ERIKS Partial Discharge Analysis

Page 1

PARTIAL DISCHARGE & TAN DELTA TESTING ON HIGH VOLTAGE CRITICAL ASSETS (6.6kV and 11kV machines)

1 DAYS TESTING COULD SAVE 12 WEEKS OF DOWN-TIME ERIKS unique approach to monitoring and maintaining your equipment can help to ensure a longer life and lower operating costs. For example our on-site Partial Discharge testing evaluates the condition of your medium/high voltage asset's insulation. (Motors, Generators, Switchgear, Transformers and Bus-bars). By repeating the tests over time ERIKS can determine any rate of deterioration, this can be monitored over time to give a more accurate assessment of when planned maintenance should be carried out to help prevent in service failure. Using our mobile test trailer, we can perform off-line tests on rotating machines - disconnected from the system - during a single day machine shutdown. With a line voltage up to 11kV and a power rating 50MW. (6.6kV and 11kVofmachines)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.