Skip to main content

EC&M - September 2026

Page 1

Shop online at LightingProPlus.com/15off

Get 15% off your first order!

2609ECM_LightingProPlus_CVRTip.indd 1

8/7/26 9:11 AM


2609ECM_LightingProPlus_CVRTip.indd 2

8/7/26 9:11 AM


SEPTEMBER 2026 EC&M Magazine

ecmweb.com

C EL EB R AT I N G 1 2 5 Y E A R S • 1901-2026

THE TOP 50 Electrical Construction • National Electrical Code • Electrical Inspection

We rank this year’s top players in electrical contracting. PAGE 28

Electrical Inspection Strategies PAGE 10 September 2026 • Vol. 125, No. 9

NFPA 70E and OSHA Violations PAGE 16

Top Job-Site Time Wasters PAGE 64

2609ECM_C1_Cover.indd 1

9/9/26 12:30 PM


Built for Contractors, Designed for the Field

ETCB28458PCR 8-Pole Electronic Lighting Contractor Box

ETCB284512PCR 12-Pole Electronic Lighting Contractor Box

ETCB28254PCR 4-Pole Electronic Lighting Contractor Box ETCB28253PCR 3-Pole All-Purpose Electronic Contractor Box

Tackle Projects of All Sizes with Our New Family of Contractor Box Solutions Need a control that can handle more? Simplify projects without sacrificing performance with one of four new Contractor Boxes from Intermatic. Our expanded portfolio of field-ready solutions allows contractors to install a durable enclosure that houses a built-in 7-day Astronomic timer and a 3-pole, 4-pole, 8-pole, or 12-pole contactor. These versatile, UL-listed solutions save time in the field and can support applications ranging from motor control and parking lot lighting to big box stores and university campuses. Upgrade today and install our code-compliant alternative to a la carte lighting control boxes and stackable contactors.

Adaptable. Convenient. Dependable.

Learn more today at Intermatic.com

2502ECM_IntermaticInc.indd 1 2 2609ECM_C2-5_Contents.indd

1/31/25 12:08 9/9/26 1:35 PM PM

2601EC


Progressive Casualty Insurance Co. & affiliates.

Small business owners’ to-do lists can add up. So see if you can save money on a commercial auto quote at ProgressiveCommercial.com.

Get a quote online in as little as 8 minutes

1:35 PM

2609ECM_C2-5_Contents.indd 2601ECM_ProgressiveCommercial.indd 3 1

12/11/25 9/9/26 12:08 11:35PM AM


Cover Photo courtesy of Motor City Electric

Contents

September 2026 Volume 125 • Number 9 ecmweb.com

COVER STORY

Data Center Buildout Fuels Revenue Blowout: Top 50 Electrical Contractors Special Report This year’s 2026 Top 50 electrical contractors post combined a revenue surge of 35% for 2025 as AI-fueled construction surges.

10

22 FEATURE 64 How to Beat the

Biggest Job-Site Productivity Busters

From misplaced materials and trade stacking to labor challenges and poor planning, everyday job-site time wasters can quickly eat into project schedules and margins.

16

64

82

DEPARTMENTS 8 Industry Viewpoint 10 Inspector Intel

NATIONAL ELECTRICAL CODE 74 Code Basics

16 Electrical Testing

78 Illustrated

Why you should walk the job before the inspector does

Education

The importance of NFPA 70E to OSHA violations and fines

22 Safety Corner

Rethinking ladder safety

72 Product News 81 Ad Index 4

28

U P A E E

Y S

Key revisions to Chapter 2 of the 2026 NEC

Catastrophes

S

More Code catastrophes

79 Code Quiz

of the Month Test your Code IQ

82 What’s Wrong Here? Can you spot the Code violations?

September 2026 • www.ecmweb.com

2609ECM_C2-5_Contents.indd 4

9/9/26 12:08 PM

2606EC


UNDERGROUND POWER IS ALREADY EXCITING ENOUGH

YOUR SUPPORT SYSTEM

SHOULDN’T BE BECAUSE THE BEST UNDERGROUND RACK IS THE ONE YOU NEVER THINK ABOUT AGAIN VISIT WWW.UDEVICES.COM

2606ECM_UndergroundDevices.indd 1 2609ECM_C2-5_Contents.indd 5

5/29/26 12:08 2:44 PM PM 9/9/26


online

With its exclusive online content, ecmweb.com is a valuable source of industry insight for electrical professionals. Here’s a sample of what you can find on our site right now:

The Top 5 Highest-Paying States for Electricians: 2025 See which five states offer the best compensation to electricians based on data from the U.S. Bureau of Labor Statistics. ecmweb.com/55398785

ID 14560630 © Josemaria Toscano | Dreamstime.com

NFPA 70E General Requirements for Electrical Safety-Related Work Practices, Part 1

ID 23623636 © Kemaltaner | Dreamstime.com

Members Only Quiz: How Well Do You Know Arc Flash Safety? Test your knowledge about arc flash safety with this quiz, and enter for a chance to win a $25 gift card to Amazon! ecmweb.com/55398952

Follow us X: x.com/ecmmagazine Facebook: www.facebook.com/ElectricalConstructionMaintenanceMagazine LinkedIn: www.linkedin.com/company/electrical-construction-maintenance Instagram: www.instagram.com/ecmmagazine YouTube: www.youtube.com/user/ecmwebtv TikTok: www.tiktok.com/@ecm.magazine Subscribe to our Newsletters: ecmweb.com/newsletters Electrical Construction & Maintenance (USPS Permit 499-790, ISSN 1082-295X print, ISSN 2771-6384 online) is published monthly by Endeavor Business Media, LLC. 201 N. Main St 5th Floor, Fort Atkinson, WI 53538. Periodicals postage paid at Fort Atkinson, WI, and additional mailing offices. POSTMASTER: Send address changes to Electrical Construction & Maintenance, PO Box 3257, Northbrook, IL 60065-3257. SUBSCRIPTIONS: Publisher reserves the right to reject non-qualified subscriptions. Subscription prices: U.S. ($68.75 per year); Canada/Mexico ($112.50); All other countries ($162.50). All subscriptions are payable in U.S. funds. Send subscription inquiries to Electrical Construction & Maintenance, PO Box 3257, Northbrook, IL 60065-3257. Customer service can be reached toll-free at 877-382-9187 or at electricalconstmaint@omeda.com for magazine subscription assistance or questions. Printed in the USA. Copyright 2026 Endeavor Business Media, LLC. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopies, recordings, or any information storage or retrieval system without permission from the publisher. Endeavor Business Media, LLC does not assume and hereby disclaims any liability to any person or company for any loss or damage caused by errors or omissions in the material herein, regardless of whether such errors result from negligence, accident, or any other cause whatsoever. The views and opinions in the articles herein are not to be taken as official expressions of the publishers, unless so stated. The publishers do not warrant either expressly or by implication the factual accuracy of the articles herein, nor do they so warrant any views or opinions by the authors of said articles.

6

September 2026 • www.ecmweb.com

2609ECM_6-7_Masthead.indd 6

Managing Editor Ellie Coggins ecoggins@endeavorb2b.com Editor Michael Morris mmorris@endeavorb2b.com

CONSULTANTS AND CONTRIBUTORS NEC Consultant Paul Abernathy paul.abernathy@fasttraxsystem.com NEC Consultant Ryan Jackson ryan@ryanjacksonelectrical.com NEC Consultant Russ LeBlanc russ@russleblanc.net

SALES AND MARKETING Vice President Mike Hellmann mhellmann@endeavorb2b.com

This guide explains the employer’s responsibility to establish an electrically safe work policy, emphasizing hazard elimination as the top priority and detailing OSHA’s risk control hierarchy for electrical safety. ecmweb.com/55401404

ID 323845100 © Pinyo Promprasert | Dreamstime.com

EDITORIAL Editor-in-Chief Ellen Parson eparson@endeavorb2b.com

Regional/Territory Account Manager David Sevin dsevin@endeavorb2b.com Regional/Territory Account Manager Jay Thompson jthompson@endeavorb2b.com Regional/Territory Key Account Manager Ellyn Fishman efishman@endeavorb2b.com

IP

PV NO

Account Manager Steve Suarez ssuarez@endeavorb2b.com

PRODUCTION AND CIRCULATION Art Director David Eckhart deckhart@endeavorb2b.com Production Manager Josh Troutman jtroutman@endeavorb2b.com Ad Services Manager Deanna O’Byrne dobyrne@endeavorb2b.com User Marketing Manager James Marinaccio jmarinaccio@endeavorb2b.com

ENDEAVOR BUSINESS MEDIA, LLC CEO: Chris Ferrell COO: Patrick Rains CDO: Jacquie Niemiec CMO: Amanda Landsaw CALO: Tracy Kane EVP Building & Construction Group: Chris Perrino VP of Content Strategy: Mike Eby Reprints: Contact reprints@endeavorb2b.com to purchase custom reprints or e-prints of articles appearing in this publication. Photocopies: Authorization to photocopy articles for internal corporate, personal, or instructional use may be obtained from the Copyright Clearance Center (CCC) at (978) 750-8400. Obtain further information at www.copyright.com. Archives and Microform: This magazine is available for research and retrieval of selected archived articles from leading electronic databases and online search services, including Factiva, LexisNexis, and ProQuest. Privacy Policy: Your privacy is a priority to us. For a detailed policy statement about privacy and information dissemination practices related to Endeavor Business Media products, please visit our website at www.endeavorbusinessmedia.com. Please Note: The designations “National Electrical Code,” “NE Code,” and “NEC” refer to the National Electrical Code®, which is a registered trademark of the National Fire Protection Association. Corporate Office: Endeavor Business Media, LLC, 30 Burton Hills Blvd., Ste 185, Nashville, TN 37215 USA, www.endeavorbusinessmedia.com

9/9/26 12:09 PM

P

S

2607EC


N

MADE I

U.S.A.

FOR SAFER BETTER FASTER JOBS

We’re Proud to be the Electricians’ Friend for Over 50 Years!

High Quality Above Ground Products Patented

IP12a-n

IP13r-u

Patented

PVC Slip Transition Couplings NO REAMING REQUIRED

PVC Tapered Transition Couplings REAMING REQUIRED

Bell End Transition Couplings NO REAMING REQUIRED

IP13v Rigid to PVC REAMING REQUIRED

IP3g

IP13a-p

Patented

Patented

Patented

IP14

Tapered PVC End Bell Adapter REAMING REQUIRED

IP14b

Patented

Long Slip Bell PVC to Rigid NO REAMING REQUIRED

Long End Bell Adapter REAMING REQUIRED

IP13f

Patented d

Long Slip PVC Couplings NO REAMING REQUIRED

IP14a Threaded End Bell Adapter

Patented

IP15

IP15b

IP15a

IP16

One Piece Reaming Bit

Chuck Adapter

Chamfer Bit for PVC

Patent Pending

Converts Chuck from 3/4” to 1/2”

Patent Pending

Chamfer Bit for RGD & Aluminum Patent Pending

Visit our website to view installation videos Plus More Being Invented for SAFER BETTER FASTER Jobs. . . Call With Your Ideas!

SPProducts.com 800-233-8595 Info@SPProducts.com 2609ECM_6-7_Masthead.indd 2607ECM_SPProducts_HQAboveGroundProducts.indd 7 1

9/9/26 6/26/26 12:09 9:38 PM AM


INDUSTRY VIEWPOINT

Breaking Revenue Records While Testing Limits

E L

A Last year, I questioned whether it was feasible for the Top 50 to keep their growth streak alive. This year, I got my answer.

s is customary every September, I write my editorial on our annual Top 50 Electrical Contractors survey results, looking for trends that tie the data to what’s happening in the industry. Last year, I wrote about a “year of record revenues and rising risks” for the key players in electrical contracting, who collectively brought in $59.5 billion in 2024 revenue, which was a 15% jump from the year before. So much for that record. As a group, the 2026 Top 50 smashed that record, reporting $80.4 billion in electrical revenue earned in 2025 — a whopping 35% increase from last year’s total. What’s driving this phenomenal growth? Data center construction, for starters. Snagging the spot as the “hottest market” for the past nine years, data center work is certainly driving this train. Not surprisingly, 91% of Top 50 respondents selected data centers as one of their top three markets this year, and 92% named data centers as the electrification segment currently generating the most activity for their firm. Those results align with a news release from Associated Builders and Contractors (ABC) distributed on September 1. According to ABC Chief Economist Anirban Basu, July’s increase of 0.1% in nonresidential construction spending was “entirely due to data centers.” In eight of the 16 nonresidential subcategories examined, monthly spending was down. “Nonresidential activity is even more concentrated given that the power category, which has been boosted by the electricity needs of data centers, has also grown substantially over the past year,” said Basu. “While contractors remain upbeat about their sales over the next six months, according to ABC’s Construction Confidence Index, that upbeat outlook is increasingly dependent on a single sector.” This year’s Top 50 results certainly reiterate how powerful this sector has become. However, they also reveal an interesting challenge: How do you capitalize on record opportunity in the data center space while dealing with the ongoing labor conundrum? Despite this extraordinary growth, 83% of Top 50 respondents said they are having issues with labor shortages at this time, up from 74% last year. When asked which factor was having the most negative impact on the growth of their business, 64% identified “difficulty finding and retaining quality employees” as their biggest nemesis. Without a doubt, the data center construction boom means electrical contractors are fiercely competing for an already limited pool of electrical professionals, a challenge that hiring alone can’t seem to solve. That’s where productivity comes in. That’s the motivation behind one of EC&M’s new e-books, “The Human Side of Job-Site Productivity,” which will be available on our website toward the end of September. This compilation of articles looks beyond technology to successful labor management principles, effective communication strategies, and organizational methods that allow electrical professionals to do their jobs more effectively and efficiently. Last year, I questioned whether it was feasible for the Top 50 to keep their growth streak alive. This year, I got my answer. Now the question becomes: How do they manage that success and keep up this unprecedented pace, all while being squeezed by the skilled labor shortage? I’m sure next year we’ll be talking about how this group of key industry players harnessed the power of AI to boost productivity and work smarter, not harder. However, I also know that skilled people remain our industry’s most valuable resource. The contractors who master this productivity puzzle will inevitably turn today’s record opportunity into tomorrow’s growth.

E L

M

9" L C Gr

Als D

B M

MT

#2 Sc Add

Ellen Parson, Editor-in-Chief 8

September 2026 • www.ecmweb.com

2609ECM_8-9_Viewpoint.indd 8

9/9/26 12:10 PM

2609EC


EASIEST CUTS. LASTING EDGE.

LIFETIME GUARANTEE

ª

EASIEST CUTS. LASTING EDGE.

EASIEST CUTS. LASTING EDGE.

BEST GRIP. EASIEST CUTS.

CLEAN STRIPS. EASIER CUTS.

LINEMAN’S PLIERS

DIAGONAL PLIERS

LONG NOSE PLIERS

WIRE STRIPPERS

BOLT CUTTER CRIMPER

MT550

MT550C

MT558

MT558A

MT555

MT702

9" Lineman’s Comfort Grip Pliers (USA) Also Available: Dipped Grip

9" Lineman’s Comfort Grip Pliers w/ Crimper and Bolt Cutter (USA) Also Available: Dipped Grip

8" Diagonal Comfort Grip Cutting Pliers (USA) Also Available: Dipped Grip Sizes: 6", 7", & 8"

8" Angled Head Diagonal Comfort Grip Cutting Pliers (USA) Also Available: Dipped Grip

8" Long Nose Comfort Grip Pliers (USA) Also Available: Dipped Grip

8-20 AWG Dipped Grip Wire Stripper & Cutter (USA)

BEST FIT. MAX GRIP. MT202

#2 Phillips 4" Cushion-Grip Screwdriver (USA) Additional Bit Types & Lengths Available

2609ECM_MilwaukeeToolCorp.indd 1 2609ECM_8-9_Viewpoint.indd 9

MT500-6P

6 Pc Dipped Grip Pliers, Wire Stripper, & Cushion Grip Screwdrivers Set (USA) w/ PACKOUT ª Low-Profile Compact Organizer MT200-6

or visit https://qr.mke.tl/2wu3b BE THE FIRST TO KNOW ABOUT NEW PLIERS & SCREWDRIVERS

6 Pc Cushion-Grip Screwdriver Set (USA) New Solutions

Exclusive Events

Contests

8/20/26 12:10 1:52 PM PM 9/9/26


INSPECTOR INTEL

Why You Should Walk the Job Before the Inspector Does A successful inspection begins long before the AHJ arrives on site. BY PAUL ABERNATHY, NEC CONSULTANT

Many electrical contractors focus on whether an installation complies with the NEC, but inspection success often depends on much more than Code compliance alone. The overall condition of the installation, the availability of documentation, and the professionalism of everyone involved can significantly influence how smoothly an inspection proceeds. Once a contractor decides a project is ready for inspection, the next challenge is making sure it is presented in a way that allows the AHJ to evaluate the work efficiently — which goes beyond completing the installation. It also means preparing the site, organizing documentation, and being ready to answer legitimate questions (see the Figure on page 12).

A clean installation is not just about looking good

Many people misunderstand what inspectors mean when they say a job is “clean.” A clean installation is not merely an attractive installation; it is an installation that communicates control, planning, and workmanship. An electrical room with properly arranged raceways, accessible equipment, complete labeling, and clear working space tells a story. It shows the inspector that someone was paying attention. It does not guarantee there are no Code issues, but it does suggest that the contractor has control of the work. The opposite also tells a story. When an inspector walks into an electrical room and sees materials stacked in front of switchgear, missing panel schedules, covers 10

leaning against the wall, unidentified conductors, incomplete warning labels, and open boxes, the inspection becomes harder. The inspector now must determine whether the visible lack of completion is isolated or whether it reflects a larger problem throughout the installation. This is not where a contractor wants an inspection to begin. A clean job does not prove compliance, but a sloppy job invites questions. This is where contractors sometimes get frustrated. They may say, “We were going to fix that,” “We already knew about that,” or “That was on our list.” The natural response is simple: If it was already known, why did you call for an inspection? If an item was already on the punch list, it should have been corrected before the inspection. If the work was not complete enough for inspection, the request should

have waited until the inspector could evaluate the installation properly. There will always be projectspecific realities. There may be phased or partial inspections, temporary approvals, or specific areas released while other areas remain under construction. Those situations can be completely reasonable, but they need to be clearly communicated. The inspector should know what is being requested, what area is ready, and what work is not part of that inspection. Ambiguity creates problems, while clarity helps everyone involved.

Documentation is part of inspection readiness

Inspection readiness is not limited to what is physically installed. Documentation matters, and, in some installations, it can be just as important as the equipment on the wall.

September 2026 • www.ecmweb.com

2609ECM_10-15_Inspector_Intel.indd 10

9/9/26 12:12 PM

2609EC


NECA 2026 Visit Booth 2707

2609ECM_NSiIndustries.indd 1 2609ECM_10-15_Inspector_Intel.indd 11

8/24/26 12:12 3:42 PM PM 9/9/26


INSPECTOR INTEL

Approved plans should be available. Revisions should be identified. Equipment cut sheets may be necessary. Product listing information may be needed for unusual applications. Manufacturer installation instructions may be important where equipment has specific requirements. Firestop systems, selective coordination documentation, available fault current markings, short-circuit current ratings, and other project-specific documents may all come into play depending on the installation. Too often, the field team treats documentation as someone else’s problem. The installer assumes the office has it. The project manager assumes the foreman has it. The foreman assumes the engineer handled it. The inspector arrives, asks a reasonable question, and nobody on site can provide the answer. This type of delay is preventable, and it is one of the reasons documentation should be treated as part of inspection readiness instead of an afterthought. If the installation depends on an approved detail, an engineered design, a manufacturer’s instruction, or a product listing limitation, the documentation should be available when the inspection occurs. Inspectors are not required to accept verbal assurances when the installation raises a legitimate question. A contractor who can quickly produce the approved plans, relevant instructions, or product information is in a much better position than one who says, “I think it is okay,” or “That is how we did it on the last job.” The last job is not documentation.

Internal quality control protects the contractor

Some contractors look at quality control as an added burden. I see it differently. Internal quality control protects the contractor by reducing failed inspections, rework, return trips, and embarrassing conversations with owners and general contractors. It helps train younger electricians and assists foremen with identifying patterns before they become company-wide habits. It also creates a more professional relationship with the AHJ because the contractor demonstrates that inspection readiness is being taken seriously. 12

There are several things electrical contractors can do to prepare the site before the inspection takes place, helping ensure a smooth inspection process.

A simple internal checklist can make a significant difference. It does not need to be complicated, and, in fact, if it is too complicated, nobody will use it. The best checklists are practical, job specific, and focused on the items most likely to cause inspection problems. For example, a rough-in checklist may focus on box fill, cable and raceway support, protection from physical damage, bored holes, nail plates, equipment locations, bonding paths, and coordination with other trades. A final inspection checklist may focus on covers, labels, directories, working space, GFCI and AFCI protection, disconnect identification, unused openings, equipment access, grounding and

bonding completion, and required documentation. The point of a checklist is not to replace knowledge of the Code. It is to build a process that forces someone to slow down and verify the basics before the inspector is called. That process also helps identify training needs. If the same correction appears on multiple jobs, that is not merely an inspection issue; it is a training issue. Contractors should track repeated corrections and use them to improve their internal education. Inspectors see patterns. Contractors should see them too.

When the electrician may be right

There is another side of this discussion that should not be ignored. Sometimes

September 2026 • www.ecmweb.com

2609ECM_10-15_Inspector_Intel.indd 12

9/9/26 12:12 PM

2608EC


2608ECM_TheNewIEM.indd 1 2609ECM_10-15_Inspector_Intel.indd 13

8/6/26 12:12 4:14 PM 9/9/26 PM


INSPECTOR INTEL

project. That is the outcome everyone should want.

The best inspection is usually the least dramatic one

Disagreements will inevitably happen; however, it is important for all parties involved to have professional Code discussions that respect and, most importantly, ensure a safe installation.

the electrician or contractor may be correct, and the inspector may be mistaken or apply a poor interpretation to the installation. Inspectors are human. Electricians are human. Designers are human. The Code can be complex, product listings can be specific, and field conditions can create questions that are not always answered by memory or habit. The problem is not that disagreements happen. The problem is how those disagreements are handled. A professional Code discussion should not turn into a contest of personalities. The goal is not for the electrician to embarrass the inspector or for the inspector to prove authority over the electrician. The goal is to get the installation completed safely, correctly, and on time. This is where tact matters. An electrician who believes the installation is compliant should be prepared to explain the position respectfully with the adopted Code language, approved plans, product listing, manufacturer’s instructions, or other applicable documentation available. There is a big difference between saying, “You are wrong,” and saying, “Can we look at the Code Section together so I can understand how it is being applied?” One approach creates conflict. The other keeps the conversation professional. 14

The same is true for inspectors. A good inspector should be willing to explain the basis for a correction and identify the requirement being applied. This does not mean the inspector gives up authority, and it does not mean every field disagreement becomes a debate. It simply means that inspection decisions should be grounded in Code, approved documents, listing information, and sound interpretation rather than personal preference or “that is how I have always called it.” Anyone who has spent enough time in this industry learns that tact is a skill (see Photo above). Sometimes it is learned the hard way. A young electrician may be technically correct but communicate it poorly. An inspector may have the right concern but explain it in a way that sounds dismissive. A foreman under schedule pressure may push too hard. A project manager may be more focused on the date than the details. These moments are where cooler heads need to prevail. When a disagreement is handled properly, it can improve the inspection process. The electrician learns how the AHJ views the installation. The inspector may gain additional information that changes the interpretation. The contractor avoids unnecessary escalation. The owner benefits from a safer and more efficient

A good inspection should not feel like a courtroom battle or guessing game. It should not require the inspector to uncover a long list of basic unfinished items before the real inspection can even begin. The best inspections are usually the least dramatic ones. The inspector arrives, the correct area is ready, the foreman or responsible person understands the installation, the approved plans are available, the work is accessible, the equipment is labeled, and the obvious completion items are done. Questions are answered professionally, and, if a legitimate issue is identified, it is discussed clearly and corrected properly. This is how the process should work. Electrical inspectors have an important job, but so do electricians, contractors, engineers, and facility personnel. The inspection process works best when each party understands its role. The contractor installs and verifies the work. The designer provides the design. The installer follows the Code, approved plans, product listings, and manufacturer instructions. The inspector verifies compliance for the AHJ. When the inspector becomes the first person performing meaningful quality control, that process has already broken down. The solution is not complicated — but it does require discipline. Walk the job before the inspector does. Look for the obvious. Verify the documentation. Correct known issues before the inspection request. Train crews based on repeated corrections. Treat inspection readiness as part of the installation — not as an afterthought. The inspection should not be your first quality-control program — it should be confirmation that your quality-control program is already working. Paul Abernathy is the Director of Technical Services at Prysmian, and the CEO, president, and chairman of Electrical Code Academy, Inc.

September 2026 • www.ecmweb.com

2609ECM_10-15_Inspector_Intel.indd 14

9/9/26 12:12 PM

2609EC


Mission-critical supply that meets demand. Zekelman is a 100% domestic manufacturer ready with a full line of products and services for any mission-critical project — steel and PVC conduit, metal framing (strut), EC&N and structural tubing — all available at scale. No overseas shipping and no supply chain hiccups. Our companies provide the engineering resources, logistics support and service you expect. One dependable partner that picks up when you call. Let’s talk about your next project. zekelman.com/electrical

Steel Conduit & EMT | PVC Conduit | Elbows & Couplings | Strut & Accessories

2609ECM_10-15_Inspector_Intel.indd 2609ECM_ZekelmanIndustries.indd 1 15

9/9/26 8/31/26 12:12 3:01 PM PM


ELECTRICAL TESTING EDUCATION

The Importance of NFPA 70E to OSHA Violations and Fines

O F

How OSHA enforces standards and steps employers can take to ensure compliance and safeguard employees

I o

BY RON WIDUP, VECTOR POWER

OSHA in preparing an electrical safety standard that would serve OSHA’s needs and assist in complying with the requirements of Section 6(b) of the Occupational Safety and Health Act.” When it comes to workplace safety, few industries are exempt from the risks associated with electrical hazards. They’re simply everywhere. OSHA has been a pivotal force in enforcing workplace electrical safety standards, and NFPA 70E plays a significant role in this process.

Violations and fines

Photo 1. OSHA’s primary goal with its most recent guide is to protect workers from arc flash-related hazards.

You have probably seen OSHA’s recent guide, Protecting Employees from Electric-Arc Flash Hazards. OSHA produced this guide to assist employers and employees in understanding and protecting against arc flash hazards, which raises an interesting question about OSHA and its relationship to NFPA 70E, Standard for Electrical Safety in the Workplace (Photo 1). It reminds us of how important it is to understand the hazards of electricity and, more specifically, to understand the words and meaning behind NFPA 70E, as OSHA often uses the standard as a reference for its actions related to violations and fines. Remember, it was OSHA in 1975 that recognized a need to create a standard “to fulfill OSHA’s responsibilities that would still be fully consistent with the NEC.” Here’s 16

information (in part) related to that, straight from the NEC foreword. In May 1975, the Assistant Secretary of Labor for OSHA responded as follows: “The concept, procedures, and scope of the effort discussed with my staff for preparing the subject standard appear to have great merit, and an apparent need exists for this proposed consensus document, which OSHA could consider for promulgation under the provisions of Section 6(b) of the Act. OSHA does have an interest in this effort and believes the proposed standard would serve a useful purpose. “The Standards Council of NFPA announced the formal appointment of a new electrical standards development committee on January 7, 1976. The Committee on Electrical Safety Requirements for Employee Workplaces was formed to assist

But how does NFPA 70E impact OSHA violations and fines (Photo 2 on page 18)? NFPA 70E, a comprehensive set of guidelines designed to reduce the risk of electrical injuries and fatalities, differs from OSHA regulations, which are federal law. Note that NFPA 70E is a voluntary standard, although it is widely regarded as a best-practice manual for electrical safety and is frequently used as a benchmark by OSHA inspectors.

A d c s

W t t I t a

W d A t a

How OSHA and NFPA 70E interact

OSHA enforces workplace safety under the General Duty Clause Section 5(a) (1) of the Occupational Safety and Health Act, which requires employers to provide a workplace “free from recognized hazards.” It was just said, but it bears repeating, that while NFPA 70E is not federal law, OSHA often uses it to validate and enforce compliance with safety standards… and here’s how. Validation of recognized hazards. OSHA considers NFPA 70E a recognized industry standard. If an employer fails to implement measures

P m

P

September 2026 • www.ecmweb.com

2609ECM_16-21_NETA.indd 16

9/9/26 12:16 PM

2609EC


MODULAR INTERCHANGEABLE COVERS

ONE OUTLET. YOUR FINISH. YOUR STYLE Interchangeable h bl covers let l your countertop outlet to evolve with your space. Arlington’s CT4 Series combines modern design, powerful USB charging and codecompliant performance in one sleek, space-saving solution. With up to 60W of USB charging power, the outlet provides convenient charging for today’s devices right where you need it. Interchangeable covers let you customize the finished look to complement virtually any countertop, kitchen or bar. When not in use, the flush-closing trap door creates a clean, seamless appearance. A proprietary Water Shield and sealed tamper-resistant receptacle help protect against spills.

- 60W USB-C/USB-A charging options - NEC 406.5(E) Listed for countertop applications - Passes UL 498 Spill Water Test with a 64 oz. spill while open - 20A, 125V tamper-resistant, gasketed duplex receptacle - Proprietary modular electrical connector E A S Y TO I N S TA L L

Proprietary electrical connector makes install easy

Proprietary water shield protects the outlet from spills

Contractors can install the base now; cover installation can be completed later by anyone

Covers comes in three sheens matte, semi-gloss, gloss

INTERCHANGEABLE COVERS SCAN TO LEARN

MORE ABOUT THIS PRODUCT

WHITE

Patent pending

BLACK

NICKEL

AVAILABLE IN GLOSS, SEMI-GLOSS AND MATTE

BRASS 159

www.aifittings.com Scranton, PA 18517 800-233-4717

2609ECM_Arlington_1040061-0926_159.indd 2609ECM_16-21_NETA.indd 17 1

8/28/26 12:16 9/9/26 9:36 PM AM


ELECTRICAL TESTING EDUCATION

outlined in NFPA 70E, OSHA can cite this as evidence of non-compliance with the General Duty Clause. For example, an employer who does not conduct an arc flash risk assessment violates NFPA 70E guidelines, which OSHA can use as a basis for issuing a citation. Reference in citations. OSHA frequently references NFPA 70E in violation citations to specify the standard that employers failed to meet. While the citation itself may list an OSHA regulation, the underlying details often draw directly from NFPA 70E requirements. Increased fines. Failure to comply with NFPA 70E can significantly increase OSHA fines. Penalties can range from thousands to hundreds of thousands of dollars, depending on the severity and frequency of violations.

A few real-world examples

Case No. 1: Employee killed when electrocuted (March 2024). Two serious citations (one for $11,292 and one for $16,131) were issued related to an electrocution on the job site.

Electrical Testing Education articles are provided by the InterNational Electrical Testing Association (NETA), www.NETAworld.org. NETA was formed in 1972 to establish uniform testing procedures for electrical equipment and systems. Today the association accredits electrical testing companies; certifies electrical testing technicians; publishes the ANSI/NETA Standards for Acceptance Testing, Maintenance Testing, Commissioning, and the Certification of Electrical Test Technicians; and provides training through its annual conferences (PowerTest and EPIC — Electrical Power Innovations Conference) and its expansive library of educational resources.

18

U c Photo 2. NFPA 70E plays a pivotal role when it comes to OSHA enforcement, violations, and fines.

At 9:30 a.m. on March 21, 2024, an employee (62-year-old male) was installing a shunt on a pump station. The employee was electrocuted and suffered arc blast burns to the chest, neck, and face. The employee died. (OSHA Inspection Nr: 1739835.015) Case No. 2: Employee killed by electrocution (January 2024). A serious citation for $16,131 was related to an electrocution. On Jan. 11, 2024, after completing a safety brief, a four-person crew proceeded to remove and install overhead power lines on a newly installed 95-ft-long concrete utility pole. The crew consisted of: a foreman, Employee No. 1 (59-year-old male; lineman); Coworker No. 1 (heavy equipment operator); Coworker No. 2 (lineman); and Coworker No. 3 (operator). Coworker No. 1 was operating a derrick digger to remove the second 65-ft-long concrete pole. The other 65-ft-long concrete pole had been removed from the ground the day prior. Employee No. 1 was acting as the groundman, directing Coworker No. 1. Coworkers No. 2 and No. 3 were installing the overhead power lines utilizing an electrical utility bucket truck. The three 115kV transmission power lines were not energized while performing these operations. At approximately 9:30 a.m., after Coworker No. 1 cleared the concrete utility pole off the ground, he began

to lower the pole into the hole. The boom assembly rotated toward the right, allowing the top end of the utility pole to make contact with an adjacent 46kV overhead power line, creating an arc flash. Employee No. 1 was in contact with the utility pole, which had the grounding cable still attached, and suffered an electrocution. Employee No. 1 was killed. (OSHA Inspection Nr: 1720741.015) Case No. 3: Employee killed in arc flash while troubleshooting switch (October 2023). Two serious citations (one for $11,292 and one with no fine) were issued related to an electrocution and arc flash fatality. At 10:00 a.m. on Oct. 22, 2023, an employee (25-yearold male) working as an electrician for a natural-gas distribution company was troubleshooting switchgear in the motor control center. The employee was working with three coworkers who worked for other employers. The employee contacted live electrical equipment, and an arc flash occurred. The employee died from electrocution, burns, and smoke inhalation. (OSHA Inspection Nr: 1705435.015)

Why NFPA 70E compliance matters

You should not worry only about the money associated with the consequences of non-compliance with NFPA 70E and OSHA regulations (Photo 3 on page 20). The

September 2026 • www.ecmweb.com

2609ECM_16-21_NETA.indd 18

9/9/26 12:16 PM

2605EC


CONVENIENT • TIME-SAVING

SPLIT GROUNDING BUSHINGS EASY INSTALLATION on EMT, THREADED and UNTHREADED RIGID and IMC Arlington’s 550 Series zinc diecast split grounding bushings are convenient and time-saving. Available in 5” and 6” aluminum diecast They’re split to allow the addition of a bushing BEFORE or AFTER cables are installed in threaded or unthreaded metal conduit. Great for tight spaces!

UNTHREADED conduit 553

• Ships Assembled • 1/2” to 4” zinc ground bushings can be used with IMC and RMC • 2-1/2” to 4” zinc ground bushings can be used with IMC, RMC and EMT • 5” & 6” aluminum ground bushings can be used with IMC, RMC and EMT

THREADED conduit

• For Steel or Aluminum IMC or RMC

SPLIT

555

EASY TO INSTALL

1

2

1 Loosen side screws, allowing bushing to pivot around installed cables.

2 Tighten set screw to seat bushing on conduit. ®

SCAN TO LEARN

5" Aluminum diecast 5591250

5 & 6 inch ALUMINUM DIECAST Bushing

MORE ABOUT THIS PRODUCT

152

www.aifittings.com Scranton, PA 18517 800-233-4717

2605ECM_Arlington_1031525-0526_152.indd 1 2609ECM_16-21_NETA.indd 19

5/4/26 12:16 9:47 AM 9/9/26 PM


C

ELECTRICAL TESTING EDUCATION

Photo 3. Consequences of OSHA and NFPA 70E non-compliance include significant bodily harm from arc flash hazards — or, at worst, death.

Safety Matters This twice-a-month e-newsletter delivers the latest trends and information on electrical safety, reports on specific accidents in the field, and provides tutorials and evergreen safety content that can be used for reference and training.

Topics covered include: • Best practices for safely working on electrical equipment • Accidents and investigations • Arc flash • PPE • Shock and electrocution • Fire and security • Safety audits

Subscribe Today See all of our EC&M e-newsletters at www.ecmweb.com

consequences extend beyond monetary fines. Employers who neglect electrical safety put their workers at risk of severe injury or death and face reputational damage with their customers and their competitors in the industry. As always, they risk potential litigation… not only against the company but also against individuals. Here’s why compliance is critical: Protecting employees. The primary goal of NFPA 70E is to safeguard employees from electrical hazards. Implementing its guidelines not only helps employers achieve legal compliance but also fosters a safer workplace. OSHA does not enforce NFPA 70E directly, but may use it as evidence when enforcing its own standards. Reducing financial risks. OSHA fines for electrical safety violations can be steep, often exceeding six figures. Adhering to NFPA 70E minimizes the likelihood of citations and the financial burden of non-compliance. Enhancing productivity. A safe work environment reduces downtime caused by accidents, leading to improved productivity and employee morale. Avoiding legal liabilities. In the event of an incident, adherence to NFPA 70E can serve as a defense against claims of negligence and OSHA violations.

What can you do?

As an employer, what can you do to ensure compliance with NFPA 70E and meet the intent of OSHA’s rules and requirements? If you don’t do anything else, at least do these five things: • Conduct risk assessments. 20

Regularly evaluate arc flash and electrical shock risks. • Implement LOTO procedures. Ensure all energy sources are properly de-energized. • Provide PPE. Equip employees with NFPA 70E-compliant protective gear. • Offer training. Train employees on electrical safety practices and the specific hazards of their work environment. • Document procedures. Maintain clear, written policies and procedures for electrical safety.

Conclusion

The NFPA 70E standard plays a vital role in shaping workplace safety practices and serves as a cornerstone for OSHA’s enforcement efforts. While not legally binding, it is widely regarded as the gold standard for electrical safety and often forms the basis for OSHA citations and fines. By understanding the interplay between NFPA 70E and OSHA regulations, employers can better protect their workforce, avoid costly penalties, and create a culture of safety. Ultimately, compliance is not just about avoiding fines; it’s about safeguarding lives and building a safer future for everyone. Remember: Before working on it, turn it off. And you know this — test before touch!

E C

•

•

•

•

•

A T

Ron Widup has worked in the electrical power testing and maintenance industry for more than 45 years. He serves as Chief Technical Marketing Officer for NETA Accredited Company Vector Power in Plano, Texas.

w

September 2026 • www.ecmweb.com

2609ECM_16-21_NETA.indd 20

S

9/9/26 12:16 PM

2609EC


1-INCH TRADE SIZE CABLE & CONDUIT SUPPORT BRACKET

C ableAble Commercial-Grade

TM

I N COM M ERCIAL & R ESI DENTIAL AP P LICATIONS STACKING

SAVE UP TO $32 PER CONDUIT Support Stack

SAVE UP TO $29.00 PER MC Backbone Support

ENGINEERED FOR COMMERCIAL APPLICATIONS •

PLENUM RATED

•

LOAD RATED UP TO 300LBS

•

SAVES MATERIAL AND LABOR

•

REDUCES CEILING CONGESTION

•

STACK TO MULTIPLY SAVINGS

1-1/4" holes

All styles available in bulk 50 packs. To order, add “X” suffix to item number.

CA4L

CA8L

CA4 T-Bracket

CA8 T-Bracket

¨ SCAN TO LEARN

Listed for Canada

MORE ABOUT THIS PRODUCT

www.aifittings.com Scranton, PA 18517 800-233-4717

2609ECM_Arlington_1040063-0926_148.indd 1 2609ECM_16-21_NETA.indd 21

Patent pending

148

© 2026 Arlington Industries, Inc.

8/28/26 12:16 9:32 PM AM 9/9/26


SAFETY CORNER

C C

Rethinking Ladder Safety

From the incident data, we can see the traditional approach to ladder safety isn’t working. What is the solution? BY MARK LAMENDOLA, ELECTRICAL CONSULTANT ID 51012667 © Kyle Simpson | Dreamstime.com

The traditional approach to ladder safety training is to cite a bunch of rules and expect people to remember them. This isn’t working. Each year, half a million people are treated for ladderrelated injuries in the United States, and falling off a ladder is a leading cause of workplace fatalities. Our focus here is on portable ladders, but many of the concepts also apply to fixed ladders.

Hardware

Hardware-based solutions include: • Buying only industrial-grade ladders solves the weight limit problem. They cost significantly more than consumer-grade ladders but are more stable and more durable. • Adding multi-position ladders to the ladder inventory reduces the “I couldn’t find the right size ladder” excuse for using too short of a ladder. • Providing ladder accessories allows users to make a ladder significantly safer in a given application. • Requiring a sign-out protocol makes users responsible for pre-use ladder inspection.

Misuse

Hardware solutions don’t stop people from misusing ladders however. Most ladder-related deaths are from less than 10 ft above grade, which strongly indicates most fatal incidents involve ladder misuse. It’s one of the many clues we have that ladder misuse is rampant. The question is how do we reduce it? Companies have tried various solutions, such as more frequent training, signs posted at ladder corrals, and more aggressive enforcement. Do we need bigger “Do not stand on top rung” warnings on step ladders? Do we need more warnings about other dangerous ladder usage (see Photo on 22

page 24)? Consider that even though every step ladder bears a decal or other marking saying not to stand on the top rung, many people still do. Simply banning the use of ladders would take misuse to zero, but this is not practical. Reducing the need for ladders is quite practical. Let’s go to the hierarchy of risk control methods [NFPA 70E Sec. 110.3(H)(3)]. Elimination is the first of six strategies. You can take some steps to eliminate the need for ladders (e.g., locate junction boxes within reach of someone standing at grade). You can also take steps to eliminate the tipping hazard of portable ladders. A ladder that is welded in place isn’t going to tip over, but somebody can still fall off of it. A company’s management can continue down this list to reduce (but not eliminate) ladder dangers. You still have to get people to use ladders safely.

Awareness and self-discipline

OSHA focuses on the employer’s responsibilities. This is a limited tool set. The employer can: • Ensure ladders are contractor grade. • Ensure ladders are inspected at

prescribed intervals and removed from service if damaged. • Ensure employees are trained in ladder selection and use. • Enforce ladder safety training through a variety of means. That leaves everything else up to the ladder user. For electrical safety programs, NFPA 70E, Standard for Electrical Safety in the Workplace, puts fairly heavy responsibility on the employee. As you move into NFPA 70E from the front cover, this becomes clear as early as Sec. 110.3(D), which is titled “Awareness and Self-Discipline.” This theme arises repeatedly as you continue through the standard. Why should ladder safety be any different? When this aspect is missing from the ladder safety aspect of your safety program, people misuse ladders — and it’s usually missing. A ladder, in simplest terms, is two rails connected by crossbars. What can possibly go wrong? What “goes wrong” is the ladder itself is only part of a dynamic system. In this system, the user must account for such things as: • The height needed. • The horizontal reach needed.

SC

M TH

September 2026 • www.ecmweb.com

2609ECM_22-27_Safety_Corner.indd 22

9/9/26 12:17 PM

2604EC


C ableAble Commercial-Grade

TM

NEW

2-INCH TRADE SIZE CABLE & CONDUIT SUPPORT BRACKET

ENGI N EER ED FOR COM M ERCIAL AP P LICATIONS CA4L200

STACKING

SCAN TO LEARN

MORE ABOUT THIS PRODUCT

• • • • •

PLENUM RATED LOAD RATED UP TO 300LBS SAVES MATERIAL AND LABOR REDUCES CEILING CONGESTION STACK TO MULTIPLY SAVINGS

2-1/2” CA4L200

Power or Low Voltage EMT, RMC, IMC and FEEDER MC ALSO AVAILABLE IN 1-Inch www.aifittings.com Scranton, PA 18517 800 233-4717

2604ECM_Arlington_1029729-0426_147.indd 1 2609ECM_22-27_Safety_Corner.indd 23

Patent pending

147

© 2026 Arlington Industries, Inc.

3/19/26 12:17 2:36 PM PM 9/9/26


ID 141013221 | © Welcomia | Dreamstime.com

SAFETY CORNER

This photo shows several safety mistakes, including the fact that there’s debris on one of the rungs and the worker’s center of gravity is way too far from the ladder.

• The suitability of the surface the ladder is on. Slick tile floor? Loose gravel? Slanting grade? • Lateral forces generated by load shifting, climbing, and reaching. • Transportation of tools and materials from grade to the elevated location. • User fatigue, user distraction, user errors in set-up, unanticipated foot slippage on rung, user error in downclimbing. For all but stepladders: • The amount of pressure exerted by gravity versus the amount of adhesion generated by the ladder feet at one end and the ladder stabilizer and/or top at the other. • The surface the top of the ladder is leaning against and how much adhesion is practical. • The angles formed between the top resting point and the work, the grade, and the top resting point. That’s a lot to account for. Absent a methodical approach, most of it won’t be accounted for. It’s typical to assume the ladder is safe until you spot something unsafe. That’s backwards from how you should look at it. We can again go back to NFPA 70E to draw on an electrical safety principle that we can apply to ladder safety. You assume it’s not in a safe condition until you verify certain conditions have been met [Sec. 110.2].

The zone method

One of the ways to address PPE adequacy is to break the body down into 24

zones, such as eyes, ears, chest, hands, etc. You look at each zone to determine if it’s adequately protected from the dangers identified in the particular environment about to be encountered. This is a good approach for safe ladder use, too. Instead of trying to recall a bunch of rules before using a ladder, you go one zone at a time and identify the possible dangers in that zone based on the conditions you encounter. Either the applicable rules will emerge from your memory, or you’ll know you need to look them up. What changes is those rules won’t be buried and mixed in with all the other things you have to remember and think about. Start with the application. You have a base on which to set the ladder and a target higher up where the ladder needs to reach. These are some distance apart. Depending upon that distance and the size of the base, you will determine whether to use a step ladder or a straight ladder. Once you have chosen between these two types, you now know whether both ladder supports will be on the base (stepladder) or if one will be on the surface against which you will be leaning the ladder (straight ladder). At this point, you’ll know how tall of a ladder you need. Do you have one that tall? If not, is “close enough” a valid choice? Only if you are overshooting with a “too-tall” ladder that still allows you to get a steep enough angle to avoid a “slide out.” If your ladder is too short, you need a taller ladder. This is negotiable only if you think you can win an argument against gravity. So far, nobody has managed to do that.

Once you have established the two end points, make a list of the potential dangers you see as you examine the situation. It may seem outdated, but a pocket notebook is perfect for this. Just write down everything you see, such as loose gravel, grade slants left, or grade slants back. Then use this as a checklist. For example, if you noted loose gravel then you might solve this by digging down a little way into the gravel. If it’s sharp gravel, it will hold the ladder securely. If it’s smooth (e.g., river rock), it won’t. In the latter case, laying a plywood sheet on top may work, or maybe you will need to dig down past the layer of loose rock. Since a ladder has only two ends, does that mean you have only two zones? No, because a ladder has a middle. It also has a human on it. For the middle of the ladder, inspect the rungs and any locks or extenders. What else do you see in this zone?

Human limitations

As a user, keep your human limitations in mind. Odds are you don’t have an extra set of arms with which to carry tools while also climbing up and down a ladder. So how will you safely get tools and materials up and then back down? The rope and bucket system is a common solution. If you’re fatigued, now is not the best time to get on a ladder, so be extra aware. But if you are severely fatigued, stay off the ladder until you have had a chance to rest. It’s better to come back tomorrow than to fall today. What dangers might be present if you do get on that ladder? Every conscientious electrician wears ANSIrated safety shoes, but are yours slip resistant? If you are going to use a ladder, it’s best that they are. The work itself is a distraction from ladder safety awareness and vice-versa. You should ensure you can trust your ladder and forget about it while you are checking that luminaire for 277V. Only when the circuit is locked out or the covers are back in place can you refocus your attention on the ladder and climb safely back down. Mark Lamendola is an electrical consultant based in Merriam, Kan. He can be reached at mark@mindconnection.com

September 2026 • www.ecmweb.com

2609ECM_22-27_Safety_Corner.indd 24

9/9/26 12:17 PM

2606EC


ONE PIECE • NON-METALLIC

METER MOUNTING BASE I NSTA L LS O N SI D I N G – A N D OTH E R S U R FAC ES

Whether you’re installing a meter, a timer, or an AC disconnect, Arlington’s Non-Metallic Mounting Bases give you a professional, flat surface on any siding type. MM23

MM23

•

Ultimate Versatility: Use them for electric meters, pool panels, or cable boxes.

•

Customizable: Squared-off corners allow for gangability - snap them together to create Remove flanges for retrofit work the exact size you need.

•

Easy Install: Works on any siding, whether it’s already up or yet to be installed.

•

Code Compliant: Easily meet NEC 2020 requirements for outdoor service disconnects.

•

Built to Last: UV-rated, heavyduty plastic with a paintable, textured finish to match any

J-channel covers cut ends of siding

MM18

Gangable...for custom sizing Disconnects

Time Clocks

Cable TV Boxes

®

156

MM7 5" X 7"

MM10 7" X 10"

MM18 15-7/8" X 17-5/8"

MM23 17-5/8" X 23"

www.aifittings.com Scranton, PA 18517 800-233-4717

2606ECM_Arlington_1033157-0626_156.indd 1 2609ECM_22-27_Safety_Corner.indd 25

5/20/26 12:17 2:16 PM PM 9/9/26


2609ECM_RittalCorp.indd 1 2609ECM_22-27_Safety_Corner.indd 26

9/9/26 12:17 PM


Built to perform Better Designed to work Together Legacy tools aren’t built for tomorrow’s scale. But ours are. Eliminate manual bottlenecks with an all-in-one solution from Rittal and Eplan. By integrating engineering, enclosures, and automation, we bridge the gap between design and assembly — turning data into instant, production-ready instructions. The result: No more manual drilling or field fitting. Just a high-velocity workflow that scales your capacity and handles complexity without the overhead.

Learn More

2609ECM_22-27_Safety_Corner.indd 27

9/1/26 12:17 4:08 PM 9/9/26 PM


BY TOM ZIND, FREELANCE WRITER

Data Center Buildout Fuels Revenue Blowout This year’s 2026 Top 50 Electrical Contractors post combined revenue boost of 35% for 2025 as AI-fueled construction surges.

B

eating back persistent labor challenges, project logistics headwinds, and a pervasive climate of flux on multiple fronts, leading electrical contractors leveraged a growing data center and power infrastructure buildout to post stellar revenue gains in 2025.

A collection of electrical contractors polled in 2026 by EC&M reported combined 2025 revenues of $80.417 billion, placing them in the exclusive group that forms our Top 50 Electrical Contractors (see Rankings Table on page 30). That combined revenue tally comes in

a whopping 35% higher than 2024 revenues for the 2025 Top 50, marking an unprecedented year-over-year gain for the annually top-ranked firms (see Historical Trends Chart on page 32). Only six of the 43 firms that were in last year’s Top 50 list reported revenue declines this year; revenue increases for most were in double digits — with some handily topping 50%. Continued growth in data center construction work heavily reliant on electrical professionals played to

Sponsored by

the industry’s strengths, dropping business into the laps of contractors with data center know-how and sending many of the rest scrambling to get a piece of the action.

All together now: data centers

Courtesy of MYR Group

The New England Clean Energy Connect (NECEC) began delivering clean hydropower from Canada to New England in January 2026. E.S. Boulos (ESB), an MYR Group subsidiary, was the electrical contractor selected for this critical infrastructure project in Northwest Maine. 28

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 28

Data centers were on the list of the three hottest 2025 markets (Fig. 1 on page 34) for 91% of responding firms — five percentage points higher than last year. That market has been the top votegetter for years, but the share listing it has steadily grown. Data centers also overwhelmingly received the most mentions as the component of the broad electrification trend generating the most activity for Top 50 respondents (Fig. 2 on page 36), with 92% saying Sponsored by Champion Fiberglass

9/9/26 12:01 PM


Courtesy of Motor City Electric

Courtesy of Aldridge Electric

Motor City Electric performed electrical construction for two new hyperscale data center buildings at Amazon Web Services’ Project Rainier campus in New Carlisle, Ind. Totaling approximately 440,000 square feet, the facilities are designed to support high-density AI computing and require highly reliable, mission-critical electrical infrastructure.

Courtesy of Power Design

In the heart of Miami, Fla., Royal Caribbean’s new headquarters spans more than 900,000 square feet along the city’s waterfront. Alongside long-term partner Suffolk Construction, Power Design is delivering electrical, life safety, DAS, and low-voltage systems for the project. Sponsored by Champion Fiberglass

2609ECM_28-63_Cover_Story.indd 29

www.ecmweb.com • September 2026

29

9/9/26 12:01 PM


The 2026 Top 50 Electrical contractors Sponsored by

The Top 50 Electrical Contractors Ranking 2026 2025 Company Headquarters 2025 Sales 1 1 Quanta Services Houston $23,000,000,000 2 2 Rosendin Electric San Jose, Calif. $5,500,000,000 3 3 Emcor Norwalk, Conn. $5,100,000,000 4 5 Everus Construction Group Bismarck, N.D. $3,746,387,000 5 4 MYR Group, Inc. Thornton, Colo. $3,660,000,000 6 6 IES Holdings, Inc. Sugar Land, Texas $2,947,408,000 7 8 M.C. Dean Tysons, Va. $2,458,777,008 8 7 MMR Group, Inc. Baton Rouge, La. $2,444,000,000 9 10 Faith Technologies Incorporated (FTI) Menasha, Wis. $2,283,638,907 10 9 ArchKey Solutions St. Louis $2,012,000,000 11 11 The E-J Group Long Island City, N.Y. $2,000,150,000 12 14 Cache Valley Electric Co. Logan, Utah $1,260,000,000 13 17 Aldridge Electric, Inc. Libertyville, Ill. $1,200,000,000 14 15 Helix Electric, Inc. San Diego $1,141,100,000 15 16 The Newtron Group, LLC Baton Rouge, La. $1,129,000,000 16 18 Hunt Electric Corp. Eagan, Minn. $1,104,000,000 17 12 Power Design, Inc. St. Petersburg, Fla. $1,096,275,093 18 22 Facility Solutions Group (FSG) Austin, Texas $992,318,540 19 13 Motor City Electric Co. Detroit $974,903,962 20 NL New River Electrical Corporation Roanoke, Va. $942,000,000 21 20 Gaylor Electric Indianapolis $860,000,000 22 NL The State Group Franklin, Tenn. $851,000,000 23 NL Loenbro Westminster, Colo. $850,000,000 24 19 Bergelectric Corp. Carlsbad, Calif. $737,598,677 25 23 Wayne J. Griffin Electric, Inc. Holliston, Mass. $609,443,000 26 27 VECA Electric & Technologies Seattle $604,000,000 27 26 Alterman San Antonio $553,400,000 28 30 Sargent Electric Company Pittsburgh $553,000,000 29 24 ISC Constructors Baton Rouge, La. $551,000,000 30 31 Redwood Electric Group, Inc. Santa Clara, Calif. $550,000,000 31 NL Baker Electric & Renewables, LLC Escondido, Calif. $538,900,000 32 33 Rogers Electric Alpharetta, Ga. $525,000,000 33 47 O’Connell Electric Co., Inc. Victor, N.Y. $520,000,000 34 28 Interstates, Inc. Sioux Center, Iowa $512,819,000 35 42 Big State Electric San Antonio $508,000,000 36 34 Cleveland Electric Co. Atlanta $491,000,000 37 29 Inglett & Stubbs, LLC Mableton, Ga. $480,000,000 38 36 Encore Electric Lakewood, Colo. $463,000,000 39 38 Ace Electric, Inc. Valdosta, Ga. $443,850,000 40 46 J.F. Electric Edwardsville, Ill. $440,871,251 41 NL Corbins, LLC Phoenix $431,100,000 42 41 Commonwealth Holdings Lincoln, Neb. $428,400,000 43 35 Guarantee Electrical Co. St. Louis $428,000,000 44 39 Lake Erie Electric Companies Westlake, Ohio $405,629,000 45 37 Freestate Electric Laurel, Md. $396,500,000 46 32 JMEG, LLC Farmer’s Branch, Texas $368,764,000 47 44 ERMCO, Inc. Greenwood, Ind. $363,227,703 48 49 Continental Electrical Construction Co. Oak Brook, Ill. $361,465,000 49 50 Wilson Electric Tempe, Ariz. $301,000,000 50 43 The Morse Group Freeport, Ill. $298,000,000 NL-not listed. This company did not appear in last year’s Top 50 listing. NA-not available. EC&M did not have access to the electrical and datacom sales figure for 2024. 30

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 30

% change (2024-2025) 70.37% 49.05% 42.46% 31.47% 8.93% 17.61% 27.54% 4.83% 62.64% 18.35% 47.07% 16.67% 29.36% 19.24% 21.01% 24.75% -2.27% 32.99% -10.81% NA 14.67% NA NA -10.55% -1.06% 26.89% 12.89% 22.08% 0.37% 22.22% NA 23.53% 68.83% 9.13% 46.40% 17.52% 5.03% 18.11% 16.19% 44.08% NA 19.83% 4.39% 13.02% 1.41% -15.61% 9.43% 30.80% 15.11% -12.03%

N

Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2609EC


NO BURN-THROUGH FAULT RESISTANT CONDUIT ELBOWS FOR DATA CENTERS No burn-through eliminates elbow repairs

Durable and corrosionresistant for lower total cost of ownership

Light weight facilitates a smooth, safe, cost-effective installation

A 110 °C temperature rating results in less ampacity derating for the cable

Low coefficient of friction reduces cable pulling calculations Champion Duct® Electrical Conduit Elbows

®

p g ,

BABA-COMPLIANT DATA CENTER SOLUTIONS

BIM/REVIT

2609ECM_28-63_Cover_Story.indd 2609ECM_ChampionFiberglass_DataCenter.indd 31 1

8/28/26 9/9/26 12:01 10:16 PM AM


The 2026 Top 50 Electrical contractors

Comparison of Annual Revenue from Electrical and Voice/Data/Video Work (in billions of dollars)

80 70 Billions of dollars

60 50 40 30

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

10

2011

20 2010

it’s the primary driver. Further evidence of data centers’ impact: 63% say “AI-driven (hyperscale) data center expansion” is exerting a significant positive impact on business opportunities (Fig. 3 on page 36). Once again, no other market came anywhere near data centers in frequency of hot market mentions. But this year, power & utilities made a stronger showing, reflecting growth in a budding power transmission & distribution buildout that has strong ties to growing data center construction. That market was on 28% of firms’ top three markets list, which is double last year’s figure. Meanwhile, manufacturing, health care, renewables, and water/wastewater were highly ranked again. Contractors may have enjoyed firmer markets across the board in 2025. Those making more firms’ “slow” list (Fig. 4 on page 38) included private office, education/ institution, retail, hospitality, and oil and gas. That resembles last year’s

Year This year’s Top 50 electrical contractors smashed last year’s revenue record of $59.5 billion, reaching more than $80 billion this year — a 35% increase from last year’s survey results.

π SAFETY STARTS HERE COMPLETE LINE OF SAFETY PRODUCTS ALWAYS IN STOCK

ORDER BY 6 PM FOR SAME DAY SHIPPING

COMPLETE CATALOG

2609ECM_Uline.indd 1 32 September 2026

2609ECM_28-63_Cover_Story.indd 32

• www.ecmweb.com

1-800-295-5510

uline.com 8/21/26 9:57 AM Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2608EC


LOW VOLTAGE • HEAVY DUTY ZINC & STEEL

MOUNTING BRACKETS MULTIPLE STYLES FOR CLASS 2 LOW VOLTAGE WIRING

Arlington’s Low Voltage Mounting Brackets provide fast, easy cut-in installation for Class 2 communications, computer and cable TV wiring in existing or retrofit construction.

Two-Gang LV2M

Sturdy Non-bendable ZINC

LV1M and LV2M COMMERCIAL GRADE heavy duty ZINC mounting brackets, offer... • Extra rigidity and stability where performance and visibility are important or critical

Threaded holes for easy device installation

• Threaded holes for easy, fast device installation • Adjustable bracket for 1/4” to 1” wall board thicknesses

LV1M

Notched corners form cut out template Patented

LV1M, LV2M Sturdy, Non-bending ZINC • for Commercial Work

Two-Gang LV2S

NEW Notched corners on all - for cut out template

Our LV1S and LV2S PLATED STEEL mounting brackets, with the unique X-shaped bracket design, provide excellent stability and secure installation of low voltage devices in 1/4” to 1-1/4” walls - without an electrical box. Notched corners form cut out template

LV1S

®

Patent Pending

ELIMINATES

NEED FOR BOX

SCAN TO LEARN MORE ABOUT THIS PRODUCT

LV1S, LV2S Secure 4-corner wall support. Easy to install

132G

www.aifittings.com Scranton, PA 18517 800-233-4717

2609ECM_28-63_Cover_Story.indd 2608ECM_Arlington_1037942-0826_132.indd 33 1

7/21/26 9/9/26 12:01 10:07 PM AM


The 2026 Top 50 Electrical contractors

Courtesy of Bergelectric

S

Bergelectric installed critical electrical systems supporting patient care, advanced medical equipment, and reliable health care operations at Cedars-Sinai Marina Del Rey Medical Facility, Marina Del Rey, Calif.

Hottest market segments

LEDVANCE.COM/EN-US

1. Data centers 2. Manufacturing 3. Health care 4. Power (utilities/T&D) 5. Water/wastewater Fig. 1. Similar to last year’s results, data centers ranked as the hottest market sector for electrical contracting firms in 2025, followed by manufacturing and health care.

AREA LIGHT LUNAVIA SLEEK, MODERN DESIGN ELEVATES ANY OUTDOOR SPACE

High design meets high performance. With OPTI-SELECT as well as dedicated T5 distributions, plus wattage and CCT selectability, these versatile area lights deliver crisp, clean optics tailored to any application. Controls-ready, 0-10V dimming, LLLC, and DarkSky Approved.

34

SCAN TO

SEE MORE

ranking, but slow market mentions were somewhat less concentrated. Private office and education/ institution drew more mentions while hospitality, retail and oil/gas got fewer. Interstates, Inc. (No. 34), Sioux Center, Iowa, has been a fixture in serving the broad industrial sector, but some continued softness in pockets there has led it to engage more deeply in other emerging markets. “From a construction perspective, many of these (industrial) markets have seen slower growth in the last couple Sponsored by Champion Fiberglass

September 2026 • www.ecmweb.com

2609ECM_Ledvance_RMEL.indd 1 2609ECM_28-63_Cover_Story.indd 34

8/25/26 9:33 AM 9/9/26 12:01 PM

2509EC


SNAP2IT CONNECTORS ®

E AS IE ST C AB LE I NSERTI ON • N O TOOLS • S E CURE H O L D

17 seconds SAVE

4010AST 1/2” KO

4110ST

5010AST

LISTED SNAP2IT ® CONNECTORS FOR

NEW MC-PCS CABLE ...lighting & low voltage circuits in the same cable

1/2" KO

Easy to Snap into Box!

505010AST 3/4" KO

Fully assembled, SNAP2IT® fittings handle the widest variety of MC cable AND THE NEW MC-PCS cables. Compared to fittings with a locknut and screw, you can’t beat these snap in connectors for time-savings!

9

• Fits widest range and variety of MC cable 14/2 to 3/3 AC, MC, HCF, MC continuous corrugated aluminum cable and MCI-A cables (steel and aluminum)...including the new MC-PCS cable that combines power and low voltage in the same MC cable ANY Snap2It Connectors LISTED for MC cable are also LISTED for MC-PCS cable! These products offer the greatest time-savings. • Fast, secure snap-on installation • Easy to remove, reusable connector From cable Loosen screw on top. Remove connector from cable. From box Slip screwdriver under notch in Snap-Tite® ring. Twist. Remove connector. CATALOG NUMBER

Snap2It® connectors

DESCRIPTION

CABLE OUTSIDE DIA (OD)

4010AST

Snap in, 1/2" KO w insulated throat

.405 to .610

5010AST

Snap in, 1/2" KO w insulated throat

.580 to .780

505010AST

Duplex Snap in, 3/4" KO w insulated throat

(2) .590 to .820

4110ST

Snap in, 1/2" KO

.525 to .705

414110ST

Duplex Snap in, 1/2" KO

(2) .525 to .640

4141107ST

Duplex Snap in, 3/4" KO

(2) .525 to .690

4141107ST

Patented. Other patents pending.

www.aifittings.com • Scranton, PA 18517 • 800/233-4717

© 2015 Arlington Industries, Inc.

Product info aifittings.com/landing/snap2it-mc-cable-connectors

2609ECM_28-63_Cover_Story.indd 2509ECM_Arlington_988001-0925_9_REV.indd 35 1

8/27/25 9/9/26 12:01 10:03 PM AM


Courtesy of Aldridge Electric

The 2026 Top 50 Electrical contractors

Aldridge Electric served as the prime contractor for a freeway tunnel lighting upgrade, a project focused on replacing aging infrastructure with modern LED technology and intelligent control systems. The technical scope of the project included the installation of 835 LED luminaires across 6,400 feet of lighting.

Which electrification segment is currently generating the most activity for your firm? Data centers Building electrification (all-electric buildings) Battery energy storage systems (BESS) Utility/grid modernization

(N=37)

0

10

20

30

40

50

60

70

80

90

100

Percentage of respondents

Fig. 2. Consuming vast amounts of power, it was no surprise to see that data centers qualified as the top electrification business source among this year’s Top 50 respondents.

years,” says Chief Financial Officer Joel Van Egdom. “The food and beverage market has slowed the past year or two but is showing signs of growth. Meanwhile, data center opportunities continue to grow significantly, and we saw growth in our manufactured solutions offerings.” Data centers, advanced manufacturing, and high-power infrastructure have been key markets for Faith Technologies Incorporated (FTI), coming in at No. 9, Menasha, Wis. Executive Vice President Wade Leipold says that sharp focus easily sustained the firm in 2025. 36

How significantly is the AI-driven data center expansion affecting your business opportunities? Significant positive impact Moderate positive impact Minor positive impact No impact 10

20

30

40

50

60

70

Percentage of respondents

Fig. 3. Many electrical contractors are finding significant opportunities in hyperscale data center work.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 36

(N=40)

0

Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2608EC


CableStop

®

TRANSITION FITTINGS COST-EFFECTIVE CABLE TRANSITION FOR FEEDER SIZE CABLE SCAN TO LEARN MORE ABOUT THIS PRODUCT AND SIZING

2-1/2" 841536

NEC COMPLIANT

CABLE & CONDUIT TRANSITIONS Ideal for data center remote power panel feeds, equipment feeds, panels, and EV charger in parking garages, Arlington’s Listed CableStop® Transition Fittings provide a fast, cost-effective way to transition feeder cables into 1.25”, 2.5”, 3”, and 3.5” EMT, IMC, and RMC conduit.

Concrete tight when taped

Combining Arlington’s patented 8412 series cable fittings with conduit fittings, CableStop® simplifies transitions to larger knockout sizes while reducing SKUs. Available with set-screw or compression connections, each fitting includes multiple end-stop bushings and a free sizing template for quick, accurate installation. - 2026 NEC 300.17(F) & 2023 NEC 300.15(F)

841516

Set screw

FREE TEMPLATE for selecting bushing size

841536

Compression

®

131G Patented. Other Patents pending.

www.aifittings.com Scranton, PA 18517 800-233-4717

2608ECM_Arlington_1037939-0826_131G.indd 1 2609ECM_28-63_Cover_Story.indd 37

7/21/26 12:01 9:57 PM AM 9/9/26


Courtesy of FSG

The 2026 Top 50 Electrical contractors

L P

B

Facility Solutions Group is playing a vital role in strengthening North Texas’ water infrastructure through its work on the Leonard Water Treatment Plant. As part of the Bois d’Arc Lake Regional Water System, the facility is designed to provide a reliable supply of clean drinking water to one of the fastest-growing regions in the United States.

“Demand for reliable power infrastructure continues to grow, driven by AI, cloud computing, electrification, advanced manufacturing, and grid modernization,” he says. “Our customers are investing in larger, more sophisticated facilities that require the type of engineering, planning, and execution capabilities FTI offers.” Such markets are expected to sustain the growth trajectory at The E-J Group (No. 11), Long Island City, N.Y. The company’s revenues grew by 47%, fed by technology-fueled markets but also bolstered by more traditional sectors. “Data centers continue to be a major driver of growth, and mission-critical facilities remain strong,” says CEO Anthony Mann. “Beyond that, we’re seeing growth in power generation, transmission and distribution, transportation, renewable energy, and health care.”

It doesn’t get old

Several years of unrelenting demand pushing planned data center projects through to construction, coupled with overall strong and consistent demand in other sectors, again translated to upside revenue surprises for many contractors. Like last year — when there was a 17-point surge from the prior year — nearly three-quarters 38

Coldest market segments 1. Private office 2. Education/institution 3. Hospitality (tie) 3. Retail (tie) 5. Oil/gas (tie)

Exceed 73%

5. Public building (tie) Fig. 4. The top five slowest growth areas for Top 50 respondents mirror the same vertical market segments as the last few years.

say company revenues exceeded expectations in the prior year (Fig. 5). Michael Parkes, CEO of O’Connell Electric Company, Inc. (No. 33), Victor, N.Y., whose revenues surged 69%, says the company was inundated with work, forcing the company to make choices and be more strategic in taking on new business. “A lot of engineering and procurement activity in the utility project space is shifting to the construction phase,” says Parkes, adding that more revenue began flowing from data center projects. Revenues came in stronger than expected at Gaylor Electric (No. 21), Indianapolis, but receipts “could have been larger if we had had sufficient

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 38

Did your company meet, exceed, or not meet its revenue expectations in 2025? (N=44)

Did not Meet 2%

Met 25%

Fig. 5. After jumping 17 points last year, nearly three-quarters of Top 50 respondents again said prior-year revenues exceeded expectations.

supplies of materials,” says Jim Crews, president. Difficulty securing materials was one of several challenges contractors faced in 2025, none of which, however, seemed to dull overall assessments of the year past. Solid revenues, the broad impact of data center construction, and the growing Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2606EC


USE WITH YOUR OWN COVER

Low e l Profi

FURRED WALL BOX

™

ONE & TWO GANG BOX LOW PROFILE BOX & COVER ASSEMBLIES

Base Assemblies for 1/2" Wall Thickness & Standard Depth

Install on 1x2 Furring Strips or Block Wall with 1/2" Drywall

Block wall Furring strip

Mounting Bracket

Mounting Bracket

Eliminates Installation Steps! NO new furring strips NO wall break out NO sealing hole 1 $60/hour fully burdened labor rate

Two-gang

SAVE

15 MINUTES1 and $15.00 per BOX

FSB22

Our NEW Low Profile single and two-gang Furred Wwwall Box™ base assemblies have a 1/2” raised box cover for use with 1/2” wall thickness and standard depth devices. Fast, easy installation. There’s NO NEED to break out concrete block. NO NEED to install separate furring strips. NO NEED to seal the block wall breakout and box.

FSB12 exploded 1-Gang 17.0 cu. in.

• Integral cable securement – No pullout! • Versatile mounting options - installers can place the box/outlet where it’s needed.

FSB22 assembled

• Add BE1 or BE2 Box Extenders for applications with > 1/2” to 1-1/2 wall thickness

2-Gang 20.5 cu. in.

• Add BES1 or BES2 Surface Box Extenders for applicatoins with deep GFCI or USB oultet and 1/2” wall thickness ® SCAN TO LEARN

MORE ABOUT THIS PRODUCT

Patent pending

www.aifittings.com Scranton, PA 18517 800-233-4717 © 2026 Arlington Industries, Inc.

2609ECM_28-63_Cover_Story.indd 2606ECM_Arlington_1033152-0626_150.indd 39 1

150

9/9/26 6/2/26 12:01 3:07 PM PM


The 2026 Top 50 Electrical contractors

How would you characterize the 2025 business climate? (N=44)

Which material type has seen the greatest increase in price this year? Wire & cable

Strong 91%

Conduit, raceway & wireway Distribution equipment

(N=36)

0

10

20

30

40

50

60

70

80

90

Percentage of respondents

Fig. 8. In a dramatic shift from last year, “wire & cable” overtook “distribution equipment” by a big margin — up in mentions from last year by 36 points. Fair 9%

By what percentage has this material increased?

Fig. 6. Like last year, all but a handful of respondents characterized the business climate as “strong.”

1% to 5% increase 6% to 10% increase

Did your business experience an increase in material prices in 2025? (N=40)

11% to 14% increase 15% to 19% increase 20% to 24% increase

Yes 95%

25% to 29% increase 30% to 34% increase 35% to 39% increase

(N=35)

0

5

10

15

20

25

30

Percentage of respondents

No 5% Fig. 7. Again this year, material price increases were a major factor for nearly all electrical contractors completing this survey.

promise of sustained growth led nearly all firms to rate the 2026 business climate as “strong” (Fig. 6), up a couple of ticks from last year. Strong assessments by respondents have risen steadily since 2022. But supply chain issues, project delays, design glitches, and the ongoing problem of labor availability tested the nerves and creativity of electrical contractors.

A material problem

Nearly every firm said it faced increases in material prices (Fig. 7). Driven higher by a combination of surging 40

Fig. 9. Materials with the biggest percentage increase appeared to be modest for most Top 50 respondents; however, a fair share reported higher-than-usual increases in 2025.

demand, tariffs, and changing supply chains, prices continued to rise on many essential construction products. Project delays, cancellations, and design changes ensued in some cases, sending ripples of disruption through businesses. The electrical product experiencing the biggest price increase for most firms was “wire and cable” (Fig. 8). Half of respondents said the single material seeing the greatest increase for them rose 15% to 39% (Fig. 9). Availability continued to be a problem with many key electrical products contractors need. Respondents overwhelmingly put three products — switchgear, transformers, and generators — on their list of equipment categories with especially long lead times or other availability

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 40

constraints (Fig. 10 on page 42). For some, there were consequences; 65% of respondents say they at least occasionally had to deal with modified project designs or scheduling timelines (Fig. 11 on page 42). Increasingly compressed project timelines are a growing reality for contractors, and supply chain and design flaw issues top the list of culprits. Nearly half singled out poor design as the variable most impacting on-time/ on-budget completion (Fig. 12 on page 44) — up six points. Material delivery issues were cited by 29% and changeorders by 15%. Some projects Sargent Electric Company (No. 28), Pittsburgh, was engaged in had timelines adjusted due to product lead time issues, “but we’ve Sponsored by Champion Fiberglass

9/9/26 12:01 PM


NON-METALLIC • FIRE RATED

LISTED BOX EXTENDERS MULTIPLE STYLES EXTEND SET BACK BOXES UP TO 1-1/2 INCHES

Arlington’s variety of cULus Listed Box Extenders extend set back electrical boxes up to 1-1/2”. BE4

Made of heavy-duty, 105°C continuous use 94V0 rated, flame retardant plastic, they level and support wiring devices, while protecting wires against damage and stripping.

BE3

BE2

BE1

Choose the one that’s right for you! BE1, BE2, BE3, BE4...Single-, two-, threeand four-gang, and BE1R for round or octagonal boxes.

for ROUND or OCTAGONAL BOX

For all standard devices, switches and GFCIs, our box extenders comply with NEC Article 314.20 for set back boxes.

ROUND BE1R © 2024 Arlington Industries, Inc.

For use with Metallic and Non-Metallic Boxes 153

SCAN TO LEARN MORE ABOUT THIS PRODUCT

www.aifittings.com Scranton, PA 18517 800-233-4717 2605ECM_Arlington_1032106-0526_153.indd 1

5/1/26 1:09 PM

NON-METALLIC • FIRE RATED

LISTED BOX EXTENDERS LARGER & HEAVY DUTY FLANGES

Choose the one that’s right for you! Box Extenders with LARGER FLANGES for better device support in oversized or mis-cut wall openings, available in single-, two-, three- and four-gang, (patented BE1X, BE2X, BE3X, BE4X.)

LARGER FLANGE BE2X

Our new heavy duty, COMMERCIAL-GRADE Box Extender with a galvanized steel support plate! As shipped, single and two-gang BE1XLS and BE2XLS work with maxi cover plates, but they’re TRIMMABLE for use with midi and standard plates. Convenient. Saves time. Great for poorly cut drywall.

BE3X

BE2X

BE1X

For all standard devices, switches and GFCIs, our box extenders comply with NEC Article 314.20 for set back boxes. For use with Metallic and Non-Metallic Boxes

154

BE1XLS TRIMMED for MID-SIZE cover plate

© 2024 Arlington Industries, Inc.

Arlington’s variety of cULus Listed Box Extenders extend set back electrical boxes up to 1-1/2”.

Ready for Maxi Plates ...Trimmable for Mid- and Standard Wall Plates

BE2XLS SCAN TO LEARN MORE ABOUT THIS PRODUCT

BE1XLS Single gang Patented

www.aifittings.com Scranton, PA 18517 800-233-4717

2605ECM_Arlington_1031528-0526_154.indd 1

2609ECM_28-63_Cover_Story.indd 41

5/1/26 1:13 PM

9/9/26 12:01 PM


Courtesy of E-J Electric

The 2026 Top 50 Electrical contractors

Which equipment categories are currently presenting the greatest challenges due to long lead times or availability constraints? Switchgear Transformers Generators Breakers Motor control centers Battery energy storage systems Transfer switches/ATS UPS systems No significant supply challenges 0

10 20 30 40 50 60 70 80 90 100 Percentage of respondents

Fig. 10. High demand, production pressures, and supply chain issues put the squeeze on three critical electrical products (switchgear, transformers, and generators), affecting project timelines and costs for most Top 50 firms.

Did your firm have to modify project designs or scheduling timelines in 2025 due to equipment availability or long lead-time constraints?

The redevelopment of 270 Park Avenue establishes a new global headquarters for JPMorgan Chase and represents a landmark achievement in high‑performance commercial construction. The E‑J Group served as the electrical contractor for the core and shell scope of work, delivering critical infrastructure that supports both construction execution and long‑term building performance.

worked our schedules around it,” says CEO Rob Smith. The industry broadly, he suspects, is now “largely adapting to the realities of the supply chain and reconciling lead times and costs.” Medium-voltage cables have been a particular problem of late, he adds, and concerns about aluminum supply related to the Iran conflict are joining copper as a construction commodity worry. Planning is the key to dealing with supply chain issues, which have slowly begun to moderate, says Leipold. “Rather than reacting after projects are underway, FTI is doing our best to plan earlier, (working) with customers and suppliers during pre-construction to identify long 42

Frequently Occasionally Rarely 0

10

20

30

40

50

60

70

Percentage of responses

Fig. 11. Supply chain problems spawned project design modifications and scheduling timelines that affected Top 50 respondents, but it was an intermittent problem for most.

lead times, evaluate alternative products when appropriate and make procurement decisions sooner.” Problems, however, are likely to persist as “trade policies continue to create uncertainty around pricing.”

Policy intrusion

But tariffs and trade policy, generally, do remain an open question and could exert new and unforeseen pressures on the construction industry broadly. But having navigated issues so far, electrical contractors may be checking that worry off to some extent. More than

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 42

(N=37)

three-quarters of respondents say tariffs and trade policy uncertainty (Fig. 13 on page 44) had only a minor negative impact or no measurable impact on 2026 business planning. “Tariffs are temporarily out of the picture” as a big concern, “but we still see supply chain issues,” says Gaylor’s Crews. Long-term tariffs, however, could help beneficially restructure the supply chain and bring more manufacturing of construction products to the U.S., he says. That would be a help now as data center construction ramps up demand, he Sponsored by Champion Fiberglass

9/9/26 12:01 PM


NON-METALLIC • VENTED FOR EASIER STACKABILITY

CONCRETE PIPE SLEEVE THE EASY, ECONOMICAL WAY TO SLEEVE THROUGH CONCRETE POURS!

Arlington’s Concrete Pipe Sleeves are the economical way to sleeve through concrete pours in tilt-up construction WALLS – and FLOORS allowing cable and conduit to run easily from one floor to the next. No costly core drilling – No cutting holes in the form. Plus, you can position the hole prior to pouring the concrete. CPS40 Pipe Sleeve for 4" hole

• Attaches to form with nails or screws • Stackable up to 23" h for extra deep pours • Vents keep wet pipe sleeves from sticking together

CPS40

© 2007/REV2014 Arlington Industries, Inc.

• Multiple hole sizes: 1-1/2" • 2" • 3" • 4" • 5" • 6"

21 Nail sleeve to form.

800/233-4717 • www.aifittings.com

After concrete sets, cut sleeve flush with surface.

Insert conduit into sleeve.

Product info aifittings.com/landing/concrete-pipe-sleeve

2509ECM_Arlington_988030-0925_21.indd 1

NO TOOLS • EASY SNAP-IN INSTALLATION • SAVES TIME!

8/27/25 11:44 AM

SNAP2IT® CONNECTORS FOR RETROFIT INSTALLATIONS

Arlington’s new one-piece RETROFIT SNAP2IT® fittings are easy to use in an OLD WORK installation, and handle the widest variety of cables! They’re ideal for adding additional circuits to a load center. And you get the same labor-savings in a retrofit installation!

© 2014 Arlington Industries, Inc.

Easy snap-in installation - NO TOOLS. Install connector into the knockout in an existing box, pulling cable/conduit through the knockout. Slip the fitting onto the cable, then snap the assembly into the box. That’s it... a secure installation with no pullout. Widest total cable ranges 14/2 to 10/3 Widest variety of cables AC, MC, HCF, MC continuous corrugated aluminum cable, MCI-A cables (steel and aluminum), AC90, ACG90 and FLEX

W!

NE

Snap connector onto installed MC cable.

40RAST

Snap assembly into box. Done!

8

38RAST

Patented

800/233-4717 • www.aifittings.com

2509ECM_Arlington_988029-0925_8.indd 1

2609ECM_28-63_Cover_Story.indd 43

Product info aifittings.com/landing/38rast-40rast/

8/14/25 10:37 AM

9/9/26 12:01 PM


Courtesy of MYR Group

The 2026 Top 50 Electrical contractors

Harlan Electric Company (Harlan Electric), an MYR Group subsidiary, completed the S136 transmission line rebuild project, replacing more than 200 wood pole structures with light-duty steel structures, installing all new 1272 ACSS conductor and one new OPGW line.

Which of these is having the greatest influence on your company’s ability to get a job done on time and within budget? Change orders Inaccurate bids Poor design Delays with material delivery and logistics Internal management and company processes Canceled projects

(N=34)

0

5

10

15

20

25

30

35

40

45

50

Percentage of responses

Fig. 12. Compared to last year’s results, poor design and change-orders rose in mentions as having the greatest influence on the ability to get jobs done efficiently. Most notably, mentions of material delivery/logistics as the key factor fell 16 points from last year.

says, but “near-shoring or re-shoring takes time.” Another headache that became more pronounced for electrical contractors (in 2025 and into 2026 especially) was growing backlash against data center construction. Across the country, local opposition to data centers spread as worries about impacts on energy consumption and the environment grew. Moratoriums sprouted in some jurisdictions, putting some projects in limbo, while others faced potential delays. Heavily invested in the data center buildout, some electrical contractors faced complications along with their construction partners. The data center 44

How are tariffs and trade policy uncertainty affecting your business planning for 2026? Significant negative impact Moderate negative impact Minor negative impact No measurable impact Too early to determine 0

10

20

30

40

50

Percentage of respondents

Fig. 13. While talk of tariffs and trade were headline grabbers in 2025, the impact for this year’s group of respondents was mostly subdued.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 44

(N=35)

Sponsored by Champion Fiberglass

9/9/26 12:01 PM


ADJUSTABLE BRACKET • FOR NEW CONSTRUCTION

FAN FIXTURE BOX FLUSH CEILING INSTALLATIONS

Arlington’s heavy-duty, plated steel fan/ fixture box has an adjustable bracket that mounts securely between joists spaced 16" to 24" o.c.

© 2004-2013 Arlington Industries, Inc.

Captive screws attach bracket ends to joists

Flush ceiling installations FBRS415 is designed for ceilings up to 1-1/4" thick. For 1/2" ceilings, use the pre-bent positioning tab. For other ceiling thicknesses, bend along the appropriate score line. • 15.6 cu. inch box ships with captive screws, mud cover, installed NM cable connector Fan bracket installation screws

Attach to joists, adjust box position

FBRS415 Patented

UL ratings 70 lb fan/90 lb fixture at 24" oc 70 lb fan/150 lb fixture at 16" oc

41

CSA rated 50 lb fan/fixture at 16" and 24"

800/233-4717 • www.aifittings.com

Positions box between joists Positioning tab for 1/2" ceilings

Product info aifittings.com/landing/fbrs415

2508ECM_Arlington_985719-0825_41.indd 1

7/18/25 9:51 AM

FOR POWER OR LOW VOLTAGE CABLE

CABLE WAY

®

Listed as Cable Runway Support System

CAB LE SU P PORT SYSTEM FOR N EW WOR K OR R ETROF IT

Try Arlington’s easy to install CableWay®, for a secure, UL Listed cable runway support system. System components get the job done quickly and easily.

© 2007 Arlington Industries, Inc.

SCAN TO LEARN

MORE ABOUT THIS PRODUCT

Support Bracket T23H

Coupling T23C

5 ft Trough T205

Angle T23A

Tee T23T

18B

End Cap T23E

800/233-4717 • www.aifittings.com

2604ECM_Arlington_1029750-0426_18B.indd 1

2609ECM_28-63_Cover_Story.indd 45

Captive screws from both sides attach bracket ends to joists

Support Brackets attach to framing members, with no structural damage. They hold cables securely in place, and open for easy cable insertion!

Flat surface Support Bracket T23F

Wall mount Support Bracket T23W

The Slide-On Trough holds and protects cable. Add length by installing more sections joined together with Coupling. Support Bracket Angles and Tees make turning corners a breeze.

T23H open

Push-on End Caps complete the job. T23H closed

aifittings.com/landing/cableway-series

Patented

3/18/26 3:22 PM

9/9/26 12:01 PM


The 2026 Top 50 Electrical contractors

How much are permitting, inspection, or AHJ approval delays affecting project timelines? (N=39)

Significant impact

Are you having any issues with labor shortages at this time? (N=42) Yes 83%

Moderate impact Minor impact No impact 0

5

10

15

20

25

30

35

40

Percentage of respondents

Fig. 14. Headlined by growing data center moratorium debate, the matter of project hurdles stemming from stricter project oversight and scrutiny was felt by many electrical contractors returning this year’s survey.

Did your company add or lay off employees in 2025? (N=43)

Is your company adding or laying off employees in 2026? (N=43)

Added 91%

Adding 93%

No change 9%

No change 7%

Fig. 15. The number of respondents indicating that they added to their workforce in the prior year grew — from 86% in the last survey to 91% this year.

Fig. 16. Feeling optimistic about this year, almost all Top 50 respondents said they plan to add workers in 2026 — an increase of 12 percentage points from last year.

pushback, along with perhaps other “permitting, inspection, or authorities having jurisdiction approval delays,” such as with battery energy storage systems projects and possibly nuclear projects as they surface, might be an emerging concern. The survey found three-quarters of respondents feeling an impact from such scrutiny, with nearly half saying it was significant or moderate (Fig. 14). A stronger push into the data center market by Hunt Electric Corp. (No. 16), Eagan, Minn., resulted in a big project win that’s moving ahead, but also in others now facing possible delays due to community opposition.

Aware of that rising potential risk in that market, CEO John Axelson says the company will be asking more questions about project viability. “During early-on estimating and preconstruction, part of the vetting will be ‘do they have the permitting done and a site they can build on?’”

46

Laboring with a problem

The other pressing question contractors will be asking — and were asking intently in 2025 — is whether they have adequate labor. The industry’s long-simmering labor shortage got more acute in 2025 as data center construction exploded, stalling projects

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 46

No 17%

Fig. 17. Chasing more business, many firms say they’re experiencing the industry’s labor shortage issue firsthand. At 83%, the share saying so increased nine points from last year.

and leaving many contractors wanting as that sector’s growth siphoned off available workers for other projects. Indeed, data centers may be putting contractors’ labor woes into overdrive. In fact, almost every company surveyed said they added to their workforce last year and expect to this year (Fig. 15 and Fig. 16), at levels slightly higher than in last year’s survey. Reported labor shortages (Fig. 17) ticked up also, with 83% saying that was an issue (nine points higher than last year). The biggest need (Fig. 18 on page 48): electricians, which is a consistent answer going back several surveys. Once again, from a list of highimpact factors that could negatively affect overall business growth (Fig. 19 on page 50), difficulty finding and retaining quality employees was far and away the top choice — seven points higher than in last year’s survey. Sargent, Smith says, is keenly focused on labor as a variable that can make or break a project, especially those in challenging markets. “It’s a tight labor market, and that’s part of the decision process we look at on which jobs to pursue,” he says. “Can we get the people, predict their productivity, and what’s the impact of where the job is? The sum of all those things drives our view on whether a project is a go or no go and how much Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2605EC


SAVE TIME... ONE-PIECE • NON-METALLIC

QUICKLATCH™ AVAILABLE IN WALL MOUNT OR PRE-INSTALLED STRUT CLIP

QuickLatch mounts to Wall, Strut, Stud or Threaded Rod TM

100 NM3 ies Ser

000 NM2 ies Ser

Extra-Duty with PRE-INSTALLED Strut Clip

1/2” to 4” QUICKLATCH

Patented

MOUNT.

PRESS IN

MOUNT

LOCKED!

Arlington’s corrosion-resistant QUICKLATCH™ pipe hangers cost the same as a steel pipe hanger with a bolt and nut – but better.

SAVE S OND 25 SECtallation!

They’re faster and easier to install. And SAVE 25 seconds* per installation!

per Ins

• UV rated for outdoor use • Listed for environmental air handling spaces • For thin walls, rigid conduit, PVC conduit or copper

PRESS PIPE into QUICKLATCH.

* about 33¢ each at $60/hr labor rate

DONE!

®

SCAN TO LEARN MORE ABOUT THIS PRODUCT

124G

www.aifittings.com Scranton, PA 18517 800-233-4717

2609ECM_28-63_Cover_Story.indd 2605ECM_Arlington_1031529-0526_124G.indd 47 1

9/9/26 5/4/26 12:01 9:41 AM PM


Courtesy of Gaylor Electric

The 2026 Top 50 Electrical contractors

A Gaylor Electric employee routes server whip connections as part of an innovative load bank testing process at a data center job site in Atlanta. The company’s custom “whip cart” solution helps accelerate commissioning by testing power systems in stages before servers are fully operational.

we’re willing to commit to do a job in a place that may be tough to staff.” Data center growth has crystallized the industry’s labor challenge, Van Egdom says, one that “will continue to be a challenge into the future.” A war for talent continues to build in areas thick with both data centers and megaprojects, he adds, ratcheting up long-standing concerns about the looming exit of experienced skilled tradespeople as they age out. Part of solving the labor problem will involve bringing younger people into the industry, especially into electrician slots via apprenticeship programs. Efforts are starting to bear fruit as program funding expands, but worries persist about the number and quality of entrants and their ability to stay the course. Contractors are of a mixed mind about the state of the apprentice pipeline (Fig. 20 on page 50); half say it’s strong or adequate, slightly fewer say it’s not good. “I think the quality is there, with more coming into programs who have some mechanical or farming background with repeatable skills, but also those who don’t have much experience working with their hands,” says O’Connell Electric’s 48

Which position/job title are you having the most difficulty filling? Project manager Job superintendent Electrical foreman Electrician Journeyman Estimator Other 5

10

15

20

25

30

Percentage of responses

Fig. 18. In a continuation of past survey findings, Top 50 respondents pegged “electricians” as the slot they’re having the most difficulty filling.

Parkes. “We need more people at this point; I don’t care who they are.” A barrier to getting more apprentices onto job sites and learning/contributing, he notes, is union limitations on ratios of journeymen to apprentices. “That’s hampering our ability to bring more apprentices in, leaving more of them sitting at home,” he says.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 48

(N=35)

0

The E-J Group’s Mann says the apprentice pipeline is improving, but the core challenge is “attracting and developing the next generation, which remains a long-term priority.” Selling industry jobs, whether in the field or the office, to young people, career changers, minorities, women, and other non-traditional groups is part of the answer, he says. Mann is Sponsored by Champion Fiberglass

9/9/26 12:01 PM


POWER & LOW VOLTAGE

L O WEST CO ST • L -SHAPED

FAN/FIXTURE BOX

COMBO BOX FOR RETROFIT PROJECTS

SECURE MOUNTING TO SINGLE, DOUBLE JOISTS Patented

UL rated fans up to 70 lbs; fixtures to 200 lbs.

FB442 13.4 cu. inch

LVDR2

Patented

• Locator posts assure proper positioning of fan/fixture bracket

• 2-hour Fire Rating Product info aifittings.com/landing/joist-mount-fan-fixture-box 800/233-4717 • www.aifittings.com

© 2001-2016 Arlington Industries, Inc.

• Fast, easy installation

• 2-Hour Fire Rating • Low voltage side has a combo 1/2" and 3/4" KO for raceway

Installed NM cable connector

• For 1/2" or 5/8" drywall

No loose parts! Installation screws ship captive, ready to install box and bracket.

36

The box adjusts to fit wall thicknesses from 1/4" to 1-1/2". Mounting wing screws hold it securely in place.

• Includes NM cable connector (power side)

© 2013 Arlington Industries, Inc.

Super-secure installation! Our lowest cost, L-shaped fan/fixture box mounts to single or double joists with a captive center screw.

This convenient combo box has power and low voltage openings in the same box for a neat, time-saving installation.

Product info aifittings.com/ landing/ combo-boxes

84

800/233-4717 • www.aifittings.com

RECESSED FOR FLUSH-TO-THE-WALL MOUNTING OF LED, HI-DEF TVs

STEEL TV BOX KIT

2509ECM_Arlington_988032-0925_36.indd 1

8/27/25 2509ECM_Arlington_988031-0925_84.indd 10:38 AM 1

8/27/25 10:41 AM

®

CO M B O BOXES FOR USE WI TH METAL RACEWAYS Arlington’s recessed STEEL combination power/low voltage TV BOX® is the best way to mount an LED or Hi-Def TV flush against a wall.

retrofit

Mounting wing screws hold box in the wall

© 2008-2020 Arlington Industries, Inc.

TV BOX provides power and/or low voltage in one or more of the openings. Plugs and connectors stay inside the box, without extending past the wall.

New work

2-GANG TVBS505

Mounting screws hold box on stud

Designed for use in new or retrofit commercial construction where metal raceway is used, we have a STEEL TV BOX for almost any application! • Steel box; non-metallic paintable white trim p plate • Easy, secure installation

! NEW 1-GANG TVBS503

• Optional covers Patented

3-GANG TVBS507

98

800/233-4717 • www.aifittings.com

2508ECM_Arlington_985709-0825_98.indd 1

2609ECM_28-63_Cover_Story.indd 49

Product Info aifittings.com/landing/recessed-tv-boxes

7/17/25 2:49 PM

9/9/26 12:01 PM


The 2026 Top 50 Electrical contractors

Which factor is having the most negative impact on the growth of your business? (N=36)

Economic conditions Difficulty finding and retaining quality employees Stagnant or retracting market segments Project cancellations Rising material costs Supply chain problems Inflation (other than material costs) Tariffs and uncertainty with tariffs 0

10

20

30

40

50

60

70

Percentage of responses

Fig. 19. The story remains the same as past years when it comes to factors impeding growth the most: Few factors come close to rivaling finding and securing quality employees in their impact on business growth.

getting personally involved in that effort, serving in a leadership role on two non-profits working to attract women and high school students into construction careers.

How would you rate the current pipeline of qualified apprentices entering the electrical industry? (N=40)

Off-site insight

Another approach contractors are taking to the labor challenge is offsite construction. More are turning to pre-fabrication and modular electrical construction operations (Fig. 21) to turn out installation-ready assemblies that can be shipped to job sites. A tactic that can cut down on the need for highpriced labor and make field operations more efficient, its use appears to be widespread; nearly all respondents say it’s increasing — nearly 60% noting a significant shift. Interstates continues to move more standardized electrical and prefabricated products assembly work off site, building up a dedicated workforce to support a growing element of its business. “We’re continuing to invest in growing our manufacturing, including prefab, for our projects and providing manufactured solutions for direct sale to clients,” Van Egdom says. At FTI, the tactic is evolving as the value of off-site construction becomes more apparent. Its operations, Leipold says, are taking on the character of industrialized manufacturing, 50

Weak 32.5%

Critical shortage 12.5%

Strong 7.5%

Fig. 20. Apprentices hold one of the keys to solving the industry’s labor challenges, but close to half of respondents say the quantity and quality of the apprentice pipeline is merely adequate.

“taking that next step by integrating manufacturing processes and procedures.” The approach improves quality and safety while keeping projects on schedule, “advantages incredibly valuable in markets like data centers, where speed, consistency and reliability are important.”

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 50

Adequate 47.5%

Is your firm increasing the use of prefabrication or modular electrical construction methods? (N=38) Significantly increasing 58%

Moderately increasing 37%

No change 5%

Fig. 21. Partly as a response to the labor challenge, electrical contractors are certainly increasing their use of prefabrication and modular construction, hoping to save on labor and make it more efficient.

Productivity, generally, is an area of growing concern for contractors. The labor shortage is a primary driver, pushing firms to adopt technologies and processes to make workers and operations more efficient. Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2609EC


FOR INSTALLATION OF OUTDOOR FIXTURES AND DEVICES

GARD N POST

®

U L / CSA L ISTED SU P P ORTS, ENCLOSU R ES FOR R ECEPTACLE & F I XTU R ES

Gard-N-Post Low Cost Bollard Kits ®

Arlington’s Gard-N-Post® are the attractive, safe, and easy way to install a light fixture and/or one or two devices outdoors! • Each kit comes with a low-voltage separator that gives you the option to install power and low-voltage in the same post. • Non-metallic, heavy-duty, damage resistant UV rated plastic • Perfect for decks, boat docks and concrete walkways • Non chipping permanent colors...black, bronze • Bollard Kits comes in two heights... 28” or 35” tall GPBK28B

GPBK28B GPP60LB

®

Gard-N-Post are available in other styles & sizes

155

GPP60LB

®

SCAN TO LEARN

GPBK35B

MORE ABOUT THIS PRODUCT

GPD19

GP19

GPD9

www.aifittings.com Scranton, PA 18517 800-233-4717

2609ECM_28-63_Cover_Story.indd 2609ECM_Arlington_1040071-0926_155.indd 51 1

9/9/26 8/28/26 12:01 9:05 PM AM


Courtesy of Rosendin Electric

The 2026 Top 50 Electrical contractors

Rosendin Electric took on this new 48X Complex at UC Davis Medical Center, which expands access to advanced outpatient surgical care. The four-story, 270,000-square-foot facility was designed to increase capacity and support the region’s growing health care needs.

AI interest matures

Artificial intelligence is drawing contractor interest as a tool to achieve that goal, but many are taking it slow — perhaps wary of placing too much confidence now into a powerful but still-evolving technology. There’s evidence some contractors may have stepped back a bit from using AI for electrical work. This year, 28% say AI is already a major part of their work (Fig. 22), 14 points lower than last year. Most now say adoption is one to three years off. Still, like last year, half of respondents say they’re now using AI to some degree for electrical work (Fig. 23 on page 54). Likewise, equally common applications are for human resources/ recruitment, process optimization, marketing, and cost/profit estimating. Hunt Electric, Axelson says, is looking to 2027 as the year AI makes a definitive mark on the company’s operations. More training is needed on it, and the company’s software team is researching ways to utilize it more fully, but so far “it has helped people become more efficient, spending more 52

How long will it take for AI to become a major component of your electrical work? Already a major part of our work Within one year Within two years Within three years Within four years Within five years or more Never/not likely 0

5

10

15

20

25

30

Percentage of responses

Fig. 22. AI has been making inroads into electrical contracting for some time now, but the pace of adoption is still a little erratic. More than a quarter of respondents say they see it showing up in their work now — down from 42% last year. The balance sees viability further down the line.

time on what they (critically) need to do every day.” O’Connell Electric has tasked a committee to study AI integration, consistent with what Parkes says is the

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 52

(N=40)

firm’s interest in “being on the leading edge but proceeding with caution.” Early indications are it could relieve staff of monotonous work and repeatable tasks, he says, but “human Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2604EC


LOW COST HANGER

THE LOOP

®

FOR COMMUNICATION CABLE EASY TO USE

Flexible, non-metallic, The LOOP® holds a 2" to 5" diameter bundle of CAT 5 or fiber optic cable without sagging, bending or damaging the cable!

Listed for Air Handling Spaces

Single or multiple LOOP hangers mount in a variety of ways and rotate to any angle. The 2.5" TL25 holds the same amount of cable as a J-hook at 1/2 the COST!

SCAN TO LEARN

2" TL20

5" TL50

2.5" TL25

TL50 for a 5" diameter bundle

MORE ABOUT THIS PRODUCT

© 2001-2011 Arlington Industries, Inc.

Patented

NON-METALLIC

THE HOOP

™

HIGH SPEED CABLE RING PROTECTS CABLE AGAINST DAMAGE

The HOOP™ is easy to use – and its smooth, non-metallic surface protects MC/ AC and NM cable against damage. No bending or kinking! Plus, it offers versatile mounting... Horizontal or vertical ON a beam clamp, wood beam or threaded rod – or UNDER a beam clamp. • To add cable use a screwdriver to open the latch.

© 2026 Arlington Industries, Inc.

Locking latch holds cable tight SCAN TO LEARN

MORE ABOUT THIS PRODUCT

Without 1/4-20 screw

FOR USE IN ENVIRONMENTAL AIR HANDLING SPACES 800/233-4717

2604ECM_Arlington_1029737-0426_149.indd 1 2609ECM_28-63_Cover_Story.indd 53

With BUILT-IN 1/4-20 screw 4" H4S (2" H2S)

Patented

1" wide bearing surface reduces cable separation

2" H2 (4" H4)

Product Info aifittings.com/landing/the-hoop 149

www.aifittings.com

3/18/26 12:01 3:11 PM PM 9/9/26


The 2026 Top 50 Electrical contractors

How is your firm currently using AI? Answer

Ranking

Optimize processes/improve efficiency

1 (tie)

Marketing/promotions

1 (tie)

Finance/accounting

1 (tie)

Generate, analyze, and optimize electrical designs/BIM (e.g., conduit groupings, raceway sizing, routing, etc.)

4 (tie)

Human resources/employee recruitment

4 (tie)

Improve profitability/cost estimating

6

Labor management

7

Diagnostics and troubleshooting

8

Gather intelligence data on electrical equipment (e.g., fault detection/diagnosis)

9

Predictive maintenance

10 (tie)

Autonomous systems/robots/drones

10 (tie)

Fig. 23. AI applications are varied in the industry, with Top 50 respondents identifying multiple uses in their firms — the most common of which include process optimization, marketing, and finance/accounting.

interaction and quality control on AI is extremely important.” Many contracts already have clauses addressing its application, he adds, so it will be important to “develop some lines to operate between” with AI. The E-J Group is boring deeper into AI, turning to outside help in finding and accelerating adoption of possible applications. Mann says a new strategic partnership with Augmenta, a specialist in AI-enhanced electrical raceway modeling, will aid engineering, prefab, and project delivery for his company. More study of AI and more experience working with it will be critical — and likely an important component of the broad training function at many electrical contractor operations. From a list of about a dozen training areas possibly requiring more attention and support, AI was second in mentions, trailing only field apps/ software (Fig. 24).

Topics employees need the most training on Answer

54

Artificial intelligence

2

National Electrical Code

3

Building management/building automation systems

4 (tie)

NFPA 70E

4 (tie)

Lighting & control technology

6

Bonding & grounding theory

7 (tie)

Energy codes & standards

7 (tie)

NFPA 70B

9 (tie)

Other

9 (tie)

Topics employees focus on when using apps/software in the field Answer

Ranking

Project management

1

Time management

2

BIM/VDC coordination

3

Safety/compliance management

4

Product specs and installation guidelines

5

Codes/standards rules & regulations

6 (tie)

Labor management

6 (tie)

Job costing/estimating

8

Tool management

9

Fig. 25. Presented with two new possible uses for apps/software in the field, respondents elevated safety/compliance management and BIM/VDC coordination, costing mentions of other former leading areas.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 54

1

Fig. 24. Training needs for the Top 50 remain extensive and varied, with AI entering the picture and giving other areas competition for the most pressing.

Seeking a productivity boost

Electrical contractor use of information technology for field operations has expanded, and integration of AI into field apps and software is likely to make them even more powerful productivity-enhancing tools. Their value and utilization are already extensive, contractors say, but project and time management along with safety compliance and building information modeling are primary uses (Fig. 25).

Ranking

Field apps & software

Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2604EC


5.5" CONCRETE

FLOOR BOX

AND RECESSED

COVER KITS

CONVENIENT, COST-EFFECTIVE • FLUSH INSTALLATION IN NEW CONCRETE

FLBC5500 5.5" FLOOR BOX w/ SIX HUBS

FLBC5570MB B BRASS Finish

EW FOR N ETE CONCR

PLATED

In use with Low Voltage Option

Arlington’s CONCRETE FLOOR BOX and RECESSED COVER KITS offer cost-savings and easy, flush installation of a receptacle and low voltage ports in a new concrete floor. Our heavy-duty FLBC5500 non-metallic 5.5” concrete floor box has six conduit hubs, four plugs and MULTIPLE slots for positioning two low voltage dividers in the box.

Recessed devices and thin flange reduce trip hazards in new concrete floors!

FLBC5570NL NICKEL Finish

POWDERCOATED

PLATED

Plugs stay inside Recessed Cover

IN USE

FLBC5570BL BLACK

Slotted In-use Cover

Designed to fit the FLBC5500 box, FLBC5570 recessed cover kits come with two installed UL Listed 20A decorator-style receptacles, an ultra-thin stamped steel flange and two flush-to-the-floor covers. Also a low voltage divider and a 4-port keystone device. Zinc cover, steel flange in 6 Finishes/Colors: PLATED in brass, nickel, antique bronze, POWDER-COATED in brown, black and light almond.

SCAN TO LEARN

121D POWDER-COATED PLATED COVERS MORE ABOUT THIS PRODUCT

Patents pending

www.aifittings.com 800-233-4717 Product Info: https://www.aifittings.com/landing/flbc5570/

2609ECM_28-63_Cover_Story.indd 2604ECM_Arlington_1029735-0426_121D.indd 55 1

9/9/26 3/18/26 12:01 3:04 PM PM


The 2026 Top 50 Electrical contractors Mobile device usage on the job for contractor employees is a fully mature technology application, but its importance grows as the ability to access detailed real-time project information, likely enhanced by AI as it develops, expands. Contractors say employees are relying on mobile devices for a range of vital information and data, chiefly highlevel design, safety, and project management insight (Fig. 26). Job-site technology is well entrenched, but there’s now a new horizon with software and AI, as well as drones and 3-D cameras, which AI could enhance, Parkes says. “There’s more change on the software side, and there’s more in process with AI integration,” he says. “And a lot of programs are getting easier to adapt to the field versus five-plus years ago.” Much has changed even in that span in the electrical contracting world, and the pace of change may be gathering steam. AI is a big part of that story as contractors make their way through 2026 and beyond, but so too are the nature of projects, sources of funding to sustain infrastructure and construction growth, rising costs and availability of inputs impacting profitability, and the pace of continued technology integration.

Banking on infrastructure

Two overarching trends stand to impact electrical contractors: mass electrification and fortifying/ hardening power generation, transmission, and distribution. On both scores, there are already signs of a benefit flowing to contractors. Most polled say they’re seeing a modest, but not insignificant contribution to revenues from electrification projects (Fig. 27) — at most 10%. But a third say they’re seeing more, with 14% saying they’re claiming a 50% to 75% share. Demand for resiliency-focused projects increased for most contractors in 2025 (Fig. 28), with most terming the increase “moderate.” Given the size and scale of the need for each, funding will be critical to deployment. Two key expected sources of that funding were the Infrastructure 56

Information most likely accessed via mobile devices on the job Answer Project communications/collaboration

1

BIM/model drawings

2

Product specifications

3

Installation instructions

4 (tie)

Safety/compliance reporting

4 (tie)

Codes and standards requirements

6

Product availability

7

Product pricing information

8

Fig. 26. Project-specific communications and BIM modeling are among the many ways workers continue to expand utilization of mobile devices while on the clock.

What percentage of your firm’s 2025 electrical revenue was directly tied to electrification-related projects? 0% to 10% 11% to 25% 26% to 50% 51% to 75% More than 75%

(N=36)

0

10

20

30

40

50

60

70

Percentage of respondents

Fig. 27. Over time, the broad trend of electrification will play directly into the hands of electrical contractors. For now, though, most respondents attributed no more than 10% of 2025 revenue to things like EV charging, grid modernization, battery energy storage, and building electrification.

Did demand for resiliency-focused electrical system design and installation increase in 2025? Increased significantly Increased moderately No change

(N=37)

0

10

20

30

40

50

60

70

Percentage of respondents

Fig. 28. Projects focused on redundancy, backup power, microgrids, and hardened power systems increased for electrical contractors in 2025, with most respondents characterizing growth as “moderate.”

Investment and Jobs Act (IIJA) and the Inflation Reduction Act (IRA). Both are now in some state of legal/legislative limbo, and Top 50

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 56

Ranking

respondents don’t seem to be banking on their survival. Nearly half see the IIJA ultimately changed or scaled back, while the same share say its fate Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2608EC


AVAILABLE IN TRADE SIZES 1-INCH TO 3-1/2 INCHES

MC CABLE FITTINGS ONE FITTING FITS MULTIPLE CABLE/CONDUIT TYPES & SIZES

ONE FITTING. MORE CABLE TYPES. DESIGNED TO SAVE. Arlington’s versatile MC cable fittings are Listed for use with MC, PVC-MC, TECK, MCI-A* (HCF MC), Tray Cable, and Flexible Metal Conduit—giving contractors one fitting solution for a wide range of cable installations.

Designed for maximum jobsite flexibility, each fitting includes interchangeable end-stop bushings to accommodate different cable bundle sizes. ONE trade size fits SEVERAL cable types and sizes, plus flexible metal conduit for super convenience and cost-savings! Reduces material handling. Great for data centers and more! * Aluminum & Steel Flexible Metal Conduits SCAN TO LEARN MORE ABOUT THIS PRODUCT AND SIZING

Concrete tight when taped

FREE TEMPLATE for selecting bushing size

®

Patented 134G

www.aifittings.com Scranton, PA 18517 800-233-4717

2609ECM_28-63_Cover_Story.indd 2608ECM_Arlington_1037946-0826_134G.indd 57 1

7/21/26 9/9/26 12:01 10:49 PM AM


Courtesy of Hunt Electric

The 2026 Top 50 Electrical contractors

The Divo 16 Solar Installation is a 1MW renewable energy project designed to seamlessly integrate with the Xcel Energy grid and deliver reliable solar power to the region. Hunt Electric completed the full electrical scope of this fixed-tilt solar array, ensuring long-term system durability and high-performance energy generation.

Do you believe the Infrastructure Investment and Jobs Act (IIJA) will be fully implemented through 2026 as currently authorized by Congress? (N=35)

Partially implemented with delays or changes No — major programs will be reduced or repealed Unsure or too early to tell 0

10

20

30

40

50

Percentage of responses

Fig. 29. The future of the IIJA, which funded projects potentially benefiting electrical contractors, is cloudy at present. Most respondents say it’s either on track for changes or delays, or its fate is now ultimately uncertain. Courtesy of MYR Group

can’t be known now (Fig. 29). Should changes come to pass for both, a third see them rendering a negative impact on 2026 operations. More, however, see either no impact or a net positive impact (Fig. 30 on page 60).

2026 and beyond stirs excitement

What’s almost certain to impact 2026 performance is what supercharged it in 2025: data centers and power markets. And as of the first quarter, many respondents, though certainly not all, were quite bullish. Half expect revenues to exceed expectations this year (Fig. 31 on page 60), up 16 points from the last survey, but half say they’ll 58

Sturgeon Electric Company, an MYR Group subsidiary, performed the electrical scope of work for this 300,000-square-foot health care facility project in Loveland, Colo.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 58

Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2609EC


2609ECM_28-63_Cover_Story.indd 2609ECM_OrbitIndustries.indd 1 59

8/31/26 9/9/26 12:01 10:54 PM AM


The 2026 Top 50 Electrical contractors

How do you expect ongoing federal policy and legal challenges affecting IIJA and IRA infrastructure funding to impact electrical design and construction work in 2026? (N=34)

Moderate positive economic impact Minor positive economic impact No impact Minor negative economic impact Moderate negative economic impact Significant negative economic impact 0

5

10

15

20

25

30

35

40

Percentage of responses

Courtesy of Faith Technologies, Inc.

Fig. 30. Many respondents see some potential negatives coming their way if the Infrastructure Investment and Jobs Act and the Inflation Reduction Act are potentially scaled back or ended. However, nearly a third see no impact.

Revenue expectations in 2026 (N=43)

Exceed 53%

Meet 47%

Fig. 31. Buoyed by 2025 growth, more than half of respondents expect revenues to exceed expectations in 2026; last year 37% expected a revenue boost in 2025.

come in as expected. Half also see revenue growth topping 11%, up 20 points (Fig. 32 on page 62). The profit outlook is also solid. Benefitting from surging demand, yet also buffeted by rising costs, Top 50 contractors faced a more rewarding but potentially complex bidding picture in 2025. And that may be the case again this year. Last year, 43% said they generally adjusted bids for greater profit (Fig. 33 on page 62), up 17 points. Looking to this year, 44% said they’d take the same approach (Fig. 34 on page 62), up 14 points. 60

Shown above is Faith Technologies Incorporated (FTI) headquarters in Menasha, Wis. Established in 1972, FTI delivers comprehensive energy solutions.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 60

Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2607EC


WHEN THE POWER MATTERS, THE RACEWAY MATTERS. Steel conduit protects electrical systems in the real world, from jobsite abuse to long-term building operation.

For more than a century, EMT, IMC, and RMC have helped electrical professionals build systems with physical protection, effective equipment grounding, durability, and long-term adaptability. In commercial, industrial, institutional, EV charging, healthcare, and data center environments, the raceway is not an afterthought. It is part of the system's safety, reliability, and serviceability.

Scan the QR code to visit STI's website for technical resources, NEC guidance, installation information, FAQs, and other steel conduit materials. steeltubeinstitute.org

2609ECM_28-63_Cover_Story.indd 2607ECM_RyanJacksonElectricalTraining_STI.indd 61 1

STEEL CONDUIT HELPS DELIVER: Physical protection Effective equipment grounding path Noncombustible raceway material Repairable and replaceable circuits Long service life and recyclability

The Steel Tube Institute is the leading trade association for manufacturers of steel conduit.

9/9/26 7/1/26 12:01 8:30 AM PM


Courtesy of Guarantee Electric

The 2026 Top 50 Electrical contractors

2026 Overall Electrical Revenue Forecast (N=42)

More than 11% decrease

H

6 to 10% decrease 5% or less decrease Will stay the same

I

5% or less increase

“T 2

6 to 10% increase More than an 11% increase 0

10

20

30

40

50

60

Percentage of responses

Fig. 32. In a big shift in optimism, 55% of respondents see revenues coming in 11% or more in 2026 — 20 points higher than last year. More, however, saw a decrease of 11% or more, suggesting uncertainty. Guarantee Electrical Company electrician Spencer Vincent installs conduit supports at the Cardinal Glennon Children’s Hospital job site in St. Louis. The electrical box pictured was assembled off site at Guarantee’s prefabrication workshop, cutting install time on site by approximately eight hours.

“This will be a stronger year for us than 2025,” says Crews, noting that projects delayed last year will start in the second half. “But this year will also be strong in terms of awards, with a lot of data center work coming.” Crews expects a long runway for solid revenue gains for Gaylor, projecting a bullish market into 2028 based on how project owners and general contractors are “recognizing that to get things built they have to get ahead of the curve.” Hunt Electric is counting on longer term revenue boosts from missioncritical project work supplementing health care and renewables projects, but 2026 revenues could be softened by project delays. “A total of $800 million of data center work has been pushed back, so the start time change changed our revenue projections,” Axelson says. “Peaking of revenues for us has gotten pushed out to 2027 or 2028.” Sargent Electric is seeing some possible softness in revenues this year as looming 62

Made bid adjustments in 2025 (N=42) No, the profit margin stayed the same 57%

Yes, for greater profits 43% Fig. 33. Slightly more Top 50 respondents said they adjusted their bids for higher profit in 2025, but a majority, like last year, said their profit margins stayed steady.

questions about capital spending and input costs shift some timelines. “Overall, we’re not seeing cancellations, but more jobs flipped to the right — now starting maybe in November rather than May,” he says. “More could be moving to 2027, which could be a strong year.” Widening the lens, Smith sees nothing but growth.

September 2026 • www.ecmweb.com

2609ECM_28-63_Cover_Story.indd 62

Plan to make bid adjustments in 2026 (N=41)

2%

4 B S P

Sup of t sid

No, the profit margin will stay the same 54%

Yes, for smaller profits or a loss

I

Yes, for greater profits 44%

Fig. 34. In a sign of increased confidence in a more favorable supply and demand situation, the number of respondents expecting to adjust bids for higher profits in 2026 went up by 14 percentage points.

“It’s a healthy industry for some time as megatrends around electrification move through,” he says. “Our project scope is now deep into the 2030s.” Tom Zind is a freelance writer based in Lee’s Summit, Mo. He can be reached at tomzind@att.net.

Pl

Sponsored by Champion Fiberglass

9/9/26 12:01 PM

2607EC


N MADE I

U.S.A.

FOR SAFER BETTER FASTER JOBS

Conforms Buy America to n Requiremen Act ts

We’re Proud to be the Electricians’ Friend for Over 50 Years!

High Quality Ceiling Rough-In Products IP7 IP4

Patented

IP11

“The Original” 2 Way Box Support

Trapeze Brackets

4 Way Box Support Plate with Fingers Patented

Supports ALL KOs on back and sides of the box Vertically or Horizontally

Patented

IP6 IP6d 2 Way Box

4 Way Box Patented Support Plate

Support Plate

with Fingers Patented

Supports KOs on back of the box and center side KOs only

IP8a

IP8 IP6a

Patented

2 Way Box Support Plate

Junction Box Support Plate

Grid System Box Support Plate

20” x 20” 28” x 28”

Patent Pending

Patent Pending

IP19

IP20

Install vertically or horizontally

IP20a

IP21a Patent Pending

Patented

Patented

4-Conduit Block

4-Conduit Block

Box Support Rod Cube Patent Pending

QwikBlock Box Support Rod

QwikBlock Box

Supported From A Single Threaded/Non-Threaded Rod

Visit our website to view installation videos Plus More Being Invented for SAFER BETTER FASTER Jobs . . . Call With Your Ideas!

SPProducts.com 2607ECM_SPProducts_CR26.indd 163 2609ECM_28-63_Cover_Story.indd

800-233-8595

Info@SPProducts.com 7/7/26 12:01 8:41 AM 9/9/26 PM


ID 357992834 © Aaron Amat | Dreamstime.com

FEATURE

How to Beat the Biggest Job-Site Productivity Busters From misplaced materials and trade stacking to labor challenges and poor planning, everyday job-site time wasters can quickly eat into project schedules and margins. BY TIM KRIDEL, FREELANCE WRITER

R

oughly 20% of electricians are 55 or older, according to the U.S. Bureau of Labor Statistics (BLS). Their retirements over the next several years are a major reason for the 81,000 annual job openings that the BLS forecasts through 2034. But the profession isn’t losing just workers. It’s also losing experience — the hard-won kind that knows how to avoid wasting time on job sites. “You’ve got less experienced workers trying to do what the lead foreman or the experienced worker used to do,” says Greg Shannon, Henderson Building Solutions director of project management. “That wastes time because then as a project manager, construction manager, or project executive, you’ve got more supervision 64

time: ‘You don’t understand what you gotta do here, so let me walk you through this.’ And it affects not only that project because if you’re managing multiple projects, you have only so many hours in a day.” Hence the importance of workforcedevelopment plans that create ample opportunities for veterans to share their decades of tips and best practices before they retire. “As experienced workers retire or move into different roles, the industry has to transfer knowledge more effectively while still keeping projects moving,” says Natalie Eide, Wesco vice president of construction – Southeast. “Mentorship, apprenticeship pathways, and better project-management training can help, but contractors also

need processes and tools that make the best use of the skilled workers they have today.” A workforce-development plan can leverage that experience to identify the top job-site time wasters and then the policies and processes for mitigating them. “Waste is whatever labor does other than final installation,” says Dr. Perry Daneshgari, president and CEO of MCA, Inc. “[Examples include] material handling, chasing information, rework, travel and movement, congestion, waiting on other trades, inspectionbefore-inspection, wrong installation, poor sequencing, and field improvisation caused by incomplete planning.” For more on Dr. Perry Daneshgari’s biggest job-site time wasters and how

A an p re

B th g U

September 2026 • www.ecmweb.com

2609ECM_64-71_Feature_1.indd 64

9/9/26 12:21 PM

2609EC


BLUE LIGHTNING® Aluminum EMT is the smart choice for data centers.

As data center construction continues to boom, so does the specification and use of our BLUE LIGHTNING aluminum EMT for these and other large projects. At 1/3 the weight of steel EMT, the benefits of BLUE LIGHTNING really add up over thousands of feet installed: • Increased jobsite efficiency • Reduced fatigue and injury risk • No risk of zinc whiskers

• Lower cost than steel EMT • Easy cutting and bending • 100% recyclable

BLUE LIGHTNING meets the same code standards (UL 797A), uses the same fittings, and is available in the same trade sizes (1/2" - 4") as galvanized steel EMT. Plus, it’s internally coated with our proprietary, UL listed compound to reduce resistance and make wire pulling easier.

For additional information and resources visit:

pennconduit.com MADE IN AMERICA

2609ECM_PennAluminumConduit&EMT.indd 1 2609ECM_64-71_Feature_1.indd 65

8/11/26 10:54 PM AM 9/9/26 12:21


FEATURE to minimize them, see the Sidebar, “Top Time Wasters at a Glance,” on page 70. Maximizing job-site productivity and efficiency isn’t a new priority, of course. But it’s more important than ever with megaprojects, such as hyperscale data centers, that can tie up employees on a single site for years. “Customers are asking contractors to complete larger, more complex projects on shorter timelines,” Eide says. “It is no longer just about protecting margin on a single job. It is about protecting capacity across the business. When crews lose time on one project, that can affect the contractor’s ability to take on the next project, meet customer expectations, or deploy scarce labor where it is needed most.”

Plan ahead

Planning is key for ensuring that journeymen and master electricians can show up at the job site every day and get straight to work instead of spending the first hour rounding up everything they need.

“One of the biggest time wasters on any job site is failing to use skilled labor where it creates the most value,” Eide says. “When licensed electricians are spending time unpacking materials, sorting boxes, tracking down missing products, or performing basic assembly, that is time not being spent on the work only they are trained and qualified to do.” Ideally, planning should begin long before electricians show up at a new job site. “It’s almost comical in the industry how often a field team’s first interaction with the site is the first day they mobilize,” says Tyler Paré, who leads FMI’s Performance practice. “‘Here’s the address of where you’re going Monday. When you get there Monday, you can start to figure it out.’” For example, foremen and other supervisors should scope out the project far enough in advance to ensure that everything from materials and tools to dumpsters and telehandlers will be staged where electricians will need them. That could take weeks to plan and execute.

PRECAST HOUSEKEEPING PADS

“We’re big proponents for forcing that job-site visit to happen well before mobilization, where a field leader can really start to conceptualize what they’re up against in terms of the spatial layout,” Paré says. “They can really start to think about their site logistics and their layout and how they’re going to approach it.” The bigger the project — such as a hyperscale data center or high-rise — the earlier planning should start. “The connection between the field and the back office is an area that does not always get enough attention,” Eide says. “Inventory management, order tracking, project planning, documentation, and vendor coordination all have a direct impact on job-site productivity. If those processes are handled manually — or if information is spread across too many systems and stakeholders — delays can quickly show up in the field. A crew may be ready to work, but the materials, approvals, or information they need may not be ready with them.” It’s obviously important to have materials and equipment on site when

CABLE INSTALLATION EQUIPMENT

customized to fit your exact project ec

4X Stronger Than Traditional Concrete Pads Rapid Installation Labor Savings Stainless Steel Inserts for Mounting Equipment to the Pad Counter Bore Anchoring to Existing Concrete Excellent Corrosion Resistance Flexibility and Options: - Bottom Access - Exact Sizes - Dedicated Handling and Lifting

THE TRUSTED SOURCE IN THE INDUSTRY

MOUNT YOUR EQUIPMENT THE SAME DAY!

877-712-2273 www.basetek.com info@basetek.com

Maximize safety and efficiency with Condux durable, versatile duct rodders, sheaves, swivels, pulling eyes and accessories. Precision-engineered in multiple sizes to fit any power cable installation.

Reusable— just unbolt and move

Built to last and outperform. We guarantee it. ©2026 BaseTek, LLC.,

66

CONDUX.COM 800-533-2077

Zanite Plus is a registered trademark of BaseTek LLC.

September 2026 • www.ecmweb.com

2609ECM_BaseTek.indd 1 2609ECM_64-71_Feature_1.indd 66

8/20/26 2609ECM_Condux.indd 1:47 PM 1

8/12/26 11:36 AM 9/9/26 12:21 PM

2609EC


inhe r e n t ly ar/fr

lightweight

breathable

colorfast to the core

AR/FR

MADE IN THE CAROLINAS

F A B R I C

We are focused on the details that make GlenGuard fabrics the ultimate in protection, performance, comfort, and compliance for arc-rated and flame-resistant industrial uniforms. Whatever the job demands, choose GlenGuard fabrics for workwear.

SOFT COMFORT HARD WORKING

GLENGUARD.COM

2609ECM_64-71_Feature_1.indd 2609ECM_GlenRavenTechnical.indd 67 1

9/9/26 8/25/26 12:21 2:09 PM PM


FEATURE they’re needed. It’s less obvious but equally important that they shouldn’t show up so far in advance that they wind up staged and forgotten in some remote, inconvenient corner. “Field material management is a huge time waster,” Paré says. “Vendors show up on site with a truckload of light fixtures or whatever. Who’s receiving that? Where are we storing it? Do we know where it is? Oftentimes, that’s grossly mismanaged and leads to theft, loss, damage of material, and a bunch of wasted time going back and forth across the site looking for that stuff. How far the material is from the point of install is a huge one. An enormous amount of labor is wasted just going back and forth to get more material to keep the crew flowing and installing.”

Communication with GCs, other trades

Timely, accurate information can be as important as materials for maximizing productivity. “We have three things that we have to make sure the field has: information,

material, and tools,” says Dave Aguirre, Tri-City Electric director of construction services. “If one of those is missing, then your productivity is shot. If the information is missing, it’s gonna get worse because you might be redoing it.” Eide agrees: “Rework is another significant time waster. When teams are working from outdated information, incomplete drawings, late changes, or unclear scopes, productivity suffers. The work may still get done, but it takes longer, costs more, and puts additional pressure on already constrained labor resources. In many cases, the issue is not the capability of the field team; it is the lack of alignment, visibility or preparation around them.” Sharing information with general contractors and other trades helps avoid time wasters such as trade stacking. “We have daily sub meetings,” says Henderson’s Shannon. “Even if it’s just a 10- or 15-minute meeting: ‘What’s going on today? Here’s what I need.’ The plumber may say, ‘I’m shutting down this water line,’ so I’m going to make sure all power is not here. Or the electrician

2607ECM_ElectricalCodeAcademy.indd 1 68 September 2026 • www.ecmweb.com

2609ECM_64-71_Feature_1.indd 68

says, ‘I got these panels locked out, so don’t anybody go in there and try to mess with the padlocks on them.’” That’s also an example of how some types of communication needs to be in writing. “We have a pretty adept lockout/ tagout procedure,” Aguirre says. “Anytime you fill it out, you’re the only one that’s going to have a key to it. Your information’s going to be on there. They will be able to get ahold of you.”

A safe job site is a productive job site

LOTO also highlights how safety affects productivity. “Oftentimes, we hear that all of these safety requirements and rules and regulations are slowing us down,” Paré says. “My argument to that is a safe job site is a productive job site.” Even when it’s not fatal, an incident can shut down a job site for a day or more. “People don’t realize how a safety incident affects the project, the schedule, and even the morale on the

6/17/26 11:40 AM

9/9/26 12:21 PM

2606EC


PT-FX and PT-MFX: The cleanest, most dependable way to land flex cable.

In electrical engineering and construction, as in nature: adaptability means survival.

Gfiflflvflfi USAfiflflfifl PT-FX and PT-MFX flfiflflflflfifi flflflvflfifl flflfiflfiflflfiflflfiflflflfl flflflflflflflflflflflflflflflfl flfl flflflflfl flflflfl Cflflfifi B flfi fiflflflfi flflflfi, flfiflfiflfififlfi flfl Eflflflfl flflfi Sflflflflflfiflfi fiflfi flflfiflflflflflflflfl flfl flflflflfi flflflfi. Tflflfi flfiflflflflflflflfl flfiflflflfi flflfl flflflflfififififififififi flfi flfi fifififififififififififififi flflfififlfiflflfiflfi flflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflflfl flfl flflflflfl flflflflflflflfi flflflfl flflfl flflflflflfiflfififlflflfi flflfl flflfl fififlfl fl flfiflflfl fiflflflflfiflflflfl flflflflflflflflflfl. Problem Solver: Ififlflfl flflflfiflvflfi flflflfiflflfififlflflfifififlfiflflfi flflflflflflflflflflflfi flfifl flfiflfiflfififlfi flfi fiflqflflfiflfi. Confidence Builder: Pflfiflflflfi fiflflflfifl, fiflfiflflflfl, flflfi fiflfifl flflfiflflflflflflflfl flflflflflflfl flfiflflfl fiflfififlflflfi flfi fiflfiflfiflflflfl fiflfiflflfifi. Easy Slider: Pflflflflflflfi, flflfiflfi flflfififlfl fiflflflflflfiflfi flflflflfl flflfiflfiflflflfl flfl flflflflflfiflflfl flfl flflflfifl flfi fififlflflfi fiflfiflflfifi. PT-MFX Shoo-pin adaptor Fflfi fiflflflflflflflzflfi flflfiflfiflfiflflfi flflflfifl Cflflfifi 5 flflflfiflfl flflflflflfi flfifl fiflflflflfiflfi. Avflflflflflflfl flfl fiflflflfififlflfl vflfififlflflfi fiflfi flfifl flfl jflflflflflflfl flflflflfi. UL flflfi ABS flflfiflflfiflfi.

PT-FX Shoo-pin adaptor Cflflflflflflflflfl flflflfl Cflflfifi I, K, M, flflfi Sflflflflflflfifl Mflflflflflfl Fflflfl flflflflflfi. UL flflfi CSA flflfiflflfiflfi.

Centerbrook, CT | www.greaves-usa.com

Connectors. It’s all we do.

2609ECM_64-71_Feature_1.indd 2606ECM_GreavesCorp.indd 1 69

5/28/26 9/9/26 12:21 10:17 PM AM


FEATURE job site,” Shannon says. “I think safety is one of those [time wasters] that is underestimated: ‘When something happens, okay, well, we’ll shut down for a day, but we’ll be right back the day after that.’ And that’s just not the way it works.” Safety also ties in with pre-planning to ensure that everything is in the right place at the right time, including empty boxes in dumpsters and safe temporary power for other trades. “You can pretty much tell when you walk on a job site which ones are safe and which ones are not,” Paré says. “There’s a general tightness and cleanliness to a safe job site where there’s not trash and cords and obstacles and hazards lying around because someone’s monitoring that and maintaining a safe and clean job site. All those things relate to productivity, as well.” That’s why FMI spends five minutes every morning doing a job hazard analysis. “People will say we’re burning productive time doing this job hazard analysis,” Paré says. “The five minutes you invest in thinking about the safety parameters of the day are going to pay back tenfold in maintaining a job site where people aren’t going to be injured. An injury kills productivity for the entire day or week and then sucks the morale out of the job site.”

Top Time Wasters at a Glance What’s eating away at labor productivity on today’s job sites? According to Dr. Perry Daneshgari, president and CEO of MCA, Inc., a Grand Blanc, Mich.based construction consulting firm specializing in productivity and process improvement, here’s a quick look at the biggest time wasters, how contractors can minimize them, and why improving productivity is becoming more critical. Top time wasters: • Material handling. • Chasing information. • Rework • Travel and movement. • Congestion. • Waiting on other trades. • Inspection-before-inspection. • Wrong installation. • Poor sequencing. • Field improvisation caused by incomplete planning. Basically, he says waste is whatever labor does other than final installation. How to minimize job-site productivity busters: • Make waste visible. • Plan from a field-based WBS. • Use short-interval schedules. • Externalize repetitive work through prefab and agile procurement. • Measure obstacles daily. • Create fast feedback loops. According to Dr. Daneshgari, if it is not measured, it is not managed. Other pressures on productivity: • Electrification. • Grid modernization. • Schedule compression. • Complex systems. • Supply-chain risk. • Aging workforce. • Larger project scale. • Rising customer expectations. He says productivity is no longer a competitive advantage; it’s an industry requirement.

Prefab off site and on site

Prefab is another approach to avoid wasting time. “Prefabrication, to me, that’s like an efficiency gain versus avoidance of a time waster, but they could be two sides of the same coin,” Paré says. “Prefabrication is a whole spectrum — from kitting all the way up to full modular. I do think we see more and more on-site prefabrication where we’re staging certain areas to bend pipe and conduit and do assemblies in a controlled space on the job site before moving it to the point of install.” Prefab can be done off site, but sometimes it makes more sense to do it on site. “A big part of trying to solve prefab for the industry has been: ‘How do I balance the workflow in a manufacturing facility? I’ve got to continuously have enough backlog, the right kind of backlog, the right workers to drive a factory environment,” Paré 70

says. “[Instead], we’re setting up an area on the job site or adjacent where we’re going to do a lot of repetitive tasks very efficiently and not force someone to try to do that in confined space on the eighth floor.” The home stretch is a time when productivity can plummet. Planning helps here, too. “Closeout is a big one,” Paré says. “This is symptomatic of usually larger projects. Let’s say it’s a 12- to 18-month project. We’ve had all kinds of ups and downs, and we just want the job to be over. Without a real crisp and clear plan for executing the

final 20%, there’s a huge opportunity for the job just to sort of slide along and never cross the finish line. This is a killer on schedule. Productivity goes off a cliff. There’s usually a lot of punchlist stuff. By that time, they’ve probably demobilized some of the crew, some of the management, and some of the equipment. All that has an impact on the margins and client satisfaction.” Tim Kridel is an independent analyst and freelance writer with experience in covering technology, telecommunications, and more. He can be reached at tim@timkridel.com.

September 2026 • www.ecmweb.com

2609ECM_64-71_Feature_1.indd 70

9/9/26 12:21 PM

2609EC


Safeguard Electrical Utility, Data & Fiber with Certa-Com® Trenchless Conduit Certa-Com® PVC Electrical Conduit is designed for HDD or open/continuous trench installations. Manufactured in iron pipe size (IPS) outside diameters, it meets all NEMA TC-2 and UL 651 requirements. Widely specified for electrical utilities, data, and optical fiber communication, it helps protect infrastructure and reduce weather-related damage.

Learn more at westlakepipe.com/ecm © 2026 Westlake Pipe & Fittings. All rights reserved.

2609ECM_WestlakePipe&Fittings_RMEL.indd 1 2609ECM_64-71_Feature_1.indd 71

8/25/26 10:28 PM AM 9/9/26 12:21


PRODUCT NEWS

Non-Metallic Liquid-Tight Fittings

The company recently expanded the size offering of its Type A non-metallic liquid-tight fittings. The T&B Liquidtight Systems Type A non-metallic liquid-tight fittings are now available in larger 1½-in. to 2-in. trade sizes. The fully non-metallic, corrosion-resistant system is designed for demanding washdown, wet, and corrosive industrial environments. The expanded size range features a push-on design for simpler installations. Built from glass-filled reinforced thermoplastic, these fittings are UL 50E listed to deliver reliable ingress protection for food and beverage, chemical, and pharmaceutical applications, according to the company. ABB

Traceable Duct Rodder

The new Copper Python Traceable Duct Rodders provide a new level of functionality, according to the company, allowing contractors the ability to locate ducts and conduits through a traceable copper wire core. The new duct rod is available in 1/4-, 5/16- and 7/16-in. diameters and lengths up to 1,500 ft (lengths vary per rod diameter). The rod is compatible with the full range of the company’s rodding accessories and attachments. Optional footage marks are available to make field work easier. The products come equipped with a threaded end fitting on each end, plus a tapered head on the outward end. A number of optional end fitting accessories for additional applications are also available. Condux International

Commercial Luminaires SPEED

_

STRENGTH

_

SIMPLICITY

SPEED - STRENGTH - SIMPLICITY

HVAC & MEP SEISMIC BRACING FAST HIGH TOOL-FREE INSTALLATION STRENGTH ADJUSTMENTS

CABLE SUSPENSION

Complete Suspension Systems 805-566-0064 | griplocksystems.com 72

The new family of Beam Selectable LED commercial luminaires designed to give contractors and lighting professionals greater flexibility during installation. The lineup includes round and linear high bays, flood lights, area lights, and wall packs, all featuring field-adjustable beam distributions that can be changed using an internal selector switch rather than requiring lens replacements or mechanical modifications. The technology allows installers to adapt light distribution on site to accommodate changing project requirements, mounting heights, and coverage needs while reducing the number of fixture variations required. Designed for applications such as warehouses, manufacturing facilities, parking areas, and building exteriors, the luminaires incorporate high-efficiency LED technology, advanced thermal management, and durable construction. The entire Beam Selectable family is certified to the DLC 6.0 standard, supporting energy-efficiency goals and potential rebate eligibility. SATCO

September 2026 • www.ecmweb.com

2609ECM_GriplockSystems.indd 1 2609ECM_72-73_Products.indd 72

8/20/26 1:57 PM 9/9/26 12:22 PM

2607EC


ONE EVENT. UNLIMITED OPPORTUNITIES.

The Electrical Industry's Must-Attend Event October 21-24, 2026

Join hundreds of electrical contractors and industry professionals for four days of education, networking, business growth, and innovation. Discover new solutions, gain practical insights, and build connections that help move your company forward.

2609ECM_72-73_Products.indd 2607ECM_RyanJacksonElectricalTraining_IEC.indd 73 1

Columbus, OH

Register Today! iecspark.com

9/9/26 6/30/26 12:22 2:58 PM PM


N AT I O N A L E L E CT R I C A L CO D E

CODE BASICS

Key Revisions to Chapter 2 of the 2026 NEC

Major changes in the 2026 NEC focus on GFCI device standards, outdoor disconnecting means, and receptacle placement in dwelling units. BY RYAN JACKSON, NEC CONSULTANT

Info Note 2: See UL 943 for information about GFCIs marked “HF” or “HF+” that are used in applications with high frequency leakage currents from adjustable speed drives Fig. 1. A GFCI-HF device provides protection for humans and is a Class A device. For an HF device, the current level at which the GFCI is not allowed to trip is determined by the frequency of the circuit, with greater frequencies allowing for higher (but safe) current levels.

The 2026 edition of the National Electrical Code (NEC) is the result of more than 4,000 public inputs (formerly called “proposals”) and just fewer than 2,000 public comments. Hundreds of changes were made, and over the next several issues, we plan to cover some of the most important ones. In this edition, we focus on a few of the key changes made to Chapter Two.

Section 210.8 Ground-Fault Circuit-Interrupter (GFCI) Protection for Personnel

Clarifications and editorial revisions were made, new Informational Notes 74

were added, and the rules for HVAC equipment were revised to expand the ampere rating and to reduce the protection requirements. For the first time in more than 30 years, the GFCI requirements in this Section were not expanded in any significant way. Several small edits were made, such as changing “indoor damp or wet locations” into two requirements for “indoor wet locations” and “indoor damp locations.” Edits like these are not covered in this article because they did not change the requirements. Two new Informational Notes were added to inform the reader of

the changes taking place with GFCI devices. When the 2026 NEC was being written, types GFCI-HF (GFCI high frequency) and GFCI-HF+ (GFCI high frequency plus) were both expected to be available soon. GFCI-HF was approved in the product safety standard, but GFCI-HF+ was not. GFCI-HF devices are now available, but GFCI-HF+ devices are not — and will not be unless UL 943 is revised. Over the last several years, there has been much discussion about unwanted tripping of GFCIs on circuits supplying appliances. These appliances vary from HVAC equipment to refrigerators

September 2026 • www.ecmweb.com

2609ECM_74-77_Code_Basics.indd 74

9/9/26 12:23 PM

2609EC


Initial Studies

Engineering & Design Control Systems Integration Testing & Commissioning Maintenance Services Motor & Generator Services Emergency Response Electrical Training

®

2609ECM_ShermcoIndustries.indd 1 75 2609ECM_74-77_Code_Basics.indd

9/3/26 12:23 9:22 AM 9/9/26 PM


N AT I O N A L E L E CT R I C A L CO D E

does not open until a differential current of more than 20mA is present. If such a device is used, a warning label must be placed on the disconnecting means to indicate that the protective device is not the Class A type that is to be expected after the deadline in Exception No. 2 expires. This all may be a moot point, however, as GFCI-HF devices are now available (Fig. 1 on page 74).

Section 210.52 Dwelling Unit Receptacle Outlets

Fig. 2. Receptacles are not allowed in the red shaded areas. Note that this rule applies only to kitchens, so receptacles beneath built-in desks and other similar installations are still allowed.

and other appliances. The reason for these unwanted trips is the existence of high-frequency leakage current. Many modern appliances employ variable-speed motors supplied by internal adjustable-speed drives, such as variable-frequency drives (VFDs). At high frequencies (above 10,000 Hz), there is often a small amount of leakage current that exceeds what would be allowed on a GFCI device. The Class A GFCIs that are used today must not open at differential current less than 4 milliamperes (mA) or 0.004A and must open at differential current exceeding 6mA or 0.006A. These values are sometimes called the “green zone” for less than 4mA, the “yellow zone” for 4mA to 6mA, and the “red zone” for greater than 6mA. These are based on research carried out in the 1940s and ’50s by Dr. Charles Dalziel, and that research is still used today. When GFCIs were first invented, there was little research about the effects of high frequency on humans. By the time the research was needed, we could no longer shock a bunch of college students as Dr. Dalziel did 70 years ago. Newer research published by the International Electrotechnical Commission (IEC) has shown that the severity of a shock decreases as the frequency increases. Modern appliances with VFDs can reach frequencies of up to 150 kHz (150,000 Hz). If the GFCI opens at 6mA on such a frequency, it has opened during a condition that 76

is not unsafe. Because of Department of Energy regulations, appliance manufacturers will continue to use VFDs in their designs, and their usage will likely increase significantly over the next several years. With this in mind, a more modern GFCI device is needed to protect at 4mA to 6mA at low frequencies and at a higher mA value for higher frequencies. This is where the GFCI-HF and GFCI-HF+ come into the discussion. Both HF and HF+ move the “green zone” value discussed earlier. The HF+ device would also have moved the “red zone,” but because of ongoing debate over the available high-frequency shock data, GFCI-HF+ was not added to UL 943. The 2020 NEC added Sec. 210.8(F) for outdoor outlets, and the GFCI discussion has not been the same since. This is where the world’s eyes were opened to the problems associated with GFCIs on variablespeed motors. Multiple proposals have been submitted, and multiple Tentative Interim Amendments (TIAs) have been issued to resolve the problems created by this requirement. In a rather surprising move, the GFCI requirement was increased to include 60A circuits — not just 50A and lower. Although it surprised many to see an increase in this requirement considering the well-known incompatibility issue, a third exception was added to allow SPGFCI protection for HVAC equipment. An SPGFCI

The language regarding cabinets without countertops or work surfaces was deleted, and the issue of receptacles below kitchen countertops and work surfaces was clarified. Section 210.52 requires receptacles in certain locations of dwelling units. Any receptacle in a location indicated in Sec. 210.52(1) through (4) does not count. In the 2020 NEC, language was added to address “switches” that are not really switches, but rather wireless control devices (mainly in Sec. 210.70). Correlating changes were made throughout the Code, mainly by changing the term “switch” to “wallmounted control device.” That covers wall-mounted control devices, but what about switches? The change to Sec. 210.52 list item (2) now covers both, which means a receptacle that is controlled by a wall-mounted control device or a switch does not count as a required receptacle outlet. The solution is to control one half of a duplex receptacle, which leaves the other half unswitched so it still counts. See Sec. 210.70 for similar changes. The wall space receptacle requirement saw a slight revision in Sec. 210.52(A)(2)(1). Wall space does not include the space occupied by fixed cabinets — period. Previously, the space consumed by cabinets was considered wall space, but only if the cabinetry had a countertop or work surface. What part of the installation had to be treated as wall space? The portion that had the work surface/countertop or the entire cabinet? With this change, a built-in bookshelf still does not require receptacle outlets, but a built-in desk likely does because the floor line beneath the desk is longer than 24 in. and does not contain cabinetry.

September 2026 • www.ecmweb.com

2609ECM_74-77_Code_Basics.indd 76

9/9/26 12:23 PM


Section 225.31 Disconnecting Means

The building disconnecting means no longer needs to be in or on the building. This Section has long required buildings supplied by a feeder or branch circuit to have a disconnecting means that is (typically) on or inside the building served, but recent changes to the NEC have highlighted some flaws with that requirement. The 2023 NEC added Sec. 225.41 to correlate with the emergency disconnect (formerly) required in Sec. 230.85. Section 230.85 required one- and two-family dwellings to have a way to allow first responders (mainly firefighters) to have a way to shut off the power to a dwelling without

N AT I O N A L E L E CT R I C A L CO D E

Perhaps the most highly debated 2023 NEC change was regarding dwelling unit kitchen island and peninsula countertops. The 2023 edition removed the long-standing requirement of installing a receptacle for kitchen islands and peninsulas and prohibited receptacles from being installed beneath the countertop — sort of. In actuality, receptacles were still allowed beneath a countertop because installing a cord- and plug-connected in-sink disposer would have been impossible otherwise. The rule instead indicated that receptacles for the countertop could not be installed beneath the countertop — sort of. That too was debatable. Now the rules are clearer, although you will need to read them several times to get the full picture. The intent is that receptacles should not be beneath the countertop because people can accidentally (or in the case of young children, intentionally) pull the cord and drop an appliance full of boiling water or oil onto themselves. Data provided by the U.S. Consumer Product Safety Commission showed that this type of injury (and even death) is a documented and recurring hazard. The hazard does not exist, however, if the receptacle is beneath the countertop but close to the floor. Revisions in the 2026 NEC clarify that receptacles beneath the countertop must be at least 24 in. below the countertop; otherwise, the hazard still exists. Receptacles in drawers are also allowed, but do not count as a required receptacle [Sec. 210.52(3)], as shown in Fig. 2 on page 76.

Despite its camouflage, there are two service disconnects for this two-family dwelling. They are outdoors, as required by Sec. 230.70(A)(1), but the markings in Sec. 230.70(B)(2) need to be applied.

having to resort to dangerous practices, such as pulling out the utility meter while it was under load. Section 225.41 recognizes that not every dwelling has the service equipment hanging on the exterior wall. Sometimes the service equipment is 100 ft (or more) from the house, meaning the house is supplied by a feeder circuit and not a service. Section 225.41 was added to ensure that firefighters can shut off power to the one- or two-family dwelling, regardless of whether it is supplied directly by a service or from a feeder. The emergency disconnect for the dwelling does not need to be on the dwelling. As long as it is within sight, it is “safe enough.” Why must the building disconnect required by this section (Sec. 225.31) be either on or within the building if “within sight” is safe enough for applications covered by Sec. 225.41? Revisions to Secs. 225.31(A) and (B) were made to address this inconsistency.

Section 230.70 General

The service equipment for one- and two-family dwellings must now be outdoors. Some editorial revisions and clarifications were also made. At first glance, it appears that this entire Section was either rewritten or is totally new, but very little has changed. The requirement for an emergency disconnect for one- and two-family dwellings was added in Sec. 230.85 of the 2020 NEC. It received a handful

of small revisions in the 2023 edition, including signage requirements. The biggest topic regarding the emergency disconnect requirement has always been the list of options for how to comply. If a person put a disconnect on the outside of their house, they could still put the service disconnect on the inside by simply putting a sticker on the outside disconnect that indicated that the outdoor disconnect was not really a service disconnect; it just looked and acted like one. Putting a sticker on a switch does not change the definition of service equipment. The service equipment is where you shut off the utility — sticker or no sticker. There was also an option for a meter disconnect switch, but even code experts disagreed on what that piece of equipment actually was. Searching online for “meter disconnect” yields a variety of contradictory results. New to this edition, Sec. 230.85 was deleted, and many of its former requirements were relocated here, with one key difference: The service disconnect must be outdoors for oneand two-family dwellings. No more stickers and no more meter disconnects (see Photo above). Ryan Jackson is a National Electrical Code instructor and textbook author. He can be reached at ryan@ ryanjacksonelectrical.com. www.ecmweb.com • September 2026

2609ECM_74-77_Code_Basics.indd 77

77

9/9/26 12:23 PM


N AT I O N A L E L E CT R I C A L CO D E

ILLUSTRATED CATASTROPHES All references are based on the 2026 edition of the NEC BY RUSS LEBLANC, NEC CONSULTANT

The Missing Connector Mystery I’m guessing that the original installation here included a complete 90° connector for the liquidtight flexible nonmetallic conduit (LFNC) entering the side of the weatherproof box. But what happened to it? It’s broken, and some parts are missing. The discolored appearance of the other two LFNC connectors and the LFNC itself suggests sunlight damage played a role in the mystery of the missing connector. Section 300.8(C)(1) requires nonmetallic raceways and fittings exposed to direct sunlight to be either listed or identified as being sunlight resistant. And since this installation is in New England, perhaps the bitter cold of the winter months also played a role. While Sec. 356.10(3) permits LFNC outdoors, the Informational Note for Sec. 356.10 reminds us that extreme cold can cause nonmetallic raceways and fittings to become brittle. When this occurs, they can easily be damaged by physical contact. UV rays from the sun and extreme cold probably caused this connector to become brittle, which most likely led to its demise.

Saggy Raceway Installation

Gravity is doing a great job of dragging down the boxes, lights, and raceways installed here. The four boxes and four lights installed in the middle of this conduit run are not

78

properly supported. Section 314.23 requires boxes to be supported in accordance with the provisions specified in Sec. 314.23(A) through Sec. 314.23(H). Section 314.23(F)

is the Section we need to focus on here. The two boxes supporting floodlights on this side of the sign do not comply with the requirements in Sec. 314.23(F) allowing a box to be supported by two or more conduits threaded into the box. The two boxes installed at the ends of the rigid metal conduits jutting out underneath the sign do not comply with the very specific requirements spelled out in either Exception No. 1 or Exception No. 2, which allow a box to be supported by a single conduit. Section 410.36(A) permits luminaires to be supported by an outlet box, but only if the box is supported in accordance with Sec. 314.23. Lastly, Sec. 344.30(A)(1) requires rigid metallic conduit (RMC) to be securely fastened within 3 ft of each outlet box. That didn’t happen here either.

September 2026 • www.ecmweb.com

2609ECM_78_Illustrated_Catastrophes.indd 78

9/9/26 12:24 PM


All questions and answers are based on the 2026 NEC.

Test Your Code IQ How much do you know about the National Electrical Code? ID 27365969 © Speedfighter17 | Dreamstime.com

BY RYAN JACKSON, NEC CONSULTANT

Q1. The power supply to a mobile home shall be a feeder assembly consisting of not more than one listed mobile home powersupply cord or a permanently installed feeder. a. 30A c. 50A b. 40A d. 100A Q2. If used to splice service

conductors, must be marked “suitable for use on the line side of service equipment” or equivalent. a. devices for splices and taps b. power distribution blocks c. pressure connectors d. all of these

Q3. Aluminum electrical metallic tubing (EMT) shall be provided with approved supplementary corrosion protection where encased in concrete or in direct contact with . a. concrete c. masonry b. earth d. any of these Q4. Where located in a remote location, a transformer disconnecting means shall be , and its location shall be field marked on the transformer. a. accessible only to qualified persons b. accessible to unqualified persons c. lockable d. readily accessible

N AT I O N A L E L E CT R I C A L CO D E

CODE QUIZ OF THE MONTH

Q5. Disregarding the exception, the smallest copper overhead service conductors allowed for a service are AWG. a. 8 b. 6 c. 4 d. 2 Q6. Which of these methods is allowed for identifying grounded conductors 6 AWG and smaller? a. gray outer finish b. white outer finish c. white outer finish with a tracer thread d. any of these

See the answers to these Code questions online at ecmweb.com/55397983. www.ecmweb.com • September 2026

2609ECM_79_Code_IQ.indd 79

79

9/9/26 12:25 PM


MARKETPLACE

PARTNER for Performance

Corporate Headquarters

Regional Offices

Wayne J. Griffin Electric, Inc 116 Hopping Brook Road Holliston, MA 01746 (800) 421-0151

Pelham, AL Doraville, GA Charlotte, NC Durham, NC

Visit us at waynejgriffinelectric.com

MA Lic 4536 A1 MA Lic 8999 A

CT Lic ELC.0201601-E1

MAKE SURE YOU’RE IN FRONT OF KEY DECISION MAKERS

2609ECM_WayneJGriffinElectric.indd 1

8/26/26 2:55 PM

CHAMP PULL

™

CABLE PULL CALCULATOR & PLANNING TOOL BETA VERSION

Accurate coefficient of friction values Saves time in specifying and helps prevent costly mistakes Compare to other conduit types for NECA install hours, coefficient of friction, weight/foot, cable fault, and more <?

Outputs continuous and maximum tension on cables and sidewalls plus tension limits and jam probability

™

REGISTER FOR ACCESS

BIM/REVIT

2609ECM_80-81_Ad_Index.indd 80 1 2609ECM_ChampionFiberglass_MKPL.indd

®

©2016 Champion Fiberglass, Inc.

CHAMP

Contact Steve Suarez at ssuarez@endeavorb2b.com to include your company in the next Marketplace section.

8/28/26 2407ECM_House_Suarez_MKPL.indd 10:17 AM 1

9/9/26 12:25 4:18 PM PM 6/28/24


AD INDEX/SALES STAFF

Advertiser

Page #

Phone #

Web Address

ABB Electrification Installation Products Division

82

—

electrification.us.abb.com

Arlington Industries, Inc.

17

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

19

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

21

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

23

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

25

800-233-4717

www.aifittings.com

Mike Hellmann

Arlington Industries, Inc.

33

800-233-4717

www.aifittings.com

Andover, MA

Arlington Industries, Inc.

35

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

37

800-233-4717

www.aifittings.com

(978) 289-0098

Arlington Industries, Inc.

39

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

41

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

43

800-233-4717

www.aifittings.com

Western U.S. & Western Canada

Arlington Industries, Inc.

45

800-233-4717

www.aifittings.com

Ellyn Fishman

Arlington Industries, Inc.

47

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

49

800-233-4717

www.aifittings.com

Key Account Manager

Arlington Industries, Inc.

51

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

53

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

55

800-233-4717

www.aifittings.com

Arlington Industries, Inc.

57

800-233-4717

www.aifittings.com

Northeast U.S. & Eastern Canada

BaseTek, LLC

66

877-712-2273

www.basetek.com

David Sevin

31, 80, BC

—

www.championfiberglass.com

Condux International

66

800-533-2077

www.condux.com

Electrical Code Academy

68

—

www.stackcaddy.com

Glen Raven Technical Fabrics

67

336-227-6211

www.glenguard.com

Barrington, RI 02806

Greaves Corporation

69

800-243-1130

www.greaves-usa.com

(401) 246-1903

Griplock Systems, LLC

72

805-566-0064

www.griplocksystems.com

Hubbell Wiring Devices - Kellems

IBC

800-288-6000

www.hubbell.com/ wiringdevice-kellems/en

Intermatic, Inc.

IFC

815-675-2321

www.intermatic.com

Champion Fiberglass, Inc.

To place a display ad (1/6 page or larger), call the Advertising Sales Representative for your area. Vice President

mhellmann@endeavorb2b.com

(949) 239-6030 efishman@endeavorb2b.com

Account Manager 24 Houghton Street

dsevin@endeavorb2b.com

34

800-544-4828

www.ledvance.com/en-us

Midwest, Southeast, and Southwest

Cover Tip

833-730-3259

lightingproplus.com/15off

Jay Thompson

Milwaukee Tool Corporation

9

800-729-3878

https://qr.mke.tl/2wu3b

11

800-321-5847

www.nsiindustries.com/ polaris-compression

Account Manager

NSi Industries, LLC Orbit Industries, Inc.

59

213-451-6091

www.orbitelectric.com

Suite #210

Penn Aluminum Conduit & EMT

65

800-445-7366

www.pennconduit.com

Overland Park, KS 66213

Progressive Insurance

3

—

progressivecommercial.com

Rittal Corporation

26

800-477-4000

www.rittal.com/us-en_US/

Ryan Jackson Electrical Training

61

703-549-7351

www.steeltubeinstitute.org

Ryan Jackson Electrical Training

73

703-549-7351

www.iecspark.com

Shermco Industries, Inc.

75

888-743-7626

www.shermco.com

Marketplace/Inside Sales

SP Products Inc

7, 63

800-233-8595

www.spproducts.com

Steve Suarez

The New IEM, LLC dba Industrial Electric Mfg. (IEM)

13

—

www.iemfg.com/products

Media Account Exec 7450 W. 130th Street

Ledvance LLC Lighting Pro Plus, Inc.

Uline

32

800-295-5510

www.uline.com

Underground Devices

5

847-205-9000

www.udevices.com

Wayne J. Griffin Electric, Inc.

80

800-421-0151

www.waynejgriffinelectric.com

Westlake Pipe & Fittings

71

—

www.westlakepipe.com/ecm

Zekelman Industries

15

312-275-1600

www.zekelman.com/electrical

(Every effort is made to ensure the accuracy of this index. However, the publisher cannot be held responsible for errors or omissions.)

7450 W. 130th Street

(913) 967-7543 jthompson@endeavorb2b.com

Suite #210 Overland Park, KS 66213 (816) 588-7372 ssuarez@endeavorb2b.com

www.ecmweb.com • September 2026

2609ECM_80-81_Ad_Index.indd 81

81

9/9/26 12:29 PM


N AT I O N A L E L E CT R I C A L CO D E

WHAT’S WRONG HERE? All references are based on the 2026 edition of the NEC.

How Well Do You Know the Code? BY RUSS LEBLANC, NEC CONSULTANT How well do you know the Code? Think you can spot violations the original installer either ignored or couldn’t identify? Here’s your chance to moonlight as an electrical inspector and second-guess someone else’s work from the safety of your living room or office. Can you identify the specific Code violation(s) in this photo? Note: Submitted comments must include specific references from the 2026 NEC. Hint: A coverless and crowded box.

‘Tell Them What They’ve Won...’ Using the 2026 NEC, correctly identify the Code violation(s) in this month’s photo — in 200 words or less — and you could win a 40-oz. insulated tumbler valued at $39.99, courtesy of ABB. E-mail your response, including your name and mailing address, to russ@russleblanc.net, and Russ will select two winners (excluding manufacturers and prior winners) at random from the correct submissions. Note that submissions without an address will not be eligible to win.

July Winner Our lone winner this month is Austin Rogers of Austin Rogers Electrical Services LLC in Reform, Ala. I am going to assume this PVC box was not secured to the concrete base, but I cannot guarantee that. I didn’t see any holes drilled for anchors, so I believe it was only secured by the PVC conduit and the box connectors. Either way, the box is now just flopping around on the ground with the circuit wires exposed. Section 352.12(B) prohibits rigid PVC conduit from being

used to support luminaires and equipment other than conduit bodies that

aren’t larger than the trade size of the PVC conduit. The exposed wiring is not properly protected and could increase the risk of shock if the insulation is damaged, since it is easily accessible by anyone passing by on this public sidewalk, including curious children who may play in this area. Section 110.12(B) prohibits broken parts that may adversely affect the safe operation of electrical equipment and circuits.

—

Hello, innovation. Goodbye, over-rotation. INTRODUCING THE U-SHAPED WASHER.

2609ECM_ABB.indd 1 82 September 2026

2609ECM_82-C4_WWH.indd 82

• www.ecmweb.com

8/24/26 3:45 PM

9/9/26 12:26 PM

2609EC


Two New Ways to Power and Protect

The EdgeConnect™ GFCI combines advanced ground fault protection with patented screwless termination technology for faster installation and dependable performance. The GFCI + USB Receptacle delivers advanced protection with USB-C and USB-A charging in one space-saving device.

Visit us at booth #4310 at NECA to learn more

EdgeConnect GFCI Receptacle

GFCI + USB Receptacle

©2026 Hubbell Incorporated EP-WDK-PA-EN-04539 | 09/26

2609ECM_HubbellWiringDevicesKellems.indd 1 2609ECM_82-C4_WWH.indd 3

9/3/26 12:26 11:17 PM AM 9/9/26


CHAMP PULL

™

CABLE PULL CALCULATOR & PLANNING TOOL BETA VERSION

Web-based platform that is easy to use, highly functional, and always up to date

Accurate coefficient of friction values

600V version available

Outputs continuous and maximum tension on cables and sidewalls plus tension limits and jam probability

Compare to other conduit types for NECA install hours, coefficient of friction, weight/foot, cable fault, and more

<?

Saves time in specifying and helps prevent costly mistakes

® ©2016 Champion Fiberglass, Inc.

CHAMP ™

REGISTER FOR ACCESS AI not used in the making and management of Champ Pull

BIM/REVIT

2609ECM_ChampionFiberglass_ChampPull.indd 1 2609ECM_82-C4_WWH.indd 4

8/28/26 12:26 1:04 PM PM 9/9/26