ERICA CARVALHO | SELECTED WORK CARVALER@GMAIL.COM
Selected work developed at SVA Architects 2019 - Current
Selected work developed at CallisonRTKL 2008 - 2018 https://issuu.com/ericamcarvalho/docs/erica_carvalho_portifolio_2018
1 2 3 4 5 6 7 8 9 10 11 12
CHULA VISTA MIXED USE DISTRICT CRENSHAW CROSSING LAKELANDAND LAUREL HOLLYWOOD MODULAR SACRAMENTO ARMORY SITE ISENBERG TOWERS EMERYVILLE SENIOR WAIPAHU TOWERS WILLOWBROOK MASTER PLAN GLENDALE FAMILY + SENIOR HOUSING OAKLAND COLISEUM COMMUNITY PLANNING PROJECTS
Chula Vista, CA Los Angeles, CA Santa Fe Springs, CA Los Angeles, CA Sacramento, CA Waipahu, HA Emeryville, CA Waipahu, HA Los Angeles, CA Los Angeles, CA Oakland, CA
1 2 3 4 5 6 7 8 9 10
SAUDI BRITISH BANK HEAD OFFICE ONE CENTER COMPLEX QINGDAO 300M TOWER POINT DU HOC MEMORIAL TOWER DUBAI WATER CANAL HOTEL AVENUES OFFICE TOWER SHANGHAI RED TOWN NEW WORLD GUANGZHOU MALL SUNING FUZHOU COMPLEX GUIYANG RIVERSIDE THEATRE
Riyadh, KSA Shenzhen, China Qingdao, China Point du Hoc, France Dubai, UAE Riyadh, KSA Shanghai, China Guangzhou, China Fuzhou, China Guiyang, China
1
CHULA VISTA TOD MIXED USE DISTRICT
CHULA VISTA, CA - USA | STATUS: HOLD
SVA Architects
FAMILY AFFORDABLE PODIUM SENIOR AFFORDABLE PODIUM MARKET RATE WRAP TRAVEL HOTEL TRANSIT ORIENTED (RAIL + BUS STATION)
E STREET TROLLEY PLATFORM
RAIL PLAZA
RAIL PLAZA
VILLAGE GREEN
SITE PLAN WORK SAMPLES | ERICA CARVALHO
2
CRENSHAW CROSSING
LOS ANGELES, CA | sva architects STATUS: ENTITLED | WAITING ON FUNDING FAMILY AFFORDABLE 2 sites Podium with 1 underground level 400+ family units total MIXED-USE TRANSIT ORIENTED DEVELOPMENT
BUILDING SECTION THROUGH WEST SITE
EAST SIDE - GROUND FLOOR PLAN
ELEVATION SAMPLES
RENDERING FROM EXPO BLV
WEST SIDE - GROUND FLOOR PLAN
SITE PLAN WORK SAMPLES | ERICA CARVALHO
3
LAKELAND AND LAUREL APARTMENTS + THE WHOLE CHILD INTERIM HOUSING SANTA FE SPRINGS, LOS ANGELES | SVA Architects STATUS: PHASE 1 (CD) / PHASE 2 (DD) A complex project with 2 ownerships (Private + Not for Profit) and 3 distinct programs. Erica serves as the lead designer and works directly with the clients and city to take advantage of the available state and local bonus credits in order to maximize housing availability. The projects, although separate products, work together in design of the building and spaces that tie them together.
AFFORDABLE FAMILY HOUSING (2 buildings at 3 level walk-up - 32 units)
SENIOR LIVING (4 Levels - 52 units)
INTERIM HOUSING - The Whole Child (19 Units)
THE WHOLE CHILD BUILDING PERSPECTIVE
PERSPECTIVE FROM LAKELAND AVE
1" 382'-52 5' 1" 11'-12
20'-8"
16'
19'
5'
Apartment Parking 8'-6" 5'
26'
70'-11"
13'
20'
60" x 30" Tub
19' EVCS
EVCS
EVCS
EVCS
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
8'-6"
EV(R)
water heater
EV(R)
5'
Pantry DW
Bike Parking Ref
30" Work Area 60" x 30" Tub
Sto.
WH
3 BED
39'-11"
Pantry
retaw retaeh
DW
EV(R)
3 BED HW
5'
3 BED
WH
DW
W
D
W
D
Pantry
W
D
W
Linen
2 BED
WD
yrtnaP
yrtnaP
Ref
30" Work Area
D
HW
LAKELAND APARTMENT 2
WD
Pantry
buT "03 x "06
water heater
EV(R)
98'-8"
Pantry
Maintenance
yrtnaP
EV(R)
Ref
DW
Ref
DW
EVCS
11'-3"
DW WH
WH
"03 kroW aerA
DW
WD
D
feR
W
water heater WH
buT "03 x "06
D
DW
W
Pantry
60" x 30" Tub
EV(R)
3 BED
3 BED
Pantry
EVCS
EVCS
Linen
WH
6'
retaw retaeh
EV(R)
2 BED
3 BED
DW 30" Work Area
Ref
"03 kroW aerA
feR
EVCS
251'-1"
WD
Pantry
EV(R)
1" 26'-12
yrtnaP
EVCS
5'-11" 22'-3"
buT "03 x "06
retaw retaeh
EV(R)
EVCS
retaw retaeh
buT "03 x "06
feR
"03 kroW aerA
WD
Senior Parking
yrtnaP
Pantry
EV(R)
EV(R)
EVCS
WD
Pantry
EV(R) feR
"03 kroW aerA
Lobby
Veranda
SENIOR LIVING
Fitness
WH
Club Room
The Whole Child
EVCS
WC
Pantry
yrtnaP
DW
DW
DW
Area Work 30"
DW
30" Work Area heater water
60" x 30" Tub
water heater
60" x 30" Tub
30" Work Area water heater
60" x 30" Tub Ref
EVCS
Pantry
EVCS
1" 76'-82
yrtnaP
Ref
Area Work 30"
60" x 30" Tub Ref
heater water
WR
Ref
1" 36'-112
EVCS
1" 13'-72
EVCS
M/T JC
SSOff SSWait
WC
Mngr
Laundry Room
CLUB
1" 57'-02
WC
Recep.
Package Room
Lobby
EL
Mail Room
MP Room
EVCS
5'
EV(R)
EV(R)
Apartment Parking
EV(R)
EV(R)
EV(R)
EV(R)
19' EV(R)
EV(R)
EV(R)
EV(R)
EV(R)
EVCS
8'-6" 5'
26'
EVCS
EVCS
8'-6" 5'
13'
EVCS
DELIVERIES
EV(R)
EV(R)
1" 324'-22
EVCS
EVCS
1" 39'-62
366'-3"
EVCS
5'
EVCS
36'-3"
5'
24'
Lobby Client Wait
8'-6"
Prospect Client Wait
TRASH
TRASH 86 SQ.FT.
5'
Reception
19'
Office 2
Office
File
Intake Office
30'-9"
Storage
Office
5' Workstations
Sanitary
Pantry
Office
Storage
Laundry
Office 1
WH
D
2 BED
2 BED Linen
Pantry
Pantry yrtnaP
W
Ref
DW
Ref
DW
DW WH
5'
Linen
2-BED Pantry
WH
1 15' 15'-62"
Courtyard Conference Room
26'
12'
2 BED
FAMILY AREA
1" 11'-92
Water Heaters
3 BED
WH
Pantry
DW
Linen
2 BED feR
Linen
yrtnaP
Ref
WD
yrtnaP
2 BED
DW
DW
Ref
Ref
Pantry
W
WH
3 BED
neniL
LAKELAND APARTMENT 1 DW
D
yrtnaP
D
Pantry
W
Linen
2 BED
WD
yrtnaP
1" 5' 15'-102
D
Ref
HW
DW
W
HW
3 BED
WH
Staff break
DW
WH
3 BED
110'-8"
30" Work Area
365'-10"
EVCS
Lounge 1,000 sf
THE WHOLE CHILD
Client Laundry
MEP
WH
Computer Lab / Homework Center
Multi - purpuse
Teen Area
6' 5'-11" 1" 63'-32 303'-11"
LAKELAND
1" 194'-82
SITE PLAN
WORK SAMPLES | ERICA CARVALHO
HOLLYWOOD MODULAR
LOS ANGELES, CA | sva architects STATUS: ENTITLED / FUNDING APPLICATION AFFORDABLE PERMANENT SUPPORTIVE HOUSING TRANSIT ORIENTED MODULAR (CONTAINER) CONSTRUCTION OVER TYPE 1 PODIUM
DE LONGPRE AVE.
WAITING ROOM
LOUNGE / AMENITIES
N. ORANGE DR.
PROJECT ENTRY • 42” ht. wall • Decorative paving • Fixed furniture • Pottery
ELEV.
STAIRS
TRASH
TOILET
ELEV.
MAIL ROOM
CONF. ROOM
OFFICE
T
OFFICE
OFFICE
BREAK ROOM
OFFICE
OFFICE
2-BED
BIKE RACKS
VEHICULAR ENTRY
PARKING LEVEL 1 BIKE ROOM
VEHICULAR and PEDESTRIAN GATE
BIKE ROOM
STREETSCAPE • Street trees in tree wells
STAIRS
PEDESTRIAN GATE
DE LONGPRE AVE. OR ANGE D R IV E AP AR T MENTS
SHEET NUMBER
1 3 5 2 N O R A N GE D R , H O L L Y W O O D | Z O NI NG PL AN REVI EW (PZ A) DECEMBER.09.2021
0’
2’
4’
8’
16’
SHEET NAME
L-1 GROUND LEVEL LANDSCAPE PLAN
T STUDIO
ELEV.
STUDIO
STUDIO
STUDIO
STUDIO
STUDIO
ELEV. TRASH STUDIO
STAIRS DINING TERRACE • Built-in single BBQ • Festival lights • Dining/game tables • Soft seating • Umbrellas
GAME TERRACE • Ping pong • Overhead pendant light • Soft seating • Pottery • Synthetic turf
COMMUNITY GARDEN • Edible garden in pottery
STUDIO
N. ORANGE DR.
4
2 BED
LOUNGE
STUDIO STUDIO LAUNDRY STUDIO
STUDIO STUDIO
STUDIO
STUDIO
STUDIO STAIRS
GROUND AND PODIUM FLOOR PLAN
OR ANGE D R IV E AP AR T MENTS
RENDERED PERSP
L-2
PECTIVES WORK SAMPLES | ERICA CARVALHO
5
SACRAMENTO ARMORY SITE
SACRAMENTO, CA | sva architects STATUS: RFP
AFFORDABLE TRANSIT ORIENTED TYPE VA OVER 1 LEVEL OF TYPE 1
3 ROOF
2 1 6
5 4
PODIUM LEVEL FLOOR PLAN
RENDERED PERSPECTIVE FROM PARK
3
1
1. CONNECTION TO WOODLAKE PARK The architectural massing is broken up at the east facade to provide a recess and better connection to the Woodlake Park amenities.
2. INTERCONNECTED PODIUM AMENITIES At Level 2, three podium areas are interconnected to provide residents with a variety of recreational activities. From passive uses, such as sitting areas, to group gatherings, such as BBQ areas.
2
3 4
3. ACTIVE GROUND FLOOR Usingdistinctstrategies,thegroundfloorisactivatedthroughoutthedevelopment by lining the garage level with active uses. On the northern edges facing the transit, uses such as light commercial and residential amenities are introduced. On the edges facing the park and memorial, garden units are introduced.
4. MASSING RECESS At the northwest corner, near the transit platform, the massing is recessed. This architectural move not only create a more human scale architecture, but also allows for some shared community spaces to be introduced at Level 2, creating further opportunity for “eyes-on-the-street”
CONCEPT DIAGRAM
T/ PARAPET 48’-0” ROOF
45’-0”
L4
35’-0”
L3
25’-0”
L2
15’-0”
GROUND
0’-0”
T/ PARAPET 48’-0”
ELEVATIONS WORK SAMPLES | ERICA CARVALHO
ROOF
45’-0”
L4
35’-0”
L3
25’-0”
L2
15’-0”
GROUND
0’-0”
6
ISENBERG TOWERS
WAIPAHU, HA | STATUS: RFP
SVA Architects
SENIOR / FAMILY PRODUCT AFFORDABLE HOUSING TRANSIT ORIENTED
FLEX SPACE / AFTER SCHOOL PROGRAMS
COMMUNITY ROOM
FITNESS
OFFICE
DAY CARE
OFFICE FIRE COMMAND
LOBBY
KITCHEN
MEP
TRASH / MEP
PHASE TWO PHASE ONE
TRANSFORMERS
PARKING
RAMP UP
PHASE TWO PHASE ONE
FIRE COMMAND
TRASH / MEP
MEP
UP
LOBBY 0
15'
35'
55' UP
0
FLOOR PLAN
20'
50'
Nā Mea Hawaiʻi Retail
OFFICE
75'
AERIAL PERSPECTIVE
16 15 Tower 1 | Moena Kua 128 Senior Residences Unit Count / Mix...........Unit Type.............Unit Size 24 units / 19 % ....................... Studios.......................... 360 sf 94 units / 73 % ...................... 1-bed.............................. 540 sf 10 units / 8 % ........................ 2-bed............................. 762 sf Total SF = 67,000
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6
14 13 12 11 10 9 8 7
Tower 2 | Moena Hinano 219 Family Residences Unit Count / Mix.......Unit Type.........Unit Size 23 units / 11 % ...................... Studios.................... 360 sf 71 units / 32 % .................... 1-bed........................ 540 sf 91 units / 42 % .................... 2-bed....................... 762 sf 34 units / 16 % ..................... 3-bed....................... 1,095 sf Total SF = 153,192
6 5 4 3
Management Office
2
Residential Lobby Shared Amenities 381 Parking Spaces
1 Community oriented Residential Lobby
WORK SAMPLES | ERICA CARVALHO
7
EMERYVILLE SENIOR
EMERYVILLE, CA | sva architects STATUS: RFP
SENIOR AFFORDABLE PODIUM
UNIT SIZE
UNIT COUNT
1 BED
530 sf
38
2 BED
740 sf
9
ROOF PLAN
47
FAR
2.09
Property Line
PARKING
16 spaces
Setback Line
BUILDING SF
43,016 sf
Transitional Height
UNITS
UNITS
UNITS
UNITS
UNITS
L5
GROUND OPEN AREA
2,820 sf
LEVEL 4 OPEN AREA
4,025 sf
L4
75'-0"
UNITS
930 sf
9'-0"
GROUND MANAGEMENT AREA
3,505 sf
9'-0"
GROUND COMMON AREA
9'-0"
10'-0"
UNITS
COMMON AREA
13'-0"
L2
PARKING L1
San Pablo Ave
San Pablo Senior Residence
BUILDING SECTION
STUDY 1B
30'-0"
UNITS
9'-0"
L3
DESIGN NARRATIVE Connectiontoexisting senior housing + community
Open Green Space
Community Spaces
LowerMassAdjacenttoSingle-FamilyHomes
Rooftop Deck
Identifying the Gateway
Pedestrian Scale
DESIGN DIAGRAM
PERSPECTIVE VIEW WORK SAMPLES | ERICA CARVALHO
8
WAIPAHU TOWERS
WAIPAHU, HA | sva architects STATUS: IN-PROGRESS | SCHEMATIC DESIGN FAMILY AFFORDABLE 2 Towers Design 15 stories tall 200 units total MIXED-USE TRANSIT ORIENTED DEVELOPMENT
FLOOR PLAN
PERSPECTIVE RENDERING
PERSPECTIVE STUDIES WORK SAMPLES | ERICA CARVALHO
9
WILLOWBROOK MASTER PLAN
LOS ANGELES, CA | sva architects STATUS: RFP
Student Housing 104
Parking Spaces for Student Housing
27 35 59 12
Jr 1-Bedroom 1-Bedroom U 2-Bedroom U 3-Bedroom U
133 Total Units
For-Sale Town homes 9 22
2-Bedroom Units 3 Bedroom Units
31
Total Units
5,491 sf Comm 165,313 sf Total G
1,200 sf 1,380 sf
107 Parking Spac
2 garage spaces per unit
Student Housing
Family Affordable Housing 38 74 38
1-Bedroom Units 2-Bedroom Units 3 Bedroom Units
600 sf 800 sf 1,000 sf
19 30 31 12
Jr 1-Bedroom 1-Bedroom U 2-Bedroom U 3-Bedroom U
92
Total Units
4,724 sf Comm 117,030 sf Total G
150 Total Units
71 Parking Space
4,794 sf Common Space 185,703 sf Total Gross Area 89 Parking Spaces at L1
Wellness Building
Workforce Housing 30 45
1-Bedroom Units 2-Bedroom Units
75
Total Units
600 sf 800 sf
4,479 sf Common Space 91,235 sf Total Gross Area 47 Parking Spaces at L1 17 Surface Parking Spaces
PROGRAM DIAGRAM
3,600 sf 13,295 sf
Food Hall with outdoor sitting Wellness Center 3,600 sf Gymnasium / Auditori 9,695 sf Fitness center, yoga / classroom, p 33,505 sf Administrative Office 50,400 sf
Total Gross Area
94 Parking Spaces
office
town-homes Charles drew university gym
118th
St.
AERIAL PERSPECTIVE VIEW LOOKING FROM UNIVERSITY CAMPUS workforce housing
office / wellness / food-hall Charles drew university
family affordable housing
existing multifamily residential
.
h
t 18
St
1
lobby
400 sf 600 sf 900 sf 1,200 sf
20% 26% 44% 9%
corner plaza Compton
Ave.
AERIAL PERSPECTIVE VIEW FROM CORNER OF COMPTON AVE AND 118TH ST. TO INTERSTATE 105
Legend
mon Space Gross Area
ces at L1
PEDESTRIAN
PEDESTRIAN DROP OFF
g (West Building)
mon Space Gross Area
es at L1
20% 26% 44% 9%
117TH STREET
PODIUM GARAGE ACCESS
PODIUM GARAGE ACCESS
VEHICULAR
TOWN-HOMES GARAGE ACCESS
EMERGENCY VEHICLE ACCESS
TOWNHOME PARKING ACCESS
FAMILY AFFORDABLE GARAGE ACCESS
WORKFORCE HOUSING + TOWNHOME PARKING ACCESS
WILLOW ST.
400 sf 600 sf 900 sf 1,200 sf
STUDENT HOUSING / STAFF PARKING
COMPTON AVENUE
m units Units Units Units
food-hall
the courtyard
g (East Building)
m units Units Units Units
office
workforce housing
117TH PL
ium dance studios program offices
PODIUM GARAGE ACCESS
EMERGENCY VEHICLE ACCESS
TO ROSA PARKS STATION
118TH STREET TO UNIVERSITY
WORK SAMPLES | ERICA CARVALHO
10
GLENDALE FAMILY + SENIOR HOUSING
N PACIFIC AVE
GLENDALE, CA | sva architects STATUS: RFP
NORTH
SENIOR PODIUM 86 units 4 stories
PEDESTRIAN TUNNEL
SR-134
PIONEER DR
FAMILY WRAP 150 unit 5 stories
ENHANCE CONNECTION TO FREMONT PARK
N KENILWORTH AVE
BUFFER SR-134 AND MAJOR INTERSECTION
FREMONT PARK
NOISE & POLLUTION
TUNNEL ENHANCEMENT
FAMILY WRAP GARAGE PLACED AT BUSIEST AREA OF THE SITE THE STRUCTURE ACTS AS A BARRIER FROM NOISE AND POLLUTION
IMPROVEMENTS TO TUNNEL ENTRANCE CREATE FRIENDLIER ACCESS TO FREMONT PARK PEDESTRIAN PATH RESIDENTIAL UNITS FACE COURTYARDS AND NEIGHBORING STREETS
INTERGENERATIONAL CONNECTION
TRANSITIONAL HEIGHT
DROP IN SCALE ON LOW DENSITY SIDE
MULTIFAM-
SENIORS
♡ GREEN SPACES ARE PLACED TO BREAK UP THE BUILDING MASS
THE HEART OF THE COMMUNITY THE CENTRAL COURTYARD SERVES AS AN INTERGENERATIONAL GATHERING SPACE
LOW DEN-
MID DEN-
WORK SAMPLES | ERICA CARVALHO
OAKLAND COLISEUM MASTER PLAN
OAKLAND, CA | sva architects STATUS: CONCEPT
Revisioning the Oakland Coliseum site into a mixed-use district anchored for a Film Studio. 24 acres mixed-income residential 30 acres Offices 40 acres Film Studio 10 Acres mixed-used / enterteinment district
MASTER PLAN Vehicular Access and Circulation
ro St
San Leand
Mixed-Use Residential District
il
Ra Amtrack
He
Mixed-Use Residential District
Neighborhood Park
ge
Waterfront Trails
Mixed-Use Residential District
66th Ave
11
Office Park
Youth Excelence Center
5-star Hotel
Mixed Use Retail District
nb
erg
er
Rd
Office Park
Entertainment District
Movie Studios
Flagship Office Post-Production
PROPERTY LINE PRIMARY SITE ACCESS SECONDARY SITE ACCESS M A I N B O U L E VA R D LO C A L B O U L E VA R D RESIDENTIAL / LOCAL SIDE STREETS I N T E R N A L C I R C U L AT I O N 8 • TITLE OF THE PROJECT
Ty pe of D ocume nt • 9
S I T E A N A LY S I S ACCES + TRANSIT
SITE PUBLIC TRANSIT STOP ACCESSIBLE EDGES EXISTING SITE ACCESS
Park 1 2 • TITLE OF THE PROJECT
Tech Hub
Post Production
Comm P
munity Park
MASTER PLAN Circulation and Access
Residential District
Youth Excelence Center
Entertainment District
Luxury Hotel
Legacy Studios
Retail Mixed Use District
Class-A Office Buildings Typ e o f D o cu m e nt WORK SAMPLES | ERICA CARVALHO
• 13
12
COMMUNITY PLANNING
CALIFORNIA | sva architects
EL CENTRO FAMILY VILLAGE EL CENTRO, CA STATUS: RFP 92 units (Family + Senior)
RESIDENT POOL
W LINCOLN AVE
Responding to its desert climate, the planning of this community has been designed to create 2 large courtyards that are shaded with varios apertures to allow for wind to circulate. Large overhands help shade the facades and windows to help mitigate the heat onto the interior leaving spaces.
MANAGEMENT & AMENITIES
VISITOR PARKING
COMMUNITY BUILDING
MONTEBELLO FAMILY AFFORDABLE HOUSING MONTEBELLO, CA STATUS: RFP
E
HEALDSBURG, CA STATUS: RFP
ENU
HEALDSBURG SERNIOR + FAMILY VILLAGE
E AV
The apartments will be contained within three story buildings with attached single car garages and detached covered carports. The community will offer gated entry, and active and passive common areas amenities including pools and spas, wi-fi lounge, outdoor cabana, fitness center, business center, dog park, and EV and bicycle parking stations.
MAIN ENTRY
G AG
The residential apartment community will be designed across approximately 12 acres and include 300 rental apartment homes, with floor plans providing one, two and three bedrooms in sizes ranging from 650 to 1,250 square feet.
GARFIELD AVENUE
RESIDENT ENTRY
WITH ITS ADJACENCY TO THE RAIL LINE, A BUFFER IS FOSS CREEK TRAIL CREATED AND THE RESIDENTIAL ELEMENTS ARE PUSHED FURHTER TO THE WEST
68 units (Family + Senior)
VIEWS
DRY CREED RD
residential buildings are placed and oriented to ensure views to amenities / community and away from railine as feasible various pedestrian experiences within the site that connect to the wider community and trails
VIEWS VIEWS
GROVE ST
WORK SAMPLES | ERICA CARVALHO
THANK YOU