Emily Pietrantone 440-667-9143 pietraey@mail.uc.edu
ABOUT ME
EDUCATION
I am a fifth year at the University of Cincinnati and this is my fourth year in Urban Planning. I originally came to the University of Cincinnati to study Civil Engineering but I have found my true passion for Urban Planning.
University of Cincinnati, Cincinnati OH B.S. in Urban Planning Certificate in Professional Communication
GPA 3.3 May 2023
Mayfield High School, Mayfield Heights OH Diploma
GPA 3.4 May 2017
I grew up in a small suburb about 30 minutes east of Cleveland. In high school, I attended a college preparatory program called Excel TECC where I was in the CADD (Computer Aided-Drafted Design) program. While I was in this program I fell in love with drafting and data analysis.
Excel TECC CADD Engineering Technology, Mayfield Heights OH Diploma
GPA 4.0 May 2017
I hope to continue my education by pursuing a Master’s in Community Planning through the University of Cincinnati. At the time of graduation, I will also have a certificate in Professional Communication.
Programs Used: Adobe CC ArcGIS AutoCAD Sketchup
2
EXPERIENCE
Cuyahoga County Planning Commission, Cleveland OH Planning Intern •Assist in development of plans •Jurisdictional and multi-jurisdictional •Creation of graphics and plan elements in Adobe CC and Sketchup •Research (Case Studies, grants, etc.)
May 2021 - August 2021
Planning Design and Construction, University of Cincinnati, Cincinnati OH Renovations Co-op/Intern January 2020 - December 2020 •Assist in development of phasing plans •Make changes to existing plans in AutoCAD •Prepare renderings through Revit Residential Education and Development University of Cincinnati, Cincinnati OH 2017 – Present Head Resident Advisor, Resident Advisor and Desk Assistant •Head Resident Advisor beginning Fall 2020 (lead team of 15 people) •Prepared packages for students to retrieve in a timely manner •Assisted residents with lock-outs and maintenance requests •Transition residents into college smoothly •Prepare programs focusing on diversity, leadership, community, etc.
SKILLS
•Adobe Creative Cloud Programs •AutoCAD •ArcMAP/ArcGIS •Microsoft Office Programs •Revit •SketchUp
Table of Contents
Year Four: Summer 2021 Work at Cuyahoga County Planning Commission Lakefront Public Access Plan Center Ridge Corridor Plan East Cleveland Park Buffer Year Three: Summer 2020 Making the East End Resilient Title Page Street Sections Phasing and Funding Year Two/Three: Co-op PDC Work At Planning Design and Construction Title Page Rhodes Revit Renderings Usquare Phasing Plan Year Two: Fall 2019 The Steps on How to Plan a Site Title Page Conceptual Plan Proposed Zoning Plan Proposed Overall Plan Year One: Spring 2019 Analysis of Over-The-Rhine (OTR) Title Page Impressions Map Imageability Map Site Development Recommendation
Page 3 Page 4 Page 5
Page 6 Pages 7-8 Page 9
Page 10 Page 11 Pages 12 - 13
Pages 14 - 15 Page 16 Pages 16 - 17 Page 17
Pages 18 -19 Page 20 Page 20 Page 21
Cuyahoga Co
Lakefront Public Ac
Rocky River Bradstreet Landin
Co-op #3
LEGEND
TLCI Study Area
Cuyahoga County Planning Commission
Euclid Waterfront Project Area Lake Erie Water Trail Paddle Access Point Cuyahoga Greenway Plan Routes County Public Works Projects Lakefront Public Access Plan (LPAP) Cities Non-Lakefront Public Access Plan (LPAP) Cities Companion Projects
KE
LA RD
HUNTINGTON RESERVATION
DLE
Y RD
6
BRA
CAHOONPARK
On-S treet:
LAKE
Futur e
6
BAY VILLAGE
WOLF
RD
MBIA
COLU
RA NN E
PK WY
BRADSTR LANDING
RD
90
On -Str eet: OnFu Stre ture et: Fu tur e
FORD HA
RD
RD
CAH OON
PK
Y
CRO CKE RR D
CHES TER
WY
ETT
WE ST
COLUMBIA PARK
RD
BASS
My third co-op was in my hometown, Cleveland, Ohio. I worked for Cuyahoga County Planning Commission (CCPC) as a planning intern. My work primarily focused on creating plans and plan elements in Adobe Creative Cloud and Sketchup. I additionally prepared research in the form of case studies, grant background and more. Additional impactful work included community outreach. Navigating community outreach during COVID-19 created an interesting challenge, especially when engaging with a community with very limited internet access.
WY
M PK
252 2
254
90 DETROI
T RD
RD BL VD
RSESHOE HO BLVD
Y
R CE NTER RD
IDGE RD CENTER R
WEST
WOOD
D
ERBU
R RD
RD
CANT RY RD RD
St On-
: reet
Fu t u
re
2 Miles
LORAIN
RD
TH ST
ROOT
1
RD
NORTH OLMSTED
W 220
NER
RD
0
RD
CLAG UE RD
IA
WALTE
COLU MB
ture
TE R POR
GESS
10
2
RD BLV D
Futur e
PKWY
On-S treet: Fu
CLA RK
M A RQUETTE B L V
HILLIA
On-S treet:
252
BLOSS OM BLV D EDGEPAR K BLV D
254
UE RD
L L BLVD
HILLIA
WESTLAKE
CLAG
WEST HI
RD
DOVE
ETT
SA L E M P KW
BASS
LVD DB IAR LL HI
EATO N
RD
ounty Lakefront Initiatives
One of the most exciting this about being an intern is that you enter projects in every stage. I was fortunate enough to be at CCPC during the tail end of the Lakefront Public Access Plan.
Euclid Waterfront Improvement Plan
Cleveland Metroparks Lakefront Reservation Wildwood Park
ccess Plan and Companion Projects
Cleveland Harbor Eastern Embayment Resilience Study (CHEERS)
Lakewood Park & Solstice Steps
ng
The Lakefront Public Access Plan is a plan to connect the public to the lakefront and fortify the shoreline to prevent any future erosion. On the left, is a map of the area with corresponding project pictures. This was created to be placed in a news article to help promote the project. A huge part of this project was getting individual property owners on board.
Browns Stadium Proposed Development & Land Bridge
EUCLID WATERFRONT IMPROVEMENT PLAN PADDLE CRAFT BEACH (TBD) SIMS PARK EUCLID PARK E3 NWAY T GREE
Cleveland Metroparks Lakefront Reservation Wildwood Park
FRON LAKE
GR EE
EFR O AK
BLVD
On-Street: Future
D
D BLV RE
D RD
CL AY
HLAN HIG
OAK YAL RO
BLVD
SW
ND RA
KP R EE LID C E BLVD EUC SID PA R K
BLVD N
OR CT REE K CONN E YEUCLID C KW
LA
EDDY
RD
BIK EWAY
BE L
RD
D LARD LR SE DIL AN ON RRIS HA
E
BL
NO
ER
MT V
BLVD
ON MIL
t: Futur e
RNB
BLVD
BURY
LS RD
BLVD
MAYFIELD LANDE
RD RD
BRAINA
URY
LYNDHURST
RIDGE
ROSE BLVD
NO
CR
F AW
OR
D
RD
RAIL LAK E T
KLIN
T
O LAK E T
BLV
FRAN
WILS
t u re
TH O
CORRI DOR
G
MO
RD
reet : F u
MAYFIELD HEIGHTS R RD
On-St
175 ADOW
WO O
D BLVD
Futur e
ME
reet:
re
BLVD
utu
OIR
:F
RD
E LV
tree t
SB
EEN
Y
RD
RD
OND
uture eet: F EN -S tr On F I R S T
RD
BISHO P
RICHM
ture
On St
On-St ree
On S
T
ITE
WY
T PK
HIGHLAND HEIGHTS
t: Fu
ME MO RI AL SH
SW
ree t: Fu ture
BLVD
On-St ree
D
WH
RIGH
On-St
R Y JAY
HIGHL
AND
KY RD
D
C PK WY
Programs Used: Adobe CC ArcGIS
RICHMOND175 HEIGHTS
TREBIS
T OU
H
N IO A L L P
RD
BRUSH RD
AE
RTIS
t: Futur e
RD
I T E RD
LAND BLVD ET
CU
CA
IS RD
NN
S WH
6
RD DON
STEVE N B LV D DUMB AR TO N D
Y BLV
AVE
T
20
re
S GR
F
HARR
RD
Y
T
utu
SOUTH EUCLID S B E LVOIR BLVD
MU
E 2 60
E
t: F
On-St ree
E RD S BEL VOIR B LV D
et :
E 26 0 TH ST
ee -S tr On
CHAR
ANDERSON
CLID EU
H
ND ST
ture Fu
tre
ut ur UNIVERSITY e YHEIGHTS RD
BLVD
ure
Fut
E 222
eet: -Str Off
IL
S PURI T A
LAKE
et:
D FW ELAN LAK
ure
ture
RD
On -S
SILSB
eet: Fut On-Str
t: Fu
M
D
t: Futur e
BLV D
STON
M IRA MAR BL WARR VD ENSV On-Stree ILLE t: Fu CENT ture ER RD
WBRO OK
ELLO
BLUE
TH ST
TH ST
LAND
90 Stre Off-
175
VD E BL STON BLUE
ture
ID AV EUCL
BLVD
E 260
E 250
On-St ree
EUCLID
et: Fu
Stre
On-
HA
S BLV D
FAIR MO U
BLVD LAKELAND
TOR EC
ING TT
NO
H EIG H
S PK
RD
JAME
NTIC
MO
BEXLE
LOR
W ST
On-St ree
D
WY N PA SHAKER RK HEIGHTSBLVD
B NT LV D
RHIL LR
ITT RD
E 222 ND ST
K REE
e u tu r t: F
S TAY
LEE RD
N
FAI
RD MEA DO
D
EVELAN
t re e
CLEVELAND HEIGHTS
GHTS B LVD
BL VD
B LV TON
CL
EUCL ID H E I
CE PRIN
RD
Future
GT O SHIN WA
: reet - St On
Y
re
IAMS
S On -
ture
u tu
QUILL
LV D
Fu
:F
RD
EST HILLS B
On -Str eet:
IOR RD
LEE BLVD
ER
ee t
YLOR N TA
re SU P
RD EEN GR
tr f-S Of
MAYFI ELD
PK W EN AR G L
D
TH ST
RD
RD
IR BLVD VO
ture
Fu
tu FO R
CED
NEFF
E HO
AVE
ture
EU
E AV20
Fu
Fu
AR ME L
E
IVAN
COIT
et:
ID CL EU
-S On
t:
et: Future
BABB
ORE BLV
E 200
E 185 TH ST
E 156 TH ST
On-St ture
reet: Fu
On-
E
D AV
CLI
ee
MT C
Futur e
RD
reet:
ND ST
RD
RD
RD
ture
ER
Fu
EY
t:
CK
On-St
E 152
IT
DY
UN
AVE
ED
IT
ORTH
AVE
EAST CLEVELAND
CEDAR
W OO DH I LL
O P P O RT
e tre
re
BU
RD
tu
-S On
N MA NS
Fu
6 OnStre
2
CO NN
S AVE
t:
r
N
U CLID C
HOLME
e tre
On -S t
BLVD
AVE
KI
t:
re
E
ES STOK
WOOD
LAND
tre e
BLVD
R AV
L
AVE WO AIR ODW
ST
20
CEDA
: Fu t u
TH EAST
87 -S
BLVD
E 105
E
e
Off
77
QUINCY AVE
ID AV
H ST
OnTOR St (SL 77 reet: F utur A
E2 AY NW
90
Stre
20
E 79T
E
EUCL
S LAKESH
AVE
SHAW
BLVD
LVD
CO
Off-S t re e t
ON RD
CO LLEG E AV
NT
90 KIRBY
ST C
On-St reet: Futur e
ADDIS
TY
AVE
ture
490
E
On-S treet : Fu ture 322
t: Fu
L
ST
AI
RAL
H AVE
AVE
ST
OWPATH
EC
CENT UNI
SOUTH
SUPERIOR
HOUG
CHESTER AVE
PROSPECT
E 40TH
TH ST
71
TR
W 25
W 14T H ST
JE
AVE SON FF ER
U GE S -422 AV E
AN
SUPERIOR AVE
On-St ree
OR
CO MM
6
90
C VILLA G E) VI
90
AVE
E 55T H
20
NN
D
tree
AVE
W 41S T ST
CLARK
E IE AV
AVE
RE D LI E N
90
FULTON t: Fu tu re RD
ON NIS DE RIDGE RD
RD
AV E
ture
ture
RACK 10
CYCLET
EG
CARN
On -S
Fu
BROOKLYN
LORAIN
Future
t: Fu
et:
D ST
73R
TH ST
W 117
re utu :F eet
TH ST
BOSW ORTH
On-S tr
On-Street:
On -Str e
On-St ree
L
CENTRA
W
LORAIN
IN LORA
CHESTER
CLEVELAND ON
SCRA NTON R
ure
WES T BLVD S
Fut
WH UR ON RD
AVE
42
Futur e
BLVD
10
FRANKLIN BLVD
OR PERI
CO
treet:
W SU
2
e t: Futur
ree On-St
NORTH
ture
Off-S
EL
AY R MIDW
SUPERIO
E 30TH ST
Futur e
CLEV
e Futur
E 22ND ST
AVE
AN
AY EW OR
H ST
reet:
20
DETROIT AVE
ture
On-St
DETROIT
EC NN
N ST W RIO TO TA N W DO
tu re
t: Fu
et: Fu
WEST
et:
AVE LORAIN
W 130
RD ST
W 143
AVE
W 140 TH ST
IELD
W 15 0TH S T
re
utu
-Str eet: F
On
AVE
Futur e
CHATF
On-Street: Future
S tre Off-
O RK C Y PA WEND
On-St ree
TH ST
W
On-
Stre
LORAIN KAMMS
E
Futur e TRISKETT R D
DR
On-S treet:
re
W 117
N RD
237
VER
Fu
AIL Y TR W E S T SHOREWA
BLVD
A RD BERE
Y RI
t:
LIN
ON AV
CK
tre e
RO
n-S
ANK
MADIS
90
142ND ST
RD
TRA
O
WA RR EN
U RPOSE
LVD R RY B
BROW
VAT
LAKEW OOD HEI GHT S BL VD
20
254
D
WAY E 1 EEN GR
treet: On-S
ture
et: Fu
Stre
Off-
et: Fu
FR
On-S treet:
Y RIVER RESER
tu
K RD STIC MA
RD
O WO KE LA
Y ERG
ture
E 9T
PK WY
HILLIARD
90
Fu
TOR
ISON AVE
BUNT S RD
EY
S ID ED R
M AD
On -Str eet:
re
LAKEWOOD
90
Stre
PK W Y
VA LL
TH ST
W 210
COFF INBE
10
OnStreet : Futu
90
ROCK
STOR Y RD
FAIRVIEW PARK
AVE
On -St reet: F u tu re
On-
OIT
WENDY PARK LAKEFRONT RESERVATION
EDGEWATER PARK LAKEFRONT RESERVATION
GRE ENW AY W CLIFT 1 ON BL VD
DETR
RIVE R
HI
NCE S P E R RD
D
WO OST ER RD SSE R BL VD
VD H IL LI A R D B L
GE RD CENTER RID
LAKE FRO NT
re utu
GH
GA
R RD
WAGA
et:
On-Stre
Future
20
BLVD
On- S tree t:F
Y PKW OOD MOREW
2
SLOANE AVE
IFTON
ROCKY RIVER
RD
PERKINS BEACH
FR O KE
EB ESHOR LAK
283
2 YE WA EE GR
BRATENAHL
EAST 55TH STREET MARINA LAKEFRONT RESERVATION D ST
BE
LAKE
W CL
VD N BL CLI F TO
AC
L A KEFRONT GREENWA H C LIFF BLVD YW 2
BROWNS STADIUM PROPOSED DEVELOPMENT & LAND BRIDGE
E 72N
6
CLEVELAND LAKEFRONT NATURE PRESERVE
TH ST
ROCKY RIVER PARK
-NORTHCOAST HARBOR -VOINOVICH PARK
On-
283
ST
ture Fu
L
On-Street: Future
E 140
REET’S G
COMMUNITY CONFLUENCE TLCI STUDY AREA LAKEWOOD PARK & SOlSTICE STEPS
CLEVELAND HARBOR GORDON EASTERN EMBAYMENT PARK RESILIENCE STUDY LAKEFRONT RESERVATION (CHEERS)
NT
Stre
1ST E 20
t:
e tre
-S
Off
e utur
F et:
3
60’
At the beginning of my internship I worked extensively on the Center Ridge Corridor Plan for Westlake, Ohio. This plan was about creating a safer more appealing Center Ridge Rd.
Rig
Set
k
ht o
fW ay COM
MER
Sid
CE
NT
The figures on your left show the existing (top) and proposed (bottom) storefronts on Center Ridge Rd. The plan is to bring buildings closer to the road and put parking in the back, to allow for a more welcoming environment for all users. Programs Used: Adobe CC Sketchup
bac
ER
ew alk
L
Parking
COM
MER
RID
GE
5’ L
CIA
RD
25 ’ Se tba ds ck c a Rig pe ht bu of ffe Wa r y
L
an
Parking RES
IDE
4
CO M
NTI
AL
ME
Sid
ew alk
CE
NT
ER
1
Bu
ild
RCI
AL
3
2
to Zo n
Parking
RID
e
GE
RD
OF
FIC
CO M
E
ME
1 Reduce building setbacks 2 Allow Mixed-Use developments 3 Parking moved to side or rear
4
CIA
4 Landscape ribbon
RC
IAL
CLEVELAND
CLEVELAND
CO IT AV E RD
NO
E
CL
RECREATION CENTER
HAWLEY PARK
ER D
RR
AC
BL
TE
AVE
EU
SH A W
ID
AV
E
HAYDEN AVE
MANN AVENUE PARK
CALDONIA PARK
N
CLEVELAND
YL
O
R
RD
CLEVELAND HEIGHTS
EAST CLEVELAND
LVD LEE B
EU
CL
TE
ID
RR
AV
AC
E
PATTISON PARK
E
RD
HA
YD
EN
AV
E
FOREST HILLS PARK
TA
FOREST HILL PARK
SUPERIOR AVE
FO
R E S T HIL
LS
BLV
LEGEND
E
CLEVELAND HEIGHTS
AV ID CL EU
LAKE VIEW CEMETERY
ERI
OR
AVE
Something the city of East Cleveland wants to focus on is a safer and more desirable place to live. During the study it was found that 90% of residents live within a 10 minute walk to a park. So, the city decided to focus on the parks and the surrounding areas. This map shows a 10 minute walk shed around the park, highlighting what areas should be prioritized for repair.
D
FOREST HILL PARK
SUP
ENDORA PLAYFIELD
One that I touched very frequently was the East Cleveland Parks and Greenspace Plan. East Cleveland is an area that has been consistently loosing population since 1970. The area has a very low median household income and limited access to Internet and other amenities.
FOREST HILLS PARK
Parks Cemeteries Other Greenspaces & Recreation Areas
Programs Used: Adobe CC ArcGIS
1/4 Mile Buffer From Park or Greenspace Priority Sidewalks
5 LAKE VIEW CEMETERY
LAKE VIEW CEMETERY
CUMBERLAND PARK
COLLEGE YEAR 3
How to Protect the East End, Cincinnati from Flooding My fourth studio focused on making the East End, Cincinnati resilient. The East End is located eat of Cincinnati right along the Ohio River. This makes the area very prone to flooding. My focus was to create a plan to separate the existing sewer system.
6
WHY? Cincinnati has a very old water management system. The current infrastructure will need to be replaced very soon. Instead of replacing the existing system, money should be directed towards separating a new system and implementing green infrastructure.
PROS: - Long-term solution - Increases capacity for sewage to go to treatment plant - Decreases wastewater in river, leads to cleaner water going into river - Green infrastructure beautifies street-scape CONS: - Costly $$$ - Long-term project - Stormwater is no longer sent to treatment plants
PROPOSED
EXISTING
Separate Sewage & Stormwater System
WALWORTH AVE.
On Walworth Ave. the existing median will be replaced by a bioswale, as shown in green. The sewer systems will be separated. Allowing stormwater runoff to go directly to the river or wetland. This area was meant to change as little as possible on the surface. Programs Used: Adobe CC
7
EXISTING
Programs Used: Adobe CC, Sketchup
Programs Used: Adobe CC, Sketchup
In addition to separating the wastewater and stormwater systems, two bioswale will be added on Riverside Dr. The road will be modified to allow the bioswale to be adjacent to the sidewalks on either side. Effectively taking up the space that is currently used as bike lanes.
8
PROPOSED
EXISTING PROPOSED
GLADSTONE AVE
10’ 10’ 10’ 10’
Sidewalk
RIVERSIDE DR.
Sidewalk
To Treatment Plant
Trail
To River/Wetland
Bioswale
5’ 10’
To Treatment Plant
Parking
Sidewalk Bioswale
20’
20’
Driving
Driving
Parking
Sidewalk
10’ 5’ 8’
Railroad Tracks
To Treatment Plant
10’ 10’
Parking
Sidewalk Bike Lane
5’ 10’
Driving
Driving
20’
Bioswale
atment Plant
Bike Lane Parking
r/Wetland
10’ 8’ 5’
Sidewalk
tment Plant
To River/Wetland To Treatment Plant
In addition to separating the wastewater and stormwater systems, a bio-swale and trail will be added in place of the existing railroad. Smaller streets like this without room to expand will still benefit from the separated system even if green infrastructure is not put in place.
1
PHASING: PHASE 1: Everything south of Riverside Dr. This allows for the area most vulnerable to flooding to have some alleviation for storm water. PHASE 2: Area in light blue. This is the area north of Riverside Dr. that is not highly elevated to protect from flooding. PHASE 3: Area shown in orange. This area is elevated and is not as high risk for flooding. Phases 1 and 2 would alleviate some risk of flooding while phase 3 waits to be completed. FUNDING: Referencing North East Ohio Sewer District’s funding plan, funds for this project will come from a variety of locations including: -Bonds -Impervious surface tax -Grants -Investors Most often, funding does not come from the federal level for these projects. According to NEO Sewer district representative, most funding comes in the form of bonds.
$ $$ $$
$$$
$$$
±
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
3,800
1,900
0
3,800 Feet
1 inch = 1,500 feet
The larger the area of impervious surfaces the larger sum of money that the developer will pay towards the sewer project. In theory, the larger the area of impervious surfaces the more stormwater run-off there is on a site. This tax also makes it financially beneficial for developers to implement pervious surfaces on their sites.
Programs Used: Adobe CC ArcGIS
9
Co-op #1 & 2
University of Cincinnati: Planning + Design + Construction My first two co-op rotations were at University of Cincinnati: Planning, Design and Construction (PDC). I worked in the renovations department to make changes to existing buildings and structures on campus. Most of the work I touched involved making changes to existing plans through redlining, making phasing plans and helping visualize the designs through Revit renderings.
10
One project that I worked on heavily was the transformation of a lab space. The space consisted of many rooms connected through doors. The room was reconfigured and refurnished to accommodate upcoming classes as well as two large pieces of equipment. The vent hood shown in the bottom left corner of the bottom image had to stay in place because of existing venting. But a new piece of very sensitive equipment was being added to the room, shown in the top left of the top image. It was an interesting challenge to create a workable space, as the existing room was obvious not updated or taken care of for a long time. Programs Used: Revit
11
300.02
7
OFFICE 304B
SUITE 352
D1. D2.
300.02
4
CLOSET 352A
E2
CLOSET 352A
1
10
STAIR 398A
5
3 S2
CLOSET 397A
CONF. 308A
E3
300.18
E4
300.17
OFFICE 310C
OFFICE 310D
11A.
SUITE 310
12.
300.14
OFFICE 310B
S2
OFFICE 300F
OFFICE 310F
RENOVATION PLAN 2 SCALE: 1/8" = 1'-0"
OFFICE 310E
OFFICE 310C
13.
A
ST
TS
S1
OFFICE 300H
S3 OFFICE 300C
OFFICE 310A
300.16 300.15
OFFICE 310B SUITE 350
OFFICE 310E
10. 11.
OFFICE 300H OFFICE 310F
9.
300.13
OFFICE 300C
OFFICE 310A
OFFICE 300F
E1. E2. E3. E4. E5.
NEW POWER POLE POWER FOR DOOR AND CARD SWIPE - REFER TO AE-102 POKE THROUGH, USE CIRCUIT FROM ABANDONED WHIP. INSTALL DUPLEX RECEPTACLE. USE CIRCUIT FROM ABANDONED WHIP. JUNCTION FOR WHIP TO SYSTEMS FURNITURE. USE CIRCUIT FROM ABANDONED WHIP.
DEMOLITION PLAN 1 SCALE: 1/8" = 1'-0" EXISTING CORRUGATED METAL DECK / POLYISO / TPO
EXIST. STEEL BEAM
EXIST. 1 HOUR SPRAY-APPLIED FIRE RESISTIVE MATERIAL UL N782 A901 CR DWGS 6/1/12 SCRAPE AWAY EXISTING FIRE-PROOFING TO INSTALL 20 GA. Z-CLIPS @ 16" O.C. MAX., FILL GAPS WITH MINERAL WOOL
5 AE101
FASTEN STEEL TRACK TO Z-CLIPS MINERAL WOOL INSULATION ELASTOMERIC SPRAY FIRESTOP OR FIRE CAULK
Project Title
WALL IS NOT RATED
DOOR ELEVATION 5 SCALE: 1/2" = 1'-0"
5/8" TYPE "X" GYPSUM BOARD 3 5/8" STEEL STUD 16" O.C. 3" MIN. ROXUL SOUND INSULATION
1/4" MIN.
Bldg No. X
Drawn
Date 2019
Checked _
Scale As Noted
5/8" TYPE "X" GYPSUM BOARD
3 AE101
DEMOLITION PLANS & RENOVATION PLAN
SUITE 310
4. 5. 6. 7. 8.
300.12
BATH 349
11A
11
SUITE 350
PAINT ALL WALLS - TO MATCH EXISTING NEW SOLID COLOR CARPET TILE - SUBMIT NEW WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL EACH SIDE, TERMINATE WALL AT UNDERSIDE OF BEAM. CENTER WALL ON COLUMNLINE. REFER TO 3/AE101 NEW WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL EACH SIDE. EXTEND STUDS TO DECK TYPICAL UNLESS NOTED OTHERWISE. RELOCATED ALL GLASS DOOR WITH CARD SWIPE. REFER 5/AE 101 TEMPORARY PLYWOOD DOOR, 4'-0" WIDE X 7' HEIGHT RELOCATED SYSTEMS FURNITURE (BY FURNITURE CONTRACTOR) NEW POWER POLE TEMPORARY WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL, ONE SIDED AT CORRIDOR WALL. TERMINATE WALL AT UNDERSIDE OF GRID. NEW WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL EA. SIDE. TERMINATE WALL AT UNDERSIDE OF SOFFIT. 36" DOOR X 84" RELOCATED DOOR. REFER TO 6/AE-101. INSTALL FULL LITE KIT NEW WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL ONE SIDED ON OCCUPIED SIDE (PLAN NORTH). METAL STUDS SHALL EXTEND FROM FLOOR TO ROOF DECK. NEW WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL ONE SIDED ON OCCUPIED SIDE (PLAN NORTH). METAL STUDS SHALL EXTEND FROM FLOOR AND TERMINATE AT GRID. FRAME METAL STUDS FOR FUTURE OPENING (APPROXIMATELY 3'-4" X 7'-2" OPENING) FRAME METAL STUDS FOR FUTURE OPENING, REFER TO 4 AE-101
3A.
12
OFFICE 310D
1. 2. 3.
RENOVATION NOTES
300.09
300.11
BATH 351
11
DE1
300.19
CLOSET 397A
BATH 351
12
REMOVE SECURITY WIRE - VERIFY DOOR CONTACT
300.10
S1 OFFICE 308K
BATH 349
REMOVE ELECTRIC FROM SYSTEMS FURNITURE. TD CONTRACTOR REMOVE TD CABLE AND COIL UP AND PLACE IN CEILING OF 300C
DE2.
Drawing Title
OFFICE 353
D2
REMOVE SYSTEMS FURNITURE (BY OWNER) - STORE OFF SITE REMOVE DOOR, OCCUPANCY SENSOR, CARD SWIPE, SALVAGE FOR RE-USE REMOVE GLASS. REMOVE BULKHEAD ABOVE FOR ENTRANCE WALL FRAMING
DE1.
300.07
300.08
E5
E4
300.06
IT
D1 SUITE 300
E4
13
CORRIDOR 300Z
D3
13500
E D A RCH
BRIAN PHALEN, LICENSE #13500 EXPIRATION DATE: 12/31/2020
USQUARE, Calhoun, Cinti OH 45221
8
PHALEN
ER
USQAURE TEMPORARY OGE & I
2
D3.
300.03
300.05
OFFICE 300A
304C
3A SUITE 304
STAIR 398A
DEMOLITION NOTES
OFFICE 300E
300.04
300.01
DE2
9
S3
OFFICE 300C
GC SHALL REMOVE ABANDONED EQUIPMENT ELECTRICIAN REMOVE ALL ABANDONED CONDUIT
ST
OFFICE 300B
304.02
SUITE 300
10
G1. G2.
OFFICE 300D
EC
DE1 D1
6
OFFICE 300B
OFFICE 300C
OFFICE 304A
I
E1
SUITE 352
6
7 304.01
H
C.
Division of Administration and Finance Planning + Design + Construction PO Box 210186 Cincinnati, Ohio 45221-0186 University Hall, Suite 600 51 Goodman Drive Cincinnati, Ohio 45219 Phone 513-556-5200 Fax 513-556-4885
E1 300.01
OF O
BRIAN
R EG
OFFICE 300A
TE
IO
GENERAL NOTES
STEEL TRACK MECHANICALLY FASTEN 24" O.C. MAX.
Reviewed _ U.C. Project No.
18249
FLEXIBLE SEALANT (OPTIONAL)
CAD File
X Drawing No.
DETAIL PLAN 4 SCALE: 1/2" = 1'-0"
SECTION THROUGH WALL 3 SCALE: 3" = 1'-0"
DOOR ELEVATION 6 SCALE: 1/2" = 1'-0"
AE-101 1
of
Another project I was involved in was the reconstruction of the offices off-campus inside of Usquare. This image shows the first of three phases in a phasing plan to create new spaces for two groups at University of Cincinnati. The office of Gender Equity and Inclusion and the Faculty Senate. The plan created three office spaces, one to become empty for potential use in the future. Programs Used: AutoCAD 12
OFFICE 300B
300.02X
OFFICE 300B 300.02
OFFICE 300A
CLOSET 352A
SUITE 300
300.03
300.05
OFFICE 300A
300w
CLOSET 352A
SUITE 300
300.09
300.19
STAIR 398A
300.06
300.10
1
8 1
BATH 349
1
CONFERENCE 308A
E1
7
5
S2
HUDDLE 308B
OFFICE 308E
1
1
SUITE 350
EX
OFFICE 310D
EX
OFFICE 310F
OFFICE 310B
EX
EX OFFICE 310E
EX
EX
OFFICE 310C
9
1
OFFICE 310A
1
1
D2
E3 OFFICE 308C
S1
D6
1
CLOSET 308H 1
3
SUITE 350
A
4.
PAINT ALL WALLS - TO MATCH EXISTING INFILL CARPET AT DEMOLISHED WALL TO MATCH EXISTING NEW WALL - 3 58" METAL STUDS @ 16" O.C. W/ 58" DRYWALL EACH SIDE, TERMINATE WALL AT UNDERSIDE OF DECK. NEW ALL GLASS DOOR WITH CARD SWIPE. REFER 5/AE 101
E1. E2. E3.
POWER FOR DOOR AND CARD SWIPE - REFER TO AE-102 AND 3/AE-101 INSTALL DUPLEX RECEPTACLE (TYP.) NEW JACK
OFFICE 300y
TS EC
RENOVATION NOTES
D3 OFFICE 310D
SUITE 310
ST
1. 2. 3.
D5
D3
OFFICE 310B
D4
11 1
REMOVE SECURITY WIRE - VERIFY DOOR CONTACT
D5
BATH 349
1
4 2
REMOVE ELECTRIC FROM SYSTEMS FURNITURE. TD CONTRACTOR REMOVE TD CABLE AND COIL UP AND PLACE IN CEILING OF 300C
DE2.
1
1
2 1
CONFERENCE 300x
D1
OFFICE 308J
10 SUITE 310
S2
BATH 351
6
S1
308
OFFICE 308K
DE1.
OFFICE 300H
1
E2
OFFICE 308D
RENOVATION PLAN 2 SCALE: 1/8" = 1'-0"
OFFICE 308F
OFFICE 308G
OFFICE 310F
OFFICE 310E
OFFICE 310C
OFFICE 310A
DEMOLITION PLAN 1 SCALE: 1/8" = 1'-0"
OFFICE 300C
OFFICE 300F
DOOR ELEVATION 5 SCALE: 1/2" = 1'-0"
DOOR SCHEDULE
Project Title
DOOR ELEVATION 6 SCALE: 1/2" = 1'-0"
DEMOLITION PLANS & RENOVATION PLAN
4
3
IT
Drawing Title
BATH 351
1
DEMOLISH TEMPORARY WALL DEMOLISH DOOR DEMOLISH WALL DEMOLISH GLASS AND WALL. SALVAGE GLASS FOR REUSE. REMOVE PORTION OF WALL FOR NEW OPENING. RELOCATE SALVAGED DOOR - REFER TO 2/AE-101
USQUARE, Calhoun, Cinti OH 45221
OFFICE 353
CLOSET 397A
13500
E D A RCH
USQAURE TEMPORARY OGE & I
CLOSET 397A
ER
BRIAN PHALEN, LICENSE #13500 EXPIRATION DATE: 12/31/2020
D1. D2. D3. D4. D5. D6.
300.07
300.08 CORRIDOR 399
STAIR 398A
DEMOLITION NOTES
OFFICE 300E
300.04
300.01
SUITE 352
300.03X
PHALEN
ST
I
OFFICE 300E
SUITE 352
OFFICE 300D
H
C.
GC SHALL REMOVE ABANDONED EQUIPMENT ELECTRICIAN REMOVE ALL ABANDONED CONDUIT
Division of Administration and Finance Planning + Design + Construction PO Box 210186 Cincinnati, Ohio 45221-0186 University Hall, Suite 600 51 Goodman Drive Cincinnati, Ohio 45219 Phone 513-556-5200 Fax 513-556-4885
OFFICE 300C
OFFICE 300D
300.04X
300.01X
OF O
BRIAN
R EG
OFFICE 300C
G1. G2.
TE
IO
GENERAL NOTES
8
Bldg No. X
Drawn
Date 2019
Checked _
Scale As Noted
Reviewed _ U.C. Project No.
18249 CAD File
1
X Drawing No.
ENLARGED PLAN 3 SCALE: 1/2" = 1'-0"
DOOR ELEVATION 7 SCALE: 1/2" = 1'-0"
AE-101 1
of
PHASE 2
The above plan details the second phase of the three part phasing plan for the offices at Usquare. The priority was to get the office of Gender Equity and Inclusion up and running as soon as possible. That office would be temporarily held in the north section of the building, highlighted in phase 1. Then moved to their permanent place in the south side of the building, show in phase 2. In the 3rd and final phase, the north offices would be converted to the Faculty Senate space and an empty office for future use. Programs Used: 13 AutoCAD
COLLEGE YEAR 2
Steps on How to Plan a Site My third semester at the Unversity of Cincinnati my studio focused on the steps it takes to plan a site. From researching the site and its respective zoning codes to creating a proposed plan. The site that my class was given is outlined in red.
14
The site is located in Middletown, Ohio which is about a 45 minute drive from the University of Cincinnati campus. The site was located just east of the major highway I-75 and just west of a Fischer homes development. Programs Used: Adobe CC ArcGIS
Legend
Proposed Buildings Existing Buildings Outline of Site Proposed Trees Existing Trees Active Greenspace Planned Lots Natural Existing Land Water Parking Water Lot Lines Sidewalks Pathways
15
Legend
Water Greenspace Tree Canopy Commerical/ Office
Instituional Mixed Use Residential Parking
Traffic Flow Existing Buildings Pathways
Conceptual Plan
This map hows a conceptual plan for the site. Planning out zoning districts based on the existing zoning ordinance and comprehensive plan for the area. My goal for the site was to make a ‘park-like’ setting. I focused on separating the types of uses on the site so the residential area was quiet and not disturbed my the commercial area near the highway west of the site..By using a topographic map as a base I was able to plan around large changes in topography. Programs Used: ArcGIS 16
Overall
This overall plan was the final product from the conceptual plan, I was able to modify the plan t lots, buildings and greenspace. These changes w conceptual plan for Middletown as well as zonin car to pedestrian based modified the plans road Programs Used: Adobe CC, ArcGIS
Legend Mixed Used Commercial High Density Residential Medium Density Residential Low Density Residential Institutional Commercial/Office Site Outline Active Greenspace Natural Existing Land Water Parking Water Sidewalks Pathways
Plan
e site planning studio. Taking pieces from the to account for changes to square footage of parking were made so the plan would be in line with the ng ordinances. Additionally, turning the focus from dways.
Land Use Plan This map shows the proposed zoning for the site. The goal was to one large neighborhood center at the northwest and then have a smaller center just south of the main center. With the addition of mixed use buildings pedestrians become the focus of the area. Programs Used: Adobe CC, ArcGIS
17
COLLEGE YEAR 1
AN ANALYSIS OF OVER-THE-RHINE My second semester of Urban Planning focused on an area of Cincinnati known as Over-The-Rhine (OTR). OTR has been a key factor in the growth and decline of Cincinnati from the very beginning. Throughout the semester, analysis was been done to understand Over-The-Rhine deeply. Asplanners, we must understand the people of an area to create projects that impact those within it correctly. Each student picked a site to revitalize in the area.
18
An important aspect of this studio was making sure we were revitalizing the area we choose, without displacing the existing residents. CAGIS was used very often in this studio. CAGIS is a company that provides GIS information about the Cincinnati Area and the greater OKI (Ohio Kentucky Indianna) Region. Programs Used: ArcGIS
19
In order to help visualize my original perceptions of Over-The-Rhine an impressions map was made. The impressions map is meant to give a basic interpretation of the area. The focus is on what areas stood out or made an impression. Programs Used: ArcGIS
20
Based on Kevin Lynch’s The Image of a City this map was created to help understand how observers look at Over-The-Rhine. Lynch had a five-year study that helped to understand how users understand surroundings in consistent and predictable ways. It was found that in each mental map created by an observer five elements where used: paths, edges, districts, nodes and landmarks. This map uses those five criteria to show OTR. Programs Used: Adobe CC, ArcGIS
12’
40’
The top image shows the original elevation of the Kroger site. Where the bottom image shows the elevation of the rest of the street. In order to fit both images on the page, they are not in the same scale. But, it is still shown how drastically different the Kroger site’s elevation is compared to the rest of the street. The proposed redevelopment plan moved the building forward in order to keep the same elevation as the rest of the street. This helped increase uniformity on the street and allowed for a better feel of the street.
79’
Programs Used: Adobe CC AutoCAD
p r
, 12’
40’
12’
21
Programs Used: Adobe CC ArcGIS AutoCAD Sketchup
22