1 minute read

NEVI HPC HUB HIGH POWER FAST CHARGING EXPERIENCE

Next Article
SAT 600 HPC

SAT 600 HPC

EEP has been manufacturing reliable DC fast charging solutions for all electric vehicles since the beginning of the eRevolution. We are present in 30 countries with charging solutions in everyday use.

Our NEVI HPC HUB represents a compliant system that proves our premises - usability, scalability, an innovative approach to be easy to install, own, and use.

Advertisement

Most importantly, it is designed to meet the requirements of the NEVI program.

EEP has a perfect answer for the National Electric Vehicle Infrastructure Program (NEVI).

EEP’s NEVI HPC HUB uses two power units and four user units in its basic configuration to provide backup charging power for increased reliability and site uptime.

Nevi Hpc Hub

ALL-IN-ONE DC Fast Charger

2 x HPC HUBs provides 4 CCS1 parts with 200 kW each of charging power

2x HPC HUBs provides 800kW of power (in configuration with 4x200kW or 2x400kW)

SAT 600 HPC – part of HPC HUB by EEP maitain a max output of 200 kW when power sharing

>98 % at the individual station level

Supports payment methods: RFID, CCV, Payter

Highly visible illuminationPanel illumination integrated with functional lighting

Withstands extreme weather conditions

Satisfies Buy America requirements

Meets Americans with Disabilities Act (ADA)

Real-Time data sharing protocols –LTE wireless comunication and wired Ethernet

Expansion possible due to the modular architecture

Remote diagnostics & problem resolution

Open source network connectivity – OCPP 1.6 & 2.0.1.

Visibility through industry leading mapping services –software supports OCPI for roaming & data sharing

Real time status – Illuminated state of charge indicators

Detailed pricing transparency and display requirements by touchscreen interface

Multiply language support – english, spanish, french

This is a powerful opportunity to accelerate the adoption of electric vehicles, and EEP is partnering to help you get started from the ground up with the appropriate charging infrastructure.

Nevi Requirements

The NEVI program provides funding for up to 80% of eligible project costs to deploy fast chargers along major transit corridors to support the growing adoption of electric vehicles.

This article is from: