Dominique Mhasseb Portfolio

Page 1

Dominique Mhasseb Architect

Content

Resume - Page 3

University Projects - Page 5

Internships - Page 26

Site Architect - Page 34

Permit Files - Page 40

3D Renders - Page 44

2/

Resume

Address Details & Personal Information

Ghosta, Keserwan, Lebanon

Date of Birth: May 25, 1993

Citizenship: Lebanese

Computer Skills

AutoCAD

Revit

Microsoft Office

Illustrator

Education

Marital Status: Married

Mobile : +961 70 259780

E-mail : dominique.j.mhasseb@gmail.com

Language Skills

Arabic - Fluent

English - Fluent

French - Fluent

2017 – 2019: Université Saint Esprit de Kaslik (USEK), Kaslik, Lebanon

Master of Arts; Major: Architecture; GPA: 86.25/100

2012 – 2017: Université Saint Esprit de Kaslik (USEK), Kaslik, Lebanon

Bachelor of Sc.in Architectural Studies; GPA: 75.79/100.00

2011:Collège Saint Joseph - Antoura, Lebanon

Lebanese Baccalaureate - Emphasis: General Sciences

Experience

Jan 2019 - Present Freelance projects

Performed general architectural works including architectural design, site visits and inspections, and prepared related reports. Works include tiling, paint, waterproofing, woodworks, reinforced concrete, topcrete, aluminum, false ceiling and other.

Coordinated with other engineering and construction units on site to successfully deliver turnkey projects that include architectural, civil, and MEP works.

Reviewed and developed CAD drawings, renderings, layouts, study models and color boards in compliance with client requirements, standards and codes.

Prepared and finalized construction permits and approvals with Local Authorities for various projects. Main projects: Villa Renovation – Faraya, Residential Apartment – Ghosta, Restoration of St.Challita Monastery - Ghosta , Commercial Building in Rayfoun

3/

Aug 2017 – Aug 2018 Abi Rizk Architecture & Restauration – Lebanon

Architect

Prepared permit files, tender documents, architectural details, and renovation requirements for restoration projects (Chateau Tibnine, Permit of Kosaybe 890, Toula 412 project).

Observed worker's performance on site and prepared daily site progress reports.

Followed up on the procurement of site needs and maintained records of sub-contractors’ payments (Faqra project, Archeological site of Saifi Beirut-SGBL).

Confirmed on-site and off-site quantities with submitted payment certificates.

Performed QS on architectural and civil execution drawings to develop project BoQ in accordance with international measurement standards.

Drafted estimates for architectural and civil works with the assistance of a direct super visor.

Aug 2016

A.R. Hourie Enterprises.

Intern Architect

Prepared shop drawings for masonry & false ceiling and calculated required manpower on site.

Supervised witnessing tests and works related to framing slabs, stairs, block work, false ceiling

Aug 2015

Vivid Architecture Office.

Observed worker's performance, productivity and efficiency and the procurement of site needs.

4/

1-University Projects

A - Revitalization of Zokak El-Blat

In this project, we are trying to open up the area of Zokak el Blat, restore the collective memory of this district, preserve its identity, protect its heritage and reinject cultural and artisanal functions.

To achieve this objective, it is necessary to highlight the lost spaces with the aim of integrating them into the urban skeleton of the district.

So our strategy is to create a cultural and artisanal zone to which the flow of the city center will have access on foot.

In addition, at the residential level, two interventions will take place with the same system present in zokak el blat.

Section A-A
5/
R.D.C Plan Floor 2 Plan 6/
Section B-B
7/
Section C-C

We worked with the present urban template and converted the existing heritage while preserving some important facades.

Mass Plan

8/
9/

B - Residential Complex

In this project, the purpose was to create a residential complex with different types of living spaces.

We worked on modular architecture using strip shapes and integrating green spaces.

Mass Plan Type A Type A
10/
Type B Type C
11/
Adapting the project to the lands topography.
C - Military
TERREDEFORCE L'AIRDEFORCE TERREDEFORCE L'AIRDEFORCE MERDEFORCE THEMATIQUE CAFETTE BILBLIO D'ENTREE+SALONHALL CHEHABFOUAD POLYVALENTESALLE BOUTIQUE POMPE+RESERVOIR D'EAU ENTRETIEN+GROUPE ELECTROGENE PARKING North Elevation
4 Plan
8 Plan 12/
Museum
Floor
Floor

This project was designed to showcase the importance and grandeur of former military generals.

Cartesian architecture was used (square, rectangles) to reflect the stern and unbending values taught in the military.

Section 1
West Elevation
13/
Section 2
3 14/
Section

In this project, we tried to attract people to enter the mediatheque by liberating the ground floor. They will walk on a promenade that reaches the roof, which is used as a lecturing space.

D - Mediatheque West Elevation
Mass Plan North Elevation
15/
Section 1 Section 2 16/
E - Professional and technical high-school
South Elevation
17/
Mass Plan Plan

West Elevation

The concept of this project was to create a new green area to provide a healthy and clean environment.

In addition to the class rooms, the project contained an auditorium and a public sports area.

18/

Detailed Section

Detail 1

Detail 2

North Elevation
19/

F - Gastronomic space

East Elevation

An abandoned beer factory was converted to a gastronomic space because of its location in a touristic area with a nice view to the beach.

Mass Plan

20/
Section A-A
South Elevation
21/
A foodcourt was created with private bungalows and a hotel using the main structure elements of the factory.
Plan +4.5 Plan +7 Section B-B West Elevation 22/

G - Technical School

Will Problems

Absence of green spaces

Lack of meeting spaces

Lack of communication spaces

Dense neighborhood

Live in the basement

Plot, Meeting spaces

Integration of nature

Plein/Vide

23/
Mass Plan

North Elevation

After a study that we made about delinquency in Lebanon and specifically at Ras El Nabeh-Beirut,we found a series of projects that can be made to help children avoid this problem.

I worked on building a technical school to help children learn professions

24/
Section 1 West Elevation
25/
Section 2

Prepared permit files, tender documents, architectural details, and renovation requirements for restoration projects (Chateau Beaufort, Permit of Kosaybe 890, Toula 412 project).

Observed worker's performance on site and prepared daily site progress reports.

Followed up on the procurement of site needs and maintained records of sub-contractors’ payments (Faqra project, Archeological site of Saifi Beirut-SGBL).

Confirmed on-site and off-site quantities with submitted payment certificates.

Performed QS on architectural and civil execution drawings to develop project BoQ in accordance with international measurement standards.

Drafted estimates for architectural and civil works with the assistance of a direct super visor.

Location: Tibnin

Built: 12th century

Year: 2018

Type: site conservation and restoration

1
Facade
2 2 - Internships A
Facade
- Arar
Beaufort Castle
26/

Plot # 890

Year: October 2018

Type: Private house

Area: 800 m2

Fichier de permis

KOSAYBE 27/

Location: Toula

Plot # 412

Year: June 2018

Type: Private house

Area: 700 m2

TOULA 28/

Location: Faqra

Year: May 2017

Type: site conservation and restoration

Detail
Model 1 Model 2
On Site Work - Faqra
29/

Saifi Archaeological Site - Beirut

Location: Saifi - Beirut

Year: 2017

Type: dismantling of the archaeological site

30/

Prepared shop drawings for masonry and false ceiling. Calculated required manpower on site. Supervised works related to framig slabs, stairs, block work, false ceiling.

False Ceiling Kitchen

B - A.R. Hourie Entreprise
31/
Wood 32/

C - Vivid Architecture

Observed worker's performance, productivity, efficiency and the procurement of site needs.

Bathrooms
33/

3 - Site Architect

A - Residential Apartment

Performed general architectural works including architectural design, site visits, and prepared related reports. Works include tiling, paint, waterproofing, woodworks, reinforced concrete, topcrete, aluminum, false ceiling...

Demolition of the old building

Sanitary

34/
Gypsum Installation

Topcrete for flooring

Micro Ceiling Tiling
35/
Mass Plan
Final Outcome 36/

B - Monastery Restoration

Performed site visits and inspections, prepared related reports, followed up the procurement of site needs. Works include sanitary and electrical installations, stone grout works, masonry, wood , tiling....

37/

C - Villa faraya

Prepared and finalized construction permit. Followed up on the procurement of site needs. Reinforced the structure of the building by planting new structural elements. Roof waterproofing isolation and roof tiles installation.

Final Outcome

38/

E - Land excretion

Office work: Executed partition plans for this excretion project.

On site: Excavation phase for the road and infrastructure. Installation of electricity and sanitary equipments. Asphalting the road.

39/

Files

Prepared and finalized construction permits and approvals with local authorities for various projects.

4 - Permit
A - Maarab
40/
Ground Floor Second Floor Basement Floor First Floor B
PLOT PLOT LIMIT PLOTLIMIT PLOTLIMIT PLOT LIMIT PLOT LIMIT LIMIT SETBACK SETBACK LIMIT SETBACKLIMIT SETBACKLIMIT SETBACKLIMIT SETBACK LIMIT 41/
- Batha

Sanitary Plan

South Elevation

Sous-Sol Plan

R.D.C Plan

North Elevation

West Elevation

East Elevation

C - Haret Sakher
Plan 1
42/
Plan
43/
Ghosta Entre-sol
Soupente
5 - 3D Renders 44/

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.