Leca Insulation Fill enables you to: • save hours • eliminate the cost of machinery hire • eliminate the need for secondary
INSULATION FILL
polystyrene insulation in ground floor construction • meet the new Building Regulations • simply carry into restricted access sites
FAST, ECONOMICAL,
SAVE TIME AND MONEY INSULATING FLOORS
I N S U L A T I N G F I L L F O R N E W BUILD APPLICATIONS One Product That Offers Two Solutions Leca Insulation Fill is the fastest and easiest method of preparing
it’s in the bag
Regulations a simple, one man process. What is really clever about Leca Insulation Fill in bags is that it is stored in the bag, collected and transported in the bag, laid in the site in the bag and covered in concrete _ still in the bag.
mess, no need for heavy machinery, no heavy lifting and no waste. Step 1 Lay loose fill to level up the site and lay the bags of
through blowing vehicles two man operation no heavy site machinery required restricted access or difficult site conditions overcome with ease no sand blinding required to level oversite depths of up to 3m ideal for use on gas contaminated land
Leca Insulation Fill on top
Step 2 Continue laying the bags side by side to cover the floor area Step 3 Fill in any spaces with more loose fill Step 4 Lay a 1200 gauge damp proof membrane to complete the oversite. Then lay the concrete or Weber levelling compound.
2
1
4
Order your Leca Insulation Fill from:
ELIMINATE HEALTH AND SAFETY PROBLEMS Leca Insulation Fill bags weigh a nominal 15kg, well within the H&SE
Dickens House
recommendations for a single-man lift. Leca Insulation Fill is chemically
Enterprise Way
requirements for disposal.
foundations which comply with the new Part L of the Building
The 50 litre bags weigh just 15kg and are easily portable. There’s no
safe to handle and does not need any special protective clothing or special
Leca Insulation Fill is lightweight insulation that cuts foundation
foundations for extensions, conservatories, garages, driveways and patios.
neutral and does not contain any environmentally harmful constituents. It is
RENOVATION AND NEW BUILD
It will save hours of time, hard labour and cost when creating
• achieves the latest U-values • minimal labour required 3 • fills oversites quickly _ discharge up to 50m per hour
3
CREATE FOUNDATIONS FOR
time by hours. It is available in 50 litre bags, making insulated
an insulated oversite for a concrete slab with added benefits:
• • • • • •
IT’S THE ENERGY-SAVING WAY TO
MEET THE BUILDING REGULATIONS FOR THERMAL INSULATION The table is for guidance only. Where U-value is critical, please refer to Weber’s
Maulden Road Flitwick Bedfordshire
INSULATION FILL
technical department on 01525 722110. The U-value has been calculated in accordance with BS EN ISO 13370:1998 ‘Thermal Performance of Buildings. Heat Transfer via the ground. Calculation methods’ or can be calculated using
MK45 5BY Tel: 01525 718877
CIBSE Guide: Part A3:1999
Fax: 01525 718988
‘Thermal Properties of Building
Email: mail@netweber.co.uk
Structures’.
Web: www.netweber.co.uk
U-value (W/m2k)
Nominal Depth (mm)
Quantity (No. of bags)
0.22 0.45
300 150
6 bags per m2 3 bags per m2