nitrate between samples could go undetected until the next collection round. Recognizing the limitations of this model, plant staff looked for a continuous, online monitoring system that could watch the intake around the clock without demanding constant operator attention. They chose a YSI NitraVis IQ NI UV-Vis optical nitrate sensor, which is an instrument purpose-built for con-

tinuous source water monitoring. Supplied and commissioned by SPD Sales Limited, the sensor was installed directly in a stilling well at the Holmedale WTP river intake, immersed in the raw water flow. The stilling well protects the instrument from direct current forces and floating debris, while ensuring the measurement gap remains in continuous contact with a representative sample of the intake water. Environmental Science & Engineering Magazine


This approach keeps the sensor where the data matter most, which is at the point of entry, before any treatment has occurred. A key feature of this installation is the sensor’s automatic cleaning system. An integrated ultrasonic cleaning mechanism continuously excites the measurement windows, preventing biofouling and sediment accumulation from interfering with readings. In the biologically active and sometimes turbid waters of the Grand River intake, this self-cleaning capability is essential to maintaining measurement integrity, without requiring frequent manual intervention. For more challenging fouling conditions, the sensor also supports an optional compressed air cleaning system. This provides an additional layer of cleaning power that activates automatically on a timed cycle. This further extends the intervals between physical maintenance visits. This sensor uses UV-Vis absorption spectrometry, which is a proven optical measurement principle. A xenon flash lamp generates a broadband light beam that passes through the water sample. A high-resolution photodiode array captures the full absorbance spectrum from 200 to 390 nm, and onboard algorithms resolve this into accurate, real-time nitrate concentration values. There are no chemical reagents, no sample conditioning requirements, and no wet-chemistry consumables. The result is a robust, low-maintenance installation that delivers continuous data with minimal operator intervention.

typically exceeding 85–95%. While energy-intensive compared to conventional treatment, it is one of the few technologies capable of reliably reducing nitrate concentrations to safe levels, when source water quality alone cannot be managed. Together, these three layers form a coherent and proportionate defence. The analyzer watches and warns. The canal buys time, and the RO system resolves what conventional treatment cannot. The City of Brantford’s approach offers a practical model for any conventional surface water utility operating in an agricultural watershed, where nitrate is a persistent and growing concern. The controller showing a live reading of nitrate.

enabling informed decisions before conditions become critical. This early warning capability is what makes the rest of the strategy possible. Without it, the plant would be reacting to conditions rather than anticipating them. The Holmedale Canal serves as a strategic raw water reservoir, providing the plant with operational flexibility during elevated nitrate events. When online monitoring signals rising nitrate levels in the Grand River, intake gates to the canal can be closed, allowing the plant to draw from stored water. This buffer capacity is a critical tool for managing short-duration nitrate spikes without interrupting supply to the community. RO – THE LAST LINE OF DEFENCE

Recognizing that conventional treatment cannot remove nitrate, the City BRANTFORD'S NITRATE of Brantford has acquired an emerMITIGATION STRATEGY gency RO system specifically for nitrate The online nitrate analyzer is the cor- removal. It is operated during the winnerstone of a broader, multi-layered ter months, when cold temperatures nitrate mitigation strategy developed by suppress biological activity in the river, the city to protect its drinking water sup- reducing the natural uptake of nitrogen ply. The strategy combines three comple- and driving nitrate concentrations to mentary lines of defence, each activated their seasonal peak. This is the period of in sequence as conditions demand. highest risk, and the RO system provides The continuous online nitrate analyzer the most effective available response. at the raw water intake provides real-time RO works by forcing water under presvisibility into nitrate concentrations in sure through a semi-permeable memthe Grand River. When levels begin to brane that rejects dissolved ions, includrise, operators receive an immediate alert, ing nitrate, achieving removal efficiencies www.esemag.com

THE VALUE OF CONTINUOUS NITRATE MONITORING

Daily grab sampling can help operators determine nitrate levels at the moment of collection. However, it cannot tell what happened between samples. Agricultural runoff pulses, fertilizer application events, spring snowmelt, or upstream tile drainage can cause nitrate concentrations to spike and subside within hours. Continuous optical monitoring captures these dynamics in full, giving operators a complete picture of what their intake is receiving every hour of every day. The early warning function of the online analyzer is what activates the other layers of Brantford’s mitigation strategy. Without real-time data, neither the Holmedale Canal nor the RO system can be deployed with confidence and precision. Ontario’s Safe Drinking Water Act, 2002 and Ontario Regulation 170/03 impose rigorous source water monitoring and adverse condition reporting obligations on municipal drinking water systems. A continuous, time-stamped nitrate record provides a defensible, auditable compliance dataset. Patrick Halevy is with the City of Brantford. Niranjana Babu and Vedant Patel are with SPD Sales Limited. For more information, email: niranjana.babu@spdsales.com References are available upon request.

November/December 2026 | 47


WASTE MANAGEMENT

Transforming a southern Alberta landfill into a modern, regional waste management system

L

By Klas Ohman

ocated in the scenic Bow Valley corridor between Canmore and Calgary in southern Alberta, the Francis Cooke Landfill has long played an important role in regional waste management and carried the legacy of more than a century of industrial use. Originally established as a lime quarry disposal site for waste kiln dust from an adjacent cement manufacturing facility, the property gradually evolved over time to also accept construction and demolition debris and other residual materials. More recently, the site has expanded its role to include resource recovery and composting activities supporting the surrounding communities. By 2016, the landfill was operating under legacy conditions that no longer aligned with modern environmental expectations, or the 2010 Standards for Landfills in Alberta. Historical disposal practices had raised concerns regarding groundwater protection. At the same time, the site’s proximity to the Bow River, a sensitive and ecologically significant watershed, heightened regulatory scrutiny. Furthermore, increasing operational demands, stockpiled materials, and aging infrastructure created inefficiencies that limited long-term planning and growth. To address these challenges, the Bow Valley Waste Management Commission engaged Associated Engineering (AE) to support a comprehensive, long-term transformation of the facility. What 48 | November/December 2026

Limited availability of suitable clay material for liner and cover construction required alternative design approaches and material evaluations.

began as early-stage technical support in 2016, evolved into a multi-decade master landfill planning initiative focused on extending the site’s life, improving environmental performance, and achieving full regulatory compliance. The primary objective was to transition the facility from a legacy disposal operation into a fully engineered, sustainable landfill system capable of serving the region for the next 50 years. This required not only physical upgrades to infrastructure, but also a fundamental shift in how the site was planned, modelled, and regulated. Associated Engineering’s scope included developing a master landfill plan to guide phased expansion, longterm site development, and hydrogeological investigations to understand groundwater flow and potential contamination pathways, and stormwater run-on/run-

off analysis to inform drainage design. The team also supported landfill cell and closure design concepts, financial security assessments, and multiple regulatory approval amendments with Alberta Environment and Protected Areas. A key milestone in the work included securing approval for increased final waste elevation, effectively expanding the landfill’s airspace and long-term capacity. Additional planning supported future development of northern expansion areas and the continued optimization of lime waste and construction and demolition debris disposal cells to maximize available land within the existing footprint. The project presented several significant technical and environmental challenges. The site’s mountainous terrain required careful grading and staged Environmental Science & Engineering Magazine


development planning to ensure safe, efficient use of available space. Limited availability of suitable clay material for liner and cover construction required alternative design approaches and material evaluations. In addition, the site’s location within a sensitive watershed demanded rigorous assessment of groundwater and surface water interactions to ensure longterm protection of the Bow River system. To support regulatory engagement and build stakeholder confidence, AE’s team combined detailed technical studies with advanced visualization tools. InfraWorks modelling was used extensively to communicate phased landfill development and illustrate how modern engineering controls would be implemented over time.

These visualizations played a key role in demonstrating environmental performance improvements and supporting discussions with regulators and stakeholders. A complementary 3D physical model of the site was also developed for community engagement and educational outreach, helping local groups and students better understand landfill operations and environmental safeguards. Sustainability and climate resilience were embedded throughout the planning process. The design incorporated enhanced stormwater management systems, including runoff and retention infrastructure designed for a one-in25-year storm event and to be robust enough to address the increasing frequency of extreme weather conditions.

Progressive reclamation strategies were also integrated to extend landfill life, reduce disturbed areas, and improve long-term site stability. Operational improvements included better management of reprocessed materials, thus reducing the need to permanently close operational areas and supporting more efficient land use. The Francis Cooke Landfill master plan represents a significant shift from legacy landfill operations toward a modern, engineered, and environmentally responsible waste management system. Klas Ohman is with Associated Engineering. Email: ohmank@ae.ca

PRODUCT & SERVICE SHOWCASE

SEWAGE GRINDER FOR HIGH FLOW AND EASY SERVICE

The Channel Monster FLEX is a modular, high flow sewage grinder engineered to capture and shred tough solids, while protecting pumps and downstream equipment. Its separate FLEX grinder and solids diverter allow easy field replacement, while the Exacta Lock adjuster ensures precise performance. Designed for demanding pump stations and headworks applications. Represented by ACG-Envirocan T: 905-856-1414 E: sales@acg-envirocan.ca W: www.acg-envirocan.ca Sulzer Pumps Solutions Inc. W: www.sulzer.com

www.esemag.com

PROGRESSIVE STEP SCREENING AND SOLIDS SEPARATION

The MevaScreen® RSM Monster is a self-cleaning progressive-step fine screen for facilities with high screening loads, or difficult operating conditions. The unique patented design offers a high degree of solids separation, easy maintenance, prevention of sand and grit blockages, and can be tailored to specific application requirements. It is ideal for protecting downstream equipment in sewage and industrial water treatment applications. Represented by ACG-Envirocan T: 905-856-1414 E: sales@acg-envirocan.ca W: www.acg-envirocan.ca Sulzer Pumps Solutions Inc. W: www.sulzer.com

MAXIMIZE AERATION PERFORMANCE

Aeration is typically the largest energy consumer in a wastewater treatment plant. AERZEN’s turbo, hybrid, and positive displacement blower technologies precisely adapt airflow to fluctuating biological loads, maintaining optimal dissolved oxygen levels while minimizing energy use. The result is improved process reliability, lower operating costs, and more sustainable wastewater treatment across municipal and industrial applications. AERZEN CANADA INC. T: 450-424-3966 (Montreal) T: 437-703-7630 (Ancaster) T: 587-316-0155 (Calgary) E: sales-ca@aerzen.com W: www.aerzen.com/canada

November/December 2026 | 49


PRODUCT & SERVICE SHOWCASE

ACCURATE CHEMICAL MONITORING

THERMOPLASTIC BUTTERFLY VALVES

Asahi/America’s Type-57LIS butterfly valves are quarter turn valves that provide moderate flow control and conform to ISO 5752 short pattern face-to-face dimensions. This allows the Type-57LIS to directly replace metal valves conforming to the same standard. Available as ANSI B16.5 wafer or ANSI B16.5 lug models with 316SS drop-in inserts. Type-57LIS butterfly valves can be pneumatically, or electrically actuated. Asahi/America T: 800-343-3618 F: 800-787-6861 E: asahi@asahi-america.com W: www.asahi-america.com

CUSTOM SKIDS BUILT AROUND YOUR PROCESS

When standard options fall short, BlueWhite builds custom engineered skid systems around your exact requirements. Configurations include single or multiple peristaltic or diaphragm pumps, flow meters, valves, piping, and built-in spill containment. Every skid is factory tested and backed by single-source support for municipal and industrial chemical dosing and transfer. Blue-White Industries T: 714-893-8529 E: info@blue-white.com W: www.blue-white.com

ROTARY LOBE PUMPS FOR ABRASIVE AND VISCOUS FLUIDS

BRINGING PRECISION TO HIGH-VOLUME DOSING

The FLEXFLO® M5 peristaltic metering pump delivers up to 2,021 LPH at pressures to 125 psi. Its exclusive offset-roller design reduces pulsation by up to 80%, while patented tube failure detection helps prevent chemical spills. A 10,000:1 turndown, NEMA 4X enclosure, and 5-year warranty suit water treatment applications. Blue-White Industries T: 714-893-8529 E: info@blue-white.com W: www.blue-white.com 50 | November/December 2026

Boerger’s rotary lobe pumps provide reliable performance for municipal water and wastewater applications, including pump stations, sludge handling, and solids-laden media transfer. Designed for abrasive and viscous fluids, these valveless, self-priming pumps feature maintenance-in-place serviceability to minimize downtime. Multiple sizes and configurations are available to meet the demands of critical municipal infrastructure. Boerger, LLC T: 612-435-7300 E: america@boerger.com W: www.boerger.com

Force Flow’s CHEM-SCALE™ and TOTE BIN SCALE™ provide accurate chemical monitoring for sodium hypochlorite, polymer, fluoride, and other chemicals stored and fed from day tanks and IBC totes. These systems help operators track chemical usage and inventory, identify over and underfeed conditions, and document the amount of chemical fed for improved process control. Force Flow T: 925-686-6700, or 800-893-6723 F: 925-686-6713 E: info@forceflow.com W: www.forceflowscales.com

EMERGENCY SHUTOFF FOR CHLORINE CONTAINERS AND CYLINDERS

Halogen Valve Systems Inc. provides rapid emergency shutoff for chlorine ton containers and cylinders, automatically closing the valve within seconds of leak detection. The actuator mounts quickly without tools, while still allowing manual valve operation. Torque confirmation verifies that the valve has been properly closed to Chlorine Institute recommended standards, providing added confidence during an emergency shutdown. Halogen Valve Systems T: 949-261-5030 F: 949-261-5033 W: www.halogenvalve.com

Environmental Science & Engineering Magazine


PRODUCT & SERVICE SHOWCASE

MAG-DRIVE PUMPS

OGS/HYDRODYNAMIC SEPARATOR

The new Stormceptor® EF is an oil grit separator (OGS)/hydrodynamic separator that effectively targets sediment (TSS), free oils, gross pollutants and other pollutants that attach to particles, such as nutrients and metals. The Stormceptor EF has been verified through the ISO 14034 Environmental Management – Environmental Technology Verification (ETV). Imbrium Systems T: 800-565-4801 E: info@imbriumsystems.com W: www.imbriumsystems.com

QUALITY STORMWATER TREATMENT

Inspection and maintenance are fundamental to the long-term performance of any stormwater quality treatment device. The Stormceptor EF/EFO design makes inspections and maintenance an easy and inexpensive process conducted at grade. Once serviced, the Stormceptor EF/EFO is functionally restored as designed, with full pollutant capture capacity. Learn more at: www.imbriumsystems.com Imbrium Systems T: 800-565-4801 E: info@imbriumsystems.com W: www.imbriumsystems.com www.esemag.com

HYPERBOLOID MIXERS

Invent Environment is the manufacturer of hyperboloid mixers, which have revolutionized anoxic and swing zone mixing. Invent provides low-shear, efficient mixers with no submerged motors or gear boxes for easy access for maintenance. They have now released the Hyperclassic Mixer Evo 7, which has increased the number of motion fins and adjusted the geometry of the mixer to maximize its efficiency, reducing operation costs even further. Pro Aqua, Inc. T: 647-923-8244 E: aron@proaquasales.com W: www.proaquasales.com

FULLY INTEGRATED WATER PRESSURE BOOSTER SYSTEM

DAB Pumps ESYBOX MINI 3 is a compact, fully integrated water-pressure booster system. It combines a self-priming multistage pump, variable-speed inverter, pressure and flow sensors, expansion tank, and user-friendly display in one compact unit. It delivers constant water pressure and automatically adjusts its operation to match water demand, helping reduce energy consumption. Quiet operation and flexible design allow for installation in a variety of locations. Summit Water T: 800-265-9355 E: sales@summitwater.ca W: www.summitwater.ca

Vanton Chem-Gard CGM-ANSI magnetically driven end suction pumps are sealless, single-stage process pumps which meet ANSI B73.1 specifications and conform to Hydraulic Institute Standards. All wet-end components are homogenous, injection-molded polypropylene (PP) and polyvinylidene fluoride (PVDF), eliminating metal-to-fluid contact. This makes them ideally suited for handling corrosive, hazardous and ultrapure fluids. Flows to 450 GPM, heads to 180 ft, and temperatures to 225°F. Vanton Pump & Equipment Corporation T: 908-688-4216 F: 908-686-9314 E: mkt@vanton.com W: www.vanton.com

VERTICAL THERMOPLASTIC SUMP PUMPS

Vanton’s vertical thermoplastic sump pumps are engineered for the dependable handling of corrosive, abrasive, and ultra-pure process fluids, plant effluents and wastewater, over broad temperature and pH ranges. These rugged pumps are widely used by various manufacturing industries and water treatment facilities. They are available in polypropylene, PVC, CPVC, or PVDF. Every Vanton pump is performance tested to the specified service condition intended. Vanton Pump & Equipment Corporation T: 908-688-4216 F: 908-686-9314 E: mkt@vanton.com W: www.vanton.com November/December 2026 | 51


BIOSOLIDS

Turning dairy processing residuals into resources for healthier soils

D

By John Abel

issolved air flotation (DAF) systems are often used to separate suspended solids and fats from dairy manufacturing wastewaters, often with the help of coagulants and polymers. The recovered material can contain organic matter and nutrients, but its properties depend on the plant and treatment process. When the composition, treatment, and receiving site are properly evaluated, dairy manufacturing residuals can become a resource for nutrient recovery and soil improvement. Dairy processing sludge is not automatically finished compost, a standardized fertilizer, or suitable for unrestricted spreading. Research on dairy sludge phosphorus shows that treatment chemistry and soil conditions influence nutrient behaviour and availability. Each material needs its own evaluation. This begins with understanding what enters the wastewater system, which treatment chemicals are used, and how production or cleaning changes affect residuals. Representative laboratory testing should establish solids content, organic matter, nutrient concentrations, pH, salinity, and any other parameters needed to determine suitability. Metals, pathogens, sodium, and source-specific contaminants may require assessment. The receiving operator must know what is arriving and whether their process and authorization can accept it. Circular Byproduct Management Group’s (Circular) management approach is to bring together manufacturers, laboratories, qualified agronomic special52 | November/December 2026

Research on dairy sludge phosphorus shows that treatment chemistry and soil conditions influence nutrient behaviour and availability. Each material needs its own evaluation. Credit: torvalmork, stock.adobe.com

ists, transport providers, and receiving facilities. The objectives are to identify an appropriate beneficial use and document the conditions under which it can occur. Depending on the material, that may involve a compost yard, a fertilizer developer, or a farm operating under a site-specific nutrient management plan. Materials that fail the acceptance criteria need another outlet. Soil improvement starts with the soil itself. Acidity and alkalinity describe soil chemistry, while clay, sand and loam describe texture. These are separate characteristics that must be considered together. An alkaline clay field presents different challenges from an acidic sandy loam. Soil testing, field history, crop demand, drainage, and water availability establish the starting point for choosing an amendment. In acidic soils, a material with demonstrated neutralizing capacity may help address acidity, when matched to a mea-

sured lime requirement. However, its pH alone does not establish that capacity. In alkaline soils, adding more alkaline material may be counterproductive, and nutrient availability and salt loading deserve particular attention. For clay-rich soils, appropriately prepared organic amendments can support aggregation and pore space, but traffic on wet ground can undermine those gains. In sandy soils and sandy loams, mature compost can improve water and nutrient retention, but application planning must still account for leaching. The technical task is to match nutrient forms, carbon characteristics, and amendment properties to the receiving soil. There is no single molecular formula that repairs every field. Carbon-to-nitrogen balance, nutrient release, phosphorus chemistry, and salinity all matter. For compost producers, feedstock selection must also support adequate aeration, moisture control, stabilization, and Environmental Science & Engineering Magazine


a suitable finished product. Application rates must follow calculations, rather than disposal pressure. A nitrogen-based starting rate divides the crop’s remaining nitrogen requirement, after existing nutrient credits, by the estimated plant-available nitrogen supplied by weight or volume. Laboratory results must be converted consistently between wet and dry bases. Total nitrogen is not the same as first-season available nitrogen. The proposed rate must then be checked against phosphorus constraints, salt loading, hydraulic capacity, and other site limits. For dryland farmers, realistic yield expectations and rainfall conditions are especially important. Recycled nutrients cannot overcome a lack of water, and liquid residuals should not be treated as an unrestricted irrigation source. The aim is to support soil function over time, alongside appropriate crop rotations, residue retention, and erosion control. Progress should be measured through repeat soil testing and field observations, including changes in organic matter, infiltration, nutrient status, and crop performance. This work also gives multinational manufacturers a practical way to advance environmental, social, and governance objectives. Where suitable materials would otherwise go to landfill, a documented beneficial-use program can support diversion goals and nutrient circularity. The value lies in verified outcomes. This includes quantities moved, material characteristics, receiving-site acceptance, treatment records, and evidence of final use. Diversion alone does not establish carbon neutrality or prove that every goal has been met. Any emissions claim needs a defined baseline and a suitable accounting method. Preventing food loss remains the priority. Materials that can safely remain in the food supply should be evaluated for those uses first. For residuals requiring other management, the best route depends on their composition and the receiving system. Circular’s role is to coordinate those decisions, maintain traceability, and keep the generator and recipient aligned on responsibilities. Circular’s vision is a full-circle www.esemag.com

approach, in which appropriate organic resources return to land that can benefit from them. Restoring depleted soils takes repeated, well-managed effort. One truckload alone does not rebuild a region. But when manufacturers, composters, fertilizer developers, and farm-

ers work from reliable data, dairy residuals can contribute to that effort. Dr. John Abel is with Circular Byproduct Management Group. Email: john@circularbyproduct.com

Market leader in System Integration SCADA | Instrumentation Automation Solutions | 24/7/365 Support

Scan for our Solutions & Services for Water/Wastewater

Delivering Clean Water Solutions For More Than Six Decades Treatment • Collection • Distribution • Storage

AINLEYGROUP.COM

B a rri e • B e l l e v i l l e • C o l l i n gw o o d • M i s s i s s a u ga • K i n gs t o n • O tt awa

Sustainable, Resilient Solutions

www.ae.ca

November/December 2026 | 53


Advertiser INDEX

WASTEWATER

Get listed in ES&E Magazine’s

Consultants, Products & Services Guide Register your company at esemag.com/get-listed

COMPANY

By ES&E Staff

PAGE

ACG-Envirocan........................................ 55 ACO Systems ........................................... 22 Associated Engineering.......................... 21 Blue-White..................................................7 Boerger.................................................... 27 CANECT 2027........................................... 35 CB Shield................................................. 11 Contech Engineered Solutions............... 56 Crane Pumps & Systems............................3 ECO Canada............................................. 15 H2Flow Equipment....................................9 Imbrium Systems.................................... 56 International Water Supply.................... 28 INVENT Environmental Technologies.... 23 NorthVault Tanks.................................... 38 OASIS....................................................... 15 OOWA ...................................................... 14 Pentair..................................................... 17 Pro Aqua.....................................................5 Rinker Materials...................................... 56 Sienna Geodynamics.............................. 29 SPD Sales................................................. 33 Stantec..................................................... 40 Summit Water......................................... 25 Uline Canada........................................... 37 Vanton Pump & Equipment.................... 19 Vissers Sales...............................................2 Water for People..................................... 31 54 | November/December 2026

Moose Jaw breaks ground on $73M wastewater headworks facility

T

he City of Moose Jaw has broken ground on a $73-million wastewater headworks facility, which is the largest infrastructure project in the Saskatchewan city’s history. This major upgrade is intended to support population growth, while reducing the risk of sewer backups and flooding. The Crescent View Headworks Facility will replace the existing Crescent View Lift Station, which opened in 1961 and has exceeded its expected 60-year service life. The new facility will be constructed immediately west of the existing station at the east end of Manitoba Street and is expected to be completed by the end of the decade. Once operational, the new headworks facility will increase wastewater handling capacity to support a population of more than 45,000. There is potential for future expansion to accommodate as many as 60,000 residents. The facility will be constructed above the regional flood elevation and is designed to reduce the risk of sewer backups, overflows and flooding during major storm events. Major components include high-efficiency pumps and motors, fine screening and grit removal equipment, a septage receiving station, a bulk water fill station and two standby generators. Improved screening will also capture smaller debris that can cause premature wear on pumps and treatment equipment. The city has budgeted $73 million for the project between 2026 and 2029. More than $9.7 million is being provided through the federal Canada Community-Building Fund, with the remainder funded primarily by the city. Planning for the project dates back to 2021, when Moose Jaw retained AECOM to undertake conceptual planning and

A rendering of the new Crescent View Headworks Facility. Credit: City of Moose Jaw

design for the old lift station. An assessment determined that replacing the facility offered better value than rehabilitating the existing infrastructure. Detailed design advanced through 2022 and 2023, although applications for funding through the Investing in Canada Infrastructure Program and Disaster Mitigation and Adaptation Fund were unsuccessful. In August 2025, the city secured approximately $9.7 million through the Canada Community-Building Fund, to be allocated to construction over five years beginning in 2026. Council subsequently approved borrowing $30 million over 15 years in March 2026 to help finance construction. Seven contractors were prequalified for the project before the tendering process ran from March to June. On July 16, 2026, the city awarded Westridge Construction Ltd. the contract to build the new facility. For more information, email: editor@esemag.com

Environmental Science & Engineering Magazine


PERFORMANCE THAT LASTS LONG AFTER INSTALLATION

Your equipment works hard, and JWC Environmental (JWC) works just as hard to keep it performing. Our aftermarket team helps grinders and screens operate at peak efficiency year after year. With genuine OEM parts, expert rebuilds, responsive field service, and proactive maintenance, JWC reduces downtime and extends equipment life.

Authorized Representative

sales | service needs 800.331.2277 jwce.com

ACG Envirocan (905) 856-1414 sales@acg-envirocan.ca


Protecting Canada’s Waterways

• Three media options to target specific pollutants of concern including sediment, oil and grease, soluble metals, organics, nutrients, and phosphorus. • Three cartridge heights to reduce system size and costs. • Multiple custom and standard configurations to accommodate site specific loading, orientations, flows, project footprints, and hydraulics. • Full engineering and design support from experienced stormwater engineers. • 20+ year history of successful installations and over 200,000 cartridges installed worldwide. • Cartridge design includes patented siphon-based technology to maximize longevity and reduce maintenance frequency.

The Most Flexible and Reliable Stormwater Treatment Technology Vault • Manhole • Curb Inlet • Cast in Place • Peak Diversion D e s i gn, i ns t al l at i o n a nd a f ter - sa l e ser v i c es pr ov i d ed by:

ALBERTA, BRITISH COLUMBIA & YUKON Kon Kast Concrete Products www.konkast.ca 250-765-1423

ONTARIO Echelon Environmental www.echelonenvironmental.ca 905-948-0000

QUEBEC & MARITIMES Soleno www.soleno.com 800-363-1471

Co nt e ch Engi ne e r e d S o l ut i o ns LLC | www. C ontec hES . c om | 8 0 0 - 338 - 1 122