Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2014 8 January 2014 Water War Room
0
SUMMARY OF THE WATER VOLUME, AND PROGRESS OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES IN RAYONG AND CHONBURI PROVINCES FOR 2014-15 On January 8th 2015 the combined water volume in the 3 reservoirs is = 215.23 MCM. (78.2%) • Decrease since yesterday= -0.99 MCM. •
Water diversion through tunnel from the KlongYai res. to NongPlaLai res. presently stopped due to Klong Yai Res. level being lower than Nongplalai Res.
Water transfer from Prasae Reservoir to Klongyai Reservoir
0 MCM pumped during January 7th (Pumps stopped for pipe repairs)
0 MCM accumulated volume to date (1 Jan 15 – 8 Jan 15 at 6:00 am) 20.30 MCM accumulated volume to date (1 Aug 14 –
25 Dec 15 at 6:00 am)
The Royal Irrigation Department has temporarily raised the spillway level at Klongyai and Prasae Reservoirs by 0.50m
1
OVERVIEW
OF WATER SITUATION IN
Chachoengsao Reserve Pond P2
P4
RAYONG-CHONBURI AREA JANUARY 8TH 2015
Chonburi
P1
Rayong
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
71.40
163.75
40.10
248.00
58.00
16.98
46.38
146.23
22.63
233.24
50%
79%
65%
89%
56%
94%
45.95
15.98
43.38
132.73
19.63
213.24
-0.28
-0.04
0.120
0.173
0.172
P3
P5 P6
Private Pond
Reservoir capacity (MCM) Current storage volume (MCM) 6 Percentage of reservoir capacity Useable storage volume Samnakbok (excluding Dead Storage) Reserve Pond (MCM) Inflow into reservoir (MCM)
P7
Bang Phra res. P9
58.0
82
P-BPN P8
17.0
Nong Kho res.
P10
0.464
-
Water volume compared -1.58 -0.44 -2.46 -3.07 -0.99 to previous week -2.88 (-decrease, +increase) -2.02 -6.53 (MCM) Total water volume in 74.98 MCM 215.23 MCM each area (54.2%) (78.2%) Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir
28
233.2
22.6
Khlong Yai res. P11Pla Lai res. 46.4 Nong P12 P-NP3 P13 Dok Krai res. P14
Prasae res.
146.2
P
28
120 P7
P15
180
Raw Water Pipe Line (EW) P16
Source of data: Royal Irrigation Department
Demand 2557 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID)
Existing Pipe Network
Existing Pipe Network
Constructing Pipe Network
2 Constructing Pipe Network
PROGRESS OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES IN CHONBURI PROVINCES Planned/actual water volume (MCM) Measure 1. Primary measures 1.1Transfer water from Prasae Reservoir to Klongyai Reservoir via the Prasae-Klongyai pipeline and Klong Namdaeng canal 1.2Connecting pipe between RID’s PrasaeKlongyai and Eastwater’s Prasae-Nongplalai pipelines to transfer water in 2015
2014
2015
Total
Jul
Aug
Sep
Oct
Nov
Dec
Plan
-
4.7
6.0
7.0
7.0
7.0
Actual
-
Plan
-
-
-
-
-
-
78
78
Plan
-
-
2.0
2.0
2.0
2.0
-
8.0
Actual
-
-
-
4.99 4.38 5.95 4.98
-
-
0.91 0.48
- Cumulative pumped volume since August 1st, 2014 = 20.30 MCM 20.30 - Pumps stopped for pipe repairs
1.39
Total
Plan
0.6
Actual
0.6
4.09 5.41 5.22
Plan
0.6
8.3 12.5 13.5
Actual
0.6
3.6
4.5
4.5
2.7
1.4
-
-
9.7
10.4
9.08 10.70 11.65 4.98
- The 20 km of pipe laying to connect to existing PS-KY pipeline is scheduled be completed Jan ‘15 - The 30km of pipe from new pump station is scheduled for May ‘15 - Pumping started on September 3th, 2014 - Pumps stopped
- Pumping from Bangpakong River started 25th, July 2014 17.3 - Currently, pumps stopped according to instruction letter 15.33 from CCS Province
1.4Water transfer from Bangpakong River Pumping water for use in local area and for storage in Bangphra
Status (8th Jan. 2014)
31.7
Actual 1.3Pump water from Rayong River back to Nongplalai Reservoir using RID’s Wat Lahanyai pump station.
RAYONG AND
78
134.4
37.01
3
PROGRESS OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES IN CHONBURI PROVINCES
Measure
Water volume (MCM)
Planned implementation
10-20
Apr-July 2015
RAYONG AND
Status
2. Eastwater’s secondary measures Private pond in Chonburi area
Under construction
4
Simulation of water volume in main Rayong Reservoirs
Scenario with Prasae-Konglyai water transfer and reduction of water send to Chonburi
8 Jan . 15 215.2 MCM.
WATER SITUATION OF NONGPLALAI, DOKKRAI AND KLONGYAI RESERVOIRS
Source of data: Royal Irrigation Department
WATER SITUATION OF BANGPHRA AND NONGKHO RESERVOIRS
Source of data: Royal Irrigation Department
7
WATER SITUATION OF PRASAE RESERVOIR
Source of data: Royal Irrigation Department
8
WATER SITUATION OF DOKKRAI RESERVOIR (BY YEAR)
Source of data: Royal Irrigation Department
WATER SITUATION OF NONGPLALAI RESERVOIR (BY YEAR)
Source of data: Royal Irrigation Department
WATER SITUATION OF KLONGYAI RESERVOIR (BY YEAR)
Source of data: Royal Irrigation Department
Progress of pipe-laying of Prasae-Nongplalai pipeline
30 km from beginning (Prasae reservoir to Junction point with new pipeline) 20 km at end (junction with existing RID pipeline to Nongplalai Reservoir)
Location of laid pipeline Progress Summary : 30 km. section (beginning) – 8 construction teams; length of laid pipe: 8,466.5 m. (31.53%) as of 7 Jan 2015
: 20 km section (tail end) – 11 construction teams; length of laid pipe: 14,724.9 m. (63.73%) : Total length of laid paid 23,191.4 m. (46.42%)
TUBMA RESERVOIR DEVELOPMENT PROJECT OBJECTIVE To develop raw water reservoir to increase water supply by 47 MCM per year by pumping water from Rayong River and Tabma canal to be stored at the Tabma reservoir Investment: Bt.2,200 mil P
Tabma Canal pumping station
P Tabma pond pumping station
Capacity:
47 MCM per year
Project duration:
60 months
Progress update:
57.81%
Operating date:
End 2015
(Expedited to be complete
P
2015, RY River Progress:
by Sep.
pump ready Jun. 2015)
Started construction of
Tubma
Canal and Rayong River pump stations and pipe laying (9,768 m). Main pump station design is
being
finalized.
13
Source : East Water