Abdollah Ansari YEARS of EXPERIENCE
44
AREAS of EXPERTISE
Education • MBA with Honors, Keller Graduate School of Management • Graduate Certificate in Project/ Program Management with Honors, Keller Graduate School of Management • Certificate in Mediation and Arbitration, Pepperdine University School of Law/C.A.R. • B.S. Civil Engineering, California State University, Los Angeles
Affiliations + Memberships • Advisory Board Member, California State University, Los Angeles College of Engineering and Science • Advisory Board Member, University of California at Santa Barbara, Engineering Leadership Program • Advisor to the Metro Transportation Business Advisory Committee • National Honor Society of Civil Engineers • Project Management Institute (PMI)
Senior Project/Program Advisor
Program Management, Transportation Mobility and Safety, Risk Assessment, QA/QC, Dispute Resolution
Abdollah has decades of experience in planning, engineering, construction, and management of transportation projects and programs in Southern California on both public agency and private sector sides. He has served as LA Metro’s Sr. Executive Officer leading the 30+ Billion Countywide Highway Programs, has led the City of Long Beach’s Traffic & Transportation Bureau, and served in various technical and managerial capacities at Caltrans. He also has provided project management and advisory services to agencies as a consultant for 11 years. PROJECT EXPERIENCE Senior Executive Officer | Los Angeles County Metropolitan Transportation Authority (LA Metro), Los Angeles, CA I-5 N. HOV Lanes in Santa Clarita and Castaic, CA Initiated and completed the final design for this freeway widening including HOV and truck lanes between the I-5/SR14 Interchange and Parker Rd. in record time. Included technical guidance, oversight, multi-agency and elected officials coordination, QA/QC, funding, and pre-bid efforts. I-710 Mobility Improvement Project, Gateway Cities, L.A. County, CA Led the development of alternatives, environmental studies and preliminary engineering for a multi-billion-dollar freeway widening project between the south end of the freeway and SR60. Engagement included technical guidance, project development oversight, multi-agency coordination, QA/QC, development and implementation of “Early Action Projects,” leading the community and stakeholder outreach, and funding coordination.
SR-91, I-405, I-605 “Hot Spots” Package of Highway Improvement Projects, Gateway and South Bay Cities, L.A. County, CA Program management, need assessment, project initiation and PAED/design delivery oversight, multi-agency coordination, QA/QC, risk, and funding coordination. SR710 Gap Closure Projects in San Gabriel Valley and Los Angeles, CA Project/Program Lead. Completed a 70-year environmental process, led multi-agency dispute resolution efforts, identified mobility and congestion relief in local cities along the corridor, and secured Metro Board’s approval of $1B funding allocation for implementation of local mobility and safety improvement projects. Worked with the cities to start projects; plus helped them develop them to construction. SR57/SR60 Interchange Improvements, Diamond Bar, CA This location was deemed to be “the worst truck bottleneck in California”. Initiated and completed the PAED and PS&E for this project. Conducted all necessary coordination for funding, ROW acquisition/ exchange, and environmental mitigations. Coordinated with Caltrans, FHWA, EPA, County of Los Angeles, and the Cities of Diamond Bar and Industry. The project is in construction now. 1
ABDOLLAH ANSARI
Interstate 10 Widening and High Occupancy Vehicle Lane Projects, San Gabriel Valley, CA Transportation Program Manager. Managed consultant and multi-agency team of planners and engineers to prepare engineering and planning documents (including environmental clearance) for 3 consecutive projects totaling 11 miles at a total capital cost of over $400 million. Responsibilities included contract negotiations, PID oversight, schedule and cost control, quality assurance; stakeholder outreach and consensus building working with Caltrans, FHWA, Metro, corridor cities, local communities, Foothill Transit, and business owners. Resolved disputes related to ROW impacts that had stopped the project progress in prior years. Manager, City of Long Beach Traffic & Transportation Bureau Initiated and implemented local streets, intersections, local freeway interchange improvements, traffic signal, bike lanes, and pedestrian improvements under CIP; oversaw review and approval of private development proposals/submittals, communicated with and presented to the City Council various items needing approval; worked with the Gateway Cities Council of Governments on regional projects; worked with the Port of Long Beach, and regional, State and federal agencies in start and continuation of various major transportation projects affecting the City; Assisted the Port of Long Beach in implementation of their projects. Also responsible for prioritizing, programming, and overseeing the implementation of the citywide roadway rehab/maintenance and street signing and striping projects. On-Call Engineering Services Contract | City of Los Angeles Bureau of Engineering Consultant to the City under an On-Call contract. Led the engineering services for the following projects: Kinney Street Improvements Projects, Los Angeles, CA Phase 1: Led the design and construction management phases of this project. The roadway had major settlement and downhill shift as a result of heavy rains in 2023. Due to limited access to the communities served by this road, the City declared this phase of the project as “emergency”. I managed the design phase of the project including roadway geometric design, all utilities coordination/relocation, geotechnical testing and studies, drainage studies and design of a new storm drain system, coordination of biological/habitat studies, community outreach, and Bid Support services. Also, oversaw the construction management and inspection activities. Received a Certificate of Recognition from the CD-1 City Councilmember and high recognition from the LABOE management. Phase 2: Led the roadway, drainage and intersection improvement design, and coordinated geotechnical investigations, environmental studies, SWPPP studies, utilities conflicts, and design, and other activities. Project is awaiting budget approval to advance to construction. 7th Street Corridor Improvements, Los Angeles Led design modification efforts during construction (design was provided by another engineering firm). Identified and corrected numerous design errors and guided the design of new features. Oversaw preparation of a 3D postimplementation condition model. Coordinated water and power connections and landscape design. Flooding Investigations at Various Locations, Los Angeles Conducted field review of several locations cited by various communities in their complaints filed with the City. Worked with the LABOE management and the City Attorney assigned to those cases; field-checked the locations; identified the causes of flooding; met and discussed the issues with the homeowners, city staff and council office representatives; prepared comprehensive reports with narrative and photographs explaining the conditions and recommending alternative solutions.
2