Skip to main content

South River Water Reclamation Center

Page 1

South River Water Reclamation Center


Drinking Water Service Area

About South River Water Reclamation Center

The City of Atlanta has three water reclamation centers with a combined treatment capacity of 222 million gallons per day (MGD); 188 MGD of wastewater is treated each day within City limits.

South River Water Reclamation Center (WRC), built in 1936, has a permitted treatment capacity of 48 million gallons per day (MGD), and provides wastewater treatment for Hapeville, portions of Atlanta, East Point, College Park, and parts of Dekalb County and Clayton County. The South River WRC

140

120

400

Intrenchment Creek facility which serves portions of Atlanta and a small portion of DeKalb County.

141

wastewater, from the combined stormwater and

3

are also stored and conveyed to the South River WRC through a deep rock tunnel system that is pumped to

400

located at the WRC. Subsequently, the treated water is returned to the Chattahoochee River via the Three Rivers Tunnel at a higher quality than the raw water in the river.

407

Long Island Creek RM Clayton

85 285

403

RM Clayton WRC 75

78

402

Proctor Creek

407 20

85 29

South River WRC

Camp Creek

Aerial view of South River WRC Facilities

155 407 285

East Area WQCF (former Intrenchment Creek WRC) 42

South River

92 14

285

75 139

Construction of Atlanta’s sewer system began in the late 1800’s. By 1880, there were 8 miles of stone, masonry and small pipe sewers ranging in size from 12-inches to 6-feet in diameter. In 1910, $1.35 million in bonds was issued to construct three sewage treatment plants: Proctor Creek, Peachtree Creek and Intrenchment Creek. Between 1932-1945, Utoy Creek, South River and RM Clayton were constructed, with Proctor and Peachtree Creek plants becoming decommissioned. The South River WRC has undergone multiple upgrades and expansions over the past 80+ years.

407 14

(UV) disinfection and post aeration. Throughout the upgrades and expansion, the existing WRC remained operational. In subsequent years, many of the pumps have been upgraded with variable frequency drive (VFD) technology, and in 2015, improvements were

20

Intrenchment Creek 28 154

to the Chattahoochee River were installed. Upgrades and improvements completed in 2000 featured new screening and grit removal facilities to reduce negative effects to the downstream wastewater treatment processes and improved operational reliability, which avoided violations of the City’s wastewater discharge permit. The project also included upgrades to the primary sludge pumping system, conversion of the existing aeration tanks to

154

29

Utoy Creek

mechanically aerated activated sludge basins, new

requirements of the National Pollutant Discharge Elimination System (NPDES) permit. In addition, the South River WRC is part of the $36.2 million Schneider Guaranteed Energy Savings Performance Contract,

78

ATL ANTA

Utoy Creek WRC

6

19

South River WRC Treatment Process Electrical Panel

Water Reclamation Center Water Reclamation Center (Outside City)

that increased the WRC capacity to 48 MGD. The expansion also included diversion of Intrenchment address new environmental regulations. Additionally,

South River WRC Aeration Basin

which consists of seventeen energy conservation measures for the South River WRC, other Department of Watershed Management facilities and overall water distribution system. The project includes improvements to two of the South River WRC anaerobic digesters.


South River Water Treatment Plant Filtration Process

Sou th R iver Tun nel

BAR SCREENS

PRIMARY CLARIFIER

AERATION BASINS

Filter out rags, sticks and other large items.

Allows heavier particles to settle; and oils, grease and lighter particles to float.

Air is pumped through the wastewater to promote microorganism growth. The bugs “eat” the particles left after primary clarification.

Headworks Bar screens (x3) Grit removal tanks (x2) Drum screens (x2)

Primary Sludge Scum Aeration Basins (x4)

Primary Clarifier (x8) Grit & Trash to Landfill

Primary Sludge

Fine sand Sand Gravel

Three Rivers Tunnel

UV Disinfection Units (x3)

Secondary Clarifiers (x6)

Effluent Filtration Basins (x12)

POST AERATION

UV DISINFECTION

EFFLUENT FILTRATION BASINS

Ensures that an adequate amount of dissolved oxygen is in the effluent prior to discharge into the river.

Ultraviolet light which kills disease-causing organisms.

Removes any final particles left after secondary clarification.

Waste Activated Sludge

Chattahoochee River

Post Aeration Basins (x2)

Thickening Centrifuges (x2)

Sludge to Land Application

Lime Stabilization

Dewatering Centrifuges (x3)

Anaerobic Digesters (x2)


South River Water Reclamation Center – Treatment Process The South River Water Reclamation Center (WRC) provides wastewater treatment for the wastewater service area that encompasses Hapeville and portions of Atlanta, East Point, College Park, DeKalb County and Clayton County. The South River WRC also treats partially treated effluent from the former Intrenchment Creek facility which serves portions of Atlanta and a small portion of DeKalb County. Intrenchment Creek sends partially treated effluent to the South River WRC where it receives further treatment. The South River WRC has a permitted treatment capacity of 48 MGD including the treated flow from Intrenchment Creek. South River WRC employs primary, secondary, and tertiary processes for treating the wastewater. Influent flow is received from the South River WRC ervice Area. At the primary treatment stage, wastewater from the South River service area passes through mechanically cleaned bar screens, fine mesh rotatory drum screens, and grit collectors also known as the headworks to remove trash, sand, rock, and other items that can damage the downstream treatment units. The screened wastewater flows into the north and south primary clarifiers. There are four 11-ft primary clarifiers in the north section and four 12-ft primary clarifiers in the south section. At this stage, settleable and floatable solids are removed from the wastewater. In the secondary treatment, the wastewater from the primary clarifiers flows into 4 aeration basins/ biological nutrient removal tanks (BNR), where a biological treatment called the activated sludge process occurs. Sludge is a thick, soft substance with a mud-like consistency, and activated sludge is used to remove pollutants from wastewater by a biological reaction involving wastewater. The aeration basins are equipped with a fine bubble aeration system which provides and environment for the microorganism (referred to as bugs) to thrive and multiply. These bugs “eat” the organic waste in the wastewater and once the food/waste is gone, the treated water flows into the six secondary clarifiers. At this stage, the activated sludge is removed from the wastewater using scraper type sludge collection mechanisms. In the tertiary treatment, treated wastewater from former Intrenchment Creek WRC and South River’s secondary treatment are combined and treated in twelve deep bed granular media filters to remove floating solids and remaining phosphorus from the wastewater. The granular media filters are

made up of a mixture of fine sand, coarse sand, and gravel, and layers are typically 2-6 ft deep. After filtration, a chemical polymer is added to cause any remaining floating solids to clump together. The filtered water is then disinfected in three ultraviolet (UV) radiation channels to reduce the diseasecausing organisms and ready the treated water for entry to the Chattahoochee River. More oxygen is added to the treated water in a post aeration process, which ensures that an adequate amount of dissolved oxygen is present in the treated water before it enters the river. The treated water is conveyed to the Chattahoochee River for discharge via the 10-foot diameter, Three Rivers Tunnel. In the future, the facilities at Intrenchment Creek will be fully decommissioned and the wastewater will be sent directly to South River WRC for treatment. In addition to the treatment of the liquid stream, South River WRC treats its solid stream. The trash collected from the headworks is hauled to a landfill. The sludge from the primary clarifiers (primary sludge) is collected and sent into the anaerobic digesters. The digestion process stabilizes the sludge and reduces the volatile solids and pathogens by using anaerobic (without oxygen) microorganisms (bugs) to convert organic matter into carbon dioxide, methane, water, and non-degradable solids. Sludge from the secondary clarifiers (waste activated sludge) is sent to two thickening centrifuges where the sludge is dewatered and leftover waste is sent to the two anaerobic digesters. The centrifuges employ a highspeed process that uses the force from rapid rotation of a cylindrical bowl to separate wastewater solids (sludge) from liquid. From the anaerobic digesters, sludge is sent to three dewatering centrifuges. The dewatering removes more water and produces a drier material referred to as “cake.” After the dewatering centrifuges, any liquid is sent back to the plant’s headworks and the dewatered sludge “cake” is treated with lime stabilization and hauled for land application.

Fun Facts

Awards

Atlanta has approximately miles of sewer lines in the wastewater system

2,150

Atlanta has approximately manholes in the wastewater system

47,327

There are approximately retail wastewater services accounts

94,000

188M

Approximately gallons of wastewater is treated each day at three water reclamation centers

Tours One-hour guided, walking tours are offered at the South River WRC that provide guests a behind-the scenes look at the wastewater treatment process, the plant’s unique story, and how wastewater travels through the facility and is discharged into the Chattahoochee River. Contact our office to schedule a tour today! Please email us at dwmcommunications@atlantaga.gov. Include the following information in your email: Name of school/program/organization, contact person name and phone number, tour date, tour time, name of plant to be toured.

Innovations South River WRC Filter Backwash Basins

System Control and Data Acquisition (SCADA) system upgrades are ongoing to increase the number of processes that can be automated at the South River WRC.

Georgia Association of Water Proessionals (GAWP) •

2019 Safety Award


SCAN HERE TO VISIT US ONLINE!

Thinking about becoming a wastewater treatment plant operator? The State of Georgia requires the following for an operator to become certified: • Take and pass an exam that demonstrates that the applicant has the necessary skills, knowledge, ability and judgment as appropriate for the classification

DEPARTMENT OF WATERSHED MANAGEMENT ADMINISTRATIVE OFFICES

• Have a high school diploma or a general equivalency diploma (GED)

72 Marietta Street, NW Atlanta, GA 30303 Mon-Fri – 8:15 am to 5:00 pm atlantawatershed.org

• Have the defined minimum amount of on-the-job experience for each appropriate level of classification.


Turn static files into dynamic content formats.

Create a flipbook
South River Water Reclamation Center by DWMatlantaga - Issuu