Ele

Page 1


ARCHITECT

PORTFOLIO 2015 - 2022

Eleazar Martínez Lindes

nickname/AKA: Ele

...about myself

My name is Eleazar Martínez, but everybody calls me Ele.

I am graduated in Architecture at the Girona college (UdG), in Catalonia, Spain. I consider myself as a hard-working, disciplined and reliable person with good interpersonal skills.

Native Catalan and Spanish speaker, fluent in English. I enjoy being creative, designing and approaching into the technical details to make sure the feasibility of the execution of the works and being aware of the timings or sequencings required in the full process.

Oriented to the BIM methodology I am always interested in innovation technologies, but comfortable to work within conservatives methodologies such as CAD or sketches. I have reliable experience leading teams and/or being a productive part of them.

...relevant experience

Experienced Architect | Façades ~ Solduct, Girona (2017- summer2018)

Architect | Façades ~ Bryden Wood, Barcelona-London, SP-UK (summer’18-winter’21)

Junior Architect | Site ~ UT Arabtec San Jose ASJV, Abu Dhabi UAE (2017- summer2018)

Draftsman | 3D Modeler ~ Aguirre Newman Arquitectura, Barcelona (2017)

Entry-Level Architect | BIM Revit Specialist ~ Servitec Ingeniería, Sant Cugat BCN (2016) ...related

Santander Bank Internship programme at GMK associates structural studio (summer 2012)

University Internship programme at C2 Architecture architectural studio (autumn 2012)

Graduated with honours in Technological Bachelor (pre-college spanish courses) (2007)

Eleazar Martínez Lindes
Eleazar Martínez Lindes

what have I done?

CONSTRUCTION

AEC experience

2023, Torrejón de Ardoz , Madrid, (Spain)

Client: TRUMPF España, Offices and Logistic Warehouse

Engineering: Arditecnica - Barkow Leibinger

Construction: Carbonell Figueras SA

City, State: Torrejón de Ardoz, Madrid

Country: Spain

Size: 10.250 m2

Sector: Offices and Logistic

Main tasks developed at TRUMPF Es, Construction project:

-Developing the model and sheets for the periodical As Built Submittals we were issuing for the architectural team.

-Complete modelling of all disciplines while the construction stages were advancing, supporting the production team

-Coordinating Structural model and CAFISA Models whilst doing Architectural workshop reviews for aesthetical approvals

-Supporting on the elaboration of documents for the Cost Changes and Delay Communications, f.e.

-Attending Site Construction Meetings with the wider team

TRUMPF, Carbonell Figueras Madrid role; BIM Project Manager

BIM Development all throught the Building Execution

Submitting As Built Drawings, Layouts and Details

360 Renders by Scanning QRs:

what have I done?

CONSTRUCTION

2023, Torrejón de Ardoz , Madrid, (Spain)

TRUMPF, Carbonell Figueras Madrid role; BIM Project Manager

what have I done?

AEC experience

2022, Lliçà d’Amunt , Barcelona, (Spain)

Client: MANGO, Ampliació centre Logístic

Engineering: Nadico

Construction: Solduct

City, State: Lliçà d’Amunt, Barcelona

Country: Spain

Size: 90.000 m2

Sector: Logistic

Main tasks developed at MANGO, Construction project:

-Creating the Solduct BIM Template for this and future projects.

-Initial BIM Modelling for the complete Envelope model (all TRIMO Panels - around % of the façade).

-Reviewing later inputs and model from architectural department.

-Coordinating model with Structural department Model

-Coordination meetings with chain supply for the TRIMO architectural Panels Qbiss One.

- Attending meetings with Engineering and client.

- Assistance to engineering company, construction managers, technical department and model development

Phases of execution
Types of QBiss TRIMO Panels
Early Coordination Model
Denity of Insulation for wind loads calculation

what have I done?

CONSTRUCTION

AEC experience

2021, Aiguaviva , Barcelona, (Spain)

Client: HIPRA, Research and Development R+D Building

Architecture: Dopec

Construction (Façade): Solduct

City, State: Aiguaviva, Girona

Country: Spain

Size: 10.000 m2

Sector: Healthcare

Main tasks developed at HIPRA, Construction project:

-First BIM Project in the company, developed with Revit and Tekla.

-Responsible of Modelling, coordination and detailing.

-Entry-level Construction Manager for the Envelope Package, daily on Site while working on models.

- Defining production timings to best fit with execution phases and programme

-Attending meetings with Main Contractor and Architects

-Coordination meetings with chain supply for the TRIMO architectural Panels Qbiss One.

- Balance of production and monthly certifications of execution of works.

- Assistance to architects, construction managers, structural coordinators, and subcontractors...

HIPRA R+D, Solduct Girona role; Construction Manager also; BIM Modelling and Coordinator

BIM Mapping of the Execution of Works for certifcations for both Main Contractor and Subcontractors

AEC experience what have I done?

CONSTRUCTION

2021, Aiguaviva , Barcelona, (Spain)

Client: HIPRA, Medical Device MD Building

Architecture: IPB Chemgineering

Construction (Façade): Solduct

City, State: Aiguaviva, Girona

Country: Spain

Size: 10.000 m2

Sector: Offices

Main tasks developed at HIPRA, Construction project:

-First BIM Project in the company, developed with Revit and Tekla.

-Responsible of Modelling, coordination and detailing.

-Entry-level Construction Manager for the Envelope Package, daily on Site while working on models.

- Defining production timings to best fit with execution phases and programme

-Attending meetings with Main Contractor and Architects

-Coordination meetings with chain supply for the TRIMO architectural Panels Qbiss One.

- Balance of production and monthly certifications of execution of works.

- Assistance to architects, construction managers, structural coordinators, and subcontractors...

HIPRA MD, Solduct Girona role; Construction Manager also; BIM Modelling and Coordinator

BIM Mapping of the Execution of Works for certifcations for both Main Contractor and Subcontractors

Material Stockpile control using BIM Model

AEC experience what have I done?

TECHNICAL DESIGN

MAYDEW

2021, London, (UK)

Developement of the Facade Performance Specifications for a Residential Building Façade Rehabilitation

Client: MAYDEW HOUSE

Consultant (Façade): BWT

City, State: London

Country: United Kingdom

Sector: Residential

Main tasks developed at Maydew House:

-Façade Technical Design Assitance to architects and main contractor through BWT Consultancy.

-Ellaboration of Façade Performance Specs following the British Standards and Building Regulations. -Coordination with Building Physics Department.

-Providing Thermal and Condensation Assessment to the Construction Systems and interface Details

Sample of an RFI Sketch for clarification or Teams Conference discussion with the larger Design Agents

AEC experience what have I done?

TECHNICAL DESIGN

Client:

Architecture:

2020, London, (UK)

SOM, Skidmore Owings and Merril

Main Contractor: LOR

Consultant: BWT

City, State: London

Country: UK

Sector: Residential

Main tasks developed at Nine Elms Residential Project:

-Façade Technical Design Assitance to architects and main contractor through BWT Consultancy.

-Coordination with Building Physics and Structural Departments within BWT.

-Providing Thermal and Condensation Assessment to the Construction Systems and interface Details.

- Collaborating in the detailing definition and actively participating in design meetings with Main Contractor and Architects.

- Providing 3D sketches for a quicker Q&A Brainstorming than BIM Modelling with wider Team

Drawing details or providing mark-ups to other Draftsmen colleagues following Design Meetings

Thermal Performance Assesment Excerpt

AEC experience what have I done?

TECHNICAL DESIGN

Client:

Architecture:

2020, London, (UK)

F+P, Foster and Partners

Main Contractor: LOR

Consultant: BWT

City, State: London

Country: UK

Sector: Residential

Main tasks developed at Nine Elms Residential Project:

-Façade Technical Design Assitance to architects and main contractor through BWT Consultancy.

-Coordination with Building Physics and Structural Departments within BWT.

-Providing Thermal and Condensation Assessment to the Construction Systems and interface Details.

- Collaborating in the detailing definition and actively participating in design meetings with Main Contractor and Architects.

- Providing 3D sketches for a quicker Q&A Brainstorming than BIM Modelling with wider Team WHITELEYS, BWT

AEC experience what have I done?

TECHNICAL DESIGN

2020, London, (UK)

Client:

Main Contractor: Bouygues Construction // L&G Consultant: BWT

City, State: London

Country: UK

Sector: Residential

Main tasks developed at Nine Elms Residential Project: -Providing Thermal and Condensation Assessment to the Construction Systems and interface Details.

- Collaborating in the detailing definition and assisting Facade Design Leader.

- Providing 3D sketches for a quicker Q&A Brainstorming than BIM Modelling with wider Team

MODULAR CONSTRUCTION., BWT London role;

AEC experience what have I done?

TECHNICAL DESIGN

2019, Somerset, (UK)

Main Contractor: ByLOR

Consultant: BWT

City, State: London Country: UK

Sector: Residential

Main tasks developed at HPC:

-Façade Technical Design Assitance to architects and main contractor through BWT Consultancy.

-Coordination with Building Physics and Structural Departments within BWT.

-Providing Thermal and Condensation Assessment to the Construction Systems and interface Details.

- Collaborating in the detailing definition and actively participating in design meetings with Main Contractor.

- Providing 3D sketches for a quicker Q&A Brainstorming than BIM Modelling with wider Team

AEC experience what have I done?

TECHNICAL DESIGN

2019, Edinburgh, (Scotland)

Main Contractor: LOR

Consultant: BWT City, State: London Country: UK Sector: Residential

Main tasks developed at ESJ: -Development of the technical detailing and assisting to Facade Design Leader. - Responding and/or raising RFI for clarification. - Providing 3D sketches for a quicker Q&A Brainstorming than BIM Modelling with wider Team ESJ, BWT Edinburgh

what have I done?

CONSTRUCTION

2018, New Al Ain Hospital , Al Ain, (Abu Dhabi, UAE)

Client: Abu Dhabi General Services Company (Musanada) / Abu Dhabi Health Services Company (SEHA)

Contract Company:

Constructora San Jose, Abu Dhabi

City, State: Al Ain ,Abu Dhabi, UAE

Country: United Arab Emirates

Size:

3.853.479 sq. ft. / 358.000 m2

Sector: Healthcare

Main tasks developed at Ain Hospital, Construction project:

- Developing details and drawings

- Reviewing shop drawings from Subcontractors.

- Checking the Consultant’s revisions for the submitted Shop Drawings .

-Workshops with the consultants, internal departments and subcontractors.

-Coordinating changes from the original design.

- Attending meetings with Subcontractors and managers.

- Assistance to architects, construction managers, project engineers, commercials...

Al Ain Hospital, ASJV, Abu Dhabi role; Junior Architect

- Providing sketches and instructions to our Draftsmen and Subcontractor´s.

- Coordination with MEP, Civil, Construction, Structural and Commercial Departments.

- Raising Requests for Information (RFI) and Main Contractor Instructions to Consultant and Subcontractors.

- Site Inspections and writing Construction Reports. -Official letters writings.

Scope of Work: Departments and Subcontractors asigned

Some packages under my supervision:

Arabtec:

Tiling and wall covering Stone Facade Coordination

Alsa:

Solar and thermal panels

Libel:

Roller blinds

Motorized venetian blinds

XSPlatform:

Gantries

BMU (Building Maintenance Units) Systems

Fall Arrest systems for roof

Hall Facade Cradle System

Fibrex:

Aluminium Soffit Cladding

Vertical Lamellas

Engineering Façade´s Decorative panels

All the Curtain Walls of the project

Vestibules

Roof Skylights

Box and Loggia (external) Windows

Internal Windows

Gutters and maintenance walkways

Pavilions & Connecting Building Walkways

Acoustic glass partitions

Sand trap and architectural louvers.

Shaft and Fan Parapets for Roofs

Glass Cladding at panoramic lifts

Slidding decorative shutters.

Aluminium doors (FR, ironmongery...)

Glass railing at internal and exterior areas

Leader Metal: Shaft Gratings

Elevator Jambs

Drainage channels

Protect:

SBS waterproofing system

Hot-Applied Rubberized System

Elevator Core Waterproofing

Waterproofing at Garden Areas

Western: Underground waterproofing

Powerscape (Indoor Landscaping) & Citiscape (Outdoor Landscaping)

Hardlandscaping

Softlandscaping

Irrigation Systems

All this packages require constant coordination between our Technical and Construction departments (MEP and Civil) with all the subcontractors involved

what have I done?

CONSTRUCTION

2018, New Al Ain Hospital , Al Ain, (Abu Dhabi, UAE)

Al Ain Hospital, ASJV, Abu Dhabi role; Junior Architect

what have I done?

CONCEPT DESIGN

AEC experience

2016, Andorra Center Mall , Andorra la Vella

Servitec, Sant Cugat, Barcelona

Main tasks developed at Andorra Center Mall, Design project:

- Project Architect; Designing the Commercial Mall according to the costumer premises.

- Project management; Meeting with Promoters and Operators for the commercial mall.

- Revit Specialist; 3D modeling and design.

- Leading the Drafting and Architectural Vizualization for the layouts.

what have I done?

PROJECT DESIGN

AEC experience

2016, Estepark , Castelló de la Plana, (Valencia)

Client: Estepark

Contract Company: Servitec Ingenieria SL

City, State: Castelló de la Plana, Valencia

Country: Spain

Size: 344.445 sq. ft. / 32.000 m2

Sector: Commercial

Main tasks developed at Estepark Commercial Park, Design project: - Project Designer; Designing the Commercial Park according to the costumer premises. - Revit Specialist; 3D modeling and design. - Leading the Drafting and Architectural Vizualization for the layouts.

http://www.elperiodicomediterraneo.com/noticias/castellon/como-sera-nuevo-centro-comercial-castellon_1050420.html

http://www.elmundo.es/comunidad-valenciana/castellon/2016/09/14/57d95249e2704edd668b4587.html

what have I done?

PROJECT DESIGN

AEC experience

2016, Estepark , Castelló de la Plana, (Valencia)

Servitec, Sant Cugat, Barcelona role; Concept Design Lead entry-level Architect

what have I done?

PROJECT DESIGN

AEC experience

2016, Estepark , Castelló de la Plana, (Valencia)

Servitec, Sant Cugat, Barcelona role; Concept Design Lead entry-level Architect

how do I work?

BIM+CAD+Sketches

sketch to render

Research examples for landscaping brainstorming concepts

Sketching within digital soft copies... brainstorming

2D

Two examples of sketches that ended being one design proposal (vestibule and

Estepark Project)

how do I work?

2D Sketching within digital soft copies...

BIM+CAD+Sketches

... when detailing for construction

Comments on direct soft copies, to attach and send to clients and subcontractors

No need to print and scan hard copies,so... paperless office.

3D Sketching within digital computers

where would I like to work?

BIM Methodology / VR visualization

Para PMMT;

Gracias por haber dedicado tiempo a revisar mi Portfolio y llegar hasta aquí. Por mi parte, he estado siguiendo el desarrollo de PMMT desde que empezase a trabajar en el Hospital de Al Ain de Emiratos Árabes, por allá el 2018. El motivo fue un contacto en LinkedIN que había solicitado trabajar para mi anterior empresa pero para mejor cambio, finalmente entró con vosotros. Empecé a indagar y supe que PMMT podría ser una empresa en la que mi perfil pudiera encajar una vez terminase mi trabajo en el Hospital de EAU. Me alegra comprobar que dicho contacto sigue en vuestra plantilla, es un excelente indicativo.

En una ventana de oportunidad, apliqué a una posición vuestra estando todavía en el extranjero que no prosperó, pero aun así seguí muy al tanto de vuestro desarrollo. Ya en Barcelona, y durante la pandemia, aprovechaba algún momento para incorporarme en alguna reunión de Zoom en la que erais entrevistados por vuestra respuesta arquitectónica a la pandemia CoVID. También adquirí vuestro cuaderno nº 147 de editorial TC sobre la Arquitectura Sanitaria.

Esta primavera finalicé mi contratación en mi anterior empresa y decidí actualizar el CV y enviarlo a PMMT a través del correo que conservaba del proceso anterior. Un poco a “puerta fría” quizás, pero con el mismo interés que antaño. Mi principal motivo para llegar a un acuerdo de finalización de contrato es que tanto circunstancias externas como internas en las compañías derivaron en una implicación mía de 2 años enteros sin prácticamente nada de vacaciones (como referencia, esos dos años implican proyectos desde la página 4 a la 19 de este portfolio). He de agradecer el apoyo recibido de algunos antiguos compañeros pero también de la familia, y he podido recuperar fuerzas después de hacer una serie de viajes que tenia pendiente realizar.

Recientemente una de estas compañeras me puso en contacto con Hugo, que necesitaba un poco de apoyo para finalizar su TFG en Arquitectura, ya que actualmente es el jefe de obra para la constructora que ejecuta vuestro Nou Hospital Evangèlic de Barcelona. Ha sido para mí un placer apoyar a Hugo y, habiendo entregado ya el proyecto, le deseo lo mejor tanto en el último tramo académico como en lo laboral. En una de las revisiones de su trabajo le pregunté sobre como era trabajar con vosotros y no solo tuvo buenas palabras, sino que muy amablemente me comentó que podia intentar establecer vínculo aprovechando que ahora estabais buscando arquitectos para vuestras oficinas.

Sin extenderme más, para mí sería un auténtico placer poder tener un tiempo para conocernos de manera presencial ahora que las circunstancias lo permiten, si lo encontráis conveniente, claro.

Gracias y saludos cordiales.

Ele

Eleazar Martínez Lindes

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.