Chapter XX Document Name Date
Author Issue XXXX
Plot Drawings for Approval WB05: Revision 02 dRMM EC.LBHF.01C-02 October 2026
1
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary
AISGILL GARDENS
LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
• •
Internal layouts are for information. Landscape Plan is for illustrative purposes only and not for approval. Refer to Parameter Plans for Outline Component.
•
Mixed-Use Education Hub
Outline Component Development Zone I Reception
Creative Room
Office
WC
AWC
4.000 m
Changing Place
Community Hub
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
Music
Plant
AV EN UE
REV.
Community Cafe
4.000 m
AI SG IL L
Community Kitchen
Cafe BoH
WB04
Lobby
Bike Store
Outline Component Development Zone H (O) Bulky Waste Plant Bike Store
Pla nt ab ov e
SCALE
Bin Store Plant
6
8
10 m
KEYPLAN
Bin Presentation Area
Pla nt ab ov e
Bin Store
Plant Bike Store
4
Resident Courtyard
Plant Plant
2
0
Plant Plant
N
WB05 T2
Service Access Road
Garden Store
WB04 T1
e tlin ent Ou pon m Co
Plant
WB03 T1
Maintenance Corridor
CLIENT
Earls Court Partnership Limited ('ECPL')
DEMISE LINE
WB05-T2
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed Ground Floor Plan
EMPRESS STATE BUILDING CAR PARK
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-GF-DR-A-020100
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
• •
Internal layouts are for information. Landscape Plan is for illustrative purposes only and not for approval. Refer to Parameter Plans for Outline Component.
•
3B5P
Outline Component Development Zone I
3B5P
1B2P
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
8.800 m
WB04 2B4P
1B2P
Outline Component Development Zone H (O)
SCALE
2B3P Cat3
2
0
4
6
8
10 m
3B5P
KEYPLAN
N
3B5P
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
Earls Court Partnership Limited ('ECPL')
DEMISE LINE
WB05-T2
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed First Floor Plan
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-01-DR-A-020101
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
• •
Internal layouts are for information. Landscape Plan is for illustrative purposes only and not for approval. Refer to Parameter Plans for Outline Component.
•
3B5P
Outline Component Development Zone I
3B5P
1B2P
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
WB04 2B4P
1B2P
Outline Component Development Zone H (O)
SCALE
2B3P Cat3
2
0
4
6
8
10 m
3B5P
KEYPLAN
N
3B5P
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
Earls Court Partnership Limited ('ECPL')
DEMISE LINE
WB05-T2
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed Typical Lower Floor Plan (L01-07)
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-020103
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
• •
Internal layouts are for information. Landscape Plan is for illustrative purposes only and not for approval. Refer to Parameter Plans for Outline Component.
•
3B5P
Outline Component Development Zone I
3B5P
1B2P
REV.
DATE
AMENDMENT
P1
01/09/2026
For Planning Approval
30.850 m
WB04 2B4P
1B2P
Outline Component Development Zone H (O)
SCALE
2B4P
2
0
4
6
8
10 m
3B5P
KEYPLAN
N
3B5P
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
Earls Court Partnership Limited ('ECPL')
DEMISE LINE
WB05-T2
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed Eighth Floor
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-020108
P1
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
• •
Internal layouts are for information. Landscape Plan is for illustrative purposes only and not for approval. Refer to Parameter Plans for Outline Component.
•
Outline Component Development Zone I
Plant
Plant
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
AOV Access Hatch 34.100 m
Lift Overrun
WB04
Lift Overrun
Plant AOV
Outline Component Development Zone H (O)
SCALE
Plant
2
0
4
6
8
10 m
KEYPLAN
N
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
Earls Court Partnership Limited ('ECPL')
DEMISE LINE
WB05-T2
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed Ninth Floor Plan
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-09-DR-A-020109
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
• •
Internal layouts are for information. Landscape Plan is for illustrative purposes only and not for approval. Refer to Parameter Plans for Outline Component.
•
Outline Component Development Zone I
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
WB04
Outline Component Development Zone H (O)
SCALE
2
0
4
6
8
10 m
KEYPLAN
N
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
Earls Court Partnership Limited ('ECPL')
DEMISE LINE
WB05-T2
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed Roof Floor Plan
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-RF-DR-A-020120
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
62.400 m
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
38.600 m
Outline Component Development Zone H (O) Level WB05-T2-09
Level WB05-T2-08
SCALE
Level WB05-T2-07
2
0
4
6
8
10 m
Level WB05-T2-06
KEYPLAN
N Level WB05-T2-05
Level WB05-T2-04
AA
Level WB05-T2-03
For Information Please refer to WB04 Drawings
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
Level WB05-T2-02
CLIENT Level WB05-T2-01
Level WB05-T2-M1
4.000 m
4.000 m
Outline Component Development Zone I
Earls Court Partnership Limited ('ECPL')
Level WB05-T2-00
Aisgill Gardens Mews and Sports Area Masterplan Application Site
WB05-T2 LBHF Detailed Component
WB05 Courtyard
LBHF Detailed Component
WB05-T1 WB05
Service Access Road Demise Line WB04
WB04
PROJECT
EARLS COURT WB05
1
WB05 Proposed East-West Site Section AA 1 : 200
Section
SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05 Proposed Site Section
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-030100
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
62.400 m
Outline Component Development Zone H (O)
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
38.600 m
Level WB05-T2-09
Level WB05-T2-08
SCALE
2
0
4
6
8
Level WB05-T2-07
10 m
KEYPLAN
N
Level WB05-T2-06
1
Level WB05-T2-05
WB04 T1
e tlin ent Ou pon m Co
Level WB05-T2-04
WB05 T2 WB03 T1
Level WB05-T2-03
For Information Please refer to WB04 Drawings
CLIENT
Level WB05-T2-02
Earls Court Partnership Limited ('ECPL') Level WB05-T2-01
Level WB05-T2-M1
Outline Component Development Zone I 4.000 m
Level WB05-T2-00
WB05-T2
Masterplan Application Site
Aisgill Gardens Mews and Sports Area LBHF Detailed Component
WB05 Courtyard Entrance LBHF Detailed Component
WB05-T1
WB05
Service Access Road
Demise Line WB04
WB04
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
1
WB05 Proposed North-West Site Elevation_1-200 1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05 Proposed North-West Site Elevation
Elevation
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-040100
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
Hybrid Planning Application Site Boundary LBHF Detailed Component Boundary Demise Line Intensive Green Roof Outline Component
62.400 m
Outline Component Development Zone H (O) REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
38.600 m
Level WB05-T2-09
Level WB05-T2-08
Level WB05-T2-07
SCALE
2
0
4
6
8
10 m
Level WB05-T2-06
KEYPLAN
N Level WB05-T2-05
Level WB05-T2-04
WB04 T1
e tlin ent Ou pon m Co
Level WB05-T2-03
WB05 T2
Outline Component Development Zone I
Level WB05-T2-02
For Information Please refer to WB04 Drawings
Level WB05-T2-01
WB03 T1
1 CLIENT
Earls Court Partnership Limited ('ECPL')
Level WB05-T2-M1
4.000 m
Level WB05-T2-00
Service Access Road
WB04
Demise Line WB04
WB05-T1
WB05
WB05 Courtyard LBHF Detailed Component
WB05-T2 LBHF Detailed Component
Masterplan Application Site
Aisgill Garden Mews, Yard & Sports Area
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
1
WB05 Proposed South-East Site Elevation_1-200 1 : 200
Elevation
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05 Proposed South-East Site Elevation
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-040101
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
WB05 T2 T2-1 - Textured brickwork T2-2 - Stretcher bond brickwork T2-3 - Metal bolt on balcony T2-4 - Composite window T2-5 - Metal acoustic panel T2-6 - Curtain wall T2-7 - Metal entrance gate
38.600 m
38.600 m
T2-5
T2-5 Level WB05-T2-09
Level WB05-T2-09
T2-4
T2-4
Level WB05-T2-08
Level WB05-T2-08
Level WB05-T2-07
T2-3
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
Level WB05-T2-07
T2-3
Level WB05-T2-06
Level WB05-T2-06
1 T2-2
T2-2
Level WB05-T2-05
Level WB05-T2-05
Level WB05-T2-04
T2-2
Level WB05-T2-04
T2-2 1
SCALE Level WB05-T2-03
Level WB05-T2-03
2
0
4
6
8
10 m
T2-6 Level WB05-T2-02
Level WB05-T2-02
KEYPLAN
N Level WB05-T2-01
Level WB05-T2-01
T2-7 Level WB05-T2-M1
Level WB05-T2-M1
4.000 m
2
4.000 m
Level WB05-T2-00
WB04 T1
e tlin ent Ou pon m Co
Level WB05-T2-00
WB05 T2 WB03 T1
1
CLIENT
Earls Court Partnership Limited ('ECPL')
1
WB05-T2 Proposed South Elevation 1 : 200
Elevation
2
WB05-T2 Proposed North Elevation 1 : 200
Elevation
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed North and South Elevations
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-040112
P2
A1 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
WB05 T2 T2-1 - Textured brickwork T2-2 - Stretcher bond brickwork T2-3 - Metal bolt on balcony T2-4 - Composite window T2-5 - Metal acoustic panel T2-6 - Curtain wall T2-7 - Metal entrance gate
38.600 m
38.600 m
T2-5
T2-5
Level WB05-T2-09
Level WB05-T2-09
T2-4
T2-4
Level WB05-T2-08
Level WB05-T2-08
Level WB05-T2-07
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
Level WB05-T2-07
T2-3
Level WB05-T2-06
REV.
Level WB05-T2-06
T2-3 T2-2
Level WB05-T2-05
Level WB05-T2-05
T2-2 Level WB05-T2-04
Level WB05-T2-04
1 T2-2
SCALE
T2-2 1
Level WB05-T2-03
Level WB05-T2-03
2
0
4
6
8
T2-6 Level WB05-T2-02
10 m
Level WB05-T2-02
T2-6
KEYPLAN
N
Level WB05-T2-01
Level WB05-T2-01
Level WB05-T2-M1
Level WB05-T2-M1
4.000 m 3.995 m Level WB05-T2-00
WB04 T1
e tlin ent Ou pon m Co
Level WB05-T2-00
WB05 T2
1
2 WB03 T1
CLIENT
1
WB05-T2 - Proposed West Elevation 1 : 200
Elevation
2
WB05-T2 - Proposed East Elevation 1 : 200
Earls Court Partnership Limited ('ECPL')
Elevation
PROJECT
EARLS COURT WB05 SCALE@A1
1 : 200
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
LBHF Detailed Component - WB05-T2 Proposed East and West Elevations
STATUS
PURPOSE FOR ISSUE
S2
Planning
DRAWING NO.
REV.
ECD-WB05-ZZ-DRM-07-ZZ-DR-A-040113
P2
A0 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
WB05 T2 - Material Key T2-1 - Textured brickwork T2-2 - Stretcher bond brickwork T2-3 - Metal bolt on balcony T2-4 - Composite window T2-5 - Metal acoustic panel
4 040125
Creative Room
1
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
Mixed-Use Education Hub
WB05-T2 - Ground Floor Plan 1 : 50
REV.
3
WB05-T2 - 3D Axo - Base
Floor Plan
3D View
4 040125
T2-4 3B5P
T2-3
SCALE
0.5
0
1
1.5
2
2.5 m
KEYPLAN
N
3B5P
1 2
T2-1
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
T2-2
Earls Court Partnership Limited ('ECPL')
Mixed-Use Education Hub
PROJECT
EARLS COURT WB05
2
WB05-T2 - Typical Bay North Elevation - Base 1 : 50
Elevation
4
WB05-T2 - Typical Bay North Section - Base 1 : 50
SCALE@A0
1 : 50
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
Section
ILLUSTRATIVE WB05-T2 BAY STUDY BASE
STATUS
PURPOSE FOR ISSUE
S2
Planning Issue
DRAWING NO.
REV.
ECD-WB05-T2-DRM-07-ZZ-DR-A-040125
P2
A0 © COPYRIGHT The copyright in this drawing is vested in dRMM Limited and no license or assignment of any kind has been, or is, granted to any third party whether by provision of copies or originals or otherwise unless agreed in writing. DO NOT SCALE FROM THIS DRAWING The contractor shall check and verify all dimensions on site and report any discrepancies in writing to dRMM Limited before proceeding work FOR ELECTRONIC DATA ISSUE Electronic Data / drawings are issued as "read only" and should not be interrogated for measurement. All dimensions and levels should read, only from those values stated in text on the drawing.
4
WB05 T2 - Material Key
040126
T2-1 - Textured brickwork T2-2 - Stretcher bond brickwork T2-3 - Metal bolt on balcony T2-4 - Composite window T2-5 - Metal acoustic panel
REV.
DATE
AMENDMENT
P1 P2
20/06/2025 01/09/2026
For Planning Approval For Planning Approval
3B5P 3B5P
1
WB05-T2 - Typical Floor Plan 1 : 50
3
WB05-T2 - 3D Axo - Top
Floor Plan
3D View
4 040126
T2-5
SCALE
0.5
0
1
1.5
2
2.5 m
KEYPLAN
N
T2-2 1 2 3B5P
WB04 T1
e tlin ent Ou pon m Co
WB05 T2 WB03 T1
CLIENT
T2-1
Earls Court Partnership Limited ('ECPL')
3B5P
T2-4
T2-3 PROJECT
EARLS COURT WB05 SCALE@A0
1 : 50
2
WB05-T2 - Typical Bay North Elevation - Top 1 : 50
Elevation
4
WB05-T2 - Typical Bay North Section - Top 1 : 50
DATE
ORIGINATOR
CHECKED
AUTHORISED
01/09/2026
AS
VH
VH
ILLUSTRATIVE WB05-T2 BAY STUDY - TOP
Section
STATUS
PURPOSE FOR ISSUE
S2
Planning Issue
DRAWING NO.
REV.
ECD-WB05-T2-DRM-07-ZZ-DR-A-040126
P2
Chapter XX Document Name Date
Author Issue XXXX
Thank you dRMM EC.LBHF.01C-02 October 2026
2