Mitsubishi 4M50 Valve Adjusting Procedure, Valve Lash Clearance, Valve Train Parts Page,

Page 1

MITSUBISHI 4M50 Valve Adjusting Procedure, Valve Train Parts, Page 1 of 5

Inspection and Adjustment of Valve Clearances Service standards (Unit: mm {in.}) Location –

Maintenance item Mitsubishi 4M50 Valve Lash Clearance (when cold)

Standard value

Limit

Intake valve

0.4 MM {0.016 Inch}

Exhaust valve

0.5 MM {0.020 Inch}

Remedy Adjust

Mitsubishi 4M50 Tightening torque (Unit: N·m {lbf·ft, kgf·m}) Mark

Parts to be tightened

Tightening torque

Remarks

23.2 {17, 2.4}

30.4 to 35 {22 to 26, 3.1 to 3.6}

Bolt (cover installation) Bolt (rocker cover installation) Bolt (PCV pipe installation) Injection pipe (union nut installation) Bolt (injector installation) –

5.2 to 7.2 {3.8 to 5.3, 0.53 to 0.73}

Bolt (cylinder sensor installation)

8 {5.9, 0.82}

Lock nut (adjusting screw stopping)

20.6 {15, 2.1}

Special tools Mark

Tool name and shape

Part No.

Application

Cranking handle (design may vary)

MH063704

Turning the fan pulley

Fuel line wrench

HAZET 4550-1 SnapOn FRXM17

Tightening the fuel lines

Mitsubishi 4M50 Engine Parts contact: Email: EngineParts@HeavyEquipmentRestorationParts.com Phone: 269 673 1638


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Mitsubishi 4M50 Valve Adjusting Procedure, Valve Lash Clearance, Valve Train Parts Page, by engineparts2 - Issuu