Skip to main content

Emily Guo - Selected Works 2021

Page 1

SELECTED WORKS 2021 EMILY GUO


TABLE OF CONTENTS 4

c.v.

professional work 8 14 18 20

forest hill residence (setless architecture) camp lake cottage (setless architecture) carlyle south (arquitectonica) royal alberta museum (dialog)

academic work 24 34

no man’s land: the american military as the new american park la matrice della cita / the city matrix

installation work / other 40 42

grow op (no man’s land) nuit blanche (starscape)


EMILY GUO

1239 Davenport Road, Toronto, ON +1 647 571 6646 | emilyguo@yahoo.com http://issuu.com/emilyguo/docs/selected_works

education 2016 - 2018

MASTERS OF ARCHITECTURE (M.Arch) University of Waterloo, Cambridge, ON Thesis: No Man’s Land: The American military landscape as the new American park

2010 - 2015

BACHELOR OF ARCHITECTURAL STUDIES, HONS. (BAS Hons.) University of Waterloo, Cambridge, ON 2014: Semester abroad in Rome, Italy

professional experience 2018 - now

INTERN ARCHITECT Setless Architecture, Toronto, ON Worked with minimal supervision on a number of high-end residential projects through SD, DD, CD, and CA phases. Responsibilities include developing and maintaining all drawings; coordinating engineering drawings with architectural; preparing and submitting CoA and permit drawings; reviewing and signing off on shop drawings; and creating interior design packages. Contributed to the firms online presence by updating the website and Instagram as needed. Notable Projects: Forest Hill Residence, Thornbury Live/Work

2015 - 2016

JUNIOR ARCHITECT Arquitectonica Inc., New York, NY Established project drawing standards for a multi-family residential building and individually spearheaded production for all working drawings under the project managers supervision. Due to the project experiencing higher than average changes, this made great impact in keeping up with multiple deadlines. Other responsibilities included coordinating with the out-of-house renderers and handling the statistical analysis of building requirements (FAR, efficiency, unit breakdown etc.). Notable Projects: Carlyle South, Nashville Boutique Hotel

01 - 04 / 2015 01 - 08 / 2014

ARCHITECTURAL STUDENT Arquitectonica Inc., Miami, FL / New York, NY Both internships included working with a small design team on a number of projects with tight deadlines through SD and DD. Work included preparing drawings and 3D models for in-house meetings, client presentations, and RFP’s. Notable Projects: MLS Stadium, Brickel City Centre, SkyRise Miami, Chateau Solis, Ko Shan Road, numerous RFP’s

05 - 08 / 2013

ARCHITECTURAL STUDENT Kris Yao | Artech, Taipei, Taiwan Crafted high quality physical models to be used in in-house and client meetings. Took on the responsibility of delegating work among the other less experienced interns. Notable Projects: National Taiwan University (NTU), Formosa Television Media Centre

01 - 04 / 2012

ARCHITECTURAL STUDENT CS&P Architects, Toronto, ON Assisted on a variety of projects at various design stages with 3D modelling, rendering, and preparing presentation drawings as needed. Other work included updating CAD drawings and construction details. Notable Projects: University of Windsor

01 - 04 / 2012

ARCHITECTURAL STUDENT DIALOG, Edmonton, AB Assisted the architectural team in the preparation of the schematic design report for the Royal Alberta Museum presented to the city of Edmonton. Notable Projects: Royal Alberta Museum 4


other relevant experience 05 - 08 / 2017

GRADUATE TEACHING ASSISTANT (DESIGN STUDIO) University of Waterloo, Cambridge, ON Assisted the 2nd year design studio run by Lola Sheppard: “Land/Lake/Shore: Ontario Place”.

08 - 10 / 2017

STARscape FABRICATION (NUIT BLANCHE) f_rmLAB, Toronto, ON Assisted in the testing and fabrication of the final installation, and ensured event ran smoothly overnight.

04 / 2018

GROUP EXHIBITION (GROW OP) Gladstone Hotel, Toronto ON Project “No Man’s Land” displayed at exhibition that focuses on urbanism, landscape, and art curated by LeuWebb.

04 / 2017

STOP GAP Stop Gap, Cambridge, ON 2 designs chosen by popular vote to be created and distributed around the city of Cambridge.

02 / 2017

ART EXHIBITION ORGANIZER Bridge Centre for Art + Architecture, Cambridge, ON Organized and ran student art show at Bridge Centre for Art + Architecture.

06 - 08 / 2015

GRADBOOK PORTRAIT PHOTOGRAPHER Independent project, Cambridge, ON Conceptualized and shot 70+ portraits with an extended team.

presentations + distinctions 04 / 2018

Interviewed for project “No Man’s Land” by Creatives of Toronto (ig: @creativesoftoronto)

04 / 2018

Project “No Man’s Land” awarded the Toronto Friends of the Visual Arts Award at Grow Op 2018

04 / 2018

Project “No Man’s Land” presented at the Grow Op Artist Talks: After the Flood in Toronto, ON.

03 / 2018

Project “No Man’s Land” presented at the 106th ACSA Annual Meeting: The Ethical Imperative in Denver, CO.

03 / 2017

Project “No Man’s Land” accepted for the EKU Living With Animals Conference

2014

Project “La Matrice Della Cita” shown at Bridge Centre for Architecture + Design

2012

“Kings College Chapel” model published in Archnet - IJAR

technical skills software

AutoCAD Rhino VRay for Rhino SketchUp, Adobe Photoshop Adobe Illustrator Adobe InDesign Adobe Lightroom MS Office (Word, Powerpoint, Excel) 3DS Max Revit ArcGIS

hardware

5

Physical Modelling Laser Cutting Hand Drafting Photography (digital + analogue)


professional work


FOREST HILL RESIDENCE firm SETLESS ARCHITECTURE

| location TORONTO, ON |

type RESIDENTIAL

Setless Architecture is a small architectural firm based in Toronto that focuses on custom high-end residential homes. Over the last 3 years, I have taken a 10,000 sq.ft. residence in the Toronto neighbourhood of Forest Hill from schematic design into the construction administration phase. The project team was composed of myself working under the supervision of the firm’s owner.

| date 2018-now

As the project moved from from DD into CD, more detailed drawings were required as I started to coordinate with various suppliers. This phase allowed me to review and comment on shop drawings , such as window, steel, and rebar. The project is currently under construction.

Due to the complex nature of the project, extreme attention to detail was needed in the coordination of all engineering systems, landscape design, and interior design. The project required very detailed drawings to sufficiently communicate the complex coordination of these systems. I was able to illustrate the extensive concrete beams, suspended slab, and any sleeving that was required in two drawings. elevation render

8


massing render

9


General Notes:

concrete beam + sleeving plan, section window schedule (opposite)

10

1/

These Contract Documents are the p Upon written application Setless will or supplementary information regard

2/

Drawings are not to be scaled for co conditions and dimensions required ancies with the Contract Documents

3/

Positions of exposed or finished mec fixtures are indicated on the Architec Architectural drawings govern over t Items not clearly located will be loca


General Notes: 1/

These Contract Documents are the proper Upon written application Setless will provid or supplementary information regarding the

2/

Drawings are not to be scaled for construc conditions and dimensions required to perf ancies with the Contract Documents before

3/

Positions of exposed or finished mechanica fixtures are indicated on the Architectural d Architectural drawings govern over the Me Items not clearly located will be located wh

General Notes: General Notes: 1/ These Contract Documents are the property of th 1/ These Contract Documents are the property of th Upon written application Setless will provide writ Upon written application Setless will provide writ or supplementary information regarding the inten or supplementary information regarding the inten

11

2/ 2/

Drawings are not to be scaled for construction. C Drawings are not to be scaled for construction. C conditions and dimensions required to perform th conditions and dimensions required to perform th ancies with the Contract Documents before com ancies with the Contract Documents before com

3/ 3/

Positions of exposed or finished mechanical or e Positions of exposed or finished mechanical or e fixtures are indicated on the Architectural drawin fixtures are indicated on the Architectural drawin Architectural drawings govern over the Mechanic Architectural drawings govern over the Mechanic Items not clearly located will be located when the Items not clearly located will be located when the


detail set

12


detail

13


CAMP LAKE COTTAGE firm SETLESS ARCHITECTURE

| location LAKE OF BAYS, ON |

type RESIDENTIAL

This black metal-clad cottage is located on a remote portion off of a lake in the Lake of Bays region. The pitched roof is made more dramatic by cantilevering the main massing off of a landscape wall, exaggerating the already hilly landscape. Through SD to DD, I translated a schematic layout into a realized detailed set in preparation for permit submission. A structural system was worked out with the engineer, and schematic truss designs were started. This project is still in its design development phase.

elevation

14

cottage | date 2021


ground floor plan

15


General

section

16

1/

Thes Upo or su

2/

Draw cond anci

3/

Posi fixtu Arch Item


timber truss sketch

17


CARLYLE SOUTH firm ARQUITECTONICA

| location ALEXANDRIA, VA |

type HIGH-END

RESIDENTIAL | date 2016

Arquitectonica is an award winning multi-disciplinary firm with offices all over the world. During my year in the New York office, I worked on a number of projects with a small team of four. The main project I was involved in was Carlyle South, a 34-storey residential tower in Alexandria, Virginia. Due to the demands of the project, it was my responsibility to set up and maintain project standards in AutoCAD, Photoshop, and 3DS Max for drawings and renderings. I was also responsible for keeping track of project requirements including parking, FAR, efficiency, and unit count. These standards were incredibly important to the project due to the amount of design changes the building went through during its conceptual and schematic design phase. During these phases, I designed the parking and unit layouts for the building with consideration for future phases. For important client and city meetings, I became responsible for the communication with the out-of-house renderers in regards to mark-ups and ensuring on-time completion due to deadline shifts. As a result of the masterplan size, I also gained experience in communicating with outside consultants, including landscape and city.

elevation detail

18


44

window details

SECTION DETAIL

ELEVATION DETAIL

47

PERSPECTIVE DETAIL

SECTION DETAIL

PERSPECTIVE DETAIL

43

45

SECTION DETAIL

PERSPECTIVE DETAIL

46

SECTION DETAIL

ELEVATION DETAIL

48

PERSPECTIVE DETAIL

SECTION DETAIL

19

PERSPECTIVE DETAIL


ROYAL ALBERTA MUSEUM firm DIALOG

| location EDMONTON, AB |

type MUSEUM

| date WINTER 2012

DIALOG is a nation wide Canadian multi-disciplinary award winning firm. Their work ranges from architectural projects, interiors, and urban design. During my 4 month internship, I worked closely with the design team managed by Donna Clare on the Royal Alberta Museum. The work cumulated into preparing the final schematic design package. My main responsibilities for this important deadline included testing out designs through 3D modelling, aiding the clean up of the Revit model, rendering, and photoshoping final renders. Another major part of my job was to make and maintain a working 1:100 scale model of the entire museum that was continually updated over this time to reflect design changes and options.

render

20


elevations (south/east/north/west)

21


academic work


NO MAN’S LAND THE AMERICAN MILITARY LANDSCAPE AS THE NEW AMERICAN PARK format GRADUATE

THESIS |

location U.S.A

|

type LANDSCAPE

|

date 2017-2018

|

supervisors Lola

Sheppard, Jane Hutton

This project was presented at the 106th ACSA Annual Meeting: The Ethical Imperative, Grow Op: Artist Talks, and accepted to the EKU Living with Animals Conference. A portion was exhibited at Grow Op 2018 and awarded the Toronto Friends of the Visual Arts Award. Military landscapes are seldom seen as ecologically diverse territories, full of life. Yet, there is growing evidence that these volatile lands are finding a second life as animal refuges, born out of necessity under the growing effects of the Anthropocene and sixth wave of mass extinction. It is the very nature of the military landscape – weaponized, contaminated, protected – that deters regular human activity and allows this new, damaged Nature to appear. These new cyborg landscapes tell a story of a posthuman future where new ecological relationships are formed between the military artefacts and the animals that inhabit the land. These artefacts range from chemical contamination to landmines, nuclear fallout to defensive perimeters. Although this is a worldwide phenomenon, the thesis focuses on the United States in recognition of their $611 billion military-industrial complex that places them at the forefront of this investigation. No Man’s Land presents two test sites to illustrate these new complex relationships: Johnston Atoll (closed/abandoned) and Rocky Mountain Arsenal Wildlife Refuge (closed/reused). By recognizing the ecological importance of these landscapes, the thesis argues to re-introduce these territories back into the American imagination as the ‘involuntary park’ – a kind of posthumanist National Park. A series of interventions have been proposed to leverage human engagement by reaching out to the civilian public under the guise of ‘voluntourism’ to further encourage animal occupation. The thesis aims to interrogate the contradictory nature of these landscapes and question their future in an increasingly anthropocentric world.

johnston

001 atoll

rocky mountain arsenal

002 national wildlife refuge

the cyborg

Technology

Ecology

new Nature 24


design principles

The placement of the animal as the primary stakeholder in the Anthropocene and the rise of a new cyborg landscape calls for a proposal: to create a new series of parks akin to the National Park System fit for a posthuman 21st century that argues for continued animal occupation. Within this is the choice to remove the responsibility from the Department of Defense in regard to their dismal track record and a rejection of the myth of “pure nature”. Looking back to 1988 where the first round of the Base Realignment and Closure (BRAC) commission was seen, only 3% of the contaminated sites had been completely cleaned up within 5 years with a budget of $164,773,000. In 2018 the requested budget for the next round of closures in 2021 is $255,867,000, less than that of 1988 given inflation. Given these trends, the thesis chooses instead to engage elsewhere. In discussing the idea of a new National Park System, many issues must be considered. What notion of agency does the design necessitate and who is it for? How much or how little design is needed to be successful? What does it mean to design for non-human species?

The design for these involuntary parks chooses a combination method must be employed that sets up a unifying methodology with design objectives (top-down) that allows room for a highly calibrated response at the bottom (bottom-up). Then, the design objectives are as follows: 1. Strengthen ecological connections and needs by encouraging colonization by the animal. 2. Ensure flexibility in response to site-specific needs and conditions. 3. Consider material cycles. 4. Consider growth over time.

proposed intervention axonometrics

25


johnston atoll airfield

Johnston Island, or Kalama Atoll to Native Hawaiians, is a 13 km2 atoll located in the Pacific Ocean. Its 4 islands are currently unincorporated territory of the United States and has been under the control and jurisdiction of the U.S. Fish and Wildlife Service since 2003. Prior to this, the islands were occupied by multiple branches of the U.S. military in which many technological pollutants have been left behind due to its 69 years of intense military activity. site plan

26

Between 1934 and 2003 (figure 2.41), the islands were used for many activities, including a naval refuelling depot, airbase, chemical weapons storage and disposal site, nuclear and biological weapons testing, and space recovery. Many of these activities were incredibly harmful to the existing environment and remain present to this day, altering the atolls’ ecological network. The main island, Johnston Island, quadrupled over 20 years, while 2 new islands, Akau and Hikina, were created.


3 x collage

27


28


29


rocky mountain arsenal national wildlife refuge

The Rocky Mountain Arsenal Wildlife Refuge is a national refuge maintained by the U.S. Fish and Wildlife Service located on the border of Denver, CO. However, the site was originally an arsenal opened by the U.S. Army to manufacture chemical weapons in World War II. Near the end of the war, the army leased out parts of their facilities to private industries like Shell Oil Company who manufactured pesticides and herbicides.

The processes undergone on this site - the manufacturing and demilitarization of weapons, the manufacturing of pesticides, and the dumping required for both, left behind one of the most polluted landscape in America. Because the site was allowed to remain undeveloped before and during remediation efforts, animals began to re-occupy the landscape. Once this was noted, President George W. Bush established the land as a wildlife refuge in 1992, and a cleanup program was initiated by all 3 bodies (U.S Army, Shell Oil Co., and USFWS) between 1992-2010.

site plan

30


3 x collage

31


32


33


LA MATRICE DELLA CITA / THE CITY MATRIX location ROME,

ITALY |

type MUSEUM,

LANDSCAPE | date WINTER 2014 |

with JENNIFER

YONG

This project was shown at the Rome Show at Bridge Centre for Architecture + Design. In Rome, an excavated city of simultaneous stories, there is constantly a life that exists between what is above and below the ground. The placement of a museum on this site, a serene but underused neighbourhood park along the Aurelian Wall, required a great sensitivity to the ground plane.

The four themes: Forma Urbis, Imago Hominis, History and Myth, and Nature and Landscape were developed into a mnenosyn atlas broken down into 4 eras of Rome’s history. Architectural qualities were then used to organize a linear movement through the exhibits: Scale, Framing, Obstructing, and Revealing. These exhibits and additional program sit in and on the landscape to form a dialogue with the public park redesigned along the site.

mnenosyn atlas / matrix

linear plan strategy / sectional concept

34


site plan

1

porta metronia

underground plan

1

1 porta metronia entrance 2 sunken piazza 3 lobby + offices 2

sunken plaza

3

temporary exhibition museum steps

4

4 obstruct/reveal exhibit

2

5 framing exhibit

3

6 scale exhibit 7 public piazza 8 temporary exhibit

4

9 auditorium 10 conferance rooms 11 library/archive

5 5

park

6 7 6 7 8

broken tower viewpoint piazza water feature

9

8

water feature

9 10 bar/auditorium entrance

10

11 orange grove orchard

12 playground

11 13 library

14 cypress hall

35


sections

exploded axonometric

The relationship between above and below ground was explored through landscape elements that represented the influence that the built museum had on the park above. Using the towers as an organizing element each plot of land had a different program to help create a rhythm along the Aurelian Wall.

36


vignettes

37


installation work / other


GROW OP NO MAN’S LAND location TORONTO,

ON |

type EXHIBITION

|

date APRIL

2018

This project was installed for Grow Op, presented at the Grow Op Artist Talks, awarded the Toronto Friends of the Visual Arts Award, and interviewed by Creatives of Toronto. Grow Op is an annual exhibition held at the Gladstone Hotel in Toronto that “examines how humans and other species live within and without natural systems of growth, change, abundance, scarcity, decay and life” through art and design. In 2018, Grow Op asks us: “What lies beyond once the floodwaters recede? What emerges once the smoke clears? As cataclysmic climate events multiply in tandem with our species’ continuously expanding footprint, we are re-conceiving our relationships with the organic and inorganic world around us in unprecedented ways.”

20 ’ - 9 ”

Provided system Cable

54 m

15 - 20 m

500 km

ƵďĂŶ WLJŐŵLJ Kǁů /Glaucidium siju/

ĂůĚ ĂŐůĞ /Haliaeetus leucocephalus/

ŽƩŽŶǁŽŽĚ dƌĞĞ /Populus sect. Aigeiros/

+8 m tĂƚĐŚƚŽǁĞƌ

ŚĞĂƚŐƌĂƐƐ /Bromus tectorum/

+

0m 'ƌŽƵŶĚ

+ 83.82 m tŝŶĚ dƵƌďŝŶĞ

ĂŐƌĞĞŵĞŶƚ ĨŽƌ ƚŚĞ ůĞĂƐĞ ƚŽ ƚŚĞ ƵŶŝƚĞĚ ƐƚĂƚĞƐ ŽĨ ůĂŶĚƐ ŝŶ ĐƵďĂ ĨŽƌ ĐŽĂůŝŶŐ ĂŶĚ ŶĂǀĂů ƐƚĂƟŽŶƐ͗ ϭͺϭƐƚ͘ /Ŷ 'ƵĂŶƚĂŶĂŵŽ ;ƐĞĞ ,LJĚƌŽŐƌĂƉŚŝĐ KĸĐĞ ŚĂƌƚ ϭϴϱϳͿ͘ &ƌŽŵ Ă ƉŽŝŶƚ ŽŶ ƚŚĞ ƐŽƵƚŚ ĐŽĂƐƚ͕ ϰ͘ϯϳ ŶĂƵƟĐĂů ŵŝůĞƐ ƚŽ ƚŚĞ ĞĂƐƚǁĂƌĚ ŽĨ tŝŶĚǁĂƌĚ WŽŝŶƚ >ŝŐŚƚ ,ŽƵƐĞ͕ Ă ůŝŶĞ ƌƵŶŶŝŶŐ ŶŽƌƚŚ ;ƚƌƵĞͿ Ă ĚŝƐƚĂŶĐĞ ŽĨ ϰ͘Ϯϱ ŶĂƵƟĐĂů ŵŝůĞƐ͖ 0 500 km ϮͺĨƌŽŵ ƚŚĞ ŶŽƌƚŚĞƌŶ ĞdžƚƌĞŵŝƚLJ ŽĨ ƚŚŝƐ ůŝŶĞ͕ Ă ůŝŶĞ ƌƵŶŶŝŶŐ ǁĞƐƚ ;ƚƌƵĞͿ͕ Ă ĚŝƐƚĂŶĐĞ ŽĨ ϱ͘ϴϳ ŶĂƵƟĐĂů ŵŝůĞƐ͖ ϯͺĨƌŽŵ ƚŚĞ ǁĞƐƚĞƌŶ ĞdžƚƌĞŵŝƚLJ ŽĨ ƚŚŝƐ ůĂƐƚ ůŝŶĞ͕ Ă ůŝŶĞ ƌƵŶŶŝŶŐ ƐŽƵƚŚǁĞƐƚ ;ƚƌƵĞͿ ϯ͘ϯϭ ŶĂƵƟĐĂů ŵŝůĞƐ͖ ϰͺĨƌŽŵ ƚŚĞ ƐŽƵƚŚǁĞƐƚĞƌŶ ĞdžƚƌĞŵŝƚLJ ŽĨ ƚŚŝƐ ůĂƐƚ ůŝŶĞ͕ Ă ůŝŶĞ ƌƵŶŶŝŶŐ ƐŽƵƚŚ ;ƚƌƵĞͿ ƚŽ ƚŚĞ ƐĞĂĐŽĂƐƚ͘

BORDER

Brown Booby /Sula leucogaster/

CHEMICAL WEAPONS

NUCLEAR TESTING

AM E

Mounted provided

Y

L ENERG

PROGR ; Z Ϳ FEDERA / E z EMENT E Z'z z &&/

Z E t

MANAG E Z' >

Z Z ǀLJ

z ĂƐĞ ZZ/dKZ ĞŶƚ ĞĚ ďLJ ůĞ ĂŐƌĞĞŵ

5

0

+ +

ϮͲĐŚůŽƌŽĞƚŚĞŶLJůĂƌƐŽŶŽƵƐ ĚŝĐŚůŽƌŝĚĞ

dĞƚƌĂƉŚŽƐƉŚŽƌƵƐ

0

+

ϭͲ ŚůŽƌŽͲϮͲ΀;ϮͲĐŚůŽƌŽĞƚŚLJůͿƐƵůĨĂŶLJů΁ĞƚŚĂŶĞ

ĂƌďŽŶLJů ĚŝĐŚůŽƌŝĚĞ

E Kh͘^͘ EĂ

+0.25 m ďĂŶĚŽŶĞĚ WŝĞƌƐ

+48.32 km KƉĞƌĂƟŽŶ ͞ ůƵĞŐŝůů dƌŝƉůĞ WƌŝŵĞ͟

E d

+400.1 km KƉĞƌĂƟŽŶ ͞^ƚĂƌĮƐŚ WƌŝŵĞ͟

D Z/

ŽďũĞĐƟǀĞƐ ϭͺĞīĞĐƚ ŽĨ ĞůĞĐƚƌŽŵĂŐŶĞƟĐ ƉƵůƐĞ Ăƚ ĚŝīĞƌĞŶƚ ĂůƟƚƵĚĞƐ ϮͺƐƚƵĚLJ ƚŚĞ ŐĞŶĞƌĂƚĞĚ ĂƵƌŽƌĂƐ ϯͺƵƐĞ ŝŶ ƚŚĞ ďůĂĐŬŽƵƚ ŽĨ ƌĂĚŝŽ ĐŽŵŵƵŶŝĐĂƟŽŶ

D Z/ Ɛ ĚĞĮŶ

A

BASIN ĂŶƚƐ

OWL” 1962

“FISHBber

ŽƵƚŚ Wů W> y Ɛ ů ĂƌĞĂ ^ ^ KDĞƌĂƟŽŶƵƌĞƐ ŝƐƉŽƐĂ W> EdƌŝŶŐ ŽƉϱ ƐƚƌƵĐƚ

+21.03 km KƉĞƌĂƟŽŶ ͞dŝŐŚƚƌŽƉĞ͟

^Khd,ŶƵĨĂĐƚƵǁŝƚŚ ϭϲ

&ŝƌƐƚ ŵĂ

:ŽŚŶƐƚŽŶ ƚŽůů

TION Novem -

OPERAJune

NO MAN‘S LAND NO MAN‘S LAND NO MAN‘S LAND 0m Sea Level

10 km

+97.24 km KƉĞƌĂƟŽŶ ͞<ŝŶŐĮƐŚ͟

+147.3 km KƉĞƌĂƟŽŶ ͞ ŚĞĐŬŵĂƚĞ͟

ĞƐŵĂƌĞƐƚ͛Ɛ ,ƵƟĂ /Capromys pilorides/

ZĞĚ dĂŝůĞĚ ,ĂǁŬ /Buteo jamaicensis/

K/>

t/Z

Z

'ƌĞLJ ZĞĞĨ ^ŚĂƌŬ /Carcharhinus amblyrhynchos/

500 km

+ 2.7 m ĂƌďĞĚ tŝƌĞ &ĞŶĐĞ

;ϭZ͕Ϯ^͕ϯZ͕ϲ^͕ϳZ͕ϴ^͕ϵ^͕ϭϭZͿͲϯ͕ϰ͕ϱ͕ϲ͕ϭϯ͕ϭϯͲ,ĞdžĂĐŚůŽƌŽͲϭϬͲŽdžĂƉĞŶƚĂĐLJĐůŽ΀ϲ͘ϯ͘ϭ͘ϭ3,6.02,7.09,11΁ƚƌŝĚĞĐͲϰͲĞŶĞ

PESTICIDE

ƚŽŶŝƵŵ

44’

^, >> K/> KDW Ez ůĞĂƐĞ͗ ϭϵϱϮ Ͳ ϭϵϴϮ ƉƌŽĚƵĐƟŽŶ ŽĨ ƉĞƐƟĐŝĚĞƐ ĂŶĚ ŚĞƌďŝĐŝĚĞƐ͘

/s/> d/KE EK͘ ϴϯͲ ͲϮϯϴϲ 1983

USFWS PILOT BISON WZK: d 2 DĂƌĐŚ ϮϬϬϳ͖ ϱ͘ϵ Ŭŵ ϭϲ ŵĞƌŝĐĂŶ ŝƐŽŶ ďƌŽƵŐŚƚ ĨƌŽŵ ƚŚĞ EĂƟŽŶĂů ŝƐŽŶ ZĂŶŐĞ ŝŶ DŽŶƚĂŶĂ ƌĞůĞĂƐĞĚ ŝŶƚŽ Ă ĐŽŶƚƌŽůůĞĚ ĂƌĞĂ

^d d K& K>KZ K ǀ͘ h͘^͘ ͕͘ ^, >> K/> KDW Ez͕ d >͘ ŽƚŚ ^ŚĞůů ĂŶĚ ƚŚĞ ƌŵLJ ŚĂĚ ƚŽ ƉĂLJ ΨϮ ďŝůůŝŽŶ ƚŽ ƚŚĞ W ƚŽ ĐůĞĂŶ ƵƉ ƚŚĞ ĐŚĞŵŝĐĂů ƉŽůůƵƟŽŶ 0m 'ƌŽƵŶĚ

-1m+ ^ĞĂ &ůŽŽƌ

0

500 km

+2.7 m ĂƌďĞĚ tŝƌĞ &ĞŶĐĞ

0m 'ƌŽƵŶĚ 0

BORDER

dĂďůĞ ŽƌĂů /Acropora/

ϭ͕Ϯ͕ϯ͕ϰ͕ϭϬ͕ϭϬͲ,ĞdžĂĐŚůŽƌŽͲϭ͕ϰ͕ϰĂ͕ϱ͕ϴ͕ϴĂͲŚĞdžĂŚLJĚƌŽͲϭ͕ϰ͗ϱ͕ϴͲĚŝŵĞƚŚĂŶŽŶĂƉŚƚŚĂůĞŶĞ

-2m ĂƐŝŶ & ϵϯͲĂĐƌĞƐ ϮϰϬ͕ϬϬϬ͕ϬϬϬ ŐĂůůŽŶƐ

^ŽůĚŝĞƌĮƐŚ /Holocentridae/

ϵϰ͗ ƉůƵ

44’

1-5m

K͕KͲ ŝĞƚŚLJů KͲ;ϰͲŶŝƚƌŽƉŚĞŶLJůͿ ƉŚŽƐƉŚŽƌŽƚŚŝŽĂƚĞ

45’

KƉƵŶƟĂ ĐĂƚƵƐ /Opuntia/

++ + +

ŝŵĞƚŚLJůͲϭ͕ϮͲĚŝďƌŽŵŽͲϮ͕ϮͲĚŝĐŚůŽƌĞƚŚLJů ƉŚŽƐƉŚĂƚĞ

46’

ϱϭ Đŵ

KƉƵŶƟĂ ĐĂƚƵƐ /Opuntia/

47’

+400.1 km ĞƚŽŶĂƟŽŶ ϭϯϰͲϭϰϳ Đŵ

500 km

0

/E͛

^ hZd

ƚƌŽŽƉƐ

/E͛ 1961 Ě ĂŶ ^ hZd Ĩ ƉůĂŶƚĞ ďLJ ƵďĞĂƐƵƌĞ ĂƌƌŝĞƌ Ž ĐĂĐƚƵƐĨĞŶƐĞ ŵ ϴ ŵŝůĞ ď ĂƐ Ă ĚĞ KƉƵŶƟĂ

͚ dh

26’

͚ dh

͕ &

Z

0

-5m+ ^Žŝů ůĞǀĞů

W> y

͕ ͕

Zh dh

^ KD

/KE ^d

^/E^

500 m

28’

30’

W> Ed

/s Z^

169.63

W49 ůĞĂƌ Ě

, ^/d 534°W

ŵŽŶƵĐ ǁĂƌŚĞĂ

42°N

> hE 169.52

ĂŶ ƚŚĞƌ

OWL” ϵϲϮ 9 “FISHB PRIME” FISH ϵ :ƵůLJ ϭ 09:00:0 008°W

65°N

16.468

TION

ŵĞƌŝĐ

16.733

OPERA >“STAR

0m Sea Level

32’

0

NUCLEAR TESTING

500 m

EKZd,

0

ŵĞƌŝĐĂŶ ŝƐŽŶ /Bison bison/

10 km

ŝŶĚǁĞĞĚ /Convolvulus arvensis/

5

0

500 km

0m 'ƌŽƵŶĚ

- 0.91 m &ŽƵŶĚĂƟŽŶ

42’

WD&,Ͳϭ ĂŶƟͲƉĞƌƐŽŶŶĞů ŵŝŶĞ WD& Ͳϭ ĂŶƟͲƉĞƌƐŽŶŶĞů ŵŝŶĞ WDDͲϭ ;^,h D/E Ϳ 60 mm 106 mm

+

0m 'ƌŽƵŶĚ ůĞǀĞů

ĞůůĂ DŽƚŚ /Utetheisa ornatrix/

ĞƌĂƵŶƵƐ ůƵĞ /Hemiargus ceraunus/

͞WƌŽũĞĐƚ ĂŐůĞ͟ 1973 - 1976 ĞŵŝůŝƚĂƌŝnjĂƟŽŶ ŽĨ ĞdžĐĞƐƐ ƚŽdžŝĐ ĂŐĞŶƚƐ ;Ϯϭ͕ϬϬϬ Dϯϰ ĐůƵƐƚĞƌ ďŽŵďƐ ĮůůĞĚ ǁŝƚŚ ^ĂƌŝŶͿ

>ŝŵĞ ^ǁĂůůŽǁƚĂŝů /Papilio demoleus/

500 km

54 mm

ŽĐŽŶƵƚ WĂůŵ /Cocos nucifera/

0

111 mm

;Z^ͿͲWƌŽƉĂŶͲϮͲLJů ŵĞƚŚLJůƉŚŽƐƉŚŽŶŽŇƵŽƌŝĚĂƚĞ

LANDMINE

DEMILITAIZATION

'ƌĞĞŶ ^ĞĂ dƵƌƚůĞ /Chelonia mydas/

AGENT ORANGE

500 km

ELD

MARIN

ING ϭϵϵϲƌĞĚ DEMIN ϭϲ DĂLJ ŽŶ ŽƌĚĞϱϱ͕ϬϬϬ ͲŵŝŶĞƐ

500 km

0

ϮͲDĞƚŚLJůͲϭ͕ϯ͕ϱͲƚƌŝŶŝƚƌŽďĞŶnjĞŶĞ

1955 - 1970 ĞŵŝůŝƚĂƌŝnjĂƟŽŶ ŽĨ ^ĂƌŝŶ ŵƵŶŝƟŽŶƐ ;ϮϬϰ͕ϬϬϬ ĐŽŶƚĂŝŶĞƌƐͿ

+

MINEFI

U.S.

ŽŶƚĂŵŝŶĂƚĞĚ ŽĐŽŶƵƚ &ƌƵŝƚ

Ŷƚ ůŝŶƚŽǀĂů ŽĨ ĂŶ ůĂŶĚ WƌĞƐŝĚĞƚŚĞ ƌĞŵ ŵĞƌŝĐ E

EYE

E/^d Z

RABBIT ŶŝŵĂů

ĞƐƟŶŐ Ă

ŐĂƐ RABBIT ƌĂƉŝĚůLJ ŽŶƚƌĂĐƚŽƵŶƚ ŽĨ

500 m

' ^

ƟĐ ĂŝƌͲƚ

KW Z d/KE ͞W Z ,K͟ Ɖƌŝů Ͳ ^ĞƉƚĞŵďĞƌ ϭϵϳϳ ŝƐƉŽƐĂů ŽĨ ŐĞŶƚ KƌĂŶŐĞ

WƵƉŝůƐ ĐƌŽƵƐ Ăŵ

KW Z d/KE ͞W Z /sz͟ DĂƌĐŚ Ͳ Ɖƌŝů ϭϵϳϮ ZĞŵŽǀĂů ŽĨ ŐĞŶƚ KƌĂŶŐĞ ĨƌŽŵ ^ŽƵƚŚ sŝĞƚŶĂŵ ;ϭ͕ϴϬϬ͕ϬϬϬ ŐĂůůŽŶƐͿ

с ĚĂŶŐĞ

^ Z/E

ƵƚŽŵĂ

+

500 m

;Z^ͿͲWƌŽƉĂŶͲϮͲLJů ŵĞƚŚLJůƉŚŽƐƉŚŽŶŽŇƵŽƌŝĚĂƚĞ

0

YARD 93°W

0

GE

Ϯ͕ϯ͕ϳ͕ϴͲƚĞƚƌĂĐŚůŽƌŽĚŝďĞŶnjŽͲƉͲĚŝŽdžŝŶ

ORANG 169.53 4°N

AGENT 16.730

YARD 93°W

Ϯ͕ϰ͕ϱͲƚƌŝĐŚůŽƌŽƉŚĞŶŽdžLJĂĐĞƟĐ ĂĐŝĚ

Ϯ͕ϰͲĚŝĐŚůŽƌŽƉŚĞŶŽdžLJĂĐĞƟĐ ĂĐŝĚ

STORA169.53 HAT 4°N YARD E 59°W RED 16.723

GE

More information can be found here: http://www.gladstonehotel.com/art/growop2018/ #growop2018

STORA169.53 HAT 4°N E YARD 59°W RED 16.723 ORANG 169.53 4°N AGENT 16.730

A portion of my thesis work, seen earlier, was selected through a juried process to be shown on the 2nd floor of the Gladstone Hotel. The show received press from Canadian Architect, Toronto Life, and BlogTO with over 1,800 in attendance over its course. My work was awarded the Toronto Friends of the Visual Arts Award valued at $2000.

0

&ƵůǀŽƵƐ ,ĂŝƌƐƚƌĞĂŬ /Electrostrymon angelia/

-5m+ ^Žŝů ůĞǀĞů 41’

- 0.2 m WŝŬĞ - 0.2 m >ĂŶĚŵŝŶĞ WŝŬĞ

Site Information Plaque (Location, Military History, Photograph etc.)

GROW OP-NO MAN’S LAND

CO N S TRU CTI O N D ETA I L -O V ERA LL I N S TA LLATI O N

installation photo (by gabby frank on behalf of gladstone)

40

Printed p with pain


41


NUIT BLANCHE STARSCAPE location TORONTO,

ON|

type INSTALLATION

| date OCTOBER 2017 |

with F_RM lab (Cam, Chris, Joel, Pavel, Jacqueline + volunteers)

This project was installed for Nuit Blanche. (https://www.youtube.com/watch?v=TZRJyRqY6nw) For Nuit Blanche, F_RM lab, a student-led collective at the University of Waterloo, was chosen as an independent artist to install a large canopy in downtown Toronto. The installation asks the viewer to contemplate the issue of light pollution, while imagining how we could regain a connection to our skies.

My main role was as a fabricator and coordinator. Through the process of creating the mesh canopy, I kept the process organized and taught volunteers the methodology. I also assisted in set-up and take down, as well as ran the event overnight for 12 hours.

installation photographs (by leo liu)

42


43


Thank you, and I hope to meet you soon. +1 647 571 6646 emilyguo@yahoo.com


Turn static files into dynamic content formats.

Create a flipbook