Folio-2024

Page 1

1 Folio no. 03 / xx .selected work. 2019 | 2024 .... Dorothy Tse
LIGHT POLE 2 46000 LIGHT POLE 3 58000 NEW LED SPOT LIGHT & POLE AS SPECIFIED. REFER TO SPECIALIST'S DETAILS. NEW LED SPOT LIGHT & POLE AS SPECIFIED. REFER TO SPECIALIST'S DETAILS. BASKETBALL COURT 30553 -LOCATION PLAN 08. SUBJECT SITE KNOXFIELD FERNTREE GULLY WANTIRNA SOUTH WANTIRNA BAYSWATER BORONIA scale @ A1 size sheet no. project no. revision original sheet size -A1 (594mm 841mm) sheet title scale bar drawn checked verified date date date rev date details init. Copyright These drawings and designs and the copyright thereo are the property the Victorian School Building Authority and must not be used, ained copied without written permission of the Victorian School Building Authori Dimensions take precedence over scaling. Do not measure drawings as print sizes may vary. client project 21.0051.13 VICTORIAN SCHOOL BUILDING AUTHORITY T1 C:\_REVITLOCALFILES\2020\21.0051.13 Fairhills Hig School_Central_R20_kenny.wang6MEMK.rvt 1 100 COVER SHEET FOR TENDER PM FAIRHILLS HIGH SCHOOL FH.00.A000 DRAWING LIST CONTRACT DOCUMENTATION Sheet Code_In stance SHEET NUMBER SHEET NAME REVISION FH.G1.A202PROPOSED FLOOR PLAN (GA) FH.G1.A203ROOF PLAN FH.G1.A230SLAB PLAN FH.G1.A250WALL SETOUT PLAN FH.G1.A260REFLECTED CEILING PLAN FH.G1.A280FURNITURE PLAN FH.G1.A300PROPOSED ELEVATIONS SHEET 1A FH.G1.A301PROPOSED ELEVATIONS SHEET 2A FH.G1.A310SECTIONS FH.G1.A515BLOCK G WINDOWS SCHEDULE SHEET1 FH.G1.A516BLOCK G WINDOWS SCHEDULE SHEET FH.G1.A700WET AREAS KITCHEN & SINK SPACESA FH.G1.A701WET AREAS BATHROOMS FH.G1.A705INTERNAL ELEVATIONS SHEET 1A FH.G1.A706INTERNAL ELEVATIONS SHEET 2A FH.X1.A400DETAILED SECTIONS SHEET 1A FH.X1.A401DETAILED SECTIONS SHEET 2A FH.X1.A402CONSTRUCTION DETAILS SHEET FH.X1.A405JOINERY DETAILS SHEET FH.X1.A410BUILDING ENVELOPE DETAILS 01A FH.X1.A500WALL TYPES FH.X1.A510DOOR TYPES SCHEDULE DRAWING LIST CONTRACT DOCUMENTATION Sheet Code_In stance SHEET NUMBER SHEET NAME REVISION FH.00.A000COVER SHEET T1 FH.00.A100EXISTING SITE PLAN T1 FH.00.A101DEMOLITION SITE PLAN T1 FH.00.A102PROPOSED SITE PLAN T1 FH.A1.A200EXISTING & DEMOLITION PLANT1 FH.A1.A201EXISTING & DEMOLITION ELEVATIONST1 FH.A1.A202PROPOSED FLOOR PLAN (GA) T1 FH.A1.A203ROOF PLAN PROPOSED AND DEMOLITION T1 FH.A1.A230SLAB PLAN T1 FH.A1.A250WALL SETOUT PLAN T1 FH.A1.A260REFLECTED CEILING PLAN T1 FH.A1.A280FURNITURE PLAN T1 FH.A1.A300PROPOSED ELEVATIONS T1 FH.A1.A310SECTIONS T1 FH.A1.A515WINDOWS SCHEDULE SHEET 1T1 FH.A1.A516WINDOWS SCHEDULE SHEET FH.A1.A700WET AREAS KITCHEN T1 FH.A1.A701INTERNAL ELEVATIONS SHEET 1T1 FH.A1.A702INTERNAL ELEVATIONS SHEET 1T1 FH.G1.A200EXISTING & DEMOLITION PLANA FH.G1.A201EXISTING & DEMOLITION ELEVATIONSA FAIRHILLS HIGH SCHOOL ALTERATIONS & ADDITIONS TO BLOCK G & AUDITORIUM -PROJECT No 21.0051 330 SCORESBY ROAD, KNOXFIELD, VIC 3180 T122/03/2022ISSUE FOR TENDER KW 05. 03. LIFT LIFT LIFT FS CC EC FH RR SP STAIR STAIR 10 m² HOLD m² SCRUB 10 m² OFFICE WC m² WC m² STORAGE 10 m² INT/CHG m² CHG m² CHG m² ENS 5 m² WC m² HOIST RECOVERY STAGE RECOVERY STAGE 1000 06 10 m CLIENT nominated architect: ROBERT PUFLETT (reg. 5376) rev.2 11 TILLEY LANE, FRENCHS FOREST NSW 2086 NORTHERN BEACHES MENTAL HEALTH HUB CK FRENCHS FOREST PTY LTD. TA# 21.0111.12 1:200 A 2.33 LEVEL 1 PLAN -TYPICAL FLOOR Telephone +61 9003 9000 sydney@thomsonadsett.com Level 4, Suite 411, 50 Holt Street Surry Hills NSW 2010 Australia thomsonadsett.com © Copyright Thomson Adsett Pty Ltd. ABN 76 105 314 654 Dimensions take precedence over scaling. Do not measure off drawings as print sizes may vary 128.06.2022ISSUE 201.09.2023REVISED Functional Relationship Patient Journey Diagram Level 1 - 3x OT 10 m² STORE 58 m² OT STORE m² WC STORE 2 13 m² INT/CHG 12 m² CU 4 3 2 1 6 53 m² OT 22 m² WC Patient Pathway Legend: Changing Room Recovery Store and Washrooms Staff Area Operational Area Utility Room Operation Hold Room Day Admissions
4 5 4 00 xx What did I do? / // TABLE OF CONTENTS // P.08 01.Remediation Site development P.14 02. Readymade Chinatown Hotel design ... ... ... P.26 03. Eyes on The Street Soical Housing Development P.36 04. Tommy Residence Residential P.38 05. Post Shelter Public Toilet P.40 06. Boroondara Sports Complex Renovation, Revit drawing P.46 07.Floating City Photography Project comissioned by Hong Kong University Blackbox Theatre 00 xx What did I do ? / // TABLE OF CONTENTS // P.06 01. Carlingford Age Care Facility Age Care Facility Tender Documentation P.12 02. Half Basketbak Court at MOE Public Facilities Tender Documentation P.16 03. Northern Beaches Mental Helath Hub Hospital Scheme Design P.14 04.Fairhills High School Documentation Under Victorian School Building Authority P.18 05. New RMIT Media Building Renovation Concept Design P.22 06. Remediation Masterplan development / Museum Concept Design 5 Remark #1. 00/ -// INSTRUCTION // I believe architecture is a process of bringing people closer to the community and culture. .... Dorothy Tse ... ... ... P.26 07. Laputa Affordable Collective Housing Concept Design P.32 08. Eyes on the street Social Housing Concept Design
8 9 Project Number: / 08 01 Project: CarlingfordAge Care Facilty Ground FLoor Plan Level 1 FLoor Plan Lower Ground FLoor Plan
10 11 Project Number: / 08 01 Project: CarlingfordAge Care Facilty 2645 LV01 2365 270 2635 2365 270 2635 2365 270 270 2365 2635 1840 625 2465 W30 -LG.61.1 W30 -G.90.1 W30 -G.67.1 W30 -G.64.3 W30 -G.80.1 W30 -LG.53.1 project no. scale original sheet size -A1 (594mm 841mm) date details init. Regulated Design Record 1 50 @ A1 1 Autodesk Docs://Regis Carlingford_2023.rvtCarlingford/22.0165.12_Regis- 16/02/2024 9:44:34 AM 47 MURRAY FARM ROAD, CARLINGFORD, NSW, 2118 CARLINGFORD AGED CARE FACILITY A-50-28 WINDOW SCHEDULE CURTAIN WALL -SHEET 1 22.0165.12 REGIS PROPERTY Project Address: 47 MURRAY FARM ROAD, CARLINGFORD, NSW, 2118 Project Title: CARLINGFORD AGED CARE FACILITY W30 -G.73.1 © Copyright These drawings and designs and the copyright thereof are the property of Thomson Adsett Pty print sizes may vary W30 -LG.62.1 WIDTH: 4285 HEIGHT: 2635 SILL HEIGHT: HEAD HEIGHT: 2635 WIDTH: 4290 HEIGHT: 2635 SILL HEIGHT: HEAD HEIGHT: 2635 FRAME:ALUMINIUM FRAME FINISH:POWDER COATED FINISH, COLOR AS SELECTED GLASS:6.38mm CLEAR GLASS TO AS1288 TOTAL U-VALUE 4.5 TOTAL SHGC 0.35 ALLOW FOR REGIS BRANDING DECALS ** POWDER COATED CRIMSAFE TO BE PROVIDED ON LOWER G ROUND FLOOR WINDOWS. POWDER COATED SCREEN TO BE PROVIDED ON UPPER GROUND FLOOR WINDOWS. FINISH TO MATCH WINDOW WINDOW TYPE: W30 -CURTAIN WALL WIDTH: 3815 HEIGHT: 2635 SILL HEIGHT: HEAD HEIGHT: 2635 W30 -G.74.2 Arch. Reg. No. NSW 5376 ACT 2726 Telephone +61 2 9003 9000 sydney@thomsonadsett.com Surry Hills NSW 2010 Australia RevDate Description DP Full NameReg No CONTINUOUS LOUVRE BLADES, INVISIBLE SUBFRAME CONTINUOUS LOUVRE BLADES, INVISIBLE SUBFRAME CONTINUOUS LOUVRE BLADES, INVISIBLE SUBFRAME Window Schedule Front ramp in plan Louvre schedule Curtain wall schedule Statutory signage schedule

Half Basketball Court at Moe

The proposed half court basketball court in Moe, New South Wales, is envisioned as a dynamic recreational space aimed at enhancing the vibrancy of the area and catering to the active lifestyle preferences of the community. Commissioned by the La Trobe Council, this project seeks to provide a modern and inviting facility that encourages social interaction, physical activity, and community engagement.

12 Project Number: / 08 02
Project:
LIGHT POLE 2 70000 LIGHT POLE 2 46000 LIGHT POLE 3 16500 LIGHT POLE 3 58000 LIGHT POLE 1 113300 LIGHT POLE 1 5000 NEW LED SPOT LIGHT POLE AS SPECIFIED. REFER TO SPECIALIST'S DETAILS. NEW LED SPOT LIGHT POLE AS SPECIFIED. REFER TO SPECIALIST'S DETAILS. NEW LED SPOT LIGHT POLE AS SPECIFIED. REFER TO SPECIALIST'S DETAILS. HALF BASKETBALL COURT 47904 HALF BASKETBALL COURT 30553 Scale 200 HALF BASKETBALL COURT -LOCATION PLAN NEW LED SPOT LIGHT REFER TO SPECIALIST'S DETAILS. BASKETBALL AUSTRALIA FIBA CODES AND REGULATIONS LINE MARKING COLOUR TO BE WHITE COURT R60 FLOOR FINISH -TYPE ORANGE CRUSH CO M42 Y99 KO FLOOR FINISH -TYPE SEA GREEN C72 MO Y38 KO FLOOR FINISH -TYPE ULTRA VIOLET C77 M72 YO KO FLOOR FINISH -TYPE C100 M14 Y31 K5 LEGEND FLOOR FINISH -TYPE LIGHT CORAL CO M64 Y40 KO FLOOR FINISH -TYPE LINE MARKING WHITE 035 2 1.0 m scale sheet no. project no. revision scale original sheet size -A0 (841mm 1189mm) drawn checked verified date date date rev date details init. for Contractor 1 100 C:\_REVITLOCALFILES\24.0107.13 HALF BASKETBALL CO URT MOESITER2023.rvt2_dorothy.tse.rvt 20/02/2024 5:51:47 PM AAA, PLAY SPACE HALF BASKETBALL COURT MOE A101 FLOOR PLAN AND FINISHES PLAN 18.0262.13 DT CY LA TROBE CITY COUNCIL Telephone +61 3 9685 9100 mel@thomsonadsett.com Albert Coates Ln Melbourne VIC 3000 Australia thomsonadsett.com © Copyright These drawings and designs and the copyright thereof are the property Thomson Adsett (Victoria) Pty Ltd and must not be used, retained copied without written permission of Thomson Adsett (Victoria) Pty Ltd. ABN 70 105 314 627 Trading ThomsonAdsett. Dimensions take precedence over scaling. Do not measure off drawings print sizes may LINEMARKING-HALF BASKETBALL COURT Scale 100 HALF BASKETBALL COURT COLOUR SCHEME HALF BASKETBALL COURT -VIEW

Fairhills High School, in collaboration with the Victorian School Building Authority (VSBA), is embarking on a transformative project to enhance its facilities and elevate the learning experience for its students. The proposed alterations and additions to Block G and the Auditorium signify a commitment to providing state-of-the-art educational spaces that inspire creativity, foster collaboration, and promote academic excellence.

14 15 Project Number: / 08 03
Project: Fairhills Highschool
67 66 60 DIRECT INSTRUCTION DIRECT INSTRUCTION G1.27 OFFICE G1.28 THEORY G1.21 m² PHYSICS LAB G1.22 ADAPTABLE PROJECT SPACE G1.01 MEETING AMB WC G1.12 STAFF DDA G1.10 m² ROBOTICS G1.03 STORE G1.09 m² STAFF WORK G1.06 E C A m² STORE MEETING G1.04 CHEMISTRY LAB BIOLOGY LAB m² PREP STORE G1.17 E.W E.W COMMS G1.24 C B D 4 5 10 11 12 13 4 20 18 A E 15 16 H 14 60 DIRECT INSTRUCTION G1.25 1862 4273 4273 4273 17 2 2 8 6 6 48 3 281 m² COLLAB CIRCULATION G1.20 AMENITIES G1.11 G1.J01 G1.J05 G1.J01 KITCHENETTE G1.J02 G1.J01 G1.J01 G1.J14 G1.J13 G1.J15 G1.J10 G1.J17 ex.COL. ex.COL. ex.COL. ex.COL. ex.COL. ex.COL. ex.COL. ex.COL. ex.COL. ex.COL. DT02 G1.D25 DT02 G1.D22 G1.D03 DT02 G1.D28 DT08 G1.D30 DT02 G1.D33 DT03 DT03 DT03 G1.D36 DT07 G1.D37 DT03 G1.D40 DT03 G1.D42 DT03 G1.D46 G1.D07 WT01 G1.W01 WT03 G1.W03 G1.W05 G1.W06 WT05 G1.W07 WT06 WT07 WT07 WT05 WT02 WT11 G1.W21 WT10 G1.W22 WT11 G1.W24 WT12 G1.W25 G1.W26 G1.W27 G1.W28 WT09 G1.W29 WT03 G1.W37 WT16 G1.W38 WT18 G1.W41 ex.COL. COL. COL COL COL COL. COL. COL. COL. WT09 DT03 G1.D59 COL COL COL. COL. G1.W52 G1.W82 G1.W77 WT29 G1.W74 WT25 WT27 G1.W66 WT20 G1.W59 WT25 WT20 WT26 WT26 G1.W63 WT20 G1.W62 G1.W75 WT25 G1.W72 HIGHLEVEL WINDOWS W01 P04 P01 P03a W01 W01 W01 P08 P02 P03 W01 W01 P03a W01 P01 P07 P03 P01 P01 P01 P02 P07 P01 P01 P02 P02 P02 P04 P03 P02 P01 P03 P02 P01 P02 P02 P04 P02 P03 P02 P02 P02 P03a P01 P03a P02 W01 P02 COL WT20 G1.W73 G1.D04 WT02 G1.W02 G1.D11 DP DP DP COL WT10 G1.W20 WT16 G1.W31 G1.D08 WT17 G1.W30 WT20 G1.W54 WT18 G1.W40 G1.W36 0 G1.W50 WT22 G1.W53 WT23 G1.W55 WT20 WT27 WT20 G1.W80 WT28 G1.W81 4273 4273 4273 4273 4273 4274 4273 4273 4 5 0 1 6 G1.J14 G1.J14 G1.J14 G1.J14 G1.J03 P02 G1.J07 G1.J07 G1.J13 WT20 G1.D09 WT16 G1.W10 G1.W33 WT02 G1.W42 5 0 7 5 2783 1846 ALIGN A706 A706 WT07 WT07 WT08 WT08 WT10 G1.W19 W01 W01 W01 WT28 WT09 G1.W18 P03 COL W01 75 5 1 3075 4 3 5 5 2 0 0 7 6 0 5 035 1.0 scale A1 size sheet no. project no. revision original sheet size -A1 (594mm 841mm) sheet title scale bar drawn checked verified date date date date details init. Copyright These drawings designs the copyright thereo property Victorian over scaling. measure drawings print sizes may vary. client project 21.0051.13 VICTORIAN SCHOOL BUILDING AUTHORITY C03 100 PROPOSED FLOOR PLAN GA FOR CONSTRUCTION PM/TW/KB HM TW NOVEMBER, 2021 FEBRUARY, 2022 FEBRUARY, 2022 FAIRHILLS HIGH SCHOOL FH.G1.A202 ISSUE C021/05/2023RFI STEEL SHOP DWGS C0324/08/2023DB RELOCATION Ground floor plan. A701 A701 A701 15 A701 16 A701 A702 A702 A701 14 MUSIC ACTIVITY PROP STORE AUDITORIUM STAGE FEMALE CHANGE FEMALE TOILETS ST. A/L STAFF OFFICE CIRCULATION MALE TOILETS AIRLOCK MALE CHANGE MALE SHR STORE DRESSING RM CORRIDOR FAN RM ENTRY FOYER STORE S U M POSSIBLE AREA FOR SELF FUNDER STORAGE A1.07 A1.11 PRACTICE A1.05 CIRC. COLLAB STAGE CENTER LINE NOWORKSTHSAREA EXISTING MIRRORS TO AUDITORIUM NORTH WALL SHALL BE PLACED ON THIS WALL A1.J05 SERVICE CP-1 CP-3 CP-1 CP-1 CP-1 RS-1 RS-1 RS-1 CP-1 CP-1 CP-3 CP-3 TB CP-3 CP-1 PN-5(TYP) 1540 PN-5(TYP) 2205 PN-1 (TYP) 1530 PP 2620 P1 0 10 11 WALL PAINTED WITH FEATURE PAINT COLOUR PF-5 FULL HEIGHT OF WALL UNLESS OTHERWISE NOTED N1540 FFL 86.070 A701 12 A701 13 NOWORKSTHSAREA PN-1 2795 1000T PN-5 1030 PN-5 1030 PN-5 1170 PN-5 1170 PN-5 473 NFOYER/ MULTIPURPOSE SERVERY SERVERY STORE MT-1 MT-1 CP-1 RS-1 RS-1 MT-1 2800 4030 PN1 (TYP) 1005035 1.0 scale size sheet no. project no. revision original sheet size -A1 (594mm 841mm) sheet title scale bar drawn checked verified date date date rev date details init. Copyright These drawings and designs copyright thereo property the Victorian School Building Authority and must not used, ained copied without written permission Victorian School Building Authori Dimensions take precedence scaling. Do measure drawings as print sizes vary. client project 21.0051.13 VICTORIAN SCHOOL BUILDING AUTHORITY C04 100 INTERNAL FINISHES PLAN FOR CONSTRUCTION TW HM TW JANUARY, 2022 FEBRUARY, 2022 FEBRUARY, 2022 FAIRHILLS HIGH SCHOOL FH.A1.A240 C0119.10.2022BP STAGE CONSTRUCTION ISSUE C0301.12.2023WINDOW CHANGE A1.W05 C0407.02.2024AUDITORIUM FLOOR FINISHES AND PIN BOARD UPDATE Finishes Plan. A701 A1.J03 A701 700 1 3 70 0 1 2 A701 TB PF-5 PF-5 PF-5 PF-1 SK-1 PN-5 3535 539625 DR 1020 PN-5 PN-5 TB SK-1 PF-1 PN-5 DR 1904384 PN-5 2115 700 A701 A1.J05 600 0 22 23 10 11 A701 12 A701 13 A405 PN-5 (TYP) 1030 1301 WB 1201 PN-5(TYP) 1030 TW1 2501 PF-5 PF-5 SK-1 PN-5(TYP) 473 AV 1800 WB 1200 PN-5(TYP) 472 WB PF-5 TW1 3472 PN-5 PN-5 PN-5 WB TW1 2506 AV 1306 WB 1200 PN-5 1170 PN-5 1170 PN-5 PF-5 PF-5 PF-1 PF-1 SK-1 2150 1500 2700 LM-1 PF-1 PF-1 LM-1 2150 1500 2700 PF-1 PF-1 SK-1 2150 1500 2700 PF-1 2150 1500 700 2700 SK-1 LM-1 FG 1020 m² PRACTICE 1 A701 15 WB PN-5 PN-1 PN-1 WT06 PN-5 2795 A701 0 0 5 PRACTICE A701 16 WT11 A1.W20 PN-5 24 m² PRACTICE A701 14 PN-1 WB PF-1 PF-5 PN-1 1005 DR 1904384 PN-5 2115 PF-1 PN-1 1005 PN-1 PF-1 scale @ A1 size sheet project no. revision original sheet size -A1 (594mm 841mm) scale bar checked verified date date rev date details init. Copyright School Building Authority must used, permission Victorian School Building Authori over scaling. Do measure drawings print sizes may vary. project 21.0051.13 VICTORIAN SCHOOL BUILDING AUTHORITY C05 1 50 INTERNAL ELEVATIONS -SHEET 1 FOR CONSTRUCTION PM HM Checker JANUARY, 2022 FEBRUARY, 2022 FEBRUARY, 2022 FAIRHILLS HIGH SCHOOL FH.A1.A701 50 INTERNAL FINISHES/ JOINERY DETAIL -A1.J03 50 A240 J03 -E1 2 50 A240 J03 -E2 50 A701 J03 -SECTION 50 INTERNALFINISHES/JOINERY DETAIL -A1.J05 9 50 A701 J05 -SECTION 1 22 50 A701 J05 -SECTION 2 23 50 A240 PRACTICE 3 -TEACHING WALL 14 50 A240 PRACTICE -TEACHING WALL ELEVATION 15 50 A240 PRACTICE -TEACHING WALL ELEVATION 16 50 A240 J05 -E1 10 50 A240 J05 -E2 11 50 A240 J05 -E3 12 50 A240 J05 -E4 13 KEYNOTE LEGEND FGFIXED GLAZING WBWHITE BOARD C0119.10.2022BP STAGE CONSTRUCTION ISSUE C0211.07.2023RFI OVERLAY C0331.08.2023UPDATED INTERNAL LAYOUT C0403.10.2023INTERNAL FINISHES UPDATE C0516.02.2024AUDITORIUM PIN BOARD 50 PRACTICE 1 50 PRACTICE 50 PRACTICE 3 50 A240 J03-E3 50 A240 PRACTICE -EXTERNAL ELEVATION 17 RS-1 PF-1 1400 SK-2 BMR CS-1 TP4 1400 BMR RS-1 PF-1 SK-2 1850 1350 900 825 GR2 MI MAX 300 WC-3 TRH1 GR-2 M 70 RS-2 VB2 MI SK-2 1400 1850 PTD1 GR-2 WC-3 GR-2 TRH1 RS-2 PF-1 SK-2 900 1400 1850 PTD1 RS-2 SK-2 PF-1 900 1400 1850 CH1 SD1 VB2 TP3 RS-1 SK-2 DT02 G1.D34 MAX. 2700 150 TRH1 RS-2 2700 150 WC-1 VB-1 PTD1 RS-2 SK-2900 2700 150 G1.D33 PF-1 RS-2 SK-2 GR-1 WC-2 VB-1 SD1 MI TP2 PTD1 RS-2 RS-2 PF-1 SK-2 800 150 2700 2100 GR1 GR1 SD1 TRH1 RS-2 PF-1 SK-2 800 150 2700 GR1 GR1 2100 800 150 2700 GR1 GR-1 TRH1 WC-2 RS-2 PF-1 SK-2 2100 RS-2 SK-2 VB-1 SD1 MAX 70 WC-3 GR-2 0 RS-1 PF-1 SK-2 GR2 GR2 1850 825 G1.D29 SK-2 PTD1 CH1 PTD1 RS-1 PF-1 3065 1350 825 PTD1 WC-3 GR-2 GR-2 RS-1 SK-2 GR2 GR2 TRH1 1400 RS-1 PF-1 TP4 1400 PF-1 SK-2 G1.D35 BMR 2700 150 WC-1 RS-2 PF-2 SK-2 DT08 G1.D31 DT02 G1.D29 DT08 G1.D30 SK-2 PF-1 1850 RS-1 1850 G1.D35 G1.D34 G1.D32 G1.D33 RS-1 SK-2 PF-1 SK-2 RS-1 A701 21 A701 A701 11 12 10 A701 13 14 15 A701 19 17 20 A701 22 23 24 A510 RS-1 187392EQ EQ 92EQEQ92EQEQ92902 92 2784 92 3076 92 0FAL 0 AL 1FAL 1 0 AL 110 L 1FL 0 A 0 F L 0 F L F11 L 0 L 0 L FW TH-1 PTD1 GR-2 CS-1 TP4 GR-2 GR-2 WC-3 VB2 SD1 VB-1 SD1 TP2 G1.14 AMB WC G1.12 HIGH WINDOWS RS-2 RS-2 RS-2 HD 1100 HD HD 1000 85 1051 1.52.5 1.0 0.5 scale @ A1 size sheet no. project no. revision original sheet size -A1 (594mm 841mm) sheet title scale bar drawn verified date date rev date details init. Copyright project 21.0051.13 VICTORIAN SCHOOL BUILDING AUTHORITY C02 C:\_REVITLOCALFILES\2020\BlockG_dorothy.tse.rvt 2/10/2023 2:40:15 PM 1 50 WET AREAS -BATHROOMS FOR CONSTRUCTION TW HM KB NOVEMBER,2021 DECEMBER,2021 NOVEMBER,2021 FAIRHILLS HIGH SCHOOL FH.G1.A701 50 A240 CLEANER 50 A240 CLEANER 50 A240 DDA 50 A240 DDA 10 50 A240 DDA 11 50 A240 DDA 12 50 A240 WC 14 50 A240 WC 15 50 A240 WC 16 50 A240 WC -AMBULANT 17 50 A240 WC -AMBULANT 18 50 A240 WC -AMBULANT 19 50 A240 WC -AMBULANT 20 50 A240 STAFF DDA 1 50 A240 STAFF DDA 50 A240 STAFF DDA 50 A240 STAFF DDA 21 50 A240 CLEANER 50 A240 CLEANER 1 50 A240 WC 13 50 A240 Elevation 17 -a 22 50 A240 Elevation 17 -c 23 50 A240 Elevation 17 -d 24 SK-2 KEYNOTE LEGEND BMRBROOM/ MOP RACK CH1COAT HOOK CS-1CLEANER'S SINK TYPE FGFIXED GLAZING FWFLOOR WASTER TYPE- TBC GR-1GRAB RAILS TYPE GR-2GRAB RAILS TYPE HDHAND DRYER MIMIRROR PTD1PAPER TOWEL DISPENSER SD1SOAP DISPENSER TH-1TOILET ROLL HOLDER TYPE TP2GENERAL BASIN MIXER TP3ACCESSIBLE SINK MIXER TP4CLEANER, LAUNDRY FOOTWASH TAP SET TRH1TOILET ROLL HOLDER VB2VANITY BASIN TYPE 2 VB-1VANITY BASIN TYPE 1 WC-1TOILET SUITE TYPE WC-2TOILET SUITE TYPE WC-3TOILET SUITE TYPE C0119/10/2022BP STAGE CONSTRUCTION ISSUE C022/10/2023HAND DRYER SETOUT 50 AMENITIES Internal elevations. Wet areas- Bathrooms.

DESIGN BRIEF:

Our design is a new Media Building for RMIT. Our design intention is to respond to the neighbouring context. There is a residential building behind the new Media Building. With respond to this context, we don’t want to block the residence’s view. Therefore, our building becomes a vertical garden where the façade is wire mesh and permeable to see.

Our school is in the heart of Melbourne Carlton, our media building is an innovative and dynamic educational institution that is dedicated to inspiring their students. We’ve also aimed to incorporate nature within the design to assist with a peaceful and calm intention for the users.

The renders provided are to help visualise this intention. In addition to this we also have a ETFE façade to allow film projection of the students work to create opportunities for the building to interact with the public. The following render also shows a glimpse of the vertical garden and different articulation of all levels and how they can interact and open together in its individual uniqueness.

It is a 10-storey high building that is also sustainable with water tanks, strategic sunlight approach and a double façade system with passive ventilation that optimises the temperature throughout the year.

18 19 Project Number: 05 / 08 Project:
RMITNew Media Building

Our goal was to create a projectable façade that faces the main streets of Bouverie and Queensberry. This façade not only showcases the media building but also emphasizes transparency to reflect the

2580 RECORDING STUDIO 2580 820 20002640
4500 340082025808202580820258082025808202580820258082025801059 OPEN STUDY GARDEN CLASSROOM GREEN SCREEN STUDIO RECORDING STUDIO CW-01 00GROUNDFLOORFFL FFL 14.447 01FIRSTFLOORFFL FFL 17.847 RL48.447 ROOFFFL B1BASEMENTFFL FFL 11.447 LEVEL01FCL FCL 17.03 02SECONDFLOORFFL FFL 21.247 03THIRDFLOORFFL FFL 24.647 04FOURTHFLOORFFL FFL 28.047 05FIFTHFLOORFFL FFL 31.447 07SEVENTHFLOORFFL FFL 38.247 08EIGHTHFLOORFFL FFL 41.647 09NINTHFLOORFFL FFL 45.286 06SIXTHFLOORFFL FFL 34.847 LEVELROOFFCL FFL 47.627 LEVEL09FCL FFL 44.227 LEVEL08FCL FFL 40.827 LEVEL07FCL FFL 37.427 LEVEL06FCL FFL 34.027 LEVEL05FCL FFL 30.627 LEVEL04FCL FFL 27.227 LEVEL02FCL FFL 20.427 LEVEL03FCL FFL 23.827 1 3 4 6 2 7 5 GROUNDFLOORFCL FCL 13.63 450045005000301726833560 2180 3400 340082025808202580820258082025808202580820258082025801059 STUDIO ROOM 01 LECTURE HALL SCREENING ROOM STUDENT LOUNGE STUDY AREA 33839 23260 ? ? ? ? CP-01 LECTURE HALL CAFE MALE TOILETS OPEN STUDY SPACE MALE TOILETS MALE TOILETS MALE TOILETS MALE TOILETS MALE TOILETS MALE TOILETS MALE TOILETS MALE TOILETS STAFF ROOM STAFF ROOM STAFF ROOM MULTIUMEDIA ROOM OPEN STUDY GARDEN OPEN STUDY GARDEN OPEN STUDY GARDEN COLLAB SPACE 2 FLEXIBLE OUTDOOR CLASS EDITING ROOMS CLASSROOM GARDEN OPEN STUDY AREA GREEN SCREEN STUDIO GREEN SCREEN STUDIO RECORDING STUDIO RECORDING STUDIO WM-01 EE-01 CW-01 CW-01 CW-01 CW-01 CW-01 CW-01 CW-01 CW-01 1 A401 DRAWING No. REVISION JOB No. DRAWN CHECKED SCALE -01 DRAWING TITLE Architecture Design Firm NORTH CONSTRUCTION MANAGER DHP 666 Bourke Street Melboune, Victoria, 3000 T (61) 53377899 1 100@A1 CIRCULATION SECTION A300 13-XXX RMIT NEW MEDIA COMPLEX 80 BOUVERIE STREET 1 100 A300 CIRCULATION 1 A300 SECTION-CIRCULATION 2 Our concept revolves around creating a vertical garden city within a city. We prioritize passive ventilation and openair techniques while fostering interaction among study spaces. Additionally, we incorporate a natural study space and ensure smooth circulation throughout the building.

In remediation, my project aims to provide a connection within buildings in the site to provide opportunities of different functions interacting together. Most of the roof of the buildings are connected and cross programmed.

In remediation, my project aims to provide a connection within buildings in the site to provide opportunities of different functions interacting together. Most of the roof of the buildings are connected and cross programmed.

Contamination not only of sediment, groundwater, soil and air; but contamination of form and conceptual ideas.

Typology Plan

Based on the typology research conducted earlier, I have decided to have the programs cross contaminate each other in various moments, for example: the residential and commercial programs are almost completely cross contaminated. Inside the apartments building, commercial programs are located on the ground floor. This was done to integrate the building designs and programs more fluidly throughout the site.

// The big native gum tree in the middle of the conservatory acts as an element to visually connect each floor between the office and the roof garden. This activates the “green heart” of the office and encourages staff to go out.

// Conservatory //

The big native gum tree in the middle of the conservatory acts as an element to visually connect each floor between the office and the roof garden. This activates the “green heart” of the office and encourages staff to go out.

COMMERCIAL

Different zones of the opened office are made in different colours and plant themes to create a “greenwood” in different seasons to further extend the ideas of the nature idea

// Meeting Pots // COMMERCIAL // CONSERVATORY

Different zones of the opened office are made in different colours and plant themes to create a “greenwood” in different seasons to further extend the ideas of the nature idea.

22 23 Project Number: 6 What did I do ? 01 / 07
Project: Remediation
Cross Programming Diagram, 2020 What did I do ? 01 / 06
Site
Project: Remediation
What did I do? 01 Office and Commercial Typology Site Cross Programming Diagram, 2020 S c a n f o r V i d e o
08 / 06 7
24 25 Project Number: / 08 06 8 What did I do ? 01 / 07 Project: Remediation Museum Typology - Main Entrance 9

Each cluster might look like the same at first glance. Yet, all clusters are slightly different, as such voids are made in different size in each level to make sure all residents have enough sunlight. This form is inspired by the Expo 2000 and Kowloon City, in which continuity is cruital in this project to connect all residents. Therefore, the roof of each level are connected on those rooftop, just to create a full level circulation as well. Each cluster share a common courtyard between 2-4 clusters and pathways are creates within the site to create more articulations. in order to visualise a closer community and the “Village within a village” concept.

28 29 Project Number: / 08 07
Project: Laputa

Axonometric drawing. .

Tommy is a plant enthusiast and loves cooking. His room is located at the back of kitchen as an extension of the house, has a backdoor that directly connected to the courtyard. Since plants strive in blue light, his room is made of grass and blue colored glass. Tommy’s room is a reflection of his personality, he is a lonely person that wants to connect with people, this level of intimacy is reflected in the level of transparency of his room. He has a little small courtyard of his own as well, where he could sit with his dog and watch the sunset. Sometimes Willy will come over and find Tommy to chat and play after school, this little semiprivate courtyard becomes their meeting place.

30 31 Project Number: / 08 07 Resident #1 Tommy’s Room.

Eyes on the Street

CONCEPT ....

Our main idea is to break the social stigma of social housing being unsafe and unwelcoming, whilst also promoting a sense of community.

This can be broken into two parts. The first part is to break the negative connotation of unsafe social housing we aimed to create passive surveillance through an architectural strategy inspired by Jane Jacobs idea of “Eyes

on the streets” The buildings are composed to surround the public area, by doing so the residents in the social housing act as passive surveillance.

The second concept also focuses on building degrees of private, public, and semi-private threshold that can help with communal thresholds for human interaction.

32 33 Project Number: / 08 08 24 // TITLE //
07 25
--
//
What did I do ? 03 /
How so? 01 /
// PURPOSE
Eyes should be upon the street, the buildings on a street equipped to handle strangers and to insure the safety of both residents and strangers.

The reading space are designed to create an intimate space between readers. Plantations are loacted in the middle to provide partitions. The bookshelves are allocated in this way to provide a specific path for people to distant themselves from others. Unfolded elveation of whole site

This site is the final stop of the progressive changes in the journey through the whole site. It is opened, welcoming yet safe and secured. As you could see in small facilities, It focuses on the communal activities that articulate through the whole site. The site is also designed in a way to to gain sense of safety through passive suvilance and constant thresholds.

34 35 26 COFFEE HOUSE Tiny Hole Wall Cafe Reading Space
What did I do ? 03 / 07 Project: Eyes on the Street Project Number: 08 / 08 27 The Spine The Joint Tiny Hole Wall Cafe Reading Space
Inspired by the coffee culture in Melbourne, the cafe is embedded under the stairs. Pop out chairs are located on the walls to promote communal interaction. The slide is located next to the stairs to create another small playground for kids as well.
36 37 30 What did I do ? 03 / 07 Project: Eyes on the Street Axometric drawing Project Number: 08 / 08 31 Axometric drawing Section

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.